YOMA YEIK THAR MASTER PLAN + STAFF HOUSING
YOMA YEIK THAT STREET, YANGON, MYANMAR GROSS FLOOR AREA: 68025sqft BUILDING TYPE: RESIDENTIAL
CONTENTS MASTER PLAN
MEP
SITE CONTEXT SITE LOCATION MAP (EXISTING) SITE ANALYSIS (EXISTING) SITE LOCATION MAP SITE PLAN AND SECTION MASTER PLAN MEP MASTER PLAN
GROUND FLOOR PLAN 1ST FLOOR PLAN 2ND FLOOR PLAN 3RD FLOOR PLAN 4TH FLOOR PLAN 5TH FLOOR PLAN 6TH FLOOR PLAN ROOF FLOOR PLAN
DESIGN DIAGRAM PROCESS DIAGRAM MASTER PLAN ISOMETRIC DIAGRAM PROGRAM DIAGRAM
ARCHITECTURE DRAWINGS BUILDING TYPES GROUND FLOOR PLAN 1ST FLOOR PLAN 2ND FLOOR PLAN 3RD FLOOR PLAN 4TH FLOOR PLAN 5TH FLOOR PLAN 6TH FLOOR PLAN ATTIC FLOOR PLAN ROOF FLOOR PLAN ELEVATION-1 ELEVATION-2 ELEVATION-3 ELEVATION-4 SECTION (A-A) SECTION (B-B) & (C-C) GUARD HOUSE: PLAN, SECTION & ELEVATION FENCE: PLAN, SECTION & ELEVATION
PERSPECTIVE VIEW SOUTH-EAST FACADE VIEW EAST FACADE VIEW NORTH-WAST FACADE VIEW SOUTH-WEST FACADE VIEW GARDEN VIEW LIVING+DINNING KITCHEN BATHROOM MASTER BEDROOM BEDROOM
MATERIAL PALETTE MATERIAL PALETTE
MASTER PLAN
SITE CONTEXT
MYA KAN THAR STREET
MOGOK MONASTARY
EET
ROA
D
THAR STR
PYA Y
YOMA YE IK
YOMA YEIK THAR STREE
T
MAHA THEDI SHIN PAGODA
YOMA YE
CON
IK THAR S
VOC
TREET
VANTAGE T
OWER
SITE LOCATION MAP
ATIO
NS
TRE
ET
EXISTING BUILDING
EXISTING TREES
EXISTING WATER TANK
EXISTING SITE CONDITION
MYA KAN THAR STREET
MOGOK MONASTARY
EET
ROA
D
THAR STR
PYA Y
YOMA YE IK
YOMA YEIK THAR STREE
T
MAHA THEDI SHIN PAGODA
YOMA YE
CON
IK THAR S
VOC
TREET
VANTAGE T
OWER
SITE LOCATION MAP
ATIO
NS
TRE
ET
MYA KAN THAR STREET
7 STOREY YOMA YEIK THAR STAFF HOUSING
EXISTING 4 STOREY BUILDING
PLAYGROUND
GUARD HOUSE
MAIN GATE
MEZZ
GARBAGE DISPOSAL PEDESTRIAN ENTRANCE-2 PEDESTRIAN ENTRANCE-1
YOMA YEIK THAR STRE
MEZZAINE
ET
MASTER PLAN SCALE: 1/32" = 1'-0" LEGEND TRANSFORMER STREET POLE TREE DRAINAGE GRASS AND SHRUB SAND PEDESTRIAN PLATFORM 62 CAR PARK 4 ACCESSIBLE CAR PARK
YOAM YEIK THAR STAFF HOUSING BUILDING FOOTPRINT AREA: 8890sqft /0.2acre GROSS FLOOR AREA: 68025sqft /1.5acre SITE AREA: 55982sqft /1.2acre FAR: 1.7 BCR: 15%
MYA KAN THAR STREET
FAP
7 STOREY YOMA YITEK THAR STAFF HOUSING
EXISTING 4 STOREY BUILDING
YOMA YEIK THAR STRE
ET
MEP MASTER PLAN
DESIGN DIAGRAM
ARCHITECTURE DRAWINGS
CORRIDOR
CORRIDOR
ENTRANCE
ENTRANCE
BEDROOM-2
BEDROOM-2
BEDROOM-1
BEDROOM-1
MASTER BEDROOM
MASTER BEDROOM
MASTER BATH
BATH
MASTER BATH
KITCHEN
BATH
KITCHEN
DINNING
DINNING LIVING
APARTMENT TYPE-A 1307sqft (14)
LIVING
APARTMENT TYPE-B 1210sqft (28)
LIN INNOVATIVE NETWORKS
A
C A-303
B
C
D
E
F
