06 FUNCTION & AREA REQUIREMENT
01 INTRODUCTION • • • •
Project Information Project Background Target Group Timeline
• List of Function • Area Requirement • Summary 07 FUNCTION RELATIONSHIP
02 LITERATURE REVIEW • • •
CONTENT
Exhibition & Performing Review Case Study Law & Regulation
03 USER • • • •
User Type Number of User Calculation User Timetable Summary
04 SITE SELECTION & SITE ANALYSIS • • • • • •
District Selection District Analysis Site Selection Site Information Site Analysis Boat Route
05 CONCEPT • •
Major Concept Minor Concept
• • • •
Bubble Diagram Function Diagram Zoning Mass Develop
08 DESIGN • • • • •
Plan Section / Wall Section Elevation Materials Perspective
09 STRUCTURE • • • •
Wide Span Structure Skeleton Structure Basement Structure Materials Installation
10 EQUIPMENT • • • • • • • •
Electrical System Sanitary System A/C System Ventilation System Fire Protection System Auditorium & Exhibition Lift & Escalator Cleaning System
1 INTRODUCTION
• Project Information • Project Background • Target Group • Timeline
1
PROJECT INFORMATION
INTRO
THE D.O.C.K
Charoenkrung , Bangkok
THE DESTINATION OF CHAROENKRUNG
11 INTERACTIVE EXHIBITIONS
ART HUB
800 SEATS AUDITORIUM
AUDITORIUM
EXHIBITION & AUDITORIUM
COMMUNITY SPACE
MORE THAN 40 STORES COMMUNITY MALL
LUXURY HOTEL
1,630 LUXURY ROOMS
HOTEL
COMMUNITY MALL
1 INTRO
PROJECT INFORMATION THE D.O.C.K
Charoenkrung , Bangkok
Ê‹§àÊÃÔÁ¹âºÒ¡ÒþѲ¹Ò ÈÔÅ»ÇѲ¹¸ÃÃÁ¢Í§ÀÒ¤ÃÑ°
ÊÌҧ¾×é¹·ÕèʹѺʹع¡Ò÷‹Í§à·ÕèÂÇàªÔ§ ÈÔÅ»ÇѲ¹¸ÃÃÁ «Öè§à»š¹¡Ò÷‹Í§à·ÕèÂÇ ÃٻẺãËÁ‹ã¹ä·Â
ÊÌҧ¾×é¹·Õè¡ÒÃàÃÕ¹ÃÙŒ·Ò§ÈÔŻзÕè ãËŒºØ¤¤Å·ÑèÇä»à¢ŒÒ¶Ö§ä´Œ§‹ÒÂ
“ ¾×é ¹ ·Õè ÈÙ ¹ Â Ã Ç Á ¡ Ò Ã ·‹ Í § à ·Õè Â Ç à ªÔ § ÈÔ Å » ÇÑ ² ¹ ¸ à à Á ”
EXHIBITION & AUDITORIUM
COMMUNITY MALL
LUXURY HOTEL
‹ҹà¨ÃÔÞ¡ÃاÁÕÈÑ¡ÂÀÒ¾·ÕèÊ‹§àÊÃÔÁµ‹Í ¡ÒþѲ¹Òâ¤Ã§¡ÒÃ໚¹Èٹ ÃÇÁ ¢Í§ÈÔÅ»ÐáÅСÒ÷‹Í§à·ÕèÂÇ
1
PROJECT BACKGROUND
INTRO
¡ÒÃÊ‹§àÊÃÔÁÈÔÅ»ÐËÇÁÊÁÑÂáÅÐ ÍصÊÒË¡ÃÃÁÊÌҧÊÃä
à¼Âá¾Ã‹ÇѲ¹¸ÃÃÁ´ŒÒ¹ÈÔŻРËÇÁÊÁÑÂä·ÂÊÙ‹ÊÒ¡Å
à¾ÔèÁ¾×é¹·ÕèʹѺʹع¡ÒèѴáÊ´§áÅÐÊ‹§àÊÃÔÁ¡ÒÃàÃÕ¹ÃÙŒ´ŒÒ¹ÈÔÅ»Ð
¾Ñ²¹ÒµÒÁ¹âºÒÂÊÌҧÁÙŤ‹Òà¾ÔèÁ·Ò§ àÈÃÉ°¡Ô¨áÅФس¤‹Ò·Ò§Êѧ¤Á
¡ÅØ‹Á໇ÒËÁÒ¤×Í»ÃЪҪ¹·ÑèÇä» áÅйѡ·‹Í§à·ÕèÂÇ
1
PROJECT BACKGROUND
INTRO
¹ â  º Ò Â á Å Ð ÂØ · ¸ È Ò Ê µ à ʋ § à Ê ÃÔ Á ÈÔ Å » ÇÑ ² ¹ ¸ à à Á Ë Ç Á Ê ÁÑ Â (¾.È.2560-2564) Ê‹ Ç ¹ ·Õè 1 º · ¹íÒ ¡ Ò Ã Ê‹ § à Ê ÃÔ Á ÈÔ Å » РË Ç Á Ê ÁÑ Â á Å Ð ÍØ µ Ê Ò Ë ¡ à à Á Ê ÃŒ Ò § Ê Ã Ã ¤
- á ¹ Ç ¤Ô ´ á Å Ð ¢ Í º ¢‹ Ò Â § Ò ¹ ÈÔ Å » Ð ÇÑ ² ¹ ¸ à à Á Ë Ç Á Ê ÁÑ Â - ¡ ฎ Ë Á Ò Â á ¹ Ç ¤Ô ´ á Å Ð ¹ â  º Ò Â ÃÑ ° º Ò Å ·Õè à ¡Õè Â Ç ¢Œ Í § -
ÁÔ µÔ ¡ Ò Ã ¾Ñ ² ¹ Ò ÈÔ Å » ÇÑ ² ¹ ¸ à à Á Ë Ç Á Ê ÁÑ Â
¹âºÒ THAILAND 4.0
Ê‹ Ç ¹ ·Õè 2 ·Ô È · Ò § ¡ Ò Ã ¾Ñ ² ¹ Ò - ¾Ñ ¹ ¸ ¡Ô ¨ ·Õè ñ : Ê‹ § à Ê ÃÔ Á Ê ¹Ñ º Ê ¹Ø ¹ ã ËŒ ÁÕ ¡ Ò Ã ¾Ñ ² ¹ Ò à ¼ Â á ¾ Ë Í § ¤ ¤ Ç Ò Á ÃÙŒ - ¾Ñ ¹ ¸ ¡Ô ¨ ·Õè ò : Ê‹ § à Ê ÃÔ Á Ê ¹Ñ º Ê ¹Ø ¹ ã ËŒ ÁÕ ¡ Ò Ã ºÙ à ³ Ò ¡ Ò Ã ¤ Ç Ò Á Ë Ç Á Á× Í
¡ÅØ‹ÁÍصÊÒË¡ÃÃÁÊÌҧÊÃä ÇѲ¹¸ÃÃÁ áÅкÃÔ¡Ò÷ÕèÁÕÁÙŤ‹ÒÊÙ§ (Creative, Culture & High Value Services)
Ê‹ Ç ¹ ·Õè 3 ¡ Ò Ã ¢Ñ º à ¤ Å×è Í ¹ ä » ÊÙ‹ ¡ Ò Ã » ¯Ô ºÑ µÔ - á ¹ Ç · Ò § ¡ Ò Ã ¢Ñ º à ¤ Å×è Í ¹ - á ¹ Ç · Ò § ¡ Ò Ã µÔ ´ µ Ò Á » à Рà ÁÔ ¹ ¼ Å
5F ¡ÒÃÊ‹§àÊÃÔÁ ¡ÒþѲ¹ÒÍصÊÒË¡ÃÃÁ ÊÌҧÊÃä ÇѲ¹¸ÃÃÁ áÅкÃÔ¡Ò÷ÕèÁÕ ÁÙŤ‹ÒÊÙ§ â´ÂàÃÔèÁ¨Ò¡ÊÔ¹¤ŒÒáÅСÒà ºÃÔ¡Ò÷ҧÇѲ¹¸ÃÃÁ·ÕèÁÕÈÑ¡ÂÀÒ¾ 5 F Food Film
¹âºÒ THAILAND 4.0
Fashion Fighting Festival
1
PROJECT BACKGROUND
INTRO
¹ â  º Ò Â ÃÑ ° Á ¹ µ ÃÕ Ç‹ Ò ¡ Ò Ã ¡ à Р· Ã Ç § ÇÑ ² ¹ ¸ à à Á ´ŒÒ¹¡ÒÃÊ׺ÊÒ¹§Ò¹ ÇѲ¹¸ÃÃÁ¢Í§ªÒµÔ
ผ
à¼Âá¾Ã‹Ç² Ñ ¹¸ÃÃÁ´ŒÒ¹ ÈÔŻРËÇÁÊÁÑÂä·ÂÊÙ‹ÊÒ¡Å
¡Òõ‹ÍÂÍ´ÇѲ¹¸ÃÃÁ ´ŒÇ¡ùíҤس¤‹Ò¢Í§ ÇѲ¹¸ÃÃÁ ÊÌҧÊÃä ÊÔ¹¤ŒÒáÅкÃÔ¡Òà à¾×èÍà¾ÔèÁÁÙŤ‹Ò·Ò§àÈÃÉ°¡Ô¨ ÊÌҧÃÒÂä´Œ¨Ò¡ ¡Ò÷‹Í§à·ÕèÂÇáÅкÃÔ¡Ò÷ҧÇѲ¹¸ÃÃÁ
´ŒÒ¹¡ÒÃÃÑ¡ÉÒáÅÐËǹá˹ Áô¡·Ò§ÇѲ¹¸ÃÃÁ
»¯ÔºÑµÔ˹ŒÒ·ÕèÃÒª¡ÒôŒÇÂËÅÑ¡ ¸ÃÃÁÒÀÔºÒÅ áÅСÒÃÊÌҧ¤Ø³¤‹Ò·Ò§Êѧ¤Á
1
PROJECT BACKGROUND
INTRO
ÍØ µ Ê Ò Ë ¡ à à Á Ê ÃŒ Ò § Ê Ã Ã ¤ ¢ Í § â Å ¡ ÂØ ¤ »˜ ¨ ¨Ø ºÑ ¹ ·Õè Ê Ò Á Ò Ã ¶ Ê ÃŒ Ò § ÁÙ Å ¤‹ Ò ä ´Œ Á Ë Ò È Ò Å á Å Ð à »š ¹ ·Õè ¹Ô Â Á ¢ Í § ¡ à Рá Ê â Å ¡
ผ
1.
ÈÔÅ»ÐáÅÐËѵ¶¡ÃÃÁ (Art & Craft) ÊÔ¹¤ŒÒ ËÁÇ´ËÁÙ‹§Ò¹½‚Á×ÍáÅÐËѵ¶¡ÃÃÁ¢Í§»ÃÐà·Èä·Â ÊÌҧÁÙŤ‹Ò¶Ö§ 87,306 ŌҹºÒ· ã¹»‚ 2557
2.
¤ÇÒÁ§ÒÁáÅÐῪÑè¹ (Beauty &Fashion) »ÃÐà·Èä·ÂÁÕÍصÊÒË¡ÃÃÁ¤ÇÒÁ§ÒÁ¢¹Ò´ãËÞ‹ ·ÕèÊØ´ã¹ÍÒà«Õ¹ ÁÕÍѵÃÒ¡ÒÃàµÔºâµ¢Öé¹Í‹ҧ µ‹Íà¹×èͧ â´Ââµ¢Öé¹ 6.5 à»Íà à«ç¹µ
¾Ñ²¹ÒµÒÁ¹âºÒÂÊÌҧ ÁÙŤ‹Òà¾ÔÁ è ·Ò§àÈÃÉ°¡Ô¨ áÅФس¤‹Ò·Ò§Êѧ¤Á
ÁÙ Å ¤‹ Ò ÍØ µ Ê Ò Ë ¡ à à Á Ê ÃŒ Ò § Ê Ã Ã ¤ ÃÒÂÊҢҢͧ »ÃÐà·Èä·Â
ÊÑ ´ Ê‹ Ç ¹ á à § § Ò ¹ Ê ÃŒ Ò § Ê Ã Ã ¤ ¢ Í § ä · Â
1
PROJECT BACKGROUND
INTRO
ผ à¾ÔèÁ¾×¹ é ·ÕÊ è ¹ÑºÊ¹Ø¹¡Òà ¨Ñ´áÊ´§áÅÐÊ‹§àÊÃÔÁ ¡ÒÃàÃÕ¹ÃÙ´ Œ Ò Œ ¹ÈÔÅ»Ð
MOCA
TCDC
BACC
1
PROJECT BACKGROUND
INTRO
ผ ¡ÅØ‹Á໇ÒËÁÒ¤×Í »ÃЪҪ¹·ÑÇ è ä» áÅÐ ¹Ñ¡·‹Í§à·Õ è Ç
»ÃЪҪ¹·ÑÇ è ä»
¹Ñ¡·‹Í§à·Õ è Ç
¾Ñ¡¼‹Í¹ àÃÕ¹ÃÙŒ ¾º»Ð áÅ¡à»ÅÕ蹤ÇÒÁ¤Ô´àËç¹ Ã‹ÇÁ·íÒ¡Ô¨¡ÃÃÁ ÊÌҧÊÃä
ʶҹ·Õ跋ͧà·ÕèÂÇ·Õè ª‹Ç¡Ãе،¹ àÈÃÉ°¡Ô¨ ÊÌҧÊÃä
¹Ñ¡àÃÕ¹ / ¹Ñ¡ÈÖ¡ÉÒ
¾×é¹·Õè»ÅÙ¡½˜§¤‹Ò¹ÔÂÁ ´ŒÒ¹ÈÔŻРãËŒ¤ÇÒÁÃÙŒ áÅÐ ¨Ñ´áÊ´§¼Å§Ò¹
1
PROJECT BACKGROUND
INTRO
¨Ô µ à ÈÔ Å »Š
¢ Í º ¢‹ Ò Â § Ò ¹ ÈÔ Å » Ð ÇÑ ² ¹ ¸ à à Á Ë Ç Á Ê ÁÑ Â
·Ñ È ¹ ÈÔ Å »Š
Ç Ã Ã ³ ÈÔ Å »Š
ÈÔ Å » Ð ¡ Ò Ã áÊ´§
´Ø ÃÔ Â Ò § ¤ ÈÔ Å »Š
¨ÔµÃ¡ÃÃÁ »ÃеÔÁÒ¡ÃÃÁ ÀÒ¾¾ÔÁ¾ ÀÒ¾¶‹Ò Ê×èÍ»ÃÐÊÁ
¡ÇÕ¹Ô¾¹¸ àÃ×èͧÊÑé¹ ¹Ç¹ÔÂÒ º·ÅФÃ
§Ò¹Í͡ẺËÃ×ÍÈÔŻР·Õèà¡ÕèÂǡѺÊÔ觡‹ÍÊÌҧ
¡ÒÃàÅ‹¹´¹µÃÕÊÒ¡Å áÅд¹µÃÕä·Â»ÃÐÂØ¡µ
» à РÂØ ¡ µ ÈÔ Å »Š
¢ Í º ¢‹ Ò Â § Ò ¹ ÈÔ Å » Ð ÇÑ ² ¹ ¸ à à Á Ë Ç Á Ê ÁÑ Â
à à ¢ ÈÔ Å »Š
ÁÑ ³ ± ³ ÈÔ Å »Š
Ê ¶ Ò »˜ µ  ¡ÃÃÁ
À Ò ¾ Â ¹ µ Ã
Í͡Ẻ à ¤ Ã×è Í § á µ‹ § ¡ Ò Â
§Ò¹ÊÔ觾ÔÁ¾ §Ò¹Í͡ẺµÃÒÊÔ¹¤ŒÒ §Ò¹Í͡ẺºÃèØÀѳ± §Ò¹Í͡ẺàÇçºä«µ
ÈÔŻСÒÃÍ͡Ẻ ¡ÒûÃдѺáÅе¡áµ‹§ ÊÀÒ¾áÇ´ÅŒÍÁÀÒ¹͡áÅÐ ÀÒÂã¹ÍÒ¤ÒÃ
§Ò¹Í͡ẺËÃ×Í ÈÔŻзÕèà¡ÕèÂǡѺ ÊÔ觡‹ÍÊÌҧ
§Ò¹ÈÔŻдŒÒ¹Ê×èÍ ÀÒ¾à¤Å×è͹äËÇ
¡ÒÃÍ͡ẺàÊ×éͼŒÒÍÒÀó à¤Ã×èͧ»ÃдѺËҧ¡ÒÂáÅÐ ¡ÒÃáÊ´§áºº¡Òù؋§Ë‹Á
1
PROJECT BACKGROUND
INTRO
PROJECT OBJECTIVE
PURPOSE OF PROJECT
ÈÖ¡ÉÒͧ¤ »ÃСͺáÅо×é¹·Õè ÈÖ¡ÉÒ¡ÒáíÒ˹´Í§¤ »ÃСͺáÅÐ è Ñ´áÊ´§§Ò¹ÈÔŻР¡íÒ˹´¡Ô¨¡ÃÃÁÀÒÂã¹â¤Ã§¡Òà à¡ÕèÂǡѺ¾×é¹·Õ¨
à »š ¹ ¾×é ¹ ·Õè ¨Ñ ´ á Ê ´ § áÅÐà¼Âá¾Ã‹ÈÔŻРËÇÁÊÁÑÂËÅÒÂᢹ§
໚¹¾×é¹·ÕèÊ‹§àÊÃÔÁ¡Òà áÊ´§ÍÍ¡ áÅзíÒ ¡Ô¨¡ÃÃÁ´ŒÒ¹ÈÔÅ»Ð
ÈÖ¡ÉÒ§Ò¹ÇÒ§¼Ñ§¢¹Ò´ãËÞ‹â´Â ¤íÒ¹Ö§¶Ö§Í§¤ »ÃСͺâ¤Ã§¡ÒÃáÅÐ ¤ÇÒÁÊÑÁ¾Ñ¹¸ ¡º Ñ ÊÀÒ¾áÇ´ÅŒÍÁ
ผ ໚¹áËÅ‹§¤Œ¹¤ÇŒÒ ¤ÇÒÁÃÙŒ´ŒÒ¹ÈÔŻР¢Í§¤¹ã¹Êѧ¤Á
໚¹¾×é¹·Õè¾Ñ¡¼‹Í¹ ¾º»Ð áÅÐáÅ¡à»ÅÕè¹ ¤ÇÒÁ¤Ô´ÊÌҧÊÃä
ÈÖ¡ÉҾĵԡÃÃÁ¢Í§ ¡ÅØ‹Á໇ÒËÁÒ·ÕÊ è ‹§¼Åµ‹Í ¡ÒÃÍ͡Ẻâ¤Ã§¡ÒÃ
ÈÖ¡ÉÒ¡ÒÃÍ͡Ẻâ¤Ã§¡Òà ¢¹Ò´ãËÞ‹¾ÔàÈɵÒÁ¡ฎËÁÒ áÅТŒÍ¡íÒ˹´
ผ ÈÖ¡ÉÒá¹Ç·Ò§¡ÒÃÍ͡Ẻ ʶһ˜µÂ¡ÃÃÁãËŒ¹Ò ‹ ʹã¨ÈÖ¡ÉÒ §Ò¹â¤Ã§ÊÌҧáÅÐÃкº ÊíÒËÃѺâ¤Ã§¡Òâ¹Ò´ãËÞ‹
1
PROJECT BACKGROUND
INTRO
ÈÔ Å » РË Ç Á Ê ÁÑ Â ä ·  㠹 »˜ ¨ ¨Ø ºÑ ¹
ÊíÒ ¹Ñ ¡ § Ò ¹ ÈÔ Å » ÇÑ ² ¹ ¸ à à Á Ë Ç Á Ê ÁÑ Â
¨Ñ´µÑé§Êíҹѡ§Ò¹ÈÔÅ»ÇѲ¹¸ÃÃÁËÇÁÊÁÑ ÀÒÂ㵌¡ÃзÃǧÇѲ¹¸ÃÃÁ µÒÁ¾ÃÐÃÒªºÑÞÞѵԡÒÃẋ§Ê‹Ç¹ÃÒª¡Òà ¡ÃзÃǧ ·ºÇ§ ¡ÃÁ ¾.È. òõôõ
à» ´¾×é¹·ÕèáÊ´§¹Ô·ÃÃÈ¡Òà “ËÍÈÔÅ»ŠÃ‹ÇÁÊÁÑÂÃÒª´íÒà¹Ô¹”
ËÍÈÔÅ»ÇѲ¹¸ÃÃÁáË‹§ ¡Ãا෾ÁËÒ¹¤Ã ËÍÈÔÅ»Š¢Í§ ʶҺѹÍØ´ÁÈÖ¡ÉÒ·Õ訴 Ñ ¡ÒÃàÃÕ¹¡Òà Ê͹´ŒÒ¹ÈÔÅ»Ð
»ÃÐÊÒ¹§Ò¹à¤Ã×Í¢‹ÒÂͧ¤ ¡ÃÈÔÅ»ÇѲ¹¸ÃÃÁ·Ñé§ÀÒ¤ÃÑ°áÅÐÀÒ¤àÍ¡ª¹ ·Ñé§ã¹áÅе‹Ò§»ÃÐà·È
¡ Ò Ã ´íÒ à ¹Ô ¹ ¡ Ò Ã
´íÒà¹Ô¹¡ÒüÅÑ¡´Ñ¹§Ò¹ÈÔÅ»ÐËÇÁÊÁÑ·Ñé§ ù ÊÒ¢Ò Ã‹ÇÁ¡Ñºà¤Ã×Í¢‹ÒÂÈÔÅ» ¹áÅÐͧ¤ ¡Ã´ŒÒ¹ÈÔŻР·Ø¡ÊÒ¢Ò
Ê‹§àÊÃÔÁ ʹѺʹع áÅШѴãËŒÁÕËÍÈÔÅ»Šà¾×èÍà¼Âá¾Ã‹ÈÔÅ»ÇѲ¹¸ÃÃÁËÇÁÊÁÑÂ
¨Ñ´ãËŒÁÕÈٹ ¢ŒÍÁÙÅÊÒÃʹà·È´ŒÒ¹ÈÔÅ»ÇѲ¹¸ÃÃÁËÇÁÊÁÑ ÈÖ¡ÉÒ ÇԨѠà¾×è;Ѳ¹Òͧ¤ ¤ÇÒÁÃÙŒ ʵԻ˜ÞÞÒ áÅСÒûÃÐÂØ¡µ 㪌 §Ò¹ÈÔÅ»ÇѲ¹¸ÃÃÁËÇÁÊÁÑ ÃдÁ·ÃѾÂÒ¡ÃáÅШѴãËŒÁաͧ·Ø¹/áËÅ‹§·Ø¹´ŒÒ¹ÈÔÅ»ÇѲ¹¸ÃÃÁËÇÁÊÁÑ »¯ÔºÑµÔ¡ÒÃÍ×è¹ã´µÒÁ·Õè¡ฎËÁÒ¡íÒ˹´ãˌ໚¹ÍíҹҨ˹ŒÒ·Õè¢Í§Êíҹѡ§Ò¹ ËÃ×͵ÒÁ·Õè¡ÃзÃǧËÃ×ͤ³ÐÃÑ°Á¹µÃÕÁͺËÁÒÂ
1 INTRO
TARGET GROUP ¡ ÅØ‹ Á à »‡ Ò Ë Á Ò Â ¢ Í § â ¤ à § ¡ Ò Ã
»ÃЪҪ¹·ÑèÇä» / ¹Ñ¡·‹Í§à·ÕèÂÇ
‹ҹ¸ØáԨ
‹ҹÈÔŻРTourist
‹ҹªØÁª¹
Business Group (MICE)
11.00
19.00
Group Tour Independent Tour
¹Ñ¡·‹Í§à·ÕèÂÇä·Â ¹Ñ¡·‹Í§à·ÕèÂǵ‹Ò§ªÒµÔ
¹Ñ¡àÃÕ¹-¹Ñ¡ÈÖ¡ÉÒ
JAN/DEC PEAK SEASON
NOV-APR
MAY-OCT
HIGH SEASON
LOW SEASON
10.00
15.00
15.00
20.00
Group Tour
Independent
1
Exhibition and Performing Timeline
INTRO
EXHIBITION TIMELINE
PERMANENT MULTIMEDIA ART EXHIBITION Digital Interactive Media Art
PERIOD
ALL THE YEAR
Lighting
EXHIBITION TYPE TEMPORARY CONTEMPORARY EXHIBITION Installation 2D and 3D
PERIOD
3-4 months
1
Exhibition and Performing Timeline
INTRO
EXHIBITION TIMELINE TEMPORARY EXHIBITION
µÑ Ç Í Â‹ Ò § EXHIBITION
3 MONTH
Concept Exhibition “ WAT E R ”
Social Reflection
3 MONTH
20 DAYS
PERMENENT EXHIBITION
4 MONTH
30 DAYS
20 DAYS
4 MONTH
30 DAYS
20 DAYS
3 MONTH 20 DAYS
3 MONTH
Permanent Exhibition JAN
FEB
MAR
APR
3 MONTH
20 DAYS 3 MONTH
MAY
7 DAYS
7 DAYS
2 MONTH
2 MONTH
Permanent Exhibition (Paid) Temporary Exhibition (Free)
JUN
JUL
7 DAYS
20 DAYS
AUG
SEB
OCT
20 DAYS
2 MONTH 3 MONTH
NOV
3 MONTH 7 DAYS
2 MONTH
Temporary Exhibition (Paid) Prepare
DEC
20 DAYS
1
Exhibition and Performing Timeline
INTRO
PERFORMING TIMELINE MUSICAL
DURATION
CONCERT
PERFORMING TYPE DURATION
JUKEBOX MUSICAL / BOOK MUSICAL CONCEPT MUSICAL
2-3 hrs
LIVE PERFORMANCE
1-2 hrs
TALK SHOW
DURATION
PERIOD
PERIOD
ISSUE-BASED
2-3 hrs
PERIOD
20-65 days
/
ROUND
5-10 rounds
CHARITY CONCERT
/
3-10 days
/
5-10 days
ROUND
2-5 rounds
COMEDIC
ROUND
2-5 rounds
1
Exhibition and Performing Timeline
INTRO
PERFORMING TIMELINE MUSICAL µÑ Ç Í Â‹ Ò § PERFORMING
40days
¤ Í ¹ à ÊÔ Ã µ ¸Õ Ã ä ª Â à ´ ª
TED Talk
A Midsummer Night’s Dream
Be Musical
James Corden’s
CONCEPT MUSICAL
BOOK MUSICAL
JUKEBOX MUSICAL 65days
35days
35days
LIVE PERFORMANCE
TALK SHOW
The Candlelight Blues
BOOK MUSICAL
JUKEBOX MUSICAL
20days LIVE PERFORMANCE
CHARITY CONCERT 3days
5days
MAR
APR
MAY
JUN
10days
5days
JUL
20days
10days
SUMMARY
ISSUE-BASED
10days
5days
FEB
10days COMEDIC
ISSUE-BASED
JAN
CONCERT
15days
10days
AUG
SEP
OCT
NOV
15days
10days
25days
DEC
12days
5days Musical
Concert
Talk show
Prepare
2 LITERATURE REVIEW
• Exhibition & Performing Review • Case Study • Law & Regulation
2
EXHIBITION
LITERATURE REVIEW
EXHIBITION
EXHIBITION DESIGN
¤ Ç Ò Á à ´‹ ¹ ¤ Ç Ò Á à ÃÕ Â º §‹ Ò Â ¤ Ç Ò Á ¡ Å Á ¡ Å× ¹ ¤ Ç Ò Á á µ ¡ µ‹ Ò §
THEORY
EXHIBITION DESIGN
¡ Ò Ã à ¹Œ ¹ ¨Ø ´ Ê ¹ ã ¨ ¡ Ò Ã ¨Ñ ´ ã ËŒ ÁÕ à Í ¡ À Ò ¾ ¤ Ç Ò Á ä Á‹ «éÒ í «Ò¡ ¤ Ç Ò Á µ‹ Í à ¹×è Í § ¤ Ç Ò Á Ê Á ´Ø Å
2
EXHIBITION
LITERATURE REVIEW
EXHIBITION
1
EXHIBITION REVIEW ¡Äª §ÒÁÊÁ
Siamese Smile
INSTALLATION
Tape Bangkok
2
VISUAL ARTS
2D ARTS
INSTALLATION
The State of Suffering
3
3D ARTS
ÊØ ¹Ñ ¹ · Ò ¼ Ò Ê Á Ç § ¤
Cult And Trace
à ÎÔ Ã µ . . . . ¼ Á ËÔ Ç
2D ARTS
Siamese Smile
ª Ò µÔ ª Ò Â »Ø Â à »‚ Â
3D ARTS
¼Õ ã ¹ à Á× Í §
È Ã ªÑ  ¾ § É É Ò
2
PERFORMING
LITERATURE REVIEW
PERFORMING HALL
AUDITORIUM DESIGN STAGE
MATERIALS
SEATS
ÃÐÂÐÃÐËÇ‹Ò§á¶Çà¡ŒÒÍÕé¤ÇÃÁÕ¢¹Ò´ 30.5 cm ¢Öé¹ä» ÃÙ»ÊÕèàËÅÕèÂÁÁØÁฉÒ¡
¤ÇÒÁÅÖ¡¢Í§àÇ·ÕäÁ‹¤ÇÃà¡Ô¹ 13.5 Á.
PREFABRICATED ACOUSTIC UNITS
¤ÇÒÁÊÙ§ 15-18 Á.
¡ÒáÃдѺàÇ·Õ ¹ÔÂÁ㪌¾×é¹·Õè·ÕèÊÒÁÒö
ACOUSTICPLASTER AND
¤ÇÒÁ¡ÇŒÒ§ 19-23 Á.
à¤Å×è͹ŒÒÂä´Œ àËÁÒСѺ Concert Hall
SPRAYEDON MATERIAL
äÁ‹¤ÇÃÁÕ¤ÇÒÁ¡ÇŒÒ§à¡Ô¹ 32 Á.
¤ÇÒÁÊÙ§µ‹Í¤ÇÒÁ¡ÇŒÒ§ 1.2:1
á¶Ç·Õè¹Ñ觵Դ·Ò§à´Ô¹à¾Õ§´ŒÒ¹à´ÕÂǨѴ䴌 7-8 ·Õè¹Ñè§ ¤ÇÒÁÅÒ´àÍÕ§ 8-30 ͧÈÒ â´Â¡ÃдѺᵋÅТÑé¹ »ÃÐÁÒ³ 12 «Á. ᵋÅТÑ鹡njҧ»ÃÐÁÒ³ 0.84-1.00 Á. ·Ò§à´Ô¹¢Í§·Õè¹Ñè§ ¡ÇŒÒ§Í‹ҧ¹ŒÍ 1.07 m.
¾×é¹àÇ·Õ·íÒ´ŒÇÂäÁŒº¹â¤Ã§ÊÌҧäÁŒ ¤ÇÒÁÂÒÇ µ‹Í¤ÇÒÁ ¡ÇŒÒ§à»š¹ 2:1
á¶Ç·Õè¹Ñ觷ÕèµÔ´·Ò§à´Ô¹ 2 ¢ŒÒ§¨Ñ´ä´Œ 14-16 ·Õè¹Ñè§
à¾×èÍãËŒÁÕ¡ÒÃÊзŒÍ¹àÊÕ§·Õè´Õ
·Ò§à´Ô¹ ËÅÑ¡àª×èÍÁ¡Ñº·Ò§ÍÍ¡µŒÍ§¡ÇŒÒ§Í‹ҧ¹ŒÍ 1.52 m ACOUSTIC BLANKET
¡ÒèѴ·Õè¹Ñè§ ãªŒ¾×é¹·Õè 0.80 µÃ.Á. / ¤¹ - Multiple-Aisle ¨Ñ´ãˌᵋÅÐá¶ÇÁÕ·Õè¹Ñè§ 14-16 ·Õè¹Ñè§ ¢¹Òº´ŒÇ ·Ò§à´Ô¹ 2 ¢ŒÒ§ - Continental ·Ø¡·Õè¹Ñ觨Ѵ¡ÅØ‹Á¡Ñ¹·Õè¡Åҧˌͧ ·íÒãËŒ ÊÒÁÒö¨Ø¤¹ä´ŒÁÒ¡¢Öé¹
2
EXHIBITION
LITERATURE REVIEW
PERFORMING
1
PERFORMANCE REVIEW
The Candlelight Blues
MUSICAL
Be Musical
PERFORMING ARTS
2
CONCERT
MUSICAL
A Midsummer Night’s Dream
3
TALK SHOW
TED Talk
CONCERT
TALK SHOW
¤ Í ¹ à ÊÔ Ã µ ¸Õ Ã ä ª Â à ´ ª
James Corden’s
2
CASE STUDY
LITERATURE REVIEW
ã ¹»ÃÐ à ·È BACC PROJECT INFORMATION ARTS TYPE
FUNCTION
FLOORS
ÁÕ ¾× é ¹ ·Õ è ¡ Ò Ã ã ªŒ § Ò ¹ ·Õ è ã ¡ ÅŒ à ¤Õ Â § ¡Ñ º â ¤ à § ¡ Ò Ã Ã Ç Á ¶Ö § Ê Ò Á Ò Ã ¶ ÈÖ ¡ É Ò ÅÑ ¡ É ³ Ð ¼ Å § Ò ¹ ·Õè ¨Ñ ´ ä ´Œ
DESIGN CONCEPT
CONTEMPORARY ARTS
EXHIBITION
SHOPS
AUDITORIUM
LIBRARY
¤ Ç Ò Á Â× ´ Ë ÂØ‹ ¹ ã ¹ ¡ Ò Ã ã ªŒ Ê Í Â á Å Ð à Í×é Í µ‹ Í ¡ Ò Ã » ÃÑ º à » ÅÕè  ¹
ÍÔ § ÃÙ » ÅÑ ¡ É ³ Ê ¶ Ò »˜ µ  ¡ à à Á ä · Â
Í Ò ¤ Ò Ã Í Í ¡ á º º ã ËŒ ÁÕ ¾×é ¹ ·Õè À Ò Â ã ¹ ÊÙ §
¡ Ò Ã ã ªŒ » à Рâ  ª ¹ ¨ Ò ¡ á Ê § ¸ à à Á ª Ò µÔ
8 FLOORS
2
CASE STUDY
LITERATURE REVIEW
SECTION
7-9 Floor
EXHIBITION
Exhibition
OPEN SPACE HALL
1-6 Floor Commercial Auditorium Studio
LINK TO BTS
Office
Basement Library
Parking
PARKING
2
CASE STUDY
LITERATURE REVIEW
L FLOOR
1 FLOOR
ËŒ Í § Ê ÁØ ´
2 FLOOR
ÃŒ Ò ¹ ¤Œ Ò
ÃŒ Ò ¹ ¤Œ Ò
SERVICE
SERVICE
ËŒ Í § ¨Ñ ´ á Ê ´ § § Ò ¹
Temporary exhibition
ËŒ Í § ¨Ñ ´ á Ê ´ § § Ò ¹
ÃŒ Ò ¹ ¤Œ Ò ã ËŒ à ª‹ Ò 3 ÃŒ Ò ¹ ËŒ Í § ¨Ñ ´ á Ê ´ § § Ò ¹ ã ËŒ à ª‹ Ò ËŒ Í § Í à ¹ ¡ » Ã Ð Ê § ¤
Ê‹ Ç ¹ à ¡ç º ÃÑ ¡ É Ò ¼ Å § Ò ¹
FUNCTION
ËŒ Í § Ê ÁØ ´
ËŒ Í § Í à ¹ ¡ » Ã Ð Ê § ¤
FUNCTION
FUNCTION
TO BASEMENT
ÃŒ Ò ¹ ¤Œ Ò ã ËŒ à ª‹ Ò 3 ÃŒ Ò ¹ ËŒ Í § ¨Ñ ´ á Ê ´ § § Ò ¹ ã ËŒ à ª‹ Ò Ê‹ Ç ¹ à ¡ç º ÃÑ ¡ É Ò ¼ Å § Ò ¹
2
CASE STUDY
LITERATURE REVIEW
3 FLOOR
4 FLOOR
5 FLOOR
ÃŒ Ò ¹ ¤Œ Ò ÃŒ Ò ¹ ¤Œ Ò
ËŒ Í § » à РªØ Á
SERVICE
ËŒ Í § ¨Ñ ´ á Ê ´ § § Ò ¹
ËŒ Í § ¨Ñ ´ á Ê ´ § § Ò ¹
ËŒ Í § ¨Ñ ´ á Ê ´ § § Ò ¹ ã ËŒ à ª‹ Ò ËŒ Í § Í à ¹ ¡ » Ã Ð Ê § ¤
STUDIO
FUNCTION
FUNCTION
ËŒ Í § Í à ¹ ¡ » Ã Ð Ê § ¤
ÃŒ Ò ¹ ¤Œ Ò ã ËŒ à ª‹ Ò 3 ÃŒ Ò ¹
SERVICE
ÃŒ Ò ¹ ¤Œ Ò ã ËŒ à ª‹ Ò 3 ÃŒ Ò ¹ ËŒ Í § ¨Ñ ´ á Ê ´ § § Ò ¹ ã ËŒ à ª‹ Ò STUDIO
AUDITORIUM
FUNCTION
SERVICE
Temporary exhibition
ËŒ Í § Ê ÁØ ´ Auditorium Temporary exhibition
2
CASE STUDY
LITERATURE REVIEW
7 FLOOR
8 FLOOR
Temporary exhibition
9 FLOOR
Temporary exhibition
Temporary exhibition
SERVICE
SERVICE
SERVICE
Temporary exhibition
FUNCTION
Temporary exhibition
FUNCTION
FUNCTION
SERVICE
Temporary exhibition
2
CASE STUDY
LITERATURE REVIEW
ã ¹»ÃÐ à ·È TCDC
PROJECT INFORMATION ARTS TYPE
FUNCTION
FLOORS
ÁÕ ¾× é ¹ ·Õ è ¡ Ò Ã ã ªŒ § Ò ¹ ·Õ è ÁÕ ¡ Ò Ã ¹í Ò à Í Ò ¾× é ¹ ·Õ è » ¯ Ô º Ñ µ Ô ¡ Ò Ã Ã Ç Á ¶ Ö § ¾× é ¹ ·Õè I n t e r a c t i v e Á Ò ã ªŒ â ¤ à § ¡ Ò Ã
DESIGN CONCEPT
CONTEMPORARY EXHIBITION
EXHIBITION
WORKSHOP
AUDITORIUM
LIBRARY
6 FLOORS
DANCE WITH YOUR IMAGINATION AND CHANGE YOUR LIFE
2
CASE STUDY
LITERATURE REVIEW
ISOMETRIC
ROOFTOP GARDEN
CREATIVE SPACE
FUNCTION ROOM
RESOURCE CENTER
MEETING ROOM
TCDC OFFICE
MAKING SPACE
MATERIAL LIBRARY
AUDITORIUM
ENTRANCE & SHOP
GALLERY
2
CASE STUDY
LITERATURE REVIEW
ÁÕ ¾× é ¹ ·Õ è ¡ Ò Ã ã ªŒ § Ò ¹ ·Õ è ã ¡ ÅŒ à ¤Õ Â § ¡Ñ º â ¤ à § ¡ Ò Ã Ã Ç Á ¶Ö§ Ê Ò Á Ò Ã ¶ ÈÖ ¡ É Ò ¡ Ò Ã Í Í ¡ á º º Í Ò ¤ Ò Ã ä ´Œ
µ‹ Ò § »ÃÐà ·È TATE ST. IVES PROJECT INFORMATION ARTS TYPE
FUNCTION
FLOORS
CONTEMPORARY EXHIBITION [9 galleries]
EXHIBITION
WORKSHOP
AUDITORIUM
LIBRARY
6 FLOORS
EXHIBITION CONCEPT 1 st G a l l e r y
2 nd - 4 th G a l l e r y
Gallery modern artists in associated with St. Ives
artistic exchanges between Europe, London and St Ives [before and after the Second World War]
7 th – 8 th G a l l e r y
9 th G a l l e r y
The international modern art from post-war St. Ives
Studio and houses oral histories, arts resources
2
CASE STUDY
LITERATURE REVIEW
3 FLOOR
4 FLOOR
5-6 FLOOR
Exhibition
Studio Service
Service
2
CASE STUDY
LITERATURE REVIEW
µ‹ Ò § »ÃÐà ·È GETTY CENTER PROJECT INFORMATION ARTS TYPE
LOCATION
FUNCTION
CONTEMPORARY EXHIBITION
Los Angeles, California
GALLERIES
LIBRARY
AUDITORIUM
OFFICE
ÁÕ ¾× é ¹ ·Õ è ¡ Ò Ã ã ªŒ § Ò ¹ ·Õ è ã ¡ ÅŒ à ¤Õ Â § ¡Ñ º â ¤ à § ¡ Ò Ã Ã Ç Á ¶ Ö§ Á Õ¡ Ò Ã Í Í ¡ á º º ·Õ è á µ ¡ µ‹ Ò § ¨ Ò ¡ Í Ò ¤ Ò Ã ¡ à ³Õ ÈÖ ¡ É Ò Í× è ¹ æ à ª‹ ¹ Í Ò ¤ Ò Ã á º º á ¼‹ à »š ¹ µŒ ¹
DESIGN CONCEPT sustainable elements
Natural Light
Circulation
Energy-saving technologies
Materials
2
CASE STUDY
LITERATURE REVIEW
ELEVATION
ENTRY LEVEL
UPPER LEVEL
The J.Paul Getty Museum
Auditorium
Museum
Restaurant
Center of Education
Center for History of Art
2
LAW & REGULATION
LITERATURE REVIEW
6 m.
