LANDSCAPE PORTFOLIO Zhenghao(Jack) He 2016-2018
Internship //2016 - 2017 ECADI - Eastern China Architectural Design Ins�tue Zhenghao(Jack) He Length - 3 month | Loca�on: Shanghai
Landscape Architect
Zhenghao(Jack) He
Location. Melbourne,Victoria
Landscape Architect
Tel. 0422803393 Birth. 12.OCT.1993
Location. Melbourne,Victoria
Mail. 8 Ashby CT Balwyn North 3104
Tel. 0422803393
Email. zhenghaohe1234@gmail.com
Birth. 12.OCT.1993
Portfolio. https://issuu.com/zhenghaohe
WORK Experience Internship //2013 - 2014
WORK Experience
Email. zhenghaohe1234@gmail.com
Master of Landscape Architecture // 2016 - 2018 Portfolio. https://issuu.com/zhenghaohe RMIT University - Main Focus: Large scale urban design projects / Professional prac�ce / Post-disaster redesign / Mul�cultural design
Computer Skills
Bachelor of Landscape Architecture Design // 2013 - 2016
RMIT University - Main Focus: Digital design skill / Design theore�cal Computer TJAD - Tongji Architectural Design (Group) Co., Ltd . framwork / Common design language Length - 1 month | Loca�on: ShanghaiSkills
Internship //2013 - 2014 TJAD - Tongji Architectural Design (Group) Co., Ltd . Length - 1 month | Loca�on: Shanghai
Internship //2014 - 2015
Adobe Suite
High School Educa�on // 2010 - 2013
BalwynAdobe High School Australia culture learning / Basic design skill. Suite -Ins�tute. SLADI - Shanghai Landscape Architecture Design Length- 1 month | Loca�on: Shanghai
Internship //2014 - 2015
Internship //2016 - 2017 PERSONAL
SLADI - Shanghai Landscape Architecture Design Ins�tute. Length- 1 month | Loca�on: Shanghai
Skills
ArcGIS ECADI - Eastern China Architectural Design Ins�tue Analytical Skills Length - 3 month | Loca�on: Shanghai
Internship //2016 - 2017 ECADI - Eastern China Architectural Design Ins�tue Length - 3 month | Loca�on: Shanghai
Mail. 8 Ashby CT Balwyn North 3104 EDUCATION
EDUCATION
EDUCATION Master of Landscape Architecture // 2016 - 2018
Communication Skills
Skills Autocad Master of Landscape Design Architecture // 2016 - 2018 RMIT University - Main Focus: Large scale urban design projects / Professional prac�ce / Post-disaster redesign / Mul�cultural design
ArcGIS
INTERESTS Photography
Travel
Reading
Autocad Soccer
Gym
Painting Rhinoceros
RMIT University - Main Focus: Large scale urban design projects / Rhinoceros Bachelor of Landscape Architecture Design // 2013 - 2016 Professional prac�ce / Post-disaster redesign / Mul�cultural design
Bachelor of Landscape Architecture Design // 2013 - 2016
RMIT University - Main Focus: Digital design skill / Design theore�cal framwork / Common design language
RMIT University - Main Focus: Digital design skill / Design theore�cal
High School Educa�on // 2010 - 2013
Luminon
Table of Contents Project 1// Adaptive Settlement Iskandar,Malaysia urban & landscape design project Project 2// Connectivity Vietnam public space & landscape design project Project 3// Penleigh and Essendon Grammar School PEGS Melbourne school landscape design project
01 Iskandar Malaysia - Adaptive Settlement
LA RMIT 2017 Spring -2018 Winter Project Leader - Ata Tara Location - Johor,Malaysia & Singapore Final exports includes a design document, a 3x3 meters panel and a physical model
In the world of developing countries, developments are often expected to be rapidly and massively. It has many challenges which require lots of consideration by designers who act as problem-solvers, prepared to make contributions to solving the environmental problems in the world we are facing nowadays. The aim of this project is much more than a strategy to inform people considering the adaptive settlement as a possible design intervention. It is meant for people who wish to make a difference in their lives, in the lives of others, and for the sustainable preservation of the environment through design. The current title suggests the story that follows, beginning with the work for the Malaysia biennial which was meant to show the world how this region would look like in next 100years. However, through a year of research, I found out that there are lots of problems that these developments are bringing to the region. Therefore, this project would detail explain what the problems are and how to solve it.
