Portfolio-ZP

Page 1

PORTFOLIO OF ZHUPING LI Selected works 2014-2020 Master of Urban Design - UC Berkeley Bachelor of Architecture - SCUT


01

03

09

17

22

25

29

32


00 GIS BASED VISUALIZING WORKS Drafting, Modeling, Rendering

1


CALIFORNIA TRANSPORTATION INFRASTRUCTURE

G

G

G

G

G G G

G

G

G

G

G G

G

G GG

G G G

G

G

G

G

G

G

G

G

G

G G G

G

G G

G

G

E G

G

G

G G G

G G

G

G G

G

G

G

G G G

G

G G

G G

G

G G G

G E

G G G G G

G

G

G

GE

G

G

G GG

G G

G

G G

G

G

G G

G G

G G

G G G GG GG G G G

G

G

G

G

GG

G

G G

GG

G G

G

G

G

G

GG E

G G

G G

G

G G

Data analysis of Bay Area -- diagram + video

G G G

G G G

G GG G G

G

E

G G

G

G

G

E G

G G

G G E

LEGEND

G

G

G GG

G E E

G

G

G

G G G

G

GG G GG G G GG G GG G G E G G G E G G G G

CA_Rail

CA_Military Airports

E E

G

CA_Highway Network

E

G

G

E G GG E

G

E G G

G G

CA_Water Bodies

CA_Public Airports

GE

G G G G

G

G

G

G

G

G G

G

G

G

G

G

G

G G G G G G G

G

G E G G

E G G G

G

E G G EG E G

G

G

G

G

G

G G

G

G

G G EG

G

G

2


Location: Guangzhou, China

3


*

4


5


6


*

7


8


9


EXISTING ISSUES

SITE BIRDVIEW

DIVISION - HIGHWAY COMMUNITY

FOOTBALL STADIUM

BASKETBALL STADIUM

FLOOD - SEA LEVEL RISE

HIGHWAY

WASTAGE - STADIUM

10


GENERAL STRATEGY CONNECTIVITY

ECOLOGY & MEMORY

CONNECTIVITY

11


BIG MOVES TO DEAL WITH SEA LEVEL RISE

Line of proposed building

Raised streets

Building pad on grade

Two levels of parking at land bridge, typ.

HIGHWAY STRATEGY

Line of proposed building Raised streets Building pad on grade

5’-0”new grade 0’-0”Existing grade -15’-0”Water table RETENTION POND STRATEGY

This project propose several big moves to deal with climate change and sea level rise challenges, firstly including burying the high way, providing soft edge along waterfront space, building creek levee inside the land and creating 2 retention ponds

12


BIG MOVES TO DEAL WITH SEA LEVEL RISE

Levee system Line of proposed building Raised streets Building pad on grade

WATERFRONT STRATEGY Levee system Line of proposed building Raised streets Building pad on grade

5’-0”new grade 0’-0”Existing grade -15’-0”Water table CREEK LEVEE

This project propose several big moves to deal with climate change and sea level rise challenges, firstly including burying the high way, providing soft edge along waterfront space, building creek levee inside the land and creating 2 retention ponds

13


CONTRACT BEWTEEN EXISTING AND PROPOSED PLAN

EXISTING PLAN

PROPOSED PLAN

48' SEA LEVEL RISE -

66' SEA LEVEL RISE 14


BLOCK STRATEGY

PHASING 4 & LAND USE

BLOCKS AS SPONGES

BLOCKS AS GREEN FINGERS

Residential

Office

1F Retail

Education

Pdr

Industry

BLOCKS AS CORRIDORS PHASING 1

PHASING 2

PHASING 3

BLOCKS AS ELEVATED PODIUM

15


PERSPECTIVE RENDERING

16


03

Location: Guangzhou, China

17


18


3F - RESIDENTIAL

2F - RESIDENTIAL

1F - RETAILING & MANUFACTURING 19


20


21


04

Location: Shenzhen, China

22


23


24


05

Location: Shenzhen, China

25


26


27


28


06

29


30


31


32


33


34


35



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.