Masters and Bachelors Architecture Portfolio

Page 1


02

Tzannes ABN 54 069 785 655

Nominated Architects Alec Tzannes 4174 Jonathan Evans 6613 Mladen Prnjatovic 7468 Ben Green 7066 Chi Melhem 7754

W . tzannes.com.au T . +61 2 9319 3744 E . tzannes@tzannes.com.au

Suite 5, L5, 2-12 Foveaux St Surry Hills NSW 2010 Sydney, Australia

17 November 2020

Reference for Joanne Hui Lee Ling To whom it may concern, Joanne Hui Lee Ling was a student in the 2019 UNSW Masters of Architecture Housing Studio which I tutored. She was a very conscientious student and applied herself with great discipline throughout the 2 terms, which she completed with a HD. Joanne’s prefabricated affordable housing model demonstrated a genuine ambition to explore alternative housing strategies which addressed the social, economic, design and construction challenges the housing sector currently faces. The outcome of her project was informed by critical research, a clear design brief, innovative fabrication techniques, craft in design detailing and some youthful optimism for our housing future. I highly commend Joanne for her commitment, hard work and growth through the studio. I wish her all the best with her future employment endeavours. Yours sincerely

Chi Melhem Director



04

DOCUMENTATION - WORK PROJECTS ATTACHED DUAL OCCUPANCY (CDC) - SYDNEY (2021)

FOOD RETAIL REFURBISHMENT - SYDNEY (2020)


DOCUMENTATION - WORK PROJECTS RESIDENTIAL DWELLING - SYDNEY (2018)

ROOF 11.24

GUTTER 10.99

SKILLION ROOF

RIDGE 15.10

METAL AWNING

LOT 3 DP 23816

GUTTER 14.22

PARAPET 11.85

7.57

FIBRO SHED METAL ROOF

8.00

7.98

BED 4 2.8 X 3.6m

8.16 8.03

SKILLION ROOF

BATH 1.6 X 3.5m

BED 2 3.4 X 3.0m

R

8.16

8.17

8.16

7.96

7.97 METAL AWNING METAL ROOF

7.90

BITUMEN PATH

7.96

LDRY

LOT 2 DP 23816 AREA: 522 m²

WM

METAL AWNING METAL ROOF

BATH 1.6 X 3.5m

WM

13.716

7.84

8.37

RIDGE 12.75 GARAGE 6.0 X 5.8m

7.7

8

TIMBER GARAGE METAL ROOF

GRASS 8.42

8.39

GUTTER 10.59

L AI R AL CE ET E N F

8.00

PAVED PATH

7.77

BRICK RET. WALL

RIDGE 11.65 CONCRETE DRIVEWAY

G.L.7.83

BRICK & RENDERED GARAGE TILE ROOF

7.43

270°20´

8.00 M

270°12´

13.715

PAVED PATH

R

R

F.L.8.44 RIDGE 13.36

8.01

CONCRETE AREA

7.82

SEWER VENT DINING 3.6 X 2.7m

8.03

7.99

ROOF 10.22

PATIO

8.17

8.03

7.98

7.94

8.38 7.95 BED 1 3.6 X 3.0m

F.L. 8.50

D-0.20 H-3 S-2R

INGROUND POOL

BED 3 2.8 X 4.0m

GRASS

GRASS

KITCHEN 3.6 X 2.6m

LIVING 4.6 X 5.3m

7.61 7.49

7.97

8.00

8.05

BRICK WALL

7.96

R

ROOF 11.47

ENS

8.04

NO. 49 ONE STOREY BRICK COTTAGE TILE ROOF

8.05

7.96

COLORBOND FENCE

GUTTER 11.11

8.17

GUTTER 10.75

COLORBOND FENCE

RIDGE 10.50

METAL RAIL FANCE

8.16

8.01

BRICK WALL

7.98 8.02

8.00

COLORBOND FENCE

CONCRETE PATH

8.06

8.03

8.05

8.01

8.09

38.115

GARDEN 8.05

0°20´

COLORBOND FENCE

8.05

NOT FENCE 7.97

7.89

GUTTER 14.27

NO. 51 TWO STOREY RENDERED RESIDENCE TILE ROOF

GUTTER 11.47

GUTTER 14.25

HEAD 14.08 SILL 12.80 HEAD 10.98 SILL 9.78

ROOF 12.96

HEAD 10.98 SILL 9.78 HEAD 14.08 SILL 12.80

HEAD 10.89 SILL 9.69 HEAD 14.06 SILL 12.81

ROOF

URBAN PLANNING - MALAYSIA (2014)

