Lei YU_ 2019 Portfolio

Page 1

CONTACT: (215)- 900- 2219 yulei@alumni.upenn.edu

Lei YU SELECTED WORK


Lei YU EDUCATION Master of Architecture/ May 2017 University of Pennsylvania B.A Industrial Design/ June 2013 China Academy of Art

PROFESSIONAL EXPERIENCE Kimmel Bogrette Architecture + Site Architectural Designer Blue Bell, PA October 2017- Current PRDG Intern Architect New York May- August 2016 HASSELL Intern Architect Shanghai, P.R.China April 2015- July 2015 UNStudio Design Intern Amsterdam, The Netherlands September 2014- February 2015 Buro Ole Scheeren Architectural Intern Beijing, P.R. China June 2014- September 2014

SELECTED ACADEMIC EXPERIENCE Certificate of Participation the 5 th LafargeHolcim Awards Competition in Sustainable Design (North American Region) March 2017 Research Assistant (with Professor Mark Yim and Associate Professor Simon Kim) Pennovation Center, University of Pennsylvania February 2017- August 2017 The 2nd Prize, E. Lewis Dales Traveling Fellowships PennDesign, Department of Architecture January 2016 Annual scholarship University of Pennsylvania PennDesign, Department of Architecture Year of 2013, 2015 and 2017 Golden Prize of Graduation Design Award Lin Fengmian Scholarship China Academy of Art June 2013 st

The 1 Prize Comprehensive Excellence Scholarship China Academy of Art Year of 2011, Year of 2012

CONTACT (215)- 900- 2219 yulei@alumni.upenn.edu


CONTENT ARCHITECTURE & TECTONICS MIXED- USE HIGH RISE Office, Hotel and Theater Site: SOHO, New York City

Instructor: Hina Jamelle Structure Consultant: Arup New York Team: Lei Yu, Chao Liu 2016 Spring

SHIFTING- HYBRIDS

Wellness Hotel & Residential Building Site: Tribeca, New York City Instructor: Hina Jamelle Solo work 2015 Fall

ARCHITECTURE & LANDSCAPE URBAN DEVELOPMENT SFOAK Resilient Airport Development Site: San Francisco and Oakland, C.A

Instructor: Matthijs Bouw, Kai-Uwe Bergmann Team: Lei Yu, Baihe Cui 2016 Fall

THE LANDING

Tot

S Hot Ret Res to

6

Proposed 1. MARTA Station Hall 2. Supermarket+Shopping Mall+Community Center 3. Retials+Apartments+Affordabal Housing 4. Restaurants+Tech Retial+Other Retials (with underground parking) 5. Hotels (with underground parking) 6. Business Incubator 7. Condominium housing 8. Retails (with underground parking) 9. Media Center 10. WeWork+Retail 11. Work and Live Lofts

JURONG N.E.X.T

Singapore HSR Station & CBD DevelopmentNext Engine for Exchange and Transformation

5

11

Bus Incu

11

or n Connect

Downtow

Instructor: Marilyn Taylor, Bob Yaro Team: Garesa Hao En Au, Adam Berkowitz, Ruyi Chen, Tingting Feng, Danqi (Silvia) Fang, Yiling Li, Sandy Klanfer,Yidi Xu, Lei Yu, Peiqian (Peggy) Zhong, Xinyi (Elynor) Zhou, Mengjie Zhu 2017 Spring PennDesign Asian Urbanism Studio

Comm C

4th St. NW

a. Pop-up Market Plaza b. MARTA Plaza c. Tech Plaza d. Olympic Tower Sq e. Media Center Event Lawn f. Overlook Hills g. Landing Grand Path h. Woods i. Ecologycal Rain Gardens j. Event Lawn k. Tech Square 2.0 l. bike lane m. Belt Line

Site: Singapore

Bus Com Par T Job

The Landing is a vision for the next generation’s urban experience. It means connecting people with opportunity and also each other by increased density; bridging Midtown, Georgia Tech, and Downtown together with a much needed green space; and anchoring jobs and investments by creating a “live where you work” environment.

k

10

3rd St. NW

Existing 1.Bank of America Plaza Atlanta 2. Fox Theatre 3. AT&T building 4. Bobby Dodd Stadium at Historic Grant Field 5. Georgia Tech Global Learning Center 6. Scheller College of Business

9

d

f

6 4

e

5 c

8

The LANDING

4 3

7

2

Peachtree St. Commer

Atlanta Midtown Urban Redevelopment

4

g

4

8 h b

7

i

3 3

M

Tot

S Ret Res t

tial Corridor

(ULI Hines Student Competition) Site: Atlanta

1

j 2

North Ave.

400 feet

300

Benefits

MARTA line

Spring St

Site Analysis

Live and work places for graduates

residence

Georgia Tech

Freeway Blocker

Tunnel

Georgia Tech Stadium

5m

P

Catalyze the development

New Research Facilities

DENSITY

Robust and healthy living environment

Increased land value New Festivals

Tax Benefits

Entertainments

Good Environment

PUBLIC REALM

1

P

MIDTOWN Catalyze the development

MARTA RIDERSHIP Energize the Stadium Increased land value

walkable streets

Good Environment Job Creation

Access to Midtown

CONNECTIVITY

Tax Benefits Catalyze the development

GEORGIA-TECH Energize the Stadium

Church

AT&T

The Fox Theater

North Ave M Station

l wa k

10

mi

P

k al nw

P

P

Historical District P

Other Works

BOA P

Residence

Jobs

Parks

North Ave

100%

2945 residences

95%

2306 jobs

79%

2.2 acres

Plazas

87%

1.09 acres

Walkable street

83%

1.89 miles

bike lanes

82%

0.82 miles

A

New Research Facilities Live and work places for graduates Access to Midtown

P

Site P The Varsity

in

North Ave

Olympic Tower

Peachtree NW

Tech Square

Tech Related Jobs

restaurants increased ridership Increased land value

Job Creation

Peachtree Corrido r

5th St

West Peachtree St. NW

200

Spring St. NW

100

l m a

Downtown Connector

2015 Spring PennDesign

Professional Works

Med Par t Job

b

Team: Lei Yu, You Wu, Lu Han, Siyang Jing, Mei Zhang

Open Space

COMMUNITY Increased land value

B

Job opportunities walkable streets more recreation facilities Open Space

MARTA

increased ridership

Tot

S Ret Wor t Par t Job

Team 160125

Te


When Tectonic meet Architecture


Mixed-Use High Rise

ART PERFORMANCE

Integration of Office, Hotel and Theater with Elegance in SOHO, NYC

ShanS

Product insp

CENTER

Instructor: Hina Jamelle Structure Consultant: Dan Brodkin and Matt Jackson, Arup New York Team: Lei Yu, Chao Liu 2016 Spring 602 PennDesign Studio

Golden Prize, 2013 C Instructor: Weibin Du China Academy of Art Solo Work

Organic shape/ infinity space Instructor: Simon Kim Solo work 2013 Fall 501 PennDesign Studio

Cultural Transportation Station

Waterf

ANTI- EQUILIBRIUM PAVILION

Shower Head

The 2nd Prize, 2012 R Instructor: Weibin Du China Academy of Art Solo Work

Shaking & Emotional Architecture

Utopia Architecture/ Mixed Use_ Education & Transportation

Instructor: Simon Kim Solo work 2013 Fall 501 PennDesign Studio

Instructor: Eduardo Rega Solo work 2013 Fall 502 PennDesign Studio

The Landing

LIGHT OF CATHEDRAL

Cup fo

Assistant pro

Atlanta Midtown Urban Redevelopment Caping landscape, TOD development, Tech Park & Retail

Shortlisted, Red Dot D Team: Lei Yu, Fan Wa China Academy of Art

ULI Hines Student Competition Team: Lei Yu, You Wu, Lu Han, Siyang Jing, Mei Zhang 2015 Spring PennDesign

Inspiration of Light

Instructor: Larry Mitnick Solo work 2013 Summer Studio/ PennDesign

DUO SELF- TRANSFORMING PAVILION

ALINE ARCHITECTURE Aline Popcorn & Bridging

Instructor: Danielle Willems Solo work 2013 Fall PennDesign

Part/ Whole/ Magnet

Instructor: Simon Kim Team: Lei Yu, Katie McBride, Angela Huang, Joey JH P 2013 Fall 501 PennDesign Studio

Lei Yu_ Work Sample

5

Mixed-use High-rise D Architect: Buro ole Sc Location: Singapore Site Area: 26,700m2 Program: Premium Offices, Luxury Residences and Signature Retail Commission: March 2011 Construction Start: 2013 Completion: 2017

Reponsibility: Facade development, i Develop exterior cannopy and related diagram development, rendering, dai


Attribute Study- Protea Cynaroides/ King of Protea

Humidity

Temputure

10 C

40%

15 C

50%

20 C

60%

Transformation Diagram Study of Protea

Transformation Diagram Study of Protea

70%

Seed

Sprout

Branching

fused

scaled

bifurcated

clustered

bended

peeled

fused packed

scaled concealed

bifurcated layered

clustered

bended

peeled

packed

concealed

layered


Latitude

Soil PH

6.5

6

5.5

5

Time

Budding

Blooming

split

protruded

extended

detached

centered

subdivided

split interlaced

protruded notched

extended revealed

detached

centered

subdivided

interlaced

notched

revealed


Building Section

2

EPDM Roof

6” Rigid Insulation 3/4” Plywood

6

Corrugated Metal

6

Swimming Pool

Strutting Truss

Sw

5

6

5

Hotel Restaurant

5

Hotel

Sky Galley

Restaurant

Swimming Pool Rooftop

Hotel

DETAIL SECT

530’

Rooftop 530’ Level 33

Em Ski Exp 1/4” Glazing

515’

4

Rooftop 530’

Level 33

Level 30 485’

Sky Lobby

4

Level 30 485’

550’

Glass Fiber Rei 2*4 20GA Stud

Public

320’

Level 18

20 SkyLevelLobby 305’

20 SkyLevelLobby

Sky Lougne

1 Sky Lougne Level 19

1 Sky Lougne

Public

DETAIL SECTION(FL

335’

335’

3

Level 19

Level 19

Level 16

320’

275’

Level 18

Theater

260 305’

Office

Level 16

Level 16

275’

3

3

275’

Level 15 260

Office

320’

LevelLevel 15 18

305’

Level 15

Insulation

260

Steel Beam

Office

Theater

Glass Fiber Rei Level 3

55’ Media Center

2

Public

Level 3

55’ Media Center

2

Public

Restaurant & Cafe Level 2 40’ Retail Level 3

55’ Media Center

Public

25’

Restaurant & Cafe Level 2 40’ Retail

Ground Level

1 2 3

Ground Level 0’

AUDITORIUM MEDIA CENTER OFFICE

-25’Level 1

25’

Level B2 -50’

1

1 2 3

Level B1

1

1 2

AUDITORIUM MEDIA CENTER

4 5

-25’

HOTEL RESTAURANT | LOUNGE

Level B2

Ground Level

AUDITORIUM MEDIA CENTER BUILDING SECTION OFFICE 1/16” = 1’0”

4 0’ HOTEL 5 RESTAURANT | LOUNGE BUILDING WALL SECTION 1/16” = 1’0” B1 AUDITORIUM 6 1Level SWIMMING POOL

2 3

-50’

-25’

Level B2

4 5

HOTEL RESTAURANT | LOUNGE

DETAIL (

0’

Level B1

Theater

1/4” Glazing

25’

Level 1

1

2*4 20GA Stud Block

Level 1

Restaurant & Cafe Level 2 240’ Retail

Media Center

AUDITORIUM MEDIA CENTER

Loc

Insulation Steel Beam

335’

Restaurant

1 2

Ski

Block 8” - 12 GA Trac 8” - 12 GA Stud Flashing Concealed Fas

Emergency Stairs Level 30 485’ Skip Stairs Express Elevator 1 Sky Lougne Skip Elevator Public Level 20 Sky Lobby Local Elevator

515’

4

550’

515’

Level 33

BUILDING SECTION

BUILDING WALL SECTION

1/16” = 1’0”

1 2

MEDIA CENTER OFFICE

-50’

1/16” = 1’0”

AUDITORIUM MEDIA CENTER

4

HOTEL

5 RESTAURANT | LOUNGE Lei Yu_ Work Sample

BUILDING SECTION

8

1/16” = 1’0”

BUILDING WALL SECTION 1/16” =


Vertical Circulation Diagram

Auditorium Viewing gallery

Stair

Hotel Sky Lobby

Local Elevators/Hotel

Restaurant Open office

Office

Skip Stairs

Private office

Skip Elevators Local Elevators Express Elevator Hotel Express Elevator

Media Center Restaurant & Cafe

Charlton Street

Theather

Retail

Underground Parking

Lei Yu_ Work Sample

9

King Street


1

2

3 30’

30’

A

1

2

5

30’

30’

5

30’

7

30’

4

30’

6

30’

3

30’

30’

4

N

6

30’

7

30’

30’

N

A 2

B

1

2

30’

S1

2

4

30’

2

B

1

C S1

2

3

2

11 2

4

30’

6

3

12

13

30’

C

11

14

2

6 12

13

30’

7 10

8

5

D

10

9 7

14 8

5

D

S2

1 2 3 4 51 62 37

MAIN LOBBY RETAIL CONCIERGE WAITING AREA BACK OF HOUSE MAIN LOBBY THEATER RETAIL TECHNICAL ROOM CONCIERGE

4 5 6 7 20’

WAITING AREA BACK OF HOUSE THEATER TECHNICAL ROOM 30’

S2

20’ 10’

GROUND FLOOR PLAN 40’

40’

1/16” = 1’0”

40’

W24

W21

W21

W24

W21

W21 W21

W21 W24

W21

W33

W33

W21

W21

W21

W24

W21

W21

W24

W21 W21

W33

10’ 5’

W21

W21

W24

W21

W24

W24

10’ 10’

W33

W21 W21

W21

W21 W21

W21

W33

W21

W21

W21

W24 W21

W21

W24

W24 W21

W24

10’

W33

W21

W21

W21

W21

W21

W24 W21

W24

W33

10’

W21

W21

W33 W21 W21

W21 W33

10’

W21

2 30’

3 30’

30’

1

W24

W21

2

1

A

W21

W21

W24W21

10’ 10’ 30’

W21

1/16” = 1’0”

TICKET CLOAKROOM STORAGE WASHROOMS 40’

W24

30’

40’ W24

GROUND FLOOR PLAN

W24

10’

5’ 10’ 25’

30’ W24

W24

W21

W24

10’

20’ 25’

11 12 13 40’ 14

MEETING ROOM STAFF OFFICE THEATER LOBBY TICKET CLOAKROOM MEETING ROOM STORAGE STAFF OFFICE WASHROOMS THEATER LOBBY

W33 W24

W24

20’

8 9 10 11 12 8 13 9 14 10

9

4 30’

3

Lei Yu_ Work Sample 30’

30’

5 30’

4

Ground Floor Structure Plan 6

30’

5

10 30’

7

30’

6 30’

7 30’

N


30’

W33

10’ 10’

W21 W21

W21 W21

W21

W21

W21

W21

W21 W21

W21

W21 W21

W21

W21 W21

W24

W33

W21 W21

W24

10’ 10’

W33

W21 W21 W24

30’

W21 W21

W24

10’5’

W33

W24 W21 W33

10’

W21

2

1 1

3 2

30’

A

W24

W21

4 3

30’

4

30’

30’

30’

5 5

30’

30’

6 30’

30’

30’

A

7 6

30’

7

30’

N

30’

N

30’

B S1

B 2

30’

S1

5 2

30’

5

C

1 C

3 1

30’

6

3 6

30’

D

4

7 D

4

7 S2 S2

E E

1 2 31 42 3 4 10’

RECEPTION WAITING AREA DINNING AREA RECEPTION BAR WAITING AREA DINNING AREA BAR42’ - 8”

10’

42’ - 8”

42’ - 8”

W21 W33

W21 W21

W21 W21

W21 W21

W33

W33

W21

W21

W21

W33 W21

27’

W33

W21 W33

30’

W21

W21 W21

W21

W21

W21

W33

W21

W21

W21

W21

W21

W21

W21

W21

W33

W33 W21

W33

40’

1/16” = 1’0”

27’

42’ - 8”

W33

30’

LEVEL 32 FLOOR PLAN 1/16”PLAN = 1’0” LEVEL 32 FLOOR

5 KITCHEN 6 RESTROOM 7 5 STORAGE KITCHEN 6 RESTROOM 7 STORAGE

W21

W33

W21

W21

W21

W21

W21

W21

W21

W21

W21

W33

W33

60’ 60’

W21

W21

Lei Yu_ Work Sample

11

W24 W24

W24

W33 W33

W33

W21

20’

W24

W24

W24 W33

W24

20’

W24

W24 W24

W24 W24

W24

W24 W24

W24

W33

W24

40’

W24

W33


Lei Yu_ Work Sample

12


Structure Analysis Core Core Load Transfer Load Transfer Major Structure Facade Major Structure Facade Structure Facade Structure Facade

Load Transfer Principle

South- West Facade Analysis

North- West Facade Analysis Lei Yu_ Work Sample

13


Level 20 335’ Level 19

Level 20 335’

320’

Level 18

Level 19 320’

305’

Level 18

Floor 15 to 20

305’

Level 16 275’ Level 15 260

Level 16 275’ Level 15 260

g Wall Section with Structural Integration

Level 3 55’

Level 2

Level 3 40’ 55’ Level 1

Floor B2 to 3

Level 2 25’ 40’ Ground Level

Level 1 0’ 25’

Level B1 -25’ Ground Level

0’

Level B2 -50’

Level B1 -25’

Level B2

Lei Yu_ Work Sample

14

BUILDING WALL SECTION 1/16” = 1’0”


Lei Yu_ Work Sample

15

Physical Model- Structure Integration


egration Floor 30-34

EPDM Roof 6” Rigid Insulation 3/4” Plywood Corrugated Metal 18GA Strutting Truss

Rooftop

DETAIL SECTION(ROOF) 1/2” = 1’0”

530’ Rooftop 530’

Level 33

Level 33 515’

515’

1/4” Glazing Block 8” - 12 GA Track 8” - 12 GA Stud Flashing Concealed Fastener

EPDM Roof 6” Rigid Insulation 3/4” Plywood Corrugated Metal 18GA

Level 30

Insulation Steel Beam

Strutting Truss

485’

Glass Fiber Reinforced Concrete 2*4 20GA Stud

Level 30 485’ Selected Building Details Level 20

DETAIL SECTION(FLOORSLAB) DETAIL SECTION(ROOF)

335’

1/2” = 1’0”

1/2” = 1’0”

Level 19 320’ Level 18 305’

Level 16 275’

1/4” Glazing Block 8” - 12 GA Track 8” - 12 GA Stud Flashing Concealed Fastener

Level 15 260

Insulation Steel Beam

Insulation Steel Beam

Glass Fiber Reinforced Concrete

Glass Fiber Reinforced Concrete 2*4 20GA Stud

Block

2*4 20GA Stud 1/4” Glazing

Level 20

Level 3

335’

55’

Level 2 40’

Level 19

Level 1

320’

DETAIL SECTION(FLOORSLAB)

DETAIL (FLOORSLAB)

1/2” = 1’0”

1/2” = 1’0”

Lei Yu_ Work Sample

16


Lei Yu_ Work Sample

17


Lei Yu_ Work Sample

18


Day Lighting Strategy 1. Solid Shading 2. Mesh Outside Glass 3. Print on Glass 4. Glass Material

Day Lighting Analysis

ctor: Jessica _ Daylighting Strategy for Mixed-Use High Rise in Soho, NYC ents: Lei Yu, Yuheng Ouyang ARCH- 632-005 Daylighting Instructor: Jessica Students: Lei Yu, Yuheng Ouyang

BEFORE

RESULT

BEFORE

Tower Penthouse Optimization _ Daylighting Strategy for Mixed-Use High Rise in Soho, NYC

31ST FLOOR PLAN OFFICE / LOBBY Annual Anatomy - Cap: 1000 lux

ARCH- 632-005 Daylighting

31ST FLOOR PLAN OFFICE / LOBBY Annual Anatomy - Cap: 1000 lux

31ST FLOOR PLAN OFFICE / LOBBY Annual Anatomy - Cap: 1000 lux

Instructor: Jessica Students: Lei Yu, Yuheng Ouyang

BEFORE

CH- 632-005 Daylighting Tower Penthouse Optimization

31ST FLOOR PLAN OFFICE / LOBBY Annual Anatomy - Cap: 1000 lux

wer Penthouse Optimization aylighting Strategy for Mixed-Use High Rise in Soho, NYC

Lei Yu_ Work Sample

19

0

17

% Occupied Hour

33

50

67

83

100


SHIFTINGHYBRIDS Transformations for a Wellness Hotel & Residential Building in Tribeca, NYC Instructor: Hina Jamelle Solo work 2015 Fall 601 PennDesign Studio

ART PERFORM CENTER Organic shape/ infinity space Instructor: Simon Kim Solo work 2013 Fall 501 PennDesign Studio

Cultural Transportation Hub

Utopia Architecture/ Mixed Use_ Education & Transportation Instructor: Eduardo Rega Solo work 2013 Fall 502 PennDesign Studio

LIGHT OF CATHEDRAL Inspiration of Light

ANTI- EQU PAVILION

Shaking & Emotional A Instructor: Simon Kim Solo work 2013 Fall 501 PennDesign Studio

The Landin

Atlanta Midtown Urban Caping landscape, TOD

ULI Hines Student Competition Team: Lei Yu, You Wu, Lu Han, Siyang J 2015 Spring PennDesign

Instructor: Larry Mitnick Solo work 2013 Summer Studio/ PennDesign

SELF- TRANSFORMING PAVILION Part/ Whole/ Magnet

Jurong N.E.X.T

Singapore HSR Station and CBD Next Engine for Exchange and T

Location: Singapore Instructor: Marilyn Taylor, Bob Yaro Team: Garesa Hao En Au, Adam Berkowitz, Ruyi Chen Sandy Klanfer,Yidi Xu, Lei Yu, Peiqian (Peggy) Zhong, 2017 Spring PennDesign Asian Urbanism Studio

Instructor: Simon Kim Team: Lei Yu, Katie McBride, Angela Huang, Joey JH P 2013 Fall 501 PennDesign Studio

This project is a hybrid of residential building and wellness hotel in TriBeCa, New York City. It serves as an urban treatment for travelers and city dwellers who seek to build healthy life styles and bodies to escape from bustling city life. A wellness center (with fitness store) focuses on offering public space that enhances mental and physical well being. The facade is a changing gradient to give a variety of spatial qualities, from inhabitable balcony to flat facade. The interior changes from basic unit to luxury unit. For residents, apartment units offer them a comfortable home with inhabitable balcony and home jacuzzi. For hotel rooms, basic units are equipped with hot tubs for visitors to enjoy spa treatment within the room and sports in the gym during their stay.

Lei Yu_ Work Sample

20


Greenwich St

Washington St

Site Plan

Vestry St

Program Diagram 8F

Spa

10.25

10.25

PROGRAM DIAGRAM

10.25

7F 6F

10.25

Spa

13.00 13.00

Apartment Administration

4F

Hotel Lobby

3F

10.25

Swimming Pool

2F

Gym

Apartment Entrance

Hotel Entrance

Health Station

Fitness Store

Swimming Pool

10.25

13.25

5F

Spa

B1

Vestry St 18.74

16.06

Wellness Program Residential Residential/ Public Hotel

13.39

Greenwich St

16.06

18.74

7.96

Residential - Small- 14 Units Medium- 7 Units Large- 3 Units

Hotel - Small- 9 Units Medium- 4 Units Large- 3 Units

Total Residential Unit: 24

Total Hotel Unit: 16

Hotel/ Public

Lei Yu_ Work Sample

1F

21

17.68

10.61

14.15

Total Unit number : 40


INTER-RELATIONSHIPS // Diagram PART // Diagram

t

1.1 Curvature

1.1 Curvature The thickness between the curve of the

d

t

2.2 Cupping

The thickness between the curve of the exumbrella (exterior skin) and the curve of the subumbrella (interior skin)- is inver exumbrella (exterior skin) and the curve sly proportional to the overall Moon Jelly of the subumbrella (interior skin)- is inver radius. sly proportional to the overall Moon Jelly radius. 1.2 Translucency

The level of translucency is determined by the density of material. The Moon Jelly appears denser at the perimeter of its bell because light must pass through more material at the tangent of a curve. The level of translucency is determined Additionally, less translucency occurs in by the density of material. The Moon areas of more concentrated tissue.

1.2 Translucency

Jelly appears denser at the perimeter of its bell because light must pass through 1.3 Splitting more material at the tangent of a curve. The number of bifurcations is constant Additionally, less translucency occursthroughout in the Moon Jelly; however, the and shape of the branching ele areas of more concentrated tissue. density ments is determined by the curve of its

d

bell.

t

1.3 Splitting The number of bifurcations is constant throughout the Moon Jelly; however, the density and shape of the branching ele ments is determined by the curve of its bell.