G
H
I
J
20'-0"
R-001 R-002 19'-2"
BEDROOM-2
BEDROOM-1
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
20'-0"
9'-0"
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
BEDROOM-1
MASTER BEDROOM
MASTER BEDROOM
R-005 R-006 BEDROOM-2
BEDROOM-2
BEDROOM-1
BEDROOM-1
MASTER BEDROOM
MASTER BEDROOM
A A-301
19'-2"
62'-9"
20'-0"
LIFT
R-003 R-004
BEDROOM-2
3 A A-301
10'-8"
MASTER BATH
4
BATH
BATH
KITCHEN
19'-2"
LIVING
MASTER BATH
MASTER BATH
KITCHEN
DINNING
BATH
KITCHEN
LIVING
DINNING
BATH
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
LIVING
MASTER BATH
BATH
BATH
KITCHEN
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
UNIVERSITY OF YANGON
2
20'-0"
CORRIDOR
5'-3"
1
10'-8"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
LIVING
5
B A-302
3 2
4 1
C A-303
GROUND FLOOR PLAN SCALE: 1/16" = 1'-0"
A-101
LIN INNOVATIVE NETWORKS
A
C A-303
B
C
D
E
F
G
H
I
J
20'-0"
R-101 R-102 19'-2"
BEDROOM-2
BEDROOM-1
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
MASTER BATH
4
BATH
19'-2"
LIVING
20'-0"
9'-0"
BATH
BEDROOM-2
BEDROOM-2
BEDROOM-1
BEDROOM-1
MASTER BEDROOM
MASTER BEDROOM
A A-301 BATH
KITCHEN
LIVING
DINNING
MASTER BEDROOM
R-105 R-106
MASTER BATH
KITCHEN
DINNING
BEDROOM-1
MASTER BEDROOM
BATH
KITCHEN
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
MASTER BATH
19'-2"
62'-9"
20'-0"
LIFT
R-103 R-104
BEDROOM-2
3 A A-301
10'-8"
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
LIVING
MASTER BATH
BATH
BATH
KITCHEN
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
UNIVERSITY OF YANGON
2
20'-0"
CORRIDOR
5'-3"
1
10'-8"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
LIVING
5
B A-302
3 2
4 1
C A-303
FIRST FLOOR PLAN SCALE: 1/16" = 1'-0"
A-102
LIN INNOVATIVE NETWORKS
A
C A-303
B
C
D
E
F
G
H
I
J
20'-0"
R-201 R-202 19'-2"
BEDROOM-2
BEDROOM-1
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
20'-0"
9'-0"
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
BEDROOM-1
MASTER BEDROOM
MASTER BEDROOM
R-205 R-206 BEDROOM-2
MASTER BATH
4
BATH
BATH
KITCHEN
19'-2"
LIVING
MASTER BATH
MASTER BATH
KITCHEN
DINNING
BEDROOM-1
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
BEDROOM-1 MASTER BEDROOM
A A-301
MASTER BATH
BATH
KITCHEN
LIVING
DINNING
BATH
BEDROOM-2
MASTER BEDROOM
MASTER BATH
19'-2"
62'-9"
20'-0"
LIFT
R-203 R-204
BEDROOM-2
3 A A-301
10'-8"
LIVING
BATH
BATH
KITCHEN
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
UNIVERSITY OF YANGON
2
20'-0"
CORRIDOR
5'-3"
1
10'-8"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
LIVING
5
B A-302
3 2
4 1
C A-303
