PORTFOLIO
Weilan Zhang, AIA • Domestic Projects • International Projects • Studio Projects
WSU Digital Classroom Building Pullman, WA ZGF Architects, 7/2015 - 10/2016 Scope of work: SD, DD, CD , CA & LEED Under construction Design-build project Owner: Washington State university GC/CM: Clark construction Structural: KPFF MEP: AEI Total area: 83,295 sf 4-story above grade and 1-story basement, Steel moment frame structure $43.4 million budget University-wide collaboration and innovation center / 12 Abelson Hall Fulmer Hall classrooms of variousHeald sizes / 250 seat circular active learning hall / LEED Silver
pus Relationship NE College Avenue
Stimson Hall
SE Idaho Street
Owen Cleveland Hall
3 5
NE Washington Street
Washington Building
1
Waller Hall
2 E Nevada St.
Education Addition
Library Road
4
m
ay W
2493' - 0" IT HELP DESK
Spatial layout diagram
Building section 1 A3.12
BUILDING SECTION LOOKING WEST ALONG GRID-11 1/8" = 1'-0"
A
A.5
B
B.3
B.4
B.5
B.6
C
C.8 D
D.6
E
E.3
F
G
G.1
G.3
G.5
H
PENTHOUSE ROOF 2571' - 0"
18' - 0"
MECHANICAL PENTHOUSE 401
16' - 0"
LEVEL 3 2537' - 0"
L1.0 OPEN INFORMAL LEARNING 220
C6.0 FLEXIBLE CLASSROOM FOR 30 233
92' - 0"
ACTIVE LEARNING CLASSROOM 235
L1.0 OPEN INFORMAL LEARNING 316
GLASS GUARDRAIL
C6.0 FLEXIBLE CLASSROOM FOR 30 333
16' - 0"
LEVEL 2 2521' - 0"
STAIR 06
GLASS GUARDRAIL
STAIR 03
LEVEL 1 2505' - 0"
12' - 0"
C2.0 ACTIVE LEARNING CLASSROOM G10
C1.0 ACTIVE LEARNING HALL G45
P1.1 LOBBY G40
GROUND 2493' - 0"
4' - 0"
C3.0 FLEXIBLE CLASSROOM FOR 80 339
16' - 0"
PENTHOUSE 2553' - 0"
10' - 0"
ELEVATOR PIT 2489' - 0"
BASEMENT 2479' - 0"
4/20/2016 3:57:39 PM
2 A3.12
Ground floor plan
BUILDING SECTION LOOKING EAST 1/8" = 1'-0"
Typical wall section
0'
E
2 A3.12
1
2
2.1
3
3.1
2 A3.13
4
5
9' - 10"
6
18' - 0"
7
18' - 0"
8
18' - 0"
9
18' - 0"
10
18' - 0"
11
17' - 2"
GL-1
19' - 2"
1' - 9"
2
3 A3.21
2.1
8'
3
LEVEL 2 2521' - 0"
1 A3.02
3 A3.28
LEVEL 2 2521' - 0"
LEVEL 2 2521' - 0"
VISION GLASS 4' - 11 1/2"
7' - 8"
5' - 0"
6' - 4"
FACE OF BRICK
4' - 2"
FACE OF BRICK
18' - 2"
4 A3.21
4'
1 A3.12
174' - 3" 1' - 9"
1
E
2'
GL-1
BRICK HEADER COURSE
RELIEVING ANGLE-
925 Four Suite 240 Seattle, W T 206 623 F 206 623 www.zgf
2 A4.11
VISION GLASS
CL OF MULLION SPANDREL GLASS
A7.05 5
8' - 5"
102F
BA 03
10' - 4 1/2"
7' - 7 1/2"
10' - 4 1/2"
B A3
7' - 7 1/2"
B A3
10' - 4 1/2"
7' - 7 1/2"
10' - 4 1/2"
A7.03
16 A7.03
BA 03
BA 3
7' - 7 1/2"
1' - 0"
3' - 7 1/2"
6' - 7 1/2"
3 A8.36
1' - 0" 6' - 11"
13' - 4 1/2"
11"
B A3
10' - 4 1/2"
1' - 0"
BA 03 7' - 0" 5' - 9 1/4"
BA 06
10' - 4 1/2"
7' - 7 1/2"
16' - 0"
16' - 0"
64 BRICK COURSES
4' - 0" 16' - 0"
1' - 8 1/2"
4' - 0"
12' - 0"
12' - 0"
48 BRICK COURSES
12' - 0" 4' - 8 1/2" 19 COURSES
9' - 1"
1' - 6 1/2"
6' - 7"
GROUND 2493' - 0"
VARIES
VARIES
14' - 0"
14' - 0"
10' - 0" 8' - 8"
1 A3.11
9' - 7"
4 A3.21
1' - 9"
WALL SECTION
1
3
5 A3.24
PLAN, FLOOR LEVEL 1
2 A3.13
3
MECH STEAM CHILLED WATER POE B3
1' - 0" MIN.
E
E
Date: Job No:
Drawn By Checked
H 7' - 4"
FACE OF BRICK
14' - 0 1/2"
4 A3.24
28' - 8"
ENLARGED 5 2. FOR INTERIOR PARTITIONS SEE A8.01 FOR PARTITION A3.21 SCHEDULE. 1/2" = 1'-0"