2.1 Overlapping

2.2 Cupping

2.3 Morphing

WHOLE FORMATION // Diagram

2.1 Overlapping

d

3.1 Gradient of Density 3.2 Multi-orientation 3.3 Gapping

Typical TypicalResidencial ResidencialUnit Unit Typical Residencial Unit ypical Residencial Unit Typical Residencial Unit idencial Unit Deluxe DeluxeStudio/ Studio/327 327sq.ft sq.ft Deluxe Studio/ 327 sq.ft eluxe Studio/ 327Studio/ sq.ft Deluxe 327 sq.ft dio/ 327 sq.ft

Typical Residential Unit Configuration

Residential_ Residential_Deluxe Residential_DeluxeStudio/Queen Studio/Queen Residential_One Onebed bedroom/Queen room/Queen Residential_ One bed room/Queen Residential_Deluxe _Deluxe Studio/Queen Residential_Deluxe Residential_Deluxe Studio/Queen Studio/Queen Studio/Queen Residential_ Residential_ One bedResidential_ room/Queen One bed room/Queen One bed room/Queen 365 327 327sq.ft sq.ft 365sq.ft sq.ft 365 sq.ft 327 sq.ft 327 sq.ft 327 327 sq.ft sq.ft 365 sq.ft 365 sq.ft 365 sq.ft

Residential_2 Residential_2bed bedroom/ room/ Residential_2 bed room/ Residential_2 Residential_2 bed room/ Residential_2 bed room/ bed room/ Queen Queenand andTwin Twin Queen and Twin Queen and Queen Twin and Queen Twin and Twin 510 510sq.ft sq.ft 510 sq.ft 510 sq.ft 510 sq.ft 510 sq.ft

Typical TypicalHotel HotelUnit Unit Typical Hotel Unit Typical Unit Hotel Typical Unit al Hotel UnitHotel Queen QueenBed BedRoom Room/ /272 272sq.ft sq.ft Queen Bed Room / 272 sq.ft Queen Room 272 sq.ft Queen Room / 272 sq.ft n Bed RoomBed / 272 sq.ft /Bed

Typical Hotel Unit Configuration

Hotel_ Hotel_Queen Queenbed bedroom room Hotel_ Queen bed room Hotel_ Queen Hotel_ bedQueen room Hotel_ bed Queen room bed room 272 272sq.ft sq.ft 272 sq.ft 272 sq.ft 272 sq.ft 272 sq.ft

Hotel_ Hotel_Twin Twinbed bedroom room Hotel_ Twin bed room Hotel_ Twin Hotel_ bed Twin room Hotel_ bed room Twin bed room 302 302sq.ft sq.ft 302 sq.ft 302 sq.ft 302 sq.ft 302 sq.ft

Lei Yu_ Work Sample

Hotel_ Hotel_22bed bedroom roomSuit Suit Hotel_ 2 bed room Suit Hotel_ 2 Hotel_ bed room 2 bed Suit Hotel_ room2Suit bed room Suit 408 408sq.ft sq.ft 408 sq.ft 408 sq.ft 408 sq.ft 408 sq.ft

22

Residential_ Residential_Loft Loft22bed bedroom room Residential_ Loft 2 bed Residential_ Residential_ Loft 2 bed Loft room 2 bed Suitroom /Loft /ro Residential_ 2Suit bed Queen Queenand andTwin Twin Queen and Tw Queen and Queen Twin and Queen Twin and Twi 532 532sq.ft sq.ft 532 sq.ft 532 sq.ft 532 sq.ft 532 sq.ft


#2.1 Private Spa

#2.2 Facade Transformation

Lei Yu_ Work Sample

23

#2.3 Integrated Facade_ Main


2

3

4

5

6

7

8

9

A

B

C

Greenwich St

D

E

F

1

Vestry St #1

Ground Floor Plan

_Apt Entrance/ Hotel Entrance/ & Health Station/Fitness Store

Lei Yu_ Work Sample

24


Typical Floor Plan _Apt Admission/ Hotel Admission/Gym/Units

2

3

4

5

A

B

C

D

E

F

1

#2

Typical Floor Plan

_Apt Admission/ Hotel Lobby/ Hotel & Residential Unit/ Gym

Lei Yu_ Work Sample

25

6

7

8

9


Resid

10’ -3’’

Hote

10’ -3’’

Hotel/ Spa

S

10’ -3’’

Residential/ Hotel

10’ -3’’

Residential/ Hotel

13’ -0’’

Residential/ Spa

Hotel Lobby/ Residential 13’ -0’’

Facad e Turni _ ng co rne

r

10’ -3’’

Swimming Pool

13’ -3’’

Gym

-19’ -3’’

Fitness Store/ Health Station

Swimming Pool

Section A

Lei Yu_ Work Sample

26


dential Unit

tel Lobby Jacuzzi Hotel Unit

Swimming Pool Small Hotel Unit

Gym

Fitness Store Hotel Entrance Apt Entrance

A Health Station/ Cafe Swimming Pool

Perspective Section Lei Yu_ Work Sample

27


Lei Yu_ Work Sample

28


#1.1 Main Entrance-Lobby

Lei Yu_ Work Sample

29


Wh Resili me Transpo orien Develo

Lei Yu_ Work Sample

30


hen ience eet ortation nted opment

Lei Yu_ Work Sample

31


I-8 80

I-280

Oakland International Airport

US-101

l

0 I-28

nne

nd

e2

Hayward Executive Airport

SFO 01

-1 US

San Francisco International Airport

ns

Tra

0 I-88

Th

Tu bay

0

I-28

Palo Alto Airport

I-880

existing BART Stations future BART Stations BART route regional railway

Mineta San Jose International Airport


SF

AK

SFO & OAK Airports Resilient Development Instructor: Matthijs Bouw, Kai-Uwe Bergmann Team: Lei Yu, Baihe Cui 2016 Fall

KEPPEL LAND_ JINGA Shanghai, China April- June 2015 Architect: HASSELL

Reponsibility: Facade Development, Floor Plan Layout and GFR Calculation

Deployable Structure Transform from one objet to an other Instructor: Mohamad Al Khayer Team: David Feng, Lei Yu, Yu Gan 2017 Spring

Contemporary Furniture From full to vacant

Instructor: Katrin Mueller-Russo Solo Work 2017 Spring


6’ 5’ 4’ 3’

Elevation AMSL LAX 128ft

SFO 13ft

OAK 9ft

Airport BART line Railway

Projected Sea Level Rise 6’ 1’ 5’ 4’ 3’ 2’ 0 2.5 51’ 10

Lique

2’

miles 15

Analysis Analysis

(San Francisco International airport) is airport the largest airport in Northern California and the second busiest SFOSFO (San Francisco International airport) is the largest in Northern California and the second busiest in California. However,in rate severely of development forits thedevelopment, whole Bay Area. limited but also impacted the rate of development for the whole Bay Area.

The The two airports are facing challenges. For example, SFO has significant delaysignificant issues—23.34% of the airport’s flights were dela two airports are other facing other challenges. For example, SFO has delay issues—23.34% of the a fell at the lower elevations and 8-10 inches in the coastal hills. The storm caused havoc at San Francisco Airport where hundreds of conditions. In the storm on Feburary 2017, 1.54 inches storm fell at the lower elevations and 8-10 inches in t in OAK currently at only 1.6ft in elevation, which already puts it at a high risk of flooding. Airport-related development such as hotels either cancelled or delayed. Both airports willconstrained. be severely impacted from sea level rise, with the north field run development opportunities at SFO are already severely

Airport-related development such as hotels are far from the OAK terminals, causing increasing traffic and grou Fromalready the perspective of constrained. regional public transportation, it is estimated that if a second transbay tube connecting San Francisco to th severely


au dF ar

yw Ha

0.7-6.6ft

as

re

nd Fa ult

Airport BART line

nA

Both are on the highly vulnerable zone

Sa

By 2100

lt

Risk in Future: By 2050 0.3-1.9ft 19in=1.58ft

Railway Liquefaction Susceptibility Alquist Priolo Zones Very high High Medium Low

0

2.5

5

10

15 miles

nd California. However, bigand problems such have as insufficient capacity and delaysbut have only the bigbusiest problemsinsuch as insufficient capacity flights delays not only severely limited itsflights development, alsonot impacted a.

ayed by of flights 59 minutes—and even worse poor weather conditions. In the storm Feburary 2017, weather 1.5- 4 inches storm 34% of an theaverage airport’s were delayed by aninaverage of 59 minutes—and evenonworse in poor f flights were either cancelled or delayed. Both airports will be severely impacted from sea level rise, with the north field runway 0 inches in the coastal hills. The storm caused havoc at San Francisco Airport where hundreds of flights were s are far from the OAK terminals, causing increasing traffic and ground parking demand in the airport and in the city, while orth field runway in OAK currently at only 1.6ft in elevation, which already puts it at a high risk of flooding. ffic and ground parking demand in the airport and in the city, while development opportunities at SFO are

he East Bay is not built, BART will exceed capacity by 2024( From Regional Think Tank SPUR )


Aircraft Traffic Capacity 137%

64%

Takeos and Landings (Thousands)

SFO

1

OAK

630 485 High

500

0

270

SFO

5

Low 460

S

OAK

Commute Time 80 min Aircraft Capacity from SFO to OAK

913,100 flights per year Runway San Francisco Airport (SFO) BART Station

OAK

SFO

Average Delay Time SFO

OAK

59 Mins

Highest on-time arriv percentage among 40 busiest North Americ Airports

CURRENT

As the main strategy of SFOAK, the proposed se and OAK airport directly. It offers an opportunit redundancy for the airports as well as speedy c two airports. In the meantime, it optimizes Airpo and developing resilient strategies before reach


100% SFO

562

SFO

val 0 can

100% OAK 727 High (Increased)

562

Low 690 (Increased)

Air Carrier Air Taxi General Aviation/ Other Runway Capacity *Includes passager and air cargo operation

OAK

*projection in 2035

from SFO to OAK

18 min

1,150,000 flights per year

Oakland Airport (OAK) BART Station

SFOAK (12 Runways) SFOAK On Time

SFOAK

econd transbay tunnel, links SFO airport

ty for balancing the capacities and creating connectivity for passengers transferring between ort share and 20 years for enlarging the capacity h the limit and be shocked by disasters.

SF AK 1+1>2


SFO Side- limit & Opportunity Airport Capacity Limit: International & Runway Public Parking Limit Hotel and Transportation (Airtrain) Energy Consuming Tech(Biotech) Park/Bussiness Opportunities (Job) Limite land-use for Bussiness Open Space for Social Activities Residential Development Limit Car Rental Development

26%

ENVIRONMENT ECOL

OAK Side- limit & Opportunity

ENERGY TRANSFOR

100%

Airport Capacity Growth: Domestic & Cargo Public Parking Opportunities Hotel and Transportation (Airtrain) Energy Station (Water/Electricity Supply ) Manufacture Development and Storage Space Foreign Free trade Zone Limited Public Access/ Limited Social Activities Residential Development Opportunities

WETLAND GOLFCOUR

FOSSIL JET FUEL

LAND VALUE

BIOTECH INDUSTRY

BIOENERGY HUB

INDUSTRY

TRANSPORTATION

PUBLIC ACCESS

WETLAND HABITAT

BLOCKED

CURRENT

HIGH-END HOTEL/CONFERENCE

SFOAK is a resilient and systematic str Complementary relationship between San Franci for building the second trans-bay tunnel. While th side, Alameda County’s logistical and transportat uses, both economically, such as resorts, educat as wetlands. A large amount of job opportunities


OAK Side- limit & Opportunity Airport Capacity Growth: Domestic & Cargo Public Parking Opportunities Hotel and Transportation (Airtrain) Energy Station (Water/Electricity Supply ) Manufacture Development and Storage Space Foreign Free trade Zone Limited Public Access/ Limited Social Activities Residential Development Opportunities

30%

LOGY

RSE

WETLAND GOLFCOURSE PARK GREEN SPACE HABITAT

50%+50%

RMATION

DISTRIBUTION HUB

BIOJET FUEL

BIOENERGY/ WETLAND

FOSSIL JET FUEL

RESORT OFFICE & EDUATION INDUSTRY

N

TRANSPORTATION

GOLF/SAIL TOURISM FREE TRADE ZONE

BRIDGED

SFOAK

rategy for SFO and OAK airport developmen.

isco and Oakland is another key driven element he public accessibility is increasing on Oakland tion lands can be unlocked for more valuable land tion institutes and offices, and ecologically, such can be generated in Oakland in the future.

SF AK Cross Bay Engine


A

Noise BarrierA+ Trail/ Sailboat A Noise Barrier + Trail/ Sailboat Entertainment Noise Barrier + Trail/ Sailboat Entertainment Entertainment

B

B Algae + Wetland

BWastewater Algae + Wetland Treatment+ Biojet fuel Algae + Wetland Wastewater Treatment+ Biojet fuel Wastewater Treatment+ Biojet fuel

C

C

C

C Consolidation R

Consolida Restoration +

Restoratio


C

C Consolidation Wetland Consolidation Wetland RestorationC+ Habitat

fuel

Restoration + Habitat Consolidation Wetland Restoration + Habitat

D

LeveeD+ Warehouse DLevee + Warehouse Public waterfront

Public+waterfront Levee Warehouse Public waterfront


Int

ern

ati

on

al

er

Bl

B

vd

b en

g

A

He

R T n Sa

o dr an Le St

11

10

B 1

13

3

C

t

98

80

12

I8

14

D

4 2

9

16

LEGEND A B C D

19

20

Noise barrier + Entertainment Remediation + Algae Open Ponds Consolidation + Levee + Habitat Waterfront + Warehouse

22

17 18 7

5

21

6

1

Warehouse + Distribution Hub FedEx Center 3 Wetland 4 Golf Course 5 Wetland Park 6 Oyster Bay Regional Shoreline Park 7 Waste Recycle 8 Free Trade Zone 9 New Runways-MEGA Float (South) 10 New Runway (North) 11 Golf course 12 Bay Farm Island 13 Waterfront Park 14 Martin Luther King Jr Regional Shoreline 15 O.co Colideum 16 New Parking System 17 Distribution Center 18 Vestibule Campus & Apartment 19 Hotel & Retail 20 New BART Station 21 New Terminal 22 Office Campus for FTZ 2

A

RT

BA

0

500

1000

2000

8


d

R er

rg Bl v

e

g er

d

Phase 1 Phase 1 The 2 TransBay

d rR

b en

nd

Tunnel

g

He

Levee Warehouse

nd

The 2 TransBay Tunnel

Hotel (OAK Loop)

Levee Warehouse

Airports Transit

Levee

New Terminal

Sa n Le o dr St th

98

e Av

Phase 2

New Terminal

Phase 2Phase 2

Phase 2

Previous

Previous

Algae Open Ponds New Runway*

Warehouse & Distribution Hub

Warehouse & Distribution Hub

Algae Open Ponds Levee Warehouse Waterfront Park New Runway*

Levee Warehouse Waterfront Park

Algae Energy Generator

Fe Hu dE b x

Fe Hu dE b x

e

on

Z de

Tra ree F Wetland

+H

+H

ab

ab

ita

Wetland

t

ita

t

8

e rad

eT

Fre

Noise Barrier Trail

Noise Barrier Trail

Rtail (OAK Loop)

Rtail (OAK Loop)

Conference ne Zo Center

Conference Center (OAK Loop)

(OAK Loop) Hub

Distribution Hub

BART Station & Park (OAK Loop)

BART Station & Park (OAK Loop)

Re-route for Distribution Free Trade Zone and Recreation

Re-route for Free Trade Zone and Recreation

Flexible Parking Garage (OAK Loop)

Phase 3 Previous

Flexible Parking Garage (OAK Loop)

Phase 3 Previous

Warehouse & Distribution Hub Algae Open Ponds Algae Open Ponds Levee Warehouse New Runway* Waterfront Park New Runway*

Warehouse & Distribution Hub Levee Warehouse Waterfront Park

Fe Hu dE b x

Fe Hu dE b x

OAK Loop Development e rad

ab

ita

t

Wetland Park

OAK Loop Development

Phase 3 Phase 3

e rad on eT e ati r F ne ific Zo dens Free Re

on eT ati Fre ne Trade Zone ific s o n Z de ab Redensification Re Re-route for ita Wetland t Park Free Trade Zone Re-route for and Recreation Recreational Free Trade Zone and Recreation Noise Barrier Park

+H

+H

5000ft

Algae Energy Generator

Free Trade Zone Free Trade Zone Office Office (OAK Loop) (OAK Loop)

OAK Loop Development

OAK Loop Development

5000ft

Water Filteration

Consolidation + Consolidation + Floating Runway Floating Runway

an

th

Airports Transit

Levee

Water Filteration

e Av

Hotel (OAK Loop)

Noise Barrier Trail Recreation

Trail Recreation

Wetland Park

Free Trade Zone Redensification Recreational Park Wetland Park


CANOPY RETAIL + CONFERENCE HIGH-END NEW HOTEL TERMINAL RETAIL + HOTEL STATION + RETAIL OFFICE RETAIL + HIGH-END CONFERENCE HOTEL FLEXIBLE (GARAGE--OFFICE) RETAIL + STATION HOTEL RETAIL FREE-TRADE ZONE OFFICEOFFICE RETAIL + +CONFERENCE CONFERENCE + HOTEL FLEXIBLERETAIL (GARAGE--OFFICE) OFFICE CANOPY FREE-TRADE ZONE OFFICE FLEXIBLE (GARAGE--OFFICE) HIGH-END HOTEL CONFERENCE NEW TERMINAL FREE-TRADE ZONE OFFICE STATION + RETAIL CANOPY CONFERENCE RETAIL + CONFERENCE CANOPY NEW TERMINAL RETAIL + HOTEL

RETAIL + HOTEL

OFFICE Layout OAK LOOP Program FLEXIBLE (GARAGE--OFFICE)

SFOAK: OAK LOOP Program Layout OFFICE FLEXIBLE (GARAGE--OFFICE) FREE-TRADE ZONE OFFICE CONFERENCE CANOPY NEW TERMINAL

FREE-TRADE ZONE OFFICE CONFERENCE CANOPY NEW TERMINAL

NEW TERMINAL

RT BA

PARKING

RESILENT CIRCLE

$IRCLE

AXIS

OAK LOOP Develop Principle

T AR

B

Flexible

T

BA

RM

E WT

Flexible

L INA

NE

AL

IN RM

E

WT

NE

L

INA

M ER

W TEconomic

B

Hotel

L

INA

M ER

WT

NE

NE

T AR

Parking

Office Retail

StationCon P Office Retail Retail Economic Circle Conference Station Axis

R Flexible BA Parking Hotel

NE

RT

RT BA

Rd

E WT

Hotel

Office Retail

Axis

Parking

Station Park Retail Conference Station Confe

OAK LOOP Central Axis Section

OAK LOOP Central Axis Section


development

development

AL

IN RM

WT

NE

c Circle

L

INA

M ER

Economic Circle

Flexible

Flexible

l n

Axis

Station Park Retail Park nference Station Conference

Conference

Retail

Retail

Office

Office

Hotel

Hotel

Hotel

Hotel


OAK Loop Traffic Principle

OAK Loop Program Layout hotel hotel +office +office +free +free trade trade zone zone

W-shape STATION TERMINAL W-shape STATION PROGRAM

Hotel+retail+ Hotel+retail+ conference conference SFO & OAK Airport RESILIENT Development SFO & OAK Airport RESILIENT Development SFOAK SFOAK

SFO & OAK Airport RESILIENT Development SFOAK

HOTEL SHUTTLE PROGRAM

Station Park & Conference Complex (cultural,art...)

SFO & OAK Airport RESILIENT Development SFOAK

AXIS

SFO & OAK Airport RESILIENT Development SFO & OAK Airport RESILIENT Development SFOAK SFOAK

SFO & OAK Airport RESILIENT Development SFOAK

$IRCLE

HOTEL & OFFICE

DROPOFF PEOPLE GATHERING

Flexible Parking Garage Ground Parking Under Green Cover

P

Free Trade Zone Campus & Ground Parking


from Coliseum to OAK from SFO to OAK

DISTANCE: 3.2 miles TRAVEL TIME: 6min

from Air-side Station to Land-side Station

DISTANCE: 12 miles TRAVEL TIME: 20min

4-10 car x 710 ft ma

60 ft

Air Station

AIRSIDE TUNNEL

AIRSIDE TUNNEL SFO & OAK Airport RESILIENT Development SFOAK

SFO & OAK Airport RESILIENT Development SFOAK

BART Station

LANDSIDE TRAIN

2 STATION+ 1 Bagage claim

STATION-RETAIL SFO & OAK Airport RESILIENT Development SFOAK

TUNNEL COVER to Station PARK SFO & OAK Airport RESILIENT Development SFOAK

Most Profitable


current :

Ground Parking

SFOAK :

Station Park




You are here SFO & OAK Airport RESILIENT Development

SFOAK

You are here SFO & OAK Airport RESILIENT Development

SFOAK


PARKING AVAILABILITY

OFFICE

830 648 WITHIN OAK LOOP + 3200 FUTURE HOTEL CAPACITY

SFOAK: Airport Hotel

3568

3835

PREVIOUS GROUND PARKING

CURRENT FLEXIBLE PARKING


You are here SFO & OAK Airport RESILIENT Development

SFOAK


Architecture Resilience

Program Resilience

Social Resilience

Structure Resilience

Energy Resilience

Energency Resilience

Day Lighting & Program Oriented Facade

35% Opening facade for Retail & Overheated Space

60% Opening for Office View

PARKI

FLEXIBLE S

OAK TERMINAL SFOAK TUNNEL

TAXI WAY

RETAIL


Structure & ProgramResilience Flexible Parking Structure+ Program Shifting Circulation Structure & Scale Study

#1

#2

#3

Section Study Before

After

Before

After

Split Program

Double Hight Public

Structure Transformation After

Before

ING

STRUCTURE

HOTEL PLAZA

HOUR PARKING

STATION

OFFICE BART

PLAZA SFOAK STATION

CIVIAL PLAZA

CIVIAL PLAZA


DUO

JurongN.E.X.T N.E.X.T Jurong

DUO

Mixed-use High-rise Development

Mixed-use High-rise Development Architect: Buro ole Scheeren Architect: Buro ole Scheeren Location: Singapore

Singapore HSR Station andDevelopment CBD Development Singapore HSR Station and CBD Next Engine for Exchange and Transformation Next Engine for Exchange and Transformation

Location: Singapore Site Area: 26,700m2 Site Area: 26,700m2 Program: Premium Offices, Luxury Hotel, Program: Premium Offices, Luxury Hotel, Residences and Signature Retail Residences and Signature Retail Commission: March 2011 Commission: March 2011 Construction Start: 2013 Construction Start: 2013 Completion: 2017 Completion: 2017

Location: Singapore Location: Singapore Instructor: Marilyn Taylor, Bob Yaro Instructor: Marilyn Taylor, Bob Yaro Reponsibility: Facade development, including 3D-modeling facade for mock-up; Team: Garesa Hao En Au, Adam Berkowitz, Ruyi Chen, Tingting Feng, Danqi (Silvia) Fang, Yiling Li, Reponsibility: Facade development, including 3D-modeling facade for mock-up; Team: Garesa EnYu, Au,Peiqian Adam(Peggy) Berkowitz, Chen, Tingting Feng,Zhu Danqi (Silvia) Fang, Yiling Li, cannopy Develop exterior and related Interior & exterior construction drawing; Sandy Klanfer,YidiHao Xu, Lei Zhong, Ruyi Xinyi (Elynor) Zhou, Mengjie cannopy and related Interior & exterior construction drawing; diagram development, Develop rendering,exterior dairy for meeting Sandy Klanfer,Yidi Xu, Lei Yu, Peiqian 2017 Spring PennDesign Asian Urbanism Studio (Peggy) Zhong, Xinyi (Elynor) Zhou, Mengjie Zhu

diagram development, rendering, dairy for meeting

2017 Spring PennDesign Asian Urbanism Studio

Lei Yu_ Work Sample

56

East

Berlin Archite

PROJECT FA Address: Wa Commencem Rental space: Completion:

Reponsibility


NEXT CBD Jurong CBD Design Principle

Conceptual Diagram Conceptual Diagram

Jurong NEXT District_ Land Use Diagram

Districts

D Districts

Land Use Diagram Lei Yu_ Work Sample

Land Use Diagram

57


EDU Commons

CIVIC BELT

JURONG NEXT CBD

Civic Belt

INNOVATION PEAK Innovative Peak

AT Neighborhood

EDU COMMON Lei Yu_ Work Sample

58

EDU Commons


SETTING CBD SETTING CBDCONCE DEVEL CONC DEVE TH T

SETTIN CBD C D

Leverage existing Jurong Town Hall • Activated by the arrival• of HSR Station • Civic Focal Point

• Civic • Leverage existing Jurong TownFocal Hall Point • Civic Focal Point

reen Space 9%

Hotel 5% Commercial reen Space 9% 10% Hotel

SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN

SETTING CBD CONCEPT DEVELOPM THE ST P

Civic Belt • Civic Focal Point • Leverage existing Jurong Town Hall

AT(Art&Tech) Neighborhood 20%

Commercial 10%

O ce 20% O ce 20%

Commercial CIVIC BELT 10%

SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN

AT(Art&Tech) Neighborhood • Flexible Live-Work art studio/lab provision O ce 20%

CIVIC BELT CIVIC BELT

CIVIC BELT

Civic & Cultural 25%

Innova on Co-Work 10%

Innova on

Co-Work on Innova • Flexible 10%provision Co-Work • Maker’s SquareLive-Work art studio/lab MICE 10% 10% MICE • Maker’s Square 10% • Community facilities

Civic & Cultural 25%

on Innova Civic & Cultural Co-Work 25% MICE Civic10% & Cultural 25% 10%

Innov Peak

119

MICE 10%

119

Community • Highest Height•119 and Density facilities • Sky Floor Connection Among Towers • Sky Conference Space

SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN

Green Space Hotel 3% Green Space 2% Hotel 3% Commercial 2% 8% Commercial Civic Residen al 8% Green Space 2% 30% Civic Residen al Hotel 3% 2% 30% 5% MICE Commercial 5% MICE 8% 5%

Civic 2% MICE 8%

Residen al 34%

AT (ART&TECH)

EDU Commons AT (ART&TECH)

