01 02 03 04 05 Site Zoning
Cascade
Pavilion
Hotel Option
Area Chart
TO HOSUR
6M FIRE DRIVEWAY + AREA RESERVED FOR GREEN
SITE BOUNDARY
SITE AREA : 7338.48 SQM / 78,990.74 SFT SITE AREA AFTER SITE SETBACKS : 4562.60 SQM / 49,111.42 SFT
SITE SETBACKS FOR BASEMENT 8M SITE SETBACK
6M FIRE DRIVEWAY + AREA RESERVED FOR GREEN TO AIRPORT
01
Site Boundary & Setback Site Zoning
TO HOSUR
SITE BOUNDARY SITE SETBACKS FOR BASEMENT 8M SITE SETBACK
SITE AREA RESERVED FOR HOTEL : 1457.72 SQM / 15,690.77 SFT
SITE AREA FOR MALL : 5880.76 SQM / 63,299.97 SFT
TO AIRPORT
01
Site Division Site Zoning
01
Site Development Site Zoning
All round 8M setback applied to site, giving a maximum height of 27M height as per ZR.
3M high level 2 basement within maximum permissible area.
Level 1 Basement segregated into 2 parts separate for hotel and mall, with its own dedicated entry and exit points.
01
Site Development Site Zoning
The hotel block has a total overall height of 26.9M to accomodate G+6 floors consisting of a 50 key hotel. The total foot print of hotel and mall forms the level 2 basement dedicated to parking.
The mall volume has a total of height of 23.75M for a G+4 structure of 4.5M floor height each.
Basement 1 has part of the area allocated for a Supermarket, and remaining for Parking and Services. The driveway ramps down at the west and south-west corner of the site.
01
Design Strategy Site Zoning
Typical Mall - Internal Response Centralised atrium and common areas and result medium sized shop depths. User circulation responds only to the interior spaces and is visually disconnected from the exterior, resulting in unchanging vistas.
01
Design Strategy Site Zoning
Typical Mall - External Response Malls are generally devoid of windows due to the central atrium layouts, thereby cutting of visibility of internal activity to the outside. The resultant mass becomes a static object within the context.
01
Design Strategy Site Zoning
Decentralised Atrium - Internal Response The long and narrow nature of the site provides the oppurtunity to shift the atrium to the periphery of the building, thereby enabling users to equally experience both interior and the ever changing exterior according to time and season, resulting in varied vistas.
01
Design Strategy Site Zoning
Decentralised Atrium - External Response A see through facade provides for visual engagement between the exterior and interior spaces and also allows for a more dynamic response towards the exterior.
01
Design Strategy Site Zoning
Decentralised Atrium - Facade The overall height of the facade is broken down into 2 parts to reduce the scale of the building mass as well as emphasize the length of the ‘street’ experience within the atrium.
01
Design Strategy Site Zoning
Facade Repsonse The road facing facade is tilted outwards at the North-East and North-West corners in order to give further visibility for apporaching vehicles and pedstrians.
01 02 03 04 05 Site Zoning
Cascade
Pavilion
Hotel Option
Area Chart
02
Design Development Cascade
G+4 Floor Plates
Introduction of ‘cascading’ to the corridor edges to create visual connectivity
Placement of circulation cores
02
Design Development Cascade
Placement of circulation cores
Exploded Isometric
Shop Supermarket Multiplex Gaming Area Food Court
-3.250 LVL
FIRE DRIVE WAY SERVICE ENTRY/EX
IT
-3.250 LVL
MALL BASEMENT EX
IT
HOTEL
0.000 LVL
SHOPPING MALL
HOTEL ENTRY
± 0.000 LVL
MALL BASEMENT EN TRY MALL DROP OFF
02
Master Plan Cascade
02
Basement 1 Cascade
Lift and Staircase Corridor Services Parking and Driveway
108.65 567.97 115.49 1568.53
SQM SQM SQM SQM
Shop Area
1343.94 SQM
Total Plinth Area
3704.58 SQM
02
Basement 2 Cascade
Lift and Staircase Corridor Services Parking and Driveway
