Architecture Portfolio | 2020

Page 1

architecture portfolio 2020

ZUL FADZLI SHAFIEE dp, bsc. arch, m.arch LAM / RIBA part II

m.arch | University of Malaya thesis project studio work research study bsc. arch | Infrastructure University of Kuala Lumpur design studio work others

| selected work during practice, internship and freelance work


“ARCHITECTURE IS UNNECESSARILY DIFFICULT, IT IS TOUGH� - ZAHA HADID -

Preface This portfolio is a collection of my architectural work from 2007 to 2020 in the Diploma level untill my current practice. These projects represent a simultaneous process of learning and self expression through critical exploration of space technology and concept. The work shown here has helped me to understand architecture not as abstraction or experience, but paradoxicaly as both. To me, it is all about imagination about putting all the idea together and deal with the challenge that have to be solved. Thank you to all the lectures, friends and collegues who have made this work possible. Regards, ZuFa. S

Third Edition All rights reserved Note : This is a back to back printing document, some pages are intentionally left empty Last Update : May 1st, 2020



CURRICULUM VITAE Was born in a middle class family-nurse & post officer in July,1988.I Started to walk a year later. I lean how to draw with observing things surrounding as i was one curious child. I see, i analyze, i experiment throughout my growth but most of all,i learn everything by things around me. Architecture is my passion and i learn about it through the process. It is tough but i find it more fun while putting all the things together. Although i have yet to find my own architectural design philosophy, but i do have greatly interest in design & architecture which are too subjective in the sense that they respond to the surrounding. It is fundamental for architecture to be functional and perform accordingly, however physical & technology are also important as in to express its own identity and sustain without depending on the un-renewable energy. Details differentiate great & amazing architecture. The other side of me, i had like to challenge myself with sports especially climbing where the angle & difficulties give me 1001 options and lead me to the un-explainable satisfaction & victory.

Zul Fadzli Shafiee

Dip. PoliSAS BSc. Arch, IUKL M.Arch, U.M. (LAM Part II/RIBA)

origin Kuantan, Pahang current city Kuala Lumpur current address Bandar Menjalara,W.P. Kuala Lumpur Malaysia mobile +60 12 940 4650 e-mail zulfadzlishafiee@gmail.com skype kecix3c facetime kecix3c@hotmail.com linked in Zul Fadzli Shafiee LAM reg. no ag/z 174 online publication http://issuu.com/zulfadzli date of birth : nationality race : religion : maritial status :

Personal Details

July 16th, 1988 Malaysia Malay Muslim Single

Started climbing in 2001 and managed myself to be in the National Sport Climbing Team in 2002 and represent country in the various number of international competition.


Educational Background Sept 2016 - Sept 2018

Master of Architecture (LAM Part II / RIBA)

June 2012 - Dec 2014

Bachelor Science of Architectural Studies

(2 years)

(2 years 6 months)

Jan 2007 - Dec 2009

(3 Years)

Experiences Jan 2015 - Current

Free-lance | Collaboration with Monosist Architect & Engineers Sdn Bhd

University of Malaya, Kuala Lumpur, Malaysia CGPA : 3.48

Infrastructure University of Kuala Lumpur (IUKL) Kuala Lumpur, Malaysia CGPA : 3.165

Jan 2015 - Sept 2016

(1 Year 9 months)

B-5-10, Plaza Mont Kiara 50480 Kuala Lumpur, Malaysia www.cmcdesignworks.com Architectural Asssistant

Diploma in Architecture

Politeknik Sultan Haji Ahmad Shah (POLISAS) Kuantan, Pahang CGPA : 3.33

CMC Designworks Sdn Bhd

Mac 2014 - June 2014

MONOSIST Architects & Engineers Sdn Bhd

2004 - 2005

Sekolah Menengah Teknik Temerloh

May 2011 - May 2012

8, Jalan Industi Putra 1 Precint 14, 62050 W.P.Putrajaya, Malaysia www.monosist.com

2001 - 2003

Sekolah Menengah Saint.Thomas

April 2010 - April 2011

Teng Art Illustration

1995 - 2000

Sekolah Kebangsaan Teruntum

(Secondary School) (Secondary School)

(Primary School)

(Boarding School), Temerloh, Pahang Kuantan, Pahang

Architectural Software

Graphic Software

Nippon Paint Yound Designer Award 2009

Mac . Windows Autodesk Autocad Autodesk Revit Architecture Autodesk 3D Studio Max + Vray Sketchup 2019 Adobe Photoshop Adobe Indesign Adobe Acrobat Microsoft Excel Microsoft Word Microsoft Power Point

Languages

(1 Year)

Technical Assistant

B-811,Kelana Square, Jalan SS7/26 Kelana Jaya 47301 Petaling Jaya, Malaysia www.teng.com.my

Architectural Illustrator/ Digital Artist

Dec 2008 - Nov 2008

(6 months)

Draften Design Management Holding Kepong, Kuala Lumpur. Diploma - Internship

Short-listed Design

Skills Operating System

(1 Year)

Kuantan, Pahang

Award & Achievement 2009

B. Sc Arch- internship (3 months)

Malaysia [Mother tongue] English [proficiency 8.9/10]

Extra Curricular & Interest

Academic Hybrid Design Studio, M.Arch UM | Class Representative Asia Coalition For Architecture & Urbanism, Hong Kong University | Team Leader Design Thesis Exhibition | Organiser

Land Sport ‘Khursus Rekreasi Tahap i & ii’ Malaysia Mountainering Federation, PMM South East Asia Climbing Course Level II South East Climbing Federation,SEACF Gold Medalist for Asian Climibing Cup, 2006 1st ranking in National Climbing Championship 2007 & 2008 World Ranking no 19-World Cup Climbing Malaysia Series, 2007 IFSC Bronze Medalist for South East Asia Games (SEA Games, 2011) Palembang, Airsport Fédération Aéronautique Internationale FAI, Certified Paragliding License (PL2) Malaysia Sports Aviation Federation, MSAF Certified Static-Line Skydiving Licence Fédération Aéronautique Internationale FAI, Underwater Sport Certified P.A.D.I Advance Scuba Diving PADI, SDI