7.40 7.39

7.81

7.88

GUTTER 11.11

7.71

GUTTER 10.43

7.76

CONCRETE

38.08

7.79

7.89

0°20´

COLORBOND FENCE

7.34

7.86

COLORBOND FENCE

BRICK WALL

GUTTER 9.73

LOT 1 DP 23816

METAL AWNING METAL ROOF

RIDGE 10.98

EA

SE

GUTTER 10.76 FIBRO GARAGE TILE ROOF

NO. 47 ONE STOREY BRICK COTTAGE TILE ROOF

PROPOSED GROUND FLOOR PLAN SCALE 1:100@A3

FOR DEVELOPMENT APPLICATION

0

2.5m

FUYONG XIE

ME

NT

DR

AIN

F.L. 8.30

1

HEAD 10.30

49 FORSTER STREET

MARCELLINO SAIN ARCHITECTS (M.A.R.S)

PROPOSED GROUND FLOOR PLAN

T +61 433 886 628 E fuyong.xie@gmail.com

R

BED 4 2.8 X 3.6m

LIVING 4.6 X 5.3m

.74

5W

IDE 1807

A100

A

NTS

A3

DO NOT SCALE FROM DRAWINGS. VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK. WITHOUT THE CONSENT OF THE CLIENT & MARCELLINO SAIN ARCHITECTS PTY LTD

KITCHEN 3.6 X 2.6m

BED 1 3.6 X 3.0m

BED 3 2.8 X 4.0m BATH 1.6 X 3.5m

DINING 3.6 X 2.7m

E2

COPYING OR THE REPRODUCTION OF THIS DRAWING IS STRICTLY PROHIBITED

www.m-a-r-s.co

ENS

AG

BED 2 3.4 X 3.0m

R

R

R

LDRY WM WM

BATH 1.6 X 3.5m

GARAGE 6.0 X 5.8m

1

PROPOSED SITE COVERAGE DIAGRAM SCALE 1:100@A3

PROPOSED SITE COVERAGE BUILDING FOOTPRINT

230.1 m2 (MAX 261.0m2)

TIMBER DECKING

13.6m2

LANDSCAPE AREA

278.9 m2 (MIN 208.8m2)

FOR DEVELOPMENT APPLICATION

0

2.5m

FUYONG XIE

MARCELLINO SAIN ARCHITECTS (M.A.R.S)

49 FORSTER STREET

PROPOSED SITE COVERAGE DIAGRAM

T +61 433 886 628 E fuyong.xie@gmail.com

1807

A405

A

NTS

A3

DO NOT SCALE FROM DRAWINGS. VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK.

www.m-a-r-s.co

COPYING OR THE REPRODUCTION OF THIS DRAWING IS STRICTLY PROHIBITED WITHOUT THE CONSENT OF THE CLIENT & MARCELLINO SAIN ARCHITECTS PTY LTD


06 L FLEXI REDFERN, NEW SOUTH WALES SITE AREA: 10,000 SQM

Types of modular construction

‘How can modular construction provide flexible and affordable housing strategies to cater for the changing needs of home owners?’ Deriving from the research question, this project explores how prefabricated housing can tackle the current housing stress problems by targeting on young single professionals and low-income families in Sydney. Given the site at Redfern, 300 prefab modules are designed with a 30sqm typical studio unit. A sliding drawing concept using the scaffolding technique is then introduced for the construction assembly of modules; reminiscing the mass production during Industrial Revolution era. This idea also provides multiple flexible floor layout strategies with the addition of new modules - single extension, horizontal expansion and vertical expansion; in which Flexi can continuously evolve in the future.

Individual work M. Arch Year 2 Graduation Studio, Autumn + Winter 2019 Instructed by Chi Melhem + Sandra Furtado AutoCAD, SketchUp, V-ray, Rhino, Lumion, Adobe Creative Suites *** Invited to represent Housing Studio cohort to present in the MAD Architects Masterclass Presentation with the visiting Chinese Architect, Dang Qun.


Given the site that faces the opposite public Redfern Oval, it draws a public connection into the site via the main Elizabeth Street, making the ground floor to function as cafes and retail outlets. The existing public PCYC Community Centre is maintained at the south location as two bus stops located outside its entrance act as a public drop-off spot. A crane is placed in the centre of private community garden to ease the convenience of replacing module units from the loading zone at north-facing Kettle Street. Besides, it also represents an identity of the site, reminiscing the industrialisation era in Redfern.


