Pike Construction Review Edition 4 | January 2014
CONTENTS Company Profile 1 Resources & Capacity 2 Recent Projects 4
Manuele Engineers 5
Kent Town Office 6
Commercial Motor Vehicles 7
Austral Steel Eagle & Globe 8
Allsons Transport 9
ACS Investments 10
Adelaide Produce Markets
Wastewater Services 12
11
Current Projects 16
Osborne Fuel Storage Facility
17
Bulky Goods Retail Development
18
Terminals Office
19
Repco – Kmart Tyre & Auto Service
20
Equals Facade & Fit-Out
21
Pelican Point Road Widening
22
Quality, Safety & Environmental Management 24
Quality Assurance 25
Occupational Health & Safety 26
Environmental Management 27
Our Referees 28
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW
WHO IS PIKE?
COMPANY
PROFILE With over three decades of experience, Pike Constructions have established themselves as a recognised company, servicing both the commercial and industrial sectors of the construction industry. This they’ve done by increasing technical capacities and building professional relationships with clients, consultants, subcontractors and suppliers throughout the years. It all began with Robert Pike. Having gained significant experience working for the commercial division of AV Jennings, Robert decided that starting his own business was fundamental in moving forward. This led to the establishment of Pike Industries Pty Ltd, which commenced trading on the 1st of July 1981. In 1988, the company changed its trading name to Pike Constructions Pty Ltd, as it provided a more defined image of the company’s operations. Phillip Pike joined the company in 1995 and together with his father Robert, fostered a strong partnership, which has seen the company gain recognition within the construction industry. Their ability of identifying and employing individuals that are well credentialed and share a passion for quality and excellence, has seen the company enjoy a significant amount of growth from early 2000 till today. A major step forward took place in 2007 when the management team of Pike Constructions procured major plant and equipment along with skilled personnel, to enable the company to perform the majority of its own civil work. Having control of such an integral part of the construction process has not only given Pike Constructions greater control of the project delivery, but a competitive efficiency recognised by clients. Given the success of this investment, the civil operations of the business are set to expand. The company has a solid background in the development of multistorey office buildings, large-scale industrial developments and commercial properties. In addition, Pike Constructions has delivered educational and Institutional facilities along with sports and recreation. Our service concentrates on negotiated design and construction, competitive and invitation tender including construction and project management. Design and construction projects have been a core part of the business since the company’s inception. Over the past three decades, it has increased to a level where it is generating approximately 60% of the annual turnover. Having established teams of professional consultants, Pike Constructions are able to provide Architectural, Structural and Civil documentation along with Service design requirements. Additionally, the company is adept in negotiating with relevant authorities, working with Councils 1 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
and certification bodies to achieve both planning and development approval. Invitation and competitive tender is another strong area of the companies operations. Being a common form of industry contracting, Pike Constructions participate regularly in the tender market. Having experience in design and construction work has enabled the company to work in sync with the design team, the client and end user of the development. Plus, a history in providing competitive and conforming bids has enabled Pike Constructions to grow in the tender market, developing many successful projects. Having established repeat clientele with some of Australia’s largest organisations, the client contractor relationship has seen Pike Constructions become a leader in delivering the construction industries services. Equipped with sound construction knowledge, hands on experience and an acute ability to understand the needs of clients, Pike Constructions provides a service that exceeds expectations.
OUR PEOPLE
RESOURCES &
CAPACITY Pike Constructions has a commitment to all its clients in providing an experienced and professional team. From management and office staff to site personnel and external partners, all have formal and recognised training in their areas of responsibility. With a strong corporate belief for continual improvement, Pike Constructions employees are encouraged to undertake regular training in order to gain greater skills and achieve a fulfilling career path. This philosophy has seen our people develop and grow with the business - the driving force behind our success. We are extremely confident with their skills and capabilities. So much so that for every project, we provide a construction team list, outlining personnel with their accompanying CV’s. In other words, clients can be assured that a reputable and well-credentialed team services every project we’re involved in. The other major focus of the company has been to establish strong partnering relationships with our subcontractors and suppliers. We have spent years building a team of dedicated professionals that can be depended upon. As a result, it has provided us with people who understand how each party works, enabling greater continuity in the project delivery. We are proud to say that our subcontractors and suppliers want to work with us.