Indonesia


CONTENT

jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

2007

f ree-lance

d i g i t a l a r t i s t - Te n g A r t I l l u s t r a t i o n

internship

d iplo ma in ar c hit ec t ur e - PO LI SA S dec

jan

2027

jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

2008

dec

jan

2026

B.Sc of Architectural Studies Part I | LAM Semester 01 | Sep 2016 - Jan 2017

jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

2009

dec

jan

2025

jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

2010

Semester 03 | Jul 2017 - Aug 2017

Semester 01 | Sep 2016 - Jan 2017

Semester 02 | Feb 2017 - Jun 2017

Penang Jetty

Eco Cafe

Masterplan

Pavilion

Penang Maritme Museum

Urban Studies

Conventional Housing

Office Complex

Co-Housing

Boutique Hotel

Bank Training Center

jan

2024

jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

2011

Master of Architecure Part II | LAM

Folly Design

Semester 02 | Feb 2017 - Jun 2017

dec

technical asisstant

Semester 03 | Jul 2017 - Aug 2017 School of Hospitality & tourism

Semester 03-05 | Jul 2017 - Jun 2018 Architectural Thesis Batu Caves Climbing Center

dec

jan

2023


Monosist jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

jan

2012

arch.asisstant- CMC Designworks

internship

B.Sc Architecture - IUKL jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

jan

2013

jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

jan

2014

Part timeCMC Designworks

M.Architecture - UM jan

feb

mar

apr

may

june

jul

aug

sep

oct

nov

dec

dec

nov

oct

sep

aug

jul

jun

may

apr

mac

feb

jan

2015

jan

feb

mar

apr

dec

nov

oct

sep

2016

may

june

jul

aug

sep

oct

nov

mac

feb

dec

M.Architecture - UM 2022

2021

2020

2019

aug

jul

jun

may

Teng Art Illustration Tiara Business Park, PJ

Monosist Architects & Engineers Sdn Bhd. Putrajaya

CMC Designworks Sdn. Bhd. Plaza Mont Kiara, KL

Free-lance | Collaboration with Monosist Architect & Engineers Putrajaya

Apr 2010 - May 2011

May 2011 - June 2012

Jan 2015 - Aug 2016

Jan 2015 - Current

Rendering Works

Monorail Fleet Expansion Kuala Lumpur

Mersilau Eco-Resort

Kuala Lumpur

jan

2018

Bungalow Pn. Farzana Damansara Jaya, Selangor

Bungalow Khairul Hafiz, Setapak, KL

Hevea Estate Resort Spa Siliau, Negeri Sembilan

3 Storey Terrace House Taman Sri Sinar, KL

New Campus, UCSI University

2 Storey Bungalow

Multi-use Activity Tower

Lambaian 2 Residence

Previous 3d Works

Covid Disinfect Tunnel

Ranau, Sabah

Renovation & Extension

Monorail Line Extension

apr

Huayang Development Selayang, Selangor

New Resort

Cheras, Selangor

Cheras, Selangor

Kajang, Selangor

New building

Renovation & Extension

Langkawi Air Force Base, Nilai

Mobile

7



selected works

Free-lance | Monosist Architects & Engineers Sdn Bhd Various

CMC Designworks Sdn Bhd Mont. Kiara, F.T. Kuala Lumpur

Monosist Architects & Engineers Sdn Bhd

Putrajaya, F.T

9


Private Bungalow | Ayer Bersih 04 Setapak, W. P Kuala Lumpur

Project Detail Location: Setapak, KL Land Size: 341 SqM Project: New Building Project Value: RM 700,000. 00 Status: Construction

The bungalow is designed to accomodate for a young-family with 2 adult and 2 children. The idea is to provide comfortable space within a small plot of land in the housing area. The living & dining area are intentionally to have double volume to maximise the natural ventilation to penetrate and it is also to give a big-space effect. The overall design is to fullfill client`s dream house to have a contemporary bungalow.


11


Extension of 2 Storey Bungalow Damansara Jaya, Selangor

Project Detail Location: Damansara Jaya Land Size: 1,055.44 SqM Project: Renovation & Extension Project Value: RM 400,000. 00 Status: Authority Approval

Existing bungalow comprises of 2 storey house area with approx. 2,800 SqF. With the addition to the family member, the owner wanted to maximise the land with extending the house The extension area approx. 3,000 Sqf include a2 master bedrooms, 3 bedrooms and a family area. The Landlord wanted to maintain the existing exterior look. The new extension area is to matched back with the existing building.


Extension of 2 Storey Bungalow Damansara Jaya, Selangor

EXISTING

NEW

The Client is required the empty compound area to be utilised as the business grows. The Oil & Gas equipment require bigger space to keep all the item. The extension area is designed with a fast-construction technique to reduce the whole project timeline.

13


Private Bungalow | 2 Storey Sungai Long, Cheras, Selangor

Proposed design a 2-storey private bungalow bungalow in Sungai Long, Cheras. The owner wanted the house to be natural ventilated for the common area. Sliding Door & Windows are partially louvers to allow natural air ventilation to in & out in the common area.