INNOV PEAK Innova onInnova onCo-Work Co-Work 25% 25%

SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN

SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN

SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN

122

reen Space Residen al 9% 11% Hotel reen Space Residen al 9% 5% 11% Hotel O ce 5%

Residen al 11%

5%

Commercial 10%

119

Residen al 11%

EDU Commons • Tech Grove

O ce/Ins tu 25% • International Satellite 25% University Campus

O ce/Ins tu

O ce 40%

EDU Commons • International Satellite University Campus

126

126

• Live-Work Incubator

• International Satellite University Campus

• Tech Grove

Micro Units • Tech•Grove

• Live-Work Incubator

• Live-Work Incubator • Micro Units

• Micro Units

Green Space Hotel 4% 5% Commercial Green Space 6% Hotel 4%

Commercial 6% MICE 5%

5%

MICE 5%

Green SpaceResiden al 30% Hotel 4%

Residen al5% 30% Commercial

6%

Residen al 30%

MICE 5% COMMONS EDU COMMONS EDU Innova on Co-Work 25%

Innova on Co-Work 25%

EDU COMMONS O ce/Ins tu Innova on25% -

Co-Work 25%

124

O ce/Ins tu 25% O ce/Ins tu 25%

124 124

Lei Yu_ Work Sample

59


High-Speed Rail Station Design

age Title

PHASE 2

n text in bullet nts gyskl;asx n text in bullet nts fwkj

PHASE 1

PHASE 2 OD

SECTION

OD

FO

Groud

econdary text

CU

LTU R

ATR I

UM

E

RET AIL ATR I

UM ATR I

Culture

UM

RET AIL

RET AIL

OF

I TA

RE

Comercial &RETAIL Hotel Mix

L

Food Exhibition Atrium Vertical Circulation Tech Workshop Health & Fitness

OD

CU

LTU R

ATR I

UM

E EXH

IBIT

Culture Culture

CIQ Office

FO O TAU & D RA NT

RES

B1

Belo to w

CO

RET AIL

ATR I

ATR I

UM

RET AIL

RET AIL

OF

FIC

E

Mixed-Use Development Ground Level

B1 99

Health Health & Fitness & Fitness

Office Office

60

Belo to w

ope

n

STU TECH DIO

RET AIL

Atrium Atrium Vertical Vertical Circulation Circulation

Lei Yu_ Work Sample

n

RET AIL

Exhibition Exhibition

Back House Back of of House CIQ CIQ

CIA

L

UM

Food Food

Tech Tech Workshop Workshop

ope

RET AIL

RET A info ER IL

MM

IL TA RE

Comercial Comercial &RETAIL &RETAIL Hotel Hotel Mix Mix

ION

HSR STATIONSTATION SECTION DEVELOPMENT INTITLE CBD

Mixed Mixed Development Development

FO

OD

HSR STATION DEVELOPMENT

Back of House

FO

2

FO

BAC K HO of U

HEA L FITN & TH ESS

FIC

E


D D M M

D D

Ground Ground

NEXT TRAVEL

D D

NEXT TRAVEL

Public Realm

Travelator • Travel time 4 minutes between the two stations

Travelator

Jurong East MRT Station

• Travel time 4 minutes between the two stations Jurong East MRT 7mStation above street level

sheltered boardwalk

access to adjacent building

above 5.5m 7m below streetstreet level level

B1 B1

access to adjacent building

HSR Station B1 Level

D D

166

NEXT TRAVEL

M M

Strategy 3 - Enhance Public Realm

166

• Street Types - Neighorhood Streets

B4 B4

Station Multimodal Connection

D

D M

Ground

D

SECTION NEXT TRAVEL TITLE SECTION NEXT TRAVEL TITLE

D

HSR Station B1 Level

B3 B3

M M

5.5m below street level Observation Deck

B2 B2

NEXT TRAVEL

sheltered boardwalk

Observation Deck

Strategy Strategy3 3- Enhance - EnhancePublic PublicRealm Realm

M

B1

D 161

NEXT TRAVEL

• Street • Street Types Types - Walk - Walk & Cycle & Cycle Friendly Friendly Boulevard Boulevard B2

Mass Rapid Transit (MRT)

Travelator to Jurong East Station

B3

M

M M

Ground B4

164

B1

B2 JRL

M

CRL

M CRL 165

B3

JRL B4

160 160

Lei Yu_ Work Sample

61


Lei Yu_ Work Sample

62


Ground Ground

B1 B1

B2

B2

You are here

B3 Lei Yu_ Work Sample

63


Lei Yu_ Work Sample

64


CU

ATR IU

RET AIL

ATR IU

RET AAITL

OD FO

M

RIU

M

CU

LTFU OROE D

ATR IU

M

ATR IU

ATR IU

M

OD

CU

LTU R

Hotel Mix

M

Belo to w

RET RETAIL AIL i n f REi T o nfAoIL REi T nfAoIL

ope

n

CO RE M T CO MREREC AIL MM TIAAL ERC IL I CO RE AL MM TA ERC IL CFO RETIAL OOM RES M AIL TAU & D ER CIA RA NT L

Ticket Hall Office

Belo to w

Belo to w

Ticket Hall

Belo to w

CO

n

ope

n

info

BUS

NE

HEA L FITN & TH ESS

S BU RIV AL

S BU

R

I&

E AT IV

PR

R

CA

NE

ZO

WA ARE ITING A WA ARE ITING A

CO

WA ARE ITING A

L VA

RI AR

WA ARE ITING A WA ARE ITING A

CO

WA ARE ITING A

to

MM ERC CO WA IAL MAM ITIN REEAR G CIA L L

CR

AR

RIV AL

L VA RI

L CR L CR

BA CK HO of USEB AC K HO of USE

L VA RI AR

to

IAL

AR

to

ERC

L VA RI

AR

BA CK HO of USE

BA CK o BA f HO CK USE of HO USE BA CK BA o C BA f HO K of CK USE HO of USE HO USE BA CK of HO USE

Platform Platform Platform 65

NE

NE

ZO

ZO

R

CA

X TA

AR

IVA WA BA L BA CK CK oAf RE ITING HO of HOA USE USE ARR IVA L BA CK HO of USE

BA CK HO of USE

Platform Platform

NE

RIV HO f AL US

NE

E AT IV

ofA AITIN HROE AUS G E

BA o CK EBA CK HO of USE ZO

AR

ZO

W USE

PR

BA CK

NE

ZO

AR

R

HO

CA

of

S BU

BA CK

BA CK HO of USE

L VA RI AR

Departure & Arrival

STU TECH DIO

WA ARE ITING A WA ARE ITING A

I&

WA ARE ITING A

MM

BAC K HO of USE

en

RET AIL

X TA

RIV AL

HEA L FITN & TH ESS

RET AIL op

E AT IV

AR

L VA

BAC K HO of USE

STU TECH DIO

PR

WA ARE ITING A

HEA L FITN & TH ESS

RI

BAC K HO of USE

n

I&

WA ARE ITING A

STU TECH DIO

ope

ZO

CIQ CIQ CIQ CIQ

IO

n

RET AIL

RET AIL

WA NE ARE ITING A WA B ARUES IZTOING A NE

FIC

HEA L FITN & TH ESS HEA L FITN & TH ESS

RET AIL

Belo to w

ZO

STU TECH DIO

RETS TEC UD H ope ATIL

RET AIL

L

BUS

OF

n

AR

Departure & Departure & Arrival Arrival Departure & Arrival Departure & Arrival

Belo to w

RET AIL Belo to w

n

CIQ

BAC K HO of USEB AC K o HO f USE

RET AIL

RET AIL

ope

E

ope

RET B toopen AILelow

X TA

CIQ & Waiting Area

Belo to w

ope

CIA

BAC K HO of USEB AC A K RR o f HO IVA USE L DRT A BA Z ON RRIVA CK E L oDf BAC H K BA HO RoTfOZUOSE CK US NE of E HO AR US RIV AL BA E D CK BAHOU oRfT ZO CK SE NE of HO ARR USE IVA L BAC K HO of USE

n

RET A info ER IL

MM

CIQ & CIQ & Area Waiting Waiting Area CIQ & Waiting Area CIQ & Waiting Area

ope

RE RE TA TA IL IL

CIQ

Belo to w

E

FIC

RET AIL

M

RE TA IL

Health & Fitness

Lei Yu_ Work Sample

OF

FIC

IL TA RE

FO O TAU & D RA FO NT OD RES TAU & RA NT FO OD RES & TAU RA NT FO O RES TAU & D RA NT RES

Ticket Hall Back of House

B4

RET AIL

E

IL TA RE

ATR IU

RET AIL

Ticket Hall Ticket Hall

B3

RET AIL

FIC

OF

M

Exhibition Culture Atrium Comercial &RETAIL Vertical Circulation Hotel Mix Tech Workshop Food Health & Fitness Exhibition Back of House Atrium CIQ Vertical Circulation Office Tech Workshop

B2

M

E

OF

RET AIL

ATR IU

Food

B1

ATR IU

RET AIL

ATR IU

E

M

RET AIL

FIC

IL TA RE

OD FO

Mixed Culture Comercial &RETAIL Development

ATR IU

ATR IU

FO

OF

IL TA RE

M

E

M

RET AIL

RET AIL RET AIL

M

RET AT AIRLIUM RET AIL

IL TA RE

LTU R

ATR IU

M

RET AIL

OD FO

CU

M

ATR IU

OD FO

Ground

FO OD LTU RE CU LTU FORE OD

D OO

Phase 1

Mixed Mixed Development Development Mixed Development Mixed Development

BA CK HO of USE

E


LTFU OROE D

RIU

M

ATR IU

M

OD

LTU R

ATR IU

RET AIL

ATR IU

M

E

RET AIL

Belo to w

ope

n

CO RET M A CO MRERECT IL MM IAALI ERC L I CO RET AL MM AI ERC L CFO RETIAL OOM RES M AIL TAU & D ER CIA RA NT L

CIQ Office Ticket Hall

Belo to w

Belo to w

Belo to w

Ticket Hall

Belo to w

CO

ope

n

ope

n

ope

n

ope

n

RET RETAIL infAo IL REinT fAo IL REinT fAo IL

Belo to w

RET AIL

info

BAC K HO of USE

CIA

CIQ & Waiting Area

CIQ CIQ CIQ CIQ

A ARE ITING A

AR

RIV AL

WA ARE ITING A

CIQ

BAC K HO of USEB AC K o f HO USE

Departure & Departure & Arrival Arrival Departure & Arrival Departure & Arrival

RET AIL Belo to w

BAC K HO of USEB AC A K RR o f HO IVA USE L W A AR RIV ARE ITING A L WA BAC A K ARE ITING HO of USE A AR RIV AL BAC WA K HO of ARE ITING USE A AR RIV AL W

CIQ & CIQ & Area Waiting Waiting Area CIQ & Waiting Area CIQ & Waiting Area

Belo to w

RET AIL

L

RET AIL

Belo to w

RET AIL

RET AIL

M

BAC K HO of USE

BAC K HO of USE

STU TECH DIO

RET AIL ope

n

STU TECH DIO

HEA L FITN & TH ESS

RET AIL

STU TECH DIO

HEA L FITN & TH ESS

RET AIL op en

STU TECH DIO

HEA L FITN & TH ESS

RET AIL

WA ARE ITING A WA ARE ITING A WA ARE ITING A WA ARE ITING A

AR

RIV AL

BA CK

RIV HO of AL US

AR

AR

EBA CK HO of USE

RIV AL

AR

BA CK HO of USE

RIV AL

BA CK HO of USE

WA ARE ITING A

AR

RIV AL

BA CK HO of USE

BA CK HO of USEB AC K o HO f USE BA CK HO of USE

BA CK HO of USE

Platform Platform Platform 66

E

OF

HEA L FITN & TH ESS HEA L FITN & TH ESS

RETSTU TECH n AILDIO

ope

BA CK HO of USE

Platform Platform

E

FIC

n

BAC K HO of USE

Departure & Arrival

Lei Yu_ Work Sample

OF

ope

RET B toopen AeILlow

RET A info ER IL

MM

B4

RET AIL

E

FIC

IL TA RE

FO O TAU & D RA FO N T OD RES & TAU RA NT FO O RES TAU & D RA NT FO O RES TAU & D RA NT

E

FIC

IL TA RE

ATR IU

RET AIL RES

FIC

OF

OF

M

Ticket Hall Back of House

B3

M

OF

RET AIL

ATR IU

Health & Fitness

B2

M

RET AIL

IL TA RE

OD FO

CU

ATR IU

IL TA RE

M

FO

Mixed Development

M

RET AIL

RET AIL RET AIL

M

RET AT AIRLIUM RET AIL

IL TA RE

ATR IU

ATR IU

E

ATR IU

M

RET AIL

ATR IU

LTU R

M

ATR IU

OD FO

CU

Ticket Hall Ticket Hall

B1

RET AAITL

M

OD FO

Ground

RET AIL

ATR IU

M

CU

Culture Food Atrium Comercial &RETAIL Exhibition Vertical Circulation Hotel Mix Atrium Culture Tech FoodWorkshop Vertical Circulation Comercial &RETAIL Health & Fitness Exhibition Tech Workshop Hotel Mix Back of House Atrium Health & Fitness Food CIQ Vertical Circulation Back of House Exhibition OfficeWorkshop Tech Culture CIQ Atrium Health Comercial &RETAIL Office & Fitness Vertical Circulation Back of House Hotel Mix Tech Workshop CIQ Food Health & Fitness Office Exhibition Back of House Atrium CIQ Vertical Circulation Office Tech Workshop

ATR IU

OD FO

Phase 2

FO OD LTU RE CU LTU FORE OD CU

Mixed Development Development Mixed Culture Development Comercial &RETAIL Culture Mixed Hotel Mix Comercial &RETAIL Food Hotel Mix Development Exhibition

FIC

E


Benefits

MARTA line

Spring St

Live and work places for graduates

residence

Georgia Tech

Freeway Blocker

Tunnel

Georgia Tech Stadium

5m

P

Olympic Tower

Job Creation

Catalyze the development

Site

AT&T

P Church

North Ave

BOA

mi

P

k al nw

P

P

New Research Facilities

Residence

l wa k

New Festivals

Tax Benefits

Jobs

P

walkable streets

Parks

2306 jobs

Job Creation Tax Benefits Catalyze the development

CONNECTIVITY Cup for The Blind GEORGIA-TECH

Energize the Stadium

Plazas

2.2 acres

Good Environment

Access to Midtown

Walkable street

Atlanta Midtown Urban Redevelopment Caping landscape, TOD 100% 95% development, 79% Tech Park 87% & Retail83%

2945 residences

Historical District

MARTA RIDERSHIP Energize the Stadium Increased land value

Good Environment

1.09 acres

ULI Hines Student Competition Team: Lei Yu, You Wu, Lu Han, Siyang Jing, Mei Zhang 2015 Spring PennDesign

P

Catalyze the development

Entertainments

PUBLIC REALM

The Landing

The Fox Theater

North Ave

M Station

MIDTOWN

Robust and healthy living environment

Increased land value

DENSITY

P

The Varsity

in

North Ave

Peachtree NW

Tech Square

Tech Related Jobs

restaurants increased ridership Increased land value

Peachtree Corr idor

5th St

10

L

2013 Fall 501 PennDesign Studio

Site Analysis

1.89 miles

A

New Research Facilities Live and work places for graduates Access to Midtown

Assistant product for disabled

bike lanes Open Space Shortlisted, Red Dot Design Concept Competition/Germany 2012 Team: Lei Yu, Fan Wang COMMUNITY China Academy of Art B

82%

Increased land value

0.82 miles

Job opportunities walkable streets more recreation facilities Open Space

MARTA

increased ridership

DUO

Mixed-use High-rise Development Architect: Buro ole Scheeren

Jurong N.E.X.T

NSFORMING

Total Buildou

Share Retail Work-live Space total Unites Parking total Spaces Jobs Created

Location: Singapore Site Area: 26,700m2 Program: Premium Offices, Luxury Hotel, Residences and Signature Retail Commission: March 2011 Construction Start: 2013 Completion: 2017

Singapore HSR Station and CBD Development Next Engine for Exchange and Transformation

Location: Singapore Instructor: Marilyn Taylor, Bob Yaro Team: Garesa Hao En Au, Adam Berkowitz, Ruyi Chen, Tingting Feng, Danqi (Silvia) Fang, Yiling Li, Sandy Klanfer,Yidi Xu, Lei Yu, Peiqian (Peggy) Zhong, Xinyi (Elynor) Zhou, Mengjie Zhu 2017 Spring PennDesign Asian Urbanism Studio

Parkin

Reponsibility: Facade development, including 3D-modeling facade for mock-up; Develop exterior cannopy and related Interior & exterior construction drawing; diagram development, rendering, dairy for meeting

W

Joey JH P

THE LANDING

Team 160125

Team

Total Buildou

Share Hotel Retail Residential total Unites

6

Proposed 1. MARTA Station Hall 2. Supermarket+Shopping Mall+Community Center 3. Retials+Apartments+Affordabal Housing 4. Restaurants+Tech Retial+Other Retials (with underground parking) 5. Hotels (with underground parking) 6. Business Incubator 7. Condominium housing 8. Retails (with underground parking) 9. Media Center 10. WeWork+Retail 11. Work and Live Lofts

5

Parking Community Center

4th St. NW

a. Pop-up Market Plaza b. MARTA Plaza c. Tech Plaza d. Olympic Tower Sq e. Media Center Event Lawn f. Overlook Hills g. Landing Grand Path h. Woods i. Ecologycal Rain Gardens j. Event Lawn k. Tech Square 2.0 l. bike lane m. Belt Line

Business Incuba Community Cen Parking Total Spaces Jobs Created

The Landing is a vision for the next generation’s urban experience. It means connecting people with opportunity and also each other by increased density; bridging Midtown, Georgia Tech, and Downtown together with a much needed green space; and anchoring jobs and investments by creating a “live where you work” environment.

11

Business Incubator

11

wn Downto to Connec

k

r

10

3rd St. NW

Existing 1.Bank of America Plaza Atlanta 2. Fox Theatre 3. AT&T building 4. Bobby Dodd Stadium at Historic Grant Field 5. Georgia Tech Global Learning Center 6. Scheller College of Business

9

d

f

6 4

e

5 c

8

4 3

7

2

4

Peachtree St. Comm

g

4

8 h

i

b

7

3

Total Buildou Share Retail Residential total Unites

ertial Corridor

3

M

1

j 2

Media Center Parking total Spaces Jobs Created

b l m

North Ave.

residence

Peachtree Corr

P

Peachtree NW

Tech Square

Olympic

Live and work places for graduates

idor

5th St

Georgia Tech

Benefits

MARTA line

Spring St

400 feet

Tech Related Jobs

restaurants increased ridership Increased land value

Job Creation

Research Facilities CatalyzeYu_ the development Lei WorkNewSample

DENSITY

West Peachtree St. NW

300

Spring St. NW

Site Analysis

200

Downtown Connector

100

a

Robust and healthy living environment

Increased land value New Festivals

67

Tax Benefits

Entertainments

Good Environment

PUBLIC REALM

1

Parking

MIDTOWN Catalyze the development

MARTA RIDERSHIP Energize the Stadium Increased land value

walkable streets

Good Environment Job Creation

Access to Midtown

CONNECTIVITY

Tax Benefits Catalyze the development

GEORGIA-TECH Energize the Stadium

A


North Ave.

Live and work places for graduates

residence

Freeway Blocker

Tunnel

Georgia Tech Stadium

5m

P

Olympic Tower

Catalyze the development

Site

AT&T

P Church

The Fox Theater

New Research Facilities

Catalyze the development

MARTA RIDERSHIP Energize the Stadium Increased land value

Entertainments

Good Environment

Tax Benefits

walkable streets

PUBLIC REALM

l wa

10 mi

P

k al nw

P

Residence

P

Jobs

Parks

Good Environment Job Creation

Access to Midtown

Tax Benefits Catalyze the development

CONNECTIVITY

Plazas

North Ave

100%

BOA

95%

2945 residences

P

Historical District P

GEORGIA-TECH Energize the Stadium

87%

79%

2306 jobs

Walkable street

2.2 acres

bike lanes

83%

1.09 acres

Open Space

COMMUNITY

82%

1.89 miles

Total Buildout (sf)

122,116.00

Share Hotel Retail Residential total Unites

34% 103,890 73,423 269 ,800 241 21% 30,945 27,811 130,818 436 547

Increased land value

0.82 miles

Business Incubator Community Center Parking Total Spaces Jobs Created

walkable streets more recreation facilities Open Space

MARTA

increased ridership

PHASING I-CONNECTING

16% 34% 42% 51%

Affordable housing on the top of MARTA Station provide various apartmemt APT. types for leasing and purchasing

2018 2019 2020 2021

$28,872,577 $85,535,273 $296,798,173 $349,687,517

Pop up market is a flexible public space for food market, venders, and small public gathering event during the day time.

W

ES T

Retail

PE

POP UP MARKET

AC H

TR

EE

Green roof can cool the building, provide open space for peole. It also can reduce

Business Incubator

ST R

EE

GREEN ROOF runoff by infiltrating stormwater

Residential

PHAS VIEW

Community center provides a social and recreational space for people who live there. It is an indoor space provide differCOMMUNITY ent education and recreation programs. CENTER

Hotel

Parking Community Center

Share Retail Work-live S total Uni Parking total Spa Jobs Creat

P

Hotel building is adjacent to the Peachtree, which is a commerical HOTEL corridor in the middle town of Atlanta.

Totel Asset Value

B

Job opportunities

Total Bui

Development Footprint 2018 2019 2020 2021

A

New Research Facilities Live and work places for graduates Access to Midtown

Phase 1

necting people with Tech, and Downtown reating a “live where

SP

RI

NG

ST R

T

NW

EE

T

Business incubators provide space for research labs, design offices, and idea studios. It is the place for innvation INCUBATOR and creatively.

W

AY

Tech Square

T.O.D.

FR

EE

RETAIL/ CINEMA

W

AY

idor

5

EE

Peachtree Corr

FR

MARTA Station serves as transit hub in the middle town of atlanta, which will catalize the Retail commercial and residential development in the near future. Blocker

5

I8

Freeway

I8

Retail commercial provide convenient and comfortable shopping experience for local residence and workers in this area. RETAIL

Stadium Site

TOD North Ave

Team 160125

NECTING

Hotel

Retial

Community Center

MARTA Station Hall

Bus Route

Business Incubator

Residential

Underground Parking

Proposed Bike Lane

Existing Bike Lane

Development Total Buildout (sf) 58,676 PHASE I Footprint VIEW FROM MARTA STATION Share Retail Residential total Unites

Media Center Parking total Spaces Jobs Created

provides a social and e for people who live or space provide differrecreation programs.

25% 32,000 30,433 696 11% 26,676 75,363 251 101

2022 2023 2024

Condominium housing development provide great view to the adjacent park

APT. and views to the downtown Atlanta.

59% 100% 100%

TR

CH EA

OVERLOOK

TP ES

Geogia Tech and Peachtree Corridor, TOD, Tech Square and Stadium

Olympic tower provides panoramic view to the downtown and adjacent park. It is a landmark and tourism attraction hotspot.

Parking

$397,063,190 $3,021,899,280 $1,871,272,540

RETAIL

Media Center

WN

Retail commercial provide convenient and comfortable shopping experience for local residence and workers in this area.

EVENT LAWN

Event lawn is a gathering space of people. An active public realm for fun and recreation designed for multifunction and multi generation use.

Media Center provides unique space for exploring and experiencing new social media and technology.

A: What do you want to do after done with shopping?

Piedmont Park Botanical Garden

TOP 1

A: How did you get here?

Good Environment

NO OPEN SPACE

Job Creation Tax Benefits Catalyze the development

Energize the Stadium

A

A

New Research Facilities Live and work places for graduates Access to Midtown

ridor

Peachtree Cor

Increased land value

B

THE TOWER

Retial

Media Center

Existing Bike Lane

Residential

Underground Parking

Proposed Bike Lane

Bus Route

OPEN ?NOSPACE Site

TOP 6

Centennial Olympic Park

tourism attraction hotspot.

B: I usually drive, but I took the Metro today. phasing 2:

SECTION A A: Sounds good! We might also be able to make

B

Job opportunities

LANDING

Create Open Space to fill the gap

SECTION B

it to the new show happening in the community center in the evening.

walkable streets more recreation facilities

Site

B: I am going to Olympic stadium for a The Olympic Tower provides panoramic view to the football game. downtown and adjacent park. It is a landmark and

B: What about rent a bike in the MARTA station and ride up to Ansley Park?

Tech Square Open Space

NITY

PHASE VIEW F

Residential

MEDIA CENTER

TECH

Team

PONCE DE LEO

W

Totel Asset Value 2022 2023 2024

CONNECTING

PHASING II-LANDING

W

TN

EE

R ST EE

phasing 1:

Retail

market is a flexible public r food market, venders, ll public gathering event he day time.

Open Space increased ridership

TOD

ECTING

ch and Peachtree Corridor, Square and Stadium

ANDING

e d

New Festivals

Parking

MIDTOWN

Robust and healthy living environment

Increased land value

DENSITY

North Ave

M Station

k

NG

A

1

P

The Varsity

in

North Ave

Peachtree NW

Georgia Tech

Job Creation

Peachtree Corr

Tech Square

Tech Related Jobs

restaurants increased ridership Increased land value

idor

5th St

Site Analysis

Benefits

MARTA line

Spring St

Site Analysis

West Peachtree St. NW

400 feet

300

Spring St. NW

200

a

Downtown Connector

100

Jobs Creat

m

Business Incubator

Total Buildout (sf)

52,203 41%

Share

Retail PONCE DE LEON AVE NW57,401 Work-live Spaces total Unites Parking total Spaces Jobs Created

596,438 268 65,422 218 1770

Development Footprint 2025 2026 2027

100% 100% 100%

2025 2026 2027

$1,072,788,695 $632,553,575 $653,988,143

Totel Asset Value PHASE II VIEW FROM TECH SQUARE Parking

Retail

Plaza

Media Center

The Olympic Tower

Landing

Dormitory

Business Incubator

Retail

Street

Landing

PHASING III-ANCHORING PHASE ST AD VIEW F IU WEST PEACHTREE ST NW M

Work and Live Typical Loft Unit

Work

Lei Yu_ Work Sample

Dormitory

68 LIVE/WORK

Live/work district provides vibrant neighborhood for young people who live and work here adjacnet to Tech-town


RETAIL

P

comfortable shopping experience for local residence and workers in this area.

