Portfolio_zeineb mahfoudhi_junior architect_102014

Page 1

Portfolio _ Zeineb MAHFOUDHI 10/2014 Architect


Call center

Ar-quint international- architect position

Situation: kram, Tunisia. Missions: Project manager: private Schematic design, 3d rendering, Constructed area :4000 m² construction document. Site area :2000m² Construction work starting in March 2013.

First level plan


Ar-quint international- architect position

Situation: Beirut, Liban. Project manager: private Constructed area :1000 m² Missions:

-Participating in the schematic design. -Making 3D rendering drawing -Preparing detailed drawings.


Situation: Beirut, Liban. Project manager: private Constructed area :1000 m² Missions:

-Participating in the schematic design. -Making 3D rendering drawing -Preparing detailed drawings.

Ar-quint international- architect position


COMPETITION OF A RESIDENTIAL AND COMMERCIAL COMPLEX

Architect associate with the founding architects of Fusion Archite :Akram Khelif, Slim Badri, Hanen Bahri.

Situation: Sousse, Tunisia. Project manager: private Constructed area :2000 m² Site area :5000m² Result on Septembre 2012

-Participating in the 3d conception and making the architecturale Floor Plans.


INTERNATIONAL ARCHITECTURAL IDEAS COMPETITION OF THE NATIONAL MUSUEUM OF AFGHANISTAN

Architect associate with the founding architects of Fusion Archite :Akram Khelif, Slim Badri, Hanen Bahri.

Situation: Kabul, Afghanistan. Project manager: Afghan ministry of information and culture Constructed area : 8000 m² Site area :50000m² Result on July 2012: Not selected Perspective


Architect associate with the founding architects of Fusion Archite :Akram Khelif, Slim Badri, Hanen Bahri.

-Participating in the 3d conception and making the architecturale Floor Plans.

Conceptual plans


Architect position Karim Jeddi Gonzalez architecture company

VOLVO CARS CONCESSIONARY, REFITTING PROJECT Situation: Charguia I, Tunis, Tunisia Project manager: Sayara Tunisia Constructed area: 2000m² Site area :4000m² Building Phase : building permit

Existing project

Missions:

Perspectives

-Participating in the shematic design and the building permit -Making 3D rendering drawing -Making the architecturale floor plans and elevations


INDUSTRIAL BUILDING OFFICE CALLED “SCIPP”, REFITTING PROJECT

Architect position Karim Jeddi Gonzalez architecture company Perspectives

Situation: Ksar Said,Bardo, Tunisia Project manager: private Constructed area: 910 m² Site area :3000m² Building Phase : building under construction Existant building before intervention

Missions:

-Making the architecturale floor plans,and sections. -Preparing detailed drawings and specifications of the main stair.


INDIVIDUAL HOUSE Situation: Nabeul, Tunisia Project manger: 300 m² Site area :920m² Beginning of the services : February 2011 state of progress : Building under construction .

Missions:

-Participating in the schematic design -Making 3D rendering drawing -Elaborating the building permit -Elaborating the constructions document

Architect position Karim Jeddi Gonzalez architecture company


Architect position Karim Jeddi Gonzalez architecture company

CHALET Situation: Cap negro, Béja, Tunisia Project manager: private Constructed area : 65 m² Site area : 2000m² state of progress : building permit

Site Aerial view

Missions:

-Participating in the shematic design : -Making 3D rendering drawing -Making the architecturale floor plans and elevations

ctiv rsp e P

Floor Plan


MALL

Situation: Ain Melilla, Algeria Project manager: private Constructed area : 1320m² Site area : 1320m² state of progress : Building under construction

Professional training Karim Jeddi Gonzalez architecture company Situation

Missions:

-Participating in the schematic design. -Making 3D rendering drawing -Preparing detailed drawings.

3D rendering drawing

Floor Plan


COMPETITION OF A HIGH SCHOOL

Professional training Karim Jeddi Gonzalez architecture company Situation: Mutuelleville, Tunis, Tunisia Project manager : France ambassy of Tunisia Constructed area: 8200 m² Site area : : 4,7 Hectares Result on September 2009: Not selected

Missions: -Participating in the shematic design : -Making 3D rendering drawing -Making the elevations REHABILITATION OF TWO EXISTANT BUILDING

ELEVATIONS

NEW PROJECT

EXISTANT COLLEGE


Conceptual process

Elément 1:Le collège Elément 2:Plateaux de sport

Espace vert

Elément 3: Plateau blocs ABC et FGH.

Axe A Axe B

Bloc D et Bloc E


INDIVIDUAL HOUSE Situation: El menzah IV, Tunis, Tunisia Project manager: private Constructed area : 310 m² Site area : :550m² state of progress : completed on August 2011

Missions:

Professional training Karim Jeddi Gonzalez architecture company

Existant building before intervention

-Participating in the schematic design -Elaborating the building permit -Elaborating the constructions document -Working site follow up

FLOOR PLAN

SKETCH OF THE ENTRY

-existant ACCESS

ELEVATIONS

FIRST FLOOR PLAN


INDIVIDUAL HOUSE

Missions:

-Participating in the schematic design. -Elaborating the building permit. -Elaborating the constructions document -Working site follow up.

SKETCH OF THE TERRACES

Situation: El manar II, Tunis, Tunisia Project manager: private Constructed area :600 m² Site area :2000m² state of progress : completed on August 2011

Professional training Karim Jeddi Gonzalez architecture company

ELEVATIONS


Professional training Karim Jeddi Gonzalez architecture company

Missions:

-Participating in the schematic design

INDIVIDUAL HOUSES

Situation: El manar II, Tunis, Tunisia Project manager: private Constructed area : 540 m² Site area: 1200m² state of progress : Schematic design.

FLOOR PLAN

ELEVATIONS

FIRST FLOOR PLAN


Professional training Karim Jeddi Gonzalez architecture company

Missions:

-Participating in the schematic design

INDIVIDUAL HOUSES

Situation: La Soukra, Tunis, Tunisia Project manager: private Constructed area : 560 m² Site area :1150m² state of progress : Schematic design.

ELEVATIONS

FLOOR PLAN

SKETCH OF THE ENTRY


Professional training Karim Jeddi Gonzalez architecture company

Situation: El mnihla , Tunis, Tunisia Project manager: private Constructed area : 400 m² Site area :5000m² state of progress: Schematic design

INDIVIDUAL HOUSE

-Participating in the schematic design-Participating in the schematic design

PERSPECTIVE OF THE ENTRY

-Missions:

The main idea is to create three blocks: The unit of day, the unit of night and the guess unit .

FLOOR PLAN

ELEVATIONS

Sketches showing the two massives wall limiting the living room in the interior and limiting the pool in the exterior.



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.