ARCHITECTURE PORTFOLIO MOHAMED AHMED ABDELSALAM - BIM ARCHITECT AIN SHAMS UNIVERSITY - ARCHITECTURAL DEPARTMENT “2018” www.behance.net/abdelsalam3652
STUDIO FIVE CAIRO DUBAI HOUSTON
MOHAMED AHMED ABDELSALAM Work Experience
INFORMATION Mohamed Ahmed Mohamed Abdelsalam Nationality : Egyptian Driving License : Full
june 2017-july 2017
Trainee at ACE Consulting “Moharram-Bakhoum ” uptown cairo.
sep 2017-oct 2017
Articles writer and researsher “internship” Rabat, Morrocco.
2019
Freelancer(Revit modeling and detailed shopdrawings ).
jan 2020 - Mar 2021
Technical Office Engineer at East Delta Saudi Contracting.
Architectural engineer
Address : Nasr City , Cairo , Egypt Mobile No. : +201099337264
Projects :
E-mail : Abdelsalam1800@gmail.com
-Merit university , Sohag , Egypt. -EL-othaim head office at city stars , Cairo, Egypt. -Qnb branch at diyar qatari towers , Cairo , Egypt.
Behance Profile : www.behance.net/abdelsalam3652 Linkedin Profile : /mohamed abdelsalam
EDUCATION
Mar 2021 - Present
Bim Architect at Studio Five Projects : -Walk of cairo , Giza , Egypt. -R.A house , New cairo , Egypt. -R.S house , New cairo , Egypt. -Al- arabiya office building (vip lounge - landscape ) Jeddah, Saudi Arabia.
Bachelor’s degree from Faculty of engineering architectural design department Ain shams University “2013 - 2018” Grade Average : 73 % - Good
-M.k house at el- hadaba compound, 6 octobre, Giza , Egypt.
GRADUATION PROJECT
-Ignite gym “madinaty branch” , Cairo , Egypt. -Hia hub , Riyadh , Saudi Arabia .
In an attempt to develop el-bahariya oases we had to respect it’s history and keep in mind its resources So i Worked on human development aspects
-The london restobar , Giza , Egypt. -Camelot spa - Tonino lamborghini , Sharm El- Sheikh , Egypt.
Grade Average : 83 % - Very Good
Technical Skills
COURSES - Studying project management (PRMG) Diploma at AUC “PRMG 135 Cost Managment”
Revit
Dynamo
- Bim Development plan- Cube Consultant - Dynamo
Autocad
Indesign
3ds max
Adobe photoshop
Corona
Lumion
Enscape
Microsoft office
- Data Analysis Track - FWD
Extracurriculars - PR & ADVERTISING member in AIESEC AIN SHAMS - TEAM LEADER (OGV) attraction in AIESEC AIN SHAMS . - ARTICLES WRITER in AIESEC RABAT, MORROCO.
Soft Skills Communication
Task orientation
Presentation
Project management
Team work
Problem solving
Self - learning
Work under stress
a professional and innovative architect with more than 3 years experience in all architectural fields specialized in bim field , worked on many projects with various scopes “design, technical & site supervision” i provide best - fit solutions & bim service for many projects, assisting in defining scope and sizing of work ,also i have professional communication skills to interact with all levels of managments and clients.
R.A HOUSE
4 - 13
69- 80 14 - 27 28 - 38 39 - 45
THE LONDON RESTOBAR
IGNITE GYM
R.S HOUSE
M.K HOUSE
CAMELOT SPA - TONINO LAMBORGHINI
SELECTED BIM PROJECTS 46- 56 STUDIO FIVE
57 -68
AL- ARABIYA OFFICE BUILDING
CAIRO DUBAI HOUSTON
CAMELOT SPA - TONINO LAMORGHINI SHARM EL-SHEIKH , EGYPT
3
4
6
8
4.54
SEATING AREA
RECEPTION Area:AREA 120 SQM
A
0.60
STUDIO 1 Z03
4.30
2.85
B
7
2.87
A
5
3.97
2
0.50
1
STUDIO 1 Area: 24 SQM
REFRESHMENT AREA
3.50
1.00 12.20
0.60
STAIRS 05
6.05 2.00
STAIRS 02
SALON Area: 79.5 SQM
Z10
STAIRS 01
STAIRS 04
ROOM 01 Area: 20 SQM 4.80
2.79
ROOM 02 Area: 20 SQM 4.75
1.60
5.52
1.55
2.20
3.00
1.14
1.14
2.92
1.40
4.35
4.35
9.18 3.16
4.18
WOMEN'S Area: 80 SQM LOCKERS Mirror wall
2.89
3.62
0.8
MEN'S LOCKERS Area: 76 SQM
4.25
2.89
STAIRS 03
Area: 54 SQM 6.20
0.80
5.98
ICE FOUNTAIN
2.16 1.86
0.80
3.25
3.20
TOWEL DUMP
1.60
TOWEL DUMP
1.89
2.70
6.84
6.76
4.36
12.58
6.14
4.04
9.93
STEAM ROOM
SAUNA
STEAM ROOM
RELAXATION AREA
TOWEL DUMP
SHOWER & CHANGING ROOMS
electrical panel existing location
Z04
Refreshment Area 2.31
0.47
1.50
STAFF LOUNGE
TOWEL DUMP
0.40
TOWEL DUMP
0.40
ADDITIONAL ZONE IF NEEDED STORE
1.80
ROOM 05 Area: 42 SQM4.08
7.28
1.13
2.65
1.60
COLD VITALITY POOL
1.14 3.04
ROOM 07 Area: 24 SQM
2.82
3.53
1.60
1.80
0.60
H
6.03
3.21
7.43
Steam Mech.
1.30
ROOM 06 Area: 44 SQM
3.62
ROOM 08 Area: 20 SQM
COLD VITALITY POOL
BRUNCH AREA
7.30
3.47
3.47
STORAGE ROOM
G
0.50 1.09
3.36
Serving Counter 6.02
2.85
6.03
2.82
3.50
STORAGE
STAFF LOCKERS
3.21
4.41
Z09
Steam Mech.
5.12
7.50
F
4.40
3.47
0.60
SHOWER & CHANGING ROOMS
OPEN KITCHENETTE
TOWEL DUMP
Mech.
4.01
Z05
Mech.
server existing location
0.40
F
3.61
SAUNA
3.24
RASUL
1.53
5.74
STORAGE & KITCHEN AREA
4.25
ROOM 04 Area: 56 SQM
0.94
Z06
5.80
E
2.00
Mirror wall OPEN SHOWER
2.70
D
ROOM 03 Area: 50 SQM
5.85
12.68
2.00
1.74 1.9
Mirror wall
PLANT ROOM
STOR.
G
C
3.76
Z08
ATM
0.60
STUDIO 3 STUDIO 3 Z03 Area: 24 SQM
0.50
STOR.
E
1.59
4.30
12.20
JUICE BAR
2.98
2.50
D
1.16
1.88
OFFICE Z-01
3.23
Z07
0.50
MANICURE & PEDICURE ROOM Area: 74 SQM
OFFICE Area: 10 SQM
6.76
OPEN SHOWER
Area: 25 SQM
display STOR.
SEATING AREA
TOWEL DUMP
STUDIO 2 Z03 2 STUDIO 5.89
YOGA & CLASSES ROOM
B
2.92
Area: 46 SQM
GYM Area: 143 SQM
11.87
3.98
TOWEL DUMP
Z03
GYM Z03
Refreshment1.33 Area
5.24
STOR.
Water feature
2.15
Plunge Area
4.41
RECEPTION Z01
VITALITY POOL
6.63
Z02 3.23
C
Z01
12.20
7.92
11.76
RETAIL AREA
H
MEN'S TOILETS
WOMEN'S TOILETS
1
2
3 4
1
5
6
7
8
GROUND FLOOR F.F.L Copy 1 1 : 200
BIM ARCHITECT PORTFOLIO
5
6
INTERIOR WALL
0.260.09
1.20
W-01
0.130.26
W-01
1.36
4
EG22001-DD-AR-Z04-7-01
EG22001-DD-AR-Z04-7-00
2
W-01
2.89
3
FLOOR TYPE
3
E
E
W-01
3.06 0.47
0.50
TH-01
DESCRIPTION
C-01 C-02
GYPSUM BOARD - CONCREATE EFFECT PAIN AS APPROVED SAMPLE WOODEN RIBS CEILING
Z04-ROOM 02 - FURNITURE LAYOUT 1 : 50
2
THRESHOLD TYPE TH-01
Z04-ROOM 02 -DETAILED LAYOUT 1 : 50
3
DESCRIPTION TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE
TYPE
DESCRIPTION
C-01 C-02
GYPSUM BOARD - CONCREATE EFFECT PAIN AS APPROVED SAMPLE WOODEN RIBS CEILING
START POINT SYMBOLS
DESIGN DEVELOPMENT
7
E
SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS
4
5.31
FIXED WOODEN CABINET:REFER TO THE RELEVANT DETAILS
2.12
8
1.13
3
MARCH 2022
0.55
E No.
Description
0
3
2.66 1.98
1.70
0.65 0.33
0.65
0.80
W-02
2.70
2 5.97
EG22001-DD-AR-Z04-7-07 EG22001-DD-AR-Z04-7-06
0.10
ROOM 04 Z04
DESIGN DEVELOPMENT
3 1.51
EG22001-DD-AR-Z04-125
W-03
4.01
W-01 1.61
MARCH 2022
W-03 0.32
1.80
5.44
FIXED WOODEN CABINET:REFER TO THE RELEVANT DETAILS
03-03-2022
0.90
1.13 W-03
F
Revisions
No.
Description
0
Date
TENDER DETAILS
03-03-2022
8
SHARM EL SHEIKH
SHARM EL SHEIKH
CAMELOT SPA
CAMELOT SPA
Z04 - DETAILED PLAN
Z04 - DETAILED PLAN
Date Drawn by
EG22001
Project number
1-3-2022
Date
M.ABDELSALAM
Checked by
BIM ARCHITECT PORTFOLIO
4
3.02
W-01
W-03
GL-01
GL-01
Date
TENDER DETAILS
0.36
0.10
GL-01
W-01
W-02
3 EG22001-DD-AR-Z04-12-00
W-01
0.26
F
Revisions
EG22001-DD-AR-Z04-12-00
1.45
W-03
DESCRIPTION SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS
1 1.03
0.26 0.90
D-04
1.16
0.93 0.32
Project number
Z04-ROOM 03 - DETAILED PLAN 1 : 50
W-01
GL-01 W-01
1.59
DESIGN DEVELOPMENT
W-02
0.90
W-02
W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08
1.09
1.80
GL-01 1.94
0.26
0.65
W-01
W-01
1.48
W-04
E
2.70
W-03
0.80
0.80 4.17
1.94
1.06
0.31
0.80 1.24
0.20
0.50
0.98
0.95
E
0.80
0.37
0.82
W-02
W-04
W-01
GL-01
0.94
0.10
0.26
0.86
W-03 W-01
0.58
1.59
0.60
3
1.86
4
W-01
5.58 0.78
EG22001-DD-AR-Z04-125
EG22001-DD-AR-Z04-001-02
Wall Type
FIXED WOODEN SEAT:REFER TO THE RELEVANT DETAILS
EG22001-DD-AR-Z04-001-02
2.70
GL-01
GL-01
INTERIOR WALL
8
DESCRIPTION
W-01
ROOM 03 Z04
0.86
0.47
CAIRO.DUBAI.HOUSTON
0.60
2
A2
STUDIOFIVE
1.28
1.89
3
0.03
0.41
EG22001-DD-AR-Z04-7-05 EG22001-DD-AR-Z04-7-04
As indicated
Scale
CAIRO.DUBAI.HOUSTON
5.64
4
M.WALY
EG22001-DD-AR-Z04-0-01
STUDIOFIVE
1
0.62
GL-01
Z04-ROOM 02 - REFLECTED CEILING PLAN 1 : 50
4
1.29
0.73 0.03 0.80
1.76
W-01
0.62
1-3-2022 M.ABDELSALAM
Sheet Size
W-02
EG22001-DD-AR-Z04-12-00
3.74
0.90 0.90
Z04-ROOM 02 - FLOORING LAYOUT 1 : 50
1
0.69
W-03
EG22001
Date Checked by
0.30
W-02
Project number
7
0.50
W-03 4.50 7.20
Z04 - ROOM 02
Drawn by
0.69
W-02
3.11
A2
Wall Type W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08
1.45
1.70
0.50
0.45 1.20
1.20
0.73
3 0.43
0.93
0.90
D-04
0.70
W-03
W-03
0.72
0.78
7
As indicated
Scale
D
2.70
W-04
SP 0.90
CAMELOT SPA
E
INTERIOR WALL
FIXED WOODEN SEAT:REFER TO THE RELEVANT DETAILS
W-02
2.35
E
M.WALY
EG22001-DD-AR-Z04-0-00
8
W-03
2.40
Date 03-03-2022
SHARM EL SHEIKH
+4.00
E
Description TENDER DETAILS
1.31
S.C.L C-01
4.75
0.90
No. 0
0.26
ROOM 02 Z04
1-3-2022 M.ABDELSALAM
Sheet Size
0.90
CEILING PROFILE
0.55
1.42
EG22001
Date Checked by
1.32
0.90
0.90
E
0.72
Project number Drawn by
D
0.90
0.26
+0.00 F.F.L.
Z04 - ROOM 01
Z04-ROOM 01 -REFLECTED CEILING PLAN 1 : 50
ROOM 02 Z04
1.36
0.90
0.47
0.47
0.40
0.90
0.82 3.06
TRAVERTINE MARBLE FLOORING
F-01
CAMELOT SPA
6
4
0.78
0.90
E 0.80
Z04-ROOM 01 - FLOORING PLAN 1 : 50
0.90
SHARM EL SHEIKH
E
0.68
0.90
0.90
0.60
0.40
0.90
0.90
E
0.78
0.47
03-03-2022
3.74
ROOM 01 Z04
S.C.L C-01
0.89
1.20
0.86
0.12
TENDER DETAILS
Revisions
TH-01
0.78
3.74
0
1.36
Date
0.78
Description
0.90
0.26
No.
MARCH 2022
7
0.40
1.42
3.74
0.60 0.90
0.90
0.90 0.90
1.51
0.40
THRESHOLD FINISH
E
0.72
W-02
7
0.85 0.26
6
1
3.11
7
0.90
0.90
0.90
1.39
SP
3
W-01
4.56 0.78
TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE
CEILING SCHEDULE
+4.00
0.90
ROOM 02 Z04
CAIRO.DUBAI.HOUSTON
DESCRIPTION
F-01 F-02 F-03 F-04
CEILING SCHEDULE TYPE
MARCH 2022
0.85
0.78
0.78
0.12 0.78 0.90
0.90
+0.00 F.F.L.
0.90
2
3
W-01
E
FIXED WOODEN SEAT:REFER TO THE RELEVANT DETAILS
TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE
Revisions
F-01
0.73
E
DESCRIPTION
CEILING PROFILE 0.90
1.56
EG22001-DD-AR-Z04-7-03 EG22001-DD-AR-Z04-7-02
EG22001-DD-AR-Z04-12-00
E
1.20
ROOM 01 Z04
0.87
4
3
6
4.83
E
FLOOR TYPE
W-01
W-01
ROOM 02 Z04
STUDIOFIVE
FLOOR FINISH
W-01 W-01 1.31
0.26
1-
TH-01
0.90
W-01 1.42
0.26
DESCRIPTION SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS
DESIGN DEVELOPMENT
6
0.90
W-01
W-01
4.61
START POINT SYMBOLS
0.63
W-01 1.36
THRESHOLD FINISH THRESHOLD TYPE
Z04-ROOM 01 - DETAILED PLAN 1 : 50
2
4 EG22001-DD-AR-Z04-001-02
CAIRO.DUBAI.HOUSTON
TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE
0.82
6
Z04-ROOM 01 - FURNITURE LAYOUT 1 : 50
STUDIOFIVE
DESCRIPTION
F-01 F-02 F-03 F-04
0.82
W-02
6
1
E
4.69 0.80
FIXED WOODEN SEAT:REFER TO THE RELEVANT DETAILS
0.47
E
ROOM 01 Z04
EG22001-DD-AR-Z04-12-00
W-01
SINK UNIT:REFER TO THE RELEVANT DETAILS
FLOOR FINISH
2.89
W-01
ROOM 01 Z04
4.14
1
W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08
7
0.86
W-01
W-01
1.39
7
SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS
4.21 2.88
W-01
0.85
0.85
4 EG22001-DD-AR-Z04-001-02
W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08
Wall Type
0.47
D-04 W-01
INTERIOR WALL
DESCRIPTION
0.86
Wall Type
2.88
SINK UNIT:REFER TO THE RELEVANT DETAILS
0.47
6
M.WALY
Sheet Size
M.ABDELSALAM M.WALY
Checked by
EG22001-DD-AR-Z04-3-01 Scale
EG22001 1-3-2022
Drawn by
EG22001-DD-AR-Z04-3-02 1 : 50 A2
1
Z04-ROOM 04- DETAILED PLAN 1 : 50
1 : 50
Scale Sheet Size
A2
6
Z04 - ROOM 01 - INTERNAL ELEVATION 1 : 50
2
0.47
0.78
0.60
SP
GROUND FLOOR F.F.L
+0.00 F.F.L
+0.00 F.F.L
0.90
0.75
STUDIOFIVE
1.20
0.86
CAIRO.DUBAI.HOUSTON
ROOM 02 Z04
1.20
1.20
4.00
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
+0.00 F.F.L.
SP
GROUND FLOOR F.F.L
1
+0.00 F.F.L.
EG22001-DD-AR-Z04-12-00
SP
Z04 - ROOM 02 - INTERNAL ELELVATION 1 : 50
3
Z04 - ROOM 01 - INTERNAL ELEVATION 1 : 50
0.90
1.20
1 EG22001-DD-AR-Z04-12-00
0.33
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
2.95
ROOM 02 Z04
+4.80 F.F.L
0.71 0.42 0.65
1.20
0.90
1.20
4.00 1.20
SP
0.90
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
0.45
GROUND FLOOR F.F.L
+0.00 F.F.L.
0.66
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
ROOM 01 Z04
1.20
2.40
SP
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
0.250.10 0.35 0.20 0.20
+0.00 F.F.L.
0.72
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
CAIRO.DUBAI.HOUSTON
1.20
D-04
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
0.05
0.71 0.05
2.95
1.20
1.20 1.20
EG22001-DD-AR-Z04-001-02
BOTTOM OF SLAB
0.60
1.60
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
1.85
4.00
TRAVERTINE MARBLE SINK AS PER 1 APPROVE SAMPLE
BOTTOM OF SLAB
4.00
0.05
0.50
STUDIOFIVE
1.06
ROOM 01 Z04
CLEAR MIRROR
1
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
0.50
0.05
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
+0.00 F.F.L
+4.80 F.F.L
0.71
BOTTOM OF SLAB 0.71
BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
+4.80 F.F.L
0.35 0.10
+4.80 F.F.L
E
7
E
0.50
6
4
GROUND FLOOR F.F.L
+0.00 F.F.L
Z04 - ROOM 02 - INTERNAL ELELVATION 1 : 50
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
MARCH 2022
Revisions
No.
Revisions
Description
0
Date
TENDER DETAILS
No.
03-03-2022
SHARM EL SHEIKH CAMELOT SPA
Z04 - INTERNAL ELEVATIONS
Z04 - INTERNAL ELEVATIONS
Drawn by
EG22001
Project number
1-3-2022
Date
M.ABDELSALAM
ROOM 02 - 3D 01 Copy 1
1
1 : 50
Sheet Size
0.65
STUDIOFIVE
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
CAIRO.DUBAI.HOUSTON
WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE
EG22001-DD-AR-Z04-12-00
3
+4.80 F.F.L
0.71
GROUND FLOOR F.F.L
SP
2
4
0.58
SHARM EL SHEIKH
1.20
0.58 +0.00 F.F.L.
CAMELOT SPA
2 EG22001-DD-AR-Z04-125
SP
Z04 - INTERNAL ELEVATIONS
+0.00 F.F.L.
EG22001
Project number
Date
1-3-2022
Date
Z04-ROOM 03 - 3D
M.ABDELSALAM M.WALY
EG22001-DD-AR-Z04-7-04 Scale Sheet Size
BIM ARCHITECT PORTFOLIO
ROOM 04 Z04
Project number
Checked by
1 : 50 A2
Date 03-03-2022
2.80 1.20
EG22001-DD-AR-Z04-125
Drawn by
Z04 - ROOM 03 -INTERNAL ELEVATION 1 : 50
WALNUT VENEER WOODEN SEATING +0.00 F.F.L GROUND FLOOR F.F.L
Z04 - INTERNAL ELEVATIONS
2 +0.00 F.F.L.
TENDER DETAILS
0.90
WALNUT VENEER WOOD CLADDING AS 1 PER APPROVE SAMPLE
0.35 0.10
+0.00 F.F.L.
1.20
0.60
1
EG22001-DD-AR-Z04-12-00
0.35 0.10
+0.00 F.F.L
Description
0 0.90
0.50
4.00
1.20
4.00
CAMELOT SPA
EG22001-DD-AR-Z04-12-00
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
0.50
0.05
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
SHARM EL SHEIKH ROOM 03 Z04
0.71
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
0.90
2.95
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
No. 0.90 1.20
0.90
DESIGN DEVELOPMENT
Revisions
0.05
0.71 0.90
03-03-2022
1.20
1.70
TENDER DETAILS
Z04 - ROOM 04 - 3D
BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
4.00
WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE
0
Date
3
F
2.98
0.05
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
Description
0.05
0.71
No.
+0.00 F.F.L.
MARCH 2022
Revisions
BOTTOM OF SLAB
0.50
+4.80 F.F.L
SP
E
MARCH 2022
E
+0.00 F.F.L.
Z04 - ROOM 04 - INTERNAL ELEVATION 1 : 50
1
Z04-ROOM 03 - 3D
DESIGN DEVELOPMENT
D
CAIRO.DUBAI.HOUSTON
0.35 0.10
1.20 1.20
0.60 0.35 0.10
ROOM 04 Z04
WALNUT VENEER WOODEN SEATING 4 +0.00 F.F.L GROUND FLOOR F.F.L
+0.00 F.F.L.
Z04 - ROOM 03 -INTERNAL ELEVATION 1 : 50
1
STUDIOFIVE
0.75
1.20
2.95 4.00
GROUND FLOOR F.F.L
SP
0.90
LED PROFILE AS PER APPROVED SAMPLE
4
SP
0.90
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
ROOM 03 Z04
WALNUT VENEER WOODEN SEATING
0.90
1.20
0.75
4.00
0.90
0.70
0.90
0.50
0.90
2.98
0.50 0.90
1.20
0.90
EG22001-DD-AR-Z04-12-00
+0.00 F.F.L.
A2
4.00
0.71 0.05 0.90
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
+0.00 F.F.L
1 : 50
Scale
BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
LED PROFILE AS PER APPROVED SAMPLE WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE
ROOM 02 - 3D 02 Copy 1
Sheet Size
+4.80 F.F.L
0.40
2
8
BOTTOM OF SLAB
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
M.WALY
EG22001-DD-AR-Z04-7-03
A2
8
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
1-3-2022 M.ABDELSALAM
Checked by
EG22001-DD-AR-Z04-7-00 Scale
EG22001
Drawn by
M.WALY
Checked by
+4.80 F.F.L
03-03-2022
CAMELOT SPA
Date
02 Z04 - ROOM 01 -3D
Date
TENDER DETAILS
SHARM EL SHEIKH
Project number
01 Z04 - ROOM 01 -3D
Description
0
2
Z04 - ROOM 04 - INTERNAL ELEVATION 1 : 50
4
Z04 - ROOM 04 - 3D
EG22001 1-3-2022
Drawn by
M.ABDELSALAM M.WALY
Checked by EG22001-DD-AR-Z04-7-06
1 : 50
Scale Sheet Size
A2
7
0.30
1.92 0.90
0.90
0.08
7
W-04
E
6
STUDIOFIVE
E
7
STUDIOFIVE
0.90
6
0.90
4.14
4.14
0.90
0.90
0.08
CAIRO.DUBAI.HOUSTON
CAIRO.DUBAI.HOUSTON
0.90
0.68
0.90
FLOOR FINISH
0.86
0.90
0.90 0.230.11
SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS
FLOOR TYPE
0.18
0.90
0.59
F-03
0.56
0.90
GRAVEL AREA
DESCRIPTION
F-01 F-02 F-03 F-04
TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE
THRESHOLD FINISH THRESHOLD TYPE
0.90
0.90
1.33
0.90
0.90
1.71
1.35
WOODEN LOCKERS
0.90
0.90
W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08
W-04
0.90
DESCRIPTION
0.90
W-04
3.89
0.08
0.18
Wall Type
2.77
W-08
0.90
1.35
INTERIOR WALL
9.63
W-04
WOODEN LOCKERS
0.90
3.33
0.78
0.90
EG22001-DD-AR-Z04-12-00
1.53
0.82
0.50
0.50
3
DESCRIPTION
TH-01 0.90
0.88
0.23
0.69
TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE
0.90
START POINT SYMBOLS 0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90 0.90
D-04
1.16
1.20
1.35
W-08
0.90
0.90
0.90
0.90
0.90
0.90
0.90
F
RELAXATION AREA Z04
3
MARCH 2022
0.90
0.90
+0.00 F.F.L.
0
Date
TENDER DETAILS
0.18
03-03-2022
0.90
0.90
0.90
0.90
0.90
Revisions
0.90
0.90 0.90
0.90
0.90
0.90
0.90
No.
0.90
TRAVERTINE BAR:REFER TO THE RELEVANT DETAILS 0.90
0.90
SHARM EL SHEIKH
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
1.80
0.90
Z04-FLOORING PLAN
0.90
0.90
0.90
0.90
Date
0.90
Project number
1-3-2022 M.ABDELSALAM
1 : 50 A2
0.90
1
Z04 - RELAXATION AREA - FLOORING PLAN 1 : 50
0.90
0.90
0.90
0.90
0.11 0.34
0.45
0.90
1-3-2022
6
M.ABDELSALAM M.WALY
Checked by
0.78
0.90
0.32
0.34 0.15
0.32
H
Sheet Size
0.41
0.78
M.WALY
EG22001-DD-AR-Z04-3-05 Scale
EG22001
Drawn by 0.93
0.78
1.35
0.90
0.90
0.90
0.90
0.90
0.90
0.90 0.90
0.90
G
EG22001
Checked by
7
H
EG22001-DD-AR-Z04-4-05 As indicated
Scale
7
Sheet Size
A2
CEILING PROFILE
STUDIOFIVE
3.74
7
3.74
6
0.90
Date
H
6
0.90
0.32
D-06
1.35
0.90
4.19
Z04-RELAXATION AREA - DETAILED PLAN 1 : 50
0.34
0.90
Project number Drawn by
W-04 1.86
0.90
4.19
1
W-04
0.18
D-04
0.32
0.30
H
9.01 2.00
0.90
0.78
1.20
3.35 1.70
W-04
03-03-2022
CAMELOT SPA G
Z04-DETAILED PLAN
W-04
1.80
0.90
0.90
G
W-04
0.34
0.90
CAMELOT SPA
1.32
W-08
SP 0.90
0.90
0.90
1.60
SHARM EL SHEIKH W-08
G
W-04
Date
TENDER DETAILS
TRAVERTINE MARBLE FLOORING
6.30
1.32
Description
0
0.90
Description
0.90
1.30
No.