08 M PARRABSTRACT PARRAMATTA, NEW SOUTH WALES SITE AREA: 3400 SQM

Program massing section sketch

This urban studio project aims to deliver a new contemporary art space called ArtHeart in the centre of Parramatta CBD interpreting the concept of an abstract design into the site through architecture. The existing site is functioned as car park constructed in 1981 occupying 575 car parking spaces, with 2 entrances facing the northern Phillip Street and eastern Horwood Place. Commisioned by the Parramatta Artists Studios (PAS) and Information Cultural Exchange (ICE), Parrabstract has retained 350 car parks and continued to develop and play an important role to home their needs; evolving a community of creative artists to interact with the public domain. In program massing development, lighting and acoustic qualities are taken into account to divide the public and private programs to create different spatial experience for the public users in the 1000sqm exhibition space, as well as for the working artists in the 30 proposed artist studio rooms.

Individual work M. Arch Year 1 Urban Conditions Studio, Spring 2018 Instructed by John Cabello + Sam Marshall AutoCAD, SketchUp, V-ray, Rhino, Lumion, Adobe Creative Suites

MAIN CONCEPT



10 M

3

4

A102

A102

A

WHITE WHARF

B

C

D

E

F

3500

G

H

I

J

28000

LILYVALE, NEW SOUTH WALES SITE AREA: 550 SQM

3500

3500

3500

3500

0

K

1

2

2

1

A102

A102

3

4

3500 3500

3500

3500

5

6

7

18075

3500

1675

2000

3000

2500

2500

4400

Ceiling Level 4418

Ceiling Level

2000

8000

Bore Pile Base Level

400

322

600

Basement Level 02 -4822 Bore Pile Base Level

-6722

11.98°

6722

-2422

F REE DOW N LOAD@ REVITCA RS.CO M

13.93°

2100

Basement Level 01

F REE DOW N LOAD@ REVITCA RS.CO M

300

F REE DOW N LOAD@ REVITCA RS.CO M

1300 300 300 2100

F REE DOW N LOAD@ REVITCA RS.CO M

1300 300 300 2100

6722

Basement Level 02 -4822

Excavation and Concrete Bore Pile Installation Process

0

300 1700

Basement Level 01 -2422

Ground Floor Plan

400 333

Ground Floor Plan 0

520 3815

8000

3815

8000

520 1030

3665

8000

-6722 3623

5246

215

7285

215

7285

215

7738

4968

3630

350

2150

350

6019

13836

35453

Section A-A

3

1 : 100

I

H

G

F

3500

E

D

C

B

28000 3500

3500

3500

3500

A

0

3500

3500

1675

Ceiling Level

Ceiling Level 8000

Bore Pile Base Level

4

5

6

7

2000

2000

3000

2500

2500

4400

3665 8000

3815

4148

1 A103

3 A103

322

400 322

2100

0

300 1700

Basement Level 02 -4822

-6722

Ground Floor Plan

300

Basement Level 01 -2422

1300 300 300 2100

6722

Basement Level 01 -2422

3

2 A103

8000

0

2

3500

8000

Ground Floor Plan

1

1 A102

18075

3500 3500

3499

Primary structures are constructed of double glulam with treated Tasmanian Oak, whereas the secondary structures are constructed of Spotted Gum hardwood. It has an internal void of 8m to allow maximum space for boat storage, circulation and maintenance. Load calculations are tested using the Multiframe software to determine the structural stability of the building.

Individual work M. Arch Year 1 Advanced Construction and Structures Design and Technology in Timber, Spring 2018 Instructed by John Carrick Autodesk Revit, V-ray, Adobe Creative Suites

J

2 A102

350

K

3 A102

1 : 100

520

It incorporates the features of the following:a) the use of designed timber as the principal above-ground structure; b) having an internal void of height 8m c) 2-storey basement car park

4 A102

Section C-C

Basement Level 02 -4822 Bore Pile Base Level 376

3293

7746

215

7285

215

7285

215

5246

3300

369

-6722

1300 300 300 2100

1

6722

Timber is selected as the primary material for the public boat storage facilities on a coastal sandy site with underlying sandstone at Little Garie Beach at Royal National Park, New South Wales.

