Landscape portfolio

Page 1

LANDSCAPE PORTFOLIO Zhenghao(Jack) He 2016-2018


Internship //2016 - 2017 ECADI - Eastern China Architectural Design Ins�tue Zhenghao(Jack) He Length - 3 month | Loca�on: Shanghai

Landscape Architect

Zhenghao(Jack) He

Location. Melbourne,Victoria

Landscape Architect

Tel. 0422803393 Birth. 12.OCT.1993

Location. Melbourne,Victoria

Mail. 8 Ashby CT Balwyn North 3104

Tel. 0422803393

Email. zhenghaohe1234@gmail.com

Birth. 12.OCT.1993

Portfolio. https://issuu.com/zhenghaohe

WORK Experience Internship //2013 - 2014

WORK Experience

Email. zhenghaohe1234@gmail.com

Master of Landscape Architecture // 2016 - 2018 Portfolio. https://issuu.com/zhenghaohe RMIT University - Main Focus: Large scale urban design projects / Professional prac�ce / Post-disaster redesign / Mul�cultural design

Computer Skills

Bachelor of Landscape Architecture Design // 2013 - 2016

RMIT University - Main Focus: Digital design skill / Design theore�cal Computer TJAD - Tongji Architectural Design (Group) Co., Ltd . framwork / Common design language Length - 1 month | Loca�on: ShanghaiSkills

Internship //2013 - 2014 TJAD - Tongji Architectural Design (Group) Co., Ltd . Length - 1 month | Loca�on: Shanghai

Internship //2014 - 2015

Adobe Suite

High School Educa�on // 2010 - 2013

BalwynAdobe High School Australia culture learning / Basic design skill. Suite -Ins�tute. SLADI - Shanghai Landscape Architecture Design Length- 1 month | Loca�on: Shanghai

Internship //2014 - 2015

Internship //2016 - 2017 PERSONAL

SLADI - Shanghai Landscape Architecture Design Ins�tute. Length- 1 month | Loca�on: Shanghai

Skills

ArcGIS ECADI - Eastern China Architectural Design Ins�tue Analytical Skills Length - 3 month | Loca�on: Shanghai

Internship //2016 - 2017 ECADI - Eastern China Architectural Design Ins�tue Length - 3 month | Loca�on: Shanghai

Mail. 8 Ashby CT Balwyn North 3104 EDUCATION

EDUCATION

EDUCATION Master of Landscape Architecture // 2016 - 2018

Communication Skills

Skills Autocad Master of Landscape Design Architecture // 2016 - 2018 RMIT University - Main Focus: Large scale urban design projects / Professional prac�ce / Post-disaster redesign / Mul�cultural design

ArcGIS

INTERESTS Photography

Travel

Reading

Autocad Soccer

Gym

Painting Rhinoceros

RMIT University - Main Focus: Large scale urban design projects / Rhinoceros Bachelor of Landscape Architecture Design // 2013 - 2016 Professional prac�ce / Post-disaster redesign / Mul�cultural design

Bachelor of Landscape Architecture Design // 2013 - 2016

RMIT University - Main Focus: Digital design skill / Design theore�cal framwork / Common design language

RMIT University - Main Focus: Digital design skill / Design theore�cal

High School Educa�on // 2010 - 2013

Luminon


Table of Contents Project 1// Adaptive Settlement Iskandar,Malaysia urban & landscape design project Project 2// Connectivity Vietnam public space & landscape design project Project 3// Penleigh and Essendon Grammar School PEGS Melbourne school landscape design project


01 Iskandar Malaysia - Adaptive Settlement

LA RMIT 2017 Spring -2018 Winter Project Leader - Ata Tara Location - Johor,Malaysia & Singapore Final exports includes a design document, a 3x3 meters panel and a physical model

