P O R T F O L I O
.
ZSÓFIA LESZKOVSZKI . architect
INTRODUCTION One of my first projects was a mirror that was placed between the trees. When you just pass by, maybe you don’t even notice it. But as the sun shines on its surface, first you get a bit confused, then you will be curious and amazed. I also like to describe myself as this mirror, which collects and reflects the environment in a unique way, shows the details that maybe no one notices.
.1
ZSÓFIA LESZKOVSZKI architect leszkovszki.zsofia@gmail.com +351913827816
STUDIES
.
2011 - 2017 Budapest University of Technology and Economics Master’s Degree in Architecture design specialization 2005 - 2011 Radnóti Miklós Secondary School, Dunakeszi mathematics and german in advanced level
WORK EXPERIENCE
2018 - OTO Arquitectos, Cascais
. junior architect
worked on various projects from concept until execution: licencing of a small cabin, execution plans of villas in Algarve, refurbishment and addition to a city palace in Lisbon, licencing of apartement housing blocks, concept for a hotel, competition for a public pool, interior design of restaurants and apartements
.
2017 - 2018 NOZ Arquitectura, Lisbon internship worked on execution plans of a sport facility, designed furniture, made presentations and visualizations, advanced creating parametric Revit Families, worked on the concept plans of a winery, prepared models with laser cutter and by hand
.
2015 - 2017 Lechner Knowledge Center, Budapest trainee surveyed existing buildings and processed into BIM models, made visualizations, worked on execution plans of refurbishment of an engine house, specified detail drawings, made illustrations for an architectural magazine, developed and tested new methods of building survey with laser scanner
.
2015 Construm Ltd., Budapest construction internship prepared material and budget calculations, surveyed existing buildings, studied construction techniques on site OTHER EXPERIENCE 2015 Architectural Study Trip to Austria studied contemporary austrian architecture, wrote articles for a website
.
2014 Construction Camp in Perbál, Hungary installation building part of a volunteer team, made an installation for a museum from reused materials
.
2014 Building Survey Camp in Burgundy, France Cathédrale Saint-Vincent de Mâcon surveyed a romanesque-gothic church, studied french medieval architecture 2009 - 2013 Student exchanges to Germany (Tübingen), Denmark and Spain (Barcelona)
.2
ACHIEVEMENTS
.
.
2013 Scientific Students’ Association Conference housing estates 3rd prize
.
.
2010 - 2011 Language Certificates german B2 english B2
.
2010 Driving licence B cathegory
.
2005 Certificate of Elementary Art Education violin LANGUAGES
Hungarian English German Portuguese
SKILLS
Adobe Photoshop Adobe InDesign ArchiCAD AutoCAD Autodesk Revit Microsoft Office 3ds Max Twinmotion
HOBBIES & INTERESTS
..... .... ... .... .... .... ..... ... .... ..... ... .... .
.
.
.
.
play violin in a string quartet singing ballet dancing reading travelling cooking
.3
.4
TABLE OF CONTENT
.
STONE BATH p 6-11
.
GARDEN OF EVENTS p 12-15
.
VILLAS D1 AND D2 p 16-19
.
CITY PALACE SALDANHA p 20-23
.
TOMATINO p 24-25
.
CHILDREN’S MUSEUM p 26-29
.
OTHER WORKS p 30-31
.5
STONE BATH . Complex Design Studio 1-2. Budapest University of Technology and Economics GSPublisherVersion 0.33.100.100
LOCATION: Diósd, Hungary YEAR: 2016 CONSULTANT: Péter Klobusovszki
This project is located in a very interesting place, in an abandoned limestone quarry. The area is naturally rich in thermal water sources, from here comes my proposal to design a thermal bath. The main design principal was to place everything under the terrain and to show as little as possible on the surface, because what matters is underground. So when we arrive to the plot we will first see just an elevator, as we are getting closer we will find a hole on the ground and the stairs that lead us down to the entrance atrium. Besides the reception and the staircase, this atrium also contains an extra outside pool. I was working on this project for two semesters, so I had the time to design every piece from the details of the glass structure and the pools to the filtration of the underground areas. I learned how the other disciplines can suit to the basic concept and how they can shape it.
