CONTACT: (215)- 900- 2219 yulei@alumni.upenn.edu
Lei YU SELECTED WORK
Lei YU EDUCATION Master of Architecture/ May 2017 University of Pennsylvania B.A Industrial Design/ June 2013 China Academy of Art
PROFESSIONAL EXPERIENCE Kimmel Bogrette Architecture + Site Architectural Designer Blue Bell, PA October 2017- Current PRDG Intern Architect New York May- August 2016 HASSELL Intern Architect Shanghai, P.R.China April 2015- July 2015 UNStudio Design Intern Amsterdam, The Netherlands September 2014- February 2015 Buro Ole Scheeren Architectural Intern Beijing, P.R. China June 2014- September 2014
SELECTED ACADEMIC EXPERIENCE Certificate of Participation the 5 th LafargeHolcim Awards Competition in Sustainable Design (North American Region) March 2017 Research Assistant (with Professor Mark Yim and Associate Professor Simon Kim) Pennovation Center, University of Pennsylvania February 2017- August 2017 The 2nd Prize, E. Lewis Dales Traveling Fellowships PennDesign, Department of Architecture January 2016 Annual scholarship University of Pennsylvania PennDesign, Department of Architecture Year of 2013, 2015 and 2017 Golden Prize of Graduation Design Award Lin Fengmian Scholarship China Academy of Art June 2013 st
The 1 Prize Comprehensive Excellence Scholarship China Academy of Art Year of 2011, Year of 2012
CONTACT (215)- 900- 2219 yulei@alumni.upenn.edu
CONTENT ARCHITECTURE & TECTONICS MIXED- USE HIGH RISE Office, Hotel and Theater Site: SOHO, New York City
Instructor: Hina Jamelle Structure Consultant: Arup New York Team: Lei Yu, Chao Liu 2016 Spring
SHIFTING- HYBRIDS
Wellness Hotel & Residential Building Site: Tribeca, New York City Instructor: Hina Jamelle Solo work 2015 Fall
ARCHITECTURE & LANDSCAPE URBAN DEVELOPMENT SFOAK Resilient Airport Development Site: San Francisco and Oakland, C.A
Instructor: Matthijs Bouw, Kai-Uwe Bergmann Team: Lei Yu, Baihe Cui 2016 Fall
THE LANDING
Tot
S Hot Ret Res to
6
Proposed 1. MARTA Station Hall 2. Supermarket+Shopping Mall+Community Center 3. Retials+Apartments+Affordabal Housing 4. Restaurants+Tech Retial+Other Retials (with underground parking) 5. Hotels (with underground parking) 6. Business Incubator 7. Condominium housing 8. Retails (with underground parking) 9. Media Center 10. WeWork+Retail 11. Work and Live Lofts
JURONG N.E.X.T
Singapore HSR Station & CBD DevelopmentNext Engine for Exchange and Transformation
5
11
Bus Incu
11
or n Connect
Downtow
Instructor: Marilyn Taylor, Bob Yaro Team: Garesa Hao En Au, Adam Berkowitz, Ruyi Chen, Tingting Feng, Danqi (Silvia) Fang, Yiling Li, Sandy Klanfer,Yidi Xu, Lei Yu, Peiqian (Peggy) Zhong, Xinyi (Elynor) Zhou, Mengjie Zhu 2017 Spring PennDesign Asian Urbanism Studio
Comm C
4th St. NW
a. Pop-up Market Plaza b. MARTA Plaza c. Tech Plaza d. Olympic Tower Sq e. Media Center Event Lawn f. Overlook Hills g. Landing Grand Path h. Woods i. Ecologycal Rain Gardens j. Event Lawn k. Tech Square 2.0 l. bike lane m. Belt Line
Site: Singapore
Bus Com Par T Job
The Landing is a vision for the next generation’s urban experience. It means connecting people with opportunity and also each other by increased density; bridging Midtown, Georgia Tech, and Downtown together with a much needed green space; and anchoring jobs and investments by creating a “live where you work” environment.
k
10
3rd St. NW
Existing 1.Bank of America Plaza Atlanta 2. Fox Theatre 3. AT&T building 4. Bobby Dodd Stadium at Historic Grant Field 5. Georgia Tech Global Learning Center 6. Scheller College of Business
9
d
f
6 4
e
5 c
8
The LANDING
4 3
7
2
Peachtree St. Commer
Atlanta Midtown Urban Redevelopment
4
g
4
8 h b
7
i
3 3
M
Tot
S Ret Res t
tial Corridor
(ULI Hines Student Competition) Site: Atlanta
1
j 2
North Ave.
400 feet
300
Benefits
MARTA line
Spring St
Site Analysis
Live and work places for graduates
residence
Georgia Tech
Freeway Blocker
Tunnel
Georgia Tech Stadium
5m
P
Catalyze the development
New Research Facilities
DENSITY
Robust and healthy living environment
Increased land value New Festivals
Tax Benefits
Entertainments
Good Environment
PUBLIC REALM
1
P
MIDTOWN Catalyze the development
MARTA RIDERSHIP Energize the Stadium Increased land value
walkable streets
Good Environment Job Creation
Access to Midtown
CONNECTIVITY
Tax Benefits Catalyze the development
GEORGIA-TECH Energize the Stadium
Church
AT&T
The Fox Theater
North Ave M Station
l wa k
10
mi
P
k al nw
P
P
Historical District P
Other Works
BOA P
Residence
Jobs
Parks
North Ave
100%
2945 residences
95%
2306 jobs
79%
2.2 acres
Plazas
87%
1.09 acres
Walkable street
83%
1.89 miles
bike lanes
82%
0.82 miles
A
New Research Facilities Live and work places for graduates Access to Midtown
P
Site P The Varsity
in
North Ave
Olympic Tower
Peachtree NW
Tech Square
Tech Related Jobs
restaurants increased ridership Increased land value
Job Creation
Peachtree Corrido r
5th St
West Peachtree St. NW
200
Spring St. NW
100
l m a
Downtown Connector
2015 Spring PennDesign
Professional Works
Med Par t Job
b
Team: Lei Yu, You Wu, Lu Han, Siyang Jing, Mei Zhang
Open Space
COMMUNITY Increased land value
B
Job opportunities walkable streets more recreation facilities Open Space
MARTA
increased ridership
Tot
S Ret Wor t Par t Job
Team 160125
Te
When Tectonic meet Architecture
Mixed-Use High Rise
ART PERFORMANCE
Integration of Office, Hotel and Theater with Elegance in SOHO, NYC
ShanS
Product insp
CENTER
Instructor: Hina Jamelle Structure Consultant: Dan Brodkin and Matt Jackson, Arup New York Team: Lei Yu, Chao Liu 2016 Spring 602 PennDesign Studio
Golden Prize, 2013 C Instructor: Weibin Du China Academy of Art Solo Work
Organic shape/ infinity space Instructor: Simon Kim Solo work 2013 Fall 501 PennDesign Studio
Cultural Transportation Station
Waterf
ANTI- EQUILIBRIUM PAVILION
Shower Head
The 2nd Prize, 2012 R Instructor: Weibin Du China Academy of Art Solo Work
Shaking & Emotional Architecture
Utopia Architecture/ Mixed Use_ Education & Transportation
Instructor: Simon Kim Solo work 2013 Fall 501 PennDesign Studio
Instructor: Eduardo Rega Solo work 2013 Fall 502 PennDesign Studio
The Landing
LIGHT OF CATHEDRAL
Cup fo
Assistant pro
Atlanta Midtown Urban Redevelopment Caping landscape, TOD development, Tech Park & Retail
Shortlisted, Red Dot D Team: Lei Yu, Fan Wa China Academy of Art
ULI Hines Student Competition Team: Lei Yu, You Wu, Lu Han, Siyang Jing, Mei Zhang 2015 Spring PennDesign
Inspiration of Light
Instructor: Larry Mitnick Solo work 2013 Summer Studio/ PennDesign
DUO SELF- TRANSFORMING PAVILION
ALINE ARCHITECTURE Aline Popcorn & Bridging
Instructor: Danielle Willems Solo work 2013 Fall PennDesign
Part/ Whole/ Magnet
Instructor: Simon Kim Team: Lei Yu, Katie McBride, Angela Huang, Joey JH P 2013 Fall 501 PennDesign Studio
Lei Yu_ Work Sample
5
Mixed-use High-rise D Architect: Buro ole Sc Location: Singapore Site Area: 26,700m2 Program: Premium Offices, Luxury Residences and Signature Retail Commission: March 2011 Construction Start: 2013 Completion: 2017
Reponsibility: Facade development, i Develop exterior cannopy and related diagram development, rendering, dai
Attribute Study- Protea Cynaroides/ King of Protea
Humidity
Temputure
10 C
40%
15 C
50%
20 C
60%
Transformation Diagram Study of Protea
Transformation Diagram Study of Protea
70%
Seed
Sprout
Branching
fused
scaled
bifurcated
clustered
bended
peeled
fused packed
scaled concealed
bifurcated layered
clustered
bended
peeled
packed
concealed
layered
Latitude
Soil PH
6.5
6
5.5
5
Time
Budding
Blooming
split
protruded
extended
detached
centered
subdivided
split interlaced
protruded notched
extended revealed
detached
centered
subdivided
interlaced
notched
revealed
Building Section
2
EPDM Roof
6” Rigid Insulation 3/4” Plywood
6
Corrugated Metal
6
Swimming Pool
Strutting Truss
Sw
5
6
5
Hotel Restaurant
5
Hotel
Sky Galley
Restaurant
Swimming Pool Rooftop
Hotel
DETAIL SECT
530’
Rooftop 530’ Level 33
Em Ski Exp 1/4” Glazing
515’
4
Rooftop 530’
Level 33
Level 30 485’
Sky Lobby
4
Level 30 485’
550’
Glass Fiber Rei 2*4 20GA Stud
Public
320’
Level 18
20 SkyLevelLobby 305’
20 SkyLevelLobby
Sky Lougne
1 Sky Lougne Level 19
1 Sky Lougne
Public
DETAIL SECTION(FL
335’
335’
3
Level 19
Level 19
Level 16
320’
275’
Level 18
Theater
260 305’
Office
Level 16
Level 16
275’
3
3
275’
Level 15 260
Office
320’
LevelLevel 15 18
305’
Level 15
Insulation
260
Steel Beam
Office
Theater
Glass Fiber Rei Level 3
55’ Media Center
2
Public
Level 3
55’ Media Center
2
Public
Restaurant & Cafe Level 2 40’ Retail Level 3
55’ Media Center
Public
25’
Restaurant & Cafe Level 2 40’ Retail
Ground Level
1 2 3
Ground Level 0’
AUDITORIUM MEDIA CENTER OFFICE
-25’Level 1
25’
Level B2 -50’
1
1 2 3
Level B1
1
1 2
AUDITORIUM MEDIA CENTER
4 5
-25’
HOTEL RESTAURANT | LOUNGE
Level B2
Ground Level
AUDITORIUM MEDIA CENTER BUILDING SECTION OFFICE 1/16” = 1’0”
4 0’ HOTEL 5 RESTAURANT | LOUNGE BUILDING WALL SECTION 1/16” = 1’0” B1 AUDITORIUM 6 1Level SWIMMING POOL
2 3
-50’
-25’
Level B2
4 5
HOTEL RESTAURANT | LOUNGE
DETAIL (
0’
Level B1
Theater
1/4” Glazing
25’
Level 1
1
2*4 20GA Stud Block
Level 1
Restaurant & Cafe Level 2 240’ Retail
Media Center
AUDITORIUM MEDIA CENTER
Loc
Insulation Steel Beam
335’
Restaurant
1 2
Ski
Block 8” - 12 GA Trac 8” - 12 GA Stud Flashing Concealed Fas
Emergency Stairs Level 30 485’ Skip Stairs Express Elevator 1 Sky Lougne Skip Elevator Public Level 20 Sky Lobby Local Elevator
515’
4
550’
515’
Level 33
BUILDING SECTION
BUILDING WALL SECTION
1/16” = 1’0”
1 2
MEDIA CENTER OFFICE
-50’
1/16” = 1’0”
AUDITORIUM MEDIA CENTER
4
HOTEL
5 RESTAURANT | LOUNGE Lei Yu_ Work Sample
BUILDING SECTION
8
1/16” = 1’0”
BUILDING WALL SECTION 1/16” =
Vertical Circulation Diagram
Auditorium Viewing gallery
Stair
Hotel Sky Lobby
Local Elevators/Hotel
Restaurant Open office
Office
Skip Stairs
Private office
Skip Elevators Local Elevators Express Elevator Hotel Express Elevator
Media Center Restaurant & Cafe
Charlton Street
Theather
Retail
Underground Parking
Lei Yu_ Work Sample
9
King Street
1
2
3 30’
30’
A
1
2
5
30’
30’
5
30’
7
30’
4
30’
6
30’
3
30’
30’
4
N
6
30’
7
30’
30’
N
A 2
B
1
2
30’
S1
2
4
30’
2
B
1
C S1
2
3
2
11 2
4
30’
6
3
12
13
30’
C
11
14
2
6 12
13
30’
7 10
8
5
D
10
9 7
14 8
5
D
S2
1 2 3 4 51 62 37
MAIN LOBBY RETAIL CONCIERGE WAITING AREA BACK OF HOUSE MAIN LOBBY THEATER RETAIL TECHNICAL ROOM CONCIERGE
4 5 6 7 20’
WAITING AREA BACK OF HOUSE THEATER TECHNICAL ROOM 30’
S2
20’ 10’
GROUND FLOOR PLAN 40’
40’
1/16” = 1’0”
40’
W24
W21
W21
W24
W21
W21 W21
W21 W24
W21
W33
W33
W21
W21
W21
W24
W21
W21
W24
W21 W21
W33
10’ 5’
W21
W21
W24
W21
W24
W24
10’ 10’
W33
W21 W21
W21
W21 W21
W21
W33
W21
W21
W21
W24 W21
W21
W24
W24 W21
W24
10’
W33
W21
W21
W21
W21
W21
W24 W21
W24
W33
10’
W21
W21
W33 W21 W21
W21 W33
10’
W21
2 30’
3 30’
30’
1
W24
W21
2
1
A
W21
W21
W24W21
10’ 10’ 30’
W21
1/16” = 1’0”
TICKET CLOAKROOM STORAGE WASHROOMS 40’
W24
30’
40’ W24
GROUND FLOOR PLAN
W24
10’
5’ 10’ 25’
30’ W24
W24
W21
W24
10’
20’ 25’
11 12 13 40’ 14
MEETING ROOM STAFF OFFICE THEATER LOBBY TICKET CLOAKROOM MEETING ROOM STORAGE STAFF OFFICE WASHROOMS THEATER LOBBY
W33 W24
W24
20’
8 9 10 11 12 8 13 9 14 10
9
4 30’
3
Lei Yu_ Work Sample 30’
30’
5 30’
4
Ground Floor Structure Plan 6
30’
5
10 30’
7
30’
6 30’
7 30’
N
30’
W33
10’ 10’
W21 W21
W21 W21
W21
W21
W21
W21
W21 W21
W21
W21 W21
W21
W21 W21
W24
W33
W21 W21
W24
10’ 10’
W33
W21 W21 W24
30’
W21 W21
W24
10’5’
W33
W24 W21 W33
10’
W21
2
1 1
3 2
30’
A
W24
W21
4 3
30’
4
30’
30’
30’
5 5
30’
30’
6 30’
30’
30’
A
7 6
30’
7
30’
N
30’
N
30’
B S1
B 2
30’
S1
5 2
30’
5
C
1 C
3 1
30’
6
3 6
30’
D
4
7 D
4
7 S2 S2
E E
1 2 31 42 3 4 10’
RECEPTION WAITING AREA DINNING AREA RECEPTION BAR WAITING AREA DINNING AREA BAR42’ - 8”
10’
42’ - 8”
42’ - 8”
W21 W33
W21 W21
W21 W21
W21 W21
W33
W33
W21
W21
W21
W33 W21
27’
W33
W21 W33
30’
W21
W21 W21
W21
W21
W21
W33
W21
W21
W21
W21
W21
W21
W21
W21
W33
W33 W21
W33
40’
1/16” = 1’0”
27’
42’ - 8”
W33
30’
LEVEL 32 FLOOR PLAN 1/16”PLAN = 1’0” LEVEL 32 FLOOR
5 KITCHEN 6 RESTROOM 7 5 STORAGE KITCHEN 6 RESTROOM 7 STORAGE
W21
W33
W21
W21
W21
W21
W21
W21
W21
W21
W21
W33
W33
60’ 60’
W21
W21
Lei Yu_ Work Sample
11
W24 W24
W24
W33 W33
W33
W21
20’
W24
W24
W24 W33
W24
20’
W24
W24 W24
W24 W24
W24
W24 W24
W24
W33
W24
40’
W24
W33
Lei Yu_ Work Sample
12
Structure Analysis Core Core Load Transfer Load Transfer Major Structure Facade Major Structure Facade Structure Facade Structure Facade
Load Transfer Principle
South- West Facade Analysis
North- West Facade Analysis Lei Yu_ Work Sample
13
Level 20 335’ Level 19
Level 20 335’
320’
Level 18
Level 19 320’
305’
Level 18
Floor 15 to 20
305’
Level 16 275’ Level 15 260
Level 16 275’ Level 15 260
g Wall Section with Structural Integration
Level 3 55’
Level 2
Level 3 40’ 55’ Level 1
Floor B2 to 3
Level 2 25’ 40’ Ground Level
Level 1 0’ 25’
Level B1 -25’ Ground Level
0’
Level B2 -50’
Level B1 -25’
Level B2
Lei Yu_ Work Sample
14
BUILDING WALL SECTION 1/16” = 1’0”
Lei Yu_ Work Sample
15
Physical Model- Structure Integration
egration Floor 30-34
EPDM Roof 6” Rigid Insulation 3/4” Plywood Corrugated Metal 18GA Strutting Truss
Rooftop
DETAIL SECTION(ROOF) 1/2” = 1’0”
530’ Rooftop 530’
Level 33
Level 33 515’
515’
1/4” Glazing Block 8” - 12 GA Track 8” - 12 GA Stud Flashing Concealed Fastener
EPDM Roof 6” Rigid Insulation 3/4” Plywood Corrugated Metal 18GA
Level 30
Insulation Steel Beam
Strutting Truss
485’
Glass Fiber Reinforced Concrete 2*4 20GA Stud
Level 30 485’ Selected Building Details Level 20
DETAIL SECTION(FLOORSLAB) DETAIL SECTION(ROOF)
335’
1/2” = 1’0”
1/2” = 1’0”
Level 19 320’ Level 18 305’
Level 16 275’
1/4” Glazing Block 8” - 12 GA Track 8” - 12 GA Stud Flashing Concealed Fastener
Level 15 260
Insulation Steel Beam
Insulation Steel Beam
Glass Fiber Reinforced Concrete
Glass Fiber Reinforced Concrete 2*4 20GA Stud
Block
2*4 20GA Stud 1/4” Glazing
Level 20
Level 3
335’
55’
Level 2 40’
Level 19
Level 1
320’
DETAIL SECTION(FLOORSLAB)
DETAIL (FLOORSLAB)
1/2” = 1’0”
1/2” = 1’0”
Lei Yu_ Work Sample
16
Lei Yu_ Work Sample
17
Lei Yu_ Work Sample
18
Day Lighting Strategy 1. Solid Shading 2. Mesh Outside Glass 3. Print on Glass 4. Glass Material
Day Lighting Analysis
ctor: Jessica _ Daylighting Strategy for Mixed-Use High Rise in Soho, NYC ents: Lei Yu, Yuheng Ouyang ARCH- 632-005 Daylighting Instructor: Jessica Students: Lei Yu, Yuheng Ouyang
BEFORE
RESULT
BEFORE
Tower Penthouse Optimization _ Daylighting Strategy for Mixed-Use High Rise in Soho, NYC
31ST FLOOR PLAN OFFICE / LOBBY Annual Anatomy - Cap: 1000 lux
ARCH- 632-005 Daylighting
31ST FLOOR PLAN OFFICE / LOBBY Annual Anatomy - Cap: 1000 lux
31ST FLOOR PLAN OFFICE / LOBBY Annual Anatomy - Cap: 1000 lux
Instructor: Jessica Students: Lei Yu, Yuheng Ouyang
BEFORE
CH- 632-005 Daylighting Tower Penthouse Optimization
31ST FLOOR PLAN OFFICE / LOBBY Annual Anatomy - Cap: 1000 lux
wer Penthouse Optimization aylighting Strategy for Mixed-Use High Rise in Soho, NYC
Lei Yu_ Work Sample
19
0
17
% Occupied Hour
33
50
67
83
100
SHIFTINGHYBRIDS Transformations for a Wellness Hotel & Residential Building in Tribeca, NYC Instructor: Hina Jamelle Solo work 2015 Fall 601 PennDesign Studio
ART PERFORM CENTER Organic shape/ infinity space Instructor: Simon Kim Solo work 2013 Fall 501 PennDesign Studio
Cultural Transportation Hub
Utopia Architecture/ Mixed Use_ Education & Transportation Instructor: Eduardo Rega Solo work 2013 Fall 502 PennDesign Studio
LIGHT OF CATHEDRAL Inspiration of Light
ANTI- EQU PAVILION
Shaking & Emotional A Instructor: Simon Kim Solo work 2013 Fall 501 PennDesign Studio
The Landin
Atlanta Midtown Urban Caping landscape, TOD
ULI Hines Student Competition Team: Lei Yu, You Wu, Lu Han, Siyang J 2015 Spring PennDesign
Instructor: Larry Mitnick Solo work 2013 Summer Studio/ PennDesign
SELF- TRANSFORMING PAVILION Part/ Whole/ Magnet
Jurong N.E.X.T
Singapore HSR Station and CBD Next Engine for Exchange and T
Location: Singapore Instructor: Marilyn Taylor, Bob Yaro Team: Garesa Hao En Au, Adam Berkowitz, Ruyi Chen Sandy Klanfer,Yidi Xu, Lei Yu, Peiqian (Peggy) Zhong, 2017 Spring PennDesign Asian Urbanism Studio
Instructor: Simon Kim Team: Lei Yu, Katie McBride, Angela Huang, Joey JH P 2013 Fall 501 PennDesign Studio
This project is a hybrid of residential building and wellness hotel in TriBeCa, New York City. It serves as an urban treatment for travelers and city dwellers who seek to build healthy life styles and bodies to escape from bustling city life. A wellness center (with fitness store) focuses on offering public space that enhances mental and physical well being. The facade is a changing gradient to give a variety of spatial qualities, from inhabitable balcony to flat facade. The interior changes from basic unit to luxury unit. For residents, apartment units offer them a comfortable home with inhabitable balcony and home jacuzzi. For hotel rooms, basic units are equipped with hot tubs for visitors to enjoy spa treatment within the room and sports in the gym during their stay.
Lei Yu_ Work Sample
20
Greenwich St
Washington St
Site Plan
Vestry St
Program Diagram 8F
Spa
10.25
10.25
PROGRAM DIAGRAM
10.25
7F 6F
10.25
Spa
13.00 13.00
Apartment Administration
4F
Hotel Lobby
3F
10.25
Swimming Pool
2F
Gym
Apartment Entrance
Hotel Entrance
Health Station
Fitness Store
Swimming Pool
10.25
13.25
5F
Spa
B1
Vestry St 18.74
16.06
Wellness Program Residential Residential/ Public Hotel
13.39
Greenwich St
16.06
18.74
7.96
Residential - Small- 14 Units Medium- 7 Units Large- 3 Units
Hotel - Small- 9 Units Medium- 4 Units Large- 3 Units
Total Residential Unit: 24
Total Hotel Unit: 16
Hotel/ Public
Lei Yu_ Work Sample
1F
21
17.68
10.61
14.15
Total Unit number : 40
INTER-RELATIONSHIPS // Diagram PART // Diagram
t
1.1 Curvature
1.1 Curvature The thickness between the curve of the
d
t
2.2 Cupping
The thickness between the curve of the exumbrella (exterior skin) and the curve of the subumbrella (interior skin)- is inver exumbrella (exterior skin) and the curve sly proportional to the overall Moon Jelly of the subumbrella (interior skin)- is inver radius. sly proportional to the overall Moon Jelly radius. 1.2 Translucency
The level of translucency is determined by the density of material. The Moon Jelly appears denser at the perimeter of its bell because light must pass through more material at the tangent of a curve. The level of translucency is determined Additionally, less translucency occurs in by the density of material. The Moon areas of more concentrated tissue.
1.2 Translucency
Jelly appears denser at the perimeter of its bell because light must pass through 1.3 Splitting more material at the tangent of a curve. The number of bifurcations is constant Additionally, less translucency occursthroughout in the Moon Jelly; however, the and shape of the branching ele areas of more concentrated tissue. density ments is determined by the curve of its
d
bell.
t
1.3 Splitting The number of bifurcations is constant throughout the Moon Jelly; however, the density and shape of the branching ele ments is determined by the curve of its bell.