Free-lance work


Covid- Disinfect Tunnel

Multi- activity tower

Mobile tunnel

Sendayan Air Force Base, Negeri Sembilan

In responding to the pandemic that hit globally, my team grab this opportunity to explore and built something that is useful. The sanitised tunnel system produce fine mist of negatively charged hydroxyl ions goes up and sprayed up to 99.99% exposed surfaces. The disinfection technology uses a chemical interaction of alcohol based to produce the 99.999% Kill rate. The by-products of the disinfection process are water, oxygen, alcoholbased chemical. The invisible layer of alcohol dissipates rapidly, depending upon the activity in he room, but while it remains, it provides a powerful antimicrobial layer in its own right that is completely harmless to people or animals, the fogging process will not damage sensitive electronics, surface, or substances, & the treated surface does not require wiping before reuse.

The multi tower facility is proposed for the military for them to comply with their training. the 2 tower provides 130m long zipline and climbing wall.

QUICK INSTALLATION

Multi- activity tower Langkawi, Kedah

easily transported with a pick-up truck

unfold structure

unfold skin

Free-lance work

walk through

Free-lance work

it is a design & build project where a small team was form consist of engineer, architect who shared the same passion in sports and construction. The team design, run the structure analysis and construct the tower with their own sweat. The tower is fully operate after the construction finish in 2 months time.

15


Hevea Estate Resort & Spa Masiliau, Negeri Sembilan

Project Detail

Location: Siliau, Negeri Sembilan Land Size: 3,055 SqM Project: New Resort Project Value: RM 1,800,000.00 Status: Tender Stage

The project located at the rubber estate area where it is surrounded with rows of ‘hevea’s tree. The project comprises of Main Building resort to cater for lobby area, a quarters for manager and also a small restaurant to server the resort. Besides that, there are 2 block of 2-storey suites consist of 4 suite rooms

that is suitable for a family to stay in. It is intentionally to set at the edge of compound to allow a quite view towards the hevea estate. 2 units of single-storey villas located next to the swimming pool and also a spa. An elongated quiarters block are located at the edge of the compound to sagregated the activity.


Extension of Terrace House Taman Sri Sinar, W.P. Kuala Lumpur

Project Detail

Location: Sri Sinar, KL House Size: 1,058 SqF Project: Renovation & Extension Project Value: RM 150,000.00 Status: Pending Client`s Instruction

The existing house comprises of 3-storey with 1 small master bedroom and 2 bedrooms. The task is to maximise the availabe area to accomodate a habitable space for owner to live in. The proposed extension will take spave above the car porch. the 480Sqf extended area comprises of 2 bedrooms with en-suite bathroom.

17


Baleh Dam Baleh, Sarawak

Climbing Wall Proposal Various

The project calls for supporting the Italian base company, Salini Impregilo for tendering massive project for a hydro-electric dam in Sarawak. The process involving a numerous of discussion with the engineers on how the hydro-dam operate. The task is to produce a series of construction diagram from the begining of the project up until the project completed. With the assistance of digital tools such as sketchup, makes the process even faster to visualize on the progress of the project.

The project calls for supporting the Italian base company, Salini Impregilo for tendering massive project for a hydro-electric dam in Sarawak. The process involving a numerous of discussion with the engineers on how the hydro-dam operate. The task is to produce a series of construction diagram from the begining of the project up until the project completed. with the assistance of digital tools such as sketchup, makes the process even faster to visualize on the progress of the project.

Merchandise & Logo Design Various


Private Climbing Wall

Seksyen 2, Shah Alam, Selangor

Rock Art Climbing Gym Subang Industrial Park, Selangor

A boulder wall take place at a backyard of a private bungalow in Shah Alam. The owner wanted to build a climbing wall to utilise the retaining wall area. The proposed 6m wide climbing wall immitate the world cup climbing competition style to let the user to experience various challenge. The ground area is covered with a semi-soft paded matress to reduce the fall impact. With the small group of team, the wall design & installation took 3 months to complete.

The project calls to design & build a climbing facility for a private company to utilise their un-use space. The climbing wall is designed to accommodate a intermediate climber who is love to do bouldering. The boulder wall is approx. 3metres high and 6 metres wide with approx. 400 various size and shapes of handhold. The combination of multiple wall angle and various of handhold provide endless challenge to its user.

19


UCSI university Master Plan Cheras, F.T. Kuala Lumpur

CMC Designworks Sdn Bhd Overall aerial view for UCSI University new campus consist of boulevard, arena, music academy building, administration block, & convention center and expected to complete all phases in 2028.

UCSI Unversity is one of the fast-growing in the edication industry. The existing facilities are conjested due to the growing number of students enroll. Hence. the UCSI Group planning to expand their building with the exiting site where it gives a number of callenge. Located at the hillside, the future design have to be carefully plan. Client has a vision to have a new campus, retails, and at the same time, to have a convention center and a 10,000 seats of arena for various use of events to generate income besides that is related for education. Each building component in the masterplan will be done in the seperate phasing. The main idea was that to accomodate a new proper facility for the growing number of student. UCSI is well-known with choir performance group as they have awarded with gold medal for adult choir in the international stage. The achivement leads the UCSI to gives more focus on the music study.


Eco-Hotel

Camp Rock

Ranau, Sabah

Bukit Tinggi, Pahang

CMC Designworks Sdn Bhd Camp Rock is situated in the middle of Janda Baik Forest, Bentong Pahang. The brief was to propose a camp ground with ‘glamping ‘ idea in mind. The main building provides a basic needs of management room and shared bathroom that the design detail & materials is blended with the nature.

The project is located right below the well known peak in South East Asia, Mt. Akinabalu, Sabah. The proposal calls to propose an Eco resort consist of main building & individual villas along the steep hills.

Each building is carefully place on the contour to reduce the impact to the nature. The main building situated at the highest elevation in the proposed site to give the best panorama of ‘Pekan Ranau’ that is located down the valley.

Each tent is specifically custom to create own identity for the client and the tent is place on the raised timber deck platform to maximise the comfort to the user.