Site TOD North Ave

NG

PHASE I VIEW FROM MARTA STATION

ocial and who live de differgrams.

Total Buildout (sf)

58,676

Share Retail Residential total Unites

25% 32,000 30,433 696 11% 26,676 75,363 251 101

Media Center Parking total Spaces Jobs Created

ble public venders, ing event

Retial

Residential

Development Footprint 2022 2023 2024

APT.

Underground Parking

Condominium housing development provide great view to the adjacent park and views to the downtown Atlanta.

Bus Route

Proposed Bike Lane

Existing Bike Lane

phasing 1:

CONNECTING

Geogia Tech and Peachtree Corridor, TOD, Tech Square and Stadium

PHASING II-LANDING

NW

E

TR

H AC

ET

E TR ES

MARTA Station Hall

OVERLOOK

E TP ES

Olympic tower provides panoramic view to the downtown and adjacent park. It is a landmark and tourism attraction hotspot.

PONCE DE L

PHAS VIEW

W

$397,063,190 $3,021,899,280 $1,871,272,540

Retail commercial provide convenient and comfortable shopping experience for local residence and workers in this area. RETAIL

Retail Parking

Phase 2

59% 100% 100%

Total Asset Value 2022 2023 2024

Community Center

Hotel Business Incubator

EVENT LAWN

Event lawn is a gathering space of people. An active public realm for fun and recreation designed for multifunction and multi generation use.

A: What do you want to do after done with shopping? A: How did you get here?

Residential Media Center MEDIA CENTER

Media Center provides unique space for exploring and experiencing new social media and technology.

Piedmont Park Botanical Garden

TOP 1

B: I am going to Olympic stadium for a football game.

Environment

B: What about rent a bike in the MARTA station and ride up to Ansley Park?

reation

enefits

NO OPEN SPACE

B: I usually drive, but I took the Metro today.

ze the development

OPEN ?NOSPACE Site

TOP 6

ridor

gize the Stadium

A

A

Research Facilities and work places raduates ss to Midtown

THE TOWER

Peachtree Cor

B

A: Sounds good! We might also be able to make Retial Media Center it to the new show happening in the community Underground Parking Residential center in the evening.

n Space

ased land value

Existing Bike Lane

Centennial Olympic Park

The Olympic Tower provides panoramic view to the downtown and adjacent park. It is a landmark and tourism attraction hotspot.

Bus Route

Proposed Bike Lane

phasing 2:

SECTION A

B

opportunities TOD

LANDING

Create Open Space to fill the gap

SECTION B

able streets

e recreation facilities

n Space

G

ased ridership

tree Corridor, Stadium

NG

PONCE DE LEON AVE NW

Business Incubator

Development Total Buildout (sf) 52,203 Footprint PHASE II VIEW FROM TECH SQUARE Share Retail Work-live Spaces total Unites Parking total Spaces Jobs Created Parking

41% 57,401 596,438 268 65,422 218 1770 Retail

2025 2026 2027

100% 100% 100%

Media Center

The Olympic Tower

Landing

Dormitory

Business Incubator

Retail

Street

WEST PEACHTREE Dormitory ST NW

Landing

PHASING III-ANCHORING PHAS ST AD VIEW IU M

Work and Live Typical Loft Unit

Total Asset Value 2025 2026 2027

Plaza

Work

$1,072,788,695 $632,553,575 $653,988,143 LIVE/WORK

Live/work district provides vibrant neighborhood for young people who live and work here adjacnet to Tech-town

WeWork Space Typical Unit

Work-live Spaces

2 3

4

mont Park nical Garden

fill the gap

ON B

WEWORK

1

1

WEWORK provides a place for co-working and knowledge sharing space for different background people.

4

A: Do you wan to run across the park instead of the 5th Street?

1 Entrance/Reception 2 Shared Coworking Space

3

3 CAFE Space 4 Meeting Room

1950s Highway

5

Midtown 8

Retail commercial provide convenient and comfortable shopping and dining experience for local RETAIL residence and workers in this area.

B: Sure! We can also climb up to the Olympic Tower.

A: I know there are a lot of parks built over the Existing Bike Lane Bus Route highway but this one is very unique, almost like Proposed Bike Lane an amphitheater when you stand in the highest point of it.

Retial

lofts

Work&live

Underground Parking

Team 160125

ory

ING PHASE III VIEW FROM TECH SQUARE

A: Are you Georgia Leia Yu_ Work Tech graduate too?

Sample

69

Middle area of 1880s 2 Geogia Tech Techwood Homes 1930s 4 Historic District 1990s 6 Centennial Olympic Park

B: The view is spectacular, isn’t it? It would be so nice to live here! phasing 3:

1900s Ansley Park Neighborhood

Site 7

1840s Downtown

2007 Peachtree Commercial Corridor

1981 MARTA Subway

1

ANCHORING

the history of urban development

Team


htree Corridor, Stadium

eased land value

opportunities

NG

kable streets

e recreation facilities

n Space

eased ridership

Create Open Space to fill the gap

PONCE B DE LEON AVE NW

SECTION A

PHASE II VIEW FROM TECH SQUARE

Phase 3 Business Incubator

Total Buildout (sf)

52,203

Share Retail Work-live Spaces total Unites Parking total Spaces Jobs Created

41% 57,401 596,438 268 65,422 218 1770

Parking

Development Footprint 2025 2026 2027

100% 100% 100%

Retail

Plaza

Media Center

The Olympic Tower

Landing

Dormitory

Business Incubator

Retail

Street

Landing

Dormitory

PHASING III-ANCHORING PHAS ST AD VIEW IU M

Work and Live Typical Loft Unit

Totel Asset Value 2025 2026 2027

WEST PEACHTREE ST NW B SECTION

Work

$1,072,788,695 $632,553,575 $653,988,143 LIVE/WORK

Live/work district provides vibrant neighborhood for young people who live and work here adjacnet to Tech-town

mont Park anical Garden

P1

WeWork Space Typical Unit

A: Do you wan to run across the park instead of the 5th Street?

Work-live Spaces

2

3

E

4

WEWORK

1

WEWORK provides a place for co-working and knowledge sharing space for different background people.

4

B: Sure! We can also climb up to the Olympic Tower.

1 Entrance/Reception 2 Shared Coworking Space

3 3 CAFE Space 4 Meeting Room

A: I know there are a lot of parks built over the Retail commercial provide convenient and comforthighway thisandone is experience very unique, able but shopping dining for local almost like residence and workers in this area. RETAIL an amphitheater when you stand in the highest point of it.

fill the gap

B: The view is spectacular, isn’t it? It would be so nice to live here!

1840s 1 Downtown

ON B Retial

lofts

Existing Bike Lane

Work&live

Underground Parking

Proposed Bike Lane

Bus Route

phasing 3:

Team 160125

RING PHASE III VIEW FROM TECH SQUARE

A: Are you a Georgia Tech graduate too?

B: Not really. But I heard a lot about how this place is good for start-ups and young people so I moved here.

A: Live-Work lofts significantly cut my living expenses.

900s nsley Park eighborhood

B: Same for me. But I value the synergy of this lifestyle more. I meet new people and have new ideas everyday!

7 chtree mercial Corridor

Subway

development

ANCHORING

the history of urban development

Spring

Team

itory

G

1900s Ansley Park Neighborhood

1950s 5 Midtown Highway 8 2007 Peachtree Commercial Corridor Site Middle area of 1880s 2 Geogia Tech 7 1981 Techwood Homes 1930s 4 MARTA Subway Historic District 1990s 6 Centennial Olympic Park

3rd St NW Tech Square Entrance

Spring St NW

Team 160125

Lei Yu_ Work Sample

70


Body Sensor/ Wearable Fabric Marrige of Bio-Tech, Archietcure and Fashion Wharton Fashion Show 2016 Solo Work 2016 Spring PennDesign

PROFESSIONAL WORKS UNStudio, Buro Ole Scheeren, HASSELL

Other Works SELECTED WORKS

URBAN HOUSING/ CULTURE/ EDUCATION/URBANISM

ARCHITECTURE DESIGN SELECTED WORKS

stair

Lei Yu_ Work Sample

insllation in museum

71


UNStudio, Buro Ole Scheeren, HASSELL

Qatar Intergrated Railway Project Doha, Qatar 2012- 2019 Architect: UNStudio

Reponsibility: Intergrated furniture design, Interior panelization development & Physical Development, Landscape Cannopy Design with outdoor furniture and products

2009- 2013

PRODUCT DESIGN

East Side Mall/ Friedrichshain

SELECTED WORKS

Berlin Architect: UNStudio

PROJECT FACT Address: Warschauer Street Commencement: mid-2015 Rental space: approximately 39,500 m2 Completion: 2017

URBAN HOUSING/ CULTURE/ EDUCATIO

ARCHITECTURE DESIGN

Reponsibility: Physical Scale Development

SELECTED WORKS

figure B - 11

Generic Elevated Station - Concourse Level - Coastal Theme Atmosphere

QATAR RAILWAYS

VOL 6 – SECT 12 | ARCHITECTURAL BRANDING MANUAL – PART 2

24 AUGUST 2014

Due to confidential reason, only part of UNStudio projetcs are showed.

Lei Yu_ Work Sample

72


Curtain Wall Option 2

D ng Ka

Elevation

KEPPEL LAND_ JINGAN PAC Project

Glass Wall Ratio 4:6

a Ro

定 d康

e gD an Ch

Shanghai, China April- June 2015 Architect: HASSELL

ing

a Ro d 德 常

Reponsibility: Facade Development, Floor Plan Layout and GFR Calculation

8000

Din Wu

盖顶露台

4.5m (3m Clear )

L42 L41 L40 L39 L38 L37 L36 L35 L34

47000

Deployable Structure 净高

6500

避难层/泳池 Transform from L33 one objet to an other

49500

4500

200000

49500

L32 Instructor: Mohamad Al Khayer L31 Team: David Feng, Lei Yu, Yu Gan L30 2017 Spring L29 L28 4.5m (3m Clear ) L27 净高 L26 L25 L24 L23 避难层/会议 L22 L21 L20 L19 L18 4.5m (3m Clear ) L17 L16 净高 L15 L14 L13 L12 避难层/会议 L11 L10 Instructor: Katrin Mueller-Russo L9 L8 Solo Work L7 2017 Spring 4.5m (3m Clear ) L6 净高 L5 L4 L3 L2 大堂 L1

Self-Supported Pavilion

4500

Contemporary Furniture

From full to vacant

From rotatable to stable

10000

46000

Instructor: Simon Kim Team: Angela Huang, Lei Yu, Katie Ann McBride, Joey JH P 2017 Spring

Curtain Wall Option 2 Park Avenue Central Keppel Land China

South

West Changde Rd

East Wuding Rd

Changde Rd

North Kangding Rd

吉宝置业上海静安中央商务区综合项目

Curtain Wall

Curtain Wall

Curtain Wall

D

C

C

Glass ratio

Glass ratio

Widow Wall

B

Widow Wall

A

Glass ratio

Glass ratio

Glass ratio 40%

+ 40%

40%

40%

40%

window heigth

window heigth

window heigth

window heigth

window heigth

2900 mm

2600 mm

2100 mm

2900 mm

2400 mm

Optimized Light Conddition

Goverment Approval A > B > C > D ( Easy to Difficult)

Lei Yu_ Work Sample

73

oa gR

定 d武


Curtain Wall Option 2 Interior

Curtain Wall Option 2 Dimension

吉宝置业上海静安中央商务区综合项目

Park Avenue Central Keppel Land China

Curtain Wall Option 2 Dimension

Curtain Wall Option 2 Material and Reference

panel width

spandrel height 0.65 0.45 0.3

Park Avenue Central Keppel Land China

glass height 1.40 2.14 2.40

glass width 3.10 2.55 2.10

1

1.Light Aluminium panel 浅色铝金属面板 glass sqm percent glass

0.90 1.10 1.25

2.79 2.79 2.79

40% 40% 40%

吉宝置业上海静安中央商务区综合项目

2.Dark Aluminium panel 深色铝金属面板

2

3.IGU insulated glass 中空玻璃单元

panel width

spandrel height 0.65 0.45 0.3

glass height 1.40 2.14 2.40

glass width 3.10 2.55 2.10

glass sqm

0.90 1.10 1.25

2.79 2.79 2.79

percent glass

3

40% 40% 40%

panel width

Lei Yu_ Work Sample Park Avenue Central Keppel Land China

吉宝置业上海静安中央商务区综合项目

74

spandrel height 0.65 0.45 0.3

glass height 1.40 2.14 2.40

glass width 3.10 2.55 2.10

0.90 1.10 1.25

glass sqm 2.79 2.79 2.79

percent glass

40% 40% 40%


Guardian Art Center

13

Auction House Headquarters and Cultural Complex Architect: Buro ole Scheeren

Body Sensor/ Wearable F

Location: No.1 Wangfujng Street, Beijing, China Site Area: approx. 6,320 m2 Program: Exhibition/Auction 7,580m2, Offices 3400m2, Restaurants 2050m2, Café/Bookstore 150m2, Hotel (120 Rooms) 12,680m2, Club Tower 2,000m2, Art Storage and Restoration Spaces 2,700m2, Parking 6,750m2 Commission: January 2011 roomConstruction number F119 F117 Start: 2013 Anticipated Completion: 2016

Marrige of Bio-Tech, Archietcure and Fashion

F1 EXHIBITION LOBBY / F1 展厅大堂

Wharton Fashion Show 2016 Solo Work 2016 Spring PennDesign

Reponsibility: Interior design with construction drawing, rendering, diagram development, choose and contact supplier for all related material, diary for all related meeting

13

F2 EXHIBITION / ) ኋ঻

GUARDIAN FIRE LIFT ిᗭ⎾䱨ụ

Bamboo Grove in City EXHIBITION HALL ኋ঻

TOILETS ড⭕䰪

Shower Head

Prize of Excellence, Gold-Tick Award Innovation Industrial Design Competition 2012 Instructor: Weibin Duan China Academy of Art Solo Work

PROFESSIONAL WORKS

MEETING ROOM Ր䇤ᇚ OFFICE LIFTS ࣔ‫⭫ޢ‬ụ

UNStudio, Buro Ole Scheeren, HASSELL

AUCTION LIFT ᤃঌ঻⭫ụ

Qatar Intergrated Railway Project Doha, Qatar 2012- 2019 Architect: UNStudio

Reponsibility: Intergrated furniture design, Interior panelization development & Physical Development, Landscape Cannopy Design with outdoor furniture and products

2009- 2013

PRODUCT DESIGN

East Side Mall/ Friedrichshain

SELECTED WORKS

Berlin Architect: UNStudio

PROJECT FACT Address: Warschauer Street Commencement: mid-2015 Rental space: approximately 39,500 m2 Completion: 2017

URBAN HOUSING/ CULTURE/ EDUCATIO

ARCHITECTURE DESIGN

F1 M CAFÉ BOOKSTORE / F1 M 书吧 Reponsibility: Physical Scale Development room number FM110

SELECTED WORKS

Lei Yu_ Work Sample

75


DUO

East Side Mall/ Friedrichshain

Mixed-use High-rise Development Architect: Buro ole Scheeren

E

Berlin Architect: UNStudio

Location: Singapore Site Area: 26,700m2 Program: Premium Offices, Luxury Hotel, Residences and Signature Retail Commission: March 2011 Construction Start: 2013 Completion: 2017

PROJECT FACT Address: Warschauer Street Commencement: mid-2015 Rental space: approximately 39,500 m2 Completion: 2017 Reponsibility: Physical Scale Development

Reponsibility: Facade development, including 3D-modeling facade for mock-up; Develop exterior cannopy and related Interior & exterior construction drawing; diagram development, rendering, dairy for meeting

BUS STOP CANOPY - SKYLIGHTS AND FACADE INTERFACE DETAIL

RTS STRUCTURES - NEW PROPOSAL - SCALE OF FACADES

RTS / MEP STRUCTURES FACADE

BUS STOP CANOPY - SKYLIGHTS AND FACADE INTERFACE DETAIL

SCALE FACTOR 44% OF RESIDENTIAL FACADE

VIEW BELOW CANOPY WITH SKYLIGHTS RESIDENIAL FACADE

BUS STOP CANOPY - SKYLIGHTS AND FACADE INTERFACE DETAIL

LONG ELEVATION

FACADE INTERFACE DETAIL HEXAGON FACADE

SOR - SINGAPORE OPHIR-ROCHOR

VERTICAL FIN FACADE

SOR - SINGAPORE OPHIR-ROCHOR

VIEW BELOW CANOPY WITH SKYLIGHTS

VIEW BELOW CANOPY WITH SKYLIGHTS

LONG ELEVATION

LONG ELEVATION

FACADE INTERFACE DETAIL

FACADE INTERFACE DETAIL SOR - SINGAPORE OPHIR-ROCHOR

SOR - SINGAPORE OPHIR-ROCHOR

Lei Yu_ Work Sample

76


TCNJ Traver Wolfe Hall Renovation Residential Education and Housing Kimmel Bogrette Architecture + Site Team: Jim Bogrette, Michael Pentz, Lei Yu Dec 2017- April 2018

Gloria Dei Communities: Warrington Senior Healthcare Center

Kimmel Bogrette Architecture + Site Team: Jonathan S. Trump, Corey Dockman, Lei Yu Oct 2017- April 2018

Lei Yu_ Work Sample

77


Lei Yu_ Work Sample

78


Lei Yu_ Work Sample

79


Lei Yu_ Work Sample

80


Lei Yu_ Work Sample

81


8'-8" TYP.

Gloria Dei Communities: Warrington A1 A

B1

E1

E3

E2

C1

E4

E5

E6

C1

E1

E3

E2

E3

E1

Senior Healthcare Center

Kimmel Bogrette Architecture + Site Team: Jonathan S. Trump, Corey Dockman, Lei Yu Oct 2017- April 2018 2 A3.1 M

L.8

L

K

J

i.6

i

14

H

9

W S

G

3

E

C

S

A

L

F.8

12

T

E

E

:

1

2 A3.4

11

/

8

F.2

10

L

E

"

V

=

1

A

'

-

T

0

I

F

8

O

N

"

E

14

D

3

EQ.

M

C.4

8

2

EQ.

3

EQ. EQ.

EQ.

B

6

9

4

A.4

14

TYP.

2

A.1

6

A

3

5

2

EQ.

EQ.

24'-8 1/2"

EQ.

C

14

C1

E3

E1

1

1 B25

#3

P

23

L

A

N

K

E

Y

29

2 A7.5

E

S 1 111

112

38'-0"

1 C A5.3

12'-8"

6.5

UNDERCOUNTER ICE MACHINE 7

8

MEDICAL STORAGE WC103

A36

38'-0"

TRASH CONTAINER AS PER CIVIL E5 11

11

ELEC. CLOSET

12

A36

WC108c

14

15'-5" 5'-1"

13

13

14

B06

6'-3"

12'-6"

12'-11 3/4"

MOP SINK AS PER PLUMBING DWGS

X Ax.x

C1

SOILED LINEN TOILET AS PER PLUMBING DWGS 6'-3"

1 B08

WEST M.C. LOUNGE WC108a

21

15

RECESSED HEATING PANEL AS PER MECHANICAL DWGS

16

16

5'-1"

15

UNIT MECHANICAL EQUIPMENT AS E1 PER MECHANICAL DWGS TYPE A

38'-0"

1 B05

TRASH

UNIT TYPE C

GENERAL STORAGE

B01

B04

21

5'-8"

X

W121

2 A7.2

UP

J

K

W123

26'-0"

W123 (228 SF)

5'-8"

25

L.8

2 ST-2

M

26

WEST STAIR ST-2

2 A7.1

26

7'-4 1/2"

C.9

D

1 A2.1

B S

A C

A

S L

E

E :

M 1

/

8

E

N

"

=

T 1

P '

-

0

L

A

N

T

"

R

U

E

2'-0"

N

O

P R O J E C TA

A.1

A

A.1

20'-0"

R

T

3'-4"

102

E102

FAMILY LOUNGE

A 1 C A5.2

1 102

4.2

15'-4"

3 A5.3

(237 SF)

A44 E104

A36

6.5

A44

E106

B

W110

JAN. CLOS. EC105

E108

EC105

1 WC110e

1

1

EC108c

EC108d

EAST GARDEN LOBBY

EAST M.C. RECREATION

EC108b

EC108

E113

COFFEE STATION, REFER TO INFORMATION

E113

E4

(252 SF)

1

WC110

BATHING SUITE A36 WC110 W116

E117

1

EC111c

1

STORAGE EC110c

E1

UNIT TYPE E

EC110e

EC110d 1 EC111d

EC111d

EC111b

E118

1 EC111

(227 SF)

STORAGE EC111

UNIT TYPE F

(227 SF)

EAST M.C. SOUTH CORRIDOR EC112

A44

W104

W120 E1

E1 3 ST-3 UNIT TYPE G E122

EAST STAIR ST-3

2 A7.2

D

UP

24 2'-0"

2'-0" 27'-0"

16'-3 1/2"

85'-4" NOTE: SEE CIVIL DWGS FOR COMPLETE PATIO INFO.

22

DN

(282 SF)

24 25

T Y

(228 SF)

E122

22

(228 SF)

W122

W A L L

E123

A44

E3

UNIT TYPE F

A44

UNIT TYPE F

A44

E120

(228 SF)

E3

W118

D

E3

E121

E1

E120

W120

UNIT TYPE E

A36 E121

(227 SF)

UNIT TYPE G

SKYLIGHT AS PER DETAILS

E1

(240 SF)

E119

CLOSET

CLOSET

A36

MEDICAL EXAM TABLE SUP REFER TO MEP FOR ADDITI

E119 A36

19

1 EC111b

E118

TELEVISION SUPPLIED BY O ELECTRICAL DWGS.

17

EC110c

EC110d

BATH

MECHANICAL EQUIPMENT

UNIT TYPE C

1 1 EC110e

LAV.

16

EC111c

EC110b

1 EC110

E2

CLOSET

SHOWER SHOWER EC110a

A36 E116

21

A44

SOILED LINEN TOILET AS P

RECESSED HEATING PANEL

E117 (252 SF)

1

EC111a

BATHING SUITE EC110

E116 (240 SF)

E3

UNIT TYPE B

A36

E114

19

W116

MOP SINK AS PER PLUMBIN

1 A3.4

(245 SF)

E115

A36

(252 SF) EC111a

UNIT TYPE E

W118

FLOOR DRAIN AS PER PLUM E3

E115

A36

THERAPY EC109

CLOSET

(240 SF)

A36

WC111d

ADA COMPLIANT DRINKIN DWGS

PLUMBING FIXTURE AS PER

E114

18

1

CLOSET 1

C1

UNIT TYPE A 1 EC109

E112

UNIT TYPE B E2

UNIT TYPE C

WC111

4" PERFORATED PVC FOUN

RETAINING WALL AS PER C

STEEL COLUMN AS PER STR

EAST M.C. LOUNGE EC108a

A36

UNIT TYPE C

E2

TRASH CONTAINER AS PER

KITCHEN EQUIPMENT AS P

16

(252 SF)

CLOSET SHELVING & HANG

9

UNIT TYPE B

A44

1 A4.1

17

UNIT TYPE B

W114

20'-0"

7'-4 1/2"

74'-8"

i

i.1

J

K

L.8

M

26

A2.1 16'-3 1/2"

27'-0"

74'-8"

A.4

(245 SF)

ADA COMPLIANT BENCH

EC108d

20

W122

1 ST-2

UNDERCOUNTER BIOHAZ

E5

E111

E111

STORAGE

14

EAST GARDEN

(245 SF)

A36

W114

(282 SF)

H

UNIT TYPE A A36

1

UNIT TYPE A

WC111d

FFE: 320.5' UP

N O R T H

EC106

EC107

EC108c

W112

W112

LAV.

C4

E112

WEST GARDEN

UNDERCOUNTER DISHWA

12

1 EC108b

(245 SF)

15

1

WC110e

UNDERCOUNTER ICE MAC 7

14

E3

UNIT TYPE A

COMMERCIAL IRON AS PER ADDITIONAL INFORMATIO LOCKERS AS PER DETAILS

1

STORAGE

E110

1 A3.4

WC110a

1

COMMERCIAL WASHER AS ADDITIONAL INFORMATIO

E6

E109 (240 SF)

(252 SF)

E1 1 WC108b

FFE: 320.5'

4 A4.1

CLOSET

STORAGE WC111

E109

1

FFE: 320.5'

SHOWER

WC110d

EC104a

E108

A44

E110

E3

11

13

WEST GARDEN LOBBY WC108b C4

5 A5.3

WC111c

BATH

COMMERCIAL DRYER AS PE ADDITIONAL INFORMATIO

EC100b

LAV.