0.90
Revisions
EG22001-DD-AR-Z04-12-01
0.90
13.53
13.53
0.62
RELAXATION AREA Z04
1
DESIGN DEVELOPMENT
F-01
MARCH 2022
0.90
EG22001-DD-AR-Z04-7-17 EG22001-DD-AR-Z04-7-17
0.90
2
0.90
EG22001-DD-AR-Z04-7-16 EG22001-DD-AR-Z04-7-18
1.20
1.14
1 4
0.90
F 0.90
F DESIGN DEVELOPMENT
0.90
1.33
1.35
F
0.17
5.81
0.55
6
STUDIOFIVE
7
CAIRO.DUBAI.HOUSTON
CAIRO.DUBAI.HOUSTON 0.82
3.11
0.50 1.94
2.77
CEILING SCHEDULE 0.60
1.18
0.78
1.29
0.13
1.53
0.67 1.81
1.31
2.74
0.47
0.47
0.78
0.47
0.47
3.06
TYPE
DESCRIPTION
C-01 C-02
GYPSUM BOARD - CONCREATE EFFECT PAIN AS APPROVED SAMPLE WOODEN RIBS CEILING
0.60 0.76
3.42
1.59
1.16 0.17
2.00
1.20
2.73
1.16
F
0.13
4.02
F
3.89
0 0.5
2.00
0. 50
F
1.33
F
RELAXATION AREA Z04
0.58 5.68
0.15
2.01
DESIGN DEVELOPMENT MARCH 2022
1.20
MARCH 2022
2.00
1.44
0.17
2.34
DESIGN DEVELOPMENT
Revisions
G
03-03-2022
0.17
Revisions
No.
+4.00
Description
0
1.13
TENDER DETAILS
RELAXATION AREA Z04
1.92
0
Date
Date
TENDER DETAILS
03-03-2022
S.C.L
1.60
G
1.05
Description
1.92
No.
CEILING PROFILE 0.55
SHARM EL SHEIKH
1.46
SHARM EL SHEIKH
G
CAMELOT SPA G
0.18
Z04-FURNITURE LAYOUT
1.92
H
1.13
CAMELOT SPA H
Z04-CEILING PLAN
0.55
EG22001
Date
1-3-2022
Z04-RELAXATION AREA- FURNITURE LAYOUT 1 : 50
BIM ARCHITECT PORTFOLIO
Sheet Size
1
Z04- RELAXATION AREA - CEILING PLAN 1 : 50
0.34
5.66
0.34
1.35
H 6
7
M.ABDELSALAM M.WALY
Checked by
1.05
1.32
A2
1-3-2022
Drawn by
M.WALY
1 : 50
EG22001
Date
EG22001-DD-AR-Z04-1-04 Scale
Project number
M.ABDELSALAM
Checked by
1
9.01
1.05
Drawn by
1.05
1.20
Project number
0.30
7
1.70
6
H
EG22001-DD-AR-Z04-5-05 1 : 50
Scale Sheet Size
A2
8
E
G
H
6 +4.80 F.F.L
STUDIOFIVE CAIRO.DUBAI.HOUSTON
1.90
WALNUT VENEER WOODEN RIBS AS PER APPROVE SAMPLE
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
GROUND FLOOR F.F.L
2
4.00
2.10
RELAXATION AREA Z04 +0.00 F.F.L.
+0.00 F.F.L
2.40
+0.00 F.F.L
CAIRO.DUBAI.HOUSTON
WALNUT VENEER WOODEN RIBS AS PER APPROVE SAMPLE
4.00
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
STUDIOFIVE
CONCRETE EFFECT WALL FINISH AS PER APPROVED SAMPLE
1.60
CONCRETE EFFECT WALL FINISH AS PER APPROVED SAMPLE
BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
0.05
0.05
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
7
0.71
BOTTOM OF SLAB 0.71
+4.80 F.F.L
F
+0.00 F.F.L.
GROUND FLOOR F.F.L
Z04 - RELAXATION AREA - INTERNAL ELEVATION 1 : 50
1
Z04 - RELAXATION AREA - INTERNAL ELEVATION 1 : 50
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
MARCH 2022
7
6
Revisions
Revisions
Description
0
Date
TENDER DETAILS
03-03-2022
+4.80 F.F.L
No.
BOTTOM OF SLAB
CONCRETE EFFECT WALL FINISH AS PER APPROVED SAMPLE
CAMELOT SPA
CAMELOT SPA 4.00
WALNUT VENEER WOODEN RIBS AS PER APPROVE SAMPLE
Z04-INTERNAL ELEVATIONS
Project number
EG22001
Date
1-3-2022 M.ABDELSALAM
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
+0.00 F.F.L
Project number
+0.00 F.F.L.
GROUND FLOOR F.F.L
1-3-2022
Drawn by
Z04 - RELAXATION AREA - 3D
H +4.80 F.F.L
1 : 50
Sheet Size
F
M.WALY
EG22001-DD-AR-Z04-7-17
Scale
G
M.ABDELSALAM
Checked by
EG22001-DD-AR-Z04-7-16
1
EG22001
Date
M.WALY
Checked by
03-03-2022
SHARM EL SHEIKH
Z04-INTERNAL ELEVATIONS
Drawn by
Date
TENDER DETAILS
0.05
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
SHARM EL SHEIKH
Description
0 0.71
No.
3
A2
Z04 - RELAXATION AREA - INTERNAL ELEVATION 1 : 50
1 : 50
Scale Sheet Size
A2
E
BOTTOM OF SLAB
1.90
CAIRO.DUBAI.HOUSTON
EG22001-DD-AR-Z04-12-02
7-
CLEAR MIRROR Z04-03 -
RELAXATION AREA Z04
0.20
2.10
TRAVERTINE MARBLE CALDDING AS PER APPROVED SAMPLE
E
0.10
0.35
STEEL STRUCTURE
E
0.90
TRAVERTINE MARBLE FLOORING AS +0.00 PER APPROVE SAMPLE F.F.L. +0.00 F.F.L GROUND FLOOR F.F.L
+0.00 F.F.L
2
0.25
TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
0.20
WOODEN FRAME AS PER APPROVED SAMPLE
4.00
WALNUT VENEER WOODEN UNITS AS PER APPROVE SAMPLE
STUDIOFIVE
1.85
1
CAIRO.DUBAI.HOUSTON
3.10
WALNUT VENEER WOODEN RIBS AS PER APPROVE SAMPLE
2.95
0.71 0.05
STUDIOFIVE
CONCRETE EFFECT WALL FINISH AS PER APPROVED SAMPLE
VARIABLE
0.71 0.05
0.45
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
GROUND FLOOR F.F.L
EG22001-DD-AR-Z04-12-02
4
Z04 - RELAXATION AREA - INTERNAL ELEVATION 1 : 50
4
Z04-ROOM 03 - DETAILED PLAN - Callout 1 1 : 25
1
Z04- TRAVERTINE SINK UNIT - SECTION 1 : 25
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
MARCH 2022
Revisions
Revisions
Description TENDER DETAILS
No.
03-03-2022
CAMELOT SPA
CAMELOT SPA
WOODEN FRAME AS PER APPROVED SAMPLE
Z04-INTERNAL ELEVATIONS
Date
1-3-2022
TRAVERTINE MARBLE CALDDING AS PER APPROVED SAMPLE
DETAILS VARIABLE
Project number
M.ABDELSALAM
+0.00 F.F.L
M.WALY
GROUND FLOOR F.F.L
Z04 - RELAXATION AREA -3D
BIM ARCHITECT PORTFOLIO
Scale Sheet Size
1-3-2022
Drawn by
M.ABDELSALAM M.WALY
Checked by
EG22001-DD-AR-Z04-7-18
2
EG22001
Date 0.70
EG22001
Date 03-03-2022
SHARM EL SHEIKH
CLEAR MIRROR
Project number
Checked by
TENDER DETAILS
1.85
SHARM EL SHEIKH
Drawn by
Description
0
0.20
0
Date
0.20
No.
EG22001-DD-AR-Z04-12-02 1 : 50 A2
3
TRAVERTINE MARBLE SINK UNIT
2
Z04 - TRAVERTINE SINK UNIT - ELEVATION 1 : 25
1 : 25
Scale Sheet Size
A2
9
4
5
4
5
STUDIOFIVE
STUDIOFIVE CAIRO.DUBAI.HOUSTON
0.77
0.77
3.59
0.30 0.70
6
D-01
W-01
D-01
SAUNA Z05
DESIGN DEVELOPMENT
0.30
Z05-0002
0.34
7
0.70
D-01
STEAM ROOM Z05
1.31
0.78
0.70
0.76
0.76
STEAM ROOM Z05
1.57
5 8
1.73
D-01
0.76
0.32
0.32
W-01
0.70
D-01
1.73
D-01
D-01
W-01
1.57
W-01 0.70
0.76
W-01
0.34
0.71
1.48 0.03
D-01
DESCRIPTION SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS
MARCH 2022
M.WALY
TH-01
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
F
Description
0
1.92 1.48 S-01 S-01
S-01
S-01
Date
TENDER DETAILS
03-03-2022
F
0.56
STEAM ROOM Z05
No. F-02
F-02
F
Description
0
TENDER DETAILS
Date 03-03-2022
S-01
S-01
S-01
F-03
0.90
0.90 0.90
0.90
F-03
WOMEN'S SHOWER CHANGING ROOMS Z05
0.90
SHARM EL SHEIKH CAMELOT SPA
S-01
S-01
S-01
S-01
F-01
T
Z05-FLOORING PLAN
F-02
S-01
S-01
F-02
CAMELOT SPA
0.11
T
Z05 - LIGHTING REFLECTED CEILING PLAN
Project number
EG22001
Project number
Date
1-3-2022
Date
Drawn by
4
M.ABDELSALAM M.WALY
Checked by
5
Sheet Size
EG22001 1-3-2022
Drawn by
M.ABDELSALAM M.WALY
Checked by
EG22001-DD-AR-Z05-4-01 Scale
BIM ARCHITECT PORTFOLIO
Revisions
F-01
S-01
5
MARCH 2022
SAUNA Z05
F-03
MEN'S SHOWER CHANGING ROOMS Z05
SHARM EL SHEIKH
0.90
0.90
0.90
0.90
0.90
4
DESIGN DEVELOPMENT S-01
S-01
S-01
STEAM ROOM Z05
F-03
F-01
No.
TOILET Z05
F-02
SAUNA Z05
SP SP
Z05 - BATHROOMS AREA - FLOORING PLAN 1 : 50
2.61 0.54 S-01 F-03
F-01
1
2.02
0.91 0.99 S-01
S-01
TOILET Z05
F-02
MARCH 2022
0.90
TOILET Z05
TOILET Z05
0.80
0.90
TOILET Z05
F-03
SAUNA Z05
0.53
S-01
S-01
0.86 +0.00 F.F.L.
TOILET Z05
S-01
0.53
E
LT -01
DESIGN DEVELOPMENT
0.90
0.90 0.90
S-01
MEN'S BATHROOM Z05
0.90
0.90
0.90 0.90
0.90 0.90
S-01
S-01
START POINT SYMBOLS
F-01
0.90 0.90
0.90
WOMEN'S SHOWER CHANGING ROOMS Z05 +0.00 F.F.L.
S-01
S-01
S-01
0.90 0.90
0.90
0.90
F-01
0.60
3.36
0.15
TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE
F-01
0.90
0.90
0.80
0.80
0.90
S-01
S-01
SYMBOL
S-01 S-02 F-01 F-02 F-03 F-04 L-01 T
S-01
0.90
0.63
0.90
0.80 0.90
MEN'S SHOWER CHANGING ROOMS Z05 +0.00 F.F.L.
S-01
S-01
0.90
0.50
0.90
F
0.90
S-01
S-01 S-01
E
CODE
WOMEN'S BATHROOM Z05
DESCRIPTION
Revisions 0.60
S-01
S-01
0.90
S-01
S-01
0.90 0.86
F-01 SP
0.78
S-01
S-01
0.94
STEAM ROOM Z05
F-01
S-01
S-01
STEAM ROOM Z05
0.79
0.90
0.61
0.06 +0.00 F.F.L.
STUDIOFIVE CEILING LIGHTING
MEN'S BATHROOM Z05
S-01
0.90
+0.00 F.F.L.
S-01
S-01
0.90
WOMEN'S BATHROOM Z05
S-01
S-01
SP
S-01
S-01
+0.00 F.F.L.
0.83
0.86
S-01
S-01
F-01
0.86
A2
5
S-01
0.83
0.53
0.90
F-01
+0.00 F.F.L.
0.90
0.90
+0.00 F.F.L.
F-01
0.11
0.90
F-01
0.67
THRESHOLD FINISH THRESHOLD TYPE
0.17
0.90
E
1 : 50
CAIRO.DUBAI.HOUSTON
TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE
0.90
+0.00 F.F.L.
0.90
0.83
0.90
0.90
0.79 SP
0.90
0.61
0.61
0.83
0.83
0.90
0.90
0.84
0.66
M.WALY
Checked by
Sheet Size
DESCRIPTION
F-01 F-02 F-03 F-04
M.ABDELSALAM
Scale
S-01
0.90
0.90
0.90
1-3-2022
Drawn by
5
Z05 - BATHROOMS AREA - DETAILED PLAN 1 : 50
S-01
0.67
0.32 0.60
0.90
SAUNA Z05
1
S-01
0.14
0.90
0.90
A2
0.66 0.90
0.90
0.90
EG22001
EG22001-DD-AR-Z05-3-01 1 : 50
FLOOR TYPE
0.72
0.90
0.94
0.90
0.90
0.90
0.90
0.90
0.85
0.90
0.90
0.90
SP
F-01 0.60
1.22
CAIRO.DUBAI.HOUSTON
0.72
0.90
0.90
0.17
0.69
0.90
+0.00 F.F.L.
4
S-01
0.93
0.90
0.86
0.90
0.90
0.09
0.90
0.90
0.90
0.90
MEN'S BATHROOM Z05
1.48
1.48
M.ABDELSALAM
STUDIOFIVE
0.64
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.83
0.60
0.90
Z05-DETAILED PLAN
W-01
4.14
Date
FLOOR FINISH
1.42
0.90
0.11 0.93
0.67
0.90
F-01
0.60
0.90
0.83
2.37
0.90
0.90
0.90
0.58
0.90
1.82
Project number
0.70
0.60 0.84 0.90
0.57
0.20
0.60
CAMELOT SPA
3 1
W-01
1.60
4
0.90
0.90
0.90
0.90
0.90
0.38
0.58 0.90
0.90
0.90
0.42
0.52
0.90
0.90 0.60
0.90
0.90
0.90
0.90
E
SHARM EL SHEIKH
0.45
W-01
2-
1-3-2022
Scale
0.90
0.90
+0.00 F.F.L.
0.60
0.90
0.58
0.42
0.93
0.90
0.90
EG22001-DD-AR-Z05-7-00 EG22001-DD-AR-Z05-7-01 Z05-0002 -
W-01
GL-01
EG22001
5
0.52
0.46
0.90
0.90
4 2
W-01 2.13
WOMEN'S SHOWER CHANGING ROOMS Z05
1-
Date
Sheet Size
F-01
0.90
F
0.15
5
4
0.58
W-01 0.150.25
Date 03-03-2022
1.83
1.29
EG22001-DD-AR-Z05-1-01
Z05 - BATHROOMS AREA - FURNITURE PLAN 4 1 : 50
0.90
3 2 0.72
W-01
Checked by
0.38
1.60
Project number Drawn by
0.40
GL-01 3.36
EG22001-DD-AR-Z05-7-03 EG22001-DD-AR-Z05-7-04 Z05-0003
1.72
0.90
GL-01
1.82
Description TENDER DETAILS
1.44
0.89
3.36
CAMELOT SPA
5 2
4 1
0.58
W-01
GL-01
2 1
0.99
GL-01
Z05-FURNITURE PLAN
1
W-01
1.88
2.20
GL-01
SHARM EL SHEIKH
WOMEN'S SHOWER CHANGING ROOMS Z05
No. 0
1.71
0.90
1.80
W-01
MEN'S SHOWER CHANGING ROOMS Z05
Revisions
0.72
F
W-01
0.69
0.71
03-03-2022
1.09
TENDER DETAILS
1.18
1.73
0.90
0
1.19
0.99
F
1.19
Date
0.76
F
Description
1.85
No.
2.61
2.85
Revisions
0.91
1.90
SAUNA Z05
0.32
1.68
MARCH 2022
1.56
W-01
E
W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08
1.08
1.59
W-01
0.70
0.47
SAUNA Z05
D-01
0.70
STEAM ROOM Z05
W-01
1.59
1.59
7-
Z05-0003 -
STEAM ROOM Z05
0.70
0.26
W-02
1.80
DESIGN DEVELOPMENT SAUNA Z05
W-01
0.70
TOILET Z05
1.78
TOILET Z05
6
W-01
0.53
F-01
W-01
W-01
W-01
W-01
W-01 3.12
1.59
D-01
TOILET Z05
W-01
2.27
W-01 0.71
WOMEN'S BATHROOM Z05 0.90
MEN'S BATHROOM Z05
TOILET Z05
TOILET Z05
10 2
11
MEN'S BATHROOM Z05
1.10
W-04
1.13
EG22001-DD-AR-Z05-7-02
W-01 0.42
W-01
9 1
2.78
2.78
W-01
0.76
9 2
W-05
TOILET Z05
W-02 W-02
0.68
EG22001-DD-AR-Z05-7-05 Z05-0003
W-04
0.32
W-05
0.64
E
8 1
2.80
E
1.60
W-01 W-01
W-04
E
0.57
3.06
Wall Type
3.59
1.19
1.04
0.66
W-01
INTERIOR WALL W-04
W-01
0.06
0.26 1.81
W-01
D-02
2.51
0.86
W-01
D-02
W-01
W-01
3.37 1.05
1.05
1.36
W-04
2.71 1.36
1.59
UP
0.90
1.81
0.08
CAIRO.DUBAI.HOUSTON
UP
EG22001-DD-LD-Z05-1-01
As indicated A2
1
ABDELSALAM_CEILING PLAN - Dependent 5 1 : 50
Scale
As indicated
Sheet Size
A2
10
E
0.53
1.20
0.50
1.00
D-01
0.50
STUDIOFIVE CAIRO.DUBAI.HOUSTON
2.40
1.20
SP
GROUND FLOOR F.F.L
GROUND FLOOR F.F.L
+0.00 F.F.L
+0.00 F.F.L.
GROUND FLOOR F.F.L
1.20
+0.00 F.F.L
2.10
2.40 0.40
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
D-02
GROUND FLOOR F.F.L
+0.00 F.F.L
0.40
2.40
D-01
+0.00 F.F.L.
0.80
1.80
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
+0.00 F.F.L D-01
0.78
0.80
1.20
+0.00 F.F.L.
1.20
1.20
FIBER GLASS SINK UNIT WITH COCRETE EFFECT FINISH
1.20
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
0.77
1.80
CLEAR MIRROR
GLASS PARTITION WALNUT VENEER WOODEN LOCKERS AS PER APPROVE SAMPLE
0.51
TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
1.60
TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
0.53
WALNUT VENEER WOODEN LOCKERS AS PER APPROVE SAMPLE
+4.80 F.F.L
1.20
0.51
1.60
0.90
1.60
0.90
BOTTOM OF SLAB
1.90
0.54
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
CAIRO.DUBAI.HOUSTON
BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
0.05
0.50
STUDIOFIVE
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
+4.80 F.F.L
0.71
BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
BOTTOM OF SLAB
+0.00 F.F.L
BOTTOM OF SLAB
+4.80 F.F.L
1.20
+4.80 F.F.L
E
E
1.00
F
+4.80 F.F.L
GROUND FLOOR F.F.L
Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50
1
2
Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50
Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50
2
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
MARCH 2022
5 Revisions
No.
+4.80 F.F.L
Description
0
No.
03-03-2022
Description
0
Date
TENDER DETAILS
03-03-2022
0.50
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
0.05
0.71
BOTTOM OF SLAB
Revisions
Date
TENDER DETAILS
TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
0.90
0.90
0.90
0.90
0.90
0.90
0.90
SHARM EL SHEIKH
0.83
1.20
0.04
SHARM EL SHEIKH
CAMELOT SPA
CAMELOT SPA
1.20
4.00
GLASS PARTITION
Z05-INTERNAL ELEVATIONS
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
Project number SP
Sheet Size
SP
Z05 -WOMENS BATHROOM - INTERNAL ELEVATION 1 : 50
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
0.71
0.50 0.70
0.30
0.70
0.30
0.70
0.90
0.90
STUDIOFIVE
0.22
1.60
0.86
CAIRO.DUBAI.HOUSTON
GLASS PARTITION WALNUT VENEER WOODEN LOCKERS AS PER APPROVE SAMPLE TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
0.40
D-02
+0.00 F.F.L
1.20
+0.00 F.F.L.
GROUND FLOOR F.F.L
2
0.05
TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
CAIRO.DUBAI.HOUSTON
1.20
STUDIOFIVE
0.53
1.80
CLEAR MIRROR
+0.00 F.F.L
0.90
1.20
0.90
0.80
0.40 0.80
1.20
GROUND FLOOR F.F.L
1
0.45
1.20
1.80
4.00 1.20
4.00 +0.00 F.F.L.
0.52
FIBER GLASS SINK UNIT WITH COCRETE EFFECT FINISH
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
+0.00 F.F.L
0.52
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
CLEAR MIRROR
FIBER GLASS SINK UNIT WITH COCRETE EFFECT FINISH
TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
D-01
D-01
D-01
+0.00 F.F.L.
2.40
0.74
1.20
0.90
1.00
0.90
1.20
0.44
BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
1.60
0.46
A2
F
BOTTOM OF SLAB
2.40
0.81 1.20
0.66
E
0.50
0.05
0.50
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
Sheet Size
+4.80 F.F.L
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
0.71
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
1 : 50
Scale
4.00
+4.80 F.F.L
BOTTOM OF SLAB
1.00
+4.80 F.F.L
M.WALY
EG22001-DD-AR-Z05-7-02
A2
E
4
M.ABDELSALAM
Checked by
MEN'S BATHROOM - 3D
3
1 : 50
Scale
1-3-2022
Drawn by
M.WALY
EG22001-DD-AR-Z05-7-01
Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50
EG22001
Date
M.ABDELSALAM
Checked by
1
Project number
1-3-2022
Drawn by
1.90
GROUND FLOOR F.F.L
EG22001
Date
2.10
+0.00 F.F.L.
1.20
+0.00 F.F.L
Z05-INTERNAL ELEVATIONS
SP
GROUND FLOOR F.F.L
SP
2
Z05 -WOMENS BATHROOM - INTERNAL ELEVATION 1 : 50
Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
MARCH 2022
5
Revisions TENDER DETAILS
03-03-2022
+4.80 F.F.L
No. BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
Description TENDER DETAILS
0.83
0.90
0.90
0.79
0.64
0.64
0.44
0.90
Date 03-03-2022
SHARM EL SHEIKH
0.49
1.20
SHARM EL SHEIKH
Revisions 0 0.71
0
Date
0.05
Description
0.50
No.
CAMELOT SPA 1.20
4.00
CAMELOT SPA Z05-INTERNAL ELEVATIONS EG22001
Date
1-3-2022
Drawn by
M.ABDELSALAM
Checked by
3
WOMEN'S BATHROOM - 3D
Scale
Project number +0.00 F.F.L.
GROUND FLOOR F.F.L
M.WALY
1 : 50 A2
EG22001
Date SP
1-3-2022
Drawn by
M.ABDELSALAM M.WALY
Checked by
EG22001-DD-AR-Z05-7-05
Sheet Size
BIM ARCHITECT PORTFOLIO
+0.00 F.F.L
1.20
Project number
Z05-INTERNAL ELEVATIONS
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
1
Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50
EG22001-DD-AR-Z05-7-00 1 : 50
Scale Sheet Size
A2
11
1.00
MAIN CORRIDOR Z10
0.50
0.70
W-02
0.03
0.70
0.03
1.20
0.03
W-02
W-03 W-03
W-03
0.03
0.70
0.02
0.70
0.03
0.95
1.00
W-03
1.20
0.03
0.70
0.26
+0.00 F.F.L.
0.03
0.83
UP
1.00
0.43
W-06
W-02
1.91
1.55
1.20
1.28
1.50
1.32
1.46
1.10
0.10 0.35
3.90
W-03
W-02 W-03
CAIRO.DUBAI.HOUSTON
0.87
W-02
MAIN CORRIDOR Z10
W-03
+0.45 F.F.L. 0.30 0.15
1.53
W-03
+0.45 F.F.L.
0.50
1.55
0.50
W-03
+0.45 F.F.L.
W-03
INTERIOR WALL
+0.00 F.F.L.
W-03 0.39
3.40
UP
Wall Type
W-03
W-02 W-03
W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08
UP
W-04
DESCRIPTION SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS
3.55
3.55
STUDIOFIVE
D
+0.45 F.F.L.
0.31
0.70
W-02
0.96
CAIRO.DUBAI.HOUSTON
W-06
0.95
W-02
0.46
D
0.19 0.37
STUDIOFIVE
5
GREEN WALL
0.24
D
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
4
GREEN WALL
1.41
D
3
0.95
2
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
0.46
5
0.25
4
0.19 0.37
3
0.40
2
W-04
2
2
3
4
5
Z10 - FURNITURE 02 1 : 50
1
Z10 -MAIN CORRIDOR - DETAILED PLAN 1 : 50
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
7
7
Revisions
Revisions
Description
No.
03-03-2022
Description
0
D
D
0.87
1.85
0.03
1.50
0.03
+0.00 F.F.L.
W-03
W-02
0.02
6
2.70
W-03
EG22001-DD-AR-Z10-7-03 EG22001-DD-AR-Z10-7-01 EG22001-DD-AR-Z10-7-00 EG22001-DD-AR-Z10-7-02 Z10-01
0.030.380.03
3.67
0.03
1.22
0.03
3.60
W-03
W-02
W-03
0.03
1.00
0.03
W-02
2.16
W-02
1.00
0.03
1.20
0.03
0.99
0.03
W-03
15.87
0.91
1.92
0.81
0.03
W-03 1.07
0.03
1.20
0.03
SHARM EL SHEIKH
W-03
4
5 1
W-03
0.39
1.37
3 1
W-03 +0.45 F.F.L.
CAMELOT SPA
1.30
0.03
CAMELOT SPA
W-03 2.14
Z10-FURNITURE LAYOUT
Z10-DETAILED PLAN
Project number
EG22001
Date
1-3-2022
Drawn by
7
0.90
0.90 0.90
0.90
1.55
0.90
0.90
0.90
FLOOR TYPE
DESCRIPTION
F-01 F-02 F-03 F-04
UP
0.15 0.39 0.15
TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE
0.90 0.90
7.72
0.20 1.92
5
DESCRIPTION
TH-01
S.C.L
6.48
CEILING SCHEDULE 0.15
TYPE
DESCRIPTION
C-01 C-02
GYPSUM BOARD - CONCREATE EFFECT PAIN AS APPROVED SAMPLE WOODEN RIBS CEILING
3.37
THRESHOLD FINISH THRESHOLD TYPE
CAIRO.DUBAI.HOUSTON
+4.00
FLOOR FINISH
0.15
STUDIOFIVE
0.15
0.90
D 16.86
MAIN CORRIDOR Z10 2.05
0.90
A2
7
0.15
0.90
0.86
0.90
0.73
0.90
6
0.15
0.28
0.75 0.90
0.90 0.90
Sheet Size
CAIRO.DUBAI.HOUSTON
0.30 0.30 0.30
0.40
0.90
1.79
0.90
0.86
0.90
F-01
0.90
0.90
1 : 50
Scale
D
STUDIOFIVE
SP
+0.45 F.F.L. 0.90
0.90 0.90
Z10 -MAIN CORRIDOR - DETAILED PLAN 1 : 50
0.20
D
0.28
0.38
0.44
MAIN CORRIDOR Z10
0.66
0.90
2
2.05
D
UP
A2
5
1.50
SP 0.07 0.90
1 : 50
0.15
1.21
+0.00 F.F.L.
