zhiyong yin portfolio

Page 1

Zhiyong Yin

CV & Portfolio

University of Dundee, 2010-2013



Name

Zhiyong Yin

Nationality Date of birth Language Mobile Email

Chinese 03/02/1989 English & Mandarin 0740 3206 602 zhiyong4944@gmail.com

Education 2010-2013

RIBA Part 1 BA Arch with Distinction University of Dundee, UK

2006-2010

BA of Civil Engineering Henan University of Technology, China

Computer Skills AutoCAD, Photoshop CS, Photoshop Indesign, 3D StudioMax, Sketchup, V-ray

Prize Dean Merit session 2012-13 Work selected for year three Exhibition Demarco Archive, 2012-13 The Wolfgang Jabs Prize Best Research Leading to Good Design, 2011-12 Work selected for year two Exhibition school design, semester two, 2012

Reference Jamie Brown Year 3 group tutor University of Dundee jamie.brown@jmarchitects.net



Urban analysis

Classroom

semester 1 of year 3

semester 2 of year 2

2012

2012

Demarco Archive

School

semester 1 & 2 of year 3

semester 2 of year 2

2012-2013

2012

BTM project-City

Street

semester 1 of year 3

semester 1 of year 2

2012

2011

BTM project-Space

Willow Dome

semester 2 of year 3

semester 1 of year 2

2013

2011 Others works from year 1 and others 2010-2011


mapping


potential sites perth road site

roseangle site westfield lane site

Urban analysis project type group work people involved 13 project length 3 weeks This project is to study a specific area of Dundee, then by ‘analysis – synthesis – conclusion’ to get a deeper understanding of the design process during the project and an awareness of how to analyse a particular urban district in a methodical method. And finally to discover several potential areas that could be used for the following design project-Demarco Archive, which will run through the whole semester year.


Demarco Archive project type individual project length whole semester year Demarco Archive project is to design a comprehensive building which mainly consisted of archive, galleries and artists’ flats. The primary purpose of it is to provide an exhibition space of archive for public visiting, research and learning, and a working and living space for Richard Demarco and visited artists. Its site is not specified and needed to be decided by individuals from the Dundee Roseangle Area.


My initial reaction of the site is the altitude difference between Perth Road and Roseangle. Follow the slope, the original buildings’ roofs become low e r a nd low e r one by one , a nd these roofs ha ve forme d a te rra c e . So my idea comes from this terrace, which could make Demarco Archive have more relationships with the l a n d s c a p e a n d b u i l d i n g s n e a r b y. T h e aim of it is to carry on the heritage of the Roseangle site, following the existing landscape and creating a friendly line between the sky and the building, a line that divides nature a nd urba n.


strategies


Concept model

This is my concept model which is to show the geometrical relationships among the five blocks of Demarco Archive. The size of each block is based on the buildings nearby and b y l o g i c a l o rg a n i z a t i o n , t h e s e b l o c k s have consisted the building's shape. By regular reducing the scale of the blocks, the terrace roof line that follow s the s lope on the e le va tion has joined the residential buildings on two sides of the site as a whole, and it also has brought the wonderful Dundee R ive r Ta y vie w for the building.




site plan

underground floor plan

ground floor plan


first floor plan

second floor plan

third floor plan




rei n

de t a i l C

rei n

de det taai il l CB

de t a i l A de t a i l B

de t a i l A e xt e r na l br i c k w a l l cl ad d i n g br e a t h ga p internal load-bearing brick wall

w a t e r pr oof i ng m e m b ran e e xt m oretrana r fl i br l l i c k w a l l cl ad d i n g

concrete screed internal load-bearing brick wall vapor barrier rigid insulation concrete screed waterproofing membrane vapor barrier reinforced concrete floor slab

br e a t h ga p metal wall ties w a t e r pr oof i ng m e m b ran e r i gi d i ns ul a t i on m or t a r f i l l metal wall ties r i gi ul aboa t i onr d pr otde ci tns i on

rigid insulation extend gravel waterproofing membrane reinforced concrete floor slab

pr ot e c t i on boa r d

extend gravel underfloor heating pipe c onc r e t e f ounda t i o n

underfloor heating pipe gr ound c onc r e t e f ounda t i o n

gr ound

detail A 1:20 foundation annotated drawing

d e t a idetail lA A 1 : 2 0 f o u n1:20 d a t i ofoundation n a n n o t aannotated t e d d r a wdrawing ing


roofing membrane zinc f l a s hi ng

rigid insulation roofingvapor m embrane barrier

zinc f l a s hi ng

rigid insulation reinforced concrete roof slab vapor barrier service gap

insul a t i ng gl a z i ng w i t h fully t e m pe r e d gl a s s

r einforcedplaster concrete roof slab boar d ceiling service gap

roo f z i nc gut t e r insul a t i ng gl a z i ng w i t h fully t e m pe r e d gl a s s

plaster board ceiling

e xt e r na l c onc r e t e c l a ddi ng br e a t h ga p weartna e r pr br ang ne e xt l coof onci ng r e t emcelm a ddi

roof z i nc gut t e r

i nspul a t i on brrei agit hd ga naoof l l ioa bee amrbr i ng c onc r e t e w al l w iant t eer rpr ngd-m a ne i ntde irns naul l pl s t e r c l a ddi ng boa r d r i gi a t ai on l i ght i ng