2.1 Overlapping
2.2 Cupping
2.3 Morphing
WHOLE FORMATION // Diagram
2.1 Overlapping
d
3.1 Gradient of Density 3.2 Multi-orientation 3.3 Gapping
Typical TypicalResidencial ResidencialUnit Unit Typical Residencial Unit ypical Residencial Unit Typical Residencial Unit idencial Unit Deluxe DeluxeStudio/ Studio/327 327sq.ft sq.ft Deluxe Studio/ 327 sq.ft eluxe Studio/ 327Studio/ sq.ft Deluxe 327 sq.ft dio/ 327 sq.ft
Typical Residential Unit Configuration
Residential_ Residential_Deluxe Residential_DeluxeStudio/Queen Studio/Queen Residential_One Onebed bedroom/Queen room/Queen Residential_ One bed room/Queen Residential_Deluxe _Deluxe Studio/Queen Residential_Deluxe Residential_Deluxe Studio/Queen Studio/Queen Studio/Queen Residential_ Residential_ One bedResidential_ room/Queen One bed room/Queen One bed room/Queen 365 327 327sq.ft sq.ft 365sq.ft sq.ft 365 sq.ft 327 sq.ft 327 sq.ft 327 327 sq.ft sq.ft 365 sq.ft 365 sq.ft 365 sq.ft
Residential_2 Residential_2bed bedroom/ room/ Residential_2 bed room/ Residential_2 Residential_2 bed room/ Residential_2 bed room/ bed room/ Queen Queenand andTwin Twin Queen and Twin Queen and Queen Twin and Queen Twin and Twin 510 510sq.ft sq.ft 510 sq.ft 510 sq.ft 510 sq.ft 510 sq.ft
Typical TypicalHotel HotelUnit Unit Typical Hotel Unit Typical Unit Hotel Typical Unit al Hotel UnitHotel Queen QueenBed BedRoom Room/ /272 272sq.ft sq.ft Queen Bed Room / 272 sq.ft Queen Room 272 sq.ft Queen Room / 272 sq.ft n Bed RoomBed / 272 sq.ft /Bed
Typical Hotel Unit Configuration
Hotel_ Hotel_Queen Queenbed bedroom room Hotel_ Queen bed room Hotel_ Queen Hotel_ bedQueen room Hotel_ bed Queen room bed room 272 272sq.ft sq.ft 272 sq.ft 272 sq.ft 272 sq.ft 272 sq.ft
Hotel_ Hotel_Twin Twinbed bedroom room Hotel_ Twin bed room Hotel_ Twin Hotel_ bed Twin room Hotel_ bed room Twin bed room 302 302sq.ft sq.ft 302 sq.ft 302 sq.ft 302 sq.ft 302 sq.ft
Lei Yu_ Work Sample
Hotel_ Hotel_22bed bedroom roomSuit Suit Hotel_ 2 bed room Suit Hotel_ 2 Hotel_ bed room 2 bed Suit Hotel_ room2Suit bed room Suit 408 408sq.ft sq.ft 408 sq.ft 408 sq.ft 408 sq.ft 408 sq.ft
22
Residential_ Residential_Loft Loft22bed bedroom room Residential_ Loft 2 bed Residential_ Residential_ Loft 2 bed Loft room 2 bed Suitroom /Loft /ro Residential_ 2Suit bed Queen Queenand andTwin Twin Queen and Tw Queen and Queen Twin and Queen Twin and Twi 532 532sq.ft sq.ft 532 sq.ft 532 sq.ft 532 sq.ft 532 sq.ft
#2.1 Private Spa
#2.2 Facade Transformation
Lei Yu_ Work Sample
23
#2.3 Integrated Facade_ Main
2
3
4
5
6
7
8
9
A
B
C
Greenwich St
D
E
F
1
Vestry St #1
Ground Floor Plan
_Apt Entrance/ Hotel Entrance/ & Health Station/Fitness Store
Lei Yu_ Work Sample
24
Typical Floor Plan _Apt Admission/ Hotel Admission/Gym/Units
2
3
4
5
A
B
C
D
E
F
1
#2
Typical Floor Plan
_Apt Admission/ Hotel Lobby/ Hotel & Residential Unit/ Gym
Lei Yu_ Work Sample
25
6
7
8
9
Resid
10’ -3’’
Hote
10’ -3’’
Hotel/ Spa
S
10’ -3’’
Residential/ Hotel
10’ -3’’
Residential/ Hotel
13’ -0’’
Residential/ Spa
Hotel Lobby/ Residential 13’ -0’’
Facad e Turni _ ng co rne
r
10’ -3’’
Swimming Pool
13’ -3’’
Gym
-19’ -3’’
Fitness Store/ Health Station
Swimming Pool
Section A
Lei Yu_ Work Sample
26
dential Unit
tel Lobby Jacuzzi Hotel Unit
Swimming Pool Small Hotel Unit
Gym
Fitness Store Hotel Entrance Apt Entrance
A Health Station/ Cafe Swimming Pool
Perspective Section Lei Yu_ Work Sample
27
Lei Yu_ Work Sample
28
#1.1 Main Entrance-Lobby
Lei Yu_ Work Sample
29
Wh Resili me Transpo orien Develo
Lei Yu_ Work Sample
30
hen ience eet ortation nted opment
Lei Yu_ Work Sample
31
I-8 80
I-280
Oakland International Airport
US-101
l
0 I-28
nne
nd
e2
Hayward Executive Airport
SFO 01
-1 US
San Francisco International Airport
ns
Tra
0 I-88
Th
Tu bay
0
I-28
Palo Alto Airport
I-880
existing BART Stations future BART Stations BART route regional railway
Mineta San Jose International Airport
SF
AK
SFO & OAK Airports Resilient Development Instructor: Matthijs Bouw, Kai-Uwe Bergmann Team: Lei Yu, Baihe Cui 2016 Fall
KEPPEL LAND_ JINGA Shanghai, China April- June 2015 Architect: HASSELL
Reponsibility: Facade Development, Floor Plan Layout and GFR Calculation
Deployable Structure Transform from one objet to an other Instructor: Mohamad Al Khayer Team: David Feng, Lei Yu, Yu Gan 2017 Spring
Contemporary Furniture From full to vacant
Instructor: Katrin Mueller-Russo Solo Work 2017 Spring
6’ 5’ 4’ 3’
Elevation AMSL LAX 128ft
SFO 13ft
OAK 9ft
Airport BART line Railway
Projected Sea Level Rise 6’ 1’ 5’ 4’ 3’ 2’ 0 2.5 51’ 10
Lique
2’
miles 15
Analysis Analysis
(San Francisco International airport) is airport the largest airport in Northern California and the second busiest SFOSFO (San Francisco International airport) is the largest in Northern California and the second busiest in California. However,in rate severely of development forits thedevelopment, whole Bay Area. limited but also impacted the rate of development for the whole Bay Area.
The The two airports are facing challenges. For example, SFO has significant delaysignificant issues—23.34% of the airport’s flights were dela two airports are other facing other challenges. For example, SFO has delay issues—23.34% of the a fell at the lower elevations and 8-10 inches in the coastal hills. The storm caused havoc at San Francisco Airport where hundreds of conditions. In the storm on Feburary 2017, 1.54 inches storm fell at the lower elevations and 8-10 inches in t in OAK currently at only 1.6ft in elevation, which already puts it at a high risk of flooding. Airport-related development such as hotels either cancelled or delayed. Both airports willconstrained. be severely impacted from sea level rise, with the north field run development opportunities at SFO are already severely
Airport-related development such as hotels are far from the OAK terminals, causing increasing traffic and grou Fromalready the perspective of constrained. regional public transportation, it is estimated that if a second transbay tube connecting San Francisco to th severely
au dF ar
yw Ha
0.7-6.6ft
as
re
nd Fa ult
Airport BART line
nA
Both are on the highly vulnerable zone
Sa
By 2100
lt
Risk in Future: By 2050 0.3-1.9ft 19in=1.58ft
Railway Liquefaction Susceptibility Alquist Priolo Zones Very high High Medium Low
0
2.5
5
10
15 miles
nd California. However, bigand problems such have as insufficient capacity and delaysbut have only the bigbusiest problemsinsuch as insufficient capacity flights delays not only severely limited itsflights development, alsonot impacted a.
ayed by of flights 59 minutes—and even worse poor weather conditions. In the storm Feburary 2017, weather 1.5- 4 inches storm 34% of an theaverage airport’s were delayed by aninaverage of 59 minutes—and evenonworse in poor f flights were either cancelled or delayed. Both airports will be severely impacted from sea level rise, with the north field runway 0 inches in the coastal hills. The storm caused havoc at San Francisco Airport where hundreds of flights were s are far from the OAK terminals, causing increasing traffic and ground parking demand in the airport and in the city, while orth field runway in OAK currently at only 1.6ft in elevation, which already puts it at a high risk of flooding. ffic and ground parking demand in the airport and in the city, while development opportunities at SFO are
he East Bay is not built, BART will exceed capacity by 2024( From Regional Think Tank SPUR )
Aircraft Traffic Capacity 137%
64%
Takeos and Landings (Thousands)
SFO
1
OAK
630 485 High
500
0
270
SFO
5
Low 460
S
OAK
Commute Time 80 min Aircraft Capacity from SFO to OAK
913,100 flights per year Runway San Francisco Airport (SFO) BART Station
OAK
SFO
Average Delay Time SFO
OAK
59 Mins
Highest on-time arriv percentage among 40 busiest North Americ Airports
CURRENT
As the main strategy of SFOAK, the proposed se and OAK airport directly. It offers an opportunit redundancy for the airports as well as speedy c two airports. In the meantime, it optimizes Airpo and developing resilient strategies before reach
100% SFO
562
SFO
val 0 can
100% OAK 727 High (Increased)
562
Low 690 (Increased)
Air Carrier Air Taxi General Aviation/ Other Runway Capacity *Includes passager and air cargo operation
OAK
*projection in 2035
from SFO to OAK
18 min
1,150,000 flights per year
Oakland Airport (OAK) BART Station
SFOAK (12 Runways) SFOAK On Time
SFOAK
econd transbay tunnel, links SFO airport
ty for balancing the capacities and creating connectivity for passengers transferring between ort share and 20 years for enlarging the capacity h the limit and be shocked by disasters.
SF AK 1+1>2
SFO Side- limit & Opportunity Airport Capacity Limit: International & Runway Public Parking Limit Hotel and Transportation (Airtrain) Energy Consuming Tech(Biotech) Park/Bussiness Opportunities (Job) Limite land-use for Bussiness Open Space for Social Activities Residential Development Limit Car Rental Development
26%
ENVIRONMENT ECOL
OAK Side- limit & Opportunity
ENERGY TRANSFOR
100%
Airport Capacity Growth: Domestic & Cargo Public Parking Opportunities Hotel and Transportation (Airtrain) Energy Station (Water/Electricity Supply ) Manufacture Development and Storage Space Foreign Free trade Zone Limited Public Access/ Limited Social Activities Residential Development Opportunities
WETLAND GOLFCOUR
FOSSIL JET FUEL
LAND VALUE
BIOTECH INDUSTRY
BIOENERGY HUB
INDUSTRY
TRANSPORTATION
PUBLIC ACCESS
WETLAND HABITAT
BLOCKED
CURRENT
HIGH-END HOTEL/CONFERENCE
SFOAK is a resilient and systematic str Complementary relationship between San Franci for building the second trans-bay tunnel. While th side, Alameda County’s logistical and transportat uses, both economically, such as resorts, educat as wetlands. A large amount of job opportunities
OAK Side- limit & Opportunity Airport Capacity Growth: Domestic & Cargo Public Parking Opportunities Hotel and Transportation (Airtrain) Energy Station (Water/Electricity Supply ) Manufacture Development and Storage Space Foreign Free trade Zone Limited Public Access/ Limited Social Activities Residential Development Opportunities
30%
LOGY
RSE
WETLAND GOLFCOURSE PARK GREEN SPACE HABITAT
50%+50%
RMATION
DISTRIBUTION HUB
BIOJET FUEL
BIOENERGY/ WETLAND
FOSSIL JET FUEL
RESORT OFFICE & EDUATION INDUSTRY
N
TRANSPORTATION
GOLF/SAIL TOURISM FREE TRADE ZONE
BRIDGED
SFOAK
rategy for SFO and OAK airport developmen.
isco and Oakland is another key driven element he public accessibility is increasing on Oakland tion lands can be unlocked for more valuable land tion institutes and offices, and ecologically, such can be generated in Oakland in the future.
SF AK Cross Bay Engine
A
Noise BarrierA+ Trail/ Sailboat A Noise Barrier + Trail/ Sailboat Entertainment Noise Barrier + Trail/ Sailboat Entertainment Entertainment
B
B Algae + Wetland
BWastewater Algae + Wetland Treatment+ Biojet fuel Algae + Wetland Wastewater Treatment+ Biojet fuel Wastewater Treatment+ Biojet fuel
C
C
C
C Consolidation R
Consolida Restoration +
Restoratio
C
C Consolidation Wetland Consolidation Wetland RestorationC+ Habitat
fuel
Restoration + Habitat Consolidation Wetland Restoration + Habitat
D
LeveeD+ Warehouse DLevee + Warehouse Public waterfront
Public+waterfront Levee Warehouse Public waterfront
Int
ern
ati
on
al
er
Bl
B
vd
b en
g
A
He
R T n Sa
o dr an Le St
11
10
B 1
13
3
C
t
98
80
12
I8
14
D
4 2
9
16
LEGEND A B C D
19
20
Noise barrier + Entertainment Remediation + Algae Open Ponds Consolidation + Levee + Habitat Waterfront + Warehouse
22
17 18 7
5
21
6
1
Warehouse + Distribution Hub FedEx Center 3 Wetland 4 Golf Course 5 Wetland Park 6 Oyster Bay Regional Shoreline Park 7 Waste Recycle 8 Free Trade Zone 9 New Runways-MEGA Float (South) 10 New Runway (North) 11 Golf course 12 Bay Farm Island 13 Waterfront Park 14 Martin Luther King Jr Regional Shoreline 15 O.co Colideum 16 New Parking System 17 Distribution Center 18 Vestibule Campus & Apartment 19 Hotel & Retail 20 New BART Station 21 New Terminal 22 Office Campus for FTZ 2
A
RT
BA
0
500
1000
2000
8
d
R er
rg Bl v
e
g er
d
Phase 1 Phase 1 The 2 TransBay
d rR
b en
nd
Tunnel
g
He
Levee Warehouse
nd
The 2 TransBay Tunnel
Hotel (OAK Loop)
Levee Warehouse
Airports Transit
Levee
New Terminal
Sa n Le o dr St th
98
e Av
Phase 2
New Terminal
Phase 2Phase 2
Phase 2
Previous
Previous
Algae Open Ponds New Runway*
Warehouse & Distribution Hub
Warehouse & Distribution Hub
Algae Open Ponds Levee Warehouse Waterfront Park New Runway*
Levee Warehouse Waterfront Park
Algae Energy Generator
Fe Hu dE b x
Fe Hu dE b x
e
on
Z de
Tra ree F Wetland
+H
+H
ab
ab
ita
Wetland
t
ita
t
8
e rad
eT
Fre
Noise Barrier Trail
Noise Barrier Trail
Rtail (OAK Loop)
Rtail (OAK Loop)
Conference ne Zo Center
Conference Center (OAK Loop)
(OAK Loop) Hub
Distribution Hub
BART Station & Park (OAK Loop)
BART Station & Park (OAK Loop)
Re-route for Distribution Free Trade Zone and Recreation
Re-route for Free Trade Zone and Recreation
Flexible Parking Garage (OAK Loop)
Phase 3 Previous
Flexible Parking Garage (OAK Loop)
Phase 3 Previous
Warehouse & Distribution Hub Algae Open Ponds Algae Open Ponds Levee Warehouse New Runway* Waterfront Park New Runway*
Warehouse & Distribution Hub Levee Warehouse Waterfront Park
Fe Hu dE b x
Fe Hu dE b x
OAK Loop Development e rad
ab
ita
t
Wetland Park
OAK Loop Development
Phase 3 Phase 3
e rad on eT e ati r F ne ific Zo dens Free Re
on eT ati Fre ne Trade Zone ific s o n Z de ab Redensification Re Re-route for ita Wetland t Park Free Trade Zone Re-route for and Recreation Recreational Free Trade Zone and Recreation Noise Barrier Park
+H
+H
5000ft
Algae Energy Generator
Free Trade Zone Free Trade Zone Office Office (OAK Loop) (OAK Loop)
OAK Loop Development
OAK Loop Development
5000ft
Water Filteration
Consolidation + Consolidation + Floating Runway Floating Runway
an
th
Airports Transit
Levee
Water Filteration
e Av
Hotel (OAK Loop)
Noise Barrier Trail Recreation
Trail Recreation
Wetland Park
Free Trade Zone Redensification Recreational Park Wetland Park
CANOPY RETAIL + CONFERENCE HIGH-END NEW HOTEL TERMINAL RETAIL + HOTEL STATION + RETAIL OFFICE RETAIL + HIGH-END CONFERENCE HOTEL FLEXIBLE (GARAGE--OFFICE) RETAIL + STATION HOTEL RETAIL FREE-TRADE ZONE OFFICEOFFICE RETAIL + +CONFERENCE CONFERENCE + HOTEL FLEXIBLERETAIL (GARAGE--OFFICE) OFFICE CANOPY FREE-TRADE ZONE OFFICE FLEXIBLE (GARAGE--OFFICE) HIGH-END HOTEL CONFERENCE NEW TERMINAL FREE-TRADE ZONE OFFICE STATION + RETAIL CANOPY CONFERENCE RETAIL + CONFERENCE CANOPY NEW TERMINAL RETAIL + HOTEL
RETAIL + HOTEL
OFFICE Layout OAK LOOP Program FLEXIBLE (GARAGE--OFFICE)
SFOAK: OAK LOOP Program Layout OFFICE FLEXIBLE (GARAGE--OFFICE) FREE-TRADE ZONE OFFICE CONFERENCE CANOPY NEW TERMINAL
FREE-TRADE ZONE OFFICE CONFERENCE CANOPY NEW TERMINAL
NEW TERMINAL
RT BA
PARKING
RESILENT CIRCLE
$IRCLE
AXIS
OAK LOOP Develop Principle
T AR
B
Flexible
T
BA
RM
E WT
Flexible
L INA
NE
AL
IN RM
E
WT
NE
L
INA
M ER
W TEconomic
B
Hotel
L
INA
M ER
WT
NE
NE
T AR
Parking
Office Retail
StationCon P Office Retail Retail Economic Circle Conference Station Axis
R Flexible BA Parking Hotel
NE
RT
RT BA
Rd
E WT
Hotel
Office Retail
Axis
Parking
Station Park Retail Conference Station Confe
OAK LOOP Central Axis Section
OAK LOOP Central Axis Section
development
development
AL
IN RM
WT
NE
c Circle
L
INA
M ER
Economic Circle
Flexible
Flexible
l n
Axis
Station Park Retail Park nference Station Conference
Conference
Retail
Retail
Office
Office
Hotel
Hotel
Hotel
Hotel
OAK Loop Traffic Principle
OAK Loop Program Layout hotel hotel +office +office +free +free trade trade zone zone
W-shape STATION TERMINAL W-shape STATION PROGRAM
Hotel+retail+ Hotel+retail+ conference conference SFO & OAK Airport RESILIENT Development SFO & OAK Airport RESILIENT Development SFOAK SFOAK
SFO & OAK Airport RESILIENT Development SFOAK
HOTEL SHUTTLE PROGRAM
Station Park & Conference Complex (cultural,art...)