>10%
12 m.
˹ŒÒ¡ÇŒÒ§¢Í§·Õè´Ô¹ ˹ŒÒ¡ÇŒÒ§¢Í§·Õè´Ô¹µŒÍ§¡ÇŒÒ§ äÁ‹¹ŒÍÂ¡Ç‹Ò 12 àÁµÃ
·ÕèÇ‹Ò§ÃͺÍÒ¤Òà µŒ Í §ÁÕ ¶¹¹ËÃ× Í ·Õè Ç‹ Ò §»ÃÒȨҡÊÔè §»¡¤ÅØ Á ÃͺÍÒ¤ÒánjҧÍ‹ҧ¹ŒÍ 6 àÁµÃ
¾×é¹·ÕèÇ‹Ò§ ÁÕ ·Õè Ç‹ Ò §äÁ‹ ¹Œ Í Â¡Ç‹ Ò ÃŒ Í ÂÅÐ 10 ¢Í§¾×é¹·Õè´Ô¹·Õè¡‹ÍÊÌҧ
6 m.
6 m.
SITE
6 m.
ÃÐÂÐ˹ ÃÐÂÐË ¹ ÃͺÍÒ¤Òèҡࢵ ·Õè´Ô¹Í‹ҧ¹ŒÍ 6 àÁµÃ
¡ ฎ Ë Á Ò Â ¤ Ç º ¤Ø Á Í Ò ¤ Ò Ã
+0.00 SITE
18 m.
ÍÒ¤Ò÷ÕèÁÕ¢¹Ò´ÁÒ¡¡Ç‹Ò 30,000 µÃ.Á. Ë Ò ¡ à »š ¹ Í Ò ¤ Ò Ã ·Õè ÁÕ ¢ ¹ Ò ´ ¾×é ¹ ·Õè Ã Ç Á 30,000 µÒÃÒ§àÁµÃ¢Öé ¹ ä» µŒ Í §ÍÂÙ‹ µÔ ´ ¶¹¹ÊÒ¸ÒóзÕè ÁÕ ¤ÇÒÁ¡ÇŒÒ§ 18 àÁµÃ
ÃкºÃͧÃѺÍÒ¤Òà ÍÒ¤Ò÷ÕèÁÕʋǹ¢Í§¾×é¹·ÕèÍÒ¤ÒõèíÒ¡Ç‹ÒÃдѺ ¾×é¹´Ô ¹µŒ Í §ÁÕÃкºÃкÒÂÍÒ¡ÒÈ áÅÐÃкº ºíҺѴ¹éíÒàÊÕ áÅСÒÃÃкÒ¹éíÒ·Ôé§
Ãкº»‡Í§¡Ñ¹ÍѤ¤ÕÀÑ µŒÍ§ÁÕÃкº»‡Í§¡Ñ¹ÍѤ¤ÕÀÑÂ
2
LAW & REGULATION
LITERATURE REVIEW
ËÁÇ´ 1
ËÁÇ´ 2
ËÁÇ´ 3
6 m.
6 m.
6 m.
FAR :: 10:1 OSR 10%
6 m.
à ¢ µ · Ò § ¡ ÇŒ Ò § ä Á‹ ¹Œ Í Â ¡ Ç‹ Ò 1 8 Á .
·Õè ´Ô ¹ ·Õè µÔ ´ ¶ ¹ ¹ ¡ ÇŒ Ò § Á Ò ¡ ¡ Ç‹ Ò 1 2 Á . ·Õè Ç‹ Ò § Ã Í º Í Ò ¤ Ò Ã ä Á‹ ¹Œ Í Â ¡ Ç‹ Ò 6 Á .
à Рº º à Рº Ò Â Í Ò ¡ Ò È Ã Ð º º ä ¿ ¿‡ Ò á Å Ð Ã Ð º º »‡ Í § ¡Ñ ¹ ÍÑ ¤ ¤Õ ÀÑ Â
à Рº º ºíÒ ºÑ ´ ¹éíÒ à ÊÕ Â á Å Ð Ã Ð º º à Рº Ò Â ¹éíÒ ·Ôé §
¡ ฎ ¡ à Р· Ã Ç § ฉ ºÑ º ·Õè 3 3
Ç‹ Ò ´Œ Ç Â à Ã×è Í § Í Ò ¤ Ò Ã ¢ ¹ Ò ´ ã Ë Þ‹ ¾Ô à È É
ËÁÇ´ 4
ËÁÇ´ 5
ËÁÇ´ 6
à Рº º ÅÔ ¿ µ â ´ Â Ê Ò Ã Ã Ð º º ÅÔ ¿ µ ´Ñ º à ¾ ÅÔ §
µŒÍ§ÁÕ·Õèà¡çº¹éíÒ㪌ÊíÒÃͧ·ÕèÊÒÁÒö¨‹Ò¹éíÒÊÙ§ÊØ´ä´Œ äÁ‹¹ŒÍÂ¡Ç‹Ò 2 ªÑèÇâÁ§ áÅеŒÍ§ÁÕÃкº·‹Í¨‹Ò ¹éíÒ»ÃлҷÕèÁÕáç´Ñ¹
à Рº º ¡íÒ ¨Ñ ´ ¢  РÁÙ Å ½ Í Â
à Рº º ÅÔ ¿ µ
2
LAW & REGULATION
LITERATURE REVIEW
ÇÑÊ´ØÍÒ¤Ò÷¹ä¿
µÒÁÁҵðҹÇÔÈÇ¡ÃÃÁâ¤Ã§ÊÌҧ
·Ò§à´Ô¹ÀÒÂã¹ÍÒ¤Òà ¡ÇŒÒ§äÁ‹¹ŒÍÂ¡Ç‹Ò 1.50 àÁµÃ
ÃдѺµèíÒ¡Ç‹Ò¾×é¹´Ô¹
µŒÍ§ÁÕÃкº»ÃѺÍÒ¡ÒÈ ÃкºÃкÒ¹éíÒ áÅÐÃкºáʧÊÇ‹Ò§
ǧàÅÕéÂÇö
ÃÑÈÁÕö¹µ äÁ‹µèíÒ¡Ç‹Ò 6.00 Á. ÃÑÈÁÕöºÑÊäÁ‹µèíÒ¡Ç‹Ò 12.00 Á.
¡ ฎ ¡ à Р· Ã Ç § ฉ ºÑ º ·Õè 5 5
Ç‹ Ò ´Œ Ç Â à Ã×è Í § ¡ Ò Ã ¨Ñ ´ ·íÒ ÊÔè § ÍíÒ ¹ Ç Â ¤ Ç Ò Á Ê Ð ´ Ç ¡ ¢Ñé ¹ ¾×é ¹ ° Ò ¹
>3.00
<10.00
<10.00
>3.25 <60.00
ÃÐÂÐÂ×¹ è ·ÕèÊ´ Ø ¢Í§ÍÒ¤ÒÃ
ÁÕ¤ÇÒÁÊÙ§ÁÒ¡¡Ç‹ÒËÃ×Í෋ҡѺ 3.25 àÁµÃ
ÃÐÂдÔè§
ˌͧ¾Ñ¡âçáÃÁ >2.60 àÁµÃ ˌͧ⶧ÀѵµÒ¤Òà >3.00 àÁµÃ ˌͧ»ÃЪØÁ >3.50 àÁµÃ ÃÐàºÕ§ >2.20 àÁµÃ
ºÑ¹ä´Ë¹Õä¿
¨Ò¡ËŒÍ§ÊØ´·ŒÒÂÃÐÂÐäÁ‹à¡Ô¹ 10 àÁµÃ ᵋÅÐºÑ¹ä´ µŒÍ§ÁÕ¤ÇÒÁË‹Ò§¡Ñ¹äÁ‹à¡Ô¹ 60 àÁµÃ
ºÑ¹ä´Ë¹Õä¿
¤ÇÒÁ¡ÇŒÒ§ 1.50 àÁµÃËÃ×Í 1.20 àÁµÃ ÊͧµÑÇ ¶ŒÒ¾×é¹·Õ赋ͪÑé¹à¡Ô¹ 2000 µÒÃÒ§àÁµÃ ºÑ¹ä´ ¡ÇŒÒ§ 3.00 àÁµÃ 1 µÑÇ ËÃ×Í 1.5 àÁµÃ 2 µÑÇ
2 LITERATURE REVIEW
LAW & REGULATION ¢ŒÍ 11 ÍÒ¤ÒõÒÁ¢ŒÍ 3 µŒÍ§¨Ñ´ãËŒÁպѹ䴷Õè¼ÙŒ¾Ô¡ÒÃËÃ×ͷؾ¾ÅÀÒ¾áÅФ¹ªÃÒ㪌䴌Í‹ҧ¹ŒÍªÑé¹ÅÐ 1 áË‹§ <150 ÁÁ. <2000 ÁÁ.
¡ฎ¡ÃзÃǧ ¡íÒ˹´ÊÔè§ÍíҹǠ¤ÇÒÁÊдǡã¹ÍÒ¤Òà ÊíÒËÃѺ¼ÙŒ¾Ô¡ÒÃËÃ×ͷؾ¾ÅÀÒ¾ áÅФ¹ªÃÒ ¾.È.2558
ÅÙ¡µÑé§ÊÙ§äÁ‹à¡Ô¹ 150 ÁÁ. ÅÙ¡¹Í¹àÁ×èÍËѡʋǹ·Õè¢Ñ鹺ѹä´àËÅ×èÍÁ¡Ñ¹ÍÍ¡ áÅŒÇàËÅ×ͤÇÒÁ¡ÇŒÒ§äÁ‹¹ŒÍÂ¡Ç‹Ò 280 ÁÁ.
>1500 ÁÁ. ÁÕªÒ¹¾Ñ¡·Ø¡ÃÐÂÐã¹á¹Ç´Ôè§äÁ‹à¡Ô¹ 2,000 ÁÁ.
ÁÕ¤ÇÒÁ¡ÇŒÒ§ÊØ·¸ÔäÁ‹¹ŒÍÂ¡Ç‹Ò 1,500 ÁÁ.
¢ŒÍ 12 ÍÒ¤ÒõÒÁ¢ŒÍ 3 µŒÍ§¨Ñ´ãËŒÁÕ·Õè¨Í´Ã¶ÊíÒËÃѺ¼ÙŒ¾Ô¡ÒÃËÃ×ͷؾ¾ÅÀÒ¾áÅФ¹ªÃÒ Í‹ҧ¹ŒÍµÒÁ ÍѵÃÒʋǹ ´Ñ§¹Õé
¢ŒÍ 11 ¢¹Ò´ÊѴʋǹ¢Í§ºÑ¹ä´ ¢ŒÍ 12 ¨íҹǹ·Õè¨Í´Ã¶ ¢ŒÍ 21 ÊѴʋǹ ¢¹Ò´ ÃÐÂТͧˌͧ¹éíÒ
51-100 ¤Ñ¹
Í‹ҧ¹ŒÍ 2 ¤Ñ¹
¶ŒÒ¨íҹǹ·Õè¨Í´Ã¶µÑé§áµ‹ 51 ¤Ñ¹ ᵋäÁ‹à¡Ô¹ 100 ¤Ñ¹ ãËŒÁÕ·Õè¨Í´Ã¶ÊíÒËÃѺ¼ÙŒ¾Ô¡ÒÃËÃ×Í ·Ø¾¾ÅÀÒ¾ áÅФ¹ªÃÒÍ‹ҧ¹ŒÍ 2 ¤Ñ¹
¢ŒÍ 21 ÍÒ¤ÒõÒÁ¢ŒÍ 3 ·Õè¨Ñ´ãËŒÁÕˌͧʌÇÁÊíÒËÃѺºØ¤¤Å·ÑèÇä» µŒÍ§¨Ñ´ãËŒÁÕˌͧʌÇÁÊíÒËÃѺ¼ÙŒ¾Ô¡ÒÃËÃ×ͷؾ¾ÅÀÒ¾ áÅФ¹ªÃÒ à¢ŒÒ㪌䴌Í‹ҧ¹ŒÍ 1 ˌͧã¹ËŒÍ§ÊŒÇÁ¹Ñé¹ËÃ×ͨШѴá¡ÍÍ¡ÁÒ ÍÂً㹺ÃÔàdzà´ÕÂǡѹ¡ÑºËŒÍ§ÊŒÇÁÊíÒËÃѺºØ¤¤Å·ÑèÇ仡çä´Œ
101 ¤Ñ¹¢Öé¹ä» [100
:
Í‹ҧ¹ŒÍ 2 ¤Ñ¹ 1]
¶ŒÒ¨íҹǹ·Õè¨Í´Ã¶µÑé§áµ‹ 101 ¤Ñ¹¢Öé¹ä» ãËŒÁÕ·Õè¨Í´Ã¶ ÊíÒËÃѺ ¼ÙŒ¾Ô¡ÒÃËÃ×ͷؾ¾ÅÀÒ¾ áÅФ¹ªÃÒÍ‹ҧ¹ŒÍ 2 ¤Ñ¹áÅÐ à¾ÔèÁ¢Öé¹ÍÕ¡ 1 ¤Ñ¹ÊíÒËÃѺ ·Ø¡ æ ¨íҹǹö 100 ¤Ñ¹ ·Õèà¾ÔèÁ¢Öé¹ àÈɢͧ 100 ¤Ñ¹ ¶ŒÒà¡Ô¹¡Ç‹Ò 50 ¤Ñ¹ ãËŒ¤Ô´à»š¹ 100 ¤Ñ¹
2
LAW & REGULATION
LITERATURE REVIEW
EIA
»ÃСÒÈ¡ÃзÃǧ ·ÃѾÂҡøÃÃÁªÒµÔáÅÐÊÔè§áÇ´ÅŒÍÁ
Environmental Impact Assessment
Á Ò µ à ° Ò ¹ ¢Ñé ¹ µèÒ í ·Õè µŒ Í § ¨Ñ ´ ã ËŒ ÁÕ
¡Òû‡Í§¡Ñ¹ÍѤ¤ÕÀÑ (¾×é¹·Õè¨Ø´ÃÇÁ¾Åàº×éͧµŒ¹)
¾×é¹·ÕèÊÕà¢ÕÂÇ
¡ÒêÐÅ͹éíÒ½¹ (¡ÒÃ˹‹Ç§¹éíÒ)
»ÃÐàÀ· : ÍÒ¤Òâ¹Ò´ãËÞ‹¾ÔàÈÉ ¢ŒÍ27.1 ÍÒ¤Ò÷ÕèµÑé§ÍÂÙ‹ÃÔÁáÁ‹¹éíÒ
¡Òá‹ÍÊÌҧÃÑéÇ
¡ÒÃ͹ØÃÑ¡É ¾Åѧ§Ò¹
¡ÒúíҺѴ ¹éíÒàÊÕÂ
ࡳ± ¡ÒûÃÐàÁÔ¹ ·ÃѾÂҡêÕÇÀÒ¾
·ÃѾÂҡáÒÂÀÒ¾ -
ÊÀÒ¾ÀÙÁÔ»ÃÐà·È ·ÃѾÂҡôԹ ¸Ã³ÕÇÔ·ÂÒ ÊÀÒ¾áÅФسÀÒ¾ÀÙÁÔÍÒ¡ÒÈ àÊÕ§áÅФÇÒÁÊÑè¹ÊÐà·×͹ ·ÃѾÂҡùéÒ í
- ¼Å¡Ãзºµ‹Í ·ÃѾÂҡøÃÃÁªÒµÔ áÅÐÊÔè§áÇ´ÅŒÍÁ
ÊѴʋǹ¢Í§¾×é¹ÊÕà¢ÕÂÇÀÒÂã¹â¤Ã§¡ÒÃ
äÁ‹¹ŒÍÂ¡Ç‹Ò 1 µÃ.Á.
:
¤Ø³¤‹Ò¡ÒÃ㪌»ÃÐ⪹ ¢Í§Á¹ØÉ - ÊÒ¸ÒóÊØ¢ - ÍÒªÕÇ͹ÒÁÑ áÅФÇÒÁ »ÅÍ´ÀÑ - Êع·ÃÕÂÀÒ¾
- ¡ÒûÃÐàÁÔ¹¼Å¡Ãзº ¨Ò¡¡Òú´ºÑ§·ÔÈ·Ò§ÅÁ - ¡Òú´ºÑ§·È·Ò§ÅÁ áʧᴴ áÅФÅ×è¹ÊÑÞÞÒ³ ÇÔ·ÂØ-â·Ã·Ñȹ
¤ÇÒÁÅÖ¡¢Í§ªÑé¹´Ô¹ (äÁ‹ÃÇÁÇÑÊ´ØÃͧ»ÅÙ¡) äÁŒÂ×¹µŒ¹
1 ¤¹
>1 àÁµÃ äÁŒ¾Ø‹Á 50 «Á.
¾×é¹·ÕèÊÕà¢ÕÂÇ
¾×ª¤ÅØÁ´Ô¹ ¡ÇŒÒ§ >1 àÁµÃ
>10 «Á.
¤Ø³¤‹Òµ‹Í¤Ø³ÀÒ¾ªÕÇÔµ - ¡ÒÃ㪌¹éíÒ - ¡ÒáíҨѴ¹éíÒàÊÕ áÅÐÊÔ觻¯Ô¡ÙÅ - ¡ÒèѴ¡ÒâÂÐÁÙÅ ½ÍÂ
- ¡ÒèÃҨà - ¡ÒÃÊ×èÍÊÒà - ¡ÒÃ㪌»ÃÐ⪹ ·Õè´Ô¹
¾×é¹·ÕèÊÕà¢ÕÂǺÃÔàdzªÑé¹Å‹Ò§ > 50% ¢Í§¾×é¹·ÕèÊÕà¢ÕÂÇ·ÕèãËŒÁÕµÒÁࡳ± äÁŒÂ×¹µŒ¹ > 50% ¢Í§¾×é¹·ÕèÊÕà¢ÕÂǪÑé¹Å‹Ò§ ¡Ã³Õ ¾×é¹·ÕèÊÕà¢ÕÂÇ·ÕèÁÕâ¤Ã§ÊÌҧ 㵌´Ô¹ ¾×é¹·ÕèÊÕà¢ÕÂǢͧâ¤Ã§¡Òà ¾×é¹·ÕèÊÕà¢ÕÂǪÑé¹Å‹Ò§¢Í§â¤Ã§¡ÒÃ
3 USER ANALYSIS
• User Type • Number of User Calculation • User Timetable • Summary
3
USER ANALYSIS
USER
USER TYPE
»ÃÐàÀ·¼ÙŒãªŒâ¤Ã§¡ÒÃ
¼ÙŒãªŒºÃÔ¡ÒÃ
¼ÙŒãËŒºÃÔ¡ÒÃ
PERFORMING AND GALLERY ¤¹·ÑèÇä»
¼ÙŒªÁ¹Ô·ÃÃÈ¡ÒÃ
¼ÙŒãªŒºÃÔ¡ÒÃ
¼ÙŒªÁ¡ÒÃáÊ´§
¹Ñ¡áÊ´§
ʋǹºÃÔËÒÃ
ª‹Ò§à·¤¹Ô¤
¼ÙŒãËŒºÃÔ¡ÒÃ
HOTEL ¼ÙŒà¢ŒÒ¾Ñ¡
ʋǹºÃÔËÒÃ
ª‹Ò§à·¤¹Ô¤
áÁ‹ºŒÒ¹
¤¹ºÃÔ¡Òà ¨Í´Ã¶
3
USER ANALYSIS
USER
NUMBER of USER CALCULATION
¡Òäíҹdz¼ÙŒãªŒâ¤Ã§¡ÒÃ
PERFORMING AND GALLERY TYPE
USER ¹Ñ¡áÊ´§
¹Ñ¡áÊ´§
¼ÙŒà¢ŒÒªÁ áÅÐËÇÁ ¡Ô¨¡ÃÃÁ
¼ÙŒªÁ¡ÒÃáÊ´§
¼ÙŒãªŒÊ‹Ç¹ ¾Ò³ÔªÂ
ACTIVITY ½ƒ¡«ŒÍÁ , à»ÅÕè¹àÊ×éͼŒÒ , ¾Ñ¡¤Í , ¡ÒÃáÊ´§
ROOM
TIME
ˌͧ«ŒÍÁ , ˌͧᵋ§µÑÇ , àÇ·Õ¡ÒÃáÊ´§
µÒÁª‹Ç§àÇÅÒáÊ´§
¼ÙŒãªŒ§Ò¹·Õè໚¹¹Ñ¡àÃÕ¹ ¹Ñ¡ÈÖ¡ÉÒ
ªÁ¹Ô·ÃÃÈ¡Òà , Í‹Ò¹ ˹ѧÊ×Í , ·íÒ§Ò¹
¹Ô·ÃÃÈ¡Òà , ˌͧÊÁØ´ , Co-Working Space
10.00-20.00
¼ÙŒà¢ŒÒªÁẺ¡ÅØ‹Á
ªÁ¹Ô·ÃÃÈ¡Òà , ÊÑÁÁ¹Ò , §Ò¹»ÃЪØÁ
¹Ô·ÃÃÈ¡Òà , ˌͧ»ÃЪØÁ
10.00-20.00
¼ÙŒà¢ŒÒªÁẺ¡ÅØ‹Á¹Ñ¡·‹Í§à·ÕèÂÇ
ªÁ¹Ô·ÃÃÈ¡ÒÃ
¹Ô·ÃÃÈ¡ÒÃ
10.00-20.00
¼ÙŒà¢ŒÒ㪌ˌͧÊÁØ´ áÅÐ Co-Working Space
͋ҹ˹ѧÊ×Í , ·íÒ§Ò¹ , »ÃЪØÁÊÑÁÁ¹Ò
ˌͧÊÁØ´ , Co-Working Space
10.00-20.00
¼ÙŒªÁ¡ÒÃáÊ´§
¾Ñ¡¤Í , ªÁ¡ÒÃáÊ´§
¾Ñ¡¤Í , Auditorium
¼ÙŒà¢ŒÒÁÒ㪌ºÃÔ¡ÒÃÌҹ¤ŒÒáÅÐ ÊǹÊÒ¸ÒóÐ
à´Ô¹àÅ‹¹ , «×éÍÊÔ¹¤ŒÒ , ÃѺ»ÃзҹÍÒËÒÃ
ʋǹ¾Ñ¡¤Í , ¾×é¹·Õè¾Ò³ÔªÂ , ÌҹÍÒËÒÃ
10.00-20.00
¼ÙŒà¢ŒÒÁÒ㪌ºÃÔ¡ÒÃÌҹÍÒËÒÃ
ÃѺ»ÃзҹÍÒËÒÃ
ÌҹÍÒËÒÃ
10.00-20.00
µÒÁª‹Ç§àÇÅÒ·ÕèáÊ´§
3
USER ANALYSIS
USER
NUMBER of USER CALCULATION
¡Òäíҹdz¼ÙŒãªŒâ¤Ã§¡ÒÃ
PERFORMING AND GALLERY TYPE
ʋǹºÃÔËÒÃ
USER ½†ÒºÃÔËÒÃ,½†Ò¸ØáÒÃ,½†ÒºÑÞªÕ, ½†Ò·ÐàºÕ¹áÅоÑÊ´Ø,½†Ò¾Ѳ¹Ò¸ØáԨ
à·¤¹Ô¤¾ÔàÈÉ
§Ò¹àÍ¡ÊÒÃ
ROOM
TIME
Êíҹѡ§Ò¹
09.00-17.00
½†ÒÂÇÔªÒ¡ÒÃ,½†ÒÂÀѳ±ÒÃÑ¡É
¢Öé¹·ÐàºÕ¹áÅШѴà¡çº ´ÙáÅáÅÐÃÑ¡ÉÒªÔ¹ é §Ò¹
Êíҹѡ§Ò¹,ˌͧà¡çºªÔ鹧ҹ
09.00-21.00
½†Ò»ÃЪÒÊÑÁ¾Ñ¹¸
·íÒÊ×èÍ»ÃЪÒÊÑÁ¾Ñ¹¸ »ÃЪÒÊÑÁ¾Ñ¹¸ ã¹¾×é¹·Õè
Êíҹѡ§Ò¹,⶧µŒÍ¹ÃѺ
09.00-21.00
½†ÒÂÍÒ¤ÒÃʶҹ·Õè
´ÙáŨѴ¡ÒùԷÃÃÈ¡Òà ´ÙáÅáÅÐÃÑ¡ÉÒ¤ÇÒÁÊÐÍÒ´
ˌͧ¹Ô·ÃÃÈ¡ÒÃ,ˌͧà¡çº¢Í§, ˌͧà¡çºÍØ»¡Ã³ ·íÒ¤ÇÒÁÊÐÍÒ´
09.00-21.00
ʋǹÃÑ¡ÉÒ¤ÇÒÁ»ÅÍ´ÀÑÂ
´ÙáŤÇÒÁ»ÅÍ´ÀÑÂ㹠ʶҹ·Õè
ˌͧCCTV,·Ò§à¢ŒÒÍÒ¤ÒÃ
24 ªÁ.
ʋǹÌҹÍÒËÒÃ
ºÃÔ¡ÒÃÀÒÂã¹ÃŒÒ¹ÍÒËÒÃ
ˌͧÍÒËÒÃ,ˌͧ¾Ñ¡¾¹Ñ¡§Ò¹
09.00-21.00
½†Ò«‹ÍÁºíÒÃا
«‹ÍÁºíÒÃاÍØ»¡Ã³ ·Õè㪌¨Ñ´ áÊ´§¹Ô·ÃÃÈ¡ÒÃ
ˌͧ«‹ÍÁºíÒÃا
09.00-17.00
ˌͧ§Ò¹Ãкº
09.00-17.00
ʋǹÇÔªÒ¡ÒÃ
ʋǹºÃÔ¡ÒÃ
ACTIVITY
½†Ò§ҹÃкº
3
USER ANALYSIS
USER
NUMBER of USER CALCULATION ¡Òäíҹdz¼ÙŒãªŒâ¤Ã§¡Òà PERFORMING AND GALLERY
TIMETABLE
µÒÃÒ§àÇÅÒ
AUDIENCES EXHIBITION GENERAL PEOPLE SERVICE SECURITY GUARD ADMINISTRATORS / TECHNIC HOTEL
03.00 05.00 09.00
10.00
12.00
13.00
15.00
CUSTOMERS ADMINISTRATORS / TECHNIC SECURITY GUARD MAID SERVICE
16.00
17.00
18.00
19.00
20.00
24.00
01.00
3
USER ANALYSIS
USER
NUMBER of USER CALCULATION
3%
¡Òäíҹdz¼ÙŒãªŒâ¤Ã§¡ÒÃ
1%
PERFORMING AND GALLERY ¼ÙŒªÁ¹Ô·ÃÃÈ¡Òà 96%
¨íÒ ¹ Ç ¹ ¼ÙŒ à ¢Œ Ò ª Á ¹Ô · Ã Ã È ¡ Ò Ã Ë Í ÈÔ Å » ÇÑ ² ¹ ¸ à à Á ¡ ÃØ § à · ¾ Ï »‚
¼ÙŒà¢ŒÒªÁ
up
¹Ô·ÃÃÈ¡ÒÃËÅÑ¡
ˌͧÊÁØ´
¤³ÐàÂÕèÂÁ
¹Ô·ÃÃÈ¡ÒÃ
2558
1086955
10%
1,083,900
43106
3055
282
2559
1274736
17%
1,268,791
41186
5945
369
2560
1757970
38%
1,746,395
42801
11575
444
2561
1753682
-0.2%
1,742,555
38620
11127
416
2562
1818622
4%
1,809,784
55501
8838
467
¨íҹǹ¼ÙŒªÁ¹Ô·ÃÃÈ¡ÒÃËÅÑ¡ ¨íҹǹ¼ÙŒãªŒËŒÍ§ÊÁØ´ ¨íҹǹ¼ÙŒªÁẺ¤³Ð
¹Ô·ÃÃÈ¡ÒÃà¾ÔÁ è ¢Ö¹ é àฉÅÕ è
17 %
ÁռٌࢌҪÁà¾ÔÁ è ¢Ö¹ é àฉÅÕ è
13 %
3
USER ANALYSIS
USER
NUMBER of USER CALCULATION ¡Òäíҹdz¼ÙŒãªŒâ¤Ã§¡ÒÃ
PERFORMING AND GALLERY ¼ÙŒãªŒâ¤Ã§¡Òý˜›§¹Ô·ÃÃÈ¡ÒÃ
¼ÙŒ ã ªŒ º ÃÔ ¡ Ò Ã
ÃÇÁ 7,580 ¤¹ / Çѹ ¼ÙŒªÁ¡ÒÃáÊ´§
¼ÙŒªÁ¹Ô·ÃÃÈ¡Òà áÅÐËÇÁ¡Ô¨¡ÃÃÁ ¼ÙŒªÁ¹Ô·ÃÃÈ¡Òà áÅÐËÇÁ¡Ô¨¡ÃÃÁ
¹Ô·ÃÃÈ¡ÒÃ
ˌͧÊÁØ´ 5,700 ¤¹ / Çѹ
Co-Working space
¼ÙŒªÁ¡ÒÃáÊ´§
¤¹·ÑÇ è ä»
¤¹·ÑÇ è ä»
Auditorium
ÌҹÍÒËÒÃ
800 ·Õè¹Ñè§
1,080 ·Õè¹Ñè§
3
USER ANALYSIS
USER
NUMBER of USER CALCULATION ¡Òäíҹdz¼ÙŒãªŒâ¤Ã§¡ÒÃ
PERFORMING AND GALLERY ¼ÙŒãªŒâ¤Ã§¡Òý˜›§¹Ô·ÃÃÈ¡ÒÃ
¼ÙŒ ã ËŒ º ÃÔ ¡ Ò Ã
ÃÇÁ 106 ¤¹ ʋǹºÃÔËÒà ʋǹºÃÔËÒÃ
ʋǹÇÔªÒ¡Òà ʋǹÇÔªÒ¡ÒÃ
ʋǹºÃÔ¡ÒÃ
à·¤¹Ô¤¾ÔàÈÉ
ʋǹºÃÔ¡ÒÃ
à·¤¹Ô¤¾ÔàÈÉ
½†ÒºÃÔËÒÃ
½†ÒÂÇÔªÒ¡ÒÃ
½†Ò»ÃЪÒÊÑÁ¾Ñ¹¸
½†Ò«‹ÍÁºíÒÃا
½†Ò¸ØáÒÃ
½†ÒÂÀѳ±ÒÃÑ¡É
½†ÒÂÍÒ¤ÒÃʶҹ·Õè
½†Ò§ҹÃкº
½†ÒºÑÞªÕ
½†ÒÂÃÑ¡ÉÒ¤ÇÒÁ»ÅÍ´ÀÑÂ
½†Ò·ÐàºÕ¹áÅоÑÊ´Ø
½†ÒºÃÔ¡ÒÃÌҹÍÒËÒÃ
½†Ò¾Ѳ¹Ò¸ØáԨ
¹Ñ¡áÊ´§
4 SITE SELECTION & SITE ANALYSIS
• • • • • •
District Selection District Analysis Site Selection Site Information Site Analysis Boat Route
4
SITE CRITERIA
SITE
SITE LOCATION LOCATION CRITERIA
5 ¡ÒäÁ¹Ò¤Á ¡ÒÃࢌҶ֧Êдǡ
5
4
3
ÁÕ¹âºÒÂʹѺʹع´ŒÒ¹ÈÔŻРÁÕâ¤Ã§¡Ò÷Õèà¡ÕèÂÇ¢ŒÍ§â´ÂÃͺ
ÃͧÃѺ¼ÙŒãªŒ§Ò¹ä´Œà»š¹ ¨íҹǹÁÒ¡
ÁÕÊÒ¸ÒóٻâÀ¤ ¤Ãº¤Ãѹ
4 SITE
SITE CRITERIA
SITE LOCATION LOCATION CRITERIA
¡ÒÃàÅ×Í¡·Õµ è § Ñé â¤Ã§¡ÒÃ
ผ
¡Ãا෾
໚¹¾×é¹·Õè·ÕèÁÕ¡ÒÃà´Ô¹·Ò§áÅТ¹Ê‹§ÊÒ¸ÒóР¤Ãͺ¤ÅØÁã¹ËÅÒÂࢵ ໚¹áËÅ‹§ªØÁª¹áÅзÕ跋ͧà·ÕèÂÇ àËÁÒÐÊÁá¡‹¡ÒõÑé§â¤Ã§¡Ò÷Õ赌ͧ¡ÒÃà¼Âá¾Ã‹ÊÙ‹¤¹·ÑèÇä» áÅйѡ·‹Í§à·ÕèÂÇ
¤ÅͧÊÒ¹
à¨ÃÔÞ¡Ãا
¨µØ¨Ñ¡Ã
4
SITE CRITERIA
SITE
SITE LOCATION LOCATION CRITERIA ‹ҹ¤ÅͧÊÒ¹ ºÃÔº·ã¹à¢µ¨µØ¨¡ Ñ Ã 1
2
âçàÃÕ¹àµÃÕÂÁÍØ´ÁÈÖ¡ÉÒ âçàÃÕ¹¾Ñ²¹ÒÇÔ·ÂÒ âçàÃÕ¹ÈÖ¡ÉÒ¹ÒÃÕ âçàÃÕ¹ÇÑ´ÊØ·¸ÔÇÃÒÃÒÁ âçàÃÕ¹ʵÃÕÇر²ÔÈÖ¡ÉÒ
3
4
äͤ͹ÊÂÒÁ àʹÒà¿Êµ ÅŒ§1919 á¨Áῤ·ÍÃÕè
¾Ô¾Ô¸Àѳ± ÊǹÊÁà´ç¨Â‹Ò ¾Ô¾Ô¸Àѳ± ·ŒÍ§¶Ô蹡Ãا෾ ࢵ¤ÅͧÊÒ¹
Èٹ ÃÇÁ·ÕÊ è íÒ¤ÑÞã¹à¨ÃÔÞ¡Ãا 1
ʶҺѹ¡ÒÃÈÖ¡ÉÒ
3
2
ÅŒ§1919
äͤ͹ÊÂÒÁ á¨Áῤ·ÍÃÕ
4
àʹÒà¿Êµ
4
SITE CRITERIA
SITE
SITE LOCATION LOCATION CRITERIA
ࡳ± àÅ×͡‹ҹ·Õµ è § Ñé â¤Ã§¡Òà ¤ÅͧÊÒ¹
ö俿‡ÒÊÒÂÊշͧ 5 àÊŒ¹ ·Ò§ ö俿‡ÒáÅÐʶҹÕàª×èÍÁµ‹Í·‹Ò¾ÃÐ ¨Ð·íÒãËŒ¡ÒÃà´Ô¹·Ò§´ŒÇ¢¹Ê‹§ ÊÒ¸ÒóÐÊдǡÁÒ¡ÂÔ觢Öé¹
äͤ͹ÊÂÒÁ áÅЋҹ¡ÒäŒÒ ãËÁ‹æ ´Ö§´Ù´¡ÅØ‹ÁÅÙ¡¤ŒÒãˌࢌÒÁÒ㹠‹ҹÁÒ¡¢Öé¹
¡ÒÃÇÔÇѲ¹ ‹ҹࡋÒá¡‹ÊÙ‹ÊÕÊѹáË‹§ ¹Çѵ¡ÃÃÁàÁ×ͧ
4
SITE CRITERIA
SITE
SITE LOCATION LOCATION CRITERIA ‹ҹà¨ÃÔÞ¡Ãا ºÃÔº·ã¹à¢µ¨µØ¨Ñ¡Ã âçàÃÕ¹ÍÑÊÊÑÁªÑÞ âçàÃÕ¹ÍÑÊÊÑÁªÑÞÈÖ¡ÉÒ âçàÃÕ¹¡Ãا෾¤ÃÔÊàµÕ¹ âçàÃÕ¹ૹµ ËÅØÂÊ ÈÖ¡ÉÒ âçàÃÕ¹ૹµ âÂà«¿µÍ¹àǹµ
1
3
Silom Complex Silom Night Market Jewelry Trade Center Thailand River City Bangkok Asiatique The Riverfront µÅÒ´¡ÅÒ§¤×¹¾Ñ²¹ ¾§É
Èٹ ÊÌҧÊÃä §Ò¹Í͡Ẻ (TCDC) Warehouse 30
2
Èٹ ÃÇÁ·ÕèÊíÒ¤ÑÞã¹à¨ÃÔÞ¡Ãا 1
4
Silom Complex
Jewelry Trade Center Thailand ʶҹÈÖ¡ÉÒ 3 TCDC Warehouse 30
2
4
Asiatique The Riverfront
4
SITE CRITERIA
SITE
SITE SELECTION LOCATION CRITERIA
ࡳ± àÅ×͡‹ҹ·Õµ è § Ñé â¤Ã§¡Òà à¨ÃÔÞ¡Ãا
໚ ¹ ‹ Ò ¹ÈÙ ¹  ¡ ÅÒ§·Ò§àÈÃÉ°¡Ô ¨ (CBD) ·ÕèàµçÁä»ÊÒ¸ÒóٻâÀ¤µ‹Ò§ æ ÁÒ¡ÁÒÂ
໚ ¹ ‹ Ò ¹·Õè ÁÕ ¤ ÇÒÁËÅÒ¡ËÅÒ ·Ò§àª×éÍªÒµÔ áÅÐÈÔÅ»ÇѲ¹¸ÃÃÁ
໚¹Â‹Ò¹·ÕèÂѧÁչѡŧ·Ø¹ÁÒŧ·Ø¹ â¤Ã§¡Òõ‹ Ò § æ ÍÂÙ‹ ä Á‹ ¢ Ò´ÊÒ à¾ÃÒÐ໚¹¾×é¹·ÕèÈÑ¡ÂÀÒ¾·ÕèÊÒÁÒö ¾Ñ²¹Òµ‹Íä´Œã¹Í¹Ò¤µ
4
SITE CRITERIA
SITE
SITE LOCATION LOCATION CRITERIA ‹ҹ¨µØ¨Ñ¡Ã ºÃÔº·ã¹à¢µ¨µØ¨Ñ¡Ã 1
ÁËÒÇÔ·ÂÒÅÑÂà¡ÉµÃÈÒʵà ÁËÒÇÔ·ÂÒÅÑÂÈÃÕ»ÃзØÁ ÇÔ·ÂÒÅÑÂÍÒªÕÇÈÖ¡ÉÒÊѹµÔÃÒÉฎà âçàÃÕ¹ÊÒÁàʹÇÔ·ÂÒÅÑÂ2 âçàÃÕ¹ÇѴ伋µÑ¹ âçàÃÕ¹ËÍÇѧ âçàÃÕ¹ª‹Ò§½‚Á×Í·ËÒÃ
ૹ·ÃÑÅÅÒ´¾ÃŒÒÇ ÂÙà¹Õ¹ÁÍÅÅ à¨à¨ÁÍÅÅ µÅÒ´¹Ñ´¨µØ¨Ñ¡Ã
¾Ô¾Ô¸Àѳ± ÈÔÅ»ÐËÇÁÊÁÑÂ(MOCA) ¾Ô¾Ô¸Àѳ± à´ç¡¡Ãا෾ÁËÒ¹¤Ã
ʶҹաÅÒ§ºÒ§«×èÍ
Èٹ ÃÇÁ·ÕèÊíÒ¤ÑÞã¹à¨ÃÔÞ¡Ãا 2
1
¾Ô¾Ô¸Àѳ± ÈÔÅ»Ðä·ÂËÇÁÊÁÑ ÁËÒÇÔ·ÂÒÅÑÂà¡ÉµÃÈÒʵÃ
2
ૹ·ÃÑžÅÒ«ÒÅÒ´¾ÃŒÒÇ ÂÙà¹Õ¹ÁÍÅÅ âÎÁâ»ÃÅÒ´¾ÃŒÒÇ
4 3
3
µÅÒ´¹Ñ´¨µØ¨Ñ¡Ã à¨à¨ÁÍÅÅ ºÒ§«×èͨѧ¡ ªÑ¹ªÍ»» § œ ૹàµÍà ¾Ô¾Ô¸Àѳ± à´ç¡ ¡Ãا෾ÁËÒ¹¤Ã
4
ʶҹաÅÒ§ºÒ§«×èÍ
4
SITE CRITERIA
SITE
SITE LOCATION LOCATION CRITERIA
ࡳ± àÅ×͡‹ҹ·Õµ è § Ñé â¤Ã§¡Òà ¨µØ¨Ñ¡Ã
¾×é¹·ÕèµÑ駢ͧÊѧ¤Á¤Ø³ÀÒ¾ ÁÕ ÊÒ¸ÒóٻâÀ¤¤Ãº¤Ãѹ áÅдŒÇÂÁÕ Ê¶Ò¹Õ¡ÅÒ§ºÒ§«×èÍ·íÒãËŒ¨µØ¨Ñ¡ÃàÃÔèÁ à¨ÃÔÞàµÔºâµ¢Öé¹Í‹ҧÁÒ¡
¾×é¹·ÕèáË‹§äÅ¿ŠÊäµÅ ·ÕèËÅÒ¡ËÅÒ ໚¹¨Ø´àÃÔèÁµŒ¹¢Í§¹Ñ¡Í͡Ẻ ËÅÒÂ椹 ´ŒÇ¡ÒÃÊÌҧÊÃä ¼Å§Ò¹ã¹Â‹Ò¹·ÕèàµçÁä»´ŒÇÂÈÔÅ»Ð
àÁ¡Ðâ»Ãਤ¢Í§ÃÑ°ºÒÅ ¾Ñ²¹Ò ¾×é¹·Õè‹ҹ¨µØ¨Ñ¡ÃãËŒÁÕ»ÃÐÊÔ·¸ÔÀÒ¾ áÅй‹Òʹ㨠´Ö§´Ù´¡ÅØ‹ÁÅÙ¡¤ŒÒä´Œ ÁÒ¡¢Öé¹
4
SITE CRITERIA
SITE
SITE LOCATION LOCATION CRITERIA
¤ÅͧÊÒ¹
à¨ÃÔÞ¡Ãا
¨µØ¨Ñ¡Ã
ÊÃØ»¡ÒÃàÅ×Í¡ ‹ҹ·ÕèµÑé§ ÍÒ¤Òà 1x5=5
2 x 5 = 10
2 x 5 = 10
2 x 5 = 10
3 x 5 = 15
1x5=5
2x4=8 1x3=3
26
3 x 4 = 12 3x3=9
46
3 x 4 = 12 3x3=9
36
4
SITE SELECTION
SITE
SITE SELECTION ࡳ± ·Õè㪌㹡ÒÃàÅ×Í¡·ÕèµÑé§ 5 point
5 point
Transportation
Public Transportation
view
Site’s shape
5 point
5 point
5 point
5 point
art Landmark
nodes
Site’s price
City plan
5 point
5 point
5 point
community
law
5 point
4
SITE LOCATION
SITE
SITE LOCATION CHAROEN KRUNG Rd.