3 A3.25
E OF BRICK
OF BRICK
1 A3.01
2.1
3 A3.21
P1.1 LOBBY G40
Drawing Title
CAST IN PLACE CONCRETE PLANTER, SEE LANDSCAPE, CIVIL
3. PARTITIONS ARE TO BE TYPE FA/0/3 UNLESS NOTED OTHERWISE.
1 A3.12
5. SEE A8.02 FOR THE DOOR & RELITE SCHEDULE. 6. SEE A4.01 FOR EXTERIOR BUILDING ASSEMBLIES.
Drawing N
1' - 9" 3' - 3 1/2"
PLAN - INTERMEDIATE LANDING
2 A3.21
4' - 0 1/2" MASONRY OPENING
ENLARGED PLAN - DISCHARGE LEVEL 1/2" = 1'-0"
21' - 4"
A
D
4. FURRING AT COLUMNS TO BE PARTITION TYPE B/A/2 U.N.O. 2 A3.12
4 A3.21
ST 01 100SW
G.5
4/20/2016 3:57:48 PM
3 A3.23
ENLA ELEV PLAN SECT
1/2" = 1'-0"
2.1
3 A3.21
G.3
1. SEE A0.01 FOR DIMENSIONING STANDARDS. 5 A3.23
Wash Univ Digit
BASEMENT 2479' - 0"
3 A3.21
1/2" = 1'-0"
4 A3.21
SIM
1/2" = 1'-0"
Drawing Titl
WALL SECTION
1
2 A4.12
ENLARGED ELEVATION
WA-30
Washington State University Digital Classroom
2 A3.11
F G
3 A4.15
7 A4.11
CAST IN PLACE CONCRETE PLANTER, SEE LANDSCAPE, CIVIL
GENERAL PLAN NOTES 6 A3.23
GROUND 2493' - 0"
2 A4.15
12' - 1" 9' - 9"
WA-4
BASEMENT 2479' - 0"
2' - 6" BA L6.0 FACULTY 0 3 TRAINING ROOM 102A 2 1/2" FT 0 3 9 A7.03
Revisions
1 A4.15
GROUND 2493' - 0"
15' - 6"
16' - 8 1/2"
182' - 8"
100VN-C
14' - 8 1/4"
1' - 11 1/2"
16' - 8 1/2" 1' - 11 1/2"
E
7
BA A3
1' - 9"
1' - 9" 22' - 7"
1' - 4 1/4"
100VN-A
100VN-B 100VN-D 7' - 7 1/2" 8' - 6 1/2"
OPEN TO BELOW
BA 03
6
2 A4.11
11 A4.12 BRICK
CORBEL OR THICKENED CONCRETE WALL TO SUPPORT BRICK
G.1
BA 03
8 A8.37 11 A7.03
7' - 0"
32' - 8"
FACE OF BRICK
1' - 4 3/4" 10' - 0" 2 EQUAL
BA 03 L6.0 FACULTY INNOVATION STUDIO 102
L8.0 HOTELING OFFICE 102D L8.0 HOTELING 8 OFFICE FA 102B 03 B TYP A3 14 A8.16
7' - 7 1/2"
1' - 11 1/2"
1' - 4"
ALIGN
FEC
L6.0 FACULTY L6.0 FACULTY RECORDING RECORDING 102F 102G FT 03
8' - 1 1/2"
OPEN TO BELOW
12 A7.05
GLASS RAILING
L1.0 OPEN INFORMAL LEARNING 106
10
1' - 9"
1' - 11 1/4"
A7.01 10
D
E.3
LINE OF OPENING ABOVE
A7.05 14
SIM
Telecom Vantage Group 150 Bak Suite 310 Concord P 978 34
GL-2
SPANDREL GLASS
1 A3.21
1' - 1" 8' - 0"
17 A8.16 6
FA 03
PA 06
OPEN TO BELOW
B A3
DN
L1.0 OPEN INFORMAL LEARNING 101
LEVEL 1 2505' - 0"
10 A4.31
CANOPY BEYOND
2 A3.01
5' - 9"
A7.01
C.8
17' - 11"
3
A7.05
LEVEL 1 2505' - 0"
Mechani Plumbing Affiliated 1601 Fift Seattle, W P 206 25
BOTTOM OF BRICK
C 5 A3.26
Civil and KPFF Co 1601 Fift Seattle, W P 206 62
GL-1
2 A3.21
1' - 9"
PA 06
7' - 5"
B A6
27' - 11 1/2"
OPEN TO BELOW
10' - 0" 2 EQUAL
10"
ST 05 101SE
DN
102B
8' - 0"
PA 06
10"
Revisions
D.6
3
UP
3 A3.26
DN
EL 02 102EL
102
16' - 0 1/2"
10' - 0" 2 EQUAL
LINE OF BUILDING ABOVE
FACE OF BRICK
ST 02 100SE UP
CORRIDOR 100E
LINE OF OPENING ABOVE
3 A3.21 PA 06
H
ST 04 101S
111T
ST 05 100SC
G
BUILT-IN BENCH
1 A3.13
B.6
F.O. MULL P1.1 ENTRY LOBBY 100
B.4
B.5
Landsca ZGF Arc 925 Fou Seattle, W P 206 62
SIM
BRICK LEVEL 1 2505' - 0"
TOP OF BRICK
Telecom and Data Vantage Technology Consutling BRICK Group 150 Baker Avenue Extension, Suite 310 Concord, MAWA-1 01742 P 978 341 0700
9' - 11"
B A6
F.O. BRICK
1' - 6"
B 06
FA 08
2 A3.34
16' - 8 1/2"
MDF 111T
VESTIBULE 100VN
7
CORRIDOR 100E 3'X7' REMOVABLE FRAMING
Mechanical, Electrical, and Plumbing Engineers GL-2 Inc. Affiliated Engineers 1601 Fifth Avenue, Suite 1400 Seattle, WA 98101 P 206 256 0800
LINE OF CANOPY ABOVE
1' - 4 1/2"
CORRIDOR 100N
Civil and Structural Engineers KPFF Consulting Engineers 1601 Fifth Avenue, Suite 1600 CL OF MULLION Seattle, WA 98101 P 206 622 5822
6 A4.12
SIM
5 A3.21
HSS STEEL
SPANDREL GLASS
1' - 11 1/2"
OPEN TO BELOW
1' - 4 1/2"
EL 01 101EL A7.05
8
A7.05 17
DOOR PUSH PLATE
113
ELEC RM 113 L1.0 OPEN INFORMAL LEARNING 135
DN
1ALIGN
4
T 26
1 ST 01 A8.41 100SW
FA 06
1' - 6"
8"
12' - 2"
16
A7.05
BUILT-IN BENCH
3 A4.22
VISION GLASS
GL-1
B
16' - 8 1/2"
FEC BA 03
ALIGN
5' - 1"
FACE OF BRICK
General Clark Co 701 Dex Seattle, W P 425 20
8 A4.14
WA-1
Landscape Architect ZGF Architects LLP 925 Fourth Avenue, Suite 2400 Seattle, WA 98104 P 206 623 9414
WALK-OFF GRATE
DOOR PUSH PLATE
A7.05
117
W.C. 121A 121A
DOOR PUSH PLATE
1' - 11 1/2"
DN
16' - 2"
199DD CHASE 121C 121C
121B
6' - 6"
FA 13 L8.0 HOTELING OFFICE 117 BA 03
7 A8.41 ST 03 100SN
AV MATRIX
W.C. 121E
SNOW MELT MANIFOLD
DOOR PUSH PLATE 15 A7.05
General Contractor Clark Construction Group LLC. 701 Dexter Avenue N, Suite 108 Seattle, WA 98109 P 425 203 5362
2' - 3"
L3.0 MAKER SPACE/ COLLABORATION STUDIO/ STORAGE 4 115 B A3.34 03
1' - 0"
OPEN TO BELOW
CORRIDOR 100N
ALIGN
1' - 6"
GLASS RAILING B 06 B 06
121E
B 03
14' - 8 1/4"
RL139
2 A6.11
PA 16
125
121F
CHASE 121D 121D W.C. 121B
EM ELEC RM 125 3 A6.01 F 13
F HALLWAY 1 3 127V
127
3' - 6"
BA 03
10"
1 A5.01 F 06
CUSTODIAL SUPPLY RM 137
11
139
10
9
P1.1 LOBBY G40
4 A3.21
34' - 8"
A7.05
L2.0 PROBLEM BASED LEARNING 139 BA 02
T 26
3 A3.32
F
UTILITY SINK
1 A3.34
11' - 1 1/2"
F 13
199A
127V
7' - 11 1/2" 8' - 0 1/2" 8' - 0 1/2" 22' - 0 1/2"
18' - 3"
5' - 11 1/2"
1' - 8"
4 A3.33
MAINTENANCE MECHANIC RM 127
1' - 6"
F 13
4 A3.03
7 A3.03
W.C. 121F
HA 16
PA 16
15
12 A7.04
UP
25' - 6"
E
LOADING 199DD
HA 16
HA 16
OPEN TO BELOW
17' - 11 1/2"
B 03
MAIN ELEC RM 199
2504' - 0"
4 5 A3.27 A3.27
199B
1 A3.03
7 A5.01
NA 13 BA 16
FA 06
METAL CANOPY
3' - 11 1/2"
OPEN TO BELOW
B A6
7' - 11 1/2" 182' - 8" 9' - 9"
4 A3.30
29' - 0"
102G
8' - 0 1/2"
4' - 0"
7' - 11 1/2"
C
3 A3.27 3' - 4 1/2" M.O.
B 03 PROJECTION SURFACE
GL-2
VISION GLASS
9' - 8"
BA 03 B A6
1' - 2 3/4"
North Elevation 5 A3.30
9' - 8"
FA 06
BA 16 OPEN TO BELOW
8' - 0 1/2"
18' - 8"
6 A3.30
9' - 8"
1 A3.35
FA 06
1' - 3 1/4"
B.5
4' - 0"
6' - 5 1/4"
7' - 11 1/2"
B A3
BA 06
6' - 1 3/4"
1 A8.21
10" 115
B A6
FA 06
CONTROL JOINT
BRICK
OPEN TO CEILING BELOW
102A
8' - 0 1/2"
B A6
BA 06
10"
FA 06
14' - 0"
5' - 7 1/2"
OPEN TO BELOW
8' - 0 1/2"
16' - 0"
1 A3.13
2 A3.11
925 Fourth Avenue Suite 2400 SPANDREL GLASS Seattle, WA 98104 T 206 623 9414 F 206 623 7828 www.zgf.com CL OF MULLION
1' - 9"
20' - 8"
A
7' - 11 1/2"
15' - 8"
B.3
1 A3.11
16' - 0"
137
1' - 9" 17' - 4" 15' - 4"
B
D
12' - 0"
FACE OF BRICK
A.5
2 A3.02
16' - 0"
COLD FORM FRAMING CONNECTION-ATTACHED TO EDGE OF SLAB
GL-2
1' - 9" 21' - 0" FACE OF BRICK
A
Date:
April 20, 2016
Job No:
22774.01
Drawn By:
WZ YA NF
1
2 18' - 2"
4' - 2"
1' - 4"
1' - 9"
3' - 6"
1' - 9"
3' - 6"
1' - 9"
120. 00°
11"
ENLARGED PLAN, GROUND- WARMING KITCHEN 1/4" = 1'-0"
ALIGN 5' - 6" 1' - 4 1/2"
F 03
P4.0 VENDING MACHINES G10N ALIGN 6' - 9"
F 06
MS
31' - 8"
0" TY P.
