林 亭 維
TING-WEI,LIN Archutecture Porfolio
2 0 0 8 - 2 0 1 5
Name TING-WEI,LIN Home Country Taichung,Taiwan Current Job Designer,at Art Stock Design Co., Ltd. Taipei, Taiwan E-Mail wendy80205@gmail.com
Contents Cortex
2.5
The Story Line
module
Reuse of suspended railwayThe Old Mountain Line
Environment and Histroy Center for the University of California at Santa Barbara
2010 Thesis Project Individual
2008 Academic Work Individual
Advisor: Ih-Cheng Lai
Advisor: Wei-Xiang Song 01
Other Works
Exclusive Pavilion of a designer 2009 Academic Work Individual Advisor: Chen-Cheng Chen Studio:[Digital Design Studio] 10
On The Paper
Professional Project group work 15
21
26
The Story Line Reuse of suspended railwayThe Old Mountain Line 2010 Thesis Project Individual Advisorďźš Ih-Cheng Lai LocationďźšMiaoli & Taichung, Taiwan This design was originated from my journeys. Before I started this project, I had traveled around Taiwan to observe this small country with diversified cultures from a tourist's viewpoint. In the journey, I only used my feet and trains, and found great potential of traveling Taiwan with trains. The train is not considered as a fast way to travel around. Having been completely developed early, trains are not only vehicles, but important means to improve industries and economic developments. In my journey, I found a long-suspended rail line, nicknamed "Old Mountain Line," in central mountain areas of western Taiwan. The line was a branch line for industries in the past, so it had abundant natural and historical resources along the line. I hoped that a new "railway traveling project" can be designed to better integrate local unique scenery with existing rail roads and historical sites.
Old Mountain line in the future 01
Thesis Statement Re-appear the trace of local landscape and industry feature
A freight transportation station
The transformation is light view tourist spot now.
It was also an industrys assembled location, such as woods , teas, camphor industrys in 1903. Particularly do the passenger transportation from 1983.
The New Mountain line establishes in 1998, and Old Mountain line suspended forever consequently . Now ,The old mountain line becomes a hot spot. And parts of the old railrways have already changed into cycling routes.
Old Mountain line in 1980's
1.Experience landscape
?
2.The package tour of
Changes the style of trains to link new style. The train carries bikes at any local geography and important time with the slow-moving tourist spot. speed, people and bicycles can up get off at any time.
Travel way
How did people go the travel in Taiwan Cars Tour buses Motorcycles Taiwan Railways Administration(TRA) Taiwan High Speed Rail(THSR) Buses MRT Taxis Boats Airplan Bikes Renting Cars The Other
In the future,what can do it
Planned the way of tour in Taiwan 2006 2007
backpacking
Now
The other package tour School excursion Religious organization Incentive tour conducted tour
Before
2006 2007
vehicles
According to the charts the backpacking and train is the popular way of the tour and vehicle on travel in Taiwan.
Old Mountain line in 2010 02
Site Analysis
Long valley
Rugged mountains
Four kinds of geography Ruins of Longteng Bridge Old Mountain Line Taiwan Railways system in present Train Station
Existing Condition Railways
Taiwan Railways system
The Old Mountain Line Railway is seen as a potential World Heritage List site for Taiwan. Steep slopes and many curved sections are the line’s special characteristics. It grows about 15.6km. Why are there 4 stations, 4 bridges and 9 tunnels? Because of the complicated geography. So make use of the region four kinds of geography start analyzing the lines. 1. Study the four each area geography environments programme future the new stops and itinerarys. 2.Study the existing activities of the region, and analyze a circulation of person, bicycle and train.Find out the position of main activity for people. In conclusion,Put forth the humanities and natural environment special feature of the region.And the main design will are Runis of Longteng and Shengxing train station these two whole history culture enrich of region.
Rivers Tunnels
+ Single-site activites-[Shegxing train station] Linear activites-[Link of steel bridge and Ruins of Longteng Bridge]
Bridges waterways Train stations Culverts More Culvert Routes
Existing Activities +
+
Single-site, Linear or Planar activites Train stops Activity stops People routes Bike routes
[The Haka Tung Blossom Festival] in May + Linear activites-[Culvert routes] Planar activites-[Experience of industry]
Departure Station [Sanyi Old street] The wood carving art
[Sanyi train station]
Rruins of Pedestrian Culvert More Valleys
[Shegxing Station] Historic villages Elevation's highest of Shegxing train station, 402.326m of elevation.