·ÕèµÑé§â¤Ã§¡Òà 1
·ÕèµÑé§â¤Ã§¡Òà 2
¶¹¹à¨ÃÔÞ¡Ãا 2
1
·ÕèµÑé§â¤Ã§¡Òà 3
·ÕèµÑé§â¤Ã§¡Òà 4
ʶҹÕÊØÃÈÑ¡´Ôì ʶҹÕÊоҹµÒ¡ÊÔ¹ ·‹ÒàÃ×ÍÊҸà 4
3
4
SITE LOCATION
SITE
SITE LOCATION CHAROEN KRUNG Rd.
VIEW
ʶҹÕÊоҹµÒ¡ÊÔ¹ ·‹ÒàÃ×ÍÊÒ¸Ã
Node
BTS
Road
1
ʶҹÕÊØÃÈÑ¡´Ôì
·ÕèµÑé§ 1 ¾×é¹·Õè : 31,236 µÃ.Á 7,809 µÃ.ÇÒ ¼Ñ§ÊÕ : ¾×é¹·ÕèÊÕ¹éíÒµÒÅ Â.11-26 FAR : 6 ¾×é¹·Õ· è ãÕè ªŒä´Œ : 187,416 µÃ.Á. OSR : 5 ¾×é¹·Õ¹ è Ò í «ÖÁ¼‹Ò¹ : 1,561.80 µÃ.Á.
Èٹ ÊÌҧÊÃä §Ò¹Í͡Ẻ (TCDC) Warehouse30 ¢ŒÍÁÙÅ·ÑèÇä»
ö俿‡ÒʶҹÕÊØÃÈÑ¡´Ôì äͤ͹ÊÂÒÁ ·‹ÒàÃ×ÍÊҸà ÊÕÅÁ¾ÅÒ«Ò µÅÒ´ºÒ§ÃÑ¡
ÃÒ¤Ò·Õè´Ô¹ 215,000 / µÃ.ÇÒ 1,678,935,000 ºÒ·
4
SITE LOCATION
SITE
SITE LOCATION CHAROEN KRUNG Rd.
VIEW
ʶҹÕÊоҹµÒ¡ÊÔ¹ ·‹ÒàÃ×ÍÊÒ¸Ã
Node
BTS
2
Road
ʶҹÕÊØÃÈÑ¡´Ôì
·ÕèµÑé§ 2 ¾×é¹·Õè : 21,330 µÃ.Á 5,332 µÃ.ÇÒ ¼Ñ§ÊÕ : ¾×é¹·ÕèÊÕ¹éíÒµÒÅ ¾.8-7 FAR : 10 ¾×é¹·Õ· è ãÕè ªŒä´Œ : 213,330 µÃ.Á. OSR : 3 ¾×é¹·Õ¹ è Ò í «ÖÁ¼‹Ò¹ : 639.90 µÃ.Á.
Èٹ ÊÌҧÊÃä §Ò¹Í͡Ẻ (TCDC) Warehouse30 ¢ŒÍÁÙÅ·ÑèÇä»
ö俿‡ÒʶҹÕÊØÃÈÑ¡´Ôì äͤ͹ÊÂÒÁ ·‹ÒàÃ×ÍÊҸà ÊÕÅÁ¾ÅÒ«Ò µÅÒ´ºÒ§ÃÑ¡
ÃÒ¤Ò·Õè´Ô¹ 215,000 / µÃ.ÇÒ 1,146,380,000 ºÒ·
4
SITE LOCATION
SITE
SITE LOCATION CHAROEN KRUNG Rd.
VIEW
ʶҹÕÊоҹµÒ¡ÊÔ¹ ·‹ÒàÃ×ÍÊÒ¸Ã
Node
BTS
Road
ʶҹÕÊØÃÈÑ¡´Ôì 3
·ÕèµÑé§ 3 ¾×é¹·Õè : 29,479 µÃ.Á 7,369 µÃ.ÇÒ ¼Ñ§ÊÕ : ¾×é¹·ÕèÊÕ¹éíÒµÒÅ Â.11-26 FAR : 6 ¾×é¹·Õ· è ãÕè ªŒä´Œ : 206,353 µÃ.Á. OSR : 5 ¾×é¹·Õ¹ è Ò í «ÖÁ¼‹Ò¹ : 1,326.55 µÃ.Á.
Èٹ ÊÌҧÊÃä §Ò¹Í͡Ẻ (TCDC) Warehouse30 ¢ŒÍÁÙÅ·ÑèÇä»
ö俿‡ÒʶҹÕÊØÃÈÑ¡´Ôì äͤ͹ÊÂÒÁ ·‹ÒàÃ×ÍÊҸà ÊÕÅÁ¾ÅÒ«Ò µÅÒ´ºÒ§ÃÑ¡ ÊÕÅÁ¤ÍÁà¾Åç¡«
ÃÒ¤Ò·Õè´Ô¹ 97,500 / µÃ.ÇÒ 718,477,500 ºÒ·
4
SITE LOCATION
SITE
SITE LOCATION CHAROEN KRUNG Rd.
VIEW
ʶҹÕÊоҹµÒ¡ÊÔ¹ ·‹ÒàÃ×ÍÊÒ¸Ã
Node
BTS
Road
·ÕèµÑé§ 4 4
¾×é¹·Õè : 29,717 µÃ.Á 7,429 µÃ.ÇÒ ¼Ñ§ÊÕ : ¾×é¹·ÕèÊÕ¹éíÒµÒÅ Â.13-28 FAR : 7 ¾×é¹·Õ· è ãÕè ªŒä´Œ : 208,019 µÃ.Á. OSR : 4.5 ¾×é¹·Õ¹ è Ò í «ÖÁ¼‹Ò¹ : 1,337.27 µÃ.Á.
Èٹ ÊÌҧÊÃä §Ò¹Í͡Ẻ (TCDC) Warehouse30 ¢ŒÍÁÙÅ·ÑèÇä»
ö俿‡ÒʶҹÕÊØÃÈÑ¡´Ôì äͤ͹ÊÂÒÁ ·‹ÒàÃ×ÍÊҸà ÊÕÅÁ¾ÅÒ«Ò µÅÒ´ºÒ§ÃÑ¡ ÊÕÅÁ¤ÍÁà¾Åç¡«
ÃÒ¤Ò·Õè´Ô¹ 155,000 / µÃ.ÇÒ 718,477,500 ºÒ·
4
SITE LOCATION
SITE
SITE LOCATION CHAROEN KRUNG Rd. 3 ´ÕÁÒ¡
2 »Ò¹¡ÅÒ§ 5
1 ¹ŒÍ 5
4
4
4
4
3
2
2
2
total
SITE
1
3 x 5 15
5 x 5 25
1 x4 4
3 x 4 12
5x 4 20
5 x 4 20
5 x 3 15
3x 2 6
5 x 2 10
5 x2 10
137
2
3 x 5 15
5 x 5 25
1 x4 4
3 x 4 12
5x 4 20
5 x 4 20
4x 3 12
4x 2 8
5 x 2 10
2 x2 4
130
3
4 x 5 20
3 x 5 15
1 x4 4
2 x4 8
3x 4 12
1 x4 4
3x 3 9
5x 2 10
4x2 8
5 x2 10
100
4
3 x 5 15
1 x5 5
5 x 4 20
5 x 4 20
1x4 4
5 x 4 20
4x 3 12
4x 2 8
4x2 8
5 x2 10
122
4
SITE EXISTING
SITE
SITE EXISTING BTS ÊоҹµÒ¡ÊÔ¹ ÇÑ´ÂÒ¹¹ÒÇÒ
SITE
·ÕèµÑé§ : ºÃÔÉÑ· ÍÙ‹¡Ãا෾ ¨íÒ¡Ñ´ ¶¹¹à¨ÃÔÞ¡Ãا á¢Ç§ÂÒ¹¹ÒÇÒ à¢µÊÒ·Ã ¡Ãا෾ÁËÒ¹¤Ã
¼Ñ§ÊÕ : ·ÕèµÑé§ÍÂÙ‹ã¹à¢µ¼Ñ§ÊÕ¹éíÒµÒÅ Â.11-12 ¾×é¹·Õ· è § Ñé ËÁ´ : 31,236 µÃ.Á. ÁËÒÇÔ·ÂÒÅÑ ෤â¹âÅÂÕÃÒªÁ§¤Å ¡Ãا෾㵌
FAR : 6 OSR : 5
ÈÒÅᾋ§¡Ãا෾㵌
¢¹Ò´·Õµ è § Ñé 86.5 m.
89.2 m. 78.8 m.
192 m.
SITE 123.4 m.
¢¹Ò´·Õ´ è ¹ Ô : 31,236 µÒÃÒ§àÁµÃ 㪌¾¹ ×é ·Õäè ´Œ : 187,416 µÒÃÒ§àÁµÃ
181 m.
ÃÒ¤Ò·Õ´ è ¹ Ô ·Ñ§ é ËÁ´ : 215,000 ºÒ· µ‹ÍµÒÃÒ§ÇÒ ÃÒ¤Ò·Õ´ è ¹ Ô ·Ñ§ é ËÁ´ : 1,678,935,000 ŌҹºÒ·
ÃÐÂзҧ¨Ò¡·Õµ è é§ Ñ ¨¹¶Ö§ÊÒ¸ÒóٻâÀ¤ ¨Ò¡·ÕèµÑé§ä»Âѧö俿‡Ò BTS ÃÐÂзҧ 500 àÁµÃ ¨Ò¡·ÕèµÑé§ä»ÂѧÇÑ´ÂÒ¹¹ÒÇÒ ÃÐÂзҧ 150 àÁµÃ ¨Ò¡·ÕèµÑé§ä»ÂѧÁËÒÇÔ·ÂÒÅÑÂà·¤â¹âÅÂÕÃÒªÁ§¤Å ¡Ãا෾㵌 ÃÐÂзҧ 150 àÁµÃ ¨Ò¡·ÕèµÑé§ä»ÂѧÈÒÅᾋ§¡Ãا෾㵌 ÃÐÂзҧ 200 àÁµÃ
4
SITE EXISTING
SITE
SITE EXISTING CHAROEN KRUNG Rd.
4
SITE EXISTING
SITE
SITE EXISTING DOCKS
3
DOCK ANALYSIS
2 1
DOCK
1
2 ÁÕ¤ÇÒÁÅÖ¡ 7 àÁµÃ ÁÕ ºÑ¹ä´Êͧ½˜›§ áÅÐ ´ŒÒ¹¢ŒÒ§ÁÕÅѡɳÐ໚¹ ¢Ñé¹ ÁÕ»Ãе١Ñé¹¹éíÒ ¤Í¹¡ÃÕµË¹Ò 1 àÁµÃ
á·‹¹ÊíÒËÃѺ ÂÖ´àÃ×Í
¢Ñ鹺ѹä´ÊíÒËÃѺ ÇÒ§ÍØ»¡Ã³ à¾×èÍ «‹ÍÁàÃ×Í
ºÑ¹ä´ 7.00 m.
ºÃÔàdzÍÙ‹àÃ×Í ¨ÐÁÕʋǹ·ÕèàËÁ×͹¡Ñ¹ ¤×Í Ê‹Ç¹·Õè 1 áÅÐ 2 ¨ÐÁÕ¤ÇÒÁÊÙ§ áÅÐÅѡɳÐàËÁ×͹¡Ñ¹¤×Í ÁÕ¤ÇÒÁ ÅÖ¡ 7 àÁµÃ áÅÐʋǹ·Õè 3 ¨ÐÁÕ ¤ÇÒÁÅÖ¡ 4 àÁµÃ ·Ñé§ 3 ʋǹ¹ÕéÁÕ Ë¹ŒÒ·Õè㹡ÒÃÃѺàÃ×Í â´Â·Õè·Ñé§ 3 ʋǹ¨ÐÁÕ»Ãе١Ñé¹¹éíÒ·ÕèÊÒÁÒö à» ´» ´ä´Œ
DOCK
3 ÁÕ¤ÇÒÁÅÖ¡ 4 àÁµÃ ໚¹ Slope ÅÒ´Å§ä» ´ŒÒ¹áÁ‹¹éíÒ ÁÕ»Ãе١Ñé¹ ¹éíҤ͹¡ÃÕµË¹Ò 1 àÁµÃ
4 SITE
SITE EXISTING SITE EXISTING ºÃÔàdz´ŒÒ¹Ë¹ŒÒ¢Í§·ÕèµÑé§ µÔ´ ¡Ñº¶¹¹à¨ÃÔÞ¡Ãا໚¹¶¹¹ 4 àŹ ÁտصºÒ·¡ÇŒÒ§ 2 àÁµÃ áÅÐÁÕµÖ¡á¶Ç´ŒÒ¹Ë¹ŒÒ
Outside In
áÁ‹¹Ò éí ਌ҾÃÐÂÒ ÇÑ´ÂÒ¹¹ÒÇÒ
¾×é¹·Õ贌ҹ˹ŒÒ·ÕèµÑ駨ÐÁÕµÖ¡á¶Ç ໚¹ÍÒ¤ÒÃÊÙ§ 3-4 ªÑé¹ µÔ´ÃÔÁ ¶¹¹à¨ÃÔÞ¡Ãا
ÁØÁÁͧ·ÕèÁͧ¨Ò¡áÁ‹¹éíÒ à¨ŒÒ¾ÃÐÂÒ Ê‹Ç¹»ÅÒ¢ͧ·ÕèµÑé§ ¨Ð໚¹Ê‹Ç¹¢Í§ÍÙ‹µ‹ÍàÃ×Í ·ÕèÁÕ »Ãе١Ñé¹¹éíÒÊÙ§ 7 àÁµÃ áÅÐ 4 àÁµÃ
ÁØÁÁͧ·ÕèÁͧ¨Ò¡Ã¶ä¿¿‡Ò àËç¹ ºÃÔàdzâ´ÂÃͺ ·ÕèÁÕ·Ñé§ÇÑ´ÂÒ¹ ¹ÒÇÒ Ê‹Ç¹¢Í§ÍÙ‹µ‹ÍàÃ×Í áÅÐ µÖ¡á¶Çâ´ÂÃͺ
SITE µÖ¡á¶ÇÊÙ§ 3-4 ªÑé¹
¶¹¹à¨ÃÔÞ¡Ãا
¨Ò¡ÁØ ÁÁͧ¡ÒÃÁÍ§à¢ŒÒ ä»Âѧ ·ÕèµÑé §â¤Ã§¡ÒþºÇ‹ Ò ÁØÁ Áͧ·Õè ´Ö § ´Ù ´ ÊÒµÒáÅй‹ Ò Ê¹ã¨ ¤× Í ÁØ Á Áͧ¨Ò¡ ´Œ Ò ¹Ë¹Œ Ò â¤Ã§¡Òà à¹×è ͧ¨Ò¡à»š ¹ àÊŒ ¹·Ò§¡Òü‹ Ò¹¢Í§¶¹¹à¨ÃÔÞ¡ÃØ § ÁØ ÁÁͧ¨Ò¡ áÁ‹¹éíÒ਌ҾÃÐÂÒ áÅÐÁØÁÁͧ¨Ò¡Ã¶ä¿¿‡Ò ·Ñé§Êͧ½˜›§à»š¹àÊŒ¹·Ò§ ¡ÒÃÊÑ Þ ¨Ã·Ñé § ·Ò§àÃ× Í áÅзҧÃÒ§ «Öè § ÊÒÁÒöÁͧàËç ¹ â¤Ã§¡ÒÃä´ŒªÑ´à¨¹
4 SITE
SITE EXISTING SITE EXISTING ÁØÁÁͧ´ŒÒ¹Ë¹ŒÒ·ÕèÁͧÍÍ¡ÁҨР໚¹¶¹¹à¨ÃÔÞ¡Ãا 57 â´Â¢¹Òº ¢ŒÒ§â´Â µÖ¡á¶Ç·Õè໚¹¸¹Ò¤ÒÃáÅÐ ÁËÒÇÔ·ÂÒÅÑÂà·¤â¹âÅÂÕÃÒªÁ§¤Å ¡Ãا෾
Inside Out µÖ¡ÊÙ§
áÁ‹¹Ò éí ਌ҾÃÐÂÒ
SITE
ÁØÁÁͧ·ÕèÁͧÍÍ¡¨Ò¡·ÕèµÑé§ µÔ´ÃÔÁ áÁ‹¹éíÒ਌ҾÃÐÂÒ ½˜›§µÃ§¢ŒÒÁ໚¹ ºŒÒ¹¾Ñ¡ÍÒÈÑ áÅÐÍÒ¤ÒþҳԪ µÖ¡á¶Ç ÍÒ¤Òà ¾Ò³ÔªÂ
ÁØÁÁͧ·ÕèÁͧÍÍ¡¨Ò¡·ÕèµÑé§ µÔ´ÃÔÁ áÁ‹¹éíÒ਌ҾÃÐÂÒ ÍÕ¡½˜›§¨Ð໚¹µÖ¡ÊÙ§ áÅÐÁÕàÊŒ¹·Ò§¡ÒäÁ¹Ò¤Á·Ò§ÃÒ§ ÇÔ觼‹Ò¹áÁ‹¹éíÒ਌ҾÃÐÂÒ
ÁØÁÁͧ´ŒÒ¹Ë¹ŒÒ·ÕèµÑé§â¤Ã§¡Òà ¨Ð ໚¹¶¹¹à¨ÃÔÞ¡ÃاáÅн˜›§µÃ§¢ŒÒÁ ໚¹ÁËÒÇÔ·ÂÒÅÑÂà·¤â¹âÅÂÕÃÒª Á§¤Å¡Ãا෾ áÅÐÁÕ»‡ÒÂöàÁÅ ºÃÔàdz˹ŒÒÁËÒÇÔ·ÂÒÅÑÂ
ÇÑ´ÂÒ¹¹ÒÇÒ
ÁËÒÇÔ·ÂÒÅÑ ෤â¹âÅÂÕÃÒª Á§¤Å¡Ãا෾
µÖ¡á¶Ç ÍÒ¤Òà ¾Ò³ÔªÂ
ÁØ Á Áͧ·Õè Ê‹ § àÊÃÔ Á â¤Ã§¡Òà ໚ ¹ ÁØ Á Áͧ¨Ò¡½˜› § ÃÔ Á áÁ‹ ¹éí Ò à¨Œ Ò ¾ÃÐÂÒ áÅÐÁØ Á Áͧ¨Ò¡ºÃÔ à dzö俿‡ Ò à¹×è Í §¨Ò¡ ໚ ¹ ºÃÔ à dz·Õè à »š ¹ àÊŒ ¹ ·Ò§¡ÒÃÊÑ Þ ¨Ã ÍÕ ¡ ·Ñé § ໚ ¹ ºÃÔ à dz໠´ âÅ‹ § ÁͧàËç¹µÑÇâ¤Ã§¡ÒêѴਹ áÅÐÁØÁÁͧ·ÕèÁͧÍÍ¡ä» à»š¹ÁØÁÁͧ ·ÕèÊǧÒÁ
4
SITE SURROUNDING
SITE
SITE SURROUNDING TRANSPORTATION ·‹ÒàµÕ¹
·‹Ò»Ò¡¤ÅͧµÅÒ´ ·‹ÒàÃ×ÍÊÕ¾ è ÃÐÂÒ ·‹ÒàÃ×Í IconSiam
BTS ǧàÇÕ¹ãËÞ‹
BTS ¡Ãا¸¹ºØÃÕ BTS ÊоҹµÒ¡ÊÔ¹ ·‹ÒàÃ×ÍÊÒ·Ã SITE
·‹ÒàÃ×ÍÇÑ´ÃÒªÊÔ§¢Ã ·‹ÒàÃ×Í àÍàªÕ·դ
BTS ÊØÃÈÑ¡´Ôì
4 SITE
SITE SURROUNDING
SITE SURROUNDING TRANSPORTATION
¶¹¹à¨ÃÔÞÃÒÉฎÃ
¶¹¹à¨ÃÔÞ¹¤Ã SITE
·Ò§¾ÔàÈÉÈÃÕê Ñ ¶¹¹à¨ÃÔÞ¡Ãا
4
SITE SURROUNDING
SITE
SITE SURROUNDING LANDMARK : TOURIST ATTRACTION ÅŒ§
The river city
The Jam Factory äͤ͹ÊÂÒÁ TCDC
SITE
àÍàªÕ·դ
4 SITE
SITE SURROUNDING
SITE SURROUNDING HOTEL MILLENNIUM HILTON BANGKOK
ICONSIAM HOTEL
MANDARIN ORENTAL PENINSULA BANGKOK HOTEL CENTRE POINT HOTEL SILOM
SITE
FOUR SEASONS PRIVATE RESIDENCES
CHATRIUM HOTEL RIVERSIDE BANGKOK
4 SITE
SITE SURROUNDING
SITE SURROUNDING ACADEMY
âçàÃÕ¹ÊѨ¨¾Ô·ÂÒ
âçàÃÕ¹ÇÑ´ÂÒ¹¹ÒÇÒ SITE
âçàÃÕ¹ÇÑ´ÊØ·¸ÔÇÃÒÃÒÁ
âçàÃÕ¹â¡ÈÅÇÔ·ÂÒ âçàÃÕ¹ʵÃÕÈÃÕÊÃ Ø Ôâ·ÑÂ
ÁËÒÇÔ·ÂÒÅÑÂà·¤â¹âÅÂÕÃÒªÁ§¤Å¡Ãا෾ (¾Ãй¤Ã㵌)
âçàÃÕ¹ÇÑ´´Í¹
4
SITE SURROUNDING
SITE
SITE SURROUNDING
BOAT ROUTE
Icon Siam
Si Phraya
¤ÅͧÊÒ¹
Si Phraya ÇÑ ´ Á‹ Ç § á ¤
ÇÑ ´ ÊØ Ç Ã Ã ³
Icon Siam
Oriental
Dumex
Ê Ç ¹ ¾ ÅÙ
Sathorn
Sathorn
ÇÑ ´ Á‹ Ç § á ¤
SITE
ÇÑ ´ à È Ç µ Ã ฉÑ µ Ã ÇÑ ´ ÊØ Ç Ã Ã ³
ÇÑ ´ Ç Ã ¨ Ã Ã Â Ò Ç Ò Ê
Oriental Dumex
ÇÑ ´ Ã Ò ª ÊÔ § ¢ Ã Ê Ç ¹ ¾ ÅÙ
Sathorn
Asiatique
Sathorn
ÇÑ ´ à È Ç µ Ã ฉÑ µ Ã
·‹ÒàÃ×Í
Central Pier
Major Tourist Area
Chao Phraya Express Boat
ÇÑ ´ Ç Ã ¨ Ã Ã Â Ò Ç Ò Ê
ÇÑ ´ Ã Ò ª ÊÔ § ¢ Ã
Asiatique
·Ò§àÃ×Í
Chao Phraya Express Boat
Cross-river Ferries
4
SITE SURROUNDING
SITE
SITE SURROUNDING SHUTTLE BOAT ROUTE
SERVICE BOAT ROUTE
Project Express Boat Si Phraya
Icon Siam
Si Phraya
Oriental The Peninsula Bangkok
Icon Siam
Shangri-la Hotel
Sathorn
Sathorn SITE
Oriental
The Peninsula Bangkok
Sathorn
Chatrium Hotel Riverside Shangri-la Hotel
Asiatique
Sathorn
THE DOCK
Shangri-la Hotel
à ÊŒ ¹ · Ò § à ´Ô ¹ à Ã× Í á Å Ð ·‹ Ò à Ã× Í ·Õè à ·Õ Â º Central Pier
Asiatique
PIER CONNECTION
Charoenkrung, Bangkok
Hotels
Shopping Center
4
SITE ANALYSIS
SITE
SITE ANALYSIS POLLUTION
ÁžÔÉ·Ò§àÊÕ§¨Ò¡¶¹¹à¨ÃÔÞ¡Ãا ´ŒÒ¹·ÔȵÐÇѹÍÍ¡àฉÕ§à˹×Í
ÁžÔÉ·Ò§½Ø†¹¨Ò¡¶¹¹à¨ÃÔÞ¡Ãا ´ŒÒ¹·ÔȵÐÇѹÍÍ¡àฉÕ§à˹×Í
ÃдѺ¹éÒ í ã¹áÁ‹¹Ò éí ਌ҾÃÐÂÒ
ÃдѺ¹éíÒµèíÒÊØ´ 0.80 Á. ÃдѺ¹éíÒÊÙ§ÊØ´ 1.40 Á.
ÃдѺ¹éíÒàฉÅÕè 1.10 Á.
4
SITE ANALYSIS
SITE
LAW
¡ฎ¡ÃзÃǧฉºÑº·Õè 7 - ·Ò§à¢ŒÒÍÍ¡¢Í§Ã¶Â¹µ ¡ÇŒÒ§äÁ‹¹Í Œ Â¡Ç‹Ò 6 Á. - ¡Ã³Õ¶¹¹àŹà´ÕÂǵŒÍ§¡ÇŒÒ§äÁ‹¹Í Œ Â¡Ç‹Ò 3.50 Á.
áÁ‹¹éíÒ਌ҾÃÐÂÒ
¡ฎ¡ÃзÃǧฉºÑº·Õè 33
SITE
¶¹¹à¨ÃÔÞ¡Ãا SITE 6 àÁµÃ
ÍÒ¤ÒÃÊÙ§ËÃ×ÍÍÒ¤Òâ¹Ò´ãËÞ‹ ¾ÔàÈÉ µŒÍ§ÁÕ¼ÔǨÃҨánjҧäÁ‹¹ŒÍ ¡Ç‹Ò 6 àÁµÃ »ÃÒȨҡÊÔ觻¡¤ÅØÁ ÃͺÍÒ¤ÒÃ
¢ŒÍºÑÞÞѵ¡ Ô Ãا෾ÁËÒ¹¤Ã
- ¢ŒÍºÑÞÞÑµÔ ¡Ãا෾ÁËÒ¹¤Ã àÃ×èͧ¡ÒÃËŒÒÁ·íÒ¡Òà ¡‹ÍÊÌҧÍÒ¤ÒúÃÔàdz ÃÔÁáÁ‹¹éíÒ
- ¡ฎ¡ÃзÃǧฉºÑº·Õè 7 ¡Ò÷íҷҧࢌÒÍ͡ö¹µ - ¡ฎ¡ÃзÃǧฉºÑº·Õè 33 ÃÐÂÐ˹ÍÒ¤Òâ¹Ò´ãËÞ‹ - ¡ฎ¡ÃзÃǧฉºÑº·Õè 55 ¤ÇÒÁÊÙ§¢Í§ÍÒ¤ÒÃ
1
ÃÐÂÐ 0-3 àÁµÃ áá ËŒÒÁÊÌҧÍÒ¤ÒÃã´ æ àÅÂ
2
ÃÐÂÐ 3-15 àÁµÃ ÊÌҧÍÒ¤ÒÃÊ٧䴌äÁ‹à¡Ô¹ 8 àÁµÃ
3
ÃÐÂÐ 15-45 àÁµÃ ÊÌҧÍÒ¤ÒÃÊ٧䴌äÁ‹à¡Ô¹ 16 àÁµÃ
4
¤ÇÒÁÊÙ§µÒÁ¡¯¡ÃзÃǧฉºÑº·Õè 55
4
SITE ANALYSIS
SITE
LAW ¡ฎ¡ÃзÃǧฉºÑº 55 ¡ฎËÁÒÂÃÐÂЋ¹ÃÔÁáÁ‹¹éíÒ
SETBACK LAW
¢ŒÍºÑÞÞѵ¡ Ô Ãا෾ÁËÒ¹¤Ã ¡Òá‹ÍÊÌҧÍÒ¤ÒÃÃÔÁáÁ‹¹Ò éí â¤Ã§ÊÌҧÍÒ¤ÒÃäÁ‹·íÒãËŒ·ÔÈ·Ò§¡Òà äËŢͧ¹éíÒà»ÅÕè¹á»Å§ ÁÕª‹Í§â»Ã‹§ ÃÐËÇ‹Ò§àÊÒäÁ‹¹ŒÍÂ¡Ç‹Ò 3 àÁµÃ
192 m. 6 m.
82 m.
12 3
SITE
93 m.
181 m. 78.8 m.
4
6 m.
- ¾×é¹·Õèà·ÕºàÃ×Íã¹áÁ‹¹éíÒ µŒÍ§äÁ‹ÁÕ ÅѡɳР໚¹á¼‹¹¤Í¹¡ÃÕµ» ´µÅÍ´ ãËŒÁÕª‹Í§Ç‹Ò§ãËŒáʧᴴʋͧ¼‹Ò¹¾×é¹ ãµŒ·‹Òä´Œ - »ÅÒÂÊØ´¢Í§·‹Òà·ÕºàÃ×͵ŒÍ§äÁ‹ à¡Ô¹ 1 ã¹ 3 ¢Í§¤ÇÒÁ¡ÇŒÒ§áÁ‹¹éíÒ
123.4 m.