In the world of developing countries, developments are often expected to be rapidly and massively. It has many challenges which require lots of consideration by designers who act as problem-solvers, prepared to make contributions to solving the environmental problems in the world we are facing nowadays. The aim of this project is much more than a strategy to inform people considering the adaptive settlement as a possible design intervention. It is meant for people who wish to make a difference in their lives, in the lives of others, and for the sustainable preservation of the environment through design. The current title suggests the story that follows, beginning with the work for the Malaysia biennial which was meant to show the world how this region would look like in next 100years. However, through a year of research, I found out that there are lots of problems that these developments are bringing to the region. Therefore, this project would detail explain what the problems are and how to solve it.


m e gaci ty r egi o n

TIMELINE OF MEGACITY REGION TIm el ine O F m egac ity regio n

Urban Footprint of Megacity Region 1996

1924

1996

The causewaymultimodal land bridge was Beginning B e g i n n of i nIskandar g o f IMalaysia skandar The Causeway land bridge was built Comprehensive Development built Malaysia Comprehensive Plan Development Plan

Land Characters

Urban Footprint of Megacity Region 2006

1998

2006

2017

2117

TThe h eSecond S e c oLink n dcarriageway Link was built carriageway was built

L a u n of c hIskandar o f I sMalaysia kandar Launch Development Project Malaysia Development

Launch Malaysia Biennial Launch of of Malaysia Biennial 100YC: Medini Iskandar Project 100YC: Medini Iskandar Project

Projection of Future Projection of Future Cities Laboratory Design Research Cities Laboratory Design Project Research Project

Project

Urban Footprint of Megacity Region 2017

Causeway

2

Second Link


POCKET OPEN SPACE OPEN SPACE MOSQUE SCHOOL & PLAYGROUNG

FISH FARM

Potential Area Overall strategy plan

Connecting Space

Possible Pedestrian Walk

Access to the site

SHOPPING CENTERS


space between buildings

commercial building

road

commercial area

site classification of commercial area


section-before

section-after Hand drawing concepts


02 Connectivity and public space HCMC

LA RMIT 2017 Summer Project Leader - Charles Anderson Location - Ho chi ming city, Vietnam Final exports includes a presentation document, a folio and documentary videos

Ho Chi Minh City’s Park and Greenery Oce reports a 50% loss of green space in the past 11 years. Blame is attributed to developers ignoring city requirements for green space. The calculation includes parks, ower gardens, and road-side plants. There are some interesting statistics. Currently there is .7 square meters of green space per person in the 7 million person city. The city’s goal is 4 to 5 square meters per person. The World Health Organization has set a global standard of 8 square meters per person.This story illustrates the rapid rate of urbanization in Asia, the importance of green space as a health issue, and the diculties of balancing urban development and human health.


Project2 Green spaces in HCMC

public green space density most dense

least dense public green spaces quickest park to park routes based on road network

Site anaylsis

road network


Alleyway extension Alleyway extension

Supercrossing Linear park Linear park

Water systemWater system

Road systemRoad system

Site base

Masterplan of a vacant space in HCMC

Site base


Design diagram


03 Penleigh and Essendon Grammar School

LA RMIT 2016 Winter Project Leader - Charles Anderson Location - Melbourne,Australia Final exports includes an EOI, a document and a specification

The Penleigh and Essendon Grammar School Project comprises the landscape for the Girls’ Middle School, integrating and incorporating the Middle School boys as they use the canteen and seating areas at lunchtimes and recess. The design site is bounded by linear buildings running north-south, with pathways joining these spaces in an east-west direction. A vehicle access road enters from the north, running south between the two major building zones. With 600+ students plus additional staff members, the landscape is heavily trafficked, most strongly in evidence closest to the administration building. This space interfaces with both the canteen and the vehicle access road, and is dominated by concrete and asphalt. Drainage here needs careful consideration, due to the elevation change between the access road and the administration building. There is an opportunity to bring water and plantings into this area, while considering safety and human traffic issues presented by a school landscape with a large student population.