H.S Lee Hotel KL City Center

The project located at Jalan Tun H.S. Lee here it is listed under UNESCO herritage area class 3. The existing 5 units colonial shop-lot is going to be renovate where the now building to be built ontop without touching the existing facade. The 100 years front facade is a valuave as it is a piece of herritage left after the british left and this will be kept for future generation to appreciate the history through the architecture. The 14-storey hotel will accommodate 114 rooms (10 deluxe rooms, 104 superior rooms) offers 3-star there are a restaurant to serve the customer.

21


Lambaian 2 Residential Kajang, Selangor

Lambaian 2 Residence is a gated comunity introduce by a developer, Layaran Pintas that promotes a new lifestye. The deevelopent consist of a multi-purpose hall to accomodate resident with any kind of activity.

CMC Designworks Sdn Bhd


Renovation of Semi- D

Huayang Mix-development

Cheras, Selangor

Selayang, Selangor The project calls to renovate an existing semi-detached house to accommodate a young family of 2 adult with single kids. Each spaces is design to maximise the comfort of the family needs.

Huayang is one of the wellknown developer in Malaysia. The brief is to do the projection study on a piece of land that consist of apartments, podium, and retails.

the grand entrance for the development.

23


Kuala Lumpur Monorail Fleet Project Federal Territory of Kuala Lumpur

Monorail fleet expansion project (mfep) is a expansion project on current monorail station to serve the new 4 car-train. The existing 40m station length are extended to 60m length with the steel platform. The project also require roof for all stations to be replace with new roof system. There are some stations is going to be linked to the existing nearby to improve the pedestrian movement.

Monosist Architects & Engineers Sdn Bhd


Kuala Lumpur Monorail Expansion Project Federal Territory of Kuala Lumpur

The project is to propose new alignment for existing monorail line which currently focusing the city center area. The extension line requires numerous process to have a new depot and stations. The new line extension will be connected from the existing station at Tun Sambathan (TSS) and follows from Jalan Klang Lama to stretch up untill USJ 19. TSS is going to be connected with 2 layer of bridge over the Klang River that is seperate the padestrian movement. This way will reduce the padestrian conjestion especially during the peak hour.

25


Teng Art Illustration Sdn Bhd Visualising is one of the important skills to be an architect. During my practice with the office (Teng Art), i did numerous of rendering work for architect as well as marketing team.


27



academic works master of architecture,

bachelor science of architecture,

year 4 | semester i master plan office tower

year 2 | studio 2B painting work folly design

year 4 | semester ii conventional housing co-housing

year 3 | studio 3A penang cruise Jetty penang maritime museum

year 5 | semester III-IV thesis- climbing hub

year 3 | studio 3B culin`s university

University of Malaya

Infrastructure University of Kuala Lumpur

29


CLIMBING HUB : BATU CAVES CLIMBING CENTER Project Summary Task: Site: Sch.:

Individual option Wira Damai, Gombak Selangor Darul Ehsan

Program: Duration:

University of Malaya M.Arch Semester 3- 5 [Jul‘17 Jun ‘18] 30 Weeks Individual Work

Project type: Client:

Recreational Building Ministry Youth & Spot

Function:

National Sport Climbing Center

Operator:

Persekutuan Mendaki Malaysia [PMM]

GFA:

2800SqM /

Site area:

2.5 Acre/ 10,117SqM

Project Description As sport climbing is popular recreational activity with growing number of participants worldwide, it needs to inject some education and awareness in it to generate safer environment. Besides that, this project is trying to see what contribution could architecture gives in terms of providing a better space for the youth which takes in consideration of their physical & mental needs. The Climbing Center is a project that focus on the idea of promoting a safer environment for such a dangerous sport. Through architecture, this thesis will test out the new typology of climbing center that submerge with the natural setting. The combination of indoor and outdoor may give a new experience to the user to exercise and do sport more in order to achieve healthy life. Site Location Batu Caves is an iconic place that has beautiful limestone. Situated almost middle of the peninsular, has been center of rock climbing development in Malaysia for the past de-cade. Batu Caves is currently the biggest sport climbing area in Malaysia.


31


ISSUE

idea the building form is resembling from the geographical context that has been the backdrop of proposed site. the outer skin is sloping gently that will allow people to climb up all over the building. the outer skin provides shelter and cave experience just like being in the real cave. the massing is a place where the fun begin for those who are exploring the rock climbing. the facility provides basic training in the indoor on how the basic knowledge about climbing and safety which is the major element in climbing.

Climbing activity has become popular these day. It is part of the adventure sport that youth would love to do as they have time and energy to spend on. Youth from the range of 15-24 years old (United Nations ,2017) are keep searching for a new opportunity to explore and test their adrenaline in a different way of adventure. As the result, consequences is not part of their consideration which put their life at risk. Lack of awareness is one of the factor that leads to this issue. The challenge of this design thesis is to seek opportunities to find a new typology of the climbing facility that suits the user. Besides that, this proposal is looking for opportunity to balance the inadequately of sport climbing facility to accommodate the needs of beginner or youth climber. A group of youth risking their life just to express their interest in exploring the adventure without taking any safety consideration. (Utusan, Jan 2017)

rock climbing bccc INITIAL SKETCHES

basic training wall climbing HEADLINE OF THE MONTH WHERE A GROUP OF TEENAGERS ILLEGALY CLIMB ‘IPOH’ SIGN WHERE IT IS LOCATED AT THE STEEP SLOPE IN THE JUNGLE


architectural PROGRAM learning

basic skills and safety throughout the experience of the sports

DEVELOPMENT

prepare and create potential athlete for prestige competition

DEVELOPMENT the idea is to create a high volume area to accommodate climbing activity and at the same time it will resemble the shape of gua damai. the building massing looks like bending in with the terrain. the high volume creates a new ‘hidden’ massing that can be seen from far. introducing atrium that will allow natural lighting to penetrate into the indoor climbing area. atrium allow stack to happen. outdoor climbing area to be publically seen from far.