F REE

DOW N LOAD@ REVITCA RS.CO M

4 A103

5023

350

2150

350

6000

13947

35545

2

Section B-B 1 : 100

4

Section D-D 1 : 100

FOR INFORMATIO


REFERENCE MAP

20

20MM CORRUGATED STEEL ROOFING

1 40

DIAGONAL COLUMN: GLULAM 350 x 85 DIAGONAL BEAM FOR SCISSOR-CUT JOINT, TREATED SOFTWOOD

3 50

140 x 75 TIMBER PURLINS

COLUMNS: DOUBLE GLULAM 350 x 65 COLUMN BOLTED TO CONCRETE FLOOR SLAB, TREATED SOFTWOOD

35 0

59

RAFTERS: GLULAM 350 x 85, TREATED SOFTWOOD, PINNED TO COLUMNS

303

° .75

STEEL PIVOT CONNECTOR BOLTED TO CONCRETE GROUND SLAB

Ground Floor Plan 0

NAIL PLATE

STEEL PLATE CONNECTOR BOLTED TO CONCRETE FLOOR SLAB

TRIANGULATION DIAGONAL MEMBER: GLULAM 350 x 85, TREATED SOFTWOOD, PINNED TO COLUMNS AND RAFTERS

Ground Floor Plan 0

15

335

397 0 35

CLIENT :

COST CONSULTANT:

1

Section D-D - Callout 1

2

1 : 10

Section D-D - Callout 2

3

1 : 10

Diagonal Column and Rafter Connection

Diagonal Column and Floor Connection

Section D-D - Callout 3 1 : 10

LANDSCAPE ARCHITECT:

Double Columns and Floor Connection

NOTES:

BIFOLD FRONT ENTRANCE DOOR WITH 4 PANELS

DIAGONAL COLUMN: GLULAM 350 x 85 DIAGONAL BEAM FOR SCISSOR-CUT JOINT, TREATED SOFTWOOD

CLADDING: 30MM THK POLYCARBONATE PANELS W/ 550W x 400H CLIPPED W/ 50x50x4 ALUM. SHS SUCTION ANCHOR

COLUMNS: DOUBLE GLULAM 350 x 65 COLUMN BOLTED TO CONCRETE FLOOR SLAB, TREATED SOFTWOOD

400

CONCRETE FLOOR SLAB

322

Ground Floor Plan 0

CONCRETE CAPPING BEAM

600

RAFTERS: GLULAM 350 x 85, TREATED SOFTWOOD, PINNED TO COLUMNS

1700

SPOON DRAIN

TRIANGULATION DIAGONAL MEMBER: GLULAM 350 x 85, TREATED SOFTWOOD, PINNED TO COLUMNS AND RAFTERS

DISCLAIMER

USE FIGURED DIMENSIONS ONLY DO NOT SCALE FROM DRAWING CHECK & VERIFY ALL DIMENSIONS ON SITE BEFORE FABRICATION OR SET OUT. This drawing is diagrammatic and shows general arrangements. Any information involving measurement of the works shall be taken from documented dimensions on the architectural and structural drawings, workshop drawings by others and conditions on site. The works shall comply with the contract conditions and Statutory Regulations. All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means graphic, electronic or mechanical, including photocopying without the written permission of Populous architects in association. Any licence, expressed or implied, to use this document for any purpose whatsoever is restricted to the terms of the agreement or implied agreement between Populous and the instructing party.

Basement Level 01 THIS DRAWING IS AN UNCONTROLLED COPY. UNLESS NOTED OTHERWISE.

300

-2422

REV

DESCRIPTION

DATE

2100

REINFORCED CONCRETE SUSPENDED SLAB

SPOON DRAIN FREE

DOWNLOAD @ REVITCARS. COM

300

REINFORCED CONCRETE FOOTING AND SLAB

300

Basement Level 02 -4822

WATERPROOFING SHEET

JOANNE LING

1300

REINFORCED CONCRETE BORED PILE ACTING AS RETAINING WALL

ARCHITECT:

z5185572 Z5185572@student.unsw.edu.au

5

Sectional Perspective

REINFORCED CONCRETE BORED PILE ACTING AS RETAINING WALL

REINFORCED CONCRETE FOOTING AND SLAB

SHEET TITLE

SECTION DETAILS

25/10/2020 5:42:51 PM

1 : 20

PROJECT

THE WHITE WHARF LITTLE GARIE BEACH, LILYVALE NSW 2508.