SFO & OAK Airport RESILIENT Development SFOAK
AXIS
SFO & OAK Airport RESILIENT Development SFO & OAK Airport RESILIENT Development SFOAK SFOAK
SFO & OAK Airport RESILIENT Development SFOAK
$IRCLE
HOTEL & OFFICE
DROPOFF PEOPLE GATHERING
Flexible Parking Garage Ground Parking Under Green Cover
P
Free Trade Zone Campus & Ground Parking
from Coliseum to OAK from SFO to OAK
DISTANCE: 3.2 miles TRAVEL TIME: 6min
from Air-side Station to Land-side Station
DISTANCE: 12 miles TRAVEL TIME: 20min
4-10 car x 710 ft ma
60 ft
Air Station
AIRSIDE TUNNEL
AIRSIDE TUNNEL SFO & OAK Airport RESILIENT Development SFOAK
SFO & OAK Airport RESILIENT Development SFOAK
BART Station
LANDSIDE TRAIN
2 STATION+ 1 Bagage claim
STATION-RETAIL SFO & OAK Airport RESILIENT Development SFOAK
TUNNEL COVER to Station PARK SFO & OAK Airport RESILIENT Development SFOAK
Most Profitable
current :
Ground Parking
SFOAK :
Station Park
You are here SFO & OAK Airport RESILIENT Development
SFOAK
You are here SFO & OAK Airport RESILIENT Development
SFOAK
PARKING AVAILABILITY
OFFICE
830 648 WITHIN OAK LOOP + 3200 FUTURE HOTEL CAPACITY
SFOAK: Airport Hotel
3568
3835
PREVIOUS GROUND PARKING
CURRENT FLEXIBLE PARKING
You are here SFO & OAK Airport RESILIENT Development
SFOAK
Architecture Resilience
Program Resilience
Social Resilience
Structure Resilience
Energy Resilience
Energency Resilience
Day Lighting & Program Oriented Facade
35% Opening facade for Retail & Overheated Space
60% Opening for Office View
PARKI
FLEXIBLE S
OAK TERMINAL SFOAK TUNNEL
TAXI WAY
RETAIL
Structure & ProgramResilience Flexible Parking Structure+ Program Shifting Circulation Structure & Scale Study
#1
#2
#3
Section Study Before
After
Before
After
Split Program
Double Hight Public
Structure Transformation After
Before
ING
STRUCTURE
HOTEL PLAZA
HOUR PARKING
STATION
OFFICE BART
PLAZA SFOAK STATION
CIVIAL PLAZA
CIVIAL PLAZA
DUO
JurongN.E.X.T N.E.X.T Jurong
DUO
Mixed-use High-rise Development
Mixed-use High-rise Development Architect: Buro ole Scheeren Architect: Buro ole Scheeren Location: Singapore
Singapore HSR Station andDevelopment CBD Development Singapore HSR Station and CBD Next Engine for Exchange and Transformation Next Engine for Exchange and Transformation
Location: Singapore Site Area: 26,700m2 Site Area: 26,700m2 Program: Premium Offices, Luxury Hotel, Program: Premium Offices, Luxury Hotel, Residences and Signature Retail Residences and Signature Retail Commission: March 2011 Commission: March 2011 Construction Start: 2013 Construction Start: 2013 Completion: 2017 Completion: 2017
Location: Singapore Location: Singapore Instructor: Marilyn Taylor, Bob Yaro Instructor: Marilyn Taylor, Bob Yaro Reponsibility: Facade development, including 3D-modeling facade for mock-up; Team: Garesa Hao En Au, Adam Berkowitz, Ruyi Chen, Tingting Feng, Danqi (Silvia) Fang, Yiling Li, Reponsibility: Facade development, including 3D-modeling facade for mock-up; Team: Garesa EnYu, Au,Peiqian Adam(Peggy) Berkowitz, Chen, Tingting Feng,Zhu Danqi (Silvia) Fang, Yiling Li, cannopy Develop exterior and related Interior & exterior construction drawing; Sandy Klanfer,YidiHao Xu, Lei Zhong, Ruyi Xinyi (Elynor) Zhou, Mengjie cannopy and related Interior & exterior construction drawing; diagram development, Develop rendering,exterior dairy for meeting Sandy Klanfer,Yidi Xu, Lei Yu, Peiqian 2017 Spring PennDesign Asian Urbanism Studio (Peggy) Zhong, Xinyi (Elynor) Zhou, Mengjie Zhu
diagram development, rendering, dairy for meeting
2017 Spring PennDesign Asian Urbanism Studio
Lei Yu_ Work Sample
56
East
Berlin Archite
PROJECT FA Address: Wa Commencem Rental space: Completion:
Reponsibility
NEXT CBD Jurong CBD Design Principle
Conceptual Diagram Conceptual Diagram
Jurong NEXT District_ Land Use Diagram
Districts
D Districts
Land Use Diagram Lei Yu_ Work Sample
Land Use Diagram
57
EDU Commons
CIVIC BELT
JURONG NEXT CBD
Civic Belt
INNOVATION PEAK Innovative Peak
AT Neighborhood
EDU COMMON Lei Yu_ Work Sample
58
EDU Commons
SETTING CBD SETTING CBDCONCE DEVEL CONC DEVE TH T
SETTIN CBD C D
Leverage existing Jurong Town Hall • Activated by the arrival• of HSR Station • Civic Focal Point
• Civic • Leverage existing Jurong TownFocal Hall Point • Civic Focal Point
reen Space 9%
Hotel 5% Commercial reen Space 9% 10% Hotel
SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN
SETTING CBD CONCEPT DEVELOPM THE ST P
Civic Belt • Civic Focal Point • Leverage existing Jurong Town Hall
AT(Art&Tech) Neighborhood 20%
Commercial 10%
O ce 20% O ce 20%
Commercial CIVIC BELT 10%
SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN
AT(Art&Tech) Neighborhood • Flexible Live-Work art studio/lab provision O ce 20%
CIVIC BELT CIVIC BELT
CIVIC BELT
Civic & Cultural 25%
Innova on Co-Work 10%
Innova on
Co-Work on Innova • Flexible 10%provision Co-Work • Maker’s SquareLive-Work art studio/lab MICE 10% 10% MICE • Maker’s Square 10% • Community facilities
Civic & Cultural 25%
on Innova Civic & Cultural Co-Work 25% MICE Civic10% & Cultural 25% 10%
Innov Peak
119
MICE 10%
119
Community • Highest Height•119 and Density facilities • Sky Floor Connection Among Towers • Sky Conference Space
SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN
Green Space Hotel 3% Green Space 2% Hotel 3% Commercial 2% 8% Commercial Civic Residen al 8% Green Space 2% 30% Civic Residen al Hotel 3% 2% 30% 5% MICE Commercial 5% MICE 8% 5%
Civic 2% MICE 8%
Residen al 34%
AT (ART&TECH)
EDU Commons AT (ART&TECH)
INNOV PEAK Innova onInnova onCo-Work Co-Work 25% 25%
SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN
SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN
SETTING CBD CONCEPT DEVELOPMENT THE STAGE PLAN
122
reen Space Residen al 9% 11% Hotel reen Space Residen al 9% 5% 11% Hotel O ce 5%
Residen al 11%
5%
Commercial 10%
119
Residen al 11%
EDU Commons • Tech Grove
O ce/Ins tu 25% • International Satellite 25% University Campus
O ce/Ins tu
O ce 40%
EDU Commons • International Satellite University Campus
126
126
• Live-Work Incubator
• International Satellite University Campus
• Tech Grove
Micro Units • Tech•Grove
• Live-Work Incubator
• Live-Work Incubator • Micro Units
• Micro Units
Green Space Hotel 4% 5% Commercial Green Space 6% Hotel 4%
Commercial 6% MICE 5%
5%
MICE 5%
Green SpaceResiden al 30% Hotel 4%
Residen al5% 30% Commercial
6%
Residen al 30%
MICE 5% COMMONS EDU COMMONS EDU Innova on Co-Work 25%
Innova on Co-Work 25%
EDU COMMONS O ce/Ins tu Innova on25% -
Co-Work 25%
124
O ce/Ins tu 25% O ce/Ins tu 25%
124 124
Lei Yu_ Work Sample
59
High-Speed Rail Station Design
age Title
PHASE 2
n text in bullet nts gyskl;asx n text in bullet nts fwkj
PHASE 1
PHASE 2 OD
SECTION
OD
FO
Groud
econdary text
CU
LTU R
ATR I
UM
E
RET AIL ATR I
UM ATR I
Culture
UM
RET AIL
RET AIL
OF
I TA
RE
Comercial &RETAIL Hotel Mix
L
Food Exhibition Atrium Vertical Circulation Tech Workshop Health & Fitness
OD
CU
LTU R
ATR I
UM
E EXH
IBIT
Culture Culture
CIQ Office
FO O TAU & D RA NT
RES
B1
Belo to w
CO
RET AIL
ATR I
ATR I
UM
RET AIL
RET AIL
OF
FIC
E
Mixed-Use Development Ground Level
B1 99
Health Health & Fitness & Fitness
Office Office
60
Belo to w
ope
n
STU TECH DIO
RET AIL
Atrium Atrium Vertical Vertical Circulation Circulation
Lei Yu_ Work Sample
n
RET AIL
Exhibition Exhibition
Back House Back of of House CIQ CIQ
CIA
L
UM
Food Food
Tech Tech Workshop Workshop
ope
RET AIL
RET A info ER IL
MM
IL TA RE
Comercial Comercial &RETAIL &RETAIL Hotel Hotel Mix Mix
ION
HSR STATIONSTATION SECTION DEVELOPMENT INTITLE CBD
Mixed Mixed Development Development
FO
OD
HSR STATION DEVELOPMENT
Back of House
FO
2
FO
BAC K HO of U
HEA L FITN & TH ESS
FIC
E
D D M M
D D
Ground Ground
NEXT TRAVEL
D D
NEXT TRAVEL
Public Realm
Travelator • Travel time 4 minutes between the two stations
Travelator
Jurong East MRT Station
• Travel time 4 minutes between the two stations Jurong East MRT 7mStation above street level
sheltered boardwalk
access to adjacent building
above 5.5m 7m below streetstreet level level
B1 B1
access to adjacent building
HSR Station B1 Level
D D
166
NEXT TRAVEL
M M
Strategy 3 - Enhance Public Realm
166
• Street Types - Neighorhood Streets
B4 B4
Station Multimodal Connection
D
D M
Ground
D
SECTION NEXT TRAVEL TITLE SECTION NEXT TRAVEL TITLE
D
HSR Station B1 Level
B3 B3
M M
5.5m below street level Observation Deck
B2 B2
NEXT TRAVEL
sheltered boardwalk
Observation Deck
Strategy Strategy3 3- Enhance - EnhancePublic PublicRealm Realm
M
B1
D 161
NEXT TRAVEL
• Street • Street Types Types - Walk - Walk & Cycle & Cycle Friendly Friendly Boulevard Boulevard B2
Mass Rapid Transit (MRT)
Travelator to Jurong East Station
B3
M
M M
Ground B4
164
B1
B2 JRL
M
CRL
M CRL 165
B3
JRL B4
160 160
Lei Yu_ Work Sample
61
Lei Yu_ Work Sample
62
Ground Ground
B1 B1
B2
B2
You are here
B3 Lei Yu_ Work Sample
63
Lei Yu_ Work Sample
64
CU
ATR IU
RET AIL
ATR IU
RET AAITL
OD FO
M
RIU
M
CU
LTFU OROE D
ATR IU
M
ATR IU
ATR IU
M
OD
CU
LTU R
Hotel Mix
M
Belo to w
RET RETAIL AIL i n f REi T o nfAoIL REi T nfAoIL
ope
n
CO RE M T CO MREREC AIL MM TIAAL ERC IL I CO RE AL MM TA ERC IL CFO RETIAL OOM RES M AIL TAU & D ER CIA RA NT L
Ticket Hall Office
Belo to w
Belo to w
Ticket Hall
Belo to w
CO
n
ope
n
info
BUS
NE
HEA L FITN & TH ESS
S BU RIV AL
S BU
R
I&
E AT IV
PR
R
CA
NE
ZO
WA ARE ITING A WA ARE ITING A
CO
WA ARE ITING A
L VA
RI AR
WA ARE ITING A WA ARE ITING A
CO
WA ARE ITING A
to
MM ERC CO WA IAL MAM ITIN REEAR G CIA L L
CR
AR
RIV AL
L VA RI
L CR L CR
BA CK HO of USEB AC K HO of USE
L VA RI AR
to
IAL
AR
to
ERC
L VA RI
AR
BA CK HO of USE
BA CK o BA f HO CK USE of HO USE BA CK BA o C BA f HO K of CK USE HO of USE HO USE BA CK of HO USE
Platform Platform Platform 65
NE
NE
ZO
ZO
R
CA
X TA
AR
IVA WA BA L BA CK CK oAf RE ITING HO of HOA USE USE ARR IVA L BA CK HO of USE
BA CK HO of USE
Platform Platform
NE
RIV HO f AL US
NE
E AT IV
ofA AITIN HROE AUS G E
BA o CK EBA CK HO of USE ZO
AR
ZO
W USE
PR
BA CK
NE
ZO
AR
R
HO
CA
of
S BU
BA CK
BA CK HO of USE
L VA RI AR
Departure & Arrival
STU TECH DIO
WA ARE ITING A WA ARE ITING A
I&
WA ARE ITING A
MM
BAC K HO of USE
en
RET AIL
X TA
RIV AL
HEA L FITN & TH ESS
RET AIL op
E AT IV
AR
L VA
BAC K HO of USE
STU TECH DIO
PR
WA ARE ITING A
HEA L FITN & TH ESS
RI
BAC K HO of USE
n
I&
WA ARE ITING A
STU TECH DIO
ope
ZO
CIQ CIQ CIQ CIQ
IO
n
RET AIL
RET AIL
WA NE ARE ITING A WA B ARUES IZTOING A NE
FIC
HEA L FITN & TH ESS HEA L FITN & TH ESS
RET AIL
Belo to w
ZO
STU TECH DIO
RETS TEC UD H ope ATIL
RET AIL
L
BUS
OF
n
AR
Departure & Departure & Arrival Arrival Departure & Arrival Departure & Arrival
Belo to w
RET AIL Belo to w
n
CIQ
BAC K HO of USEB AC K o HO f USE
RET AIL
RET AIL
ope
E
ope
RET B toopen AILelow
X TA
CIQ & Waiting Area
Belo to w
ope
CIA
BAC K HO of USEB AC A K RR o f HO IVA USE L DRT A BA Z ON RRIVA CK E L oDf BAC H K BA HO RoTfOZUOSE CK US NE of E HO AR US RIV AL BA E D CK BAHOU oRfT ZO CK SE NE of HO ARR USE IVA L BAC K HO of USE
n
RET A info ER IL
MM
CIQ & CIQ & Area Waiting Waiting Area CIQ & Waiting Area CIQ & Waiting Area
ope
RE RE TA TA IL IL
CIQ
Belo to w
E
FIC
RET AIL
M
RE TA IL
Health & Fitness
Lei Yu_ Work Sample
OF
FIC
IL TA RE
FO O TAU & D RA FO NT OD RES TAU & RA NT FO OD RES & TAU RA NT FO O RES TAU & D RA NT RES
Ticket Hall Back of House
B4
RET AIL
E
IL TA RE
ATR IU
RET AIL
Ticket Hall Ticket Hall
B3
RET AIL
FIC
OF
M
Exhibition Culture Atrium Comercial &RETAIL Vertical Circulation Hotel Mix Tech Workshop Food Health & Fitness Exhibition Back of House Atrium CIQ Vertical Circulation Office Tech Workshop
B2
M
E
OF
RET AIL
ATR IU
Food
B1
ATR IU
RET AIL
ATR IU
E
M
RET AIL
FIC
IL TA RE
OD FO
Mixed Culture Comercial &RETAIL Development
ATR IU
ATR IU
FO
OF
IL TA RE
M
E
M
RET AIL
RET AIL RET AIL
M
RET AT AIRLIUM RET AIL
IL TA RE
LTU R
ATR IU
M
RET AIL
OD FO
CU
M
ATR IU
OD FO
Ground
FO OD LTU RE CU LTU FORE OD
D OO
Phase 1
Mixed Mixed Development Development Mixed Development Mixed Development
BA CK HO of USE
E
LTFU OROE D
RIU
M
ATR IU
M
OD
LTU R
ATR IU
RET AIL
ATR IU
M
E
RET AIL
Belo to w
ope
n
CO RET M A CO MRERECT IL MM IAALI ERC L I CO RET AL MM AI ERC L CFO RETIAL OOM RES M AIL TAU & D ER CIA RA NT L
CIQ Office Ticket Hall
Belo to w
Belo to w
Belo to w
Ticket Hall
Belo to w
CO
ope
n
ope
n
ope
n
ope
n
RET RETAIL infAo IL REinT fAo IL REinT fAo IL
Belo to w
RET AIL
info
BAC K HO of USE
CIA
CIQ & Waiting Area
CIQ CIQ CIQ CIQ
A ARE ITING A
AR
RIV AL
WA ARE ITING A
CIQ
BAC K HO of USEB AC K o f HO USE
Departure & Departure & Arrival Arrival Departure & Arrival Departure & Arrival
RET AIL Belo to w
BAC K HO of USEB AC A K RR o f HO IVA USE L W A AR RIV ARE ITING A L WA BAC A K ARE ITING HO of USE A AR RIV AL BAC WA K HO of ARE ITING USE A AR RIV AL W
CIQ & CIQ & Area Waiting Waiting Area CIQ & Waiting Area CIQ & Waiting Area
Belo to w
RET AIL
L
RET AIL
Belo to w
RET AIL
RET AIL
M
BAC K HO of USE
BAC K HO of USE
STU TECH DIO
RET AIL ope
n
STU TECH DIO
HEA L FITN & TH ESS
RET AIL
STU TECH DIO
HEA L FITN & TH ESS
RET AIL op en
STU TECH DIO
HEA L FITN & TH ESS
RET AIL
WA ARE ITING A WA ARE ITING A WA ARE ITING A WA ARE ITING A
AR
RIV AL
BA CK
RIV HO of AL US
AR
AR
EBA CK HO of USE
RIV AL
AR
BA CK HO of USE
RIV AL
BA CK HO of USE
WA ARE ITING A
AR
RIV AL
BA CK HO of USE
BA CK HO of USEB AC K o HO f USE BA CK HO of USE
BA CK HO of USE
Platform Platform Platform 66
E
OF
HEA L FITN & TH ESS HEA L FITN & TH ESS
RETSTU TECH n AILDIO
ope
BA CK HO of USE
Platform Platform
E
FIC
n
BAC K HO of USE
Departure & Arrival
Lei Yu_ Work Sample
OF
ope
RET B toopen AeILlow
RET A info ER IL
MM
B4
RET AIL
E
FIC
IL TA RE
FO O TAU & D RA FO N T OD RES & TAU RA NT FO O RES TAU & D RA NT FO O RES TAU & D RA NT
E
FIC
IL TA RE
ATR IU
RET AIL RES
FIC
OF
OF
M
Ticket Hall Back of House
B3
M
OF
RET AIL
ATR IU
Health & Fitness
B2
M
RET AIL
IL TA RE
OD FO
CU
ATR IU
IL TA RE
M
FO
Mixed Development
M
RET AIL
RET AIL RET AIL
M
RET AT AIRLIUM RET AIL
IL TA RE
ATR IU
ATR IU
E
ATR IU
M
RET AIL
ATR IU
LTU R
M
ATR IU
OD FO
CU
Ticket Hall Ticket Hall
B1
RET AAITL
M
OD FO
Ground
RET AIL
ATR IU
M
CU
Culture Food Atrium Comercial &RETAIL Exhibition Vertical Circulation Hotel Mix Atrium Culture Tech FoodWorkshop Vertical Circulation Comercial &RETAIL Health & Fitness Exhibition Tech Workshop Hotel Mix Back of House Atrium Health & Fitness Food CIQ Vertical Circulation Back of House Exhibition OfficeWorkshop Tech Culture CIQ Atrium Health Comercial &RETAIL Office & Fitness Vertical Circulation Back of House Hotel Mix Tech Workshop CIQ Food Health & Fitness Office Exhibition Back of House Atrium CIQ Vertical Circulation Office Tech Workshop
ATR IU
OD FO
Phase 2
FO OD LTU RE CU LTU FORE OD CU
Mixed Development Development Mixed Culture Development Comercial &RETAIL Culture Mixed Hotel Mix Comercial &RETAIL Food Hotel Mix Development Exhibition
FIC
E
Benefits
MARTA line
Spring St
Live and work places for graduates
residence
Georgia Tech
Freeway Blocker
Tunnel
Georgia Tech Stadium
5m
P
Olympic Tower
Job Creation
Catalyze the development
Site
AT&T
P Church
North Ave
BOA
mi
P
k al nw
P
P
New Research Facilities
Residence
l wa k
New Festivals
Tax Benefits
Jobs
P
walkable streets
Parks
2306 jobs
Job Creation Tax Benefits Catalyze the development
CONNECTIVITY Cup for The Blind GEORGIA-TECH
Energize the Stadium
Plazas
2.2 acres
Good Environment
Access to Midtown
Walkable street
Atlanta Midtown Urban Redevelopment Caping landscape, TOD 100% 95% development, 79% Tech Park 87% & Retail83%
2945 residences
Historical District
MARTA RIDERSHIP Energize the Stadium Increased land value
Good Environment
1.09 acres
ULI Hines Student Competition Team: Lei Yu, You Wu, Lu Han, Siyang Jing, Mei Zhang 2015 Spring PennDesign
P
Catalyze the development
Entertainments
PUBLIC REALM
The Landing
The Fox Theater
North Ave
M Station
MIDTOWN
Robust and healthy living environment
Increased land value
DENSITY
P
The Varsity
in
North Ave
Peachtree NW
Tech Square
Tech Related Jobs
restaurants increased ridership Increased land value
Peachtree Corr idor
5th St
10
L
2013 Fall 501 PennDesign Studio
Site Analysis
1.89 miles
A
New Research Facilities Live and work places for graduates Access to Midtown
Assistant product for disabled
bike lanes Open Space Shortlisted, Red Dot Design Concept Competition/Germany 2012 Team: Lei Yu, Fan Wang COMMUNITY China Academy of Art B
82%
Increased land value
0.82 miles
Job opportunities walkable streets more recreation facilities Open Space
MARTA
increased ridership
DUO
Mixed-use High-rise Development Architect: Buro ole Scheeren
Jurong N.E.X.T
NSFORMING
Total Buildou
Share Retail Work-live Space total Unites Parking total Spaces Jobs Created
Location: Singapore Site Area: 26,700m2 Program: Premium Offices, Luxury Hotel, Residences and Signature Retail Commission: March 2011 Construction Start: 2013 Completion: 2017
Singapore HSR Station and CBD Development Next Engine for Exchange and Transformation
Location: Singapore Instructor: Marilyn Taylor, Bob Yaro Team: Garesa Hao En Au, Adam Berkowitz, Ruyi Chen, Tingting Feng, Danqi (Silvia) Fang, Yiling Li, Sandy Klanfer,Yidi Xu, Lei Yu, Peiqian (Peggy) Zhong, Xinyi (Elynor) Zhou, Mengjie Zhu 2017 Spring PennDesign Asian Urbanism Studio
Parkin
Reponsibility: Facade development, including 3D-modeling facade for mock-up; Develop exterior cannopy and related Interior & exterior construction drawing; diagram development, rendering, dairy for meeting
W
Joey JH P
THE LANDING
Team 160125
Team
Total Buildou
Share Hotel Retail Residential total Unites
6
Proposed 1. MARTA Station Hall 2. Supermarket+Shopping Mall+Community Center 3. Retials+Apartments+Affordabal Housing 4. Restaurants+Tech Retial+Other Retials (with underground parking) 5. Hotels (with underground parking) 6. Business Incubator 7. Condominium housing 8. Retails (with underground parking) 9. Media Center 10. WeWork+Retail 11. Work and Live Lofts
5
Parking Community Center
4th St. NW
a. Pop-up Market Plaza b. MARTA Plaza c. Tech Plaza d. Olympic Tower Sq e. Media Center Event Lawn f. Overlook Hills g. Landing Grand Path h. Woods i. Ecologycal Rain Gardens j. Event Lawn k. Tech Square 2.0 l. bike lane m. Belt Line
Business Incuba Community Cen Parking Total Spaces Jobs Created
The Landing is a vision for the next generation’s urban experience. It means connecting people with opportunity and also each other by increased density; bridging Midtown, Georgia Tech, and Downtown together with a much needed green space; and anchoring jobs and investments by creating a “live where you work” environment.
11
Business Incubator
11
wn Downto to Connec
k
r
10
3rd St. NW
Existing 1.Bank of America Plaza Atlanta 2. Fox Theatre 3. AT&T building 4. Bobby Dodd Stadium at Historic Grant Field 5. Georgia Tech Global Learning Center 6. Scheller College of Business
9
d
f
6 4
e
5 c
8
4 3
7
2
4
Peachtree St. Comm
g
4
8 h
i
b
7
3
Total Buildou Share Retail Residential total Unites
ertial Corridor
3
M
1
j 2
Media Center Parking total Spaces Jobs Created
b l m
North Ave.
residence
Peachtree Corr
P
Peachtree NW
Tech Square
Olympic
Live and work places for graduates
idor
5th St
Georgia Tech
Benefits
MARTA line
Spring St
400 feet
Tech Related Jobs
restaurants increased ridership Increased land value
Job Creation
Research Facilities CatalyzeYu_ the development Lei WorkNewSample
DENSITY
West Peachtree St. NW
300
Spring St. NW
Site Analysis
200
Downtown Connector
100
a
Robust and healthy living environment
Increased land value New Festivals
67
Tax Benefits
Entertainments
Good Environment
PUBLIC REALM
1
Parking
MIDTOWN Catalyze the development
MARTA RIDERSHIP Energize the Stadium Increased land value
walkable streets
Good Environment Job Creation
Access to Midtown
CONNECTIVITY
Tax Benefits Catalyze the development
GEORGIA-TECH Energize the Stadium
A
North Ave.
Live and work places for graduates
residence
Freeway Blocker
Tunnel
Georgia Tech Stadium
5m
P
Olympic Tower
Catalyze the development
Site
AT&T
P Church
The Fox Theater
New Research Facilities
Catalyze the development
MARTA RIDERSHIP Energize the Stadium Increased land value
Entertainments
Good Environment
Tax Benefits
walkable streets
PUBLIC REALM
l wa
10 mi
P
k al nw
P
Residence
P
Jobs
Parks
Good Environment Job Creation
Access to Midtown
Tax Benefits Catalyze the development
CONNECTIVITY
Plazas
North Ave
100%
BOA
95%
2945 residences
P
Historical District P
GEORGIA-TECH Energize the Stadium
87%
79%
2306 jobs
Walkable street
2.2 acres
bike lanes
83%
1.09 acres
Open Space
COMMUNITY
82%
1.89 miles
Total Buildout (sf)
122,116.00
Share Hotel Retail Residential total Unites
34% 103,890 73,423 269 ,800 241 21% 30,945 27,811 130,818 436 547
Increased land value
0.82 miles
Business Incubator Community Center Parking Total Spaces Jobs Created
walkable streets more recreation facilities Open Space
MARTA
increased ridership
PHASING I-CONNECTING
16% 34% 42% 51%
Affordable housing on the top of MARTA Station provide various apartmemt APT. types for leasing and purchasing
2018 2019 2020 2021
$28,872,577 $85,535,273 $296,798,173 $349,687,517
Pop up market is a flexible public space for food market, venders, and small public gathering event during the day time.
W
ES T
Retail
PE
POP UP MARKET
AC H
TR
EE
Green roof can cool the building, provide open space for peole. It also can reduce
Business Incubator
ST R
EE
GREEN ROOF runoff by infiltrating stormwater
Residential
PHAS VIEW
Community center provides a social and recreational space for people who live there. It is an indoor space provide differCOMMUNITY ent education and recreation programs. CENTER
Hotel
Parking Community Center
Share Retail Work-live S total Uni Parking total Spa Jobs Creat
P
Hotel building is adjacent to the Peachtree, which is a commerical HOTEL corridor in the middle town of Atlanta.
Totel Asset Value
B
Job opportunities
Total Bui
Development Footprint 2018 2019 2020 2021
A
New Research Facilities Live and work places for graduates Access to Midtown
Phase 1
necting people with Tech, and Downtown reating a “live where
SP
RI
NG
ST R
T
NW
EE
T
Business incubators provide space for research labs, design offices, and idea studios. It is the place for innvation INCUBATOR and creatively.
W
AY
Tech Square
T.O.D.
FR
EE
RETAIL/ CINEMA
W
AY
idor
5
EE
Peachtree Corr
FR
MARTA Station serves as transit hub in the middle town of atlanta, which will catalize the Retail commercial and residential development in the near future. Blocker
5
I8
Freeway
I8
Retail commercial provide convenient and comfortable shopping experience for local residence and workers in this area. RETAIL
Stadium Site
TOD North Ave
Team 160125
NECTING
Hotel
Retial
Community Center
MARTA Station Hall
Bus Route
Business Incubator
Residential
Underground Parking
Proposed Bike Lane
Existing Bike Lane
Development Total Buildout (sf) 58,676 PHASE I Footprint VIEW FROM MARTA STATION Share Retail Residential total Unites
Media Center Parking total Spaces Jobs Created
provides a social and e for people who live or space provide differrecreation programs.
25% 32,000 30,433 696 11% 26,676 75,363 251 101
2022 2023 2024
Condominium housing development provide great view to the adjacent park
APT. and views to the downtown Atlanta.
59% 100% 100%
TR
CH EA
OVERLOOK
TP ES
Geogia Tech and Peachtree Corridor, TOD, Tech Square and Stadium
Olympic tower provides panoramic view to the downtown and adjacent park. It is a landmark and tourism attraction hotspot.
Parking
$397,063,190 $3,021,899,280 $1,871,272,540
RETAIL
Media Center
WN
Retail commercial provide convenient and comfortable shopping experience for local residence and workers in this area.
EVENT LAWN
Event lawn is a gathering space of people. An active public realm for fun and recreation designed for multifunction and multi generation use.
Media Center provides unique space for exploring and experiencing new social media and technology.
A: What do you want to do after done with shopping?
Piedmont Park Botanical Garden
TOP 1
A: How did you get here?
Good Environment
NO OPEN SPACE
Job Creation Tax Benefits Catalyze the development
Energize the Stadium
A
A
New Research Facilities Live and work places for graduates Access to Midtown
ridor
Peachtree Cor
Increased land value
B
THE TOWER
Retial
Media Center
Existing Bike Lane
Residential
Underground Parking
Proposed Bike Lane
Bus Route
OPEN ?NOSPACE Site
TOP 6
Centennial Olympic Park
tourism attraction hotspot.
B: I usually drive, but I took the Metro today. phasing 2:
SECTION A A: Sounds good! We might also be able to make
B
Job opportunities
LANDING
Create Open Space to fill the gap
SECTION B
it to the new show happening in the community center in the evening.
walkable streets more recreation facilities
Site
B: I am going to Olympic stadium for a The Olympic Tower provides panoramic view to the football game. downtown and adjacent park. It is a landmark and
B: What about rent a bike in the MARTA station and ride up to Ansley Park?
Tech Square Open Space
NITY
PHASE VIEW F
Residential
MEDIA CENTER
TECH
Team
PONCE DE LEO
W
Totel Asset Value 2022 2023 2024
CONNECTING
PHASING II-LANDING
W
TN
EE
R ST EE
phasing 1:
Retail
market is a flexible public r food market, venders, ll public gathering event he day time.
Open Space increased ridership
TOD
ECTING
ch and Peachtree Corridor, Square and Stadium
ANDING
e d
New Festivals
Parking
MIDTOWN
Robust and healthy living environment
Increased land value
DENSITY
North Ave
M Station
k
NG
A
1
P
The Varsity
in
North Ave
Peachtree NW
Georgia Tech
Job Creation
Peachtree Corr
Tech Square
Tech Related Jobs
restaurants increased ridership Increased land value
idor
5th St
Site Analysis
Benefits
MARTA line
Spring St
Site Analysis
West Peachtree St. NW
400 feet
300
Spring St. NW
200
a
Downtown Connector
100
Jobs Creat
m
Business Incubator
Total Buildout (sf)
52,203 41%
Share
Retail PONCE DE LEON AVE NW57,401 Work-live Spaces total Unites Parking total Spaces Jobs Created
596,438 268 65,422 218 1770
Development Footprint 2025 2026 2027
100% 100% 100%
2025 2026 2027
$1,072,788,695 $632,553,575 $653,988,143
Totel Asset Value PHASE II VIEW FROM TECH SQUARE Parking
Retail
Plaza
Media Center
The Olympic Tower
Landing
Dormitory
Business Incubator
Retail
Street
Landing
PHASING III-ANCHORING PHASE ST AD VIEW F IU WEST PEACHTREE ST NW M
Work and Live Typical Loft Unit
Work
Lei Yu_ Work Sample
Dormitory
68 LIVE/WORK
Live/work district provides vibrant neighborhood for young people who live and work here adjacnet to Tech-town
RETAIL
P
comfortable shopping experience for local residence and workers in this area.
