Figure 1.1 Figure 4.1 Figure 6.1a-b Figure 6.2 Figure 6.3-6.6 Figure 6.7-6.8 Figure 6.9-6.11 Figure 6.12 Figure 6.13 Figure 6.14 Figure 6.15 Figure 6.16a-b Figure 6.17-6.21 Figure 6.22-6.26 Figure 6.27-6.31 Figure 6.32-6.36 Figure 6.37-6.41 Figure 6.42-46 Figure 6.47-50 Figure 6.51
Locality Plan Data Collection Locations Grid Set-Up D3D Hydrodynamic Model Grid Set-Up SWAN Wave Model D3D Model Calibration D3D Morphological Calibration June 2007 Flood Event - Sedimentation/Erosion: 8th - 13th June Effect of D50 on Lake Flood Levels Proposed Breakwater Layouts Effect of Major Ocean Storm on Karagi Point Proposed Breakwater Layouts - Bed and Rock Layer Profiles Comparison of Flood Levels for Training Wall Options Bed Level and Cumulative Sedimentation/Erosion: 100yrs ARI Flooding Event – Existing Entrance Condition Bed Level and Cumulative Sedimentation/Erosion: 100yrs ARI Flooding Event – Single Northern Training Wall Bed Level and Cumulative Sedimentation/Erosion: 100yrs ARI Flooding Event – Dual Training Walls - 150m Apart Bed Level and Cumulative Sedimentation/Erosion: 100yrs ARI Flooding Event – Dual Training Walls - 200m Apart Bed Level and Cumulative Sedimentation/Erosion: 100yrs ARI Flooding Event – Dual Training Walls - 100m Apart Wave Penetration Post 100yrARI Flood Difference in Wave Penetration Post 100yrARI Flood Salinity Verification Plot
Figures
October 2013 P:\Doc\2013\Reports.2013\Rep2773V4.docx
Cardno (NSW/ACT) Pty Ltd Version 4
Page 1
Figure 6.52 Figure 6.53 Figure 6.54 Figure 6.55-6.56 Figure 6.57-6.58 Figure 6.59 Figure 6.60-63 Figure 7.1 Figure 7.2 Figure 7.3-7.6 Figure 7.7-7.9 Figure 7.10 Figure 7.11
Comparison of Lake Salinity Using Predicted and Measured Tides - 1996 - MHL Site L2 Annual Time Series of Salinity Post 100yr ARI Flood Event: Entrance Bathymetries Post 100yr ARI Flood Event: Difference in Entrance Bathymetries Entrance Channel Currents - 2 Months after Breakout Sediment Transport Vectors Entrance Bed Level Change. 17 June – 3 August Wyong Shire Council Dredge Plan Annual Time-Series of Water Level and Salinity - Pre and Post Dredging Entrance Bathymetry Entrance Channel Current Map - Ebb and Flood Currents Entrance Channel Current Time-Series June 2007 Flood Event - Pre and Post Dredging Entrance Bathymetry Entrance Channel Morphology - Modelled and Projected Infilling
Figures Figures Figures Figures Figures Figures October 2013 P:\Doc\2013\Reports.2013\Rep2773V4.docx
Cardno (NSW/ACT) Pty Ltd Version 4
Page 1
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Locality Plan LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Figure 1.1
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Data Collection Locations LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Figure 4.1
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Grid Set−up D3D Hydrodynamic Model Figure 6.1a
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Grid Set−up D3D Hydrodynamic Model − Entrance Grid Figure 6.1b
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Grid Set−up SWAN Wave Model Figure 6.2
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
D3D Model Calibration − January 2011 Combinations of Model Tidal Boundaries and Wind Inputs Figure 6.3
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
D3D Model Calibration − January 2011 Wind Resiudal with Varying Drag Coefficients Figure 6.4
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
D3D Model Calibration − January 2011 Model with Sydney Waves and Varying Tidal Boundaries Figure 6.5
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
D3D Model Calibration − January 2011 Final Calibration Figure 6.6
Tuggerah Lakes − The Entrance Morphodynamic Modelling
D3D Morphological Calibration Lake Water Levels, Offshore Wave Conditions and Lake Inflows LJ2985/R2773 Oct 2013 Figure 6.7 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
D3D Morphological Calibration Entrance Bed Levels Pre and Post Breakout Figure 6.8
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
June 2007 Flood Event Sedimentation/Erosion: 8th − 13th June Figure 6.9
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
June 2007 Flood Event Sedimentation/Erosion: 13th June − 8th July Figure 6.10
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
June 2007 Flood Event Sedimentation/Erosion: 8th July − 3rd August Figure 6.11
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Affect of D50 on Lake Flood Levels LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Figure 6.12
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Proposed Breakwater Layouts LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Figure 6.13