100.88 36.39 74.54 4315.70
SQM SQM SQM SQM
Total Plinth Area
4526.51 SQM
02
Ground floor Cascade
Lift and Staircase Corridor Services aand Toilets Shop Area
113.20 595.76 137.73 2222.39
SQM SQM SQM SQM
Total Plinth Area
3067.85 SQM
02
First Floor Cascade
Lift and Staircase Corridor Services and Toilets Shop Area
100.46 489.82 137.73 2180.02
SQM SQM SQM SQM
Total Plinth Area
2906.11 SQM
02
Second Floor Cascade
Lift and Staircase Corridor Services and toilets Shop Area
113.20 413.09 137.73 2217.07
SQM SQM SQM SQM
Total Plinth Area
2878.63 SQM
02
Third Floor Cascade
Lift and Stairscase Corridor Services and Toilet Multiplex Lower Level
111.54 395.98 115.49 1287.71
SQM SQM SQM SQM
Multiplex Exit Corridor Food Court Shop Area Food Court Service Corridor Food Court Seating
134.67 174.83 96.65 579.03
SQM SQM SQM SQM
Restaurant
Total Plinth Area
406.51 SQM
3324.65 SQM
02
Fourth Floor Cascade
Lift and Stairscase Corridor Services and Toilets Multiplex Upper Level
101.37 194.26 137.73 549.91
SQM SQM SQM SQM
Gaming Zone
1309.53 SQM
Total Plinth Area
2490.58 SQM
02
Section A Cascade
02
Achieved Spaces Cascade
Fourth floor
Gaming Zone Multiplex Upper Level Services and Toilets
Third floor
8 Food Counters Seating Area Restaurant
Second floor
3 Anchor Shops 6 Shops Services and Toilets
First floor
3 Anchor Shops 5 Shops Services and Toilets
Ground floor
2 Anchor Shops 6 Shops Services and Toilets
Basement 1
Supermarket Services Parking
Basement 2
Parking Services
Multiplex Lower Level Services and Toilets
02
References Cascade
02
References Cascade
02
Reference Cascade
02
Renders Cascade
01 02 03 04 05 Site Zoning
Cascade
Pavilion
Hotel Option
Area Chart
03
Design Development Pavilion
G+4 Floor Plates
Introduction of ‘notches’ for placement of escalators and lifts
Placement of circulation cores
03
Design Development Pavilion
Resultant program
Exploded Isometric
Shop Supermarket Multiplex Gaming Area Food Court
-3.250 LVL
FIRE DRIVE WAY SERVICE ENTRY/EX
IT
-3.250 LVL
MALL BASEMENT EX
± 0.000 LVL
TRY
IT
MALL BASEMENT EN
HOTEL
SHOPPING MALL
MALL DROP OFF
03
Master Plan Pavilion
0.000 LVL
HOTEL ENTRY
03
Basement 1 Pavilion
Lift and Stairscase Corridor Services Parking and Driveway
71.61 540.58 116.97 1573.51
SQM SQM SQM SQM
Shop Area
1425.31 SQM
Total Plinth Area
3727.98 SQM
03
Basement 2 Pavilion
Lift and Stairscase Corridor Services Parking and Driveway
59.82 39.35 55.45 4372.56
SQM SQM SQM SQM
Total Plinth Area
4527.18 SQM
03
Ground Floor Pavilion
Lift and Stairscase Service Corridor Corridor Services and Toilet
119.57 154.33 722.62 137.73
SQM SQM SQM SQM
Shop Area
2007.69 SQM
Total Plinth Area
3141.94 SQM
03
First Floor Pavilion
Lift and Stairscase Service Corridor Corridor Services and Toilets
121.01 154.33 480.86 137.73
SQM SQM SQM SQM
Shop Area
2011.13 SQM
Total Plinth Area
2905.07 SQM
03
Second Floor Pavilion
Lift and Stairscase Service Corridor Corridor Services and Toilets
121.01 154.33 478.29 137.73
SQM SQM SQM SQM
Shop Area
2011.13 SQM
Total Plinth Area
2902.50 SQM
03
Third Floor Pavilion
Lift and Stairscase Corridor Services and Toilets Multiplex Lower Level
121.12 303.77 137.73 1403.16
SQM SQM SQM SQM
Multiplex Exit Corridor Food Court Shop Area Food Court Service Corridor Food Court Seating
162.06 219.96 255.88 657.28W
SQM SQM SQM SQM
Restaurant
Total Plinth Area
406.51 SQM
3260.96 SQM
03
Fourth Floor Pavilion
Lift and Staircase Service Corridor Corridor Services and Toilets
119.11 156.78 215.87 137.73
SQM SQM SQM SQM
Multiplex Upper Level Gaming Area
641.42 SQM 1042.08 SQM
Total Plinth Area
2312.99 SQM
03
Achieved Spaces Pavilion
Fourth floor
Gaming Zone Multiplex Upper Level Services and Toilets
Third floor