SECOND FLOOR PLAN SCALE: 1/16" = 1'-0"
A-103
LIN INNOVATIVE NETWORKS
A
C A-303
B
C
D
E
F
G
H
I
J
20'-0"
R-301 R-302 19'-2"
BEDROOM-2
BEDROOM-1
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
MASTER BATH
4
BATH
19'-2"
LIVING
BATH
20'-0"
9'-0"
LIVING
BEDROOM-2
BEDROOM-1
BEDROOM-1
MASTER BEDROOM
MASTER BATH
BATH
DINNING
BEDROOM-2
MASTER BEDROOM
A A-301
MASTER BATH
KITCHEN
DINNING
R-305 R-306
MASTER BATH
KITCHEN
LIVING
DINNING
MASTER BEDROOM
MASTER BATH
KITCHEN
DINNING
BEDROOM-1
MASTER BEDROOM
BATH
KITCHEN
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
MASTER BATH
19'-2"
62'-9"
20'-0"
LIFT
R-303 R-304
BEDROOM-2
3 A A-301
10'-8"
LIVING
BATH
BATH
KITCHEN
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
UNIVERSITY OF YANGON
2
20'-0"
CORRIDOR
5'-3"
1
10'-8"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
LIVING
5
B A-302
3 2
4 1
C A-303
THIRD FLOOR PLAN SCALE: 1/16" = 1'-0"
A-104
LIN INNOVATIVE NETWORKS
A
C A-303
B
C
D
E
F
G
H
I
J
20'-0"
R-401 R-402 19'-2"
BEDROOM-2
BEDROOM-1
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
20'-0"
9'-0"
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
BEDROOM-1
MASTER BEDROOM
MASTER BEDROOM
R-405 R-406 BEDROOM-2
MASTER BATH
4
BATH
BEDROOM-1
19'-2"
LIVING
MASTER BATH
KITCHEN
DINNING
BATH
BATH
KITCHEN
LIVING
DINNING
BEDROOM-1 MASTER BEDROOM
A A-301
MASTER BATH
BATH
KITCHEN
BEDROOM-2
MASTER BEDROOM
MASTER BATH
19'-2"
62'-9"
20'-0"
LIFT
R-403 R-404
BEDROOM-2
3 A A-301
10'-8"
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
LIVING
MASTER BATH
BATH
BATH
KITCHEN
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
UNIVERSITY OF YANGON
2
20'-0"
CORRIDOR
5'-3"
1
10'-8"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
LIVING
5
B A-302
3 2
4 1
C A-303
FOURTH FLOOR PLAN SCALE: 1/16" = 1'-0"
A-105
LIN INNOVATIVE NETWORKS
A
C A-303
B
C
D
E
F
G
H
I
J
20'-0"
R-501 R-502 19'-2"
BEDROOM-2
BEDROOM-1
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
MASTER BATH
4
BATH
19'-2"
LIVING
BATH
20'-0"
9'-0"
LIVING
BEDROOM-2
BEDROOM-1
BEDROOM-1
MASTER BEDROOM
BATH
DINNING
BEDROOM-2
MASTER BEDROOM
A A-301
MASTER BATH
BATH
KITCHEN
DINNING
R-505 R-506
MASTER BATH
KITCHEN
LIVING
DINNING
MASTER BEDROOM
MASTER BATH
KITCHEN
DINNING
BEDROOM-1
MASTER BEDROOM
BATH
KITCHEN
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
MASTER BATH
19'-2"
62'-9"
20'-0"
LIFT
R-503 R-504
BEDROOM-2
3 A A-301
10'-8"
LIVING
BATH
KITCHEN
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
UNIVERSITY OF YANGON
2
20'-0"
CORRIDOR
5'-3"
1
10'-8"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