MS
21' - 0"AFF M
BA 06
3' -
FA 5' - 3" 0 6
1' - 4"
9"
BA 06
3' -
PA 16
?
SOFFIT ABOVE
9"
MS
3' - 8 1/4"
BA 03 4' - 0 3/4"
DOOR PUSH PLATE
M
C1.0 VESTIBULE Washington G45VW State University 20' - 2"AFF Digital Classroom
18' - 8"
FA 6
TACK BOARD
L2.0 PROBLEM BASED LEARNING 139
M
18' - 8"
BA 03 18' - 8"
DOOR PUSH PLATE
C1.0 VESTIBULE G45VE DOOR PUSH PLATE BA FA 06 06
20' - 2"AFF S
REFER TO A9.02 FOR VESTIBULE RCP INFORMATION
BA 03
BA 06
SOFFIT ABOVE
6' - 9 1/4"
C
S
G45VE-B -A VE G45
° 122.5
B.5 S
90°
BA 06
B.5
BA 03
BA 03 5' - 3"
BA 03
C
10' - 0"AFF
6 A8.35
C
C
VESTIBULE G1VW
4 1/4"
3' - 4 3/4"
10' - 0"AFF
L1.0 OPEN INFORMAL LEARNING 100N
20' - 2"AFF
9' - 7 1/2" 1' - 4 1/2"
S
M
5' -
5' - 0" (CLR.) H 26
EQ
0"
5' -
G45VW-B
BA A6
PA 16 FA 03
G45 VW -A
4
TACK BOARD
16 A7.02 8
2 A8.41
PA 16
C1.0 VESTIBULE G45VW
2' - 3"
A7.02 17
7
11' - 11 1/4"
AMBULATORY STALL RESTROOM G21
BA A6
A7.04
SIM
SIM
2' - 7" 4' - 9"
F 03
ALIGN
G21 10' - 2 1/4" 10"10"
RL37 15' - 5 1/2"
3"
F 03 F 06
5 3/4"
FEC
NA 03 1' - 8"
8
?
ADA DRINKING FOUNTAIN
G37
2' - 1 1/4"
BA 03
9
A7.04
CHASE G21A
B 03
58°
3' - 1" 3' - 1"
2' - 3"
2' - 7" 2' - 7"
1' - 11 1/4"
2' - 7" 2' - 7"
BA 16 18' - 8"
2' - 7" 2' - 7"
3' - 8 1/2"
2' - 7" 2' - 7"
WS
M
S
B.5
HA 16
90°
L2.0 PROBLEM BASED LEARNING G37
10' - 0 1/4"
9 1/4"
FA 03
3' - 8 1/4"
2' - 3 3/4" 5' - 0"
2' - 7" 2' - 7"
15 A7.02
BA 03
2 A6.01
G21A F 03
CLR
CORRIDOR G10N
G23
5' - 0"
A7.04
TYP
7
BA 03
S
DOOR PUSH PLATE
2493' - 0"
HA 16
B.5
B 03
F 03
3' - 0"
CUSTODIAL CLOSET G23
BA 03
F 03
F 03
FA 06
BA 03
B
S
5' - 0"
M
NA 13
R 40' - 0"
NA 13
REFERENCE POINT FOR THE CENTER OF THE ROOM
M
3
2
2493' - 0"
BA 16
1' - 0"
4' - 2"
AMBULATORY STALL
10
3"
G25
G27
15 A7.02 17
F 03
F 03
CLR
F 03
6
A7.02
4
RESTROOM G25 9
ALIGN
3' - 8 1/2"
OFCI ICE MACHINE
5 A7.02
2492' - 6"
1
2492' - 6"
M
2493' - 0"
DO WN
0"
NA 13
WA-30
5%
5' -
P2.0 WARMING KITCHEN G27
5%
BA 16
5' - 0" (CLR.)
F 06
B A6
WN DO
M
C1.0 ACTIVE LEARNING HALL G45
16' - 0"
16' - 0"
2493' - 0"
10' - 0"
0" TY P
5' - 0 1/2"
C1.0 ACTIVE LEARNING HALL G45
M
M
1 1/2" WIDE CONTRASTING MARKING STRIP AT SLOPING EDGES (BOTH SIDES) (TYPICAL AT ALL RAMPS AS SHOWN)
5' -
EQ
16' - 0"
B.3
2492' - 6"
EQ
0"
6' - 9"
S
MS
0" TY P. 5' -
9
18' - 0"
EQ
8
18' - 0"
REFL
S
S
CONC RAMP REFER TO STRUCTURAL (TYPICAL FOR 3)
5' -
120.00°
12. REF LOCATI
DIM POINT
S
FIXED SEATING AT LAST ROW OF TABLES, TYP
2492' - 6"
11. REF LEARNI
M
Revisions
WA-30
B A6
B.3 7
32' - 8"
REFERENCE POINT FOR THE CENTER OF THE ROOM
5' - 0"
18' - 0"
L8
15' - 4"
3' - 6"
15' - 8"
1' - 9"
M
Telecom and Data Vantage Technology Consutling Group 150 Baker Avenue Extension, Suite 310 Concord, MA 01742 P 978 341 0700
FLOOR MOUNTED FIXED AUDIENCE SEATING
5' - 0"
6
17' -15' 4" - 6 3/4"
6" 2' -
5% DOWN
G45VN-A
15' - 8"
3' - 6"
3"
10. PEN LENGTH
REFER TO A9.02 FOR CONTROL RM RCP INFORMATION
S
Mechanical, Electrical, and Plumbing Engineers Affiliated Engineers Inc. 1601 Fifth Avenue, Suite 1400 Seattle, WA 98101 P 206 256 0800
B
B
5' - 0" TYP
1' - 9"
R 12' -
8. RECE INSULA
9. ALL S STRUC TO BE C S
Civil and Structural Engineers KPFF Consulting Engineers 1601 Fifth Avenue, Suite 1600 Seattle, WA 98101 P 206 622 5822
EDGE OF RECESSED SLAB SEE STRUCTURAL
B 03
00° 120.
1/4" = 1'-0"
6. REFE
OTS
M
S
S
Landscape Architect ZGF Architects LLP 925 Fourth Avenue, Suite 2400 Seattle, WA 98104 P 206 623 9414
WA-30
B A6
1' - 6"
M
C1.0 VESTIBULE G45VN
General Contractor Clark Construction Group LLC. 701 Dexter Avenue N, Suite 108 Seattle, WA 98109 P 425 203 5362
CEILING SUPPORTED PROJECTOR SCREEN ABV SEE REFLECTED CEILING PLAN
ELARGED PLAN, LEVEL 1 - RESTROOMS, CUSTODIAL CLOSET
3 A6.01
EQ
C
20' - 2"AFF
31' - 8"
3' - 8"
BA 03
6' - 10"
A.5
P 0" TY
1' - 6"1' - 4"
FA 06
2" 3 1/
G45A
17' - 4" 1' - 9 1/4"
7' - 0"
SIM
4' - 0"
EQ
'42
5' - 0" 7' - 4"
3' - 8"
4' - 0" 7' - 4"
11SIM
F 06
TY P
R
FA 03
13SIM
- 0"
5. ALL C
A
1 A8.21
BA A 3 5' - 4 3/4" VERIFY
BA EQ 0 6
2492' - 6"
B A6
14 A7.02 12
121A
2492' - 6"
FA 06
20' - 2"AFF
2
5'
A.5
A7.04
RLG45A
FEC
F 03 3' - 11 3/4"
5' - 0" CLR
W.C. 121A
BA 03
CHASE B 121C 03
F 03
F 03
121B
B 03
121C
FA 03
925 Fourth Avenue Suite 2400 Seattle, WA 98104 - 2"AFF T 206 62320'9414 F 206 623 7828 www.zgf.com
1' - 0" 2' - 3"
SIM11
B 03
1' - 6"
13
W.C. 121E
SIM
SIM
1' - 6"
FA 06
EQ
MS
7. REFE STRUC
C1.0 ACTIVE LEARNING HALL - CONTROL G45A
90°
B A6
14 A7.02 12
F 03
B.5
1. LOCA ARCHIT CENTE
5
C1.0 VESTIBULE G45VN
11
MS
B A3
15' - 4"
F 03
F 13
GEN
6 18' - 0"
4. REFE LOCATI INSTAL
BA A3
21 A7.04
ED GE OF SLA R 28 B (S ' - 0" EE ST RU CT UR AL)
137
?
