SELECTED
WORK SAMPLES PROFESSIONAL /ACADEMIC
ZHONG REN HUANG
AIA, LEED BD+C, NCARB Columbia University New York Master of Science In Advanced Architectural Design California Polytechnic State University San Luis Obispo Bachelor Of Architecture
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
SELECTED
WORK SAMPLES PROFESSIONAL /ACADEMIC ZHONG REN HUANG
AIA, LEED BD+C, NCARB Columbia University New York Master of Science In Advanced Architectural Design California Polytechnic State University San Luis Obispo Bachelor Of Architecture
PROFESSIONAL PROJECTS Handel ARCHITECTS ASSOCIATE : July 2011 - Present
Port Imperial Site 12 Weehawken, NJ
Cathedral Church of Saint John the Divine North Site New York, NY
99 Hudson St Jersey City, NJ
180_2nd Ave New York, NY
STEVEN EHRLICH ARCHITECTS Internship : September 2009 - April 2010
Media Arts/Performing Arts Center Los Angeles Valley College, California.
the Federal National Council’s New Parliament Building Complex United Arab Emirates
01
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Port Imperial Site 12 A302
0'-0" ORIGIN POINT
0'-0" ORIGIN POINT
PROPERTY LINE
Port imperial Site 12 Weehawken, New Jersey
SEE
SEE
SEE
SEE 02 A302
PROPERTY LINE
Team: Handel Architects
17
Phases involved in: Feasibility Study | Pre Design | Schematic Design | Design Development | Construction Document |Construction Admistration - New 7 story with 103 units residential tower. - Role: zoning compliance | code research | massings studies | presentational drawing and renderings for client meetings | design facade | detail facade | landscape design | unit planning and layouts | ADA compliance for kitchen and bath egress | coordination with consultants for tower core Respond to Requests for Information (RFI) | Issue Architect’s Supplemental Instructions (ASI) | Process shop drawings and submittals | Process Change Orders | Review and certify contractor’s application for payment | Review material test reports | Record changes to the contract documents | Provide substantial and final completion services
18
20
19
22
23
24
25
27
26
28
29
30
31
32
33
34
35
36
37
39
38
98
97
16
21
99
100 105 102
101 15
103
104
40
106
96 UP ST2 DN
14
41
COMM. CLOSET
115 ELEV. LOBBY
ST1 UP DN
PE1
114
13
113
112
111
110
109
107 108
PE2
42
02 A301
95
12
43
116 61
11
60
62 10
59
58
57
56
55
54
53
52
51
50
49
48
47
46
45
44
94
SEE DWG. A104A
63
117
SEE DWG. A104B
SEE DWG. A104C
09
SEE DWG. A104D
SEE DWG. A104E
64 93
08
67
65 07
68
69
70
71
72
73
118 66
06
74A
175 ELEC CL.
92
01
TRASH RM
UP ST4 DN
MEHC.ROOM
ELEV. LOBBY 119
DN UP ST3 04
03
120 75
123
124
02
A301
74
COMM. CLOSET PE3
05
90
121
122
76
77
01
87
84
83
82
81
79
80
78
PROPERTY LINE
89
Site SEE DWG. A104E
SEE DWG. A104E
SEE DWG. A104D
10"
8"
PROPERTY LINE
OWNER
LENNAR UST LENNAR PIS 12, LP 1 FERRY LANDING CIRCLE WEEHAWKEN, NJ 07086 T: 201.325.8611
1'-9"
9'-6"
8'-10"
ARCHITECT
RESIDENTIAL UNIT
RESIDENTIAL UNIT
9 A481
1
WEIDLINGER ASSOCIATES 40 Wall Street, 19th Floor New York, NY 10005 T: 212.367.3000
9'-6"
8'-10"
3'-7"
STRUCTURAL ENGINEER
1'-9"
3 A362
HANDEL ARCHITECTS, LLP 150 VARICK STREET 8TH NEW YORK, NY, 10013 T: 212.595.4112
4TH FLOOR PLAN
M.E.P. ENGINEER LKU GROUP, INC 241 MOLNAR DRIVE, SUITE ELMWOOD PARK, NJ 0740 T: 201.791.1210
26 A352
1/4"=1'-0"
CONCRETE PARAPET W/ MINERAL SILICATE COATING SYSTEM, MC-1 2'-0"
1'-0"
CIVIL ENGINEER
1'-0"
10"
1'-0"
8"
1'-0"
5'-0"
OMLAND ENGINEERING A 303 W. MAIN STREET SUITE 3 FREEHOLD, NJ 07728 T: 732-665-5500 INTERIOR DESIGNER
TYP.
1'-6"
CONT. 1/2" X1/2" DRIP EDGE, OCCURS ON ALL OPEN SIDES OF LEDGE
INTERIOR DESIGN ASSOC 618 CHURCH STREET, SUI NASHVILLE, TN 37219 T: 615-320-7550
8"
WINDOW TYPE 2.2, GL-2 SEE WINDOW TYPE DWG
10"
6" BATT INSULATION AT UNDERSIDE OF SLAB W/ IN RETAIL SPACE BRICK FINISH, BR-1 W/ RODDED MORTAR JOINTS SECURED TO BACKUP W/ ADJUSTABLE STEEL REINFORCEMENT
LANDSCAPE ARCHITECT
FOIL FACED - BATT INSULATION PINNED TO BACKUP WALL CONT. 1/2" X1/2" DRIP EDGE, OCCURS ON ALL OPEN SIDES OF LEDGE
4'-10"
GEOTECHNICAL ENGINEE McLAREN ENGINEERING G 100 SNAKE HILL ROAD WEST NYACK, NY 10994 T:845-353-6400
8'-10"
11'-0"
10'-4"
STRUCTURAL BEAM, SEE STRUCTURAL DWGS
RESIDENTIAL UNIT
MELILLO + BAUER ASSOC LANDSCAPE ARCHITECTU 200 UNION AVENUE BRIELLE, NEW JERSEY 08
CONCRETE BLOCK BACKUP
42" HEIGHT GLASS PANEL GLAV. STL GUARDRAIL, GL-3
PAINT EXPOSED LINTEL TO MATCH BRICK COLOR
DATE 03.17.14 05.05.14 07.11.14 10.15.14 11.07.14
FACE OF BRICK, BEYOND STRUCTURAL COLUMN, BEYOND
42" HEIGHT GLASS PANEL GLAV. STL GUARDRAIL, GL-3
STRUCTURAL COLUMN, BEYOND
INSULATED GLASS AND ALUM. SLIDING WINDOW UNIT, WINDOW TYPE 2.1, GL-1, SEE WINDOW TYPE DWG
COLUMN COVER, BEYOND
STRUCTURAL COLUMN, BEYOND
FINISHED FLOOR SEE SCEHDULE
FOUNDAT
ISSUE
BLDG. D
COLUMN COVER, BEYOND FINISHED FLOOR SEE SCEHDULE
PAINTED ALUM. PANEL, MTL-1
1'-6"
SEAL & SIGNATURE
6" 20'-11"
6" 8"
PAINTED ALUM. PANEL, MTL-1
RESIDENTIAL UNIT
9'-6"
8'-10"
RESIDENTIAL UNIT
10'-4"
9'-8"
PORT IMPERIAL AVENUE
13'-4"
10"
8"
CONCRETE LEDGE W/ MINERAL SILICATE COATING SYSTEM
10"
CONCRETE LEDGE W/ MINERAL SILICATE COATING SYSTEM
RESIDENTIAL UNIT
CONC. WALL W/MINERAL SILICATE COATING, MC-1, BEYOND
INSULATED GLASS AND ALUM. SLIDING WINDOW UNIT, WINDOW TYPE 2.2, GL-1, SEE WINDOW TYPE DWG
9'-6"
8'-10"
CONC. WALL W/MINERAL SILICATE COATING, MC-1, BEYOND
RETAIL B
INSULATED GLASS AND ALUM. STOREFRONT, WINDOW TYPE 4.3 FINISHED FLOOR, N.I.C GRANITE SILL, ST-15
A352
2'-0"
1, 2, 3 1'-0"
1'-0"
10"
10"
8"
8"
1'-0"
5'-0"
KEY PLAN
ANCHOR PLATE BOLTED TO CONC. CURB AND GRANITE SILL - SEAL ALL EDGES AND FASTENERS
26
SCALE: PROJECT NO: DRAWING TITLE:
6" BATT INSULATION AT UNDERSIDE OF SLAB W/ IN RETAIL SPACE BRICK FINISH, BR-1 W/ RODDED MORTAR JOINTS SECURED TO BACKUP W/ ADJUSTABLE STEEL REINFORCEMENT
3
WALL SECTION WEST FACADE @ RETAIL B LEVEL 6-ROOF Scale: 3/4"=1'-0"
2
WALL SECTION WEST FACADE @ RETAIL B LEVEL 3-5 Scale: 3/4"=1'-0"
1
WALL SECTION WEST FACADE @ RETAIL B LEVEL 1-2 Scale: 3/4"=1'-0"
DRAWING NO:
4
5
Site12
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Port Imperial Site 12
Port imperial Site 12 Weehawken, New Jersey
OWNER LENNAR UST LENNAR PIS 12, LP 1 FERRY LANDING CIRCLE WEEHAWKEN, NJ 07086 T: 201.325.8611
Team: Handel Architects
ARCHITECT HANDEL ARCHITECTS, LLP 150 VARICK STREET 8TH FLOOR NEW YORK, NY, 10013 T: 212.595.4112
RESIDENTIAL UNIT 26
WOOD TRELLIS, WD-12
A352
STRUCTURAL ENGINEER WEIDLINGER ASSOCIATES, INC. 40 Wall Street, 19th Floor New York, NY 10005 T: 212.367.3000
5 A362
M.E.P. ENGINEER LKU GROUP, INC 241 MOLNAR DRIVE, SUITE 201 ELMWOOD PARK, NJ 07407 T: 201.791.1210 CIVIL ENGINEER OMLAND ENGINEERING ASSOCIATES, INC. 303 W. MAIN STREET SUITE 350 FREEHOLD, NJ 07728 T: 732-665-5500
2" RIGID INSULATION CLIPPED TO UNDERSIDE OF SLAB
INTERIOR DESIGNER
W/ ADJUSTABLE STEEL REINFORCEMENT
INTERIOR DESIGN ASSOCIATES, INC. 618 CHURCH STREET, SUITE 400 NASHVILLE, TN 37219 T: 615-320-7550
CONCRETE BLOCK BACKUP 6" BATT INSULATION AT UNDERSIDE OF SLAB
4'-10"
Phases involved in: Feasibility Study | Pre Design | Schematic Design | Design Development | Construction Document |Construction Admistration - New 7 story with 103 units residential tower. - Role: zoning compliance | code research | massings studies | presentational drawing and renderings for client meetings | design facade | detail facade | landscape design | unit planning and layouts | ADA compliance for kitchen and bath egress | coordination with consultants for tower core Respond to Requests for Information (RFI) | Issue Architect’s Supplemental Instructions (ASI) | Process shop drawings and submittals | Process Change Orders | Review and certify contractor’s application for payment | Review material test reports | Record changes to the contract documents | Provide substantial and final completion services
5/8" CEMENT BD ON 2 1/2" METAL FRAMING W/ FOIL FACED BAIT INSULATION FULL DEPTH OF STUD
STRUCTURAL BEAM, SEE STRUCTURAL DWGS CONT. PTD STL. RELIEVING ANGLE BOLTED TO CONCRETE LEDGE, SEE STRUCTURAL DWGS
LANDSCAPE ARCHITECT MELILLO + BAUER ASSOCIATES, INC. LANDSCAPE ARCHITECTURE 200 UNION AVENUE BRIELLE, NEW JERSEY 08730
7 A361
CONCEALED BRICK LINTEL SYSTEM ANCHORED TO CONCRETE BEAM
BRICK SOFFIT, BR-1
GEOTECHNICAL ENGINEER McLAREN ENGINEERING GROUP 100 SNAKE HILL ROAD WEST NYACK, NY 10994 T:845-353-6400
SEE I.D DWGS FOR CEILING LAYOUT
6 A361
HUNG STL. LINTEL W/ HANGER, SEE STRUCTURAL DWGS FOR SIZE AND LAYOUT
3'-7"
STRUCTURAL COLUMN, BEYOND SUSPENDED EXT. GRADE GWB CEILING, SEE RCP DWGS EXTERIOR LIGHTING FIXTURE, SEE RCP DWGS
DATE 03.17.14 05.05.14 07.11.14 11.07.14
11'-7"
PAINTED ALUM. PLATE COLUMN COVER, MTL-2
ISSUANCE FOUNDATION / WINDOW BID SET BUILDING PERMIT SET ISSUED FOR CONSTRUCTION BLDG. DEPT. CONFORMING SET
SEAL & SIGNATURE
PORT IMPERIAL AVENUE
8'-0"
LOBBY
REVOLVING DOOR, BEYOND TEMPERED GLASS STOREFRONT, WINDOW TYPE 5, GL-4, SEE WINDOW TYPE DWGS FINISHED FLOOR, NIC PAVING ON SETTING BED, ST-17 PAVING JOINTS TO ALIGN W/ INTERIOR PATTERN
ST. STL. HANDRAIL, MTL-3 SIM.