Our business direction and motivation has concentrated on being performance driven rather than dollar driven, which inturn, we believe, has given us a competitive edge. It is a proven formula in meeting the quality, time and cost objectives of all our projects. And the result? From regular feedback, our clients are confident and trust the people whom we engage. With significant growth over the past 10 years, the management of Pike Constructions has focused on maintaining a financial model that has enabled the company to undertake multiple developments at any one time. Able to fulfil clients’ needs and deliver multimillion-dollar contracts, the company has a proven ability to carry out complex and demanding projects. It has been our reputation to successfully engage in contracts and to provide confidence in meeting the financial objectives of projects. We firmly believe in reinvesting our profits back into the business, in order to sustain our recognised growth. The company owns our fleet of cars, plant and equipment and we are not burdened by any financial loans or leases. Evidence can be provided upon request, showing financial records of the past three years.
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 2
3 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
RECENT
PROJECTS MANUELE ENGINEERS KENT TOWN OFFICE COMMERCIAL MOTOR VEHICLES AUSTRAL STEEL EAGLE & GLOBE ALLSONS TRANSPORT ACS INVESTMENTS ADELAIDE PRODUCE MARKETS WASTEWATER SERVICES
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 4
RECENT PROJECTS
READY FOR TAKE-OFF
MANUELE ENGINEERS
Manuele Engineers Morphett Road Adelaide Airport CONTRACT VALUE:
$14.35 million
SCOPE: The warehouse component is built on a massive scale, with a floor area over 16,500m2. With 20 overhead cranes of up to 100 tonne capacity and a floor to ceiling height of 18 meters, the factory has the capacity to fabricate over 30,000 tonnes of steel on an annual basis. The 2500m2 two-storey office building design is a testament to what can be achieved with the use of structural steel. With features such as a central atrium, utilising 36 exposed plate steel columns, polished concrete stairs and acoustic wall panelling the atrium forms the centre piece of the building. In addition the external faรงade of the office has been screened with a custom made steel structure with automated panels allowing natural light to filter through the building at the touch of a button. PROJECT DELIVERY: Head Contractor
5 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
FACT SHEET CRITICAL TIMING
With the construction of such a state of the art facility it was only natural that our client would be procuring state of the art machinery for the fit-out of the factory. With machinery being purchased from all over the world including Japan, Italy & the Netherlands it was critical that we reached certain milestones to facilitate the installation. . With each piece of equipment a specialised team, from the country of origin accompanied the machinery to undertake the installation and commissioning. Working closely with our client and project engineers we were able to influence certain design requirements and construction methodology to successfully achieve the critical milestones.
RECENT PROJECTS
CITY FRINGE DEVELOPMENT
JOHN BRYANT PROPERTIES
Kent Town Office 66 Rundle Street Kent Town CONTRACT VALUE:
$9.3 million
SCOPE: Construction of a 5-storey office complex, including tenancy fit-out works and basement car parking. The office facility provided 2650m2 of floor space with two levels underground for basement car parking, providing 104 vehicle spaces. The design of the building focused on a 5 star energy efficiency rating, which integrated various technologies and passive design measures to achieve the outcomes. The building utilises expansive amounts of natural lighting and is highlighted by a two level glass atrium through the centre of the building. The introduction of natural gas powered air-conditioning systems and “Clipsal C-Bus” smart building electronic software, gave the facility its green star rating. PROJECT DELIVERY: Head Contractor
FACT SHEET
OVERCOMING OBSTACLES The project involved a major site works component with basement car parking, two and a half levels underground. With the building encompassing the entire site, the 8m deep 20,000 tonne excavation provided many logistical challenges. To further complicate the issue, the existing site had approximately 300 tonnes of contaminated filling material, which was classed as high level. This had to be kept on site. To contain it, we built a repository underneath the building and achieved this, by utilising a fully sealed high-density polyethylene membrane supported by geotech liners. The ground water also posed some major issues but with some smart thinking and EPA testing, we gave a little back to the environment. During the summer months, we pumped the ground water into the local Council’s water trucks, which serviced the local gardens and nature strips with crystal clear water.
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 6
RECENT PROJECTS
GEARED FOR SUCCESS
CMV GROUP FACT SHEET FROM LIVE STOCK TO TRUCKS
The new CMV Truck Sales facility is located on a prime piece of real estate. Many would remember it as once being Adelaide’s main abattoir. The conversion from cattle yards to arguably one of Australia’s best truck sales and service facilities is impressive. The design incorporates stylish features such as polished concrete and jarrah timber floors. The main entry features two prime movers parked just inside the front door, which leads to a reception counter complete with bull bars and headlights. The Eco design also utilised expansive amounts of natural light and sensor detection lighting throughout. Furthermore, the warehouse areas are heated by recycling the waste oil from the trucks, which they service. The expansive site area also allowed us to catch over 300,000 litres of water which is treated and reused in their truck wash bay, wet areas and landscaping.