M.WALY
5
1.53
F-01
M.ABDELSALAM
Checked by
2.05
4
MAIN CORRIDOR Z10
1-3-2022
Drawn by
EG22001-DD-AR-Z10-3-00
Sheet Size
3
EG22001
Date
7
Checker
Scale
Z10 - FURNITURE 1 : 50
2
6
EG22001-DD-AR-Z10-1-00
0.30 0.30 0.30
1
6
Project number
5
Author
Checked by
5
03-03-2022
D
W-02
SHARM EL SHEIKH
Date
TENDER DETAILS
0.50
D
Date
TENDER DETAILS
1.20
No. 0
2.40
6
6
0.70
5
MARCH 2022
5
6
7
TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE
0.87
START POINT SYMBOLS
1
Z10 -MAIN CORRIDOR - FLOORING PLAN 1 : 50
1
Z10 - CORRIDOR - CEILING PLAN 1 : 50
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
MARCH 2022
2
7
3
4
Revisions
0.15 0.25
9.34
0.15 0.35 0.15
3.60
0.15 0.50 0.15
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
5
Z10 -MAIN CORRIDOR - FLOORING PLAN 1 : 50
BIM ARCHITECT PORTFOLIO
0.90
0.90
0.90
0.90
0.44
6
7
TENDER DETAILS
0.15 0.50 0.15
3.10
SHARM EL SHEIKH
0.15 0.39 0.15
CAMELOT SPA
Z10-FLOOR FINISH PLAN
Z10-REFLECTED CEILING PLAN
Project number
EG22001
Date
1-3-2022
Drawn by
Project number
2
M.ABDELSALAM M.WALY
Checked by
3
4
5
Sheet Size
EG22001
Date
1-3-2022
Drawn by
M.ABDELSALAM M.WALY
Checked by
EG22001-DD-AR-Z10-4-00 Scale
Date 03-03-2022
3.15 1.25
0.15
0.15
1.10
0.87
SP
0.15 0.35 0.15
S.C.L
Description
0
0.15
C-01
+4.00
5.50
CAMELOT SPA
0.35
0.90 0.35
0.20
1.71
0.56
+0.00 F.F.L. 0.87
0.15
0.15 0.35 0.15
0.75
SHARM EL SHEIKH
F-01
No.
D
MAIN CORRIDOR Z10 5.30
1.60
0.38
0.15
0.90
0.90
MAIN CORRIDOR Z10
UP
2
D
D 0.38
D
Revisions
1.45
Date 03-03-2022
0.15
Description TENDER DETAILS
0.15
No. 0
5
0.15
6
0.77
5
EG22001-DD-AR-Z10-5-00
As indicated A2
2
Z10 - CORRIDOR - CEILING PLAN 1 : 50
1 : 50
Scale Sheet Size
A2
12
7
5
8 +4.80 F.F.L
BOTTOM OF SLAB
0.90
0.90
0.40
0.90
GROUND FLOOR F.F.L
2.40
D-03
SP
SP
+0.00 F.F.L
SP
Z10 - MAIN CORRIDOR - INTERNAL ELEVATIONS 1 : 50
1
1
0.71 0.05 0.90
0.90
0.90
0.15
STUDIOFIVE
1.20 1.70
0.90
CAIRO.DUBAI.HOUSTON
3.03
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE +0.00 F.F.L.
SP
0.15
D-04
WALNUT VENEER WOOD CALDDING AS PER APPROVED SAMPLE
1.20
+0.00 F.F.L
D-05
+0.45 F.F.L.
0.75
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
1.20 2.40
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
0.80
SP
4.00
0.90
0.80
MAIN CORRIDOR Z10
2.40
0.90
0.90
D-03
+0.45 F.F.L. 0.52
0.90
0.90
SP
SP
2.40
1.60 0.90
0.80
1.15
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
CAIRO.DUBAI.HOUSTON
4.00
0.90
BOTTOM OF SLAB
0.50
STUDIOFIVE
1.20
WALNUT VENEER WOOD CALDDING AS PER APPROVED SAMPLE
2
1.20
0.05
0.50 1.70
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
3
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
0.71
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
4
1.20
+4.80 F.F.L
6
0.75
5
+0.00 F.F.L.
GROUND FLOOR F.F.L
Z10 - MAIN CORRIDOR - INTERNAL ELEVATIONS 1 : 50
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
MARCH 2022
Revisions
Revisions
No.
Description
0
Date
TENDER DETAILS
No.
03-03-2022
Description
0
SHARM EL SHEIKH
CAMELOT SPA
CAMELOT SPA
Z10-INTERNAL ELEVATIONS
Date Drawn by
Z10-INTERNAL ELEVATIONS
EG22001
Project number
1-3-2022
Date
M.ABDELSALAM
1-3-2022
1
0.71 0.50 1.20 0.73
0.83
Z10 - MAIN CORRIDOR - INTERNAL ELEVATIONS 1 : 50
1
GROUND FLOOR F.F.L
SP
+0.45 F.F.L.
0.59
2.40
D-03 +0.00 F.F.L.
0.60
MAIN CORRIDOR Z10
0.60
3.55
2.96 0.93
1.20
2.40
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
+0.00 F.F.L
0.05
0.71 0.05
0.93 4.00
1.20
WALNUT VENEER WOOD CALDDING AS PER APPROVED SAMPLE SP
STUDIOFIVE
1.70
1.70
0.50 1.20
0.05
ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION
GROUND FLOOR F.F.L
5
CAIRO.DUBAI.HOUSTON
1.20
+0.00 F.F.L
4
0.66
0.66
0.60
0.50
0.87
SP
Z10 - MAIN CORRIDOR - INTERNAL ELEVATIONS 1 : 50
DESIGN DEVELOPMENT
DESIGN DEVELOPMENT
MARCH 2022
MARCH 2022
Revisions
No.
Revisions
Description
0
TENDER DETAILS
Date
No.
03-03-2022
Description
0
SHARM EL SHEIKH CAMELOT SPA
Z10-INTERNAL ELEVATIONS
Z10-INTERNAL ELEVATIONS
Date Drawn by
EG22001
Project number
1-3-2022
Date
M.ABDELSALAM
Checked by
Scale Sheet Size
EG22001 1-3-2022
Drawn by
M.WALY
M.ABDELSALAM M.WALY
Checked by
EG22001-DD-AR-Z10-7-02
BIM ARCHITECT PORTFOLIO
03-03-2022
CAMELOT SPA
Project number
MAIN CORRIDOR
Date
TENDER DETAILS
SHARM EL SHEIKH
2
A2
BOTTOM OF SLAB
TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION
4.00
1.60
CAIRO.DUBAI.HOUSTON
D-04
2.40
TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE
3
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
STUDIOFIVE
0.80
D-04
Sheet Size
2 +4.80 F.F.L
1 : 50
Scale
MAIN CORRIDOR
5
BOTTOM OF SLAB
CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE
WALNUT VENEER WOOD CALDDING AS PER APPROVED SAMPLE
2
1.20
A2
0.75
1 : 50
Sheet Size
0.71
+4.80 F.F.L
M.WALY
EG22001-DD-AR-Z10-7-01
Scale
6
M.ABDELSALAM
Checked by
EG22001-DD-AR-Z10-7-00
7
EG22001
Drawn by
M.WALY
Checked by
MAIN CORRIDOR
03-03-2022
SHARM EL SHEIKH
Project number
2
Date
TENDER DETAILS
EG22001-DD-AR-Z10-7-03 1 : 50 A2
2
MAIN CORRIDOR - 3D
1 : 50
Scale Sheet Size
A2
13
M.K HOUSE - 6 OCTOBRE GIZA, EGYPT
ELEVATION TARGETS
ELEVATION
ELEVATION DESIGNATION
01
A-02-02 000-0001
SHEET REFERENCE NUMBER SITE/BUILDING/SERIAL NUMBER
BUILDING SECTION TARGETS
SECTION DESIGNATION
01
A-03-02 000-0001
SHEET REFERENCE NUMBER
01
A-03-02 000-0001
WALL SECTION TARGETS
WS-A
0-G-000-01
SECTION DESIGNATION SHEET REFERENCE NUMBER
DETAIL TARGETS DETAIL DESIGNATION
01
2
A-04-01 000-0001
SHEET REFERENCE NUMBER SITE/BUILDING/SERIAL NUMBER
AREA DETAIL REFERENCE
2
DETAIL DESIGNATION
01
A-04-01 000-0001
SHEET REFERENCE NUMBER
ELEVATION MARK +289.90 F.F.L
+289.90 T.O.P
+289.90 T.O.S
+289.90 F.F.L
For CONSTRUCTION
LEVEL INDICATION ON PLAN
SEPTEMBER 2021 LEVEL INDICATION ON SECTIONS & ELEVATIONS
No.
DRAWING NUMBERING SYSTEM
0 1
EG20029 - TD - ID - 01 - GRF - 0001 - R00
Description APPROVED ISSUE AS CLOUDED
Date 01/09/2021 24/10/2021
REVISION SEQUENCE NO
Revisions
LEVEL INDICATOR DRAWING TYPE (DETAILED PLAN/CEILING PLAN) DISCIPLINE ACRONYM (INTERIOR DESIGN) PROJECT PHASE (TENDER DESIGN)
VILLA MR/ M .KHALIFA
PROJECT NUMBER
MISCELLANEOUS TARGETS
COVER
DOOR TAG DOOR CONSECUTIVE NUMBER
WINDOW CONSECUTIVE NUMBER
Date Drawn by
WALL TAG WALL TYPE
Checked by SPACE NAME ROOM NUMBER
EG20026 24/10/2021 M.ABDELSALAM M.WALY
EG20026-TD-ID-0-GN-0 FINISH NUMBER (REFER TO FINISH SCHEDULE) FLOOR NUMBER ROOM CONSECUTIVE NUMBER
BIM ARCHITECT PORTFOLIO
Scale
1 : 50
15
10/24/2021 12:34:52 PM
Project number WINDOW TAG
1
2
3
3'
4
5
6
6'
7
8
9
1
A'
2
3
3'
4
5
6
6'
7
8
9
A'
A'
A
A
A
B'
B'
B'
B
B
A'
DRIVER & PORTER'S BEDROOM 074
SUN BED
A BATHROOM 075
KITCHENETTE 082
B'
BATHROOM 077
SAUNA 085
POOL HOUSE 079 LAUNDRY 076
SHOWER 078
B
B
STORAGE 073
SECONDARY SEATING 064
DINING AREA 063
LIVING AREA 086
MAIN SEATING AREA 065
BATHROOM 083
C
C LOBBY 081
STORAGE 084
MAID'S BEDROOM 087
C
C
OUTDOOR GYM 089
D
RECEPTION 062
D
D
D
For CONSTRUCTION
E
E
No.
Description
E
No.
01/09/2021
G
F
G
0
GUEST WASHROOM 061
D
01/0
Revisions
G
VILLA MR/ M .KHALIFA
Description APPROVED ISSUE
F
KITCHEN 010
Revisions
HARD KITCHEN 088
SEPTEMBER 2021
Date
APPROVED ISSUE
F
INDOOR JACUZZI 080
For CONSTRUCTION
E
SEPTEMBER 2021
0
F
UP
G
VILLA MR/ M .KHALIF
CIGAR LOUNGE 066
H
M.WALY
Checked by
1
3
3'
4
5
6
6'
7
8
9
EG20026-TD-ID-1-BF-0
1 : 50
1 : 50
Scale
1
2
3
3'
4
5
6
6'
7
8
+0.35 F.F.L.
+0.20 F.F.L.
1
1
+0.05 F.F.L.
2
3
3'
4
5
6
6'
7
EG20
01/09/2
Date -0.10 F.F.L.
8
M.ABDELSAL
Drawn by
M.W
Checked by
9
EG20026-TD-ID-1-GR
GROUND FLOOR FURNITURE PLAN 1 : 50
1
Scale
9 1
A'
2
3
4
3'
5
6
6'
7
8
9
A' SECONDARY BEDROOM (A) F-01
A'
A
A'
A MASTER SUITE F-06
OUTDOOR AREA 095
A
B'
A
B' FAMILY LIVING ROOM F-07
2.35
LAUNDRY ROOM 067
D
KITCHENETTE/BAR AREA F-08
C
B
B
C
GUEST BATHROOM 090
D
FOYER F-09
E
SEATING AREA 092
C
D
FOYER F-04 UP
E
D
For CONSTRUCTION
For CONSTRUCT
E
SEPTEMBER 2021 HIS DRESSING ROOM F-05
No. 0
F
Description APPROVED ISSUE
Date
No. 0
F
Revisions
G
HER DRESSING ROOM F-10
G
G
VILLA MR/ M .KHALIFA
SECONDARY CLOSET B F-03
H
VILLA MR/ M .K
H
H
FIRST FLOOR FURNITURE PLAN
Date Drawn by
3
3'
4
5
6
6'
7
8
9
Checked by
1 : 50
BIM ARCHITECT PORTFOLIO
Scale
ROOF FLOOR FU PLAN
EG20026
Project number Date
M.ABDELSALAM M.WALY
EG20026-TD-ID-1- FR-0 FIRST FLOOR FURNITURE PLAN
H
01/09/2021
1 : 50
Drawn by
10/10/2021 7:01:25 PM
Project number
Description APPROVED ISSUE
F
PREPARATION COUNTER 093
Revisions
SECONDARY BEDROOM B F-02
2
SEPTEMBER 2
GUEST BEDROOM 091
01/09/2021
F
1
E
GUEST WASHROOM 094
UP
SECONDARY BATH ROOM (B) 068
G
B'
B
SECONDARY BATHROOM (A) 060
C
B'
0.35
B
1
GROUND FLOOR FURNITURE PLAN Project number
+0.20 F.F.L.
+0.05 F.F.L. -0.10 F.F.L.
M.ABDELSALAM
Drawn by
2
+0.35 F.F.L.
01/09/2021
Date
BASEMENT FURNITURE PLAN
H UP
EG20026
Project number
1
H
BASEMENT FLOOR FURNITURE PLAN
10/10/2021 7:01:26 PM
H
1
1
2
3
3'
4
5
6
6'
7
8
9
0
M.ABD
Checked by
EG20026-TD-ID
ROOF FLOOR FURNITURE PLAN 1 : 50
Scale
16
1
2
3
3'
4
5
6
6'
7
8
1
9
2
3
4
3'
5
6
6'
7
8
9
WALL FINISHES LEGEND WALL TYPE
20
21
22
0.90
W-01 W-01
M.WALY 1 EG20026-TD-ID-3-BF-2 1 : 50
1.57
+4.00 F.F.L.
24
0.22
1.62
3
H
42
43
44
45
W-01
SECONDARY CLOSET B F-03
W-02 W-02
W-02
W-02
2.00
1.55
Description APPROVED ISSUE
Date
5
01/09/2021
0.80
4.66
3.17
1.25 0.25
30
29
28
27
26
25
0.44
24
AL-01
33 34 35
HER DRESSING ROOM F-10
G
2.45
0.21
0.35
GUEST WASHROOM 094
0.80 0.11
0.43 0.60 1.93 2.08 1.93 1.50 2.02 2.74
SEPTEMBER 20
0.95
0.90
3.26
0.12
0.90
3.26
W-01
36 37
1.41
0.12
1.40
1.38
39
40
41
42
43
44
45
No.
W-01
W-01 PREPARATION COUNTER 093
46
W-14
0.08
2 EG20026-TD-ID-8-GN-2
0.95
W-01
Revisions
3.24
1 EG20026-TD-ID-8-GN-2
8.20
H
4.57
VILLA MR/ M .K
8.18
H
ROOF FLOOR DE PLAN
FIRST FLOOR DETAILED PLAN
Date 1 EG20026-TD-ID-8-GN-0
1
2
3
3'
4
5
Drawn by
6
6'
7
8
9
Checked by
EG20026
FIRST FLOOR DETAILED PLAN 1 : 50
BIM ARCHITECT PORTFOLIO
Scale
Date 1
M.ABDELSALAM M.WALY
EG20026-TD-ID-3- FR-0 1
Project number
01/09/2021
1 : 50
EG20026-TD-ID-8-GN-0
10/10/2021 7:01:31 PM
Project number
Description APPROVED ISSUE
G
0.90
H
0
F
1.36
W-14
0.09
For CONSTRUCT
E
W-01
0.12
G
VILLA MR/ M .KHALIFA
W-01
W-01
3.23
1.58
D
EG20026-TD-ID-8-GN-1 1
2.27 W-01
32
1 3 EG20026-TD-ID-7-RF-0
W-01
Revisions
W-01
3.26
UP
4
W-01 W-01
3.75
0.70
5.09 0.83
W-01
3.23
0.60
W-02
7.65
0.60 W-01
W-01
GUEST BEDROOM 091
W-01
0.80
0.80
2.68
0.43
EG20026-TD-ID-7-RF-0
F
B
4.29
C
38
W-01
4.22
0.40 0.40 0.40 0.50 0.89
0.80
0.35
W-01
SEATING AREA 092
31
W-01
3.67
W-01
0.39 0.35 0.25
1.24 1.59
E
0.35
0.27
6.57
1.90
4.80
No.
W-02
W-02
W-14
2
W-01
1 EG20026-TD-ID-8-GN-2
For CONSTRUCTION
3.09
W-01 4 EG20026-TD-ID-8-GN-2
W-01
GUEST W-01 BATHROOM 090
0.80
8.59
Descript
GYPSUM BOARD WITH WHITE PAINT WOOD CLADDING BIANCO WHITE MARBLE INTERIOR W NORMAL MIRROR CLADDING WHITE WOOD MDF CLADDING OFF WHITE PAINT PORCELIAN TILES 1.20X0.60 M CLAD WHITE WOOD MDF RIBS CALDDING WOODEN RIBS CLADDING INTERIOR CALCATTA MARBLE TILES 100*100 C GLASS PARTITION SHOWER SGLASS PARTITION GALSS PARTITON VEIN MARBLE TILES 100*100 CM MOSAIC TILES 5 X5 CM IVORY WHITE PAINT EXTERIOR FAC BIANCO WHITE MARBLE EXTERIOR PAINT CONCRETE EFFECT - EXTERI BIANCO WHITE MARBLE EXTERIOR WOODEN RIBS CLADDING EXTERIOR
6 EG20026-TD-ID-8-GN-2
1.11
W-01
W-01
1.57
46
0.35
W-60
2.83
W-14
D
0
WALL FINISHES L WALL TYPE W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-20 W-30 W-40 W-50 W-60 W-70
B'
W-01 W-70
W-14
SEPTEMBER 2021
3.50
41
0.10
0.38 0.10
2.38
40
3.28
4 2 2 EG20026-TD-ID-7-FR-4 EG20026-TD-ID-8-GN-2
0.26
1.55 0.60
39
W-01
1.25
C
E
F
0.35
W-01
W-02
1.44
W-02
SECONDARY BEDROOM B F-02
1
C
0.60
4.19
1.80
38
2.90
EG20026-TD-ID-7-FR-4 W-01
W-02
5 EG20026-TD-ID-8-GN-2
5
4.40 HIS DRESSING ROOM F-05
9
4.88
3.19
3.68
EG20026-TD-ID-7-FR-2
W-01
F-07
3.41
3.35
5
W-02
0.25
B'
1.60
0.22
1 : 50
A
EG20026-TD-ID-8-GN-1 2
W-01
35
2.90
W-09
0.90
1.25
2.31
W-01
8
0.35
25
W-01
7
0.35
26
6'
11.22
B
3.29
27
2.09
28
2.09
29
6
A
W-60
W-01
1.71
W-01
0.38
1.32
1.00
5
1.09
0.57
0.82
1.57
M.WALY
EG20026-TD-ID-3-GR-0
2
B
1.18
9
EG20026-TD-ID-8-GN-0
0.60
W-01
1.20
1.01
0.85
8
A'
TOILOET W-03 072
0.30 30
1.20
31
1.71
0.80
0.080.08
4
3'
4.88
D
3.17
37
0.94
0.85 W-03
7
A'
Description GYPSUM BOARD WITH WHITE PAINT CLADDING WOOD CLADDING BIANCO WHITE MARBLE INTERIOR WALL CLADDING NORMAL MIRROR CLADDING WHITE WOOD MDF CLADDING OFF WHITE PAINT PORCELIAN TILES 1.20X0.60 M CLADDING WHITE WOOD MDF RIBS CALDDING WOODEN RIBS CLADDING INTERIOR CALCATTA MARBLE TILES 100*100 CM GLASS PARTITION SHOWER SGLASS PARTITION GALSS PARTITON VEIN MARBLE TILES 100*100 CM MOSAIC TILES 5 X5 CM IVORY WHITE PAINT EXTERIOR FACADES BIANCO WHITE MARBLE EXTERIOR LANDSCAPE CALDDING PAINT CONCRETE EFFECT - EXTERIOR BIANCO WHITE MARBLE EXTERIOR FACADES CLADDING WOODEN RIBS CLADDING EXTERIOR FACADES
EG20026-TD-ID-8-GN-1 1
W-01
1.66
33
0.25
1.63
1.75
FOYER F-09
0.75
0.20 0.63 0.12
0.60
2.90
1.53
2.47
32
1.36 0.90
TOILET 071
3
4.30
1.18
6'
4.19
1.72 0.80
2.35
W-01
2
4.27
1.17
6
M.ABDELSALAM
Scale
2 EG20026-TD-ID-7-FR-2
1.17
5
GROUND FLOOR DETAILED PLAN
1.16
1
3 6 EG20026-TD-ID-8-GN-2 0.85 0.36 0.85
W-01
1.21
W-02
34
0.11
0.90
2.45
36
W-09
G
3.61
W-02
W-01
2.10
MASTER BATHROOM 070 4
Drawn by
EG20026 01/09/2021
1 : 50
W-01
+5.25 F.F.L.
0.22
0.803 0.13
W-04
4
3'
2.56
1.27 2.39 0.35 0.85
2.10
1.20
0.63 0.35
1.80
0.60
0.72 0.80
3.13
2.90
0.85
1 SECONDARY BATH ROOM 4 2 (B) EG20026-TD-ID-7-FR-5 F-07 068
5
W-04
W-02
+4.00 F.F.L.
E
W-01
W-02
FOYER F-04
EG20026-TD-ID-7-FR-5
4 EG20026-TD-ID-8-GN-2
KITCHENETTE/BAR AREA F-08
0.20 0.60
1.18
UP
F
1.15
0.60 2.84
0.90
0.35
D
W-01
W-01
0.92
EG20026-TD-ID-8-GN-1 2
0.85
0.73 LAUNDRY ROOM 067
0.10 0.80
0.52
0.80
0.15
0.37
2.04
C
W-01
W-01 W-01
W-01
3 5 EG20026-TD-ID-8-GN-2
W-04
0.54
0.63
0.70
SECONDARY BATHROOM (A) 4 2 060 EG20026-TD-ID-7-FR-3
2.00
EG20026-TD-ID-7-FR-3
0.54
B' W-04
3
2.09
3.25
3 EG20026-TD-ID-8-GN-2
0.55
1.00 1
5
EG20026-TD-ID-7-FR-0 W-02
2
0.80
5.13
0.60
FAMILY LIVING ROOM F-07
A
5
W-01
MASTER SUITE F-06
1.35
W-01
0.92
W-08
W-01
0.35
1
0.35
0.50
3.31
W-01
B
4 2 EG20026-TD-ID-7-FR-0
0.47 0.40 0.40 0.40
0.45
3.25
1.04
W-01
2.80
0.30
0.30
0.25
0.45 W-01
1.06
WALL TYPE W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-20 W-30 W-40 W-50 W-60 W-70
3
3.32
W-01
1.13
2.82
0.34
WALL FINISHES LEGEND
A'
Date
+0.05 F.F.L. -0.10 F.F.L.
1
0.25
Project number
+0.20 F.F.L.
3.27
1.60
1.60
1.60
2.99
4
3.78 1
GROUND FLOOR DETAILED PLAN
Checked by
9
2
W-08
W-08
0.300.25
EG20026-TD-ID-8-GN-0
3 2 EG20026-TD-ID-7-FR-1 SECONDARY W-01 W-08 BEDROOM (A) F-01
8
+0.05 F.F.L.
+0.35 F.F.L.
1.45
0.30
1
5 EG20026-TD-ID-7-FR-1
0.92
7
1.75
0.25
3.77
W-01
B'
6'
W-01
W-01
0.25
A
6
0.35 0.43
5.13
5
0.200.30
4
0.25
3'
0.40 0.25
0.250.30
A'
3
2.44
0.60
Scale
VILLA MR/ M .KHALIFA
1.04
BASEMENT FLOOR DETAILED PLAN
2
0.12
1.59
0.21
-0.10 F.F.L.
M.ABDELSALAM
Drawn by
9
1 : 50
1
1.62
1.60
+0.20 F.F.L.
-0.10 F.F.L.
01/09/2021
Checked by
1
W-01
0.80
8
W-01
3.12
7
G
1 EG20026-TD-ID-8-GN-2
6.78
2.70
6'
Revisions
0.60
W-01
W-02
0.35
0.66
6
0.90
H
4.36
5
0.40
10/10/2021 7:01:33 PM
4
3.09
3.75 W-01
+0.35 F.F.L.
EG20026
Date
3'
0.90
H
Project number
3
0.61
23
10/10/2021 7:01:35 PM
0.85
BASEMENT FLOOR DETAILED PLAN
2
1.52
1.60 0.35 3.15 19
UP
1
0.25
0.23 1.63 W-01
+0.35 F.F.L.
H
18
0.98
0.35
H
17
1.00
G
VILLA MR/ M .KHALIFA 2.80
0.30
0.30
0.35 0.40
16
2 EG20026-TD-ID-8-GN-2
1 EG20026-TD-ID-8-GN-2
W-03
Date 01/09/2021
1.00
G
18
CIGAR LOUNGE 7 066 EG20026-TD-ID-7-GR-3
RECEPTION 062
Description APPROVED ISSUE
F
3
14
W-02
W-01
Revisions
0
7 EG20026-TD-ID-7-GR-1
2.03
5.98
No.
1 4 2 EG20026-TD-ID-7-GR-1
1.38
0.35
17
2 EG20026-TD-ID-8-GN-2
13
SEPTEMBER 2021
---
2
15
KITCHEN 010
24
GUEST WASHROOM 061
0.35
G
9
For CONSTRUCTION
-
2.05
23
W-01
W-04
16
3 1 EG20026-TD-ID-7-GR-3
11
0.86
F
D
10
DUMBWAITER
12
01/09/2021
EG20026-TD-ID-8-GN-1 1
E
0.56
1.03
22
W-01
2.29 4
1.50
21
APPROVED ISSUE
Date
0.57
1.84
20
+0.45 F.F.L.
1
1.00
19
2
1.09
18
3
3.39
17
4
W-01
4.48
16
0
Description
C
0.52
0.50
2.14
15
5
0.26
W-02
1.47
W-02 HARD KITCHEN 088
14
F
INDOOR JACUZZI 080
15
13
6
1.20
4.10
W-04
14
12
0.31
11
1.52
1
No.
1.18
2.23
2
UP
13
7
UP
3
W-04
8
W-02
SEPTEMBER 2021
4
W-02
F
2.08
5
11 12
10
+1.70 F.F.L.
1.20
4.50
10
9
E
2.59
0.35
2.00
2.00
For CONSTRUCTION
6
9 8
E
7
W-01
1.55
W-02
5.62
2.28
UP
W-02
3.87
W-02 +0.45 F.F.L.