3
4'-7" 5 TREADS @ 11"
A410
ST-17 SOLID STONE TREAD, ST-17
KEY PLAN
Site12 OWNER
1
LENNAR UST LENNAR PIS 12, LP 1 FERRY LANDING CIRCLE WEEHAWKEN, NJ 07086 T: 201.325.8611 ARCHITECT
1/2" TEMPERED GLASS GUARDRAIL, GL-3
HANDEL ARCHITECTS, LLP 150 VARICK STREET 8TH FLOOR NEW YORK, NY, 10013 T: 212.595.4112
1 348
TERRACE CONCRETE CANOPY FRAMING W/ MINERAL SILICATE COATING SYSTEM, MC-1
RESIDENTIAL UNIT
SCALE: PROJECT NO:
4
10"
5" 7"
CIVIL ENGINEER 1'-0"
Scale: 3/4"=1'-0"
10"
1
DRAWING NO:
2" RIGID INSUL. AT UNDERSIDE OF SLAB BRICK FINISH, BR-1 W/ RODDED MORTAR JOINTS SECURED TO BACKUP W/ ADJUSTABLE STEEL REINFORCEMENT
OMLAND ENGINEERING ASSOCIATES, INC. 303 W. MAIN STREET SUITE 350 FREEHOLD, NJ 07728 T: 732-665-5500 INTERIOR DESIGNER
STRUCTURAL STL. TUBE, SEE STRUCTURAL DWG.
CONCRETE BLOCK BACKUP
INTERIOR DESIGN ASSOCIATES, INC. 618 CHURCH STREET, SUITE 400 NASHVILLE, TN 37219 T: 615-320-7550
4'-10"
6" BATT INSULATION AT UNDERSIDE OF SLAB W/ IN RETAIL SPACE
LANDSCAPE ARCHITECT
STRUCTURAL BEAM, SEE STRUCTURAL DWGS CONT. PTD STL. RELIEVING ANGLE BOLTED TO CONCRETE LEDGE, SEE STRUCTURAL DWGS
550
M.E.P. ENGINEER LKU GROUP, INC 241 MOLNAR DRIVE, SUITE 201 ELMWOOD PARK, NJ 07407 T: 201.791.1210
3
WALL SECTION WEST FACADE @ LOBBY ENTRY LEVEL 1-2
STRUCTURAL ENGINEER
WEIDLINGER ASSOCIATES, INC. DRAWING TITLE:40 Wall Street, 19th Floor New York, NY 10005 T: 212.367.3000
5
MELILLO + BAUER ASSOCIATES, INC. LANDSCAPE ARCHITECTURE 200 UNION AVENUE BRIELLE, NEW JERSEY 08730
PAINTED ALUM. LOUVER, MTL-2 PROVIDE INSULATED BLANK-OFF PANELS 2 A361
GEOTECHNICAL ENGINEER McLAREN ENGINEERING GROUP 100 SNAKE HILL ROAD WEST NYACK, NY 10994 T:845-353-6400
CONCEALED BRICK LINTEL SYSTEM ANCHORED TO CONCRETE BEAM
BRICK SOFFIT, BR-1 5/4" THK WOOD PANEL CEILING, WD-11 6
EXTERIOR LIGHTING FIXTURE, SEE RCP DWGS
ISSUANCE FOUNDATION / WINDOW BID SET BUILDING PERMIT SET ISSUED FOR CONSTRUCTION BLDG. DEPT. CONFORMING SET
19'-6"
20'-10"
DATE 03.17.14 05.05.14 07.11.14 11.07.14
SEAL & SIGNATURE
PORT IMPERIAL AVENUE
RETAIL A
STRUCTURAL COLUMN, BEYOND
INSULATED GLASS AND ALUM. STOREFRONT WINDOW TYPE 4.1, SEE WINDOW TYPE DWGS
BRICK PIER, BEYOND
FINISHED FLOOR, NIC
STOREFRONT, BEYOND WOOD BENCH, WD-12
1/8" MTL. PLATE CURB COVER, MTL-2 7 A362
SIDEWALK PAVING, SEE LANDSCAPE DWG
1
1'-0"
KEY PLAN
10"
4"
A410
1
SCALE: PROJECT NO:
550
DRAWING TITLE:
1
WALL SECTION WEST FACADE @ SET BACK AREA RETAIL A ENTRY LEVEL 1-2 Scale: 3/4"=1'-0"
DRAWING NO:
6
7
OWNER MORNINGSIDE ASSOCIATES 400 WEST 59TH STREET, 3R NEW YORK, NY 10019 T: 212.896.5565
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Cathedral Church of Saint John the Divine North Site
Cathedral Church of Saint John the Divine North Site New York, New York .
ARCHITECT HANDEL ARCHITECTS LLP 150 VARICK STREET, 8TH FL NEW YORK, NY 10013 T: 212.595.4112
STRUCTURAL ENGINEER WSP 228 EAST 45TH STREET, 3R NEW YORK, NY 10017 T: 212.687.9888
MEP ENGINEER & LIGHTING COSENTINI ASSOCIATES TWO PENNSYLVANIA PLAZA NEW YORK, NY 10121 T: 212.615.3600
VERTICAL TRANSPORTATIO JOSEPH NETO & ASSOCIAT 1065 AVENUE OF AMERICAS NEW YORK, NY 10018 T: 212.596.4690
EXTERIOR WALL GILSANZ MURRAY STEFICE 129 WEST 27TH STREET, 5T NEW YORK, NY 10017 T: 212.254.0030
Team: Handel Architects
EL. +115.60'
WEST 113TH STREET EL. +124.04'
Phases involved in: Feasibility Study | Pre Design | Schematic Design | Design Development. - New 15 story with 122 units residential tower. - Role: zoning compliance | code research | massings studies | presentational drawing and renderings for client meetings | design facade | detail facade | landscape design | unit planning and layouts | ADA compliance for kitchen and bath.