NA 03
1' - 9 1/2"
125
5 18' - 0"
3. REFE
A
5' -
1' - 6"
W.C. 121B
SIM13 12 A7.02 14
F 03 F 03 6' - 0 1/4"
121D
SIM
BA 03
7' - 0"
SIM
ADA DRINKING FDOUNTAIN & BOTTLE FILLER
BA 03
F 03
F 03
121E
CORRIDOR 100N
W.C. 121F
CHASE 121D
B 03
SIM
FA 03
BA 06 2493' - 0"
8"
121F
B 03
B 03
CUSTODIAL SUPPLY RM 137
B A6
'R 42
18
11
SIM13
F 03
A7.05 13
HALLWAY 127V
127V
F 03
12 A7.02 14
BA 3
FEC
4 82' - 2" 9' - 10"
18' - 0"
B A6 2493' - 0" 2493' - 0"
MAINTENANCE MECHANIC RM 127
SIM11
BA 03
B A6
FA 06
3.1 7' - 8"
2"
1' - 0 3/4"
2' - 9 1/2" VERIFY
B A6
3 6' - 4"
2. ALL S DEVICE
A
18' - 0"
NA 13
A7.05
18' - 0"
1' - 2 3/4"
1' - 6"
F 03
82' - 2" 9' - 10"
7' - 8"
2.1 4' - 2"
6
8
18' - 0"
B 03
5
11 1/2"
7
6' - 4"
4
9' - 3"
Active learning hall
6
3.1
32' - 8"
18' - 2"
3
83' - 0"
2.1
R 26 ' - 0"
2
9' - 3"
1
Drawing Title
1ENLARGED PLANS - ACTIVE LEARNING HALL, RESTROOMS, WARMING KITCHEN ENLARGED RCP - ACTIVE LEARNING HALL
1' - 4 1/2"
1 A6.01
ENLARGED PLAN, GROUND - ACTIVE LEARNING HALL 1/4" = 1'-0"
5
6
7
1 A6.02
8 GENERAL PLAN NOTES
1/4" = 1'-0"
PENTHOUSE 2553' - 0"
1. SEE A0.01 FOR DIMENSIONING STANDARDS.
2. FOR INTERIOR PARTITIONS SEE A8.01 FOR PARTITION SCHEDULE. 3. PARTITIONS ARE TO BE TYPE FA/0/3 UNLESS NOTED OTHERWISE.
5. SEE A8.02 FOR THE DOOR & RELITE SCHEDULE.
16' - 0"
6. SEE A4.01 FOR EXTERIOR BUILDING ASSEMBLIES.
April 20, 2016
Date:
4. FURRING AT COLUMNS TO BE PARTITION TYPE B/A/2 U.N.O.
Job No:
22774.01
Drawn By:
WZ SAB
Checked By:
ER
925 Fourth Aven Suite 2400 Seattle, WA 981 T 206 623 9414 F 206 623 7828 www.zgf.com
7. SEE ENLARGED PLANS AND FINISH PLANS FOR ADDITIONAL INFORMATION.
3' - 0" TYP.
10. REMOVABLE FRAMING IS INTENDED TO ALLOW ACCESS TO SHAFTS DURING REMODELS AND REPAIRS ONLY.
A6.01
TYPE D LEVEL 3 2537' - 0"
2' - 5" TYP.
2' - 0" TYP.
Drawing No.
8. SEE LS1.03 & LS1.04 FOR EXTENTS OF FIRE PROOFING.
PERF. METAL PANEL, 9. SEE SHEET A7.00 FOR TYPICAL MOUNTING HEIGHTS. PAINTED P-8
4/20/2016 4:01:04 PM
PERF. METAL PANEL, PAINTED P-8
3' - 7" TYP.
HANDRAIL
3' - 7" TYP.
4/20/2016 4:00:56 PM
GLASS RAILING
TYPE A
0'
2'
4'
General Contra Clark Construct 701 Dexter Ave Seattle, WA 981 P 425 203 5362
DOC REL. 06
8'
TYPE A
Communicating stair
TYPE B
TYPE B
TYPE B
TYPE A
Landscape Arch ZGF Architects 925 Fourth Ave Seattle, WA 981 P 206 623 9414
STAIR 05
16' - 0"
TYPE A TYPE A
Civil and Structu KPFF Consultin 1601 Fifth Aven Seattle, WA 981 P 206 622 5822
TYPE B
Mechanical, Ele Plumbing Engin Affiliated Engine 1601 Fifth Aven Seattle, WA 981 P 206 256 0800
TYPE A LEVEL 2 2521' - 0"
TYPE C
Telecom and D Vantage Techn Group 150 Baker Aven Suite 310 Concord, MA 01 P 978 341 0700
STAIR 05
Revisions
SECTION - STAIR 05, L2 TO L3, LOOKING NORTH
5 A5.04
1/4" = 1'-0"
1 A5.04
5
6
7
8
ISOMETRIC VIEW - STAIR 05 AND STAIR 06, COMMUNICATING STAIR
9
10
LEVEL 3 2537' - 0" 7 A5.28
16' - 0"
15 A5.27
TYPE A
2 A8.21
3' - 7" TYP.
C-CHANNEL STRINGER SEE STRUCT.
LEVEL 2 2521' - 0"
PRECAST CONCRETE TREAD AND RISER
TYPE A
Washing Universi Digital C
1
4' -
10"
2 A5.26
4' -
6' - 10"
3 A5.26
TYPE F
10"
2 1/2" x 3/4" SS BAR CANE RAIL,
6 A5.04
SECTION - STAIR 05, GROUND LEVEL TO L2, LOOKING NORTH 1/4" = 1'-0"
TYPE E TYPE E 4' -
STEEL STRINGER SEE STRUCT. MDF PANEL SOFFIT, PAINTED P-8
1 A5.26
TYPE F
4' - 4"
26.57°
10"
TYPE G 4' -
10" 7
A5.25
EQ
C.I.P. FLOOR
EQ
SIM
EQ
GROUND 2493' - 0"
PERF. METAL GUARDRAIL
PERF. METAL GUARDRAIL
8 A5.25
C-CHANNEL
C-CHANNEL HANDRAIL
TYPE K
24.17°
EQ
2 1/2" x 3/4" SS BAR CANE RAIL,
2 A5.04
EQ
3' - 0 1/2" 6 EQ. RISERS
TYP
LEVEL 1 2505' - 0"
TYPE J
1' - 0"
2 1/ 2"
5 A5.28
TYPE E
5' -
3 A5.27
E
PRECAST CONCRETE TREAD AND RISER
TYPE H
1' - 0"
MDF PANEL SOFFIT, PAINTED P-8
26.57°
TYPE C
10"
3' - 6" 5' - 6" 11 EQ. RISERS 7 EQ. RISERS
STEEL STRINGER SEE STRUCT.
1 1/2" STAINLESS STEEL HANDRAIL C-CHANNEL STRINGER SEE STRUCT.