Site TOD North Ave
NG
PHASE I VIEW FROM MARTA STATION
ocial and who live de differgrams.
Total Buildout (sf)
58,676
Share Retail Residential total Unites
25% 32,000 30,433 696 11% 26,676 75,363 251 101
Media Center Parking total Spaces Jobs Created
ble public venders, ing event
Retial
Residential
Development Footprint 2022 2023 2024
APT.
Underground Parking
Condominium housing development provide great view to the adjacent park and views to the downtown Atlanta.
Bus Route
Proposed Bike Lane
Existing Bike Lane
phasing 1:
CONNECTING
Geogia Tech and Peachtree Corridor, TOD, Tech Square and Stadium
PHASING II-LANDING
NW
E
TR
H AC
ET
E TR ES
MARTA Station Hall
OVERLOOK
E TP ES
Olympic tower provides panoramic view to the downtown and adjacent park. It is a landmark and tourism attraction hotspot.
PONCE DE L
PHAS VIEW
W
$397,063,190 $3,021,899,280 $1,871,272,540
Retail commercial provide convenient and comfortable shopping experience for local residence and workers in this area. RETAIL
Retail Parking
Phase 2
59% 100% 100%
Total Asset Value 2022 2023 2024
Community Center
Hotel Business Incubator
EVENT LAWN
Event lawn is a gathering space of people. An active public realm for fun and recreation designed for multifunction and multi generation use.
A: What do you want to do after done with shopping? A: How did you get here?
Residential Media Center MEDIA CENTER
Media Center provides unique space for exploring and experiencing new social media and technology.
Piedmont Park Botanical Garden
TOP 1
B: I am going to Olympic stadium for a football game.
Environment
B: What about rent a bike in the MARTA station and ride up to Ansley Park?
reation
enefits
NO OPEN SPACE
B: I usually drive, but I took the Metro today.
ze the development
OPEN ?NOSPACE Site
TOP 6
ridor
gize the Stadium
A
A
Research Facilities and work places raduates ss to Midtown
THE TOWER
Peachtree Cor
B
A: Sounds good! We might also be able to make Retial Media Center it to the new show happening in the community Underground Parking Residential center in the evening.
n Space
ased land value
Existing Bike Lane
Centennial Olympic Park
The Olympic Tower provides panoramic view to the downtown and adjacent park. It is a landmark and tourism attraction hotspot.
Bus Route
Proposed Bike Lane
phasing 2:
SECTION A
B
opportunities TOD
LANDING
Create Open Space to fill the gap
SECTION B
able streets
e recreation facilities
n Space
G
ased ridership
tree Corridor, Stadium
NG
PONCE DE LEON AVE NW
Business Incubator
Development Total Buildout (sf) 52,203 Footprint PHASE II VIEW FROM TECH SQUARE Share Retail Work-live Spaces total Unites Parking total Spaces Jobs Created Parking
41% 57,401 596,438 268 65,422 218 1770 Retail
2025 2026 2027
100% 100% 100%
Media Center
The Olympic Tower
Landing
Dormitory
Business Incubator
Retail
Street
WEST PEACHTREE Dormitory ST NW
Landing
PHASING III-ANCHORING PHAS ST AD VIEW IU M
Work and Live Typical Loft Unit
Total Asset Value 2025 2026 2027
Plaza
Work
$1,072,788,695 $632,553,575 $653,988,143 LIVE/WORK
Live/work district provides vibrant neighborhood for young people who live and work here adjacnet to Tech-town
WeWork Space Typical Unit
Work-live Spaces
2 3
4
mont Park nical Garden
fill the gap
ON B
WEWORK
1
1
WEWORK provides a place for co-working and knowledge sharing space for different background people.
4
A: Do you wan to run across the park instead of the 5th Street?
1 Entrance/Reception 2 Shared Coworking Space
3
3 CAFE Space 4 Meeting Room
1950s Highway
5
Midtown 8
Retail commercial provide convenient and comfortable shopping and dining experience for local RETAIL residence and workers in this area.
B: Sure! We can also climb up to the Olympic Tower.
A: I know there are a lot of parks built over the Existing Bike Lane Bus Route highway but this one is very unique, almost like Proposed Bike Lane an amphitheater when you stand in the highest point of it.
Retial
lofts
Work&live
Underground Parking
Team 160125
ory
ING PHASE III VIEW FROM TECH SQUARE
A: Are you Georgia Leia Yu_ Work Tech graduate too?
Sample
69
Middle area of 1880s 2 Geogia Tech Techwood Homes 1930s 4 Historic District 1990s 6 Centennial Olympic Park
B: The view is spectacular, isn’t it? It would be so nice to live here! phasing 3:
1900s Ansley Park Neighborhood
Site 7
1840s Downtown
2007 Peachtree Commercial Corridor
1981 MARTA Subway
1
ANCHORING
the history of urban development
Team
htree Corridor, Stadium
eased land value
opportunities
NG
kable streets
e recreation facilities
n Space
eased ridership
Create Open Space to fill the gap
PONCE B DE LEON AVE NW
SECTION A
PHASE II VIEW FROM TECH SQUARE
Phase 3 Business Incubator
Total Buildout (sf)
52,203
Share Retail Work-live Spaces total Unites Parking total Spaces Jobs Created
41% 57,401 596,438 268 65,422 218 1770
Parking
Development Footprint 2025 2026 2027
100% 100% 100%
Retail
Plaza
Media Center
The Olympic Tower
Landing
Dormitory
Business Incubator
Retail
Street
Landing
Dormitory
PHASING III-ANCHORING PHAS ST AD VIEW IU M
Work and Live Typical Loft Unit
Totel Asset Value 2025 2026 2027
WEST PEACHTREE ST NW B SECTION
Work
$1,072,788,695 $632,553,575 $653,988,143 LIVE/WORK
Live/work district provides vibrant neighborhood for young people who live and work here adjacnet to Tech-town
mont Park anical Garden
P1
WeWork Space Typical Unit
A: Do you wan to run across the park instead of the 5th Street?
Work-live Spaces
2
3
E
4
WEWORK
1
WEWORK provides a place for co-working and knowledge sharing space for different background people.
4
B: Sure! We can also climb up to the Olympic Tower.
1 Entrance/Reception 2 Shared Coworking Space
3 3 CAFE Space 4 Meeting Room
A: I know there are a lot of parks built over the Retail commercial provide convenient and comforthighway thisandone is experience very unique, able but shopping dining for local almost like residence and workers in this area. RETAIL an amphitheater when you stand in the highest point of it.
fill the gap
B: The view is spectacular, isn’t it? It would be so nice to live here!
1840s 1 Downtown
ON B Retial
lofts
Existing Bike Lane
Work&live
Underground Parking
Proposed Bike Lane
Bus Route
phasing 3:
Team 160125
RING PHASE III VIEW FROM TECH SQUARE
A: Are you a Georgia Tech graduate too?
B: Not really. But I heard a lot about how this place is good for start-ups and young people so I moved here.
A: Live-Work lofts significantly cut my living expenses.
900s nsley Park eighborhood
B: Same for me. But I value the synergy of this lifestyle more. I meet new people and have new ideas everyday!
7 chtree mercial Corridor
Subway
development
ANCHORING
the history of urban development
Spring
Team
itory
G
1900s Ansley Park Neighborhood
1950s 5 Midtown Highway 8 2007 Peachtree Commercial Corridor Site Middle area of 1880s 2 Geogia Tech 7 1981 Techwood Homes 1930s 4 MARTA Subway Historic District 1990s 6 Centennial Olympic Park
3rd St NW Tech Square Entrance
Spring St NW
Team 160125
Lei Yu_ Work Sample
70
Body Sensor/ Wearable Fabric Marrige of Bio-Tech, Archietcure and Fashion Wharton Fashion Show 2016 Solo Work 2016 Spring PennDesign
PROFESSIONAL WORKS UNStudio, Buro Ole Scheeren, HASSELL
Other Works SELECTED WORKS
URBAN HOUSING/ CULTURE/ EDUCATION/URBANISM
ARCHITECTURE DESIGN SELECTED WORKS
stair
Lei Yu_ Work Sample
insllation in museum
71
UNStudio, Buro Ole Scheeren, HASSELL
Qatar Intergrated Railway Project Doha, Qatar 2012- 2019 Architect: UNStudio
Reponsibility: Intergrated furniture design, Interior panelization development & Physical Development, Landscape Cannopy Design with outdoor furniture and products
2009- 2013
PRODUCT DESIGN
East Side Mall/ Friedrichshain
SELECTED WORKS
Berlin Architect: UNStudio
PROJECT FACT Address: Warschauer Street Commencement: mid-2015 Rental space: approximately 39,500 m2 Completion: 2017
URBAN HOUSING/ CULTURE/ EDUCATIO
ARCHITECTURE DESIGN
Reponsibility: Physical Scale Development
SELECTED WORKS
figure B - 11
Generic Elevated Station - Concourse Level - Coastal Theme Atmosphere
QATAR RAILWAYS
VOL 6 – SECT 12 | ARCHITECTURAL BRANDING MANUAL – PART 2
24 AUGUST 2014
Due to confidential reason, only part of UNStudio projetcs are showed.
Lei Yu_ Work Sample
72
Curtain Wall Option 2
D ng Ka
Elevation
KEPPEL LAND_ JINGAN PAC Project
Glass Wall Ratio 4:6
a Ro
定 d康
e gD an Ch
Shanghai, China April- June 2015 Architect: HASSELL
ing
a Ro d 德 常
Reponsibility: Facade Development, Floor Plan Layout and GFR Calculation
8000
Din Wu
盖顶露台
4.5m (3m Clear )
L42 L41 L40 L39 L38 L37 L36 L35 L34
47000
Deployable Structure 净高
6500
避难层/泳池 Transform from L33 one objet to an other
49500
4500
200000
49500
L32 Instructor: Mohamad Al Khayer L31 Team: David Feng, Lei Yu, Yu Gan L30 2017 Spring L29 L28 4.5m (3m Clear ) L27 净高 L26 L25 L24 L23 避难层/会议 L22 L21 L20 L19 L18 4.5m (3m Clear ) L17 L16 净高 L15 L14 L13 L12 避难层/会议 L11 L10 Instructor: Katrin Mueller-Russo L9 L8 Solo Work L7 2017 Spring 4.5m (3m Clear ) L6 净高 L5 L4 L3 L2 大堂 L1
Self-Supported Pavilion
4500
Contemporary Furniture
From full to vacant
From rotatable to stable
10000
46000
Instructor: Simon Kim Team: Angela Huang, Lei Yu, Katie Ann McBride, Joey JH P 2017 Spring
Curtain Wall Option 2 Park Avenue Central Keppel Land China
South
West Changde Rd
East Wuding Rd
Changde Rd
North Kangding Rd
吉宝置业上海静安中央商务区综合项目
Curtain Wall
Curtain Wall
Curtain Wall
D
C
C
Glass ratio
Glass ratio
Widow Wall
B
Widow Wall
A
Glass ratio
Glass ratio
Glass ratio 40%
+ 40%
40%
40%
40%
window heigth
window heigth
window heigth
window heigth
window heigth
2900 mm
2600 mm
2100 mm
2900 mm
2400 mm
Optimized Light Conddition
Goverment Approval A > B > C > D ( Easy to Difficult)
Lei Yu_ Work Sample
73
oa gR
定 d武
Curtain Wall Option 2 Interior
Curtain Wall Option 2 Dimension
吉宝置业上海静安中央商务区综合项目
Park Avenue Central Keppel Land China
Curtain Wall Option 2 Dimension
Curtain Wall Option 2 Material and Reference
panel width
spandrel height 0.65 0.45 0.3
Park Avenue Central Keppel Land China
glass height 1.40 2.14 2.40
glass width 3.10 2.55 2.10
1
1.Light Aluminium panel 浅色铝金属面板 glass sqm percent glass
0.90 1.10 1.25
2.79 2.79 2.79
40% 40% 40%
吉宝置业上海静安中央商务区综合项目
2.Dark Aluminium panel 深色铝金属面板
2
3.IGU insulated glass 中空玻璃单元
panel width
spandrel height 0.65 0.45 0.3
glass height 1.40 2.14 2.40
glass width 3.10 2.55 2.10
glass sqm
0.90 1.10 1.25
2.79 2.79 2.79
percent glass
3
40% 40% 40%
panel width
Lei Yu_ Work Sample Park Avenue Central Keppel Land China
吉宝置业上海静安中央商务区综合项目
74
spandrel height 0.65 0.45 0.3
glass height 1.40 2.14 2.40
glass width 3.10 2.55 2.10
0.90 1.10 1.25
glass sqm 2.79 2.79 2.79
percent glass
40% 40% 40%
Guardian Art Center
13
Auction House Headquarters and Cultural Complex Architect: Buro ole Scheeren
Body Sensor/ Wearable F
Location: No.1 Wangfujng Street, Beijing, China Site Area: approx. 6,320 m2 Program: Exhibition/Auction 7,580m2, Offices 3400m2, Restaurants 2050m2, Café/Bookstore 150m2, Hotel (120 Rooms) 12,680m2, Club Tower 2,000m2, Art Storage and Restoration Spaces 2,700m2, Parking 6,750m2 Commission: January 2011 roomConstruction number F119 F117 Start: 2013 Anticipated Completion: 2016
Marrige of Bio-Tech, Archietcure and Fashion
F1 EXHIBITION LOBBY / F1 展厅大堂
Wharton Fashion Show 2016 Solo Work 2016 Spring PennDesign
Reponsibility: Interior design with construction drawing, rendering, diagram development, choose and contact supplier for all related material, diary for all related meeting
13
F2 EXHIBITION / ) ኋ
GUARDIAN FIRE LIFT ిᗭ⎾䱨ụ
Bamboo Grove in City EXHIBITION HALL ኋ
TOILETS ড⭕䰪
Shower Head
Prize of Excellence, Gold-Tick Award Innovation Industrial Design Competition 2012 Instructor: Weibin Duan China Academy of Art Solo Work
PROFESSIONAL WORKS
MEETING ROOM Ր䇤ᇚ OFFICE LIFTS ࣔ⭫ޢụ
UNStudio, Buro Ole Scheeren, HASSELL
AUCTION LIFT ᤃঌ⭫ụ
Qatar Intergrated Railway Project Doha, Qatar 2012- 2019 Architect: UNStudio
Reponsibility: Intergrated furniture design, Interior panelization development & Physical Development, Landscape Cannopy Design with outdoor furniture and products
2009- 2013
PRODUCT DESIGN
East Side Mall/ Friedrichshain
SELECTED WORKS
Berlin Architect: UNStudio
PROJECT FACT Address: Warschauer Street Commencement: mid-2015 Rental space: approximately 39,500 m2 Completion: 2017
URBAN HOUSING/ CULTURE/ EDUCATIO
ARCHITECTURE DESIGN
F1 M CAFÉ BOOKSTORE / F1 M 书吧 Reponsibility: Physical Scale Development room number FM110
SELECTED WORKS
Lei Yu_ Work Sample
75
DUO
East Side Mall/ Friedrichshain
Mixed-use High-rise Development Architect: Buro ole Scheeren
E
Berlin Architect: UNStudio
Location: Singapore Site Area: 26,700m2 Program: Premium Offices, Luxury Hotel, Residences and Signature Retail Commission: March 2011 Construction Start: 2013 Completion: 2017
PROJECT FACT Address: Warschauer Street Commencement: mid-2015 Rental space: approximately 39,500 m2 Completion: 2017 Reponsibility: Physical Scale Development
Reponsibility: Facade development, including 3D-modeling facade for mock-up; Develop exterior cannopy and related Interior & exterior construction drawing; diagram development, rendering, dairy for meeting
BUS STOP CANOPY - SKYLIGHTS AND FACADE INTERFACE DETAIL
RTS STRUCTURES - NEW PROPOSAL - SCALE OF FACADES
RTS / MEP STRUCTURES FACADE
BUS STOP CANOPY - SKYLIGHTS AND FACADE INTERFACE DETAIL
SCALE FACTOR 44% OF RESIDENTIAL FACADE
VIEW BELOW CANOPY WITH SKYLIGHTS RESIDENIAL FACADE
BUS STOP CANOPY - SKYLIGHTS AND FACADE INTERFACE DETAIL
LONG ELEVATION
FACADE INTERFACE DETAIL HEXAGON FACADE
SOR - SINGAPORE OPHIR-ROCHOR
VERTICAL FIN FACADE
SOR - SINGAPORE OPHIR-ROCHOR
VIEW BELOW CANOPY WITH SKYLIGHTS
VIEW BELOW CANOPY WITH SKYLIGHTS
LONG ELEVATION
LONG ELEVATION
FACADE INTERFACE DETAIL
FACADE INTERFACE DETAIL SOR - SINGAPORE OPHIR-ROCHOR
SOR - SINGAPORE OPHIR-ROCHOR
Lei Yu_ Work Sample
76
TCNJ Traver Wolfe Hall Renovation Residential Education and Housing Kimmel Bogrette Architecture + Site Team: Jim Bogrette, Michael Pentz, Lei Yu Dec 2017- April 2018
Gloria Dei Communities: Warrington Senior Healthcare Center
Kimmel Bogrette Architecture + Site Team: Jonathan S. Trump, Corey Dockman, Lei Yu Oct 2017- April 2018
Lei Yu_ Work Sample
77
Lei Yu_ Work Sample
78
Lei Yu_ Work Sample
79
Lei Yu_ Work Sample
80
Lei Yu_ Work Sample
81
8'-8" TYP.
Gloria Dei Communities: Warrington A1 A
B1
E1
E3
E2
C1
E4
E5
E6
C1
E1
E3
E2
E3
E1
Senior Healthcare Center
Kimmel Bogrette Architecture + Site Team: Jonathan S. Trump, Corey Dockman, Lei Yu Oct 2017- April 2018 2 A3.1 M
L.8
L
K
J
i.6
i
14
H
9
W S
G
3
E
C
S
A
L
F.8
12
T
E
E
:
1
2 A3.4
11
/
8
F.2
10
L
E
"
V
=
1
A
'
-
T
0
I
F
8
O
N
"
E
14
D
3
EQ.
M
C.4
8
2
EQ.
3
EQ. EQ.
EQ.
B
6
9
4
A.4
14
TYP.
2
A.1
6
A
3
5
2
EQ.
EQ.
24'-8 1/2"
EQ.
C
14
C1
E3
E1
1
1 B25
#3
P
23
L
A
N
K
E
Y
29
2 A7.5
E
S 1 111
112
38'-0"
1 C A5.3
12'-8"
6.5
UNDERCOUNTER ICE MACHINE 7
8
MEDICAL STORAGE WC103
A36
38'-0"
TRASH CONTAINER AS PER CIVIL E5 11
11
ELEC. CLOSET
12
A36
WC108c
14
15'-5" 5'-1"
13
13
14
B06
6'-3"
12'-6"
12'-11 3/4"
MOP SINK AS PER PLUMBING DWGS
X Ax.x
C1
SOILED LINEN TOILET AS PER PLUMBING DWGS 6'-3"
1 B08
WEST M.C. LOUNGE WC108a
21
15
RECESSED HEATING PANEL AS PER MECHANICAL DWGS
16
16
5'-1"
15
UNIT MECHANICAL EQUIPMENT AS E1 PER MECHANICAL DWGS TYPE A
38'-0"
1 B05
TRASH
UNIT TYPE C
GENERAL STORAGE
B01
B04
21
5'-8"
X
W121
2 A7.2
UP
J
K
W123
26'-0"
W123 (228 SF)
5'-8"
25
L.8
2 ST-2
M
26
WEST STAIR ST-2
2 A7.1
26
7'-4 1/2"
C.9
D
1 A2.1
B S
A C
A
S L
E
E :
M 1
/
8
E
N
"
=
T 1
P '
-
0
L
A
N
T
"
R
U
E
2'-0"
N
O
P R O J E C TA
A.1
A
A.1
20'-0"
R
T
3'-4"
102
E102
FAMILY LOUNGE
A 1 C A5.2
1 102
4.2
15'-4"
3 A5.3
(237 SF)
A44 E104
A36
6.5
A44
E106
B
W110
JAN. CLOS. EC105
E108
EC105
1 WC110e
1
1
EC108c
EC108d
EAST GARDEN LOBBY
EAST M.C. RECREATION
EC108b
EC108
E113
COFFEE STATION, REFER TO INFORMATION
E113
E4
(252 SF)
1
WC110
BATHING SUITE A36 WC110 W116
E117
1
EC111c
1
STORAGE EC110c
E1
UNIT TYPE E
EC110e
EC110d 1 EC111d
EC111d
EC111b
E118
1 EC111
(227 SF)
STORAGE EC111
UNIT TYPE F
(227 SF)
EAST M.C. SOUTH CORRIDOR EC112
A44
W104
W120 E1
E1 3 ST-3 UNIT TYPE G E122
EAST STAIR ST-3
2 A7.2
D
UP
24 2'-0"
2'-0" 27'-0"
16'-3 1/2"
85'-4" NOTE: SEE CIVIL DWGS FOR COMPLETE PATIO INFO.
22
DN
(282 SF)
24 25
T Y
(228 SF)
E122
22
(228 SF)
W122
W A L L
E123
A44
E3
UNIT TYPE F
A44
UNIT TYPE F
A44
E120
(228 SF)
E3
W118
D
E3
E121
E1
E120
W120
UNIT TYPE E
A36 E121
(227 SF)
UNIT TYPE G
SKYLIGHT AS PER DETAILS
E1
(240 SF)
E119
CLOSET
CLOSET
A36
MEDICAL EXAM TABLE SUP REFER TO MEP FOR ADDITI
E119 A36
19
1 EC111b
E118
TELEVISION SUPPLIED BY O ELECTRICAL DWGS.
17
EC110c
EC110d
BATH
MECHANICAL EQUIPMENT
UNIT TYPE C
1 1 EC110e
LAV.
16
EC111c
EC110b
1 EC110
E2
CLOSET
SHOWER SHOWER EC110a
A36 E116
21
A44
SOILED LINEN TOILET AS P
RECESSED HEATING PANEL
E117 (252 SF)
1
EC111a
BATHING SUITE EC110
E116 (240 SF)
E3
UNIT TYPE B
A36
E114
19
W116
MOP SINK AS PER PLUMBIN
1 A3.4
(245 SF)
E115
A36
(252 SF) EC111a
UNIT TYPE E
W118
FLOOR DRAIN AS PER PLUM E3
E115
A36
THERAPY EC109
CLOSET
(240 SF)
A36
WC111d
ADA COMPLIANT DRINKIN DWGS
PLUMBING FIXTURE AS PER
E114
18
1
CLOSET 1
C1
UNIT TYPE A 1 EC109
E112
UNIT TYPE B E2
UNIT TYPE C
WC111
4" PERFORATED PVC FOUN
RETAINING WALL AS PER C
STEEL COLUMN AS PER STR
EAST M.C. LOUNGE EC108a
A36
UNIT TYPE C
E2
TRASH CONTAINER AS PER
KITCHEN EQUIPMENT AS P
16
(252 SF)
CLOSET SHELVING & HANG
9
UNIT TYPE B
A44
1 A4.1
17
UNIT TYPE B
W114
20'-0"
7'-4 1/2"
74'-8"
i
i.1
J
K
L.8
M
26
A2.1 16'-3 1/2"
27'-0"
74'-8"
A.4
(245 SF)
ADA COMPLIANT BENCH
EC108d
20
W122
1 ST-2
UNDERCOUNTER BIOHAZ
E5
E111
E111
STORAGE
14
EAST GARDEN
(245 SF)
A36
W114
(282 SF)
H
UNIT TYPE A A36
1
UNIT TYPE A
WC111d
FFE: 320.5' UP
N O R T H
EC106
EC107
EC108c
W112
W112
LAV.
C4
E112
WEST GARDEN
UNDERCOUNTER DISHWA
12
1 EC108b
(245 SF)
15
1
WC110e
UNDERCOUNTER ICE MAC 7
14
E3
UNIT TYPE A
COMMERCIAL IRON AS PER ADDITIONAL INFORMATIO LOCKERS AS PER DETAILS
1
STORAGE
E110
1 A3.4
WC110a
1
COMMERCIAL WASHER AS ADDITIONAL INFORMATIO
E6
E109 (240 SF)
(252 SF)
E1 1 WC108b
FFE: 320.5'
4 A4.1
CLOSET
STORAGE WC111
E109
1
FFE: 320.5'
SHOWER
WC110d
EC104a
E108
A44
E110
E3
11
13
WEST GARDEN LOBBY WC108b C4
5 A5.3
WC111c
BATH
COMMERCIAL DRYER AS PE ADDITIONAL INFORMATIO
EC100b
LAV.