EL. +126.16'
EL. +126.51'
EL. +125.47'
EL. +122.91'
EL. +118.72'
EL. +120.80'
EL. +124.84'
EL. +116.66'
EL. +115.77'
EL. +122.90'
EL. +126.84'
1
1
2
A301
A201
A302
3
EL. +
A301
EL. +122.22'
EL. +123.62'
EL. +123.00'
EL. +124.18'
EL. +124.77'
EL. +125.40'
EL. +126.07'
EL. +126.62'
EL. +126.97'
EL. +127.14'
EL. +126.86'
EL. +126.47'
EL. +125.69'
EL. +121.73'
EL. +124.1'
PARKING EXIT
PARKING ENTRY
10 502
DOCTOR'S OFFICE 101
3
64A
64B
17
VESTIBULE 114
3TRASH 501 ROOM 104
BATH ROOM 103
PACKAGE ROOM 117
LOBBY 118 2 STORY LOBBY EL. +125.0'
1
A202
2 A202
15
VESTIBULE EL. +122.5' 123
81
3
EL. +123.72'
EL. +123.72'
57
56
UNIT 113 UNIT 112 1 BR 1 BR 601 SF 583 SF
3
55
TOS EL.54 +125.5' TO PLANTING EL. +126.5'
53
52
UNIT 111 UNIT 110 1 BR 1 BR 597 SF 616 SF
51
50
49
48
47
UNIT 109 1 BR 598 SF
46
45
UNIT 108 UNIT 107 1 BR 1 BR 589 SF 595 SF
44
43
42
121
BATH ROOM 129
MULTIPURP. RM. 130
STORAGE 34
41
40
39
38
33
GROUND 37 COVER36
LOBBY
121
118
1
YOGA
MEETING ROOM 132
EL. +116.0'
LOBBY
120
EL. 116.0' A302
131
35 2
EL. 116.0'
CORRIDOR
CORRIDOR
117
133
EL. +112.32'
116
122
115
IS SCHEMATIC PROGR SUPERSTRU FOUNDATION, EL & WINDOWS 10.01.2013 D.O.B. FIL
EL. +113.10' 111
120
DATE 06.17.2013 07.31.2013 09.04.2013
2 A201
127 5
14
5
17
126
124 31
MAIL ROOM 119
83
GROUND COVER
BATH ROOM 128 17
EMR EL. +122.5'
24'-634"
60
LEASING OFFICE 125 PANTRY
5
106 3
EL. +113.92'
3
10
BATH 7 ROOM 115501
17
CORRIDOR
17
A201
EL. +115.50'
EL. +116.00'
502
UNIT 102 SUPERINTENDENT 2BR/2BA 1002 SF
3
EL. +116.60'
EL. +115.0'
8
501
EL. +125.00'
EL. +119.71'
14
GROUND COVER
11 12
EL. +120.72'
H.C. PLAZA ENTRY
RESIDENTIAL ENTRY
EL. +123.91'
ACOUSTICS CERAMI & ASSOCIATES 404 FIFTH AVENUE, 5#8 NEW YORK, NY 10018 T: 212.370.1776
EL. +111.5'
3 LOADING EL. +101.6' 502
114 DN
7
TAX LOT LIINE 1
1 A-126 EL. +125.0'
1
A202
1
A-127
A-128 EL. +128.02'
EL. +126.5'
1
1
A-129
A-130 EL. +120.01'
KEY PLAN
CLOISTER
EL.+132.0'
EL. +113.4' (LOWER LEVEL)
EL. +125.4'
AMSTERDAM AVENUE
W 113TH ST.
5 RISES @ 0.54'
EL. +113.54'
EL. +132.0'
W 110TH ST.
SYMBOL LEGEND: (SEE G SERIES FOR ADDITIONAL SYMBOLS)
FD HB
CMU WALL
1.
ALL CORRIDOR AND STAIR WALLS SHALL BE 2-HOUR RATED WALL
CAST IN PLACE CONCRETE
2.
ALL DEMISING WALLS BETWEEN RESIDENTIAL UNITS SHALL BE 1-HOUR RATED WALL, U.O.N.
INDICATES OPENING IN SLAB
3.
ALL RESIDENTIAL INTERIOR PARTITIONS SHALL BE NON-RATED WALL, U.O.N.
4.
ALL ENCLOSING WALLS AT MECHANICAL RISERS (EXHAUST AND VENTILATION) SHALL BE 2-HOUR RATED WALL, U.O.N.
FLOOR DRAIN HOSE BIB KITCHEN EXHAUST
KE TOILET EXHAUST TE HP
VERTICAL STACKED HEAT PUMP
W
WASHER
D
DRYER
5.
ALL WALLS AT TRASH CHUTE RISERS SHALL BE 2-HOUR RATED CONCRETE CONSTRUCTION OR MASONRY WALL.
6.
ALL FURRING WALLS AT EXTERIOR WALL SHALL BE NON-RATED WALL WITH 3" INSULATION
7.
ALL PLUMBING CHASE SHALL BE NON-RATED WALL, U.O.N.
8.
PROVIDE WATER RESISTANT GWB IN ALL AREAS HAVING A WATER SOURCE INCLUDING BUT NOT LIMITED TO BATHROOMS AND UTILITY CLOSETS.
9.
PROVIDE 16 GA. METAL GROUNDS FOR ATTACHMENT OF MILLWORK, GRAB BARS, BATHROOM ACCESSORIES AND OTHER SIMILAR ITEMS REQUIRING SUPPORT.
10.
ALL FLOOR DRAINS ARE TO BE FLUSH WITH THR FINISHED FLOOR, U.O.N.
11.
REFER TO DRAWING G004 FOR HANDICAP CLEARANCES
12.
ALL CLOSETS ARE 2'-0" DEEP MIN. WITH ONE HANG ROD AND STANDARD SHELF. CLOSETS SHOWN GREATER THAN 4'-8" DEEP HAVE TWO HANG RODS AND STANDARD SHELF.
13.
FIRESTOP ALL PLUMBING SLAB PENETRATIONS
1/
SCALE: PROJECT NO:
KEYED NOTES:
GENERAL NOTES:
1
CUSTOM FRONT DESK
11
METAL GRATING AIR INTAKE LOUVER, TYP.
2
PROVIDE MAIL BOX
12
TRENCH DRAIN
3
ROLL DOWN DOOR
13
METAL FENCE TO MATCH EXISTING CATHEDRAL SITE
4
NOT USED
14
PRECAST PAVERS
5
GRANITE FLOOR
15
PRECAST STEPS
6
SKY LIGHT ABOVE
16
EXHAUST
7
RETAINING WALL
17
8
SIAMESE CONNECTION
SEE G-004 8C-F & 6D-G FOR ACCESSIBLE MOUNTING HEIGHTS AND CLEARANCES
9
ENTRY CANOPY
10
RAILING
DRAWI
SEAL & SIGNATURE
THE NORTH GR DEVELOPM PROJEC
ON THE GROUNDS OF THE C OF SAINT JOHN THE D DRAWING NO:
A-101.
OWNER MORNINGSIDE ASSOCIAT 400 WEST 59TH STREET, NEW YORK, NY 10019 T: 212.896.5565
N
ARCHITECT 1 HANDEL ARCHITECTS LL 150 VARICK STREET, 8TH NEW YORK, NY 10013 T: 212.595.4112
STRUCTURAL ENGINEER WSP 228 EAST 45TH STREET, NEW YORK, NY 10017 T: 212.687.9888
MEP ENGINEER & LIGHTI COSENTINI ASSOCIATES TWO PENNSYLVANIA PLA NEW YORK, NY 10121 T: 212.615.3600
VERTICAL TRANSPORTA JOSEPH NETO & ASSOCI 1065 AVENUE OF AMERIC NEW YORK, NY 10018 T: 212.596.4690
1 2"'CHAMFER @ COLUMN EDGES
MTL-1 CONC-2
PAINTED WINDOW WALL MULLION
EXTERIOR WALL GILSANZ MURRAY STEFI 129 WEST 27TH STREET, NEW YORK, NY 10017 T: 212.254.0030
1 2"'CHAMFER @ COLUMN EDGES
ACOUSTICS CERAMI & ASSOCIATES 404 FIFTH AVENUE, 5#8 NEW YORK, NY 10018 T: 212.370.1776
CONC-1
CONCRETE COLUMN
GL-1
CASEMENT WINDOW REUSABLE CONC. ANCHOR FOR WINDOWWASHING ROLLER SHADE
GL-1
DATE 06.17.2013 07.31.2013 09.04.2013
FIXED LITE
SCHEMA PRO SUPERST FOUNDATION, & WINDOW D.O.B 10.01.2013
KEY PLAN
PARTIAL ELEVATION
3
1/2"=1'-0"
SECTION
W 113TH S
1/2"=1'-0"
AMSTERDAM AVENUE
2
3" SEMI-RIGID MINERAL FIBER INSULATION AT 4.2 R/INCH
CONC-2
W 110TH S SCALE: PROJECT NO: SEAL & SIGNATURE
SLAB EDGE
1
8
GENERAL NOTE: SEE A-240 & A-241 FOR WINDOW SCHEDULE SEE A-430 AND A-431 FOR WINDOW DETAILS SEE A440 &A-441 FOR TYPICAL ROOF DETAILS
DRA
S
DRAWING NO:
A-402
PARTIAL PLAN 1/2"=1'-0"
9
SELECTED
WORK SAMPLES PROFESSIONAL /ACADEMIC
ZHONG REN HUANG
AIA, LEED BD+C, NCARB Columbia University New York Master of Science In Advanced Architectural Design California Polytechnic State University San Luis Obispo Bachelor Of Architecture
2
BUILDING PROJECTION DIAGRAM 1/16" = 1'-0"
TAX LOT LINE
SEC. 24-51 (c) PERMITTED OBSTRUCTION BUILDING COLUMNS, HAVING AN AGGREGATE WIDTH EQUAL TO NOT MORE THAN 20 PERCENT OF THE AGGREGATE WIDTH OF STREET WALLS OF A BUILDING.
Cathedral Church of Saint John the Divine North Site New York, New York .
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Cathedral Church of Saint John the Divine North Site
AGGREGATE WIDTH OF THE STREET WALL AT ANY ONE LEVEL = 474.1' .20 X 474.1' = 94.82' ALLOWABLE AGGREGATE WIDTH OF COLUMNS AT ANY ONE LEVEL = 65' (26 COLUMNS X 2.5' WIDE EACH). COMPLIES.
Team: Handel Architects Phases involved in: Feasibility Study | Pre Design | Schematic Design | Design Development. - New 15 story with 122 units residential tower. - Role: zoning compliance | code research | massings studies | presentational drawing and renderings for client meetings | design facade | detail facade | landscape design | unit planning and layouts | ADA compliance for kitchen and bath.
101.4'
68.5'
304.2' 474.1'
1
NORTH EXTERIOR ELEVATION DIAGRAM 1/16" = 1'-0"
T.O BULK HEAD EL. 272.95'
PROPERTY LINE
TAX LOT LINE
PROPERTY LINE
T.O. BULKHEAD EL. +272.95'
TAX LOT LINE
22.78'
T.O. ROOF EL. +264.33'
15TH FLOOR EL. +253.25' 14TH FLOOR EL. +244.17' 13TH FLOOR EL. +235.08' 12TH FLOOR EL. +226.00' 11TH FLOOR EL. +216.92' 10TH FLOOR EL. +207.83' 9TH FLOOR EL. +198.75' 8TH FLOOR EL. +189.67'
15.0'
7TH FLOOR EL. +180.58' 6TH FLOOR EL. +171.50' 5TH FLOOR EL. +162.42'
PERMITTED OBSTRUCTION
0.3' 15.0'
4TH FLOOR EL. +153.33' 3RD FLOOR EL. +144.25' PLAZA EL. 132'
2ND FLOOR EL. +135.17'
WEST 113TH STREET
WEST 113TH STREET
16.0'
THROUGH LOT PORTION 1 A.C.L.
