ARCHITECTURE PORTFOLIO Zainab Alaradi
ZAINAB ALARADI alaradi.zainab@gmail.com
tel: 734.620.5022
E D U C AT I O N
EXPERIENCE
2014-2016 Master of Architecture University of Michigan, Ann Arbor
07.16-06.17 Architectural Designer JKRP Architects | Philadelphia, PA Completed drawings, digital models, renderings, and building safety analysis for client presentations and submittals. Designed interior and exterior parts of multiple projects.
2007-2012 Bachelor of Science in Architecture Minor in Art & Design University of Michigan, Ann Arbor
SKILLS
Digital Rhino 5.0, Revit, Google Sketchup, Bluebeam, Adobe Illustrator, Adobe Photoshop, Adobe InDesign, AutoCAD, V-Ray for Rhino, Final Cut Pro/ Express Physical Hand Sketching, Scaled Modeling, Foam Cutting, Laser Cutting, Woodshop Machinery, Printmaking, Photography
03.2016 Architectural Intern KieranTimberlake Architects | Philadelphia, PA Participated in project team meetings, conducted precedent research, and site diagrams for a higher education project. 03.2015 Architectural Intern Neumann Smith Architects | Southfield, MI Assisted staff with digital model, site plan drawing, rendering, and completed interiors board. 09.14-08.15 Graphic Designer Ecology Center | Ann Arbor, MI Edited Identity Package design including logo, letterhead, and business cards. Also designed flyers and postcards for multiple events. 06.13-08.14 Design Assistant La-Z-Boy Furniture Gallery | Novi, MI Assisted customers in selecting custom furniture and prepared design presentations for the store Interior Designer. Achieved and exceeded sales goals.
TA B L E O F C O N T E N T S
PROFESSIONAL WA L N U T S T. T H E AT R E
4
T H R E E P A R K W AY
12
C O N S T I T U T I O N H E A LT H P L A Z A
20
H A M I LT O N
22
BLOCK 200 HURON
24
IDENTITY RECONSTRUCTED
32
MICRO DETROIT
38
VA H O S P I TA L
44
BROOKSCAPE[s]
48
WALKING WHALE: BUBBLE
50
ACADEMIC
W A L N U T S T. T H E A T R E T H E AT R E E X T E N S I O N | R E V I T | P H O T O S H O P
Walnut St. Theatre is said to be the oldest theatre in America, standing at the corner of Walnut and 9th streets for over two centuries. JKRP was hired to design a theatre expansion and ground floor retail, which I worked on during it’s Design D e v e l o p m e n t stage. Part of a team with two other architects, I developed the design of the main southfacing facade, and worked on the interior design of the ground floor and performance hall lobbies. I also assisted with preparing drawings and renderings for client p r e s e n t a t i o n s and project team meetings.
4 JKRP Architects | Walnut St Theatre
5 Fall 2016
EXISTING 2-STORY BUILDING
STAIR 3
UP STAIR 2
BACKSTAGE
STAIR 3
MENS
UP
AISLE 1
DN
STAIR 2
DN
UP
WOMENS
AUDITORIUM
RETAIL
AISLE 2 MENS
AISLE 3
WOMENS UP VESTIBULE ELEVATOR
THEATRE LOBBY
TO MAIN STAGE EXISTING LOBBY
MENS
TO ARENA STAGE
LOADING
LOBBY WOMENS
ARC
100 EA S U IT E
P H IL A D
2 1 5 .9 2
VESTIBULE
JK R P A R
Ground Floor Plan
A
Second Floor Plan
B
C
D
E
F
T .O . E L E V A T O R P E N T H O U S E
91' - 5"
1 A4.1
ARCHITECTS
T .O . H IG H P A R A P E T
84' - 11"
A
B
C
D
E
F
1 0 0 E A S T P1E N N S Q U A R E
T .O . H IG H P A R A P E T
S U IT E 1 0 8 0
8 H4IG' H 1R1O"O F (T .O . D E C K ) 83' - 6"
7
8
9
10
T .O . H IG H P A R A P E T
5
6
6
TRAP
T03
T01
10' - 5 1/2"
M E C H A N IC A L
24' - 7"
1' - 7 1/2"
P R O D U C T IO N M G R
A C T O R S LO U N G E
C O R R ID O R
T11
T12
T13
4
R E T A IL
1 11 0 6
4
T RA P LEVEL
6 13' - 0 1/2"
6
5
6
M 05
11
6
4
5
208
D R E S S IN G R O O M
C O R R ID O R
T05
T13
LO BBY
1' - 7 1/2"
BA C KSTA G E
1' - 7 1/2"
208
T RA P LEVEL
13' - 7"
45' - 10"
T E C H N IC A L B O O T H
201
1' - 7 1/2"
SEC O N D FLO O R
24' - 7"
SEC O N D FLO O R
48' - 8"
C A T W A LK LEV EL - LO W
47' - 0"
6 BA C KSTA G E
10' - 1 1/2"
6
57' - 10"
C A T W A L K L E V E L - H IG H
R EH EA R SA L LEV EL
A U D IT O R IU M
15' - 5"
4
1' - 7 1/2"
202
O RC H ESTRA M 01
1' - 7 1/2"
C O R R ID O R
6
G R ID L E V E L
301
304
201
1' - 7 1/2"
7
R EH EA R SA L H A LL 1
C O R R ID O R
304
A U D IT O R IU M
20' - 8 1/2"
M E Z Z A N IN E L E V E L
35' - 3"
4
70' - 1"
44' - 11 1/2"
45' - 10"
45' - 10"
71' - 9"
R O O F - L O W (T .O . D E C K )
5' - 10"
R EH EA R SA L LEV EL
10' - 0 1/2"
304
47' - 0"
1' - 7 1/2"
C A T W A LK LEV EL - LO W
C O R R ID O R 44' - 11 1/4"
C O R R ID O R
RO O F. O WP A(FRIN T .O L OLW A PISEH T LO R ") 7F 5 ' -O 3
401
203
M E Z Z A N IN E L E V E L
35' - 3"
C O R R ID O R 202
SEC O N D FLO O R
24' - 7"
TRAP T01
R E T A IL
4
20' - 8 1/2"
B
C A T W A L K L E V E L - H IG H
48' - 8"
R O O F D EC K
23' - 8"
6
106
24' - 0 1/2"
6
1' - 7 1/2"
1
1
6
2 1 5 .9 2 8 .9 3 3 1
JK R P A R C H IT E C T S .C O M
T RA P LEVEL
13' - 7"
C O R R ID O R 013
G R O U N D FLO O R
4
5
D A TE:
4
R E T A IL B A S E M E N T 001
2
S O U T H E L E V A T IO N
A 4 .1
1 / 8 " = 1 '- 0 "
12
16 1
E A S T - W E S T B U IL D IN G S E C T IO N 1 / 8 " = 1 '- 0 "
A 4 .1
South Elevation 1
C U R T A IN W A L L - O L D C A S T L E R E L IA N C E
2
2 -1 /2 " X 1 0 -3 /8 " - FR P PR ESSU R E PLA T E
B
2 -1/2" X 7-1/4" - C A PTU RED SSG
W IN D O W W A L L - O L D C A S T L E - T C R 2 5 0 - 2 - 1 / 2 " X 6 " S S G 1 " IN S U L A T E D G L A S S W / R O O M S ID E L O W E . A R G O N F IL L E D .
3
B P S T Y L E F R A M E L E S S G L A S S D O O R S W / P A N IC D E V IC E (IN T E R IO R ) & F U L L H E IG H T P U L L (E X T E R IO R )
6 JKRP Architects | Walnut St Theatre 4
F R A M E L E S S S T O R E F R O N T S Y S T E M - O L D C A S T L E F IN W A L L
5
3 " L IM E S T O N E
6
L IM E S T O N E V E N E E R B Y S T O N E L IT E (B E H IN D C U R T A IN W A L L )
7
S T O R E F R O N T S Y S T E M (T O M A T C H O V E R H E A D G L A S S D O O R )
8
C U S T O M L E D P A N E L S Y S T E M B Y P IX E L F L E X
9
L E D M A R Q U E E W IT H S T E E L F R A M E
10
F A B R IC A T E D S T E E L M A R Q U E E W / IL L U M IN A T E D L E T T E R S
11
F A B R IC A T E D S T E E L C A N O P Y
7
1
A
T STREET THEATRE
1 " IN S U L A T E D G L A S S W / R O O M S ID E L O W E . A R G O N F IL L E D
1
N O R T H - S O U T H B U IL D IN G S E C T IO N 1 / 8 " = 1 '- 0 "
Section
M A T E R IA L K E Y / L E G E N D 1
13
STO RA G E
001
003
-14' - 0"
16
1
R E T A IL B A S E M E N T
BA SEM EN T LEV EL
-14' - 0"
A 3 .1
R E V IS IO N S :
0' - 0"
BA SEM EN T LEV EL
0' - 0"
20
D RA W N BY G R O U N D FLO O R
13' - 5 1/2"
3
5
13' - 5 1/2"
5
17' - 6"
5
13' - 5 1/2"
3
G R O U N D FLO O R
0' - 0"
B U IL D
6' - 0"
13' - 7"
5
WALNUT STREET THEATRE
5' - 9"
T O IL E T
23' - 8 1/2"
A
G R ID L E V E L
57' - 10"
6
8
6
15' - 6 1/2"
1
23' - 8 1/2"
R O O F - L O W (T .O . D E C K )
9
5
1' - 3"
15
405
70' - 1"
R EH EA R SA L LEV EL
4.7
6' - 7"
15
R O O F - L O W (F IN IS H T .O . L O W P A RFA P EOTR ) LO
7 75 1 '' - 3 9 ""
70' - 1"
4
84' - 11"
1' - 3" 6' - 1 1/2"
FLO O R )
R O O F - L O W (T .O . D E C K )
3.3
P H IL A D E L P H IA , P A 1 9 1 0 7
R O O F - L O W (F IN IS H 71' - 9"
91' - 5"
3
10' - 5 1/2"
75' - 3"
T .O . E L E V A T O R P E N T H O U S E
2
13' - 0 1/2"
T .O . L O W P A R A P E T
C O P Y R IG H T 2 0
A
7 Fall 2016
B
A
C
B
C
7' - 9 1/2"
10"
6 K
C T-1
T O IL E T
6' - 6 1/2"
A0 6 . 1 .1 A1 6 . 1 .1
104 A0 6 . 1 .1
D
K
D
8' - 0"
8' - 0" EQ
7' - 8 1/2"
EQ
7' - 0"
A0 6 .1 .1
104
6 . 1 .1
102A T ER -1 A
A0 6 . 1 .1
102A
2 10
T ER -1 A
T .J.
10
14' - 9 1/2"
10' - 0"
A
A
A
10' - 0"
A
4' - 10" EQ
10
A
A
B O X O F F IC E
10
EQ
A5.2
EQ
A1 6 . 1 .1
5' - 1"
9
A1
EQ
2' - 5 1/2"
11' - 4"
TH M -1
10
7
102B
B
EQ
B
EQ
B A
B
1' - 0"
B0 3 . 0 .1
B
B
A0 6 . 1 .1
102
5
11
A
1' - 0" EQ
C9
C
A
12' - 0"
C
T .J. T ER -1 A
T H S-1
A
8 A5.2
18' - 4"
B
7
10' - 0"
A
11 T ER -1 A
T .J.
EQ
B
(T Y P .)
18' - 0"
B
101B
A
6' - 6"
A
A
11 0
8
B
T .J.
S2 8 . 0 .0
1' - 0"
S2 8 .0 .0
B
A1 6 . 1 .1
S2 8 . 0 .0
EX
T .J.
T .J.
V A R IE S
8' - 0"
S2 8 . 0 .0
EQ
EQ
EQ
EQ
EQ .
O PEN TO BEYO N D
G L-1
10
VW C -2 ?
D A TE:
2 1 5 .9 2 8 .9 3
2 0 1 6 .1 2 .2 0
D RA W N BY: PO STER
Q TZ-1 VW C -3
A
EQ . 7' - 1"
EQ .
9
101A
P H IL A D E L P H
EQ
VW C -2
S U IT E 1 0 8 0
JK R P A R C H IT
FLO O R LO BBY
T ER -1 A
A
100 EAST P
EN LA RG ED G RO U N D
EQ
W D -1
ARCH
C A SE
VW C -3
NORTH
1' - 0"
4' - 9"
B O X O F F IC E
PROJECT
4
825 WALNUT ST.
3
PHILADELPHIA, PA 19107
2' - 10 1/2"
102
A5.2
B
B
A
12' - 2 1/2"
B O X O F F IC E
6
B
11
WALNUT STREET THEATRE
T ER -1 A
ST O -1 A
PO STER
JA B | L E | M F
O PEN R TE OVBISEIO Y ONNSD:
VW C -2
C A SE
VW C -2
VW C -2
T ER -1 A
T ER -1 A
7
A 5 .2
G R O U N D F L O O R L O B B Y E L E V A T IO N
6
1 / 4 " = 1 '- 0 "
A 5 .2
G R O U N D F L O O R L O B B Y E L E V A T IO NC O P Y R IG H T 2 0 1 6 JK R 1 / 4 " = 1 '- 0 "
EQ .
EQ .
3' - 9"
EQ .