2.06
W-02
W-02
1
D
1.71
2
4.57
W-01
2.30
3
B
W-02
UP
8
3.92 W-01
0.35
4
1.14
W-01
W-01
1.80
5
2.88
EG20026-TD-ID-8-GN-1 2
1.71
6
3
EG20026-TD-ID-7-BF-00 OUTDOOR GYM 089
6 EG20026-TD-ID-8-GN-2
3
9
0.93
2.20
7
4 2 EG20026-TD-ID-7-GR-0
C
C
D W-01
4.31
3.34
8
3.62
1.39
10
B'
Description GYPSUM BOARD WITH WHITE PAINT CLADDING WOOD CLADDING BIANCO WHITE MARBLE INTERIOR WALL CLADDING NORMAL MIRROR CLADDING WHITE WOOD MDF CLADDING OFF WHITE PAINT PORCELIAN TILES 1.20X0.60 M CLADDING WHITE WOOD MDF RIBS CALDDING WOODEN RIBS CLADDING INTERIOR CALCATTA MARBLE TILES 100*100 CM GLASS PARTITION SHOWER SGLASS PARTITION GALSS PARTITON VEIN MARBLE TILES 100*100 CM MOSAIC TILES 5 X5 CM IVORY WHITE PAINT EXTERIOR FACADES BIANCO WHITE MARBLE EXTERIOR LANDSCAPE CALDDING PAINT CONCRETE EFFECT - EXTERIOR BIANCO WHITE MARBLE EXTERIOR FACADES CLADDING WOODEN RIBS CLADDING EXTERIOR FACADES
MAIN SEATING AREA 065
W-01 SECONDARY SEATING 064
0.84
12
W-04
-1.70 F.F.L.
3 EG20026-TD-ID-8-GN-2
1.93
5.37
13
6 7
5 EG20026-TD-ID-8-GN-2
14
11
A
0.50
W-01
B
15
2.83
W-06
2.32
3.16
3.77
DINING AREA 063
1.24
W-06
2.95
B'
W-01 W-01
0.35
16
W-04
0.25
4 EG20026-TD-ID-8-GN-2 1
0.31
W-06 W-06
STORAGE 084
3.63
2.32
W-01
17
W-01
6 EG20026-TD-ID-8-GN-2
5
E
LIVING AREA 086
W-01
4.16
0.43 0.96
W-06
4
2.85
3.63
0.12 1.34
0.80
A
18
W-06
W-06
1.14
3
0.90
0.12
MAID'S BEDROOM 087
1.70
0.12
2.57
2
0.56
1.27
3.05
W-06
1.15
0.46
1
D
1.90
0.85
0.85
LOBBY 081
0.80
1.52
1.34
1.24
0.36
1.42
UP
0.80
W-01
0.90
3.78
W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-20 W-30 W-40 W-50 W-60 W-70
2
0.50
4.12 0.12
2.49
1.90
0.80
C
2.99
2 EG20026-TD-ID-10-GN-8
0.25 BATHROOM 083
W-07
EG20026-TD-ID-8-GN-0
GYPSUM BOARD WITH WHITE PAINT CLADDING WOOD CLADDING BIANCO WHITE MARBLE INTERIOR WALL CLADDING NORMAL MIRROR CLADDING WHITE WOOD MDF CLADDING OFF WHITE PAINT PORCELIAN TILES 1.20X0.60 M CLADDING WHITE WOOD MDF RIBS CALDDING WOODEN RIBS CLADDING INTERIOR CALCATTA MARBLE TILES 100*100 CM GLASS PARTITION SHOWER SGLASS PARTITION GALSS PARTITON VEIN MARBLE TILES 100*100 CM MOSAIC TILES 5 X5 CM IVORY WHITE PAINT EXTERIOR FACADES BIANCO WHITE MARBLE EXTERIOR LANDSCAPE CALDDING PAINT CONCRETE EFFECT - EXTERIOR BIANCO WHITE MARBLE EXTERIOR FACADES CLADDING WOODEN RIBS CLADDING EXTERIOR FACADES
1.94
0.67
2.82 1.41
5 EG20026-TD-ID-8-GN-2
0.25
0.25
1.10
W-06
3.78
0.80
0.12
2.32
0.25
B
0.13
0.31
0.59
SHOWER 078
0.16
4.24
2.82
0.85
0.85
0.15
STORAGE 073
0.90
0.78
085
0.80
2.00 0.85 0.15
0.12
B'
3 EG20026-TD-ID-8-GN-2 SAUNA
W-01 POOL HOUSE 079
0.80
W-07
1.53
4.48
2.31
3.40
W-07 LAUNDRY 076
W-06
B
0.54 0.12
2.24 2.39
A
2.53 W-01
0.80
W-07
W-06
0.13
0.25
BATHROOM 077
0.27
2.31
1.49
1.49
2.82
0.80
0.76
3.46
3.49
B'
0.85 BATHROOM 075
0.42
0.63
Description
0.63
-
KITCHENETTE 082
W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-20 W-30 W-40 W-50 W-60 W-70
W-09
2 EG20026-TD-ID-7-BF-00
0.91
0.18
A
0.85
2.15
W-06
2.55
WALL TYPE
1
W-01
1.90
1.90
DRIVER & PORTER'S BEDROOM 074
A'
4.23
1.92
4.32
A'
3.96
A'
A'
WALL FINISHES LEGEND
1
1
2
3
3'
4
5
01
Drawn by
6
6'
7
8
9
Checked by
ROOF FLOOR DETAILED PLAN
EG20026-TD-ID
1 : 50
Scale
17
3 EG20026-TD-ID-10-GN-6
1
2
3
3'
4
5
6
6'
7
8
9
1
4 EG20026-TD-ID-10-GN-6
2
3
4
3'
5
6
6'
7
8
9
Floor Schedule LEGEND
1.00
1.00
24
0.60
0.60
H
1
6
6'
G
VILLA MR/ M .KHALIFA
4
5
6
6'
7
G
BASEMENT FLOOR FLOORING PLAN
H
9
8
1.00 1.00
0.61 1.00
1.00 1.00
1.00 6 0.88 EG20026-TD-ID-8-GN-2 1.00
1.00
17.36 1.00
C
1.00 1.00
D
For
KITCHEN 010
F-01
EG20026
0.32
1.00 1.00
1.00
CIGAR LOUNGE 066
1.00
1.00
1.00
1.00
1.00
0.52
1 EG20026-TD-ID-8-GN-2
0.51
APPRO
F Revisions
F-01
+0.45 F.F.L.
SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²
0.24 SP
1.00
1.00 4.12
G
1.00
VILLA M
0.88
SP SP
GRO FLO
H
6 EG20026-TD-ID-10-GN-8
+0.35 F.F.L.
01/09/2021
1 : 50
+0.45 F.F.L.
De
0
UP
+0.35 F.F.L.
+0.20 F.F.L.
M.ABDELSALAM
EG20026-TD-ID-4- BF-0
GUEST WASHROOM 061
1.00
SE
No.
F-01 SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²
E
+0.45 F.F.L.
2 1.00EG20026-TD-ID-8-GN-2 1.00 1.00
H
M.WALY
SILVER EMPRADOR FLOORING 1.00 * 1.00 M 15 m²
SP
+0.45 F.F.L.
1.00
1.00
RECEPTION 062
SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²
0.62
8
1.00
1.00
1.00
7
1.00
1.00
F
Revisions
Project numbe +0.20 F.F.L.
+0.05 F.F.L.
Date
+0.05 F.F.L.
-0.10 F.F.L.
-0.10 F.F.L.
Drawn by Checked by
1
1
2
3
4
3'
5
6
6'
7
8
9
EG2002
GROUND FLOOR FLOORING PLAN
Scale
1 : 50
1 3'
1.00
1.00 1.00
4.38
Scale
3
1.00
1.00
01/09/2021
F
1 : 50
2
+0.45 F.F.L.
1.00
1.00
APPROVED ISSUE
1
BASEMENT FLOOR FLOORING PLAN
1
1.00
1.00 1.00 10.04 1.00 1.00 1.00
0
Date
1.00
5
1.00
0.63
2
Checked by
4
1.00
UP
Drawn by
3'
1.00
1.00
F-60
INDOOR JACUZZI 080 -3.10 F.F.L.
SP
3
1.00
UP
Description
Date
2
1.00
F-01
No.
Project number
1
1.00
1.00
23
1.00
1.00
22
1.00
1.00
21
D
SEPTEMBER 2021
E
11 m²
20
2 EG20026-TD-ID-10-GN-8
1.00
B
1.00
0.60
E
5
MOSIC FLOORING 0.05 * 0.05 M
19
+0.45 F.F.L.
1.00
4
9
18
B'
0.41
0.60
C
For CONSTRUCTION
8
0.95
13
15
F-01 SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²
4 EG20026-TD-ID-8-GN-2
1.00
1.00
+0.45 F.F.L.
1.00 0.73
D
9
0.24
0.60
OUTDOOR GYM 089
6
0.60 0.60
0.60
0.18 0.60
C
46 m²
-2.75 F.F.L.
1.00
0.60
18
RUBBER FLOORNG TILES
5 EG20026-TD-ID-8-GN-2
1.00
17
F-09
7
1.00
SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²
1.00 12.07
1.00
SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²
1.00
1.00
11
17
0.99
MAIN SEATING AREA 065
1.00
1.00
F-01
1.00
1.00
10
16
F-80 F-90
1.00
1.00
1.00
0.36
1.00 1.00 1.00 1.00 0.30 1.00
UP
1.00
1.00
SLAB ON G SILVER EM CALACATTA BIANCO W WPC FLOO TERAZZO M LIGHT WOO HPL ON MO PORCELAIN RUBBER FL TEAK WOO MOSIC FLO BIANCO W M WPC FLOO MOSIC FLO
1.00 1.00
0.45 0.75 0.60 0.60
1.00
11 10
1
1.00
1.00
1.00
2
SECONDARY SEATING 064
F-01
1.00
0.80
1.00 0.52
1.00 1.00 0.60 0.60 0.60
12
1.00
G
14
16 m²
STORAGE 084 -2.75 F.F.L.
DINING AREA 063
15
13
1.00
30 m²
HARD KITCHEN 088 -2.75 F.F.L.
16
-2.75 F.F.L.
0.60
16
0.60 0.17
1.00
15
0.60
3
0.60
0.60
14
0.60
F-08
14
PORCELAIN FLOORING 60 *60 CM
13
0.75
0.60 0.25
3
1.00
1.00
4
1.00
1.00
5
1.00
1.00
6
1.00
1.00
7
1.00
1.00
8
0.66
0.60
11 12
0.34
0.51
0.60
0.60
PORCELAIN FLOORING 60 *60 CM
12
F-08
0.60
F
0.60
1.00
3 EG20026-TD-ID-8-GN-2
17
1.00
0.60
0.60
1.00
1.00
0.60
0.60
0.60
1.00
0.60
0.60
1.00
0.98
0.60 0.60
0.60
1.00
0.30
0.60
0.60
0.60 0.60
9
0.60
1.00
18
1.00
0.60
MAID'S BEDROOM 087 -2.75 F.F.L.
111 m²
LIVING AREA 086
0.60
0.60
0.60
-1.70 F.F.L.
0.60
dumbwaiter 0.51
8
B'
B
1.00
7
10
0.60
F-08
1.00
B
0.20
0.60
5 6
0.60
0.09 0.60
0.60
0.10 0.60
4
0.60
PORCELAIN FLOORING 60 *60 CM
F-03
SP SP
15 m²
0.10 0.60
3
0.57
0.60
A 0.73
4.38
1.00
0.60
0.60
0.60
0.60
+0.35 F.F.L.
A
BIANCO WHITE MARBLE 100*100 CM
1.00
0.60
SP0.56
2
0.60
BATHROOM 083 -2.75 F.F.L.
F-80 F-90
A'
50 m²
B'
SAUNA 085
POOL HOUSE 079 -2.75 F.F.L.
0.60
0.60
111 m²
0.09 0.60
LOBBY 081
0.60
SP
0.60
SP
0.60
0.60
7 m²
0.60 0.60 0.34
0.60
0.48
0.60
0.60 0.19
0.60 0.19
0.60 0.60
F-08 0.60
PORCELAIN FLOORING 60 *60 CM
SHOWER 078
0.60
0.60 0.60
0.20 0.60
0.60
0.60 0.28
0.60
0.60
0.60
0.05 0.60
0.56
BIANCO WHITE MARBLE 100*100 CM
16 m²
0.60
0.60
0.60
0.38
1.00
WPC FLOORING
F-03
SP
0.60
STORAGE 073 -2.75 F.F.L.
0.60
0.60 0.21
12 m²
0.60
-2.75 F.F.L.
1.00
PORCELAIN FLOORING 60 *60 CM
LAUNDRY 076 -2.75 F.F.L.
0.60
F-08 PORCELAIN FLOORING 60 *60 CM
0.21
1.00
BATHROOM 077
0.60
0.60 0.10
0.60 0.60
0.60
A
SP
0.60
F-08
0.60
0.60
0.22 0.60 UP
1
0.60
0.60
KITCHENETTE 082 -2.75 F.F.L.
0.22 0.60
C
0.60
15 m²
0.60
B
0.60
0.60
0.48
1.00
1.00
0.60
BATHROOM 075
PORCELAIN FLOORING 60 *60 CM
0.37
0.09 0.60
0.60 0.60
F-08
0.60
B'
E
1.00
4 m²
SP
0.60
0.60
0.53
BIANCO WHITE MARBLE 100*100 CM
A
A'
1.00
1.00
F-00 F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-60 F-70
1.00
1.00
1.00
1.00
1.00
0.33
F-03
0.60
0.60
0.60 0.18
1.00
0.60
1.00 5.30
0.60
TYPE
F-04
1.00
0.60
Floor S
DESCRIPTION SLAB ON GRADE SILVER EMPRADOR FLOORING 1.00 * 1.00 M CALACATTA MARBLE TILES 100*100 CM BIANCO WHITE MARBLE 100*100 CM WPC FLOORING TERAZZO MARBLE TILES 100*100 CM LIGHT WOOD VEIN MARBLE 100*100 CM HPL ON MOSIC FLOORING PORCELAIN FLOORING 60 *60 CM RUBBER FLOORNG TILES TEAK WOOD FLOORING ON STEEL MOSIC FLOORING 0.05 * 0.05 M BIANCO WHITE MARBLE FLOORING SWIMMING POOL 1.00 X1.00 M WPC FLOORING MOSIC FLOORING 0.02 * 0.02M
10/10/2021 7:01:36 PM
0.60 DRIVER & PORTER'S BEDROOM 074
1.00
0.60
0.60 0.23
0.60 0.23
0.60
D
A'
SP
10.36
A'
1.00
TYPE F-00 F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-60 F-70
2
3
3'
4
5
6
6'
7
8
9
9 Floor Schedule LEGEND
F-07
F-07
HPL ON MOSIC FLOORING
HPL ON MOSIC FLOORING
26 m²
SECONDARY BEDROOM (A) F-01 +4.00 F.F.L.
F-80 F-90
56 m²
A
1.00
1.00
1.00
1.00
1.00
1.52
B
1.00
1.00
25
1.00
0
54 m²
HIS DRESSING ROOM F-05 +4.00 F.F.L.
33
Description APPROVED ISSUE
Date
35
F
36 37
41
42
43
44
45
46
VILLA MR/ M .KHALIFA
54 m²
HPL ON MOSIC FLOORING 6 m²
SECONDARY CLOSET B F-03
H
H
Date Drawn by Checked by
5
6
6'
7
1.00 1.00 1.00 1.00 1.00
1.00
0.62
No.
1.52
PREPARATION COUNTER 093 +7.55 F.F.L.
0
8
9
Scale
Des
APPROV
F Revisions
G
H
H
ROOF FLO
EG20026 Project number
01/09/2021
Date
M.ABDELSALAM M.WALY
EG20026-TD-ID-4- FR-0 4
1.00
F-01
SILVER EMPRADOR FLOORING 1.00 * 1.00 M 13 m²
VILLA M
FIRST FLOOR FLOORING PLAN Project number
3'
1.00
G
HPL ON MOSIC FLOORING
HER DRESSING ROOM F-10 +4.00 F.F.L.
F-07
0.86
0.35
40
16 m²
GUEST WASHROOM 094 +7.55 F.F.L.
G
1 : 50
10/10/2021 7:01:38 PM
39
F-07
HPL ON MOSIC FLOORING
3
1.00
4.38
F-07
SECONDARY BEDROOM B F-02 +4.00 F.F.L.
1.00
Revisions
38
SEP
SP
13 m²
+7.55 F.F.L.
1.00
34
For C
E
1.00
LIGHT WOOD VEIN MARBLE 100*100 CM
GUEST BEDROOM 091
F
1.00
F-06
20 m²
01/09/2021
1.00
UP
HPL ON MOSIC FLOORING
4.46
0.44
HPL ON MOSIC FLOORING
32
F-02
No.
24
+4.00 F.F.L.
0.19
F-07
1.00
26
1.00
E
1.00
27
D
SP SP
SEPTEMBER 2021
E
C
0.93
28
1.00
1.00
29
1.00
1.00
0.92
For CONSTRUCTION
D
1.00
0.19
1.00
1.00
0.45
1.00
1.00
1.00
SEATING AREA 092
1.00
30
F-01 SILVER EMPRADOR FLOORING 1.00 * 1.00 M 98 m²
1.00
1.00
+4.00 F.F.L.
SECONDARY BATH ROOM CALACATTA MARBLE (B) TILES 100*100 CM 068 1.00 SP 1.00 4 m²0.76
BIM ARCHITECT PORTFOLIO
1.00
0.67
0.19
60 m²
FOYER F-09
F-07
1 : 50
1.00
1.00
0.93
D
1.00
F-07
FOYER F-04
2
1.00
+7.55 F.F.L.
GUEST BATHROOM 090 +7.55 F.F.L.
C
HPL ON MOSIC FLOORING
0.60
31
FIRST FLOOR FLOORING PLAN 1
1.00
LIGHT WOOD VEIN MARBLE 100*100 CM 8 m²
+5.25 F.F.L.
1
1.00
0.93
1.00 1.00
F-06
C
+4.00 F.F.L.
UP
G
1.00
1.21
0.78
1.00
1.00 0.10
0.50
SP SP
E
F
1.00
1.00
0.60
1.00
0.40
0.60
1.00
9 m²
KITCHENETTE/BAR AREA F-08
0.60
6 m²
LAUNDRY ROOM 067
1.00
F-03 BIANCO WHITE MARBLE 100*100 CM
SP
0.60
0.60
0.47
PORCELAIN FLOORING 60 *60 CM
0.60 0.40
D
0.60
1.00
1.00
F-08
0.60
1.00
0.60
SECONDARY BATHROOM (A) 060
0.30 0.60
0.50
SP
6 m²
2 m²
0.36
B
TERAZZO MARBLE TILES 100*100 CM
TEAK WOOD FLOORING ON STEEL
C
1.00
0.40
F-10
F-05
1.00
0.82
SP
B
+4.00 F.F.L.
0.40
1.00
F-80 F-90
B'
1.00
60 m²
B
A
SLAB ON GRAD SILVER EMPRA CALACATTA MA BIANCO WHITE WPC FLOORIN TERAZZO MAR LIGHT WOOD V HPL ON MOSIC PORCELAIN FL RUBBER FLOOR TEAK WOOD F MOSIC FLOORI BIANCO WHITE M WPC FLOORIN MOSIC FLOORI
B'
HPL ON MOSIC FLOORING
FAMILY LIVING ROOM F-07
SP
OUTDOOR AREA 095 +7.55 F.F.L.
1.00
B'
F-07
B'
0.34
A
F-00 F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-60 F-70
SILVER EMPRADOR FLOORING 1.00 * 1.00 M 116 m²
2.78
A
MASTER SUITE F-06 +4.00 F.F.L.
TYPE
A'
F-01
1.00
A'
A'
1.00
A'
Floor Sc
DESCRIPTION SLAB ON GRADE SILVER EMPRADOR FLOORING 1.00 * 1.00 M CALACATTA MARBLE TILES 100*100 CM BIANCO WHITE MARBLE 100*100 CM WPC FLOORING TERAZZO MARBLE TILES 100*100 CM LIGHT WOOD VEIN MARBLE 100*100 CM HPL ON MOSIC FLOORING PORCELAIN FLOORING 60 *60 CM RUBBER FLOORNG TILES TEAK WOOD FLOORING ON STEEL MOSIC FLOORING 0.05 * 0.05 M BIANCO WHITE MARBLE FLOORING SWIMMING POOL 1.00 X1.00 M WPC FLOORING MOSIC FLOORING 0.02 * 0.02M
1.00
TYPE F-00 F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-60 F-70
Drawn by
1
1
2
3
3'
4
5
6
6'
7
8
9
Checked by
EG20026
ROOF FLOOR FLOORING PLAN 1 : 50
18
Scale
1 3
4
5
6
6'
7
8
A'
A'
4.32
0.25
+2.35
S.C.L
B'
B'
1.10
8.03
B
C1
C1 WHITE PAINT ON GYPSUM BOARD CEILING
3.56
+2.70
S.C.L
E
E
SEPTEMBER 2021
0.35
2.15
0.78
3.06
WHITE PAINT ON GYPSUM BOARD CEILING
4 EG20026-TD-ID-12-GN-1
7.54
3.19
F
KITCHEN 010
CIGAR LOUNGE 066
+2.70
S.C.L
S.C.L
1.76
1.71
6'
7
8
M.WALY
EG20026-TD-ID-5-BF-0 1 : 50
Scale
5
6
6'
7
8
0.20
4.07
3
3'
0.50
4
5
6
6'
7
8
9
M.A
Drawn by Checked by
1
EG20026-TD
GROUND FLOOR CEILING PLAN 1 : 50
Scale
2
3
3'
4
5
6
6'
7
8
9
A'
A'
A
A
B'
B'
A'
0.30
0.30
SECONDARY BEDROOM (A) F-01
2
9
0.30
0.30
A'
4
GROUND FLO PL
Date
1
1 3'
H
Project number
M.ABDELSALAM
1 : 50
3
0.62
24/10/2021
Checked by
BASEMENT FLOOR CEILING PLAN
3.42
EG20026
Project number
9
Drawn by
4.28
0.22
MASTER SUITE F-06
C1
C1
WHITE PAINT ON GYPSUM BOARD CEILING
3.47
S.C.L
0.20
0.20
7.83
0.10 5.52
0.10
A
+2.70
0.30
4.07
0.20
0.20
WHITE PAINT ON GYPSUM BOARD CEILING
A
B'
B' 0.37
1.91
0.10
0.10
TOILET 071
1.90
No.
C1
0 1
Description APPROVED ISSUE AS CLOUDED
S.C.L
4.28
+2.70
0.38
0.23
0.69
0.62
2.77 +2.70
G
VILLA MR/ M .KHALIFA
0.35
H
FIRST FLOOR CEILING PLAN
Drawn by Checked by
FIRST FLOOR CEILING PLAN 1 : 50
BIM ARCHITECT PORTFOLIO
3
3'
4
5
6
6'
7
S.C.L
+2.87
PREPARATION COUNTER 093
0 1
F
Descr
APPROVED AS CLOUDED
S.C.L
Revisions
4.27
G
H
Date
2
No.
WHITE PAINT ON GYPSUM BOARD CEILING
+2.35
VILLA MR/
0.16
S.C.L
Project number
1
S.C.L
2.12
2.89 2.95 3.42
0.41
0.30
S.C.L
C1
8
9
EG20026
Project number
24/10/2021
Date
M.ABDELSALAM M.WALY
EG20026-TD-ID-5- FR-0 Scale
H
ROOF FLO PL
1 : 50
Drawn by 10/24/2021 2:09:46 PM
2.38
C1
GUEST WASHROOM 094
+2.35
G
HER DRESSING ROOM F-10
WHITE PAINT ON GYPSUM BOARD CEILING
SEPTEM
1.36
1.39 0.26
WHITE PAINT ON GYPSUM BOARD CEILING
H
3.50
0.35
S.C.L
1.71
C1
+2.70 1.25
1.19
SECONDARY CLOSET B F-03
2.12
C1 WHITE PAINT ON GYPSUM BOARD CEILING
For CONS
C1 WHITE PAINT ON GYPSUM BOARD CEILING
---
0.74 3.50
G
5 EG20026-TD-ID-12-GN-2
GUEST BEDROOM 091
Revisions
SECONDARY BEDROOM B F-02
3.26
E
F
F
1.58
7.14
F
4.66
4 EG20026-TD-ID-12-GN-1
Date 01/09/2021 24/10/2021
+2.70
1.26
3.23
WHITE PAINT ON GYPSUM BOARD CEILING
WHITE PAINT ON GYPSUM BOARD CEILING
4.03
D
1.11
C1
3.29
3.29
E
SEPTEMBER 2021
E
7.66
0.60
2.83
D
HIS DRESSING ROOM F-05
C
---
S.C.L
D For CONSTRUCTION
4.59
S.C.L
+2.35
TOILOET 072
S.C.L
S.C.L
6 EG20026-TD-ID-8-GN-2
+2.35
SKYLIGHT
6.27
GUEST BATHROOM 090
+2.70
+2.70
WHITE PAINT ON GYPSUM BOARD CEILING
C
0.82
0.55
9.25
3.82
1.36
SECONDARY BATH ROOM (B) 068
1.51
C1 WHITE PAINT ON GYPSUM BOARD CEILING
2.93
0.22
S.C.L
0.20
0.35 0.63
+2.70
3.01
1.19
0.10
C1
C
0.35
WHITE PAINT ON GYPSUM BOARD CEILING
FOYER F-09
0.72
C1
1.73
E
FOYER F-04
0.10
SEATING AREA 092
1.00
+2.70
S.C.L
3.02
3.39
1.43
WHITE PAINT ON GYPSUM BOARD CEILING
2.84
D
0.10 0.10
S.C.L
1.12
2.15
2.44
C1 WHITE PAINT ON GYPSUM BOARD CEILING
C1
+2.70
0.10
LAUNDRY ROOM 067
0.80 1.41
KITCHENETTE/BAR AREA F-08
1.25
C1 WHITE PAINT ON GYPSUM BOARD CEILING
5 EG20026-TD-ID-8-GN-2
MASTER BATHROOM 070
2.08
0.73
2.04
B
4 EG20026-TD-ID-8-GN-2
4.40
0.20
0.10
2.80
7.09
15.77
B
0.10
0.10
0.10 0.80 0.10
3.13
7.30
2.00
C1 WHITE PAINT ON GYPSUM BOARD CEILING
C
0.20
S.C.L
SECONDARY BATHROOM (A) 060
0.30
B
+2.70
B
2.83
7.83
0.30
0.20
C1 WHITE PAINT ON GYPSUM BOARD CEILING
4.87
FAMILY LIVING ROOM F-07
2.68
0.10
2.70
1.15
4.87
2.82
4.83
0.20
1
1 EG20026-TD-ID-8-GN-2
0.41
H
BASEMENT FLOOR CEILING PLAN
Date
2
VILLA MR/
3.75
0.85
10/24/2021 2:09:46 PM
6
G
+2.70
0.23
5
Revisions
WHITE PAINT ON GYPSUM BOARD CEILING
4.27
Descri
APPROVED IS AS CLOUDED
F C1
WHITE PAINT ON GYPSUM BOARD CEILING
G
H
4
0 1
C1
---
VILLA MR/ M .KHALIFA
H
3'
No.
GUEST WASHROOM 061
1.18
2 EG20026-TD-ID-8-GN-2
3
SEPTEM
C1 WHITE PAINT ON GYPSUM BOARD CEILING
+2.70
3.96
3.55
4.00
2.23
For CONS
E
S.C.L
G
0.35
S.C.L 4.59
2.30
Date
C1
2.80
+2.70
5 EG20026-TD-ID-12-GN-2
01/09/2021 24/10/2021
Revisions WHITE PAINT ON GYPSUM BOARD CEILING
D
RECEPTION 062
0.93
1.24
Description APPROVED ISSUE AS CLOUDED
F
4.00
3.07
3.33
0.35
4.06 0.31
2.09
3.83
7.50
3.31 1.26
0 1
INDOOR JACUZZI 080
S.C.L
1
6 EG20026-TD-ID-8-GN-2
4.59
3.34
4.50
+2.35
1
+2.70
S.C.L
1.16
For CONSTRUCTION
No.