.6
3,165
8,155
5,245
9,18
1,67
18
AJ-08
8,155
75 2,10
5
106 RAKTÁR
1,22
75 2,10 AJ-08
105 BÜFÉ
1,35 18
79
108 WC
18
18
4,60
75 2,10
87
75 2,10
107 ÖLTÖZŐ
75 2,10
AJ-08
AJ-08
2,50
PIHENŐ SAROK
7
5
AJ-07
polimerbeton folyóka mészkőfal mentén
18
15 cm vtg szerelt gipszkarton válaszfal András-kereszt merevítésekkel
615
18
5,245
9,18
7
15,59
102 KÁVÉZÓ
8,64
21,40
9,315
PIHENŐ TÉR -10,40 M3
2 cm polírozo , impregnált, adalékokkal felületkezelt, szálerősíte , aljzatbetonnal együ
befogo
ÁTRIUM
48 cm Thermomass rendszerű maghőszigetelt vasbeton fal 54
53
55
52
51
50
49
47
48
45
46
M4
2,935
2,91
7
M4
7,135
4,495
8,00
645
44
43
1
42
2
41
3
-10,40
40
4
165
25,685
1,845
bordákkal erősíte
AJ-07
7
36
8
35
9
34
10
11
8,00
feszíte szórt (PebbleTec) medenceburkola
33
AJ-06
2,295
AJ-07 90 2,10 AJ-07
32
31
12
29
14
15
16
915
27
17
26
1
1,51 12 KONCEPCIÓ
165
5
7
24
6,965
GIPSZKARTON 2,05
KISZOLGÁL (ÖLTÖZŐ, TERÁPIÁS
MEDENCÉ TARTÓSZE
GÉPÉSZET 4,465
15
2,05
18,175
109 MEDENCETÉR
15°C
VOLUMES POOLS
1,655
ÜVEG
KÜLSŐ TÉR
DETAIL2,30OF FLOOR -1 WITH ENTRANCE 5
1,20
VASBETON M3
4,90
35 °C
8,00
6,965
GIPSZKARTONÁTRIUMOK 2,555
815
LIFT
1,20 2,40
165
1,195
VASBETON MEDENCÉK -10,40 ÜVEG TÖMEGEK
bordákkal erősíte 1,30
4,675
1,715 AJ-03
8,71
20
22
001 LÉPCSŐHÁZ
3,015
19
21
23
103 MOSDÓK
225
18
KONCEPCIÓ3
25
1,25
LIFT
1,20 2,10
1
28
15 cm vtg mon. vb. li
13
28 °C
30
AJ-04
75 2,10
6,19
1,10 2,10
AJ-05
1,20 2,10
8,00
75 2,10
75 2,10
1
M2
6
37
SZERTÁR
905
104 TAK.
5
hőszigetelő üvegezésű
38
AJ-03
39
2,05
21,56
22
26,365
LEHATÁROLÁS BEJÁRAT/MEDENCÉK ATRIUMS OUTDOOR
KÖZLEKEDÉS LEHATÁROLÁS
MEDENCÉK
VASBETON
TÖMEGEK
ÜVEG
ÁTRIUMOK
GIPSZKARTON
SERVING SPACES UNDER POOLS
FUNKCIÓK MACHINERY
KÖZLEK
KÜLSŐ TÉR
.
FALSZERKEZETEK VOLUMES / ATRIUMS FLOOR -1 TÖMEGEK/ÁTRIUMOK TÖMEGEK/ÁTRIUMOK
.
VENTILATION FLOOR -1 FALSZERKEZETEK
SZELLŐZÉS FALSZERKEZETEK
.
CONNECTING CORRIDORS FLOOR -2 ÖSSZEKÖTŐ FOLYOSÓK KÖZLEKEDÉS 7
.