W D -1
3' - 6 1/2"
3' - 4 1/2"
W D -1
2' - 6"
2' - 2 1/2"
2' - 2 1/2"
2' - 5 1/2"
3' - 9"
VW C -2
W D -1 W D -1
PO STER C A SE
4' - 6"
G L-1
P A R T N E R S L L C A L L R IG H T S R E S E R V E D
A5.1
R EC ESSED M O N IT O R
PT-1
2' - 5 1/2"
Q TZ-1
Q TZ-1
C T-4 T ER -1 A
C U S T O M M O N IT O R D IS P L A Y S ,
4
G R O U N D F L O O R L O B B Y E L E V A T IO N
A 5 .2
1 / 4 " = 1 '- 0 "
W D -1
W D -1
1 / 2 " R E V E A L , T Y P IC A L
P R O V ID E P O W E R & D A T A
5 A 5 .2
3' - 1"
6"
LM -1
C U S T O M M IL L W O R K W A LL PA N ELS
G R O U N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
825 WALNUT ST.
8 ND E N L A R G E D G R O U N D F L O O R L O B B Y R E F L E C T E DGCREOILUIN G FPLLOAONR L O B B Y E L E V A T IO N A 5 .2 1 / 4 " = 1 '- 0 " 1 / 4 " = 1 '- 0 "
PHILADELPHIA, PA 19107
G R O U N D F L O O R L O B B Y E L E V A T IO N 2 1 / 4 " = 1 '- 0 " A 5 .1
A 5 .2
T ER -1 A
A S IN D IC A T E D
WALNUT STREET THEATRE
1 '- 0 "
W D -1
Ground Floor Lobby Reflected Ceiling Plan
9
D F L O O R L O B B Y E L E V A T IO N
T ER -1 A
8' - 0"
T ER -1 A
6' - 5"
T ER -1 A
2' - 10"
Q TZ-1
GROUND
LO BBY ELE
D A TE:
PT-1
PT-1
VW C -2
PT-1
PT-1
PT-1
PO STER
PO STER
C A SE
O PEN TO
C A SE
BEYO N D
PO STER
PO STER
C A SE
C A SE
C A SE
O PEN TO BEYO N D
O PEN TO
2' - 10 1/2"
PO STER
BEYO N D
2 0 1 6 .1 2 .2 0
D RA W N BY:
JA B |
PO STER
C A SE
C A SE
Q TZ-1
M U R-2
Q TZ-1
T ER -1 A
T ER -1 A
3' - 0"
6"
LM -1
PO STER
PT-1
R E V IS IO N S :
W D -1
T ER -1 A
T ER -1 A
T ER -1 A
C O P Y R IG H T 2 0 1 6 JK R P A R T N
3 A 5 .2
G R O U N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
Ground Floor Lobby Interior Elevations
8 JKRP Architects | Walnut St Theatre
2 A 5 .2
G R O U N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
1 A 5 .2
G R O U N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
A5
T H S-1
A5.4
4 LO BBY
2
3
203
204
12' - 1
21
T ER -1 A
Q T-1 A0 3 .0 .1
FD
C PT-1
6 22
207B
S
2 8 . 0 .0
P E R F O R A T E D , C O R R U G A T E D P R IV A C Y S C R E E N @ 6 '- 0 "
W O M EN S
S2 8 . 0 .0
205
A0 3 .1 .1
A BO VE RO O F D EC K.
A5.5
7 C T-3
9
16' - 1 35/64"
L O W P R O F IL E C O R R U G A T E D M E T A L S ID IN G
11
B0 3 . 0 .1
8
8' - 0"
T ER -1 A
R EC ESSED SLA B A T BA LC O N Y A R EA .
TYP. (U.N.O.)
2' - 6"
B A C K B A R P O S . P R O V ID E P O W E R & D A T A .
8
A0 6 . 1 .1
1 1 / 2 " D IA M E T E R G U A R D R A IL IN G W / H O R IZ O N T A L
6' - 7"
R A IL @ 3 6 " & 1 8 " A F F
A0 3 . 0 .1
A0 3 . 1 .1
1
S2 8 . 0 .0
A 7 .1
7' - 11"
P R O V ID E (8 ) R O O F A N C H O R S E Q U A L L Y S P A C E D T O B E U T IL IZ E D B Y W IN D O W W A S H IN G S E R V IC E .
S2 8 . 0 .0
S L ID E T IT E F O U R F O L D D O O R B Y R IC H A R D W IL C O X
11
B0 3 . 1 .1
S P E C IA L T Y D O O R S W / G E A R D R IV E O P E R A T O R &
A0 3 .1 .1
C O N T R O L PA N EL.
1' - 10 1/4"
O V ER H EA D G A R A G E D O O R & D O C K SEA L.
205 A0 3 .1 .1
18
T .J.
8
8
38' - 9 1/2"
8
T .J.
1
T .J.
8
23
207
A0 3 . 1 .1
3' - 0"
207A
BA LC O N Y A R EA
8
18
S0 1 2 . 0 .0
TH G -1
6
A0 6 . 1 .1
A5.4 8
18
26' - 6 1/2"
8
PVR-1
10
T ER -1 A
8
1
9 ST O -1 A
T ER -1 A
T .J.
T ER -1 A
T .J.
T ER -1 A
10 1
S E C OAN D F L O O R L O B B Y P L A N
A
ST O -1 A
A
1 / 4 " = 1 '- 0 "
A 5 .3
B
ST O -1 A
C
ST O -1 A
D
E
F
B
WALNUT STREET THEATRE
D
R E B Y C IT A D E L
D
B
D
D B
B
B
B
D
D
D
D
D
D
D H
D
D
D
D
15' - 6"
E
A A
A
B
A
9' - 0" A
15' - 0"
8' - 4"
8' - 0"
A
2' - 0"
EQ
EQ
EQ
EQ
EQ
C (T Y P .)
A A
B
A
A
A
A A
R E C T IO N A L S P O T L IG H T / F L C S 4
EQ
L LED PEN D A N T W / C U ST O M
M
EQ
U
15' - 6"
U O
U O
U
8' - 4"
E
U
O
O
4"
O W N L IG H T / F L C 3 D
B
D
D
B
4"
7
IS O L A T IO N H A N G E R S
B
7' - 6"
R V E D B Y A S IN G L E R E M O T E
A
C
B
0 IN D O O R C O V E L IG H T W / L E N S
(T Y P .)
C B
(T Y P .) VW C -3
B 2' - 6"
D LED TR O FFER 2x4
E A R S U S P E N D E D IN D U S T R IA L
A
PO STER
O A
N T IN U O U S R U N
EQ
L IG H T IN G
8' - 0"
U
A
D A TE:
O
10
2' - 6"
G R O O VE SU SPEN D ED LED /
A 5 .4
E L E V A T O R L O B B Y E L E V A T IO N
9
C (T Y P .)
1 / 4 " = 1 '- 0 "
A 5 .4
8
E L E V A T O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
A
8' - 4"
E L E V A T O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
A 5 .4
A
A
15' - 0"
JA B | L E | M F
R E V IS IO N S : O
E
2 ' X 2 ' R E C E S S E D L IG H T /
2 1 5 .9 2 8 .9
2 0 1 6 .1 2 .2 0
D RA W N BY:
U
U
4"
U M IN A T E D M IR R O R
P H IL A D E L
O
A
E R IE S D O W N L IG H T /
S U IT E 1 0 8
JK R P A R C H
FLO O R LO BBY
T ER -1 A
U
R E Q U IR E M E N T S .
A
EQ
A
100 EAST
EN LA RG ED SEC O
O
A D D IT IO N A L
A
A
A
VW C -3
ARCH
U S E E A 9 / 5 .5 F O R T ER -1 A
T ER -1 A
2' - 6 1/4"
LO R G R A ZE M X4 PO W ER C O R E
O
C T-8
VW C -3
T ER -1 A
A EQ
A VW C -3
PO STER
A
EQ
U
C A SE
C A SE
T ER -1 A
P . S H O W E R D O W N L IG H T / F L C 3 D
8' - 4" VW C -3
PO STER
C A SE
V O L T A G E 0 7 M S T R IP L IG H T
U
E
12' - 9"
VW C -2
8
O W N L IG H T / F L C S 4 4
4"
R IM E T E R D O W N L IG H T / F S M 4 L
825 WALNUT ST.
A
D
PHILADELPHIA, PA 19107
D D
U R F A C E L E D D O W N L IG H T / S 5 R
S P O T L IG H T / L 2 2 1 V D / BEST SO U RC E
A
8 E T E R N IT Y JE W E L R Y
A
A
A
F
A
17' - 6"
F
A
17' - 6"
A
F
A
17' - 6"
A
A
A S IN D IC
B
C O P Y R IG H T 2 0 1 6 JK R P A R T N E R S L L C A L L R IG H
/ BEST SO U RC E
9
2' - 3"
F
17' - 6"
7 1/2"
S E C O N D F L O O R L O B B Y R E F L E C T E D C E IL IN G P L A N 1 / 4 " = 1 '- 0 "
Second Floor Lobby Reflected Ceiling Plan
W D -1
W D -1
Q TZ-1
G L-1
M U R-2
4' - 7"
G L-1
6
S E C O N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
5
S E C O N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
4' - 9" 9' - 7 1/2"
ST O -1 A
ST O -1 A
2' - 9 1/2"
1' - 5"
2' - 6"
2' - 6" 1' - 1"
R EC ESSED W A L N U T D R IN K R A IL
G L-1
6' - 6"
2' - 4" 1' - 0"
3' - 4"
1 /2" R EVEA L
STO REFRO N T
7 1/2"
Q TZ-1
GL-2
W D -1
8 1/2"
1' - 5"
W D -1
M O N IT O R
9' - 9"
2' - 6"
9' - 8 1/2"
2' - 6"
3' - 5"
2' - 6"
2' - 9"
2' - 6"
3' - 0"
2' - 11 1/2"
W D -1
2' - 1 1/2"
A L U M IN U M
4
1 / 4 " = 1 '- 0 "
C T-4
T EM PER ED FR A M ELESS G LA SS G U A R D
8' - 4"
W D -1
TER-1A
TER-1A
ST O -1 A
C U S T O M M IL L W O R K
H O U S E M A N A G E R K IO S K
3
S E C O N D F L O O R L O B B Y E L E V A T IO N
A 5 .4
S E C O N D F L O O R L O B B Y E L E V A T IO N
A 5 .4
2' - 0"
C T-4 ST O -1 A
3' - 0"
VW C -2
4' - 8"
A 5 .4
T ER -1 A
T ER -1 A
A 5 .4
1 / 4 " = 1 '- 0 "
S E C O N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
VW C -2
ST O -1 A
G LA SS SH ELV ES
PO W ER & DATA
2' - 3"
M U R-2
T ER -1 A
T Y P IC A L
A 5 .4
T ER -1 A
W D -1
1 /2 " R EV EA L,
2
T ER -1 A
2' - 11 1/2"
3' - 5"
M U R-1
T ER -1 A
S E C O N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
W D -1
1 /2 " R EV EA L,
C U S T O M M IL L W O R K B A R
T Y P IC A L
1 A 5 .4
D A TE:
C U S T O M M IL L W O R K W A LL PA N ELS
2 0 1 6 .1 2
W D -1
D RA W N BY: R E V IS IO N S :
7 1/2" 8 1/2"
Q TZ-1
M U R-1 W D -1
JA
W D -1
7' - 6"
W D -1
IL L U M IN A T E D
Q TZ-1
C A SE
P R O V ID E
8' - 1 1/2"
DATA
PO STER
M O N IT O R
W D -1
PO W ER &
VW C -3
R EC ESSED G L-1
P R O V ID E
C U S T O M T IM E L IN E G R A P H IC
7' - 6"
9' - 3"
M O N IT O R
ELEVA TI 2' - 0"
C U S T O M T IM E L IN E G R A P H IC
R EC ESSED
SECO N D
W D -1
?
6"
G L-1
W D -1
W D -1
3' - 5"
12' - 4"
2' - 11 1/2"
6"
2' - 3 1/2"
VW C -2
4' - 11 1/2"
2' - 3"
W D -1
VW C -2
825 WALNUT ST.
W D -1
WALNUT STREET THEATRE
3' - 5"
W D -1
3' - 5"
1' - 6"
Q TZ-1
1' - 6" 2' - 9"
7
7"
Q TZ-1 Q TZ-1
A 5 .4
VW C -4
C U S T O M D O N O R W A L L D IS P L A Y
4' - 7"
4' - 9"
A 5 .3
1' - 5 1/2"
A5.3
17' - 6"
W D -1
2' - 9"
2
F
17' - 6"
2' - 3"
F
10
C A B IN E T S
C O P Y R IG H T 2 0 1 6 JK R P
A
S E C O N D F L O O R L O B B Y E L E V A T IO N 1 / 4 " = 1 '- 0 "
Second Floor Lobby Interior ELevations
9 Fall 2016
Ground Floor Lobby Interior Renderings
10 JKRP Architects | Walnut St Theatre
Second Floor Lobby Interior Renderings
11 Fall 2016
T H R E E PA R K W AY GROUND FLOOR LOBBY | SKETCHUP | PODIUM
12 JKRP Architects | Three Parkway
3. 4. 5. 6. 7.