Commercial Motor Vehicles Port Wakefield Road Gepps Cross CONTRACT VALUE:
$7.2 million
SCOPE: Construction of a 12,000m2 Truck Sales & Service facility on a 65,000m2 site. The project included a new state of the art service workshop including truck wash-bay, spare parts warehousing and a spare part sales centre. The service centre has the capacity to accommodate 36 prime movers/ semi trailers at any one time including service pits with the capacity to handle two BW semi-trailers. As the service centre was a 24hr operation, the facility included sleeping quarters for their customers. The office area incorporated some 2000m2 of floor area to handle the sales of their premier fleet of Kenworth, Fuso and DAF trucks. PROJECT DELIVERY: Head Contractor
7 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
RECENT PROJECTS
TONS OF TONNES
AUSTRAL STEEL
FACT SHEET
A CONTINUED ASSOCIATION The new Ottoway facility was one of many that Pike Constructions was involved in for Austral Steel Eagle and Globe. During the late 80’s and leading up to the year 2000, we extended, refurbished and built a number of new facilities for our client. The majority of the work was undertaken at their previous head quarters on Port Road at Woodville. It was this relationship, built over that period, which helped secure the contract for the Ottoway development. Such was the success of our work with Austral Steel Eagle & Globe, that upon completion of the Ottoway project, we constructed a similar size facility at their Melbourne based premises in Clayton.
Austral Steel Eagle & Globe Cnr Grand Junction Road & Hanson Road Ottoway CONTRACT VALUE:
$6.5 million
SCOPE: Construction of a new two-storey office building, warehouse and refurbishment of existing buildings for Austral Steel Eagle & Globe currently occupied by Smorgan Steel. The 1800m2 office building was cutting edge engineering and architecture for that time. Utilising precast concrete panels and reinforced floor slabs, the mass concrete structure was impressive. In order to make a showpiece for the building, a joint Government and client funded steel sculpture formed a centrepiece to the main entry. The artist depicted South Australian icons such as the River Torrens and Pop-eye. The 18,000m2 warehouse incorporated hi-tech machinery with 15 overhead magnet cranes and a document vacuum retrieval system. On average, the warehouse stores 20,000 tonnes of steel at any one time. PROJECT DELIVERY: Head Contractor
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 8
RECENT PROJECTS
SPACE FOR EVERYTHING
DANIF PROPERTIES
FACT SHEET
ALTERNATIVE SOLUTIONS During the tender period, we became aware that some of the design elements of the building were not cost effective, which prompted us to put forward some alternative solutions.
Allsons Transport
Working closely with the Melbourne based developer and Architect,
Wilkins Road Wingfield
designs for the main building structure and the external concrete
CONTRACT VALUE:
$11.5 million
SCOPE: Allsons Transport project was a major site development of some 35,000m2. The main building was a large-scale 10,400m2 warehouse with associated cool rooms, freezers and a cold chain truck loading dock. The AQIS registered facility provides a fully enclosed wash down bay conforming to quarantine requirements for the treatment of international shipping containers. The office components provided 3 areas of high-grade commercial space, including a two storey and single storey office with an internal warehouse despatch facility. Another major feature was an internal 500m2 fire separated compartment for the storage of dangerous goods. The rear concrete hardstand provided over 14000m2 for shipping container handling designed to accommodate 90 tonne loads. PROJECT DELIVERY: Head Contractor Design & Construct
9 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
we engaged our Adelaide based engineering firm and provided revised container-handling yard. Both alternative solutions provided a cost saving to our client in excess of $200k. In addition to this, our client was intending to develop the remainder of the site over the coming years. It was at this point that we provided additional infrastructure requirements in the form of transformers and fire services, which would accommodate additional buildings. This additional outlay on infrastructure will provide future cost savings over $350k.
RECENT PROJECTS
THE WHOLE PACKAGE
ACS INVESTMENTS
Adelaide Clutch Services Hakkinen Road Wingfield CONTRACT VALUE:
$3.4 million
SCOPE: This was a total site development of 8000m2, constructing a two-tenancy development for our client. Tenancy one provided 2000m2 of warehouse, along with 500m2 of office and retail sales.