[Shegxing train station] Here are also called “tiger's den ”or “fog village’.
[Wood Sculpture Museum] More exhibitions and educational activites.
[Culvert routes] Related to with position of railroad.
[Ruins of Longteng Bridge] Historic relic of earthquake and the new bridge
Have the bridge of history in 100 years
Valley plain
Tableland
+ Single-site activites-[Tai'an train station] Planar activites- [Experience of waterway landscpe] + Single-site activites-[NO.5 tunnel] Linear activites-[Continuous tunnels link bridges, the train up and down drives of experience]
Nei She Chuan Bridge
Waterways
Tai'an train station
[Nei She ChuanBridge] Suspend the railroad on Liyutan Reservoir. [waterway] The railroad freight transportation connects to river navigation.
[waterway] Built in Japanese colonization period.They are historic relices.
Destination Station
Rruins of Tunnels
[Ruins of Longteng Bridge] Trails around the ruins.
[Liyutan Reservoir] The biggest reservoir in the area.
[No.7 Tunnels]
Ruins of StationTai'an Station
Ruins of Waterways [Tai'an train station entrance] The circulation of station and platform. The station is under the platform.
[No.9 Tunnel] The last and longest tunnel in the line. It was already a cycling route.
[Houli train station]
[Continuous tunnels ] The tunnels and railways have already become the pedestrian and exploration areas. [ Daan Creek railway bridge] The Longest railway bridge in the line.
This bridge has already become a famoustourism spot now
04
Train Analysis How special is this railway in Old Mountain Line? There are more big curves. When trains crossing, the train reduces the speed. -This train must be controled the [speed] very easily. Here are almost single tracks and narrow gauge railrways. -Have to notice the [width size] of train.(Width of narrow gauge is 1,067mm). There are more small tunnels -Have to notice the [height size] of train.
big curve in Shengxing
single tracks
trains crossing
crossed the continuous tunnel
Study which type of train? Electric multiple unit EMU500 The EMU500 is the evolution type of EMU100 and 200 typeses that drove the old mountain line at that time. The highest speed:110/HR 1 unit: 80m/130t (At most can 4 sets be juxtaposed)
The EMU500 stoped at Shengxing station platform in 1998.
The EMU500 elevation
The EMU500 Plan
Train Diagrams How to match with speed, actions and tourists? Take EMU500 as the standard,try to change the openings method of carriage types. And take account of the peoples and bikes to get on and off.
+
+
? Mix Variations
Lift 1
Lift + Push&Pull + Board
2
Push&Pull
3
Push&Pull + Rotate Board
4
1
2
3
4
5
5
Push&Pull Board + Push&Pull Box
Rotate
6 6
7
7
Rotate Board + Push&Pull Box
Itinerary of One Day
of Ruins e idg ng Br e t g Lon
gx
Prototype Section Prototype Section
12.9m/8.6km
Ruins of Longteng Bridge
Shen
Shengxing
culvert
l unne t 2 . NO n Stop r Retu
n tatio ain s ing tr
7.5m/5km
Mileage Plan
tr
i Sany ation ain st
+New Stops+Arrange 3 segments differently the route of travel of landscapes +Make train keep in the 10 km/hr slowly +Set 2 return stops to match with traveller the flexibility on time
Departure station
11:39
11:50
The Circulation
The Circulation of travellers,bikes and train. Prototype Section Type 1
Type 1
Type 2
New Terrace
9:27
Type 2 Shengxing
penetrate
Two Floor carriage
Type 1 New Terrace
Tempral Plannig
Survey the relics
Ruins of Longteng Bridge
Variation Carriage on the culvert Variation Carriage with the station
9:00
In a culvert that was slightly oppressive, I could hear faint sounds of trains, and feel shakes of rails when trains was
Variation Carria on the Bridge
The elevation
In Shengxing Station, I was surrounded by mountains and thick fog. I felt that I was about to be devoured.
I was walking on a high iron bridge and looking historical wounds. I was standing there, firmly.
I went closer to a collapsed bridge, touching vines which covered the bridge. It felt like wrinkles of the history.