SZEL
FÜRDŐ
KISZOLGÁLÓ
VÍZELVEZETÉS
FÜRDŐ
KISZOLGÁLÓ
SZELLŐZÉS
VÍZELVEZETÉS
BÜFÉ BEJÁRAT
ÉR
CET
DEN
ME
ÖLTÖZŐK
BÜFÉ SZEMÉLYZET
HANGSZIGETELÉS
TÉRELHATÁROLÁS
HANGSZIGETELÉS
TÉRELHATÁROLÁS
AT JÁR
BEJÁRAT
SZEMÉLYZET
FŰTÉS
SZELLŐZÉS
FŰTÉS
The built elements are vertically separated to two levels: the upper floor contains the main guest areas: pools, resting areas and the cafeteria, the lower floor consists of the serving spaces, such as dressing rooms, workers’ rooms, machinery and the therapy section.
ÉR
CET
DEN
ME
BE The main entrance of the building is made through the main atrium, which is carved into the stone. The visitors are arriving to the -2 level and Bafter AT changing clothes EJÁR will be allowed to enter the bath area using a separate circulation route.
SZELLŐZÉS VÍZELVEZETÉS
FŰTÉS
ÖLTÖZŐK
HANGSZIGETELÉS
TÉRELHATÁROLÁS
The two levels areSZERKEZET separated by a complex slab, which = MÉSZKŐPILLÉREK contains the heating and cooling system, the air-conditioning and the pools. FALAK SZABADON ELHELYEZHETŐEK CSAK TÉRELVÁLASZTÓ SZEREP
GSEduca
GSEduca
SZERKEZET = MÉSZKŐPILLÉREK
SZERKEZET
FALAK SZABADON=ELHELYEZHETŐEK CSAK TÉRELVÁLASZTÓ SZEREP
MÉSZKŐPILLÉREK
RAT BEJÁ
The slab structurally lays on the existing limestone. This means that the walls don’t have structural function, so they can be placed freely . SZOBA
FALAK SZABADON ELHELYEZHETŐEK CSAK TÉRELVÁLASZTÓ SZEREP
SZOBA
TERÁPIÁS
SZOBA
TERÁPIÁS
The therapy rooms are in a unique position, they are placed on the -2 level and they are getting light through a light tunnel from the surface.
TERÁPIÁS
.8
LESZKOVSZKI ZSÓFIA KOMPLEX2
DIÓSD
KONZULENS: KLOBUSOVSZKI PÉTER
KŐFÜRDŐ
.9
LÉPCSŐHÁZ
CS8
CS7
R10
extenzív zöldtető
12 cm vtg. konzolos mon. vb. lépcső
48 cm Thermom
R3
SZABADTÉRI MEDENCE
bordákkal erősíte
5 cm polírozo , impregnált, adalékokkal felületkezelt, szálerősíte
CS1
CS3
MEDENCETÉR
R1
CS4
NŐI ÖLTÖZŐ
R6
CS5
LIFT
feszíte szórt (PebbleTec) m
10,985 225
1,805
3,265
3,345 1,05
9,435
.
MEDENCE GÉPÉSZET
10 CONNECTION TO EXISTING LIMESTONE WALL
1,05
1,81
225
1,20
57
85
4,49
715
85
4,49
715
POOL EDGE DETAIL
6,8 27
51
GLASS WALL DETAIL
20
4,5
6,4
CS7
R10
AB-01
mass rendszerű maghőszigetelt vasbeton fal
MOSDÓ
15 cm vtg szerelt gipszkarton válasz András-kereszt merevítések
AJ-07
R2
R7
AJ-07
medenceburkola szerelt gipszkarton álmennyezet
SZELLŐZŐ GÉPHÁZ
KONZOLOS VASBETON LÉPCSŐ KIALAKÍTÁSA 5,005
775
5,005
775
51
475
216 FÉRFI WC
32 57
12
85 51
27
3
YZÓ 295
10
12
4,98
185
3,875
6,605
12
48
C
2,68 6,63
27
20
8,84
52 TÁR
2,33
4,295
165
2,85 21 2,90
LESZK
10
KOMP
KONZUL
gően átlátszó vagy savmarato
g
295
212 ELŐTÉR
15,145
CONCRETE STAIRS IRON DETAIL
elül befogo
A
B
. 11
KŐ
GARDEN OF EVENTS . Diploma Project Budapest University of Technology and Economics LOCATION: Balatonudvari, Hungary YEAR: 2017 CONSULTANT: Péter Klobusovszki GSPublisherVersion 0.33.100.100
My diploma project is located in a special place for me, in a small village near Lake Balaton. When I was a child I spent all my summers here, so when I started to think about the location this was the first place that came to my mind. This lake means the same to most humgarian people: spending the day on the lake shore, eating and going everywhere with bicycle. The main idea of the plan is creating a garden, which is a place for rest and relaxation for everyone, but also can be used for different events of the village, such as markets, local fests, exhibitions, lectures, etc... The border of the garden is a stone wall, which is commonly used in this area, and the buildings are part of this wall.