GROUND EL. +125.00'
LOBBY EL. 116'
WE
14.5'
CORNER LOT A A.C.L. EL. +121.29'
CELLAR WEST EL. +106.00'
CELLAR EAST EL.101.5'
CELLAR EAST EL. +101.5'
6
SECTION AT THROUGH LOT 1/16" = 1'-0"
NOTE: ALL ELEVATIONS ABOVE MANHATTAN DATUM = 0.0'
5
SECTION AT WEST CORNER LOT A 1/16" = 1'-0"
NOTE: ALL ELEVATIONS ABOVE MANHATTAN DATUM = 0.0'
11
10
W. 113th STREET (NARROW STREET)
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 99 Hudson Street
99 Hudson street Jersey City, NJ .
1
Team: Handel Architects
A-201
2 A-301
Phases involved in: Pre Design | Schematic Design | Design Development | Construction Document. - New 52 story with 619 units residential tower. - Role: massings studies | presentational drawing and renderings for client meetings|landscape design | unit planning layouts | ADA compliance for kitchen and bath | egress | coordination with consultants for tower core.
1
2514 2 2 BED B5 948 SF
3
2512 STUDIO S5 412 SF
2510 1 BR A9 741 SF
4
2508 2 BED+ B2 1173 SF
5
2504 1 BED+ A10 803 SF
7
8
2502 1 BED+ A7 794 SF
9
10
27
26
25
2506 STUDIO+ S6 596 SF
6
AP
AP
AP
AP
AP
2
TX8
A-201
TX9
TX8
TX6 TX6
TX9
KX6 KX6
24
11
TX12 TX10
2501 3 BED C 1262 SF
TX11 TX11
UP
TX10
AP
DN
9 KX1
KX2 KX2
1 A-301
VERIFY SLEEVE LAYOUT W/ PLUMBING DRAWING
1
TX4
30
TX3
TX4
TX3
2
KX3
KX3
UP
32
29 DN
KX7
TX2 TX14 TX14
23
TX2
TX1
KX4
22
2515 2 BED B4 988 SF21
2513 2 BED+ B3 1114 SF
20
2511 1 BED A5 705 SF
19
2509 1 BED A4 622 SF
18
12
TX1
KX4
2507 STUDIO+ S3 548 SF
17
16
15
2505 1 BED A3 768 SF
13
14
1 A-164
1
Y = 0'-0"
PROPERTY LINE
A-202
X = 0'-0"
2
25TH-52ND FLOOR PLAN 3/32"=1'-0"
99'-10" FROM GREENE ST PROPERTY LINE
OWNER
99 HUDS 400 PLA SECAUC T: 201.3
ARCHIT HANDEL 150 VAR NEW YO T:.212.5
STRUCT DESIMO 18 WEST NEW YO T: 212.5
24'-0"
9"
T.O.SLAB
UNIT 2414 2 2 BED B5 948 SF
3
UNIT 2412 STUDIO S5 421 SF
UNIT 2410 1 BR A9 732 SF
4
UNIT 2408 5 2 BED+ B2-ALT 1163 SF
UNIT 2406 STUDIO+ S6 600 SF
6
UNIT 2404 1 BED+ A10
7
8
UNIT 2402 1 BED+ A7 794 SF
9
EXTENT OF COLUMN BEYOND, 803 SF SEE STRUCTURE DRAWINGS
AP
VERTIC VDA INC 5 REGE LIVINGS T: 973.9
AP
T.O.SLAB
AP
AP
9"
AP
LANDSC MELILL 2399 HIG MANASQ T: 732.5
PROVIDE ALTERNATE DEDUCT FOR FIXED WINDOW AT THIS LOCATION, TYP.
27
26
25
8'-11"
PTD. ALUM. FRAMED LOW-E IGU, OPERABLE FOR MAINTENANCE ONLY, GL-1
TX8
TX6
EXPOSED CONCRETE
UP
TX11
CODE C HUGHE 112 W 3 NEW YO T: 212.9
PTD. ALUM. FRAMED FRITTED SPANDREL GLASS, GL-3 PTD. ALUM. FRAMED SPANDREL GLASS, GL-2
KX2
30
TX3
KX1
9'-8"
DN
AP
TX4
11
TX12
TX10
INTERIO WILSON 119 FIFT NEW YO T: 212.2
KX3
UP
32
EXTERI IBA CON 5 HANO NEW YO T: 212.2
SUSTAI STEVEN 61 WAS NORWA T: 203.8
TX9
KX6
24
GEOTEC MELICK 117 CAN SOUTH T: 732.3
CIVIL EN DRESDN 371 WAR JERSEY T: 201.2
10
9'-8"
1
MEP EN EDWAR 315 PAR NEW YO T: 212.3
29
DN
KEY PLA
TX2 TX14
23
12
TX1
KX4
T.O.SLAB
DATE 05/17/20 9'-8"
PTD. ALUM. FRAMED LOW-E IGU, OPERABLE FOR VENTILATION, GL-1
22
1
UNIT 2415 2 BED B4 21 988 SF
20
UNIT 2413 2 BED+ B3 1114 SF
UNIT 2411 1 BED A5 705 SF
19
UNIT 2409 1 BED A4 622 SF
18
17
UNIT 2407 STUDIO+ S3 548 SF
UNIT 2405 1 BED A3- ALT 769 SF
16
15
UNIT 2401 3 BED C1- ALT 1253 SF
14
13 T.O.SLAB
A-164
SEAL &
Y = 0'-0"
X = 0'-0"
1
EXT. WALL ELEVATION
1
SCALE: 1/2" = 1'-0"
EXT. WALL SECTION SCALE: 1/2" = 1'-0"
ACOUSTIC INSULATION
24TH FLOOR PLAN
RIGID INSULATION
3/32"=1'-0"
WOOD SILL
99'-10" FROM GREENE ST PROPERTY LINE
F.O. COLUMN 4" 7"
PROPERTY LINE
3
2'-9" CL
1'-9" CL
4'-6" CL
4"
2'-8" 3'-0"
CL
CL
1'-8"
3'-0" CL
SCALE: PROJEC
F.O. GLAZING
DRAWIN
E.O. SLAB NORTH, WEST AND SOUTH E.O. SLAB EAST ONLY
12
2
EXT. WALL PLAN SCALE: 1/2" = 1'-0"
13
DRAWIN
Y
PROPERTY
X = 0'-0"
2
3/32"=1'-0"
99'-10" FROM GREENE ST PROPERTY LINE
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 99 Hudson Street
1
UNIT 2414 2 2 BED B5 948 SF
3
UNIT 2412 STUDIO S5 421 SF
4
UNIT 2410 1 BR A9 732 SF
UNIT 2408 5 2 BED+ B2-ALT 1163 SF
UNIT 2404 1 BED+ A10 803 SF
7
8
UNIT 2402 1 BED+ A7 794 SF
9
10
27
26
25
UNIT 2406 STUDIO+ S6 600 SF
6
AP
AP
AP
AP
AP
TX8
TX6
TX9
KX6
24
11
TX12 TX11
UP
TX10
DN
AP
TX4
KX1
KX2
30
TX3
KX3
UP
32
DN
29
TX2 TX14
23
22
1
UNIT 2415 2 BED B4 21 988 SF
UNIT 2413 2 BED+ B3 1114 SF
20
UNIT 2411 1 BED A5 705 SF
19
18
UNIT 2409 1 BED A4 622 SF
UNIT 2407 STUDIO+ S3 548 SF
17
12
TX1
KX4
UNIT 2405 1 BED A3- ALT 769 SF
16
15
UNIT 2401 3 BED C1- ALT 1253 SF
14
13
A-164
Y = 0'-0"
PROPERTY LINE
OWNER
X = 0'-0"
1
99 HUDSO 400 PLAZA SECAUCUS T: 201.348.
24TH FLOOR PLAN 3/32"=1'-0"
ARCHITEC HANDEL A 150 VARICK NEW YORK T:.212.595.
99'-10" FROM GREENE ST PROPERTY LINE
STRUCTUR DESIMONE 18 WEST 1 NEW YORK T: 212.531.
24'-0"
MEP ENGIN EDWARDS 315 PARK A NEW YORK T: 212.330.
T.O.SLAB 9"
GEOTECHN MELICK-TU 117 CANAL SOUTH BO T: 732.356.
CIVIL ENGI DRESDNER 371 WARRE JERSEY CI T: 201.217.
LANDSCAP MELILLO+B 2399 HIGH MANASQU T: 732.528.
9'-8"
8'-2"
PROVIDE ALTERNATE DEDUCT FOR FIXED WINDOW AT THIS LOCATION, TYP. PTD. ALUM. FRAMED LOW-E IGU, OPERABLE FOR MAINTENANCE ONLY, GL-1
VERTICAL VDA INC 5 REGENT LIVINGSTO T: 973.994.
METAL SILL
EXTERIOR IBA CONSU 5 HANOVE NEW YORK T: 212.232.
T.O.SLAB
1'-6"
RIGID INSULATION
1
2"
SUSTAINA STEVEN W 61 WASHIN NORWALK T: 203.857.
CODE CON HUGHES A 112 W 34TH NEW YORK T: 212.946.
9'-8"
8'-2"
BRICK IN RUNNING BOND, ANCHORED TO SUBSTRATE WITH ADJUSTABLE REINFORCEMENT WALL TIES (TYPICAL), BRK-1
INTERIOR WILSON A 119 FIFTH NEW YORK T: 212.213.
METAL PANEL, MTL-1
21 4"
KEY PLAN
1'-6"
T.O.SLAB
PTD. ALUM. FRAMED LOW-E IGU, OPERABLE FOR VENTILATION, GL-1 6'-11 2"
METAL PANEL BEYOND
DATE 05/17/2013 9'-8"
FACE BRICK BEYOND
TRANSOM
2'-0"
CL
91 2"
METAL PTAC GRILLE
T.O.SLAB
SEAL & SIG
3
EXT. WALL ELEVATION
1
SCALE: 1/2" = 1'-0"
EXT. WALL SECTION SCALE: 1/2" = 1'-0"
ACOUSTIC INSULATION RIGID INSULATION WOOD SILL
SCALE: PROJECT
23 4"
2'-51
EQ. 2'-111
2"
CL
1'-7" 1'-81
2"
CL
EQ.