PAR
A EXISTING SUITE 130 - KDI
NOT IN SCOPE
CO
100A
100B
STAIR 2 13 DN 14
1 2
TEL PE11
PE4 9
12
EXISTING WOMEN'S ROOM
PE5 EXISTING ELEVATOR LOBBY FLOORS (2-10)
UP PE2
4
9
PE3
SHAFT 1
3
ELEC
5
ST 5
EXISTING MEN'S ROOM
PE10
PE6
PE12 EXISTING ELEVATOR LOBBY FLOORS (11-20)
PE9
6
SHAFT 2
7 8 9
PE13
10 14
11
L-6
L-6
ELEC
PE1
12
FE14
PE8
PE7
L-6
TEL
13
NOT IN SCOPE L-6
14
L-14
JAN.
L-14
L-14
L-14
2'-6"
L-1
A
9
5 9 TENANT LOUNGE 3 101
EX.
4
A 3
1 SHOWN TO CREATE COVE AS A3.1
1
11
2
1 A3.2
EXISTING BUILDING 8" LOBBY
POWER CORE RGBW WALL WASHER
L-4
L-4
100C
36'-8" REMOVE PORTION OF BULKHEAD
10
2
L-4
L-1
Suite 120 GERZON
8
A3.1
L-4
L-14
L-1
9
1 A3.3
6
8"
TOILET
7
10'-9"
101
A2.1
EX.
KEY PLAN
SCALE:
1/32" = 1'-0"
GE
EX.
1.
EXISTING DOWNLIGHT TO REMAIN.
2.
LOBBY
3.
4.
SOFFIT DETAIL
3
SCALE:
A2.1
RC
1" = 1'-0"
C1
Ground Floor Plan GROUND FLOOR PLAN
1
SCALE:
A1.1
C2
C3
1/8" = 1'-0"
C4
CE
EXISTING SUITE 130 - KDI
EQ.
CE
NOT IN SCOPE
EQ.
L-6
STAIR 2
TEL
EQ.
DN
PE11
PE4
EQ.
L-6
PE3
UP
EXISTING WOMEN'S ROOM
PE5 EXISTING ELEVATOR LOBBY FLOORS (2-10)
5'-4"
SHAFT 1
PE2
FIX
ELEC
ST 5
EXISTING MEN'S ROOM
PE10
PE6
PE12 EXISTING ELEVATOR LOBBY FLOORS (11-20)
PE9
SHAFT 2
PE13
A
ELEC
EXIST.
A
PE1 L-6
2'-0"
JAN.
L-14
EQ.
EQ. 3'-10"
TOILET L-14
4'-8"
L-14
TENANT LOUNGE 101
A L-1
3'-8"
L-14
L-4
C3
L-4
FE14
L-4
C3
L-16
L-4
L-4
L-16
C3
L-16
L-4
L-4
C3
L-4
L-4
C3
L-4
L-1
Suite 120 GERZON -
L-14
8'-0" L-1
L-16
1'-0"
TEL
EXIST.
PE8
PE7
3'-6"
8'-0"
L-6
2'-0"
Three Parkway is an office building along the Benjamin Franklin Parkway. JKRP was hired to renovate the basement fitness center and ground floor lobby. While I assisted with the working drawings of the fitness c e n t e r, I mostly focused on design iterations of the ground floor lobby desk, video wall, floor plan, and reflected ceiling plan.
C2
C2
C2
C2
3'-8" 2'-8"
C2
C2 3 A2.1
C2 C2 EXISTING BUILDING LOBBY A
EXIST.
A
EXIST.
-
EXIST.
C2
C2
C2
C2
EXIST.
C2
C2
Reflected Ceiling Plan GROUND FLOOR REFLECTED CEILING PLAN 1 A2.1
SCALE:
1/8" = 1'-0"
13 Spring 2017
4"
ST-100
1'
8"
CK GRANITE BASE
1 1/2" = 1'-0"
SCALE:
A3.2
1/2" = 1'-0"
7'-0" 2'-10"
10'-0"
CUSTOM LED DISPLAY BY ERIK NELSON ENTERTAINMENT
7'-0"
1'-6"
QTZ-100
2'-10"
PAINTED GWB
EXISTING STONE
2'-10"
3'-6"
PHILIPS POWERCORE RGB CONTINUOUS COVE LIGHTING
QTZ-100
VID AN DES
7'-0"
PAINTED GWB
7'-0"
EXISTING STONE
THREE PARKWAY
1 2" TEMPERED, FROSTED GLASS WITH BUTTON FASTENERS
DATE: 0 DRAWN FILE: K:\3
2'-10"
1'-0"
REVISION
2
A3.2
VIDEO SCREEN WALL ELEVATION 1/2" = 1'-0"
SCALE:
1'-3"
1'-6"
ST-100
0
ARCHITECTS
3 85" METAL FRAMING @16" O.C.
ST-100
1
43 4" 16'-0"
REAR MOUNT MONITOR BRACKET
1'-6"
2'-10"
CUSTOM LED MONITOR
PL-101
QTZ-100
A3.2
1'-2"
TAC-WALL BY KOROSEAL OVER PLYWOOD
QTZ-100
COPYRIGHT
100 EAST PENN SQUARE S U I T E 1 0 8 0 PHILADELPHIA, PA 19107 2 1 5 . 9 2 82'-10" . 9 3 3 1 2'-10" JKRPARCHITECTS.COM
4"
RGB-POWERCORE RGB WALL WASHER
HI-GLOSS WHITE PANELING: CLEAF, KR01 WINTER WHITE
VIDEO SCREEN WALL ENLARGED PLAN 1/2" = 1'-0"
SCALE:
2'-11"
Video Wall Details
PL-100
1'-3"
1'-6"
2'-5"
ADJUSTABLE SHELF
3'-6"
ST-100
4"
QTZ-100
2'-6"
WHITE LED COVE LIGHT
8"
BLACK GRANITE BASE
SIDE ELEVATION
1/2" = 1'-0"
32'-6"
EMERGENCY SPEAKERS
5'-0"
ALARM PANEL
FIRE COMMAND CENTER
VIDEO WALL MONITOR
STATION 2 DUAL SCREEN MONITORS
LOADING DOCK PHONE
ELEVATOR CONTROLS
1'-3"
ACCESSIBLE ENTRANCE DOOR RELEASE BUTTON
CARD READER
CARD READER
BADGE PRINTER
BADGE PRINTER
ST-100
1"
1'-6"
ACCESSIBLE ENTRANCE DOOR RELEASE BUTTON
SECURITY CAMERA MONITOR
3"2"
1'-81" 2
1'-6"
B30
STATION 1 OPEN
DB18
B12
4'-0"
STATION 1 CPU
B30
B15
B30
SECURITY CAMERA DVR HARD DRIVE
B12
4'-0"
B12
VIDEO WALL CPU
1'-6"
DB18
RGB-POWERCORE RGB WALL WASHER
OPEN CABINET
1'-81" 2
B30
STATION 2 CPU
ST-100
2" 3"
DOT MATRIX PRINTER
QTZ-100
FRONT ELEVATION
SCALE:
1/2" = 1'-0"
2'-11"
B
OPEN SHELVING
STATION 2 OPEN
4"
2'-6"
OPEN SHELVING
OPEN CABINET
5'-0"
4"
22'-6"
PL-101
VIDEO WALL AND FRONT DESK DETAILS
PL-100
4"
1'-6"
REVISIONS:
WHITE LED COVE LIGHT
ST-100
ST-100
8"
BLACK GRANITE BASE
ST-100
4
3"
A3.2
3"
C
DESK SECTION
SCALE:
1 1/2" = 1'-0"
0
ELEVATION
SCALE:
REAR MOUNT MONITOR BRACKET
DATE: 04.21.2017 DRAWN BY: NH | ZA FILE: K:\3 PARKWAY\
QTZ-100
A
TAC-WALL BY KOROSEAL OVER PLYWOOD
ADJUSTABLE SHELF
32'-6" 5'-0"
1'-6"
1'-2"
22'-6" STATION 1 WALKY-TALKY DUAL SCREEN CHARGING STATION LAPTOP MONITORS
2'-5"
5'-0"
3 BEN FRANKLIN PARKWAY PHILADELPHIA PA 19103
SCALE:
1 1/2" = 1'-0"
THREE PARKWAY
C
DESK SECTION
SCALE:
RENOVATIONS
4
A3.2
2'-6"
SI
SC
AS NOTED
COPYRIGHT 2017 JKR PARTNERS LLC ALL RIGHTS RESERVED
1/2" = 1'-0"
Lobby Desk Details 32'-6" 5'-0"
22'-6"
STATION 1 DUAL SCREEN LAPTOP MONITORS
WALKY-TALKY CHARGING STATION
SECURITY CAMERA MONITOR
A3.2
EMERGENCY SPEAKERS
ALARM PANEL
FIRE COMMAND CENTER
VIDEO WALL MONITOR
STATION 2 DUAL SCREEN MONITORS
ELEVATOR CONTROLS
CARD READER
C
B
14 JKRP Architects | Three Parkway
OPEN SHELVING
OPEN CABINET
3"2"
1'-81" 2
B30
1'-6"
STATION 1 OPEN
DB18
B12
STATION 1 CPU
B
FRONT ELEVATION
SCALE:
L
A D
BADGE PRINTER
4'-0"
1'-6"
ACCESSIBLE ENTRANCE DOOR RELEASE BUTTON
2'-6"
SCALE:
1/2" = 1'-0"
SCALE:
FRONT DESK
3
4'-0"
A3.2
DESK SECTION
4'-0"
4
PLAN
A
1/2" = 1'-0"
4'-0"
OPEN SHELVING
STATION 2 OPEN
B30
B15
B30
SECURITY CAMERA DVR HARD DRIVE
B12
4'-0" VIDEO WALL CPU
B12
DB18
STATION 2 CPU
1'-6"
15 Spring 2017
T H R E E PA R K W AY BASEMENT LEVEL FITNESS CENTER | SKETCHUP | PODIUM
16 JKRP Architects | Three Parkway
17 Spring 2017
NORDIC TRACK PRO SKIER
NOT IN SCOPE
A*
17
2'-10"
104
17
2'-6" EQ. A
EQ.
15
1 A*
10'-2"
8'-0"
17
NOT IN SCOPE NOT IN SCOPE
2'-7"
2'-10"
NOT IN SCOPE
5"
2
A1.1
10
GENERAL D 1.
CONT THE A THE E
2.
CONT CONS
3.
CONT DEMO INSTA
4.
CONT ALL D
5.
CONT COMP ETC.
6.
CONT HVAC REQU ELECT MAINT ANY D
7.
CONT BRAC REQU
8.
ALL D UNLES
9.
EXIST
BASEMENT KEY PLAN N.T.S.
SCALE:
NOT IN SCOPE
Elev Equip
8
12'-2"
A3.1
NOT IN SCOPE
3
A3.1
13 NOT IN SCOPE NOT IN SCOPE
2
3
A1.1
ENLARGED LOUNGE PLAN
SCALE: 1/4"= 1'-0" BASEMENT KEY PLAN
N.T.S.
SCALE:
D1.1
14
1.
DIMENSIONS ARE TAKEN FROM FACE OF NEW AND EXISTING FINISHES UNLESS NOTED OTHERWISE.
2.
MODIFY EXISTING FIRE PROTECTION SYSTEM TO PROVIDE REQUIRED 3 COVERAGE IN NEW WORK AREAS. PROVIDE CONCEALED RECESSED HEADS IN ALL LOCATIONS WITH A CEILING. A1.1
Elev Equip
AV CLOSET 104
L-1
1
1
YOGA STUDIO A 106
EX.
4
18 MEN'S LOCKER ROOM 103
A*
101 B
B
106A
10'-2"
A3.1
EX.
EX.
1 EQ.
EXISTING VACANT E
15
EX.
100B
A3.1
102 5'-3" 1'-41A* " 2
6
1
L-8/9
1
1
EX.
D3
EXISTING STORAGE CLOSET
CORRIDOR 100 L-8/9 D5
EX.
EX.L-11
EXISTING SHAFT
1'-21" 2 C3
L-8/9
1'-2"
EXISTING BREAK ROOM
1'-6"
D2
C3 L-11
L-8/9
D9
VIDEO GAME MACHINE, BY OWNER. PROVIDE POWER. NEW 3'-0" X 6'-0" MIRROR. 4 D7
REFER TO FINISH SCHEDULE.
A2.1
D7
FLOOR MOUNTED SINGLE SIDED BIKE RACK BY DERO.
20
BIKE REPAIR STATION BY OWNER.
21
REPAINT EXISTING DOOR AND FRAME.
-
D6
EXIST.
L-3
L-11
D1 D2
L-8/9
LOUNGE 101
-
D7
EXIST.
3'-4"
D9
9'-6"
VACANT E
1
18 JKRP Architects | Three Parkway
EXIS ENTI PATC
D5
REM SLAB
D6
EXIS
D7
REM MIRR PRES
D8
EXIS
D9
REM
D12 REM D13
EXIS AND OWN
D14 REM
L-3
B
EXIST.
-
EXIST.
B
EXIST.
D15 REM D16
L-3
ALL
D17 EXIS
L-3
EQ. L-7
A
L-7
L-4
8'-0"
L-14
EQ. REVISIONS:
L-7
L-4
EQ.
DATE: 04.21.2017 DRAWN BY: NH | ZA FILE: K:\3 PARKWAY\ EQ. L-4
L-4
1 05.16.2017
5'-6" L-14
EXIST.