. 12
GE
MAIN CE ENTRAN
E BICYCL CE N ENTRA E REST BICYCL
GARDEN
OM EVENT RO
-0,05
OM NCE FR ENTRA RKING PA
GLADE
-0,05
MARKET
+8,00
+8,00 +8,00
MAIN CE ENTRAN
MARKET
árom bejárata főbejárat a falu felől Thevan. plot Ahas three entrances. Through the main entrance we arrive akosan, általában a nyári szezonban szombaton el, gyalogos bejárat, innen rögtön a piactérre yü rightAmikor toa the market. People who arrive rnap tartanak. piacfelől van, kipakolják a with car are walking through autóval érkezők parkoló közelí ér, amely szolgálhat, kiállítások, közösségi helyeze amikre a helyi termelők az a kerten keresztülhaladó gyalogúton át to the market. the garden so they can arrive The cyclists are arriving esküvők, egyéb rendezvények befogadására. ják. a piactérre. A kerékpárosok a harmadik through thenyitható north entrance, , hogy mindkét oldalt ajtókkalwhere they can store their bikes, and resztül érkeznek, ahol fede így a teremthen a kert részévé tud válni. a can rögtön have a rest in A thekőfal garden. ükre állnak, ez a they bejárat a kertbe részre osztja, a piactérre és a kertre, amely megpihenhetnek, piknikezhetnek, yterem mindkét oldali kinyitásával eggyé k.
N STATIO
-0,05
E RAG STO
árom bejárata van. A főbejárat a falu felől is a kőfal elemei: a rendezvényterem, a el, gyalogos bejárat, innen rögtön a piactérre yü gáló raktár és a kerékpáros pihenőhely The event room, the storage fora the market and the bicycle rest staautóval parkoló felől közelí amelyérkezők szolgálhat kiállítások, közösségi eér, jelennek meg. Aa tájolásnál fontos tion continue linebefogadására. of theirányába, wall. By the orientation, it was important aesküvők, kerten keresztülhaladó gyalogúton át egyéb rendezvények olt a piactér megnyitása athe szőlőhegy akerékpárú A kerékpárosok a harmadik to open thenyitható market toajtókkal the direction of the vineyard, and to place the , piactérre. hogy mindkét oldalt . resztül érkeznek, ahol fede így a terem a kert részévé tud válni. A kőfal a bicycle station parallel with the bicycle lane. ükre állnak, ez a piactérre bejárat rögtön a kertbe részre osztja, és a kertre, amely megpihenhetnek, piknikezhetnek, yterem mindkét oldali kinyitásával eggyé k.
KONCEPCIÓ 1:1000
E BICYCL CE N ENTRA GARDEN
-0,05
OM NCE FR ENTRA RKING PA
megpihenhetnek, piknikezhetnek, k.