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Effect of Major Ocean Storm on Karagi Point ESE Waves , Hs=10m, Tp=13 seconds, Storm Tide = 1.2m AHD LJ2985/R2773 Oct 2013 Figure 6.14 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Proposed Breakwater Layouts Bed and Rock Layer Profiles Figure 6.15
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Comparison of Flood Levels for Training Wall Options Long Jetty: 100yr ARI Flood Figure 6.16a
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Comparison of Flood Levels for Training Wall Options Long Jetty: 20yr ARI Flood Figure 6.16b
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Comparison of Flood Levels for Training Wall Options Long Jetty: 1yr ARI Flood Figure 6.16c
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Comparison of Flood Levels for Training Wall Options Long Jetty: 1yr ARI Flood − 2100 Climate Change Scenario Figure 6.16d
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 8th June − Pre 100yrs ARI Flooding Event Existing Entrance Condition Figure 6.17
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 8th−12th June − Pre 100yrs ARI Flooding Event Existing Entrance Condition LJ2985/R2773 Oct 2013 Figure 6.18 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 12th June − Post 100yrs ARI Flooding Event Existing Entrance Condition Figure 6.19
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 12th−17th June − Pre 100yrs ARI Flooding Event Existing Entrance Condition LJ2985/R2773 Oct 2013 Figure 6.20 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 17th June − Post 100yrs ARI Flooding Event Existing Entrance Condition Figure 6.21
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 8th June − Pre 100yrs ARI Flooding Event Single Northern Training Wall Figure 6.22
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 8th−12th June − Pre 100yrs ARI Flooding Event Single Northern Training Wall LJ2985/R2773 Oct 2013 Figure 6.23 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 12th June − Post 100yrs ARI Flooding Event Single Northern Training Wall Figure 6.24
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 12th−17th June − Pre 100yrs ARI Flooding Event Single Northern Training Wall LJ2985/R2773 Oct 2013 Figure 6.25 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 17th June − Post 100yrs ARI Flooding Event Single Northern Training Wall Figure 6.26
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 8th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 150m Apart Figure 6.27
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 8th−12th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 150m Apart LJ2985/R2773 Oct 2013 Figure 6.28 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 12th June − Post 100yrs ARI Flooding Event Dual Training Walls − 150m Apart Figure 6.29
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 12th−17th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 150m Apart LJ2985/R2773 Oct 2013 Figure 6.30 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 17th June − Post 100yrs ARI Flooding Event Dual Training Walls − 150m Apart Figure 6.31
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 8th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 200m Apart Figure 6.32
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 8th−12th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 200m Apart LJ2985/R2773 Oct 2013 Figure 6.33 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 12th June − Post 100yrs ARI Flooding Event Dual Training Walls − 200m Apart Figure 6.34
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 12th−17th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 200m Apart LJ2985/R2773 Oct 2013 Figure 6.35 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 17th June − Post 100yrs ARI Flooding Event Dual Training Walls − 200m Apart Figure 6.36
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 8th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 100m Apart Figure 6.37
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 8th−12th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 100m Apart LJ2985/R2773 Oct 2013 Figure 6.38 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 12th June − Post 100yrs ARI Flooding Event Dual Training Walls − 100m Apart Figure 6.39
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sedimentation/Erosion: 12th−17th June − Pre 100yrs ARI Flooding Event Dual Training Walls − 100m Apart LJ2985/R2773 Oct 2013 Figure 6.40 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Bed Level: 17th June − Post 100yrs ARI Flooding Event Dual Training Walls − 100m Apart Figure 6.41
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Wave Penetration Post 100yrARI Flood Existing Entrance Condition Figure 6.42