FACT SHEET SEPARATE IDENTITIES
The site had huge exposure with three street frontages facing South Road, Cormack Road and Hakkinen Road. Critical to the development was to keep the simplicity and economy of one
The second part of the development was for our client’s business, which provided another 2200m2 of warehouse and a two-storey office building.
structure, as well as provide a clear delineation between the two
PROJECT DELIVERY: Head Contractor
precast walls and creating a community title to enable the sharing of
businesses. This was done with the use of internal fire separation, utilising full height services. The external façade of the building was dressed in corporate colours to clearly set a difference between the two companies. The buildings aesthetics increased the amenity of the locality and established the benchmark for future development in the Wingfield area.
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 10
RECENT PROJECTS
ADELAIDE PRODUCE MARKETS COVERING UP FACT SHEET MEETING THE BRIEF
Once again our trusted ability in delivering design and construct projects helped secure the development from a large tender field of 10 local and interstate companies. The new structures had to be unique in design with each canopy supported by only eight columns. This was a critical aspect of our clients brief as their operations demanded the greatest amount of unobstructed work space possible. With the introduction of a sophisticated steel truss design spanning over 48 meters and an integral “W� shaped roof structure we met our clients brief.
Adelaide Produce Markets Ltd Burma Road Pooraka CONTRACT VALUE: $5.83 million SCOPE: The existing Market Square at the Adelaide Produce Markets underwent a major transformation with two new free standing canopies being built to protect the fresh food produce we all enjoy. Each canopy is approximately 9300m2 in size providing 18,600m2 of undercover area for the logistics of handling, storage and distribution. This transformation has provided our client with the largest undercover market in the state and one of the largest in Australia. In addition to the Market Square Precinct we extended three existing canopies along with two existing warehouses on the site. In total we constructed approximately 24,000m2 of new buildings for our client. With some careful planning and strategic coordination all of the 24,000m2 of new works was built whilst our client remained fully operational. PROJECT DELIVERY: Design & Construct
11 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
RECENT PROJECTS
WASTE WATER A GREEN SERVICES SOLUTION
FACT SHEET
TIMING FOR A CORROSIVE ENVIRONMENT With delivery being the critical factor, this waste water storage facility had to be constructed in time for the rolling out of a new model vehicle. Having only a 12-week construction period, the project was based on a 7-day schedule and was managed precisely to meet the client’s deadline. The facility houses 20 stainless steel waste storage silos and an intricate hydraulic separation system. The entire facility including all internal surfaces, structures and services have been fabricated and treated with specialised paint systems to resist acid attack in a completely
Waste Water Treatment Plant Undisclosed Car Manufacturer CONTRACT VALUE: $2.5 million SCOPE: Construction of a 1200m2 facility purpose built for separation and re-use of acid based waste products, generated from the car painting process. With intricate details such as in-floor trenching, concrete plinths and bunds, spill catchment areas and extensive services, the attention to detail was imperative. The structure also provided a 500m2 ‘Deltacore” concrete mezzanine floor, 18 metres above ground level for the housing of major plant and equipment. The design catered for such shear loads, that from the footings to the structure, this fully industrial development was one of a kind. PROJECT DELIVERY: Head Contractor
submersed environment. The quality control was imperative and every part of the construction phase, both on and off site, was supervised and tested to achieve the strict design requirements.