-0,05
GLADE
-0,05
MARKET
+8,00
+8,00 +8,00
MAIN CE ENTRAN
OUTDOOR EVENT MARKET
The main element of the complex is the multifunctional event hall, akosan, általában a nyári szezonban szombaton yü rnap tartanak. Amikor piac kipakolják a which cankiállítások, serve forvan, exhibitions, community programs, weddings, etc. rendezvény alkalmával a piactér fogadótérként ér, amely szolgálhat közösségi helyeze , amikre a helyi termelők az z állófogadást esetleg i , de a rendezvény esküvők, egyéb rendezvények befogadására. It’s main feature that it has doors for both sides, so the building can ják. lesz, ilyenkoroldalt a rendezvényteremnek ,ert hogy mindkét nyitható ajtókkal csak part of the nkciója van.become így a terem a kert részévé tudgarden válni.as A well. kőfal a részre osztja, a piactérre és a kertre, amely yterem mindkét oldali kinyitásával eggyé
GARDEN -0,05
SERVING -0,05 AREA -0,05
RECEPTION
GLADE
+8,00
MARKET
+8,00 +8,00
OUTDOOR EVENT PERFORMANCE MARKET -0,05
-0,05
SERVING AREA
-0,05
TS SEA ING ND STA LACES P
When there is a bigger event happening, the place of the market beakosan, általában a nyári szezonban szombaton comes the reception but the main tok iskolai előadások rnapbemutatója,nagyobb tartanak. Amikor piac van,area, kipakolják a event is in the garden. In this rendezvény alkalmával a piactér fogadótérként keket kipakolják a raktárból és a piactéren case the event room has just serving function. helyeze , amikre a helyi termelők az z állófogadást esetleg i , de a rendezvény etején két szinten berendezik a nézőteret. A ják. ert lesz, ilyenkor a rendezvényteremnek csak erem ilyenkor szintén csak kiszolgáló nkciója van. be.
RECEPTION+8,00 +8,00 +8,00
OUTDOOR EVENT GARDEN PERFORMANCE
The grass is suitable for playing sports, so it can serve the locals and the people arriving for holidays.
-0,05
SUNNY
-0,05 -0,05
SERVING AREA +8,00
RECEPTION +8,00 +8,00
GARDEN PERFORMANCE GARDEN -0,05
REST SHADY PLAY SUNNY
-0,05 -0,05
TS SEA ING ND STA LACES P
, játékra is, így ki tudja etben a kert a pihenés, kikapcsolódás elyiek és a nyaralók igényeit is. piknikezők , fűben tok bemutatója,nagyobb iskolai előadások árnyékban az asztalokon ebédelni, keket kipakolják a raktárból és a piactéren lehet. két szinten berendezik a nézőteret. A etején erem ilyenkor szintén csak kiszolgáló be.
SHADY
TS SEA ING ND STA LACES P
In general the garden is the place of rest and relaxation. The glade is sunbathing or to have a piknik, in the shadow of the trees, people etben a kertfor a pihenés, kikapcsolódás piknikezők can have lunch, fűben or just rest. tok bemutatója,nagyobb iskolai árnyékban az alkalmával asztalokonaebédelni, rendezvény piactérelőadások fogadótérként keket kipakoljákesetleg a raktárból és a,piactéren lehet. z állófogadást i de a rendezvény etején kétilyenkor szintenaberendezik a nézőteret.csak A ert lesz, rendezvényteremnek erem ilyenkor szintén csak kiszolgáló nkciója van. be.
+8,00
+8,00 +8,00
. 13
R4 váltósorosan rako légzáró, páraáteresztő fólia kőzetgyapot hőszigetelés monolit vasbeton fal gle , festve
, a teherhordó falba bekötőtüskékkel rögzítve
váltósorosan rako légzáró, páraáteresztő fólia kőzetgyapot hőszigetelés monolit vasbeton fal gle , festve
, a teherhordó falba bekötőtüskékkel rögzítve
25
15 cm 1 rtg 15 cm 20 cm
R5
R5
25
15 cm 1 rtg 15 cm 35 cm
100/75mm L-acél vaktok 1cm vastag lágy polifoam peremdilatációs sáv
purenit nagyszilárdságú keményhab szigetelés tartósan rugalmas szilikon tömítés + PE habzsinór há 35
tartósan rugalmas szilikon tömítés 3rétegű hőszigetelő üvegezés
10
1 rtg 10 cm 20 cm
15
9
R4 35
15 cm 1 rtg 15 cm 20 cm
kivetőpánt
váltósorosan rako , a teherhordó falba bekötőtüskékkel rögzítve légzáró, páraáteresztő fólia rugalmas anyagú gumitömítés kőzetgyapot hőszigetelés monolit vasbeton fal gle , festve zsalugáter
+0,00 1,5
9.6
15
2,5 cm 7,5 cm 20 cm 5 cm 1 rtg
szalagparke polie aljzatbeton polie , ragasztással felüle ,a peremszigetelés mentén felhajtva ásványgyapot úsztatóréteg installációs réteg/EPS hőszigetelés vasalt aljzat szigetelést védő beton bitumenes vastaglemez talajnedvesség elleni szigetelés, teljes felületén lángolvasztással ragasztva hideg bitumenmáz kellősítés aljzatbeton kavicságyazat
R2
1,35 cm 1 rtg 6 cm 1 rtg
4.8
15
2
96mm tokszélességű rétegragaszto
R2
6
UV-álló, tartósan rugalmas szilikon tömítés + PE habzsinór há
2,5
külső oldali lég-és párazáró öntapadó EPDM membrán a nyílászáró beépítése mentén
7,5
20
R5 , a teherhordó falba bekötőtüskékkel rögzítve 20
váltósorosan rako légzáró, páraáteresztő fólia kőzetgyapot hőszigetelés monolit vasbeton fal gle , festve
10
5
15 cm 1 rtg 15 cm 35 cm
20
WINDOW DETAIL WITH SHADING SYSTEM AND FRAMING
LOKZATOK
GSEduca GSPublisherVersion 0.99.100.100
+5,36
+3 +3,58
+2,60 +2,53
+1,40
-0,05
SOUTH ELEVATION
. 14
When showing a whole plan or section, the details can be lost, so this page is dedicated to present a selection of the most interesting or most beautiful ones.