GLASS RAILING TYPE A
4' - 10" 4' -
16' - 0"
A5.27
10"
3' - 0 1/2"
TYPE B
TYPE A 4' -
3' - 7"
TYPE B
10"
5' - 2 1/2"
4' -
4 A5.28
1' - 0"
4' - 10" 6 A5.28
PERF. METAL PANEL, PAINTED P-8
4
12' - 0"
TYPE A TYPE A
10"
2 1/ 2"
4' -
A5.27
5' -
10"
TYPE B
3' - 7" TYP.
TYPE B
3' - 0"
4' -
6' - 0"
5' - 6" 11 EQ. RISERS 5' - 0" 10 EQ. RISERS 5' - 6" 11 EQ. RISERS
PERF. METAL PANEL, PAINTED P-8
1 1/2" STAINLESS STEEL HANDRAIL TYPE D
4' - 0"
6' -
0"
PERF. METAL PANEL, PAINTED P-8 4 A5.26
SECTION - STAIR 05, LOOKING WEST 1/4" = 1'-0"
GROUND 2493' - 0"
Drawing Title
PLANS & SECTIONS
Heating (kBtu/sf) Cooking (kBtu/sf)
Cooling (kBtu/sf) MBtu per Year (kBtu/sf) Refrigeration
Sustainable Design - LEED Category Electricity Chilled Water Silver Steam 545.8
140
TING
LING
120 100
EUI kBtu/sf yr
UX
CBECS 531.6 Median
80
T WTR
60
-
Ventilation (kBtu/sf) Water Heating (kBtu/sf) % of Total(kBtu/sf) AnnualComputer % of(kBtu/sf) Total Office Equipment MBtu
Energy Cost
Cost
545.8
15%
$
16,316
25%
531.6 1,339.7
14% 36%
$ $
15,892 12,727
25% 20%
Total
-
135 kBtu/sf/yr-
1,339.7
-
-
-
477.0
-
477.0
13%
$
3,029
5%
73.9
-
-
73.9
2%
$
2,209
3%
324.2
-
324.2
9%
$
9,692
15%
5%
$
1,727
ASHRAE 90.1 2007 181.8
-
-
7.0
-
-
-
-
232.0
75 181.8 kBtu/sf/yr 7.0 232.0
WSEC / ASHRAE 64 0% $ 90.1 2010209
6%
$
Lighting (kBtu/sf) Electricity Cost [$/kWh]: Misc (kBtu/sf)
0.1020 Chilled Water Cost [$/MBTU]:
DOMEST HOT WTR 5%
70% Reduction
3%
45% Reduction
3%
1,753.5
3,713.0
$
MISC EQUIP 14%
36% Reduction
As Designed 45.8 kBtu/sf/yr AIA 2030 Challenge 40 kBtu/sf/yr
42
VENT FANS 9%
PUMPS & AUX 2%
SPACE COOLING 13%
Energy / Performance 477.0
LIGHTS 15%
45.8 kBtu/sf/yr
40
1,482.5
6.35 Steam Cost [$/MBTU]:
SNOW MELT 6%
EXT USAGE 0%
kBtu/sf/yr 0%
2,204
$
64,006
20
ditioned Floor Area [SF] 0
Energy Use Intensity EUI [kBtu/SF]
$
0.1020 Chilled Water Cost [$/MBTU]:
6.35 Steam Cost [$/MBTU]:
$
9.50
Solar Photovoltaic System PROPOSED BETTERMENT SNOW MELT EXT USAGE 0%
Energy Concrete DOMESTLow HOTEmbodied WTR Fly ash or slag substitutes 5% Reuses industry surplus Reduces energy intensity
6%
Energy Use Category
Electricity
MISC EQUIP SPACE HEATING
531.6
-
SPACE COOLING
-
PUMPS & AUX
FANS HydronicVENT VAV Air Handler 9%to changing loads Rapidly respond PUMPS & AUX Energy efficient
73.9
VENT FANS MISC EQUIP 14%
High Head Height Windows Improved daylight penetration COOLING Even SPACE North Daylight 13% Improved productivity Improve visual comfort
Dedicated Outside Air SystemDesign Proposed Reduces duct size Year ImprovesMBtu indoorper air quality
Chilled Water Reflective Surfaces Steam 545.8 Improve daylight - penetration -
LIGHTS
LIGHTS 15%
2%
SPACE HEATING 36%
WSU Digital Classroom WSU $Digital0.79 Classroom
45.8
81,068
st [$/kWh]:
Energy Cost Intensity ECI [$/SF]
-
$
16,316
25%
14% 36%
$ $
15,892 12,727
25% 20%
-
477.0
13%
$
3,029
5%
-
73.9
2% Roof $ 2,209 Green Reduce stormwater flows 9% $ 9,692 Provide habitat 5% $ 1,727 Connection to$ nature 209 0% PROPOSED BETTERMENT
3%
-
-
-
181.8 181.8 Reduce duct size
EXT USAGE
7.0
-
- Improve comfort 7.0
SNOW MELT
-
-
Gross Conditioned Floor Area [SF]
- Active Chilled 324.2 Beams
Save energy 232.0 232.0
477.0
1,753.5
3,713.0
Energy Use Intensity EUI [kBtu/SF]
Electricity Cost [$/kWh]:
$
0.1020 Chilled Water Cost [$/MBTU]:
EXT USAGE 0%
Underfloor Air Distribution at Tiered Seating Improves comfort Improves indoor air quality Saves energy
DOMEST HOT WTR 5%
6%
$
SNOW MELT 6%
Affiliat
15% 3% 0%
2,204
3%
Glare Free Daylighting $ 64,006 Improve productivity Energy Cost Intensity ECI [$/SF]
Deciduous Tress Reduce summer solar gain 45.8 Allow winter solar gain 6.35 SteamImprove Cost [$/MBTU]: comfort Connection to nature
81,068 SPACE HEATING 36%
% of Total Cost
15%
324.2
1,482.5
Annual Energy Cost
531.6 1,339.7
DOMEST HOT WTR
TOTAL
% of Total MBtu
545.8
Natural Ventilation / Stack Effect 1,339.7 Improved comfort 477.0 Connection to outdoors 10/18/2016
Total
$
0.79
$
9.50
Sunshades Reduce solar gain Reduce glare Improve comfort LIGHTS 15%
1. Climate responsive design VENT FANS Flow Control Rainwater Vault Operable Windows 9% Reduces erosion Improve comfort In order to glean the most Reduces benefit from a specific site, climate is viewed as a resource rather than a liability. The Pullman PUMPS & AUX infrastructure impacts Provide occupant control 2% Energy energy climate offers numerous opportunities as well as challenges to ensure occupant comfortSaveand efficiency. The winter MISC EQUIP 14% months are cold and often accompanied by snowfall, but winter solar gain can reduce heating demands and improve South
Construction photo
UW Nano Engineering Building Seattle, WA ZGF Architects, 11/2014- 7/2015 Scope of work: TI SD, DD & CD Under construction