EQ. 4'-63
2"
CL
2'-73 4" 2'-91
4"
CL
F.O. BRICK
DRAWING
EQ. 4'-63
4"
CL
1'-81
4"
CL
2'-111
2"
CL
31
2"
2"
CL
2
14
81 4"
2"
E.O. SLAB / F.O COLUMN 2'-73 4"
EXT. WALL PLAN SCALE: 1/2" = 1'-0"
DRAWING
15
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 180 2nd Ave
180 2nd Ave New York, NY Team: Handel Architects Phases involved in: Feasibility Study - New 28 story with 100 units luxury residential tower. - Role: Developing a marketing book for the client use, which includes zoning compliance | code research | massing studies | presentational drawings and renderings.
E
K AL E 98th Street W
N
5
M IN UT
E 97th Street
Lexington Avenue
1st Avenue
2nd Avenue
Park Avenue
3rd Avenue
E 97th Street
E 95th Street
E 94th Street
E 94th Street
ive
Dr
E 95th Street
R
E 96th Street
FD
E 96th Street
E 92nd Street
E 92nd Street
E 91st Street
E 91st Street
York Avenue
E 93rd Street
5M IN UT EW ALK
E 93rd Street
2nd Avenue
Lexington Avenue
SITE
E 90th Street 1st Avenue
Park Avenue
3rd Avenue
E 90th Street
PERMITTED OPENINGS FOR LIGHT AND AIR
TOWER FLOOR PLATE AREA TO BE GREATER THAN 30% AND LESS THAN 52% (42% +10% FROM TRANSIT LAND USE DISTRICT) OF TOTAL ZONING LOT AREA
N
N T
T
E
E
E
E
R
R
T
T
S
S H
T
94
T
T
S
S A
A E
E
94
T
H
8B
T R D
93
R T
S
S
A
A
E
E
T
93
R
D
S
T S
T
R
E
E E
E
T
T E E R T S D R 93 T S A
60'-0"
60'-0"
T D
S
T
R
E
E
T E E R T S D
R
R
93
93
T
T
S
S
A
A E
64'-0"
64'-0"
E
84 R
T E E
T E
R
E
T
R
S D R 93 T S
E
A
C
T T S H T 94 T S E
A
N
85'-0"
60'-0"
T
E
E R
T
S H T 94
N
N T E E R T S H T
94
T
S
S
A
A
E
E
8B 84
R
55'-0" 60'-0"
T E T S A
93 E
A
S
T
E
R
D
S
94
T
T
R
H
E
S
E
T
T
T
H
S
T
R
E
64'-0"
E
T
N
R
E
E
4 8-
8 2C -4 8 C 8 24 8C
U
C
N
E
8
C
2-
C
V A
R
D
2N
C
E
E
E
U
U
N
N
E
E
U
U
N
N
E
E
NO PERMITTED NO PERMITTED OPENINGS OPENINGS
E
E
V A
V A
94
NOOPENINGS PERMITTED OPENINGS NO PERMITTED
NO PERMITTED NO PERMITTED OPENINGS OPENINGS
D
T
10% OPENING10% PER STORY PER STORY OPENING PERMITTED -PERMITTED DOES NOT - DOES NOT CONTRIBUTECONTRIBUTE TO LIGHT TO LIGHT AND AIR REQUIREMENTS AND AIR REQUIREMENTS
"
30'-0
D
S
"
30'-0
2N
E
V A
A
"
2N
U
D
V A
8B R -8 2 C 8B R -8 2 C
N
E
2N
D
2N
10% OPENING10% PER OPENING STORY PER STORY PERMITTED -PERMITTED NOT - NOT APPLICABLE APPLICABLE TO LIGHT TO LIGHT AND AIR REQUIREMENTS AND AIR REQUIREMENTS
30'-0
8B
8B
V A
IN
A
R
T
D
2N
,T
Q
UNLIMITED OPENINGS UNLIMITED OPENINGS FOR AIR ANDFOR LIGHT AIR AND LIGHT HEIGHT OF STREET WALL REQUIREMENTS REQUIREMENTS ALONG NARROW STREET TO BE BETWEEN HT. 60'-0" MIN., 85'-0" MAX. IN C2-8 ZONE
"
8 2-
C
R
R 8 2-
"
50'-0
"
55'-0
30'-0
C
E
E
U
N
E
E
"
55'-0
10% OPENING10% PER OPENING PER STORY PERMITTED STORY-PERMITTED DOES NOT CONTRIBUTE DOES NOT CONTRIBUTE TO LIGHT AND TOAIR LIGHT AND AIR REQUIREMENTS REQUIREMENTS
15'-0" SETBACK ALONG NARROW STREET
8B R -8 2 C
R
U
V A
NO PERMITTED OPENINGS UNLIMITED OPENINGS UNLIMITED OPENINGS FOR AIR ANDFOR LIGHT AIR AND LIGHT REQUIREMENTS -11 1 REQUIREMENTS 8" " 75'-0 25'-8 1 NO PERMITTED 2" OPENINGS
124'
T
HEIGHT OF STREET WALL ALONG WIDE STREET TO BE BETWEEN HT. 60'-0" MIN., 85'-0" MAX. IN C2-8 ZONE
02
D
8B R -8 2 C
2N
10% OPENING PER STORY PERMITTED - NOT APPLICABLE TO LIGHT AND AIR REQUIREMENTS
NO PERMITTED OPENINGS
18
UNLIMITED OPENINGS FOR AIR AND LIGHT REQUIREMENTS
U F
UNLIMITED OPENINGS FOR AIR AND LIGHT REQUIREMENTS
" TO BE BETWEEN " BASE 55'-0 55'-0 15'-0HT. 55'-0" 15 MIN. '-0" 60'-0" MAX. " WITH 15'-0" SETBACK FROM STREET AND 10'-0" SETBACK FROM REAR YARD LINE IN R8B ZONE.
C 8 R -4 8B C 8 R -4 8B
8 2-
8 2-
8B
R
8 2-
C N
4 8-
C
C
8 2-
C 4 8-
C
4
C
8-
C
C 8 R -4 8B
"
" UNLIMITED OPENINGS UNLIMITED OPENINGS '-0" 10'-0 FOR AIR ANDFOR LIGHT AIR AND LIGHT 10 REQUIREMENTS REQUIREMENTS 10% OPENING PER STORY PERMITTED - DOES NOT " CONTRIBUTE TO LIGHT 30'-0 AND AIR REQUIREMENTS
30'-0 10'-0" SETBACK " ALONG WIDE STREET
8B
60'-0"
"
55'-0
10% OPENING PER STORY PERMITTED DOES NOT CONTRIBUTE TO LIGHT AND AIR REQUIREMENTS
84
8
C 8 R -4 8B
2-
C
55'-0 15'-0 "
"
10'-0
75% OPENING75% PER STORY PER STORY OPENING PERMITTED WITH EASEMENT PERMITTED WITH- EASEMENT DOES NOT CONTRIBUTE TO LIGHT TO LIGHT DOES NOT CONTRIBUTE AND AIR REQUIREMENTS AND AIR REQUIREMENTS
UNLIMITED OPENINGS UNLIMITED OPENINGS FOR AIR ANDFOR LIGHT AIR AND LIGHT REQUIREMENTS REQUIREMENTS
75% OPENINGS 75%FOR OPENINGS FOR AIR AND LIGHT MAX BUILDING HEIGHT AIR AND LIGHT REQUIREMENTS REQUIREMENTS 75'-0" IN R8B ZONE
4 8-
"
UNLIMITED OPENINGS FOR AIR AND LIGHT REQUIREMENTS
15'-0
C
75% OPENING PER STORY PERMITTED WITH EASEMENT DOES NOT CONTRIBUTE TO LIGHT AND AIR REQUIREMENTS
C
55% OF TOTAL ZFA TO UNLIMITED OPENINGSBE ALLOCATED BELOW FOR AIR AND LIGHT EL.+150'-0" WHEN TOWER REQUIREMENTS FLOOR PLATE IS GREATER THAN 40% OF ZONE LOT
75% OPENINGS FOR AIR AND LIGHT REQUIREMENTS
17
16
44
MERCHANTS HOSPITALITY
HANDEL ARCHITECTS LLP
43
HANDEL ARCHITECTS LLP
45
5'-0" 5'-0"
DN
DN
DUPLEX Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 DUPLEXUNIT UNITPLAN PLAN 180 2nd Ave
DN
DN
27'-6" 5'-0" 27'-6" 5'-0"
BR 1 BR 1
DEN / BR 3 DEN / BR 3
1 OPEN TOBR BELOW 1 OPEN TOBR BELOW
MASTER BR MASTER BR
DEN / BR 3 DEN / BR 3
OPEN TO BELOW OPEN TO BELOW
27'-6" 27'-6"
MASTER BR MASTER BR
12'-0" 12'-0"
12'-0" 12'-0"
12'-0" 12'-0"
12'-0" 12'-0"
12'-0" 12'-0"
12'-0" 12'-0"
5'-0" 5'-0"
UPPER LEVEL UPPER LEVEL
UP
UP
MAID'S ROOM MAID'S ROOM W/D
W/D
27'-6" 5'-0" 27'-6" 5'-0"
W/D
W/D
UP
UP
MAID'S ROOM MAID'S ROOM W/D
LIB / BR 1 LIB / BR 1
W/D W/D
27'-6" 27'-6"
W/D
LIB / BR 1 LIB / BR 1
HANDEL ARCHITECTS LLP
18
Book Final.indd 29
29
9/17/2013 2:37:10 PM
12'-0" 12'-0"
LOWER LEVEL LOWER LEVEL
12'-0" 12'-0"
12'-0" 12'-0"
19
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
Media Arts/Performing Arts Center 50,000 square feet
Sections and Sectional physical model
Los Angeles Valley College, California.
H G.8
G
Internship with STEVEN EHRLICH ARCHITECTS
F.7
F
SMALL CONFERENCE ROOM
September 2009-April 2010
I was involved in the schematic design and design phase of the project working directly under the chief designer. Using Revit, my tasks were to accordinate room data sheets to make sure to communicate with consultants.