1

SOILED UTIL. EC106

1

A36

(245 SF)

UNIT TYPE B*

E1

(252 SF)

D

WC110d

ELEC. CLOSET

EC104

STAFF ROOM EC104

UNIT TYPE A*

E2

NORTH GARDEN

UNIT TYPE B*

W110

WC111c

WC110b

(237 SF)

UNIT TYPE C

EC100b

G

B

D

E107

A36

12

WC108d

TIMECLOCK, SUPPLIED BY O ELECTRICAL DWGS FOR AD

6

1

E106

STORAGE

A36

A

C1

E107

A44

EC103

UNIT TYPE C (240 SF)

D

B

THERAPY WC109

1

(245 SF)

W108

BARBER EQUIPMENT AS PER

UNIT TYPE D

MEDICAL RECORDS MEDICAL EC102 STORAGE EC103

E104

C1

12'-0"

E1

2 A3.4

K

WATER FEATURE AS PER D

E1

1

F

N

LINEN CHUTE AS PER DETA INFORMATION

E105

4

13'-4"

6.5

A

CASEWORK AS PER DETAIL

UNIT TYPE B (252 SF)

UNIT TYPE D

4.2 27'-4"

L

ELEVATOR AS PER DETAILS

(245 SF)

E105

CLEAN UTIL. EC107

E2

E3

E103

E103

A36

C2 C1

9

W108

UNIT TYPE A

A36

NURSE'S STATION EC101

103

D

G

1 A2.2

2'-0"

B

C

B

C

C.9

C.4

D

F I R S T S

C

A

L

E

:

E

D

F L O O R 1

/

F

8

"

F.2

=

1

'

-

P L A N 0

F.8

X Ax.x

T

"

R

U

E

P R O J E C T

G

H

0

i

i.1

i.6

J

K

L

L.8

2ND FLOOR KEY P

M

0

FLO 3

0.7

0.7 M

C1

1

E3

E1

E2

E3

E1 C1

C1

A1

E2

C1

1 212 3'-9"

1 209 2.1 COMMUNITY ROOM

E1

1 210

210

3

1 209 STORAGE 209

12'-10"

STORAGE

2,500lb ELEV.

#2

D

4 C A5.5

DINING ROOM

OFFICE

OFFICE

226

225

224

1 226

2 A7.4

2 203

MEDICATION STORAGE

NURSE'S STATION

D

1.1

OFFICE 1 224

223

GROSS BUILDING SIZE - 80,680 SF

B2

1 223

1 218

A

A

FAMILY DINING

5 C A5.5

203

C2

C1

1 215

D

6 C A5.5

P OFFICE

218

222

3 C A5.5

219

W202

UNIT TYPE A

A

i

4.2

W202 (339 SF)

2 C A5.5

E1

i

217

WATER FEATURE AS PER D

221

E1

BARBER EQUIPMENT AS PER

4.2

C1

D

UNIT TYPE E EAST CORRIDOR

E201

COMMERCIAL DRYER AS PE ADDITIONAL INFORMATIO

C1

(380 SF)

E200

A44

COMMERCIAL WASHER AS ADDITIONAL INFORMATIO

A44

E202

i

W203 (380 SF)

UNIT TYPE E

A 4 C A5.4

D

E201

W200

W203

i i

H

W204

7

UNIT TYPE A

E4

A36

A36

W205

W206

A36

W208

UNIT TYPE C

E5 11

A36

E204

E203

A36

X Ax.x

X Ax.x

UNIT TYPE C

E206

UNDERCOUNTER BIOHAZA

E5

E205

(345 SF)

CLOSET SHELVING & HANG

9

(345 SF)

W206

ADA COMPLIANT BENCH

(339 SF)

UNIT TYPE C E2

W208

A36

A36

E208

E207

11

E3

COFFEE STATION, REFER TO INFORMATION

UNIT TYPE B

UNIT TYPE B

(345 SF)

W207

UNDERCOUNTER DISHWA

7

A36

UNIT TYPE C

E2 9

UNDERCOUNTER ICE MAC

E205

10 A36

W207

LOCKERS AS PER DETAILS

(339 SF)

A36

E206

E3

UNIT TYPE A

W205 (339 SF)

COMMERCIAL IRON AS PER ADDITIONAL INFORMATIO

E6

E203

(339 SF)

6.5

8

UNIT TYPE A

E204

i

6.5

(380 SF)

A44

8

10

6 UNIT TYPE A

E1 C1

W204

CORRIDOR

A44

B

TIMECLOCK, SUPPLIED BY O ELECTRICAL DWGS FOR AD

220

E202 (380 SF)

6

UNIT TYPE E

E207

E208

TRASH CONTAINER AS PER

E4

(382 SF)

(382 SF)

4" PERFORATED PVC FOUN

(345 SF)

12

A36

A36

W209

W210

12

UNIT TYPE B W210

UNIT TYPE B

E6

UNIT TYPE D

SLOPE

(382 SF)

C4

E210 (337 SF)

E1

W209 (382 SF)

13

13

C1

UNIT TYPE D W211 (337 SF)

UNIT TYPE D W212

A36

A36

W211

W212

W213

16 E2

W214 A36

A36

W213

W214

W216

(345 SF)

20

A36

A36

W215

W216

A36

UNIT TYPE A W218

(339 SF)

A36

MEDICAL EXAM TABLE SUP REFER TO MEP FOR ADDITI

UNIT TYPE A E215

SKYLIGHT AS PER DETAILS

E1

19 A36

A36

E218

E217

UNIT TYPE F

E218 (636 SF)

E217

E3

(636 SF)

21 UNIT TYPE F E1

A36

A36

W219

W220

W220 (636 SF)

E219

E3

E3

E219 (331 SF)

E1

A.1

D

24

22 EAST STAIR ST-3

2 A7.2

24

25

W221 (331 SF)

2 A7.1

A

DN

UNIT TYPE G

DN

ST-2

26

4 ST-3

UNIT TYPE G

W221

3 ST-2

T Y

E1

22

A36

E3

WEST STAIR

W A L L

A36

UNIT TYPE F

W219 (636 SF)

25

82

TELEVISION SUPPLIED BY O ELECTRICAL DWGS.

17

E215

(339 SF)

UNIT TYPE F E1

21

Lei Yu_ Work Sample

E213

E1

(339 SF)

MECHANICAL EQUIPMENT

A36

E216

19

W218

W217

RECESSED HEATING PANEL 16 E2

A36

E214

20

UNIT TYPE A

SOILED LINEN TOILET AS P

KITCHEN EQUIPMENT AS P

E213 (345 SF)

E216

(345 SF)

MOP SINK AS PER PLUMBIN

X Ax.x

UNIT TYPE C

(339 SF)

E3

A36

W217

E3

E211

A36

18 E2

FLOOR DRAIN AS PER PLUM E3

E211 A36

E212

E214

17

UNIT TYPE C

W215

ADA COMPLIANT DRINKIN DWGS

(382 SF)

A36

(345 SF)

(382 SF)

UNIT TYPE C

STEEL COLUMN AS PER STR

UNIT TYPE B

E212 (382 SF)

UNIT TYPE A

E2

RETAINING WALL AS PER C

C1

PLUMBING FIXTURE AS PER

UNIT TYPE C

E3

UNIT TYPE B

(382 SF)

18

E209

UNIT TYPE B

15 UNIT TYPE B

E209 (337 SF)

A36

E210

14

E1 SLOPE

C4

UNIT TYPE D

A36 14

(337 SF)

15

E1

K

LINEN CHUTE AS PER DETA INFORMATION

CONFERENCE ROOM 2 218

1 220

1 E200

4

B

5

C1

N

ELEVATOR AS PER DETAILS

1 221

1 219

UTILITIES D

B

UNIT TYPE E

SLOPE

A36

A

CASEWORK AS PER DETAIL

1 222

W.C.

1 217

E3

W.C.

2 213

L

AUTOMATIC SLIDING DOO

ADMIN RECEPTION

LAUNDRY

A D

B

B

1 216

W201

E3

1 225

227

216

215

214

B

202

1 204

A2 OFFICE

SUPPORT

2

A

1

204 C2

228

2 201

A C A5.5 2 A7.5 WARMING B KITCHEN

#3 E3

1 228 STOR.

229

DN

1 203

208

1 229 SERVER

2 A7.3

201

W.C.

UNIT TYPE A

E1

D

3,500lb ELEV.

3 ST-1

UPPER LOBBY

1 201

1 207

W201 (339 SF)

A36

3,500lb ELEV.

ST-1

1 205

X

X

1 208

LOBBY STAIR

OPEN TO BELOW

D

B

#1

1 213a E2

4.1

6 C A5.4

205

212

5'-2 1/4"

X

X

JAN CLOS.

1 213

213

A

REHAB

211

D

B

E3

E1

OFFICE 230

ACTIVITIES ROOM

5 A5.4

A 3 C A5.4

B1

1

C1 E3

1.1

26'-0"

C

LOUNGE

10 UNIT TYPE A*

1 A4.1

M.C. LIVING ROOM

D

104

E3

UNIT TYPE C

A36

SKYLIGHT ABOVE

B

P 2

EAST M.C. NORTH CORRIDOR EC100

W106

A

SHOWER

GROSS BUILDING SIZE - 80,680 SF

B2

1

(240 SF)

WEST M.C. SOUTH CORRIDOR WC112

A44

E3

24

10'-1 1/2"

i.1

UNIT TYPE F

ST-3

1 ST-3

NOTE: SEE CIVIL DWGS FOR COMPLETE PATIO INFO.

i

EAST STAIR

14'-8"

2 ST-3

B03 18

24 25

A.1

WC111b

22 MAINTENANCE OFFICE

A

1 WC111b

CLOSET

E1

22

W106

1

7 C A5.3

WC110c

A36

C1

A36

JAN. CLOS. WC105

1 WC105

W119

W121 (227 SF)

1.1

E101 EC100a

EC104a

A36

(240 SF)

UNIT T Y P ETYPE E G E N D EL

W A L L

1 B03

1 B01

W119

E3 5'-1"

RECEIVING 24

20

26

1

WC110c

1 B04

21

25

WC111a

STORAGE

20

2 B02

1 B02

CLOSET

WC111a

B02

21

W117

(252 SF)

Sheet Name: BASEMENT PLAN

20

A36

W117

E2

12'-5"

20

UNIT TYPE B

18 PER DETAILS SKYLIGHT AS 19

C1

E1

M.C. DINING ROOM STORAGE

D

(237 SF)

STAFF ROOM WC104

6 C A5.3

MEDICAL EXAM TABLE SUPPLIED BY OWNER, INSTALLED BY GC. REFER TO MEP FOR ADDITIONAL INFO.

19

2 B01

B05

1

B

2 101B

B

CHAPEL

#3

W104

W104

WC108d

WC109

W115 TELEVISION SUPPLIED BY OWNER, (245 INSTALLED BY G.C. REFER W115 TO SF) ELECTRICAL DWGS.

17 29 SPRINKLER ROOM

19

A44

1

15'-5"

17

18

2 A7.5

#3

8

1

1

A36

18

2 C A5.2

2,500lb ELEV.

WARMING KITCHEN

ELEV.

UNIT TYPE D

WEST M.C. RECREATION WC108

KITCHEN EQUIPMENT AS PER KITCHEN SUPPLIER SPECS & DWGS

2'-0"

10'-8" 6'-8"

A2

1 103

B

MEDICAL RECORDS WC102

CLEAN UTIL. WC107

6'-8"

D FOOD PREP

1 C A5.4

2 A7.4

7

WC108c

FLOOR DRAIN AS PER PLUMBING DWGS

1 B06

E3

E1

E101b

#2

A

D

B

1 W102B

W102A

D

1

4 A5.3

1'-0 1/2"

AUTOMATIC SLIDING DOO

2 A7.3

101B

C2

WC104

1

A44

W113

(252 SF)

PLUMBING FIXTURE AS PER PLUMBING DWGS

1ST FLOOR KEY P

M 2'-0"

UP

LOBBY CORRIDOR

C3

SOILED 5 UTIL. A5.2 WC106

WC107

STORAGE

STEEL COLUMN AS PER STRUCTURAL DWGS W113 UNIT AS PER PLUMBING ADA COMPLIANT DRINKING FOUNTAIN TYPE B DWGS E6

HK STORAGE

13'-4" 4'-8"

D

B

3,500lb ELEV.

WC104a

1

RETAINING WALL AS PER CIVIL DWGS 196'-7 1/2"

12

1

E2 A 2 C A5.4

#1

1

WC104a

WC106

W111

E101b

3,500lb ELEV.

C3

LAV.

WC100a

1 WC100a

UNIT DWGS TYPE A

4" PERFORATED PVC FOUNDATION DRAIN AS PER CIVIL W111 DWGS (245 SF)

19

FOOD PREP

A 4 C A5.2

B

W109

W109

COFFEE STATION, REFER TO MEP FOR ADDITIONAL 10 INFORMATION

B08

19'-8" 9'-0"

6'-0"

E101a

3 A4.1

WC103

2 C A5.3

(240 SF)

12'-5"

UNFINISHED SPACE

2 B08

9'-8" 4'-10" 4'-10"

5'-8"

6

A

ADA COMPLIANT BENCH 1 B07

B07

E3 WARMING KITCHEN

ST-1

D

B

1 104

21'-4"

W107

UNIT E4 CLOSET SHELVING & HANGING ROD AS PER DETAILS TYPE C

9

MEDICAL STORAGE

3 C A5.2

W102

UNDERCOUNTER BIOHAZARD REFRIGERATOR 9

10 UNEXCAVATED

00

NURSE'S STATION WC101

UNDERCOUNTER DISHWASHER

7

G

5'-1"

F

10'-0"

A

C1

W102B

A44

C1

6'-4"

6.5

W

W107 (237 SF)

L.8 10'-8"

EC100a

15'-5" 6'-4"

LOCKERS AS PER DETAILS

B25

10'-0"

A 1 C A5.1

D

B

1 101B

101C

W105

TYPE D

5'-8"

LOBBY C1 STAIR

12

101

A

CORRIDOR

A36

UNIT TYPE B

5

COMMERCIAL IRON AS PER SPECS, REFER TO MEP FOR ADDITIONAL INFORMATION UNIT

LOBBY

101A 6 C A5.2

1 101A

M.C. DINING ROOM

COMMERCIAL WASHER AS PERE3SPECS, REFER TO MEP FOR W105 ADDITIONAL INFORMATION (252 SF)

31'-4" 6'-8"

DN

1 113

113

WEST M.C. NORTH CORRIDOR WC100

W103

C1 RECEPT

105

1 105 1 106

L 16'-4"

0.7

110 LAV.

W101a

STOR.

A36

D

13'-4" 6'-8"

1 101

E1 CONFERENCE ROOM

106

W101a

A

(245 SF)

COMMERCIAL DRYER AS PER SPECS, REFER TO MEP FOR ADDITIONAL INFORMATION

6 RECEIVING CORRIDOR

8

1

W103

E2

B TIMECLOCK, SUPPLIED BY OWNER, INSTALLED BY G.C. REFER TO 4.1DWGS FOR ADDITIONAL INFORMATION ELECTRICAL

3 B08

4.2

19

15

1 112

E2

EXEC. DIRECTOR

1 107

107

OFFICE SUITE CORRIDOR

RECORDS

BARBER EQUIPMENT AS PER DETAILS 4

6

13

111

M.C. LIVING ROOM

UNITTO MEP FOR ADDITIONAL LINEN CHUTE AS PER DETAILS, REFER TYPE A INFORMATION

B09 1 B09

27

X Ax.x

11

T

E1

WATER FEATURE AS PER DETAILS KITCHEN STORAGE

2 B10

D

B

4.2

5

10

O

W101

CASEWORK AS PER DETAILS

B23

B12

A 1 C A5.6

B10

REFER TO KITCHEN SUPPLIER DRAWINGS FOR EQUIPMENT LAYOUT

E3 C1 DoN OFFICE

108

LAV.

3

1 B12

27

KITCHEN

3

DISH ROOM

E1

ACTIVITIES OFFICE

110a

ELEVATOR AS PER DETAILS

4.1

8

N

2.1 SLIDING DOORS AS PER DETAILS AUTOMATIC

1 B23 SHOWER

16

B24

OFFICE

1 B10

B11

1 B24

CHANGING ROOM

1 B19

COPY/ STORAGE 1 109

1

2,500lb ELEV. 24

21

2 1 B18

109

B1

K 14'-7"

J

FFE: 320.5'

0.7

1 108

GROSS BUILDING SIZE - 80,680 SF

J 11'-9"

FLO

100

L

6'-8"

12'-6"

B19

2 B18

3 22

1 B22 B22

i.6 17'-3"

26'-0"

3

B26

3 B10

3

FINANCE

W.C.

6'-8"

i 12'-0"

10'-1 1/2"

1 ST-1

LOWER LOBBY

B21

5'-6"

12'-8"

UP

2 A7.3

W.C.

12'-10"

12'-8"

1 B17

1 B21

B20 4 A5.6

13'-4"

12'-10"

H 15'-5"

0

K

38'-0"

B17

1 B13

1 B14

E3

1.1 A1

LOCKER ROOM

BREAK ROOM

2 A7.4

36'-8" 5'-6"

G

5'-8 1/2" 6'-0"

1 100

12'-6"

B14

#2

11'-8" 5'-10" 5'-10"

5'-6"

BINDER CABINET

CLEAN STOR.

B15

1.1

2

3 A5.6 3,500lb ELEV.

#1

12'-5"

CHEM. STOR.

27

B18

3,500lb ELEV.

5'-1"

1 B15

13'-10" 15'-4"

VESTIBULE

38'-0"

W.C.

2.1

11

ELECTRIC ROOM

2 ST-1

20'-4" 9'-10"

5'-0"

12'-8"

ST-1

5 A5.6

23

6'-8"

C1

38'-0"

LOBBY STAIR

B27 1 B27

B13

13'-4" 6'-8"

1 A4.1

1

F.8

2 234'-8" A3.4

12'-6"

1 B16

F.2 5'-8 1/2" 6'-0"

X Ax.x

38'-0"

EXAM ROOM

B16

2 B16

LAUNDRY ROOM

5

F 15'-5"

26'-0"

10'-0"

12'-0"

18'-0"

BEAUTY BAR

D

B

8

E 19'-4"

10'-1 1/2"

13'-4"

Blue Bell, PA 19422

19'-8"

Facsimile: 610.834.7815

9'-8"

5'-1"

6 A 2 HD C A5.6

24

D 15'-3"

X Ax.x

Phone: 610.834.7805

31'-4"

0.7

10

9

C.4 13'-9"

482 Norristown Rd. | Suite 300

13'-4"

6'-6"

1

19

C 14'-7"

2'-0"

14'-4"

31

1.1

B

17'-0"

3'-4"

6'-6"

0.7

1

5'-4 3/4"

13'-4" 19

1'-4"

36'-8"

2'-0"

11'-8"

2'-0"

20'-4"

6'-0"

13'-4"

10'-0 1/2"

0

UNEXCAVATED 10'-0"

2'-0"

FLOOR PLATE: 17,505 SF.

16'-8"

1'-0 1/2"

1'-0 1/2"

25'-4"

B A S E M E N T K E Y P LA A N V. 308'-10" A.1 - E L E A.4

M 2'-0"

12'-8"

L.8 10'-8"

38'-0"

L 16'-4"

182'-7 1/2"

K 14'-7"

0

12'-6"

J 11'-9"

"

38'-0"

i.6 17'-3"

0

26'-0"

i 12'-0"

-

10'-1 1/2"

H 15'-5"

'

BINDER CABINET

G

5'-8 1/2"

1

SKYLIGHT ABOVE

13'-10"

=

SKYLIGHT ABOVE

F.8

X 234'-8" Ax.x

"

SKYLIGHT ABOVE

F.2 5'-8 1/2"

0

E L E V A T I O N 8

1'-4"

F 15'-5"

A1

E3

12'-8"

E 19'-4"

/

BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976

D 15'-3"

1

T H E P A T H W A Y S A T W A R R I N G T O N

C.4 13'-9"

:

Scale: AS NOTED

C 14'-7"

E

Checked By: JT

B 17'-0"

L

Drawn By:

A.4 10'-0 1/2"

A

Construction Issue Date:

A.1

2'-0"

C

E1

TYP.

Progress Prints: Permit Set - 03.28.2018

A 1'-0 1/2"

N O R T H S

C1

E3

38'-0"

TYP.

2 A3.4

1 A3.1

D

E2

13

38'-0"

7

BINDER CABINET

E2

3'-0"

E1

11'-8 1/2"

E3

SKYLIGHT ABOVE

E1

C1

2'-2 1/2"

D

SKYLIGHT ABOVE

C1

14'-2 1/2"

K

A2

i

D

B

i.1

J

K

L.8

M

26

C

C.9

D

1 A2.3

S E C O N D S

C

A

L

E

:

1

/

F L O O R 8

"

=

1

'

-

0

P L A N "

T

R

U

E

P R O J E C T


13'-10" 15'-4"

W215

20

W219

9

9

W221

16

F

9

10'-1 1/2"

26

2 A7.1

26

A44

0.721

1'-10"

i

D

D

D

i.1

S

C

A

A

L

E

A.1

:

LOBBY DOUBLE HEIGHT_ SOUTH ELEVATION

1/4" =O 1'-0" R F SCALE: L O

1

/

8

"

=

1

'

-

P L A N

0

B

"

20'-0"

4 A5.1

C.9

D

14

S

C

A

L

E

:

1

/

B 3 A5.1

4 A5.1

LOBBY DOUBLE HEIGHT_ SOUTH ELEVATION SCALE: 1/4" = 1'-0"

LOBBY DOUBLE HEIGHT_ SOUTH ELEVATION SCALE: 1/4" = 1'-0"

13

0.7

22

22

1

24

1

0.7

5

=

1

'2 -

0

LOBBY ROOM 101_ WEST ELEVATION

P LA5.1A SCALE: NT 1/4"R = 1'-0"U

F L O O R

"

i.1

"

E

P R O J E C T

N

O

9

LOBBY ROOM 101_ EAST ELEVATION SCALE: 1/4" = 1'-0"

C 4 A5.1

9

LOBBY ROOM 101_ EAST ELEVATION SCALE: 1/4" = 1'-0"

Lei Yu_ Work Sample

83

5 A5.1

LOBBY ROOM 101_ WEST ELEVATION SCALE: 1/4" = 1'-0"

D 5 A5.1

LOBBY ROOM 101_ WEST ELEVATION SCALE: 1/4" = 1'-0"

A5.1 T H

N O R T H

D

2

R

SKYLIGHT ABOVE

Blue Bell, PA 19422

Facsimile: 610.834.7815

Phone: 610.834.7805 SKYLIGHT ABOVE

482 Norristown Rd. | Suite 300

38'-0"

i

0.7

D

A36

E211

A36 E218

E207

E212

A36

L E G E N D

E3

M

9

8

T Y P E

8

C

13 14

3 A5.1

L.8

8

2

S E C O N D

1

W A L L

2 9

LOBBY ROOM 101_ EAST ELEVATION SCALE: 1/4" = 1'-0"

1 A2.3

(636 SF) E1 33 12'' X 18'' 2 TIER METAL LOCKER WITH SLOPE TOP

2'-0"

9

9

B

2

K

C

E218

S.S PANEL WALL AT COOKING LINE

7'-4 1/2" 16

J

16

32

24

3

8

74'-8"

26

C

16

UP

16'-3 1/2"

14

UNIT

31 FRP PANEL WALL AND COVE BASE AS PER FINISH SCHEDULE TYPE F

3

WAINSCOT SCALE:9 1" = 1'-0"

3

13

1'-10"

3 A5.1

F I R S T

2 A7.2

1

16

3

19

30 10'' DEEP WOOD SHELVES W/SUPPORT BRACKETS

A36

A36

INSTALLED BY GC. E216

(339 SF) LINE 32 AS S.S PANEL WALL AT PER COOKING PER WALLSKYLIGHT PANEL W/CAP AND COVEDETAILS BASE AS FINISH E3 SCHEDULE 33 12'' X 18'' 2 TIER METAL LOCKER WITH SLOPE TOP EXPOSED COLUMN, PAINTED

WAINSCOT E1SCALE: 1" = 1'-0"

2

A5.1 ST-3

(282 SF)

3'-8"

1 A2.2

6 A5.1

3 EAST 6 STAIR

DN

E122

9

2'-0"

3 ST-3 UNIT TYPE G

25

29

E123 (228 SF)

2

16

27'-0"

B

W104

E122

1

28

19

WAINSCOT SCALE: 1" = 1'-0"

3 UNIT TYPE F

A44

A44

0.7

UNIT TYPE G

9

(2276SF)

A5.1

E120

TYPE A INFO. REFER TO MEP FOR ADDITIONAL

E3

E121

16

0.7

W221

E121

ELECTRICAL DWGS. 17

29 COLUMN, 25 HANDRAIL 33 12''AS X 18'' TIEREXPOSED METAL LOCKER WITHPAINTED SLOPE TOP PER2 SPECS *DETAILS

31 WALLPLANS AND COVE BASE AS PER FINISH SCHEDULE PERPANEL PLUMBING 27 PLUMBING FIXTURE ASFRP E216

UNIT TYPE E

A36

STORAGE EC111

E1

(331 SF)

EC111d

24

MEDICAL30EXAM TABLE SUPPLIED BY OWNER, UNIT 10'' DEEP WOOD SHELVES W/SUPPORT BRACKETS 26 14''X 14'' SQUARE PANELED COLUMN COVER

CLOSET

2

E120

23

E1

(240 SF)

E119

EAST M.C. SOUTH CORRIDOR EC112

1

(228 SF)

9

DN

1

22

P A T H W A Y S

12'-8" 13

2'-0"

ST-2

1 EC111d

A36

E3

1'-10"

WEST 85'-4" STAIR

16

BATH EC110d

2

16

24

3 ST-2

25

LAV.