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 12
BUILDING IS A PASSION
DELIVERED BY A TEAM
13 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 14
15 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
CURRENT
PROJECTS OSBORNE FUEL STORAGE FACILITY BULKY GOODS RETAIL DEVELOPMENT TERMINALS OFFICE REPCO – KMART TYRE & AUTO EQUALS FACADE & FIT-OUT PELICAN POINT ROAD WIDENING
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 16
CURRENT PROJECTS
POINT OSBORNE FUEL PELICAN TERMINAL
STORAGE FACILITY
Osborne Fuel Storage Facility The Pelican Point Terminal CONTRACT VALUE: $11.42 Million SCOPE: The Pelican Point Terminal project is a new fuel storage & distribution facility that will be constructed on a site area of approximately 60,000m2. Situated near the entrance of the Port River the new Terminal is adjacent the ASC Ship Yards and Techport Facility. The project is on a large scale and is divided into two distinct areas being the inner and outer compounds. The inner compound is a fully bunded area of some 30,000m2 which will include 8 fuel storage tanks. The fuel storage tanks will have the capacity to hold 84 million litres of fuel at any one time.. Fuel is delivered to the inner compound tanks through a network of external pipe lines reticulated directly from the docked ships at the Outer Harbour berth. The remainder of the site is the outer compound which is the main service area for the facility. This part of the works provides several structures including the main Gantry building, Pipe Support Bridge, Wharf-line Pump Manifold Building and Control Room. The outer compound also includes large areas of heavy duty concrete pavements, access haulage roads, waster water filtration plant and associated site works. PROJECT DELIVERY: Head Civil & Structural Works 17 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
Contractor
CURRENT PROJECTS
BULKY GOODS RETAIL MARION ROAD DEVELOPMENT MARION
Bulky Goods Retail Development Marion Road, Marion CONTRACT VALUE: $4.18 million SCOPE: Pike Constructions is well underway with the construction of the new bulky goods retail facility located at Marion Road, Marion. Being built between existing retail facilities including Harvey Norman and Freedom Furniture the brief is to provide a high quality finish suitable for its intended retail environment with clear spans and crisp clean detailing. Being split into two individual tenancies 70% of the floor area is being specifically detailed for the new home of The Good Guys. PROJECT DELIVERY: Head Contractor
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 18
CURRENT PROJECTS
PELICAN POINT TERMINALS TERMINAL OFFICE FACILITY
Terminals Office Facility The Pelican Point Terminal CONTRACT VALUE: $650K SCOPE: Continuing on with the construction of the new fuel storage and distribution facility, Terminals engaged us to design and construct a new office building that would facilitate the control of the entire 60,000m2, $50mil + facility. The office was designed around the three core objectives of our client. Those being to provide a building that could facilitate the secure control of the entire fuel storage facility from a single central point, enable testing of petrochemicals through a self contained laboratory and provide enough commercial grade office space to allow the management of Terminals Pty Ltd state-wide operations. External works included associated stormwater management systems, landscaping, paving and fencing. PROJECT DELIVERY: Design & Construct
19 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
CURRENT PROJECTS
REPCO - KMART
CHURCHILL NORTH
TYRE & AUTO SERVICE
Repco - Kmart Tyre & Auto Service Churchill North CONTRACT VALUE: $1.76 Million SCOPE: Pike Constructions has recently been awarded the design & construct contract to develop the new Kmart Tyre & Auto facility and Repco Retail facility on the Churchill North precinct site being developed by Axiom Properties Limited. With design development 90% complete works are scheduled to commence in early March 2014. The building will provide a back to back two tenancy facility with an approximate floor area of 1000m2. Working closely with both Kmart & Repco we have integrated store specific requirements to suit their operational needs. The external elements of the project include 1200m2 of car parking, stormwater management and associated landscaping. PROJECT DELIVERY: Design & Construct 3
2
AA
AA
DA04
CENTRE LINE OF CANOPY TO COINCIDE WITH CENTRE OF GLAZED AREA. CONNECTION BETWEEN BUILDING AND CANOPY TO BE WATERPROOF SEALED.
DA04
DA05
SIGNAGE TO KMART SPECIFICATION
RL 7000
Parapet
EXTERNAL SECURITY LIGHTING
1200
Telephone 13 13 28, or visit us at www.ktas.com.au
2700
Reception
3100
6000
2660
340
3700 2100
RL 0
2400
Mezzanine
RL 3000
300
2400
3600
4782
7000 2400
Ground floor
2100
1500
1500
RL 6530
770 3700 RL 0
300
Ground floor
DA05
PRECAST CONCRETE PANELS - TO ENGINEERS SPECIFICATION FINISH - TO SUIT KMART TYRE AND AUTO BRANDING
Parapet
730
RL 7000
serv tyresicing brak suspes batteensio repa ries n irs
Parapet
KTAS PYLON SIGN. 1200W x 2700HT. REFER TO SITE PLAN FOR LOCATION
Ground Floor RL 0
AA
AA
DA04
DA04
STAINLESS STEEL BOLLARDS
150mm STEEL PFC MEMBERS EXPOSED IN PRECAST PANEL FROM FFL TO FULL HEIGHT
HEAVY DUTY ROLLER SHUTTERS POWDER COATED FINISH COLOUR: WHITE
3
1
East Elevation
4
DA02 1 : 100
1
West Elevation
DA05
2
Elevation - North
DA05
DA02 1 : 100
DA02 1 : 100
5000L SLIMLINE WATER TANK
BB DA04
3
2
REPCO BUILDING EXTENT SHOWN DASHED
DA05
BOUNDARY PRECAST CONCRETE PANELS - TO ENGINEERS SPECIFICATION
DA05
2000 Parapet
Parapet
1200
Parapet
RL 7000
RL 6530
1500
600600
RL 7000
2400
6530
CMYK : C=0, M=31, Y=100, K=0, PANTONE PMS 1235 STANDARD WHITE PANTONE PMS 432 PANTONE PMS 485 STANDARD SOLID BLACK
Mezzanine
RL 3000
KTAS PYLON SIGN BEYOND
NOTE : COLOURS ARE INDICATIVE ONLY AS RESENE WILL SUPPLY PRE-MIXED COLOURS.