Prototype Section
Type 1
n tatio
The Total Mileage-47.8m/15.9km
ain s 'an tr
Tai’an station Waterway
Prototype elevation
Tai
3.45m/2.3km
ce ntran E s l e nn us Tu n xi i t n Co Da'an e Bridg
n Chua e h S e Nei Bridg
Stop rn Retu
Tunnels
7t -NO. 3 . O N
unne
ls
Destination station
Tai’an station
Prototype Section
15:50 Type 1 elevation
16:10 Type 1 New Tunnel circulating Tai’an station
Type 2
Type 2 Plan
Variation Carriage with the tunnels
17:10 Tai'an
Waterway
Variation Carriage on the waterway and station
age
I was in a continuous tunnel and could slightly see historical marks of digging by hands and smell somethings which were lonely and wet. Walking through the tunnel which was bright sometimes and was dark at other times just like doing a time traveling. I was preparing to travel back from the past to the present.
Waterway
Waterway
Was that the end? I started to expect what I could see at the next moment.
The elevation
Leaving the tunnel and I heard flowing rivers. It was a crossroad of different times. Seeing an old canal flowing under rails, I felt like I had arrived at another time, with an illusion of small boats and trains transporting various products.
06
Shengxing Site Plan Cycling Route
Ro M
ai
ad
The Trail
n
Scenic Pergola
Shengxing Train Station Site Plan
07
Shengxing Train Station Section 0.5
1
1.5
2m
Longteng Site Plan
The Trail Cycling Route
M
n ai
Ro
ad
The Trail
New Station
platform
Ruins of Longteng Bridge Site Plan
0.5 1 2
3
4
5m
Ruins of Longteng Bridge Section 0.5 1
2
3
4
08 5m
Carriage Design
Restore the structure of the carriage
With restore train structure for concept foundation, hope to make the space more penetrativity, and on the circulation, it can be freeer up having of with stops conjunction. Structure of roof
There are tree type of carriages, place into Dining , Vending machines, Seating spaces to satisfy a package tour for a day. Establish a bicycle parking to serve a traveller who have the bike. 1.penetrated the full view in the trip
View
2.Must not air condition
breez
Structure of elevetion
3.Match with the slowly train that convenient to get off and get on. Structure of chassis
Conductor room
Conductor room Vending machines
Dining
Outdoor resting
Bicycle Parking
W.C.
Seating
Carriage Plan
Carriage Section 0 50
09
100
150
200cm
I try to make use of ambulatory of car compartment space and environment dialogue, and plan a segment of itinerary that belongs to space and environment interaction
2.5
module Environment and Histroy Center for the University of California at Santa Barbara 2008 Thesis Project Individual AdvisorďźšWei-Xiang Song LocationďźšSanta Barbara, California This was a practice from an international design reviews among students. In front of this base was a historical site of the school: Campbells Barn with a natural pool (Spring Pool) surrounding it. The aim of this design was to introduce the special historical and ecological environment to visitors and students. It could be seen as a classroom with educational functions. With designs of green energy technologies, I expected it to better respond its surrounding natural environments. In my main concept, I combined every space with a modular plan. Using modules as units was easier for me to transport and make building materials to make it economical. I also researched much on microclimates of the base to assess appropriate locations and materials of facades and other spaces. For example, it had northeast wind at the base, and the positions of windows were adjusted according to it.
10
The Sites and Environment
Concept Strategy
The base was located in the wast shore of California. In summer, the high temperature would be lower down with moisture of the sea. The climate was warm and gentle because of this effect of the sea controlling the temperature.
Due to sufficient air and light at the base, unnecessary waste of resources could be decreased with such advantages. I used a quantification method with horizontal and vertical stacks to lead sunlight and wind into the space.
Two important cultural sites of the base were around the university: one of them was Campbells Barn, which would be used in the future as an exhibiting space. The other was a natural site: Spring Pool, or known as Temporary Pool. It would frozen in winter and the ice would be melted in spring. It was a swamp and a protected area for amphibians and insects.
2.5m
2.5m
Reference to the container size to set the module size
2.5m
Convenience of conveyance
Concept of construction
Match the space size
Study how to effectively make use of the modules in the environment. North pacific Ocean
N
location FACADE Use of the space depth, Come to scatter the power of strong breeze.
Campbells Barn
PLAN Use of the space height, Come to impede stronger sunlight.