NOT IN SCOPE EXISTING SUITE A
EXISTING SUITE C RELIANCE INSURANCE COMPANY
WES CORP
CORRIDOR 100
B
L-4
10'-0"
L-15
9'-0"
L-16
EXISTING STAIR ST-2
L-15
0
L-16
D19
1/8" = 1'-0"
1 D1
EXIST.
1
B
EXIST.
B
EXIST.
-
EXIST.
-
EXIST.
EXISTING STORAGE CLOSET
DEMOLITIO
L-16
AS NOTED
L-15
A1.1
REM SIDE EXIS D19 INST D18
D20 EXIS
EXIST
B
EXISTING SHAFT
-
L-3
L-7
A
WOMEN'S LOCKER ROOM 102
L-3
L-16
EXISTING SUITE B-2 AT&T CORP
B 8'-5"
L-16
L-16
Basement Reflected Ceiling Plan
REM ADJA
D11 REM
CORRIDOR 106
UP
REM
D3
D10 REM
COPYRIGHT 2017 JKR PARTNERS LLC ALL RIGHTS RESERVED
BASEMENT REFLECTED CEILING PLAN
SCALE:
1 107
BASEMENT FLOOR PLAN
3 A2.1
EXISTING MECHANICAL ROOM
REM
D2
D4
EX.
EXIST.
EXISTING BREAK ROOM
1
1
L-3
D5 5'-11" 2 EXISTING
1
A2.1
EX.
L-8/9
L-11
EXISTING UPS ROOM
NOT IN SCOPE
EXISTING SUITE B-3 MCI METRO ACCESS TRANS SVC
21
EX.
MEN'S LOCKER ROOM 103
EXIST.
EQ.
EQ. L-14
1
B
L-7
D7
L-4
5'-6"
YOGA STUDIO 106
L-11
B L-3
L-3
8'-5"
TYP.
D19
EX.
D1
EXISTING STORAGE
L-11
1
EXIST.
D7
D18
A
L-8/9 L-11
1'-0"
107
L-11
L-8/9
100A
1
EXISTING STORAGE CLOSET
9
BALLET BARRE. PROVIDE BLOCKING AS REQUIRED. REFER TO SCHEDULE FOR DETAILS.
L-8/9 L-11
L-8/9
D5
D1 D10
EX.
A
CORRIDOR 107
ENLARGED LOUNGE RCP
19
L-11
TYP.
1
1
1
N.T.S.
EX.
L-4
WALL GRAPHIC MOUNTED ON STEEL CHANNELS. REFER TO DETAIL.1
L-8/9
D2
L-8/9
L-11
CORRIDOR 100
3'-0" EXISTING BREAK ROOM
UNDERCABINET FRIDGE. PROVIDE POWER AS REQUIRED. A2.1 SCALE: 1/4" = 1'-0" UNDERCABINET ICEMAKER. PROVIDE PLUMBING CONNECTION, DRAIN, AND POWER AS REQUIRED. NEW WALL MOUNTED TELEVISION. PROVIDE BLOCKING, POWER AND DATA AS REQUIRED.
L-11
EXISTING SUITE B-3 MCI METRO ACCESSL-11 TRANS SVC
D1
107
21
DEMOLITIO
3
SCALE:
A2.1 8
1
A3.1
C1
13
B EXISTING WOMEN'S LOCKER ROOM
MAX.
D2 D1
1'-0"
EXISTING SUITE A WES CORP
8
L-4
L-4
L-11
L-11
FITNESS STUDIO 105
L-11
D11
1
CORRIDOR L-8/9 EXISTING SUITE C RELIANCE INSURANCE COMPANY
L-11
L-8/9
EX.
EX. E
9
6
BASEMENT11KEY PLAN
21
12
3
1
2
UP
L-8/9
EX.
L-8/9
L-11
L-8/9
UP
D7A
100A
1
21
2'-0"
D1
D8
L-11
11
L-11
21
M
3
TOWEL DISPOSAL BIN, BY OWNER.
D8
10
A3.1
8
1
A3.1
21
1
9
EXISTING MEN'S LOCKER ROOM
EXISTING STAIR ST-2
EXISTING SUITE B-2 AT&T CORP
D2
EQ.
2
9 A
106B
1
6'-5" 7
11
D8
1'-8"
D4
22'-7"
2
2'-6"
D
7
D8
1'-7"
103 5'-8"
1
D7
1 WOMEN'S LOCKER ROOM 102
KEY CARD READER. LOCATION TO BE COORDINATED. E MAX. UNDERCABINET KEG WITH TAP. CABINET TO REMAIN LOCKED.
18
2'-6"
D6
9 105
20'-101" 2
5
1'-2"
D2
11
9 10
17
1
D8
A3.1
INSTALL NEW GWB AND INSULATION OVER EXISTING 6'-0" 6'-6" FRAMING.
15
4
9
D7
OPP
8
D8 16
1'-6"
A3.1
1'-6"
A3.1
6
3
LOUNGE 101
GA STUDIO 106
5
5
10
A3.1
A*
L-2
STAINLESS STEEL CORNER GUARD TO 9'-0" A.F.F.
14
5
3
5
C
1
A3.1
1'-3"
4
OPP
1
1/8" = 1'-0"
1'-6"
A3.1
OPP
9
5'-3"
2
A3.1
NOT IN SCOPE
3'-8"
7
7
Basement Floor PlanD8 D9
5
SCALE:
A1.1
1'-4"
D1
A3.1
D510
3
1'-9"
8'-9"
8
A3.1
1
1'-6"
D3
3
BASEMENT FLOOR PLAN 1
1
9
1
L-1A
1/4" = 1'-0"
1'-0"
7
EQ.
1
ENLARGED YOGA STUDIO RCP
SCALE:
A2.1
17
2'-0"
17 17
L-1
6
L-1A
A3.1
11. SEE D
1 WOMEN'S LOCKER ROOM 102 NOT IN SCOPE
102
1
6'-5" 7
A*
EXISTING STAIR 6" ST-2
EXISTING LOCKER DOORS TO BE REPLACED. REFER TO FINISH SCHEDULE. C2 LOUNGE L-2 L-2 101 SINK IN EXISTING LOCATION. NEW LAVATORY & UNDERMOUNTED REFER TO FINISH SCHEDULE.B 9'-6" C2 NEW FULL HEIGHT CEILING MOUNTED PARTITIONS. REFER TO FINISH 5 SCHEDULE. EXISTING SUITE C EXISTING SUITE 4'-0" A EXISTING SHAFT C2 2'-8" 3'-2" NEW VANITY COUNTER.WES SEECORP 4/A3.1 FOR DETAILS. 6 INSURANCE RELIANCE COMPANY
EXISTING SUITE B-1 RELIANCE INSURANCE COMPANY 1
4
104
1
L-1A
L-2
3'-6" NEW WATER FOUNTAIN & BOTTLE FILLER. C2
2
5'-8"
3
L-1A EXISTING MECHANICAL ROOM
L-1
5 103
4
6'-41" 2
A1.1
3
15
L-1
3
AV CLOSET 104 A*
L-1
1" 6'-42
5
20'-101" 2 L-1
L-1A
L-1A EXISTING UPS ROOM
2'-4"
L-1
L-1A
A
L-1
L-1
3
L-1
L-1A
21
2
NOT IN SCOP
NOT IN SCOPE
A3.1
L-12
L-2
3
C3
101
C2
EXISTING CONSTRUCTION VACANT EKEYNOTES EXISTING SUITE C2 B-2 AT&T CORP ALIGN. 1
15
YOGA STUDIO 106
16
L-2
10. REMO EQUIP REQU
C3
3 BEN FRANKLIN PARKWAY PHILADELPHIA PA 19103
L-1A
L-1
12
C2
1
9
C4 2'-4" 10'-2"
3'-4"
22'-7"
5
OPP
PROJECT NORTH
L-1
9'-6"
EX.
4 A3.1
L-1
1
THREE PARKWAY
A
12
1/4"= 1'-0"
7
L-1
A
1
1
L-1A
L-2
C2
OPP
5
A3.1
B B 3 5/8" METAL STUDS @ 16" O.C. W/ (1) LAYER OF 5/8" 4'-6" 4'-10" 2'-4" GWB EACH SIDE. L-2 L-2 A C1 L-2 NOTE: A* - GWB ONE SIDE ONLY. 100B 1 EX. EX. 7'-2" C2
106B
L-1
E
A3.1
RENOVATIONS
ENLARGED LOUNGE PLAN
L-1
1 7 6'-42"
L-1A
L-1
SCALE:
4'-0"
L-1
106A
EQ.
4'-0"
L-1
6'-41" 2
L-1A
L-1A
EQ.
L-1
14
L-1A
5'-0"
L-1A
13
L-2
REPLACE ALL ACCESSORIES AND ADA FIXTURES IN LOCKER ROOM 3'-2" C2 C2 SHOWERS. REFER TO FINISH SCHEDULE.
1 7 PARTITION TYPES
D
22'-1"
12
1" 49'-22
4' -0"
105
6'-41" 2
6'-41" 2
2'-6"
12'-2"
9
3
A3.1
3
9.
3'-0"
FITNESS STUDIO 105
A3.1
A1.1
PATCH AND REPAIR EXISTING CONCRETE FLOOR AS 1 REQUIRED TO 1 L-4 L-4 RECEIVE NEW FINISHES. 3 2'-6" 3 2'-6" 8 10 A3.1 6. ALL FITNESS EQUIPMENT BY OWNER. GC TO COORDINATE FINAL A3.1 4 LOCATIONS W/ ELECTRICAL & DATA REQUIREMENTS.OPP EQ. 6'-0" 6'-0" EQ. 3 7. PROVIDE BLOCKING AS REQUIRED FOR TRX EQUIPMENT.. 6 EQ.A3.1 EQ. 1 13'-6" LOUNGE 8. PROVIDE FIRE EXTINGUISHER IN RECESSED CABINET EVERY 75'-0"ROOM 11 18 MEN'S LOCKER L-2 L-2 MINIMUM, AS DIRECTED BY FIRE MARSHALL. 101 103
C
8
9
1'-6"
5.
8'-9"
10'-0"
100 EAST PENN SQUARE S 5U I T E 1 0 8 0 5 A3.1 PHILADELPHIA, PA 19107 2 1 5 . 9 2 8 . 9 3 3 1 5 4 JKRPARCHITECTS.COM
17 17 E 17MAX. PROVIDE ACCESS PANEL AS REQUIRED FOR EXISTING 'E' VALVES OR SWITCHES CONCEALED BY NEW CONSTRUCTION. 3
4.
7
EQ.
5'-2"
10'-0"
N.T.S.
SCALE:
15
EQ.
53'-21" 2
BASEMENT KEY PLAN
A1.1
10
10'-0"
A* NOT IN SCOPE
A*
1'-3"
12
1
2'-4"
2
7
3'-0"
10'-0"
5"
15 EQ.
2'-6"
8'-0"
EQ.
1'-3"
NOT IN SCOPE
A*
7
7
1 A*
10'-2"
1
A*
22'-2"
EQ.
15
2'-7"
EQ. A
17
3'-2"
17
104
ARCHITECTS
AVTO CLOSET REFER FINISH SCHEDULE AND DOOR AND HARDWARE E SCHEDULE MAX. 104 FOR ADDITIONAL INFORMATION.
3.
2'-6"
17
2'-6"
1'-21" 2
A*
2'-10"
A*
2'-10"
104
3'-71" 2
NOT IN SCOPE
1'-6"
NORDIC TRACK PRO SKIER
GENERAL CONSTRUCTION NOTES
NOT IN SCOPE
8'-0"
L-16
L-16
L-16
EXISTING SUITE B-3 MCI METRO ACCESS TRANS SVC
RESTROOM ELEVATION
SCALE:
SCHEDULED HARDWARE AND LOCK 5'-8"
6'-5"
2" 4" MAX.
6
A3.1
1/2" = 1'-0"
8
1
LOUNGE MILLWORK Section DETAIL Kitchenette & Elevation 7 SCALE: 1" = 1'-0"
A3.1
SCALE:
1/2" = 1'-0" 1" B15 3
A3.1
LINEN STORAGE DETAIL
SCALE:
4" MAX.
11
2'-10" MAX.
2'-10" MAX.
A3.1
1"
1
1/2" = 1'-0"
3
1'-6"
12'-2"
2'-1"
B30
1"
B15
2'-1"
SCALE:
1/2" = 1'-0"
KEG FRIDGE
2'-1" LOUNGE
B30 ELEVATION
1/2" SCALE: UNDER COUNTER KEG FRIDGE
= 1'-0"
±22'-6"
1 B30
1
±22'-6"
1/2" = 1'-0" A3.1 SCALE:
6
A3.1
GLASS SIGNAGE BACK LIT. PROVIDE POWER 8
1
FULL HEIGHT CORNER GUARD
1"
UNDER COUNTER ICE MAKER
FULL HEIGHT CORNER GUARD
2 WALL GRAPHIC. REFER TO SCHEDULE.
B30
UNDER COUNTER FRIDGE
WALL GRAPHIC ELEVATION
SCALE:
3'-8"
B30
1
1
1/2" = 1'-0" CVWC - 002
1"
UNDER COUNTER ICE MAKER
PROVIDE STAINLESS STEELCOUNTER UNDER TRIM ON ALL 4 FRIDGE SIDES.