SZŐLŐHEGY I enjoy working on the details of a project, for me, creating a new line type, making a new texture or drawing people is a relaxing exercise, which makes the project unique.
,22
ke felüle
l t e , kékesszürke színben, vtg: 0.7mm
R3
TEMPLOM
DETAIL OF THE LOCATION PLAN
DETAIL OF NORTH ELEVATION FORGALMAS ÚT, ZAJ +3,58
+2,20
+3,28
R5 keret / előtető
+2,60
SZŐLŐ
+2,40
+2,6
LESZKOVSZKI ZSÓFIA
DIPLOMATERV
RENDEZVÉNYKERT ÉS PIAC BALATONUDVARI KÖZÉPÜLETTERVEZÉSI TANSZÉK 2017 DETAIL OF THE EVENT ROOM’S SECTION
DETAIL OF EAST ELEVATION
10cm vastag beton fedkő
H3 HOMLOKZAT 1:100
3,33 +3,16
+3,16
TEMPLOM
GSEduca GSPublisherVersion 0.98.100.100
. 15
VILLAS D1 AND D2 . Professional Project OTO Arquitectos LOCATION: Carvoeiro, Algarve, Portugal YEAR: 2019-2021 TEAM: André Castro Santos, Nuno Teixeira Martins, Francisco Xavier Oliveira, Inês Campina This project is located in the south part of Portugal, near the Atlantic Ocean. It will operate as an apartement house, which can serve for team building, or for vacation. I started to work on this project at the concept phase and I continued through the execution. In the beginning my tasks were to work on the layout of the suits, to prepare the plans for the presentation, and to make renders. Then in the execution phase I was working on the window consignation and then with another collegue we were responsible to accompany the execution work, to verify and correct the projects of the other collaborators, to keep in touch with the constructors, answer their questions and find solutions for the problems that arise. GSPublisherVersion 0.33.100.100
. 16
GROUND FLOOR PLAN
FIRST FLOOR PLAN
. 17
This was the first project where I was really involved in the execution works. Because of the language difficulties it was quite challenging in the beginning but when I really needed to I was evolving faster than I imagined.
. 18
I learned to work in BIM until the execution, make renders in Twinmotion, how to communicate with other collaborators, what to check when I have to verify their projects, and to manage a project with the executors.
. 19
CITY PALACE SALDANHA . Professional Project OTO Arquitectos LOCATION: Lisbon, Portugal YEAR: 2018-2020 TEAM: André Castro Santos, Nuno Teixeira Martins, Luís Peres Pinto, Ines Campina, Luís Carlos Bucha I started to work on this project in the licensing phase and then I continued until we finished the execution project. During this time it was necessary to make various modifications, because the main function have changed, from a student residence to a nursing home for people with disabilities. As a result, we had to adjust our design to many different regulations. During the project I had various tasks, I was working on some adjustments in the addition part in the back of the building, I prepared the window consignation, made the sections, I was responsible for the coordination and verification of the projects of the other engineers. We were also designing the interior, I studied different solutions for the doors and the floor covering, I made the design of the glass ceiling on the second, third and fourth floor.