South
The modules with the microclimate in the location . How to combine the modules? Foehn wind
The Occasional Monsoons
The Mist
Proposed (N) Vernal Pool East Make the outstanding modules to dispersion the wind.
11
West
Western Exposure
The modules shrinks back, therefore reduce the solar irradiation in summer.
North Move more modules layer, the indoor temperature will not too low.
South Move modules of upper level to impede the foehn.
Program Strategy
How to reduce ``the air condition utilization rate’’? This is also the concept of economy energy that use less air condition. This can reduce ``Urban Heat Island Effect ‘’. So I study the program how demand on the room size,sunlight,wind andsound control. Than depanding on the program demands also match with the microclimate in the site.
Sunlight
Wind
Sound control
general to important
Room size
The third demand The most The demand second space demand general to important
graphic illustration The least demand space
MOST Air condition demand
Receiving area/ Delivery Entrance 40m2
Sevice coreStairs,elevators,shaft
Rest room 130m2
Entarnce Kiosk/ Gift shop 200m2
Classroom 250m2
10 Faculty/ Staff office 140m2
Display Space
Lab Prep Room 50m2
Lecture Hall 200m2
Laboratory Classroom 230m2
Most don't need to open the service core of window to put in the place that needs an air condition most , make the air condition utilization rate decline to the least.
library 140m2
N
Entrance Lobby 200m2
Administration 200m2
LEAST
12
Site Plan
facade
Strategy
Strategy
Leveling, land In the landscape,planning the vast gentle slope make traveller have to stop and rest the space liberally.
opening In north elevation have the big opening can guide the sunlight to come in. In east elevation have the big balcony can guide the natural breeze to get into the indoor.
Sunlighting
NORTH ELEVATION
Natural Ventilation
circulation Make use of the module concept to partition the circulation that can link into the spring pool, center and parking.
EAST ELEVATION
Center
Parking
Spring Pool barn LEAST
Material Using four kinds of green building materials of pebbles, brick, timber and sods can classify the use of plaza.
Thermal Conductivity Coefficient concrete
Brick
wood
aluminium
MOST
SOUTH ELEVATION
Material Make use of Thermal Conductivity Coefficient of four kinds of materials the type is especially to study facade .
WEST ELEVATION
13
Plan and Section 7
2 1.Lecture Hall 2.Receiving Area / Delivery Entrance 3.Gift Shop + Entarnce Kiosk 4.Libary 5.Display Space 6.Additional Display Space
7.Laboratory Classroom (Adults)
5
8
5
8
10
8.Administration 9.Laboratory Classroom (Kids) 10.Classroom(Adults)
6
11.Classroom(Kids) 12.10 Faculty/Staff office
4
4
3
1F PLAN
6
11
2F PLAN
9
3F PLAN
12 9 8 6 8 3
6 1
14
Try the skin layer of research building material and space to measure an embodiment, and combine the economy energy building that the local environment characteristic forms.
Cortex Exclusive Pavilion of a designer 2009 Academic Work Individual Advisor: Chen-Cheng Chen Studio:[Digital Design Studio] Location:Yuanshan Fine Arts Park, Taipei, Taiwan In this project, I tried to reverse common procedures, and started from concepts and bases instead of designs. I began with an experimental method, starting with a flat surface with changed shapes, and developing every step from it. I kept the part of finding a proper concept to be used in the project to the last procedure. In the end, a pavilion was designed. The processes of the project were to figure out the possibility of "textiles" in architectural designs via digital designing. In this designing practice, I set a British lighting and furniture designer as my goal of my future exhibitions of interior designing. I researched his works and turned them into the foundation of exhibiting spaces. In doing so, I expected myself to better analyze the concept of textiles architectures.
15
STEP 01-Paper Type
STEP 02-Make paper transform
STEP 03-Make two kinds action
Four Type of the paper , each cut to "One" different action doing four pieces of papers four 50 different knives on one paper. kinds of transforms. Study gradual change of the lins. I choose with four kinds of more exaggerated actions, for the fold, rull up, Pull up and extrude. 25
100cm
"Two" different action doing four pieces of papers four kinds of transforms. With step 02 homology, but act by more than two kinds of compounds, carry on transforming to step 01 paper of action.