SPEAKER CLOSET
1
PROJECTION BOOTH
SCREENING THEATER
L1 LOBBY
CONTROL ROOM
E
FACULTY OFFICE 4
DESIGN LAB CLASSROOM
C
LAB THEATRE
CIRCULATION
B
A Roof 2 40' - 0" Top of Parapet - R1 33' - 6" Roof 1 30' - 0" Level 4 28' - 0" Level 3 (Fly Gallery) 25' - 0" Top of Parapet - L1 18' - 6" Level 2 15' - 0" Level 1 0' - 0"
REHEARSAL STUDIO #2
CLASSROOM
LAB THEATRE DRESSING / WAITING ROOMS
SCREENING MECHANICAL ROOM
SCREENING ROOM PLENUM
D
DYE / LAUNDRY
REHEARSAL STUDIO #1
COSTUME SHOP
BDF
Basement -11' -Pit 6" Orchestra Elevator -8' - 0" -15' 6"
North/South Building Section 1 - Through Screening Theater 1/16" = 1'-0"
H G.8
G
F.7
F
E
D
C
B
A Top of Fly 65' - 0" Level 5 (Loading Gallery) 51' - 0" Roof 2 40' - 0" Top of Parapet - R1 33' - 6" Roof 1 30' - 0" Level 4 28' - 0"
BALCONY
L2 LOBBY
BOX OFFICE / SCHEDULING ROOM
L1 LOBBY
CONTROL SUITE (MT)
MAIN THEATER ORCHESTRA SEATING
ORCHESTRA SHELL CIRCULATION STORAGE
MAIN THEATER STAGE/APRON ORCHESTRA PIT
MAIN THEATER PLENUM
CIRCULATION
2
CIRCULATION
TRAP ROOM
BACKSTAGE STORAGE
LIGHTING STORAGE
CIRCULATION
Level 3 (Fly Gallery) 25' - 0" Top of Parapet - L1 18' - 6" Level 2 15' - 0" Level 1 0' - 0" Basement Orchestra Pit -11' -Pit 6" Elevator -8' -- 0" -15' 6"
North/South Building Section 2 - Through Main Theater 1/16" = 1'-0"
K
J
I
H G.8
G
F.7
F
E
D
C
B
A Top of Fly 65' - 0" Level 5 (Loading Gallery) 51' - 0" Roof 2 40' - 0"
FACULTY L2 LOBBY OFFICE 12 EDIT BAY 1
EDITING LAB 1 (35)
RADIO RADIO NEWS EQUIPMENT ENGINEERING STORAGE ROOM OFFICE
NEWSROOM
RADIO LOBBY PODCAST ROOM 2
FACULTY KITCHEN / LOUNGE
MEN'S RESTROOM
L2 LOBBY
L1 LOBBY
CIRCULATION
HORSESHOE THEATRE
STAGE
CIRCULATION
FILM PROC 2
3
Ehrlich Architects
Top of Parapet - R1 33' - 6" Roof 1 30' - 0" Level 4 28' - 0" Level 3 (Fly Gallery) 25' - 0" Top of Parapet - L1 18' - 6" Level 2 15' - 0" Level 1 0' - 0"
SCENE SHOP
PHOTOGRAPHY WET LAB
PHOTOGRAPHY WET LAB
Basement Orchestra Pit -11' 6" -8' -Pit 0" Elevator -15' - 6"
North/South Building Section 3 - Through Horseshoe Theater 1/16" = 1'-0" PROJECT NAME:
LAVC MEDIA ARTS + PERFORMING ARTS COMPLEX
SHEET NAME:
Building Sections
X-1 DATE / TIME STAMP:
11/24/2009
south elevation
west elevation
20
21
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
the Federal National Council’s New Parliament Building Complex 50,000 square feet
Physical Model
THE NEW BUILDING FOR FEDERAL NATIONAL COUNCIL,
United Arab Emirates
ABU DHABI-UNITED ARAB EMIRATES
SOLAR (THERMAL GENERATION) PANEL ARRAYS
B U S I N E S S OF F I C E S
B U S I N E S S OF F I C E S
DIRECTORATES OF THE FNC
PRESS / TV AREA
SECTION OF THE COMMITTEES
KINDERGARTEN
PRESS BOX
OFFICE OF FNC SPEAKER VISITORS SEATING
LOBBY
LOBBY
OPEN TO BELOW
MINISTERS OFFICE
LOBBY
MINISTERS OFFICE
B U S I N E S S OF F I C E S
DIRECTORATES OF THE FNC
B U S I N E S S OF F I C E S
DIRECTORATES OF THE FNC
MINISTERS LOBBY
PRAYER HALL
LEVEL 4 - ASSEMBLY HALL CHAMBER MAIN FLOOR •
The Speaker of the FNC, Ministers and Members enter the Assembly Hall at the perimeter and descend to their seats in the stepped chamber. The pulpit for the Speaker of the FNC is located at the lower portion of this level. A private lobby for the President and Speaker of the FNC is located on the south side of the Assembly Hall, with direct access to their positions in the chamber.
5m
10m
PRAYER HALL
OPEN OFFICE
•
0m
REST HALL
OPEN OFFICE
OPEN OFFICE
OPEN OFFICE
September 2009-April 2010 I was involved in the design phase of the competition working directly under the chief designer, my tasks were to produce schematic sections and elevations for the project.
LOBBY
MINISTERS OFFICE
MEETING
OPEN OFFICE
OPEN OFFICE
Internship with STEVEN EHRLICH ARCHITECTS
VIP / DIPLOMATS LOBBY
MINISTERS OFFICE
OPEN TO BELOW
MEETING
PRESIDENTS LOBBY
FNC SPEAKERS SUITE
MEETING
MEETING
VIP BALCONY
PARL. LOBBY
DIPLOMATS BALCONY
ASSEMBLY HALL
BUSINESS OFFICES
LOBBY
PARL. LOBBY
LOBBY
•
The TV Rooms are located at the north side of the Assembly Hall, with views into the chamber.
•
Parliamentary Building West contains The Section of the Directorates. It includes: of ces suites, open of ce, meeting rooms, server rooms, the Section of Printing and Binding and the kindergarten.
•
Parliamentary Building East contains 36 suites for the Section of the Business Of ces for the Members.
LEVEL 6 - ASSEMBLY HALL CHAMBER, VISITORS’ BALCONY AND MINISTERS’ OFFICES
LEVEL 5 - ASSEMBLY HALL CHAMBER, VIP + DIPLOMAT’S BALCONY AND PRESS BOX
•
Both Parliamentary Buildings have terraces facing north and south, taking advantage of the views and allowing occupants to take in fresh air and views of greenery.
•
VIPs and Diplomats enter the Assembly Hall Chamber from the west and east, respectively, the Press enters from the north through a separate lobby.
•
Both Parliamentary Buildings have a sky-lit atrium, ve stories tall on the south side of the building, which brings in natural light to all levels and enhances the working environment of the occupants.
•
Parliamentary Building West contains the Section of the Committees and for the Section of Directorates. It includes of ces and exible halls.
•
The Parliamentary Building East contains 32 suites for the Section of the Business Of ces for the Members.
•
Both Parliamentary Buildings have terraces facing north, taking advantage of the views and allowing occupants to take in fresh air and views of greenery.
•
Both Parliamentary Buildings have a sky-lit atrium, ve stories tall on the south side of the building, which brings in natural light to all levels and enhances the working environment of the occupants.
20m
•
Visitors (the Public) enter the Assembly Hall chamber from the north.
•
•
Ministers’ of ces and meeting rooms make up the balance of the level (with separate circulation from the Visitors).
•
Parliamentary Building west contains Prayer Halls for the Section of the Directorates and a rest hall. The helipad is on the roof.
Both Parliamentary Buildings have a sky-lit atrium, ve stories tall on the south side of the building, which brings in natural light to all levels and enhances the working environment of the occupants.
•
•
The ceiling of the Assembly Hall Chamber is domed with an oculus at the center, allowing natural light to penetrate into the space.
•
Collectors for Solar Thermal Generation, using evacuated heat tubes occupy the open area on the Parliamentary Building roofs, providing hot water for
Parliamentary Building East contains the of ce suite (and private terrace facing the Gulf) for the Speaker of the FNC and the balance of the program of the Section of the Secretariat General.
Skylights are proposed at the perimeter of the Assembly Hall building to bring natural light into the Ministers’ of ces and meeting rooms below. Kitchen support the President’s Suite on the level above.
•
•
•
There are also 17 suites for the Section of the Business Of ces for the Members on the south side building.
The Minister’s of ces have close proximity to the President’s Suite and are connected with an open day-lit stair.
use in the absorption chiller and/or domestic hot water requirements for the building.
The Federal National Council’s New Parliament Building Complex Competition(1st place)
PRES. REC. HALL
ASSEMBLY HALL CHAMBER
TV ROOM
EXISTING ROADWAY
SECTION A
PARKING FOR EXISTING ASSEMBLY HALL AND NEW GOVERNMENT BUILDINGS ON SITE 2
EXISTING ASSEMBLY HALL BUILDING
VIP ENTRANCE LOBBY
CEREMONIAL YARD
VIP OPEN PARKING
VISITORS SEATING PRESS BOX
LOBBY
LOBBY
PEDESTRIAN BRIDGE OVER EXISTING ROADWAY
PRESIDENT’S TERRACE
VISITORS ENTRANCE LOBBY GRAND STAIR
SERVICES
BLDG SERVICE
PARKING PARKING
WATER STORAGE
PARKING
BLDG SERVICE
PARKING
2 - EAST ELEVATION
22
23
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
ACADEMIC PROJECTS TEDx Performance Center The Seventh Regiment Armory, New York
LANDSCRAPER
Fashion District, Los Angeles, California
SATELLITE AUTOMOBILE ASSEMBLY FACTORY Pasadena, California
THERMAL BATH Copenhagen, Denmark
URBAN AVAIRY Central Park, New York
COMMUNAL HOUSE Copenhagen, Denmark
SHED PROJECT Bruton, England
KAYAK CLUB
Copenhagen, Denmark
PIXILATED WALL San Luis Obispo, California
FURNITURE:THE COUCH San Luis Obispo, California
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
TEDx Performance Center Project Title: TEDx Head Seventh Armory, New York Size: 500 people Auditorium
BRIEF:
The concept for this performance center is to enchance the audience members experience in three different ways; The first experience is the experience of audience of one, which is outside of the auditorium. The second is the experience in simulcast room as a small group. The third is that the experience in auditorium as a large collective group. We believe each has its unique vaule to TEDx experience
TEAM:
David Anderson Louis Kohel Critics [ Josh Prince-Ramus ] Columbia Spring 2011
The Focus: Stage
Third Experrience: Formal
Second Experience: Informal
First Experience: Intimate
Simulcast Area Back of House
Auditorium Projection Screen Stage
26
27
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
AUDITORIUM
Typically, the way to bring audience members closer is to introduce balconies.