GSPublisherVersion 0.33.100.100
. 20
PAREDE ESTUCADA E PINTADA A ROLO À COR VERDE
LAMBRIM E RODAPÉ EM TERRAZZO CINZA FIORDE E BIT EM LATÃO ESCOVADO
ELEVADOR SIMPLES MARCA OTIS MODELO LIFE Gen 2 8D REVESTIDO A TERRAZZO VERDE BRAGANÇA DA MARCA RMC TERRAZZO CINZA FIORDE DA MARCA RMC ESTRUTURA EM AÇO SOB O VIDRO DESENVOLVIDA A PARTIR DO DESENHO ORIGINAL DO PAVIMENTO EXISTENTE
PAVIMENTO NOVO EM MADEIRA COM DESENHO DESENVOLVIDO A PARTIR DO DESENHO ORIGINAL DO PAVIMENTO EXISTENTE
TERRAZZO VERDE BRAGANÇA DA MARCA RMC
PAREDE ESTUCADA E PINTADA A ROLO À COR VERDE
LAMBRIM E RODAPÉ EM TERRAZZO CINZA FIORDE E BIT EM LATÃO ESCOVADO
ELEVADOR SIMPLES MARCA OTIS MODELO LIFE Gen 2 8D REVESTIDO A TERRAZZO VERDE BRAGANÇA DA MARCA RMC
TERRAZZO DOMINO DA MARCA RMC
ESTRUTURA EM AÇO SOB O VIDRO DESENVOLVIDA A PARTIR DO DESENHO ORIGINAL DO PAVIMENTO EXISTENTE
PAVIMENTO NOVO EM MADEIRA COM DESENHO DESENVOLVIDO A PARTIR DO DESENHO ORIGINAL DO PAVIMENTO EXISTENTE
PAREDE ESTUCADA E PINTADA A ROLO À COR VERDE
LAMBRIM E RODAPÉ EM TERRAZZO CINZA FIORDE E BIT EM LATÃO ESCOVADO
ELEVADOR SIMPLES MARCA OTIS MODELO LIFE Gen 2 8D REVESTIDO A TERRAZZO VERDE BRAGANÇA DA MARCA RMC
ESTRUTURA EM AÇO SOB O VIDRO DESENVOLVIDA A PARTIR DO DESENHO ORIGINAL DO PAVIMENTO EXISTENTE
PAVIMENTO NOVO EM MADEIRA COM DESENHO DESENVOLVIDO A PARTIR DO DESENHO ORIGINAL DO PAVIMENTO EXISTENTE
PAREDE ESTUCADA E PINTADA A ROLO À COR VERDE
LAMBRIM E RODAPÉ EM TERRAZZO CINZA FIORDE E BIT EM LATÃO ESCOVADO
ELEVADOR SIMPLES MARCA OTIS MODELO LIFE Gen 2 8D REVESTIDO A TERRAZZO VERDE BRAGANÇA DA MARCA RMC
PAVIMENTO EXISTENTE EM MADEIRA A RECUPERAR
RODAPÉ EM TERRAZZO CINZA FIORDE E BIT EM LATÃO ESCOVADO
PAREDE ESTUCADA E PINTADA A ROLO À COR VERDE
PAINÉIS EM MADEIRA PINTADOS A ROLO À COR VERDE
ELEVADOR SIMPLES MARCA OTIS MODELO LIFE Gen 2 8D REVESTIDO A TERRAZZO VERDE BRAGANÇA DA MARCA RMC
ELEVADOR MONTA MACAS MARCA OTIS MODELO LIFE Gen 2 21D REVESTIDO A TERRAZZO CINZA FIORDE DA MARCA RMC
PAVIMENTO COM ESTÉREOTOMIA PRÓPRIA DESENVOLVIDA COM TRÊS TONALIDADES DE TERRAZZO
GSPublisherVersion 0.15.100.100
. 21
3
2
+86,14
7
6
5
4
+86,14
. 22
+86,13
F
E
D
C
B
A 1
+85,86
+85,86
1
My first task on this project was to work on the addition part and to improve its relation with the existing building. After various tests I came out with the idea to make this curved, softer connection between the two building parts. This move allowed to let more light in to the floor below and to make the transition more visible and definite.+86,14 Later, this change affected the development of the addition part, its shape and nature is a consequence of this move.