Step Developments
STEP 04-Study the 3D models I choose with Twists and animations in the FormZ instruction, imitate the paper model and try to reach the effect that original models.
Paper Types
One Kinds Action Fold Roll up Poll up
Two Kinds Action Extrude
Poll up & Extrude
Fold & Roll up
Fold & Extrude
Roll up & Poll up
3D Models Study Twist Animation
TYPE 01 One slice-like in shape unit
TYPE 02 A variety of the straight line and curve
TYPE 03 Copy the veins of the tree
TYPE 04 The lines of different angles position of Fold
position of Poll up
16
Step Developments
STEP 06-Unit walls According to step 5, finding out two kinds of interesting about "strip-like" and "slice-like in shape" units, and constituting the unit evolved, semicircle, cylinder walls. The purpose is to develop the unit as possibility for of the building construct.
STEP 05-Unit Diagram By step 1-5 find out four units,and study its possible form about to variation diagrams of plans , elevation and perspective. They will become the concept that Pavilion develops diagrams.
Unit Diagram Unit Walls PlanSectionUnit Variation 03 Variation 04 Unit Variation 01 Variation 02 Combination Unit Evolved
+
+
+
+
17
Semicircle
Cylinder
Pavillion Design
STEP 08-Pavilion Design First, I must integrate previous steps, then find out the work of designing the viewpoint and concept similar designer, among them, I think a furniture designer-Tom Raffield, know how to handle the structure system of radian and helical form shape. The concept such as my previous unit concept.
Tom Raffield who is the wooden lighting and furniture designer in UK. He has created a furniturand lighting range by steam bending a variety of woods.
Works analyzed
The structure system of radian unit and helical form.
The main material is a wood . The structure is integrally formed. The wood joint and structural support also very special. Consequently analysis structure, and try to imagine to convert into the space of idea.
Find that the shape of helical type is his most use unit in the work, also with before study the unit in with"Poll up" and "Extrud" step likeness, then take this as the concept to develop, and be divided into the design"framework" and"epidermis" development.
Works and Images
Sketch development
Chairs Form Structure
Lightings Study model
The Other
Special feature of structure
Layer after layer wood structure
Structure of the�V〞 19
STEP 09-Design Strategy Program Strategy For the used space,the helical type space concept isn't reasonable. Hence convert helical frame into more simple circle type and make the modular program. At the same time, study the dimensions that the person use the space. Take circle of 45 cm diameter as most the minimum size, it’s also a height of general chair. The purpose is for starting developing the space by more close person's dimensions.
Ø135
The helical frame development
Cut
Ø225 Ø270
Ø360
Ø90 Ø180
The program sizes
Pattern Strategy Similar take circle as to develop the concept. Study Variations of circle by the 3 D software trial and turn round.And then form an unit of similar Mobius Strip. Combine the unit in framework surface, and set to equip for the openings that will turn. Unuit
Variation
20
With the digital design concept study the knitting of flat surface rational conversion for space of skin layer and space of structure design.
Other Works
Fubon Life Insurance Taichung Wenxin Office Building 2012 Professional Project group work RoleďźšDesign Development (DD) Contract Documents (CD) with TOYO ITO & Associates, Architect, Japan.
Site Plan 1/500 Unit:mm
1F Plan 1/200 Unit:mm
Detailed Plan 1/200 Unit:mm
Detailed Section 1/200 Unit:mm
22
Tian Mu Housing Project-zone C 2013 Professional Project group work RoleďźšSchematic Design (SD)
Typical Floor Plan 1/400 Unit:mm
Site Plan
Facade study models
23
The River Ecosystem Educates hall
1F Plan
2F Plan
Lao-Jei River Story hall
The Plan
Outdoor Space Exhibition
Lao-Jie River Education Center 2012 Professional Project group work RoleďźšExhibition and Interior Design / Account Executive
24
Reading Space Exhibition
The Plan
Reading Space Imagine
Taiwan Highway Museum 2015 Professional Project group work RoleďźšExhibition and Interior Design / Account Executive
25
Reading Space Imagine
On The Paper
[Lively Street] Short List, Water Color Painting Category, The 10th DA DUN Fine Arts , Exhibition of Taichung, Taipei, 2005
27
[Still Life] Water Color Painting
28
[Hang Around] Water Color Painting
29
[Solicitude] charcoal
30
Thank You wendy80205@gmail.com