LIVING
5
B A-302
3 2
4 1
C A-303
FIFTH FLOOR PLAN SCALE: 1/16" = 1'-0"
A-106
LIN INNOVATIVE NETWORKS
A
C A-303
B
C
D
E
F
G
H
I
J
20'-0"
R-601 R-602 19'-2"
BEDROOM-2
BEDROOM-1
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
20'-0"
9'-0"
BEDROOM-2
BEDROOM-1
MASTER BEDROOM
BEDROOM-1
MASTER BEDROOM
MASTER BEDROOM
R-605 R-606 BEDROOM-2
MASTER BATH
4
BATH
BATH
KITCHEN
19'-2"
LIVING
MASTER BATH
MASTER BATH
KITCHEN
DINNING
BEDROOM-1
LIVING
BATH
KITCHEN
DINNING
DINNING
BEDROOM-1 MASTER BEDROOM
A A-301
MASTER BATH
BATH
KITCHEN
LIVING
DINNING
BATH
BEDROOM-2
MASTER BEDROOM
MASTER BATH
19'-2"
62'-9"
20'-0"
LIFT
R-603 R-604
BEDROOM-2
3 A A-301
10'-8"
LIVING
BATH
KITCHEN
LIVING
MASTER BATH
KITCHEN
DINNING
DINNING
UNIVERSITY OF YANGON
2
20'-0"
CORRIDOR
5'-3"
1
10'-8"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
LIVING
5
B A-302
3 2
4 1
C A-303
SIXTH FLOOR PLAN SCALE: 1/16" = 1'-0"
A-107
LIN INNOVATIVE NETWORKS
A
B
C A-303
C
D
E
F
G
H
I
J
20'-0"
10'-8"
20'-0"
20'-0"
LIFT CORE
19'-2"
WATER TANK MEETING SPACE
STORE
WATER TANK
LAUNDARY AREA
3 62'-9"
19'-2"
ROOFTOP GARDEN
19'-2"
4
9'-0"
UNIVERSITY OF YANGON
2
A A-301
20'-0"
5'-3"
1
10'-8"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
5
B A-302
3 2
4 1
C A-303
ATTIC FLOOR PLAN SCALE: 1/16" = 1'-0"
A-108
LIN INNOVATIVE NETWORKS
A
B
C A-303
C
D
E
F
G
H
I
J
20'-0"
10'-8"
20'-0"
20'-0"
WATER TANK
19'-2"
2
WATER TANK
3 62'-9"
LAUNDARY AREA
19'-2"
ROOFTOP GARDEN
A A-301
20'-0"
19'-2"
4
9'-0"
UNIVERSITY OF YANGON
10'-8"
5'-3"
1
20'-0"
YOMA YEI THAR LOT-2 STAFF HOUSING
150'-4" 20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
B A-302
5
B A-302
3 2
4 1
C A-303
ROOF FLOOR PLAN SCALE: 1/16" = 1'-0"
A-109
A
B
C
D
E
F
G
H
I
J
150'-4" 20'-0"
20'-0"
20'-0"
10'-8"
20'-0"
20'-0"
9'-0"
YOMA YEI THAR LOT-2 STAFF HOUSING
9'-0" 10'-0"
+71'-2" ATTIC FLOOR LEVEL
10'-0"
+61'-2" 6TH FLOOR LEVEL
10'-0"
+51'-2" 5TH FLOOR LEVEL
10'-0"
+41'-2" 4TH FLOOR LEVEL 80'-2"
10'-8"
10'-0"
+31'-2" 3RD FLOOR LEVEL
UNIVERSITY OF YANGON
20'-0"
+80'-3" ROOF FLOOR LEVEL
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
LIN INNOVATIVE NETWORKS
10'-0"
+21'-2" 2ND FLOOR LEVEL
+0'-0" NATURAL GROUND LEVEL
1'-2"
+1'-2" GROUND FLOOR LEVEL
10'-0"
+11'-2" 1ST FLOOR LEVEL
ELEVATION-1 (EAST ELEVATION) SCALE: 1/16" = 1'-0"
A-201
2
3
4
5
4
5
62'-9" 5'-3"
19'-2"
19'-2"
19'-2"
19'-2"
10'-0"
+61'-2" 6TH FLOOR LEVEL 10'-0"
+61'-2" 6TH FLOOR LEVEL
10'-0"
+51'-2" 5TH FLOOR LEVEL 10'-0"
+51'-2" 5TH FLOOR LEVEL
10'-0"
80'-2" 10'-0"
+41'-2" 4TH FLOOR LEVEL