ÃÐÂÐ˹ àÇŒ¹ÃÐÂШҡ¢Íº·ÕèµÑé§à»š¹ÃÐÂÐ 6 àÁµÃ ´ŒÒ¹·ÕèµÔ´µÖ¡á¶Ç ·Ñ駴ŒÒ¹·ÔÈà˹×ÍáÅÐ ·ÔÈ㵌 ´ŒÒ¹·ÕèµÔ´¶¹¹à¨ÃÔÞ¡Ãا àÇŒ¹ÃÐÂШҡ¢Íº·ÕèµÑé§à»š¹ÃÐÂÐ 12 àÁµÃ - ´ŒÒ¹·ÕèµÔ´áÁ‹¹éíÒ਌ҾÃÐÂÒ ·ÔȵÐÇѹµ¡
LAW MASS ISOMETRIC ¡ฎËÁÒÂÃÔÁáÁ‹¹éíÒ ¡ฎ¡ÃзÃǧฉºÑº·Õè 55
- µŒ Í §¢ÍÍ¹Ø Þ Òµ¨Ò¡ ¡ÃÁ਌ҷ‹Ò à¾×èÍ¡‹ÍÊÌҧ ÍÒ¤ÒÃÅ‹ Ç §Åéí Ò Åí Ò áÁ‹ ¹éí Ò µÒÁ¡ฎ¡ÃзÃǧฉºÑº·Õè 63 ÍÍ¡µÒÁ ¾.Ã.º. ¡ÒÃà´Ô ¹ àÃ× Í ã¹¹‹ Ò ¹¹éí Ò ä·Â ¾.È. 2546
- µŒÍ§ÁÕ˹ѧÊ×ÍÃѺÃͧ ¨ Ò ¡ ¨Ñ § Ë ÇÑ ´ Ë Ã× Í Ë¹‹ Ç Â§Ò¹·Õè à ¡Õè  ǢŒ Í § Ç‹ÒÊÔ觡‹ÍÊÌҧ·ÕèŋǧÅéíÒ Åí Ò ¹éí Ò äÁ‹ à »š ¹ ÍØ » ÊÃä µ‹ Í á¼¹¾Ñ ² ¹Ò¨Ñ § ËÇÑ ´ ¼Ñ§àÁ×ͧ áÅСÒÃÃÑ¡ÉÒ Ê À Ò ¾ á Ç ´ ÅŒ Í Á ¢ Í § ¨Ñ§ËÇÑ´
- ÃÒ§ҹ¡Òà ÇÔà¤ÃÒÐË ¼Å¡Ãзº ÊÔè§áÇ´ÅŒÍÁ «Ö觵ŒÍ§ »¯ÔºÑµÔµÒÁ¡ฎËÁÒ Nj Ò ´Œ Ç Â ¡ Ò Ã Ê‹ § àÊÃÔ Á áÅÐÃÑ ¡ ÉÒ ¤Ø³ÀÒ¾ÊÔè§áÇ´ÅŒÍÁ áË‹§ªÒµÔ
4
SITE SUMMARY
SITE
ที่ ตัง้
·ÕèµÑé§ : ºÃÔÉÑ· ÍÙ‹¡Ãا෾ ¨íÒ¡Ñ´ ¶¹¹à¨ÃÔÞ¡Ãا á¢Ç§ÂÒ¹¹ÒÇÒ à¢µÊÒ·Ã ¡Ãا෾ÁËÒ¹¤Ã SITE
86.5 m.
SITE
89.2 m.
¼Ñ§ÊÕ : ·ÕèµÑé§ÍÂÙ‹ã¹à¢µ¼Ñ§ÊÕ ¹éíÒµÒÅ Â.11-26 ¾×é¹·Õ· è § Ñé ËÁ´ : 31,236 µÃ.Á.
ผัง สี
192 m. 6 m.
78.8 m.
6 m.
FAR : 6 OSR : 5
123.4 m.
¢¹Ò´·Õ´ è ¹ Ô : 31,236 µÒÃÒ§àÁµÃ 181 m.
¾×é¹·Õ· è Ê Õè ÒÁÒö¡‹ÍÊÌҧ䴌 : 187,416 µÒÃÒ§àÁµÃ
1
ÃÐÂÐ 0-3 àÁµÃ áá ËŒÒÁÊÌҧ ÍÒ¤ÒÃã´ æ àÅÂ
2
ÃÐÂÐ 3-15 àÁµÃ ÊÌҧÍÒ¤Òà Ê٧䴌äÁ‹à¡Ô¹ 8 àÁµÃ
3 â¤Ã§¡ÒõÑé§ÍÂÙ‹ã¹¾×é¹·Õè¼Ñ§ÊÕ¹éíÒµÒÅ «Öè§à»š¹·Õè´Ô¹»ÃÐàÀ··ÕèÍÂÙ‹ÍÒÈÑ ·ÕèÁÕ ¤ÇÒÁ˹Òṋ¹¢Í§¡ÒÃÍÂÙ‹ÍÒÈÑÂÊÙ§ ¾×é¹·Õèâ¤Ã§¡ÒÃᵋà´ÔÁ໚¹¾×é¹·Õè¢Í§ÍÙ‹µ‹ÍàÃ×Íà¡‹Ò «Öè§ÁÕἹ¡àÅÔ¡ÍÙ‹µ‹ÍàÃ×Í ¨Ö§ÊÒÁÒö¹íÒÁÒ໚¹¾×é¹·Õè㹡Òá‹ÍÊÌҧâ¤Ã§¡ÒÃ
4
SITE
ÃÐÂÐ 15-45 àÁµÃ ÊÌҧÍÒ¤ÒÃÊÙ§ ä´ŒäÁ‹à¡Ô¹ 16 àÁµÃ
¤ÇÒÁÊÙ§µÒÁ¡¯¡ÃзÃǧฉºÑº·Õè 55
ÊÃØ»ÃÐÂÐ˹ã¹â¤Ã§¡Òà ºÃÔàdz´ŒÒ¹¢ŒÒ§â¤Ã§¡ÒÃÃÐÂÐ˹ 6 àÁµÃ ºÃÔàdz´ŒÒ¹Ë¹ŒÒáÅдŒÒ¹·ÕèµÔ´áÁ‹¹éíÒ਌ҾÃÐÂÒ ÃÐÂÐ˹ 12 àÁµÃ
5 CONCEPT
• Major Concept • Minor Concept
5
CONCEPTUAL DESIGN
CONCEPT
CONCEPT CENTRIC OF VISUAL AND PERFORMING ARTS
SENSE OF PLACE
THE D.O.C.K
MAJOR CONCEPT
CENTRIC ÈÔ Å » Ð - á Ê § / ÊÕ / à ÊÕ Â § - ¡ Ò Ã á Ê ´ § - à · ¤ â ¹ â Å ÂÕ
FUNCTION
CENTRIC
Created by tajhin palappa from the Noun Project
GALLERY / AUDITORIUM
COMMERCIAL
HOTEL
SENSE OF PLACE
MINOR CONCEPT
à ¨ ÃÔ Þ ¡ ÃØ § ART DISTRICT
–
à ¨Œ Ò ¾ à Р Ò
RIVER CULTURE
ÍÙ‹ µ‹ Í à Ã× Í SHIPYARD
SENSE OF PLACE
DESIGN
ART COMMUNITY
-
WATER
SHIP / DOCK
5
CONCEPTUAL DESIGN
CONCEPT
MINOR CONCEPT
CENTRIC FUNCTION
GALLERY / AUDITORIUM
ART HUB COMMERCIAL
Created by tajhin palappa from the Noun Project
M GALLERY HOTEL
ART HUB COMMERCIAL ¡ Ò Ã Ã Ç Á ¾× é ¹ ·Õ è ÃŒ Ò ¹ ¤Œ Ò à ¢ Œ Ò ¡ Ñ º ¾× é ¹ ·Ô è È Ô Å » Ð à ¾×è Í à »š ¹ ¡ Ò Ã ´Ö § ´Ù ´ ã ËŒ ºØ ¤ ¤ Å ·Ñ è Ç ä » à ¢Œ Ò Á Ò ã ¹ â¤Ã§¡ÒÃ
GALLERY / AUDITORIUM ¾× é ¹ ·Õ è á Ê ´ § ¼ Å § Ò ¹ È Ô Å » Ð á Å Ð Í Í ´Ô · Í à ÃÕ Â Á ÁÕ ¡ Ò Ã Ã Ç º Ã Ç Á ¼ Å § Ò ¹ ¢ Í § ÈÔ Å » ¹ Ë Ç Á Ê ÁÑ Â Ë Å Ò ¡ Ë Å Ò Â ¤ ¹ Á Ò ¨Ñ ´ á Ê ´ §
HOTEL â à § á à Á À Ò Â ã µŒ à ¤ Ã× Í M G a l l e r y ·Õè ÁÕ ¡ Ò Ã ¹í Ò à Í Ò ¼ Å § Ò ¹ ÈÔ Å » Ð à ¢ Œ Ò Á Ò Ã Ç Á Í ÂÙ ‹ ¡ Ñ º ¾×é ¹ ·Õè â à § á à Á
5
CONCEPTUAL DESIGN
CONCEPT
MINOR CONCEPT
SENSE OF PLACE
WATER Interactive Exhibition Community Mall
ART COMMUNITY Community Mall & Art Center
SHIP / DOCK Gallery / Auditorium Building Form Concept Space
FUNCTION
WATER WATER ART COMMUNITY
¡ Ò Ã ¹í Ò ¹éí Ò Á Ò à »š ¹ á ¹ Ç ¤Ô ´ ã ¹ ¾×é ¹ ·Õè E x h i b i t i o n Ë ÅÑ ¡ ¢Í§â¤Ã§¡ÒÃ
à ٠» · à § Í Ò ¤ Ò Ã ÁÕ á ¹ Ç ¤ Ô´ Á Ò ¨ Ò ¡ ÃÙ » · à § ¤ Å×è ¹ ¢ Í § ¹éíÒ
ART COMMUNITY ¡ Ò Ã Ã Ç Á ¾×é ¹ ·Õè ÈÔ Å » Ð à ¢Œ Ò ¡Ñ º ¾×é ¹ ·Õè ÃŒ Ò ¹ ¤Œ Ò
WATER
SHIP ÃÙ » · à § Í Ò ¤ Ò Ã «Öè § ¶ Í ´ Á Ò ¨ Ò ¡ ÃÙ » · à § ¢ Í § à Ã× Í SHIP / DOCK
DOCK ¡ Ò Ã ã ªŒ ¾× é ¹ ·Õ è µ‹ Í à Ã× Í à ¡‹ Ò ¢ Í § â ¤ à § ¡ Ò Ã à »š ¹ ¾× é ¹ ·Õ è ¨Ø ´ ¢ Ò Â ã ¹ â ¤ à § ¡ Ò Ã ä ´ Œ á ¡‹ ÃŒ Ò ¹ Í Ò Ë Ò Ã , C o - W o r k i n g S p a c e , ¹Ô · Ã Ã È ¡ Ò Ã
6 FUNCTION & AREA REQUIREMENT
• List of Function • Area Requirement • Summary
6
EXHIBITION & AUDITORIUM
FUNCTION
Souvenir
Ticket
Theatre
Cafe
Paid exhibition
Free exhibition
Customers
Actors / Staffs
Rehearsal room
Control room
Dressing room
souvenir
locker
Customers
AUDITORIUM
Storage
Maintenance
EXHIBITION
Storekeeper
Staffs
Storage
Maintenance
Exterior Gallery
6
EXHIBITION & AUDITORIUM
FUNCTION
Co-Working Space
Library
Materials Library
Art Products
Customers
Actors / Staffs
Storekeeper
Storage
Bookstore & Stationary
Customers
LEARNING SPACE
Librarian Room
ART STORE
Staffs
Storekeeper
Storage
Music
6
COMMERCIAL & HOTEL
FUNCTION
Stores
Garden
Welcome Hall
Guest Room
Customers
Convention Restaurant
Carpark
Customers
Created by tajhin palappa from the Noun Project
Staffs
Storekeeper
Storage
COMMERCIAL
Maintenance
HOTEL
Storekeeper
Staffs
Storage
Maintenance
6
AREA REQUIREMENT
FUNCTION
VISUAL & PERFORMING ART CENTER 26,138.65 SQ.M. BUILDING AREA
NON-SALEABLE AREA
56.2%
38,981.13 sq.m.
SELLABLE AREA COMMUNITY MALL
40 Stores
167,834.77 SQ.M.
22.3%
17,763.12 SQ.M.
SUMMARY
21.5%
93,237.64 sq.m.
PARKING
1,484 cars 35,616.00 sq.m.
HOTEL
1,630 Rooms 123,933.00 SQ.M.
GREEN AREA µ Ò Á à ¡ ³ ± 13,510 µÃ.Á.
¾×é ¹ ·Õè ÊÕ à ¢Õ Â Ç º ¹ ´Ô ¹
ART CENTER
6,759 µÃ.Á.
+
¾×é ¹ ·Õè ÊÕ à ¢Õ Â Ç º ¹ Í Ò ¤ Ò Ã
ÃÇÁ 14,140 µÃ.Á.
7,381 µÃ.Á.
COMMUNITY MALL
HOTEL
SELLABLE AREA
SELLABLE AREA
10,208.38 sq.m.
SELLABLE AREA
7,293.26 sq.m.
SELLABLE AREA
75,736 sq.m.
GREEN AREA
CAR PARKING
PARKING 8,472 sq.m.
353 cars
PARKING 6,480 sq.m.
270 cars
PARKING 20,664 sq.m.
861 cars
6
AREA REQUIREMENT
FUNCTION
GALLERY & AUDITORIUM
46 %
4,113.91
7,743.68
Í § ¤ » à Р¡ Í º Ê ¹Ñ º Ê ¹Ø ¹
Í § ¤ » à Р¡ Í º Ë ÅÑ ¡ ¾×é ¹ ·Õè á Ê ´ § ÈÔ Å » Ð ªÑè Ç ¤ Ã Ò Ç ¾×é ¹ ·Õè á Ê ´ § ÈÔ Å » Ð ¶ Ò Ç Ã
Total Area
âçÁËÃʾ
3,976.00
Í § ¤ » à Р¡ Í º Ã Í § ¾×é ¹ ·Õè Ê Ò ¸ Ò Ã ³ Ð ¾×é ¹ ·Õè ¾ Ò ³Ô ª  ´Œ Ò ¹ ÈÔ Å » Ð ËŒ Í § Í à ¹ ¡ » Ã Ð Ê § ¤ Ê‹ Ç ¹ º ÃÔ ¡ Ò Ã ¡ Ò Ã ÈÖ ¡ É Ò
Ê‹ Ç ¹ º ÃÔ ¡ Ò Ã Ê Ò ¸ Ò Ã ³ Ð Ê‹ Ç ¹ º ÃÔ Ë Ò Ã â ¤ Ã § ¡ Ò Ã Ê‹ Ç ¹ § Ò ¹ Ã Ð º º
26,138.65 SQ.M.
2 4%
25%
Ê‹ Ç ¹ º ÃÔ ¡ Ò Ã â ¤ Ã § ¡ Ò Ã
826.70
5%
Í § ¤ » à Р¡ Í º à Ê ÃÔ Á ÃŒ Ò ¹ ¤Œ Ò ã ËŒ à ª‹ Ò ÃŒ Ò ¹ à ¤ Ã×è Í § ´×è Á ÃŒ Ò ¹ Í Ò Ë Ò Ã ã ËŒ à ª‹ Ò ÃŒ Ò ¹ Í Ò Ë Ò Ã ¢ Í § â ¤ à § ¡ Ò Ã
6
AREA REQUIREMENT
FUNCTION
สวนโรงมหรสพ
Í § ¤ » Ã Ð ¡ Í º Ë ÅÑ ¡
Í § ¤ » Ã Ð ¡ Í º Ã Í §
7,743.68 µÃ.Á.
3,976.00 µÃ.Á.
2163.68
1. โรงมหรสพ 800 ที่นั่ง
518.4
2. โถงทางเขา
160
3. เวที
233.28
4. หลังเวที
752
5. หองเก็บของ
200
6. หองเก็บตัวนักแสดง
150
7. หองซอม
150
พื้นที่จัดแสดงศิลปะถาวร 1. สวนจัดแสดงอนิเมชั่นกราฟฟก (3d mapping) 2. สวนจัดแสดงจัดแสดงภาพเขียนผลงานลอยตัว 3.โถงทางเขา 4.หองล็อคเกอร 5.รานของที่ระลึกจากนิทรรศการ 6. นิทรรศการภายนอก 7. หองเก็บผลงาน 8. หองทํางานภัณฑารักษ
5230 3000 800 760 20 100 150 380 20
พื้นที่จัดแสดงศิลปะชั่วคราว 1. หองนิทรรศการ 2. โถงทางเขา 3. หองเก็บผลงาน
350 300 15 35
สวนบริการการศึกษา 1 หองสมุด 1.1 หองสมุดทั่วไป เคานเตอร พื้นที่หองสมุด หองถายเอกสาร หองบรรณารักษ หองเก็บของ หองเก็บหนังสือ พื้นที่อานหนังสือ 1.2 หองสมุด E-LIBRARY เคานเตอร พื้นที่สื่ออิเล็กทรอนิกส หองเก็บสื่ออิเล็กทรอนิกส หองเก็บของ 1.3 หองสมุดวัสดุ โถงทางเขา พื้นที่บรรยายและใหคําปรึกษาดานวัสดุ พื้นที่จัดแสดงวัสดุ CO-WORKING SPACE โถงทางเขา / เคานเตอร / ล็อกเกอร พื้นที่ทํางานกลุม จํานวน 5 หอง พื้นที่เงียบ
1398.58 339.98 120.58 7.4 13.33 15.15 8.4 9 60 7 43.1 7.4 24 2.4 9 176.3 36 20 120 1058.3 198 200 660
สวนพาณิชยดานศิลปะ 1. รานคาอุปกรณศิลปะ จํานวน 2 ราน สวนรานคา สวนเก็บของ เคานเตอร 2. รานคาสินคาศิลปะ จํานวน 1 ราน สวนเก็บของ เคานเตอร พื้นที่ราน 3. รานหนังสือ จํานวน 1 ราน สวนรานคา สวนเก็บของ เคานเตอร 4. รานขายอุปกรณดนตรี จํานวน 1 ราน สวนรานคา สวนเก็บของ เคานเตอร
240.4 68.1 25 1.5 7.4 58.9 1.5 7.4 50 54.2 45 1.5 7.4 59.2 50 1.5 7.4
6
AREA REQUIREMENT
FUNCTION
Í § ¤ » Ã Ð ¡ Í º à Ê ÃÔ Á
826.70 µÃ.Á.
Í § ¤ » à Р¡ Í º Ê ¹Ñ º Ê ¹Ø ¹
4,113.91 µÃ.Á.
รานอาหารของโครงการ จํานวน 1 ราน เคานเตอร พื้นที่ราน พื้นที่จัดการแสดง ครัว เก็บของ สวนบริหารโครงการ 1. ฝายบริหาร หองทํางานผูอํานวยการ หองทํางานรองผูอํานวยการ พื้นที่ทํางานเลขานุการ หองทํางานคณะกรรมการ หองประชุม หองรับรอง หองเก็บเอกสาร หองน้ําฝายบริหาร 2. ฝายธุรการ หองทํางานหัวหนาฝายธุรการ พื้นที่ทํางานเจาหนาที่ฝายธุรการ หองเก็บเอกสาร 3. ฝายบัญชี หองทํางานหัวหนาฝายบัญชี พื้นที่ทํางานเจาหนาที่ฝายบัญชี พื้นที่ทํางานเจาหนาที่ฝายจัดซื้อ หองเก็บเอกสาร
826.7 7.4 750 36 30 3 466.48 189.5 20 20 10 80 31.2 26 2 14.4 27.8 16 10 1.5 37.8 16 10 10 1.5
4. ฝายทะเบียนและพัสดุ
27.8
หองทํางานหัวหนาฝายทะเบียนและ พัสดุ
16
พื้นที่ทํางานเจาหนาที่ฝายทะเบียนและ พัสดุ
10
หองเก็บเอกสาร 5. ฝายวิชาการ
1.5 37.8
หองทํางานหัวหนาฝายวิชาการ
16
พื้นที่ทํางานเจาหนาที่ฝายวิชาการ
20
หองเก็บเอกสาร
1.5
6. ฝายประชาสัมพันธ หองทํางานหัวหนาฝายประชาสัมพันธ พื้นที่ทํางานเจาหนาที่ฝาย ประชาสัมพันธ หองเก็บเอกสาร
42.8 16 25 1.5
7. ฝายงานพัฒนาธุรกิจ
47.8
หองทํางานหัวหนาฝายพัฒนาธุรกิจ
16
พื้นที่ทํางานเจาหนาที่ฝายการตลาด
10
พื้นที่ทํางานเจาหนาที่ฝายหาทุน พื้นที่ทํางานเจาหนาที่ฝายสมาชิก สัมพันธ
10 10
หองเก็บเอกสาร
1.5
9. พื้นที่สวนกลาง
55.18
โถงทางเขา
20.48
พื้นที่นั่งรอ
32
สวนเตรียมอาหาร
2.4
6
AREA REQUIREMENT
FUNCTION
Í § ¤ » à Р¡ Í º Ê ¹Ñ º Ê ¹Ø ¹
4,113.91 µÃ.Á.
สวนบริการสาธารณะ 1. หองปฐมพยาบาล พื้นที่ทําหัตถการ หองพักผูปวย หองเก็บยา หองพักเจาหนาที่พยาบาล หองน้ํา 2. หองละหมาด
43.08 37.08 5 9.6 1.5 16 4.68 6
สวนบริการโครงการ 1. ฝายรักษาความปลอดภัย หองทํางานหัวหนาฝายรักษาความปลอดภัย หองพักเจาหนาที่รักษาความปลอดภัย ปอมยาม หองเปลี่ยนชุด หองน้ํา
400.3 64.3 16 32 10 6
2. ฝายอาคารสถานที่ หองทํางานหัวหนาฝายอาคารสถานที่ หองพักเจาหนาที่ฝายอาคารสถานที่ หองเก็บอุปกรณทําความสะอาด หองเปลี่ยนชุด หองน้ํา หองเก็บขยะ
229.3 16 160 15 8 30
3. ฝายซอมบํารุง หองทํางานหัวหนาฝายซอมบํารุง หองพักเจาหนาที่ฝายซอมบํารุง โรงปฏิบัติการ หองเก็บของ หองเปลี่ยนชุด
106.7 16 9.6 64 12.8 4
4. ที่จอดรถ
8472
5. หองน้ํา
1,006.38
สวนงานระบบ
3,204.05
1. งานระบบไฟฟา
437.00
Transformer
157.50
หอง Generator
52.10
หอง RMU
118.50
หอง MDB และ EMDB
108.90
2. งานระบบสุขาภิบาล และอัคคีภัย
372.00
พื้นที่บอสํารองน้ํา
110.00
พื้นที่วางเครื่องสูบน้ํา
40.00
พื้นที่วางเครื่องสูบน้ําดับเพลิง
40.00
พื้นที่หองบําบัดน้ําเสีย
170.00
บอดักไขมัน
12.00
3. งานระบบปรับอากาศ
2,351.95
หอง Chiller
791.95
พื้นที่วาง cooling tower
1,560.00
5. งานระบบติดตอสื่อสารในอาคาร
36
6. งานระบบรักษาความปลอดภัย (CCTV)
7.1
แผงควบคุม
2
พื้นที่ทํางานเจาหนาที่
3.6
พื้นที่วางของ
1.5
6
AREA REQUIREMENT
FUNCTION
COMMERCIAL
41%
7,239.82
Í § ¤ » Ã Ð ¡ Í º Ë ÅÑ ¡
Total Area 17,763.12 SQ.M.
2 0%
39%
3,505.50
Í § ¤ » à Р¡ Í º Ê ¹Ñ º Ê ¹Ø ¹
Í § ¤ » Ã Ð ¡ Í º Ã Í §
องคประกอบหลัก 1. รานคา - ขนาด S - ขนาด M - ขนาด L - ขนาด XL 2. รานอาหาร 15 ราน จํานวน 1 ราน ขนาด องคประกอบรอง 1.พื้นที่สาธารณะ - พื้นที่ตอนรับ - พื้นที่พักคอย - หองรับรอง
7,018.36
7239.82 622.20 902.70 1,279.20 431.00 1591.07 102.65 3505.5 2337 912 1425 20
องคประกอบสนับสนุน
7018.364
1. ที่จอดรถ
6480
2. หองน้ํา
513.864
3.สวนบริการสาธารณะ
24.5
- หองปฐมพยาบาล
18.5
พื้นที่ทําหัตถการ
5
หองเก็บยา
1.5
หองพักเจาหนาที่พยาบาล
12
- หองละหมาด
6
6
AREA REQUIREMENT
FUNCTION
HOTEL
58%
71,533.00
Í § ¤ » Ã Ð ¡ Í º Ë ÅÑ ¡
Total Area 123,933.00 SQ.M.
2 1%
25,700.00
Í § ¤ » Ã Ð ¡ Í º Ã Í §
2 1%
26,700.00
Í § ¤ » à Р¡ Í º Ê ¹Ñ º Ê ¹Ø ¹
องคประกอบหลัก 1. หองพัก 1,630 หอง 2. สวนตอนรับ 3. Facilities
71,533.00 65,200.00 1,833.00 4,500.00
องคประกอบรอง 1. สํานักงาน 2. สวนบริการ
25,700.00 1,200.00 24,500.00
องคประกอบสนับสนุน 1. ที่จอดรถ 861 คัน 2. หองประชุมอเนกประสงค 3. รานอาหาร
26,700.00 20,664.00 800.00 5,236.00
7 FUNCTION RELATIONSHIP
• • • •
Bubble Diagram Function Diagram Zoning Mass Develop
7
BUBBLE DIAGRAM
FUNCTION RELATIONSHIP
ENT
ENT
Chaophreya river
Chaophreya river HOTELâ&#x20AC;&#x2122;S PORT
PAID EXHIBITION
PORT
SERVICE STORAGE
RESTAU -RANT SOUVENIR
DOCK RESTAU -RANT
COWORKING / LIBRARY
HOTEL LOBBY
SERVICE
OFFICE
EXHIBITION & AUDITORIUM HALL
PLAZA COMMERCIAL
CAR PARK
CAR PARK
SERVICE FACILITY
CUSTOMERS SERVICE AUTHORITIES
GUEST ROOM
RETAILS SHOP
ENT
Charoenkrung rd.
AUDITORIUM HALL
BACK STAGE
7
BUBBLE DIAGRAM
FUNCTION RELATIONSHIP
T O 2 ND F L O O R H A L L
2 nd Floor
HOTEL
HOTELâ&#x20AC;&#x2122;S PORT RESTAU -RANT
BASEMENT 1 ST F L O O R
COMMERCIAL
DOCK RESTAU -RANT
HOTEL LOBBY
PORT
EXHIBITION & AUDITORIUM
PAID EXHIBITION
SOUVE -NIR
WC
SERVICE
1 FL. PLAZA ST
HALL
SERVICE
WC
WC AUTO -MATIC PARKIN G
CUSTOMERS
COMMER -CIAL
RETAILS SHOP
SERVIC E PARKIN G
1 ST Floor
SERVICE
HOTEL SERVICE
AUTHORITIES
BASEMENT
CAR PARK
SYS TEM
GALLERY & AUDITO -RIUM STORAGE
7
BUBBLE DIAGRAM
FUNCTION RELATIONSHIP
T O 3 RD F L O O R H A L L
3 rd Floor
HOTEL
COMMERCIAL
EXHIBITION & AUDITORIUM WC
2 ND F L O O R S
PAID EXHIBITION
WC PORT
RESTAURANT
SERVICE
SERVICE
EXHIBITION & AUDITORIUM HALL
2 ND F L . PLAZA HALL
Coworking Space
WC
CUSTOMERS SERVICE AUTHORITIES
2 nd Floor 1 st F L . HOTEL LOBBY
CAFÃ&#x2030;
1 st F L . HALL
7
BUBBLE DIAGRAM
FUNCTION RELATIONSHIP
T O 4 TH F L O O R H A L L
4 th Floor
3
RD
HOTEL
COMMERCIAL
EXHIBITION & AUDITORIUM
FLOOR
WC
SERVICE
WC
HOTEL FACILITIES COWORKING / LIBRARY
SERVICE
WC
HALL
HALL
LIBRARIAN ROOM
OFFICE
CUSTOMERS SERVICE AUTHORITIES
3 rd Floor 2 ND F L . HOTEL HALL
2 ND F L . HALL
7
BUBBLE DIAGRAM
FUNCTION RELATIONSHIP
HOTEL
COMMERCIAL
EXHIBITION & AUDITORIUM
AUDITORIUM
4 TH F L O O R ROOM
BACK STAGE
4 th
Floor
WC SERVICE
FOYER
SERVICE HALL TICKET
CUSTOMERS SERVICE AUTHORITIES
3 rd Floor 3 RD F L . HOTEL HALL
3 RD F L . HALL
7
FUNCTION DIAGRAM
FUNCTION RELATIONSHIP
CUSTOMER
ENT
STAFF SERVICE
storage wc Souvenir + Book Shop
MAIN ENTRANCE HALL (RETAIL & RESTAURANT) EXTERIOR AMPHITHEATRE
locker
Gallery & Education Lobby (Information)
wc
EXTERIOR GALLERY Free Gallery (Temporary)
storage
Paid Gallery (Permanent)
storage
EXTERIOR GALLERY
storage
Gallery Lobby (Ticket)
Office ภัณฑารักษ์ wc
ʋǹ E X H I B I T I O N
Maintenance / Storage
Souve -nir Shop storage
7
FUNCTION DIAGRAM
FUNCTION RELATIONSHIP
CUSTOMER STAFF SERVICE
COWORKING
ENT Souvenir + Book Shop
Cafe
WC locker
MAIN ENTRANCE HALL (RETAIL & RESTAURANT) EXTERIOR AMPHITHEATRE
Ê‹ Ç ¹ ºÃÔ ¡Ò à ¡Ò à ÈÖ ¡É Ò
Gallery & Education Lobby (Information)
Education Lobby (Counter)
EXTERIOR EXHIBITION
wc
ENT
E - LIBRARY LIBRARY Librarian Room
Book Storage
7
FUNCTION DIAGRAM
FUNCTION RELATIONSHIP
CUSTOMER STAFF SERVICE
Restaurant
Kitchen
Book Store
Storage
Welcome
Musical store
Storage
WC
Art Supply Shop
Storage
Parking
Entrance
Ê‹ Ç ¹¾ Ò ³Ô ª Â ¡ Ã Ã Á
Art & Craft Souvenir Shop
Storage
Storage
7
FUNCTION DIAGRAM
FUNCTION RELATIONSHIP
CUSTOMER STAFF
½†ÒºÃÔËÒÃ
SERVICE WC
½†Ò¸ØáÒà ½†ÒºÑÞªÕ
entrance
welcome
pantry
½†Ò·ÐàºÕ¹áÅÐ ¾ÑÊ´Ø ½†ÒÂÇÔªÒ¡Òà ½†Ò »ÃЪÒÊÑÁ¾Ñ¹¸ ½†Ò§ҹ¾Ñ²¹Ò ¸ØáԨ
Ê‹ Ç ¹ ºÃÔ Ë Ò Ã
½†Ò Àѳ±ÒÃÑ¡É
7
FUNCTION DIAGRAM
FUNCTION RELATIONSHIP
CUSTOMER
Dressing Room
STAFF
Rehearsal Room
SERVICE
Souvenir Shop
MAIN ENTRANCE HALL (RETAIL & RESTAURANT) EXTERIOR AMPHITHEATRE
WC
Cafe
Welcome Area (Information / Ticket / etc.)
wc
Ê‹ Ç ¹ à · ¤¹Ô ¤ / «‹ Í Á ºíÒ ÃØ §
storage
Maintenance / Storage Wood Work
Back stage
Steel Work
VIP BOX Pre-Function
wc
Exterior Work
Theatre
office
wc
Control room
7 FUNCTION RELATIONSHIP
PLANNING ANALYSIS
SITE ÍÙ‹µ‹ÍàÃ×Íà¡‹Ò ÁÕÅѡɳÐã¹·ÕèµÑé§à´ÔÁ ·Õ蹋Òʹ㨠áÅеԴáÁ‹¹éíÒ਌ҾÃÐÂÒ
1
ãËŒÍÒ¤ÒþԾԸÀѳ± ÍÂÙ‹·Ò§·ÔÈà˹×Í à¾×èÍÃѺà§Ò á´´¨Ò¡âçáÃÁ áÅÐà» ´¡ÒÃÁͧàË繨ҡ BTS 4
ÈÖ¡ÉÒ¢¹Ò´ÍÒ¤ÒÃÊÙ§ÊØ´·Õè ÊÒÁÒöÊÌҧ䴌µÒÁ¡ฎËÁÒÂ
2
à» ´¾×é¹·ÕèÊÒ¸ÒóÐÃÔÁáÁ‹¹éíÒáÅÐÃÔÁ¶¹¹ áÅÐà» ´á¡¹ÊíÒ¤ÑÞàª×èÍÁµ‹Í·Ñé§Êͧʋǹ 5
¡íÒ˹´¢¹Ò´ÍÒ¤Òèҡ¡ÒÃÈÖ¡ÉÒ Area Requirement
3
ÊÌҧ¾×é¹·ÕèÊÒ¸ÒóÐàª×èÍÁµ‹Í ªÒ½˜›§áÁ‹¹éíÒ ¶¹¹ÊÒ¸ÒóРÍÒ¤ÒþԾԸÀѳ± áÅÐÍÒ¤ÒÃâçáÃÁࢌҴŒÇ¡ѹ 6
7
ZONING
FUNCTION RELATIONSHIP
OUT IN
«.à¨ÃÔÞ¡Ãا 55
Landscape
Amphitheatre
Pier
Community
100 ม.
«.à¨ÃÔÞ¡Ãا 57 Restaurant
Hotel
AUDITORIUM FOYER
Car Park OUT
Riverside Cafe
50 ม.
IN
¨ Ò ¡ ¡ Ò Ã ÈÖ ¡ É Ò »˜ ¨ ¨Ñ  ·Õè ÁÕ ¼ Å µ‹ Í ¡ Ò Ã Í Í ¡ á º º ¨ Ð ¹íÒ Á Ò ÊÙ‹ ¡ Ò Ã Ç Ò § Z o n i n g á Å Ð · Ò § à ¢Œ Ò - Í Í ¡ ¢ Í § â ¤ à § ¡ Ò Ã
SCHEMATIC FUNCTION GALLERY / AUDITORIUM
SERVICE
áÁ‹¹Ò éí ਌ҾÃÐÂÒ
Water Scape Gallery
¶¹¹à¨ÃÔÞ¡Ãا
Pier
30 ม.
AUDITORIUM
CO-WORKING
OFFICE
HALL
EXHIBITION
SCHEMATIC FUNCTION COMMUNITY MALL
LIBRARY
HALL
STORES LANDSCAPE
STORES
5TH FL 4TH FL 3RD FL 2ND FL 1ST FL
2ND FL 1ST FL
7
DESIGN DEVELOPMENT
FUNCTION RELATIONSHIP
DESIGN CONCEPT
SHIP
ÃÙ » · à § Í Ò ¤ Ò Ã «Öè § ¶ Í ´ Á Ò ¨ Ò ¡ ÃÙ » · à § ¢ Í § à Ã× Í á Å Ð ã º à Ã× Í
ÃÙ»·Ã§ÊÕèàËÅÕèÂÁ áÅÐàÊŒ¹â¤Œ§
»ÃѺÃÙ»·Ã§ãËŒáÊ´§¶Ö§ ¤ÇÒÁÅ×è¹äËŢͧÃÙ»·Ã§àÃ×Í ¹íÒàÊŒ¹â¤Œ§ÁÒ»ÃÑºà¢ŒÒ ¡ÑºÃÙ»·Ã§ÍÒ¤ÒÃ
Mass ¨Ò¡¡ÒèѴàÃÕ§¾×é¹·Õè 㪌§Ò¹¢Í§â¤Ã§¡ÒÃ
3
2 6
1
5
4 à¾ÔèÁʋǹÂ×蹢ͧÍÒ¤Òà à¾×èÍÁÔµÔ·Ò§ÃÙ»´ŒÒ¹
¡µŒÇÍÒ¤ÒÃãËŒÅÍ à¾×èÍãËŒà¡Ô´à§Òá¡‹¾×é¹·Õè ÊÒ¸ÒóЪÑé¹Å‹Ò§
»ÃѺÃÙ»·Ã§ãËŒÁÕ¤ÇÒÁ⤌§à¾×èÍ áÊ´§àÍ¡Åѡɳ ¢Í§ÍÒ¤Ò÷Õè ¶Í´áººÁÒ¨Ò¡àÃ×Í
FINAL MASS
8 DESIGN
• • • • •
Plan Section Elevation Materials Perspective
8 DESIGN
LAY OUT-PLAN
BTS ÊоҹµÒ¡ÊÔ¹
ÇÑ´ÂÒ¹¹ÒÇÒ
ÍÒ¤ÒþҳԪ ÊÙ§ 3-4 ªÑé¹
8
LAY-OUT PLAN
DESIGN
ÇÑ´ÂÒ¹¹ÒÇÒ ÍÒ¤ÒþҳԪ ÊÙ§ 3-4 ªÑé¹ DROP OFF
Retail
AHU
¿ØµºÒ· ¡ÇŒÒ§ 2 àÁµÃ ¶¹¹à¨ÃÔÞ§¡Ãا ¡ÇŒÒ§ 12.50 àÁµÃ
82 Á.
«.à¨ÃÔÞ¡Ãا 55
181 Á.
Retail
áÁ‹¹Ò éí ਌ҾÃÐÂÒ DN
Á . à · ¤ â ¹ â Å ÂÕ ÃÒªÁ§¤Å ¡ ÃØ § à · ¾
«.à¨ÃÔÞ¡Ãا 57
DN UP
93 Á.
DROP OFF
78.8 Á.
UP UP
ÍÒ¤ÒþҳԪ ÊÙ§ 3-4 ªÑé¹
DN
ÍÒ¤ÒþҳԪ ÊÙ§ 3-4 ªÑé¹
123.4 Á.
