FACEBOOK CAMPUS SITE IMPROVEMENTS
Professional Work 50.3 Acres / 20.3 Hectares Mar, 2019 to Oct, 2019 Description of Work
DEMO PACKAGE SCOPE OF WORK CONSISTS OF: · TREE REMOVAL · SITE DEMOLITION (PAVEMENTS, LANDSCAPE, SITE FEATURES) · ROUGH GRADING · UTILITY IMPROVEMENTS (SANITARY SEWER, STORM SEWER, WATER SERVICE) · FIRE WATER SYSTEM IMPROVEMENTS · EROSION CONTROL CONSTRUCTION PACKAGE SCOPE OF WORK CONSISTS OF: · RECONFIGURED PARKING AND ACCESS · BICYCLE PARKING AND ON-SITE PATHWAYS · PEDESTRIAN PATHWAYS · COMMUTER AND SHUTTLE BUS BOARDING AREAS AMENITY SPACES FOR: SOCIALIZING, OUTDOOR DINING, OUTDOOR FITNESS, AND RECREATION · PRIVACY FENCING AND SECURITY INFRASTRUCTURE · SITE LIGHTING · LANDSCAPING AND IRRIGATION · BUILD OUT NEW SITE STRUCTURES THROUGHOUT THE CAMPUS INCLUDING NEW WALLS, CEILINGS, ROOFS, CANOPIES, GATES, LIGHTING, MECHANICAL, PLUMBING, ELECTRICAL SYSTEMS AND STRUCTURAL. THESE STRUCTURES WILL BE PART OF CONSTRUCTION PACKAGE: 1. PEDESTRIAN SECURITY GATES/KIOSKS 2. VEHICULAR SECURITY KIOSKS 3. BUS SHELTER CANOPIES 4. LOADING AREAS CANOPIES 5. TRASH ENCLOSURES 6. BIKE CAGE
Softwares:
Adobe Photoshop, AutoCAD, SketchUp, Lumion
Participated in:
Schematic design, master plan drawing, construction documents drawing, diagrams drawing, modeling and rendering.
5
MASTER PLAN
KAIS
ER D
FRE 113
RIVE
M PU S
DR IV
E
FRE 114 FRE 112
CA
FRE 120
FRE 119
FRE 115
FRE 111
FRE 110 FRE 122 FRE 116
FRE 118
FRE 117
DUMBARTON CIRCLE
AMENITIES PLAN
FRE 113
TD
FRE 114
SHUTTLE STOP
FRE 120
FRE 112 EVENT SPACE
OUTDOOR FITNESS
FRE 124 FRE 111
OUTDOOR (S)EATING
FRE 115
FRE 119
CATERING SPACE
TD FRE 110
EVENT SPACE
FRE 116
FRE 124
FRE 123
FRE 117
LOBBY
FOOD TRUCK
AIRSTREAM
IT HELPDESK
SHIP HAPPENS
LOBBY ENTRANCE
CAFE
EVENT + TRAINING
HAIRCUT
POP-UP SHOP
PIZZA WINDOW
BEACH
MASSAGE
TOUCH DOWN
SWEET SHOP
FITNESS
SWAG STORE
COFFEE BAR JUICE BAR
BIKE SHOP
ART
FRE 118
FRE 122
FRE 123
ART INSTALLATION + GROUND-FLOOR INNOVATION LAB
ANALOG LAB
7
Cafe Bike Shop
Outdoor Seating
VIEW 1: WEST ENTRANCE
SKETCHUP+LUMION+PS (6 HOURS RENDERING)
FRE 114
Art Sculpture
Swag Store
Pre
VIEW 1
-Fu
nc
tio
n
Training
Kiosk
Soccer Basketball
Pop-up Fitness
Massage
Hair Cut
FRE 115 Main Dining
9
Outdoor Gym
Soccer Field
VIEW 2: SPORT COURTS
SKETCHUP+LUMION+PS (6 HOURS RENDERING)
FRE 114
Basketball Court
Swag Store
Pre
-Fu
nc
tio
n
Training
Kiosk
Soccer Basketball
Bioretention Basin
Fitness
VIEW 2
Pop-up Massage
Hair Cut
FRE 115 Main Dining
11
Raised Canopy 10ft Clearance
FRE117 Training Room
Event Space
VIEW 3: ORCHARD SITTING AREA SKETCHUP+LUMION+PS (6 HOURS RENDERING)
Beach Area
Help
Training
Pre-Function
Training
Ship
FRE 118
View 3 FRE 117
Lobby Lobby
13
CONSTRUCTION PLANS L1 TREE PROTECTION PLAN
L3 PAVING PLAN
L2 CONSTRUCTION PLAN
L4 LAYOUT PLAN
L5 SOIL PLAN
L7 ENLARGED PLAN