LOUNGE1 ELEVATION FITNESS CENTER ENTRANCE SIGNAGE
SCALE:
3'-8"
B30
GLASS SIGNAGE BACK LIT.UNDER COUNTER FRIDGE PROVIDE POWER
KEG FRIDGE
3'-8"
5'-0"
5'-0" 5'-0"
4'-6"
2'-10" MAX.
1'-6"
5'-0" 12'-2"
7'-0" UNDER COUNTER
CVWC - 002
A3.1
CVWCPENN - 002 SQUARE 100 EAST S U I T E 1 0 8 0 PHILADELPHIA, PA 19107 2 1 5 . 9 2 8 . 9 3 3 1 JKRPARCHITECTS.COM
1 1/2" = 1'-0"
B15
PNT-003
ARCHITECTS
EQ.
STEEL PLATE
GLASS SIGNAGE BACK LIT. PROVIDE POWER
PNT-003
PNT-003
EQ.
1
WALL GRAPHIC DETAIL
SCALE:
LOUNGE ELEVATION UNDER COUNTER
VWB-002
A3.1
GS-001
GS-001 EQ.
12'-2"
±22'-6" FITNESS CENTER ENTRANCE SIGNAGE
VWB-002
A3.1
3
3 16"
UNDER COUNTER ICE MAKER
B30
3'-8"
1
1
BASEM INTERI ELEVAT BASEM
INTERI ELEVAT
DATE: 04.21.201 DRAWN BY: N FILE: K:\3 PARK
1" FULL HEIGHT 2 CORNER GUARD
REVISIONS:
BASEM INTERI 19ELEVAT
DATE: 04.21.201 DRAWN BY: N 1 05.16.2017 FILE: K:\3 PARK
1'-6"
31" 2
1
2'-10" MAX.
SCHEDULED SOLID SURFACE COUNTER W/ WATERFALL EDGE
TOE KICK
2'-10"
4'-0"
SCHEDULED HARDWARE AND LOCK. P.LAM CABINET
1/2" = 1'-0"
1
SCHEDULED SOLID SURFACE COUNTER W/ 1'-6" WATERFALL EDGE
4'-6"
2'-10"
1
VWB-002
P.LAM SUPPORT
WALL GRAPHIC MOUNTED TO PLYWOOD
1'-6"
WATERFALL EDGE
1'-0"
4'-0"
4"SURFACE COUNTER W/
QZ-001
VWB-001
1
SCHEDULED SOLID
2"
1'-2" 2'-10"
P.LAM-002 CABINET
4'-0"
9" MIN.
2'-10"
TAIL
1'-4"
P.LAM-001 SHELVES
KEG HANDLES
VWB-001
OGA STUDIO ELEVATION
CALE:
SCHEDULED COUNTER TOP SCHEDULED HARDWARE AND LOCK
4'-6"
1'-0"
1'-0" 1'-0" 1'-2"
2'-0"
2X BLOCKING
PNT-003
EQ.
2 21" METAL STUD FRAME
EQ.
EQ.
KEG HANDLES
SCHEDULED FAUCET
OGA STUDIO ELEVATION B24
CALE:
GS-001
1 8 A3.1 CVWC - 002
1
A3.1
2'-1"
UNDER COUNTER COUNTER ICE MAKER KEG FRIDGE
1
EQ.
GS-001
8
EQ.
KEG HANDLES SCHEDULED UPPER CABINETS
SCHEDULED UPPER CABINETS
1'-6"
PNT-003
GS-001
PNT-003
SCHEDULED HARDWARE AND LOCK
SCHEDULED BARRE AND HARDWARE
EQ.
1'-6"
1'-6"
PNT-003
1'-0"
1'-0"
0"
SCHEDULED UPPER CABINETS
P.LAM-002 CABINET
VWC - 001
4'-6"
PNT-003
B30
UNDER COUNTER UNDER FRIDGE
GS-001 ±22'-6"
EQ.
1'-6"
5'-3"
8 A3.1
GS-001
PNT-003
1/2" = 1'-0"
1'-6"
4" MAX.
1/2" = 1'-0"
SCALE:
A3.1
1
A3.1
A3.1
SCHEDULED BARRE AND HARDWARE
B15
1"
LOUNGE ELEVATION 1 SCALE: 1/2" = 1'-0" 3 1 LOUNGE ELEVATION WALL GRAPHIC ELEVATION WALL GRAPHIC ELEVATION 6 A3.1 ±22'-6" 1/2" = 1'-0" SCALE: A3.11 = 1'-0" 1/2" = 1'-0" SCALE: 1/2" SCALE: 3
VWC - 001
5'-3"
B30
VWB-002
UNDER COUNTER KEG FRIDGE
WALL GRAPHIC. REFER TO SCHEDULE.
9'-1"
SCALE:
2'-1"
PROVIDE STAINLESS STEEL WALL GRAPHIC. REFER TO
12'-2" TRIM ON ALL 4
WALL GRAPHIC. SIDES. SCHEDULE. REFER TO SCHEDULE.
Wall Graphic & Elevation WALL GRAPHICPlan ELEVATION 6
1
YOGA ELEVATION 1/2" = 1'-0" SCALE:STUDIO
A3.1
A3.1
B15
EQ.
THREE PARKWAY THREE THREE PARKWAY PARKWAY
1
1"
VWB-002
5'-0"
4
YOGA STUDIO ELEVATION
4" MAX.
1'-0" 4'-0"
1'-6"
1/2" = 1'-0"
SCALE:
Yoga Studio Elevation
4
4'-0"
2" 1'-0" 1'-0"
2" 2'-10"
SCHEDULED SOLID SURFACE COUNTER W/ WATERFALL EDGE
SCHEDULED SOLID SURFACE COUNTER W/ WATERFALL EDGE 1
GS-001
EQ.
PROVIDE PROVIDE STAINLESS STAINLESS STEEL STEEL TRIM TRIM ON ALL 4 ON ALL 4 SIDES. SIDES.
7'-0"
KEG HANDLES
LINEN STORAGE DETAIL
7
A3.1
EQ.
KEG HANDLES
1
1
8 A3.1
PNT-003 GS-001
1'-6"
1/2" = 1'-0"
1 SCALE:
VWB-001 1" = 1'-0" SCALE:VWB-001
A3.1
1
REVISIONS:
1
2
1/2" = 1'-0"
1 05.16.2017
9'-1"
A3.1
LOUNGE MILLWORK DETAIL
LINEN STORAGE DETAIL
2 1 EAST 5 . 9 100 SJKRPARC U I T WALL GRAPHIC ELEVATION PHILADEL1 SCALE: 1/2" = 1'-0" 8 2 A3.1 1 5 . 9 GS-001 JKRPARC EQ.
1
Spring 2017 DATE: 04.21.201
DRAWN BY: NH FILE: K:\3 PARKW
1"
A3.1
7
1'-6"
1/2" =1 1'-0"
SCALE:
7'-0"
SCHEDULED CABINETS
LINEN STORAGE DETAIL
7
A3.1
STEEL PLATE
PNT-003
AY
8
1" = 1'-0"
6
1 1/2" = 1'-0"
2'-10" MAX.
1 SCALE:
2'-10"
4" MAX.
QZ-001
2X1BLOCKING 3 16"
GRAPHIC DETAIL PNT-003
STEEL PLATE
2 21" METAL STUD FRAME
PLYWOOD 1MOUNTED 1/2" =TO1'-0"
PNT-003 UPPER
SCHEDULED UPPER CABINETS
100 EAST S U I T ARCH PHILADEL 100 EAST 6 2 S1 U5 I.A3.1 T9 PHILADEL ARCH JKRPARC
2X BLOCKING
7'-0"
4" 1'-6"
SCHEDULED HARDWARE AND LOCK. P.LAM CABINET
SCALE:
A3.1 1'-4"
4'-0" 1
1
31" 2
2'-2"
A3.1
2'-2"
3'-8" T.O. BAR
2'-10" T.O. BAR
TOE KICK
LOUNGE MILLWORK DETAIL
8
2'-10"
4'-0" 2"
QZ-001
SCHEDULED HARDWARE AND LOCK. P.LAM CABINET P.LAM SUPPORT
31" 2
TOE KICK
P.LAM SUPPORT
2'-10"
P.LAM-002 CABINET
4"
1'-0"
SCHEDULED HARDWARE AND LOCK. P.LAM CABINET
2'-10"
2'-10"
1'-6"
STEEL PLATE
3 16"
FITNESS
SCALE:
ARCH
2X BLOCKING 3 16"
1
WALL 11PNT-003
4'-6"
2" 1'-0"
P.LAM-001 SHELVES
P.LAM-002 SCHEDULEDCABINET HARDWARE AND QZ-001 LOCK VWC - 001
4'-0"
9'-6" 1
MILLWORK DETAIL
= 1'-0" ER DETAIL
SCHEDULED BARRE AND HARDWARE
TOE KICK
2'-10" T.O. BAR
ER DETAIL
SCHEDULED BARRE AND HARDWARE
1'-4"
P.LAM-001 SHELVES
SCHEDULED COUNTER TOP P.LAM SUPPORT
2'-10"
2'-10"
9'-6" 9" MIN.
31" 2 3'-8" T.O. BAR
9" MIN.
1'-4"
2'-0"
4"
1
A3.1
2 21" METAL STUD FRAME
SCALE:
A3.1
1'-0"
SCHEDULED HARDWARE AND SCHEDULED FAUCET LOCK VWC - 001
1/2" = 1'-0"
WALL GRAPHIC WALL GRAPHICDETAIL
11
1'-4"
P.LAM-001 SHELVES
SCHEDULED FAUCET
SCHEDULED COUNTER GS-001 TOP
SCALE:
2 21" METAL STUD FRAME
1 LINEN STORAGE DETAIL WALL GRAPHIC MOUNTED TO PLYWOOD WALL = 1'-0" GRAPHIC DETAIL SCALE:11 1/2" A3.1 SCALE: 1 1/2" = 1'-0"
7
A3.1
GS-001 SCHEDULED HARDWARE AND LOCK
SCHEDULED COUNTER TOP 2'-0"
1'-4"
1
LOUNGE MILLWORK DETAIL
SCHEDULED HARDWARE AND LOCK
IN.
A3.1
1
LINEN STORAGE DETAIL
WALL GRAPHIC MOUNTED TO PLYWOOD
1'-0" 1'-0"
SCHEDULED FAUCET
P.LAM-002 CABINET
TOE KICK
SCHEDULED HARDWARE AND 8 LOCK P.LAM-002 CABINET A3.1 SCALE: 1" = 1'-0"
1'-6"
1" = 1'-0"
IN.
7
1'-0"
1
RESTROOM COUNTER DETAIL GS-001
2'-0"
1'-0"
1'-0"
31" 2
P.LAM-002 CABINET
PNT-003
7'-0"
1'-6"
1'-6"
SCALE:
2'-10"
2'-10"
SCHEDULED HARDWARE AND LOCK
1" = 1'-0"
SCALE:
1 1/2" = 1'-0"
1'-6"
SCHEDULED HARDWARE AND LOCK. P.LAM CABINET
1
1 LOUNGE MILLWORK DETAIL
A3.1
4"
QZ-001
4'-0"
1'-6"
SCALE:
ST
1
WALL GRAPHIC DETAIL
11
A3.1
P.LAM SUPPORT
B24
31" 2
1/2" = 1'-0"
9" MIN.
1'-6"
SCALE:
1'-0"A3.1
1'-2"
2'-10"
9" MIN.
1
LINEN 2 1'-4" STORAGE ELEVATION RESTROOM COUNTER DETAIL 8
9
P.LAM-002 CABINET
Linen Storage Elevation & Section
P.LAM-002 CABINET
2X BL 3 16"
1'-4"
P.LAM-001 SHELVES
TOE KICK
B24
1'-6"
SCHEDULED HARDWARE AND LOCK. P.LAM CABINET
SCHEDULED HARDWARE AND LOCK
B24
2 21" M WALL GRAPHIC MOUNTED TO PLYWOOD
QZ-001
SCHEDULED COUNTER TOP
8" MIN.
4"
P.LAM SUPPORT
SCHEDULED FAUCET 2'-0"
4" 8"
3'-4" B.O. REFLECTIVE SURFACE
1'-4"
P.LAM-002 CABINET
EQ.
GS-001
2'-10"
2'-10"
SCHEDULED HARDWARE AND LOCK.
SCHEDULED UNDERMOUNT SINK
2'-0"A3.1
EQ.
EQ.
SCHEDULED COUNTER TOP
SCHEDULED SOLID SURFACE COUNTER AND APRON. REFER TO SCHEDULE.
1"BASE. = SCALE: SCHEDULED
1'-0"
1'-6"
8" MIN.
SCHEDULED AUTOMATIC FAUCET
SCHEDULED BASE.
SCHEDULED HARDWARE AND LOCK SCHEDULED HARDWARE AND LOCK
P.LAM SUPPORT
2'-0"
1'-4"
P.LAM-001 SHELVES
SCHEDULED COUNTER
TOP P.LAM-002 CABINET
8"
3'-4" B.O. REFLECTIVE SURFACE
SCHEDULED MIRROR. REFER TO SCHEDULE BACKSPLASH
1
A
PNT-003
SCHEDULED FAUCET
1 2'-0"
P.LAM SHELVES
4"
D SOLID SURFACE TER AND APRON. ER TO SCHEDULE.