Owner: University of Washington GC: Hoffman construction Structural: KPFF MEP: AEI Total area: 69,450 SF 4-story above grade and 1-story basement concrete structure Laboraroties, offices and classrooms Flexible lab planning with overhead service carriers Natrual ventilation in office space LEED Gold Suzzallo Library
SITE PLAN
Site plan Meany Hall
Gerberding Hall
Johnson Hall
Mary Gates Hall
Nano ES Architecture Hall
MolE
Guthrie Hall
UW Nano Engineering and Sciences Building
Chemistry Library 1”=30’-0” Interior Design Meeting | May 29, 2015
Ground floor plan
Typical wall section
SMALL CLASSROOM
LARGE CLASSROOM
ES
S
6 PL-1
4'-6"
TRIM PL-1
6'-4"
A8.12-TI
EQ
THIRD PLACE
STEEL TAB HSS 3 1/2" X 3 1/2" X 1/4" MT-2 TYP
3 1/2" 9
Building section
1/2"
A8.12-TI
2'-0"
WD-1 SLAT
STEEL ANCHOR PLATE WD-1 SLAT
21
21.4
22
22.3
A8.12-TI
23
STEEL TAB 1/4" PL
SECTION
ELEVATION
4'-6 1/2"
16'-5 3/4"
2'-5"
7'-0"
9'-6"
10'-6"
22'-6"
1 1/2"
7 A8.12-TI
BOOTH 2 TABLE VERTICAL SUPPORT DETAIL 3" = 1'-0"
Consultants
3 A8.12-TI
2 1/2"
12'-0"
2 1/2"
PL-1
6'-4"
1
2'-0 1/2"
1.8
EDGE OF BENCH
2
7
2 1/2"
3
925 Fourth Avenue Suite 2400 Seattle, WA 98104 T 206 623 9414 F 206 623 7828 www.zgf.com
CUSTOM TABLE PL-1
BOLTED CONNECTION
HSS BEYOND
PL-1
1 1/2"
METAL TRIM MT-2
EAHU'S; SEE MECHANICAL DWGS
T.O. COPING 1/4" 6 1/4" EL. 216' - 8"
CONTINUOUS STEEL SUPPORT
6 A8.12-TI
3" = 1'-0"
3" = 1'-0"
STEEL ANCHOR PLATE BELOW
PENTHOUSE LEVEL BOLTED CONNECTION EL. 198' - 0"
1 1/4"X1 1/4"X1/4" ALUMINUM TRIM TOP & SIDE EDGE
Interior Design Meeting | May 29, 2015 1/2"
6 1/4"
9 A8.12-TI
1" = 1'-0"
1 A8.12-TI
BOOTH 2 ISOMETRIC
Revisions
3" = 1'-0"
EL. 182' - 0"
4'-6"
(FUTURE RESEARCH LAB) 380
SITE WORKSHOP 222 ETRURIA ST, #200 SEATTLE, WA 98109 -
PLAN - BOOTH 2
BOOTHLEVEL 2 TABLE VERTICAL PANEL DETAIL 04
16'-0"
3" = 1'-0"
SHELL ALUMINUM TRIM
SHELL (FUTURE OFFICE) 381
2 A8.12-TI
METAL TRIM MT-2
WRITABLE SURFACE WALL EDGE DETAIL
KPFF CONSULTING ENGINEERS 1601 FIFTH AVENUE, SUITE 1600 SEATTLE, WA 98101 LANDSCAPE
16'-0"
1/4"
8 A8.12-TI
5 A8.12-TI
PL-1
1/4"
SHELL (FUTURE RESEARCH LAB) 480
SHELL (FUTURE OFFICE)
NEOPRENE TAPE
BELOW
3/4" MDF BOARD WITH MB-1 APPLIED TO FACE
RESEARCH FACILITIES DESIGN 3965 FIFTH AVENUE, SUITE 300 SAN DIEGO, CA 92103 CIVIL ENGINEER
CONTINUOUS STEEL SUPPORT
PANEL MOUNTING SYSTEM
g and Sciences Building
KPFF CONSULTING ENGINEERS 111 SW FIFTH AVENUE, SUITE 2500 PORTLAND, OR 97204-3628 MECHANICAL/ELECTRICAL ENGINEER AFFILIATED ENGINEERS NW, INC 1601 FIFTH AVENUE, SUITE 1400 SEATTLE, WA 98101 LABORATORY DESIGN
BOOTH 2 TABLE EDGE SECTION DETAIL
6'-4"
BANQUETTE SECTION AT BOOTH 2
EQ
4 A8.12-TI
1/8”=1’-0” 18'-8"
MECH. CHILLER, SEE MECHANICAL DWGS
STRUCTURAL
Detail drawing
BOOTH CEILING ASSEMBLY TO MAINTAIN A MIN. OF 50% OPENNESS
3'-10 1/2" 5 A8.11-TI
LEVEL 03 EL. 166' - 0"
HSS MT-2
1" X 2.5" SLAT WD - 1
16'-0"
STEEL TAB
OFFICE 290
HALLWAY 260
P-2 IN BOOTH 2 P-1 IN BOOTH 3
LIGHTING FIXTURE AS SCHEDULED, SEE ELEC.
RESEARCH LAB 280
P-2 IN BOOTH 2 P-1 IN BOOTH 3
LEVEL 02 EL. 150' - 0"
WRITABLE SURFACE WALL MB-1
7'-6"
7 A8.11-TI
LGSTEEL CLASSROOM PLATE 181BOLTED TO STUDS OPEN
LEVEL 01 EL. 134' - 0"
FUTURE
6'-4"
7'-2 1/4" HALLWAY
SHELL SPACE 3 A8.12-TI
BOOTH 2 SECTION 2 1" = 1'-0"
G60C
5 A8.12-TI
LEVEL G EL. 116' - 0"
BOOTH 2 SECTION 1 1" = 1'-0"
ELECTRICAL OUTLET
4 TYP A8.12-TI
CONTINUOUS STEEL SUPPORT
NANO ENGINEERING AND SCIENCES 6'-4"
UNIV OF WASHINGTON 1701 NE GRANT LN SEATTLE, WA Drawing Title
14'-0"
HALLWAY G60A
18'-0"
2 1/2"
SHELL SPACE G63
8/21/2015 2:12:56 PM
INSTRUMENTATION LABS
8
BANQUETTE SEAT UPH-2 IN BOOTH 2 UPH-5 IN BOOTH 3
PHASE I BLDG
P-2 IN BOOTH 2 P-1 IN BOOTH 3
A8.12-TI
2'-6"
BANQUETTE BACK UPH-3 IN BOOTH 2 UPH-4 IN BOOTH 3
2'-3 1/2"
WD BLOCKING
P-2 IN BOOTH 2 P-1 IN BOOTH 3
ALUMINUM TRIM WRITABLE SURFACE WALL MB-1
FOR TYPICAL BANQUETTE DETAIL, SEE
16'-0"
PL-2
IN WALL
P-2 IN BOOTH 2 P-1 IN BOOTH 3
DPD STAMP
A8.11-TI
WD-1 SLAT ELECTRICAL OUTLET
HALLWAY 160
P-2 IN BOOTH 2 P-1 IN BOOTH 3
8
5'-0" A.F.F.
OFFICE 298
BUILDING SECTION
6'-4"
BOOTH SPACE
Informal Learning Space
BOOTH 1
FLOOR PLAN SEATING NUMBER: 100 - 120
8'-6" AFF
10'-6" AFF
1
4
OPEN SEISMIC JOINT
15'-0"
A9.13-TI
9' AFF
9' AFF
F.6 11'-0"
8'-0"
10'-6" AFF
G.2 11'-0"
8'-0"
10'-6" AFF
8'-6" AFF
3'-1" 8'-6" AFF
10'-6" AFF
11'-6" AFF 8"
10'-6" AFF
39'-7 1/2"
10'-10 1/2"
4'-2"
1" OPEN JOINT TYP
6"
1" OPEN JOINT TYP
BOOTH 1 BELOW
1'-0"
11'-8 5/8"
2'-2" ACCESS PANEL
BOOTH 1 BELOW
2'-2" ACCESS PANEL
1'-0"
1'-0"
3'-6"
1'-0"
1'-2"
DOWNWARD SLOPE
30'-9 1/4"
DOWNWARD SLOPE
BOOTH 2
2'-2"
2'-2" ACCESS PANEL
DOWNWARD SLOPE
DOWNWARD SLOPE
DOWNWARD
ELEVATION SLOPE
2'-2"
1'-6"
DOWNWARD SLOPE
2
2'-2"
6" DOWNWARD SLOPE
3 TYP SIM A9.13-TI
1" OPEN JOINT TYP
TYP
5 A9.13-TI
2 A9.13-TI
Interior Design Meeting | May 29, 2015
TYP
NING SPACE CEILING
LIGHTING FIXTURE AS SCHEDULED, SEE ELEC.
BOOTH 2 BELOW
6"
LIGHTING FIXTURE PER ELEC.
DOWNWARD SLOPE
PERFORATED GWB APC -8
3
8 A9.13-TI
A9.13-TI
LIGHTING FIXTURE AS SCHEDULED, SEE ELEC.