m e gaci ty r egi o n
TIMELINE OF MEGACITY REGION TIm el ine O F m egac ity regio n
Urban Footprint of Megacity Region 1996
1924
1996
The causewaymultimodal land bridge was Beginning B e g i n n of i nIskandar g o f IMalaysia skandar The Causeway land bridge was built Comprehensive Development built Malaysia Comprehensive Plan Development Plan
Land Characters
Urban Footprint of Megacity Region 2006
1998
2006
2017
2117
TThe h eSecond S e c oLink n dcarriageway Link was built carriageway was built
L a u n of c hIskandar o f I sMalaysia kandar Launch Development Project Malaysia Development
Launch Malaysia Biennial Launch of of Malaysia Biennial 100YC: Medini Iskandar Project 100YC: Medini Iskandar Project
Projection of Future Projection of Future Cities Laboratory Design Research Cities Laboratory Design Project Research Project
Project
Urban Footprint of Megacity Region 2017
Causeway
2
Second Link
POCKET OPEN SPACE OPEN SPACE MOSQUE SCHOOL & PLAYGROUNG
FISH FARM
Potential Area Overall strategy plan
Connecting Space
Possible Pedestrian Walk
Access to the site
SHOPPING CENTERS
space between buildings
commercial building
road
commercial area
site classification of commercial area
section-before
section-after Hand drawing concepts
02 Connectivity and public space HCMC
LA RMIT 2017 Summer Project Leader - Charles Anderson Location - Ho chi ming city, Vietnam Final exports includes a presentation document, a folio and documentary videos
Ho Chi Minh City’s Park and Greenery Oce reports a 50% loss of green space in the past 11 years. Blame is attributed to developers ignoring city requirements for green space. The calculation includes parks, ower gardens, and road-side plants. There are some interesting statistics. Currently there is .7 square meters of green space per person in the 7 million person city. The city’s goal is 4 to 5 square meters per person. The World Health Organization has set a global standard of 8 square meters per person.This story illustrates the rapid rate of urbanization in Asia, the importance of green space as a health issue, and the diculties of balancing urban development and human health.
Project2 Green spaces in HCMC
public green space density most dense
least dense public green spaces quickest park to park routes based on road network
Site anaylsis
road network
Alleyway extension Alleyway extension
Supercrossing Linear park Linear park
Water systemWater system
Road systemRoad system
Site base
Masterplan of a vacant space in HCMC
Site base
Design diagram
03 Penleigh and Essendon Grammar School
LA RMIT 2016 Winter Project Leader - Charles Anderson Location - Melbourne,Australia Final exports includes an EOI, a document and a specification
The Penleigh and Essendon Grammar School Project comprises the landscape for the Girls’ Middle School, integrating and incorporating the Middle School boys as they use the canteen and seating areas at lunchtimes and recess. The design site is bounded by linear buildings running north-south, with pathways joining these spaces in an east-west direction. A vehicle access road enters from the north, running south between the two major building zones. With 600+ students plus additional staff members, the landscape is heavily trafficked, most strongly in evidence closest to the administration building. This space interfaces with both the canteen and the vehicle access road, and is dominated by concrete and asphalt. Drainage here needs careful consideration, due to the elevation change between the access road and the administration building. There is an opportunity to bring water and plantings into this area, while considering safety and human traffic issues presented by a school landscape with a large student population.
4 4 4 4 4
Design Development week Design2 Development Design Development 2 week 2 week Design Development Design Development 2 week 4.1 Yolk Studio team review Development 2 week responsibilities and based 4.1 on feedback & 4.1 site visit Development Development based on feedback based on feedback & site visit 4.1 & site visit Development 4.1 4.2 based on feedback Development Preparation of & siteon visit based feedback Schedule & Cost 4.2 & siteBvisit 4.2 plan Preparation of Preparation of Schedule & Cost Schedule & Cost plan B 4.2 plan B Preparation of 4.2 4.3 Schedule &ofCost Preparation Finalise design plan B & Cost Schedule 4.3 plan B 4.3 Finalise design Finalise design 4.3 4.4 Finalise design 4.3 Presentation Finalise design to4.4 client 4.4 Presentation Presentation to client to 4.4client Presentation 4.4 to client Client Presentation tosign client off
Client Client sign off sign off Client Client sign off sign off
PEGS PROJECT EOI
process Yolk Studio team review Yolk Studio team review responsibilities and responsibilities and process process Yolk Studio team review responsibilities Yolk Studio team and review process 1 -2 page reportand responsibilities process 1 -2 page report 1 -2 page report