CONVENTIONAL
28
The problem with conventional balcony is that audience members are somewhat isolated, people in the lower level are not aware of the audience member above.
OUR iNVENTION
We rethink the typical auditorium; the intension is to make the audience members more connected as a collective group visually and physically.
Instead of the isolated balconies, we create levels that are connected with circulations and seating
29
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
FINAL MODEL Scale= 1:75 Size = 30”X 42” Material = Basswood
30
31
STUDY MODEL
Scale= 1:100 Size = 12”X 8” Material = White Museum Broad
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
FINAL MODEL
WITH SKIN
WITHOUT SKIN
32
33
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
34
35
URBAN AVAIRY
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
Central Park, New York, NY Square Footage: 1,050,000 sqft Type: Leisure
BRIEF: The idea is to create subliminal experience through rethinking an new typology of skycrapers in the city of New York. The purposal is to purpose a skyscraper which differs from its tradition housing humans, this skyscraper purposes to house bird and reduce their dead rate. In New York city, birds are in danger due our current technology which make possible for buildings to get taller and glass facade more reflective. Taller building and more reflective glass window endanger birds because birds conceive the reflection of sky on the glass facades of tall skyscrapers as true sky, they were injured or died by crashing into the glass window. The height of the skyscraper is as tall as the Time Warner building and it opens to air which want serve as a home for birds. The skyscraper attractors through a strong beam of light, which will grow at night to the sky. Food and vegetation to create nests are available this building.
Critics [ Florian Idenburg/ Jing Lui ] Columbia Summer 2010
DESIGN PROGRESSION Nest
Visitor Circulation path The Protected Circulation Path which goes from the bottom to the top and serves as one of the options circulating
Compressed The Cirulation changes
visitors’ perception on the length of path
Second Path
is added to look at the potential of the interaction of the paths.
Interwined The
Paths which creates transitional points between paths
Inspiration Image
Combined Circulation &
Nest wich blends the human and the birds into one place.
DESIGN PROGRESSION Nest
Visitor Circulation path
1.1
The Protected Circulation Path which goes from the bottom to the top and serves as one of the options circulating
1.1
36
Compressed The Cirulation changes
visitors’ perception on the length of path
1.2
Second Path
is added to look at the potential of the interaction of the paths.
1.3
Interwined The
Paths which creates transitional points between paths
1.4
Inspiration Image
1.5
1.2
1.3
1.4
1.5
1.6
1.7
Combined Circulation &
Nest wich blends the human and the birds into one place.
1.6
1.7
37
37
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
DIAGRAMS OF BIRD HABITS
DIAGRAMS OF BIRD BEHAVIORS
Fish Eater/ Summer And Winter Quarter Fish Eater/
Birds which obtain food at the water’s surface Summer And Winter Quarter fulmar red-necked phalarope grey phalarope long-tailed skua arctic skua pomarine skua great skua sabine’s gull kittiwake black tern arctic tern little auk
Piratical Pursuit
Pick Food While In Flight
Black Tern Arctic Tern
manx shearwater great shearwater sooty shearwater red-throated diver black-throated diver white biller dive great crested grebe red-necked grebe goosander razorbill guillemot black guillemot puffin
Skuas
osprey Summer And Winter Quarter black kite manx shearwater osprey lesser black-backed gullL: small great shearwater black kite caspian tern sooty shearwater lesser black-backed gullL: small common tern diver caspian tern littlered-throated tern black-throated diver common tern white biller dive little tern great crested grebe red-necked grebe goosander razorbill guillemot black guillemot puffin
Surface Feeders
Terns Storm Petrels
Fulmar Great Skua
Underwater Feeder (Purse Fish Under Water)
Surface Feeders
Pick Food While Swimming (occasionally Dive)
Little Gull Kittiwake Sabine’s Gull Skuas
distant itself away from the pond, stand still
Phalaropes
Often Dive Little Auke
Osprey Terns
Gannets
Shearwaters
Osprey 30 meter
Gannets
Auks Cornorants Divers Sawbills Grebes
Kingfisher Auks
Grey Heron Bittern Kingfisher
Grey H Bittern
30 meter
dive down 15 meter
38
Birds that feed in rivers, by shore vegetation (perch/stand still and await prey) Birds that feed in rivers, by shore veg (perch/stand still and await prey)
Underwater Feeder (Purse Fish Under Water) Cornorants Divers Sawbills Shearwaters Grebes
distant itself away from the pond, stand still
dive down 15 meter
39
MUSEUM FOR CHANG DAI-CHIEN
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 Body Position Studies
Project Title: New Mountain Face Neijiang, China
Square Footage: 50,000 sqft Type: Museum
BRIEF:
Chang Dai Chien is a renown painter in China who has left us an extraordinary and precious ink arts. He has travelled to many continents to archieve arts and get inspirations. One of the place he has been to get inspirations was Dunhuang Art Cave in China, where he has solely lived and painted for a couple years. In the Cave, he has produced many of his famous pieces. The purpose for this museum is to provide the very same experience that Chien has experienced during the years he spent in the Hieroglyphics Art. The spacital paths experience throughout the museum are executed through a study of his drawing positions as he ages. Thus, some sequence of the paths are tilted in the same degree similar to the degree where he drew in certain age of his. His art collections are not just being hung from the ceilings, they are also engraved into wall as hieroglyphics. Architecturally, the building is recessed into the mountain and mediated with the exisiting landscape and creates and a new face of the mountain for the city of Neijiang. Critics [ Benedetta Tagliabue/ Lydia Kallipoliti ] Columbia Fall 2010
Selected to publish in Columbia’s yearly Abstract Book -- Spring 2012
40
41
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
generation of the platforms
1. Define the tree locations
2. Giving proper diameter to trees
3. Defining a new curves pattern
4. Merge the existing topo curves to new topo curves .
Museum 1976-1985 Art Exhibitions
Museum 1952-1953 1954-1968 Art Exhibitions
Mediatation Area Public Talk Area Top of Hill
Chinese Opera Theater
Amphitheather Garden
Garden
1976-1985 1969-1975
9 years
6 years
1954-1968 1952-1953
14 years
1950-1951 1949-1950 1946-1948
1 year 1 year 1 year 2 year 1 year 2 year
1944-1945 1941-1943
20 years
1919-1939 1917-1919 1899-1916
Restaurant/Cafe Musuem 1944-1945 1946-1948 1950-1951 Art Exhibitions
Library
Studios Ink Class Practice Rooms Exhibitions
Reception/Gift Shop Entry/Bottom
1919-1939 Art Exhibitions
5. Composite drawing showing all the possible programs 42
43
2 year 7 year
L.A. LANDSCRAPER
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
Fashion District, Los Angeles, California Square Footage: 1,050,000 sqft Type: Mixed used: Education Factory, Retail
BRIEF: Fashion garments exist momentarily, being discarded as the fashions change or the garment wares out. Ironically, architecture, despite its inventible eventual decay, are often conceived as monuments which exists beyond temporal constraints. Yet architecture and fashion both provide protection and shelter to the human body, and each has the potential to lend an identity to the people who occupy or wear them. This project focuses on the territory where fashion and architecture share similar fabrication techniques. While fashion fabrication is at a relatively micro scale, architecture makes very similar moves but at a larger scale. This research and design project explores new possibilities of construction techniques from cloth fiber at the architectural scale. Exhibited at Cal Poly NAAB Accreditation Exhibition March 2011 Exhibited at Chumash Thesis Show June 2009 Exhibited at Los Angeles Forum for Architecture and Urban Design May 2009 RECEIVED: AIA CCC HONOR DESIGN AWARD
44
45
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
ANALOG MODEL AND DIAGRAMS Green Landscape
Spring 2009
Horizontal and Vertical Circulation
Envelope
Structural Bay
Program Distribution
Cat Walks Production Exhibition Space Commercial Retail Institution Underground Parking
Foundation Structural Grid
BASSWOOD MODEL 30” X 60” X 9” A physical model to study the contextual relationship
01_program diagram
46 Project I
02_structure grid
03_circulation
Landscraper 47
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
SATELLITE AUTOMOBILE ASSEMBLY FACTORY
Pasadena, California
Square Footage: 100,000 sqft Type: Commercial
BRIEF:
Like the assemblage of automobiles, this project’s architectonic is conceived as a kit of parts. The building’s three main programs are the assembly line, exhibition hall and design studio. The building inverts the normally private space of car manufactory to a public, urban spectacle. As such, the public can view the construction of the car – the major driver of today’s urbanism. Finally, the design studios are also connected to the assembly line are, so that design process is visually connected to the car assembly space.
Exhibited At Cal Poly Architectural Admission Office
48
49
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
SITE ANALYSIS
Spring 2007
Montage of Site Forces
Building Influence
Transportation Influence
+
Noise Influence
+
Spring 2007
Analog Models
Combo
=
Interpretation of the Image Collage
Magazine Collages
BASSWOOD MODEL 18” X 12” X 9”
It is a design technique to quickly identify the programs and circulation during design process through the use of colors.
SITE ANALYSIS First Floor
Section
Second Floor
Grid System
50
Programs Diagram
Main Hallways
Automobile Satellite Assembly Factory 51
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
THERMAL BATH Copenhagen, Denmark
Square Footage: 16,000 sqft Type: Leisure
BRIEF: The design intention is to contrast the noisy and busy environment of Copenhagen by creating a calm and relaxing atmosphere on the lake. Situating and submerging the bath in the middle of lake, it creates a disconnection from society, which allows one to escape from stress and enjoy the calm and quiet space.