1
SOILED UTIL. EC106
1
A36
(245 SF)
UNIT TYPE B*
E1
(252 SF)
D
WC110d
ELEC. CLOSET
EC104
STAFF ROOM EC104
UNIT TYPE A*
E2
NORTH GARDEN
UNIT TYPE B*
W110
WC111c
WC110b
(237 SF)
UNIT TYPE C
EC100b
G
B
D
E107
A36
12
WC108d
TIMECLOCK, SUPPLIED BY O ELECTRICAL DWGS FOR AD
6
1
E106
STORAGE
A36
A
C1
E107
A44
EC103
UNIT TYPE C (240 SF)
D
B
THERAPY WC109
1
(245 SF)
W108
BARBER EQUIPMENT AS PER
UNIT TYPE D
MEDICAL RECORDS MEDICAL EC102 STORAGE EC103
E104
C1
12'-0"
E1
2 A3.4
K
WATER FEATURE AS PER D
E1
1
F
N
LINEN CHUTE AS PER DETA INFORMATION
E105
4
13'-4"
6.5
A
CASEWORK AS PER DETAIL
UNIT TYPE B (252 SF)
UNIT TYPE D
4.2 27'-4"
L
ELEVATOR AS PER DETAILS
(245 SF)
E105
CLEAN UTIL. EC107
E2
E3
E103
E103
A36
C2 C1
9
W108
UNIT TYPE A
A36
NURSE'S STATION EC101
103
D
G
1 A2.2
2'-0"
B
C
B
C
C.9
C.4
D
F I R S T S
C
A
L
E
:
E
D
F L O O R 1
/
F
8
"
F.2
=
1
'
-
P L A N 0
F.8
X Ax.x
T
"
R
U
E
P R O J E C T
G
H
0
i
i.1
i.6
J
K
L
L.8
2ND FLOOR KEY P
M
0
FLO 3
0.7
0.7 M
C1
1
E3
E1
E2
E3
E1 C1
C1
A1
E2
C1
1 212 3'-9"
1 209 2.1 COMMUNITY ROOM
E1
1 210
210
3
1 209 STORAGE 209
12'-10"
STORAGE
2,500lb ELEV.
#2
D
4 C A5.5
DINING ROOM
OFFICE
OFFICE
226
225
224
1 226
2 A7.4
2 203
MEDICATION STORAGE
NURSE'S STATION
D
1.1
OFFICE 1 224
223
GROSS BUILDING SIZE - 80,680 SF
B2
1 223
1 218
A
A
FAMILY DINING
5 C A5.5
203
C2
C1
1 215
D
6 C A5.5
P OFFICE
218
222
3 C A5.5
219
W202
UNIT TYPE A
A
i
4.2
W202 (339 SF)
2 C A5.5
E1
i
217
WATER FEATURE AS PER D
221
E1
BARBER EQUIPMENT AS PER
4.2
C1
D
UNIT TYPE E EAST CORRIDOR
E201
COMMERCIAL DRYER AS PE ADDITIONAL INFORMATIO
C1
(380 SF)
E200
A44
COMMERCIAL WASHER AS ADDITIONAL INFORMATIO
A44
E202
i
W203 (380 SF)
UNIT TYPE E
A 4 C A5.4
D
E201
W200
W203
i i
H
W204
7
UNIT TYPE A
E4
A36
A36
W205
W206
A36
W208
UNIT TYPE C
E5 11
A36
E204
E203
A36
X Ax.x
X Ax.x
UNIT TYPE C
E206
UNDERCOUNTER BIOHAZA
E5
E205
(345 SF)
CLOSET SHELVING & HANG
9
(345 SF)
W206
ADA COMPLIANT BENCH
(339 SF)
UNIT TYPE C E2
W208
A36
A36
E208
E207
11
E3
COFFEE STATION, REFER TO INFORMATION
UNIT TYPE B
UNIT TYPE B
(345 SF)
W207
UNDERCOUNTER DISHWA
7
A36
UNIT TYPE C
E2 9
UNDERCOUNTER ICE MAC
E205
10 A36
W207
LOCKERS AS PER DETAILS
(339 SF)
A36
E206
E3
UNIT TYPE A
W205 (339 SF)
COMMERCIAL IRON AS PER ADDITIONAL INFORMATIO
E6
E203
(339 SF)
6.5
8
UNIT TYPE A
E204
i
6.5
(380 SF)
A44
8
10
6 UNIT TYPE A
E1 C1
W204
CORRIDOR
A44
B
TIMECLOCK, SUPPLIED BY O ELECTRICAL DWGS FOR AD
220
E202 (380 SF)
6
UNIT TYPE E
E207
E208
TRASH CONTAINER AS PER
E4
(382 SF)
(382 SF)
4" PERFORATED PVC FOUN
(345 SF)
12
A36
A36
W209
W210
12
UNIT TYPE B W210
UNIT TYPE B
E6
UNIT TYPE D
SLOPE
(382 SF)
C4
E210 (337 SF)
E1
W209 (382 SF)
13
13
C1
UNIT TYPE D W211 (337 SF)
UNIT TYPE D W212
A36
A36
W211
W212
W213
16 E2
W214 A36
A36
W213
W214
W216
(345 SF)
20
A36
A36
W215
W216
A36
UNIT TYPE A W218
(339 SF)
A36
MEDICAL EXAM TABLE SUP REFER TO MEP FOR ADDITI
UNIT TYPE A E215
SKYLIGHT AS PER DETAILS
E1
19 A36
A36
E218
E217
UNIT TYPE F
E218 (636 SF)
E217
E3
(636 SF)
21 UNIT TYPE F E1
A36
A36
W219
W220
W220 (636 SF)
E219
E3
E3
E219 (331 SF)
E1
A.1
D
24
22 EAST STAIR ST-3
2 A7.2
24
25
W221 (331 SF)
2 A7.1
A
DN
UNIT TYPE G
DN
ST-2
26
4 ST-3
UNIT TYPE G
W221
3 ST-2
T Y
E1
22
A36
E3
WEST STAIR
W A L L
A36
UNIT TYPE F
W219 (636 SF)
25
82
TELEVISION SUPPLIED BY O ELECTRICAL DWGS.
17
E215
(339 SF)
UNIT TYPE F E1
21
Lei Yu_ Work Sample
E213
E1
(339 SF)
MECHANICAL EQUIPMENT
A36
E216
19
W218
W217
RECESSED HEATING PANEL 16 E2
A36
E214
20
UNIT TYPE A
SOILED LINEN TOILET AS P
KITCHEN EQUIPMENT AS P
E213 (345 SF)
E216
(345 SF)
MOP SINK AS PER PLUMBIN
X Ax.x
UNIT TYPE C
(339 SF)
E3
A36
W217
E3
E211
A36
18 E2
FLOOR DRAIN AS PER PLUM E3
E211 A36
E212
E214
17
UNIT TYPE C
W215
ADA COMPLIANT DRINKIN DWGS
(382 SF)
A36
(345 SF)
(382 SF)
UNIT TYPE C
STEEL COLUMN AS PER STR
UNIT TYPE B
E212 (382 SF)
UNIT TYPE A
E2
RETAINING WALL AS PER C
C1
PLUMBING FIXTURE AS PER
UNIT TYPE C
E3
UNIT TYPE B
(382 SF)
18
E209
UNIT TYPE B
15 UNIT TYPE B
E209 (337 SF)
A36
E210
14
E1 SLOPE
C4
UNIT TYPE D
A36 14
(337 SF)
15
E1
K
LINEN CHUTE AS PER DETA INFORMATION
CONFERENCE ROOM 2 218
1 220
1 E200
4
B
5
C1
N
ELEVATOR AS PER DETAILS
1 221
1 219
UTILITIES D
B
UNIT TYPE E
SLOPE
A36
A
CASEWORK AS PER DETAIL
1 222
W.C.
1 217
E3
W.C.
2 213
L
AUTOMATIC SLIDING DOO
ADMIN RECEPTION
LAUNDRY
A D
B
B
1 216
W201
E3
1 225
227
216
215
214
B
202
1 204
A2 OFFICE
SUPPORT
2
A
1
204 C2
228
2 201
A C A5.5 2 A7.5 WARMING B KITCHEN
#3 E3
1 228 STOR.
229
DN
1 203
208
1 229 SERVER
2 A7.3
201
W.C.
UNIT TYPE A
E1
D
3,500lb ELEV.
3 ST-1
UPPER LOBBY
1 201
1 207
W201 (339 SF)
A36
3,500lb ELEV.
ST-1
1 205
X
X
1 208
LOBBY STAIR
OPEN TO BELOW
D
B
#1
1 213a E2
4.1
6 C A5.4
205
212
5'-2 1/4"
X
X
JAN CLOS.
1 213
213
A
REHAB
211
D
B
E3
E1
OFFICE 230
ACTIVITIES ROOM
5 A5.4
A 3 C A5.4
B1
1
C1 E3
1.1
26'-0"
C
LOUNGE
10 UNIT TYPE A*
1 A4.1
M.C. LIVING ROOM
D
104
E3
UNIT TYPE C
A36
SKYLIGHT ABOVE
B
P 2
EAST M.C. NORTH CORRIDOR EC100
W106
A
SHOWER
GROSS BUILDING SIZE - 80,680 SF
B2
1
(240 SF)
WEST M.C. SOUTH CORRIDOR WC112
A44
E3
24
10'-1 1/2"
i.1
UNIT TYPE F
ST-3
1 ST-3
NOTE: SEE CIVIL DWGS FOR COMPLETE PATIO INFO.
i
EAST STAIR
14'-8"
2 ST-3
B03 18
24 25
A.1
WC111b
22 MAINTENANCE OFFICE
A
1 WC111b
CLOSET
E1
22
W106
1
7 C A5.3
WC110c
A36
C1
A36
JAN. CLOS. WC105
1 WC105
W119
W121 (227 SF)
1.1
E101 EC100a
EC104a
A36
(240 SF)
UNIT T Y P ETYPE E G E N D EL
W A L L
1 B03
1 B01
W119
E3 5'-1"
RECEIVING 24
20
26
1
WC110c
1 B04
21
25
WC111a
STORAGE
20
2 B02
1 B02
CLOSET
WC111a
B02
21
W117
(252 SF)
Sheet Name: BASEMENT PLAN
20
A36
W117
E2
12'-5"
20
UNIT TYPE B
18 PER DETAILS SKYLIGHT AS 19
C1
E1
M.C. DINING ROOM STORAGE
D
(237 SF)
STAFF ROOM WC104
6 C A5.3
MEDICAL EXAM TABLE SUPPLIED BY OWNER, INSTALLED BY GC. REFER TO MEP FOR ADDITIONAL INFO.
19
2 B01
B05
1
B
2 101B
B
CHAPEL
#3
W104
W104
WC108d
WC109
W115 TELEVISION SUPPLIED BY OWNER, (245 INSTALLED BY G.C. REFER W115 TO SF) ELECTRICAL DWGS.
17 29 SPRINKLER ROOM
19
A44
1
15'-5"
17
18
2 A7.5
#3
8
1
1
A36
18
2 C A5.2
2,500lb ELEV.
WARMING KITCHEN
ELEV.
UNIT TYPE D
WEST M.C. RECREATION WC108
KITCHEN EQUIPMENT AS PER KITCHEN SUPPLIER SPECS & DWGS
2'-0"
10'-8" 6'-8"
A2
1 103
B
MEDICAL RECORDS WC102
CLEAN UTIL. WC107
6'-8"
D FOOD PREP
1 C A5.4
2 A7.4
7
WC108c
FLOOR DRAIN AS PER PLUMBING DWGS
1 B06
E3
E1
E101b
#2
A
D
B
1 W102B
W102A
D
1
4 A5.3
1'-0 1/2"
AUTOMATIC SLIDING DOO
2 A7.3
101B
C2
WC104
1
A44
W113
(252 SF)
PLUMBING FIXTURE AS PER PLUMBING DWGS
1ST FLOOR KEY P
M 2'-0"
UP
LOBBY CORRIDOR
C3
SOILED 5 UTIL. A5.2 WC106
WC107
STORAGE
STEEL COLUMN AS PER STRUCTURAL DWGS W113 UNIT AS PER PLUMBING ADA COMPLIANT DRINKING FOUNTAIN TYPE B DWGS E6
HK STORAGE
13'-4" 4'-8"
D
B
3,500lb ELEV.
WC104a
1
RETAINING WALL AS PER CIVIL DWGS 196'-7 1/2"
12
1
E2 A 2 C A5.4
#1
1
WC104a
WC106
W111
E101b
3,500lb ELEV.
C3
LAV.
WC100a
1 WC100a
UNIT DWGS TYPE A
4" PERFORATED PVC FOUNDATION DRAIN AS PER CIVIL W111 DWGS (245 SF)
19
FOOD PREP
A 4 C A5.2
B
W109
W109
COFFEE STATION, REFER TO MEP FOR ADDITIONAL 10 INFORMATION
B08
19'-8" 9'-0"
6'-0"
E101a
3 A4.1
WC103
2 C A5.3
(240 SF)
12'-5"
UNFINISHED SPACE
2 B08
9'-8" 4'-10" 4'-10"
5'-8"
6
A
ADA COMPLIANT BENCH 1 B07
B07
E3 WARMING KITCHEN
ST-1
D
B
1 104
21'-4"
W107
UNIT E4 CLOSET SHELVING & HANGING ROD AS PER DETAILS TYPE C
9
MEDICAL STORAGE
3 C A5.2
W102
UNDERCOUNTER BIOHAZARD REFRIGERATOR 9
10 UNEXCAVATED
00
NURSE'S STATION WC101
UNDERCOUNTER DISHWASHER
7
G
5'-1"
F
10'-0"
A
C1
W102B
A44
C1
6'-4"
6.5
W
W107 (237 SF)
L.8 10'-8"
EC100a
15'-5" 6'-4"
LOCKERS AS PER DETAILS
B25
10'-0"
A 1 C A5.1
D
B
1 101B
101C
W105
TYPE D
5'-8"
LOBBY C1 STAIR
12
101
A
CORRIDOR
A36
UNIT TYPE B
5
COMMERCIAL IRON AS PER SPECS, REFER TO MEP FOR ADDITIONAL INFORMATION UNIT
LOBBY
101A 6 C A5.2
1 101A
M.C. DINING ROOM
COMMERCIAL WASHER AS PERE3SPECS, REFER TO MEP FOR W105 ADDITIONAL INFORMATION (252 SF)
31'-4" 6'-8"
DN
1 113
113
WEST M.C. NORTH CORRIDOR WC100
W103
C1 RECEPT
105
1 105 1 106
L 16'-4"
0.7
110 LAV.
W101a
STOR.
A36
D
13'-4" 6'-8"
1 101
E1 CONFERENCE ROOM
106
W101a
A
(245 SF)
COMMERCIAL DRYER AS PER SPECS, REFER TO MEP FOR ADDITIONAL INFORMATION
6 RECEIVING CORRIDOR
8
1
W103
E2
B TIMECLOCK, SUPPLIED BY OWNER, INSTALLED BY G.C. REFER TO 4.1DWGS FOR ADDITIONAL INFORMATION ELECTRICAL
3 B08
4.2
19
15
1 112
E2
EXEC. DIRECTOR
1 107
107
OFFICE SUITE CORRIDOR
RECORDS
BARBER EQUIPMENT AS PER DETAILS 4
6
13
111
M.C. LIVING ROOM
UNITTO MEP FOR ADDITIONAL LINEN CHUTE AS PER DETAILS, REFER TYPE A INFORMATION
B09 1 B09
27
X Ax.x
11
T
E1
WATER FEATURE AS PER DETAILS KITCHEN STORAGE
2 B10
D
B
4.2
5
10
O
W101
CASEWORK AS PER DETAILS
B23
B12
A 1 C A5.6
B10
REFER TO KITCHEN SUPPLIER DRAWINGS FOR EQUIPMENT LAYOUT
E3 C1 DoN OFFICE
108
LAV.
3
1 B12
27
KITCHEN
3
DISH ROOM
E1
ACTIVITIES OFFICE
110a
ELEVATOR AS PER DETAILS
4.1
8
N
2.1 SLIDING DOORS AS PER DETAILS AUTOMATIC
1 B23 SHOWER
16
B24
OFFICE
1 B10
B11
1 B24
CHANGING ROOM
1 B19
COPY/ STORAGE 1 109
1
2,500lb ELEV. 24
21
2 1 B18
109
B1
K 14'-7"
J
FFE: 320.5'
0.7
1 108
GROSS BUILDING SIZE - 80,680 SF
J 11'-9"
FLO
100
L
6'-8"
12'-6"
B19
2 B18
3 22
1 B22 B22
i.6 17'-3"
26'-0"
3
B26
3 B10
3
FINANCE
W.C.
6'-8"
i 12'-0"
10'-1 1/2"
1 ST-1
LOWER LOBBY
B21
5'-6"
12'-8"
UP
2 A7.3
W.C.
12'-10"
12'-8"
1 B17
1 B21
B20 4 A5.6
13'-4"
12'-10"
H 15'-5"
0
K
38'-0"
B17
1 B13
1 B14
E3
1.1 A1
LOCKER ROOM
BREAK ROOM
2 A7.4
36'-8" 5'-6"
G
5'-8 1/2" 6'-0"
1 100
12'-6"
B14
#2
11'-8" 5'-10" 5'-10"
5'-6"
BINDER CABINET
CLEAN STOR.
B15
1.1
2
3 A5.6 3,500lb ELEV.
#1
12'-5"
CHEM. STOR.
27
B18
3,500lb ELEV.
5'-1"
1 B15
13'-10" 15'-4"
VESTIBULE
38'-0"
W.C.
2.1
11
ELECTRIC ROOM
2 ST-1
20'-4" 9'-10"
5'-0"
12'-8"
ST-1
5 A5.6
23
6'-8"
C1
38'-0"
LOBBY STAIR
B27 1 B27
B13
13'-4" 6'-8"
1 A4.1
1
F.8
2 234'-8" A3.4
12'-6"
1 B16
F.2 5'-8 1/2" 6'-0"
X Ax.x
38'-0"
EXAM ROOM
B16
2 B16
LAUNDRY ROOM
5
F 15'-5"
26'-0"
10'-0"
12'-0"
18'-0"
BEAUTY BAR
D
B
8
E 19'-4"
10'-1 1/2"
13'-4"
Blue Bell, PA 19422
19'-8"
Facsimile: 610.834.7815
9'-8"
5'-1"
6 A 2 HD C A5.6
24
D 15'-3"
X Ax.x
Phone: 610.834.7805
31'-4"
0.7
10
9
C.4 13'-9"
482 Norristown Rd. | Suite 300
13'-4"
6'-6"
1
19
C 14'-7"
2'-0"
14'-4"
31
1.1
B
17'-0"
3'-4"
6'-6"
0.7
1
5'-4 3/4"
13'-4" 19
1'-4"
36'-8"
2'-0"
11'-8"
2'-0"
20'-4"
6'-0"
13'-4"
10'-0 1/2"
0
UNEXCAVATED 10'-0"
2'-0"
FLOOR PLATE: 17,505 SF.
16'-8"
1'-0 1/2"
1'-0 1/2"
25'-4"
B A S E M E N T K E Y P LA A N V. 308'-10" A.1 - E L E A.4
M 2'-0"
12'-8"
L.8 10'-8"
38'-0"
L 16'-4"
182'-7 1/2"
K 14'-7"
0
12'-6"
J 11'-9"
"
38'-0"
i.6 17'-3"
0
26'-0"
i 12'-0"
-
10'-1 1/2"
H 15'-5"
'
BINDER CABINET
G
5'-8 1/2"
1
SKYLIGHT ABOVE
13'-10"
=
SKYLIGHT ABOVE
F.8
X 234'-8" Ax.x
"
SKYLIGHT ABOVE
F.2 5'-8 1/2"
0
E L E V A T I O N 8
1'-4"
F 15'-5"
A1
E3
12'-8"
E 19'-4"
/
BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976
D 15'-3"
1
T H E P A T H W A Y S A T W A R R I N G T O N
C.4 13'-9"
:
Scale: AS NOTED
C 14'-7"
E
Checked By: JT
B 17'-0"
L
Drawn By:
A.4 10'-0 1/2"
A
Construction Issue Date:
A.1
2'-0"
C
E1
TYP.
Progress Prints: Permit Set - 03.28.2018
A 1'-0 1/2"
N O R T H S
C1
E3
38'-0"
TYP.
2 A3.4
1 A3.1
D
E2
13
38'-0"
7
BINDER CABINET
E2
3'-0"
E1
11'-8 1/2"
E3
SKYLIGHT ABOVE
E1
C1
2'-2 1/2"
D
SKYLIGHT ABOVE
C1
14'-2 1/2"
K
A2
i
D
B
i.1
J
K
L.8
M
26
C
C.9
D
1 A2.3
S E C O N D S
C
A
L
E
:
1
/
F L O O R 8
"
=
1
'
-
0
P L A N "
T
R
U
E
P R O J E C T
13'-10" 15'-4"
W215
20
W219
9
9
W221
16
F
9
10'-1 1/2"
26
2 A7.1
26
A44
0.721
1'-10"
i
D
D
D
i.1
S
C
A
A
L
E
A.1
:
LOBBY DOUBLE HEIGHT_ SOUTH ELEVATION
1/4" =O 1'-0" R F SCALE: L O
1
/
8
"
=
1
'
-
P L A N
0
B
"
20'-0"
4 A5.1
C.9
D
14
S
C
A
L
E
:
1
/
B 3 A5.1
4 A5.1
LOBBY DOUBLE HEIGHT_ SOUTH ELEVATION SCALE: 1/4" = 1'-0"
LOBBY DOUBLE HEIGHT_ SOUTH ELEVATION SCALE: 1/4" = 1'-0"
13
0.7
22
22
1
24
1
0.7
5
=
1
'2 -
0
LOBBY ROOM 101_ WEST ELEVATION
P LA5.1A SCALE: NT 1/4"R = 1'-0"U
F L O O R
"
i.1
"
E
P R O J E C T
N
O
9
LOBBY ROOM 101_ EAST ELEVATION SCALE: 1/4" = 1'-0"
C 4 A5.1
9
LOBBY ROOM 101_ EAST ELEVATION SCALE: 1/4" = 1'-0"
Lei Yu_ Work Sample
83
5 A5.1
LOBBY ROOM 101_ WEST ELEVATION SCALE: 1/4" = 1'-0"
D 5 A5.1
LOBBY ROOM 101_ WEST ELEVATION SCALE: 1/4" = 1'-0"
A5.1 T H
N O R T H
D
2
R
SKYLIGHT ABOVE
Blue Bell, PA 19422
Facsimile: 610.834.7815
Phone: 610.834.7805 SKYLIGHT ABOVE
482 Norristown Rd. | Suite 300
38'-0"
i
0.7
D
A36
E211
A36 E218
E207
E212
A36
L E G E N D
E3
M
9
8
T Y P E
8
C
13 14
3 A5.1
L.8
8
2
S E C O N D
1
W A L L
2 9
LOBBY ROOM 101_ EAST ELEVATION SCALE: 1/4" = 1'-0"
1 A2.3
(636 SF) E1 33 12'' X 18'' 2 TIER METAL LOCKER WITH SLOPE TOP
2'-0"
9
9
B
2
K
C
E218
S.S PANEL WALL AT COOKING LINE
7'-4 1/2" 16
J
16
32
24
3
8
74'-8"
26
C
16
UP
16'-3 1/2"
14
UNIT
31 FRP PANEL WALL AND COVE BASE AS PER FINISH SCHEDULE TYPE F
3
WAINSCOT SCALE:9 1" = 1'-0"
3
13
1'-10"
3 A5.1
F I R S T
2 A7.2
1
16
3
19
30 10'' DEEP WOOD SHELVES W/SUPPORT BRACKETS
A36
A36
INSTALLED BY GC. E216
(339 SF) LINE 32 AS S.S PANEL WALL AT PER COOKING PER WALLSKYLIGHT PANEL W/CAP AND COVEDETAILS BASE AS FINISH E3 SCHEDULE 33 12'' X 18'' 2 TIER METAL LOCKER WITH SLOPE TOP EXPOSED COLUMN, PAINTED
WAINSCOT E1SCALE: 1" = 1'-0"
2
A5.1 ST-3
(282 SF)
3'-8"
1 A2.2
6 A5.1
3 EAST 6 STAIR
DN
E122
9
2'-0"
3 ST-3 UNIT TYPE G
25
29
E123 (228 SF)
2
16
27'-0"
B
W104
E122
1
28
19
WAINSCOT SCALE: 1" = 1'-0"
3 UNIT TYPE F
A44
A44
0.7
UNIT TYPE G
9
(2276SF)
A5.1
E120
TYPE A INFO. REFER TO MEP FOR ADDITIONAL
E3
E121
16
0.7
W221
E121
ELECTRICAL DWGS. 17
29 COLUMN, 25 HANDRAIL 33 12''AS X 18'' TIEREXPOSED METAL LOCKER WITHPAINTED SLOPE TOP PER2 SPECS *DETAILS
31 WALLPLANS AND COVE BASE AS PER FINISH SCHEDULE PERPANEL PLUMBING 27 PLUMBING FIXTURE ASFRP E216
UNIT TYPE E
A36
STORAGE EC111
E1
(331 SF)
EC111d
24
MEDICAL30EXAM TABLE SUPPLIED BY OWNER, UNIT 10'' DEEP WOOD SHELVES W/SUPPORT BRACKETS 26 14''X 14'' SQUARE PANELED COLUMN COVER
CLOSET
2
E120
23
E1
(240 SF)
E119
EAST M.C. SOUTH CORRIDOR EC112
1
(228 SF)
9
DN
1
22
P A T H W A Y S
12'-8" 13
2'-0"
ST-2
1 EC111d
A36
E3
1'-10"
WEST 85'-4" STAIR
16
BATH EC110d
2
16
24
3 ST-2
25
LAV.