8
CAR PARK
DESIGN
¨Í´Ã¶º¹ÍÒ¤Òà ·Õè¨Í´à»š¹áºº Split ¨íҹǹ 10 ªÑé¹ ÊÒÁÒö¨Í´Ã¶ä´Œ 27 ¤Ñ¹ ໚¹ã¹Ê‹Ç¹¢Í§·Õè ¨Í´Ã¶Ê‹Ç¹¢Í§âçáÃÁ ÃÇÁ·Õè¨Í´Ã¶º¹ÍÒ¤Òà ¨íҹǹ 270 ¤Ñ¹
໚¹·Õè¨Í´Ã¶ÊíÒËÃѺ¼ÙŒãªŒºÃÔ¡ÒÃÊíÒËÃѺâçáÃÁà·‹Ò¹Ñé¹ ª‹Ç ã¹àÃ×èͧ¢Í§¡ÒÃÊÑÞ¨ÃÃÐËÇ‹Ò§¼ÙŒãªŒºÃÔ¡Òâͧá¡ÅÍÃÕè ¼ÙŒãªŒºÃÔ¡ÒÃâçáÃÁÁÕ¤ÇÒÁÊдǡ㹡ÒÃ㪌§Ò¹
TOTAL
1,578 ¤Ñ¹
¨Í´Ã¶ãµŒ´¹ Ô ·Õè¨Í´à»š¹áººàµçÁªÑé¹ 1 áÅÐẺ Split 5 ªÑé¹ ÊÒÁÒö¨Í´Ã¶ä´Œ 1,296¤Ñ¹ áÅзÕè ¨Í´Ã¶¼ÙŒ¾Ô¡Òà ¨íҹǹ 12 ¤Ñ¹ ÃÇÁ·Õè¨Í´Ã¶ãµŒ´Ô¹ ¨íҹǹ 1,308 ¤Ñ¹
»ÃÐËÂÑ´¾×é¹·Õ躹´Ô¹ ·ÕèÁÕà¹×éÍ·Õè¨íÒ¡Ñ´ ·íÒãËŒÁÕ¾×é¹·Õè㹡ÒÃ㪌 §Ò¹Ê‹Ç¹Í×è¹ æ à¾ÔèÁÁÒ¡¢Öé¹ áÅÐ໚¹¡ÒáÃШÒ¼ٌ㪌ºÃÔ¡Òà á¡ÅÍÃÕè
8 DESIGN F
G
2
3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7
6.40 9.00 8.00 9.00 8.00 9.00 8.00 9.00 8.00 9.00 8.00 9.00 8.00 9.00 8.00
8.40
H
I
J
K
L
PLAN
M
N
O
8.40 8.40 8.40 8.40 8.40 8.40 8.40 8.40
Garbage Room
Rain Water Tank
Staff Office -2.80 m.
Water Tank 2
Water Tank 1 Staff Room -2.80 m. Septic
Pump Room
Grey Water Tank
DN
Loading
Hall
UP
B-1 FLOOR Grease Trap
8
PLAN
DESIGN
F
2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3
H
I
J
K
L
M
N
O
8.40 8.40 8.40 8.40 8.40 8.40 8.40 8.40
8.00 9.00 8.00 9.00 8.00 9.00 8.00 9.00 8.00 9.00 8.00
8.40
G
B-1A FLOOR
8
PLAN
DESIGN
F
1 1 1 2 1 3 1 4 1 5 1 6 1 7
H
I
J
K
L
M
N
O
8.40 8.40 8.40 8.40 8.40 8.40 8.40 8.40
6.40 9.00 8.00 9.00 8.00 9.00
8.40
G
B-2,B-3 FLOOR
8
PLAN
DESIGN
F
2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3
H
I
J
K
L
M
N
O
8.40 8.40 8.40 8.40 8.40 8.40 8.40 8.40
8.00 9.00 8.00 9.00 8.00 9.00 8.00 9.00 8.00 9.00 8.00
8.40
G
B-2A,B-3A FLOOR
8
PLAN
DESIGN
Gallery
Hall
B
Drop Off
Pier
service
C
cafe
Water scape
souvenir
A
AHU
Amphitheatre
Wall Section
Restaurant
Retails
A
Retail
Retail
Co-working
Plaza
B
C
DN
DN UP
Plaza
Drop Off
Hall UP UP
DN
Pier
1 st F L O O R
8 DESIGN B TEMPORARY EXHIBITION
TEMPORARY EXHIBITION AREA
A
A
Wall Section
B
2 nd FLOOR
ISOMETRIC
8 ˌͧà¡çº ¢Í§ Generator CCTV
ˌͧ à¡çº¢Í§ ˌͧ¡Ô¹ ¢ŒÒÇ
B
ISOMETRIC
MDB
Office
ËÅѧ àÇ·Õ àÇ·Õ
A
Wall Section
¾×é¹·Õè «ŒÍÁ¡Òà áÊ´§
wc
DESIGN
CoWorking A and Library
wc
ˌͧᵋ§µÑÇ ¹Ñ¡áÊ´§ªÒÂ
Café Shop
B
Core
ˌͧᵋ§µÑÇ ¹Ñ¡áÊ´§ËÞÔ§ ÌҹÍÒËÒà ÀÒ¹͡ ·Õè¨Í´Ã¶
ÌҹÍÒËÒà ¤ÃÑÇ
3rd FLOOR
8 DESIGN
LibraryB
A
A
Wall Section
B
Terrace Facility
4 th FLOOR
ISOMETRIC
8 CONTROL ROOM
B
DESIGN
ISOMETRIC A
A
Wall Section
B
5 th FLOOR
8
PLAN
DESIGN
Èٹ ·ÑȹÈÔÅ»Š áÅÐ ÈÔŻСÒÃáÊ´§
âçáÃÁ Roof Plan
ISOMETRIC
8
EXHIBITION
DESIGN
5
4 2
1
4
3
1 INSTALLATION
INSTALLATION
5 7
INSTALLATION
6 2
8
5
9
§ Ò ¹ Å Í Â µÑ Ç
10 3
3D PROJECTION
11
6
3D PROJECTION
8
EXHIBITION
DESIGN
7
5
4 2
3D PROJECTION
10
3
1
ARCHITECTURE
5 7 6
8
8
9
INSTALLATION
11 10 9
3D PROJECTION
3D PROJECTION 11
8
AUDITORIUM
DESIGN
AUDITORIUM 800 seat
¨Ñ´·Õè¹Ñ觵Դµ‹Í¡Ñ¹µÅÍ´á¶Ç à¡Ô¹ 1 µÍ¹ ÁÕ·Õè¹Ñ觵Դµ‹Í¡Ñ¹ ä´ŒäÁ‹à¡Ô¹ 16 ·Õè¹Ñè§
DETAIL
¼¹Ñ§â¤Œ§´ŒÒ¹ËÅѧ
·íÒÁØÁ¼¹Ñ§ 92 ͧÈÒ ¤ÇÒÁ¡ÇŒÒ§·Ò§à´Ô¹ 1.50 àÁµÃ
ÃÐÂзÕè¹Ñè§äÁ‹à¡Ô¹ 8 á¶Ç µŒÍ§ ¨Ñ´ãËŒÁÕ·Ò§à´Ô¹µÒÁ¢ÇÒ§ ¡ÇŒÒ§äÁ‹¹ŒÍÂ¡Ç‹Ò 1.50 àÁµÃ âçÁËÃʾÃÙ»¾Ñ´ §‹Òµ‹Í ¡ÒèѴ·Õè¹Ñè§ áµ‹¡ÒÃÊзŒÍ¹ àÊÕ§äÁ‹´Õ
¤ÇÒÁÅÖ¡àÇ·Õ 10 àÁµÃ ·Ò§à´Ô¹µÒÁ¢ÇÒ§ ˹ŒÒ-ËÅѧ ¡ÇŒÒ§ 2.00 àÁµÃ
¼¹Ñ§´ŒÒ¹ËÅѧÁÕÅѡɳÐ⤌§ ÃÐÂзíÒÁØÁ¢Í§¼¹Ñ§ÍÂً㹪‹Ç§ 90-115 ͧÈÒ ¤ÇÒÁÅÖ¡àÇ·ÕäÁ‹¤ÇÃà¡Ô¹ 13.5 àÁµÃ
ͧÈÒ¤ÇÒÁÅÒ´àÍÕ§¢Í§·Õè¹Ñè§ 8-30 ͧÈÒ
Auditorium Plan Section
㪌§Ò¹¾×é¹·Õè㵌·Õè¹Ñè§ à»š¹Êíҹѡ§Ò¹ áÅÐ §Ò¹ÃкººÒ§Ê‹Ç¹ ¤ÇÒÁÅÒ´àÍÕ§¢Í§ ·Õè¹Ñè§ 17.8 ͧÈÒ
4.45 2.90
7.35
8
SECTION
DESIGN
SECTION A-A
8
SECTION
DESIGN
à Р´Ñ º ¾×é ¹ ªÑé ¹ 5 à Р´Ñ º ¾×é ¹ ªÑé ¹ 4 à Р´Ñ º ¾×é ¹ ªÑé ¹ 3 à Р´Ñ º ¾×é ¹ ªÑé ¹ 2 à Р´Ñ º ¾×é ¹ ªÑé ¹ 1
10.00 10.00 10.00 10.00 6.85
8.40 8.40 8.40 8.40 8.40 8.40
O
N
M
L
K
J
I
ฉ
¨
§
¤
¢
à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 2 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 3
+22.15 +18.30 +14.80 +9.80 +1.50 -2.80 -7.00 -8.40
¡
SECTION A-A
8
SECTION
DESIGN
à Р´Ñ º ¾×é ¹ ªÑé ¹ 5
+22.15
à Р´Ñ º ¾×é ¹ ªÑé ¹ 4
+18.30
à Р´Ñ º ¾×é ¹ ªÑé ¹ 3
+14.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ 2
+9.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 2 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 3
SECTION B-B
+1.50 -2.80 -7.00 -8.40
8 DESIGN
SECTION
SECTION C-C
8 DESIGN
SECTION
à Р´Ñ º ¾×é ¹ ªÑé ¹ 5 à Р´Ñ º ¾×é ¹ ªÑé ¹ 4 à Р´Ñ º ¾×é ¹ ªÑé ¹ 3
+22.15 +18.30 +14.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ 2
+9.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 2 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 3 9.00 8.00 9.00 8.00
8
7
6
5
+1.50 -2.80 -7.00 -8.40
9.00 8.00
4
3
2
SECTION C-C
8
WALL SECTION
DESIGN +39.25
à Р´Ñ º Ë ÅÑ § ¤ Ò
â ¤ Ã § T r u s s à Ë Åç ¡ ¡ Å Á R 0 . 4 0 Á . ¤ Ç Ò Á ÅÖ ¡ 0 . 7 0 à Á µ Ã
Ẻ¢ÂÒÂ
9.60
7.50
+22.15 3.85 +18.30
à Р´Ñ º ½‡ Ò ªÑé ¹ ·Õè 5 â ¤ à § à ¤ Ë Ò ½‡ Ò @ 1.00 Á.
á ¼‹ ¹ G F R C
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 5
+22.15
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 4
¾×é ¹ ·Õè à ¡ç º ¢ Í §
+14.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 3
¾×é ¹ ·Õè «Œ Í Á ¹Ñ ¡ á Ê ´ §
5.00 +9.80
-5.60
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè B 1
-7.00
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè B 2
-8.40
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè B 3
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 5 à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 4
¾×é ¹ P o s t - t e n s i o n Ë¹Ò 0.28 Á.
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 3
Exhibition
Ẻ¢ÂÒÂ
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 1
3.50
+14.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 2
8.30
+1.50
3.85
+18.30
3.50
¤ Ò ¹ à Ë Åç ¡ à ª×è Í Á µ‹ Í ¡Ñ º ¼ ¹Ñ § ´Œ Ç Â à Ë Åç ¡ » à Р¡Ñ º
á ¼‹ ¹ ¼ ¹Ñ § ÊíÒ à Ãç ¨ ÃÙ » µÔ ´ µÑé § º ¹ ¾×é ¹
5.00 Á.
+29.65
¾×é ¹ P o s t - t e n s i o n Ë¹Ò 0.28 Á.
5.00
+9.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ ·Õè 2
Exhibition ¾×é ¹ ä ÃŒ ¤ Ò ¹ Ë¹Ò 0.29 Á.
6
á ¼‹ ¹ G F R C Ë¹Ò 20 ÁÁ.
â ¤ Ã § T r u s s à Ë Åç ¡ ¡ Å Á ÃÑ È ÁÕ 0 . 4 0 Á . ¤ Ç Ò Á ÅÖ ¡ 0 . 7 0 à Á µ Ã
8 DESIGN
ELEVATION
+39.25
à Р´Ñ º Ë ÅÑ § ¤ Ò
+39.25
à Р´Ñ º Ë ÅÑ § ¤ Ò
+22.15 +18.30 +14.80 +9.80 +1.50 -2.80 -7.00 -8.40
à Р´Ñ º ¾×é ¹ ªÑé ¹ 5 à Р´Ñ º ¾×é ¹ ªÑé ¹ 4 à Р´Ñ º ¾×é ¹ ªÑé ¹ 3 à Р´Ñ º ¾×é ¹ ªÑé ¹ 2 à Р´Ñ º ¾×é ¹ ªÑé ¹ 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 2 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 3
+22.15 +18.30 +14.80 +9.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ 5 à Р´Ñ º ¾×é ¹ ªÑé ¹ 4 à Р´Ñ º ¾×é ¹ ªÑé ¹ 3 à Р´Ñ º ¾×é ¹ ªÑé ¹ 2
NORTH ELEVATION
+1.50 -2.80 -7.00 -8.40
à Р´Ñ º ¾×é ¹ ªÑé ¹ 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 2 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 3
EAST ELEVATION
8 DESIGN
+39.25
à Р´Ñ º Ë ÅÑ § ¤ Ò
+22.15 +18.30 +14.80 +9.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ 5 à Р´Ñ º ¾×é ¹ ªÑé ¹ 4 à Р´Ñ º ¾×é ¹ ªÑé ¹ 3 à Р´Ñ º ¾×é ¹ ªÑé ¹ 2
+1.50 -2.80 -7.00 -8.40
à Р´Ñ º ¾×é ¹ ªÑé ¹ 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 2 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 3
SOUTH ELEVATION
ELEVATION
+39.25
à Р´Ñ º Ë ÅÑ § ¤ Ò
+22.15 +18.30 +14.80 +9.80
à Р´Ñ º ¾×é ¹ ªÑé ¹ 5 à Р´Ñ º ¾×é ¹ ªÑé ¹ 4 à Р´Ñ º ¾×é ¹ ªÑé ¹ 3 à Р´Ñ º ¾×é ¹ ªÑé ¹ 2
+1.50 -2.80 -7.00 -8.40
à Р´Ñ º ¾×é ¹ ªÑé ¹ 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 1 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 2 à Р´Ñ º ¾×é ¹ ªÑé ¹Ú b 3
WEST ELEVATION
8
MATERIAL
DESIGN
Ἃ¹ Glass fiber reinforced concrete [GFRC]
ÍÅÙÁÔà¹ÕÂÁฉÅØ
㪌 à »š ¹ à»Å× Í ¡áÅÐËÅÑ § ¤Ò¢Í§ÍÒ¤ÒÃã¹Ê‹ Ç ¹¢Í§ Gallery áÅÐ Auditorium
㪌ºÃÔàdzÍÒ¤ÒèʹöáÅÐ Facade ºÒ§Ê‹Ç¹¢Í§âçáÃÁ ¢ŒÍ´Õ ÊÒÁÒöÃкÒÂÍÒ¡ÒÈã¹¾×é ¹ ·Õè ¨ ʹö䴌 ÁÕ ¤ ÇÒÁÂ× ´ ËÂØ‹ ¹ ¹éí Ò Ë¹Ñ ¡ àºÒ äÁ‹ à »š ¹ Ê¹Ô Á µÔ ´ µÑé § ä´Œ à ǴàÃç Ç áÅÐ㪌 § ҹ䴌 Í Â‹ Ò § »ÅÍ´ÀÑÂ
¢ŒÍ´Õ ÁÕ¤ÇÒÁ·¹·Ò¹ á¢ç§áç ÁÕ¤ÇÒÁÂ×´ËÂØ‹¹ ÊÒÁÒö·¹¤ÇÒÁ ໂ¡ª×é¹ä´Œ áÅÐÊÒÁÒö´Ñ´â¤Œ§µÒÁÃÙ»·Ã§·Õ赌ͧ¡ÒÃä´Œ
Í ÅÙ ÁÔ à ¹Õ Â Á ฉ ÅØ
á ¼‹ ¹ G F R C ¡ÃШ¡ÅÒÁÔ๵
¡ÃШ¡à¤Å×ͺ¼ÔÇ Reflective 㪌ºÃÔàdzà»Å×Í¡ÍÒ¤ÒôŒÒ¹·ÕèµÔ´¡ÑºÃÔÁáÁ‹¹éíÒ
㪌ºÃÔàdz·Õ赌ͧ¡ÒÃãËŒÁͧàËç¹ÁØÁÁͧÀÒ¹͡áÅÐÀÒÂã¹ÍÒ¤Òà ·Ñé§ã¹Ê‹Ç¹¢Í§á¡ÅÍÃÕèáÅÐâçáÃÁ â´Â㪌໚¹Êբ؋¹ ¡Ñº ÊÕãÊ
¡ÃШ¡à§Ò
¢Œ Í´Õ ÁÕ ¤ÇÒÁ»ÅÍ´ÀÑ Â ÊÙ § ÊÒÁÒö»‡Í§¡Ñ¹ àÊÕ§¨Ò¡ÀÒ¹͡䴌 ´Õ¡Ç‹Ò¡ÃШ¡¸ÃÃÁ´Ò ¹Í¡¨Ò¡¹ÕéÂѧ»‡Í§¡Ñ¹¤ÇÒÁÌ͹䴌´Õ ·¹µ‹Í áç´Ñ¹ÅÁã¹·ÕèÊÙ§ áÅÐÊÒÁÒöà¤Å×ͺÊÕµÒÁµŒÍ§¡ÒÃä´Œ
¢ŒÍ´Õ ÊÒÁÒöÊзŒÍ¹ÀÒ¾¨Ò¡Çѵ¶Øä´Œ
¡ Ã Ð ¨ ¡ Å Ò ÁÔ à ¹ µ
8
WALL
DESIGN
¼¹Ñ§
Gallery, Auditorium
Auditorium
Gallery ¼¹Ñ§àºÒ ¼¹Ñ § ·Õè ¡‹ Í ÊÃŒ Ò §´Œ Ç Â¡Òà µÔ ´ Ἃ ¹ ºÍà ´ ¡Ñ º ⠤ç à¤Ã‹Ò â¤Ã§à¤Ã‹Ò áÅÐἋ¹ÂÔ»«ÑÁ ºÍà ´
Ἃ¹ÍФÙʵԡ
¼¹Ñ§ÂÔ»«ÑÁºÍà ´ á ¼‹ ¹ ¼ ¹Ñ § ÂÔ » «Ñ Á º Í Ã ´ àËÁÒÐ¡Ñ º ¡ÒÃ㪌 À ÒÂã¹ ÍÒ¤Òà áÅÐÍÒ¤Ò÷Õè ã ªŒ à Рº º ä ÃŒ ¤ Ò ¹ à ¾ Ã Ò Ð ÁÕ ¹éí Ò Ë¹Ñ ¡àºÒ ª‹ Ç Â´Ù ´¡Å× ¹ àÊÕ§䴌´Õ
¼¹Ñ§´ŒÒ¹¢ŒÒ§áÅдŒÒ¹º¹
Å´àÊÕ§ÊзŒÍ¹ÀÒÂã¹ËŒÍ§ ÊÒÁÒö´Ù´«ÑºàÊÕ§䴌´Õ »‡Í§¡Ñ¹àÊÕ§ú¡Ç¹¨Ò¡ÀÒ¹͡ ¹éíÒ˹ѡàºÒ ÍÒÂØ¡ÒÃ㪌§Ò¹¹Ò¹ äÁ‹µÔ´ä¿ µÔ´µÑ駧‹ÒÂ
¡ÒèѴ¼¹Ñ§ÊíÒËÃѺ Auditorium
â¤Ã§à¤Ã‹Ò
¨Ñ´¼¹Ñ§ãËŒÁÕÅѡɳмÒÂÍÍ¡ ¼¹Ñ§äÁ‹¢¹Ò¹¡Ñ¹ ¼¹Ñ§·Õèà¡Ô´àÊÕ§ÊзŒÍ¹ãªŒ¼¹Ñ§¾×é¹·Õè¼ÔÇËÂÒº ËÃ×Í ãªŒÇÑÊ´Ø¡Å×¹¡Ô¹àÊÕ§ª‹ÇÂ
¼¹Ñ§´ŒÒ¹¢ŒÒ§ Ἃ¹ÂÔ»«ÑÁºÍà ´
¼¹Ñ§àºÒ
8
EXTERIOR PERSPECTIVE
DESIGN
MAIN ENTRANCE
DROP OFF
8
EXTERIOR PERSPECTIVE
DESIGN
COMMERCIAL LINKAGE 1 ST F L O O R
COMMERCIAL LINKAGE 2 ND F L O O R
8
EXTERIOR PERSPECTIVE
DESIGN
THE D.O.C.K RESTAURANT
WATERSCAPE DOCK
8
EXTERIOR PERSPECTIVE
DESIGN
AMPHITHEATRE
RIVERSIDE
8
INTERIOR PERSPECTIVE
DESIGN
AUDITORIUM
EXHIBITION HALL
9 STRUCTURE
• • • •
Wide Span Structure Skeleton Structure Basement Structure Materials Installation
9
OVERALL STRUCTURE
STRUCTURE
OVERALL STRUCTURE WIDE SPAN STRUCTURE
Lattice
Truss
Lattice Truss
Column and Beam Special Floor
SKELETON STRUCTURE Column and Beam Special Floor BASEMENT STRUCTURE
Basement Structure
9 STRUCTURE
SKELETON STRUCTURE Column and Beam àÊÒ-¤Ò¹¤Í¹¡ÃÕµ ˹ŒÒµÑ´ 2 µÃ.Á.
1
0.50 Á.
˹ŒÒµÑ´ 0.50 µÃ.Á.
2
˹ŒÒµÑ´ÃÑÈÁÕ 0.4 Á.
3
0.50 Á.
0.40 Á. 1.00 Á. 2.00 Á.
Lattice
Truss àÊÒ·Õè¨Í´Ã¶ªÑé¹ãµŒ´Ô¹
Column and Beam Special Floor
àÊÒ·Õè¨Í´Ã¶ªÑé¹ãµŒ´Ô¹
àÊÒªÑ鹺¹´Ô¹
Special Floor Ë¹Ò 29 «Á.
Drop Panel
¾×鹪Ñé¹ãµŒ´Ô¹ -
ÃѺ¹éíÒ˹ѡ 1000 ¡¡./µÃ.Á. Span /Depth ratio = 35 ÃÐÂÐàÊÒ 10 àÁµÃ 1000 / 35 = 29 «Á. ´Ñ§¹Ñé¹ ¨Ðä´Œ ¤ÇÒÁ˹Ҿ׹ é 29 «Á.
¾×鹪Ñ鹺¹´Ô¹
Basement Structure Post-Tension
-
ÃѺ¹éíÒ˹ѡ 500 ¡¡./µÃ.Á. Span /Depth ratio = 36 ÃÐÂÐàÊÒ 10 àÁµÃ 1000 / 36 = 28 «Á. ´Ñ§¹Ñé¹ ¨Ðä´Œ ¤ÇÒÁ˹Ҿ׹ é 28 «Á.
9 STRUCTURE
WIDE SPAN STRUCTURE Case Study : The Twist Architect : BIG
Truss
• SPAN
• ¢ ¹ Ò ´ à Á Á à º Í Ã
6 8 - 4 8 àÁµÃ
Lattice
Truss
à Ë Åç ¡ ¡ Å Á ÃÑ È ÁÕ 0 . 4 0 Á .
0.70 Á.
• ÇÑ Ê ´Ø » ´ ¼Ô Ç
Glass fiber reinforced concrete [GFRC]
Column and Beam Special Floor
T
• ¡ Ò Ã ¶‹ Ò Â á à § á à § ÍÑ ´ ( C ) á à § ´Ö § ( T )
T C
• JOINT
HINGE JOINT
Basement Structure
• ¢ ¹ Ò ´ ¤ Ç Ò Á ÅÖ ¡
5 th F l . 4 th F l . 3 rd F l . 2 nd F l . 1 st F l .
C
T C
T C
T C
T C
T C
T
T C
T C
T C
T C
T C
T C
T
C C
9 STRUCTURE
WIDE SPAN STRUCTURE Lattice • ¤ Ç Ò Á ÊÙ §
84.15 àÁµÃ
• ÇÑ Ê ´Ø » ´ ¼Ô Ç Í ÅÙ ÁÔ à ¹Õ Â Á ฉ ÅØ
• ¢ ¹ Ò ´ à Á Á à º Í Ã
â ¤ à § T r u s s ¡ ÃØ ¼Ô Ç ¢¹Ò´ 1.5*3 àÁµÃ @ 6.00 Á.
• JOINT
Lattice
Hinge Joint
Truss
• ¡ Ò Ã ¶‹ Ò Â á à §
¶‹ Ò Â á à § á º º á ¼‹ ¹ ¼× ¹ µ Ò ¢‹ Ò Â
• ¢Œ Í ´Õ
ÁÕ ÅÑ ¡ É ³ Ð â » Ë § â ¤ à § Ê ÃŒ Ò § ÁÕ à ÊŒ ¹ Ê Ò Â ·Õ è ä Á‹ «Ñ º «Œ Í ¹ ·í Ò ã Ë Œ Ã Ñ º á Ê § ä ´Œ à µ ç Á ·Õ è à Ë Á Ò Ð ¡ Ñ º ¡ Ò Ã ¹í Ò ä » à » š ¹ F a c a d e ¢ Í § Ê‹ Ç ¹ âçáÃÁ
áçàฉ×͹ (S) / áç´Ö§ (T) / áçÍÑ´ (C)
Column and Beam Special Floor
Weld
S
àª×èÍÁµ‹Í¡Ñº¾×é¹
ÍÅÙÁÔà¹ÕÂÁฉÅØ
C
C
â¤Ã§ËÅÑ¡
C T
T ÇÑ Ê ´Ø ¡ ÃØ ¼Ô Ç
Basement Structure
column
Ἃ¹ÍÅÙÁÔà¹ÕÂÁ
column â ¤ Ã § Ë ÅÑ ¡
9
AUDITORIUM
STRUCTURE
FOYER
JOINT II
JOINT I
5 th F l o o r
W A L K W AY
4 th F l o o r
II
STRUCTURE OFFICE
I
â ¤ à § Ê ÃŒ Ò § C o l u m n - B e a m I
• ¢ ¹ Ò ´ à Á Á à º Í Ã
à Ë Åç ¡ ¡ Å‹ Í § ¢ ¹ Ò ´ 0 . 1 5 * 0 . 1 5 M 0.15 Á.
â ¤ à § Ê ÃŒ Ò § T r u s s II
• ¢Œ Í ´Õ
ÁÕ Ã Ò ¤ Ò ¶Ù ¡ à Ë Á Ò Ð ¡Ñ º ¡ Ò Ã µÔ ´ µÑé § º ¹ ¾×é ¹ ·Õè «Öè § ä Á‹ ÁÕ ¡ Ò Ã ã ªŒ § Ò ¹ ´Œ Ò ¹ Å‹ Ò § ·Õè ¹Ñè §
R 0.20
»ÃСͺ¨Ò¡ âç§Ò¹
• ¤ Ç Ò Á ÅÖ ¡
¤ Ç Ò Á Â Ò Ç Ë ¹Œ Ò § Ò ¹ 0.70- 3.30 àÁµÃ
@ 0.50 àÁµÃ
• ¢ ¹ Ò ´ à Á Á à º Í Ã R 0.40
¤ÇÒÁÂÒǨҡâç§Ò¹ 6 àÁµÃ
• à Р Рˋ Ò § â ¤ à § Ê ÃŒ Ò § à Ê Ò
Hinge Joint
ÃÑ È ÁÕ 0 . 4 0 Á . / 0 . 2 0 Á .
Fixed Joint
0.15 Á.
CASE STUDY Gallery of Princess Alexandra Auditorium
3 rd F l o o r
2.30 M
1.00 àÁµÃ / 0.40 àÁµÃ
CASE STUDY Echo Park School of Performing Arts
• à Р Рˋ Ò § T r u s s @ 8.00 àÁµÃ
• ¢Œ Í ´Õ
Ê Ò Á Ò Ã ¶ ã ªŒ § Ò ¹ ¾×é ¹ ·Õè ´Œ Ò ¹ Å‹ Ò § ·Õè ¹Ñè § ä ´Œ
9 STRUCTURE
DIAPHRAGM WALL
¼¹Ñ§¡Ñ¹´Ô¹ªÑé¹ãµŒ´Ô¹ à¹×èͧ¨Ò¡·ÕèµÑ駢ͧâ¤Ã§¡Òà ÍÂÙ‹µÔ´áÁ‹¹éíÒ਌ҾÃÐÂÒ áÅÐÁÕ Ê‹Ç¹¢Í§ÍÒ¤Ò÷Õè໚¹ªÑé¹ãµŒ´Ô¹ ¨íҹǹ 2 ªÑé¹ ÅÖ¡ 5.6 àÁµÃ ¨Ö§·íÒãËŒµŒÍ§ÁÕ¡íÒᾧ¡Ñ¹´Ô¹·ÕèÁÕ¤ÇÒÁá¢ç§áçáÅСѹ¹éíÒ㵌 ´Ô¹ä´Œ´Õ ¨Ö§àÅ×͡㪌 ໚¹ Diaphragm Wall
Diaphragm wall ¢ŒÍ´Õ -
¡Ñ¹¹éíÒ㵌´Ô¹ä´Œ´Õ äÁ‹µŒÍ§ãªŒ Sheet pile
¤ÇÒÁË¹Ò 60 «Á.
0.60 Á.
SITE
9 STRUCTURE
MATERIALS INSTALLATION
¡ Ò Ã µÔ ´ µÑé § Glass fiber reinforced concrete[GFRC] 㪌໚¹à»Å×Í¡áÅÐËÅѧ¤Ò¢Í§ÍÒ¤ÒÃã¹Ê‹Ç¹¢Í§ Gallery áÅÐ Auditorium
Ê‹ Ç ¹ » Ã Ð ¡ Í º ¢ Í § ÇÑ Ê ´Ø â ¤ Ã § Ë ÅÑ ¡ Truss
á ¼‹ ¹ à Ë Åç ¡
¤ Í ¹ ¡ ÃÕ µ ·Õè ¼ Ê Á ¡Ñ º à ÊŒ ¹ ã Â á ¡Œ Ç ä ¿ à º Í Ã ( G l a s s f i b e r ) á · ¹ ¡ Ò Ã ã ªŒ à Ë Åç ¡ » ¡ µÔ à Ã Ò Ê Ò Á Ò Ã ¶ Ë Å‹ Í ã ËŒ º Ò § ´Œ Ç Â ¤ Ç Ò Á Ë ¹ Ò µÑé § á µ‹ 5 Á Á . ¨ ¹ ¶Ö § 2 0 Á Á . ã Â á ¡Œ Ç ä ¿ à º Í Ã ¨ Ð ä Á‹ à ¡Ô ´ Ê ¹Ô Á à Ë Á× Í ¹ à Ë Åç ¡ ¨Ö § ä Á‹ ¨í Ò à »š ¹ µŒ Í § Ë Å‹ Í ã ËŒ Ë ¹ Ò à ¾×è Í »‡ Í § ¡Ñ ¹ ¡ Ò Ã ¢Öé ¹ Ê ¹Ô Á ã ¹ à Ë Åç ¡ ´Œ Ç Â ¡ Ò Ã ¢Öé ¹ ÃÙ » ·Õè ä Á‹ Ë ¹ Ò ¨Ö § ·íÒ ã ËŒ ªÔé ¹ § Ò ¹ ÁÕ ¹éíÒ Ë ¹Ñ ¡ à º Ò à ·Õ Â º ¡Ñ º ¡ Ò Ã Ë Å‹ Í ¤ Í ¹ ¡ ÃÕ µ ·Ñè Ç æ ä »
¡ Ò Ã µÔ ´ µÑé § Í ÅÙ ÁÔ à ¹Õ Â Á ฉ ÅØ ãªŒºÃÔàdzÍÒ¤ÒèʹöáÅÐ Facade ºÒ§Ê‹Ç¹¢Í§âçáÃÁ
F i x e d J o i n t - ¡ Ò Ã à ª×è Í Á H i n g e J o i n t - à Ë Åç ¡ » à Р¡Ñ º
• ¡ÒõԴµÑ駷Õèä´ŒÁҵðҹµŒÍ§¤íÒ¹Ö§¶Ö§¡Òáѹ½¹à¢ŒÒÀÒÂã¹ÍÒ¤Òà Ëҡ໚¹¡ÒõԴµÑ駺¹à§×èÍ¹ä¢ Rain Screen • «ÔÅÔ⤹·Õè¹ÔÂÁ㪌§Ò¹¡Ñ¹¨Ð໚¹ non-stain à¾×èÍ»‡Í§¡Ñ¹¤ÃÒº´íÒ·Õèà¡Ô´¨Ò¡¡Ò÷íÒ»¯Ô¡ÔÃÔÂҡѺ½¹¡Ã´ ¤ÃÒºàËÅ‹Ò¹Õé·íÒ¤ÇÒÁ ÊÐÍÒ´ÂÒ¡ äÁ‹ÊÒÁÒö¶Ù¡ªÐŌҧÍÍ¡ä´Œàͧ¨Ò¡¹éíÒ½¹¸ÃÃÁªÒµÔ • Ἃ¹ ACM ·ÕèฉÅØÅÒ·íÒ Facade ã¹Ãкº Double Wall ËÃ×ͼ¹Ñ§ÊͧªÑé¹ÍÒ¨äÁ‹µŒÍ§¤íÒ¹Ö§¶Ö§¡Òáѹ½¹à¢ŒÒÀÒÂã¹ ´ŒÇÂà赯 ¹Õéàͧ ¡ÒÃ㪌 Silicone ¨Ö§à»š¹ÊÔè§äÁ‹¨íÒ໚¹ ᵋÍ‹ҧäáçµÒÁ¤ÇÃàÇŒ¹ÃÐÂÐË‹Ò§»ÃÐÁÒ³ 5 ÁÁ. à¾×èÍÅ´¼Å¡Ãзº¨Ò¡¡Òà ¢ÂÒµÑǢͧἋ¹ã¹ÊÀÒ¾ÍÒ¡ÒÈ·ÕèÍسËÀÙÁÔÊÙ§¡Ç‹Ò»¡µÔ • ¡ÒÃÂÖ´»ÃСͺ·ÕèÁͧàËç¹Ãкºâ¤Ã§ÊÌҧáÅСÒõԴµÑ駨ҡ·Ñé§ÀÒ¹͡áÅÐÀÒÂã¹à»š¹Ãкº·Õ赌ͧ¡ÒäÇÒÁ»ÃгյÊÙ§ ¼ÙŒÍ͡Ẻ¾Ö§Êͺ¶ÒÁ¶Ö§Ãкº¡ÒÃâªÇ á¹ÇµÔ´µÑé§áÅÐÍØ»¡Ã³ ¾ÃŒÍÁà·¤¹Ô¤¡ÒÃÂÔ´µÔ´á¼‹¹à¾×èͤÇÒÁ¤§·¹ äÁ‹à»š¹Ê¹ÔÁ
â¤Ã§ËÅÑ¡
9
MATERIALS INSTALLATION
STRUCTURE
¡ Ò Ã µÔ ´ µÑé § ¡ à Р¨ ¡ à ¤ Å× Í º ¼Ô Ç R e f l e c t i v e [ C o a t e d G l a s s ] 㪌ºÃÔàdzà»Å×Í¡ÍÒ¤ÒôŒÒ¹·ÕèµÔ´¡ÑºÃÔÁáÁ‹¹éíÒ • C l e a r R e f l e c t i v e G l a s s ¡ à Р¨ ¡ Ê Ð ·Œ Í ¹ á Ê § ÊÕ ã Ê (¤ÇÒÁË¹Ò 5 mm. – 6 mm. / Maximum size 3.6 x 2.4 m.)