4 4 4 4 4

Design Development week Design2 Development Design Development 2 week 2 week Design Development Design Development 2 week 4.1 Yolk Studio team review Development 2 week responsibilities and based 4.1 on feedback & 4.1 site visit Development Development based on feedback based on feedback & site visit 4.1 & site visit Development 4.1 4.2 based on feedback Development Preparation of & siteon visit based feedback Schedule & Cost 4.2 & siteBvisit 4.2 plan Preparation of Preparation of Schedule & Cost Schedule & Cost plan B 4.2 plan B Preparation of 4.2 4.3 Schedule &ofCost Preparation Finalise design plan B & Cost Schedule 4.3 plan B 4.3 Finalise design Finalise design 4.3 4.4 Finalise design 4.3 Presentation Finalise design to4.4 client 4.4 Presentation Presentation to client to 4.4client Presentation 4.4 to client Client Presentation tosign client off

Client Client sign off sign off Client Client sign off sign off

PEGS PROJECT EOI

process Yolk Studio team review Yolk Studio team review responsibilities and responsibilities and process process Yolk Studio team review responsibilities Yolk Studio team and review process 1 -2 page reportand responsibilities process 1 -2 page report 1 -2 page report

1 -2 page report Pin-up process, review 1 -2 page initial Yolk report Studio and student Pin-upconcept process,ideas review Pin-up process, initial Yolk Studioreview and initial Yolk Studioideas and student concept student concept ideas Pin-up process, review initial process, Yolk Studio and Pin-up review student ideas initial Yolkconcept Studio and student Pin-upconcept process,ideas review Pin-up process, initial Yolk Studioreview and initial Yolk Studioideas and student concept student concept review ideas Pin-up process, initial process, Yolk Studio and Pin-up review student ideas initial Yolkconcept Studio and student concept ideas

Meeting or presentation with PEGS Meeting or presentation with PEGS Meeting or presentation with PEGS

5 5 5 5 5

Contract documentation 9 weeks Contract documentation Contract documentation 9 weeks 9 weeks Contract documentation 5.1Contract9documentation weeks Site and setout, grading Draft 9 weeks plan, surface finishes,

documentation 5.1 5.1 package Draft for client Draft documentation documentation package for client 5.1 package for client Draft 5.1 5.2 documentation Draft Draft documentation package for client documentation package for 5.2 package for client 5.2 architects Draft documentation Draft documentation package for package for architects 5.2 architects Draft documentation 5.2 5.3 package for Draft Final documentation documentation architects package for package for client 5.3 architects 5.3 Final documentation Final documentation package for client package for client 5.3 5.4 Final documentation 5.3 Final documentation package for client package for client 5.4 5.4 architects Final documentation Final documentation package for package architectsfor 5.4 architects Final documentation 5.4 package for Client Final documentation architects package for sign off architects Client

Client sign off sign off Client Client sign off sign off

planting plan and grading Site and setout, Site setout, grading landscape details plan,and surface finishes, plan, surface finishes, planting plan and planting andgrading landscape details Site and plan setout, landscape details plan, Site andsurface setout,finishes, grading planting planfinishes, and plan, surface Electronic copy only landscape planting plandetails and landscape details Electronic copy only Electronic copy only Electronic copy only Electronic copy only As 5.1 As 5.1 As 5.1 As 5.1 As 5.1 Electronic copy only Electronic copy only Electronic copy only Electronic copy only Electronic copy only

6 6 6 6 6

Contract administration within 6administration months Contract Contract administration within 6 months within 6 months Contract administration Contract withinadministration 6 months 6.1 within 6 months Two site visits Setout 6.1 6.1 Setout Setout

6.1 Setout 6.2 6.1 Planting Setout supervision 6.2 6.2 Planting Planting supervision supervision 6.2 Planting 6.2 6.3 supervision Planting Construction supervision progress review 6.3 6.3 Construction Construction progress review progress review 6.3 Construction 6.3 6.4 progress Construction Project signreview off progress review 6.4 6.4 Project sign off Project sign off 6.4 Project sign off 6.4 Client Project sign off

sign off Client Client sign off sign off Client Client sign off sign off

Two site visits Two site visits Two site visits Two site visits Three site visits Three site visits Three site visits Three site visits Three site visits Three site visits Three site visits Three site visits Closing egg ceremony Three site visits and review Closing egg ceremony Closing egg ceremony and review and review Closing egg ceremony and review Closing egg ceremony and review


C1

Rev.