16

17

E119

E1

13

3'-8"

25

STORAGE

EC110e 16

3'-8"

A36

G

E3

F

22

1 EC110d

EC111

UNIT TYPE F

UNIT TYPE F

9

1

EC110c

EC111b

EC111b

E118

UNIT TYPE C EC110c

1

E2

1' BULLNOSE CAP EC111c

1

EC110e

CLOSET

13 A36

F

W220 E3 SF) (636

2

E116

(227 SF)

W218

16

EC110

21

E117

CLOSET

EC110b

1

E118

(339 SF)

W220

LOBBY ROOM 101_ SOUTH ELEVATION SCALE: 1/4" = 1'-0"

H

E1

G

SHOWER SHOWER

BATHING SUITE 18 EC110

A36 E2

UNIT TYPE E

10'-1 1/2"

H

2 A5.1

UNITE1 TYPE A

LOBBY ROOM 101_ SOUTH ELEVATION 16 W219 E1 SF)= 1'-0" SCALE:(636 1/4"

B

EC111a

20

(252 SF)

1 EC111c

E

19

UNIT TYPE B

E117

20 9

1' BULLNOSE CAP A36

1 EC111a

CLOSET

17 18

E

2

E114

F

16

1 A3.4

(245 SF)

E115

A36

E114 E3

E3

1' BULLNOSE E115 CAP

A36

THERAPY EC109

(345 SF)

2

A36

1

15

(252 SF)

14 15

UNIT TYPE A

E

EC109

EC110a

19

G 2

F

F

10

(382 SF)

16

UNIT TYPE F

E112

W214

26'-0"

3'-6"

B

SLOPE A36

9

UNIT TYPE E2 B

LOBBY ROOM 101_ SOUTH ELEVATION SCALE: 1/4" = 1'-0"

A36

2 A5.1

26'-0"

(339 SF)

W218

H

21

A36

W217

W217 A5.1

E3

W216

A36

B

UNIT TYPE2A

E1

A36

13

2

17

W215

12

14

10

UNIT TYPE B

A36

11

E208

T H E

8

W216 16

C1

A36

SKYLIGHT ABOVE

7

8

1 A4.1

2

(337 SF)

G

7

5 C8 STEEL LINTEL (PAINTED) 6 SLIDING DOOR AS PER SCHEDULE & DETAILS CASEWORK AS PER SPECS ADA COMPLIANT BENCH 6 SLIDING DOOR AS PER SCHEDULE & DETAILS 7 WATER WALL AS PER DETAILS & SPECS DOOR AND FRAME AS PER SCHEDULE 8 INTERIOR7STAIR WATER DETAILS & SPECS AS PER WALL DETAILSAS & PER SPECS COFFEE STATION, REFER TO MEP FOR ADDITIONAL STONE VENEER TO MATCH EXTERIOR 9 WOOD WAINSCOT 8 INTERIOR AS PER DETAILS STAIR AS PER DETAILS & SPECS INFORMATION RECESSED HEATING PANEL AS PER MECH PLAN UNIT 10 ELEVATOR AS PER SPECS 9 DOORS WOOD WAINSCOT AS PER DETAILS TYPE B C8 STEEL (PAINTED) TRASH CONTAINER AS PER &CIVIL 11 LINTEL WINDOWS PER ELEVATORS & DETAIL SPECS DWGS 10 ASELEVATOR DOORS AS PER SPECS E3 E208 12 DOOR SLIDING AS PER SCHEDULE DETAILS(382 SF) HANDRAIL AS PER DETAILS &&SPECS 11 WINDOWS PER ELEVATORS & DETAIL & SPECS 4" PERFORATED PVCASFOUNDATION DRAIN AS PER CIVIL DWGS 13 8'' SQUARE COLUMN AS PER DETAILS WATER WALL AS PER DETAILS & SPECS 12 HANDRAIL AS PER DETAILS & SPECS 12 14 TV/ MONITOR BY OWNER RETAINING PER CIVIL DWGS INTERIOR STAIR AS PERWALL DETAILS AS & SPECS 13 SQUARE COLUMN AS PER DETAILS 15 LIGHT FIXTURE8''AS PER FIXTURE SCHEDULE WOOD WAINSCOT AS PER DETAILS 14 TV/ MONITOR BY OWNER 16 GYPSUM STEEL COLUMN PERASSTRUCTURAL DWGS WALLBOARDAS (PAINTED NOTED) UNIT ELEVATOR DOORS AS PER SPECS TYPE D 15AS NOTED, 17 TILE (TYPE LIGHT FIXTURE AS PER FIXTURE SCHEDULE SEE SCHEDULE) SLOPE C4 & SPECS E210 ADA COMPLIANT FOUNTAIN AS PER PLUMBING WINDOWS AS PER ELEVATORS &DRINKING DETAIL 18 ROLL DOWN 16 SHUTTER PER DETAIL (PAINTED AS NOTED) GYPSUM AS WALLBOARD (337 SF) DWGS HANDRAIL ASFIREPLACE PER DETAILS & SPECS 19 GAS AS PER DETAIL 17 TILE (TYPE AS NOTED, SEE SCHEDULE) A36 E210 8'' SQUARE COLUMN AS PER DETAILS 20 BASE AS PER FINISH SCHEDULE PLUMBING AS PER PLUMBING DWGS 18 FIXTURE ROLL DOWN SHUTTER AS PER DETAIL 14 MONITOR 21 KITCHEN EQUIPMENT AS PER SCHEDULE TV/ BY OWNER 19 GAS FIREPLACE AS PER DETAIL FLOOR ASMECHANICAL PER PLUMBING DWGS 22 RANGE DRAIN HOOD AS PER PLANS LIGHT FIXTURE AS PER FIXTURE SCHEDULE UNIT 20 BASE AS PER FINISH SCHEDULE TYPE 23 COUNTERTOP AS PER FINISH SCHEDULE *SPEC B GYPSUM WALLBOARD (PAINTEDE1 AS NOTED) MOP SINK DWGS 21 AS PER PLUMBING EQUIPMENT AS PER SCHEDULE E212 24 GRILLS AS PER KITCHEN MECHANICAL PLANS TILE (TYPE AS NOTED, SEE SCHEDULE) (382 SF) 22AS RANGE HOOD AS PER MECHANICAL PLANS 25 HANDRAIL PER SPECS *DETAILS SOILED LINEN TOILET AS PER PLUMBING DWGS ROLL DOWN SHUTTER AS PER DETAIL 23 COUNTERTOP 26 14''X 14'' SQUARE PANELED COLUMN COVER AS PER FINISH SCHEDULE *SPEC GAS FIREPLACE AS PER DETAIL KITCHEN EQUIPMENT AS PER SUPPLIER SPECS & DWGS ASAS PERPER PLUMBING PLANSKITCHEN 27 PLUMBING 24FIXTURE GRILLS MECHANICAL PLANS BASE AS FINISH SCHEDULE WALL PANEL W/CAP AND COVE BASE AS PER FINISH 28 PER UNIT 25 HANDRAIL ASPANEL PER SPECS *DETAILS SCHEDULE HEATING RECESSED AS PER MECHANICAL DWGS TYPE C KITCHEN EQUIPMENT AS PER SCHEDULE 29 14''X 14'' SQUARE PANELED COLUMN COVER EXPOSED COLUMN, PAINTED 16 26 E214 RANGE HOOD AS PER MECHANICAL PLANS AS PER MECHANICAL DWGS MECHANICAL EQUIPMENT 30 10'' DEEP WOOD (345 SHELVES W/SUPPORT FIXTURE ASBRACKETS PERSF) PLUMBING PLANS 27 PLUMBING E2 COUNTERTOP AS PER FINISH SCHEDULE *SPEC 31 FRP PANEL ANDPANEL COVE BASE PER FINISH SCHEDULE WALL W/CAP AND COVE BASE AS PER FINISHBY G.C. REFERA36 28WALL TELEVISION SUPPLIED BYASOWNER, INSTALLED TO SCHEDULE GRILLS PER MECHANICAL PLANS LINE E214 32ASS.S PANEL WALL AT COOKING

BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD Construction Issue Date:

4

6

10

38'-0"

1 A3.4

9

E112 C4

E116 UNIT (240 SF) E3 TYPE C

(345 SF)

10

UNIT TYPE C

SKYLIGHT ABOVE

E2

9

(245 SF)

W212

3'-6"

38'-0"

18

E1 FFE: 8 320.5'

UNIT TYPE A

16

UNIT TYPE C

EC108a

E206

RECESSED HEATING PANEL AS PER MECH PLAN

A36 E219

UNIT TYPE G E219

(331 SF) JT

W214

EC108

4

PA 18976 PLAN Sheet Name: FIRST FLOORWARRINGTON,

W213

EC108b

TYPE RECESSED HEATING PANEL AS PER MECH PLANC E2

LY

A36

EAST M.C. LOUNGE

4

Scale: AS NOTED

A36

EAST M.C. RECREATION

8

TYPE D

G 3'-6"

(382 SF)

7

E1

16

H

EAST GARDEN LOBBY

7

4

4

5

4'-0"

W213

(252 SF)

STONE VENEER TO MATCH EXTERIOR

Checked By: JT

5

TYPE B

i

E4

9

EAST GARDEN

LOBBY ROOM 101_ NORTH ELEVATION UNIT SCALE: 1/4" E1 = 1'-0"

E113

4'-0"

1 A5.1

10

5

W212

EC108d

12

C4

GUNIT

5

WEST GARDEN

11

EC108c

4

13

A36 10

3 E113

3

E206 ROD AS PER DETAILS 9 ELEVATION 5 C8 STEEL LINTEL (PAINTED)& HANGING CLOSET SHELVING INTERIOR KEYNOTES (345 SF)

9

UNIT TYPE B

A44

E204

A36

DOOR AND FRAME AS PER SCHEDULE

3 STONE VENEER UNIT UNDERCOUNTER BIOHAZARD REFRIGERATOR TO MATCH EXTERIOR

E5

1

EC108d

1

A36

CASEWORK PER SPECS AS PER SPECS 1 ASCASEWORK

2

2

STORAGE 1

E202

7 UNDERCOUNTER DISHWASHER 2 DOOR AND FRAME AS PER SCHEDULE

1

EC108c

E200

A44

E204

26'-0"

H

W211

(245 SF)

220

EAST CORRIDOR

10'-1 1/2"

A36

i

10

E111

UNIT

(339 SF)

EC107

10 STORAGE

E110

16

X UNIT Ax.xTYPE A

W.C.

TYPE A

E1

5'-6"

A

CLEAN UTIL. EC107

14

H

SKYLIGHT ABOVE

LOBBY SCALE: 1/4" = 1'-0" W211

C1

i

1 E200

LY

2'-3" 15'-0"

i 101_ NORTH ELEVATION

(337 SF)

E3

.9

LOBBY ROOM 101_ NORTH ELEVATION SCALE: 1/4" = 1'-0"

W210 1 EC108b (382 SF)

2'-3"

8'-6"

12'-6"

1 A5.1

UNIT ROOM TYPE D

E108

217

D

B

(380 SF)

LOCKERS AS PER DETAILS

1

E111

3 C A5.5

INTERIOR KEYNOTES INTERIOR ELEVATION KEYNOTES UNDERCOUNTER ICEELEVATION MACHINE 7

A36

D

6 COMMERCIAL IRON AS PER SPECS, REFER TO MEP FOR ADDITIONAL INFORMATION UNIT

i

1

EC106

6 C A5.5

C1

12'-6"

W

1 A5.1

(240 SF)

5'-6"

W210

(252 SF)

UNIT TYPE B

12'-6"

W209

A

16

1 215

D

TYPE E COMMERCIAL DRYER AS PER SPECS, REFER TO MEP FOR E202 ADDITIONAL INFORMATION

6.5

1

5

B

TIMECLOCK, SUPPLIED BY OWNER, INSTALLED BY G.C. REFER TO ELECTRICAL DWGS FOR ADDITIONAL INFORMATION

4

i E6

E109 H

4'-0"

15'-0"

A36

W209

1

2

21

C2

4.2

9'-5"

15'-0"

4'-0" 8'-6"

A

(345 SF)

12

A36

EC100b

EC104a

E109

219

COMMERCIAL WASHER AS PER SPECS, REFER TO MEP FOR ADDITIONAL INFORMATION

UNIT TYPE C

A36

5'-6"

6'-4"

W

(382 SF)

20

i

C1

E107 2 C A5.5 (237 D SF)

i

16

A36

A44

UNIT TYPE C UNIT TYPE B* E2 W208 E110 E3

3

W208

38'-0"

8'-0" 8'-6"

1 1'-6"

UNIT TYPE B

E6

18

C

6

SOILED UTIL. EC106

EC105

EC105

H

W206

1

2

13 13

E2

C1

W.C.

1 217

1 216 LAUNDRY

STORAGE

A5.5 BARBER EQUIPMENT AS PERB DETAILS

203

B

6.5 LAV.

1

1

(339 SF)

A36

11

2

UNIT TYPE A*3

3

W

WINDOWS

8'-0"

G

1'-6"

W207

E1

E3

B

UNIT TYPE D

A

A44

i

i i

S

216 LINEN CHUTE AS PER DETAILS, FOR ADDITIONAL 215 REFER TO MEP 214 UTILITIES A INFORMATION A A

FAMILY DINING

2 203

E1

(252 SF)

ELEC. CLOSET

EC104a

JAN. 8 CLOS.

E108 E3 UNIT TYPE A (245 SF)

1'-6"

(345 SF)

2

E2

A36

T

W207

11

15 15

1 204

NURSE'S STATION

D

182'-7 1/2"

11

NORTH GARDEN

H

38'-0"

6'-4"

8'-0"

A36

WINDOWS

9

W206

WINDOWS

H

G

227 T E

1 21

WATER FEATURE AS PER DETAILS MEDICATION

A

EC100b

T

W205

2

(380 SF)

7

T 11

A36

UNIT TYPE C

E5

A44 W204

F

W205

2

W203

G

G

(339 SF)

10

F W200

2 A3.4

UNIT TYPE A

E

1

1 203

4 C A5.5

DINING UNIT ROOM TYPE B 202 E105

E105

E107

EC104

STAFF ROOM EC104

12'-6"

F E4

A44

F

BE

6'-4"

8

11

A36

i

1

E106

4'-0"

(380 SF)

A36

E106

(240C1 SF)

W204

6.5 CORRIDOR

D

38'-0"

4 C A5.4

SKYLIGHT ABOVE

W203

6.5

UNIT TYPE C

E1 UNIT TYPE E

SUPPORT

2 201

CASEWORK AS PER DETAILS

EC103

A

4'-0"

12'-8"

UNIT TYPE E

C1

10

E104

E1

6

E3

WC108b

(339 SF)

12'-0"

13'-4"

8

38'-0"

15'-4"

D

MEDICAL 4.2 RECORDS MEDICAL EC102 STORAGE EC103

A44

O

ELEVATOR AS PER DETAILS

1

E

E2

UNIT UNIT TYPE D E104 TYPE A C1 (237 SF) W202

N

Y

Drawn By:

2 213

27'-4"

5

21'-4"

C1

W202

2 A7.4

E

D

A

J

A5.1

Progress Prints: Permit Set - 03.28.2018

E3

A36

4.2

K

1 226

Blue Bell, PA 19422

12'-8"

C3

C3

1 102

4.2

12'-8"

#3

2 A7.3

E3

(245 SF)

The Second Floor Plan_ Lobby

W201

3'-0"

G

SLOPE

ELEV.

A36

C1

C2

4.1

1'-4"

The First Floor Plan_ Lobby

1

E3

W201 (339 SF)

C2

#2

N

228

Facsimile: 610.834.7815

UNIT TYPE A

103

#1

A

229

SF

226

AUTOMATIC SLIDING DOORS AS PER DETAILS

E103

E103

A C A5.5 2 A7.5 WARMING B KITCHEN NURSE'S 204 STATION EC101 C2

#3

L

1 228 STOR.

Facsimile: 610.834.7815

FAMILY LOUNGE

D

2,500lb ELEV.

E102

B

UPPER LOBBY UNIT 201 TYPE A

A36

1 A4.1

3 ST-1

W.C.

M.C. 208 LIVING ROOM

P

DN

SIZE

1 229 SERVER

2

1 201 EAST M.C. NORTH CORRIDOR EC100

1 207

GROSS

3,500lb ELEV. - 80,680

Phone: 610.834.7805

1 C A5.2

102

B2

3,500lb ELEV. BUILDING

OFFICE

482 Norristown Blue Rd. | Suite Bell, 300 PA 19422

A

LOUNGE

2 101B

ST-1

1 205

X

D

Phone: 610.834.7805

CHAPELE2 104

5'-2 1/4"

38'-0"

W102B

B

EC100a

X

1 208

LOBBY STAIR

OPEN TO BELOW

D

E3

E1

230

482 Norristown Rd. | Suite 300

#3

1 213a

B

212

1

209

D

B

E2 OFFICE

T H E P A T H W A Y S A T W A R R I N G T O N

2 A7.5

2 A7.4 12'-10"

D

M.C. DINING A ROOM REHAB 6 205 E101 C A5.4 STORAGE

STORAGE

1 212

EC100a

STORAGE

A 2 C A5.2

2,500lb ELEV.

1 C A5.4

#2

1 209

3 D

B

WARMING KITCHEN

FOOD PREP

X

1 210

E3

A2

3'-9"

X

1 C1 1.1

INTERIOR ELEVATIONS

213

C1

Sheet Name:

1 213

ROOM101B

1 E1 104

0.7

C1

E1

D

E101a

2'-3"

3 C A5.2

1

E101b

#1

JAN 2 CLOS. A7.3 1 210 103

E3

E1

D

3,500lb ELEV.

1 209

DN

E2

E1

B

211 3,500lb ELEV.

UP

1

A 2 C A5.4

ACTIVITIES ROOM

5 A5.4

D

LOBBY CORRIDOR COMMUNITY

1 101B

E3 E2

Checked By: JT COMMUNITIES BY GLORIA DEI COMMUNITIES BY GLORIA DEI JT 2900 WEST STREET ROAD 2900 WEST STREET ROAD Scale: AS NOTED WARRINGTON, PA 18976 WARRINGTON, PA 18976 Construction Issue Date:

ST-1

E101b

B

B

6'-8"

JT

B1

B

6'-8"

Scale: AS NOTED

1 3 C C A5.4 D A5.1

D

E3 WARMING C1 KITCHEN

LOBBY C1 STAIR

A

A

A

E1

12

101

101A

4'-8"

0.7 M

LOBBY

2.1

W102B

6'-0"

Checked By: JT

A1

6 C A5.2

1 101A

A

5'-8"

0.7

T H E PConstruction A Issue T Date:H W S A T H W A Y S T HA E Y P A T W ADrawnRBy: R I N AG TT O W N A R R I N G T O N

105

DOR

10'-0"

2'-0"

10'-8"

BINDER CABINET

C1 RECEPT

C

10'-0"

13'-4"

INTERIOR ELEVATIONS

5'-8"

19'-8" 9'-0"

LY

6'-8"

9'-8" 4'-10" 4'-10"

Permit Set - 03.28.2018

6'-8"

1 101 E3

1 06

31'-4"

Sheet Name:

13'-4"

C1

1.1

0

Construction Issue Date:

6'-8"

1

1 105

0

J

FFE: 320.5'

E1 CONFERENCE ROOM

1'-0 1/2"

FLOOR PLATE: 31,420 SF.

100

L

0.7

E2

1ST H FLOOR K i EY i.1 P L A N - E L i.6E V . 3 2 0 ' - 6 J "

MG 2'-0"

10'-8"

Drawn By: Prints: Progress

6'-8"

F.8L.8

LX Ax.x

BINDER CABINET

5'-6"

F.2 16'-4"

0

K

F

K 14'-7"

26'-0"

12'-10"

E

J 11'-9"

VESTIBULE

9'-5"

0"

i.6

17'-3"

3'-4"

13'-4"

D

12'-0"

16'-8"

36'-8"

C.4 i

H

15'-5"

INTERIOR ELEVATIONS

11'-8 1/2"

1 100

C

G

5'-8 1/2" 6'-0"

Progress Prints: Permit Set - 03.28.2018

0 X Ax.x

B

F.8

2 234'-8" A3.4

5'-8 1/2" 6'-0"

Sheet Name:

A.4 F.2

F

25'-4"

A.1

15'-5"

12'-8"

A

E 19'-4"

9'-5"

D

A

A5.1


3'-1"

1'-2 1/2" 5'-10 7/8"

5'-10 7/8"

12'-3 3/8" 1'-1 5/8"

9 1/8" 5'-7 3/8"

5'-2"

5'-10 7/8"

5'-10 7/8"

6'-11 1/2"

2

12'-1 3/8"

20

D 42'-0" 4'-1 3/8"

3'-6"

5'-3"

2 C A5.3

D

B

4 A5.2

20

16'-0"

A

SOILED UTIL. WC106

20

A 3'-0"

CART

STAFF ROOM WC104

MEDICAL RECORDS WC102

2 A5.3 2 A5.3

8 1/2"

MEDICAL STORAGE WC103_ NORTH SCALE: 1/4" = 1'-0" MEDICAL STORAGE WC103_ NORTH SCALE: 1/4" = 1'-0"

STORAGE WC108c

CART

2'-6"

2'-9"

1

WC109

1

B

CART

1

B

3'-0"

STORAGE WC108d

JAN. CLOS. WC105

THERAPY WC109 1'-3"

3'-0"

MEDICAL STORAGE WC103_SOUTH SCALE: 1/4" = 1'-0" MEDICAL STORAGE WC103_SOUTH SCALE: 1/4" = 1'-0"

1'-3"

1'-3"

1'-3"

2'-0"

1'-9"

STORAGE

CLOSET

CLOSET

WC110c

WC111a

16

WC111b

1

SHOWER

ROOF OVERFLOW DRAINS. SEE PLUMBING DWGS F ADDITIONAL INFORMATION.

16

HVAC LOUVER AS PER DTLS. & MECHANICAL DWGS COLOR TO BE (___) STORAGE WC111

O'KEEFE'S MODEL 502 ROOF LADDER OR EQUAL.

D

FRIDGE BY OWNER

C

SHOWER

LAV.

1

WC110a

WC110e

WC110e

D

FRIDGE BY OWNER

1

MEDICAL STORAGE WC103_WEST SCALE: 1/4" = 1'-0" 1 MEDICAL STORAGE WC103_WEST SCALE: 1/4" = 1'-0" WC111c

2 A5.31 2 A5.3

CLOSET WC111d

1 WC110

WC111d

WC111c

14'-5 5/8"

5'-3"

7'-11"

2'-9"

6'-0" HIGH VINYL T&G PANEL FENCE AS PER DTLS. COLOR TO BE (___) LIGHT AS PER RCP & ELECTRICAL DWGS.

WC111

CLOSET

2 A5.3 2 A5.3

SLIDING DOOR AS PER DTLS. & SPECS. 16 COLOR TO B

B

BATHING SUITE WC110

C

KAWNEER 451T ALUMINUM & GLASS STOREFRONT PER DTLS. & SPECS. FRAME COLOR TO BE (___). 1" COLOR TO BE (___)

BATH WC110d

1 WC110d

2'-0"

1'-9"

6 3 4" x 12" GLUED LAMINATED BEAM AS PER DTLS

1

WC110c

CART

WEST M.C. RECREATION WC108

EL DORADO "MESETA" FIELDLEDGE, OR EQUAL, W/ PROVIDE SPLIT EDGE WAINSCOT SILL AS PER DTLS

WC111b

16

WC110b

CLEAN UTIL. WC107

20

DIRECTED BY ARCHITECT. 1 1ST FLOOR TYP UNIT_ COLOR EAST 21 D ALUMINUM WRAPPED FASCIA AS PER DTLS. COLOR A5.3 SCALE: 1/4" = 1'-0" 1 4'-2 3/8" 1ST3'-3"FLOOR TYP UNIT_ GLUE EAST 5'-4 7/8" LAMINATED TIMBER ENTRY CANOPY AS PER COLOR AS DIRECTED BY ARCHITECT. A5.3 SCALE: 1/4" = 1'-0"

5'-0"

MEDICAL STORAGE WC103

LAV. WC104a

2'-9"

PELLA DESIGNER SERIES WINDOWS AS PER DETAI CLADDING, 3 1 2" FLAT CASING, & 1" SILL NOSE COL

LAMINATORS "THERMOLITE" PANEL, OR EQUAL, AS COLOR TO BE (___)

5'-3 5/8"

16

A

2'-6"

2'-6"

BINDER CABINET

1'-1" TYP.

EXTERIOR DOOR AS PER SCHEDULE. PAINTED AS D ARCHITECT.