໚¹¡ÃШ¡à¤Å×ͺ¼ÔÇÍÍ¡ä«´ ¤ÇÒÁâ»Ã‹§ áʧµèí Ò ¤¹ÀÒ¹͡Áͧࢌ Ò ÁÒÀÒÂã¹ ÅíÒºÒ¡ ᵋ¤¹ÀÒÂã¹ÁͧÍÍ¡ÀÒ¹͡ ä´Œ ªÑ ´ ÊÒÁÒöÊзŒ Í ¹áʧ¨Ò¡´Ç§ ÍҷԵ ·Õè¨Ð¼‹Ò¹à¢ŒÒÊÙ‹ÍÒ¤ÒÃä´Œ»ÃÐÁÒ³ 30% ໚ ¹ ¡ÒÃÅ´ÀÒÃТͧÃкº»ÃÑ º ÍÒ¡ÒÈ ÁÑ ¡ ¹Ô  Á㪌 ¡ ÃШ¡»ÃÐàÀ·¹Õé ¡Ñ º ¼¹Ñ§ÀÒ¹͡ÍÒ¤ÒÃ
Frame
â¤Ã§ÃѺ¡ÃШ¡ËÅÑ¡ ¡ÃШ¡
¡ Ò Ã µÔ ´ µÑé § ¡ à Р¨ ¡ Å Ò ÁÔ à ¹ µ 㪌 º ÃÔ à dz·Õè µŒ ͧ¡ÒÃãËŒ Á ͧàËç ¹ ÁØ Á ÁͧÀÒ¹͡áÅÐÀÒÂã¹ÍÒ¤Òà ·Ñé § ã¹Ê‹ Ç ¹¢Í§á¡ÅÍÃÕè á ÅÐ âçáÃÁ â´Â㪌໚¹Êբ؋¹ ¡Ñº ÊÕãÊ
Glass Rib System
Rib
໚¹¡ÒÃÂÖ´¡ÃШ¡´ŒÇÂâ¤Ã§Êѹ¡ÃШ¡ (Rib) ·ÕèµÔ´µÑé§ÃͧÃѺÍÂÙ‹´ŒÒ¹ËÅѧÃ͵‹Í¡ÃШ¡áµ‹ÅÐἋ¹ â´Â â¤Ã§Êѹ¡ÃШ¡¨Ð¶Ù¡ÇÒ§ã¹á¹ÇµÑé§ µÑé§áµ‹¾×é¹ÊÙ§¶Ö§à¾´Ò¹ àÁ×èͶ١µÔ´µÑ駷Õ贌ҹËÅѧÃ͵‹Í¢Í§¡ÃШ¡·Ø¡ Ἃ¹Í‹ҧṋ¹Ë¹Ò Áѹ¨Ð·íÒãËŒ¼¹Ñ§¡ÃШ¡·Ñé§á¼§µÑé§ÍÂÙ‹ä´ŒàͧÍ‹ҧ¤§·¹á¢ç§áç •
¢ŒÍ´Õ - ãËŒ·ÑȹÕÂÀÒ¾·ÕèÁÕ¤ÇÒÁâ»Ã‹§ãÊ·Ò§ÊÒµÒä´Œ´Õ - ª‹ÇÂãËŒ¼¹Ñ§¡ÃШ¡·Õè¼×¹ãËÞ‹¨ÐÁÕ¤ÇÒÁâ»Ã‹§ãÊÊǧÒÁâ´ÂäÁ‹ÁÕâ¤Ã§ÊÌҧ·Õè˹ÒáÅзֺµÑ¹ÁҺѧ
Bolted-Fixed Stainless-Steel Fitting
10 EQUIPMENT
• • • • • • • •
Electrical System Sanitary System A/C System Ventilation System Fire Protection System Auditorium & Exhibition Lift & Escalator Cleaning System
10 EQUIPMENT
TRANSFORMER àÅ×͡㪌ËÁŒÍá»Å§ä¿¿‡Òª¹Ô´ Dry Type µÔ´µÑé§ ÀÒÂã¹ÍÒ¤ÒÃâ´Â㪌 Ë ÁŒ Í á»Å§ä¿¿‡ Ò ¢¹Ò´ 2,000 kVA â´Â TR-01,TR-02 ã ªŒ Êí Ò ËÃÑ º MDB1 áÅÐ MDB2 (Ê‹ § ä¿ä»Ê‹ Ç ¹â¶§ ËŒ Í §»ÃÐªØ Á ÃŒ Ò ¹ÍÒËÒà Parking) TR-03,TR-04,TR-05( Ê‹ § ä ¿ ä » Ê‹ Ç ¹ ˌͧ¾Ñ¡)
GENERATOR àÅ× Í ¡ãªŒ à ¤Ã×è Í §»˜› ¹ ä¿ ¢¹Ò´ 1,000 kVA à¾×èÍÊíÒÃͧä¿àÁ×èÍà¡Ô´ä¿´Ñº â´ÂÊÒÁÒö ã ªŒ ä ¿ ¿‡ Ò Êí Ò Ã Í § Êí Ò Ë ÃÑ º Ê‹ Ç ¹ ÅÔ ¿ · ã ËŒ à¾Õ§¾Íµ‹Í¡ÒÃÊ‹§¼ÙŒâ´ÂÊÒ÷ÕèÂѧµ¡¤ŒÒ§ ÍÂÙ‹ ´Œ Ò ¹ã¹áÅÐÅÔ ¿ · ´Ñ º à¾ÅÔ § ¡ÒÃãËŒ á ʧ ÊÇ‹Ò§ºÃÔàdz·Ò§à´Ô¹ ÃÇÁ¶Ö§ºÑ¹ä´Ë¹Õä¿ áÅл˜ Á¹éíҴѺà¾ÅÔ§
ELECTRICAL SYSTEM RMU (Ring Main Units) ໚ ¹ ÊÇÔ µ « à ¡Õ Â Ã á çÊÙ § ¢¹Ò´ 24 kV ã¹Ãкº ¨‹ Ò Âä¿¿‡ Ò ¢Í§¡ÒÃä¿¿‡ Ò ÁÕ Ë ¹Œ Ò ·Õè µÔ ´ µ‹ Í áÅÐ »‡Í§¡Ñ¹¤ÇÒÁàÊÕÂËÒ·Õèà¡Ô´¨Ò¡¡ÒÃ㪌¡ÃÐáÊà¡Ô¹ ¾Ô ¡Ñ ´ ËÃ× Í ä¿¿‡ Ò ÅÑ ´ ǧ¨Ã áÅÐÊ‹ § µ‹ Í ä»ÂÑ § ËŒ Í § à¤Ã×èͧ俿‡ÒËÅÑ¡ (MDB) - ¢¹Ò´µÒÁ¢ŒÍ¡íÒ˹´¡ÒÃä¿¿‡Ò¹¤ÃËÅǧ - ÍØ»¡Ã³ 䴌ᡋ MDB , ÁÔàµÍà - ¾Ô¡Ñ´áç´Ñ¹ 24 kV , BIL 125 kV - ¾Ô¡Ñ´¡ÃÐáÊ SWITCH 400 A , 630 A - ¾Ô¡Ñ´¡ÃÐáÊÅѴǧ¨Ã 16 Î ËÃ×Í 24 kV
MDB ·í Ò Ë¹Œ Ò ·Õè ¨‹ Ò Âä¿ä»ÂÑ § Ê‹ Ç ¹µ‹ Ò § æ ¢Í§â¤Ã§¡Òà â´ÂÁÕ ¨íҹǹ 3 à¤Ã×èͧ ¤×Í MDB1 㪌ʋ§ä¿Âѧ Auditorium , Permanent – Temporary Gallery MDB2 㪌ä¿Ê‹§ä»Âѧ ˌͧÊÁØ´ , Co-working , Ìҹ¤ŒÒ áÅРÌҹÍÒËÒà MDB3 㪌ʋ§ä¿ä»Âѧ Office , ˌͧ§Ò¹Ãкº áÅР⶧µŒÍ¹ÃѺ MDB4 㪌ʋ§ä¿ä»Âѧ·Õè¨Í´Ã¶ãµŒ´Ô¹ áÅÐÍÒ¤Òà ¨Í´Ã¶
10
ELECTRICAL SYSTEM
EQUIPMENT
Electrical System Ãкºä¿¿‡Ò
MDB 01 : 600+ kVA
Electric Diagram ÃÒÂÅÐàÍÕ´
Automatic Transfer Switch (ATS) 㪌㹡ÒÃÊѺà»ÅÕè¹ áËÅ‹§¨‹Ò¾Åѧ§Ò¹ µÒÁ»¡µÔ໚¹Ãкº ¨Ò¡áËÅ‹§¨‹ÒÂä¿ ฉØ¡àฉÔ¹
DB PERMANENT GALLERY DB TEMPORARY GALLERY
MDB 02 : 540+ kVA
ä¿¿‡Ò¨Ò¡¡Òà 俿‡Ò
DB LIBRARY DB CO-WORKIMG SPACE DB RETAIL
RMU
Distribution Board (DB) µÙŒâËÅ´ä¿¿‡Ò µÔ´µÑé§ã¹ ·Ø¡æ 1 ªÑé¹ àÇŒ¹ÃÐÂÐ »ÅÍ´ÀÑ´ŒÒ¹ÅÐ 1.5 Á. áÅÐàÇŒ¹ÃÐÂÐ ºÃÔàdz´ŒÒ¹·ŒÒ 2 Á. ¢¹Ò´ 0.60x2.00 Á.
DB AUDITORIUM
DRY TYPE TRANSFORMER 2,500 kVA x 2
DB RESTAURANT MDB 03 800+ kVA
DB ADMINISTRATOR OFFICE DB SYSTEM ROOM DB PUBLIC HALL
GENERATOR 1,000 kVA
ATS
MDB 04 : 1610+ kVA
DB UNDERGROUND PARKING DB PARKING TOWER
10
ELECTRICAL SYSTEM
EQUIPMENT
TOTAL LOAD
4,137 Zoning
9,82
1,334
1,658
Load Load Load Area (Lighting) (Electrical) (Ventilation)
163 Load (etc)
ÃÇÁ
Auditorium
2,515
39
71
65
-
175.2
Gallery
6,520
109
134
189
-
432
Library & Co-Working
2,080
40
117
59
-
216
Shop & Restaurant
724
31
62
71
163
327
Administrator
585
11
30
17
-
58
2,379
752
920
1257
Central
2,929
10
ELECTRICAL SYSTEM
EQUIPMENT
Electrical System Riser Diagram
PLAN RMU RMU
DB
ISOMETRIC 俨ҡ¡ÒÃä¿¿‡Ò 俨‹ÒÂã¹â¤Ã§¡ÒÃ
1 st floor
ä¿ÊíÒÃͧ Floor5 Floor4 MDB 108.90 sq.m.
Floor3
Generator 52.10 sq.m.
Floor2
Transformer 157.50 sq.m.
Floor1
RMU 118.50 sq.m.
TRANSFORMER GENERATOR
3 rd floor
MDB
10
ELECTRICAL SYSTEM
EQUIPMENT
Lighting Planning Concept Area Requirement ¾×é¹·Õè㪌§Ò¹
Lighting Level ÃдѺáʧÊÇ‹Ò§µ‹Í¾×é¹·Õè㪌§Ò¹
Lumen Method ¤íҹdz¿ÅÑ¡« ÊÍ ‹ §ÊÇ‹Ò§ áÅШíҹǹ´Ç§â¤Á
Í Ò ÂØ ¡ Ò Ã ã ªŒ § Ò ¹ ¹ Ò ¹
» Ã Ð Ë ÂÑ ´ ¾ ÅÑ § § Ò ¹
Lighting Type ¤‹ Ò Á Ò µ à ° Ò ¹ ¤ Ç Ò Á à ¢Œ Á á Ê § Ê Ç‹ Ò § (LUX) 100 LUX
• ·Õè ¨ Í ´ à ¶ • ËŒ Í § ¹éíÒ
200 LUX
• · Ò § à ´Ô ¹ À Ò Â ã ¹ ÍÒ¤Òà • ÃŒ Ò ¹ ¤Œ Ò • âçÁËÃʾ
MANUAL
300 LUX
• Exhibition • ÃŒ Ò ¹ Í Ò Ë Ò Ã • ÊíÒ ¹Ñ ¡ § Ò ¹
ã ªŒ ã ¹ ¾×é ¹ ·Õè ·íÒ § Ò ¹ » à Р¨íÒ µ Ò Á ¡ Ò Ã ã ªŒ § Ò ¹ ã ËŒ à Ë Á Ò Ð Ê Á ã ¹ ª‹ Ç § à Ç Å Ò µ‹ Ò § æ
MOTION ACTIVE SENSOR ã ªŒ ã ¹ ¾×é ¹ ·Õè ·íÒ § Ò ¹ ä Á‹ º‹ Í Â µ Ò Á â Í ¡ Ò Ê à ª‹ ¹ · Ò § à ´Ô ¹ à ¾×è Í » Ã Ð Ë ÂÑ ´ ¾ ÅÑ § § Ò ¹
Calculate Distance ÃÐÂСÒõԴµÑ駴ǧâ¤Á
ã ËŒ ¤‹ Ò ÊÕ ·Õè ¶Ù ¡ µŒ Í § CRI >80
ANALOG THE SWITCH ã ªŒ ã ¹ ¾×é ¹ ·Õè ÁÕ ª‹ Ç § à Ç Å Ò ·íÒ § Ò ¹ ·Õè á ¹‹ ¹ Í ¹ à ª‹ ¹ â ¤ Á ½˜ § ¾×é ¹ Ê » Í Ã µ ä Å · ¹ Í ¡ Í Ò ¤ Ò Ã
PHOTOELECTRIC LIGHT SENSOR ã ªŒ ã ¹ ¾×é ¹ ·Õè á ´ ´ Ê‹ Í § ¶Ö § µ Ã Ç ¨ ¨Ñ º á Ê § ÍÑ µ â ¹ ÁÑ µÔ à ¾×è Í » Ã Ð Ë ÂÑ ´ ¾ ÅÑ § § Ò ¹
10
ELECTRICAL SYSTEM
EQUIPMENT
T5 LED ËÅÍ´ LED T5 , 11W 1100 Lumen ÊÕ Daylight Cool white
ËÅÍ´ LED T5 , 36W ÊÕ Daylight Cool white
ËÅÍ´ LED ÊÕ Daylight Cool White µÔ´µÑé§ã¹ÃдѺ¤ÇÒÁÊÙ§ 2.5 – 4 àÁµÃ ÃÐÂÐˋҧ㹡ÒõԴµÑé§ 1.50 – 2.50 àÁµÃ
ËÅÍ´ LED ÊÕ Daylight Cool White µÔ´µÑé§ã¹ÃдѺ¤ÇÒÁÊÙ§ 5 – 7 àÁµÃ ÃÐÂÐˋҧ㹡ÒõԴµÑé§ 2.00 – 3.50 àÁµÃ
ʋǹÊíҹѡ§Ò¹
ʋǹ§Ò¹Ãкº áÅÐÍÒ¤Òèʹö
ʋǹÌҹ¤ŒÒ ¹Ô·ÃÃÈ¡Òà Êíҹѡ§Ò¹
⶧·Ò§à´Ô¹ ʋǹÌҹ¤ŒÒ ¹Ô·ÃÃÈ¡ÒÃ
ÃÒÂÅÐàÍÕ´
¨Ø´µÔ´µÑé§
DOWNLIGHT
10
ELECTRICAL SYSTEM
EQUIPMENT
LED PENDANT â¤Áä¿ËŒÍÂྴҹ ËÅÍ´ LED ÊÕ Day Light 180*180*1400 mm.
CHANDELIER â¤Áä¿ËŒÍÂྴҹ CHANDELIER ÊÕ Day Light Dia 900 + Dia 700 * H1500 mm.
LED STRIP LIGHT ä¿·‹Í , 12W / M LED LINEAR FLEX Flexible PCB Silicone RGB / RGBW Dia 431*228 mm.
ä¿ÎÒâÅਹ , 75W 230 V ÍÒÂØ¡ÒÃ㪌§Ò¹ 2000 ªÁ. 8.8*8.8*10 cm. áʧÊíÒËÃѺ¡ÒÃ์¹§Ò¹ ÊÒÁÒöËÃÕèáʧä¿ä´Œ
ʋǹµ¡áµ‹§ÀÒÂã¹ áÅÐÀÒ¹͡
ʋǹ¹Ô·ÃÃÈ¡ÒÃ
ÃÒÂÅÐàÍÕ´
¨Ø´µÔ´µÑé§
⶧ÅÔ¿µ ⶧·Ò§à´Ô¹
⶧µŒÍ¹ÃѺ
HALOGEN LIGHT
10
ELECTRICAL SYSTEM
EQUIPMENT
俽˜§¾×é¹
ÃÒÂÅÐàÍÕ´
¨Ø´µÔ´µÑé§
俽˜§¾×é¹ , 3W LED Inground LED Module ÊÕ Warm Light Dia 50 mm. H 80 mm.
ä¿Ê‹Í§µŒ¹äÁŒ ËÅÍ´ GU10 ¢ÑéÇËÅÍ´ MR16 Dia 58 mm. H 92 mm.
·Ò§à´Ô¹ Landscape
·Ò§à´Ô¹ Landscape
ä¿àÊÒÊǹ â¤Áä¿Êǹ ËÅÍ´ LED , 7W ÊÕ Warm White W : 105*105 mm. H : 600 mm.
·Ò§à´Ô¹ Landscape
ä¿àÊÒʹÒÁ
ä¿ãµŒ¹éíÒ
â¤Áä¿Ê¹ÒÁ ËÅÍ´ LED Streetlight 110W ÊÕ Cool White W : 370*872*134 mm.
ä¿ãµŒ¹éíÒ ËÅÍ´ LED 320 Lumen ÊÕ Warmwhite 3000K Dia 120 mm. * H 64 mm.
·Ò§Ã¶Â¹µ
º‹Í¹éíÒ
10
ELECTRICAL SYSTEM
EQUIPMENT
Indoor Lighting System ¡Òäíҹdz
¡ Ò Ã ¨Ñ ´ Ç Ò § ´ Ç § â ¤ Á S
ÇÔ¸Õ¡Òäíҹdz
S
¤‹Ò¤ÇÒÁÊÇ‹Ò§¢Í§¾×é¹·Õè = ¤ÇÒÁࢌÁáʧÊÇ‹Ò§¢Í§¾×é¹·Õè x ¾×é¹·Õè (Lumen,lm) (lux) (sq.m.) ¨íҹǹËÅÍ´ä¿
= ¤‹Ò¤ÇÒÁÊÇ‹Ò§¢Í§¾×é¹·Õè ¤‹Ò¤ÇÒÁÊÇ‹Ò§¢Í§ËÅÍ´ä¿
¤‹Ò¤ÇÒÁࢌÁáʧÊÇ‹Ò§¢Í§¾×é¹·Õè µÒÁ¡ฎËÁÒ 1. 2. 3. 4. 5.
ÍÒ¤Òèʹö âçÁËÃʾ ˌҧÊÃþÊÔ¹¤ŒÒ ˌͧÊÁØ´ Êíҹѡ§Ò¹
– – – -
100 lux 100 lux 200 lux 300 lux 300 lux
S S
Downlight / LED Pendant
S
T5 LED
T5 LED µÔ´ÂÒǵÅÍ´
à Р Р¡ Ò Ã ¨Ñ ´ Ç Ò § ´ Ç § â ¤ Á á ¶ Ç ÊØ ´ ·Œ Ò Â ªÔ ´ ¼ ¹Ñ § S
x S
S y
x
Downlight / LED Pendant
ÃÐÂÐ
x
x
T5 LED µÔ´ÂÒǵÅÍ´
á¹Ð¹íÒ
ÊÙ§ÊØ´
X
79 – 90 cm.
S/2
Y
15 – 30 cm.
60 cm.
¤ÇèѴÃÐÂÐäÁ‹à¡Ô¹ S/2 ËÃ×ÍÃÐÂÐá¹Ð¹íÒ
10 EQUIPMENT
ELECTRICAL SYSTEM
¼Ñ§áÊ´§µíÒá˹‹§ áÅСÒÃà´Ô¹ÊÒÂä¿ ä¿·‹Í«‹Í¹ LED Strip Light ÀÒ¹͡ 俽˜§¾×é¹ 3W inground 俽˜§¾×é¹ Ê‹Í§µŒ¹äÁŒ ä¿àÊÒÊǹ ä¿àÊÒʹÒÁ
Layout Floor Plan
10
ELECTRICAL SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§ áÅСÒÃà´Ô¹ÊÒÂä¿ LED T5 ä¿·‹Í LED Strip Light Down light H.2.5 - 4 m. Down light H.5 - 7 m. LED Pendant Chandelier Halogen Light
100 lux 200 lux 300 lux 100 lux * 16,438 sqm. = 1,643,800 lumen ãªŒä¿ 3000 lumen = 1,643,800/3000 = 547.93 ´Ç§
Basement 1 Floor Plan
10
ELECTRICAL SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§ áÅСÒÃà´Ô¹ÊÒÂä¿ LED T5 ä¿·‹Í LED Strip Light Down light H.2.5 - 4 m. Down light H.5 - 7 m. LED Pendant Chandelier Halogen Light
Basement 1A , 2A , 3A
100 lux 200 lux 300 lux 100 lux * 16,438 sqm. = 1,643,800 lumen ãªŒä¿ 3000 lumen = 1,643,800/3000 = 548 ´Ç§
Basement 2 , 3
10
ELECTRICAL SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§ áÅСÒÃà´Ô¹ÊÒÂä¿ LED T5 ä¿·‹Í LED Strip Light Down light H.2.5 - 4 m. Down light H.5 - 7 m. LED Pendant Chandelier Halogen Light
Hotel
Gallery
100 lux 200 lux 300 lux 100 lux * 1,023 sqm. = 102,300 lumen 3000 lumen = 102,300/3000 = 35 ´Ç§ 100 lux * 1,699 sqm. = 169,900 lumen 3000 lumen = 57 ´Ç§
200 lux * 4,745 sqm. = 949,000 lumen 9600 lumen = 47 ´Ç§ 2600 lumen = 50 ´Ç§ 200 lux * 1,783 sqm. = 356,600 lumen 9600 lumen = 38 ´Ç§ Chandelier 2 ´Ç§
1 st Floor Plan
10
ELECTRICAL SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§ áÅСÒÃà´Ô¹ÊÒÂä¿ LED T5 ä¿·‹Í LED Strip Light Down light H.2.5 - 4 m. Down light H.5 - 7 m. LED Pendant Chandelier Halogen Light
Hotel
Gallery
100 lux 200 lux 300 lux 100 lux * 581.4 sqm. = 58,140 lumen 3000 lumen = 58,140/3000 = 20 ´Ç§
200 lux * 4,550.5 sqm. = 910,100 lumen 9600 lumen = 8 ´Ç§ 2600 lumen = 350 ´Ç§
100 lux * 1,699 sqm. = 169,900 lumen 3000 lumen = 57 ´Ç§
200 lux * 2,912 sqm. = 582,400 lumen 2600 lumen = 196 ´Ç§ 3300 lumen = 28 ´Ç§
2 nd Floor Plan
10
ELECTRICAL SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§ áÅСÒÃà´Ô¹ÊÒÂä¿ LED T5 ä¿·‹Í LED Strip Light Down light H.2.5 - 4 m. Down light H.5 - 7 m. LED Pendant Chandelier Halogen Light
Hotel
Gallery
100 lux 200 lux 300 lux 100 lux * 1,727.69 sqm. = 172,769 lumen 3000 lumen = 172,769/3000 = 58 ´Ç§
100 lux * 1,699 sqm. = 169,900 lumen 3000 lumen = 57 ´Ç§
1,562 sqm. = 312,400 lumen 2600 lumen = 120 ´Ç§ 3300 lumen = 2 ´Ç§ 1,617 sqm. = 485,100 lumen 3000 lumen = 42 ´Ç§ 2600 lumen = 120 ´Ç§ 200 lux * 2,912 sqm. = 582,400 lumen 2600 lumen = 196 ´Ç§ 3300 lumen = 28 ´Ç§
3 rd Floor Plan
10
ELECTRICAL SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§ áÅСÒÃà´Ô¹ÊÒÂä¿ LED T5 ä¿·‹Í LED Strip Light Down light H.2.5 - 4 m. Down light H.5 - 7 m. LED Pendant Chandelier Halogen Light
Gallery
100 lux * 390 sqm. = 39,000 lumen 3000 lumen = 39,000/3000 = 13 ´Ç§
Hotel
100 lux 200 lux 300 lux
100 lux * 1,699 sqm. = 169,900 lumen 2600 lumen = 57 ´Ç§ 3300 lumen = 6 ´Ç§
300 lux * 466.37 sqm. = 139,911 lumen 2600 lumen = 53 ´Ç§
4 th Floor Plan
10
ELECTRICAL SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§ áÅСÒÃà´Ô¹ÊÒÂä¿ LED T5
ä¿·‹Í LED Strip Light Down light H.2.5 - 4 m. Down light H.5 - 7 m. LED Pendant Chandelier Halogen Light 俽˜§¾×é¹ â¤Áä¿Ê‹Í§ º¹àÇ·Õ
â¤Áä¿Ê‹Í§ ˹ŒÒàÇ·Õ
Hotel
Gallery
100 lux 200 lux 300 lux 100 lux * 1304.49 sqm. = 130,449 lumen 2600 lumen = 130,449/3000 = 51 ´Ç§
100 lux * 3,137.36 sqm. = 313,736 lumen 3000 lumen = 105 ´Ç§
200 lux * 2460.74 sqm. = 492,148 lumen 2600 lumen = 190 ´Ç§ Chandelier 2 ´Ç§
5 th Floor Plan
10 EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§àµŒÒÃѺ俿‡Ò Wall Receptacle H 1.20 m. Wall Receptacle H 0.30 m. Water Proof Wall Receptacle H 1.20 m Floor Receptacle H 0.00 m. TV Wall Receptacle Internet Wall Receptacle
Basement 1 Floor Plan
ELECTRICAL SYSTEM
10 EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§àµŒÒÃѺ俿‡Ò Wall Receptacle H 1.20 m. Wall Receptacle H 0.30 m. Water Proof Wall Receptacle H 1.20 m Floor Receptacle H 0.00 m. TV Wall Receptacle Internet Wall Receptacle
1 st Floor Plan
ELECTRICAL SYSTEM
10 EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§àµŒÒÃѺ俿‡Ò Wall Receptacle H 1.20 m. Wall Receptacle H 0.30 m. Water Proof Wall Receptacle H 1.20 m Floor Receptacle H 0.00 m. TV Wall Receptacle Internet Wall Receptacle
2 nd Floor Plan
ELECTRICAL SYSTEM
10 EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§àµŒÒÃѺ俿‡Ò Wall Receptacle H 1.20 m. Wall Receptacle H 0.30 m. Water Proof Wall Receptacle H 1.20 m Floor Receptacle H 0.00 m. TV Wall Receptacle Internet Wall Receptacle
3 rd Floor Plan
ELECTRICAL SYSTEM
10 EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§àµŒÒÃѺ俿‡Ò Wall Receptacle H 1.20 m. Wall Receptacle H 0.30 m. Water Proof Wall Receptacle H 1.20 m Floor Receptacle H 0.00 m. TV Wall Receptacle Internet Wall Receptacle
4 th Floor Plan
ELECTRICAL SYSTEM
10 EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§àµŒÒÃѺ俿‡Ò Wall Receptacle H 1.20 m. Wall Receptacle H 0.30 m. Water Proof Wall Receptacle H 1.20 m Floor Receptacle H 0.00 m. TV Wall Receptacle Internet Wall Receptacle
5 th Floor Plan
ELECTRICAL SYSTEM
10
SANITARY SYSTEM
EQUIPMENT
Sanitary System Information
5 4 3 2 1
Up Feed
¡Ò÷íÒ§Ò¹¢Í§Ãкº ¤×Í ¹éíÒ¨Ò¡·‹Í»ÃлҨж١¹íÒÁÒ à¡çºã¹¶Ñ§à¡çº¹éíÒ «Öè§ÍÂÙ‹º¹´Ô¹ËÃ×Í ½˜§änj㵌´Ô¹ ¨Ò¡¹Ñ鹨е‹Í»˜ Á¹éíÒà¾×èÍ ÊÙº¹éíÒ¨Ò¡¶Ñ§à¡çº¹éíÒä»ãªŒµÒÁ¨Ø´ µ‹Ò§æ
ÁÕ¨íҹǹªÑé¹·Ñé§ËÁ´ 4 ªÑé¹
àÅ×͡㪌 Ãкº¨‹Ò¹éÒ í ¢Ñ¹ é ËÃ×Í ÃкºUp Feed ໚¹Ãкº¨‹Ò¹éíÒÊíÒËÃѺ ÍÒ¤Ò÷ÕèÊÙ§ »ÃÐÁÒ³ 3-4 ªÑé¹
Floor 4 Floor 3 Floor 2 Floor 1
P
ÍÒ¤Òà 5 ªÑé¹ â¤Ã§¡ÒÃÈٹ ·ÑȹÈÔÅ»Š áÅÐ ÈÔŻСÒÃáÊ´§
Up Feed Diagram
ÍØ»¡Ã³ »ÃСͺÃкº ¶Ñ§à¡çº¹éíÒ㵌´Ô¹¤Í¹¡ÃÕµ ¶Ñ§à¡çº¹éíÒ㵌´Ô¹áºº¤Í¹¡ÃÕµ â´Âä´Œ ¨Ñ´¾×é¹·ÕèÊíÒËÃѺ¡ÒÃËÅ‹Í¢Öé¹ÃÙ»¶Ñ§à¡çº ¹éíÒäÇŒ
»˜ Á¹éíÒáç´Ñ¹¤§·Õè »˜ Á¹éíÒÍѵâ¹ÁѵÔáç´Ñ¹¤§·Õè ໚¹»˜ Á¹éíÒ áººÁնѧÊÐÊÁ¤ÇÒÁ´Ñ¹ÊíÒËÃѺà¡çº¹éíÒäÇŒ 㹶ѧà¾×èͨ‹ÒÂä»Âѧ¨Ø´µ‹Ò§æ
ÊØ¢Àѳ± Flush Valve ÊØ¢Àѳ± ã¹ÍÒ¤ÒÃÊÒ¸ÒóРʋǹãËދ໚¹ Ẻ Flush Valve â´Â㪌áç´Ñ¹¨Ò¡·‹Í »ÃлÒâ´ÂµÃ§ à¾×èͤÇÒÁµ‹Íà¹×èͧ㹡ÒÃ㪌 §Ò¹
10
SANITARY SYSTEM
EQUIPMENT
¨íҹǹÊØ¢Àѳ±
»ÃÐàÀ·¢Í§ÊØ¢Àѳ±
Others
¤‹Ò FU
31
64
10
18
11
32
10
16
36
20
32
1.5
126
984
774
450
1008
280.5
775.5
685.5
508
787
Auditorium
Gallery
Temporary Gallery
Office
Flush Valve
44
104
24
8
64
54
Urinal Flush Valve
22
52
12
4
32
Lavatory
22
52
12
4
¤‹ÒFU ÊØ·¸Ô
693
1638
378
ÍѵÃÒ¡ÒÃ㪌¹éíÒÊÙ§ÊØ´ (l/m)
647
1087.5
462
ÃÇÁÍѵÃÒ¡ÒÃ㪌¹éíÒÊÙ§ÊØ´ (l/hr)
313,980
¤íҹdz ¢¹Ò´ º‹Íà¡çº¹éíÒ ãªŒ
¹éíÒ»ÃлÒäËÅࢌÒâ¤Ã§¡Òà = 3000 l/hr µŒÍ§¡ÒùéíÒÊíÒÃͧ㪌 2 hr. µŒÍ§ÁÕ¹éíÒ㪌µ‹Íà¹×èͧ 3 hr. ¢¹Ò´¶Ñ§à¡çº¹éíÒ㪌ã¹â¤Ã§¡Òà (313,980-3000) * 3 = 932,940 ÅÔµÃ
¤íҹdz ¢¹Ò´ º‹Íà¡çº¹éíÒ ÊíÒÃͧ
Restaurant Commercial Car Park
¢¹Ò´¶Ñ§à¡çº¹éíÒÊíÒÃͧ㪌㹠â¤Ã§¡Òà = (313,980-3000) * 2 = 621,960 ÅÔµÃ
¢¹Ò´¶Ñ§à¡çº¹éíÒ ã¹â¤Ã§¡Òà = 932.94 ź.Á.
¢¹Ò´¶Ñ§à¡çº¹éíÒ ÊíÒÃͧâ¤Ã§¡Òà = 621.96 ź.Á.
10
SANITARY SYSTEM
EQUIPMENT
Sanitary System Up feed Diagram
º‹Íà¡çº¹éíÒ Ê‹Ç¹âçáÃÁ
¹éíÒ¨Ò¡ ¡ÒûÃлÒ
ÁÔàµÍà ¹éíÒ º‹Íà¡çº¹éíÒ Ê‹Ç¹Èٹ ·ÑȹÈÔÅ»Š áÅÐ ÈÔŻСÒÃáÊ´§â¤Ã§¡Òà ¶Ñ§à¡çº¹éíÒ ¤Í¹¡ÃÕµ¢¹Ò´ 932.94 ź.Á. ¶Ñ§à¡çº¹éíÒ ÊíÒÃͧ ¤Í¹¡ÃÕµ¢¹Ò´ 621.96 ź.Á.
»˜ Á¹éíÒÍѵâ¹ÁÑµÔ áç´Ñ¹¤§·Õè
»˜ Á¹éíÒ ¶Ñ§áç´Ñ¹
Floor4
- Hall - Auditorium
Floor3
- Hall - Auditorium - Library
Floor2
- Hall - Gallery - Contemporary Gallery - Library - Co- Working Space
Floor1
- Hall - Gallery
â¶ÊŒÇÁ áÅÐⶠ»˜ÊÊÒÇРẺ Flush Valve
105 300 194
183
10 EQUIPMENT
SANITARY SYSTEM
Sanitary System Riser Diagram
à´Ô¹·‹Í㵌´Ô¹¨Ò¡¶Ñ§ à¡çº¹éíÒ½˜›§âçáÃÁ
ÃÒÂÅÐàÍÕ´
PLAN
Up Feed System Valve
WATER TANK 2
Meter Pump
PUMP ROOM
Tank
B1 floor
·‹Í¨Ò¡¡ÒûÃÐ»Ò ·‹Í¨‹Ò¹éíÒ㪌
¶Ñ§à¡çº¹éíÒ ¢¹Ò´ 932.24 ź.Á. ÍÂÙ‹ªÑé¹ãµŒ´Ô¹ ½˜›§ âçáÃÁ
¹éíÒ¨Ò¡¡ÒûÃлÒ
WATER TANK 1
10
WASTE WATER SYSTEM
EQUIPMENT
» ÃÔ Á Ò ³ ¹éíÒ à ÊÕ Â
à Рº º ¹éÒ í à ÊÕ Â
127,230 ź.Á.
ÅԵà / Çѹ
˹‹Ç (µÃ.Á.)
ÅԵà / Çѹ
˹‹Ç (¤¹)
ÅԵà / ¤¹
11,763
5
11,283
5
800
15
TOTAL 56,415 ź.Á.
TOTAL 58,815 ź.Á.
1 , 4 3 9 . 2 Á Á . / »‚
à Рº º ¹éÒ í à ÊÕ Â
¹éíÒ à ÊÕ Â
AUDITORIUM
˹‹Ç (µÃ.Á.)
» ÃÔ Á Ò ³ ¹éíÒ ½ ¹ à ฉ ÅÕè Â
ÃкºÃкÒ¹éíÒâÊâ¤Ã¡
COMMUNITY MALL
ART CENTER
à Рº º ·‹ Í Ã Ð º Ò Â ¹éíÒ ½ ¹
à Рº º ·‹ Í á  ¡
TOTAL 12,000 ź.Á.