i nt e r na l l oa d- be a r i ng c onc r e t e w al l i nt e r na l pl a s t e r c l a ddi ng boa r d

c l ad d in g

li ght i ng

detail C detail C 1:20 roof annotated drawing 1:20 roof annotated drawing

b r an e adding

ane

detail C 1:20 roof annotated drawing concrete screed rigid insulation e xt e r na l c onc r e t e c l a ddi ng

concretefloor screed reinforced concrete slab

br e a t h ga p

rigid insulation service gap

weartna e r pr br ang ne e xt l coof onci ng r e t emcelm a ddi

reinforced plaster concreteboard floorceiling slab

i nspul a t i on brrei agit hd ga

service gap

naoof l l ioa bee amrbr i ng c onc r e t e w al l w iant t eer rpr ngd-m a ne

underfloor heating pipe plaster board ceiling

i ntde irns naul l pl s t e r c l a ddi ng boa r d r i gi a t ai on i nt e r na l l oa d- be a r i ng c onc r e t e w al l

underfloor heating pipe

i nt e r na l pl a s t e r c l a ddi ng boa r d PFC ( pa r a l l e l f l a nge c ha nne l ) as l i nt e l be a r i ng e xt e r na l br i c k w a l l c l a ddi ng PFC ( pa r a l l e l f l a nge c ha nne l ) a s l i nt e l be a r i ng metal wall ties

lighting

e xt e r na l br i c k w a l l c l a ddi ng internal load-be a r i ng br i c k w a l l metal wall ties

lighting internal load-bea r i ng br i c k w a l l

detail B 1:20 ceiling and wall annotated drawing d e t a i l B detail B 1:20 ceiling and wall 1 : 2 0 c e i l i n g a n d w a l l a n n o t a t e d d rannotated a w i n g drawing



Dundee River Tay view from top floor

sculpture gallery


introductory gallery

sculpture gallery


sculpture gallery

archive gallery


introductory gallery


light cone of the sculpture gallery


corridor outside the cinema

sculpture gallery

demarco archive library

view from archive gallery


demarco archive gallery

demarco archive gallery

reading & sitting stairs

demarco archive gallery


BTM project-City project type group work people involved 9 project length 4 days This project is to investigate the relationship between building forms, site and surroundings. Each group has nine people, and each student needs to provide three solutions comply with the brief requirements on one of nine site units of each group. Then by discussion, research, analysis, testing, photograph to choose the most reasonable grouping.


BTM project-Space project type group work people involved 3 project length 4 days This project is asking us to make a gallery space within a 9m cube. And the final result is to provide a 1:20 model, details drawings, environment drawings and light testing. In my group, we focus on the space and natural light, by testing lots of ideas and models and finally we designed a box which contains an independent vault inside to generate a simple, symmetrical, bright, order space, providing people a feeling of balance, peaceful, unforgettable.




Classroom project type individual length 3 weeks The classroom project is to design a studying unit which consists of two primary classrooms, cloakrooms and toilets, the aim of it is to get a basis understanding of classroom design and prepare for the next school project. My idea is using many ‘box rooms’ to create the classroom space, and by symmetrical allocation, to express the idea of architectural geometry.


working model 1

elevation

2

classroom

3

activities and reading area

4

courtyard


School project type individual length 6 weeks The school project is based on the former project-classroom, by intergrating the developed classrooms with office area, dining area and gym area to finish the whole school design. The site of it is located in Roseangle area of Dundee which faces the River Tay and surrounded by the railway and a traffic road.


school plan

south elevation

north elevation

east-west section

north-south section


developed plan of the classroom

developed sections of the classroom


annotated construction drawing


Structure glulam beam glulam column purlin studs joists This is the structure model of the classrooms which also shows some detail parts of the wall and roof. It is timber structure, based on the 'Post and Beam' principle, the glulam beams and columns form the main structure, while the studs wall forms the exterior and interior.



Outdoor classroom project type group work people involved 14 project length 4 weeks This project is aiming to design an outdoor space for a local primary school. The name Willow Dome is coming from the concept idea-organic. The site of it is located in an open grassy space which surrounded by many trees outside that school. Because this is a real project that fundraised by the primary school, finally, our group has won the competition among five design groups in our year, and it has already been started to build since July of 2012.



Street project type individual length 5 weeks The brief of this project is to design five living units by five groups on five different sites. Each unit is consisted of several individual houses that according to the group students’ number. My site is 4.5m by 20m, and there are solid walls on two sides. By discussion, five parameters need to be set up by each group. In my group, the parameters are: garages need to be lined up on the same direction; having the parking within the plot; the height of the street facade is 12 meters; garden inside each plot; at least two bedrooms is needed.


sketch section

elevation development


group long site elevation

ground floor plan

first floor plan

second floor plan

third floor plan



measured drawing

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT



precedent study spring, 2012

sketch design autumn, 2011

measured drawing

perth visit

autumn, 2011

autumn, 2011


3dmax summer class assignment summer, 2011 paper project spring, 2011

research retreat design project spring, 2011

habitant design project autumn, 2010

precedent study

beach project

autumn, 2010

autumn, 2010


Zhiyong Yin

CV & Portfolio

University of Dundee, 2010-2013


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.