MEDICAL STORAGE C 1 1 2" ØWC103_EAST ALUMINUM HANDRAIL W/ 1 2" SQ. PICKETS & SPECS. SCALE: 1/4" = 1'-0" MEDICAL STORAGE WC103_EAST SCALE: 1/4" = 1'-0"

5'-0"

E Q U I P M E N T

3 A5.3 3 A5.3

B

D

CLEAN UTIL WC107_ SOUTH SCALE: 1/4" = 1'-0" CLEAN UTIL WC107_ SOUTH SCALE: 1/4" = 1'-0" 15

1 / 4 "

=

P

P

O

R

1 ' - 0 "

CLEAN UTIL WC107_ EAST SCALE: 1/4" = 1'-0" CLEAN UTIL WC107_ EAST SCALE: 1/4" = 1'-0"

2

4 A5.3 4 A5.3

6'-0"

PARTIAL CORRIDOR_ EAST ELEVATION SCALE: 1/4" = 1'-0" PARTIAL CORRIDOR_ EAST ELEVATION SCALE: 1/4" = 1'-0"

16

2

16

16

INTERIOR ELEVATIO

15

1'-8"

2'-10"

2 20

20

CART

20

16

20

BB

CART

1

B

1

2

DOOR AND FRAME AS PER SCHEDULE

3

STONE VENEER TO MATCH EXTERIOR

4

RECESSED HEATING PANEL AS PER MECH PLAN

20

6

2" 1'-0"

16 CART

C8 STEEL LINTEL (PAINTED)

3'-0"

1'-3"

1'-3"

2'-0"

1'-9"

C

C

SLIDING DOOR AS PER SCHEDULE & DETAILS 3'-0"

1'-3"

1'-3"

1'-9"

2'-0"

1'-2" 2"

2"

16 1

CART 5

10'-8"

8'-0"

10'-8"

CASEWORK AS PER SPECS2'-9" 2'-6"

16 20

DOOR AND FRAME AS PER SCHE

8'-0"

7'-8"

1

3'-0"

3

STONE VENEER TO MATCH EXT

4

RECESSED HEATING PANEL AS P

5

C8 STEEL LINTEL (PAINTED)

16 16

C

8

INTERIOR STAIR AS PER DETAILS

9

WOOD WAINSCOT AS PER DET

11

WINDOWS AS PER 16 ELEVATORS &

12 HANDRAIL AS PER DETAILS & SP

1'-2" 2"

16

FRIDGE BY OWNER

D

D

13

8'' SQUARE COLUMN AS PER DET

14

16 TV/ MONITOR BY OWNER

D

15 LIGHT FIXTURE AS PER FIXTURE 16 16

GYPSUM WALLBOARD (PAINTED

17

TILE (TYPE AS NOTED, SEE SCHE

FRIDGE BY OWNER

ROLL DOWN SHUTTER AS PER D 7 WATER WALL AS PER DETAILS 2 2 B MEDICAL STORAGE WC103_SOUTH 2 & SPECS MEDICAL STORAGE WC103_WEST 2 D MEDICAL STORAGE18WC103_EAST AMEDICAL STORAGE WC103_ NORTH C 6 THERAPY WC109_ 6 THERAPY WC109_ 6 THERAPY WC109_ 6 THERAPY WC109_ 19 GAS FIREPLACE AS PER DETAIL C A5.3 D A5.3 A5.3 A5.3 SCALE: 1/4" = 1'-0" NORTH SCALE: 1/4" = 1'-0" SOUTH 1/4" = 1'-0" WEST SCALE: 1/4" = 1'-0" EAST 8 INTERIOR STAIR AS PER DETAILS &SCALE: SPECS A5.3 TYP A5.3 A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" 20 BASE AS PER FINISH SCHEDULE SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" 1 1ST FLOOR UNIT_ WEST 1 1ST FLOOR TYP UNIT_ EAST 9 WOOD WAINSCOT AS PER THERAPY WC109_ NORTH THERAPY WC109_ SOUTH2 THERAPY WC109_ WEST 2 THERAPY WC109_ EAST DETAILS MEDICAL STORAGE6WC103_ NORTH 2 MEDICAL STORAGE6WC103_SOUTH MEDICAL STORAGE6WC103_WEST MEDICAL STORAGE6WC103_EAST A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" 21 KITCHEN EQUIPMENT AS PER SC 10 ELEVATOR DOORS ASA5.3 A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" 1/4" = 1'-0" PER SPECS SCALE: 1/4" = 1'-0"

1'-3"

1'-3"

1'-9"

D 3'-0"

TILE (TYPE AS NOTED, SEE SCHEDULE)

18 ROLL DOWN SHUTTER AS PER DETAIL

20 21

C

24

GRILLS AS PER MECHANICAL PLANS

6'-0"

6'-6"

28 GRILLS 16 AS PER MECHANICAL PLA

26 14''X 14'' SQUARE PANELED COL 31 27 PLUMBING FIXTURE AS PER PLUM 28

D

WALL PANEL W/CAP AND COVE SCHEDULE

SHOWER WC110 b_ 29 EAST EXPOSED COLUMN, PAINTED SCALE: 1/4" = 1'-0" 30 10'' DEEP WOOD SHELVES W/SUP SHOWER WC110 b_ EAST 31 FRP PANEL WALL AND COVE BA SCALE: 1/4" = 1'-0" 32

22 RANGE HOOD AS PER MECHANICAL PLANS

COUNTERTOP AS PER FINISH SCHEDULE *SPEC

16 COUNTERTOP AS PER FINISH SC

24

6'-6"

D

4 PARTIAL 7 SHOWER WC110 b_ WESTCORRIDOR_ EAST ELEVATION 7 GAS FIREPLACE AS PER DETAIL A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" A5.3 = 1'-0" 7 SHOWER WC110 b_ WEST 7 BASE AS PER FINISH SCHEDULE 4 PARTIAL CORRIDOR_ A5.3 SCALE: A5.3 1/4" =EAST 1'-0" ELEVATION KITCHEN EQUIPMENT AS PER SCHEDULE A5.3 SCALE: 1/4" = 1'-0"

23

23

25 HANDRAIL AS PER SPECS *DETAI 31 28

27

6'-0"

17

C

27 6'-0" Phone: 610.834.7805

GYPSUM WALLBOARD (PAINTED AS NOTED)

27 27

6'-0"

16

19

482 Norristown Rd. | Suite 300

3'-0"

6'-6"

15 LIGHT FIXTURE AS PER FIXTURE SCHEDULE

28 3'-0"

3 CLEAN UTIL WC107_ SOUTH 3 CLEAN UTIL WC107_ EAST 7 SHOWER WC110 b_ NORTH 7 SHOWER WC110 b_ SOUTH B D A5.3 A5.3 SCALE: SCALE: 1/4" 1/4" = = 1'-0" 1'-0" SCALE: 1/4" 1/4" = = 1'-0" 1'-0" A5.3 SCALE: A5.3 7 SHOWER WC110 b_ NORTH 7 SHOWER WC110 b_ SOUTH 2 MEDICAL STORAGE WC103_WEST 2 WC107_ MEDICAL STORAGE WC103_EAST CLEAN UTIL WC107_ SOUTH 3 CLEAN UTIL EAST A5.3 A5.3 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A5.3= 1'-0" 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" SCALE:A5.3 1/4" = SCALE: 1'-0" 2'-0"

28

TV/ MONITOR BY OWNER

16

6'-6"

2'-6" 1'-8"

B

FRIDGE BY OWNER

2'-0"

14

2'-10"

6'-6"

2'-6"

16 16 28

BD

16

3'-0"

C

16

B

6'-6"

1'-8"

A

1

BY OWNER

22 RANGE HOOD AS PER MECHAN

WINDOWS AS PER ELEVATORS & DETAIL & SPECS

12 HANDRAIL AS PER DETAILS & SPECS 28 13 8'' SQUARE COLUMN AS PER DETAILS

S.S PANEL WALL AT COOKING L

33 12'' X 18'' 2 TIER METAL LOCKER

7'-8"

3'-0"

2'-10"

A

27CART

1'-8"

2'-0"

CART BY OWNER

16

2'-10"

2'-6"

6'-6" 6'-6"

1'-8" 2'-10"

2'-6" 1'-8"

28

WASHER & DRYER BY OWNER

16

28

CART

WASHER & DRYER BY OWNER

2'-10"

16

16

1

16

27

16

2'-9"

2'-11 1/4"2'-11 1/4"

2'-6"

11 16 2'-6"

3 A5.3

7'-8"

10'-8"

10'-8"

8'-4"

16

1

2" 1'-0"

2"3'-4"

16

3'-6"

2'-10"

A

A

A 3'-0"

1'-3"

20

2"

BY OWNER

11

FRIDGE BY OWNER

1'-3"

2 A5.3

16FRIDGE

2"3'-4"

2'-6"

1 2 20

INTERIOR ELEVATION KEYNOTES

16 2" 1'-3 1/2"

3'-0"

CASEWORK AS PER SPECS

2

10 ELEVATOR DOORS AS PER SPECS

3'-6" 3'-4"2" 2"

2"

16

2'-9"

3'-6"

3'-0"

2'-6"

Facsimile: 610.834.7815

2"

SCALE: = 1'-0" 1 1/4" 1ST FLOOR TYP UNIT_ EAST A5.3 SCALE: 1/4" = 1'-0" 2'-10" 1'-8" 2'-6" 2" 3'-6" 3'-4"2" 2"3'-4" 2"

3'-0"

D

D

A5.3

3'-6"

2"

C

20

Blue Bell, PA 19422

3'-0"

2" 3'-6" 3'-4"2"

16

2

4

1'-8"

1'-3"

20

1

6 SLIDING DOOR AS PER SCHEDU 5 UNIT_ PARTIAL CORRIDOR_ EAST ELEVATION 1ST FLOOR TYP WEST 1 1ST FLOOR TYP UNIT_ EAST 7 WATER WALL AS PER DETAILS & 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" SCALE: 1/4"A5.3 =51'-0" SCALE: PARTIAL CORRIDOR_ EAST ELEVATION

1 A5.3

1ST FLOOR TYP UNIT_ WEST SCALE: 1/4" = 1'-0"

16

2" 1'-3 1/2"

3'-0"

1

1'-3 1/2" 2" 1'-3"

16

8'-0"

2"

2'-6"

3'-0"

2'-6" 1'-8"

2"

1 A5.3

2'-10" 1'-8"

1'-3"

2'-10"

3'-0"

1ST FLOOR TYP UNIT_SOUTH SCALE: 1/4" = 1'-0"

10'-8"

1'-3"

2"

2'-6"

1'-3"

3'-0"

20

C

24 1ST FLOOR TYP UNIT_SOUTH SCALE: 1/4" = 1'-0"

16

20

2'-6"

1 A5.3

B 1 A5.3

C1

2

C1

2

1'-8"

B

1'-3 1/2" 2"

1'-3"

20

11

24

2'-10"

20

16 11

20

1ST FLOOR TYP UNIT_ NORTH SCALE: 1/4" = 1'-0"

1ST FLOOR TYP UNIT_ NORTH SCALE: 1/4" = 1'-0"

6

8'-4"

8'-0"

6'-0"

A

C1

25 HANDRAIL AS PER SPECS *DETAILS 7'-8"

A

2'-6"

1 2" 1'-0"

16 1 16

B Lei Yu_ Work Sample 20

20

84

16

C

16

1'-2" 2"

2"

C1

1'-8"

16

2'-10"

3'-4"

2" 1'-3 1/2"

2"

3'-0"

2'-6"

2"

20

3'-6"

3'-0" 2

1'-8"

2"

2'-10"

3'-0"

3'-4" 2" 7'-8"

2"

2"

3'-0"

3'-6"

1'-3 1/2" 2"

1'-2" 2"

2" 1'-0"

2"

16

3'-6"

2" 1'-3 1/2"

3'-4"

3'-0"

2"2"

2"

3'-4" 3'-6"

3'-0"

2"

2"

ELEVATION

3'-6"

3'-0"

= 1'-0"

2"

2"

A5.3 S.S PANEL WALL AT COOKING 1/4" LINE SCALE:

33 12'' X 18'' 2 TIER METAL LOCKER WITH SLOPE TOP

3'-4"

3'-0"

32

2"

1'-3 1/2" 2"

31 FRP PANEL COVE BASECORRIDOR_ AS PER FINISH SCHEDULE 5 WALL AND PARTIAL EAST

PARTIAL CORRIDOR_ EAST ELEVATION SCALE: 1/4" = 1'-0"

2"

4 A5.3

PARTIAL CORRIDOR_ EAST ELEVATION SCALE: 1/4" = 1'-0"

2"

5

EXPOSED COLUMN, PAINTED

30 10'' DEEP WOOD SHELVES W/SUPPORT BRACKETS A5.3

3'-4"

29

C1

WALL PANEL W/CAP AND COVE BASE AS PER FINISH SCHEDULE

RIA DEI COMMUNITIES EST STREET ROAD RINGTON, PA 18976

28

P A T H W A Y S A R R I N G T O N

6'-0"

27 PLUMBING FIXTURE AS PER PLUMBING PLANS

3'-0"

6'-0"

26 14''X 14'' SQUARE PANELED COLUMN COVER

3'-6"

1 5.3

20

8'-0"

6'-0"

A 1 A5.3

16

2

2

16

S C H E

ALL EQUIPMENT IS SUPPLIED BY OWNER, INSTALLED BY

REFER TO SINGER SPEC BOOK & DRAWINGS FOR ADDIT

T

6'-0"

U

6'-0"

S

21

6'-0"

.

D

3 A5.3 3 A5.3

16

C

S C A L E :

16

B

2'-0"

.

18

3'-0"

CART BY OWNER

M

15

2'-10" 1'-8"

WASHER & DRYER BY OWNER

13

2'-10"

2'-10" 1'-8" 2'-10"

2'-0"

CART BY OWNER

3 A4.2

16 1

16 WASHER & DRYER BY OWNER

11

3'-0"

16

10

2'-6"

1

8

2'-6" 1'-8"

5

2'-6" 1'-8"

2'-6"

4.1

O

20

8 1/2"

1ST FLOOR TYP UNIT_ WEST 15C 18 SCALE: 1/4" = 1'-0" 3'-7 1/2" 1ST FLOOR TYP UNIT_ WEST 12'-0" 2'-2" SCALE: 1/4" = 1'-0"

2'-6" 1'-8"

16

N

EIFS SYSTEM "V" REVEAL AS PER ELEVATIONS 6'-11 1/2"

16'-0"

13 3'-7 1/2"

Y

EIFS STSTEM 16 AS PER DTLS. & SPECS. COLOR 2 TO B

21

C

1 A5.3 1 A5.3

E

8 1/2"

W I N G

1 ' - 0 "

K

8'-0"

2

11

2'-8 1/4"

=

N

EIFS STSTEM AS PER DTLS. & SPECS. COLOR 1 TO B

2'-11"

8'-0"

16 11

2'-7 1/4"

2'-6"

2'-6"

3'-0"

1'-6"

1 / 4 "

3'-0"

20

W E24 S T

S C A L E :

A 16

2'-7 1/4"

12'-9 1/4"

20

L

FOOTING AS PER STRUCTURAL DWGS & DTLS. 1'-10 1/2"

2'-3 1/4"

12'-1 3/8"

24

M . C .

2'-7 1/4"

10'-8"

4'-0"

6'-9 5/8"

13'-0 5/8"

15

3'-0"

2'-6"

3'-0"

10'-8"

8'-4"

3 A4.1

20

6'-2 1/2"

1ST FLOOR TYP UNIT_SOUTH B 10 11 SCALE: 1/4" = 1'-0" 47'-9" 1ST FLOOR TYP UNIT_SOUTH SCALE: 1/4" = 1'-0"

3'-0"

1'-3"

10'-8"

2'-6"

1'-9"

8

1 A5.3 1 A5.3

2'-7 1/4"

2'-10" 1'-8"

2'-10" 1'-8" 2'-10"

13

B

1

NURSE'S FRIDGE STATION BY OWNER WC101

5'-10 7/8"

1

1 16

C.9

P 16

1'-10 1/2"

2'-2"

2'-3 1/4"

16

20

1'-10 3/8"

2'-7 1/4"

2

16

1'-3"

2C A5.3 2 A5.3

3'-0"

P

2'-3 5/8" 5'-10 7/8"

5'-3"

WC111a

FRIDGE BY OWNER

WEST M.C. NORTH CORRIDOR WC100

3'-1"

1'-4 1/2"

5'-3"

2'-10"

1'-3"

5'-10 7/8"

1'-2 1/2"

1'-3"

3'-0"

8 1/2"

1'-3"

5'-10 7/8"

1'-1" TYP.

2'-6"

1'-3"

2'-6" 1'-8"

1'-3"

2'-7 1/4"

11

20

1'-3"

16

1'-6 7/8"

2'-3 1/4"

10

1ST FLOOR TYP UNIT_ NORTH A 4.1 5 SCALE: 1/4" = 1'-0" 1ST FLOOR TYP UNIT_ NORTH 8'-6 3/8" SCALE: 1/4" = 1'-0"

B

2'-7 1/4"

12'-11 3/4"

8'-0"

20 8

6'-0"

3'-0"

8'-4"

6'-0"

13'-4 5/8"

A 1 A5.3 1 A5.3

3'-0"

8'-0"

2'-6"

1'-9"

2

16

2

1'-9 1/2" 2'-7 1/4"

2'-3 1/4"

6'-2 1/2"

5

1'-10 3/8"2

10'-8"

15 16

1'-10"

1'-9"

8'-3"

15

2'-7 1/4"

7 1/8" 5'-6 1/2"

3'-1"

12'-6 3/8"

11'-9"

10"

5'-2 7/8"

M.C. UNIT W120

4'-0"

5'-2 7/8"

M.C. UNIT W118

1'-2 1/2"

9'-9 1/4"

7 1/4"

5'-10 1/2"

K E Y

D

M.C. UNIT W116

3'-1"

12'-3 3/8" 1'-4 3/8"

5'-10 7/8"

3'-0"

M.C. UNIT W114

3'-1"

2'-5"

M.C. UNIT W112

2'-5"

M.C. UNIT W110

3'-1"

B U I L D I N G

21

5'-6"

3'-1"

20

2'-5"

M.C. UNIT W108

3'-1"

15

2'-5"

M.C. UNIT W106

UNIT TYP D W104

13

2'-5"

D

11

2'-5"

10

2'-5"

8

2'-5"

5

16

D

16


Blue Bell, PA 19422

4'-0"

FASCIA BOARDS AS PER DETAILS.

4'-0"

6" 6"

SLOPE

Phone: 610.834.7805

2'-6"

482 Norristown Rd. | Suite 300

TY PIC A L RO OF CON S TRU C TIO N

Facsimile: 610.834.7815

M

P.C. UNIT

8'-0"

8'-6"

EIFS. EXTERIOR NON-BEARING WALL CONSTRUCTION

LIGHT GAUGE METAL ANGLE BRIDGING GAP FROM CONC. PLANK TO MTL STUDS

6 A10.3

STRUCT. BEAM BEYOND AS PER STRUCT. DWGS.

MANUFACTURED STONE VENEER ON CONCRETE WALL CONSTRUCTION

STEEL BASE PLATE W/ LEVELING GROUT AS PER STRUCT. DWGS

HOLD MSV. 2" MIN. ABOVE GRADE

Construction Issue Date:

24" x 24" CONCRETE PIER AS PER STRUCT. DWGS.

UNFINISHED SPACE

BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976

T.O. PIER 3'-0"

8x8 TUBE STEEL COLUMN AS PER STRUCT. DWGS.

Scale: AS NOTED

M.C. UNIT LIGHT GAUGE METAL ANGLE BRIDGING GAP FROM CONC. PLANK TO MTL STUDS

Checked By: JT

7'-10"

8'-4"

PR EC A S T H OLL OW C OR E C ON C . PLANK FLOOR CONSTRUCTION

Drawn By:

T H E P A T H W A Y S A T W A R R I N G T O N

LIGHT GAUGE METAL SLIP CLIP

WALL SECTIONS C

A

L

E

W A L L :

1

/

2

"

=

1 A8.0

S E C T I O N 1

'

-

0

"

T Y P . S

C

A

L

W A L L

E

:

1

I

/

2

"

A8.0

S E C T I O N

=

1

2

'

-

0

"

3

4.3

K

6.3

E

Y

P

L

B 5'-0"

5'-0" SLOPE

SLOPE

B A 31

32

0

33

19

20

S E C T I O N

29 UPPER LOBBY

DINING ROOM

i

i

K E Y

1

FOOTING AS PER STRUCTURAL DWGS & DT

2

4" CONCRETE SLAB OVER 15 MIL STEGO VA STONE. SEE STRUCTURAL DWGS FOR ADDI

3 J

STEEL COLUMN AS PER STRUCTURAL DWG

4

STEEL BEAM AS PER STRUCTURAL DWGS.

5

FOUNDATION WALL AS PER STRUCTURAL

6

BITUMINOUS WATERPROOFING W/ COMPO AT BASEMENT AREAS.

31 30 VESTIBULE

LOBBY CORRIDOR

LOBBY

8'-6"

T Y P . S

8'-0"

2 A8.0

28 LOUNGE

SLOPE

7

4" Ø PERFORATED PVC FOUNDATION DRA SOCK. DAYLIGHT TO STORMWATER MANA

8

1 12" RIGID INSULATION MIN. 3'-0" BELOW FI

9

MANUFACTURED STONE VENEER OVER 1 12 INSTALL AS PER MANUFACTURER'S RECOMM

10

6" METAL STUDS AS PER DELAGATED DESIG GYPSUM SHEATHING AND 12" GWB.

SLOPE

27

8'-0"

C T I O N "

Sheet Name:

M

S L A B - O N - G R A D E FLOOR CONSTRUCTION

Progress Prints: Permit Set - 03.28.2018

PERIMETER DRAIN AS PER DETAILS

BEAUTY BAR

2 A3.4 I

S S

E C

A

C L

E

:

CORRIDOR

T 1

I /

4

"

O =

J

Lei Yu_ Work Sample

23

KITCHEN

N 1

'

B -

0

-

B

11

6" BATT INSULATION

12

EIFS SYSTEM INSTALLED AS PER MANU. RECO OVER 1 12" RIGID INSULATION

13

ALUM. CLAD WOOD WINDOWS & DOORS

14

6 3 4" x 12" GLUED LAMINATED WOOD BEAM SPECS.

15

ALUMINUM WRAPPED FASCIA & COPING AS

16

8" PRECAST CONCRETE PLANK W/ STRUCTURAL DWGS & SPECS.

17

OPEN WEB STEEL JOIST AS PER STRUCTURA

18

1 12" METAL DECK AS PER STRUCTURAL DWG

19

4 12" RIGID INSULATION. PROVIDE TAPPERED ROOF DRAINS AS PER PLANS.

20

EPDM ROOF MEMBRANE AS PER DTLS. & SPE

3

4"

TOP

"

K

M

85 15 2'-6"

21

8" CMU WALLS ON THICKENED CONC. SLA

22

METAL STUD PARTITIONS AS PER PLANS.

4'-0"


STEEL JOIST AS PER STRUCTURE DRAWINGS

25

BALUSTERS

19

CEILING AS PER RCP

26

STAIR TREAD

20

STEEL LO WITH SAFETY POST

27

STEEL FRAME

21

36'' X36'' ROOF HATCH

10

229

5 5A5.6

A5.6

STAIR

STAIRST-1

2 ST-12

2 ST-1

LOWER LOWER 2 LOWER 2 2 A7.3 A7.3 A7.3

1

1 A7.4

1

#1

#2

BASEMENT_ LOBBY STAIR & ELEVATOR

BASEMENT_ LOBBY STAIR & ELEVATOR

A7.4 SCALE: 1/4" = STAIR 1'-0" & ELEVATOR BASEMENT_ LOBBY A7.4 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0"

1

1

1

9

NEWEL BOX

24

NEWEL BOX

25

BALUSTERS

26

STAIR TREAD

7'-4"

26

STAIR TREAD

27

STEEL FRAME

5 5 ELECTRIC ROOM ELECTRIC ROOM

13'-5" 13'-5"

ELECTRIC ROOM

1 FINISHED FLOOR FINISHED FLOOR

1

1

2

3

2 2 B18 B18

LOBBY STAIR & ELEVATOR SECTION LOBBY STAIR ELEVATORSECTION SECTION 2 = 21'-0"LOBBY STAIR && ELEVATOR SCALE: 1/2"

SCALE: 1/2" = 1'-0"

SCALE: 1/2" = 1'-0"

86

3 3

STEEL FRAME

26

27 TREAD STAIR

27

STEEL FRAME

A7.4

482 Norristown Rd. | Suite 300

Blue Bell, PA 19422

Phone: 610.834.7805

T H E P A T H W A Y S A T W A R R I N G T O N

BY GLORIA DEI COMMUNITIES JT

CCD, LY

Checked By: JT

Drawn By:

Construction Issue Date: Facsimile: 610.834.7815

Blue Bell, PA 19422 482 Norristown Rd. | Suite 300

Facsimile: 610.834.7815

Progress Prints: Permit Set - 03.28.2018

Scale: AS NOTED

JT

LY

Checked By: JT

Drawn By: Blue Bell, PA 19422

Sheet Name: ELEVATOR PLAN & SECTION

STAIR PLANS & SECTION

Progress Prints: Permit Set - 03.28.2018 Phone: 610.834.7805

Phone: 610.834.7805

Scale: AS NOTED

5'-3"

METAL PAD STAIR AS PER SPECS

24

36'' X36'' ROOF HATCH

1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS

BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976

NEWEL BOX

15

Lei Yu_ Work Sample

23

21

JT

METAL PAD STAIR AS PER SPECS SERVER

15

FINISHED FLOOR

LANDING

A7.4

36'' X36'' ROOF HATCH

Checked By: JT

8

FOOD PREP

15

A7.4

21

COMMUNITIES T BY H GLORIA E PDEIA T H W A Y S 2900 WEST STREET ROAD A T WARRINGTON, W A R R N G T O N PA I18976

7 HATCH 36'' X36'' ROOF

FOOD PREP

5

2 A7.4

20

STEEL LO WITH SAFETY POST

JT

9

STEEL LO WITH SAFETY POST

21

FINISHED FLOOR

2

CEILING AS PER RCP

CEILING AS PER RCP

20

FINISHED FLOOR

x A8.3

13'-5"

20

19

22 FOUNDATION WALL AS PER STRUCTURE DRAWINGS

6"

x A8.3

x A8.3

x A8.3

Sheet Name:

CMU BOND BEAM

6"

15

x A8.3

2 A7.4 A7.4 A7.4 2 B18

19

2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK JOIST LO AS PER STRUCTURE 18 STEELSTEEL WITH SAFETY DRAWINGS POST

15

Drawn By: AS NOTED Scale: CCD, LY

5'-3"

B18

3,500lb 3,500lb 3,500lb3,500lb 3,500lb ELEV. 3,500lb ELEV. ELEV. ELEV. ELEV. ELEV. #1 #2 #1 #2

1 UP UP 1 UP 1 ST-1 ST-1 ST-1

22

ROOM

B18

ST-1

ST-1

2

ELECTRIC B18 ROOM

LOBBY ST-1

8'' COLD FORM STEEL CHANNEL 24'' O.C. WALL PER STRUCTURE DRAWINGS 17 FOUNDATION CEILING AS PERAS RCP

14

Progress Prints: Permit Set - 03.28.2018

B27

EXTERIOR JOISTAS ASPER PERDETAIL STRUCTURE DRAWINGS 18 STEELFINISH

38'-0"

5'-1 1/4"

5'-3"

ROOM B27

5 A5.6

WALL AS PER STRUCTURE DRAWINGS CMU BOND BEAM 17 FOUNDATION

16

FOOD PREP

LANDING

6'-5"

ROOM B27 1.1 EXAM

x A8.3

LANDING

A7.