L6 FINE GRADING PLAN
L11 PLANTING PLAN
15
CONSTRUCTION DETAILS
17
ECOLOGICAL RESTORATION AND DEVELOPMENT PLAN FOR PORT OF TIANJIN
Academic Work 154.6 Acres / 62.5 Hectares Jan, 2018 to May, 2018
Mission Statement: Turn a brown land to a public park to make citizens' lives better. Project Scope: The Port of Tianjin is on the coast of Tianjin Municipality, in the former county of Tanggu, on the coast between the estuaries of the Haihe to the south and the New Yongding River to the north. To the west, the port borders the city of Tanggu (now the Urban Core of the Binhai New Area) and the TEDA. To the east, the port opens up to the Bohai Bay. Tianjin Port is divided into nine port areas: the three core ("Tianjin Xingang") areas of Beijiang, Nanjiang, and Dongjiang around the Xingang fairway; the Haihe area along the river; the Beitang port area around the Beitangkou estuary; the Dagukou port area in the estuary of the Haihe River; and three areas under construction (Hanggu, Gaoshaling, Nangang). The site of exlposion is located in the midwest of Port of Tianjin. Totally 60 ha land was polluted and destroyed. The residential buildings in the south of the site were severely damaged. The highway bridge in the east can still be used with minor damage. Softwares: Adobe Photoshop, AutoCAD, SketchUp, Rhinoceros 3D, Lumion.
19
Timeline
WHAT HAPPENED? On 12 August 2015, a series of explosions killed 173 people and injured 798 people at a container storage station at the Port of Tianjin. The first two explosions occurred within 30 seconds of each other at the facility, which is located in the Binhai New Area of Tianjin, China. The second explosion was far larger and involved the detonation of about 800 tonnes of ammonium nitrate. Fires caused by the initial explosions continued to burn uncontrolled throughout the weekend, repeatedly causing secondary explosions, with eight additional explosions occurring on 15 August. Photographs and videos showed extensive destruction in and around the warehouse compound with a enormous crater at the blast site. The building of seven more surrounding logistics companies were destroyed, and large quantities of intermodal container stacks were toppled and thrown by the farces of the explosions.
21
CONTEXT ANALYSIS
SITE CONTEXT As the impact of the explosion is enormous, 60 hectares of the site was completely destroyed. Residential areas close to the site are also severely damaged. Due to the volatilization and permeation of toxic substances, plants on the site wither away and died. Till 5th Febrary 2017, 19,000 m3 polluted soil was removed and backfilled with urban soil. The water on the site has been completely drained. All damaged containers and buildings have been removed. Now the site is clean enough for further design and utilize.