à Рº º ·‹ Í ¹éíÒ â Ê â ¤ à ¡
à Рº º ·‹ Í Ã Ð º Ò Â ¹éíÒ ÀÒ¹͡ÍÒ¤ÒÃ
à Рº º ·‹ Í Ã Ð º Ò Â ¹éíÒ ·Ôé §
à Рº º ·‹ Í Ã Ð º Ò Â Í Ò ¡ Ò È
¹éíÒ ½ ¹
¢Œ Í ´Õ ÃкºÃкÒ¹éíÒ·Ôé§
1
ÃкººíҺѴ
¡Òá‹ÍÊÌҧÃкºÁÕ¢¹Ò´àÅç¡
ÃкººíҺѴ Water Recycling
ÃкºÃкÒ¹éíÒ½¹ / AC
3
2 ÊÒ¸ÒóÐ
¹íÒ¡ÅѺÁÒ㪌 ËÁعàÇÕ¹ ã¹â¤Ã§¡ÒÃ
äÁ‹Ê‹§¼Å¡Ãзºµ‹ÍÊÀÒ¾áÇ´ÅŒÍÁ
4 ¤‹Ò´íÒà¹Ô¹¡ÒúíÒÃاÃÑ¡ÉÒÃкºµèíÒ
Å´»˜ÞËÒàÃ×èͧ¡ÅÔè¹áÅÐ ¡ÒáѴ¡Ã‹Í¹ÀÒÂã¹·‹Í
10
WASTE WATER SYSTEM
EQUIPMENT
à Рº º ·‹ Í á  ¡
à Рº º ·‹ Í Ã Ð º Ò Â ¹éÒ í ½¹
WATER RECYCLING SYSTEM
1
ÃкºÃкÒ¹éíÒ·Ôé§
à Рº º ·‹ Í ¹éÒ í âÊâ¤Ã¡
RECYCLING WATER
WASTE WATER
à Рº º ·‹ Í Ã Ð º Ò Â Í Ò ¡ Ò È
¹éíÒ ·Ôé §
BASIN
GREY WATER
ACTIVATED SLUDGE PROCESS
¹éíÒ¨Ò¡¡ÒÃÃкÒ¹éíÒ½¹áÅСÒÃô¹éíÒ µŒ¹äÁŒº¹ÍÒ¤Òà ¨Ð¹íÒÁÒ¡ÃͧàÈÉ»¹à»„œÍ¹ áÅÐà¡çºänj䴌äÁ‹à¡Ô¹ 7 Çѹ
¡ Ò Ã ¹íÒ ä » ã ªŒ » à Рâ  ª ¹
RECYCLING WATER TREATED WATER STORAGE
WATER CLOSET
REACT
ÃкºÃкÒ¹éíÒ½¹
RAIN [roof]
WATER TREATMENT SYSTEM
FILL
à¡çºä´ŒäÁ‹à¡Ô¹ 3 Çѹ
à¡çºä´ŒäÁ‹à¡Ô¹ 7 Çѹ
ÊØ ¢ ÀÑ ³ ±
à Рº º ·‹ Í Ã Ð º Ò Â ¹éÒ í ÀÒ¹͡ÍÒ¤ÒÃ
WATER RECYLING PROCESS
¹éíÒàÊÕ¨ҡ͋ҧŌҧÁ×Í á¡·‹Íà¾×èÍ à¢ŒÒÊÙ‹¡Ãкǹ¡ÒáÃͧáÅйíÒ¡ÅѺÁÒ㪌 ãËÁ‹ «Ö觹éíÒ»ÃÐàÀ·¹Õé¨Ðà¡çºËÅѧ¨Ò¡¡Ãͧ áÅŒÇäÁ‹à¡Ô¹ 3 Çѹ à¾×èÍ»‡Í§¡Ñ¹¡ÒÃà¡Ô´¡ÅÔè¹ äÁ‹¾Ö§»ÃÐʧ¤ áÅÐẤ·ÕàÃÕÂ
2
à Рº º ·‹ Í Ã Ð º Ò Â ¹éÒ í ·Ôé §
URINAL
SETTLE DRAW SEPTIC TANK
IDLE
ADD CHLORINE
PUBLIC MANHOLE
COOLING TOWER
GREEN SPACE
10
WASTE WATER SYSTEM
EQUIPMENT
ÃкººíҺѴ¹éÒ í àÊÕÂ
WORKING CYCLE ¨ Ð ÁÕ 5 ª‹ Ç § µ Ò Á ÅíÒ ´Ñ º
ÃкººíҺѴ¹éíÒàÊÕÂẺáÍ¡·ÔàÇàµç´ÊÅÑ´¨ (Activated Sludge Process)
2
1
ª‹Ç§·íÒ»¯Ô¡ÔÃÔÂÒ (React) ໚¹¡ÒÃÅ´ÊÒÃÍÔ¹·ÃÕ 㹹éíÒàÊÕ (BOD)
1
5 ª‹Ç§¾Ñ¡Ãкº (Idle) à¾×èÍ«‹ÍÁá«ÁËÃ×Í ÃÍÃѺ¹éíÒàÊÕÂãËÁ‹
3 ª‹Ç§µ¡µÐ¡Í¹ (Settle) ·íÒãËŒµÐ¡Í¹¨ØÅÔ¹·ÃÕ µ¡Å§¡Œ¹¶Ñ§»¯Ô¡ÔÃÔÂÒ
ª‹Ç§àµÔÁ¹éíÒàÊÕ (Fill) ¹íÒ¹éíÒàÊÕÂࢌÒÃкº
WATER TREATMENT SYSTEM
SYSTEM PROPERTIES
4
2
3
ª‹Ç§ÃкÒ¹éíÒ·Ôé§ (Draw) ÃкÒ¹éíÒ·Õ輋ҹ¡ÒúíҺѴ 4
¤‹ Ò ¡‹ Í Ê ÃŒ Ò § ¤‹Ò㪌¨‹ÒÂÊÙ§
¤‹ Ò à ´Ô ¹ à Рº º ¤‹Ò㪌¨‹ÒÂÊÙ§
¡ Ò Ã ã ªŒ ¾×é ¹ ·Õè 㪌¾×é¹·Õè ¹ŒÍÂ-»Ò¹¡ÅÒ§
¡ Ò Ã ã ªŒ ÍØ » ¡ à ³ 㪌ÍØ»¡Ã³ ÁÒ¡
10 EQUIPMENT
WASTE WATER SYSTEM EIA STANDARD
º‹Í˹‹Ç§¹éÒ í ¡ÒÃà¡çº¡Ñ¡¹éíÒ½¹¡‹Í¹ »Å‹ÍÂÍÍ¡ÊÙ‹ÊÒ¸ÒóÐ
ÍѵÃÒ¡ÒÃÃкÒ¹éíÒ ¡‹Í¹ÁÕâ¤Ã§¡ÒÃ
RETENTION POND PROCESS
=
¡ÒÃà¡çº¹éíÒ½¹¨Ò¡ËÅѧ¤Ò
ÍѵÃÒ¡ÒÃÃкÒ¹éíÒ ËÅѧÁÕâ¤Ã§¡ÒÃ
¡ Ò Ã ¤íÒ ¹ Ç ¹ » ÃÔ Á Ò µ à º‹ Í Ë ¹‹ Ç § ¹éÒ í
RAIN [ground]
º‹Í µ¡µÐ¡Í¹
Q = cia » ÃÔ Á Ò µ à º‹ Í Ë ¹‹ Ç § ¹éÒ í 18,225 ź.Á.
c – Ê»Ê.¡ÒÃäËŹͧ¢Í§¾×é¹·Õè¼ÔÇ ¾×鹤͹¡ÃÕµ = 0.70
º‹ÍàµÔÁ ¤ÅÍÃÕ¹
i – ¤‹Ò¤ÇÒÁࢌÁ½¹ 5 »‚ [24hr] = 5.40 mm/hr
a – ¾×é¹·ÕèÃͧÃѺ¹éíÒ = 4,500 µÃ.Á.
·ÕèÁÒ : ¤‹Ò¤ÇÒÁࢌÁ½¹ (i) ¨Ò¡ R.I.D. office samsen
º‹Íà¡çº ¹éíÒ
»ÃÔÁҵú‹Í˹‹Ç§¹éÒ í [ 3 ªÑèÇâÁ§ ]
Q = 0.7x5.40x 4,500 x3hr = 18,225 ź.Á.
¹íÒ¡ÅѺÁÒ㪌ËÁعàÇÕ¹ ã¹â¤Ã§¡ÒÃ
10
SANITARY SYSTEM
EQUIPMENT
RAIN RAIN
RAIN
RAIN
SHAFT
RAIN RAIN
W
º‹ÍºíҺѴ¹éíÒàÊÕÂ
S
º‹ÍºíҺѴ¹éíÒâÊâ¤Ã¡ ª‹Í§ shaft º‹ÍÃкÒ¹éíÒ ·‹ÍÃкÒ¹éíÒ
RAIN
º‹ÍµÃǨÊÀÒ¾¹éíÒ º‹ÍÃкÒ¹éíÒÊÒ¸ÒóÐ
RAIN
W S
Slope
Slope
GROUND FLOOR
10
WASTE WATER SYSTEM
EQUIPMENT
SOIL WATER
à Рº º ¹éÒ í à ÊÕ Â
S PIPE
WC 2
PROCESS
SHAFT
Floor 2-3,5
WC 1
ROOM AREA
Floor 1-3,5
SEPTIC TANK VOLUME 1,435.00 SQ.M. - 10x17x8.4 M. EXHIBITION & AUDITORIUM
ÃкºÃкÒ¹éíÒâÊâ¤Ã¡
TREATMENT POND VOLUME 1,435.00 SQ.M. - 10x17x8.40 M.
仧ҹÃкº ( ªÑé ¹ ã µŒ ´Ô ¹ ) 仧ҹÃкº ( ªÑé ¹ ã µŒ ´Ô ¹ )
SEPTIC TANK
BASEMENT
ÊØ ¢ ÀÑ ³ ±
º‹ Í ¾Ñ ¡ ÊÒ¸ÒóÐ
ÃкºÃкÒ¹éíÒ·Ôé§ SOIL WATER TREATMENT
WATER CLOSET
URINAL
SOIL WATER PROCESS ÃкºÃкÒ¹éíÒ½¹
S
º‹ Í à ¡ Ã Í Ð
º‹ Í ºíÒ ºÑ ´ ¹éíÒ à ÊÕ Â
º‹ Í µ¡µÐ¡Í¹
º‹ Í à µÔ Á ¤ Å Í ÃÕ ¹
º‹ Í Ã Ð º Ò Â ¹éÒ í ·Ôé §
ÊÒ¸ÒóÐ
10
WASTE WATER SYSTEM
EQUIPMENT
WASTE WATER
CAFÉ Floor 1-3
à Рº º ¹éÒ í à ÊÕ Â
WC 2 WC 1
SHAFT
W PIPE REUSE WATER
Floor 2-3,5
Floor 1-3,5
ROOM AREA
RESTAURANT Dock
ÃкºÃкÒ¹éíÒâÊâ¤Ã¡
GREASE TRAP VOLUME 477.00 SQ.M.
EXHIBITION & AUDITORIUM
- 3x4x4.3 M.
仧ҹÃкº ( ªÑé ¹ ã µŒ ´Ô ¹ ) 仧ҹÃкº ( ªÑé ¹ ã µŒ ´Ô ¹ ) RECYCLING WATER
GREASE TRAP SEPTIC TANK
ÃкºÃкÒ¹éíÒ·Ôé§
ÊØ ¢ ÀÑ ³ ±
BASEMENT
º‹ Í ¾Ñ ¡ ÊÒ¸ÒóÐ
w
WASTE WATER TREATMENT
kw BASIN
KITCHEN SINK
WASTE WATER PROCESS ÃкºÃкÒ¹éíÒ½¹
kw
w
º‹Í´Ñ¡ä¢Áѹ
º‹Íà¡ÃÍÐ
º‹Í¾Ñ¡ ¹éíÒàÊÕÂ
º‹ÍºíҺѴ ¹éíÒàÊÕÂ
º‹Íµ¡µÐ¡Í¹
º‹ÍàµÔÁ ¤ÅÍÃÕ¹
º‹ÍÃкÒ ¹éíÒ·Ôé§
ÊÒ¸ÒóÐ
º‹Í¾Ñ¡ ¹éíÒàÊÕÂ
º‹ÍºíҺѴ ¹éíÒàÊÕÂ
º‹Íµ¡µÐ¡Í¹
º‹ÍàµÔÁ ¤ÅÍÃÕ¹
º‹Íà¡çº¹éÒ í
¹íÒ¡ÅѺÁÒ㪌 ËÁعàÇÕ¹ ã¹â¤Ã§¡ÒÃ
10
WASTE WATER SYSTEM
EQUIPMENT
RAIN / AC
à Рº º ¹éÒ í à ÊÕ Â
WC 2 WC 1
DRAINAGE AREA
REUSE WATER
Floor 2-3,5
Floor 1-3,5
EXHIBITION & AUDITORIUM
ÃкºÃкÒ¹éíÒâÊâ¤Ã¡
RECYCLING WATER
ÃкºÃкÒ¹éíÒ·Ôé§
ÍØ » ¡ Ã ³
RL
RAIN / AC WATER PROCESS
º‹ÍàµÔÁ¤ÅÍÃÕ¹
RAIN DRAINAGE
» ÃÔ Á Ò ³ ¹éÒ í ½¹
ÃкºÃкÒ¹éíÒ½¹ º‹Íµ¡µÐ¡Í¹
- 10x17x8.40 M.
BASEMENT
WASTE WATER TREATMENT
RL
TREATMENT POND VOLUME 1,435.00 SQ.M.
º‹Íà¡çº¹éÒ í
¹íÒ¡ÅѺÁÒ㪌 ËÁعàÇÕ¹ ã¹â¤Ã§¡ÒÃ
¾×é ¹ ·Õè ¹éíÒ «Ö Á ¼‹ Ò ¹ 624.72 µÃ.Á.
10
AIR CONDITIONING SYSTEM
EQUIPMENT
Air Condition System Ãкº»ÃѺÍÒ¡ÒÈ
Water Cooled Water Chilled System
Water Cooled Water Chilled Diagram AIR CONDITION ROOM Cooling Tower
Ãкº»ÃѺÍÒ¡ÒÈẺ㪌à¤Ã×èͧ·íÒ¹éíÒ àÂç¹ áÅÐÃкÒ¤ÇÒÁÌ͹´ŒÇ¹éíÒ
㪌ÊíÒËÃѺÃкº·Õ赌ͧ¡Òâ¹Ò´¡Òà ·íÒ¤ÇÒÁàÂç¹ÁÒ¡
Air Condition Room
»ÃÐÊÔ·¸ÔÀÒ¾ÊíÒËÃѺà¤Ã×èͧ·íÒ¹éíÒ àÂ繪¹Ô´ÃкÒ¤ÇÒÁÌ͹´ŒÇ¹éíÒ
Condenser Water Pump
àÅ×͡㪌ÃкºVAV à¾×èͪ‹ÇÂ㹡ÒÃ
Chiller
¤Çº¤ØÁÍسËÀÙÁÔ´ŒÇ»ÃÔÁÒ³ÅÁà¾×èÍ
Thermostat
ᨡ¨‹ÒÂä»Âѧ¾×é¹·ÕèᵋÅо×é¹·Õè¢Í§ â¤Ã§¡ÒÃ
AHU VAV box
10
AIR CONDITIONING SYSTEM
EQUIPMENT
GALLERY 430 BTU
14%
PERMANENT EXHIBITION CONTEMPORARY EXHIBITION HALL TOILET
TOTAL LOAD
PUBLIC FACILITY 388 BTU
943
41%
MAIN : 500 BTU
45%
BTU
RESTAURANT RETAIL LIBRARY CO-WORKING SPACE HALL TOILET
MAIN : 500 BTU SPARE : 500 BTU
AUDITORIUM 125 BTU GALLERY
PUBLIC FACILITIES
AUDITORIUM
AUDITORIUM HALL BACK STAGE TOILET
MAIN : 200 BTU SPARE : 200 BTU
10
AIR CONDITIONING SYSTEM
EQUIPMENT
Air Condition System ÃкºÃкÒÂÍÒ¡ÒÈ
Displacement Ventilation System (DVS) Ãкº¡ÃШÒÂÅÁàÂç¹áººá·¹·Õè : ¤×ÍÅÁàÂç¹ ¨‹ÒÂÍÍ¡¨Ò¡¾×é¹ÍÒ¤ÒúÃÔàdz㵌·Õè¹Ñ觼ٌªÁ «Ö觨ÐäÁ‹ÊÙÞàÊÕ¾Åѧ§Ò¹ä»¡Ñº¾×é¹·ÕèÇ‹Ò§¢¹Ò´ ãËÞ‹·ÕèÍÂÙ‹à˹×Í¢Öé¹ä»
ÃкºÃкÒÂÍÒ¡ÒÈã¹âçÁËÃʾ
㪌Ǹ Ô Õ¡Òè‹ÒÂÅÁàÂ繨ҡ㵌·Õè¹Ñ觼ٌªÁ à¾×èÍÅ´ ¡ÒûÃѺÍÒ¡ÒȺ¹¾×é¹·Õè⶧·ÕèÊÙ§ 㪌ÇÔ¸Õ¡Òà ¨‹ Ò ÂÅÁàÂç ¹ ࢌ Ò á·¹·Õè Í Ò¡ÒÈÃŒ Í ¹·Õè Š͢Öé ¹ ´ŒÒ¹º¹ ¡ÅѺࢌÒÊÙ‹ Return Air Grill à¾×èÍ ¡ÅѺࢌÒÊÙ‹à¤Ã×èͧʋ§ÅÁàÂç¹ (AHU) »ÃÐËÂÑ´ä¿ã¹ÃÐÂÐÂÒÇ
Å´¡ÒáÃШÒ¢ͧ½Ø†¹ÅÐÍͧã¹ÍÒ¡ÒÈ àÁ×èÍ à·Õº¡Ñº¡ÒáÃШÒÂÅÁàÂç¹áºº»¡µÔ (Mixing Air System)
10
AIR CONDITIONING SYSTEM
EQUIPMENT
Riser Diagram Return Air Supply Air
Cooling Tower 1,560 sq.m.
VAV Box ÍÂÙ‹¡Ñº·‹ÍÅÁ·Õ赋ÍÍÍ¡¨Ò¡ AHU
PLAN
º¹·Õè¨Í´Ã¶½˜›§âçáÃÁ 㪌 Ë ÅÑ ¡ ¡ÒÃáÅ¡à»ÅÕè  ¹¤ÇÒÁÃŒ Í ¹ ÃÐËÇ‹ Ò §¹éí Ò ¡Ñ º ÍÒ¡ÒÈẺÊǹ · Ò § ¡Ñ ¹ ã ¹ á ¹ Ç µÑé § ¨Ö § ·í Ò ã ËŒ ÁÕ »ÃÐÊÔ · ¸Ô ÀҾ㹡ÒÃÃкÒ¤ÇÒÁ Ì͹
ÍØ»¡Ã³ µÔ´µÑé§à¾×èÍ»ÃѺ»ÃÔÁÒ³ ¾×é¹·ÕèàÅ×Í¡à» ´ 㪌à¤Ã×èͧ»ÃѺÍÒ¡ÒÈ áÅÐÍسËÀÙÁÔã¹áµ‹ÅÐ⫹ 䴌͋ҧÍÔÊÃÐ
COOLING TOWER
AHU 98.20 sq.m. ÍÂÙ‹ã¹á¡¹ÍÒ¤Òâͧ·Ø¡ªÑé¹ AHU (Air handing unit) ẺµÑ駾×é¹ ÁÕ¡ÒÃàµÃÕÂÁ¾×é¹·ÕèàÍÒäÇŒ·Ø´ªÑé¹ â´ÂµÑé§ÍÂÙ‹ºÃÔàdz᡹ÍÒ¤ÒÃáÅо×é¹·Õè㪌 §Ò¹áµ‹ÅÐ⫹
Chiller 791.95 sq.m. ÍÂÙ‹ªÑé¹·Õè 5 ªÑ鹧ҹÃкº ¢Í§½˜›§âçáÃÁ à¤Ã×èͧ·íÒ¹éíÒàÂ繪¹Ô´»ÃѺ¤ÇÒÁàÃçÇÃͺ¢Í§¤ÍÁà¾ÃÊà«Íà (VSD Chiller) µÒÁâËÅ´·Õ赌ͧ¡ÒûÃѺ¤ÇÒÁ¶Õè¢Í§ ¡ÃÐáÊä¿¿‡Ò·Õ訋ÒÂãËŒ¡ÑºÁÍàµÍà µÒÁâËÅ´¨ÃÔ§
5 th floor
10
AIR CONDITIONING SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§áÅСÒÃà´Ô¹·‹ÍÃкº»ÃѺÍÒ¡ÒÈ Supply Air Grille Return Air Grille
Fresh Air Grille
AHU
Exhaust Air Grille Fresh Air Duct Return Air Duct AHU
Exhaust Air Duct 1 st Floor
10
AIR CONDITIONING SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§áÅСÒÃà´Ô¹·‹ÍÃкº»ÃѺÍÒ¡ÒÈ Supply Air Grille Return Air Grille
Fresh Air Grille
AHU
Exhaust Air Grille Fresh Air Duct Return Air Duct AHU
Exhaust Air Duct
.
2 nd Floor
10
AIR CONDITIONING SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§áÅСÒÃà´Ô¹·‹ÍÃкº»ÃѺÍÒ¡ÒÈ Supply Air Grille Return Air Grille AHU
Fresh Air Grille Exhaust Air Grille Fresh Air Duct Return Air Duct AHU
Exhaust Air Duct 3 rd Floor
10
AIR CONDITIONING SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§áÅСÒÃà´Ô¹·‹ÍÃкº»ÃѺÍÒ¡ÒÈ Supply Air Grille Return Air Grille AHU
Fresh Air Grille Exhaust Air Grille Fresh Air Duct Return Air Duct AHU
Exhaust Air Duct
4 th Floor
10
AIR CONDITIONING SYSTEM
EQUIPMENT
¼Ñ§áÊ´§µíÒá˹‹§áÅСÒÃà´Ô¹·‹ÍÃкº»ÃѺÍÒ¡ÒÈ Supply Air Grille Return Air Grille AHU
Fresh Air Grille Exhaust Air Grille Fresh Air Duct
Exhaust Air Duct
AHU
Return Air Duct
5 th Floor
10
VENTILATION SYSTEM
EQUIPMENT
AIR CHANGE
¡ÒÃÃкÒÂÍÒ¡ÒÈã¹¾×¹ é ·Õ» è ÃѺÍÒ¡ÒÈ
ÍѵÃÒ¡ÒÃÃкÒÂÍÒ¡ÒÈ : µÒÁÁҵðҹ ÇÊ·.3010 áÅÐÁҵðҹ ¡ÒûÃѺ ÍÒ¡ÒÈáÅÐÃкÒÂÍÒ¡ÒÈ ¢Í§ÍàÁÃÔ¡Ò ËÃ×Í “ASHRAE” 㪌ÇÔ¸Õ¡ÒÃÃкÒÂÍÒ¡ÒÈ´ŒÇÂ
»ÃÔÁÒ³¡ÒÃÃкÒÂÍÒ¡ÒÈ·Õàè ¾Õ§¾Í = ¨íÒ¹Ç¹à·‹Ò x ¾×é¹·Õ(è µÃ.Á.)ÍÒ¤ÒúÃÔàdz·Õ» è ÃѺÍÒ¡ÒÈ »ÃÐàÀ·¡ÒÃ㪌§Ò¹
¨íҹǹ෋Ò
¡ÒÃÃкÒÂÍÒ¡ÒÈã¹¾×¹ é ·Õäè Á‹»ÃѺÍÒ¡ÒÈ â¶§
»ÃÔÁÒ³¡ÒÃÃкÒÂÍÒ¡ÒÈ·Õàè ¾Õ§¾Í = ¾×é¹·Õ¢ è ͧˌͧ (µÃ.Á.) x ¤ÇÒÁÊÙ§¢Í§ËŒÍ§ (Á.) x ¤‹ÒÁҵðҹ¤íҹdz¨Ò¡¤ÇÒÁÊÙ§¢Í§ËŒÍ§Áҵðҹ »ÃÐàÀ·¡ÒÃ㪌§Ò¹
ËÍ»ÃЪØÁ âçÅФÃ
¨íҹǹ෋Ò
¨Í´Ã¶º¹ÍÒ¤ÒÃ
-
¨Í´Ã¶ãµŒ´Ô¹
4
¾×é¹·Õè§Ò¹Ãкº
ÊØ¢Ò
2 4 10
ʶҹ·Õè¨íÒ˹‹ÒÂÍÒËÒÃ
10
ˌͧ¤ÃÑÇ ¾×é¹·Õè»ÃاÍÒËÒÃ
30
ˌͧ·íÒ§Ò¹ Êíҹѡ§Ò¹
2
2
ÊØ¢Ò
4
ˌͧà¡çº¢Í§
2
Ìҹ¤ŒÒ
2
ˌͧ¨Ñ´áÊ´§
2
10
BASEMENT VENTILATION
EQUIPMENT
Ãкº·‹ÍÅÁÃкÒÂÍÒ¡ÒÈ (·Õè¨Í´Ã¶ãµŒ´Ô¹) »ÃСͺ´ŒÇ ¨Ø´ÅÁàµÔÁÍÒ¡ÒÈ áÅШشÃкÒÂÍÒ¡ÒÈ ¨Ø´ÅÁàµÔÁÍÒ¡ÒȨíҹǹ 1 ¨Ø´ ¨Ø´ÃкÒÂÍÒ¡ÒȨíҹǹ 2 ¨Ø´ (Exhaust fan room) â´Â»ÃСͺ仴ŒÇ ¾Ñ´ÅÁ·Õ誋ÇÂ㹡ÒôٴÍÒ¡ÒÈÍÍ¡ ¨Ò¡ªÑé¹ãµŒ´Ô¹
Rain Water Tank
Staff Office -2.80 m.
Water Tank 2
Water Tank 1 Staff Room -2.80 m. Septic
Pump Room
Grey Water Tank
DN
Loading
Hall
UP
Grease Trap
10
FIRE PROTECTION SYSTEM
EQUIPMENT
Fire Protection System Ãкº»‡Í§¡Ñ¹à¾ÅÔ§äËÁŒ
Detail Fire Alarm
Fire Alarm Diagram Heat Detector
Heat Detector
Smoke Detector
Heat Detector Heat Detector Smoke Detector Addressable Input / Output Module Fire Alarm Control Panel
Addressabl e Manual call point
Smoke Detector
Fire Bell
Smoke Gate
Beam Smoke Detector Fire Indicating Lamp
Air Impeller
Fire Control Panel ໚ ¹ÈÙ ¹Â ¡Åҧ㹡ÒäǺ¤Ø ÁáÅеÃǨÊͺ ¡Ò÷íÒ§Ò¹¢Í§ÍØ»¡Ã³ â´Â¨ÐÁÕä¿áÅÐàÊÕ§ 㹡ÒÃáÊ´§Ê¶Ò¹Ð¢Í§ÍØ»¡Ã³ µ‹Ò§ æ
Fire Extinguisher ÅѡɳÐ໚¹ DRY CHEMICAL ʋǹº¹ÊØ´ÍÂÙ‹ÊÙ§¨Ò¡¾×é¹äÁ‹à¡Ô¹ 1.50 àÁµÃ
Heat / Smoke Detectors à¤Ã×è Í §µÃǨ¨Ñ º ¤ÇÒÁÃŒ Í ¹ ËÃ× Í ¤ÇÑ ¹ ä¿ à¾×èÍÊ‹§ÊÑÞÞҳᨌ§àµ×͹ä»Ãкº
Fire Hose Cabinet Í‹ҧ¹ŒÍ 1 ¨Ø´ ᵋÅШشˋҧ ¡Ñ¹äÁ‹à¡Ô¹ 45 àÁµÃ
Manual Point µÔ ´ µÑé § Ë‹ Ò §¡Ñ ¹ äÁ‹ à ¡Ô ¹ 65 àÁµÃ ã¹áµ‹ Å Ð ¾×é¹·Õè ËÃ×͵ԴµÑé§ã¡ÅŒà¤Õ§¡ÑºFHC
Sprinkler ËÑǨ‹Ò´Ѻà¾ÅÔ§ÊÒÁÒö¤Çº¤ØÁ ÃÑÈÁÕ 18 µÃ.Á. ÃÐÂÐË‹Ò§äÁ‹¤Çà à¡Ô¹ 4.6 Á. áÅÐäÁ‹¤ÇùŒÍÂ¡Ç‹Ò 1.8 Á.
Bell / Strobe 㪌㹡ÒÃᨌ§àµ×͹à˵Øä¿äËÁŒ ÁÕ·Ñé§áººàÊÕ§¡ÃÔè§ áÅÐẺ信ÃоÃÔº
Fire Extinguisher Wet Pipe System àËÁÒÐÊíÒËÃѺÍÒ¤Ò÷ÑèÇä» ÁÕ¹éíÒã¹·‹ÍµÅÍ´àÇÅÒ Water Flow Detector
Spec
Buzzer
à¤Ã×èͧµÃǨ¨ÑºÊ‹§ÊÑÞÞÒ³ä»Âѧἧ¤Çº¤ØÁ ÊÑ觡ÒÃÃкºãËŒ·íÒ§Ò¹¼‹Ò¹á¼§¤Çº¤ØÁÃкºä»ÂѧÍØ»¡Ã³ »‡Í§¡Ñ¹ à¾ÅÔ§µÒÁ¨Ø´µ‹Ò§æ
ÁÕÍØ»¡Ã³ Ê‹§ÊÑÞÞÒ³¡ÒÃäËŢͧ ¹éíÒª‹Ç¤Ǻ¤ØÁÊ»ÃÔ§à¡Íà ªÑé¹ÅÐ Í‹ҧ¹ŒÍ 1 µÑÇ
Water Mist System ໚¹Ãкº·Õè㪌¹éíÒà¾Õ§ 10% ¨Ò¡»¡µÔà¾×èÍÅ´ »˜ÞËÒ¡Òûŋ͹éíÒ·Õè ÁÒ¡à¡Ô¹ä»¢Í§Ãкº ´Ñºà¾ÅÔ§Íѵâ¹ÁѵÔ
10 EQUIPMENT
FIRE PROTECTION SYSTEM
¼Ñ§¡ÒõԴµÑé§ËÑǨ‹Ò¹éíҴѺà¾ÅÔ§ ˌͧ Water Tank ÊíÒËÃѺÊíÒÃͧ ¹éíҴѺà¾ÅÔ§ ·‹ÍÂ×¹ SPRINKLER ·‹Íໂ¡ ÁÕ¹éíÒã¹·‹ÍµÅÍ´àÇÅÒ
Ãкº·‹ÍÂ×¹ µíÒá˹‹§ Fire Host Cabinet
1 st Floor
10 EQUIPMENT
FIRE PROTECTION SYSTEM
¼Ñ§¡ÒõԴµÑé§ËÑǨ‹Ò¹éíҴѺà¾ÅÔ§ ˌͧ Water Tank ÊíÒËÃѺÊíÒÃͧ ¹éíҴѺà¾ÅÔ§ ·‹ÍÂ×¹ SPRINKLER ·‹Íໂ¡ ÁÕ¹éíÒã¹·‹ÍµÅÍ´àÇÅÒ
Ãкº·‹ÍÂ×¹ µíÒá˹‹§ Fire Host Cabinet
Basement 1
10 EQUIPMENT
FIRE PROTECTION SYSTEM
¼Ñ§¡ÒõԴµÑé§ËÑǨ‹Ò¹éíҴѺà¾ÅÔ§ ˌͧ Water Tank ÊíÒËÃѺÊíÒÃͧ ¹éíҴѺà¾ÅÔ§ ·‹ÍÂ×¹ SPRINKLER Basement 1A,2A,3A
·‹Íໂ¡ ÁÕ¹éíÒã¹·‹ÍµÅÍ´àÇÅÒ
DN UP
DN DN UP
Ãкº·‹ÍÂ×¹
UP
UP
DN
µíÒá˹‹§ Fire Host Cabinet
Basement 2,3
10 EQUIPMENT
FIRE PROTECTION SYSTEM
¼Ñ§¡ÒõԴµÑé§ËÑǨ‹Ò¹éíҴѺà¾ÅÔ§ ˌͧ Water Tank ÊíÒËÃѺÊíÒÃͧ ¹éíҴѺà¾ÅÔ§ ·‹ÍÂ×¹ SPRINKLER ·‹Íໂ¡ ÁÕ¹éíÒã¹·‹ÍµÅÍ´àÇÅÒ
Ãкº·‹ÍÂ×¹ µíÒá˹‹§ Fire Host Cabinet
2 nd Floor
10 EQUIPMENT
FIRE PROTECTION SYSTEM
¼Ñ§¡ÒõԴµÑé§ËÑǨ‹Ò¹éíҴѺà¾ÅÔ§ ˌͧ Water Tank ÊíÒËÃѺÊíÒÃͧ ¹éíҴѺà¾ÅÔ§ ·‹ÍÂ×¹ SPRINKLER ·‹Íໂ¡ ÁÕ¹éíÒã¹·‹ÍµÅÍ´àÇÅÒ
·‹ÍáËŒ§ Ãкº·‹ÍÂ×¹ µíÒá˹‹§ Fire Host Cabinet
3 rd Floor
10 EQUIPMENT
FIRE PROTECTION SYSTEM
¼Ñ§¡ÒõԴµÑé§ËÑǨ‹Ò¹éíҴѺà¾ÅÔ§ ˌͧ Water Tank ÊíÒËÃѺÊíÒÃͧ ¹éíҴѺà¾ÅÔ§ ·‹ÍÂ×¹ SPRINKLER ·‹Íໂ¡ ÁÕ¹éíÒã¹·‹ÍµÅÍ´àÇÅÒ
Ãкº·‹ÍÂ×¹ µíÒá˹‹§ Fire Host Cabinet
4 th Floor
10 EQUIPMENT
FIRE PROTECTION SYSTEM
¼Ñ§¡ÒõԴµÑé§ËÑǨ‹Ò¹éíҴѺà¾ÅÔ§ ˌͧ Water Tank ÊíÒËÃѺÊíÒÃͧ ¹éíҴѺà¾ÅÔ§ ·‹ÍÂ×¹ SPRINKLER ·‹Íໂ¡ ÁÕ¹éíÒã¹·‹ÍµÅÍ´àÇÅÒ
Ãкº·‹ÍÂ×¹ µíÒá˹‹§ Fire Host Cabinet
5 th Floor
10
FIRE PROTECTION SYSTEM
EQUIPMENT
Fire Protection System ÃкºÍÑ´ÍÒ¡ÒÈ
ÃкºÍÑ´ÍÒ¡ÒÈºÑ¹ä´ Ë¹Õä¿ àÅ×͡㪌
ÃкºÍÑ´ÍÒ¡ÒÈẺËÅÒ¨ش (Multiple Injection) ¾Ñ´ÅÁËÍÂ⢋§ (Centrifugal Fan)
ÃкºÍÑ´ÍÒ¡ÒÈËÅÒ¨ش Smoke Detector
5
Centrifugal Fan
Duct ¢¹Ò´ 0.3-0.5 cm.
4
˹ŒÒ¡Ò¡ ÊÙ§¨Ò¡¾×é¹ äÁ‹¹ŒÍÂ¡Ç‹Ò 1.50 Á.