EXTERIOR PERWITH DETAIL 2.16LAYER 5/8'' FIREFINISH CODE AS GWB FIRE CAULK

15

7/14'' METAL DECK

x A8.3

6"

6'-5"

ROOM1.1 EXAM

ELECTRIC ELECTRIC ROOM

14

2X8 P.T. WOOD BLOCKING .040 ALUMINUM COPING

FINISHED FLOOR

1

CMU BOND BEAM 15COLD 8'' FORM STEEL CHANNEL 24'' O.C.

12

15

15

x A8.3

2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK 14 METAL 7/14'' DECK

13

11

SERVER 25 BALUSTERS

x A8.3

SERVER

6'-2 3/4"

H

7

x A8.3

LANDING

H

7

12

10

24 7'-4"

7'-4" x A8.3

2'-11 1/2"

2 A7.4

ROOF MEMBRANE

7/14'' METAL DECK

.040 ALUMINUM COPING

7

15

x A8.3

LANDING

LOBBY STAIR LOBBY

14

2 A7.4 C

6'-5"

1

6

LANDING

G

1.1 EXAM1

7

4'' RIGID INSULATION

9

23

8

C

SCALE: 1/4" = 1'-0" 1ST FLOOR_ LOBBY STAIR & ELEVATOR G H SCALE: 1/4" = 1'-0"

15

7'-4"

2 FOOD A7.4

A7.3

G

1 1/2'' METAL DECK

8

19

15

9

A7.3 UP

A7.4

7

12

11

BALUSTERS BALUSTERS 22 1 1/2'' PAINTED HANDRAILS WITH 1/2''25X 1/2''

7'-4"

#2

14

10

C

1ST FLOOR_ LOBBY STAIR & ELEVATOR SCALE: = 1'-0" 1 1/4"1ST FLOOR_2LOBBY STAIR & ELEVATOR 1 A7.4

13 8'' COLD FORM STEEL CHANNEL 24'' O.C. W8 HOISTBEAM AS PER STRUCTURE DRAWINGS

Sheet Name: ELEVATOR PLAN & SECTION

E101b

7'-4"

#1

6

x A8.3

2'-11 1/2"

3,500lb ELEV.

DN

2

2

1 A7.4

1

#2

3,500lb ELEV.

UP

2 A7.3

B

14

FOOD

#2 3,500lb ELEV.

#1

DN

6

5'-1 1/4"

DN UP

STEEL BEAM AS PER STRUCTURE DRAWING 10 2X8 P.T. WOOD BLOCKING

6

1018 STEEL JOIST AS PER STRUCTURE DRAWINGS23 METAL PAD STAIR AS PER SPECS 22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS 8

H

5'-1 1/4"

ELEV.

3,500lb ELEV. D

G

D

2'-11 1/2"

ST-1

2

2 C A5.4

3,500lb #1 E101b

FOOD

2X8 P.T. WOOD BLOCKING

5

8

17

x A8.3

E101b

A

ROOF MEMBRANE

8'' CONCRETE PLANK AS PER STRUCTURE 11 .040 ALUMINUM COPING 9 ROOF MEMBRANE DRAWING & DETAIL

1610 EXTERIOR FINISH AS PER DETAIL

LOBBY ELEVATOR ROOF_ DETAIL SECTIONx A8.3 SCALE: 1" = 1'-0"

1

B

A

H

6'-2 3/4"

3,500lb WARMING KITCHEN ELEV.

3 A7.4

D 2 C A5.4

E101b

LOBBY STAIR

2

2 C A5.4

B KITCHEN

ST-1

1.1

1 E101b

A

E101b WARMING

H

LOBBY STAIR

1

WARMING KITCHEN

6'-2 3/4"

G

G

9

4

13

7

H

2ND FLOOR_ LOBBY STAIR & ELEVATOR SCALE: 1/4" = 1'-0"

ST-1

G

LOBBY ELEVATOR ROOF_ DETAIL SECTION SCALE: 1" = 1'-0" H

4'' RIGID INSULATION

T H E P A T H W A Y S A T W A R R I N G T O N

2 A7.3

G

LOBBY ELEVATOR ROOF_ DETAIL SECTION 14 6 15 SCALE: 1" = 1'-0"

3 A7.4

8

1 1/2'' METAL DECK

8

CCD, LY

3 A7.4

9

W8 HOISTBEAM AS PER STRUCTURE DRAWINGS

7

Construction Checked By: JT Issue Date:

2 A7.4

1 2ND FLOOR_ LOBBY STAIR & ELEVATOR 3 ST-1 A7.4 GSCALE: 1/4" = 1'-0" H

1.1

9

6

ELEVATION PIT AS PER STRUCT DRWGS & 10 ELEVATOR MANUFACTURE'S REQUIREMENTS

SERVER

ST-1

2

LOBBY STAIR

8

ELEVATION AS PER SPECS

3

Drawn By:

LOBBY STAIR

92

15

14 6 15 LOBBY STAIR & ELEVATOR SECTION SCALE: 1/2" = 1'-0"

2 A7.4

1 228

W8 HOISTBEAM AS PER STRUCTURE DRAWINGS

Construction Issue Date:

1 229

2ND FLOOR_ LOBBY STAIR & ELEVATOR A7.3 SCALE: 1/4" = 1'-0" DN

1

6

6

Progress Prints: Permit Set - 03.28.2018

230

DN

1.1

14 9

8

4" 1'-4"

2 A7.4

OFFICE

3 ST-1

1 A7.4

10

13

8'' CONCRETE PLANK AS PER STRUCTURE

8'' CMU BLOCK 3WALL AS PER DETAILS5& STEEL BEAM AS PER STRUCTURE DRAWING 8 4'' RIGID INSULATION STRUCTURE DRAWINGS

1

482 Norristown Rd. | Suite 300

12

229

ELEVATION AS AS PERPER STRUCT DRWGS DRAWING & 5 STEEL PIT BEAM STRUCTURE ELEVATOR MANUFACTURE'S REQUIREMENTS

4

Sheet Name: ELEVATOR PLAN & SECTION

E1

3

DRAWING & DETAIL PLAN AND SECTION NOTES 7 1 1/2'' METAL DECK

Blue Bell, PA 19422

1 228

2 2 A7.4B18 SERVER

1

A7.3

8'' CONCRETE PLANK AS PER STRUCTURE ELEVATION AS PER DRAWING & SPECS DETAIL

Facsimile: 610.834.7815

1 229

C1

2 BASEMENT_ LOBBY 2 A7.3 STAIR & ELEVATOR 3 SCALE: 1/4" = 1'-0" ST-1

1

9

2 A7.4 SERVER

1

E2

8

2

A7.3

ELEVATION PIT AS PER STRUCT DRWGS &

4

BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976

E3

13

38'-0"

2 A7.3

10

3

8'' CMU BLOCK WALL AS PER DETAILS & ELEVATOR MANUFACTURE'S REQUIREMENTS STRUCTURE DRAWINGS

Scale: AS NOTED

LOBBY STAIR

1.1

#2OFFICE

1 E1 228

229

ST-1 LOWER DN

1

9 FINISHED FLOOR

1 229

AS PER SPECS PLAN ELEVATION AND SECTION NOTES

T H E P A T H W A Y S A T W A R R I N G T O N

#1

ELECTRIC ROOM

4" 1'-4"

G

3,500lb E2 ELEV. 230

1

8

12

1 H UP ST-1

ST-1

2

2

13 13'-5"

230

3,500lb E3 ELEV.

2 ST-1 C1 LOBBY STAIR

1 A7.4

SCALE: 1/2" = 1'-0"

OFFICE

1.1

1 A7.4

A7.3

E1

C1

8'' CMU BLOCK WALL AS PER DETAILS & STRUCTURE DRAWINGS

2

10

38'-0"

B18

E2

LOBBY STAIR SECTION_ST-1 2 LOBBY STAIR SECTION_ST-1 12 SCALE: 1/2" = 1'-0"

4" 1'-4"

E3

H

2 A7.3

LANDING

1

5

482 Norristown Rd. | Suite 300

5'-3"

ST-1

G

5 A5.6 1

2

2

2

1.1

1

1.1

B27

1.1

PLAN AND SECTION NOTES 15

6'-5"

ROOMA7.3

1

H

Phone: 610.834.7805

6'-2 3/4"

x A8.3

Sheet Name:

38'-0"

STAIR PLANS & SECTION

2'-11 1/2"

5'-1 1/4"

6"

LOWER LOBBY

FOOD PREP

LANDING

ELECTRIC ROOM

STEEL FRAME

LOWER LOBBY

15

x A8.3

1 LOBBY BASEMENT_ LOBBY STAIR_ST-1 BASEMENT_ STAIR_ST-1 LOBBY A7.3 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" STAIR

1.1 EXAM 1

STAIR TREAD

27

x A8.3

LANDING

1'-9" 1'-9"

G

1 G

BALUSTERS

26

Construction Issue Date:

7'-4" x A8.3

FINISHED FLOOR

1

NEWEL BOX

25

SERVER

LANDING

H

METAL PAD STAIR AS PER SPECS

24

Scale: AS NOTED

x A8.3

2 A7.4

11'-8''

7

23

JT

x A8.3

15

LY

14

Checked By: JT

8

Construction Issue Date:

22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS

LOBBY

6

BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976

NEWEL BOX

18

24

T H E P A T H W A Y S A T W A R R I N G T O N

METAL PAD STAIR AS PER SPECS

x A8.3

LANDING

EXTERIOR FINISH AS PER DETAIL

FOUNDATION WALL AS PER STRUCTURE DRAWINGS

27

23

9

LANDING

CMU BOND BEAM

15

BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976

STAIR TREAD 16

26

2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK

NEWEL BOX 14

T H E P A T H W A Y S A T W A R R I N G T O N

36'' X36'' ROOF HATCH

24

7'-4"

11'-4'' 20 RISERS

6'-2 3/4" 5'-1 1/4"

BALUSTERS

7

Drawn By:

H

x A8.3

6'-2 3/4"

5'-3"

STEEL LO WITH SAFETY POST 25

X 1/2'' BALUSTERS 22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' STEEL FRAME 17

LOBBY

11'-8''20 RISERS 20 RISERS 4'-8" 4'-8" 5'-3"

B26

LOWER B26 LOBBY

2 A7.3

CEILING AS PER RCP

20

LANDING

FOOD

C

2 A7.3

STEEL JOIST AS PER STRUCTURE DRAWINGS

19

21

x A8.3

11'-4'' 20 RISERS

2

UP

LOBBY

1 UP ST-1 LOWER

3,500lb

1 ELEV. ST-1 #1

#2

18

JT

5'-1 1/4"

1 103

UP

2 A7.3

D

B

LOBBY

x A8.3

1

11 .040 ALUMINUM COPING 36'' X36'' ROOF HATCH

Progress Prints: Permit Set - 03.28.2018

10'-10"

1 103 DN

2 A7.3 2 C A5.4

#1

2 ST-1

LOBBY ELEVATOR ROOF_ DETAIL SECTION SCALE: 1" = 1'-0"

E101b

21

EXTERIOR FINISH AS PER DETAIL

CCD, LY

#1

2

A

3,500lb ELEV.

G

3 A7.4 x A8.3

Blu 482 Norristown Rd. | Suite 300

8

12 7/14'' METAL DECK 22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS 17 FOUNDATION WALL AS PER STRUCTURE DRAWINGS 13 8'' COLD FORM STEEL CHANNEL 24'' O.C. 23 METAL PAD STAIR AS PER SPECS

x A8.3

x A8.3

482 Norristown Rd. | Suite 300

14

Drawn By:

10'-10"

13

LANDING

#1

2 ST-1

9

12

SLOPE

15

16

G

3,500lb ELEV.

1ST FLOOR_ LOBBY STAIR & ELEVATOR SCALE: 1/4" = 1'-0"

G

6

11

Construction Issue Date:

2 A7.3

2 3,500lb ELEV.

UP

ST-1

3,500lb ELEV.

WARMING KITCHEN

ST-1

LOBBY STAIR

14

DN

E3 WARMING KITCHEN

LOBBY C1 STAIR

1.1

ST-1

LOBBY STAIR

2 A7.3

SLOPE

14

Progress Prints: Permit Set - 03.28.2018

LOBBY STAIR

#1

3,500lb ELEV. 1.1

1 1

H

H

9

x A8.3

2 A7.4

8'' CONCRETE PLANK 8'' COLD FORM4 STEEL CHANNEL 24'' O.C. AS PER STRUCTURE DRAWING & DETAIL 2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK 5 STEEL BEAM AS PER STRUCTURE DRAWING 15 CMU BOND BEAM 4'' RIGID INSULATION 6 W8 HOISTBEAM AS PER STRUCTURE DRAWINGS ROOF MEMBRANE 16 EXTERIOR FINISH AS PER DETAIL 7 1 1/2'' METAL DECK 2X8 P.T. WOOD BLOCKING 17 FOUNDATION WALL AS PER STRUCTURE DRAWINGS 8 4'' RIGID INSULATION .040 ALUMINUM COPING 18 STEEL JOIST AS PER STRUCTURE DRAWINGS 7/14'' METAL DECK 9 ROOF MEMBRANE CEILING AS PER RCP 8'' COLD FORM STEEL CHANNEL19 24'' O.C. 10 2X8 P.T. WOOD BLOCKING STEEL LO WITH SAFETY POST 2. LAYER 5/8'' FIRE CODE GWB WITH CAULK 20 FIRE 13

1 1/2'' METAL DECK

10

x A8.3

AS PER SPECS

.040 ALUMINUM COPING 3 ELEVATION PIT AS PER STRUCT DRWGS & 7/14'' METAL DECKELEVATOR MANUFACTURE'S REQUIREMENTS

W8 HOISTBEAM AS PER STRUCTURE DRAWINGS

8

W18

x A8.3

E101b

1ST FLOOR_ LOBBY STAIR_ST-1 SCALE: 1/4" = 1'-0"

UP

STEEL BEAM AS PER STRUCTURE DRAWING

LOBBY 15 CMU BOND BEAM

H

DN

1 A7.4

2

W18

1.1 1 A7.3

2

1.1

W12

LOBBY STAIR 1ST FLOOR_ LOBBY STAIR_ST-1 ST-1 SCALE: 1/4" = 1'-0"

1 A7.3

1

1 228

229

ST-1

LOBBY C1 STAIR

H G

1

1.1

5

11

Sheet Name: ELEVATOR PLAN & SECTION

3 ST-1

1 229

G

1

8'' CONCRETE PLANK AS PER STRUCTURE DRAWING & DETAIL

12

SERVER

2ND FLOOR_ LOBBY STAIR & ELEVATOR SCALE: 1/4" = 1'-0"

G

BLOCKING 10 2X8 ELEVATION PIT AS PER STRUCT DRWGS & P.T. WOOD 2 ELEVATION ELEVATOR MANUFACTURE'S REQUIREMENTS

4

7

2ND FLOOR_ LOBBY STAIR_ST-1 SCALE: 1/4" = 1'-0" 3

2 A7.3

ELEVATION AS PER SPECS

3

SLOPE 6

230

1 8'' CMU BLOCK WALL AS PER DETAILS & ROOF MEMBRANE STRUCTURE DRAWINGS

2

4" 1'-4"

DN

E3 WARMING KITCHEN

ST-1

ST-1

1 A7.4

9

W12

LOBBY STAIR

H

1 A7.3

8 SLOPE

DN

2

13

x A8.3

OFFICE

2ND FLOOR_ LOBBY STAIR_ST-1 SCALE: 1/4" = 1'-0"

G

1 A7.3

E1

2

C1 C1

1.1

E2

ST-1

1

1.1

E3

10

9

Blue Bell, PA 19422

12

1

PLAN AND SECTION NOTES

8'' CMU BLOCK WALL AS PER DETAILS & RIGID INSULATION 8 4'' STRUCTURE DRAWINGS

1

Facsimile: 610.834.7815

2

Phone: 610.834.7805

1.1

W8 HOISTBEAM AS PER STRUCTURE DRAWINGS

Checked By: JT

2 A7.3

1

STEEL BEAM AS PER STRUCTURE DRAWING

6

7 1NOTES 1/2'' METAL DECK PLAN AND SECTION

H

H

G

G

Facsimil

3 ST-

D ST-1

LOBBY STAIR

C1

DRAWING & DETAIL 5

A7.4 A7.4


7

A.1

B

E3

UNIT TYPE G

i A.1

2ND FLOOR_WEST STAIR_ST-2 SCALE: 1/4" = 1'-0" 5'-8"

A.1

E3

2 A7.1

WEST STAIR

SLOPE

LANDING

FFE: 320.5' UP DN

2ND FLOOR_WEST STAIR_ST-2 1ST FLOOR_WEST SCALE: 1/4" = 1'-0" STAIR_ST-2 SCALE: 1/4" = 1'-0"

EXTERIOR FINISH AS PER DETAIL FOUNDATION WALL AS PER STRUCTURE DRAWINGS

5'-8"

W12

5'-8"

25

WEST STAIR_ST-2 SECTION SCALE: 1/2" = 1'-0"

10 RISERS

K

SLOPE

4'-0"

EAST STAIR

SLOPE

2 A7.2

B

10'-2"

1ST FLOOR_WEST STAIR_ST-2 K SCALE: 1/4" = 1'-0"

UNIT TYPE G 2 A7.1

2ND FLOOR_ EAST STAIR_ST-3 SCALE: 1/4" = 1'-0"

3 ST-3

DN

5'-8" EAST STAIR ST-3

2 A7.2

WEST STAIR_ST-2 SECTION SCALE: 1/2" = 1'-0"

W10

LANDING

UNIT TYPE G 5'-8"

UP

11'-4" 20 RISERS

22

K 1ST FLOOR_ EAST STAIR_ST-3 SCALE: 1/4" = 1'-0"

W10

11'-8" 20 RISERS

5'-10"

1 A7.2

2 ST-3

2 A7.2

UP

EAST STAIR ST-3

LANDING

MAINE OFFICE 5'-10"

22 MAINTENANCE OFFICE

4'-0"

1 ST-3

K 1 A7.2

18

STEEL JOIST AS PER STRUCTURE DRAWINGS

19

CEILING AS PER RCP

20

STEEL LO WITH SAFETY POST

21

36'' X36'' ROOF HATCH

BASEMENT_ EAST STAIR_ST-3 SCALE: 1/4" = 1'-0"

2 A7.2

Lei Yu_ Work Sample

EAST STAIR TOWER_ ST-3 SECTION SCALE: 1/2" = 1'-0"

87

23

METAL PAD STAIR AS PER SPECS

24

NEWEL BOX

25

BALUSTERS

26

STAIR TREAD

27

STEEL FRAME

PLAN AND SECTION NOTES

10 RISERS

DN

ST-3

1 A7.2

8'' COLD FORM STEEL CHANNEL 24'' O.C.

17

UNIT TYPE G

DN

7/14'' METAL DECK

13

16

i

3 ST-2

2 A7.1

12

UNIT TYPE G

LANDING

22

LO WITH SAFETY POST 420 8''STEEL CONCRETE PLANK AS PER STRUCTURE DRAWING & DETAIL 21 36'' X36'' ROOF HATCH 5 STEEL BEAM AS PER STRUCTURE DRAWING 22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS 6 W8 HOISTBEAM AS PER STRUCTURE DRAWINGS 23 METAL PAD STAIR AS PER SPECS 7 1 1/2'' METAL DECK 24 NEWEL BOX 8 4'' RIGID INSULATION 25 BALUSTERS

SLOPE

B B

WEST STAIR 4ST-2 ST-3

FINISH AS PER DETAIL 116 8''EXTERIOR CMU BLOCK WALL AS PER DETAILS & STRUCTURE DRAWINGS 17 FOUNDATION WALL AS PER STRUCTURE DRAWINGS 2 ELEVATION AS PER SPECS 18 STEEL JOIST AS PER STRUCTURE DRAWINGS

2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK

UNIT TYPE G

4'-0"

1 ST-2

E3

24

2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK

CMU BOND BEAM

10 RISERS

2 A7.1

24

8'' COLD FORM STEEL CHANNEL 24'' O.C.

14

22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS

A.1 A.1

1 A7.1

13

15

ST-2

2 A7.1

24A.1

7/14'' METAL DECK

14

3 ST-2

5'-8"

WEST STAIR ST-2

B

W12

10 RISERS

2 ST-2

E3

25

26

.040 ALUMINUM COPING

12

9 ROOF MEMBRANE 26 STAIR TREAD 10 2X8 P.T. WOOD BLOCKING 27 STEEL FRAME 11 .040 ALUMINUM COPING

B

1 A7.1

1 1 A7.1 A7.1

2X8 P.T. WOOD BLOCKING

11

3 ELEVATION PIT AS PER STRUCT DRWGS & CEILING AS PER RCP 19 ELEVATOR MANUFACTURE'S REQUIREMENTS

FFE: 320.5' UP

1 ST-2

26

10

Construction Issue Date:

2 A7.1

26

ROOF MEMBRANE

1

8'' CMU BLOCK WALL AS PER DETAILS & STRUCTURE DRAWINGS

2

ELEVATION AS PER SPECS

3

ELEVATION PIT AS PER STRUCT DRWGS & ELEVATOR MANUFACTURE'S REQUIREMENTS

4

8'' CONCRETE PLANK AS PER STRUCTURE DRAWING & DETAIL

5

STEEL BEAM AS PER STRUCTURE DRAWING

6

W8 HOISTBEAM AS PER STRUCTURE DRAWINGS

7

1 1/2'' METAL DECK

8

4'' RIGID INSULATION

9

ROOF MEMBRANE

10

2X8 P.T. WOOD BLOCKING

11

.040 ALUMINUM COPING

12

7/14'' METAL DECK

13

8'' COLD FORM STEEL CHANNEL 24'' O.C.

14

2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK

15

CMU BOND BEAM

16

EXTERIOR FINISH AS PER DETAIL

17

FOUNDATION WALL AS PER STRUCTURE DRAWINGS

18

STEEL JOIST AS PER STRUCTURE DRAWINGS

19

CEILING AS PER RCP

20

STEEL LO WITH SAFETY POST

21

36'' X36'' ROOF HATCH

22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS 23

METAL PAD STAIR AS PER SPECS

24

NEWEL BOX

25

BALUSTERS

26

STAIR TREAD

27

STEEL FRAME

Construction Issue Date:

WEST STAIR ST-2

SLOPE

SLOPE

2 ST-2

25

4'' RIGID INSULATION

9

BEAMSECTION NOTES PLAN AND 15 CMU BOND

25

26

1 1/2'' METAL DECK

8

A


Bulter Residence Private Residential House on Mountain in Cashiers, NC Team work Kimmel Bogrette Architecture+ Site From Original Concept to Schematic Design and Design Development

CO-TENT All in one tent- Immediate Rescue Solutions and Temporary Space after Disaster Personal Work Design for Nepal Earthquake Rescue 2015

Lei Yu_ Work Sample

88


Lei Yu_ Work Sample

89


BUILDING ENVELOPE COVERAGE: 10,100 SQ. FT. BUILDING COVERAGE MAXIMUM (80%) = 8,088 SQ. FT. BUILDING COVERAGE MAX PROVIDED = 4,570 SQ. FT.

ROOF BELOW

LOT COVERAGE BUILDING LOT COVERAGE MAX (30%) = 11,343 SQ. FT. BUILDING LOT COVERAGE PROVIDED = 4,570 SQ. FT.

DECK

SCALE: 3/32" = 1'-0" 6 ft

0 ft

6 ft

12 ft

18 ft

LIVING AREA

DINING AREA

GALLERY

BAR

DUMB WAITER

WALK-IN CLOSET

KITCHEN

WINE CELLAR

COATS PANTRY

ENTRY

BUILDING ENVELOPE COVERAGE: 10,100 SQ. FT. BUILDING COVERAGE MAXIMUM (80%) = 8,088 SQ. FT. BUILDING COVERAGE MAX PROVIDED = 4,570 SQ. FT. LOT COVERAGE BUILDING LOT COVERAGE MAX (30%) = 11,343 SQ. FT. BUILDING LOT COVERAGE PROVIDED = 4,570 SQ. FT.

PLANTER

SCALE: 3/32" = 1'-0" 6 ft

STORAGE & MECHANICAL

Lei Yu_ Work Sample

90

0 ft

6 ft

12 ft

18 ft


Deployable Structure Transform from one objet to an other Instructor: Mohamad Al Khayer Team: David Feng, Lei Yu, Yu Gan 2017 Spring

Contemporary Furniture

Self-Supported Pav

From full to vacant

From rotatable to stable

Instructor: Katrin Mueller-Russo Solo Work 2017 Spring

Instructor: Simon Kim Team: Angela Huang, Lei Yu, Katie Ann McBride, Joey JH P 2017 Spring

Lei Yu_ Work Sample

91


State 1

State 2

Lei Yu_ Work Sample

92


State 3

Lei Yu_ Work Sample

93


Lei Yu_ Work Sample

94


Lei Yu_ Work Sample

95


Elastic unfolding From horizon to universe Lei Yu 2017 Portfolio University of Pennsylvania Master of Architecture Contact: 215-900-2219 yulei@upenn.edu

Critics: Cecil Balmond, Ezio Blasetti Student Group: Chih Kai Chan, Lei Yu, Moise Yamba

Lei Yu_ Work Sample

96


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.