ADMINISTRATION

involvement of Malaysia Mountaineering federation to conduct and develop the sport

ACCOMMODATION

ACCOMMODATION FOR VISITOR EXPECIALLY DURING COMPETITION & TOURIST

staircase to climb up to gua damai caves louvers to filter direct sunlightand fresh air intake opening on the roof allowing natural sunlight to penetrate

33



PRECEDENCE STUDY

PUTRAJAYA CLIMBING COMPLEX FEDERAL TERRITORY, MALAYSIA

KLETTERZENTRUM, INNSBRUCK, AUSTRIA

SCHOOL OF BOULDERING, & CLIMBING CENTER BRUNICO, ITALY

35


L00000 VIEW FROM SOUTH WEST


SITE ISSUES

SITE PLAN NOT TO SCALE

FACILITIES INADEQUATE FACILITY TO SERVE THE ACTIVITY AROUND THE EXISTING EXTREME PARK

landmark there is no landmard to access the existing gua damai extreme park

retention pond existing retention pond IS NOT BEING USED.

site intervention

rejuvenate the area develope the entire area that is potential to be a new landmark for batu caves.

programme insertion inserting programme and activities that can benefit the entire neighourhood for both socially and economically

nexus connecting the existing extreme park to the future park. that will complete the entire scheme

nature encroachment landscape will embended partially on the external building skin area

extrude plinth area is extrudded to give a volume that core activity needed. this will give a building height that can be visible from the main road.

PEDESTRIAN connectivity EXISTING PEDESTRIAN FROM GUA DAMAI EXTREME PARK EXTEND TO TE FUTURE PARK WHICH THE LAKE as a NEW LANDMARK

public access public are able to access the indoor area to observe the activity inside the building via designated area.

elevate plate public walkway are elevated to allow public domnation on the ground floor, such as cafe and retail. It will be a spectator area as seating area will be located along the walkway that is facing to the climbing wall.

adjustable climbing wall adjustable climbing wall will provide millions combination of route and endless adventure

37


7.3 floor plan

0

5

10

20

LV. UPPER GROUND +1.500m SCALE 1:300


39


floor planS

pool

LV. sub basement -1.50m SCALE 1:300


view over entrance atrium the multiple level of activity area such as beginner wall climbing area & yoga gym gives sence of welcoming to the visitor to have an idea of what is inside the building. series of specially louvers design to allow natural ventilation & air movement.

41


LV. 01 +5.40m SCALE 1:300


LV. 02 +9.30m SCALE 1:300 43


7.5 elevations

north ELEVATION SCALE 1:300


west ELEVATION SCALE 1:300

45


east ELEVATION SCALE 1:300


METAL DECK ROOFING SHEET 12MM THK. LAMINATED TEMPERED GLASS SILICON SEALANT TO FILL THE GAP BETWEEN GLASS PANEL

detail section

BULL-NOSE ALUMN SHEET

50 X 125MM RHS SECTION DIAGONAL STRUCTURE MEMBER 100 X 200MM PURLIN

ROCKWOOL INSULATION PERFORATED ALUMINIUM CEILING PANEL

CUSTOM I-SECTION COLUMN

BULLNOSE TERMINATION DETAIL N . T . S

SECTION Y03 N . T . S

north ELEVATION SCALE 1:300

47


BOULDERING AREA WET CLIMBING AREA ADVANCE CLIMBING AREA OUTDOOR CLLIMBING AREA

north section x01 SCALE 1:300 LV. ROOF DECK +20.00M LV. ROOF DECK +20.00M LV. ROOF DECK +15.60M LV. 02 +9.30M LV. 01 +5.40M LV. UPPER GROUND +1.50M LV. SUB- BASEMENT -1.50M

LV. GROUND +0.00M

structural study


section north section y01 nts

49


special study - morph climbing wall system

CLIMBING ON DIFFERENT STEEPNESS ACTIVATE DIFFERENT GROUP MUSCLE. MULTIPLE COMPINATION OF STEEPNESS COULD LEADS TO COMPLETE BODY WORK OUT WHILE IT CONTRIBUTES TO THE HEALTHY LIVING STYLE.

muscle usage low

intense

THIS ADJUSTABLE WALL SYSTEM WILL ALLOW CLIMBER TO EXPLORE THEIR CAPABILITY TO THE NEXT LEVEL WHRER THERE WILL BE ENDLESS CHALLENGE OFFERED AS THE WALL WILL KEEP CHANGES DAY BY DAY. THE SYSTEM APPLIED TO ALL CLIMBING AREA IN THE BATU CAVES CLLIMBING CENTER. ADVANTAGE REDUCE WORK - CLIMBING ROUTE ARE NORMALLY REQUIRE MANPOWER TO RESHUFFLE THE HANDHOLD ON THE WALL IN ORDER TO GET A NEW ROUTE CHALLENGE. MORPH SYSTEM WILL REDUCE THE WORKLOAD FOR ROUTE SETTING.

conceptual idea of morph wall system

SLAB

VERTICAL

ROUTE - OFFERS VARIOUS COMBINATION OF ROUTE DIFFICULTY WITHOUT CREATING MUCH PROCESS. WITH A SMART ELECTRONIC SYSTEM , VARIOUS ROUTE CAN BE CREATED.

morph CLIMBING WALL is a climbing wall system that aLLOW CLIMBING SURFACE TO MOVE IN MULTIPLE DIRECTON AND PROVIDES VARIOUS COMBINATION OF DIFFICULTY and personalised their climbing experience. the wall feature will give climber the ability to not to climb the same difficulty twice. this feature will save alot of work to shuffle the handhold that requires alot of energy and cost. with morph climbing system, it will ensure the climbers that will never get bored or find themself unchallenge.