Ground Floor RL 0
Ground floor
RL 0
3500
REPCO YELLOW REPCO WHITE REPCO GREY REPCO RED REPCO BLACK
7000
Ground floor
900
300
4000
REPCO PYLON SIGN 1200W x 6000 H. REFER TO SITE PLAN FOR LOCATION.
4700
4800
6000
COLOUR SCHEDULE:
RL 0
BB
3
DA04
DA05
2000
2
1200
DA05
400
1200
200
2
North Elevation 600
600
REPCO BUILDING EXTENT
4800
6000
600600
4800
REPCO PYLON SIGN 1200W x 6000 H. REFER TO SITE PLAN FOR LOCATION.
RL 7000
6000
2000 1200
Parapet
300mm WIDE EXTERNAL ALUMINIUM LOUVERS FROM PLANT ROOM - POWDER COATFINISH
5m BACK LIT ILLUMINATED FACIA SIGN REFER: DIADEM SIGNAGE PACKAGE FOR DETAILS
PRECAST CONCRETE PANELS - TO ENGINEERS SPECIFICATION
EXTERNAL SECURITY LIGHTING
Parapet
5m BACK LIT ILLUMINATED FACIA SIGN REFER: DIADEM SIGNAGE PACKAGE FOR DETAILS
PRECAST CONCRETE PANELS - TO ENGINEERS SPECIFICATION
REPCO BUILDING EXTENT
KTAS PYLON SIGN: 1200W x 2700HT. REFER TO SITE PLAN FOR LOCATION. KMART LOGO & SIGNAGE DETAILS AS PER KMART STANDARDS.
Parapet
RL 6530
RL 6530
RL 0
6530
Ground Floor
5
DA04
Pylon Sign - Typical Elevation
DA02 1 : 50
6
200 6000
340
Mezzanine
Reception
2390
2700
3500
RL 3000
KTAS PYLON SIGN. 1200W x 2700HT. REFER TO SITE PLAN FOR LOCATION
Ground Floor
RL 0
BB
2660
2400
Ground floor
RL 0
Reception
2700
RL 3000
Ground floor
1800
Mezzanine
REPCO PYLON SIGN 1200W x 6000 H. REFER TO SITE PLAN FOR LOCATION. RL 0
6000
6000
4800
7000
ALUCOBOND CLADDING
Ground floor
Ground Floor
RL 0
Pylon Sign - East Elevation
Ground Floor
RL 0
RL 0
STAINLESS STEEL BOLLARDS
DA02 1 : 50
Pylon Sign - Typical Elevation 1 : 20
3
South Elevation
REPCO
Elevation - East
DA02 1 : 100
DA02 1 : 100
2700
INTERNALLY ILLUMINATED SIGN BOX
2700
600
BB DA04
3
200
Elevation - South
DA02 1 : 100
600
2
DA02 1 : 100
D:\Users\troyb\Desktop\REVIT PROJECTS\REVIT 2013 Version\31405 - Iso - Churchill Centre North\31405 - 2B _ REPCO - TB - Local.rvt
Scale: As indicated @ A1 Date:
01.08.2013
rev
www.hamessharley.com.au
+61 8 81123400
4
Pylon Sign - End Elevation 1 : 20
Elevation - West
DA02 1 : 100
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 20 EXTERNAL ELEVATIONS
KMART TYRE AND AUTO
0
0.5
1
2.5
D:\Local Files\31405 Central - KTAS - DA - Central_PaulS.rvt
5m
Scale: As indicated @ A1 Date:
13.08.2013
31405 rev DA04 A
www.hamessharley.com.au
+61 8 81123400
CURRENT PROJECTS
EQUALS FACADE CURRIE ST ADELAIDE CBD & FIT-OUT
Equals Facade & Fit-Out 81 Currie Street, Adelaide CBD CONTRACT VALUE: $1 Million SCOPE: A significant rejuvenation of a tired city building situated at 81 Currie Street in Adelaide’s CBD. The building is used for educational training purposes spanning over 4 levels with additional basement facilities. The key objective of our client was to enhance both the internal and external appeal of the building and to deliver the project whilst they remain fully operational. The works includes the removal and replacement of the existing façade on two elevations, construction of a new main entry foyer, new lift installation and a fire safety up grade. With construction due to begin in May and a dead line of October the design and construction team are working closely and effectively to ensure the client’s time requirements are achieved. PROJECT DELIVERY: Design & Construct
21 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
CURRENT PROJECTS
POINT PELICAN POINT PELICAN TERMINAL ROAD WIDENING