PNT-003
1'-6"
7 A3.1 1'-6"
PNT-003
D UNDERMOUNT SINK
3.1
5'-3" GS-001
ULED AUTOMATIC FAUCET
9
1/2" = 1'-0"
SCALE:
A3.1
2'-0"
EDULED MIRROR. ER TO SCHEDULE BACKSPLASH
YOGA STUDIO ELEVATION
4
P.LAM-002 CABINET
1/2" = 1'-0"
1'-6"
5
A3.1
0
REVISIONS:
C O N S T I T U T I O N H E A LT H PLAZA H E A LT H C A R E R E N O V A T I O N | A U T O C A D
KEY NOTES
W.CL.
EXISTING STAIR
W
BEDROOM N519
N519
N521
N520 ELECT. N520
BEDROOM N521
6
3
W
W.CL.
EXISTING ELEVATORS WITH 5TH FLOOR ACCESS
5
CLINICAL SERVICE SINK ON 24" W X 10" H CONCRETE PEDESTAL
6
BEDPAN WASHER 48" AFF
7
WALL MOUNTED SWING ARM GRAB BAR, 29" LENGTH ASI CO. MODEL 3451
8
PER DRAWINGS E1.1 REPLACE ELECTRICAL PANEL. ENLARGE OPENING DIMENSIONS AS REQUIRED.
9
INSTALL NEW RECESSED ELECTRICAL PANEL PER DRAWINGS E1.1. CREATE OPENING IN MASONRY WALL
3 5/8" MTL. STUDS AT 16" O.C. W/ (1) LAYER 5/8" GWB ON EACH SIDE. USE MOISTURE RESISTANT GWB AT ALL WET AREAS. SOUND BATT INSULATION. EXTEND WALL ASSEMBLY AND SEAL TIGHT TO STRUCTURE/DECK ABOVE. INCREASE SIZE TO 6" MTL. STUDS PER MECHANICAL RISER REQUIREMENTS. 1-HOUR RATED PARTITION (UL #419) REQUIRED AT SMOKE PARTITION MODIFICATIONS
A1
3 5/8 " MTL. STUDS AT 16" O.C. W/ (1) LAYER 5/8" TYPE 'X' GWB ON EACH SIDE. USE MOISTURE RESISTANT GWB AT ALL WET AREAS. SOUND BATT INSULATION. EXTEND WALL ASSEMBLY AND SEAL TIGHT TO STRUCTURE/DECK ABOVE. INCREASE SIZE OF MTL. STUD TO 6" PER MECHANICAL RISER REQUIREMENTS. REQUIRED AT SMOKE PARTITIONS.
SCREEN WINDOW FOR PRIVACY
11
EXISTING DUMBWAITER SHAFT TO REMAIN.
W.CL.
W
1
W.CL.
W.CL.
W.CL.
W.CL.
C
DIALYSIS M502
C
A3.3
10
A
W
N525
2 HOUR FIRE/SMOKE PARTITION (SMOKE BARRIER)
EXIST. MECH. N526
REFER TO LS-5 LIFE SAFETY PLAN FOR LOCATIONS OF EXISTING SMOKE AND FIRE PARTITIONS. WILL REMAIN INTACT THROUGH CONSTRUCTION.
W.CL.
C
C
N527
N501A C1 N2
UP +5"
N512
A3.2 2
BEDROOM N511
ADA TOILET M526 M526
W.CL.
TRASH M528
JANITOR CLOSET M529
A
M524
N505
7 A3.1
1 OXYGEN CL. M538
CORRIDOR C1 W
A
JANITOR CLOSET N506
M540
M513
TOILET M539
MECH.
6 A3.3
BATHING STATION M513
TRAINING TOILET
TOILET M540
10
M514A
SOILED UTILITY M541
M542
NURSE STATION M534
SOUTH LOUNGE/DINING M514
EXISTING STAIR
356SF
11 A3.2
1
M533A
9 CORRIDOR C1 W
C1 W M522
M521
A
M520
BEDROOM M522
M519
M518
W.CL.
A
W
W
A
W.CL.
A
M512
A
M514B
W
BEDROOM M523
W
3
8'-0" 1
OFFICE M533
M532
W
W
W.CL.
BEDROOM M521
BEDROOM M520
3
M517
M516
A
A
W
W
W.CL.
BEDROOM M519
BEDROOM M518
CLEAN LINEN M543
M515
W
W.CL.
A
M543
2
BEDROOM M517
BEDROOM M116
W.CL.
A
A W.CL.
BEDROOM M515
C
DIALYSIS M524 2
W.CL.
BEDROOM N505
M539
M541
M533B
A1
2
W
W
A
M511
CORRIDOR C1 E
9 A3.1
CLEAN LINEN M532
M531
A
M510
M536B
W.CL.
DIALYSIS M525
W
1
W.CL.
A
W
M509
A
719SF
MED ROOM M536
OFFICE M531
C W.CL.
CENTRAL LOUNGE/DINING M535
M536A
M538 OFFICE M530
M523
A
M508 8 A3.1
W.CL.
W
W
DIALYSIS M512
BEDROOM M510
5
3
W.CL.
W
M507
16 A3.2
M529
A1
3
NURSE STATION M537
ELEV. 2
C W.CL.
C1 N1
N510
M506
4
M530
B
BEDROOM M509
A
A
11
ELEV. 3
A
C
2
W
A
M505 C1 E
ELEV. 1
M528
BEDROOM M508 W.CL.
A
6 A3.2
4
10 A3.1
5
W
W
W
W.CL.
M504
ELEV. 4
M546B
M525
W
N511
M527
2
OXYGEN CL. N528
SOILED UTILITY N504
N504
IT LL. 546
SOILED UTILITY M527
N528
MED ROOM N503
2
W
M546A
5
RAMP
1 A3.2
NURSE STATION N502
8 M544
9
MECH.
1
N503
BEDROOM M507 W.CL.
A
CORRIDOR C1 E
M545 ELECTRICAL 545
573 SF
N501B
N526
21
W
BEDROOM M506
W.CL.
M503
RAMP
NORTH LOUNGE/DINING N501
ELEC.
3
BEDROOM M505
C A
W.CL.
M502
FIRE TOWER 544
EXISTING STAIR
EXIST. MECH. N527
CORRIDOR C1 N
SPECIAL CARE BEDROOM N510
2 HOUR FIRE PARTITION
NOTE:
VERITY EXISTING PARTITION DETAILS. MATCH AND MAKE FLUSH AT NEW CORRIDOR INFILL WALLS.
C
UP +5"
SERVICE ELEV.
3 A3.1
BEDROOM M504
2 A
1 A3.1
303 SQ. FT.
N514
A
W
3
BATHING STATION N525
W
N513
W.CL.
W.CL.
C W.CL.
W.CL.
W.CL.
C
C
W.CL.
5TH PLA
13 A3.3
N506
11 A3.3
N508
BEDROOM N508 W.CL.
DATE:
N507
W
W
BEDROOM N507 W.CL.
W.CL.
EXISTING STAIR
Constitution Health Plaza is a hospital project in which the client wished to renovate and update the fifth floor interior and add a number of dialysis units. I assisted with multiple production drawings including ground floor plans, reflected ceiling plans, elevations, and sections. N
W
1 -
5TH FLOOR PLAN
SCALE:
1
W
EXIST. ELECT. N509 N509
W.CL.
AR
100 EA S U PHILA 2 1 5 JKRPA
1 HOUR FIRE/SMOKE PARTITION (SMOKE BARRIER)
2 1/2 " MTL. STUDS AT 16" O.C. W/ (1) LAYER 5/8" GWB ONE SIDE. SOUND BATT INSULATION. SEAL TIGHT TO STRUCTURE/DECK ABOVE. INCREASE SIZE TO 3 5/8" MTL. STUDS PER MECHANICAL RISER REQUIREMENTS.
C
BEDROOM M503 W.CL.
1
TRAINING TOILET
699 SF
W.CL.
PROVIDE NURSE CALL CORD W/ BUTTON AT ALL TOILETS FOR PATIENT USE AND AT CENTRAL SHOWERS
W.CL.
2
M501
W.CL.
7.
NOTE:
W.CL.
DIALYSIS M501
BEDROOM N524
N524
3
W.CL.
W.CL.
MAINTAIN INTEGRITY OF EXISTING COLUMNS AND 2HR FIRE RATED ASSEMBLY
15 A3.3
17 A3.3
W
N515
CLEAN LINEN N512
PENETRATIONS THROUGH CONCRETE FLOOR ASSEMBLY ABOVE OR BELOW THE WORK AREA SHALL BE NON-COMBUSTIBLE PIPE AND SHALL BE SEALED WITH APPROVED FIRE SEALANT PER 2HR ASSEMBLY.
6.
DIALYSIS M511
W
PHYSICAL THERAPY N513
CONTRACTOR TO PROVIDE TEMPORARY LIGHTING IN UNOCCUPIED SPACES.
TYPICAL AT ALL EXISTING BEDROOM HEADWALLS
NOTE:
A
BEDROOM N514
4. 5.
1/16" = 1'=0"
SCALE:
-
N516
W.CL.
CONTRACTOR TO FUR OR BOX OUT PARTITIONS AS REQUIRED TO ACCOMMODATE UTILITIES.
3 5/8" MTL. STUDS AT 16" O.C. W/ (1) LAYER 5/8" GWB ON EACH SIDE. TERMINATE GWB AT 6" ABOVE CEILING. USE MOISTURE RESISTANT GWB AT ALL WET AREAS. SOUND BATT INSULATION.
W
BEDROOM N515
FIELD VERIFY ALL DIMENSIONS.
SUB-BASEMENT STORAGE FLOOR PLAN
2
BEDROOM N523
N523 N517
ALL DIMENSIONS TAKEN TO FACE OF FINISH OR FACE OF MASONRY UNLESS NOTED.
2. 3.
LEGEND:
B
10
1.
BEDROOM N522
N522
BEDROOM N516
EXISTING FIRE EXTINGUISHER CABINET
4
A
C
W
BEDROOM N517
3
TYPICAL FOR ALL NEW CORRIDOR AND BEDROOM PARTITIONS AT HEADWALLS
W.CL.
W.CL.
W.CL.
ALIGN
W
A3.1 N518
BEDROOM N518
NEW MED GAS ZONE VALVE BOX
2
FOX SUBACUTE CARE
W.CL.
STORAGE REQUIRED: 540 SF. STORAGE PROVIDED: 1168 SF.
GENERAL NOTES:
PARTITION TYPES:
1
1/8" = 1'=0"
20 JKRP Architects | Constitution Health Plaza
WAIVER REQUIRED FOR DIMENSIONAL CLEARANCE
DRAWN FILE: K:
REVISIO 1
01.