2
MAIN SEATING AREA 065
3.62
0.94
4.31
0.35
B
WHITE PAINT ON GYPSUM BOARD CEILING
C
D
D
HARD KITCHEN 088
1
0.48
4 EG20026-TD-ID-8-GN-2
7.71
2.00
0.31
B' 7.76
C1
S.C.L
+2.87
2.09
C1
3 EG20026-TD-ID-8-GN-2
0.20
S.C.L
0.21
+2.87
MAID'S BEDROOM 087 S.C.L 2.32
1.15
3.63
STORAGE 084
WHITE PAINT
WHITE PAINT ON GYPSUM BOARD CEILING
0.48
C
C 4.16
3.63
3.63
C2
E
0.94
A' 3.95
C1
SECONDARY SEATING 064
+2.70
5 EG20026-TD-ID-8-GN-2
WHITE PAINT
2.32 0.96
1.34
3.13
0.86
0.20
WHITE PAINT ON GYPSUM BOARD CEILING
4.62
4.31
1.70
2.95
G
9
A
DINING AREA 063
C2
1.34
A
B
1.31
0.12
1.14
LIVING AREA 086
0.61 4.57
0.90
4.24
1.34
1.42
0.20
7.11
1.94
2.32
2.57
F
8
BATHROOM 083
C2 WHITE PAINT
7
9.46
1.53 0.12
A
0.80
SAUNA 085
S.C.L
2.32
2.99
D
SHOWER 078
S.C.L
2.82
1.15
6'
0.20
2.40
+2.35
S.C.L
2.24
2.42
3.46
3.49 2.00
4.48
+2.87
0.60
4.21
0.21
+2.35
WHITE PAINT ON GYPSUM BOARD CEILING
LAUNDRY 076
STORAGE 073
S.C.L
POOL HOUSE 079
2.31 C1
WHITE PAINT
+2.87
3.75
C
BATHROOM 077
S.C.L
2.05
+2.35 C2
WHITE PAINT
1.15
6
WOODEN RIBS CEILING
3.13
BATHROOM 075
2.39 C2
1.75
C3
2.53
WHITE PAINT ON GYPSUM BOARD CEILING
S.C.L
KITCHENETTE 082
0.13
1.10
1.49
5.57
+2.87
WOODEN RIBS CEILING
2.31 C1
2.82
4.12
C3
2.24 C2 WHITE PAINT
B
5
2.15
3.20
0.67
B'
4
2.35
0.21
1.90
DRIVER & PORTER'S BEDROOM 074
S.C.L
A
3'
4.23
WHITE PAINT
+2.87
3
9.80
C2
2
9
1.80
A'
3'
0.20
2
0.20
1
1
1
2
3
3'
4
5
6
6'
7
8
9
M.
Checked by
EG20026-T
ROOF CEILING PLAN 1 : 50
19
Scale
1
1
2
3
3'
4
5
6
6'
7
8
2
3
A'
KITCHENETTE 082
BATHROOM 075
B'
P2
DOT10
LED120
B'
S3.2
S3.2
B
S6.1
LED120
DOT10
LED120
LED60
DOT10
DOT10
DOT10
LED120
LED60
C
C S6.1 S3.2
STORAGE 084
MAID'S BEDROOM 087
S3.2
LED60
IL LED 68
LED120
IL1
CY1
E
S3.2
ILM
S4
E
PR
SEPTEMBER 2021
E
TR-3300
CY1
0 1
DOT10
INDOOR JACUZZI 080
DOT10
SF8
SF8
Description
Date
APPROVED ISSUE AS CLOUDED
01/09/2021 24/10/2021
S4
S4
S4
S4
S0
D.L
CY9
F
S4
WM
S4
UP2.1
G
VILLA MR/ M .KHALIFA
S.A.D 28"X14" FROM BASEMENT UP EX.A.D 30"X14" TO ROOF FROM H BASEMENT UP
3'
4
5
6
6'
7
8
9
M.WALY
Checked by
EG20026-TD-ID-6-BF-0
BASEMENT FLOOR REFLECTED CEILING PLAN 1 : 50
1 : 50
Scale
2
4
3'
5
6
6'
7
8
VILLA M
GRO REFLEC
3
4
3'
5
6
6'
7
8
9
Date
Checked by
1
EG2002
GROUND FLOOR REFLECTED CEILING PLAN 1 : 50
Scale
2
3
3'
4
5
6
6'
7
8
9
9
A'
A'
A
A
B'
B'
A'
IL1
IL1
S3
Drawn by
1 3
S3
S3
Project number
1
M.ABDELSALAM
Drawn by
S3
EG20026 24/10/2021
Date
G
S.A.D 28"X14" FROM BASEMENT UP EX.A.D 30"X14" TO ROOF FROM BASEMENT HUP TO ROOF
FL3
H
BASEMENT FLOOR REFLECTED CEILING PLAN Project number
3
Revisions
UC
S4 S4 S4
S4
De
APPROV AS CLO
SF8
F50
UC
LOUVERS ABOVE DOOR
10/24/2021 2:09:47 PM
H
0 1
F
SF8
3xPR
G
LED60
CIGAR LOUNGE 066
F50
Revisions
LED120
No.
S0
KITCHEN 010
IL LED 68
G
F50
GUEST WASHROOM 061
ILM
F
DOT10 SF8
SE
WM
No. HARD KITCHEN 088
For C
F50
LED60
dumbwaiter
D
SU10
D
E
S3.2
RECEPTION 062
D For CONSTRUCTION
IL1
LED60
LED120
C
A'
LED120
FL
C
2
DOT10
P2
S3.2
IL1
BATHROOM 083
1
DOT10
SU1
DOT10
1
A
DOT10
SECONDARY SEATING 064
B
2
LED60
TL1
B
S5
1
IL1
SU1
DOT10
B
D
SU20
IL1
P2
DOT10
P2
S5
F
LED120
DINING AREA 063
B' DOT10
LOBBY 081
A'
IL1
IL1
B'
DOT10
STORAGE 073
9
TL1
A
SAUNA 085
LAUNDRY 076
8
IL1
DOT10
POOL HOUSE 079
S4
7
IL1
A
ILP-3100
6'
IL1
SU20
LED120
LIVING AREA 086
S4
6
IL1
A'
A
5
9
A' DRIVER & PORTER'S BEDROOM 074
4
3'
FL10
FL55 S3.2
PRO
S3.2
PRO
S3.2 S3.2 S3.2
PRO
PRO
A
IL1
IL1
SECONDARY BEDROOM (A) F-01
TL66
IL1
IL1
PRO
A
MASTER SUITE F-06
S3.2
PRO
PRO
B'
S6.1
S3.2
S6.1
PRO
PRO
PRO
PRO
TL55
SU2
ILM
B'
SU1 LED56
W1
LED20
S5
S6.1
LOUVERS ABOVE WINDOW
ILM
S4
S4
MASTER BATHROOM 070
S3
S5
EX.WM-1ST-01 100 CFM
S5
UC
UC
LED67
D.L
IL1 SU97 S3.2
S3.2
CY1
TOILET 071
S3.2
S3.2
FOYER F-04
S0
S3.2
S3 TOILOET
S5
S3
SELF LIT
S10
S3.2
S3
S3
LED67
LED20 2xLED20
F
S10
ILM
S5
SECONDARY BATH ROOM (B) 068
LED67
S3
S5
W1
SELF LIT
SELF LIT
SELF LIT
SELF LIT
G
S3.2
SECONDARY BEDROOM B F-02
CY9-W
S3
S3
SELF LIT
ILM S3.2
S3
HER DRESSING ROOM F-10
CY9-W
SU77
SELF LIT
S10
SELF LIT
IL1
SELF LIT
S3
H
Description APPROVED ISSUE AS CLOUDED
EX.A.D 30"X14" FROM BASEMENT UP TO H ROOF
FIRST FLOOR REFLECTED CEILING PLAN
1
FIRST FLOOR REFLECTED CEILING PLAN 1 : 50
BIM ARCHITECT PORTFOLIO
4
5
6
6'
7
8
9
UC S3
F
UC
S3
S3
3xPR
IL1
ILM
LED67
Revisions
IL1
ILM
G
LED67
VILLA M H
H
RO REFLE
Project numbe Date
M.ABDELSALAM
1 : 50
D
APPRO AS CLO
S3
EG20026
M.WALY
0 1
S3
24/10/2021
EG20026-TD-ID-6-FR-0 Scale
No.
ILM
CY9 LED20
F S3
VILLA MR/ M .KHALIFA
Checked by
3'
SE
S6.B
01/09/2021 24/10/2021
S.A.D 28"X14" G FROM BASEMENT UP TO ROOF
Drawn by
3
For
S6.B
Date
Revisions
Date
2
E S3
Project number
1
D
PRO
SU50
G
S10 S10.3
LED1200
E
SEPTEMBER 2021
SELF LIT
3xPR
LED1200
SU12
SELF LIT
ILM
SELF LIT
SECONDARY BEDROOM B F-02
LED1200
D.L
For CONSTRUCTION
0 1
F W1
SELF LIT
S6.1
F1
S5
E
D.L ILM
C
LED1200 PRO
ILM S5
No.
ILM SELF LIT
CY9
PRO
SF8
D
LOUVERS ABOVE WINDOW
072
S3
S3
PRO
SF8
S3
ILM
HIS DRESSING ROOM F-05
SELF LIT
SU0
LOUVERS ABOVE WINDOW
S10.3
SKYLIGHT
S3
SF8
PRO
C
SELF LIT
SU50
S3.2
C
SELF LIT
E CY1
ILM
PRO
SF8
PRO
EX.WM-1ST-02 D 100 CFM
W1
SELF LIT
LED1200
S3
S5
SELF LIT
S3.2
PRO
LOUVERS ABOVE WINDOW
S5
S3
P3
S3.2
LED1200
ILM
LED67
SUP
FOYER F-09
EX.WM-1ST-05 100 CFM
IL1
WM5
2xLED20
2x mirror lights P3
LED20
S3.2
EX.WM-1ST-04 100 CFM
WM5
F1
S3 IL1
LAUNDRY ROOM 067
WM5 downwards
B
B
W5
D.L
S2 S2 S2
S6.1
ILM
LOUVERS ABOVE WINDOW
W5
D.L SU0
LED20
C
D
IL1 IL1
LED20 S3
EX.WM-1ST-03 100 CFM
WM5 downwards
IL1
LED67
FAMILY LIVING ROOM F-07
S3
SECONDARY BATHROOM (A) 060
WM5 downwards
B
PRO
Drawn by 10/24/2021 5:38:11 PM
B
SF8
PRO
LED67
WM5 downwards
SF8
1
1
2
3
3'
4
5
6
6'
7
8
9
Checked by
EG2002
ROOF FLOOR REFLECTED CEILING PLAN 1 : 50
20
Scale
7
8
1
9
2
3
3'
4
5
6
6'
7
8
9
0.50 0.05
WHITE PAINT ON GYPSUM BOARD CEILING
0.08
A'
0.50
FIRST FLOOR PLAN T.O.S +3900
A' 1
WHITE PAINT ON GYPSUM BOARD CLADDING
WHITE PAINT ON GYPSUM BOARD CLADDING
2 EG20026-TD-ID-7-BF-00 -
A
SILVER EMPERADOR MARBLE TILES 100 *100 CM AS PER APPROVED SAMPLE
CURTAIN WALL
A
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350
B'
SEATING AREA - GR - ELEV 01
1
1 : 50
9
8
7
6'
E
3
2
1
RIMADESIO DOOR WHITE PAINT ON GYPSUM BOARD CLADDING
1.80
SILVER EMPERADOR MARBLE TILES 100 *100 CM AS PER APPROVED SAMPLE
2.20 0.70
0.90
FIRE PLACE
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
0.20
GROUND FLOOR PLAN F.F.L +450
E
3'
0.10
WHITE BIANCO MARBLE CLADDING FOR BAR AS PER APPROVED SAMPLE
C
D
4
1.80
1.70
WOOD CALDDING AS PER APPROVED SAMPLE
D
5
0.05 0.50 0.50
WHITE PAINT ON GYPSUM BOARD CEILING
C
6
FIRST FLOOR PLAN T.O.S +3900
B
0.05 0.50
B
0.70
B'
GROUND FLOOR PLAN T.O.S +350
SEATING AREA - GR - ELEV 03
3
1 : 50
B
C
D
E
F
G
H
FIRST FLOOR PLAN T.O.S +3900
7
8
9
BASEMENT FLOOR DETAILED PLAN - Callout 1
No. 0 1
Description
No.
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
Date
APPROVED ISSUE AS CLOUDED
SEPTEMBER 2021
SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
WHITE PAINT ON GYPSUM BOARD CLADDING
BASEMENT 3D 01
4
1 : 50
For CONSTRUCTION
2 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
WOOD CALDDING AS PER APPROVED SAMPLE
SEPTEMBER 2021
3
RIMADESIO DOOR
WHITE PAINT ON GYPSUM BOARD CEILING
For CONSTRUCTION
01/09/2021 24/10/2021
0 1
GROUND FLOOR PLAN F.F.L +450
Description
Da
APPROVED ISSUE AS CLOUDED
01/09 24/10
GROUND FLOOR PLAN T.O.S +350
Revisions Revisions
SEATING AREA - GR - ELEV 02
2
1 : 50
VILLA MR/ M .KHALIFA
VILLA MR/ M .KHALIFA 7
H
9
H
E
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
WHITE BIANCO MARBLE CLADDING FOR BAR AS PER APPROVED SAMPLE FIRE PLACE
GROUND FLOOR PLAN F.F.L +450
GROUND FLOOR PLAN F.F.L +450
GROUND FLOOR PLAN T.O.S +350
GROUND FLOOR PLAN T.O.S +350
E
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
1
E
4
1
BAR AREA - ELE 01
1 : 50
9
WHITE BIANCO MARBLE CLADDING FOR BAR AS PER APPROVED SAMPLE
GROUND FLOOR PLAN F.F.L +450
GROUND FLOOR PLAN F.F.L +450
GROUND FLOOR PLAN T.O.S +350
GROUND FLOOR PLAN T.O.S +350
H
BIANCO WHITE MARBLE CALDDING FOR SINKS AS PER APPROVED SAMPLE
6
7 3
BAR AREA - ELE 03
4
1 : 50
BAR AREA - ELE 04
6'
GROUND FLOOR PLAN F.F.L +450
7
1 : 50
3
0.50 0.05
SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
GROUND FLOOR PLAN F.F.L +450
2
F
GUEST WASHROOM - ELE 02 1 : 50
E
6
6'
7
WHITE PAINT ON GYPSUM BOARD CEILING WHITE PAINT ON GYPSUM BOARD CLADDING SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
2 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE GROUND FLOOR PLAN F.F.L +450
GROUND FLOOR PLAN T.O.S +350
GROUND FLOOR DETAILED PLAN - Callout 3
6
FIRST FLOOR PLAN T.O.S +3900
H
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
6'
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
FIRST FLOOR PLAN T.O.S +3900
WHITE PAINT ON GYPSUM BOARD CLADDING SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
G
2.20
WHITE PAINT ON GYPSUM BOARD CLADDING
G
WHITE PAINT ON GYPSUM BOARD CEILING
1.70
SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
WHITE PAINT ON GYPSUM BOARD CLADDING
WHITE PAINT ON GYPSUM BOARD CLADDING
GUEST WASHROOM - ELE 01
D G
0.10
BIANCO WHITE MARBLE CALDDING AS PER APPROVED SAMPLE
GROUND FLOOR DETAILED PLAN - Callout 2 8
E
0.90
WHITE PAINT ON GYPSUM BOARD CEILING WOOD CALDDING AS PER APPROVED SAMPLE
2.72
H
F
0.50
WHITE PAINT ON GYPSUM BOARD CEILING WOOD CALDDING AS PER APPROVED SAMPLE
H
G
WHITE PAINT ON GYPSUM BOARD CEILING
SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
1 : 50
0.50
H
0.05
G
7
1
F
H
FIRST FLOOR PLAN T.O.S +3900
0.05 0.50
G
1 : 50
F
0.05
7
7
GROUND FLOOR PLAN T.O.S +350
2.20
8 FIRST FLOOR PLAN T.O.S +3900
H
GROUND FLOOR PLAN T.O.S +350
F
3
7
BIANCO WHITE MARBLE CALDDING FOR SINKS AS PER APPROVED SAMPLE
BAR AREA - ELE 02
2
1 : 50
GLASS PARTITION AS PER APPROVED SAMPLE
GROUND FLOOR PLAN F.F.L +450
3 1 EG20026-TD-ID-7-GR-3
2.70
F
G
FIRST FLOOR PLAN T.O.S +3900
WHITE PAINT ON GYPSUM BOARD CLADDING
SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
2
4 2 EG20026-TD-ID-7-GR-1
F
FIRST FLOOR PLAN T.O.S +3900
7
1:
Scale
1.90
BIANCO WHITE MARBLE CALDDING AS PER APPROVED SAMPLE
2.70
1.70 0.10
WHITE PAINT ON GYPSUM BOARD CLADDING
6'
WHITE PAINT ON GYPSUM BOARD CEILING
1.80
WOOD CALDDING AS PER APPROVED SAMPLE
SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
6
RECEPTION - 3D - 01
5
1 : 50
0.05
WHITE PAINT ON GYPSUM BOARD CEILING
M.WA
0.80
E
SEATING AREA - GR - ELEV 04
4
H
0.20 0.70
E
G
M.ABDELSAL
Drawn by
EG20026-TD-ID-7-GR-
0.50
0.05 0.50
WHITE PAINT ON GYPSUM BOARD CEILING
D
F
EG200
24/10/20
Checked by
FIRST FLOOR PLAN T.O.S +3900
BIANCO WHITE MARBLE CALDDING AS PER APPROVED SAMPLE
D
E
2 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350
0.50
D
8
1 : 50
Scale
Date
0.05
M.WALY
Project number
WHITE PAINT ON GYPSUM BOARD CLADDING
0.50
7 FIRST FLOOR PLAN T.O.S +3900
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
M.ABDELSALAM
Drawn by
BASEMENT ELE 01 1 : 50
SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
24/10/2021
Date
WOOD CALDDING AS PER APPROVED SAMPLE
2.20
BASEMENT FLOOR PLAN F.F.L +-2750
EG20026
Project number
GROUND FLOOR INTERNAL ELEVATION
WHITE PAINT ON GYPSUM BOARD CEILING
2.20
1
9
B
0.50
BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
EG20026-TD-ID-7-BF-00 BASEMENT ELE 02 1 : 50
8
C
2.70
0.05
0.50
WOODEN RIBS 3CM x 3CM
BASEMENT FLOOR PLAN F.F.L BASEMENT FLOOR PLAN F.F.L +-2750 +-2750
7
D
0.50
1.80
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
Checked by
2
E
ELEVATOR
10/24/2021 2:25:49 PM
0.25
WOODEN RIBS CEILING
BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
BASEMENT FLOOR PLAN F.F.L +-2750
F
WOOD CALDDING AS PER APPROVED SAMPLE
BASEMENT FLOOR INTERNAL ELEVATIONS
ZERO LEVEL +-100
2.35
0.50
0.05
0.50
0.05
2.35
2.34
WHITE PAINT ON GYPSUM BOARD CLADDING
ZERO LEVEL +-100
2.05
WOODEN RIBS CEILING
G
FIRST FLOOR PLAN T.O.S +3900
GROUND FLOOR PLAN T.O.S +350
0.050.50
GROUND FLOOR PLAN T.O.S +350
8
0.05
G
1.90
F
0.80
E
0.50
D
0.05
C
0.50
B
1.90
B'
0.80
A
0.50
A'
GROUND FLOOR PLAN T.O.S +350
GUEST WASHROOM - ELE 03
4
1 : 50
GUEST WASHROOM - ELE 04 1 : 50
1 : 50
For CONSTRUCTION For CONSTRUCTION
SEPTEMBER 2021
SEPTEMBER 2021
No. 0 1
Description APPROVED ISSUE AS CLOUDED
Date
No.
01/09/2021 24/10/2021
0 1
Description APPROVED ISSUE AS CLOUDED
D
01/0 24/1
Revisions Revisions
VILLA MR/ M .KHALIFA
VILLA MR/ M .KHALIF
GROUND FLOOR INTERNAL ELEVATIONS
Date Drawn by Checked by
BIM ARCHITECT PORTFOLIO
BAR AREA - 3D 01
6
BAR AREA - 3D 02
Scale
Project number
24/10/2021
Date
M.ABDELSALAM M.WALY
EG20026-TD-ID-7-GR-1 5
GROUND FLOOR INTERNAL ELEVATION
EG20026
1 : 50
Drawn by 10/24/2021 2:36:48 PM
Project number
Checked by
EG20
24/10/2
M.ABDELSAL
M.W
EG20026-TD-ID-7-GR 6
GUEST WASHROOM - 3D - 02
5
GUEST WASHROOM - 3D - 01
Scale
21
1
A
A
2
1 : 50
B'
9
8
7
B
8
9
FIRST FLOOR F.F.L +4000
5
MASTER SUITE - CALLOUT
3
1 : 50
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE
WHITE PAINT ON GYPSUM BOARD CLADDING
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
1.10
4 2 EG20026-TD-ID-7-FR-2
A
A
SECONDARY BEDROOM (A) F-01
1
0.50
2.29
1.90
0.05
0.05
0.50
0.50 0.05
0.80
FIRST FLOOR F.F.L +4000
3 B'
B
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE
CLEAR MIRROR CLADDING
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
B 1
2
4
2
MASTER SUITE - ELEV 04
SECONDARY BEDROOOM A - CALLOUT
5
1 : 50
B
1
WHITE WOOD RIBS
FIRST FLOOR F.F.L +4000
1 : 50
4
SECONDARY BEDROOM A - ELEV 02 1 : 50
B'
A
A'
ROOF FLOOR PLAN T.O.S +7450
3
FIRST FLOOR F.F.L +4000
MASTER SUITE - ELEV 03
2
ROOF FLOOR PLAN T.O.S +7450
B'
WHITE PAINT ON GYPSUM BOARD CEILING
WHITE PAINT ON GYPSUM BOARD CLADDING
1 : 50
SECONDARY BEDROOM A - ELEV 01 1 : 50
A'
WHITE PAINT ON GYPSUM BOARD CEILING
0.05
WHITE PAINT ON GYPSUM BOARD CEILING
1.60
B
B'
ROOF FLOOR PLAN T.O.S +7450
0.50
ROOF FLOOR PLAN T.O.S +7450
FIRST FLOOR F.F.L +4000
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
1 : 50
A
B'
B
A'
WHITE PAINT ON GYPSUM BOARD CLADDING
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
MASTER SUITE - ELEV 02
MASTER SUITE F-06
7
WHITE PAINT ON GYPSUM BOARD CLADDING
A'
MASTER SUITE - ELEV 01
1
3
6'
3
1.00
1 4 2 EG20026-TD-ID-7-FR-0
6
2
FIRST FLOOR F.F.L +4000
B'
0.41
1
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
1.70
WHITE PAINT ON GYPSUM BOARD CLADDING
FIRST FLOOR F.F.L +4000
A
ROOF FLOOR PLAN T.O.S +7450
WHITE PAINT ON GYPSUM BOARD CEILING
0.50
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
A'
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE
CLEAR MIRROR CALDDING
ROOF FLOOR PLAN F.F.L +7550
WHITE PAINT ON GYPSUM BOARD CEILING
0.05
2.70
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE
A'
3
1.70
A'
WHITE PAINT ON GYPSUM BOARD CEILING
WOODEN SHELVES WHITE PAINT ON GYPSUM BOARD CLADDING
2
1.00
0.50
9
1
ROOF FLOOR PLAN F.F.L +7550
2.20
8
B
2.70
7
2.70
6'
B'
WHITE PAINT ON GYPSUM BOARD CEILING
0.05
WHITE PAINT ON GYPSUM BOARD CEILING
6
A
0.50
A' ROOF FLOOR PLAN T.O.S +7450
0.05 0.50
9
0.50
8
0.05
7 ROOF FLOOR PLAN T.O.S +7450
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
WHITE PAINT ON GYPSUM BOARD CLADDING
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE
WHITE WOOD RIBS
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
FIRST FLOOR F.F.L +4000
SECONDARY BEDROOM A - ELEV 03
3
1 : 50
SECONDARY BEDROOM A - ELEV 04 1 : 50
For CONSTRUCTION For CONSTRUCTION
SEPTEMBER 2021
SEPTEMBER 2021
No. 0 1
Description APPROVED ISSUE AS CLOUDED
Date
No.
01/09/2021 24/10/2021
0 1
Description
Date
APPROVED ISSUE AS CLOUDED
01/09/2021 24/10/2021
Revisions Revisions
VILLA MR/ M .KHALIFA
VILLA MR/ M .KHALIFA
FIRST FLOOR INTERNAL ELEVATIONS
7
1
SP
1
1 : 50
MASTER BATHROOM - ELEV 02
B
1 : 50
BATHROOM A - ELEV 01
2
1 : 50
MASTER BATHROOM - CALLOUT 1 : 50
3
4
1 : 50
TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
2
BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
CLEAR MIRROR WITH INDIRECT LED LIGHT
TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
TERAZZO CLADDING FOR SINK
TEAK WOOD FLOORING AS PER APPROVED SAMPLE
FIRST FLOOR F.F.L +4000
SP
TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
1.20
0.50 0.30
0.20
0.50
MASTER BATHROOM - ELEV 03
FIRST FLOOR F.F.L +4000
1
WHITE PAINT ON GYPSUM BOARD CEILING 0.50
WHITE PAINT ON GYPSUM BOARD CEILING
0.05 0.50
1.00
BIANCO WHITE MARBLE CLADDING FOR SINK
0.90
BIANCO WHITE MARBLE TILES 100 * 100 CM AS PER APPROVED SAMPLE
0.80
0.05 0.70 0.50
BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
0.50
B
1.00
2.70
0.90
0.05
0.50
FIRST FLOOR F.F.L +4000
0.40
WHITE PAINT ON GYPSUM BOARD CLADDING
MIRROR WITH INDIRECT LED LIGHT
WHITE PAINT ON GYPSUM BOARD CEILING
0.20 0.70
9
0.38 0.38 0.38 0.38 0.37
8
WHITE PAINT ON GYPSUM BOARD CEILING
C
0.50 2.20
B
0.05
D ROOF FLOOR PLAN T.O.S +7450
1.70
7
BATHROOM A - ELEV 02
ROOF FLOOR PLAN T.O.S +7450
0.20
8
TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
1 : 50
1
0.80
9
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
SP
B 2
ROOF FLOOR PLAN T.O.S +7450
0.50
0.50 0.05
0.20
2.30
FIRST FLOOR F.F.L +4000
SP
ROOF FLOOR PLAN T.O.S +7450
D
7
TERAZZO CLADDING FOR SINK
FIRST FLOOR F.F.L +4000
TEAK WOOD FLOORING AS PER APPROVED SAMPLE TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE SP
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
5
SECONDARY BATHROOM A - CALLOUT 1 : 50
3
BATHROOM A - ELEV 03 1 : 50
4
BATHROOM A - ELEV 04 1 : 50
MASTER BATHROOM - ELEV 04 1 : 50
For CONSTRUCTION
For CONSTRUCTION
SEPTEMBER 2021
No. 0 1
Description APPROVED ISSUE AS CLOUDED
SEPTEMBER 2021
Date
No.