ROOF

EFFICENT - the system does not require much electric. actuator require very minimal electric to operate. the primary electric source will be supplied from solar panel that is located on the roof top.

OVERHANG

EXPLODED MORPH CLIMBING SYSTEM BY LAYER CHS COLUMN

climber

apps

COMPUTER

HORIZONTAL STEEL BEAM

actuator

MOVEMENT MECHANISM (ACTUATOR)

THE SYSTEM USING SMART SYSTEM TO OPERATE. THE CLIMBERS BASICALLY SELECT THE PRESET CLIMBING WALL CONFIGURATION USING AN SMART APP THAT BUILD SPECIFICALLY FOR THIS MORPHING SYSTEM. THE MAIN COMPUTER SYSTEM WILL RECEIVE IT AND TRANSMIT IT TO THE SELECTED WALL AREA AND ACTUATOR, THE MOVING MECHANISM THAT WILL ADJUST THE CLIMBING WALL.

PRIMARY RC. STRUCTURE

SHS SECONDARY FRAME

marine plywood

INCLINED WALL SURFACE PERFECT FOR INTERMEDIATE & EXPERT CLIMBER TO TEST THEIR ABILITY AND PERFORMANCE.

VERTICAL CLIMBING WALL WILL ALLOW NEW ENTRY CLIMBER TO TEST THEIR ABILITY TO CLIMB AND IT IS SUITABLE FOR A VENUE FOR TEACHING SUCH AS CONDUCTING BASIC CLIMBING CLASS.

FIXED ANCHOR fixed anchor installed at the top of the wall & directly fixed on the wall structure frame.


THERMAL PERFORMANCE IN SPORT CLIMBING HALL AIR TEMPERATURE

SKYLIGHT ROOF PHOTOVOLTAIC PANEL PANEL

LV. ROOF DECK

COLLECTED WATER FROM THE ROOF WILL BE FILTERED BEFORE IT CHANNELS DOWN TO THE POOL THE WATER CASCADING WILL CREATE COOL BREEZE AND IT HELPS TO REDUCE THE INDOOR TEMPERATURE. AIR VELOCITY

ABSEILING DECENDING POINT

BOULDERING AREA WITH MORPH SYSTEM

OPENING AT THE SIDES OF THE WALL WILL ALLOW AIR TO CIRCULATE IN THE INDOOR AREA. JET ROOF AT THE ROOF DECK WILL CREAT A STACK EFFECT WHERE THE ROOF JETTED UP TO ALLOW SMALL OPENING. LIGHT INTENSITY

LV. UPPER GROUND INTERNATIONAL STANDARD ADVANCE LEAD CLIMBING WALL CAN ACCOMMODATE UP TO 6 ROUTES at A TIME. SPECTATOR SEATING AREA WITH MAX. CAPACITY OF 200 PAX ALLOWING LIGHT TO PENETRATE INTO THE INDOOR CLIMBING HALL THROUGH THE JET ROOF AT THE TOP AND MOVABLE LOUVERS ASSISTED WITH THE MECHANICAL EQUIPMENT AND POWER UP BY THE RENEWABLE ENERGY THAT IS COLLECTED FROM THE PV PANEL. ATRIUM OPENING SIZE DETERMINED BY THE SUN PATH CHART.

LV. SUB- BASEMENT

PSICOBLOC WET AREA WITH 3M DEEP POOL USING FILTERED RAINWATER. THE WATER ALSO SERVE AS A COOLING AGENT TO BRING DOWN THE INDOOR TEMPERATURE.

SECTIONAL DETAIL OVER ATRIUM N . T . S

51


PHYSICAL MODEL

DETAIL section DETAIL SECTION OVER ATRIUM SCALE 1:50

FIGURES: 1.

special study model - powered by motorised lego power functions


53


ventilation LV. SKYLIGHT N. T . S

LV. ROOF DECK N. T . S

LV. PLATFORM N. T . S

LV. 02 N. T . S

vehicle planning AND LOADING & UNLOADING THE BUILDING IS USING NATURAL VENTILATION TO COOL DOWN THE INDOOR CLIMBING HALL. THERE IS FEW OPEING THAT IS STRATEGICALLY SELECT TO DISCHARGE THE HOT AIR AND ALSO TO ALLOW FRESH AIR INTAKE. THE AIR MOVEMENT IN THE HALL IS ASSISTED WITH THE MECHNICAL FAN TO ENSURE THAT THE AIR MOVEMENT IS CONSTANTLY CIRCULATE TO PRODUCE BETTER ENVIRONMENT FOR CLIMBING FACILITY. ATRIUM IS BEING INTRODUCED AT THE CENTER OF THE BUILDING TO ALLOW NATURAL LIGHTING AND FRESH AIR TO COME IN.

LV. SKYLIGHT

THE ACCESS PROPOSED SITE IS LIMITED THE ACCESS FOR VEHICLE TO ENCOURAGE PEDESTRIAN TO UTIISED THE AREA. VEHICLE ACCESS ARE LIMITED ONLY FOR THE MAIN ENTRANCE AND ACCESS TO THE SUB- BASEMENT. SERVICE ROAD IS ACCESS FROM THE RESIDENTIAL AREA. THE ACCESS FOR LOADING AND UNLOADING IS SEPERATED AND LOCATED AT THE ROAD FACING AT THE BACK OF RESIDENTIAL AREA. BESIDES THAT, THE MECHANICAL AND ELECTRICAL SERVICES ARE LOCATED AT SERVICES AREA TO EASE THE MAINTENANCE WORK.