0
COPYRIGH
5
1/4" = 1'-0"
27
2
A3.4
33
11
29
32
B18
3'-0"
B24
18 B18
36
32
SCALE:
3
A3.4
1/4" = 1'0"
4 4
1 SHOWER
EAST BATHING ROOM ELEVATION
SCALE: 11
A3.3
1/4" = 1'-0"
4
A3.4
SCALE:
1'-3"
32
3
1/4" = 1'0"
SCALE:
A3.2 27
33
3
36
5
N528
15
A3.4 28
1/4" = 1'0"
2'-6" 41
10
28 29
4'-0"
1'-6"
18
4
EXISTING WINDOW
18
17
A3.4
12
A3.3
3
SCALE:
32
SHOW CONT
1/4" = 1'0" 33
4
A3.4 11
18
28
SOUTH BATH
SCALE:
29
36
1
17 A3.4
1/4" =
28
18
32
18 41
10
32
32 B18
B30
WEST INTERIOR ELEVATION 5 EAST BATHING S 4 A3.2 ROOM 1/4" = 1'0" SCALE: ELEVATION
SCALE:
1/4" = 1'-0"
A3.4
S
WEST BATHING ROOM ELEVATION
SCALE:
1/4" = 1'-0"
TYP. DOUBLE BEDROOM ELEVATION
SCALE:
1
32
EAST INTERIOR ELEVATION 6.1
28
18 24
36
B30
1/4" = 1'-0"
6
4
18
B18
29
28
B18
4
5
41 18
B12
4
1/4" = 1'-0"
1 28
EAST BATHING ROOM ELEVATION
SCALE:
N503
B36
1/4" = 1'-0"
NORTH BUILDING, DOUBLE BEDROOM (315 SF) Patient RoomTYP. Plan & Elevations
SCALE:
SCA
A3.4
11 1/4" = 1'-0"
B18
NORTH INTERIOR ELEVATION
SOUTH BATHING ROOM ELEVATION
SCALE:
2'-0"
2'-6" 1'-6"
1'-3" 2'-6" B24
3'-0"
B18
4
CONTROL
A3.4
6.1
1/4" = 1'-0"
RTH INTERIOR ELEVATION EAST INTERIOR ELEVATION SOUTH INTERIOR ELEVATION 3 4 PLAN NORTH BATHING ROOM ELEVATION 2 3 A3.2 SCALE: 1/4" = 1'0" SCALE: 1/4" = 1'0" LE: 1/4" =11'0"NORTH WING BATHING ROOMA3.2 A3.4
B18
36
WEST BATHING ROOM ELEVATION
A3.4 28SCALE: 10 18
B18
29 4
B30
32
SHOWER CONTROL
4
SCALE:
A3.4
10
41
18
SHOWER CONTROL
1'-6"
18
3'-0"
28 41
3'-0"
18
28
NORTH BATHING ROOM ELEVATION
SCALE:33 1/4" = 1'-0"
18 28
10
B18
2'-6"
3'-0"
A3.2
11
28
41
41
B30
3'-0"
1/4" = 1'0"
3'-0"
11
11
3'-0"
NORTH WING BATHING ROOM PLAN
B30
2
1/4" = 1'0"
SCALE:
A3.2
4
1'-6"
6.1
EW SOFFIT
4
11
1/4" = 1'-0"
SHOWER 1/4" = 1'-0" 10 CONTROL
29
NORTH WING NURSE STATION PLAN 6.1 EXISTING WINDOW
1
SCALE:
SCALE:
A3.4 18
3'-0" 5
7
A3.4
36 SOUTH BATHING ROOM ELEVATION
9
1/4" = 1'-0"
SCALE:
A3.4
B30
SOU
9
33
11
10 29 18
4 32
27
4 32 SOUTH INTERIOR ELEVATION 10 4 WEST INTERIOR ELEVATION TYP. SINGLE BEDROOM ELEVATION A3.2 SCALE: 1/4" = 1'-0" 17 NORTH BUILDIN 27 33 33 1/4" = 1' A3.3 SCALE: NORTH BATHING ROOM ELEVATION EAST BATHING ROOM ELEVATION 8
3'-0"
EAST BATHING ROOM ELEVATION
8
5
A
3'-0"
1'-6"
Bathing Station Plan & Elevations 1/4" = 1'0"
SCALE:
32
32 9
4'-0"
6
6.1
10
A3.2 16 SCALE: 1/4" = 1'-0" 33 A3.3 SCALE: 1/4" = 1'0"
4'-0"
MAIN
1'-6"
1'-6"
ELEVATION 8 45 EAST A3.2 INTERIOR 3 1 (234 SF) MAIN BUILDING, SINGLE A3.2TYP. 1/4" BEDROOM = 1'-0" SCALE: 4 1/4" = 1'0" SCALE: BLDG. BATHING ROOM PLAN
15
NEW SOFFIT
NEW SOFFIT
1/4" = 1'-0"
33
= 1'-0"
4'-0"
29
5
B18 17
24 1/4"
2'-10"
29
A3.3
A3.2
SCALE:
B18
B24 4
29
EAST BATHING ROOM ELEVATION
SCALE:
41 3'-0"
B30
18
B18
33
18
10
28
36
3'-0"
B30
2
SCALE:
A3.2
A3.4
11
28
3'-0"
SHOWER CONTROL
3'-0"
B18
2'-6"
41
B30
4 EAST INTERIOR ELEVATION
8
32
8
15
11
18
29
4" = 1'-0"
33
1/4" = 1'-0"
SCALE:
A3.4
11
B24
32 NTERIOR ELEVATION
NORTH BATHING ROOM ELEVATION
7
27
B30
29
NEW SOFFIT
6.1
1
3'-0"
2'-6"
B18
33
2'-6"
2'-6"
10
B18
SHOWE CONTR
29
1/4" = 1'-0"
27
41
33
2'-0"
1/4" =111'0"33
SCALE:
A3.2
33 11
B24
1
MAIN BLDG. BATHING ROOM PLAN
SCALE:
B18
32 ELEVATION 3 NORTH INTERIOR
74
NEW SOFFIT
6.1
1/4" = 1'0"
4'-0"
SCALE:
A3.2
10
B30
1
1
3'-0"
6.1
3'-0"
MAIN BLDG. NURSE STATION 4PLAN
6
5
4128 18
2'-6"
1/4" = 1'0"
33
1'-6"
11
1'-3" 2'-6"
10
18
2'-6"
1'-3" 2'-6"
SCALE:
A3.3
33
11
1'-3"
1/4" = 1'0"
SCALE:
9 A3.3
1/4" = 1'-0"
SCALE:
A3.2
TYP. THREE BEDROOM ELEVATION
14
2'-6"
SCALE:
A3.2
1
NEW SOFFIT 6.1 13 MAIN BUILDING, TYP. T WEST INTERIOR ELEVATION A3.3 SCALE: 1/4" = 1'0"
15
3'-0"
8
NEW SOFFIT 6.1 BEDROOM ELEVATION 12 TYP. DOUBLE SOUTH INTERIOR ELEVATION A3.3 SCALE: 1/4" = 1'0"
MAIN BUILDING, TYP. THREE BEDROOM (508 SF)
4
B30
4
1'-6"
1/4" = 1'-0"
SCALE:
A3.2
13
17
B30
3'-0"
A3.2 10
41 17
B24
5
14
1/4" = 1'0"
3'-0"
1'-0"
B18
B18
S
BUILDING, TYP. THREE BEDR 39
4'-0"
B30
11 NORTH BUILDING, TYP. DOUBLE BEDROOM (315 SF) RIOR ELEVATION INTERIOR ELEVATION 13 EAST 7 A3.3 SCALE: 1/4" = 1'0"
EVATION
10
41
S
14
A3.2
3'-0"
B30
41
1'-6"
10
17
B30
NEW SOFFIT
11
4
3'-0"
B18
B30
17
10
B30
15
11
1'-3"
1'-3" 2'-6"
10
41
15
24
11
2'-6"
1'-3" B30
24
2'-0"
B18
10
1/4" =6.1 1'-0" 13 MAIN A3.3 SCALE:
SCALE:
A3.2
2'-0"
B18
2'-6"
10
B18
4 EAST INTERIOR ELEVATION
13
NEW SOFFIT
11
11
3'-0"
7
24
10
41
B30
1/4" = 1'0"
SCALE:
A3.3
10
B30
TYP. DOUBLE BEDROOM ELEVATION 15
12
1/4" = 1'0"
B18
1/4" = 1'-0"
SCALE:
A3.2
NORTH BUILDING, TYP. DOUBLE BEDROOM (315 SF)
SCALE:
B18
NORTH INTERIOR ELEVATION
12
NEW SOFFIT
6.1
1/4" = 1'0"
17
2'-0"
SCALE:
4
2'-6"
Nurse Station Elevations 3PLAN MAIN BLDG. Plan NURSE&STATION
5 11 6.1A3.2
1
11
10 B24
NEW SOFFIT
NEW SOFFIT
11
17
1/4" = 1'0"
1/4" = 1'0"
SCALE:
A3.2
2'-6"
11
1
3 6.1
24
15
14
B36
WEST INTERIOR ELEVATION
20
1/4" = 1'0"
SCALE:
A3.2
13
B18
1/4" = 1'0"
5 SCALE: 6.1
1'-3"
A3.2
A3.3
NORTH BUILDING, TYP. S
SCALE:
TYP. SINGLE BEDROOM ELEVATION
SOUTH INTERIOR ELEVATION
19
1/4" = 1'0" 15
B36
17
A3.3
4
2'-6"
SCALE:
A3.2
B18
NEW SOFFIT
EAST INTERIOR ELEVATION 12
18
1'0"
REF
1/4" = 1'0"
SCALE:
A3.3
18
10
3'-0"
NORTH BUILDING, TYP. SINGLE BEDROOM (174 SF)
17
RIOR ELEVATION
1/4" =101'0"
SCALE:
A3.3
*SINK TO HAVE AUTOMATIC SENSOR
M536A
6"
ON
6
11 4
17
2'-6"
4
12
TYP. SINGLE BEDROOM ELEVATION
16
2'-10"
1/4" = 1'0"
SCALE:
A3.3
2'-6"
MAIN BUILDING, TYP. SINGLE BEDROOM (234 SF)
15
10
1'-8"
M536B
12
A
4
2'-10"
11
2'-10"
6
2'-6"
17
1'-8"
3'
A
1/4" = 1'0"
13
A3.3
MAIN BUILD
SCALE:
21 Winter 2016
1/4" =
H A M I LT O N P A D S I T E PA D S I T E R E TA I L P L A Z A | R E V I T
22 JKRP Architects | Hamilton Pad Site
4
3
2
1
1
2
3
4
1
S
P
2
J P A R A P E T (H IG H )
P A R A P E T (H IG H )
78' - 0" P A R A P E T (L O W )
78' - 0" P A R A P E T (L O W )
76' - 0"
76' - 0"
4
3
2
LEVEL 2
1
1
70' - 0"
2
3
LEVEL 2
4
70' - 0"
A 10 SU
PH
O1 W 2
F IN IS H F L O O R
F IN IS H F L O O R
78' - 0" P A R A P E T (L O W )
78' - 0" P A R A P E T (L O W )
1
76' - 0"
76' - 0"
N o r th
A 1 .2
JK R
58' - 0" LO W -GROUND P A R A P E T (H IG 5 6H' )- 0 "
58' - 0" LO W -GROUND P A R A P E T (H IG 5 6H' )- 0 "
1 / 8 " = 1 '- 0 " LEVEL 2
LEVEL 2
2
70' - 0"
70' - 0"
S o u th 1 / 8 " = 1 '- 0 "
A 1 .2
OWNE F IN IS H F L O O R
F IN IS H F L O O R
58' - 0" LO W -GROUND
58' - 0" LO W -GROUND
56' - 0"
56' - 0"
1
N o r th 1 / 8 " = 1 '- 0 "
A 1 .2
2 A 1 .2
B
1 / 8 " = 1 '- 0 "
A
A
B
C
P A R A P E T (H IG H )
P A R A P E T (H IG H )
78' - 0" P A R A P E T (L O W )
78' - 0" P A R A P E T (L O W )
76' - 0"
76' - 0"
LEVEL 2
LEVEL 2
70' - 0"
C
B
70' - 0"
A
A
B
C
F IN IS H F L O O R
F IN IS H F L O O R
58' - 0" LO W -GROUND P A R A P E T (H IG 5 6H' )- 0 "
58' - 0" LO W -GROUND P A R A P E T (H IG 5 6H' )- 0 "
78' - 0" P A R A P E T (L O W )
78' - 0" P A R A P E T (L O W )
76' - 0"
LEVEL 2
70' - 0"
70' - 0"
4
East
A 1 .2
1 / 8 " = 1 '- 0 "
A 1 .2
1 / 8 " = 1 '- 0 "
R
F IN IS H F L O O R
58' - 0" LO W -GROUND
1
56' - 0"
East 1 / 8 " = 1 '- 0 "
This pad site project was a quick twoweek proposal for a pad site located outside Hamilton, NJ, consisting of three retail stores, one of which having a drive-thru window. I was responsible for addressing the sloping ground and developing the exterior elevations. With the guidance of another architect, I prepared the working drawings and renderings for the proposal.
2
58' - 0" LO W -GROUND
3
45 6 ' -
0"
ELE
DAT
4 A 1 .2
DRA
W est 1 / 8 " = 1 '- 0 "
REVI 90' - 0"
35' - 0"
35' - 0"
20' - 0"
A
COP
B
75' - 0"
3
D
D
W est
F IN IS H F L O O R
A 1 .2
E
76' - 0"
LEVEL 2
3
C:\Users\za\Desktop\JKRP_2015_Local Files\Hamilton 2- Pad Site_Central_2015_zalaradiRL9BV.rvt
C:\Users\za\Desktop\JKRP_2015_Local Files\Hamilton 2- Pad Site_Central_2015_zalaradiRL9BV.rvt C:\Users\za\Desktop\JKRP_2015_Local Files\Hamilton 2- Pad Site_Central_2015_zalaradiRL9BV.rvt
C
S o u th
DN
DN
DN
C
1 A 1 .1
FLO O R PLA N 1 / 8 " = 1 '- 0 "
23 December 2016
BLOCK 200 HURON R E S I D E N T I A L & R E TA I L | R E V I T | P H OTO S H O P
24 University of Michigan | Bloc 200 Huron
Life Cycle Diagram
Massing Diagram
Block 200 Huron is a semesterlong residential project done with two of my classmates, Alireza Golkarieh and Siyao Zhang. The Ann Arbor, MI site is a square block with a 13’ rise of elevation from the West to the East. Our design strategy was to break up our block into three residential buildings: senior units, family units, and luxury units, and two public buildings: YMCA annex with a rehabilitation facility to be used by seniors and a civic meeting room with afterschool children’s care. Shared by the residents and the public is a courtyard at the center of the block. Entrance thresholds are designed to differentiate public entrances from residential ones.
25 Winter 2015
HOUSING ON THE EDGE Site 1
B
C
--
A 5' - 0 7/16"
-2'
B 18' - 7 1/4"
32' - 5"
5
6 B
C
12' - 2 15/32"
A
8' - 8 5/8"
A
Roof 80' - 0"
DN
5' - 5 3/8"
UP
--
9' - 10 1/4"
7' - 10"
Level 8 70' - 0"
6
Level 7 60' - 0"
10' - 0"
10' - 0"
Level 6 50' - 0"
Level 5 40' - 0"
7
7 Level 4 30' - 0"
23' - 6"
2
8' - 10 1/2"
Level 2 - 2BD Apartment Unit 1/4" = 1'-0"
Level 3 20' - 0"
A Level 2 10' - 0"
5' - 0 7/16"
B 14' - 8"
32' - 4 1/2"
8
8
13' - 5"
13' - 10 15/32"
Level 1 0' - 0"
Level -1 -13' - 0"
Level -3 -33' - 0"
9
Transverse Section 1/8" = 1'-0" 6' - 5 3/8"
1
8' - 10 1/2"
2'
7' - 9 13/32"
8' - 11"
Level -2 -23' - 0"
Typical Floor Plan 1/8" = 1'-0"
15' - 3 1/8"
1
12' - 3 1/8"
N
1' - 4 3/32"
9
3BD Unit
2' 4' - 11"
Level 2 - 3BD Apartment Unit 1 1/4" = 1'-0"
26 University of Michigan | Bloc 200 Huron
19' - 2 5/8"
8' - 5 7/8"
6' - 5
10' - 0"
8' - 10 1/2"
7
12' - 3 1/8"
2
Level 2 - 2BD Apartment Unit 1/4" = 1'-0"
15' - 3 1/8"
23' - 6"
A 9 1' - 4 3/32"
5' - 0 7/16"
3BD Unit
UNIT A1 2 Bd & 2 Bth 1,036 Sq. Ft.