COPYRIGHT 2016 YOLK STUDIO

A380

Drawing No.

1:100 @A1

19.09.16

Scale:

Date:

Key:

SL 57.600

Drawing Name

Sheet Number

LP00

Cover Sheet

1

LP01

Planting Plan

2

LP02

Grading Plan 01

3

LP03

Grading Plan 02

4

LP04

Grading Plan 03

5

LP05

Surface Finishes Plan 01

6

LP06

Surface Finishes Plan 02

7

LP07

Surface Finishes Plan 03

8

LD01

Landscape Planting Detail 01

9

LD02

Landscape Planting Detail 02

10

LD03

Landscape Seating Detail 03

11

SL 57.600

SL 57.400

SL 57.700 SL 57.300

SL 57.400

TOD 56.500 57.000

56.600

TOS 57.500

TOM 58.400

RL 57.000

RL 57.200

SL 57.000 RL 57.400 SL 57.500

SL 57.000 SL 57.000 TOD 56.400

SL 57.700

Status:

SL 57.500

SL 57.300 TOD 56.200

SL 57.700

Construction Plan

WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.

Date: 19.09.16

Purpose:

1 of 2

SL 57.500

Sheet:

Drawing:

Contract Documentation

WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.

COVER SHEET Key: Drawing Number

WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.

SL 57.700

57.000

57.400

56.800

57.600

56.600

ZJ ZH SD By Chk App

Revision Details

Architect:

Approved by: SD

Checked by: ZH

Landscape Architect Consultant: MCBRIDE CHARLES RYAN Architecture + Interior Design 4/21 Wynnstay Rd, Prahran VIC 3181 P: Â +61 3 9510 1006

103 Howard Street stutterheim anderson North Melbourne Vic 3051 Australia landscape architecture T / F / +61 3 9329 0034 E / info@saala.com.au

Approved by: SD et Vic 3051 Australia 9 0034 m.au

C1 19.09.16 Contruct documentation Rev Date

YOLK STUDIO Corner Victoria and Swanston Streets,Carlton VIC 3000 E: yolk.studio@gmail.com

Date: 19.09.16

Status:

Drawing:

Date:

Contract Documentation

19.09.16

Sheet:

Scale:

1 of 2

11:100 : 250@A1 @ A3

Purpose:

Drawing No.

Cover Sheet Plan Construction

LP00 A380

Designed by: Yolk Studio

Consultant File Reference: A666

Penleigh & Essendon Grammar School Stage 2 Rev.

C1

COPYRIGHT 2016 YOLK STUDIO

Landscape Architect:

C1 19.09.16 Contruct documentation

ZJ ZH SD

Rev Date

By Chk App

Revision Details

YOLK STUDIO Corner Victoria and Swanston Streets,Carlton VIC 3000 E: yolk.studio@gmail.com

Architect:

Landscape Architect Consultant: MCBRIDE CHARLES RYAN Architecture + Interior Design 4/21 Wynnstay Rd, Prahran VIC 3181 P: Â +61 3 9510 1006

103 Howard Street stutterheim anderson North Melbourne Vic 3051 Australia landscape architecture T / F / +61 3 9329 0034 E / info@saala.com.au

north

north Landscape Architect:

Designed by: Yolk Studio

Drawn by: ZJ

north

Penleigh & Essendon Grammar School Stage 2

Checked by: ZH

Consultant File Reference: A666

Drawn by: ZJ

Designed by: Yolk Studio

Status:

Drawn by: ZJ Checked by: ZH Approved by: SD

Date: 19.09.16

Drawing:

Date:

Contract Documentation

19.09.16

Sheet:

Scale:

1 of 2

11:100 : 100@A1 @ A3

Purpose:

Drawing No.