N. T . S

LV. ROOF DECK N. T . S

LV. PLATFORM N. T . S

LV. 02 N. T . S

LV. 01

LV. 01

LV. UPPER GROUND

LV. UPPER GROUND

LV. SUB- BASEMENT

LV. SUB- BASEMENT

N. T . S

N. T . S

N. T . S

N. T . S

N. T . S

N. T . S

SERVICE ROAD

INGRESS TO SUBBASEMENT

VEHICLE ACCESS


air conditioning system LV. SKYLIGHT N. T . S

LV. ROOF DECK N. T . S

LV. PLATFORM N. T . S

LV. 02 N. T . S

sustainable building material THE BUILDING GENERALLY USING NATURAL VENTILATION TO COOL DOWN THE INDOOR HALL. HOWEVER, THERE IS SELECTED AREA THAT WILL EQUIPPED WITH AIR CONDITIONING SYSTEM. VARIABLE REFRIGERANT VOLUME SYSTEM IS BEING USED FOR THIS PARTICULAR BUILDING. The Variable Refrigerant Volume HVAC System is a relatively new technology developed by Daikin, the world's leading HVAC manufacturer. New VRV systems offer high levels of energy efficiency, as well as flexibility. They operate quietly and provide the user full control of the environmental temperatures.

LV. SKYLIGHT N. T . S

photvoltaics direct conversion of light into electricity at the atomic level.

LV. ROOF DECK

N. T . S

LV. PLATFORM

sensor light motion detectors sense moving objects by picking up the heat that radiates.

N. T . S

LV. 02 N. T . S

LV. 01

N. T . S

N. T . S

led light light-emitting diodes, are a form of solid-state lighting that is extremely efficient and long-lasting. LV. UPPER GROUND N. T . S

LV. SUB- BASEMENT N. T . S

t5 bulb with an initial rated light output of 2,900 lumens, it means that saving installaton & long term maintenance low voc paint green paint ultra low voc (volatile organic content), low odour during application & drying.

gbi- we 1 rainwater catchment area Leads to 60% reduction in potable water consumption in domestic usage such as toilets, kitchen, gardens and water features. gbi- ee 9 sustainable maintenance gbi- eq 9 daylight glare control alumn. louvers on the selected area gbi- eq 8 daylighting

smart glass revolutionary technology using patented suspended particle device film. LV. 01

gbi- ee 4 photovoltaics panel Converting solar energy into electrical energy

gbi- eq 7 air change effectiveness

gbi- EE 2 LIGHTING ZONING

LV. UPPER GROUND N. T . S

gbi- we 4 water efficient fitting

gbi- WE 3 LANDSCAPE IRRIGATION

gbi- EE 3 SUB- METERING LV. SUB- BASEMENT N. T . S

gbi- sm 4 green vehicle

ibs industrialised building systems where the components are prepared & manufactured at the factory & ready to be assembled 55


COLLABORATIVE HOUSING Project Summary

01 PROBLEM STATEMENT

Task: Site: Sch.: Program:

Office Complex Imbi, W. P. Kuala Lumpur University of Malaya M.Arch Sem 1 [Sept ‘16- Jan ‘17] Duration: 8 Weeks, Individual Work

FORM

HARMONY

Hectic, monotonous urban life

Music industry facing brain drain

N

EXPRESSIO

Music interest in Malaysia is fragmented due to multi racial and cultural Lack of appreciation and awareness towards local talent and music industry Limited access towards music experience

Assertive building form, becomes a new attraction of Imbi. Like a performer requires audience, so does the building

The relationship between music, co housing and the site, Imbi. The co housing will provide music experience to the locals

Expression of individuals and collective of music enthusiast into public spotlight, boosting appreciation towards and confidence of performer

02 SITE RELEVANCE Presence of several numbers of store which sells and provide services related to music instruments and education Potential collaboration and education such as churches and schools Potential performing locations such as hotels, shopping malls, convention center and bars


08 DESIGN STRATEGY

04 MUSIC IN GENERAL Genre

Economy Public Access

Privacy & Security

Attract

Opening up the site to public, allowing them to experience and enjoy the music.

Providing privacy for the residents to live together by separating the public and private space

Attracting people into the public space by creating assertive building form, thus boosting the economy and publicity of the co-housing

Marketing

Social Sustainability

Economic Sustainability Generating income for the co-housing through rentable space, music education, music store and music production

Environmental Sustainability

Event

Promoting social interaction by emphasizing the design of shared spaces. Nurturing the sense of neighbourhood, thus creating a caring community.

Teaching Rock

Traditional

R&B

Vocal

Blues

Reggae

Management Production

Jazz

Classical

International

Country

Electro

Providing photovoltaic solar panel which reduce domestic electric usage

Services

Hip Hop

Focus on passive cooling and active cooling design.

Rainwater Harvesting for domestic usage and landscape irrigation.

Influences

09 DEVELOPMENT DIAGRAM Emotions

Nostalgia

Focus

Inspiring

Education

DROP-OFF

fill in

SERVICES

D

COURTYAR

05 TARGET USER Adult

Music Developement

Share experience, knowledge, and wisdom

young Adult

PUBLIC

UP & DOWN

COMMON SPACE

separate

Veteran

Music Developement

children

Share experience, knowledge, and wisdom

Open up the development to public so they can enjoy the music experience

Single

Narrowing the block to promote cross ventilation

Full height block

Share experience, knowledge, and wisdom

Couple

Veteran

Lower the front part, raised the top corner to avoid disruption of view

Communal dining, outdoor spaces, recreation room, terraces, and lounge

Studio Block separate from building block for acoustical isolation

Family

Experiences in Music Industry Ability to play any music instrument Music Academics Professional Musician Music-Related Profession Other professional

57


GBI-we Water Harvesting & Recycling

Leads to 60% reduction in potable water consumption in domestic usage such as toilets, kitchen, gardens and water features in public plaza

GBI-sm11

GBI-sm13

Greenscape and Green Roof

Reduce urban heat island by using green roof. Reduce heat impact on the roof and lower the temperature inside