3 2
¾×é¹·ÕèÍÑ´ ÍÒ¡ÒÈ
1
ÃкºÅÔ¿µ ´Ñºà¾ÅÔ§ ¼¹Ñ§¡Ñ¹ä¿ »ÃеÙà» ´ÍÍ¡ FHC
ÅÔ¿µ ´Ñºà¾ÅÔ§µŒÍ§ÁÕáËÅ‹§¨‹ÒÂä¿ 2 áˋŧ ¤×Í 1. áËÅ‹§¨‹ÒÂä¿»¡µÔ 2. áËÅ‹§¨‹ÒÂä¿ฉØ¡àฉÔ¹
¡Ò÷íÒ§Ò¹¢Í§Ãкº
à¤Ã×èͧ µÃǨ¨Ñº¤Çѹ
ἧ¤Çº¤ØÁ
ÃкºÍÑ´ÍÒ¡ÒÈËÅÒ¨ش (Multiple Injection) ໚¹ÃкºÍÑ´ÍÒ¡ÒÈ·ÕèàËÁÒÐ ÊíÒËÃѺÍÒ¤Ò÷ÕèÊÙ§¡Ç‹Ò 23 ªÑé¹ µíÒá˹‹§¢Í§ª‹Í§ÍÑ´ÍÒ¡ÒÈà¢ŒÒ áµ‹ÅШشµŒÍ§Ë‹Ò§¡Ñ¹äÁ‹à¡Ô¹ 3 ªÑé¹ ¾Ñ´ÅÁµŒÍ§Ë‹Ò§¨Ò¡»Ãеٺҹ·Õè Í͡Ẻãˌ໠´¤ŒÒ§äÁ‹¹ŒÍÂ¡Ç‹Ò 11 àÁµÃ ËÃ×ÍäÁ‹¹ŒÍÂ¡Ç‹Ò 3 ªÑé¹
¾Ñ´ÅÁ áÅÐÁÍàµÍÃ
ÃкºÊÑ觡Òà ´ŒÇÂÁ×Í ËÃ×Í Íѵâ¹ÁѵÔ
¾Ñ´ÅÁÍÑ´ ÍÒ¡ÒÈ ·íÒ§Ò¹
àÅ×͡㪌 ¾Ñ´ÅÁËÍÂ⢋§ ËÃ×;ѴÅÁẺ㪌áçàËÇÕè§ (Centrifugal Fan) ÊíÒËÃѺ㪌¡ÑºÃкºÍÑ´ ÍÒ¡ÒÈËÅÒ¨ش
10
FIRE PROTECTION SYSTEM
EQUIPMENT
Fire Protection System Ãкº»‡Í§¡Ñ¹à¾ÅÔ§äËÁŒ ISOMETRIC Fire Protection ·‹Í¹éíҴѺà¾ÅÔ§¨Ò¡¶Ñ§ à¡çº¹éíÒÊíÒÃͧ ·‹Í¹éíҴѺà¾ÅÔ§¨‹ÒÂä»·Õè Ê»ÃÔ§à¡Íà ᵋÅЪÑé¹
µíÒá˹‹§·‹ÍÂ×¹¹éíҴѺà¾ÅÔ§ ˌͧ¤Çº¤ØÁ ¶Ñ§à¡çº¹éíÒÊíÒÃͧ㵌´Ô¹ ¨Ø´ÃÇÁ¾Å
10
FIRE PROTECTION SYSTEM
EQUIPMENT
Fire Protection System Ãкº»‡Í§¡Ñ¹à¾ÅÔ§äËÁŒ ISOMETRIC Fire Protection ÅÔ¿µ ´Ñºà¾ÅÔ§
ºÑ¹ä´Ë¹Õä¿
ºÑ¹ä´Ë¹Õä¿
ÅÔ¿µ ´Ñºà¾ÅÔ§ ˌͧ¤Çº¤ØÁ
¨Ø´ÃÇÁ¾Å
¨Ø´ÃÇÁ¾Å ¨Ø´ÃÇÁ¾Å
10
FIRE PROTECTION SYSTEM
EQUIPMENT
¡ÒÃẋ§¡Ñé¹áÅл ´ÅŒÍÁ¾×é¹·Õ赋ҧ æ à¾×èÍ¡ÒèíÒ¡Ñ´ä¿ãËŒÍÂÙ‹ã¹¾×é¹·Õè¨íÒ¡Ñ´
FIRE COMPARTMENT Passive Fire Protection ¼¹Ñ§·¹ä¿
½‡Òྴҹ·¹ä¿ ÅѡɳСÒá‹ÍÊÌҧ¢Í§¼¹Ñ§·¹ä¿
㪌ÇÑÊ´Ø·ÕèÁÕ¤ÇÒÁÊÒÁÒö·¹ä¿ä´Œã¹¡Òà ¡‹ÍÊÌҧ¼¹Ñ§·¹ä¿ ÍѵÃÒ¡Ò÷¹ä¿¢Í§¼¹Ñ§·¹ 俨ж١ÃкØ໚¹ªÑèÇâÁ§ËÃ×͹ҷբͧ ¤ÇÒÁÊÒÁÒö㹡Ò÷¹ä¿ä´Œ
¼¹Ñ§·¹ä¿
»Ãеٷ¹ä¿
Ã͵‹ÍÃÐËÇ‹Ò§¼¹Ñ§·¹ä¿ ¨ÐµŒÍ§ÁÕ¡Òû ´ ´ŒÇÂÇÑÊ´Ø·¹ä¿à¾×èÍ»‡Í§¡Ñ¹äÁ‹ãËŒä¿ÅÒÁ¼‹Ò¹Ã͵‹Í ÊíÒËÃѺẋ§¡Ñé¹¾×é¹·Õè¡Ñ¹ä¿ â´ÂÇÔ¸Õ¡Òá‹ÍÊÌҧ ¼¹Ñ§·¹ä¿ã¹Åѡɳе‹Ò§æ
¼¹Ñ§ÍÔ°ÁÍÞàµçÁµÑ¹¡‹ÍẺ1/2 Ἃ¹áÅÐฉÒº»Ù¹ Ë¹Ò 15-20 ÁÁ. ·Ñé§ 2 ´ŒÒ¹
60
¼¹Ñ§ÍÔ°ÁÍ޵ѹ ¡‹ÍẺàµçÁἋ¹ áÅÐฉÒº»Ù¹Ë¹Ò 15-20 ÁÁ. ·Ñé§ 2 ´ŒÒ¹
120
¼¹Ñ§ÍÔ°ºÅçÍ¡µÑ¹ ¤ÇÒÁË¹Ò 140 ÁÁ.áÅÐฉÒº»Ù¹ Ë¹Ò 15-20 ÁÁ. ·Ñé§ 2 ´ŒÒ¹
120
¼¹Ñ§ÍÔ°ºÅçÍ¡µÑ¹ ¤ÇÒÁË¹Ò 190 ÁÁ. áÅÐฉÒº »Ù¹Ë¹Ò 15-20 ÁÁ. ·Ñé§ 2 ´ŒÒ¹
180
¼¹Ñ§¡‹Í´ŒÇ¤͹¡ÃÕµÁÇÅàºÒ (ÃÒÂÅÐàÍÕ´¡ÒõԴµÑ駢Ö鹡Ѻ¼ÙŒ¼ÅÔµ)
»Ãеٷ¹ä¿ - ÍØ»¡Ã³ ·Õè㪌¡Ñº»Ãеٷ¹ä¿ ¨ÐµŒÍ§à»š¹ÇÑÊ´Ø·Õè·¹ä¿ä´Œ áÅмÅÔµà¾×èÍ㪌¡Ñº»Ãеٷ¹ä¿à·‹Ò¹Ñé¹
»Ãеٷ¹ä¿
ª‹Í§à» ´·Õè ¾×é¹áÅм¹Ñ§
- ºÒ¹»Ãеٷ¹ä¿ ¨ÐµŒÍ§ÁÕ¡ÒõԴµÑé§ÍØ»¡Ã³ ´Ö§ºÒ¹»Ãе٠¡ÅѺÍѵâ¹ÁѵÔáÅÐÍØ»¡Ã³ Åçͤ»ÃеÙáÅÐà» ´»Ãе٨еŒÍ§ ໚¹áºººÒà (Panic device)
ÍѵÃÒ¡Ò÷¹ä¿¢Í§ÇÑʴعÑé¹µŒÍ§äÁ‹¹ŒÍ ¡Ç‹ÒÍѵÃÒ¡Ò÷¹ä¿¢Í§¾×é¹·Õ輹ѧ¹Ñé¹æ ¡Òû ´ª‹Í§à» ´¨Ðª‹Ç»‡Í§¡Ñ¹äÁ‹ãËŒä¿ ÅØ¡ÅÒÁä»Âѧ¾×é¹·Õèã¡ÅŒà¤Õ§䴌
¡Òû‡Í§¡Ñ¹ ¡ÒÃÅØ¡ÅÒÁ¢Í§ à»ÅÇä¿áÅСÒÃá¾Ã‹ ¡ÃШÒ¢ͧ¤Çѹ
¡ÒÃÍØ´ª‹Í§à» ´ ·Õ輹ѧ
µÒÁ¼Å¡Ò÷´Êͺ¢Í§¼ÙŒ¼ÅԵᵋÅÐÃÒÂ
ÍѵÃÒ¡Ò÷¹ä¿¢Í§»ÃеÙ/¼¹Ñ§·¹ä¿ (ªÑèÇâÁ§)
¾×é¹·Õè㪌§Ò¹
- Áҵðҹ ÁÍ¡. 1220 – 2537
ÍѵÃÒ¡Ò÷¹ä¿ (¹Ò·Õ)
ˌͧËÁŒÍä͹éíÒ ËÁŒÍá»Å§ä¿¿‡Ò ˌͧà¡çºÇÑÊ´Ø äÇä¿ ËŒÍ§à¡çº¹éíÒÁѹàª×éÍà¾ÅÔ§ ˌͧà¤Ã×èͧÅÔ¿µ ˌͧà¤Ã×èͧ¡íÒà¹Ô´ä¿¿‡Ò ˌͧẵàµÍÃÕè áÅÐˌͧ Í×è¹æ ·ÕèÁÕÅѡɳÐã¡ÅŒà¤Õ§
2
ˌͧà¡çº¢Í§·ÕèÁÕ¾×é¹·ÕèÁÒ¡¡Ç‹Ò 12 µÒÃÒ§àÁµÃ (à˹×ÍÃдѺ¾×é¹´Ô¹) ˌͧ¤ÃÑÇ ËŒÍ§¹Í¹ áÅÐˌͧ Í×è¹æ ·ÕèÁÕÅѡɳÐã¡ÅŒà¤Õ§
1
¡ÒÃ㪌ÇÑÊ´Ø·¹ä¿ ¾Ñ¹Ãͺ·‹Í·Ñé§Êͧ ´ŒÒ¹¢Í§¼¹Ñ§·Õè·‹Í ·ÐÅؼ‹Ò¹
¡ÒÃÍØ´ª‹Í§à» ´ ·Õè¾×é¹
·‹Í·ÕèµÔ´ä¿ – ÊÒÁÒö·íÒ¡Òû‡Í§¡Ñ¹â´ÂµÔ´µÑé§ ÇÑÊ´Ø·¹ä¿ä´Œ·Õ贌ҹ㵌¢Í§·‹Í ·‹Í·ÕèäÁ‹µÔ´ä¿ – ÊÒÁÒö»‡Í§¡Ñ¹â´Â¡ÒâÖé¹ÃٻẺ Ãͧ¾×鹨ҡ¹Ñé¹·íÒ¡ÒÃà·» ´´ŒÇÂÁÍŵŒÒà ·¹ä¿
10
FIRE PROTECTION SYSTEM
EQUIPMENT
¡ Ò Ã ¤ Ç º ¤Ø Á ¤ ÇÑ ¹ / ¡ Ò Ã Ã Ð º Ò Â ¤ ÇÑ ¹
à Рº º / ÍØ » ¡ à ³
SMOKE EXHAUST SYSTEM PROCESS
·‹ÍÅÁ
SMOKE EXHAUST FAN
ZONE SMOKE CONTROL
ºÃÔàdz·Õèà¡Ô´à¾ÅÔ§äËÁŒ
FIRE-RESISTING DAMPER
ºÃÔàdz·Õèà¡Ô´à¾ÅÔ§äËÁŒ àµÔÁÍÒ¡ÒÈ à¾×èÍà¨×ͨҧ¤Çѹ PRESSURISATION FAN
¤Çѹ¨Ò¡ à¾ÅÔ§äËÁŒ
FIRE-RESISTING DAMPER SMOKE EXHAUST DAMPER
ÍØ»¡Ã³
µÙŒ¤Çº¤ØÁÁÍàµÍÃ
Atrium SMOKE EXHAUST FAN
Smoke curtain
Convention hall
áËÅ‹§¨‹ÒÂä¿ÊíÒÃͧ Exhibition hall
PRESSURISATION FAN
SMOKE EXHAUST FAN
FIRE-RESISTING DAMPER
SMOKE EXHAUST DAMPER
ÃÐÂÐàÇÅҡѹ¤Çѹ 1 ªÑèÇâÁ§, 2 ªÑèÇâÁ§ ËÃ×Í 4 ªÑèÇâÁ§ µÙŒ¤Çº¤ØÁ¨Ð·íÒ¡ÒõѴ¡ÃÐáÊä¿¿‡Ò·Õè 仨‹ÒÂÁÍà àµÍà à¾×èͻŴÁ‹Ò¹¡Ñ¹ä¿Å§ àÁ×èÍä´ŒÃѺÊÑÞÞÒ³¨Ò¡Ãкºá¨Œ§à赯 à¾ÅÔ§äËÁŒ
Office
Guest room corridor
Smoke exhaust fan Smoke
¡ÒÃÃкÒ¤Çѹ MAIN KITCHEN
10
FIRE PROTECTION SYSTEM
EQUIPMENT
Fire Protection System Ãкº»‡Í§¡Ñ¹à¾ÅÔ§äËÁŒ PLAN
àÊŒ¹·Ò§Ë¹Õä¿ ·Ò§Í͡˹Õä¿ ¾×é¹·Õè¨Ø´ÃÇÁ¾Å ºÑ¹ä´Ë¹Õä¿ Fireman Lift Fire Compartment
1 FLOOR
10 EQUIPMENT
AUDITORIUM
Ãкºáʧ㹠Auditorium â¤Áä¿ÊíÒËÃѺʋͧÊÇ‹Ò§ºÃÔàdz˹ŒÒ àÇ·Õ F.O.H (Front of House) â¤Á俪¹Ô´¹Õé 㪌㹡ÒÃʋͧÊÇ‹Ò§ãËŒ¡Ñº ºÃÔàdz´ŒÒ¹Ë¹ŒÒÊØ´¢Í§àÇ·Õ â´ÂÁÕ¡Òà Í͡ẺãËŒ ã ªŒ â ¤Áä¿·Õè Ê ÒÁÒöʋ Í § ÊNjҧ䴌¨Ò¡ÃÐÂÐä¡Å
STAGE LIGHT â¤Áä¿Ê‹Í§ÊNjҧ˹ŒÒàÇ·Õ â¤Áä¿Ê‹Í§ÊÇ‹Ò§º¹àÇ·Õ â¤Áä¿Ê‹Í§ÊÇ‹Ò§¢ŒÒ§àÇ·Õ
â¤Áä¿ÊíÒËÃѺʋͧÊÇ‹Ò§º¹àÇ·Õ à»š¹â¤Áä¿·ÕèãËŒáʧÊÇ‹Ò§º¹àÇ·Õ໚¹áʧ ËÅÑ ¡ ºÃÔ à dz´Œ Ò ¹Ë¹Œ Ò µÃ§¡ÅÒ§áÅÐ ´ŒÒ¹ã¹¢Í§àÇ·Õ
â¤Áä¿Ê‹Í§ÊÇ‹Ò§ÊíÒËÃѺ´ŒÒ¹¢ŒÒ§àÇ·Õ à»š¹áʧàÊÃÔÁºÃÔàdz´ŒÒ¹¢ŒÒ§àÇ·Õ à¾×èÍ Åºà§Ò·Õ赡¡Ãзº¢Í§Çѵ¶Ø¹Ñé¹ à¾×èÍ·íÒ ãËŒ ÇÑ µ ¶Ø ÁÕ ¤ ÇÒÁà´‹ ¹ ªÑ ´ ¢Öé ¹ ¢Í§ÃÙ » ·Ã§ ÁÒ¡¢Öé¹
CONTROL ROOM
10 EQUIPMENT
EXHIBITION
¡ÒÃ㪌áʧÊíÒËÃѺ§Ò¹»ÃеÔÁÒ¡ÃÃÁ Çѵ¶Ø áÅÐÊÔ觻ÃдÔÉ° Çѵ¶Ø¤ÇÃÍÂÙ‹ÊÙ§¨Ò¡¾×é¹Í‹ҧ¹ŒÍ 60 ૹµÔ à ÁµÃ¢Öé ¹ ä» à Á×è Í áʧʋ Í §ÁÒ ¡ÃзºªÔé ¹ §Ò¹ ¨Ð·í Ò ãËŒ ªÔé ¹ §Ò¹¹Ñé ¹ ÁÕ ¤ÇÒÁ¹‹Òʹ㨠ÁØÁ·Õèà ËÁÒÐÊÁÊí Ò ËÃѺ¡ÒÃÊ‹ Í §ÊÇ‹Ò § Êí Ò Ë ÃÑ º § Ò ¹ » à РµÔ Á Ò ¡Ã à Á Ë Ã× Í ÊÔè § »ÃÐ´Ô É ° Å ÍÂµÑ Ç ¨ÐµŒ Í §ÍÂÙ‹ ã ¹ÁØ Á 30-36 ͧÈÒ ÅíÒáʧ᤺ à¾×èÍ໚¹¡ÒÃâ¿¡ÑʪÔ鹧ҹ ·Õè¨Ñ´áÊ´§
ËÅÍ´ä¿·ÕèàËÁÒÐÊÁ¡Ñº§Ò¹»ÃÐàÀ· »ÃеÔÁÒ¡ÃÃÁ ËÃ×Í §Ò¹Å͵ÑÇ ËÅÍ´ä¿»ÃÐàÀ·ÎÒâÅਹ Ê‹ Í §àฉ¾ÒÐ¨Ø ´ ÁÕ ¤‹ Ò áÊ´§ÊÕ ÊÙ § ¡Ç‹ Ò ËÅÍ´ä¿·ÑèÇä» ¨Ñ´à»š¹áʧÊÇ‹Ò§ÊíÒËÃѺ¡ÒÃ์¹â¿¡ÑÊ·ÕèÊÁºÙó Ẻ º¹ÇÑ µ ¶Ø â ´Âàฉ¾ÒÐ ÊÒÁÒö»ÃÑ º ¤ÇÒÁÍ‹ Í ¹-ࢌ Á ¢Í§áʧ䴌 ᵋ ÁÕ ¤ÇÒÁÌ͹ÊÙ§ µÑÇËÅÍ´¨Ö§µŒÍ§ÃкÒ¤ÇÒÁÌ͹䴌´Õ
10
EXHIBITION
EQUIPMENT
3D Projection Mapping ¡ÒÃ㪌෤â¹âÅÂÕ㹡ÒÃฉÒÂÀÒ¾ ËÃ×Í ÇÔ´ÕâÍ Í¹ÔàÁªÑè¹ 3 ÁÔµÔ Å§º¹¾×é¹¼ÔÇ¢¹Ò´ãËÞ‹ â´Â â»ÃਤàµÍà ·Õè㪌 ÁÕ¤ÇÒÁÅÐàÍÕ´ 1920x1080 ¢ŒÍ´Õ -
໚¹à¤Ã×èͧÁ×ÍáÅÐÍØ»¡Ã³ ·ÕèÊÒÁÒö¨Ñ´ËÒä´Œ§‹Ò ÁÕ¤ÇÒÁá»Å¡ãËÁ‹ ¹‹Òʹ㨠ÁÕ¡ÒÃ㪌àͿ࿤µ‹Ò§æ 㹡ÒùíÒàʹͪÔ鹧ҹ
¢ŒÍàÊÕ -
ÁÕµŒ¹·Ø¹ÊÙ§ ËÅÍ´ฉÒÂÍÒÂØ¡ÒÃ㪌§Ò¹µèíÒ
10
LIFT
EQUIPMENT
» Ã Ð à À · ÅÔ ¿ µ ã ¹ â ¤ Ã § ¡ Ò Ã ÅÔ ¿ µ â ´ Â Ê Ò Ã
㪌ÅÔ¿µ â´ÂÊÒ÷ÕèÁÕˌͧà¤Ã×èͧẺ¤ÇÒÁàÃçǵèÒ í ·ÕèÁÕ ¤ÇÒÁàÃçÇäÁ‹à¡Ô¹ 60 àÁµÃ/ ¹Ò·Õ ÃѺ¹éíÒ˹ѡ䴌 900 ¡ÔâÅ¡ÃÑÁ ¨íҹǹ¼ÙŒâ´ÂÊÒÃÊÙ§ÊØ´ 12 ¤¹
ÅÔ ¿ µ ¢ ¹ ¢ Í §
㪌ÅÔ¿µ ¢¹¢Í§·ÕèÊÒÁÒöÃѺ¹éíÒ˹ѡ䴌 3000 ¡ÔâÅ¡ÃÑÁ Ãк ºà » ´Ê ä Å ´ ´Œ Ò ¹¢Œ Ò § Ẻ 3 ºÒ ¹» Ãе٠⠴ ÁÕ ¤ÇÒÁàÃçǢͧÅÔ¿µ ໚¹ 45 àÁµÃ µ‹Í¹Ò·Õ
ÅÔ ¿ µ Ë ¹Õ ä ¿
¤ÇÃÁÕÅÔ¿µ ´Ñºà¾Åԧ͋ҧ¹ŒÍ 1 ªØ´ ÊÒÁÒö¨Í´ä´Œ·Ø¡ ªÑé ¹ áÅеŒ Í §ÁÕ Ã Ðºº¤Çº¤Ø Á ¾Ô à ÈÉÊí Ò ËÃÑ º ¾¹Ñ ¡ §Ò¹ ´Ñºà¾ÅÔ§ºÃÔàdz˹ŒÒÅÔ¿µ µŒÍ§µÔ´µÑé§ FHC ËÃ×ÍËÑǵ‹Í ÊÒÂฉÕ´¹éíҴѺà¾ÅÔ§áÅÐÍØ»¡Ã³ ´Ñºà¾ÅÔ§Í×è¹ æ
EXHIBITION & AUDITORIUM ÅÔ ¿ µ â ´ Â Ê Ò Ã
ÅÔ ¿ µ S E R V I C E
ÅÔ ¿ µ ´Ñ º à ¾ ÅÔ §
6 µÑ Ç
2 µÑ Ç
1 µÑ Ç
SIZE : 2.60 x 2.20 M. P I T T A R E A : 3 . 0 0 X 10.10 X 2.20 M. M A C H I N E R O O M : 3 . 0 0 X 10.10 X 2.50 M.
HOTEL ÅÔ ¿ µ â ´ Â Ê Ò Ã
ÅÔ ¿ µ S E R V I C E / ÅÔ ¿ µ ´Ñ º à ¾ ÅÔ §
ÅÔ ¿ µ ·Õè ¨ Í ´ Ã ¶
8 µÑ Ç
2 µÑ Ç
2 µÑ Ç
FIREMAN LIFTS
PASSENGER LIFTS SERVICE LIFTS
10
ESCALATOR
EQUIPMENT
ºÑ ¹ ä ´ à Å×è Í ¹ Interrupted Arrangement 5 th F L
UP 3-5
CIRCULATION
UP 2-3
DN 3-5
DN 2-3
3 rd F L
2 nd F L
DN 1-2
Êí Ò ËÃÑ º ¼ÙŒ ã ªŒ äÁ‹ Ê ÒÁÒö¢Öé ¹ µ‹ Í à¹×è Í § ¨Ò¡´Œ Ò ¹à´Õ Â Ç¡Ñ ¹ ¨ÐµŒ Í §ÍŒ Í Áä»ÍÕ ¡ ´ŒÒ¹Ë¹Öè§ ·íÒãËŒ¼ÙŒãªŒ§Ò¹à´Ô¹¼‹Ò¹¾×é¹·Õè â´ÂÃͺºÃÔàdz䴌 WIDTH : 1.20 M. P I T T A R E A : 1.20 X 2.40 X 0.90 M.
UP 1-2
1 st F L
10 EQUIPMENT
SECURITY & PROTECTION SYSTEM CCTV ROOM
ROOM AREA CCTV Room 32.50 sq.m. 5.80 x 5.60 m.
3 rd F L O O R
CCTV EQUIPMENT ¡ ÅŒ Í § Ç § ¨ à » ´ à Рº º ä Í ¾Õ à »š ¹ ¡ ÅŒ Í § ·Õè ÁÕ ¤ Ç Ò Á Å Ð à ÍÕ Â ´ à Р´Ñ º ÊÙ § «Öè § ·íÒ Ë ¹Œ Ò ·Õè ÃÑ º À Ò ¾ á Å Ð Ê‹ § À Ò ¾ à »š ¹ ´Ô ¨Ô µ Í Å ¡ ÅŒ Í § Ç § ¨ à » ´ á º º ÍÔ ¹ ¿ Ã Ò à à ´ à »š ¹ ¡ ÅŒ Í § ·Õè Ê Ò Á Ò Ã ¶ ¨Ñ º À Ò ¾ ã ¹ ·Õè Á× ´ ä ´Œ ªÑ ´ à ¨ ¹ ÁÕ ¤ Ç Ò Á · ¹ µ‹ Í Ê À Ò ¾ ÀÙ ÁÔ Í Ò ¡ Ò È «Öè § ¹Ô  Á ã ªŒ À Ò Â ¹ Í ¡ Í Ò ¤ Ò Ã ¡ ÅŒ Í § Ç § ¨ à » ´ á º º â ´ Á ÁÕ ¢ ¹ Ò ´ à Åç ¡ ¡ à Р·Ñ ´ ÃÑ ´ Ê Ò Á Ò Ã ¶ » ÃÑ º ÁØ Á Á Í § ¡ ÅŒ Í § ä ´Œ 3 6 0 Í § È Ò ÁÕ ÅÑ ¡ É ³ Ð ä Á‹ Ê Ð ´Ø ´
PROTECTION EQUIPMENT ã ªŒ à Рº º K e y c a r d s c a n ã ¹ ¡ Ò Ã ¼‹ Ò ¹ ¨Ø ´ à ¢Œ Ò Í Í ¡ ã ¹ á µ‹ Å Ð ¾×é ¹ ·Õè â ´  K e y c a r d ¨ Ð º‹ § º Í ¡ ¶Ö § ¼ÙŒ ã ªŒ § Ò ¹ À Ò Â ã ¹ â à § á à Á F i n g e r S c a n n e r ã ªŒ ¡Ñ º ºØ ¤ Å Ò ¡ à À Ò Â ã ¹ â à § á à Á â ´  ¨ Ð ÁÕ á µ‹ ¾ ¹Ñ ¡ § Ò ¹ À Ò Â ã ¹ â à § á à Á à ·‹ Ò ¹Ñé ¹ ·Õè Ê Ò Á Ò Ã ¶ ¼‹ Ò ¹ à ¢Œ Ò Í Í ¡ ã ¹ ¨Ø ´ ·Õè ¡íÒ Ë ¹ ´ ä ´Œ à ·‹ Ò ¹Ñé ¹
10
SECURITY & PROTECTION SYSTEM
EQUIPMENT
¼Ñ§µíÒá˹‹§¡ÒõԴµÑ§ é ¡ÅŒÍ§Ç§¨Ã» ´ IP CAMERA INFRARED CAMERA DOME CAMERA SECURITY
� J Kİ Ḻ ȷ İ ı � � ḵᵻ กล้ อ งวงจรปิ ดที่ ใ ช้ ทั้ ง ภ ายใ นแล ะ ภา ยนอ ก อาคาร เป็ นกล้อ งวงจร ปิ ดที่สามารถหมุนได้ 180 องศา
� ƖǨ � İ ǩƖ � �Ǩĵ ǩĮ ȷ ǩ� � J Kᵻ ᵼ �Ǩ
พนั ก ง านรั ก ษา ค ว า ม ป ล อ ด ภั ย ป ร ะ จํ า ตํา แหน่ ง และประจํา จุ ด ต่างๆ ภายนอกอาคาร 1 st Floor
10
SECURITY & PROTECTION SYSTEM
EQUIPMENT
¼Ñ§µíÒá˹‹§¡ÒõԴµÑ§ é ¡ÅŒÍ§Ç§¨Ã» ´ IP CAMERA INFRARED CAMERA DOME CAMERA SECURITY
� J Kİ Ḻ ȷ İ ı � � ḵᵻ กล้ อ งวงจรปิ ดที่ ใ ช้ ทั้ ง ภ ายใ นแล ะ ภา ยนอ ก อาคาร เป็ นกล้อ งวงจร ปิ ดที่สามารถหมุนได้ 180 องศา
� ƖǨ � İ ǩƖ � �Ǩĵ ǩĮ ȷ ǩ� � J Kᵻ ᵼ �Ǩ
พนั ก ง านรั ก ษา ค ว า ม ป ล อ ด ภั ย ป ร ะ จํ า ตํา แหน่ ง และประจํา จุ ด ต่างๆ ภายนอกอาคาร Basement 1
10
SECURITY & PROTECTION SYSTEM
EQUIPMENT
¼Ñ§µíÒá˹‹§¡ÒõԴµÑ§ é ¡ÅŒÍ§Ç§¨Ã» ´ IP CAMERA INFRARED CAMERA DOME CAMERA Basement 1A,2A,3A
SECURITY
DN UP
UP
DN DN UP
� J Kİ Ḻ ȷ İ ı � � ḵᵻ กล้ อ งวงจรปิ ดที่ ใ ช้ ทั้ ง ภ ายใ นแล ะ ภา ยนอ ก อาคาร เป็ นกล้อ งวงจร ปิ ดที่สามารถหมุนได้ 180 องศา
� ƖǨ � İ ǩƖ � �Ǩĵ ǩĮ ȷ ǩ� � J Kᵻ ᵼ �Ǩ
UP
DN
พนั ก ง านรั ก ษา ค ว า ม ป ล อ ด ภั ย ป ร ะ จํ า ตํา แหน่ ง และประจํา จุ ด ต่างๆ ภายนอกอาคาร
Basement 2,3
10
SECURITY & PROTECTION SYSTEM
EQUIPMENT
¼Ñ§µíÒá˹‹§¡ÒõԴµÑ§ é ¡ÅŒÍ§Ç§¨Ã» ´ IP CAMERA INFRARED CAMERA DOME CAMERA SECURITY
� J Kİ Ḻ ȷ İ ı � � ḵᵻ กล้ อ งวงจรปิ ดที่ ใ ช้ ทั้ ง ภ ายใ นแล ะ ภา ยนอ ก อาคาร เป็ นกล้อ งวงจร ปิ ดที่สามารถหมุนได้ 180 องศา
� ƖǨ � İ ǩƖ � �Ǩĵ ǩĮ ȷ ǩ� � J Kᵻ ᵼ �Ǩ
พนั ก ง านรั ก ษา ค ว า ม ป ล อ ด ภั ย ป ร ะ จํ า ตํา แหน่ ง และประจํา จุ ด ต่างๆ ภายนอกอาคาร
2 nd Floor
10
SECURITY & PROTECTION SYSTEM
EQUIPMENT
¼Ñ§µíÒá˹‹§¡ÒõԴµÑ§ é ¡ÅŒÍ§Ç§¨Ã» ´ IP CAMERA INFRARED CAMERA DOME CAMERA SECURITY
� J Kİ Ḻ ȷ İ ı � � ḵᵻ กล้ อ งวงจรปิ ดที่ ใ ช้ ทั้ ง ภ ายใ นแล ะ ภา ยนอ ก อาคาร เป็ นกล้อ งวงจร ปิ ดที่สามารถหมุนได้ 180 องศา
� ƖǨ � İ ǩƖ � �Ǩĵ ǩĮ ȷ ǩ� � J Kᵻ ᵼ �Ǩ
พนั ก ง านรั ก ษา ค ว า ม ป ล อ ด ภั ย ป ร ะ จํ า ตํา แหน่ ง และประจํา จุ ด ต่างๆ ภายนอกอาคาร
3 rd Floor
10
SECURITY & PROTECTION SYSTEM
EQUIPMENT
¼Ñ§µíÒá˹‹§¡ÒõԴµÑ§ é ¡ÅŒÍ§Ç§¨Ã» ´ IP CAMERA INFRARED CAMERA DOME CAMERA SECURITY
� J Kİ Ḻ ȷ İ ı � � ḵᵻ กล้ อ งวงจรปิ ดที่ ใ ช้ ทั้ ง ภ ายใ นแล ะ ภา ยนอ ก อาคาร เป็ นกล้อ งวงจร ปิ ดที่สามารถหมุนได้ 180 องศา
� ƖǨ � İ ǩƖ � �Ǩĵ ǩĮ ȷ ǩ� � J Kᵻ ᵼ �Ǩ
พนั ก ง านรั ก ษา ค ว า ม ป ล อ ด ภั ย ป ร ะ จํ า ตํา แหน่ ง และประจํา จุ ด ต่างๆ ภายนอกอาคาร
4 th Floor
10
SECURITY & PROTECTION SYSTEM
EQUIPMENT
¼Ñ§µíÒá˹‹§¡ÒõԴµÑ§ é ¡ÅŒÍ§Ç§¨Ã» ´ IP CAMERA INFRARED CAMERA DOME CAMERA SECURITY
� J Kİ Ḻ ȷ İ ı � � ḵᵻ กล้ อ งวงจรปิ ดที่ ใ ช้ ทั้ ง ภ ายใ นแล ะ ภา ยนอ ก อาคาร เป็ นกล้อ งวงจร ปิ ดที่สามารถหมุนได้ 180 องศา
� ƖǨ � İ ǩƖ � �Ǩĵ ǩĮ ȷ ǩ� � J Kᵻ ᵼ �Ǩ
พนั ก ง านรั ก ษา ค ว า ม ป ล อ ด ภั ย ป ร ะ จํ า ตํา แหน่ ง และประจํา จุ ด ต่างๆ ภายนอกอาคาร
5 th Floor
10
WASTE DISPOSAL SYSTEM
EQUIPMENT
à Рº º ¨Ñ ´ ¡ Ò Ã ¢ Í § à ÊÕ Â á Å Ð ¢  Р»ÃÐàÀ·¢ÂÐã¹â¤Ã§¡Òà Garbage Room
¢ Â Ð ·Ñè Ç ä » (General Waste)
¢ Â Ð ÍÑ ¹ µ Ã Ò Â (Hazardous Waste)
¡ Ò Ã ¨Ñ ´ ¡ Ò Ã ¢  Рà Ç Å Ò ã ¹ ¡ Ò Ã ¨Ñ ´ ¡ Ò Ã ¢  Ð
à ¡ç º ¢  Р⠴  à ¶ ¨ Ò ¡ ¡ · Á . ¨ Ò ¡ ¹Ñé ¹ ¹íÒ ä » ¤Ñ ´ á  ¡ ÂÑ § âçá¡¢ÂÐ
4.00 •
5.00
6.00
7.00
4 . 0 0 - 7 . 0 0 ¢ Í § ·Ø ¡ ÇÑ ¹
ROOM AREA Garbage Room 450.00 sq.m. 15.00x30.00 m.
GARBAGE ROOM
B1 FLOOR
10 EQUIPMENT
CLEANING SYSTEM HOTEL á º º ¡ Ã Ð à ªŒ Ò ä ¿ ¿‡ Ò ( G o n d o l a ) 㪌 ¡Ñ º §Ò¹ÀÒ¹͡ÍÒ¤ÒÃÊÙ § ઋ ¹ ·ÒÊÕ , µÔ ´ µÑé § ¡ÃШ¡, à´Ô¹·‹Í äÁ‹¤ÇÃ㪌㹡Ò⹢ͧ·ÕèÁÕ¹éíÒ˹ѡ ÁÒ¡ 㹡Ò÷í Ò §Ò¹¡ÃÐઌ Ò ä¿¿‡ Ò ¨ÐÂÖ ´ ÍÂÙ‹ ¡Ñ º ÊÒÂÊÅÔ § 4 àÊŒ ¹ â´Â ÊÅÔ § 2 àÊŒ ¹ ¨ÐÂÖ ´ ÍÂÙ‹ ¡Ñ º ÁÍàµÍà ·Õè㪌㹡ÒÃà¤Å×è͹·Õè áÅÐÍÕ¡ 2 àÊŒ¹¨Ðµ‹Íà¢ŒÒ ¡Ñº SAFETY LOCK à¾×èÍ»‡Í§¡Ñ¹à˵طÕèÊÒÂÊÅÔ§·Õè µ‹Í¡ÑºÁÍàµÍà ¢Ò´ àÁ×èÍ㪌§Ò¹àÊÃ稵ŒÍ§ãËŒ¡ÃÐàªŒÒ ÇÒ§ÍÂÙ‹º¹¾×é¹ à¾×èÍ»‡Í§¡Ñ¹¡ÒÃà¡Ô´¤ÇÒÁàÊÕÂËÒÂä´Œ
EXHIBITION & AUDITORIUM
á º º â à  µÑ Ç ( S p i d e r m a n )
á¹ÇÂÖ´à¡ÒÐ
¡Ò÷íÒ¤ÇÒÁÊÐÍÒ´¡ÃШ¡ÃͺÍÒ¤Òà ¨ÐÁÕ¾¹Ñ¡§Ò¹ ·íÒ¤ÇÒÁÊÐÍÒ´ ·ÕèâõÑǨҡ´ŒÒ¹º¹ â´Â㪌àª×Í¡ / ÊÅԧ㹡Ò÷íÒ¤ÇÒÁÊÐÍÒ´ â´Â¨ÐÁÕá·‹¹¼Ù¡ÂÖ´à¡ÒÐ ·Õè ª‹ Ç Â㹡ÒÃâÃÂµÑ Ç Å§ÁÒ â´Â¨ÐÁÕ ¡ Ò÷í Ò ¤ÇÒÁ ÊÐÍҴ໚¹»ÃШíÒ»‚ÅÐ 2 ¤ÃÑé§
BIBLIOGRAPHY BACC. 2563. á¼¹¼Ñ§ÍÒ¤ÒÃ. [Online]. áËÅ‹§¢ŒÍÁÙÅ https://www.bacc.or.th/content/24.html. Ê׺¤Œ¹àÁ×èÍ 30 ÊÔ§ËÒ¤Á 2563 BU Assets. 2557. Services : Seminars & Functions. [Online]. áËÅ‹§¢ŒÍÁÙÅ https://www.bu.ac.th/BU_Asset/meetsc.html. Ê׺¤Œ¹àÁ×èÍ 16 ÊÔ§ËÒ¤Á 2563 DDproperty. 2562. ÃÙŒ¨Ñ¡Â‹Ò¹à¨ÃÔÞ¡ÃاẺà¨ÒÐÅÖ¡. [Online]. áËÅ‹§¢ŒÍÁÙÅ https://www.ddproperty.com/areainsider/à¨ÃÔÞ¡Ãا/ article/ÃÙŒ¨Ñ¡Â‹Ò¹à¨ÃÔÞ¡ÃاẺà¨ÒÐÅÖ¡. Ê׺¤Œ¹àÁ×èÍ 25 ÊÔ§ËÒ¤Á 2563 ‹ Ò ‹ ¹ÊÌҧÊÃä áË‹§áá¢Í§ä·Â. [Online]. áËÅ‹§¢ŒÍÁÙÅ https://mgronline.com/ MGRonline. 2560. »ÅØ¡µíÒ¹Ò¹ “à¨ÃÔÞ¡Ãا” à´Ô¹Ë¹ŒÒÊÙ travel/detail/9600000036614. Ê׺¤Œ¹àÁ×èÍ 25 ÊÔ§ËÒ¤Á 2563 é ᵋ¤³ Ø ÀÒ¾ÊÙ§ ¡Ñº¤ÇÒÁ¹ÔÂÁ·Õàè ¾ÔÁ è ¢Ö¹ é . [Online]. áËÅ‹§¢ŒÍÁÙÅ https://www.pratimaPratima ishop. 2558. â»ÃਤàµÍà ÃÐÂÐฉÒÂÊѹ ishop.com/article/4/â»ÃਤàµÍà ÃÐÂÐฉÒÂÊÑé¹-ᵋ¤Ø³ÀÒ¾ÊÙ§-¡Ñº¤ÇÒÁ¹ÔÂÁ·Õèà¾ÔèÁ¢Öé¹. Ê׺¤Œ¹àÁ×èÍ 20 µØÅÒ¤Á 2563 Rachadalai. 2563. ºÃÔ¡ÒÃઋҾ׹ é ·Õ.è [Online]. áËÅ‹§¢ŒÍÁÙÅ https://www.rachadalai.com/ºÃÔ¡ÒÃઋҾ×é¹·Õè. Ê׺¤Œ¹àÁ×èÍ 16 ÊÔ§ËÒ¤Á 2563 SSRU. 2560. áʧ·Õè㪌㹡ÒèѴ¹Ô·ÃÃÈ¡ÒÃ. [Online]. áËÅ‹§¢ŒÍÁÙÅ http://www.elfhs.ssru.ac.th/áʧ·Õè㪌㹡ÒèѴ¹Ô·ÃÃÈ¡ÒÃ.pdf. Ê׺¤Œ¹àÁ×èÍ 25 ÊÔ§ËÒ¤Á 2563 Shawpat. 2550. ¤ÇÒÁ»ÅÍ´ÀÑÂ㹡Ò÷íÒ§Ò¹º¹ÍÒ¤ÒÃÊÙ§. [Online]. áËÅ‹§¢ŒÍÁÙÅ https://www.shawpat.or.th/index.php?option=com _content&view=article&id=250 :-m---m-s&catid=55:safety-system&Itemid=200. Ê׺¤Œ¹àÁ×èÍ 10 µØÅÒ¤Á 2563 Siaminter Electronic Lift. 2562. ÅÔ¿µ ´º Ñ à¾ÅÔ§. [Online]. áËÅ‹§¢ŒÍÁÙÅ https://www.siaminterelectroniclift.com/product/ÅÔ¿µ ´Ñºà¾ÅÔ§. Ê׺¤Œ¹àÁ×èÍ 10 µØÅÒ¤Á 2563 × ¡ÒÃઋҾ׹ é ·Õè TCDC. [Online]. áËÅ‹§¢ŒÍÁÙÅ https://hr.tcdc.or.th/upload/TCDC-VenueHire-Manual.pdf. TCDC Venue Hire. 2563. ¤Ù‹ÁÍ Ê׺¤Œ¹àÁ×èÍ 18 ÊÔ§ËÒ¤Á 2563 Tokyo International Forum. 2562. Facilities. [Online]. áËÅ‹§¢ŒÍÁÙÅ https://www.t-i-forum.co.jp/en/facilities/. Ê׺¤Œ¹àÁ×èÍ 18 ÊÔ§ËÒ¤Á 2563
Visual and Performing Art Center ÈÙ ¹  ·Ñ È ¹ ÈÔ Å »Š á Å Ð ÈÔ Å » Ð ¡ Ò Ã á Ê ´ §
¹Ò§ÊÒÇªØ µÔ ¡ ÒÞ¨¹ ÂÍ´ÊÔ § Ë ¹Ò§ÊÒÇ¸Ñ ¹ ¾à ÊË¾Ô ·Ñ ¡ É ÊÔ ¹ ¹Ò§ÊÒǾäÃÔ Ê µ à¡Õ Â ÃµÔ È ÃÕ ª ÒµÔ ¹Ò§ÊÒÇÇÔ ÃÔ Â Ò ¨Ù Ì ÒÇÔ à ÈÉ¡Ø Å ¹Ò§ÊÒÇÍÀÔ ª ÞÒ ºÑ Ç á¡Œ Ç
59020013 59020025 59020038 59020059 59020070