52
53
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
RELAXATION AREA IMMERSIVE
01 bathroom
54 Project III
01. avoid leaking system
Fall 2008
02. relax area
03. island within island
04. switch point between hot and cold bath
05. concrete meets the water
06. entry way
07. light penetration
08. light penetration from the bottom
09.beams of light on the 10. island within island shower area
Thermal Bath 55
COMMUNAL HOUSE
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
Copenhagen, Denmark
Square Footage: 3000 sqft Type: Residential BRIEF: The concepts is to create a house to bring neighbors together and breakdown isolation between them and provide an environment for social activities in and for the neighborhood. The form of the building is an expression and is deriving by joining community.
N
56 Project IV
57
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
DESIGN DEVELOPMENT
ELEVATIONS
Spring 2008
Shade Study Throughout a Year
The site is very narrow and between two existing residential units. The site is always under the shadow due the fact it is next to a taller residential building. MAIN CIRCULATION
OUTDOOR ROOF SPACE EMERGENCY STAIRCASE 4TH FLOOR
VIEW CONNECTION TO THE CITY
3RD FLOOR 1ST FLOOR
VIEW TO STREET
EXIT
Form Studies
Section B
Section A
The form generated base on the site constraints where lighting is limited.
DRIVEN LIGHT VOID
MAIN CIRCULATION
CIRCULATION DISTRIBUTION
ADJACENT BUILDING UNIT 4TH FLOOR 3RD FLOOR DOUBLE HIGH LOBBY
VIEW CONNECTION TO THE CITY OFFICE
VIEW TO STREET
VENTILATION
DIRECT SUN LIGHT BEDROOM LIVNG ROOM KITCHEN LOBBY
DIFFUSED LIGHT
BATHROOM BATHROOM BEDROOM
Adding Square Footage
Subtract Mass
Add Porosity
DIAGRAMS
Lighten The Mass
ATRIUM
VENTILATION
EXIT
ENTRY
Section C
North Elevation
EXPLODED AXON Kitchen Office Living Room Bedroom Master Bedroom
Programs are organized into two main parts; private program, such as bedrooms and working offices, are all in the right side of the house which have the view to the skyline of the city. The public programs are all in the left side of the house; they are the shared rooms within the house.
The house consists a curtain wall system on the four sides. Channel glass will be fabricated the same height as the floor heights.
EAST FACDE STRUCTURAL STEEL MAIN STRUCTURAL CORE TITANIUM WINDOW FRAME CHANNEL GLASS
NORTH FACADE
CHANNEL GLASS TITANIUM WINDOW FRAME FROSTED GLASS DOOR FRAME
private publ ic
SOUTH FACDE
CHANNEL GLASS CONCRETE SLABS STRUCTURAL STEEL TITANIUM WINDOW FRAME
FROSTED GLASS DOOR FRAME MAIN CIRCULATION DISTRIBUTION
58 Project IV
59
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
SHED PROJECT Bruton, England
Square Footage: 600 sqft Type: Artist Retreat
10 m
BRIEF: Our design concept proposes an artist retreat constructed using sustainable materials and methods. The ambition of the project is to take advantage of the serene atmosphere and introduce a structure dedicated to experiencing tranquility, reflection and inspiration through perceptive, contemplative, tactile and sensory space. While maintaining the original footprint to maximize floor area, lines of forces were also extrapolated from the existing diagram to arrive at four exclusive spaces - three pavilions and an outdoor space unified by a covered path – each embodying unique qualities that trigger different senses that facilitate contemplation.
0
1
2.5
5
10 m 2.5
These experiences are housed in an energy and acoustical efficient cordwood masonry structure, which not only help maintain low energy usage due to its effective insulative property, but also filters out noise from the adjacent roads giving the artist a sense of being in a sacred space.
5
The playful arrangement of the windows which was influenced by the relationship of the windows on the existing adjacent house transforms the architecture into a multi-lens that frames and visually connects the artist to the surrounding landscape. Each space employs particular natural elements to offer the artist a diversity of atmospheres to connect with their inner thoughts through sound, touch, smell and sight. A play of light is overlaid to add to the effects.
0
1
Cordwood masonry construction is an economical use for log ends and fallen trees. It consists of stacking whole wood log of various diameters in a bed of mortar, which inherently yields characteristics that blend with the surrounding environment.
60
61
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
SECTION EAST-WEST 0
25
50
100
0
25
50
200 cm
100
200 cm
SECTION NORTH-SOUTH 62
63
KAYAK CLUB
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
Wilders Plads, Copenhagen, Denmark Square Footage: 6000 sqft Type: Sport Leisure
BRIEF: It is located next to a water front in a cozy district, Copenhagen. The design process is to investigate on kayakers ritual processes of kayaking. A loop is designed to accommodate the process; enter, get changed, get equipped, and kayak out.
64
65
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
DESIGN DEVELOPMENT
Spring 2008
Form Development Bend To Gain Views
Conventional Program
The Division of The Kayak Club Program: Leaving and Entering
Twisted To Contact with Water
Skin Development Diamond Penetration Modules Trial 1
Trial 2
Trial 3
Trial 4
60 pairs of modules
15 pairs of modules
15 pairs of modules
30 pairs of modules
B
66 Project V
Kayak Club 67
PIXILATED WALL
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135 STRATEGY
Spring 2007
On-site material influences used to develop varied patterning density and surface relief.
San Luis Obispo, California
BRIEF: Develop a pre-cast concrete wall to serve as anchor point for future tensile structure and as memorial for patrons, alumni, and donors. Partner with Jai Kumaran
01
02
03
04
DIGITAL WORK
Evolves early formal language and allows for assembly of fabrication drawings.
SITE
Concrete Testing Yard, Cal Poly
68 Project VI
Pixilated Wall
69
UNDER CONSTRUCTION:
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
The self consolidated concrete was poured into the 8’ X 8 MDF mold. The black pipes were used to make cavities for threading wall to the concrete columns, which help stabilize the wall in place.
70 Project VI
Pixilated Wall
71
Zhong Ren Huang///zhong.ren.huang@icloud.com///(510)-590-2135
FURNITURE : THE COUCH Furniture Competition : Vellum 2008
MATERIAL: STEEL
72
73
Zhong Ren Huang,Registered Architect, AIA, LEED BD+C, NCARB 460 West 46th Street #2, New York, NY 10036 USA // (510)590-2135 // zhong.ren.huang@icloud.com // Nationality: United States
//RESUME// - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - EDUCATION 06/2010- 05/2011
Columbia University - New York, NY, USA Master of Science In Advanced Architectural Design
09/2005 - 06/2009
California Polytechnic State University - San Luis Obispo, California, USA Bachelor of Architecture
08/2007- 05/2008
Danish Institute for Study Abroad - Copenhagen, Denmark International Education In Scandinavian Architecture
SKILLS
General: Strong communication and interpersonal skills, strong work ethic and team player, detail oriented with ability to multi-task while meeting various deadlines. Design - Architecture / Interior Renovations /Planning / Graphics/ Research/ Drafting/ 3D modeling/ Rendering/Presentations / Model-making/ Lasercut/ CNC Milling / 3D print / Waterjet Software: Mac/ PC / Adobe Creative Suite / Microsoft Office / AutoCAD / Rhinoceros/ 3DS Max / V-Ray/ Maxwell Languages: Fluent in English, Mandarin and Cantonese.
WORK EXPERIENCE 07/2011 - present
Handel Architects - New York, New York, USA Architect // Work include: high-end condominum/rental buildings and residential towers from the ground up construction. Notable Project[s]: Port Imperial Site 12: Weahawken, NJ: 7-story Condominium/ 103 units- 2/3 Bedroom+ Retail +Parking// Involvment: SD-CA Cathedral - New York, NY : 15-Story Condominium/110 Units - 2/3 Bedrooms + Penthouse + Retail // Involvement: SD-CD 99 Hudson- Jersey City, NJ : 52-Story Rental Apartment+ Penthouse + Retail + Parking // Involvement: SD-CD 180 2nd Ave - New York, NY: 28-story Condominium Renovation/Restoration // Involvement: Feasiblility study + zoning
08/2009 - 04/2010
References: Supervisors:
Rick Kearns Senior Assoicate @ Handel Architects (212) 595-4112 rkearns@handelarchitects.com Note: Rick is my current Project Manager at Handel Architects, please do not contact Rick without my permission as it migh jeopardize the trustworthy relationship I have developed with the firm. Patti Rhee Partner @ Ehrlich Architects (310)237-0885 prhee@ehrlicharchitects.com
Co-workers: Lucas Chung Experiential/Architectural Designer (917)620-3276 lkkchung@gmail.com Rinaldo Perez Architectural Designer (646)239-0229 therinaldoperez@gmail.com
Steven Ehrlich Architects - Culver City, California, USA Intern Architect // Work include: mixed-use development and waterfront resort from the ground up construction Notable Project[s]: Media Arts And Performing Arts Building - Los Angeles, CA : office spaces, a theater, black box theater, // Involvement: SD-DD The Federal National Council’s New Parliament Building Complex: Offices, meeting halls, and visitors’ program// Involvement: SD Haeundae Beach Resort - Busan, Korea: Mixed-use Development - Shopping Mall, Offices, Hotel and Condo // Involvement: SD-DD
05/2008 - 09/2008
Eric Owen Moss Architects - Culver City, California, USA Intern Architect // Work include: theater on parking structure. Notable Project[s]: Warner Parking Structure and Retail, Culver City, CA / Involvement: SD
06/2006 - 09/2006
KTGY Group - Oakland, California, USA Intern Architect // Work include: single family houses and townhouses. Notable Project[s]: Single-Family home, Isleton, CA One Quarry townhouse, Brisbane,CA
HONORS/AWARDS 2011 2009 2005
Animal Architecture Award Third Runner Up Award Recipient for ‘Birdscraper’
AIA CCC Design Competition Award Honorable Mention Award Recipient for ‘L.A. Landscraper’
Bus Shelter Design Competition Award First Place Award Recipient
PUBLICATIONS
74
2011
Abstract: Columbia Yearly Publication_ Museum for Zhang Di-Chien
2011
TEDx East Salon: Presented TEDx Performance Center
2011
Studio Ambition: L.A. Landscraper
2009
AIA CCC:
2004
Laney College Newspaper: Bus Shelter Design Competition Award
Design Honor Award
CONTACT ZHONG REN HUANG 460 W. 46TH STREET APT.2 New York, NY 10036 (510)590-2135 ZHONG.REN.HUANG@ICLOUD.COM