HNGC COMMUNITY HALL
HNGC COMMUNITY HALL - INTRODUCTION
INTRODUCTION Situated off the highway in Mangalore, this convention center is designed around the idea of landscape and trees in the area to cut down the massive visual scale of the building yet incorporate the necessary requirements and services.
2
HNGC COMMUNITY HALL - THE IDEA
THE SITE
MASSING
SCALE
SKY LIGHT
Based on the requirements, and number of people to be catered to, the built mass is positioned to maximize use of the landscape around.
Dividing the space based on the function, the convention halls are situated on the first floor with the dining halls on the ground floor.
Landscape is raised around the built mass on all four sides, in order to cut down the scale and make it visually relatable.
The ground floor is slightly offset from the edges of the hall in order to harness natural light in the form of skylights cut into the bund / landscape.
3
HNGC COMMUNITY HALL - MATERIAL PALETTE
BRICK
METAL
GLASS
LANDSCAPE
Locally available and easy to source, brick cladding forms three fourths of the facade for a slightly traditional look with ample space for branding.
Metal fins help maintain the verticality and break the mass. An outer layer around the structure reduces the scale , adding a visual connection to the landscape outside.
A commonly used glazing element, helps maintain the lightness of the structure and aids in the visibility.
Landscape, with lawn and trees local to the area, wraps the structure and helps in reading the building in relation to the foreground.
4
HNGC COMMUNITY HALL - REFERENCES
Soulages museum by RCR
Modern rectangular house by FGR
Anish kapoor studio, London
5
HNGC COMMUNITY HALL - THE PROCESS
Metal fins with couple closed roof
Metal fins with pitched roof within
Metal fins with butterfly roof
Metal fins with a brick cladded facade and pitched roof within
6
OPTION - 1 Dining halls capacity - 400 ( x 2)
Seating capacity - 600 ( x 2)
Number of parking - 316
HNGC COMMUNITY HALL - OPTION - 1
1
2 6
3
4 5
SITE PLAN 5
8
01. ENTRY 02. SECURITY CABIN 03. VEHICULAR PATHWAY 04. PEDESTRIAN PATHWAY 05. PARKING 06. COMMUNITY CENTER 07. PRAYER HALL 08. EXIT
7 8
9
HNGC COMMUNITY HALL - OPTION - 1
PROPOSED MLCP YARD LEVEL PARKING 221 NOS. MLCP 449 NOS. GROUND LEVEL 75 NOS. FIRST FLOOR LEVEL 374 NOS.
10
HNGC COMMUNITY HALL - OPTION - 1
BASEMENT FLOOR 01. ENTRY TO DINING HALL 02. WOMEN’S DINING HALL 03. MEN’S DINING HALL 04. BUFFET COUNTER 05. LIFT 06. LIFT LOBBY 07. WASH 08. LADIES WASHROOM 09. MEN’S WASHROOM 10. PLATE COLLECTION UNIT 11. COMMON STORE ROOM 12. SERVICE CORRIDOR 13. KITCHEN 14. MANAGER ROOM 15. STORE ROOM 16. COOKING YARD 17. SERVICE ENTRY 18. PLATFORM FOR LOADING AND UNLOADING
11
HNGC COMMUNITY HALL - OPTION - 1
LOBBY PLAN 19. ENTRANCE FOYER 20. WELCOME DESK 21. LIFT 22. LIFT LOBBY 23. SPECIALLY ABLED TOILET 24. LOBBY 25. MEN’S TOILET 26. WOMEN’S TOILET 27. WOMEN’S HALL 28. MEN’S HALL 29. STAIRS TO WOMEN’S HALL 30. STAIRS TO MEN’S HALL 31. STORAGE