1 -2 page report Pin-up process, review 1 -2 page initial Yolk report Studio and student Pin-upconcept process,ideas review Pin-up process, initial Yolk Studioreview and initial Yolk Studioideas and student concept student concept ideas Pin-up process, review initial process, Yolk Studio and Pin-up review student ideas initial Yolkconcept Studio and student Pin-upconcept process,ideas review Pin-up process, initial Yolk Studioreview and initial Yolk Studioideas and student concept student concept review ideas Pin-up process, initial process, Yolk Studio and Pin-up review student ideas initial Yolkconcept Studio and student concept ideas
Meeting or presentation with PEGS Meeting or presentation with PEGS Meeting or presentation with PEGS
5 5 5 5 5
Contract documentation 9 weeks Contract documentation Contract documentation 9 weeks 9 weeks Contract documentation 5.1Contract9documentation weeks Site and setout, grading Draft 9 weeks plan, surface finishes,
documentation 5.1 5.1 package Draft for client Draft documentation documentation package for client 5.1 package for client Draft 5.1 5.2 documentation Draft Draft documentation package for client documentation package for 5.2 package for client 5.2 architects Draft documentation Draft documentation package for package for architects 5.2 architects Draft documentation 5.2 5.3 package for Draft Final documentation documentation architects package for package for client 5.3 architects 5.3 Final documentation Final documentation package for client package for client 5.3 5.4 Final documentation 5.3 Final documentation package for client package for client 5.4 5.4 architects Final documentation Final documentation package for package architectsfor 5.4 architects Final documentation 5.4 package for Client Final documentation architects package for sign off architects Client
Client sign off sign off Client Client sign off sign off
planting plan and grading Site and setout, Site setout, grading landscape details plan,and surface finishes, plan, surface finishes, planting plan and planting andgrading landscape details Site and plan setout, landscape details plan, Site andsurface setout,finishes, grading planting planfinishes, and plan, surface Electronic copy only landscape planting plandetails and landscape details Electronic copy only Electronic copy only Electronic copy only Electronic copy only As 5.1 As 5.1 As 5.1 As 5.1 As 5.1 Electronic copy only Electronic copy only Electronic copy only Electronic copy only Electronic copy only
6 6 6 6 6
Contract administration within 6administration months Contract Contract administration within 6 months within 6 months Contract administration Contract withinadministration 6 months 6.1 within 6 months Two site visits Setout 6.1 6.1 Setout Setout
6.1 Setout 6.2 6.1 Planting Setout supervision 6.2 6.2 Planting Planting supervision supervision 6.2 Planting 6.2 6.3 supervision Planting Construction supervision progress review 6.3 6.3 Construction Construction progress review progress review 6.3 Construction 6.3 6.4 progress Construction Project signreview off progress review 6.4 6.4 Project sign off Project sign off 6.4 Project sign off 6.4 Client Project sign off
sign off Client Client sign off sign off Client Client sign off sign off
Two site visits Two site visits Two site visits Two site visits Three site visits Three site visits Three site visits Three site visits Three site visits Three site visits Three site visits Three site visits Closing egg ceremony Three site visits and review Closing egg ceremony Closing egg ceremony and review and review Closing egg ceremony and review Closing egg ceremony and review
C1
Rev.
COPYRIGHT 2016 YOLK STUDIO
A380
Drawing No.
1:100 @A1
19.09.16
Scale:
Date:
Key:
SL 57.600
Drawing Name
Sheet Number
LP00
Cover Sheet
1
LP01
Planting Plan
2
LP02
Grading Plan 01
3
LP03
Grading Plan 02
4
LP04
Grading Plan 03
5
LP05
Surface Finishes Plan 01
6
LP06
Surface Finishes Plan 02
7
LP07
Surface Finishes Plan 03
8
LD01
Landscape Planting Detail 01
9
LD02
Landscape Planting Detail 02
10
LD03
Landscape Seating Detail 03
11
SL 57.600
SL 57.400
SL 57.700 SL 57.300
SL 57.400
TOD 56.500 57.000
56.600
TOS 57.500
TOM 58.400
RL 57.000
RL 57.200
SL 57.000 RL 57.400 SL 57.500
SL 57.000 SL 57.000 TOD 56.400
SL 57.700
Status:
SL 57.500
SL 57.300 TOD 56.200
SL 57.700
Construction Plan
WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.
Date: 19.09.16
Purpose:
1 of 2
SL 57.500
Sheet:
Drawing:
Contract Documentation
WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.
COVER SHEET Key: Drawing Number
WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.
SL 57.700
57.000
57.400
56.800
57.600
56.600
ZJ ZH SD By Chk App
Revision Details
Architect:
Approved by: SD
Checked by: ZH
Landscape Architect Consultant: MCBRIDE CHARLES RYAN Architecture + Interior Design 4/21 Wynnstay Rd, Prahran VIC 3181 P: Â +61 3 9510 1006
103 Howard Street stutterheim anderson North Melbourne Vic 3051 Australia landscape architecture T / F / +61 3 9329 0034 E / info@saala.com.au
Approved by: SD et Vic 3051 Australia 9 0034 m.au
C1 19.09.16 Contruct documentation Rev Date
YOLK STUDIO Corner Victoria and Swanston Streets,Carlton VIC 3000 E: yolk.studio@gmail.com
Date: 19.09.16
Status:
Drawing:
Date:
Contract Documentation
19.09.16
Sheet:
Scale:
1 of 2
11:100 : 250@A1 @ A3
Purpose:
Drawing No.