16
17
E119
E1
13
3'-8"
25
STORAGE
EC110e 16
3'-8"
A36
G
E3
F
22
1 EC110d
EC111
UNIT TYPE F
UNIT TYPE F
9
1
EC110c
EC111b
EC111b
E118
UNIT TYPE C EC110c
1
E2
1' BULLNOSE CAP EC111c
1
EC110e
CLOSET
13 A36
F
W220 E3 SF) (636
2
E116
(227 SF)
W218
16
EC110
21
E117
CLOSET
EC110b
1
E118
(339 SF)
W220
LOBBY ROOM 101_ SOUTH ELEVATION SCALE: 1/4" = 1'-0"
H
E1
G
SHOWER SHOWER
BATHING SUITE 18 EC110
A36 E2
UNIT TYPE E
10'-1 1/2"
H
2 A5.1
UNITE1 TYPE A
LOBBY ROOM 101_ SOUTH ELEVATION 16 W219 E1 SF)= 1'-0" SCALE:(636 1/4"
B
EC111a
20
(252 SF)
1 EC111c
E
19
UNIT TYPE B
E117
20 9
1' BULLNOSE CAP A36
1 EC111a
CLOSET
17 18
E
2
E114
F
16
1 A3.4
(245 SF)
E115
A36
E114 E3
E3
1' BULLNOSE E115 CAP
A36
THERAPY EC109
(345 SF)
2
A36
1
15
(252 SF)
14 15
UNIT TYPE A
E
EC109
EC110a
19
G 2
F
F
10
(382 SF)
16
UNIT TYPE F
E112
W214
26'-0"
3'-6"
B
SLOPE A36
9
UNIT TYPE E2 B
LOBBY ROOM 101_ SOUTH ELEVATION SCALE: 1/4" = 1'-0"
A36
2 A5.1
26'-0"
(339 SF)
W218
H
21
A36
W217
W217 A5.1
E3
W216
A36
B
UNIT TYPE2A
E1
A36
13
2
17
W215
12
14
10
UNIT TYPE B
A36
11
E208
T H E
8
W216 16
C1
A36
SKYLIGHT ABOVE
7
8
1 A4.1
2
(337 SF)
G
7
5 C8 STEEL LINTEL (PAINTED) 6 SLIDING DOOR AS PER SCHEDULE & DETAILS CASEWORK AS PER SPECS ADA COMPLIANT BENCH 6 SLIDING DOOR AS PER SCHEDULE & DETAILS 7 WATER WALL AS PER DETAILS & SPECS DOOR AND FRAME AS PER SCHEDULE 8 INTERIOR7STAIR WATER DETAILS & SPECS AS PER WALL DETAILSAS & PER SPECS COFFEE STATION, REFER TO MEP FOR ADDITIONAL STONE VENEER TO MATCH EXTERIOR 9 WOOD WAINSCOT 8 INTERIOR AS PER DETAILS STAIR AS PER DETAILS & SPECS INFORMATION RECESSED HEATING PANEL AS PER MECH PLAN UNIT 10 ELEVATOR AS PER SPECS 9 DOORS WOOD WAINSCOT AS PER DETAILS TYPE B C8 STEEL (PAINTED) TRASH CONTAINER AS PER &CIVIL 11 LINTEL WINDOWS PER ELEVATORS & DETAIL SPECS DWGS 10 ASELEVATOR DOORS AS PER SPECS E3 E208 12 DOOR SLIDING AS PER SCHEDULE DETAILS(382 SF) HANDRAIL AS PER DETAILS &&SPECS 11 WINDOWS PER ELEVATORS & DETAIL & SPECS 4" PERFORATED PVCASFOUNDATION DRAIN AS PER CIVIL DWGS 13 8'' SQUARE COLUMN AS PER DETAILS WATER WALL AS PER DETAILS & SPECS 12 HANDRAIL AS PER DETAILS & SPECS 12 14 TV/ MONITOR BY OWNER RETAINING PER CIVIL DWGS INTERIOR STAIR AS PERWALL DETAILS AS & SPECS 13 SQUARE COLUMN AS PER DETAILS 15 LIGHT FIXTURE8''AS PER FIXTURE SCHEDULE WOOD WAINSCOT AS PER DETAILS 14 TV/ MONITOR BY OWNER 16 GYPSUM STEEL COLUMN PERASSTRUCTURAL DWGS WALLBOARDAS (PAINTED NOTED) UNIT ELEVATOR DOORS AS PER SPECS TYPE D 15AS NOTED, 17 TILE (TYPE LIGHT FIXTURE AS PER FIXTURE SCHEDULE SEE SCHEDULE) SLOPE C4 & SPECS E210 ADA COMPLIANT FOUNTAIN AS PER PLUMBING WINDOWS AS PER ELEVATORS &DRINKING DETAIL 18 ROLL DOWN 16 SHUTTER PER DETAIL (PAINTED AS NOTED) GYPSUM AS WALLBOARD (337 SF) DWGS HANDRAIL ASFIREPLACE PER DETAILS & SPECS 19 GAS AS PER DETAIL 17 TILE (TYPE AS NOTED, SEE SCHEDULE) A36 E210 8'' SQUARE COLUMN AS PER DETAILS 20 BASE AS PER FINISH SCHEDULE PLUMBING AS PER PLUMBING DWGS 18 FIXTURE ROLL DOWN SHUTTER AS PER DETAIL 14 MONITOR 21 KITCHEN EQUIPMENT AS PER SCHEDULE TV/ BY OWNER 19 GAS FIREPLACE AS PER DETAIL FLOOR ASMECHANICAL PER PLUMBING DWGS 22 RANGE DRAIN HOOD AS PER PLANS LIGHT FIXTURE AS PER FIXTURE SCHEDULE UNIT 20 BASE AS PER FINISH SCHEDULE TYPE 23 COUNTERTOP AS PER FINISH SCHEDULE *SPEC B GYPSUM WALLBOARD (PAINTEDE1 AS NOTED) MOP SINK DWGS 21 AS PER PLUMBING EQUIPMENT AS PER SCHEDULE E212 24 GRILLS AS PER KITCHEN MECHANICAL PLANS TILE (TYPE AS NOTED, SEE SCHEDULE) (382 SF) 22AS RANGE HOOD AS PER MECHANICAL PLANS 25 HANDRAIL PER SPECS *DETAILS SOILED LINEN TOILET AS PER PLUMBING DWGS ROLL DOWN SHUTTER AS PER DETAIL 23 COUNTERTOP 26 14''X 14'' SQUARE PANELED COLUMN COVER AS PER FINISH SCHEDULE *SPEC GAS FIREPLACE AS PER DETAIL KITCHEN EQUIPMENT AS PER SUPPLIER SPECS & DWGS ASAS PERPER PLUMBING PLANSKITCHEN 27 PLUMBING 24FIXTURE GRILLS MECHANICAL PLANS BASE AS FINISH SCHEDULE WALL PANEL W/CAP AND COVE BASE AS PER FINISH 28 PER UNIT 25 HANDRAIL ASPANEL PER SPECS *DETAILS SCHEDULE HEATING RECESSED AS PER MECHANICAL DWGS TYPE C KITCHEN EQUIPMENT AS PER SCHEDULE 29 14''X 14'' SQUARE PANELED COLUMN COVER EXPOSED COLUMN, PAINTED 16 26 E214 RANGE HOOD AS PER MECHANICAL PLANS AS PER MECHANICAL DWGS MECHANICAL EQUIPMENT 30 10'' DEEP WOOD (345 SHELVES W/SUPPORT FIXTURE ASBRACKETS PERSF) PLUMBING PLANS 27 PLUMBING E2 COUNTERTOP AS PER FINISH SCHEDULE *SPEC 31 FRP PANEL ANDPANEL COVE BASE PER FINISH SCHEDULE WALL W/CAP AND COVE BASE AS PER FINISHBY G.C. REFERA36 28WALL TELEVISION SUPPLIED BYASOWNER, INSTALLED TO SCHEDULE GRILLS PER MECHANICAL PLANS LINE E214 32ASS.S PANEL WALL AT COOKING
BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD Construction Issue Date:
4
6
10
38'-0"
1 A3.4
9
E112 C4
E116 UNIT (240 SF) E3 TYPE C
(345 SF)
10
UNIT TYPE C
SKYLIGHT ABOVE
E2
9
(245 SF)
W212
3'-6"
38'-0"
18
E1 FFE: 8 320.5'
UNIT TYPE A
16
UNIT TYPE C
EC108a
E206
RECESSED HEATING PANEL AS PER MECH PLAN
A36 E219
UNIT TYPE G E219
(331 SF) JT
W214
EC108
4
PA 18976 PLAN Sheet Name: FIRST FLOORWARRINGTON,
W213
EC108b
TYPE RECESSED HEATING PANEL AS PER MECH PLANC E2
LY
A36
EAST M.C. LOUNGE
4
Scale: AS NOTED
A36
EAST M.C. RECREATION
8
TYPE D
G 3'-6"
(382 SF)
7
E1
16
H
EAST GARDEN LOBBY
7
4
4
5
4'-0"
W213
(252 SF)
STONE VENEER TO MATCH EXTERIOR
Checked By: JT
5
TYPE B
i
E4
9
EAST GARDEN
LOBBY ROOM 101_ NORTH ELEVATION UNIT SCALE: 1/4" E1 = 1'-0"
E113
4'-0"
1 A5.1
10
5
W212
EC108d
12
C4
GUNIT
5
WEST GARDEN
11
EC108c
4
13
A36 10
3 E113
3
E206 ROD AS PER DETAILS 9 ELEVATION 5 C8 STEEL LINTEL (PAINTED)& HANGING CLOSET SHELVING INTERIOR KEYNOTES (345 SF)
9
UNIT TYPE B
A44
E204
A36
DOOR AND FRAME AS PER SCHEDULE
3 STONE VENEER UNIT UNDERCOUNTER BIOHAZARD REFRIGERATOR TO MATCH EXTERIOR
E5
1
EC108d
1
A36
CASEWORK PER SPECS AS PER SPECS 1 ASCASEWORK
2
2
STORAGE 1
E202
7 UNDERCOUNTER DISHWASHER 2 DOOR AND FRAME AS PER SCHEDULE
1
EC108c
E200
A44
E204
26'-0"
H
W211
(245 SF)
220
EAST CORRIDOR
10'-1 1/2"
A36
i
10
E111
UNIT
(339 SF)
EC107
10 STORAGE
E110
16
X UNIT Ax.xTYPE A
W.C.
TYPE A
E1
5'-6"
A
CLEAN UTIL. EC107
14
H
SKYLIGHT ABOVE
LOBBY SCALE: 1/4" = 1'-0" W211
C1
i
1 E200
LY
2'-3" 15'-0"
i 101_ NORTH ELEVATION
(337 SF)
E3
.9
LOBBY ROOM 101_ NORTH ELEVATION SCALE: 1/4" = 1'-0"
W210 1 EC108b (382 SF)
2'-3"
8'-6"
12'-6"
1 A5.1
UNIT ROOM TYPE D
E108
217
D
B
(380 SF)
LOCKERS AS PER DETAILS
1
E111
3 C A5.5
INTERIOR KEYNOTES INTERIOR ELEVATION KEYNOTES UNDERCOUNTER ICEELEVATION MACHINE 7
A36
D
6 COMMERCIAL IRON AS PER SPECS, REFER TO MEP FOR ADDITIONAL INFORMATION UNIT
i
1
EC106
6 C A5.5
C1
12'-6"
W
1 A5.1
(240 SF)
5'-6"
W210
(252 SF)
UNIT TYPE B
12'-6"
W209
A
16
1 215
D
TYPE E COMMERCIAL DRYER AS PER SPECS, REFER TO MEP FOR E202 ADDITIONAL INFORMATION
6.5
1
5
B
TIMECLOCK, SUPPLIED BY OWNER, INSTALLED BY G.C. REFER TO ELECTRICAL DWGS FOR ADDITIONAL INFORMATION
4
i E6
E109 H
4'-0"
15'-0"
A36
W209
1
2
21
C2
4.2
9'-5"
15'-0"
4'-0" 8'-6"
A
(345 SF)
12
A36
EC100b
EC104a
E109
219
COMMERCIAL WASHER AS PER SPECS, REFER TO MEP FOR ADDITIONAL INFORMATION
UNIT TYPE C
A36
5'-6"
6'-4"
W
(382 SF)
20
i
C1
E107 2 C A5.5 (237 D SF)
i
16
A36
A44
UNIT TYPE C UNIT TYPE B* E2 W208 E110 E3
3
W208
38'-0"
8'-0" 8'-6"
1 1'-6"
UNIT TYPE B
E6
18
C
6
SOILED UTIL. EC106
EC105
EC105
H
W206
1
2
13 13
E2
C1
W.C.
1 217
1 216 LAUNDRY
STORAGE
A5.5 BARBER EQUIPMENT AS PERB DETAILS
203
B
6.5 LAV.
1
1
(339 SF)
A36
11
2
UNIT TYPE A*3
3
W
WINDOWS
8'-0"
G
1'-6"
W207
E1
E3
B
UNIT TYPE D
A
A44
i
i i
S
216 LINEN CHUTE AS PER DETAILS, FOR ADDITIONAL 215 REFER TO MEP 214 UTILITIES A INFORMATION A A
FAMILY DINING
2 203
E1
(252 SF)
ELEC. CLOSET
EC104a
JAN. 8 CLOS.
E108 E3 UNIT TYPE A (245 SF)
1'-6"
(345 SF)
2
E2
A36
T
W207
11
15 15
1 204
NURSE'S STATION
D
182'-7 1/2"
11
NORTH GARDEN
H
38'-0"
6'-4"
8'-0"
A36
WINDOWS
9
W206
WINDOWS
H
G
227 T E
1 21
WATER FEATURE AS PER DETAILS MEDICATION
A
EC100b
T
W205
2
(380 SF)
7
T 11
A36
UNIT TYPE C
E5
A44 W204
F
W205
2
W203
G
G
(339 SF)
10
F W200
2 A3.4
UNIT TYPE A
E
1
1 203
4 C A5.5
DINING UNIT ROOM TYPE B 202 E105
E105
E107
EC104
STAFF ROOM EC104
12'-6"
F E4
A44
F
BE
6'-4"
8
11
A36
i
1
E106
4'-0"
(380 SF)
A36
E106
(240C1 SF)
W204
6.5 CORRIDOR
D
38'-0"
4 C A5.4
SKYLIGHT ABOVE
W203
6.5
UNIT TYPE C
E1 UNIT TYPE E
SUPPORT
2 201
CASEWORK AS PER DETAILS
EC103
A
4'-0"
12'-8"
UNIT TYPE E
C1
10
E104
E1
6
E3
WC108b
(339 SF)
12'-0"
13'-4"
8
38'-0"
15'-4"
D
MEDICAL 4.2 RECORDS MEDICAL EC102 STORAGE EC103
A44
O
ELEVATOR AS PER DETAILS
1
E
E2
UNIT UNIT TYPE D E104 TYPE A C1 (237 SF) W202
N
Y
Drawn By:
2 213
27'-4"
5
21'-4"
C1
W202
2 A7.4
E
D
A
J
A5.1
Progress Prints: Permit Set - 03.28.2018
E3
A36
4.2
K
1 226
Blue Bell, PA 19422
12'-8"
C3
C3
1 102
4.2
12'-8"
#3
2 A7.3
E3
(245 SF)
The Second Floor Plan_ Lobby
W201
3'-0"
G
SLOPE
ELEV.
A36
C1
C2
4.1
1'-4"
The First Floor Plan_ Lobby
1
E3
W201 (339 SF)
C2
#2
N
228
Facsimile: 610.834.7815
UNIT TYPE A
103
#1
A
229
SF
226
AUTOMATIC SLIDING DOORS AS PER DETAILS
E103
E103
A C A5.5 2 A7.5 WARMING B KITCHEN NURSE'S 204 STATION EC101 C2
#3
L
1 228 STOR.
Facsimile: 610.834.7815
FAMILY LOUNGE
D
2,500lb ELEV.
E102
B
UPPER LOBBY UNIT 201 TYPE A
A36
1 A4.1
3 ST-1
W.C.
M.C. 208 LIVING ROOM
P
DN
SIZE
1 229 SERVER
2
1 201 EAST M.C. NORTH CORRIDOR EC100
1 207
GROSS
3,500lb ELEV. - 80,680
Phone: 610.834.7805
1 C A5.2
102
B2
3,500lb ELEV. BUILDING
OFFICE
482 Norristown Blue Rd. | Suite Bell, 300 PA 19422
A
LOUNGE
2 101B
ST-1
1 205
X
D
Phone: 610.834.7805
CHAPELE2 104
5'-2 1/4"
38'-0"
W102B
B
EC100a
X
1 208
LOBBY STAIR
OPEN TO BELOW
D
E3
E1
230
482 Norristown Rd. | Suite 300
#3
1 213a
B
212
1
209
D
B
E2 OFFICE
T H E P A T H W A Y S A T W A R R I N G T O N
2 A7.5
2 A7.4 12'-10"
D
M.C. DINING A ROOM REHAB 6 205 E101 C A5.4 STORAGE
STORAGE
1 212
EC100a
STORAGE
A 2 C A5.2
2,500lb ELEV.
1 C A5.4
#2
1 209
3 D
B
WARMING KITCHEN
FOOD PREP
X
1 210
E3
A2
3'-9"
X
1 C1 1.1
INTERIOR ELEVATIONS
213
C1
Sheet Name:
1 213
ROOM101B
1 E1 104
0.7
C1
E1
D
E101a
2'-3"
3 C A5.2
1
E101b
#1
JAN 2 CLOS. A7.3 1 210 103
E3
E1
D
3,500lb ELEV.
1 209
DN
E2
E1
B
211 3,500lb ELEV.
UP
1
A 2 C A5.4
ACTIVITIES ROOM
5 A5.4
D
LOBBY CORRIDOR COMMUNITY
1 101B
E3 E2
Checked By: JT COMMUNITIES BY GLORIA DEI COMMUNITIES BY GLORIA DEI JT 2900 WEST STREET ROAD 2900 WEST STREET ROAD Scale: AS NOTED WARRINGTON, PA 18976 WARRINGTON, PA 18976 Construction Issue Date:
ST-1
E101b
B
B
6'-8"
JT
B1
B
6'-8"
Scale: AS NOTED
1 3 C C A5.4 D A5.1
D
E3 WARMING C1 KITCHEN
LOBBY C1 STAIR
A
A
A
E1
12
101
101A
4'-8"
0.7 M
LOBBY
2.1
W102B
6'-0"
Checked By: JT
A1
6 C A5.2
1 101A
A
5'-8"
0.7
T H E PConstruction A Issue T Date:H W S A T H W A Y S T HA E Y P A T W ADrawnRBy: R I N AG TT O W N A R R I N G T O N
105
DOR
10'-0"
2'-0"
10'-8"
BINDER CABINET
C1 RECEPT
C
10'-0"
13'-4"
INTERIOR ELEVATIONS
5'-8"
19'-8" 9'-0"
LY
6'-8"
9'-8" 4'-10" 4'-10"
Permit Set - 03.28.2018
6'-8"
1 101 E3
1 06
31'-4"
Sheet Name:
13'-4"
C1
1.1
0
Construction Issue Date:
6'-8"
1
1 105
0
J
FFE: 320.5'
E1 CONFERENCE ROOM
1'-0 1/2"
FLOOR PLATE: 31,420 SF.
100
L
0.7
E2
1ST H FLOOR K i EY i.1 P L A N - E L i.6E V . 3 2 0 ' - 6 J "
MG 2'-0"
10'-8"
Drawn By: Prints: Progress
6'-8"
F.8L.8
LX Ax.x
BINDER CABINET
5'-6"
F.2 16'-4"
0
K
F
K 14'-7"
26'-0"
12'-10"
E
J 11'-9"
VESTIBULE
9'-5"
0"
i.6
17'-3"
3'-4"
13'-4"
D
12'-0"
16'-8"
36'-8"
C.4 i
H
15'-5"
INTERIOR ELEVATIONS
11'-8 1/2"
1 100
C
G
5'-8 1/2" 6'-0"
Progress Prints: Permit Set - 03.28.2018
0 X Ax.x
B
F.8
2 234'-8" A3.4
5'-8 1/2" 6'-0"
Sheet Name:
A.4 F.2
F
25'-4"
A.1
15'-5"
12'-8"
A
E 19'-4"
9'-5"
D
A
A5.1
3'-1"
1'-2 1/2" 5'-10 7/8"
5'-10 7/8"
12'-3 3/8" 1'-1 5/8"
9 1/8" 5'-7 3/8"
5'-2"
5'-10 7/8"
5'-10 7/8"
6'-11 1/2"
2
12'-1 3/8"
20
D 42'-0" 4'-1 3/8"
3'-6"
5'-3"
2 C A5.3
D
B
4 A5.2
20
16'-0"
A
SOILED UTIL. WC106
20
A 3'-0"
CART
STAFF ROOM WC104
MEDICAL RECORDS WC102
2 A5.3 2 A5.3
8 1/2"
MEDICAL STORAGE WC103_ NORTH SCALE: 1/4" = 1'-0" MEDICAL STORAGE WC103_ NORTH SCALE: 1/4" = 1'-0"
STORAGE WC108c
CART
2'-6"
2'-9"
1
WC109
1
B
CART
1
B
3'-0"
STORAGE WC108d
JAN. CLOS. WC105
THERAPY WC109 1'-3"
3'-0"
MEDICAL STORAGE WC103_SOUTH SCALE: 1/4" = 1'-0" MEDICAL STORAGE WC103_SOUTH SCALE: 1/4" = 1'-0"
1'-3"
1'-3"
1'-3"
2'-0"
1'-9"
STORAGE
CLOSET
CLOSET
WC110c
WC111a
16
WC111b
1
SHOWER
ROOF OVERFLOW DRAINS. SEE PLUMBING DWGS F ADDITIONAL INFORMATION.
16
HVAC LOUVER AS PER DTLS. & MECHANICAL DWGS COLOR TO BE (___) STORAGE WC111
O'KEEFE'S MODEL 502 ROOF LADDER OR EQUAL.
D
FRIDGE BY OWNER
C
SHOWER
LAV.
1
WC110a
WC110e
WC110e
D
FRIDGE BY OWNER
1
MEDICAL STORAGE WC103_WEST SCALE: 1/4" = 1'-0" 1 MEDICAL STORAGE WC103_WEST SCALE: 1/4" = 1'-0" WC111c
2 A5.31 2 A5.3
CLOSET WC111d
1 WC110
WC111d
WC111c
14'-5 5/8"
5'-3"
7'-11"
2'-9"
6'-0" HIGH VINYL T&G PANEL FENCE AS PER DTLS. COLOR TO BE (___) LIGHT AS PER RCP & ELECTRICAL DWGS.
WC111
CLOSET
2 A5.3 2 A5.3
SLIDING DOOR AS PER DTLS. & SPECS. 16 COLOR TO B
B
BATHING SUITE WC110
C
KAWNEER 451T ALUMINUM & GLASS STOREFRONT PER DTLS. & SPECS. FRAME COLOR TO BE (___). 1" COLOR TO BE (___)
BATH WC110d
1 WC110d
2'-0"
1'-9"
6 3 4" x 12" GLUED LAMINATED BEAM AS PER DTLS
1
WC110c
CART
WEST M.C. RECREATION WC108
EL DORADO "MESETA" FIELDLEDGE, OR EQUAL, W/ PROVIDE SPLIT EDGE WAINSCOT SILL AS PER DTLS
WC111b
16
WC110b
CLEAN UTIL. WC107
20
DIRECTED BY ARCHITECT. 1 1ST FLOOR TYP UNIT_ COLOR EAST 21 D ALUMINUM WRAPPED FASCIA AS PER DTLS. COLOR A5.3 SCALE: 1/4" = 1'-0" 1 4'-2 3/8" 1ST3'-3"FLOOR TYP UNIT_ GLUE EAST 5'-4 7/8" LAMINATED TIMBER ENTRY CANOPY AS PER COLOR AS DIRECTED BY ARCHITECT. A5.3 SCALE: 1/4" = 1'-0"
5'-0"
MEDICAL STORAGE WC103
LAV. WC104a
2'-9"
PELLA DESIGNER SERIES WINDOWS AS PER DETAI CLADDING, 3 1 2" FLAT CASING, & 1" SILL NOSE COL
LAMINATORS "THERMOLITE" PANEL, OR EQUAL, AS COLOR TO BE (___)
5'-3 5/8"
16
A
2'-6"
2'-6"
BINDER CABINET
1'-1" TYP.
EXTERIOR DOOR AS PER SCHEDULE. PAINTED AS D ARCHITECT.