8
4' - 11"
32' - 4 1/2"
2'
8' - 5 7/8"
Level 2 - 3BD Apartment Unit 1/4" = 1'-0"
8' - 11"
13' - 5"
1
19' - 2 5/8"
14' - 8"
2BD Unit
9
8' - 10 1/2"
2'
12' - 3 1/8"
Typical Floor Plan 1/8" = 1'-0"
1' - 4 3/32"
1
4' - 11"
3BD Unit
UNIT B1 3 Bd & 2 Bth 1,414 Sq. Ft.
2BD Unit
1
19' - 2 5/8"
Level 2 - 3BD Apartment Unit 1/4" = 1'-0"
27 Winter 2015
Site 1; N/S Elevations
A
--
Roof 80' - 0"
Level 8 70' - 0"
Level 7 60' - 0"
Level 6 50' - 0"
Level 5 40' - 0"
Elevation Drawings
Level 4 30' - 0"
Level 3 20' - 0"
Level 2 10' - 0"
Level 1 0' - 0"
Level -1 -13' - 0" 1
9
8
7
6
5
2'
South 1/8" = 1'-0"
Level -2 -23' - 0"
-2'
--
C
B
A
Level -3 -33' - 0" 1
Roof 80' - 0"
South 1/8" = 1'-0"
Level 8 70' - 0"
Level 7 60' - 0"
Level 6 50' - 0"
Level 5 40' - 0"
Level 4 30' - 0"
Level 3 20' - 0"
Level 2 10' - 0"
Level 2 10' - 0"
Level 1 0' - 0"
Level 1 0' - 0"
HOUSING ON THE EDGE Site 1; N/S Elevations
Level -1 -13' - 0"
Level -1 -13' - 0"
East 1
North
East 1/8" = 1'-0"
5
6
7
8
Level -2 -23' - 0"
-2'
9
Level 7 60' - 0"
Level 6 50' - 0"
Level 6 50' - 0"
Level 5 40' - 0"
Level 5 40' - 0"
Level 4 30' - 0"
Level 4 30' - 0"
Level 3 20' - 0"
Level 3 20' - 0"
Level 2 10' - 0"
Level 2 10' - 0"
Level 1 0' - 0"
Level 1 0' - 0"
Level -1 -13' - 0"
1
--
Level 8 70' - 0"
Level 7 60' - 0"
West
Level -2
A
Roof 80' - 0"
Level 8 70' - 0"
West
North 1/8" = 1'-0"
2' Level -3 -33' - 0"
Roof 80' - 0"
1
Level -1 -13' - 0"
1/8" = 1'-0"
Level -2 -23' - 0"
South
1
--
South 1/8" = 1'-0"
C
B
A
Level -3 -33' - 0" 1
South 1/8" = 1'-0"
Level 2 10' - 0"
28 University of Michigan | Bloc 200 Huron
Level 1 0' - 0"
Level -1 -13' - 0" 1
North 1/8" = 1'-0" Level -2
North West Corner Balcony Wall Detail Roof
Concrete Panel with Bolted connector Concrete Coping with Drip
Inset Balcony
Untreated Oak Bi-Fold Shutters 3’6” Steel Hand Rail Oak Wall siding Raised Wood Flooring Clip on Concrete Slab
Interior Flooring
Hardwood Oak Flooring Weather Proof Barrier Concrete Slab connected to Balcony through Schock Isokorb structural thermal bridge Steel Rebar Concrete Slab
Wall Detail Plan
Pre-fabricated concrete panel with Bolted connector Air Cavity Insulation Foam Weather Proof Barrier Concrete Structural Wall Interior Gypsum Board
Insulated Curtain Wall Aluminum Mullion
Ground Floor Facade Construction
Pre-fabricated concrete panel with Bolted connector Air Cavity Insulation Foam Weather Proof Barrier Concrete Structural Wall Interior Gypsum Board
Typical Facade Construction
Typical Facade Construction
Ground Floor Facade Construction Insulated Curtain Wall Aluminum Mullion
Inset Balcony
Untreated Oak Bi-Fold Shutters 3’6” Steel Hand Rail Oak Wall siding Raised Wood Flooring Clip on Concrete Slab
Roof
North West Corner Balcony
Concrete Panel with Bolted connector Concrete Coping with Drip
Interior Flooring
Hardwood Oak Flooring Weather Proof Barrier Concrete Slab connected to Balcony through Schock Isokorb structural thermal bridge Steel Rebar Concrete Slab
1’0” = 1/34”
North West Corner Balcony
1’0” = 1/34”
Wall Detail Plan
Section Detail
Plan Detail
29 Winter 2015
30 University of Michigan | Bloc 200 Huron
31 Winter 2015
IDENTITY RECONSTRUCTED C I V I C | R H I N O | V - R AY | P H O T O S H O P
32 University of Michigan | Identity Reconstructed
The basic premise of Identity Reconstructed is to create a contextualizing device for new architecture in aging cities. Using the map of the city of Manama, Bahrain, the project strives to be rooted in local urban identity while moving beyond nostalgic representations of the city. The tools used for this project are four manipulations of the figure ground map: scaling different parts to create different size programs, extruding to create the mass, rotating in the N/S and E/W axes, and carving to create the central entrance and atrium. The spatial and programmatic distribution follows the local development pattern, where N/S oriented spaces are regular and face the new part of the city, and the E/W oriented spaces are irregular and face the old part of the city. The program is split into contemporary art studios and galleries of the historic city.
33 Winter 2016
Operations
Scale
Extrude
Rotate
Carve
34 University of Michigan | Identity Reconstructed
Views
Ground Floor Plan
Section
Section
Second Floor Plan
35 Winter 2016
Atrium Rendering
36 University of Michigan | Identity Reconstructed
Front Elevation
Interior Rendering
Front View
Back View
37 Winter 2016
MICRO DETROIT S C H O O L & C O M M U N I T Y C E N T E R | R H I N O | V - R AY | I L L U S T R AT O R | P H O T O S H O P
Completed during my first semester of graduate school, Micro Detroit proposes a solution to vacancy in Detroit through the aggregation of the single family home. The site, a vacant lot situated in Milwaukee Junction in Detroit, is abutted by the Milwaukee Junction railroad to the south and by the Untitled Bottega art gallery to the east. The program for the project, a job training center for the atrisk teenagers of the Catherine Ferguson Academy, is to serve the neighborhood with a maker space and business incubator. The project provides a safe space for the girls of Catherine Ferguson, a service to the neighborhood at large, and a toolset for local entrepreneurs. Considering the project program and the residential typology of the single family home, the project strives to create an aggregation of houses that create spaces of learning, production, and gathering for the larger community.
38 University of Michigan | Micro Detroit
39 Fall 2014
Ground Floor Plan 10’ 25’
50’
100’
11
3
4
7
9
2
6 1 2
10
5
8
1. Daycare 2. Gardens 3. Community Gathering Space 4. Warehouse 5. Nursery 6. Learning Bar 7. Woodshop and Fabrication Labs 8. Meeting Rooms 9. Library 10. Retail Space 11. Untitled Bottega
Longitudinal Section
40 University of Michigan | Micro Detroit
Level Two Floor Plan 10’
50’
25’
100’
4 2
7 5
1
3
6
1. Balcony 2. Community Gathering Space 3. Clinic 4. Meeting Space 5. Classrooms + Studios 6. Large Meeting Space 7. Business Incubator Offices
Elevation
41 Fall 2014
Levels Three & Four Floor Plans 10’
25’
50’
100’
1
4
1 1 2
3
4
5
1
Transverse Section
42 University of Michigan | Micro Detroit
1
1. Balcony 2. Office Space 3. Classrooms 4. Business Incubator 5. Work Space
Placemaking Detroit Diagrams
Understanding & analyzing the current placemaking projects in Midtown Detroit.
Light Terrain
Green Alley Groundwerx
Eastern Market
Green Garage
43 Fall 2014
VA H O S P I TA L D I A LY S I S U N I T H E A LT H C A R E | R H I N O | V - R AY | I L L U S T R AT O R | P H O T O S H O P
44 University of Michigan | VA Hospital Dialysis Unit
TOILET B309D
A371 P-4
DIS WAS B310A
TOILET B309E
STAIR 1
CART WASH B310D
S-1 FEC
ELEC A311
A369 SOCIAL WORK
ELEC A335
COMM CLOS A370
CORRIDOR C304
SERVICE ELEVATOR LOBBY B339 S-2
COMM CLOSET B310B
POT WASH B310E
CORRIDOR C303
This project is a proposed addition to the Dialysis SOCIAL SOCIAL HSK MALE WORKthe Unit at Veteran A312 WORK TOILET OFFICE Affairs Healthcare A310 OFFICE A318 A316 System in Ann Arbor. With the guidance and participation of A320 the engineering A319 STAFF and maintenance OFFICE department at the A322 team of four A321 VA, our was responsible for W/C the presentation of a A323 A324 design of the addition, maintaining the existing STORAGE dialysis A326 unit and adding A325 the same number of treatment chairs. In this A328 project, I was A327 responsible for the plan, circulation, and research SOCIAL A330 WORK drawings. OFFICE SOCIAL WORK OFFICE A332
A329
STAFF LOUNGE
WAITING AREA
A338
PATIENT LOCKERS A342
CONFERENCE TEAM ROOM A344 A S-4
RECEPTION ISOLATION ROOM1 NURSE STATION
ISOLATION ROOM2
DIALYSIS TREATMENT
FUTURE ELEV.
FUTURE STAIR
250’ 0” = 1’0” Floor Plan
45 Fall 2015
PATIENT INTERVIEWS NURSE INTERVIEWS
»» Space for personal belongings is desired. »» No particular complaints, general experience is positive. »» Would appreciate more privacy and a layout more conducive to conversation. »» More space for visitors. »» Temperature can be hot and stuffy at times. »» Space for wheelchairs. »» Isolation rooms for those that need it. »» Clear view to nurse station.
»» Additional spaces for privacy and administration would be appreciated. »» Centralized nurses station with more privacy. »» Central Water System with Acid distribution conversation. »» Nurse station is high and blocks views to patients. »» Break room is small and not well planned. »» Space for storage. »» Congestion at entrance.
46 University of Michigan | VA Hospital Dialysis Unit
EXISTING DIALYSIS AREA PROPOSED DIALYSIS AREA
CIRCULATION STAFF PATIENTS ISOLATION PATIENTS
SNAPSHOT 10:35
SNAPSHOT 10:45 Snapshot | 10:45
Snapshot | 10:35
SNAPSHOT 11:45
SNAPSHOT COMPILED Snapshot | Compiled
Snapshot | 11:45
STAFF PATIENT
TRACKING: 11- 11:20 AM
TRACKING 11 - 11:20
TRACKING: 11:30- 11:45 AM
TRACKING 11:30 - 11:45
TRACKING: 11:45- 11:50 AM
TRACKING 11:45 - 11:50
TRACKING: 11:45- 11:50 AM
TRACKING COMPILED
47 Fall 2015
BROOKSCAPES L A N D S C A P E D E S I G N | R H I N O | V - R AY | I L L U S T R AT O R | P H O T O S H O P
Using the skills of an urban planner, urban designer, and two architects, this team project proposes the revitalization of a residential neighborhood that faces the Doan Brook Creek in Cleveland, OH. Four tactics were used in the project: stormwater purification, use of a bioswell and native vegetation, a pedestrian pathway, and a farmer’s market on the opposite side of the Doan Brook.
48 University of Michigan | Brookscapes
In 1-3 years
In 3-4 years
In 5-8 years
Placemaking Monument
Playground
49 Winter 2015
WALKING WHALE C I V I C | R H I N O | I L L U S T R AT O R
50 University of Michigan | Walking Whale
INTERIOR/ EXTERIOR OCCUPATION
BUBBLE STUDIES
vs / &
INTERIOR/ EXTERIOR CIRCULATION vs
NEW YORK, NY The government typology of architecture presents itself clear in hierarchy; bold in its classical form, at a grand and proud scale representative of National architecture and space. This thesis assumes the belief that the current type of government architecture is alientating to the average passerby. There is an opportunity to allow for different occupants by challenging architectural norms. Formally, bubbles, in whole and part differentiate types of occupation and building program, and are aligned in a way strategic to forming space that breaks down urban and experiential hierarchy.
above ground below ground
3
1 1
1 courtroom 2 judge chamber 3 library 4 court clerk 5 naturalization 6 restaurant and cafe 7 security 8 lobby 9 exhibit 10 court records 11 probation 12 attorney office 13 marshall service
4
2
5
6
7 8 12
11
10
9
13
51 Winter 2012
T H A N K YO U