01/09/2021 24/10/2021
0 1
Revisions
VILLA MR/ M .KHALIFA
FIRST FLOOR INTERNAL ELEVATIONS
Drawn by Checked by
MASTER BATHROOM - 3D 01
BIM ARCHITECT PORTFOLIO
7
MASTER BATHROOM - 3D 02
Scale
Project number
24/10/2021
Date
M.ABDELSALAM M.WALY
EG20026-TD-ID-7-FR-2 6
FIRST FLOOR INTERNAL ELEVATIONS
EG20026
1 : 50
Drawn by 10/24/2021 2:27:38 PM
Date
Date 01/09/2021 24/10/2021
Revisions
VILLA MR/ M .KHALIFA
Project number
Description APPROVED ISSUE AS CLOUDED
Checked by
6
BATHROOM A - 3D 01
7
EG20026 24/10/2021 M.ABDELSALAM M.WALY
EG20026-TD-ID-7-FR-3
BATHROOM A - 3D 02
Scale
22
1 : 50
10/24/2021 2:28:09 PM
2
TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
2
1
MASTER BATHROOM - ELEV 01
WHITE PAINT ON GYPSUM BOARD CEILING
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE 0.40
FIRST FLOOR F.F.L +4000
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
1.60
0.40 1.00 0.40 0.43 0.47
BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
0.90
0.050.50
0.50 0.05
TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
TOILOET 072
D
5
WHITE PAINT ON GYPSUM BOARD CEILING
ROOF FLOOR PLAN T.O.S +7450
0.05 0.70 0.50
C TOILET 071
B
2
1.00
C
1
FIRST FLOOR F.F.L +4000
0.20
FIRST FLOOR F.F.L +4000
2.70
B MASTER BATHROOM 070
WHITE PAINT ON GYPSUM BOARD CLADDING
1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE
0.20 0.30 0.20 0.90
B
BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE
D
1.50
WHITE PAINT ON GYPSUM BOARD CLADDING
0.20
MIRROR WITH INDIRECT LED LIGHT
1.50
9
0.05
8
1.80
7
WHITE PAINT ON GYPSUM BOARD CEILING
C
0.20
ROOF FLOOR PLAN T.O.S +7450
0.50
ROOF FLOOR PLAN T.O.S +7450
WHITE PAINT ON GYPSUM BOARD CEILING
B
1 : 50
Scale
ROOF FLOOR PLAN T.O.S +7450
9
0.50
8
0.96 0.05
7
SECONDARY BEDROOM A - 3D 02
10/24/2021 2:26:59 PM
SECONDARY BEDROOM A - 3D 01
1.00
6
EG20026-TD-ID-7-FR-1
0.05 0.70
1 : 50
Scale
M.WALY
Checked by
1.00
MASTER SUITE - 3D 02
7
M.ABDELSALAM
Drawn by
1.00
EG20026-TD-ID-7-FR-0
1.00
MASTER SUITE - 3D 01
10/24/2021 2:26:24 PM
M.WALY
Checked by
24/10/2021
Date
M.ABDELSALAM
Drawn by
EG20026
Project number
24/10/2021
Date
6
FIRST FLOOR INTERNAL ELEVATIONS
EG20026
Project number
8
7
6'
6
5
4
3'
3
2
1 TOP ROOF PLAN +10650
0.40
0.40
9
2.27
1.97
3.20
W-60
W-30
1.10 2.73
2
10.95
10.95
3.45
1.10
SPANDREL GLASS
3.45
ROOF FLOOR PLAN T.O.S +7450
2.73
W-30
0.66
0.66
W-60
ROOF FLOOR PLAN F.F.L +7550
BIANCO WHITE MARBLE CLADDING
W-70
3.20
1.97
2.27
WPC RIBS
TINTED GLASS
8.68
FIRST FLOOR F.F.L +4000
AL-01
AL-01 0.85
0.85
FIRST FLOOR PLAN T.O.S +3900
3.65
SPANDREL GLASS
3.65
2.70
-
2.80 GROUND FLOOR PLAN F.F.L +450
---
+0.45 F.F.L.
GROUND FLOOR PLAN T.O.S +350
ZERO LEVEL +-100
0.45
+0.00 F.F.L.
0.45
2
8.68
EG20026-TD-ID-9-GN-2
EXTERNAL ELEVATION - 02
3
-
EG20026-TD-ID-9-GN-2
---
1 : 50
1
2
3
3'
4
5
6
6'
7
8
9 For CONSTRUCTION
TOP ROOF PLAN +10650
TOP ROOF PLAN +10650
SEPTEMBER 2021
BIANCO WHITE MARBLE CLADDING
3.20
3.20
3.20
3.20
WPC RIBS
0.90
TINTED GLASS
ROOF FLOOR PLAN F.F.L +7550
0.40
ROOF FLOOR PLAN F.F.L +7550 ROOF FLOOR PLAN T.O.S +7450
ROOF FLOOR PLAN T.O.S +7450
No. 0 1
Description APPROVED ISSUE AS CLOUDED
Date 01/09/2021 24/10/2021
Revisions
SPANDREL GLASS
3.45
VILLA MR/ M .KHALIFA
WPC RIBS
10.95
3.25
10.95
3.35
3.45
BIANCO WHITE MARBLE CLADDING
8.30
TINTED GLASS
7.75
FIRST FLOOR F.F.L +4000
0.85
7.75
0.20
FIRST FLOOR F.F.L +4000 FIRST FLOOR PLAN T.O.S +3900
FIRST FLOOR PLAN T.O.S +3900
1 EG20026-TD-ID-9-GN-2
EXTERNAL ELEVATIONS
SPANDREL GLASS
EG20026
1
EXTERNAL ELEVATION - 01
3.65
Drawn by
GROUND FLOOR PLAN F.F.L +450
0.45
0.15
0.15
0.45
ZERO LEVEL +-100
+0.00 F.F.L.
24/10/2021
Date IVORY WHITE PAINT
+0.45 F.F.L.
GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350
2.80
3.80
3.65
Project number
GROUND FLOOR PLAN T.O.S +350
M.ABDELSALAM M.WALY
Checked by
EG20026-TD-ID-8-GN-0
ZERO LEVEL +-100
1 : 50
Scale
1 : 50
BIM ARCHITECT PORTFOLIO
23
H
G
F
W-30
E
D
C
B
B'
A
A' TOP ROOF PLAN +10650
2.27 3.20
ROOF FLOOR PLAN F.F.L +7550
1.93
ROOF FLOOR PLAN F.F.L +7550
1.17
0.86
3.20
3.40
2.35
2.23
2.23
TOP ROOF PLAN +10650
ROOF FLOOR PLAN T.O.S +7450
1.15
ROOF FLOOR PLAN T.O.S +7450
10.95
3.45 4.80
2.70
10.95
3.45
1.00
BIANCO WHITE MARBLE CLADDING
IVORY WHITE PAINT
W-30
W-60 FIRST FLOOR F.F.L +4000 FIRST FLOOR PLAN T.O.S +3900
2.20
GROUND FLOOR PLAN F.F.L +450
ZERO LEVEL +-100
1
GROUND FLOOR PLAN T.O.S +350
0.45
0.55
0.45
+0.00 F.F.L.
0.55
GROUND FLOOR PLAN T.O.S +350
+0.45 F.F.L.
+0.45 F.F.L. 0.45
GROUND FLOOR PLAN F.F.L +450
2.30
2.20
3.65
3.65
1.35
7.75
2.65
8.68
FIRST FLOOR F.F.L +4000 FIRST FLOOR PLAN T.O.S +3900
ZERO LEVEL +-100
Elevation 1 - a 1 : 50
A'
A
B'
B
C
D
E
F
G
H
For CONSTRUCTION TOP ROOF PLAN +10650
SEPTEMBER 2021
No.
3.20
0 1
Description APPROVED ISSUE AS CLOUDED
Date
01/09/2021 24/10/2021
1.05
1.10
ROOF FLOOR PLAN F.F.L +7550
0.89
4.65
3.20
2.31
2.31
2.30
2.27
TOP ROOF PLAN +10650
ROOF FLOOR PLAN F.F.L +7550
Revisions
ROOF FLOOR PLAN T.O.S +7450 1.25
ROOF FLOOR PLAN T.O.S +7450
IVORY WHITE PAINT
3.45
10.95
FIRST FLOOR F.F.L +4000 W-60
EXTERNAL ELEVATIONS
FIRST FLOOR PLAN T.O.S +3900
1.35
FIRST FLOOR PLAN T.O.S +3900
7.75
2.55
8.68
FIRST FLOOR F.F.L +4000
BIANCO WHITE MARBLE CLADDING
4.84
2.20
10.95
1.00
3.45
VILLA MR/ M .KHALIFA
EG20026
Project number
W-30
24/10/2021
3.65
3.65
Date
M.ABDELSALAM
2.30
2.20
2.20
Drawn by Checked by
BIM ARCHITECT PORTFOLIO
ZERO LEVEL +-100
0.45
0.55
Elevation 2 - a 1 : 50
M.WALY
EG20026-TD-ID-8-GN-1 0.45
2
0.55
GROUND FLOOR PLAN T.O.S +350
0.45
GROUND FLOOR PLAN F.F.L +450
ZERO LEVEL +-100
1 : 50
Scale
24
2.50
W-50
GLASS RAILING BIANCO WHITE MARBLE - STAIR
W-50
0.10
38 75
W-50
CONCRETE PAVEMENT
E
1
26.26
-0.10 F.F.L.
18 17 16 15 14 13 12 11 10
W-40
3
0 1
3
W-40
1
0.10
4.90
7.40 28.15 18.60
11.20
5
4
0.10
3.25
0.10
W-50
5.55
0.10
EG20026-TD-ID-10-GN-5 1 3
-0.10 F.F.L.
7.20
2
-0.15 F.F.L.
-0.10 F.F.L.
W-40
5.20
W-50
-0.15 F.F.L.
For CONSTR
SEPTEMBE
7.20 W-50
3'
0.10
29.00
4
4
3
-0.10 F.F.L.
-0.55 F.F.L.
-0.90 F.F.L.
2.45
1 2 3 4 5
-0.10 F.F.L.
ALUMINUM GATE
9.97
CONCRETE PAVEMENT
6.7
W-50
4
No.
3
2
3 2 1
0 1
29.61
1
37.81
2 EG20026-TD-ID-8-GN-1
UP
-0.10 F.F.L.
W-50
W-50
-0.10 F.F.L.
Descrip
APPROVED ISS AS CLOUDED
-0.05 F.F.L.
2
3 2 1
1
1.00
W-50
VILLA MR/ M .KHALIFA
5.70
SEATING AREA
2.68
1.40
1
6
ALUMINUM GATE
Revisions
5.80
W-50 -0.40 F.F.L.
CONCRETE PAVEMENT
0 32 17
2
STEEL COLUM
Revisions
+0.35 F.F.L. 3.05
W-40
W-40
2
3'
4.00
01/09/2021 24/10/2021
1.20
CONCRETE PAVEMENT
W-40
Date
APPROVED ISSUE AS CLOUDED
4
7.70
6'
5.0 0
W-40
Description
-1.60 F.F.L. 5.30 14.34
2.60
1.20
5
SEPTEMBER 2021
No.
1.00
2 EG20026-TD-ID-7-GR-0 1 3
6.80
3.1
1.20
0.50
1.60
11.50
3'
3
2.00
5.78
VILLA MR/ M
0.10
3'
5
2.86
2
STEEL COLUM
For CONSTRUCTION
1.20
1.20
4
OVERFLOW SWIMMING POOL
2.60
W-40
4
4
EG20026-TD-ID-10-GN-4 1 3
6
2.68
5
5.30
3.70
7
1
EG20026-TD-ID-7-GR-3 4 2
0.80
2.45
5
STEEL COLUM
0.30
6
2.60
0.10
-0.15 F.F.L.
-0.10 F.F.L.
4
6'
W-40
0.30
6
32.13
W-40
6.80
9 8
2
1
31.60
W-40
2.15
EG20026-TD-ID-7-GR-1 1 3
7
7 6 5 4 3 2 1
2.45
6'
1.20
2.45 4.00
W-40
7
6'
EG20026-TD-ID-7-BF-00 1
MOSIC STAIR
PEROGOLA LIMIT
7
2
0.10
8
-0.10 F.F.L.
0.10
7 .1 35
-0.10 F.F.L.
FIRE PLACE
8
2
8
W-40
2.66
9
11.02
-0.10 F.F.L.
9 W-40
9
CONCRETE PAVEMENT
13.09
STEEL COLUM
47.98
9 8 7 6 5 4 3 2 1
1.55
W-50
3.00 27.15
H
1.60
G
0.96
F
4.77
E
11.11 1.60
D
4
W-50
4.78
C
H
4.90
B
B'
G
23.79
EG20026-TD-ID-8-GN-1
A
A'
F
0.10
D
8.00
C
3.39
B
4.50
B'
5124
A
6.70
7.92
8.45
3
A'
UP
1 EG20026-TD-ID-10-GN-7
B
B'
C
D
E
F
G
H
LANDSCAPE FURNITURE PLAN
GLASS RAILING
C
D
BIANCO WHITE MARBLE - STAIR
E
F
G
GLASS RAILING
H
BIANCO WHITE MARBLE -STEEL STAIR
4
EG20026-TD-ID-10-GN-8
LANDSCAPE PLA Project number
EG20026-TD-ID-10-GN-8
Date Drawn by
M.ABDELSALAM
Drawn by
M.WALY
Checked by
EG20026-TD-ID-10-GN-0
LANDSCAPE FURNITURE PLAN
B
24/10/2021
Date
1 : 100
B'
EG20026
Project number
1
BIANCO WHITE
A'MARBLE -STEEL STAIR A
1
1 : 100
Scale
EG20026-TD1
LANDSCAPE DETAILED PLAN
Scale
1 : 100
C
D
E
-0.10 F.F.L.
-0.10 F.F.L.
0.10 1.20 1.20
0.95 0.400.400.40
6'
2.70
-0.10 F.F.L.
0.30
5.00
1.55 0.40
0.40
0.40
2.86
+0.35 F.F.L.
0.10
1.80
0.10
2.80 26.76
1.74
0.50
1.20 0.10
4
0.30
3 5.00
3 1.20
0.86
-0.90 F.F.L.
2 1
0.30
-0.10 F.F.L.
5.50
0.10
F-20
-0.10 F.F.L.
BIANCO WHITE MARBLE STEEL STAIR
-0.10 F.F.L.
-0.40 F.F.L.
F-50
F-30
-0.10 F.F.L. 5.70
0.10
3.25
0.10
F-30
-0.15 F.F.L. 5.55
For CONSTRUCTION
-0.15 F.F.L. 31.26
0.10
7.20
0.10
SEPTEMBER 2021
7.46
F-60 -0.40 F.F.L.
No. 0 1
Description APPROVED ISSUE AS CLOUDED
Date 01/09/2021 24/10/2021
F-110 -0.05 F.F.L.
Revisions
1 36.90
2.68
F-30
F-20
F-60
2
32.00 2.68
5.75
-0.10 F.F.L.
BIANCO WHITE MARBLE STEEL STAIR
A'
A
B'
B
C
D
E
F
G
VILLA MR/ M .KHALIFA 4.80
UP
0.10
F-04
1.20
4.60
F-04
4
11.50
3.60
F-04
5
3'
3.74
8.90
0.35
3'
1.25
6
0.10
3.42
F-04
3.20
11.11
-1.60 F.F.L.
22.45
3.25
H
BIANCO WHITE MARBLE STEEL STAIR
LANDSCAPE FLOORING PLAN Project number Date Drawn by Checked by
EG20026 24/10/2021 M.ABDELSALAM M.WALY
EG20026-TD-ID-10-GN-3 1
LANDSCAPE FLOORING PLAN 1 : 100
BIM ARCHITECT PORTFOLIO
Scale
1 : 100
10/24/2021 3:36:02 PM
0.80
3.03
5
11.11
10.55
3.20 1.10 0.10
5.80
8
6'
17.79
F-60
9
7
6
10.10
-0.15 F.F.L.
7
31.98 1.10
3.50
F-30
7.40
-0.10 F.F.L.
0.10
0.10
-0.10 F.F.L.
6.80
7.40
F-50
0.90
0.10
4.90
8
F-50
-0.10 F.F.L.
7.50
5.30
F-20
0.10
F-30
0.30
8.90
H
3.75
12.00
3.60
G
F-30
9 1.00
F 47.77
37.27
5.59
B
B'
0.10
A
3.00
7.50
8.30
8.45
0.10
2.00
MOSIC STAIR
A'
M.AB
Checked by 10/24/2021 3:35:59 PM
A
A'
BIANCO WHITE MARBLE - STAIR
1 EG20026-TD-ID-10-GN-6
25
6'
7
1
3
3'
4
5
6
6'
7
8
9
BIANCO WHITE MARBLE CLADDING
TOP +3.00 TOP +2.00 PAINT CONCRETE EFFECT 3.00
GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350
+0.45 F.F.L. +0.00 F.F.L.
PAVEMENT STONE
2.00
GRASS
-0.05 F.F.L.
GLASS RAILING
BIANCO WHITE MARBLE STEEL STAIR
TOP +3.00
PAINT CONCRETE EFFECT
PAINT CONCRETE EFFECT
3.00
+0.00 F.F.L.
BIANCO WHITE MARBLE STEEL STAIR
FIRST FLOOR F.F.L +4000
BIANCO WHITE MARBLE CLADDING
3.00
TOP +3.00
0.20 0.55
+0.00 F.F.L.
2
2.55
3.05
ALUMINUM BLACK GLOSSY FINISH PAINT CONCRETE EFFECT
3.00
0.30
0.30 4.10
3.80
3.00
2.55
3.00
TOP +3.00
-0.05 F.F.L.
0.45
9
TOP +4.10
FIRE PLACE
TOP +3.00
GROUNDFLOOR FLOORPLAN PLANT.O.S F.F.L GROUND +450 +350
8
WPC FLOORING
0.45
6
BIANCO WHITE MARBLE FLOORING
2.55
5 GLASS SKY LIGHT
2.55
4
3.00
3' WPC PERGOLA
0.45
3 WPC FLOORING
0.45
2
4.10
1
FIRST FLOOR F.F.L +4000
BASALT
-0.05 F.F.L.
GRASS
LANDSCAPE ELEVATION 01 1 : 100
1
A' BIANCO WHITE MARBLE STEEL STAIR
WPC PERGOLA
GLASS SKY LIGHT ALUMINUM BLACK GLOSSY FINISH
TOP +4.10
4.10
3.00
1.50 0.90 0.60
0.45
5
8
7
6'
6
5
WPC FLOORING
4
3'
3
SKY LIGHT
2
1
GRASS
PAINT CONCRETE EFFECT
TOP +3.00
No. 0 1
3.05
3.55 4.10
PAINT CONCRETE EFFECT
+0.45 F.F.L.
+0.00 F.F.L.
0.55
-0.05 F.F.L.
9
8
7
6'
6
5
4
3'
LANDSCAPE 3D
3
For CONSTRUCTION
SEPTEMBER 2021
TOP +3.00
3.00
-0.05 F.F.L.
0.45
GROUNDFLOOR FLOORPLAN PLANT.O.S F.F.L GROUND +450 +350
2.55
3.00
PAINT CONCRETE EFFECT
BIANCO WHITE MARBLE STEEL STAIR
5
-0.05 F.F.L.
GLASS RAILING
Description
Date
APPROVED ISSUE AS CLOUDED
PAINT CONCRETE EFFECT
BASALT
SEPTEMBER 2021
PAVEMENT STONE
TOP +3.00
01/09/2021 24/10/2021
TOP +3.00
No.
+0.05 F.F.L.
+0.00 F.F.L.
-0.05 F.F.L.
Revisions
Description
0 1
PAINT CONCRETE EFFECT
GRASS
3.00
GLASS RAILING
GLASS RAILING
LANDSCAPE ELEVATION 06
ALUMINUM BLACK GLOSSY FINISH
TOP +4.10 GRASS
PAINT CONCRETE EFFECT
+0.45 F.F.L.
1 : 100
For CONSTRUCTION
WPC PERGOLA
BIANCO WHITE MARBLE STEEL STAIR
-0.05 F.F.L.
LANDSCAPE 3D 2
FIRST FLOOR F.F.L +4000
+0.00 F.F.L.
-0.05 F.F.L.
1 : 100
9
BIANCO WHITE MARBLE CLADDING
TOP +3.00
GRAVEL
LANDSCAPE ELEVATION 02
2
ALUMINUM GATE
BIANCO WHITE MARBLE FLOORING
+0.00 F.F.L. -1.50 F.F.L.
GRASS
PAVEMENT STONE PAINT CONCRETE EFFECT
GLASS RAILING
ALUMINUM GATE
1.00
+0.46 F.F.L.
PAINT CONCRETE EFFECT
TOP +3.00
3.00
+0.70 F.F.L.
+0.55 F.F.L.
PAINT CONCRETE EFFECT
BIANCO WHITE MARBLE CLADDING
3.00
1.10 3.65
4.10
2.55
OVERFLOW SWIMMING POOL - MOSIC TILES
GROUNDFLOOR FLOORPLAN PLANT.O.S F.F.L GROUND +450 +350 0.45
PAINT CONCRETE EFFECT
TOP +3.00
2.00
WPC FLOORING
PAVEMENT STONE
FIRST FLOOR F.F.L +4000
LANDSCAPE ELEVATION 05 1 : 100
0.07
A
3.00
B'
3.00
1
Da
APPROVED ISSUE AS CLOUDED
01/09/ 24/10/
ALUMINUM GATE
Revisions
LANDSCAPE ELEVATION 03
VILLA MR/ M .KHALIFA
1 : 100
A' GLASS SKY LIGHT ALUMINUM BLACK GLOSSY FINISH
WPC PERGOLA
WPC FLOORING
PAVEMENT STONE
VILLA MR/ M .KHALIFA
LANDSCAPE ELEVATIO
LANDSCAPE 3D
1 : 100
Scale
+0.05 F.F.L.
+0.00 F.F.L.
4
LANDSCAPE ELEVATION 08
6
16.10 0.13
1.25
3.38
2.94
4.60
0.75
2.06
2.06
0.35
0.75
4.90 4.80
0.05
2.79
10.55
7 WPC PERGOLA
0.10
1.10
0.05
0.30
6'
8 ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM
9
ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM
PAINT CONCRETE EFFECT
TOP +3.00
0.30
1
0.90
2
3
4
5
6
MOSIC - STAIR
0.95
0.40
0.40
0.40
0.40
0.40 0.30
ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM
ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM PAINT CONCRETE EFFECT
2.80
21.10
21.00
1 : 50
SWIMING POOL-SEATING AREA 3D
21.10 2.30
5
2.30
GLASS SKY LIGHT
SWIMING POOL-SEATING AREA PLAN
3.80
4.10
0.70
3.80
0.60
1.40
1
GLASS SKY LIGHT
TOP +4.10
FIRST FLOOR PLAN T.O.S +3900
0.30
0.40
+4.00 F.F.L.
TOP +3.00
0.25 0.050.30
-0.55 F.F.L.
8.15
WPC PERGOLA FIRST FLOOR F.F.L +4000
0.30
0.10
5.45
0.35
2.40
0.90
0.78 0.28
8.15
1 : 50
0.30
0.95
0.75
BIANCO WHITE MARBLE - SEATING
3.85
+0.00 F.F.L.
PERGOLA SECTION 01
2
F-60
0.35
0.30
0.75
-0.10 F.F.L.
-1.60 F.F.L.
4.60 0.85
0.30 0.30
-0.90 F.F.L.
F-04
5.15
-0.50 F.F.L.
3.20
1
1.60
2
9.40
0.85
3
1.80
4
5.60
5
-0.10 F.F.L.
+0.00 F.F.L.
OVERFLOW SWIMMING POOL
SEATING AREA
2 EG20026-TD-ID-10-GN-6
GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN+450 T.O.S +350
7
16.10
0.45
-0.55 F.F.L.
9.40
BIANCO WHITE MARBLE - STAIR
0.75
0.75
0.30
0.30
3.00
0.30
ALUMINUM BLACK GLOSSY FINISH
6'
6 GLASS SKY LIGHT
3.80
6
5
3.55
5
4.10
3 EG20026-TD-ID-10-GN-7
4
1:1
Scale
TOP +4.10
FIRST FLOOR F.F.L FIRST FLOOR PLAN T.O.S +4000 +3900
3.80
4
3'
ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM
LANDSCAPE 3D
0.05
3'
3
0.30
WPC PERGOLA 4 EG20026-TD-ID-10-GN-6
3
2
I-BEAM
PAINT CONCRETE EFFECT
3
M.WA
Checked by
1 : 100
1
2 EG20026-TD-ID-10-GN-6
M.ABDELSAL
GRASS
-0.05 F.F.L.
EG20026-TD-ID-10-GN-
2 EG20026-TD-ID-10-GN-7
1
+0.05 F.F.L.
0.30
6
24/10/20
Drawn by
3.00
4.10
LANDSCAPE ELEVATION 04
TOP +3.00
PAINT CONCRETE EFFECT
+0.45 F.F.L.
EG200
Project number Date
3.00
0.46
EG20026-TD-ID-10-GN-4
1 : 100
TOP +3.00
0.07
1.10 3.00
1.50
M.WALY
Checked by BASEMENT FLOOR PLAN F.F.L +-2750
GRASS
M.ABDELSALAM
Drawn by
-1.50 F.F.L.
PAVEMENT STONE
BIANCO WHITE MARBLE STEEL STAIR
24/10/2021
Date +0.70 F.F.L.
+0.46 F.F.L.
MOSIC STAIR
+0.00 F.F.L.
GLASS RAILING
PAINT CONCRETE EFFECT
EG20026
Project number
OVERFLOW SWIMMING POOL - MOSIC TILES
BIANCO WHITE MARBLE FLOORING
0.45
PAINT CONCRETE EFFECT GROUNDFLOOR FLOORPLAN PLANT.O.S F.F.L GROUND GRAVEL +450 +350
4
LANDSCAPE ELEVATION 07 1 : 100
LANDSCAPE ELEVATION
TOP +3.00
3.65
BIANCO WHITE MARBLE CLADDING 4.10
BIANCO WHITE MARBLE STEEL STAIR
3
B'
TOP +4.10
PAINT CONCRETE EFFECT
2.54
FIRST FLOOR F.F.L +4000
A
10/24/2021 3:37:05 PM
3
-0.05 F.F.L.
+0.00 F.F.L.
PERGOLA SECTION 02
3
1 : 50
3 EG20026-TD-ID-10-GN-7
For CONSTRUCTION For CONSTRUCTION
SEPTEMBER 2021
SEPTEMBER 2021 SEATING AREA
BIANCO WHITE MARBLE -SEATING
3
3'
4
5
6
6'
7
No. 0 1
Description APPROVED ISSUE AS CLOUDED
0 1
Date 01/09/2021 24/10/2021
-0.80 F.F.L.
OVERFLOW SWIMMING POOL
SEATING AREA BIANCO WHITE MARBLE - SEATING
CONCRETE PAVEMENT
3
MOSIC TILES STAIR
SWIMINF POOL /SEATING AREA SECTION 02 1 : 50
VILLA MR/ M .KHALIF VILLA MR/ M .KHALIFA
+0.00 F.F.L.
0.60
-1.50 F.F.L.
GROUND FLOOR PLAN F.F.L +450
MOSIC TILES STAIR +0.00 F.F.L.
MOSIC FLOORING 5 CM * 5 CM
Project number
1.50
Date -1.50 F.F.L.
Drawn by Checked by
SWIMINF POOL /SEATING AREA SECTION 01 1 : 50
BIM ARCHITECT PORTFOLIO
4
SWIMINF POOL /SEATING AREA SECTION 03 1 : 50
Scale
Project number
EG20026
Date
24/10/2021
Drawn by
M.ABDELSALAM M.WALY
EG20026-TD-ID-10-GN-6 2
PERGOLA DETAILS
OVERFLOW SWIMMING POOL- SEATING AREA DETAILS 0.05
OVERFLOW SWIMMING POOL
1.50 0.90
-0.80 F.F.L.