DOWNWARD SLOPE
TYP
ELEVATION
DOWNWARD SLOPE
1
A9.13-TI SIM
TYP
1
5 A9.13-TI
PERFORATED GWB APC -8
7
DOWNWARD SLOPE
A9.13-TI
8"
TYP
11'-8 5/8"
2
LIGHTING FIXTURE AS SCHEDULED, SEE ELEC.
3'-2"
BOOTH 3 BELOW
ring and Sciences Building
ELECTED
F.4
113'-10" 5'-3"
2'-0"
8"-6" AFF
10'-6" AFF
9' AFF
OPEN SEISMIC JOINT
7
9' AFF
4
10'-6" AFF
A9.13-TI
A9.13-TI
BOOTH 3
TYP
8'-6" AFF
10'-6" AFF
TYP
8'-6" AFF
10'-6" AFF
TYP 6 A9.13-TI
1'-1"
11'-6" AFF
O.T.S P-1
FAN, TYP.
5'-5"
10'-6" AFF
6"
ABOVE TYP.
3 5'-6"
ALIGN FIXTURES AND FANS WITH MULLIONS
NOTE: REFER TO1/ A9.03-TI FOR RCP GENERAL NOTES AND LEGENDS.
FIRE SPRINKLER HEAD LAYOUT SHOWN FOR DIM LAYOUT INFO ONLY, FOR FULL EXTENT OF WOR PROTECTION DRAWINGS.
C
C.7
C.1
ENLARGED CEILING1 PLAN A9.07-TI 1/4" = 1'-0"
D
C.8
E
E.1
E.2
E.7
F
ELEVATION
F.4
F.6
G
G.2
PLAN, REFLECTED CEILING - LEVEL 01
LIGHTING FIXTURE AS SCHEDULED, SEE ELEC.
UW Nano Engineering and Sciences Building
Interior Design Meeting | May 29, 201
METAL STUD FRAME AND BRACING AS REQUIRED
SHAFT DROP FROM L2
10'-6" AFF
10'-6" AFF 11'-6" AFF 8'-6" AFF
8'-6" AFF
LOUNGE AREA - SOUTH 2 1/4" = 1'-0" and SciencesA9.07-TI Building
9' AFF
9' AFF
FINISH FLOOR
Interior Design Meeting | May 29, 2015
Interactive Learning Classroom
TRAPEZOID TABLES IN ROWS 58 TABLES 88 SEATS
BENCH
CLASSROOMS CIRCLE
SMALL CLASSROOM TABLES 28 TABLES / 56 SEATS
RECTANGLE
TRAPEZOID
TRAPEZOID TABLES IN 16 HEXZGON PODS 32 TABLES / 96 SEATS
Interior Design Meeting | May 29, 2015
es Building N/A
2'-6"
ROW
3'-1 1/2" 2'-6"
7'-0"
6'-0"
6'-0"
7'-0"
3'-1 1/2"
5'-0"
5'-0"
6'-0"
POD
BENCH
TRAPEZOID TABLE
Interior Design Mee
UW Nano Engineering and Sciences Building SOUTH ELEVATION
SMALL CLASSROOM
LARGE CLASSROOM
Construction photos
Biomed Fairview Research Building Seattle, WA ZGF Architects, 2/2015 - 4/2015 Scope of work: CD & CA Completed in 2016
Existing building
Owner: Biomed Realty GC: GLY construction Structural: CPL MEP: PAE Laboratory, office and conference center Total area: 108,500 sf 7-story above ground Below grade parking Ground floor plan
New construction
Expedia Headquarters
Seattle, WA ZGF Architects, 10/2016 - 4/2017 Scope of work: Programming, Concept, SD & DD Owner: Expedia Inc. Development manager: Seneca group GC: GLY construction Structural: Kpff MEP: Mckinstry 40-acre parcel 500,000 sf existing building renovation, 4500 employees 275,000 sf new construction 4-story of open workspace, meeting spaces, food and beverage program and other workplace support spaces. The major diagonal connector spine along level 2 creates a new energy of horizontal connectivity between and within the work spaces. The centrally located heart will provide campus community
TLE HQ
MIST
BRIDGE FRONT PORCH
HE ART OVERLOOK
BAY B A CK POR CH
DOCK
12.06.16
4
SEATTLE HQ
03.16.17
29
1. Main Entry
2. Employee Entry
SEATTLE HQ
2 1
12.06.16
5
3. Courtyard
4. The Connector
SEATTLE HQ
4 3
12.06.16
24
5. Market Place
5b
5a 5c
SEATTLE HQ 5a
5
03.16.17
30
5b
5c SEATTLE HQ
03.16.17
36
China Merchants Group Headquarters
Site Context
Zhangzhou, Fujian Province, China Master Planning and Conceptual Design 08/2013- 02/2014 ©Ellumus
Ax is n ce a
Scope of Work: Site anlysis, 3D modeling, CAD, Presentation package, Coordination with client, rendering company,
Dingzai Mountain
Concept image - Confluence
Site Context 150m Dingzai Mountain
100m
100m
130m 150m Dingzai Mountain
PORTFOLIO_WEILAN ZHANG
70m
150m
Xiamen Bay
Phase 3
16,600 m2 Service Apartment
-o
Ocean Mountain
in
Zhangzhou
nt a
Site
19,200 m2 Public Park Phase 1 8,100 m2 Office & Conference Center
ou
Xiamen Bay
Phase 1
21,300 m2 Hotel & Retail
M
Xiamen
Phase 2
The project is located in a prominent site south of Xiamen Bay, China. Creating a “lighthouse” landmark - 150-meter iconic office tower, corporate headquarter amenity includes conference center, restaurant and retail. Mountain-ocean axis spatial sequence Vertical circulation layout seperating pedestrian and vehicular traffic
Site
7 3
Iconic Tower
2 6
Corporate Campus Site Plan Phase 1 1.Mixed-use Tower 2.Grand Steps 3.Plaza 4. Conference Center 5. Auditorium Phase 2 6. Hotel 7. Retail Phase 3 8. Service Apartment
View from Xiamen Bay
4
1
5
7
8
PORTFOLIO_WEILAN ZHANG
Aerial Night View
PORTFOLIO_WEILAN ZHANG
Program Diagram
Phase 1 Office 46700 m2 Conf. center 10000 m2
Phase 3 Apt. 15000 m2 Retail 4000 m2
Phase 2 Hotel 24000 m2 Retail 5000 m2
North Elevation
Vertical Circulation Diagram
NE Elevation
L3 +7m Employee Entry L2 Mezz +5m VIP Drop off Pedestrian Entry L2 +3.5m Parking L1 0.0m Service Entry Drive way B1 -3.5m Parking
Employee Entry Service Entry
Lobby Parking
VIP Drop off/ Pedestrian Entry
Plaza
Longitudinal Section
PORTFOLIO_WEILAN ZHANG
Xuzhou Huaihai Bank Tower Xuzhou, Jiangsu Province, China Schematic Design and Design Development 03/2012 - 07/2013 ©Ellumus
Viewed from above, the rooftop resembles a silver boat. At the street level the tower base flares inward to serve as a welcoming gesture, which is a subtle reference to the Chinese “people” character . The 120-meter bank tower has function of open office, executive office and clubhouse on top two floors; podium funtion includes bank, vault, auditorium, conference center and employee cafeteria.
HUAIHAI BANK
Scope of Work: Site anlysis, 3D modeling, CAD, Revit, Presentation package, Coordination with client, rendering company and local design institution.