MEDICAL STORAGE C 1 1 2" ØWC103_EAST ALUMINUM HANDRAIL W/ 1 2" SQ. PICKETS & SPECS. SCALE: 1/4" = 1'-0" MEDICAL STORAGE WC103_EAST SCALE: 1/4" = 1'-0"
5'-0"
E Q U I P M E N T
3 A5.3 3 A5.3
B
D
CLEAN UTIL WC107_ SOUTH SCALE: 1/4" = 1'-0" CLEAN UTIL WC107_ SOUTH SCALE: 1/4" = 1'-0" 15
1 / 4 "
=
P
P
O
R
1 ' - 0 "
CLEAN UTIL WC107_ EAST SCALE: 1/4" = 1'-0" CLEAN UTIL WC107_ EAST SCALE: 1/4" = 1'-0"
2
4 A5.3 4 A5.3
6'-0"
PARTIAL CORRIDOR_ EAST ELEVATION SCALE: 1/4" = 1'-0" PARTIAL CORRIDOR_ EAST ELEVATION SCALE: 1/4" = 1'-0"
16
2
16
16
INTERIOR ELEVATIO
15
1'-8"
2'-10"
2 20
20
CART
20
16
20
BB
CART
1
B
1
2
DOOR AND FRAME AS PER SCHEDULE
3
STONE VENEER TO MATCH EXTERIOR
4
RECESSED HEATING PANEL AS PER MECH PLAN
20
6
2" 1'-0"
16 CART
C8 STEEL LINTEL (PAINTED)
3'-0"
1'-3"
1'-3"
2'-0"
1'-9"
C
C
SLIDING DOOR AS PER SCHEDULE & DETAILS 3'-0"
1'-3"
1'-3"
1'-9"
2'-0"
1'-2" 2"
2"
16 1
CART 5
10'-8"
8'-0"
10'-8"
CASEWORK AS PER SPECS2'-9" 2'-6"
16 20
DOOR AND FRAME AS PER SCHE
8'-0"
7'-8"
1
3'-0"
3
STONE VENEER TO MATCH EXT
4
RECESSED HEATING PANEL AS P
5
C8 STEEL LINTEL (PAINTED)
16 16
C
8
INTERIOR STAIR AS PER DETAILS
9
WOOD WAINSCOT AS PER DET
11
WINDOWS AS PER 16 ELEVATORS &
12 HANDRAIL AS PER DETAILS & SP
1'-2" 2"
16
FRIDGE BY OWNER
D
D
13
8'' SQUARE COLUMN AS PER DET
14
16 TV/ MONITOR BY OWNER
D
15 LIGHT FIXTURE AS PER FIXTURE 16 16
GYPSUM WALLBOARD (PAINTED
17
TILE (TYPE AS NOTED, SEE SCHE
FRIDGE BY OWNER
ROLL DOWN SHUTTER AS PER D 7 WATER WALL AS PER DETAILS 2 2 B MEDICAL STORAGE WC103_SOUTH 2 & SPECS MEDICAL STORAGE WC103_WEST 2 D MEDICAL STORAGE18WC103_EAST AMEDICAL STORAGE WC103_ NORTH C 6 THERAPY WC109_ 6 THERAPY WC109_ 6 THERAPY WC109_ 6 THERAPY WC109_ 19 GAS FIREPLACE AS PER DETAIL C A5.3 D A5.3 A5.3 A5.3 SCALE: 1/4" = 1'-0" NORTH SCALE: 1/4" = 1'-0" SOUTH 1/4" = 1'-0" WEST SCALE: 1/4" = 1'-0" EAST 8 INTERIOR STAIR AS PER DETAILS &SCALE: SPECS A5.3 TYP A5.3 A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" 20 BASE AS PER FINISH SCHEDULE SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" 1 1ST FLOOR UNIT_ WEST 1 1ST FLOOR TYP UNIT_ EAST 9 WOOD WAINSCOT AS PER THERAPY WC109_ NORTH THERAPY WC109_ SOUTH2 THERAPY WC109_ WEST 2 THERAPY WC109_ EAST DETAILS MEDICAL STORAGE6WC103_ NORTH 2 MEDICAL STORAGE6WC103_SOUTH MEDICAL STORAGE6WC103_WEST MEDICAL STORAGE6WC103_EAST A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" 21 KITCHEN EQUIPMENT AS PER SC 10 ELEVATOR DOORS ASA5.3 A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" 1/4" = 1'-0" PER SPECS SCALE: 1/4" = 1'-0"
1'-3"
1'-3"
1'-9"
D 3'-0"
TILE (TYPE AS NOTED, SEE SCHEDULE)
18 ROLL DOWN SHUTTER AS PER DETAIL
20 21
C
24
GRILLS AS PER MECHANICAL PLANS
6'-0"
6'-6"
28 GRILLS 16 AS PER MECHANICAL PLA
26 14''X 14'' SQUARE PANELED COL 31 27 PLUMBING FIXTURE AS PER PLUM 28
D
WALL PANEL W/CAP AND COVE SCHEDULE
SHOWER WC110 b_ 29 EAST EXPOSED COLUMN, PAINTED SCALE: 1/4" = 1'-0" 30 10'' DEEP WOOD SHELVES W/SUP SHOWER WC110 b_ EAST 31 FRP PANEL WALL AND COVE BA SCALE: 1/4" = 1'-0" 32
22 RANGE HOOD AS PER MECHANICAL PLANS
COUNTERTOP AS PER FINISH SCHEDULE *SPEC
16 COUNTERTOP AS PER FINISH SC
24
6'-6"
D
4 PARTIAL 7 SHOWER WC110 b_ WESTCORRIDOR_ EAST ELEVATION 7 GAS FIREPLACE AS PER DETAIL A5.3 SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" A5.3 = 1'-0" 7 SHOWER WC110 b_ WEST 7 BASE AS PER FINISH SCHEDULE 4 PARTIAL CORRIDOR_ A5.3 SCALE: A5.3 1/4" =EAST 1'-0" ELEVATION KITCHEN EQUIPMENT AS PER SCHEDULE A5.3 SCALE: 1/4" = 1'-0"
23
23
25 HANDRAIL AS PER SPECS *DETAI 31 28
27
6'-0"
17
C
27 6'-0" Phone: 610.834.7805
GYPSUM WALLBOARD (PAINTED AS NOTED)
27 27
6'-0"
16
19
482 Norristown Rd. | Suite 300
3'-0"
6'-6"
15 LIGHT FIXTURE AS PER FIXTURE SCHEDULE
28 3'-0"
3 CLEAN UTIL WC107_ SOUTH 3 CLEAN UTIL WC107_ EAST 7 SHOWER WC110 b_ NORTH 7 SHOWER WC110 b_ SOUTH B D A5.3 A5.3 SCALE: SCALE: 1/4" 1/4" = = 1'-0" 1'-0" SCALE: 1/4" 1/4" = = 1'-0" 1'-0" A5.3 SCALE: A5.3 7 SHOWER WC110 b_ NORTH 7 SHOWER WC110 b_ SOUTH 2 MEDICAL STORAGE WC103_WEST 2 WC107_ MEDICAL STORAGE WC103_EAST CLEAN UTIL WC107_ SOUTH 3 CLEAN UTIL EAST A5.3 A5.3 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A5.3= 1'-0" 1/4" = 1'-0" SCALE: 1/4" = 1'-0" A5.3 SCALE: 1/4" SCALE:A5.3 1/4" = SCALE: 1'-0" 2'-0"
28
TV/ MONITOR BY OWNER
16
6'-6"
2'-6" 1'-8"
B
FRIDGE BY OWNER
2'-0"
14
2'-10"
6'-6"
2'-6"
16 16 28
BD
16
3'-0"
C
16
B
6'-6"
1'-8"
A
1
BY OWNER
22 RANGE HOOD AS PER MECHAN
WINDOWS AS PER ELEVATORS & DETAIL & SPECS
12 HANDRAIL AS PER DETAILS & SPECS 28 13 8'' SQUARE COLUMN AS PER DETAILS
S.S PANEL WALL AT COOKING L
33 12'' X 18'' 2 TIER METAL LOCKER
7'-8"
3'-0"
2'-10"
A
27CART
1'-8"
2'-0"
CART BY OWNER
16
2'-10"
2'-6"
6'-6" 6'-6"
1'-8" 2'-10"
2'-6" 1'-8"
28
WASHER & DRYER BY OWNER
16
28
CART
WASHER & DRYER BY OWNER
2'-10"
16
16
1
16
27
16
2'-9"
2'-11 1/4"2'-11 1/4"
2'-6"
11 16 2'-6"
3 A5.3
7'-8"
10'-8"
10'-8"
8'-4"
16
1
2" 1'-0"
2"3'-4"
16
3'-6"
2'-10"
A
A
A 3'-0"
1'-3"
20
2"
BY OWNER
11
FRIDGE BY OWNER
1'-3"
2 A5.3
16FRIDGE
2"3'-4"
2'-6"
1 2 20
INTERIOR ELEVATION KEYNOTES
16 2" 1'-3 1/2"
3'-0"
CASEWORK AS PER SPECS
2
10 ELEVATOR DOORS AS PER SPECS
3'-6" 3'-4"2" 2"
2"
16
2'-9"
3'-6"
3'-0"
2'-6"
Facsimile: 610.834.7815
2"
SCALE: = 1'-0" 1 1/4" 1ST FLOOR TYP UNIT_ EAST A5.3 SCALE: 1/4" = 1'-0" 2'-10" 1'-8" 2'-6" 2" 3'-6" 3'-4"2" 2"3'-4" 2"
3'-0"
D
D
A5.3
3'-6"
2"
C
20
Blue Bell, PA 19422
3'-0"
2" 3'-6" 3'-4"2"
16
2
4
1'-8"
1'-3"
20
1
6 SLIDING DOOR AS PER SCHEDU 5 UNIT_ PARTIAL CORRIDOR_ EAST ELEVATION 1ST FLOOR TYP WEST 1 1ST FLOOR TYP UNIT_ EAST 7 WATER WALL AS PER DETAILS & 1/4" = 1'-0" A5.3 SCALE: 1/4" = 1'-0" SCALE: 1/4"A5.3 =51'-0" SCALE: PARTIAL CORRIDOR_ EAST ELEVATION
1 A5.3
1ST FLOOR TYP UNIT_ WEST SCALE: 1/4" = 1'-0"
16
2" 1'-3 1/2"
3'-0"
1
1'-3 1/2" 2" 1'-3"
16
8'-0"
2"
2'-6"
3'-0"
2'-6" 1'-8"
2"
1 A5.3
2'-10" 1'-8"
1'-3"
2'-10"
3'-0"
1ST FLOOR TYP UNIT_SOUTH SCALE: 1/4" = 1'-0"
10'-8"
1'-3"
2"
2'-6"
1'-3"
3'-0"
20
C
24 1ST FLOOR TYP UNIT_SOUTH SCALE: 1/4" = 1'-0"
16
20
2'-6"
1 A5.3
B 1 A5.3
C1
2
C1
2
1'-8"
B
1'-3 1/2" 2"
1'-3"
20
11
24
2'-10"
20
16 11
20
1ST FLOOR TYP UNIT_ NORTH SCALE: 1/4" = 1'-0"
1ST FLOOR TYP UNIT_ NORTH SCALE: 1/4" = 1'-0"
6
8'-4"
8'-0"
6'-0"
A
C1
25 HANDRAIL AS PER SPECS *DETAILS 7'-8"
A
2'-6"
1 2" 1'-0"
16 1 16
B Lei Yu_ Work Sample 20
20
84
16
C
16
1'-2" 2"
2"
C1
1'-8"
16
2'-10"
3'-4"
2" 1'-3 1/2"
2"
3'-0"
2'-6"
2"
20
3'-6"
3'-0" 2
1'-8"
2"
2'-10"
3'-0"
3'-4" 2" 7'-8"
2"
2"
3'-0"
3'-6"
1'-3 1/2" 2"
1'-2" 2"
2" 1'-0"
2"
16
3'-6"
2" 1'-3 1/2"
3'-4"
3'-0"
2"2"
2"
3'-4" 3'-6"
3'-0"
2"
2"
ELEVATION
3'-6"
3'-0"
= 1'-0"
2"
2"
A5.3 S.S PANEL WALL AT COOKING 1/4" LINE SCALE:
33 12'' X 18'' 2 TIER METAL LOCKER WITH SLOPE TOP
3'-4"
3'-0"
32
2"
1'-3 1/2" 2"
31 FRP PANEL COVE BASECORRIDOR_ AS PER FINISH SCHEDULE 5 WALL AND PARTIAL EAST
PARTIAL CORRIDOR_ EAST ELEVATION SCALE: 1/4" = 1'-0"
2"
4 A5.3
PARTIAL CORRIDOR_ EAST ELEVATION SCALE: 1/4" = 1'-0"
2"
5
EXPOSED COLUMN, PAINTED
30 10'' DEEP WOOD SHELVES W/SUPPORT BRACKETS A5.3
3'-4"
29
C1
WALL PANEL W/CAP AND COVE BASE AS PER FINISH SCHEDULE
RIA DEI COMMUNITIES EST STREET ROAD RINGTON, PA 18976
28
P A T H W A Y S A R R I N G T O N
6'-0"
27 PLUMBING FIXTURE AS PER PLUMBING PLANS
3'-0"
6'-0"
26 14''X 14'' SQUARE PANELED COLUMN COVER
3'-6"
1 5.3
20
8'-0"
6'-0"
A 1 A5.3
16
2
2
16
S C H E
ALL EQUIPMENT IS SUPPLIED BY OWNER, INSTALLED BY
REFER TO SINGER SPEC BOOK & DRAWINGS FOR ADDIT
T
6'-0"
U
6'-0"
S
21
6'-0"
.
D
3 A5.3 3 A5.3
16
C
S C A L E :
16
B
2'-0"
.
18
3'-0"
CART BY OWNER
M
15
2'-10" 1'-8"
WASHER & DRYER BY OWNER
13
2'-10"
2'-10" 1'-8" 2'-10"
2'-0"
CART BY OWNER
3 A4.2
16 1
16 WASHER & DRYER BY OWNER
11
3'-0"
16
10
2'-6"
1
8
2'-6" 1'-8"
5
2'-6" 1'-8"
2'-6"
4.1
O
20
8 1/2"
1ST FLOOR TYP UNIT_ WEST 15C 18 SCALE: 1/4" = 1'-0" 3'-7 1/2" 1ST FLOOR TYP UNIT_ WEST 12'-0" 2'-2" SCALE: 1/4" = 1'-0"
2'-6" 1'-8"
16
N
EIFS SYSTEM "V" REVEAL AS PER ELEVATIONS 6'-11 1/2"
16'-0"
13 3'-7 1/2"
Y
EIFS STSTEM 16 AS PER DTLS. & SPECS. COLOR 2 TO B
21
C
1 A5.3 1 A5.3
E
8 1/2"
W I N G
1 ' - 0 "
K
8'-0"
2
11
2'-8 1/4"
=
N
EIFS STSTEM AS PER DTLS. & SPECS. COLOR 1 TO B
2'-11"
8'-0"
16 11
2'-7 1/4"
2'-6"
2'-6"
3'-0"
1'-6"
1 / 4 "
3'-0"
20
W E24 S T
S C A L E :
A 16
2'-7 1/4"
12'-9 1/4"
20
L
FOOTING AS PER STRUCTURAL DWGS & DTLS. 1'-10 1/2"
2'-3 1/4"
12'-1 3/8"
24
M . C .
2'-7 1/4"
10'-8"
4'-0"
6'-9 5/8"
13'-0 5/8"
15
3'-0"
2'-6"
3'-0"
10'-8"
8'-4"
3 A4.1
20
6'-2 1/2"
1ST FLOOR TYP UNIT_SOUTH B 10 11 SCALE: 1/4" = 1'-0" 47'-9" 1ST FLOOR TYP UNIT_SOUTH SCALE: 1/4" = 1'-0"
3'-0"
1'-3"
10'-8"
2'-6"
1'-9"
8
1 A5.3 1 A5.3
2'-7 1/4"
2'-10" 1'-8"
2'-10" 1'-8" 2'-10"
13
B
1
NURSE'S FRIDGE STATION BY OWNER WC101
5'-10 7/8"
1
1 16
C.9
P 16
1'-10 1/2"
2'-2"
2'-3 1/4"
16
20
1'-10 3/8"
2'-7 1/4"
2
16
1'-3"
2C A5.3 2 A5.3
3'-0"
P
2'-3 5/8" 5'-10 7/8"
5'-3"
WC111a
FRIDGE BY OWNER
WEST M.C. NORTH CORRIDOR WC100
3'-1"
1'-4 1/2"
5'-3"
2'-10"
1'-3"
5'-10 7/8"
1'-2 1/2"
1'-3"
3'-0"
8 1/2"
1'-3"
5'-10 7/8"
1'-1" TYP.
2'-6"
1'-3"
2'-6" 1'-8"
1'-3"
2'-7 1/4"
11
20
1'-3"
16
1'-6 7/8"
2'-3 1/4"
10
1ST FLOOR TYP UNIT_ NORTH A 4.1 5 SCALE: 1/4" = 1'-0" 1ST FLOOR TYP UNIT_ NORTH 8'-6 3/8" SCALE: 1/4" = 1'-0"
B
2'-7 1/4"
12'-11 3/4"
8'-0"
20 8
6'-0"
3'-0"
8'-4"
6'-0"
13'-4 5/8"
A 1 A5.3 1 A5.3
3'-0"
8'-0"
2'-6"
1'-9"
2
16
2
1'-9 1/2" 2'-7 1/4"
2'-3 1/4"
6'-2 1/2"
5
1'-10 3/8"2
10'-8"
15 16
1'-10"
1'-9"
8'-3"
15
2'-7 1/4"
7 1/8" 5'-6 1/2"
3'-1"
12'-6 3/8"
11'-9"
10"
5'-2 7/8"
M.C. UNIT W120
4'-0"
5'-2 7/8"
M.C. UNIT W118
1'-2 1/2"
9'-9 1/4"
7 1/4"
5'-10 1/2"
K E Y
D
M.C. UNIT W116
3'-1"
12'-3 3/8" 1'-4 3/8"
5'-10 7/8"
3'-0"
M.C. UNIT W114
3'-1"
2'-5"
M.C. UNIT W112
2'-5"
M.C. UNIT W110
3'-1"
B U I L D I N G
21
5'-6"
3'-1"
20
2'-5"
M.C. UNIT W108
3'-1"
15
2'-5"
M.C. UNIT W106
UNIT TYP D W104
13
2'-5"
D
11
2'-5"
10
2'-5"
8
2'-5"
5
16
D
16
Blue Bell, PA 19422
4'-0"
FASCIA BOARDS AS PER DETAILS.
4'-0"
6" 6"
SLOPE
Phone: 610.834.7805
2'-6"
482 Norristown Rd. | Suite 300
TY PIC A L RO OF CON S TRU C TIO N
Facsimile: 610.834.7815
M
P.C. UNIT
8'-0"
8'-6"
EIFS. EXTERIOR NON-BEARING WALL CONSTRUCTION
LIGHT GAUGE METAL ANGLE BRIDGING GAP FROM CONC. PLANK TO MTL STUDS
6 A10.3
STRUCT. BEAM BEYOND AS PER STRUCT. DWGS.
MANUFACTURED STONE VENEER ON CONCRETE WALL CONSTRUCTION
STEEL BASE PLATE W/ LEVELING GROUT AS PER STRUCT. DWGS
HOLD MSV. 2" MIN. ABOVE GRADE
Construction Issue Date:
24" x 24" CONCRETE PIER AS PER STRUCT. DWGS.
UNFINISHED SPACE
BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976
T.O. PIER 3'-0"
8x8 TUBE STEEL COLUMN AS PER STRUCT. DWGS.
Scale: AS NOTED
M.C. UNIT LIGHT GAUGE METAL ANGLE BRIDGING GAP FROM CONC. PLANK TO MTL STUDS
Checked By: JT
7'-10"
8'-4"
PR EC A S T H OLL OW C OR E C ON C . PLANK FLOOR CONSTRUCTION
Drawn By:
T H E P A T H W A Y S A T W A R R I N G T O N
LIGHT GAUGE METAL SLIP CLIP
WALL SECTIONS C
A
L
E
W A L L :
1
/
2
"
=
1 A8.0
S E C T I O N 1
'
-
0
"
T Y P . S
C
A
L
W A L L
E
:
1
I
/
2
"
A8.0
S E C T I O N
=
1
2
'
-
0
"
3
4.3
K
6.3
E
Y
P
L
B 5'-0"
5'-0" SLOPE
SLOPE
B A 31
32
0
33
19
20
S E C T I O N
29 UPPER LOBBY
DINING ROOM
i
i
K E Y
1
FOOTING AS PER STRUCTURAL DWGS & DT
2
4" CONCRETE SLAB OVER 15 MIL STEGO VA STONE. SEE STRUCTURAL DWGS FOR ADDI
3 J
STEEL COLUMN AS PER STRUCTURAL DWG
4
STEEL BEAM AS PER STRUCTURAL DWGS.
5
FOUNDATION WALL AS PER STRUCTURAL
6
BITUMINOUS WATERPROOFING W/ COMPO AT BASEMENT AREAS.
31 30 VESTIBULE
LOBBY CORRIDOR
LOBBY
8'-6"
T Y P . S
8'-0"
2 A8.0
28 LOUNGE
SLOPE
7
4" Ø PERFORATED PVC FOUNDATION DRA SOCK. DAYLIGHT TO STORMWATER MANA
8
1 12" RIGID INSULATION MIN. 3'-0" BELOW FI
9
MANUFACTURED STONE VENEER OVER 1 12 INSTALL AS PER MANUFACTURER'S RECOMM
10
6" METAL STUDS AS PER DELAGATED DESIG GYPSUM SHEATHING AND 12" GWB.
SLOPE
27
8'-0"
C T I O N "
Sheet Name:
M
S L A B - O N - G R A D E FLOOR CONSTRUCTION
Progress Prints: Permit Set - 03.28.2018
PERIMETER DRAIN AS PER DETAILS
BEAUTY BAR
2 A3.4 I
S S
E C
A
C L
E
:
CORRIDOR
T 1
I /
4
"
O =
J
Lei Yu_ Work Sample
23
KITCHEN
N 1
'
B -
0
-
B
11
6" BATT INSULATION
12
EIFS SYSTEM INSTALLED AS PER MANU. RECO OVER 1 12" RIGID INSULATION
13
ALUM. CLAD WOOD WINDOWS & DOORS
14
6 3 4" x 12" GLUED LAMINATED WOOD BEAM SPECS.
15
ALUMINUM WRAPPED FASCIA & COPING AS
16
8" PRECAST CONCRETE PLANK W/ STRUCTURAL DWGS & SPECS.
17
OPEN WEB STEEL JOIST AS PER STRUCTURA
18
1 12" METAL DECK AS PER STRUCTURAL DWG
19
4 12" RIGID INSULATION. PROVIDE TAPPERED ROOF DRAINS AS PER PLANS.
20
EPDM ROOF MEMBRANE AS PER DTLS. & SPE
3
4"
TOP
"
K
M
85 15 2'-6"
21
8" CMU WALLS ON THICKENED CONC. SLA
22
METAL STUD PARTITIONS AS PER PLANS.
4'-0"
STEEL JOIST AS PER STRUCTURE DRAWINGS
25
BALUSTERS
19
CEILING AS PER RCP
26
STAIR TREAD
20
STEEL LO WITH SAFETY POST
27
STEEL FRAME
21
36'' X36'' ROOF HATCH
10
229
5 5A5.6
A5.6
STAIR
STAIRST-1
2 ST-12
2 ST-1
LOWER LOWER 2 LOWER 2 2 A7.3 A7.3 A7.3
1
1 A7.4
1
#1
#2
BASEMENT_ LOBBY STAIR & ELEVATOR
BASEMENT_ LOBBY STAIR & ELEVATOR
A7.4 SCALE: 1/4" = STAIR 1'-0" & ELEVATOR BASEMENT_ LOBBY A7.4 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0"
1
1
1
9
NEWEL BOX
24
NEWEL BOX
25
BALUSTERS
26
STAIR TREAD
7'-4"
26
STAIR TREAD
27
STEEL FRAME
5 5 ELECTRIC ROOM ELECTRIC ROOM
13'-5" 13'-5"
ELECTRIC ROOM
1 FINISHED FLOOR FINISHED FLOOR
1
1
2
3
2 2 B18 B18
LOBBY STAIR & ELEVATOR SECTION LOBBY STAIR ELEVATORSECTION SECTION 2 = 21'-0"LOBBY STAIR && ELEVATOR SCALE: 1/2"
SCALE: 1/2" = 1'-0"
SCALE: 1/2" = 1'-0"
86
3 3
STEEL FRAME
26
27 TREAD STAIR
27
STEEL FRAME
A7.4
482 Norristown Rd. | Suite 300
Blue Bell, PA 19422
Phone: 610.834.7805
T H E P A T H W A Y S A T W A R R I N G T O N
BY GLORIA DEI COMMUNITIES JT
CCD, LY
Checked By: JT
Drawn By:
Construction Issue Date: Facsimile: 610.834.7815
Blue Bell, PA 19422 482 Norristown Rd. | Suite 300
Facsimile: 610.834.7815
Progress Prints: Permit Set - 03.28.2018
Scale: AS NOTED
JT
LY
Checked By: JT
Drawn By: Blue Bell, PA 19422
Sheet Name: ELEVATOR PLAN & SECTION
STAIR PLANS & SECTION
Progress Prints: Permit Set - 03.28.2018 Phone: 610.834.7805
Phone: 610.834.7805
Scale: AS NOTED
5'-3"
METAL PAD STAIR AS PER SPECS
24
36'' X36'' ROOF HATCH
1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS
BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976
NEWEL BOX
15
Lei Yu_ Work Sample
23
21
JT
METAL PAD STAIR AS PER SPECS SERVER
15
FINISHED FLOOR
LANDING
A7.4
36'' X36'' ROOF HATCH
Checked By: JT
8
FOOD PREP
15
A7.4
21
COMMUNITIES T BY H GLORIA E PDEIA T H W A Y S 2900 WEST STREET ROAD A T WARRINGTON, W A R R N G T O N PA I18976
7 HATCH 36'' X36'' ROOF
FOOD PREP
5
2 A7.4
20
STEEL LO WITH SAFETY POST
JT
9
STEEL LO WITH SAFETY POST
21
FINISHED FLOOR
2
CEILING AS PER RCP
CEILING AS PER RCP
20
FINISHED FLOOR
x A8.3
13'-5"
20
19
22 FOUNDATION WALL AS PER STRUCTURE DRAWINGS
6"
x A8.3
x A8.3
x A8.3
Sheet Name:
CMU BOND BEAM
6"
15
x A8.3
2 A7.4 A7.4 A7.4 2 B18
19
2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK JOIST LO AS PER STRUCTURE 18 STEELSTEEL WITH SAFETY DRAWINGS POST
15
Drawn By: AS NOTED Scale: CCD, LY
5'-3"
B18
3,500lb 3,500lb 3,500lb3,500lb 3,500lb ELEV. 3,500lb ELEV. ELEV. ELEV. ELEV. ELEV. #1 #2 #1 #2
1 UP UP 1 UP 1 ST-1 ST-1 ST-1
22
ROOM
B18
ST-1
ST-1
2
ELECTRIC B18 ROOM
LOBBY ST-1
8'' COLD FORM STEEL CHANNEL 24'' O.C. WALL PER STRUCTURE DRAWINGS 17 FOUNDATION CEILING AS PERAS RCP
14
Progress Prints: Permit Set - 03.28.2018
B27
EXTERIOR JOISTAS ASPER PERDETAIL STRUCTURE DRAWINGS 18 STEELFINISH
38'-0"
5'-1 1/4"
5'-3"
ROOM B27
5 A5.6
WALL AS PER STRUCTURE DRAWINGS CMU BOND BEAM 17 FOUNDATION
16
FOOD PREP
LANDING
6'-5"
ROOM B27 1.1 EXAM
x A8.3
LANDING
A7.