PROJECT NUMBER

REVIEWED

COORDINATED

APPROVED

SCALE 100% @ A0

NORTH POINT

JL01

FOR INFORMATION

As indicated

PHASE

DA

DRAWING NUMBER

A103

Copyright POPULOUS ® 2016

Basement Floor and Bore Piles Section Details

REVISION

©

4

Section D-D - Callout 4

C:\Users\joann\Desktop\Revit Test\2018_Timber\Revit\Timber.rvt

Bore Pile Base Level -6722

Original Sheet Size A0 -1189 x 841mm


12 M HILLHAUS ADELAIDE, SOUTH AUSTRALIA SITE AREA: 6800 SQM

Massing model A typical apartment is all about extrusion of shape or stacking above one block to another; Hillhaus acts the same, but in different style. The stacking of every small house units develop a sense of growing like the poker cards tower, forming different approach to a new typical apartment design. Each housing unit, consisting of 3 stories, is divided into 2 apartment units by the shear wall which channels down the load to the ground; its pitch roof rafters function as roof trusses. Most single apartment units, in the huge house (extrusion model) have a vantage view to the ground level of bathhouse, developing the sensation of warmth and relaxation through the shaft of voids. The juxtaposition of exterior artificial Danpalon cladding and interior natural plywood finish creates a connection between the public and private space in one community and design.

Individual work B. Arch Year 3 Design Studio 5, Autumn 2017 Instructed by Dr James Curry + Vanessa Amodeo Autodesk Revit, AutoCAD, SketchUp, V-ray, Rhino, Lumion, Adobe Creative Suites *** Project published in www.agendasa. com/single-post/2017/06/15/DesignStudio-V-The-University-of-Adelaide



14 S TRIGONOMELIGHT UNIVERSITY OF ADELAIDE MATH LAWN SITE AREA: 180 SQM

Form exploration through origami folding

Built outside the Engineering and Maths Science Building, Trigonomelight functions as a light pavilion to showcase engineering students’ research projects, with multiple methods of seeking and exploring the interplay of light and shadows through physics and mechanics. According to an Arabic scientist Alhazen, he discovered that light reflects on hard and soft surfaces in various angles in which corresponds to the angles of a triangle. Different types of triangles consist different angles in which different materials produce different lighting qualities in different rooms of light pavilion. Heavyweight and lightweight materials perform in reflective, diffusive and refractive ways; a pond is built to further enhance the ambient by creating dynamic movement of ripple patterns in the space. Besides, artificial lighting like LED and fluorescent tubes are installed to glow at night so as reflecting on the knowledge of researching in science and technology; serving as the University’s motto (SEEK LIGHT).

Individual work B. Arch Year 2 Representation II, Spring 2016 Instructed by Prof. Samer Akkach Autodesk AutoCAD, SketchUp, V-ray, Rhino, Lumion, Adobe Creative Suites



16 M CRESCENDO NORTH TERRACE, ADELAIDE SITE AREA: 1320 SQM

Grasshopper fenestration facade

Given the site adjacent to University of Adelaide North Terrace Campus, The School of Architecture and Built Environment proposes for a new construction for architecture building to accommodate the increasing

amount of staffs and students. Crescendo is named after a faced-paced experience produced from the fast kinetic movement played by the rising melody and quickening tempo, in which most architecture students experienced, either rushing an assignment or celebration for post-critic presentation. From observation of motion to translation of sketches and three-dimensional object, a complex form is then generated to explore the spatial qualities in the school. Different programs are introduced and organized in consideration of different users and functionalities. A waffle rib structure is then constructed from laser cutting for structural system. Rhinoceros Grasshopper plug-in is used to design pixelated fenestrations on the facade; lighting qualities are explored in different rooms to welcome various atmosphere and experience throughout the architecture building.

Individual work B. Arch Year 3 Representation 3, Autumn 2017 Instructed by Jesse Jai Zilm Rhino, Grasshopper, SketchUp, V-ray, Adobe Creative Suites, Laser-cutting


S FAB-BLOG www.joanneling25.blogspot.com

QR Code for Fab-Blog

This elective course introduces creative contemporary fabrication methods to students in order to further improve their craftsmanship skills using advanced automated processes such as digital modelling, laser cutting, CNC milling, 3D printing casting, wood and metal fabrication techniques. 3 precedents are selected and fabricated to reflect the key concept of my Final Year Design Studio project. These models express key ideas, concepts and contruction assembly that explore different materiality, scales, lighting, spatial experience interiorly and exteriorly to further develop student’s imagination. This course also contributes to my digital fabrication skills for Design Studio models.

Individual work M. Arch Year 2 Contemporary Fabrication Techniques, Winter 2019 Instructed by Russell Lowe Rhino, SketchUp, AutoCAD, Adobe Creative Suites, Laser-cutting, 3D printing, Timber fabrication, Photography


18

HAND DRAWINGS

#INSTAPOST @_joanneling_archi @_joanneling

Photography has taught me on how to escape from the reality, flashback moments that spontaneously bring me to another world. The unrealistic abstract colours and unheard sound in a busy street draw a connection to the focal point on how I observe and define the quality of the image in a frame.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.