Chinese silver boat
1
Site Analysis
办公塔楼 OFFICE TOWER
2
公共大厅 CONCOURSE
3 普 陀 路
裙房 -证券交易 -多功能厅 PODIUM -STOCK EXCHANGE -MULTIFUNCTIONAL HALL
4 9 4
1
11
2 5 12
11
经济技术指标Project Data 规划用地面积 SITE AREA 总建筑面积 GROSS BUILDING AREA ‐ 地上总建筑面积 ABOVEGROUND ‐ 地下总建筑面积 UNDERGROUND 地上计容积率总建筑面积 AG(FAR) 建筑占地面积 BUILDING FOOTPRINT 建筑密度 SITE COVERAGE 容积率 FAR 公共绿地面积 GREEN AREA 绿化率 GREEN AREA RATIO 机动车停车位 PARKING ‐ 地上停车位 ABOVEGROUND PARKING ‐ 地下停车位 UNDERGROUND PARKING 非机动车停车位 BICYCLE PARKING
18334.00 73138.00 46368.00 26770.00 46368.00 5774.00 31.5% 2.53 3924.12 21.4% 520 94 426 1282
m2 m2 m2 m2 m2 m2
PODIUM -BRANCH BANK -CONFERENCE/OFFICE -AUDITORIUM
5
下客区 DROP-OFF
6
地面停车
7
服务入口
8
车库入口
9
入口广场
10
安保
11
屋顶花园
12
水景雕塑
PARKING
SERVICE RAMP ENTRY
m2
PASSANGER RAMP ENTRY ENTRY PLAZA
6
3
裙房 -银行营业厅 -会议办公 -报告厅
SECURITY
7
ROOF GARDEN WATER FEATURE
秦 郡 路
8
10
Site Plan PORTFOLIO_WEILAN ZHANG
N
SW Street View
Revit Model
Physical Model
NW Street View PORTFOLIO_WEILAN ZHANG
L5 Floor Plan - Open Office
Curtain Wall Detail L15 Floor Plan - Executive Office
L22 Floor Plan - Clubhouse PORTFOLIO_WEILAN ZHANG
South Elevations
East Elevations
North Elevations
Ground Floor Plan
Section
Enlarged Detail Drawings PORTFOLIO_WEILAN ZHANG
China Merchants Corporate Center Zhangzhou, Fujian Province, China Master Planning and Conceptual Design 05/2012- 08/2012
Site Analysis 招商大道 ZHAOSHANG AVENUE
东北主导风向 PREVAILING WIND DIRECTION
The project incldues master planning for a ocean-front site of 25000 m2 and schematic design of the 100-meter office tower. The design language is inspired by tranditional wood barcket and developing into interlocking building geometry. The outdoor plaza and sunken garden between buildings create a gather space for company event and daily use for employees.
海景视线 VIEW TO OCEAN
双鱼岛视线 夏季太阳轨迹
公园视线
SUMMER SUN PATH
Scope of Work: Site anlysis, Tower design, 3D modeling, Site plan, CAD, Presentation package, Coordination with client, rendering company and local design institution.
VIEW TO PARK
VIEW TO DOUBLE FISH ISLAND
冬季太阳轨迹 WINTER SUN PATH
N
招商局漳州开发区办公楼建筑设计方案
基地环境分析
THE SCHEMATIC DESIGN OF CHINA MERCHANTS ZHANGZHOU OFFICE TOWER
Site Plan Phase 1 1. Main Entry 2. Office Tower 3. Drop-off 4. Event plaza Phase 2 5. Sunken Garden 6. Conference Center 7. Hotel
SITE ENVIRONMENT ANALYSIS
Phase 2
Phase 1 1
6 5
4
2
7 3
Concept Image - Interlocking Wood Bracket PORTFOLIO_WEILAN ZHANG
A 17
Design Process
Aerial Night View
NE Street View PORTFOLIO_WEILAN ZHANG
Ground Floor Plan
Sustainble Design Strategy
L10 Floor Plan -Sky Garden
Section
PORTFOLIO_WEILAN ZHANG
L15 Floor Plan - Open Office
L20 Floor Plan -Executive Office
L22 Floor Plan - Clubhouse
East Elevations
West Elevations Sunken Garden View
North Elevations
South Elevations
SE Street View PORTFOLIO_WEILAN ZHANG
Wusheng Transit Center Wuhan, Hubei Province, China Master Planning and Schematic Design 03/2012 - 06/2013
R an
d
gh
Jin
Site Condition
Program Transit Center 36000 m2 TC Office 4000 m2
Site Area 32370 m2
Retail 20000 m2
SOHO Office 119,000 m2
PORTFOLIO_WEILAN ZHANG
Riv er Yan g
Scope of Work: Site anlysis, Tower design, 3D modeling, CAD, Presentation package, Coordination with client, rendering company.
tze
Site
Wusheng R
The project is a development combining transit center and commercial development. The design team works closely with traffic consultant on the bus and passenger circulation, creating a vertical layout to meet the function requirement. Main lobby at the corner orientes passengers to different levels efficiently. The 200-meter SOHO tower provides maximal investment return for developer.
d
ŠEllumus
Planning Strategy
Study model
Site Plan 1 Sunken Plaza 2 Retail Podium 3 Transit Center 4 Transit Center Office 5 Soho Tower 6 Conference Center 7 Drop-Off
1
7
2
4 5 6
3
PORTFOLIO_WEILAN ZHANG
L3 Plan-Bus Parking
L2 Circulation Diagram -Bus Departure
L2 Plan-Bus Departure
L1 Circulation Diagram -Bus Arrival L1 Plan-Bus Arrival
Transit Center
Retail
Soho office
Transit BOH
PORTFOLIO_WEILAN ZHANG
Section
North Elevation
East Elevation
Transit Center Entry PORTFOLIO_WEILAN ZHANG
COUNTERBALANCE
New Seattle Greyhound Bus Terminal ASCA Steel Structure Competition Entry 01/2010-03/2010, Tectonic Studio, UW Tutor: Rick Mohler Scope of work: concept, drawing, model, rendering
The site of the bus terminal is located the in the east side of SODO station, southeast of downtown Seattle, facing the Lander street in the south and 6th Ave. in the east. It provides an excellent view corridor to appreciate the skyline of Seattle within the site. The movement of light rail and metro buses to the west and the potential movement of Greyhound buses to the east suggest a strong north-west linear orientation of movement.
Entrance View
PORTFOLIO_WEILAN ZHANG
CONCEPT SKETCH
DOWNTOWN SEATTLE
SITE
The structure of this building expresses a simple idea of “balance within the dynamic� - counterweight concrete partition walls anchor the huge bus bay canopy in the west through tension rods in-between.
Concept model
Concourse View PORTFOLIO_WEILAN ZHANG
N 10
9 4
9
9
9
2
9
9
6 8
1
9
3
13
12
5
8
8
12
13 5
7
7 7
11
1 LUGGAGE SERVICE 2 STORAGE 3 TICKET COUNTER 4 MAIN ENTRANCE 5 FOOD SERVICE 6 LOBBY 7 OFFICE 8 WAITING AREA 9 BUS SLIP 10 PARKING 11 OPERATION ROOM 12 REST ROOM
12’00”
7’00”
LOAD-BEARING DIAGRAM
8’00”
GROUND FLOOR PLAN
Longitudinal Section PORTFOLIO_WEILAN ZHANG
Tectonic Model 1_1/4 “
PORTFOLIO_WEILAN ZHANG
MVF-MODULARITY&VARABILITY&FLUX
Multi-functional crane
Urban Climate Change Research Center 03/2011-06/2011, Built Environment Interdisciplinary Studio, UW Tutors: Ken Oshima, Thaisa Way Team member: Jordan Bell, Tera Hatfield Scope of work: concept, drawing, model, rendering The Project is a scientific research campus for researchers all over the world in Ballard waterfront. A multi-functional crane will construct and transform the site over time. The building adapt a modular pre-fabrication system, which prividing a flexiblity for various functions.
Phase 1
Phase 2
Phase 3
PORTFOLIO_WEILAN ZHANG
Site Plan
Research
Education
Manufacture
Site - Ballard waterfront
Long Site Section View from the crane
Site-layer Diagram
Building Section
PORTFOLIO_WEILAN ZHANG
Central bridge Gabion wall
Roof SIP panel
Infrastructure duct Cross bracing Structural steel frame
Sliding screen panel Trellis
Wall SIP panel / window frame
Aluminum blind
Hydroponic living wall
Pre-fabrication System
Sustainable Strategy PORTFOLIO_WEILAN ZHANG
Axon Foor Plan
Physical Model PORTFOLIO_WEILAN ZHANG
Weilan Zhang, AIA zweilan7@gmail.com 206.802.4017 7312 Linden Ave N Seattle WA 98103