EXTERIOR PERWITH DETAIL 2.16LAYER 5/8'' FIREFINISH CODE AS GWB FIRE CAULK
15
7/14'' METAL DECK
x A8.3
6"
6'-5"
ROOM1.1 EXAM
ELECTRIC ELECTRIC ROOM
14
2X8 P.T. WOOD BLOCKING .040 ALUMINUM COPING
FINISHED FLOOR
1
CMU BOND BEAM 15COLD 8'' FORM STEEL CHANNEL 24'' O.C.
12
15
15
x A8.3
2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK 14 METAL 7/14'' DECK
13
11
SERVER 25 BALUSTERS
x A8.3
SERVER
6'-2 3/4"
H
7
x A8.3
LANDING
H
7
12
10
24 7'-4"
7'-4" x A8.3
2'-11 1/2"
2 A7.4
ROOF MEMBRANE
7/14'' METAL DECK
.040 ALUMINUM COPING
7
15
x A8.3
LANDING
LOBBY STAIR LOBBY
14
2 A7.4 C
6'-5"
1
6
LANDING
G
1.1 EXAM1
7
4'' RIGID INSULATION
9
23
8
C
SCALE: 1/4" = 1'-0" 1ST FLOOR_ LOBBY STAIR & ELEVATOR G H SCALE: 1/4" = 1'-0"
15
7'-4"
2 FOOD A7.4
A7.3
G
1 1/2'' METAL DECK
8
19
15
9
A7.3 UP
A7.4
7
12
11
BALUSTERS BALUSTERS 22 1 1/2'' PAINTED HANDRAILS WITH 1/2''25X 1/2''
7'-4"
#2
14
10
C
1ST FLOOR_ LOBBY STAIR & ELEVATOR SCALE: = 1'-0" 1 1/4"1ST FLOOR_2LOBBY STAIR & ELEVATOR 1 A7.4
13 8'' COLD FORM STEEL CHANNEL 24'' O.C. W8 HOISTBEAM AS PER STRUCTURE DRAWINGS
Sheet Name: ELEVATOR PLAN & SECTION
E101b
7'-4"
#1
6
x A8.3
2'-11 1/2"
3,500lb ELEV.
DN
2
2
1 A7.4
1
#2
3,500lb ELEV.
UP
2 A7.3
B
14
FOOD
#2 3,500lb ELEV.
#1
DN
6
5'-1 1/4"
DN UP
STEEL BEAM AS PER STRUCTURE DRAWING 10 2X8 P.T. WOOD BLOCKING
6
1018 STEEL JOIST AS PER STRUCTURE DRAWINGS23 METAL PAD STAIR AS PER SPECS 22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS 8
H
5'-1 1/4"
ELEV.
3,500lb ELEV. D
G
D
2'-11 1/2"
ST-1
2
2 C A5.4
3,500lb #1 E101b
FOOD
2X8 P.T. WOOD BLOCKING
5
8
17
x A8.3
E101b
A
ROOF MEMBRANE
8'' CONCRETE PLANK AS PER STRUCTURE 11 .040 ALUMINUM COPING 9 ROOF MEMBRANE DRAWING & DETAIL
1610 EXTERIOR FINISH AS PER DETAIL
LOBBY ELEVATOR ROOF_ DETAIL SECTIONx A8.3 SCALE: 1" = 1'-0"
1
B
A
H
6'-2 3/4"
3,500lb WARMING KITCHEN ELEV.
3 A7.4
D 2 C A5.4
E101b
LOBBY STAIR
2
2 C A5.4
B KITCHEN
ST-1
1.1
1 E101b
A
E101b WARMING
H
LOBBY STAIR
1
WARMING KITCHEN
6'-2 3/4"
G
G
9
4
13
7
H
2ND FLOOR_ LOBBY STAIR & ELEVATOR SCALE: 1/4" = 1'-0"
ST-1
G
LOBBY ELEVATOR ROOF_ DETAIL SECTION SCALE: 1" = 1'-0" H
4'' RIGID INSULATION
T H E P A T H W A Y S A T W A R R I N G T O N
2 A7.3
G
LOBBY ELEVATOR ROOF_ DETAIL SECTION 14 6 15 SCALE: 1" = 1'-0"
3 A7.4
8
1 1/2'' METAL DECK
8
CCD, LY
3 A7.4
9
W8 HOISTBEAM AS PER STRUCTURE DRAWINGS
7
Construction Checked By: JT Issue Date:
2 A7.4
1 2ND FLOOR_ LOBBY STAIR & ELEVATOR 3 ST-1 A7.4 GSCALE: 1/4" = 1'-0" H
1.1
9
6
ELEVATION PIT AS PER STRUCT DRWGS & 10 ELEVATOR MANUFACTURE'S REQUIREMENTS
SERVER
ST-1
2
LOBBY STAIR
8
ELEVATION AS PER SPECS
3
Drawn By:
LOBBY STAIR
92
15
14 6 15 LOBBY STAIR & ELEVATOR SECTION SCALE: 1/2" = 1'-0"
2 A7.4
1 228
W8 HOISTBEAM AS PER STRUCTURE DRAWINGS
Construction Issue Date:
1 229
2ND FLOOR_ LOBBY STAIR & ELEVATOR A7.3 SCALE: 1/4" = 1'-0" DN
1
6
6
Progress Prints: Permit Set - 03.28.2018
230
DN
1.1
14 9
8
4" 1'-4"
2 A7.4
OFFICE
3 ST-1
1 A7.4
10
13
8'' CONCRETE PLANK AS PER STRUCTURE
8'' CMU BLOCK 3WALL AS PER DETAILS5& STEEL BEAM AS PER STRUCTURE DRAWING 8 4'' RIGID INSULATION STRUCTURE DRAWINGS
1
482 Norristown Rd. | Suite 300
12
229
ELEVATION AS AS PERPER STRUCT DRWGS DRAWING & 5 STEEL PIT BEAM STRUCTURE ELEVATOR MANUFACTURE'S REQUIREMENTS
4
Sheet Name: ELEVATOR PLAN & SECTION
E1
3
DRAWING & DETAIL PLAN AND SECTION NOTES 7 1 1/2'' METAL DECK
Blue Bell, PA 19422
1 228
2 2 A7.4B18 SERVER
1
A7.3
8'' CONCRETE PLANK AS PER STRUCTURE ELEVATION AS PER DRAWING & SPECS DETAIL
Facsimile: 610.834.7815
1 229
C1
2 BASEMENT_ LOBBY 2 A7.3 STAIR & ELEVATOR 3 SCALE: 1/4" = 1'-0" ST-1
1
9
2 A7.4 SERVER
1
E2
8
2
A7.3
ELEVATION PIT AS PER STRUCT DRWGS &
4
BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976
E3
13
38'-0"
2 A7.3
10
3
8'' CMU BLOCK WALL AS PER DETAILS & ELEVATOR MANUFACTURE'S REQUIREMENTS STRUCTURE DRAWINGS
Scale: AS NOTED
LOBBY STAIR
1.1
#2OFFICE
1 E1 228
229
ST-1 LOWER DN
1
9 FINISHED FLOOR
1 229
AS PER SPECS PLAN ELEVATION AND SECTION NOTES
T H E P A T H W A Y S A T W A R R I N G T O N
#1
ELECTRIC ROOM
4" 1'-4"
G
3,500lb E2 ELEV. 230
1
8
12
1 H UP ST-1
ST-1
2
2
13 13'-5"
230
3,500lb E3 ELEV.
2 ST-1 C1 LOBBY STAIR
1 A7.4
SCALE: 1/2" = 1'-0"
OFFICE
1.1
1 A7.4
A7.3
E1
C1
8'' CMU BLOCK WALL AS PER DETAILS & STRUCTURE DRAWINGS
2
10
38'-0"
B18
E2
LOBBY STAIR SECTION_ST-1 2 LOBBY STAIR SECTION_ST-1 12 SCALE: 1/2" = 1'-0"
4" 1'-4"
E3
H
2 A7.3
LANDING
1
5
482 Norristown Rd. | Suite 300
5'-3"
ST-1
G
5 A5.6 1
2
2
2
1.1
1
1.1
B27
1.1
PLAN AND SECTION NOTES 15
6'-5"
ROOMA7.3
1
H
Phone: 610.834.7805
6'-2 3/4"
x A8.3
Sheet Name:
38'-0"
STAIR PLANS & SECTION
2'-11 1/2"
5'-1 1/4"
6"
LOWER LOBBY
FOOD PREP
LANDING
ELECTRIC ROOM
STEEL FRAME
LOWER LOBBY
15
x A8.3
1 LOBBY BASEMENT_ LOBBY STAIR_ST-1 BASEMENT_ STAIR_ST-1 LOBBY A7.3 SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1'-0" STAIR
1.1 EXAM 1
STAIR TREAD
27
x A8.3
LANDING
1'-9" 1'-9"
G
1 G
BALUSTERS
26
Construction Issue Date:
7'-4" x A8.3
FINISHED FLOOR
1
NEWEL BOX
25
SERVER
LANDING
H
METAL PAD STAIR AS PER SPECS
24
Scale: AS NOTED
x A8.3
2 A7.4
11'-8''
7
23
JT
x A8.3
15
LY
14
Checked By: JT
8
Construction Issue Date:
22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS
LOBBY
6
BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976
NEWEL BOX
18
24
T H E P A T H W A Y S A T W A R R I N G T O N
METAL PAD STAIR AS PER SPECS
x A8.3
LANDING
EXTERIOR FINISH AS PER DETAIL
FOUNDATION WALL AS PER STRUCTURE DRAWINGS
27
23
9
LANDING
CMU BOND BEAM
15
BY GLORIA DEI COMMUNITIES 2900 WEST STREET ROAD WARRINGTON, PA 18976
STAIR TREAD 16
26
2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK
NEWEL BOX 14
T H E P A T H W A Y S A T W A R R I N G T O N
36'' X36'' ROOF HATCH
24
7'-4"
11'-4'' 20 RISERS
6'-2 3/4" 5'-1 1/4"
BALUSTERS
7
Drawn By:
H
x A8.3
6'-2 3/4"
5'-3"
STEEL LO WITH SAFETY POST 25
X 1/2'' BALUSTERS 22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' STEEL FRAME 17
LOBBY
11'-8''20 RISERS 20 RISERS 4'-8" 4'-8" 5'-3"
B26
LOWER B26 LOBBY
2 A7.3
CEILING AS PER RCP
20
LANDING
FOOD
C
2 A7.3
STEEL JOIST AS PER STRUCTURE DRAWINGS
19
21
x A8.3
11'-4'' 20 RISERS
2
UP
LOBBY
1 UP ST-1 LOWER
3,500lb
1 ELEV. ST-1 #1
#2
18
JT
5'-1 1/4"
1 103
UP
2 A7.3
D
B
LOBBY
x A8.3
1
11 .040 ALUMINUM COPING 36'' X36'' ROOF HATCH
Progress Prints: Permit Set - 03.28.2018
10'-10"
1 103 DN
2 A7.3 2 C A5.4
#1
2 ST-1
LOBBY ELEVATOR ROOF_ DETAIL SECTION SCALE: 1" = 1'-0"
E101b
21
EXTERIOR FINISH AS PER DETAIL
CCD, LY
#1
2
A
3,500lb ELEV.
G
3 A7.4 x A8.3
Blu 482 Norristown Rd. | Suite 300
8
12 7/14'' METAL DECK 22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS 17 FOUNDATION WALL AS PER STRUCTURE DRAWINGS 13 8'' COLD FORM STEEL CHANNEL 24'' O.C. 23 METAL PAD STAIR AS PER SPECS
x A8.3
x A8.3
482 Norristown Rd. | Suite 300
14
Drawn By:
10'-10"
13
LANDING
#1
2 ST-1
9
12
SLOPE
15
16
G
3,500lb ELEV.
1ST FLOOR_ LOBBY STAIR & ELEVATOR SCALE: 1/4" = 1'-0"
G
6
11
Construction Issue Date:
2 A7.3
2 3,500lb ELEV.
UP
ST-1
3,500lb ELEV.
WARMING KITCHEN
ST-1
LOBBY STAIR
14
DN
E3 WARMING KITCHEN
LOBBY C1 STAIR
1.1
ST-1
LOBBY STAIR
2 A7.3
SLOPE
14
Progress Prints: Permit Set - 03.28.2018
LOBBY STAIR
#1
3,500lb ELEV. 1.1
1 1
H
H
9
x A8.3
2 A7.4
8'' CONCRETE PLANK 8'' COLD FORM4 STEEL CHANNEL 24'' O.C. AS PER STRUCTURE DRAWING & DETAIL 2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK 5 STEEL BEAM AS PER STRUCTURE DRAWING 15 CMU BOND BEAM 4'' RIGID INSULATION 6 W8 HOISTBEAM AS PER STRUCTURE DRAWINGS ROOF MEMBRANE 16 EXTERIOR FINISH AS PER DETAIL 7 1 1/2'' METAL DECK 2X8 P.T. WOOD BLOCKING 17 FOUNDATION WALL AS PER STRUCTURE DRAWINGS 8 4'' RIGID INSULATION .040 ALUMINUM COPING 18 STEEL JOIST AS PER STRUCTURE DRAWINGS 7/14'' METAL DECK 9 ROOF MEMBRANE CEILING AS PER RCP 8'' COLD FORM STEEL CHANNEL19 24'' O.C. 10 2X8 P.T. WOOD BLOCKING STEEL LO WITH SAFETY POST 2. LAYER 5/8'' FIRE CODE GWB WITH CAULK 20 FIRE 13
1 1/2'' METAL DECK
10
x A8.3
AS PER SPECS
.040 ALUMINUM COPING 3 ELEVATION PIT AS PER STRUCT DRWGS & 7/14'' METAL DECKELEVATOR MANUFACTURE'S REQUIREMENTS
W8 HOISTBEAM AS PER STRUCTURE DRAWINGS
8
W18
x A8.3
E101b
1ST FLOOR_ LOBBY STAIR_ST-1 SCALE: 1/4" = 1'-0"
UP
STEEL BEAM AS PER STRUCTURE DRAWING
LOBBY 15 CMU BOND BEAM
H
DN
1 A7.4
2
W18
1.1 1 A7.3
2
1.1
W12
LOBBY STAIR 1ST FLOOR_ LOBBY STAIR_ST-1 ST-1 SCALE: 1/4" = 1'-0"
1 A7.3
1
1 228
229
ST-1
LOBBY C1 STAIR
H G
1
1.1
5
11
Sheet Name: ELEVATOR PLAN & SECTION
3 ST-1
1 229
G
1
8'' CONCRETE PLANK AS PER STRUCTURE DRAWING & DETAIL
12
SERVER
2ND FLOOR_ LOBBY STAIR & ELEVATOR SCALE: 1/4" = 1'-0"
G
BLOCKING 10 2X8 ELEVATION PIT AS PER STRUCT DRWGS & P.T. WOOD 2 ELEVATION ELEVATOR MANUFACTURE'S REQUIREMENTS
4
7
2ND FLOOR_ LOBBY STAIR_ST-1 SCALE: 1/4" = 1'-0" 3
2 A7.3
ELEVATION AS PER SPECS
3
SLOPE 6
230
1 8'' CMU BLOCK WALL AS PER DETAILS & ROOF MEMBRANE STRUCTURE DRAWINGS
2
4" 1'-4"
DN
E3 WARMING KITCHEN
ST-1
ST-1
1 A7.4
9
W12
LOBBY STAIR
H
1 A7.3
8 SLOPE
DN
2
13
x A8.3
OFFICE
2ND FLOOR_ LOBBY STAIR_ST-1 SCALE: 1/4" = 1'-0"
G
1 A7.3
E1
2
C1 C1
1.1
E2
ST-1
1
1.1
E3
10
9
Blue Bell, PA 19422
12
1
PLAN AND SECTION NOTES
8'' CMU BLOCK WALL AS PER DETAILS & RIGID INSULATION 8 4'' STRUCTURE DRAWINGS
1
Facsimile: 610.834.7815
2
Phone: 610.834.7805
1.1
W8 HOISTBEAM AS PER STRUCTURE DRAWINGS
Checked By: JT
2 A7.3
1
STEEL BEAM AS PER STRUCTURE DRAWING
6
7 1NOTES 1/2'' METAL DECK PLAN AND SECTION
H
H
G
G
Facsimil
3 ST-
D ST-1
LOBBY STAIR
C1
DRAWING & DETAIL 5
A7.4 A7.4
7
A.1
B
E3
UNIT TYPE G
i A.1
2ND FLOOR_WEST STAIR_ST-2 SCALE: 1/4" = 1'-0" 5'-8"
A.1
E3
2 A7.1
WEST STAIR
SLOPE
LANDING
FFE: 320.5' UP DN
2ND FLOOR_WEST STAIR_ST-2 1ST FLOOR_WEST SCALE: 1/4" = 1'-0" STAIR_ST-2 SCALE: 1/4" = 1'-0"
EXTERIOR FINISH AS PER DETAIL FOUNDATION WALL AS PER STRUCTURE DRAWINGS
5'-8"
W12
5'-8"
25
WEST STAIR_ST-2 SECTION SCALE: 1/2" = 1'-0"
10 RISERS
K
SLOPE
4'-0"
EAST STAIR
SLOPE
2 A7.2
B
10'-2"
1ST FLOOR_WEST STAIR_ST-2 K SCALE: 1/4" = 1'-0"
UNIT TYPE G 2 A7.1
2ND FLOOR_ EAST STAIR_ST-3 SCALE: 1/4" = 1'-0"
3 ST-3
DN
5'-8" EAST STAIR ST-3
2 A7.2
WEST STAIR_ST-2 SECTION SCALE: 1/2" = 1'-0"
W10
LANDING
UNIT TYPE G 5'-8"
UP
11'-4" 20 RISERS
22
K 1ST FLOOR_ EAST STAIR_ST-3 SCALE: 1/4" = 1'-0"
W10
11'-8" 20 RISERS
5'-10"
1 A7.2
2 ST-3
2 A7.2
UP
EAST STAIR ST-3
LANDING
MAINE OFFICE 5'-10"
22 MAINTENANCE OFFICE
4'-0"
1 ST-3
K 1 A7.2
18
STEEL JOIST AS PER STRUCTURE DRAWINGS
19
CEILING AS PER RCP
20
STEEL LO WITH SAFETY POST
21
36'' X36'' ROOF HATCH
BASEMENT_ EAST STAIR_ST-3 SCALE: 1/4" = 1'-0"
2 A7.2
Lei Yu_ Work Sample
EAST STAIR TOWER_ ST-3 SECTION SCALE: 1/2" = 1'-0"
87
23
METAL PAD STAIR AS PER SPECS
24
NEWEL BOX
25
BALUSTERS
26
STAIR TREAD
27
STEEL FRAME
PLAN AND SECTION NOTES
10 RISERS
DN
ST-3
1 A7.2
8'' COLD FORM STEEL CHANNEL 24'' O.C.
17
UNIT TYPE G
DN
7/14'' METAL DECK
13
16
i
3 ST-2
2 A7.1
12
UNIT TYPE G
LANDING
22
LO WITH SAFETY POST 420 8''STEEL CONCRETE PLANK AS PER STRUCTURE DRAWING & DETAIL 21 36'' X36'' ROOF HATCH 5 STEEL BEAM AS PER STRUCTURE DRAWING 22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS 6 W8 HOISTBEAM AS PER STRUCTURE DRAWINGS 23 METAL PAD STAIR AS PER SPECS 7 1 1/2'' METAL DECK 24 NEWEL BOX 8 4'' RIGID INSULATION 25 BALUSTERS
SLOPE
B B
WEST STAIR 4ST-2 ST-3
FINISH AS PER DETAIL 116 8''EXTERIOR CMU BLOCK WALL AS PER DETAILS & STRUCTURE DRAWINGS 17 FOUNDATION WALL AS PER STRUCTURE DRAWINGS 2 ELEVATION AS PER SPECS 18 STEEL JOIST AS PER STRUCTURE DRAWINGS
2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK
UNIT TYPE G
4'-0"
1 ST-2
E3
24
2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK
CMU BOND BEAM
10 RISERS
2 A7.1
24
8'' COLD FORM STEEL CHANNEL 24'' O.C.
14
22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS
A.1 A.1
1 A7.1
13
15
ST-2
2 A7.1
24A.1
7/14'' METAL DECK
14
3 ST-2
5'-8"
WEST STAIR ST-2
B
W12
10 RISERS
2 ST-2
E3
25
26
.040 ALUMINUM COPING
12
9 ROOF MEMBRANE 26 STAIR TREAD 10 2X8 P.T. WOOD BLOCKING 27 STEEL FRAME 11 .040 ALUMINUM COPING
B
1 A7.1
1 1 A7.1 A7.1
2X8 P.T. WOOD BLOCKING
11
3 ELEVATION PIT AS PER STRUCT DRWGS & CEILING AS PER RCP 19 ELEVATOR MANUFACTURE'S REQUIREMENTS
FFE: 320.5' UP
1 ST-2
26
10
Construction Issue Date:
2 A7.1
26
ROOF MEMBRANE
1
8'' CMU BLOCK WALL AS PER DETAILS & STRUCTURE DRAWINGS
2
ELEVATION AS PER SPECS
3
ELEVATION PIT AS PER STRUCT DRWGS & ELEVATOR MANUFACTURE'S REQUIREMENTS
4
8'' CONCRETE PLANK AS PER STRUCTURE DRAWING & DETAIL
5
STEEL BEAM AS PER STRUCTURE DRAWING
6
W8 HOISTBEAM AS PER STRUCTURE DRAWINGS
7
1 1/2'' METAL DECK
8
4'' RIGID INSULATION
9
ROOF MEMBRANE
10
2X8 P.T. WOOD BLOCKING
11
.040 ALUMINUM COPING
12
7/14'' METAL DECK
13
8'' COLD FORM STEEL CHANNEL 24'' O.C.
14
2. LAYER 5/8'' FIRE CODE GWB WITH FIRE CAULK
15
CMU BOND BEAM
16
EXTERIOR FINISH AS PER DETAIL
17
FOUNDATION WALL AS PER STRUCTURE DRAWINGS
18
STEEL JOIST AS PER STRUCTURE DRAWINGS
19
CEILING AS PER RCP
20
STEEL LO WITH SAFETY POST
21
36'' X36'' ROOF HATCH
22 1 1/2'' PAINTED HANDRAILS WITH 1/2'' X 1/2'' BALUSTERS 23
METAL PAD STAIR AS PER SPECS
24
NEWEL BOX
25
BALUSTERS
26
STAIR TREAD
27
STEEL FRAME
Construction Issue Date:
WEST STAIR ST-2
SLOPE
SLOPE
2 ST-2
25
4'' RIGID INSULATION
9
BEAMSECTION NOTES PLAN AND 15 CMU BOND
25
26
1 1/2'' METAL DECK
8
A
Bulter Residence Private Residential House on Mountain in Cashiers, NC Team work Kimmel Bogrette Architecture+ Site From Original Concept to Schematic Design and Design Development
CO-TENT All in one tent- Immediate Rescue Solutions and Temporary Space after Disaster Personal Work Design for Nepal Earthquake Rescue 2015
Lei Yu_ Work Sample
88
Lei Yu_ Work Sample
89
BUILDING ENVELOPE COVERAGE: 10,100 SQ. FT. BUILDING COVERAGE MAXIMUM (80%) = 8,088 SQ. FT. BUILDING COVERAGE MAX PROVIDED = 4,570 SQ. FT.
ROOF BELOW
LOT COVERAGE BUILDING LOT COVERAGE MAX (30%) = 11,343 SQ. FT. BUILDING LOT COVERAGE PROVIDED = 4,570 SQ. FT.
DECK
SCALE: 3/32" = 1'-0" 6 ft
0 ft
6 ft
12 ft
18 ft
LIVING AREA
DINING AREA
GALLERY
BAR
DUMB WAITER
WALK-IN CLOSET
KITCHEN
WINE CELLAR
COATS PANTRY
ENTRY
BUILDING ENVELOPE COVERAGE: 10,100 SQ. FT. BUILDING COVERAGE MAXIMUM (80%) = 8,088 SQ. FT. BUILDING COVERAGE MAX PROVIDED = 4,570 SQ. FT. LOT COVERAGE BUILDING LOT COVERAGE MAX (30%) = 11,343 SQ. FT. BUILDING LOT COVERAGE PROVIDED = 4,570 SQ. FT.
PLANTER
SCALE: 3/32" = 1'-0" 6 ft
STORAGE & MECHANICAL
Lei Yu_ Work Sample
90
0 ft
6 ft
12 ft
18 ft
Deployable Structure Transform from one objet to an other Instructor: Mohamad Al Khayer Team: David Feng, Lei Yu, Yu Gan 2017 Spring
Contemporary Furniture
Self-Supported Pav
From full to vacant
From rotatable to stable
Instructor: Katrin Mueller-Russo Solo Work 2017 Spring
Instructor: Simon Kim Team: Angela Huang, Lei Yu, Katie Ann McBride, Joey JH P 2017 Spring
Lei Yu_ Work Sample
91
State 1
State 2
Lei Yu_ Work Sample
92
State 3
Lei Yu_ Work Sample
93
Lei Yu_ Work Sample
94
Lei Yu_ Work Sample
95
Elastic unfolding From horizon to universe Lei Yu 2017 Portfolio University of Pennsylvania Master of Architecture Contact: 215-900-2219 yulei@upenn.edu
Critics: Cecil Balmond, Ezio Blasetti Student Group: Chih Kai Chan, Lei Yu, Moise Yamba
Lei Yu_ Work Sample
96