Environmental Building System Project

Page 1

SEP

SEP

MIDDAY

NIGHT MORNING

JP

Environmental Building Systems ABPL20036 SEMESTER 1, 2015

Assignment 1 Site Plan Scale 1:200 @ A3

N

Jaspreet Kaur 699094

Legend

Gas metre

Sewer line Water Line Gas line Power line

Water metre

Telecom Line

Electric pole w/ street light

Sewer Pit Telecom pit

Side entry pit Junction pit

SEP

JP

House Boundary Roof Line

Tree

Solar Panels

Site Boundary

Skylight


Glass Fibre Batt R Value: 2.5

WINDOW SCHEDULE

Plaster

Adjustable Horizontal Louvres

500x500

2100x1600

Double Glazed

Double Glazed

Timber Frame

Timber Frame Horizontal Louvers

CASEMENT

DOUBLE HUNG

W1

W2

2100x1600

1600x1600

Double Glazed

Double Glazed

Timber Frame

Timber Frame

Horizontal Louvers

Timber Cladding Brickwork: Clay Brick

D1

SLIDING

DOUBLE HUNG 1200x1000

1200x1500

W3

Single-Glazed

Double Glazed

Timber Frame

Timber Frame

AWNING

Horizontal Louvers

W4

DOUBLE HUNG

Electric Shutters

W8

500x500

1200x1500

Double Glazed

Double Glazed

Timber Frame

Timber Frame

SLIDING

CASEMENT

W5

F

Drapes with Pelmet

DOOR SCHEDULE

D3 2100

WM

D2

2100

20

INTERNAL

Timber

2100

Timber Fl s reen

Fl s reen

W6

20

20

Timber Fl s reen

W7 2100 2000 Drapes with Pelmet

Double Glazed ind ow e

led luminium rame

Fl s reen

Environmental Building Systems ABPL20036 SEMESTER 1, 2015

Assignment 1 House Plan Scale 1:100 @ A3

N

Jaspreet Kaur

Legend Window

699094

WM

Washing Machine

Shower

F

Fridge

Sofa

Sink

Stove

Door

Toilet

Bed w/ Side tables

Dining Table

TV w/ Cabinet Polished Concrete


Connects to SEP

Environmental Building Systems ABPL20036 SEMESTER 1, 2015

Assignment 1 Sewarage and Stormwater plan Scale 1:50 @ A3

N

Jaspreet Kaur 699094

Legend Sewerage LIne Takes Water Gives Water

Flue Greywater System Downpipes

Water Tank Connection to SEP Connection to Main Water Supply


3Kw Solar System 12 Panels

Environmental Building Systems ABPL20036 SEMESTER 1, 2015

Assignment 1 Electrical and Lighting Plan Scale 1:50 @ A3

N

Jaspreet Kaur 699094

Legend

Lights

Rangehood w/ Exhaust fan

Ceiling Fan w/ Light

Electric Meter

Exhaust Fan

Double Light Switch

Double Powerpoint

Switchbox

Smoke Detectors

Single Light Switch

Outdoor Lights

Internet and Phone Connection


Environmental Building Systems ABPL20036 SEMESTER 1, 2015

Assignment 1 Water and Gas plan Scale 1:50 @ A3

N

Jaspreet Kaur 699094

Legend

Hot Water Cold Water Gas line

Hot Water System Underground Heating Wall Mounted Heaters

Thermostat


Environmental Building Systems ABPL20036 - 2015 SM1

Embodied Energy Framework STEP 1 - Tutor House

STEP 1 - Your House

Ceiling

Ceiling

For your house, a simple comparison of:

Plasterboard 10mm

VS (Roof/ceiling/walls/ floor)

1. Plasterboard 10mm 3 845 _____________MJ Total Ceiling _____________MJ 6 834

Walls

3. Oil based paint 6 673 _____________MJ

IN

OUT

Total Ceiling

6 984 MJ

12 222 _____________MJ

Weatherboard

Plasterboard 10mm

35 785 MJ

19 648 MJ

R 2.5 Fibreglass Insulation 90mm

Water-baesd Paint

2 847 MJ Total Walls 50 873 _____________MJ

Brick Interior 41 005 MJ

_____________MJ 48 128

R 1.0 Underfloor Polystyrene Insulation 10 670 MJ

Total (tutor house): ______105 ____835 _________MJ

STEP 2 B If your house total EE is higher than the Tutor House - Make suggestions of ways you could reduce your EE, without reducing the thermal performance and star rating of your house.

7.9 Stars FirstRate Star Rating: ________ 54.4 Total Energy Usage: _________ MJ/m2.annum

5 276.8 OUT = ___________________________MJ/annum

IN

VS

9 112 MJ

Total Embodied Energy: Total Walls

194 654 ___________MJ

109 197 _____________MJ

Therefore, total Embodied Energy represent

62 565 MJ Total Floors

(heating / cooling)

2 2 97.0 54.4 ____________MJ/m .annum x ___________m

Slab 110mm Virgin Concrete

1. Slab 110mm virgin concrete 45 924 _____________MJ

Operational energy

Total annual operational energy: (Total MJ/m2.annum x area of the house):

Floor

Floor

2. R1.0 Edge polystyrene insulation 2 204 _____________MJ

R 6.0 Fiberglass Insulation 140mm

Walls

1. Brick veneer100mm _____________MJ 28 542

3. Plasterboard 10mm _____________MJ 13 676

Embodied energy

5 238 MJ

2. R3.5 Fibreglass Insulation 140mm 2 989 _____________MJ

2. R2.5 Fibreglass Insulation 90mm _____________MJ 1 982

STEP 3

Total Floors

73235 _____________MJ

37 _____________years of operational energy consumption

Total (your house): ______194 _____654 _________MJ - Use Recycled Material - Use Aluminium Cladding instead of Weatherboard

Jaspreet Kaur Student Name: __________________________ 699094 Student Number: ________________________ EMU House: ________________________________


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.