23
SCHEMATIC PLAN
PROJECT GOALS 1 Create a safe and suitable landscape 2 Ecological restoration 3 Control the air pollution and popularize of the dangers 4 Create a buffer zone 5 Increase accessibility to the site 6 Provide education for people of all age groups 7 Care for the elderly
25
SYSTEM ANALYSIS
27
BIRD'S-EYE VIEW RENDERING RHINO+LUMION+PS (10 HOURS RENDERING)
29
Public
Exhibit space
Square dancing plaza
Movable services
Event place
Semi-public
Jogging trial
Picnic circle
Playground
Flea market
Semi-private
Hedge maze
Dog play area
Outdoor Cafe
Outdoor learning
Private
ACTIVITY TYPOLOGY
Tall grass field
Intimate space
Rock garden
Greenhouse
Small Space
Medium Space
ACTIVITY & SPACE-NEED ANALYSIS
Sport court
Under-bridge exercise area
Community plaza
Bird watching area Vast Space
31
NATURESCAPE OVERTIME 0-3 Years
Pioneer communities species grow out and help enrich the soil, allowing other species to become established.
3-10 Years
The soil is then able to support a greater variety of plant life. With this plant life come animal species that feed on the plants.
10-20 Years
Over time, as the so able to grow.
oil becomes richer, more species of plants are
20-50 Years
Appropriate adjustment of tree spacing and plant species to bring the community to its initial state.
Section 1-1 > 50 Years
33
Spring Section Section A At 30 years 1"=80'
PLANTING STRATEGY Using Tianjin's native plants to create a landscape that changes ever y season. Fully consider the characteristics of flowering, fruiting and colored leaves of different plants. Using plants to shape space and provide different spatial experiences for people.
Summer Section Section B At 30 years 1"=80'
Fall Section Section C At 30 years 1"=80'
Winter Section Section D At 30 years 1"=80'
35
PLANT COMMUNITIES 5
6
2
4 1 3
1
South-facing slope
2
North-facing slope
3
Flat space
4
Gentle slope
5
Under-bridge space
6
Riverside
1
3
2
4
5
6
37
SKET
TCHUP+PS (8 HOURS RENDERING)
RIVERSIDE
39
SKET
TCHUP+PS (8 HOURS RENDERING)
UNDER-BRIDGE SPACE
41
SKET
TCHUP+PS (8 HOURS RENDERING)
EXPLOSION MEMORIAL
43
SKETCHUP+LU
UMION+PS (6 HOURS RENDERING)
MULTI-USE PLAZA
45
YORK STREET PARK DESIGN COMPETITION
Academic Work 2 Acres / 0.8 Hectare May, 2018 to August, 2018
Project Goals: 21st Century Parks; Diverse Community of Users; Integrated Public Art; New Standards for Sustainability; Complementary and Contextual; Gateway to the Waterfront; Design Excellence. Required Design Elements: Required design elements for York Street Park include green space, lunchtime activities, event space, water feature, public art, architectural pavilion, accommodation for dogs, and a full spectrum of park amenities (benches, lighting, wayfinding and more). Project Scope: Located at the southern foot of York Street, the York Street Park site is approximately 8,000 square metres (2 acres) and sits between the southern extension of the Financial District and the York Quay residential neighbourhood. It will occupy the site of the former York-Bay-Yonge eastbound off-ramp from the Gardiner Expressway, which was removed in 2016-2017. Softwares: Adobe Photoshop, AutoCAD, Rhinoceros 3D, Lumion.