9 Food Counters Seating Area Multiplex Lower Level
Second floor
3 Anchor Shops 5 Shops Services and Toilets
First floor
2 Anchor Shops 6 Shops Services and Toilets
Ground floor
1 Anchor Shops 7 Shops Services and Toilets
Basement 1
Supermarket Services Parking
Basement 2
Parking Services
Services and Toilets
03
References Pavilion
03
References Pavilion
03
Renders Pavilion
03
Renders Pavilion
01 02 03 04 05 Site Zoning
Cascade
Pavilion
Hotel Motif
Area Chart
04
Design Development Motif
G+6 Floor Plates
‘Notching’ of floor plates to create roof garden spaces at Banquet (F1) level and 1st rooms floor level (F2)
04
Design Development Motif
Vertical circulation cores - Guest and Service
Programmatic division
Hotel room Banquet Hall Gym Restaurant Lobby
04
Basement Motif
Lift and Staircase Corridor Services Parking and Driveway
45.29 47.81 47.24 524.06
SQM SQM SQM SQM
Total Plinth Area
664.40 SQM
04
Ground Floor Motif
Lift and Staircase Corridor and Lobby Services Restaurant
74.02 149.74 31.30 297.26
SQM SQM SQM SQM
Total Plinth Area
552.32 SQM
04
First Floor Motif
Lift and Staircase Corridor and Lobby Services and Toilets Kitchen
69.08 30.71 54.82 94.00
SQM SQM SQM SQM
Gym Offices
156.10 SQM 58.28 SQM
Total Plinth Area
462.99 SQM
04
Second Floor Motif
Lift and Staircase Corridor and Lobby Banquet Hall Open to Sky Landscape
69.53 83.90 338.99 83.90
SQM SQM SQM SQM
Total Plinth Area
492.42 SQM
04
Third Floor Motif
STORE/ LINEN ROOM
Lift and Staircase Corridor and Lobby Services Rooms
45.03 112.03 13.02 300.77
SQM SQM SQM SQM
Open to Sky Landscape
Total Plinth Area
49.07 SQM
519.52 SQM
Suite Rooms 55.50 SQM Bed (7.7m X 3.8m) Toilet (3.3m X 2.2m) Balcony (6.6m X 1.5m)
Rooms - 27.0 SQM Bed (3.2m X3.9) Toilet (1.7m X 2.2m) Balcony (2.3m X 1.5m)
04
Fourth Floor Motif
STORE/ LINEN ROOM
Lift and Staircase Corridor and Lobby Services Rooms
57.64 107.69 13.02 300.77
SQM SQM SQM SQM
Open to Sky Landscape
Total Plinth Area
19.85 SQM
498.97 SQM
Suite Rooms 55.50 SQM Bed (7.7m X 3.8m) Toilet (3.3m X 2.2m) Balcony (6.6m X 1.5m)
Rooms - 27.0 SQM Bed (3.2m X3.9) Toilet (1.7m X 2.2m) Balcony (2.3m X 1.5m)
04
Fifth Floor Motif
STORE/ LINEN ROOM
Lift and Staircase Corridor and Lobby Services Rooms
57.64 107.69 13.02 300.77
SQM SQM SQM SQM
Open to Sky Landscape
Total Plinth Area
49.07 SQM
528.19 SQM
Suite Rooms 55.50 SQM Bed (7.7m X 3.8m) Toilet (3.3m X 2.2m) Balcony (6.6m X 1.5m)
Rooms - 27.0 SQM Bed (3.2m X3.9) Toilet (1.7m X 2.2m) Balcony (2.3m X 1.5m)
04
Sixth Floor Motif
STORE/ LINEN ROOM
Lift and Staircase Corridor and Lobby Services Rooms
57.64 107.69 13.02 300.77
SQM SQM SQM SQM
Total Plinth Area
479.12 SQM
Suite Rooms 55.50 SQM Bed (7.7m X 3.8m) Toilet (3.3m X 2.2m) Balcony (6.6m X 1.5m)
Rooms - 27.0 SQM Bed (3.2m X3.9) Toilet (1.7m X 2.2m) Balcony (2.3m X 1.5m)
04
Seventh Floor Motif
STORE/ LINEN ROOM
Lift and Staircase Corridor and Lobby Services Rooms
57.64 107.69 13.02 300.77
SQM SQM SQM SQM
Open to Sky Landscape
Total Plinth Area
49.07 SQM
479.12 SQM
Suite Rooms 55.50 SQM Bed (7.7m X 3.8m) Toilet (3.3m X 2.2m) Balcony (6.6m X 1.5m)
Rooms - 27.0 SQM Bed (3.2m X3.9) Toilet (1.7m X 2.2m) Balcony (2.3m X 1.5m)
04
Terrace Motif
04
Achieved Spaces Motif
Sixth floor & Seventh Floor
Rooms Services
Fifth floor
Rooms Services Landscape Court
Fourth Floor
Rooms Services Landscape Court
Third floor
Rooms Services Landscape Court
Second floor
First floor
Banquet Hall Services
Admin Office Kitchen Gym and Services
Ground floor
Restaurant Services
Basement 1
Parking Services
04
Renders Motif
01 02 03 04 05 Site Zoning
Cascade
Pavilion
Hotel Motif
Area Chart
05
Area Chart Cascade
05
Area Chart Cascade
05
Area Chart Cascade
05
Area Chart Pavilion
05
Area Chart Pavilion
05
Area Chart Pavilion