A
P ORTFOLIO rchitecture
THU. ARCHITECTURE
CHUAN-WEN CHEN
William Chen
chinese name/ CHUAN-WEN CHEN birthday/ 1991.11.25 e-mail address/ saphier1125@gmail.com facebook/ hail1125@yahoo.com.tw mobile phone/ +886983380609 nationality/ R.O.C. Taiwan, USA skills/
language/ Mandarin chinese English Spanish Japanese
P1
CONTENTS
C S T R
HAOMA BUS STATION
P3~P4
INGLE HOUSING
P5~P6
HU. SPORTS CENTER
P7~P8
OME FORUM PRAYER ROOM
P9~P10
P2
C
HAOMA BUS STATION
This is a structural project.
The site is located at the corner of two street blocks,and also across two hard traffic main road.The idea is to reorganize the original bus station and choose one kinds of structure system to build it. What I choose is using the folder structure system,and the idea is separate the faster (bus station user) and the slower (visitors) to two floors,and make all the main activities on second floor to keep the circulation across the streets smooth.
P3
01 3 01 3
6
6
10 m
10 m
C
HAOMA BUS STATION
P4
S
INGLE HOUSING
This is a residential buiding project.
I love the place where we located for this project, it’s in a small alley near by Taichung Calligraphy Greenway, the whole district are full with arts ambience, includes the small alley where it placed, all the storeowner inside are young single entrepreneurs, my idea is they will be my client. The main store type in the alley is clothing store, I try to combine runway into the building as the main public part that every individual owner can have there own platform for advertisement using, and every single unit have business part and residential part as well.
P5
SLEEP
LIVING ROOM
BUSINESS
one unit
several
S
P6
INGLE HOUSING
T
HU. SPORTS CENTER
This is a compound,large span spaces project.
We’re trying to make a sports center in THU campus, our own university. In response to the new BRT system, we’re going to design a mix using center that includes sport using/ student club/ office/ swimming pool/ parkinglot / visitor using. It’s a challenge for us that we’re not only have to organize programs but also pipeline systems/ structure system/ circulation/ land scape/ new&old part of school.....etc. I choose the swimming pool as the main center part to develope my design, and I also use terraced-shape to adjust the different height of my site.
P7
student club swimming pool
sports
T
HU. SPORTS CENTER
P8
R
OME FORUM PRAYER ROOM
This is a short workshop project in Rome.
We had a workshop to stay in Rome for a month,and we spend two weeks to did this project, it’s two person team work and only using collage and little bit hand made model to complete it. The site is next to Roman Forum and it is a tourist center right now, we were going to change the tourist center to a prayer room that every religion could also use it. We try to extend the landscape inside the high wall to make our prayer secret garden”El segreto giardino”.
P9
R
OME FORUM PRAYER ROOM
P10
THANKS FOR READING