47
49
51
53
BIRD'S-EYE VIEW RENDERING - SUMMER RHINO+LUMION+PS (8 HOURS RENDERING)
BOARDWALK
BENTS
SITE
ELEVATED BOARDWALK GRADING ANALYSIS
55
BIRD'S-EYE VIEW RENDERING - WINTER RHINO+LUMION+PS (8 HOURS RENDERING)
57
LAKE ONTARIO OVERLOOK
OUTDOOR STAGE
POND
SOUTHWEST ENTRANCE RHINO+LUMION+PS (5 HOURS RENDERING)
EVENT LAWN
USER DIAGRAM
WEEKDAY
WEEKEND
FAMILY DAY
FLEA MARKET
MUSIC FESTIVAL
MOIVE NIGHT
12:23noon
2:15pm
4:48pm
10:08am
12:51noon
8:52pm
59
A NEW UNDERSTANDING OF CHINESE TRADITIONAL GARDE
EN
Academic Work 0.55 Acres / 24 000 Square Feet Jan, 2016 to May, 2016
Mission Statement: Combine the modernist with a new understanding of Chinese garden. Project Scope: Surrounding circumstances: Office-building and hotels are around the base. A commercial street is in east. The hotel is a commercial and hotel-style ser vice apartment. The conference center is a large integrated project. Courtyard circumstance: The project is the modern style courtyard in the hotel, and surrounded by the U-shaped building. The site area is 2230 m2. The hotel is a modernist brick-concrete building. The building facade is red brick cover combined with landing glass windows. Visitors are able to see the garden directly when they are in the hotel lobby and corridor. Intro Statement The conception of design combines the idea of modern landscape and Chinese traditional architectural culture, and reflects the Modernist landscape design style. Softwares: Adobe Photoshop, AutoCAD, Rhinoceros 3D, Lumion.
61
SITE ANALYSIS 63
PROJECT CONCEPT ELEMENT
TRANSFORM
APPLICATION
65
PLANTING
ELEMENT
CIRCULATIO
ON
BIRD'S-EYE VIEW RENDERING SKETCHUP+LUMION+PS (5 HOURS RENDERING)
67
SKETCHUP+LU
UMION+PS (5 HOURS RENDERING)
OUTDOOR SITTING AREA
69
SKETCHUP+LU
UMION+PS (5 HOURS RENDERING)
NORTH ENTRANCE
71
SKETCHUP+LU
UMION+PS (5 HOURS RENDERING)
SOUTH ENTRANCE
73
MASTER PLAN OF BATON ROUGE CLEARLAKE COMMUNITY
Academic Work 78.3 Acres / 31.7 Hectares Sep, 2016 to Nov, 2016
Mission Statement: Develope a new vision for a safer and more beautiful community. Intro Statement: In August 2016, prolonged rainfall resulted in catastrophic flooding in the state of Louisiana; thousands of houses and businesses were submerged. Louisiana's governor, John Bel Edwards, called the disaster a "historic, unprecedented flooding event" and declared a state of emergency. Many rivers and waterways, particularly the Amite and Comite rivers, reached record levels, and rainfall exceeded 20 inches (510 mm) in multiple parishes. Because numerous homeowners who were affected were without flood insurance, the federal government is providing disaster aid through the Federal Emergency Management Agency (FEMA). The flood has been called the worst US natural disaster since Hurricane Sandy in 2012. Thirteen deaths have been reported as a result of the flooding. The purpose of this project is to find a brand new residential community development strategy. Trying to find a solution to live in harmony with the flood Softwares: Adobe Photoshop, ArcGIS, AutoCAD, SketchUp.
75
2016 LOUISIANA FLOODS ANALYSIS
SITE ANALYSIS
79
81
OLD STRATEGY
During a Flood
VS
NEW STRATEGY
During a Flood
83
CONSTRUCTION DOCUMEN AND OTHER WORKS
NTS
Academic Work Sep, 2012 to Nov, 2018 Softwares: AutoCAD, Procreate. Drawing Media: Watercolor, Pencil, Ipad.
85
Construction Drawings
87
Rhino + Grasshopper Modeling
Grasshopper Battery Set
Lingering Garden 2016 20cm x 35cm Paper Pen sketch
Canglang Pavilion 2016 20cm x 35cm Paper Pen sketch
San Francisco 2019 40cm x 70cm Paper Pen sketch
91
Mike VI 2016 20cm x 43cm Ipad Procreate Video Link:https://youtu.be/GFBxOK-bu5k
Chengde Imperial Summer Resort 2014 30cm x 130cm Paper Pencil sketch
Saint Basil’s Cathedral 2015 53cm x 45cm Paper Watercolor Foxiangge 2015 90cm x 25cm Paper Watercolor
93