Environmental Building Systems ABPL20036 SEMESTER 1, 2015
Assignment 1 Site Plan Scale 1:200 @ A3
N
Jaspreet Kaur 699094
Legend
Gas metre
Sewer line Water Line Gas line Power line
Water metre
Telecom Line
Electric pole w/ street light
Sewer Pit Telecom pit
Side entry pit Junction pit
SEP
JP
House Boundary Roof Line
Tree
Solar Panels
Site Boundary
Skylight
Glass Fibre Batt R Value: 2.5
WINDOW SCHEDULE
Plaster
Adjustable Horizontal Louvres
500x500
2100x1600
Double Glazed
Double Glazed
Timber Frame
Timber Frame Horizontal Louvers
CASEMENT
DOUBLE HUNG
W1
W2
2100x1600
1600x1600
Double Glazed
Double Glazed
Timber Frame
Timber Frame
Horizontal Louvers
Timber Cladding Brickwork: Clay Brick
D1
SLIDING
DOUBLE HUNG 1200x1000
1200x1500
W3
Single-Glazed
Double Glazed
Timber Frame
Timber Frame
AWNING
Horizontal Louvers
W4
DOUBLE HUNG
Electric Shutters
W8
500x500
1200x1500
Double Glazed
Double Glazed
Timber Frame
Timber Frame
SLIDING
CASEMENT
W5
F
Drapes with Pelmet
DOOR SCHEDULE
D3 2100
WM
D2
2100
20
INTERNAL
Timber
2100
Timber Fl s reen
Fl s reen
W6
20
20
Timber Fl s reen
W7 2100 2000 Drapes with Pelmet
Double Glazed ind ow e
led luminium rame
Fl s reen
Environmental Building Systems ABPL20036 SEMESTER 1, 2015
Assignment 1 House Plan Scale 1:100 @ A3
N
Jaspreet Kaur
Legend Window
699094
WM
Washing Machine
Shower
F
Fridge
Sofa
Sink
Stove
Door
Toilet
Bed w/ Side tables
Dining Table
TV w/ Cabinet Polished Concrete
Connects to SEP
Environmental Building Systems ABPL20036 SEMESTER 1, 2015
Assignment 1 Sewarage and Stormwater plan Scale 1:50 @ A3
N
Jaspreet Kaur 699094
Legend Sewerage LIne Takes Water Gives Water
Flue Greywater System Downpipes
Water Tank Connection to SEP Connection to Main Water Supply
3Kw Solar System 12 Panels
Environmental Building Systems ABPL20036 SEMESTER 1, 2015
Assignment 1 Electrical and Lighting Plan Scale 1:50 @ A3
N
Jaspreet Kaur 699094
Legend
Lights
Rangehood w/ Exhaust fan
Ceiling Fan w/ Light
Electric Meter
Exhaust Fan
Double Light Switch
Double Powerpoint
Switchbox
Smoke Detectors
Single Light Switch
Outdoor Lights
Internet and Phone Connection
Environmental Building Systems ABPL20036 SEMESTER 1, 2015
Assignment 1 Water and Gas plan Scale 1:50 @ A3
N
Jaspreet Kaur 699094
Legend
Hot Water Cold Water Gas line
Hot Water System Underground Heating Wall Mounted Heaters
Thermostat
Environmental Building Systems ABPL20036 - 2015 SM1
Embodied Energy Framework STEP 1 - Tutor House
STEP 1 - Your House
Ceiling
Ceiling
For your house, a simple comparison of:
Plasterboard 10mm
VS (Roof/ceiling/walls/ floor)
1. Plasterboard 10mm 3 845 _____________MJ Total Ceiling _____________MJ 6 834
Walls
3. Oil based paint 6 673 _____________MJ
IN
OUT
Total Ceiling
6 984 MJ
12 222 _____________MJ
Weatherboard
Plasterboard 10mm
35 785 MJ
19 648 MJ
R 2.5 Fibreglass Insulation 90mm
Water-baesd Paint
2 847 MJ Total Walls 50 873 _____________MJ
Brick Interior 41 005 MJ
_____________MJ 48 128
R 1.0 Underfloor Polystyrene Insulation 10 670 MJ
Total (tutor house): ______105 ____835 _________MJ
STEP 2 B If your house total EE is higher than the Tutor House - Make suggestions of ways you could reduce your EE, without reducing the thermal performance and star rating of your house.
7.9 Stars FirstRate Star Rating: ________ 54.4 Total Energy Usage: _________ MJ/m2.annum
5 276.8 OUT = ___________________________MJ/annum
IN
VS
9 112 MJ
Total Embodied Energy: Total Walls
194 654 ___________MJ
109 197 _____________MJ
Therefore, total Embodied Energy represent
62 565 MJ Total Floors
(heating / cooling)
2 2 97.0 54.4 ____________MJ/m .annum x ___________m
Slab 110mm Virgin Concrete
1. Slab 110mm virgin concrete 45 924 _____________MJ
Operational energy
Total annual operational energy: (Total MJ/m2.annum x area of the house):
Floor
Floor
2. R1.0 Edge polystyrene insulation 2 204 _____________MJ
R 6.0 Fiberglass Insulation 140mm
Walls
1. Brick veneer100mm _____________MJ 28 542
3. Plasterboard 10mm _____________MJ 13 676
Embodied energy
5 238 MJ
2. R3.5 Fibreglass Insulation 140mm 2 989 _____________MJ
2. R2.5 Fibreglass Insulation 90mm _____________MJ 1 982
STEP 3
Total Floors
73235 _____________MJ
37 _____________years of operational energy consumption
Total (your house): ______194 _____654 _________MJ - Use Recycled Material - Use Aluminium Cladding instead of Weatherboard
Jaspreet Kaur Student Name: __________________________ 699094 Student Number: ________________________ EMU House: ________________________________