Pelican Point Road Widening The Pelican Point Terminal CONTRACT VALUE: $615K SCOPE: As a separate contract we have been engaged by Terminals Pty Ltd to undertake the road widening and stormwater up-grade of Pelican Point Road Osborne. The 500m section of existing roadway is being increased to 3 lanes to allow for a central turn-in lane and acceleration lane in and out of the new Caltex fuel storage facility. In addition to the road widening we are creating and new stormwater drainage system through a series of swales and culverts over approximately 3500m2. Both the stormwater drainage and road construction are compliant to DPTI specifications and all works is being carried out in-house by Pike Constructions civil division. PROJECT DELIVERY: Head Contractor
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 22
23 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
Quality, Safety & Environmental
MANAGEMENT ISO9001:2008 QUALITY MANAGEMENT SYSTEMS
ISO14001:2004 ENVIRONMENTAL MANAGEMENT SYSTEMS
AS/NZS 4801:2001 OCCUPATIONAL HEALTH AND SAFETY SYSTEMS
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 24
Quality, Safety & Environmental Management
QUALITY ASSURANCE
ISO9001:2008 ISO 9001:2008
Quality Certified
AU1199-QC-EC-SC
Quality Assurance ISO9001:2008 Since the company’s inception in 1981, Pike Constructions has undergone consistent and significant growth. We are continuously striving to innovate and adopt more sophisticated business practices in order to meet our strategic plan and to underpin our vision of continual improvement. This vision is supported and reinforced by our integrated business management system and our certification to the following International and Australian Standards: • ISO9001:2008 Quality Management Systems • ISO14001:2004 Environmental Management Systems • AS/NZS 4801:2001 Occupational Health and Safety Systems Our integrated business management system is driven and supported by our QHSE Data Manager Software program. This software provides us with an innovative approach to management, helping us to deliver on our key objectives and providing traceability of all our actions. This inturn ensures compliance with the contract documents, applicable standards and legislation. The QHSE Data Manager is designed in accordance with the principles of the international standard for risk management. This software enables us to proactively identify the project tasks that need to be carried out, highlight associated risks and to rectify any non conformance that may arise. A key function of the data manager is the Quality Control Module or Inspection & Test Plans which Pike Constructions executes on all our projects. An Inspection and Test Plan identifies the stages of work to be inspected or tested, by whom and at what frequency and highlights the critical hold and witness points. The ITP will also measure against the applicable standards and acceptance criteria of the project documents. Inspection and Test Plans give confidence in 25 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
quality control and the automated system ensures that all quality records are maintained. Whenever Pike Constructions is awarded a contract, we identify all project-specific quality management requirements which are supported by a project specific Quality Management Plan. It’s commitment like this that gives confidence in our ability to meet the quality objectives of the project and guarantee the quality of the finished product.