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Wave Penetration Post 100yrARI Flood Single Northern Training Wall Figure 6.43
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Wave Penetration Post 100yrARI Flood Dual Training Walls − 150m Apart Figure 6.44
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Wave Penetration Post 100yrARI Flood Dual Training Walls − 200m Apart Figure 6.45
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Wave Penetration Post 100yrARI Flood Dual Training Walls − 100m Apart Figure 6.46
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Wave Penetration Difference Between Existing Entrance Condition and Single Northern Training Wall LJ2985/R2773 Oct 2013 Figure 6.47 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Wave Penetration Difference Between Existing Entrance Condition and Dual Training Walls − 150m Apart LJ2985/R2773 Oct 2013 Figure 6.48 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Wave Penetration Difference Between Existing Entrance Condition and Dual Training Walls − 200m Apart LJ2985/R2773 Oct 2013 Figure 6.49 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Wave Penetration Difference Between Existing Entrance Condition and Dual Training Walls − 100m Apart LJ2985/R2773 Oct 2013 Figure 6.50 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Salinity Verification Plot LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Figure 6.51
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Comparson of Lake Salinity Using Predicted and Meausred Tides 1996 − MHL Site L2 LJ2985/R2773 Oct 2013 Figure 6.52 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Annual Timeseries of Salinity Post 100yr ARI Entrance Bathymetry Figure 6.53
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Post 100yr ARI Flood Event: Entrance Bathymetries Existing and Dual Training Wall 150m Apart Figure 6.54
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Post 100yr ARI Flood Event: Difference in Entrance Bathymetries Existing and Dual Training Wall 150m Apart LJ2985/R2773 Oct 2013 Figure 6.55 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Post 100yr ARI Flood Event: Difference in Entrance Bathymetries Cross−Sections of Existing and Dual Training Wall 150m Apart LJ2985/R2773 Oct 2013 Figure 6.56 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Currents − 2 Months after Breakout Ebb Currents Figure 6.57
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Currents − 2 Months after Breakout Flood Currents Figure 6.58
Tuggerah Lakes − The Entrance Morphodynamic Modelling
Sediment Transport Vectors Existing Entrance Condition and Dual Training Wall 150m Apart LJ2985/R2773 Oct 2013 Figure 6.59 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Bed Level Change. 17 June – 3 August Existing Entrance Condition Figure 6.60
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Bed Level Change. 17 June – 3 August Single Northern Training Wall Figure 6.61
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Bed Level Change. 17 June – 3 August Dual Training Walls − 150m Apart Figure 6.62
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Bed Level Change. 17 June – 3 August Dual Training Walls − 200m Apart Figure 6.63
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Wyong Shire Council Dredge Plan October−December 2012 Figure 7.1
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Annual Timeseries of Water Level and Salinity Pre and Post Dredging Entrance Bathymetry Figure 7.2
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Current Map − Ebb Currents Pre and Post Dredging Entrance Bathymetry Figure 7.3
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Current Map − Ebb Currents Pre and Post Dredging Entrance Bathymetry Figure 7.4
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Current Map − Flood Currents Pre and Post Dredging Entrance Bathymetry Figure 7.5
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Current Map − Flood Currents Pre and Post Dredging Entrance Bathymetry Figure 7.6
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Current Timeseries Pre and Post Dredging Entrance Bathymetry − Point A Figure 7.7
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Current Timeseries Pre and Post Dredging Entrance Bathymetry − Point B Figure 7.8
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Current Timeseries Pre and Post Dredging Entrance Bathymetry − Point C Figure 7.9
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
June 2007 Flood Event Pre and Post Dredging Entrance Bathymetry Figure 7.10
Tuggerah Lakes − The Entrance Morphodynamic Modelling
LJ2985/R2773 Oct 2013 J:\CM\LJ2985−TheEntrance\009−ReportingDocsandFigures\Figures\2013−06−14−FinalReport\
Entrance Channel Morphology Modelled and Projected Infilling Figure 7.11