Construction Plan

LP03 A380

Rev.

C1

COPYRIGHT 2016 YOLK STUDIO


Key:

Concret

Timber

l

01

01 LPD01

02 LPD01

Mulched Garden Bed Typ.Detail 1: 10 @ A3

03 LPD01

Hydro Mulch Laid Turf Typ.Detail 1: 10 @ A3

Bench type Plan

Roll on Turf Detail Typ.Detail 1: 10 @ A3

47.5

50

50

47.5

400mm 600mm

50

600 500

50

12x8 Carriage bolt(Non-corrosive)

380

04 LPD01

Hydro Mulch to Mulched Garden Bed Detail

05

Hydro Mulch to Roll of Turf Detail

1: 10 @ A3

LPD01

1: 10 @ A3

l

WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.

02

Timber

Concret1

Bench type Section

Machine bolt (Non-corrosive) Concret2 Compacted subgrade

Granular material Status:

Status:

Designed by: Yolk Studio

Consultant File Reference: A666

C1 19.09.16 Contruct documentation

HB ZJ ZH SD

Rev Date

By Chk App

Revision Details

YOLK STUDIO Corner Victoria and Swanston Streets,Carlton VIC 3000 E: yolk.studio@gmail.com

Architect:

Landscape Architect Consultant: MCBRIDE CHARLES RYAN Architecture + Interior Design 4/21 Wynnstay Rd, Prahran VIC 3181 P: Â +61 3 9510 1006

103 Howard Street stutterheim anderson North Melbourne Vic 3051 Australia landscape architecture T / F / +61 3 9329 0034 E / info@saala.com.au

Drawn by:

HB ZJ

Checked by: ZH Approved by: SD

Date: 19.09.16

Drawing:

Date:

Contract Documentation

19.09.16

Sheet:

Scale:

1 8 of 52

1:100 @A1

Purpose:

Drawing No.

Landscape Planting Construction Plan Detail 01

LPD01 A380

Designed by: Yolk Studio

Consultant File Reference: A666

Penleigh & Essendon Grammar School Stage 2 Landscape Architect:

Rev.

C1

COPYRIGHT 2016 YOLK STUDIO

C1 19.09.16 Contruct documentation

ZJ ZH SD

Rev Date

By Chk App

Revision Details

YOLK STUDIO Corner Victoria and Swanston Streets,Carlton VIC 3000 E: yolk.studio@gmail.com

Architect:

Landscape Architect Consultant: MCBRIDE CHARLES RYAN Architecture + Interior Design 4/21 Wynnstay Rd, Prahran VIC 3181 P: Â +61 3 9510 1006

103 Howard Street stutterheim anderson North Melbourne Vic 3051 Australia landscape architecture T / F / +61 3 9329 0034 E / info@saala.com.au

north

Landscape Architect:

north

Penleigh & Essendon Grammar School Stage 2

WARNING & DISCLAIMER Beware of underground services. The locations of underground services are approximate only and their exact location & level shall be proven on site by contractor prior to commencing works. No guarantee is given that all existing services are shown. Site Setout shall be to Australian Map Grid (AMG). An electronic format of the drawings may be issued as an Autocad 2D file for the purposes of surveyed setout. Such file shall be issued under Superintendent written instruction. All levels, grades, and dimensions shall be confirmed on site prior to construction of works. If any discrepancies arise such instances shall be directed to the Superintendent for clarification and written confirmation. Landscape Drawings shall be read in conjunction with all other consultant drawings and specifications and other written instructions as may be issued through the course of the tender and contract. All drawings to be read in conjunction with Material Schedule.

Drawn by: ZJ Checked by: ZH Approved by: SD

Date: 19.09.16

Drawing:

Date:

Contract Documentation

19.09.16

Sheet:

Scale:

1 of 2

1:100 @A1

Purpose:

Drawing No.

Rev.

A380

C1

Construction Plan

COPYRIGHT 2016 YOLK STUDIO


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.