GBI-EE Photovoltaic

Converting solar energy into electrical energy

GBI-Ee5 8

+30.000m

Internet Connectivity

Communal high speed internet connection, encourage working from home

7

GBI-eq2 +26.400m

GBI-eq2

Non-Toxic Interior

+22.800m

Sound Isolation

Acoustic panels and block isolation to reduce noise from studios from polluting the development

Low VOC Paint and Formaldehyde-Free finishes and materials being used in interior

6

GBI-eq6

GBI-MR4 Bamboo Finishes

Bamboo acoustic panel, ceiling, flooring to avoid usage of natural hardwood timber by subtitute it with farmed bamboo

GBI-in1

GBI-EE3

External Shading Device

GBI-in1

Acoustic Electric Generator

Covering more than 50% of the exposed facade thus reduce the impact of heat from the sun

Converting kinetic energy from sound vibration into electric energy using zinc-oxide panel

GBI-eq4 Natural Lighting

5

All habitable units have opening that allow daylighting to penetrate the units

+19.200m

MULTI PURPOSE ROOM

GBI-eq5 4

External Views

All habitable units have visual access towards outdoor environment

+15.600m

GBI-eq6 3

+12.000m

2

+8.400m

RECORDING STUDIO

Sound Insulation

Hollow concrete block with insulation to reduce noise from adjacent units

JAMMING STUDIO & Classroom

outdoor living area

1

COMMON living

+4.800m

gf +1.200m

drop off

security office

OUTDOOR AREA

lobby

PRACTICE ROOM

gl 0.000m sub basement parking

SB -1.500m

GBI-in1 Electric Car Charging Station

Promoting the usage of electric or hybrid car to reduce environmental impact

AMPHITHEATER

GBI-eq1 Void

GBI-eq4

Void to allow natural ventilation and lighting to penetrate into the sub-basement car park

GBI-SM11 Cascading Water Features

Create a calming sound and provide visual comfort. Reduce heat island effect in the development

GBI-SM8

GBI-SM9

Covered Walkway

For pedestrian and cyclist covered in green barrier to provide safety and filter the noise


A

STUDIO

C

TARGET USER

Or Single

Or Couple

SMALL FAMILY TARGET USER

Or

Veteran

Or

SPACES Family

SPACES

Veteran

Couple

+

Single

B

FAMILY

D

TARGET USER

+ Family

BAND HOUSE / GUEST HOUSE

Or Veteran

TARGET USER

+

Family

SPACES

Couples

Or

+ SPACES

Families

Or

+ Singles

59


DUNIA RESIDENCE : CONVENTIONAL HOUSING Project Summary Task: Site: Sch.: Program:

Office Complex Imbi, W. P. Kuala Lumpur University of Malaya M.Arch Sem 1 [Sept ‘16- Jan ‘17] Duration: 8 Weeks, Individual Work


61


FUTURE OFFICE : IMBI WORK-HUB OFFICE TOWER Project Summary

Description

Office Complex Proposed site for this office complex projImbi, W. P. Kuala Lumpur at jalan imbi in the midst of busy ect located University of Malaya urban environment which near to a busy low M.Arch riseJan shop-house district, high rise berjaya time Sem 1 [Sept ‘16‘17] Duration: 8 Weeks, Individual squareWork complex, imbi low yat, bukit bintang plaTask: Site: Sch.: Program:

za, lot 10 shopping mall, and several hotels.

The site area is 3.94 Acre is divided into 2 parcel for different building typology which is office complex for phase 1 and affordable housing for phase 2. The proposed project is a specultive category of office and it can accomodates a multi-tenancy of 4 offices for each floor. The complex comprises an office tower and supporting element such as auditorium, retail outlets, food court & day care to respond the need of users surrount that particular proposed site. The office tower complex incorporate a few sustainable element to respond to the environment. It is also to help the building owner to reduce the energy usage in the future.


63



65


Culin`s University Tebrau, Johor

School of architecture is a different that any other other building types design. Properly care of the orientations and spaces of the specific area are need to be carefully arranged. Many obstacle need to be considered during the design process as i ned to face some challenge such as to ensure the noise & tide due to the site location located next to Tebrau Straits. Reductions are well executed, classroom space do not interval one to another so that the privacy is achieve, plus to take note that tis is a culinary school therefore proper ventilation system is important to avoid being suffocated in the building

Design Studio 3B ||| Year 3 Final Year Project


Various facade design provide diferent shading which relates the interior space

67


Penang Maritime Museum Penang

Design Studio 3a ||| Year 3


69


Penang Rivercruise Jetty Penang

Taking advantage on the abudance of natural resources surrounding the jetty, the aimed to design the jetty so that it has many sustanability elements as much as possible. The building incorporated materials that reflecs excessive sunlight. and low energy appliances

Design Studio 3a ||| Year 3


71


Boutique Hotel Bangi, Selangor

Design Studio 2b ||| Year 2


Bank Training Center Bangi, Selangor

Design Studio 2b ||| Year 2

73


Home Pavilion Kuala Lumpur

Design Studio 2a ||| Year 2


Folly Design & Build

Atrium, Infrastructure University of KL

Painting Work

Infrastructure University of KL

Design Studio 2a ||| Year 2

75



personal interest


photography

random images shoot by myself

activities

Sports helps me to develop important skills in many way. With these activities, i got to develop my social skills and also adding more knowledge as it is require alot of study and research about what im into.


Sports is something that i am really into because it creates so much vibes and positivity. It is something like a bridge to connect people around me and i had really love to share with other people. I had organised a couple of activity for previous office where im working at as well as studio during my study.

colleague form cmc designworks taking a break while doing an office cycling trip up to waterfall.



thank you | f i n

for browsing, do contact me if there is any enquiry 60 12 940 4650 | zulfadzlishafiee@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.