5'-3"
10'-0"
+21'-2" 2ND FLOOR LEVEL 10'-0"
+21'-2" 2ND FLOOR LEVEL
+1'-2" GROUND FLOOR LEVEL
1'-2"
+0'-0" NATURAL GROUND LEVEL
10'-0"
+11'-2" 1ST FLOOR LEVEL 10'-0"
+11'-2" 1ST FLOOR LEVEL
+0'-0" NATURAL GROUND LEVEL
19'-2"
10'-0"
+31'-2" 3RD FLOOR LEVEL 10'-0"
+31'-2" 3RD FLOOR LEVEL
1
1'-2"
80'-2"
+41'-2" 4TH FLOOR LEVEL
2
YOMA YEI THAR LOT-2 STAFF HOUSING
9'-0" 10'-0"
+71'-2" ATTIC FLOOR LEVEL 10'-0"
+71'-2" ATTIC FLOOR LEVEL
+1'-2" GROUND FLOOR LEVEL
19'-2"
+80'-3" ROOF FLOOR LEVEL 9'-0"
+80'-3" ROOF FLOOR LEVEL
3 62'-9"
UNIVERSITY OF YANGON
1
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
LIN INNOVATIVE NETWORKS
ELEVATION-2 (SOUTH ELEVATION)
ELEVATION-4 (NORTH ELEVATION)
SCALE: 1/16" = 1'-0"
SCALE: 1/16" = 1'-0"
A-202
J
I
H
G
F
E
D
B
C
A
150'-4" 20'-0"
9'-0"
ROOF FLOOR LEVEL
10'-0"
ATTIC FLOOR LEVEL
10'-0"
6TH FLOOR LEVEL
10'-0"
5TH FLOOR LEVEL
10'-0"
4TH FLOOR LEVEL 80'-2"
10'-8"
20'-0"
20'-0"
10'-8"
20'-0"
20'-0"
10'-0"
3RD FLOOR LEVEL
UNIVERSITY OF YANGON
20'-0"
YOMA YEI THAR LOT-2 STAFF HOUSING
9'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
LIN INNOVATIVE NETWORKS
10'-0"
2ND FLOOR LEVEL
NATURAL GROUND LEVEL
1'-2"
GROUND FLOOR LEVEL
10'-0"
1ST FLOOR LEVEL
ELEVATION-3 (WEST ELEVATION) SCALE: 1/16" = 1'-0"
A-203
A
B
C
D
E
F
G
H
I
J
150'-4" 20'-0"
20'-0"
10'-8"
20'-0"
20'-0"
10'-8"
20'-0"
20'-0"
9'-0"
10'-0"
ATTIC FLOOR LEVEL
10'-0"
6TH FLOOR LEVEL
10'-0"
5TH FLOOR LEVEL
80'-2"
10'-0"
4TH FLOOR LEVEL
10'-0"
3RD FLOOR LEVEL
UNIVERSITY OF YANGON
9'-0"
YOMA YEI THAR LOT-2 STAFF HOUSING
ROOF FLOOR LEVEL
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
LIN INNOVATIVE NETWORKS
10'-0"
2ND FLOOR LEVEL
NATURAL GROUND LEVEL
1'-2"
GROUND FLOOR LEVEL
10'-0"
1ST FLOOR LEVEL
SECTION (A-A) SCALE: 1/16" = 1'-0"
A-301
1
2
3
4
1
5
2
3
62'-9" 5'-3"
19'-2"
19'-2"
5'-3"
19'-2"
19'-2"
10'-0"
5TH FLOOR LEVEL 10'-0"
5TH FLOOR LEVEL
10'-0"
80'-2" 10'-0"
4TH FLOOR LEVEL
10'-0"
3RD FLOOR LEVEL 10'-0"
3RD FLOOR LEVEL
10'-0"
2ND FLOOR LEVEL 10'-0"
2ND FLOOR LEVEL
1'-2"
GROUND FLOOR LEVEL
NATURAL GROUND LEVEL
10'-0"
1ST FLOOR LEVEL 10'-0"
1ST FLOOR LEVEL
1'-2"
80'-2"
4TH FLOOR LEVEL
UNIVERSITY OF YANGON
YOMA YEI THAR LOT-2 STAFF HOUSING
9'-0" 10'-0" 10'-0"
6TH FLOOR LEVEL 10'-0"
6TH FLOOR LEVEL
NATURAL GROUND LEVEL
19'-2"
ATTIC FLOOR LEVEL 10'-0"
ATTIC FLOOR LEVEL
GROUND FLOOR LEVEL
5
ROOF FLOOR LEVEL 9'-0"
ROOF FLOOR LEVEL
19'-2"
4 62'-9"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
LIN INNOVATIVE NETWORKS
SECTION (B-B)
SECTION (C-C)
SCALE: 1/16" = 1'-0"