12
HNGC COMMUNITY HALL - OPTION - 1
GROUND FLOOR 31. FAMILY ROOM 32. TOILET 33. GROOM’S ROOM 34. BRIDE’S ROOM 35. TOILET 36. STORAGE 37. STAGE 38. WOMEN’S HALL 39. MEN’S HALL 40. 0.90M WIDE PASSAGE 41. 1.50M WIDE PASSAGE 42. 2.80M WIDE CENTRE AISLE 43. LIFT 44. BMS 45. STORAGE 46. RAISED PERFORMANCE PLATFORM 47. 10.00 M WIDE LOBBY SEEN BELOW
13
HNGC COMMUNITY HALL - OPTION - 1
PRAYER HALL 01. ENTRY 02. CORRIDOR 03. ABLUTION AREA 04. MEN’S PRAYER HALL 05. WOMEN’S PRAYER HALL
14
HNGC COMMUNITY HALL - SCHEMATIC SECTION
15
HNGC COMMUNITY HALL - AREA STATEMENT HNGC HALL - OPTION 01 SL. NO. 1 2 3 4 5 6 7 8 9 10 11 12
SL. NO. 1 2 3 4 5 6 7 8 9 10
SL. NO. 1 2 3 4 5 6 7 8 9
SL. NO. 1 2 3
DESCRIPTION DINING HALL LIFT LIFT LOBBY TOILET HAND WASH AREA COMMON STORAGE AREA PLATE COLLECTION AREA KITCHEN KITCHEN YARD MANAGERS OFFICE STORE ROOM CIRCULATION TOTAL
DESCRIPTION ENTRANCE FOYER LIFT LIFT LOBBY SPECIALLY ABLED TOILET AND WASH STORE ROOM LOBBY WOMENS' TOILET MENS' TOILET LANDING CIRCULATION TOTAL
DESCRIPTION MAIN HALL STAGE GREEN ROOMS BMS STORE ROOM LIFT LIFT LOBBY PERFORMANCE SPACE CIRCULATION TOTAL
DESCRIPTION PRAYER HALL ABLUTION AREA TOILETS TOTAL
GRAND TOTAL
BASEMENT FLOOR No.
SQM
2 2 2 2 2 1 2 1 1 1 1
LOBBY FLOOR No.
SQM
1 2 2 1 1 1 1 1 1
GROUND FLOOR No.
2 2 2
2150 9 38 78 106 90 80 305 90 12 24.5 130 3112.5
SQM 84.5 4.5 4 18.5 18.5 180 68.5 47.5 69 62 557
SQM
2 2 2 2 2 2 2 2
PRAYER HALL No.
TOTAL AREA 1075 4.5 19 39 53 90 40 305 90 12 24.5 130 1882
84.5 9 8 18.5 18.5 180 68.5 47.5 69 62 565.5
SQM 750 118 115 28 28 4.5 6 29 305 1383.5
SQM
1500 236 230 56 56 9 12 58 305 2462
SQM 93 15 3.5 111.5
186 30 7 223
6363 sqm
16
OPTION - 2 Dining halls capacity - 200 ( x 2)
Seating capacity - 510 ( x 2)
Number of parking - 306
HNGC COMMUNITY HALL - OPTION - 2
1 4
5 2
3
7
SITE PLAN 01. ENTRY 02.SECURITY CABIN 03.COMMUNITY CENTER 04.DINING HALL 05.KITCHEN 06.PRAYER HALL 07.PARKING 08.EXIT
6
8
18
HNGC COMMUNITY HALL - OPTION - 2
DINING AREA 01. ENTRY TO DINING HALL 02. WOMEN’S DINING HALL 03. MEN’S DINING HALL 04. BUFFET COUNTER 05. WASH 06. LADIES TOILET 07. MEN’S TOILET 08. PLATE COLLECTION UNIT 09. COMMON STORE ROOM 10. SERVICE CORRIDOR (3.0 M WIDE) 11. KITCHEN 12. STORE ROOM 13. COOKING YARD 14. SERVICE ENTRY 15. PLATFORM FOR LOADING AND UNLOADING
19
HNGC COMMUNITY HALL - OPTION - 2
HALL AREA 16.FAMILY ROOM 17.TOILET 18.GROOM’S ROOM 19.BRIDE’S ROOM 20.TOILET 21.STAGE 22.WOMEN’S HALL 23.MEN’S HALL 24.0.90M WIDE PASSAGE 25.1.50M WIDE PASSAGE 26.2.80M WIDE CENTER AISLE 27.BMS 28.RAISED PERFORMANCE PLATFORM 29. LOBBY
20
HNGC COMMUNITY HALL - AREA STATEMENT HNGC HALL - OPTION 02 SL. NO. 1 2 3
AREA
KITCHEN No.
SQM
1 1 1
WORK AREA STORE ROOM COOKING YARD TOTAL
SL. NO.
AREA
1 2 3 4 5
DINING HALL PLATE COLLECTING UNIT TOILETS STORE ROOM WASH AREA TOTAL
SL. NO.