MOSIC TILES 5 CM * 5 CM MOSIC FLOORING 5 CM * 5 CM
+0.00 F.F.L.
0.20
0.40 0.40
-0.40 F.F.L.
0.60
WPC FLOORING
+0.00 F.F.L.
1 : 50
Checked by 10/24/2021 3:38:35 PM
BIANCO WHITE MARBLE - STAIR
D
01/0 24/1
Revisions Revisions
GROUND FLOOR PLAN F.F.L +450
Description APPROVED ISSUE AS CLOUDED
9.40
2
WPC FLOORING +0.00 F.F.L.
9.40
1
No.
BIANCO WHITE MARBLE - STAIR
GROUND FLOOR PLAN F.F.L +450
EG20
24/10/20
M.ABDELSAL
M.WA
EG20026-TD-ID-10-GN 1
PERGOLA DETAILS PLAN 1 : 50
4
PERGOLA 3D
Scale
26
1
1 EG20026-TD-ID-7-GR-0
2 GLASS RAILING EG20026-TD-ID-10-GN-8
1
G
4
6
-1.55 F.F.L.
10 11
2.70 9 TREADS
F
12 13
1.67
---
14 15 16
1
LANDSCAOE STAIR
2.75
-1.46 F.F.L.
1 LANDSCAPE STAIR SECTION
2
6'
1.55
6
5
MOSIC TILES 5 CM * 5 CM
-0.40 F.F.L.
4 BIANCO WHITE MARBLE - FLOORING
3
MOSIC TILES 5 CM * 5 CM
MOSIC FLOORING 5 CM * 5 CM
W-20
2 GRAVEL
CONCRETE PAVEMENT
MOSIC TILES 5 CM * 5 CM
0.10 2.80
D
1
E 14
13
15
16
17
18
19
E
20
D
D +2.05 29 F.F.L.
4 EG20026-TD-ID-12-GN-1
D 29
30
28
27
26
25
24
23
22
21 UP
28
27
26
25
24
23
22
21 UP
1
2
BASEMENT FLOOR - SERVICE STAIR
2
1 : 50
2
+0.45 F.F.L.
E
31
4 EG20026-TD-ID-12-GN-1
E
34
35
36
37
38
39
E
31
32 33
+2.60 F.F.L.
33
34
35
36
37
38
39
+4.00 F.F.L.
40
40
1
2
2
GROUND FLOOR - SERVICE STAIR
3
1 : 50
FIRST FLOOR - SERVICE STAIR 1 : 50
3
TOP ROOF PLAN +10650
MOSIC FLOORING 5 CM * 5 CM
TOP ROOF PLAN +10650
+0.05 F.F.L.
-0.30 F.F.L.
3.20
0.35
0.35
2.06 3.00
2
1
MOSIC FLOORING 5 CM * 5 CM
WATER FEATURE
-0.10 F.F.L.
F-50 2.06
3
11
1
3'
GLASS RAILING
0.10
4
WATER FEATURE
CONCRETE PAVEMENT
5
5
LANDSCAPE STAIR 3D
3
1 : 50
0.10
F-60
W-20
6
30
1
-2.65 F.F.L.
0.10
0.29 0.10
6
BASEMENT FLOOR PLAN T.O.S +-2850
18
W-20
0.75 1.55
6'
2
32
5.90 5.70
0.10
7
12
17 W-01
1 : 50
8
-1.15 F.F.L.
E
1.29
9
1
2
UP
0.00
8
D 9
10
GLASS RAILING
4 EG20026-TD-ID-12-GN-1
1.00
1.10
D BIANCO WHITE MARBLE - STAIR GROUND FLOOR PLAN F.F.L +450
0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
6.40 2.59 1.00 LOANDING
4 7 EG20026-TD-ID-12-GN-1
1
1.53 9 RISER
3
5
E
2
D
1.19 9 RISER
2
E
0.10
1
1
F
1.46
EG20026-TD-ID-8-GN-1 2
1.13 2.70 9 TREADS
D
0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
1.01
C
5.70
WATER FEATURE SECTION 01
5
0.10
1 : 50
0.10
5.90
4
ROOF FLOOR PLAN F.F.L +7550
ROOF FLOOR PLAN F.F.L +7550
ROOF FLOOR PLAN T.O.S +7450
ROOF FLOOR PLAN T.O.S +7450
For CONSTRUCTION SEPTEMBER 2021
0.75
For CONSTRUCTION CONCRETE PAVEMENT W-20
GLASS RAILING
W-20
6 EG20026-TD-ID-10-GN-8
SEPTEMBER 2021
MOSIC TILES 5 CM * 5 CM MOSIC FLOORING 5 CM * 5 CM
GROUND FLOOR PLAN F.F.L +450
No.
+0.05 F.F.L.
Description APPROVED ISSUE AS CLOUDED
No. 0 1
Date
+4.00 F.F.L.
FIRST FLOOR F.F.L +4000
01/09/2021 24/10/2021
Description
Date
APPROVED ISSUE AS CLOUDED
01/09/202 24/10/202
FIRST FLOOR F.F.L +4000
40
FIRST FLOOR PLAN T.O.S +3900
16.26
16.26
0 1
-0.30 F.F.L.
0.23
0.45
2.94
GROUND FLOOR PLAN T.O.S +350
3.55
3'
FIRST FLOOR PLAN T.O.S +3900
39 38
Revisions
37 36 35
3
34
Revisions
31
WATER FEATURE SECTION 02
6
30 29
1 : 50
VILLA MR/ M .KHALIFA
3.55
-0.05 F.F.L.
F-110
33
32
28 27 26
VILLA MR/ M .KHALIFA
11.50
3.38 11.50
2 EG20026-TD-ID-8-GN-2
25 24
+0.45 F.F.L.
23 22
GROUND FLOOR PLAN F.F.L +450
GROUND FLOOR PLAN F.F.L +450
21 20
GROUND FLOOR PLAN T.O.S +350
GROUND FLOOR PLAN T.O.S +350
19 18
Stairs Details
17 16
1.25
14
11 10 9 8
2.78
W-20 0.10
EG20026-TD-ID-10-GN-8
5 WATER FEATURE PLAN EG20026-TD-ID-10-GN-8
WATER FEATURE 3D
7
4
-2.75 F.F.L.
3 2
BASEMENT FLOOR PLAN T.O.S +-2850
1 : 50
Scale
M.ABDELSALAM
Drawn by
1
M.WALY
Checked by
EG20026-TD-ID-12-GN-1
10/24/2021 3:40:09 PM
M.WALY
Checked by
1 : 50
5
M.ABDELSALAM
Drawn by
24/10/2021
Date
6
24/10/2021
Date W-20
EG20026
Project number
7
EG20026
Project number
0.10
13
12
F-60
1
4
15
LANDSCAPE STAIRCASE DETAILS
-0.40 F.F.L.
3.20
2
4
5
SERVICE STAIR
SERVICE STAIR 3D
1 : 50
Scale
1 : 50
REINFORCED CONCRETE STAIR CONCRETE+EPOXY PAINT
20MM GRANITE RISER
3'
4
3
4
3'
3
4
3'
E
E 8
7
6
5
4
3
2
31
30
29
28
27
26
25
E
E +5.30 F.F.L.
24
+0.45 F.F.L.
5 EG20026-TD-ID-12-GN-2
UP
9
32
55
10
33
56
11
34
57
12
35
58
F
13
F
F
36
F
54
53
52
51
50
49
48
47
E
+5.30 F.F.L.
+4.00 F.F.L.
5 EG20026-TD-ID-12-GN-2
UP
2
60 61
21
22
23
39
G
3
3
BASEMENT FLOOR - STAIR
2
1 : 50
4
41
42
43
44
45
46
62
G
4
3'
40
G
3'
GROUND FLOOR - STAIR 1 : 50
63
64
65
66
67
68
G
3
3
3'
FIRST FLOOR - STAIR 1 : 50
48
5 EG20026-TD-ID-12-GN-2
TREAD
F
+6.40 F.F.L.
69
G
4
49
59
61
20
50
58
F
60
19
51
TREAD
57
4
38
18
52
56
F
59
37
17
53
MASONRY WALL CERAMIC TILES MORTAR CERAMIC TILES MORTAR BED CONCRETE SLAB
0.02
55
15
16
E 54
UP
14
G
1
E +1.75 F.F.L.
5 EG20026-TD-ID-12-GN-2
UP
F
E
1
0.25
0.02
-1.60 F.F.L.
0.05
0.02
RISER
STRUCTURE CONCRETE SLAB.
20mm MORTER NON-SLIP CARBORANDUM STRIP CONCRETE SLAB
0.10
3
4
40mm GRANITE TREAD
0.05
3'
RISER
3
0.01 0.01
G. STEEL ANTI SLIP FINISH FOR EXPOSED SURFACE (50X50X2mm) TILES (GRANITE,MARBLE OR CERAMIC) MORTAR BED SAND
1
TILES FLOORING
2
1:5
STEP DETAIL.EGRESS STAIR 1 : 10
3
TYP.STEP DETAIL.GRANITE TILE FINISH 1 : 10
4
CERAMIC SKIRTING DETAIL. 1:5
+7.55 F.F.L. 62
63
64
65
66
67
68
69
G
G 3
4
4
3'
4 Alum.Cladding 01 Alum.Angle 20*20mm
ROOF FLOOR - STAIR
S.Steel Screw S.Steel Screw Vertical Steel Sub-frame 40*40mm Horizontal Steel Sub-frame 40*40mm Steel Bracket
1 : 50
3' 0.02 0.01
0.01
TOP ROOF PLAN +10650
90MM CONC. BLOCK
20MM PLASTER
40*40 Primary Support Channel
20MM GRANITE BASE W/ CHAMFERED EDGE
0.10
TOP ROOF PLAN +10650
MASONRY WALL MORTAR PORCELAIN TILES GROUT PORCELAIN TILES MORTAR BED CONCRETE SLAB
Cross Furring Channel 600mm
0.10
3
ADHESIVE
3.20
GRANITE FLOOR TILE
Alum.Cladding 01 Alum.Angle 20*20mm +7.55 F.F.L.
ROOF FLOOR PLAN F.F.L +7550
69 68
ROOF FLOOR PLAN T.O.S +7450
ROOF FLOOR PLAN T.O.S +7450
67 66
FALSE CEILING (REFER TO ID)
SEPTEMBER 2021
65 64
+6.40 F.F.L.
63 62
S.Steel Screw Vertical Steel Sub-frame 40*40mm S.Steel Screw Horizontal Steel Sub-frame 40*40mm Alum.Cladding 01
For CONSTRUCTION
ROOF FLOOR PLAN F.F.L +7550
For CONSTRUCTIO
SEPTEMBER 2021
CURTAIN FIXATION FRAME
61 60 59
No.
57 56 55
3.55
58
0 1
54 53
Description
Date
APPROVED ISSUE AS CLOUDED
5
01/09/2021 24/10/2021
ANTI-RUST METAL ROD FOR FIXATION 60X60 MM
52 51 50
+4.00 F.F.L.
FIRST FLOOR F.F.L +4000
PORCELAIN SKIRTING DETAIL 1:5
49 48
FIRST FLOOR F.F.L +4000
46 47 45
FIRST FLOOR PLAN T.O.S +3900
Revisions
FIRST FLOOR PLAN T.O.S +3900
44 43
50X50 MM ALUMINIUM LOUVERS WITH SPACING 50 MM
6
SKIRTING DETAIL. MARBLE TILE 1:2
BULKHEAD DETAIL 12 1CURTAIN : 20
8
No.
ALU.CLADDING
0 1
1:5
Description APPROVED ISSUE AS CLOUDED
BEAM PAINT
Revisions
42 41
+2.85 F.F.L.
40 39
38 36
34
32
VILLA MR/ M .KH
-
3.55
35 33
50X50 MM ALUMINIUM LOUVERS WITH SPACING 50 MM
VILLA MR/ M .KHALIFA
37
31 30 29
ANTI-RUST METAL ROD FOR FIXATION 30X30 MM
28 27 26 25
GROUND FLOOR PLAN F.F.L +450
23 24 22 20 19 18
-0.55 F.F.L.
17 16
Project number
15 14 13 12
9
Date
3.20
11 10
8 7
Drawn by
6 5
EG20026 24/10/2021
3 2 1
Checked by
BASEMENT FLOOR PLAN T.O.S +-2850
M.ABDELSALAM M.WALY
EG20026-TD-ID-12-GN-2 5
STAIR 1 : 50
BIM ARCHITECT PORTFOLIO
6
STAIR 3D
Scale
1 : 50
Strap Hanger
Strap Hanger BEAM
9
ALU.LOUVERS CLADDING 1 : 10
Metal Furring Channel O.C Clipped To Main Channel
HEAD 10 1BULK : 10
Paint on Gypsum Board Regular Type
Project number
FLUSH LIFT HANDLE FORGED BRASS HINGES GALVANIZED STEELPINS
Metal Wall Angle Sealant Finish Refer to ID
GENERAL DET
SLAM LOCK 6mm DIAMOND PLATE COVER
Primary Support Channel
Corner Bead
4
-2.75 F.F.L.
BASEMENT FLOOR PLAN T.O.S +-2850
PLAN
Galvanized Steel Hanger Wire Primary Support Channel Corner Reinforcement Trap Gypsum Boad Tiles
Stairs Details
GROUND FLOOR PLAN T.O.S +350
21
10/24/2021 2:54:52 PM
+0.45 F.F.L.
GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350
Paint on Gypsum Board Metal Furring Channel
RED VINYL GRIP
Date
AUTOMATIC HOLD OPEN ARM AND COVER RELEASE
Drawn by LIFTING MECHANISM HOUSING -
7
M.ABDE
Checked by
EG20026-TD-ID-1
SECTION
DETAIL 11 1CEILING : 10
E
24/
ACCESS STEEL DOOR
Scale
1 : 20
27
As
R.S HOUSE - PALM HILLS NEW CAIRO, EGYPT
For CONSTRUCTION JULY 2021
No.
Description
Date
Revisions
VILLA MR. RAMADAN SOBHY
GENERAL NOTES. SYMBOLS, AND ABBREVIATIONS Project number
EG20027 Issue Date
Date Drawn by
M.ABDELSALAM M.WALY
Checked by EG20027-TD-ID-0-GN-0
Scale
BIM ARCHITECT PORTFOLIO
1 : 50
29
Y01Y02
Y05
Y03
Y04
Y05
15445 10095
520
X08
4045
500 9085
1950
W01
X07 280
135
456 GLASS PARTITIONS
X06
2190
W09
14
W02
JACUZZI
1
9455
W09
08
W02
8535
600
12675
W20 W21
800 235
03 D01
2505
BF-FFL
03
21
2695
2555
1
7
1 : 50
FLOOR TYPES
520
1
BASEMENT FLOOR DETAILED PLAN
12
BF-FFL
11
X07
F05
F05
WOODEN HPL TILES
WOODEN HPL TILES
WOODEN HPL TILES
42 m²
42 m²
42 m²
4430 960
X06
Y03
Y04
Y01Y02
Y03
Y04
2230
675 800
X08
925
X06
F04 F05 F06 F08 F09 F10
Description 2100
TOILET CABINET 13
X07 4005
540
4385
1215
BF-FFL
SAUNA 12
4660
X06
4205
BF-FFL
145
-3.100
X06
BF-FFL
-0.800 C3
-0.850
WOODEN FLOOR AS PER APPROVED SAMPLE
-0.850
145 765
340 640
BLACK MARBLE TILES 100*100 CM
Descriptio
GYPSUM BOARD C WOODEN RIBS CE MIRROR CEILING
145
JACUZZI
C1
OPENING ABOVE
4600
BF-FFL
9415
7950
7945
42 m² JACUZZI
BF-FFL
340
BF-FFL
C1
WOODEN HPL TILES
08
11
X07
3575
07
C1 C2 C3
STEAM SHOWER & DRY AREA
140
340
GYPSUM BOARD 35 CM DEPTH
Type Mark
1535
340
LIVING AREA
BF-FFL
S5-Ceiling Schedule
X08 1230
F05
-3.100 4600
1 : 50
Y05
08
BLACK SPANISH MARBLE TILES 100*100 CM 19 m²
14
EG20027-TD-ID-3-BF-0
Y05
Scale
SP
WOODEN FLOOR AS PER APPROVED SAMPLE
4205
145
340
4170 KITCHENETTE BF-FFL
1800 CERAMIC TILES 60*60 CM
600
7 m²
600
600
600
240
F04 600
SP
3 m²
600
35 85
WOODEN FLOOR AS PER APPROVED SAMPLE
Description APPROVED ISSUE
BF-FFL
640
1470
BF-FFL
For TENDER JULY 2021
DRIVER'S BEDROOM LOBBY
BF-FFL
56 5
600
1110
STORAGE 02
01
09
BF-FFL
-0.420
X04
No.
MAID'S BATHROOM 05
01/06/2021
BF-FFL
MAID'S BEDROOM 04
-0.420
X02
Revisions
1
LAUNDRY ROOM
BF-FFL
03
-0.420
BF-FFL
DRIVER'S BATHROOM
-0.420
10
X03 X02
Revisions
VILLA MR. RAMADAN SOBHY
X01
X01
BASMENT CEILING
EG20027
Project number
Issue Date
Drawn by Checked by
M.WALY
Scale
1 : 50
Is
Date
R.ABDELHAMID
EG20027-TD-ID-4-BF-0 Y05
VILLA MR. RAMA SOBHY
BASEMENT FLOORING PLAN
Date
BASEMENT FLOORING PLAN
Description APPROVED ISSUE
BF-FFL
CONCRETE SLAB WHITE PAINT FINISH
SP
Project number
BIM ARCHITECT PORTFOLIO
130
X04
Date
X05 CONCRETE SLAB WHITE PAINT FINISH
-0.420
X02
X01
Y04
800
DRIVER'S BATHROOM 10
600
X01
Y03
85
-0.420
X03
13 00
Y01Y02
290 3090
X03
CERAMIC TILES 60*60 CM
11 70
No. 1
120
C1
JULY 2021 X04
600
BF-FFL
600
185 600
1490
CERAMIC TILES 60*60 CM
15 50
-3.100
320
600
4015
87 m²
600
BF-FFL
F04
5 50
WOODEN HPL TILES
5 m²
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
600
600 600 30 600
SP
For TENDER
200
600 600
600
06
1595
130
KITCHENETTE
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
4110
3145
X05
X05
BF-FFL
F04
38 0
600
03
600
600
LAUNDRY ROOM
09
15 50
600
7 m²
600
600
BF-FFL
F05
600
600
600 5 m²
01
605
CERAMIC TILES 60*60 CM
600
CERAMIC TILES 60*60 CM
600
600 280
140
90
600
600
600
90
205
BF-FFL
F04
600
04
4 m²
X02
140 600
MAID'S BEDROOM
600
F04
CERAMIC TILES 60*60 CM
X03
F04
SP
600
BF-FFL
600
X04
05
DRIVER'S BEDROOM LOBBY
SP
MAID'S BATHROOM
BF-FFL
1595
600
250
02
1150
SP
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
SP
SP STORAGE
Drawn by 01/08/2021 04:56:56 ﻡ
4150
87 m²
4225
600
F05 WOODEN HPL TILES
X05
600
06
1 : 50
Y01Y02
F08
ENTERTAINMENT AREA
M.WALY
Checked by
1 : 50
WOOD VEIN MARBLE TILES WHITE QUARTZ MARBLE TILES 100*100 CM TRAVENTINE MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM WOODEN HPL TILES WOODEN CHEVRON TILES BLACK SPANISH MARBLE TILES 100*100 CM TEAK WOOD TILES 60*60 CM ICE GREEN MARBLE TILES
F03
BF-FFL
F05
4170
9415
STEAM SHOWER & DRY AREA
SAUNA
BF-FFL
9095
BF-FFL
R.ABDELHAMID
1075
15220
1510
X07
-3.100
Drawn by
4630 6250
640
13
1
4745 7895
100
TOILET CABINET
07
4525
1515
F01 F02
87 m² LIVING AREA
EG20027 Issue Date
Date
640
X08
WOODEN HPL TILES
BASEMENT FLOOR DETAILED PLAN
Y05
X08
4695
10
Project number
BUILDING FLOOR SCHEDULE
F05
9
X01
100
Y04
Revisions
01/08/2021 04:56:52 ﻡ
EG20027-TD-ID-1-BF-0
Y05
Date 01/06/2021
EG20027-TD-ID-7-BF-1
8
1
100
Y03
7
Description APPROVED ISSUE
X02
W03
11
7
3495
3455
M.WALY
Scale
Y01Y02
11
No. 1
EG20027-TD-ID-11-GN-0
01/08/2021 04:56:47 ﻡ
BASEMENT FLOOR PLAN Y04
12
X01
R.ABDELHAMID
Checked by
Y03
8
13
EG20027
Drawn by
Y01Y02
6
14
X03
BF-FFL
900 AL01 700
Issue Date
Date
1 : 50
15
DRIVER'S BATHROOM 10
10
EG20027-TD-ID-7-BF-19 EG20027-TD-ID-7-BF-1
BASEMENT FLOOR FURNITURE LAYOUT Project number
1
16
JULY 2021
X04
70
10 D01
W03 17
2
5
800
VILLA MR. RAMADAN SOBHY
VILLA MR. RAMADAN SOBHY
X01
18
W10 3 4 4 EG20027-TD-ID-11-GN-0
EG20027-TD-ID-7-BF-0
X01
19
W01
X02 Revisions
20
BF-FFL
X02
BF-FFL
X02
1315
LAUNDRY ROOM
W01
W01
-3.100
For TENDER
09 D01
W01
1070
W01 90
BF-FFL
W01
BF-FFL
01
90
1125
800
09
LOBBY
575
610
1665
2050
470
720 800
800
600
1150
1845
600
04
W01
800
DRIVER'S BEDROOM
1000
600
250 1410
MAID'S BEDROOM
05 D01
1665
1800
9
W03
610
1475
2505
10 EG20027-TD-ID-7-BF-08
X03
DRIVER'S BATHROOM 10
120
800
Date 01/06/2021
130
04 D01
X05
2735
W01
02 D01
5065
X03
BF-FFL
Description APPROVED ISSUE
800
BF-FFL
02
3495
03
1
W35
10010
BF-FFL
11
85
W01
4150
W01
2100
04
W03
2555 STORAGE
W01
1560
W01
2085
X03
LAUNDRY ROOM
BF-FFL
1070
BF-FFL
No. MAID'S BEDROOM
05
08 GLASS PARTITIONS
0 75
01
MAID'S BATHROOM BF-FFL
X04
X04
LOBBY
3090
MAID'S BATHROOM
JULY 2021
3105
130 120
W01
18215
200
W02
08 GLASS PARTITIONS
W01
BF-FFL
230
BF-FFL
BF-FFL
X04
2135
For TENDER
DRIVER'S BEDROOM 09
06
W01
BF-FFL
STORAGE
05
16135
X05
02
W01
KITCHENETTE
W02
1000
06
W17 W18 W19
-3.100
-3.100
-3.100
KITCHENETTE
W07 W08 W09 W10
W14 W16
BF-FFL
EG20027-TD-ID-7-BF-0
BF-FFL
X05
X05
W03 W04 W05 W06
W12 W13
1 EG20027-TD-ID-7-BF-1
4 3615
3
PROVISIONA L LOCATION FOR TV
2 5 3 EG20027-TD-ID-7-BF-1
BF-FFL
8050
4 2 EG20027-TD-ID-7-BF-0
OPENING ABOVE
W09
ENTERTAINMENT AREA
LIVING AREA
6400
2050
2085
800
BF-FFL
OPENING ABOVE
JACUZZI
120
800
13155
07
6
08
195 305
W08 W02
BF-FFL
11
800
Description OFF WHITE PAINT BLACK SPANISH MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM VEIN MARBLE TILES 100*100 CM WOOD CLADDING GREY GYPSUM BOARD CLADDING GREY PAINT CLEAR MIRROR CLADDING BLACK MIRROR CLADDING WHITE GYPSUM BOARD CLADDING ROUGH STONE CLADDING WHITE QUARTZ MARBLE TILES 100*100 CM TERRAZZO TILES 100*100 CM ICE GREEN MARBLE TILES 100*100 CM WOODEN RIBS CLADDING FABRIC CLADDING CALCATTA MARBLE TILES 100*100 CM CALCATTA GOLD MARBLE TILES 100*100 CM CLEAR MIRROR CLADDING BY PIECE FOR BATHROOMS EXTERIOR WHITE PAINT
LIVING AREA
BF-FFL
BF-FFL
260
120
200
W01 W01
07
280
BF-FFL
08 GLASS PARTITIONS
ENTERTAINMENT AREA 14
800
160
X06
X06
115 170
12
BUILDING WALL SCHEDULE WALL TYPES W01 W02
STEAM SHOWER & DRY AREA
SAUNA
BF-FFL
330
X06
4425
W01
1950
13
655
X07
1405
W01
TOILET CABINET
X07
BF-FFL
600
12
1255
W01
BF-FFL
11 SAUNA
BF-FFL
X07
595
4630
1250
STEAM SHOWER & DRY AREA
13
4745
X08
X08
TOILET CABINET
4525
2050
X08
4750
2085
Y04
7965
Y03
2085
Y01Y02
R.ABDE
Checked by
1
BASEMENT CEILING PLAN 1 : 50
EG20027-TD-ID-5Y01Y02
Y03
Y04
Y05 Scale
30
Y01Y02
Y03
Y04
Y05
Y01Y02
Y03
Y04
Y05
BUILDING WALL S
X08
X08
X08
WALL TYPES
X08
W01 W02 2800 AL03 3000
X07
X07
2800 AL03 3000
1530
1500
1710
W07
X06
1520
1500
1500
560
X06 03
GR-FFL
1
UP
DINING AREA
4
5
EG20027-TD-ID-7-GR-1
4 2 EG20027-TD-ID-7-GR-1
GR-FFL
8895
1
3
EG20027-TD-ID-12-GN-0
+0.000 -3.100
EG20027-TD-ID-12-GR-0
+0.000
W20 W05
Sim
520
640
W21 W35
520
1200 AL02 900
900
0.70
180
2.50
4065 300
No. 1
W10
X02
Revisions
4850
UP UP
2060
470
UP
22
23
UP
01 D03
24
25
26
27
7 EG20027-TD-ID-7-GR-1
05
05
VILLA MR. RAMADAN SOBHY
GR-FFL
1170
X01
GR-FFL
1165
1235
290
9
8
45
28
44
375
JULY 20
29
7 43
30
6
GR-FFL
42
31
41
32
40
33
39
38
X04
No.