Quality, Safety & Environmental Management
OCCUPATIONAL HEALTH & SAFETY
AS/NZS 4801:2001 AS 4801:2001
Safety Certified AU1199-QC-EC-SC
Occupational Health & Safety AS/NZS 4801:2001 The health, safety and well-being of our people are continuously at the forefront of everything we do. Safety is a constant priority during any project we undertake and our objective is to ensure that everyone is safe everyday. This is based on our belief that safe projects are successful projects and that all injuries are preventable. Safety is much more than just following rules. It is about attitude, discipline, the safe management of people and most importantly, the ability to prevent hazards and control risk. With a dynamic and innovative safety system in place, we are totally committed to creating safer work attitudes and encouraging behavioural change as a way of life. We are also intent on strategic planning to ensure that as much as possible, we design out any activities that involve unacceptable levels of risk. This is achieved by developing a Safety Management Plan for each and every project we undertake. The QHSE Data Manager gives us the visibility to know what is happening across all our projects and our workforce at any given time. This allows us to manage and monitor our performance across all levels of the business. The system assists in reporting incidents, identifying and managing hazards, tracking of employee and subcontractor training and identifying opportunities for improvement. An effective program built into the QHSE Data Manager system is our Job Safety & Environmental analysis tool or JSEA Module. Before our people or subcontractors carry out work on a project, it is a requirement that we think of what is the safest and most environmentally friendly way to do so. The JSEA module allows us to document each work related task, identifying the associated risk and put in place measure to eliminate or minimise the risk. We have a strong culture in which safety thinking is an inherent part of our company allowing our employees and subcontractors to contribute to continual improvement providing a better safety performance. EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 26
Quality, Safety & Environmental Management
ENVIRONMENTAL MANAGEMENT
ISO14001:2004 ISO 14001:2004
Environmentally Certified AU1199-QC-EC-SC
Environmental Management ISO14001:2004 Pike Constructions acknowledges and understands its environmental impact and is committed to meeting community, legislative and social expectations. We are actively integrating environmental management into our core business activities and environmental sustainability into our project designs. Environmental awareness, education and commitment help us to reduce our footprint and we provide our people with the necessary tools to allow them to conduct our day to day operations without having a negative impact upon the environment. Environmental best practice is a key part of all our projects and this is supported by developing project specific Environmental Management Plans. We aim to minimise the impact of our operations in many areas, including air and water quality, noise and vibration levels, native flora and fauna, soil conditions and areas of historic and cultural significance. In addition Pike Constructions implement specific recycling initiatives customised to each project and track our results through the QHSE Data Manager system. The QHSE Data Manager enables us to assess the environmental impact of our activities and record any environmental incidents and schedule actions for remediation. It also allows us to monitor community risks and any social impacts that may be a result of our business operations. Our commitment to the environment is not restricted to our work practices, it is also a focus on our many design and construct projects. ESD design measures are a major driver during the design and documentation phase. A good example of this was during the construction of our new energy efficient office & warehouse. Sound ESD principles were achieved utilising high performance glass, “Coolclad” roofing & insulation systems, stormwater harvesting which is reticulated back through the wet areas and landscaping, internal movement sensor lighting and VRV mechanical airconditioning just to name a few. 27 PIKE CONSTRUCTIONS REVIEW EDITION 4 | JANUARY 2014
Not only did the design measures help to achieve our goals but the recycling and re-use of demolition materials ensured we hit our targets. All demolished materials were separated & recycled and in particular the bricks from the existing 1920’s dwellings were individually cleaned, palletised and sent away for re-sale. The most striking part of this initiative was the reuse of the Jarrah timber floor joists which now form an iconic feature on our main staircase. Our integrated approach to Quality, Safety and Environmental Management gives us the ideal platform for continual improvement. It is Pike Constructions commitment, spanning over 30 years which gives our clients assurance they are working with an industry leader.
OUR
REFEREES Mr Vince Manuele Manuele Engineers Pty Ltd Phone: 08 8374 1680
Mr Michael Crawford CMV Group Phone: 08 8238 5566
Mr John Bryant Bryant Concepts Pty Ltd Phone: 08 8362 8860
Mr Michael O’Sullivan Terminals Pty Ltd Phone: 0413 477 175
Mr Peter Stansborough Parade Studio Architects Phone: 08 8364 4544
Mr Brenton Wilhelm Wilchem Pty Ltd Phone: 08 8359 6855
Mr Angelo Demasi Adelaide Produce Markets Ltd Phone: 08 8349 4493
EDITION 4 | JANUARY 2014 PIKE CONSTRUCTIONS REVIEW 28
31-33 South Road, Thebarton SA 5031 Phone 08 8443 6066 Facsimile 08 8354 0254 Enquiry info@pikeconstructions.com.au
Environmentally Certified AU1199-QC-EC-SC
ISO 9001:2008
ISO 14001:2004
AS 4801:2001
Safety Certified AU1199-QC-EC-SC
Quality Certified
AU1199-QC-EC-SC