AREA FUNCTION HALLS TOILETS GREEN ROOMS STAGE PERFORMANCE PLATFORM BMS LOBBY FRONT FOYER CIRCULATION TOTAL
1 2 3 5 6 7 8 9 10
SL. NO. 1 2 3
DESCRIPTION PRAYER HALL ABLUTION AREA TOILETS TOTAL
GRAND TOTAL
DINING AREA NUMBER 2 2 2 2 2
MAIN HALL NUMBER
SQM
2 2 2
181 58 142 381
TOTAL AREA
1100 9.5 39 21 29 1198.5
SQM
2 2 2 2 2 2 1 1
PRAYER HALL No.
TOTAL AREA 181 58 142 381
2200 19 78 42 58 2397
TOTAL AREA 616 40 100 93 28 17 94 30
1232 80 200 186 56 34 94 30 80.5
169
1992.5
SQM
TOTAL AREA 93 15 3.5 111.5
186 30 7 223
4993.5 sqm
21
OPTION - 3 Capacity of dining halls - 420 ( x 2)
Capacity of sitting area - 600 ( x 2)
Number of parking - 378
HNGC COMMUNITY HALL - OPTION - 3
1 3
5
2
SITE PLAN
4
01. ENTRY 02.VEHICULAR PATHWAY 03.PEDESTRIAN PATHWAY 04.PARKING 05.COMMUNITY CENTER 06.EXIT
6
23
HNGC COMMUNITY HALL - OPTION - 3
HALL AREA 01. HALL LOBBY 02. HALL (22.50M X 20.50M) 03. STORE ROOM (4.50MX5.40M) 04. STAGE (5.00M X14.30M) 05. GREEN ROOM (3.60M X 3.00M) 06. TOILET (1.20M X 2.65M) 07. LADIES TOILET (9.40M X 4.50M) 08. WASH AREA (5.40M X 4.50M) 09. ABLUTION (5.00M X 4.50M) 10. PRAYER (6.00M X 4.50M) CAPACITY – 25
24
HNGC COMMUNITY HALL - OPTION - 3
DINING AREA 01. HALL LOBBY 02. WASH AREA (5.40M X 9.00M) 03. DINNING (27.50M X 20.50M) 04. BUFFET COUNTER 05. OFFICE (5.40M X 5.55M) 06. STORE ROOM (5.40M X 8.85M) 07. GENTS TOILET BLOCK (9.40M X 4.50M) 08. WASH AREA (5.40M X 4.50M) 09. ABLUTION (5.00M X 4.50M) 10. PRAYER (6.00M X 4.50M) CAPACITY - 50
25
HNGC COMMUNITY HALL - AREA STATEMENT HNGC HALL - OPTION 03 SL. NO. 1 2 3 4 5 6 7 8 9
AREA
DINING AREA NUMBER
SQM
2 1 1 1 1 2 1 1 1
DINING HALL HALL LOBBY STORE ROOM GENTS TOILET WASHAREA 1 WASHAREA 2 PRAYER HALL OFFICE ABLUTION
TOTAL AREA 565 87 54.5 42.5 17.5 48.5 50.5 30 22
TOTAL
SL. NO.
AREA
MAIN HALL NUMBER
SQM
1130.000 87.000 54.500 42.500 17.500 97.000 50.500 30.000 22.000 1531.000
TOTAL AREA
1 2 3 4 5 6 7 8 9
MAIN HALL STAGE GREEN ROOMS LADIES WASHROOM WASH AREA LADIES ABLUTION AREA LADIES PRAYER ROOM PRAYER ROOM LOBBY
2 2 4 1 1 1 1 1 1
464 71.5 15.5 67.5 24.5 22.5 27 27 87
928 143 62 67.5 24.5 22.5 27 27 87
10
FRONT FOYER
1
23
23
11
CIRCULATION
1
345
345 1756.500
TOTAL GRAND TOTAL
3287.5 sqm
26
HNGC COMMUNITY HALL -
OPTION - 4 Capacity of dining halls - 420 ( x 2)
Capacity of sitting area - 600 ( x 2)
Number of parking - 407
27
HNGC COMMUNITY HALL - OPTION - 4
4 1
2
3
6 4
5
SITE PLAN 01. ENTRY 02.VEHICULAR PATHWAY 03.PEDESTRIAN PATHWAY 04.PARKING 05.COMMUNITY CENTER 06.EXIT
OPTION 3 TO BE REFERRED TO FOR THE INTERIOR LAYOUT.
28