+86,14
3
2
+86,14
One of my tasks during the project was to design the structure of the glass ceiling on the first floor. I have got the inspiration from the pattern of the existing wood cover and designed a structure which completes that.
6
5
4
+86,14
Becuse of the program change, we had to redesign various parts of the building. One of them was the bathrooms. All of them needed to be accessible for people with disabilities. The idea for them was to function as a box, which is independent from the existing structure. We chose to use terrazzo for floor and wall covering because of the durability and easy cleaning. I created a new texture for the plans and sections.
7
. 23
TOMATINO . Professional Project OTO Arquitectos LOCATION: Porto, Portugal YEAR: 2017-2019 TEAM: André Castro Santos This project is a milestone for me because it’s the first one that was actually built. I started to work on the first restaurant right when I arrived to the office, and I have finished in total six of them. The client have already had an idea about the look of the store, but at the first project we had to make a new design for the store, together with the graphic designers. The ones after usuallly needed some changes but the basic idea was the same.
GSPublisherVersion 0.16.100.100
Through this work I learned a lot about execution plans, construction materials, drawing furniture details, working on graphics, handle clients, read ventilation plans.
. 24
. 25
CHILDREN’S MUSEUM . Department’s Design 2-3. Budapest University of Technology and Economics LOCATION: Veresegyház, Hungary YEAR: 2015 CONSULTANT: Péter Klobusovszki TEAM: Melinda Bognár The location of the project is a small town near Budapest, during this course we were working together with the municipality, who have already had plans for this particular plot. It is located next to a Bear Farm, so it’s a popular destination for families, that is the reason for the program: a museum for children. GSPublisherVersion 0.33.100.100
Through this course we were participating in a design competition, which was organized by the town management, so we were learning a lot about listening the needs of the “client” and about the process of a competition.
. 26
CHILDREN’S MUSEUM l 2015 In this project, the layout plan was based on the human tissue. The functions, as independent glades, are placed scattered in the forest, which links them, similarly to the intercellular material. The main functions are in direct connection with and are accessible from the building so lthat they become a part of the museum. CHILDREN’S MUSEUM For this plan, I studied and created free flowing spaces and bounding them without walls. 2015 In this project, the layout plan was based on the human tissue. The functions, as independent glades, are placed scattered in the forest, which links them, similarly to the intercellular material. The main functions are in direct connection with and are accessible from the building so that they become a part of the museum. For this plan, I studied and created free flowing spaces and bounding them without walls.
The main structural element of the building is a concrete slab, which is pulled in two directions.
So it provides the structure of the museum and lets the light in through the skylights.
A-A SECTION
B-B SECTION
. 27
GROUND FLOOR PLAN
. 28
This town has many examples of organic architecture, this gave us the idea to use the human tissue as a base for the layout plan.
The playgrounds, a bicycle rent, an amphitheater, a restaurant and a forest school with accomodation, as independent glades, are placed scattered in the forest, which links them, similarly to the intercellular material.
The main functions are in direct connection with and are accessible from the building, so that they become a part of the museum.
GSPublisherVersion 0.27.100.100
The interior of the museum has a celllike organization. For this plan, we studied and created free flowing spaces and bounded them without walls.
GSPublisherVersion 0.27.100.100
GSPublisherVersion 0.27.100.100
GSPublisherVersion 0.27.100.100
. 29
OTHER WORKS . LOCATION: Lisbon, Portugal YEAR: 2020-2021
I’ve always loved photography, but for me it’s not about professional photos, I also enjoy just taking them with my phone, the composition, the colours, the mood are more important for me. The pandemic helped me to discover an old - new passion of mine, painting. With many free time inside my apartement, I started to make aquarels and giving them to my friends. My favourite part is to discover all the colours that make an image, sometimes I don’t even notice all the tones that are in a picture, just if I really pay attention, will they reveal themselves.
GSPublisherVersion 0.10.100.100
. 30
. 31
. 32
Thank you .