SCALE: 1/16" = 1'-0"
A-302
LIN INNOVATIVE NETWORKS
E-2
18'-0"
PLAN
ELEVATION-1
SCALE: 3/16" = 1'-0"
SCALE: 3/16" = 1'-0"
18'-0"
12'-3"
12'-3"
18'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
CCTV MONIT0RING
UNIVERSITY OF YANGON
E-1
YOMA YEI THAR LOT-2 GUARD HOUSE
12'-3"
S-1
15'-7"
15'-7"
SECTION-1
ELEVATION-2
SCALE: 3/16" = 1'-0"
SCALE: 3/16" = 1'-0"
A-501
LIN INNOVATIVE NETWORKS
PLAN SCALE: 1/4" = 1'-0"
10'-0"
6"
0.5" Thick Rectangular Steel Pipe
0.5"
0.5" Thick Rectangular Steel Pipe 72° Angel Galvanized Steel Fins
12" x 4" Masonry Brick Platform
7'-8"
8'-0"
8'-0"
2" x 6" Hollow Steel Section
4" Deep Submerged Brick Masonry Podium 4"
18" x 42" Concrete Footing
3'-6"
4"
Shallow Embedded (Steel Plate Bolted Connection)
UNIVERSITY OF YANGON
E-1
YOMA YEI THAR LOT-2 FENCE
10'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
1'-0"
S-1
ELEVATION-1
SECTION-1
SCALE: 1/4" = 1'-0"
SCALE: 1/4" = 1'-0"
A-502
MEP
A
B
C
D
E
F
G
H
I
J
19'-2"
2
FAP
62'-9"
19'-2"
3
20'-0"
10'-8"
20'-0"
20'-0"
9'-0"
19'-2"
4
20'-0"
UNIVERSITY OF YANGON
10'-8"
5'-3"
1
20'-0"
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
150'-4" 20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
LIN INNOVATIVE NETWORKS
5
3 2
4 1
GROUND FLOOR PLAN SCALE: 1/16" = 1'-0"
MEP-02
19'-2"
62'-9"
2 5'-3"
B
20'-0"
2 3 4
1
C
20'-0"
3
4 D
10'-8"
E
20'-0"
F
20'-0"
G
10'-8"
H
20'-0"
I
20'-0" 9'-0"
J
150'-4"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
UNIVERSITY OF YANGON
A
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
19'-2"
1
19'-2"
LIN INNOVATIVE NETWORKS
5
FIRST FLOOR PLAN
SCALE: 1/16" = 1'-0"
MEP-03
A
B
C
D
E
F
G
H
I
J
19'-2"
2
62'-9"
19'-2"
3
20'-0"
20'-0"
10'-8"
20'-0"
20'-0"
9'-0"
19'-2"
4
10'-8"
UNIVERSITY OF YANGON
5'-3"
1
20'-0"
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
150'-4" 20'-0"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
LIN INNOVATIVE NETWORKS
5
3 2
4 1
SECOND FLOOR PLAN SCALE: 1/16" = 1'-0"
MEP-04
19'-2"
62'-9"
2 5'-3"
B
20'-0"
2 3 4
1
C
20'-0"
3
4 D
10'-8"
E
20'-0"
F
20'-0"
G
10'-8"
H
20'-0"
I
20'-0" 9'-0"
J
150'-4"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
UNIVERSITY OF YANGON
A
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
19'-2"
1
19'-2"
LIN INNOVATIVE NETWORKS
5
THIRD FLOOR PLAN
SCALE: 1/16" = 1'-0"
MEP-05
19'-2"
62'-9"
2 5'-3"
B
20'-0"
2 3 4
1
C
20'-0"
3
4 D
10'-8"
E
20'-0"
F
20'-0"
G
10'-8"
H
20'-0"
I
20'-0" 9'-0"
J
150'-4"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
UNIVERSITY OF YANGON
A
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