Cover Sheet Plan Construction
LP00 A380
Designed by: Yolk Studio
Consultant File Reference: A666
Penleigh & Essendon Grammar School Stage 2 Rev.
C1
COPYRIGHT 2016 YOLK STUDIO
Landscape Architect:
C1 19.09.16 Contruct documentation
ZJ ZH SD
Rev Date
By Chk App
Revision Details
YOLK STUDIO Corner Victoria and Swanston Streets,Carlton VIC 3000 E: yolk.studio@gmail.com
Architect:
Landscape Architect Consultant: MCBRIDE CHARLES RYAN Architecture + Interior Design 4/21 Wynnstay Rd, Prahran VIC 3181 P: Â +61 3 9510 1006
103 Howard Street stutterheim anderson North Melbourne Vic 3051 Australia landscape architecture T / F / +61 3 9329 0034 E / info@saala.com.au
north
north Landscape Architect:
Designed by: Yolk Studio
Drawn by: ZJ
north
Penleigh & Essendon Grammar School Stage 2
Checked by: ZH
Consultant File Reference: A666
Drawn by: ZJ
Designed by: Yolk Studio
Status:
Drawn by: ZJ Checked by: ZH Approved by: SD
Date: 19.09.16
Drawing:
Date:
Contract Documentation
19.09.16
Sheet:
Scale:
1 of 2
11:100 : 100@A1 @ A3
Purpose:
Drawing No.
Construction Plan
LP03 A380
Rev.
C1
COPYRIGHT 2016 YOLK STUDIO
Key:
Concret
Timber
l
01
01 LPD01
02 LPD01
Mulched Garden Bed Typ.Detail 1: 10 @ A3
03 LPD01
Hydro Mulch Laid Turf Typ.Detail 1: 10 @ A3
Bench type Plan
Roll on Turf Detail Typ.Detail 1: 10 @ A3
47.5
50
50
47.5
400mm 600mm
50
600 500
50
12x8 Carriage bolt(Non-corrosive)
380
04 LPD01
Hydro Mulch to Mulched Garden Bed Detail
05
Hydro Mulch to Roll of Turf Detail
1: 10 @ A3
LPD01
1: 10 @ A3
l
WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.
02
Timber
Concret1
Bench type Section
Machine bolt (Non-corrosive) Concret2 Compacted subgrade
Granular material Status:
Status:
Designed by: Yolk Studio
Consultant File Reference: A666
C1 19.09.16 Contruct documentation
HB ZJ ZH SD
Rev Date
By Chk App
Revision Details
YOLK STUDIO Corner Victoria and Swanston Streets,Carlton VIC 3000 E: yolk.studio@gmail.com
Architect:
Landscape Architect Consultant: MCBRIDE CHARLES RYAN Architecture + Interior Design 4/21 Wynnstay Rd, Prahran VIC 3181 P: Â +61 3 9510 1006
103 Howard Street stutterheim anderson North Melbourne Vic 3051 Australia landscape architecture T / F / +61 3 9329 0034 E / info@saala.com.au
Drawn by:
HB ZJ
Checked by: ZH Approved by: SD
Date: 19.09.16
Drawing:
Date:
Contract Documentation
19.09.16
Sheet:
Scale:
1 8 of 52
1:100 @A1
Purpose:
Drawing No.
Landscape Planting Construction Plan Detail 01
LPD01 A380
Designed by: Yolk Studio
Consultant File Reference: A666
Penleigh & Essendon Grammar School Stage 2 Landscape Architect:
Rev.
C1
COPYRIGHT 2016 YOLK STUDIO
C1 19.09.16 Contruct documentation
ZJ ZH SD
Rev Date
By Chk App
Revision Details
YOLK STUDIO Corner Victoria and Swanston Streets,Carlton VIC 3000 E: yolk.studio@gmail.com
Architect:
Landscape Architect Consultant: MCBRIDE CHARLES RYAN Architecture + Interior Design 4/21 Wynnstay Rd, Prahran VIC 3181 P: Â +61 3 9510 1006
103 Howard Street stutterheim anderson North Melbourne Vic 3051 Australia landscape architecture T / F / +61 3 9329 0034 E / info@saala.com.au
north
Landscape Architect:
north
Penleigh & Essendon Grammar School Stage 2
WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.
Drawn by: ZJ Checked by: ZH Approved by: SD
Date: 19.09.16
Drawing:
Date:
Contract Documentation
19.09.16
Sheet:
Scale:
1 of 2
1:100 @A1
Purpose:
Drawing No.
Rev.
A380
C1
Construction Plan
COPYRIGHT 2016 YOLK STUDIO