PORTFOLIO OF ZHUPING LI Selected works 2014-2020 Master of Urban Design - UC Berkeley Bachelor of Architecture - SCUT
01
03
09
17
22
25
29
32
00 GIS BASED VISUALIZING WORKS Drafting, Modeling, Rendering
1
CALIFORNIA TRANSPORTATION INFRASTRUCTURE
G
G
G
G
G G G
G
G
G
G
G G
G
G GG
G G G
G
G
G
G
G
G
G
G
G
G G G
G
G G
G
G
E G
G
G
G G G
G G
G
G G
G
G
G
G G G
G
G G
G G
G
G G G
G E
G G G G G
G
G
G
GE
G
G
G GG
G G
G
G G
G
G
G G
G G
G G
G G G GG GG G G G
G
G
G
G
GG
G
G G
GG
G G
G
G
G
G
GG E
G G
G G
G
G G
Data analysis of Bay Area -- diagram + video
G G G
G G G
G GG G G
G
E
G G
G
G
G
E G
G G
G G E
LEGEND
G
G
G GG
G E E
G
G
G
G G G
G
GG G GG G G GG G GG G G E G G G E G G G G
CA_Rail
CA_Military Airports
E E
G
CA_Highway Network
E
G
G
E G GG E
G
E G G
G G
CA_Water Bodies
CA_Public Airports
GE
G G G G
G
G
G
G
G
G G
G
G
G
G
G
G
G G G G G G G
G
G E G G
E G G G
G
E G G EG E G
G
G
G
G
G
G G
G
G
G G EG
G
G
2
Location: Guangzhou, China
3
*
4
5
6
*
7
8
9
EXISTING ISSUES
SITE BIRDVIEW
DIVISION - HIGHWAY COMMUNITY
FOOTBALL STADIUM
BASKETBALL STADIUM
FLOOD - SEA LEVEL RISE
HIGHWAY
WASTAGE - STADIUM
10
GENERAL STRATEGY CONNECTIVITY
ECOLOGY & MEMORY
CONNECTIVITY
11
BIG MOVES TO DEAL WITH SEA LEVEL RISE
Line of proposed building
Raised streets
Building pad on grade
Two levels of parking at land bridge, typ.
HIGHWAY STRATEGY
Line of proposed building Raised streets Building pad on grade
5’-0”new grade 0’-0”Existing grade -15’-0”Water table RETENTION POND STRATEGY
This project propose several big moves to deal with climate change and sea level rise challenges, firstly including burying the high way, providing soft edge along waterfront space, building creek levee inside the land and creating 2 retention ponds
12
BIG MOVES TO DEAL WITH SEA LEVEL RISE
Levee system Line of proposed building Raised streets Building pad on grade
WATERFRONT STRATEGY Levee system Line of proposed building Raised streets Building pad on grade
5’-0”new grade 0’-0”Existing grade -15’-0”Water table CREEK LEVEE
This project propose several big moves to deal with climate change and sea level rise challenges, firstly including burying the high way, providing soft edge along waterfront space, building creek levee inside the land and creating 2 retention ponds
13
CONTRACT BEWTEEN EXISTING AND PROPOSED PLAN
EXISTING PLAN
PROPOSED PLAN
48' SEA LEVEL RISE -
66' SEA LEVEL RISE 14
BLOCK STRATEGY
PHASING 4 & LAND USE
BLOCKS AS SPONGES
BLOCKS AS GREEN FINGERS
Residential
Office
1F Retail
Education
Pdr
Industry
BLOCKS AS CORRIDORS PHASING 1
PHASING 2
PHASING 3
BLOCKS AS ELEVATED PODIUM
15
PERSPECTIVE RENDERING
16
03
Location: Guangzhou, China
17
18
3F - RESIDENTIAL
2F - RESIDENTIAL
1F - RETAILING & MANUFACTURING 19
20
21
04
Location: Shenzhen, China
22
23
24
05
Location: Shenzhen, China
25
26
27
28
06
29
30
31
32
33
34
35