19'-2"
1
19'-2"
LIN INNOVATIVE NETWORKS
5
FORTH FLOOR PLAN
SCALE: 1/16" = 1'-0"
MEP-06
19'-2"
62'-9"
2 5'-3"
B
20'-0"
2 3 4
1
C
20'-0"
3
4 D
10'-8"
E
20'-0"
F
20'-0"
G
10'-8"
H
20'-0"
I
20'-0" 9'-0"
J
150'-4"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
UNIVERSITY OF YANGON
A
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
19'-2"
1
19'-2"
LIN INNOVATIVE NETWORKS
5
FIFTH FLOOR PLAN
SCALE: 1/16" = 1'-0"
MEP-07
19'-2"
62'-9"
2 5'-3"
B
20'-0"
2 3 4
1
C
20'-0"
3
4 D
10'-8"
E
20'-0"
F
20'-0"
G
10'-8"
H
20'-0"
I
20'-0" 9'-0"
J
150'-4"
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
UNIVERSITY OF YANGON
A
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
19'-2"
1
19'-2"
LIN INNOVATIVE NETWORKS
5
SIXTH FLOOR PLAN
SCALE: 1/16" = 1'-0"
MEP-08
LIN INNOVATIVE NETWORKS
A
B
C
D
E
F
G
H
I
J
150'-4" 20'-0"
10'-8"
3840'-0"
10'-8"
20'-0"
20'-0"
9'-0"
20'-0"
5'-3"
1 2
Air Terminal
Air Terminal
Copper Tape
E
E Air Terminal FIRE HOSEREEL PUMP (1 DUTY, 1 STANDBY)
19'-2"
FIRE HOSEREEL TANK EFF. CAP. : 1,000 Gal
3
OVERHEAD WATER TANK EFF. CAP. : 5,000 Gal
62'-9"
Copper Tape
Copper Tape
19'-2"
Copper Tape
P
P
PRESSURE PUMP (1 DUTY, 1 STANDBY)
PRESSURE SWITCH
19'-2"
4
5
Air Terminal
E
Air Terminal
E
3 2
4 1
UNIVERSITY OF YANGON
Copper Tape
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
E
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
20'-0"
E
ROOF FLOOR PLAN SCALE: 1/16" = 1'-0"
MEP-09
DB- (TYPICAL)
ELECICAL SINGLE LINE DIAGRAM L2
LINE INCOMING INDICATOR
P1
LOCATED AT ROOM
FROM MSB
ROOF FLOOR
P2 P3 P4 P5
40A 2P RCCB 30mA
32A 2P MCB 10KA TYPE C
R
2A E
2x1C 6 SQMM CU/PVC CABLE +1x1C 6 SQMM CU/PVC (E)
16A 1P MCB 6KA P6
CLIENT NAME: UNIVERSITY OF YANGON (ENGINEERING DEPARTMENT)
UNIVERSITY OF YANGON
L1
YOMA YEI THAR LOT-2 STAFF HOUSING (MEP)
10A 1P MCB 6KA
SPARE
POWER-O1_P-1
POWER-O1_P-1
POWER-O1_P-1
POWER-O1_P-1
POWER-O1_P-1
2X1C 2.5SQMM CU/PVC CABLE + 1X1C 2.5SQMM CU/PVC(E) CABLE IN CONDUIT
LIGHTING-02_L-2
LIGHTING-01_L-1
2X1C 1.5SQMM CU/PVC CABLE + 1X1C 1.5SQMM CU/PVC(E) CABLE IN CONDUIT
LIN INNOVATIVE NETWORKS
SIXTH FLOOR
FIFTH FLOOR
FOURTH FLOOR
THIRD FLOOR
SECOND FLOOR
FIRST FLOOR
GROUND FLOOR
KWh
MEP-10
PERSPECTIVE VIEWS
SOUTH-EAST FACADE VIEW
EAST FACADE VIEW
NORTH-EAST FACADE VIEW
SOUTH-WEST FACADE VIEW
GARDEN
LIVING + DINNING
KITCHEN
BATHROOM
MASTER BEDROOM
BEDROOM
MATERIAL PALETTE
MATERIAL PALETTE
EXTERIOR
WHITE PAINT
YELLOW PAINT
CONCRETE FLOOR
GALVANIZED STEEL
CONCRETE FLOOR/WALL
12”x12” TILE
MOSAIC TILE
INTERIOR
WHITE PAINT
SPC FLOORING
THANK YOU