APPROVED ISSUE
X03 X02
37
Descriptio
1
EG20027-TD-ID-7-GR-0
W05
EG20027-TD-ID-11-GN-0
Revisions
36 UP 35
VILLA MR. RA SOBHY
34
1170
X01
GROUND FLOOR FURNITURE LAYOUT
X01
7
02
KITCHEN
KITCHEN
W05
For TEND
1200 AL02 900
W21 46
5195
X02
10
EG20027-TD-ID-7-GR-0
+0.000 80 34
200
X05
1715
W02
W02
GUEST WASHROOM
625
X02
350
8
X03
X03 UP
620 890
4425
250
+0.000
300
690
900 830
X04
Date 01/06/2021
615
90 37
X03
Description APPROVED ISSUE
300
95 29
X04
02 D02
9 10 EG20027-TD-ID-7-GR-1 625
615
900
2425
W01
5
GR-FFL
X04
W05
GR-FFL
0 94
02
GR-FFL
01
EG20027-TD-ID-12-GR-0
300
W02
LOBBY
05 D02
615
0 48
01
1225
2435
JULY 2021
GUEST WASHROOM
W09
W09
For TENDER LOBBY
300 350
W05
17 15
2435
X05
X05
W17 W18 W19
EG20027-TD-ID-7-GR-0
W06
1
EG20027-TD-ID-12-GN-0
X05
W14 W16
UP
EG20027-TD-ID-7-GR-02
3
3
14
W12 W13
GR-FFL
OPENING BELOW
GR-FFL
X06
W05
MAIN SEATING AREA
DINING AREA 04
W07 W08 W09 W10
W07
5545
03
1500
W06
W07
04
1500
W07
MAIN SEATING AREA
OPENING BELOW
W03 W04 W05 W06
X07 600
X06
2800 AL03 3000
X07
Descr
OFF WHITE PAIN BLACK SPANISH 100*100 CM CERAMIC TILES 6 VEIN MARBLE TIL WOOD CLADDING GREY GYPSUM B CLADDING GREY PAINT CLEAR MIRROR C BLACK MIRROR C WHITE GYPSUM CLADDING ROUGH STONE C WHITE QUARTZ M 100*100 CM TERRAZZO TILES ICE GREEN MARB 100*100 CM WOODEN RIBS C FABRIC CLADDIN CALCATTA MARB 100*100 CM CALCATTA GOLD 100*100 CM CLEAR MIRROR C PIECE FOR BATH EXTERIOR WHITE
GROUND FLOOR PLAN
X01
2
1800 AL04 2400
EG20027-TD-ID-11-GN-0
Project number
EG20027
Project number
Checked by
01/08/2021 04:56:48 ﻡ
M.WALY
Checked by
GROUND FLOOR PLAN
EG20027-TD-ID-1-GR-0
1 : 50
Y01Y02
Y03
Y04
Y05
1 : 50
Scale
Y01Y02
Y03
Y04
R.A
Drawn by
R.ABDELHAMID
Drawn by
1
Date
Issue Date
Date
1
EG20027-TD-ID
GROUND FLOOR DETAILED PLAN 1 : 50
Y05
Y01Y02
Y03
Y04
Y05
Y01Y02
Y03
Y04
Y05
Scale
BUILDING FLOOR SCHEDULE FLOOR TYPES
X08
F01 F02
195
X07
1000
1000
1000
1000
1000
1000
F04 F05 F06 F08
795
1000
X06
1000
1000
1000
475
1000
1000
195 1000
1000
2000
1000
625
195
F03
X07
F09 F10
X06
Description WOOD VEIN MARBLE TILES WHITE QUARTZ MARBLE TILES 100*100 CM TRAVENTINE MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM WOODEN HPL TILES WOODEN CHEVRON TILES BLACK SPANISH MARBLE TILES 100*100 CM TEAK WOOD TILES 60*60 CM ICE GREEN MARBLE TILES
X08
X08
X07
X07
F01
1000
03
GR-FFL
04
UP
GR-FFL
+2.900
+2.900
1000
143 m²
520
725
1000
1000
10620
+0.000
+0.000 2 EG20027-TD-ID-12-GR-0
03
+2.900 GYPSUM BOARD
WOOD VEIN MARBLE TILES
1000
143 m²
4495 MAIN SEATING AREA
GR-FFL
F01
WOOD VEIN MARBLE TILES
4205
DINING AREA
WOOD VEIN MARBLE TILES 100*100 CM
MAIN SEATING AREA
GR-FFL
1000
04
GYPSUM BOARD CE WOODEN RIBS CEIL MIRROR CEILING
X06
1000
1000
OPENING BELOW
DINING AREA
C1 C2 C3
Description
13360
X06 4660
WOOD VEIN MARBLE TILES 100*100 CM
S5-Ceiling Schedule Type Mark
5485
X08
1000
SHADOW GAP WITH INDIRECT LIGHT
X04
1000
GR-FFL
UP WOOD VEIN MARBLE TILES 100*100 CM
X02
UP
143 m²
1000 1000
Drawn by Checked by
BIM ARCHITECT PORTFOLIO
Description APPROVED ISSUE
Revisions
Y03
Y04
Y05
Scale
2505
4475
X01
GROUND CEILING Project number
EG20027
Date
Issue Date
Drawn by
R.ABDELHAMID M.WALY
EG20027-TD-ID-4-GR-0 Y01Y02
X02
GR-FFL
X01
GROUND FLOORING PLAN
1 : 50
Checked by
01/08/2021 04:56:59 ﻡ
X01
Date
GROUND FLOORING PLAN
1
X03
4705
Project number
1 : 50
No.
GR-FFL
VILLA MR. RAMAD SOBHY
600
X01
1
02
+2.900
KITCHEN 05
+2.900
445
1000
GUEST WASHROOM
VILLA MR. RAMADAN SOBHY
+0.000 1000
X04
GR-FFL
1000
WOOD VEIN MARBLE TILES
1000
LOBBY
4705
X02
Revisions
UP
F01
145
605
JULY 2021
+2.900 01
520
X03
4810
1000
WOOD VEIN MARBLE TILES 100*100 CM
1000
KITCHEN 05
Date 01/06/2021
SP
SP
X02
Description APPROVED ISSUE
605
X04
X03
00 10
X03
No. 1
+0.000 10 00
1000
00 10
1000
GR-FFL
For TENDER GYPSUM BOARD
GUEST WASHROOM 02
X05 +2.900
7345
1000
1000
00 10
7 m²
4065
JULY 2021
WOOD VEIN MARBLE TILES 100*100 CM
90 29
1010
00 10
143 m²
+0.000
X04
F01 WOOD VEIN MARBLE TILES
4145
290
130 1000
1000
0 41
F01 WOOD VEIN MARBLE TILES
445
845
For TENDER
LOBBY GR-FFL
840
X05
X05
5155
143 m²
X05 01
320 200
2500
1000
1000
1000
830
1000
520
F01 WOOD VEIN MARBLE TILES
1
E
Iss
R.ABDE
M
EG20027-TD-ID-5-G
GROUND CEILING PLAN 1 : 50
Y01Y02
Y03
Y04
Y05
Scale
31
Y05 Y01Y02
X08
BUILDING WALL SCHEDULE
X08 3895
320
1420
650 1880
135
330
12
815
FR-FFL
760
500
X02
Date 01/06/2021
X03
W01
2030 655
W01 3345
01
4 2 EG20027-TD-ID-7-FR-2
3695
Y04
M.WALY
EG20027-TD-ID-1-FR-0
Y05
1 : 50
Scale
1 : 50
Y03
Y04
X08 645
1000
1000
1000
1000
625
WOOD VEIN MARBLE TILES WHITE QUARTZ MARBLE TILES 100*100 CM TRAVENTINE MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM WOODEN HPL TILES WOODEN CHEVRON TILES BLACK SPANISH MARBLE TILES 100*100 CM TEAK WOOD TILES 60*60 CM ICE GREEN MARBLE TILES
F04 F05 F06 F08 F09 F10
X06
4090
200
4460
08
2495
FR-FFL
+6.250
900
2530
5 67
X02
X02
200
1295
2430
3285
C1 580
730
2825
3300
1125
JULY 2021 X04
FR-FFL
No.
55 15
Description APPROVED ISSUE
01
X02
Revisions
4 EG20027-TD-ID-11-GN-0
00 17
FR-FFL WOOD VEIN MARBLE TILES
1
X03
2665
2510 5785
Revisions
FR-FFL
+6.250
For TENDER
LOBBY 01
33 40
03
4365
+6.250
DRESSING ROOM A
X03
FR-FFL
+6.250
2120
1125
C1
Date 01/06/2021
520
F01
955
X05
C1
14
2825
200
SECONDARY BEDROOM B
420
FR-FFL
1825
C2 2305
FR-FFL
+6.250
580
Description APPROVED ISSUE
09
C1
675
1
800
0 20
X03
C2 SECONDARY BATHROOM A
1155
No.
35 17
735
FR-FFL
MASTER DRESSING ROOM
C1
FR-FFL
C2
X04
X04
965
BEDROOM C BATHROOM
04
13
4585
2685
JULY 2021
BATHROOM B
FR-FFL
2030
770
For TENDER
FR-FFL
12
1665
+6.250
485
X05
X05
C1
DRESSING ROOM B
4070
2170
FR-FFL
06
940
C1
2825
SP
1385
1665
5540
1120
C1
34 80
2160
1180
MASTER BEDROOM
FR-FFL
+6.250
DRESSING ROOM C
UP
TERRACE
GYPSUM BOARD CEILI WOODEN RIBS CEILING MIRROR CEILING
X06
520
07
2130
FR-FFL
C1 C2 C3
775
0
C1
SECONDARY BEDROOM C
FR-FFL
41 35
+3.700
2480
75 38
2170
Description
FR-FFL
11
795
2740
13
F01
WOOD VEIN MARBLE TILES
SP
4 m²
3495
FR-FFL
VILLA MR. RAMADAN SOBHY
X01
Date Drawn by Checked by
Y04
Y05
X01
FIRST CEILING PLA
EG20027
Project number Date
M.ABDELSALAM M.WALY
1
Scale
X01
Issue Date
EG20027-TD-ID-4-FR-0
1 : 50
VILLA MR. RAMADA SOBHY
FR-FFL
+6.250
FIRST FLOORING PLAN Project number
Y03
02
1 : 50
Drawn by
01/08/2021 04:56:58 ﻡ
4745
C1 SECONDARY BEDROOM A
200
28 m²
3815
MASTER BATHROOM
BATHROOM B
+3.700
BIM ARCHITECT PORTFOLIO
S5-Ceiling Schedule Type Mark
X07
650
X07
935
4720
SP
SP
Y01Y02
M.W
2020
F03
SECONDARY BEDROOM A
FIRST FLOORING PLAN
M.ABDELSA
Scale
X08
05
+3.700
15
1
1240
X08
F06 22 m²
WOODEN HPL TILES
Issue
Y05
C1
WOODEN CHEVRON TILES
14
0
480
SECONDARY BEDROOM B
F05
X01
Y04
480
+3.700
14 m²
X02
EG2
Project number
Y05
200 840
1050
2490
3335
F06
2865
02
Y03
1820
WOODEN CHEVRON TILES
SP
FIRST FLOOR DETAIL PLAN
60 16
520
FR-FFL
Y01Y02
FR-FFL
01
03
Y04
4150
20 m²
DRESSING ROOM A
Y03
1000
2780
22 m²
WHITE QUARTZ MARBLE TILES 100*100 CM 4 m²
LOBBY
X03
Y01Y02
820
1000
09
2865
X04
FIRST FLOOR DETAILED PLAN 1 : 50
MASTER DRESSING ROOM
SP
WOOD VEIN MARBLE TILES 1 m²
X01 EG20027-TD-ID-11-GN-0
2970
SP
F01
WHITE QUARTZ MARBLE TILES 100*100 CM 3 m²
VILLA MR. RAMADAN SOBHY
EG20027-TD-ID-12-GN-0
Description
30 17
SP
X06
205
2 m²
4625
1 m²
F02
1
F02
1705
WHITE QUARTZ MARBLE TILES 100*100 CM 1 m²
WOOD VEIN MARBLE TILES
790
365
1000
58
9
EG20027-TD-ID-3-FR-
2810
4355 5660
F02
2330
2210
F01
WHITE QUARTZ MARBLE TILES 100*100 CM 3 m² 790
980
FR-FFL
F06 WOODEN CHEVRON TILES
2805
1000 315
X05
1000
4205
3330 2210
5085
23 m²
1240
57
Revisions
59
Checked by
WOOD VEIN MARBLE TILES
DRESSING ROOM B
WOODEN HPL TILES
1240
56
X02 60
C1
+3.700
SP
SP
55
61
D
01
3
F01 12
F02
1000
TEAK WOOD TILES 60*60 CM
FR-FFL
2865
54
62
815
1 m²
2865 DRESSING ROOM C
SP
1000
21 m²
F05
FR-FFL
3000
F09
FR-FFL
F06
23 m²
06
W08
WOODEN CHEVRON TILES
WOODEN HPL TILES
+3.700
53
63
Description APPROVED ISSUE
EG20027-TD-ID-7-FR-2
4060
945 MASTER BEDROOM
FR-FFL
FR-FFL
WHITE QUARTZ MARBLE TILES 100*100 CM 13 m²
4225
08
620
MASTER BATHROOM 11
1400
2 m²
SP
4770
SECONDARY BEDROOM C
X07
1000
1000
+3.700
F02
2985
390
200
F10 ICE GREEN MARBLE TILES
SP
F05
52
64
No. 1
X03
Drawn by
865
1000
F03 12 m²
07
790
51
65
1800 AL10 1600
Date
BUILDING FLOOR SCHEDULE FLOOR TYPES F01 F02
FR-FFL
TRAVENTINE MARBLE TILES 100*100 CM
X06
250
50
66
TERRACE 10
X07
67
1800 AL07 3000
Y05
X08
68
200
Y01Y02
810
200
FIRST FLOOR PLAN
Y03
X01
69
5
SECONDARY BEDROOM A
X04
M.ABDELSALAM
Checked by
Y01Y02
790
49
JULY 2021
EG20027-TD-ID-7-FR-3
5
Issue Date
Date Drawn by
250
3
EG20027
Project number
780
48
2200 AL09 1200
1180
FIRST FLOOR FURNITURE LAYOUT
70
2235
1
W10
01/08/2021 04:56:47 ﻡ
X01
+3.700
W10
2115
W10
02
X01
71
For TENDER
5
FR-FFL
EG20027-TD-ID-7-FR-5
FR-FFL
47
W14
VILLA MR. RAMADAN SOBHY
W10
UP
415
FR-FFL
3
1
2520
X05
SECONDARY BEDROOM B
1895
W10
2 4 EG20027-TD-ID-7-FR-5
W05
1125
W10
1
02 D02
3500
SECONDARY BEDROOM A 02
2430
1255
W01
X02
Revisions
W01
FR-FFL
+3.700
14
975
DRESSING ROOM A 03
520
3
14 D02
16 50
Description APPROVED ISSUE
900
1155
UP
X02
No. 1
1565
LOBBY
800
1 4 2 EG20027-TD-ID-7-FR-3
2565
X03
420
04 D01
1050 1410
FR-FFL
03
X04
1120
FR-FFL
720
DRESSING ROOM A
X03
04
4
W13
W05
55 30
FR-FFL
900 AL01 700
W21 W35
W10
09 D02
W10
890
W20
W21
2505
15 17
X04
LOBBY 01
2 SECONDARY 1 3 EG20027-TD-ID-7-FR-6 BATHROOM A
-
800
0 90
X04
W21 W05
JULY 2021
07 D02
W13
W05
365
FR-FFL
+3.700
890 2685
EG20027-TD-ID-12-GN-0
FR-FFL
1690
W21
1305
For TENDER
FR-FFL
FR-FFL
Sim
09
735
W05
0 12
14
SECONDARY BATHROOM A
05
W05
EG20027-TD-ID-7-FR-6
12
05 D01
BEDROOM C BATHROOM
770
X05
W13
800
-
-
430
1770
MASTER DRESSING ROOM
W05
630
7
X05 SECONDARY BEDROOM B
900 AL01 700
980
-
FR-FFL
-
800
FR-FFL
FR-FFL
X05
04
800
630
05
1065
855
735
09
BEDROOM C BATHROOM
1965
635
MASTER DRESSING ROOM
410
FR-FFL
06
2280
2170
W01 DRESSING ROOM C
13
FR-FFL
13 D01
W17 W18 W19
BATHROOM B
DRESSING ROOM B
2715
W08 0
W04
EG20027-TD-ID-7-FR-0
800
W08
1985
7 W01
W19
DRESSING ROOM C 06
W14 W16
EG20027-TD-ID-7-GR-0 1665
+3.700
2775
W12 W13
1385
4
700
2825
X06
W05
W13
FR-FFL
5540
W17
1085
FR-FFL
935
13
FR-FFL
W07 W08 W09 W10
5
EG20027-TD-ID-7-FR-1
775
2495
MASTER BEDROOM 08
W21
1
2
5
EG20027-TD-ID-7-FR-4
12
895
3 1 EG20027-TD-ID-7-FR-0
+3.700
W10
2970
BATHROOM B
DRESSING ROOM B
980
4 2000
FR-FFL
W10
W10
W18
W16
2 4 EG20027-TD-ID-7-FR-1 3275
Description
OFF WHITE PAINT BLACK SPANISH MARBLE T 100*100 CM CERAMIC TILES 60*60 CM VEIN MARBLE TILES 100*10 WOOD CLADDING GREY GYPSUM BOARD CLADDING GREY PAINT CLEAR MIRROR CLADDING BLACK MIRROR CLADDING WHITE GYPSUM BOARD CLADDING ROUGH STONE CLADDING WHITE QUARTZ MARBLE T 100*100 CM TERRAZZO TILES 100*100 C ICE GREEN MARBLE TILES 100*100 CM WOODEN RIBS CLADDING FABRIC CLADDING CALCATTA MARBLE TILES 100*100 CM CALCATTA GOLD MARBLE 100*100 CM CLEAR MIRROR CLADDING PIECE FOR BATHROOMS EXTERIOR WHITE PAINT
W03 W04 W05 W06
X07
FR-FFL
3
795
105
11 D02
W10
2480
W13
965
900
2880
2740
W06
815
W01 W02
MASTER BATHROOM 11
790
1255
07
3
3000
2075
3210
SECONDARY BEDROOM C
1 4 EG20027-TD-ID-7-FR-4
795
W10 W17
W10 2
FR-FFL
08
775
W10
MASTER BEDROOM
FR-FFL
475
3000
310
X06
1100
X06
07
FR-FFL
2400 AL05 3000
1800 AL07 3000
X06
10
X07
FR-FFL
900
1840
TERRACE
X07
MASTER BATHROOM 11
WALL TYPES
1800 AL04 2400
370
FR-FFL
X07
SECONDARY BEDROOM C
Y05
X08
TERRACE 10
Y04
290
X08
Y03
4155
Y04
290
Y03
1190
Y01Y02
FIRST CEILING PLAN
1 : 50
Checked by
EG
Issue
M.ABDELS M.
EG20027-TD-ID-5-FR Y01Y02
Y03
Y04
Y05
Scale
32
Y01Y02
Y03
Y04
Y05
Y01Y02
X08
X08
X07
X07
Y03
Y04
Y05
X08
BUILDIN
X08
WALL TYPES W01 W02
X07
X07 3600
305
895
305
550
X06
ROOFTOP DINNING 07
X06
RF - FFL
3595
3
780
250
2705
W07 W08 W09 W10
2 4 EG20027-TD-ID-7-FR-1
1020
X06
X06
1
790
W12 W13
ROOFTOP SEATING
1030
600
3275
3
07
RF - FFL
4120
ROOFTOP DINNING
RF - FFL
1
ROOFTOP SEATING 08
W14 W16 8405
2750 AL08 2000
2000
500
W17 W18 W19
4480
2750 AL08 2000
2750 AL08 2000
2000
500
2000
705
PLAYING AREA
RF - FFL
X05
X02
550
X02
Revisions
200
200
2700
165
2700
04
5
1135 600
EG20027-TD-ID-1-RF-0
1 : 50
1 : 50
Scale
Y01Y02
Y03
Y04
X07
1000
255
1020
915
F04 F05 F06 F08
X06
SP 1000
1000
1000
1000
1000
1000
1000
1000
1000
ROOFTOP SEATING 08
F09 F10
925
ROOF FL
Checked by
1
ROOF FLOOR DETAILED PLAN 1 : 50
EG2002 Y01Y02
Y03
Y04
Y05 Scale
Y03
Y04
Y05
X08
X08
S5-Ceiling Sche Type Mark
Description
X07
X07
X06
X06
C1 C2 C3
Descr
GYPSUM BOAR WOODEN RIBS MIRROR CEILIN
1000
1000
1000
1000
1000
1000
X01
Drawn by
WOOD VEIN MARBLE TILES WHITE QUARTZ MARBLE TILES 100*100 CM TRAVENTINE MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM WOODEN HPL TILES WOODEN CHEVRON TILES BLACK SPANISH MARBLE TILES 100*100 CM TEAK WOOD TILES 60*60 CM ICE GREEN MARBLE TILES
F03
VILLA
305
Date
BUILDING FLOOR SCHEDULE FLOOR TYPES F01 F02
X06
3000
Y01Y02
X08
X07
EG20027-TD-ID-7-RF-1
Project number
Y05
X08
Revisions
5
M.ABDELSALAM M.WALY
De
APPROV
X02
4 EG20027-TD-ID-11-GN-0
X01
01/08/2021 04:56:49 ﻡ
1
W13
EG20027
Checked by
Y05
No. 1
X03
Issue Date
Drawn by
Y04
14 35
1970
ROOF FLOOR FURNITURE LAYOUT
Date
Y03
W04
1345
RF - FFL
300
Project number
Y01Y02
RF - FFL
W13
645
3105
RF - FFL
VILLA MR. RAMADAN SOBHY
ROOF FLOOR FURNITURE PLAN
JU X04
W10
4
EG20027-TD-ID-7-RF-0
TERRACE
X01
03
W21
W05
TERRACE
X01
990
W13
17 80
W10
3545
2200 AL11 2700
04
800
RF - FFL
11 70
635
01
1625
600
Fo
19 20 LOBBY
GUEST BATHROOM
4
01/06/2021
X03
02 W10 D02
RF - FFL
3
21 70
APPROVED ISSUE
02
900 100
130
05 D02
1 3 EG20027-TD-ID-7-RF-0
700
X02
1
X04
Date
2RF - FFL
2040
X03
RF - FFL
Description
05
CORRIDOR
X05
EG20027-TD-ID-7-FR-32
2125
85 45
No.
GUEST BEDROOM
215 470
06 D04 2370
900
W10 W17
X04
GUEST BATHROOM 03
W35
RF - FFL
4200
1500
JULY 2021
RF - FFL
0.53
01
09
1
LOBBY
RF - FFL
X03
W21
SERVICE ZONE
1
2020
05
W10
3545
2790
GUEST BEDROOM
W10
RF - FFL
X05
For TENDER X04
06
GROOVE 2CMEG20027-TD-ID-7-RF-1 2 4
1230
X05
W10
3
3495
3020
09
W10
W10 W10
SERVICE ZONE
PLAYING AREA
3020
RF - FFL
240
06
W20
720
470 680
500
RF - FFL
2000
08
OFF W BLACK 100*100 CERAM VEIN M WOOD GREY G CLADD GREY P CLEAR BLACK WHITE CLADD ROUGH WHITE 100*100 TERRA ICE GR 100*100 WOOD FABRIC CALCA 100*100 CALCA 100*100 CLEAR PIECE EXTER
W03 W04 W05 W06
RF - FFL
ROOFTOP DINNING RF - FFL
F03
F03
TRAVENTINE MARBLE TILES 100*100 CM 79 m²
1000
1000
79 m²
780
200
310 8755
5980 5920
1000
1000
1000
For TENDER
01
RF - FFL
SP
500
WOOD VEIN MARBLE TILES
No.
F01
X03
9 m²
1000
1000
175 1000
245
1000
X03 200
GUEST BATHROOM 03
2745
C2
RF - FFL
JULY 202
X04
C1
RF - FFL
C1
No.
X03
1
600
Descriptio APPROVED ISSUE
X02 Revisions
F03
VILLA MR. RAM SOBHY
VILLA MR. RAMADAN SOBHY
12 m²
3645
X01
X01
Checked by
Y04
ROOF CEILING
Y05 Scale
Project number
EG20027
Date
Issue Date
Drawn by
M.ABDELSALAM M.WALY
EG20027-TD-ID-4-RF-0 Y03
X01
ROOF FLOORING PLAN
Drawn by
Y01Y02
For TEND LOBBY 01
RF - FFL
Date
BIM ARCHITECT PORTFOLIO
Date 01/06/2021
1790
X02
Project number
ROOF FLOORING PLAN
RF - FFL
635
Revisions
X01
1 : 50
02
C1 3 1 EG20027-TD-ID-7-RF-0 4
1 : 50
M.AB
Checked by
01/08/2021 04:56:59 ﻡ
1000
1000
TRAVENTINE MARBLE TILES 100*100 CM
145
Description APPROVED ISSUE
2 RF - FFL
45 53
1000
TERRACE
1000
1
05
X04
X02
SP
04
1
GUEST BEDROOM
X04
WOOD VEIN MARBLE TILES
2 m²
990
2125
200
F01
F02
1000
2370 CORRIDOR
C1
JULY 2021
575
LOBBY
RF - FFL
WHITE QUARTZ MARBLE TILES 100*100 CM 3 m²
X02
1000
1000
03
1000
14 m²
GUEST BATHROOM
2140
WOODEN CHEVRON TILES
X03
1000
120
F06
1000
550
3610
1000
X05
3345
2075
RF - FFL
1000
1350
200
1230
1000
CORRIDOR 02
X05
X05
240
1000
C2
10 56
X04
RF - FFL
RF - FFL
8205
1820
490
79 m²
GUEST BEDROOM 05
C1
1
1000
3670
TRAVENTINE MARBLE TILES 100*100 CM
SP SP
2 4 EG20027-TD-ID-7-RF-1
2820
580
SP
06
RF - FFL
F03
465
PLAYING AREA
3
RF - FFL
1000
09
27 m²
SP
06
SERVICE ZONE
F05 WOODEN HPL TILES
X05
2285
200 PLAYING AREA
RF - FFL
1000
3140
06
1230
595 PLAYING AREA
2625
1000
TRAVENTINE MARBLE TILES 100*100 CM
310
1000
1000
1000
07
1
ROOF CEILING PLAN
Y01Y02
Y03
Y04
EG20027-TD-ID
Y05
1 : 50
Scale
33
GR-FFL
GR-DINING-B
GR - DINING
GR-DINING-C
100 350
Y04
1 Y03
X05
X04
350
DOUBLE WOODEN SLIDING DOOR 206* 220CM
Description
X05
Date
WHITE PAINT ON GYPSUM BOARD CEILING
10
X02
2900
WOOD VEIN MARBLE TILES 100*100 CM
02
X04
GR-FFL
BLACK MARBLE TILES 100* 100CM
X04
X03
GR-TOS +-100
WOOD VEIN MARBLE TILES 100*100 CM
GR-FFL +0
GR-FFL +0
GR-TOS +-100
GR-TOS +-100
GR-LOBBY-C
11 GR-LOBBY-3D Y04
Y05
1 : 50
Scale
Y04
Y05
350
350
2900
GR-FFL +0
GR-GUEST WASHROOM-C
8
1 : 50
R.ABDELHAMID M.WALY
Checked by SP
EG20027-TD-ID-7-GR-0
GR-TOS +-100
GR-TOS +-100
9
Issue Date
Date Drawn by
WOOD VEIN MARBLE TILES 100*100 CM
EG20027
Project number
875
GR-FFL +0
GROUND INTERNAL ELEVATIONS
1200
FIXED WINDOW 90*120 CM
2.99 WOOD VEIN MARBLE TILES 100*100 CM
VILLA MR. RAMADAN SOBHY
500
350
350
EG20027-TD-ID-7-GR-1
10 1GR-LOBBY-D : 50
Y04
M.WALY
Checked by
GR-TOS +-100
1 : 50
R.ABDELHAMID
Drawn by
Date
Revisions
GR-GUEST WASHROOM-A
WHITE PAINT ON GYPSUM BOARD CEILING
1.54
Description
1 : 50
BLACK MARBLE TILES 100*100 CM
BLACK MARBLE WOOD CLADDING
01/08/2021 05:15:10 ﻡ
1670
2900
GR-TOS +-100
WOOD VEIN MARBLE TILES 100*100 CM SKIRTING GROOVE 2CM
7
FIXED MIRROR
Issue Date
Date
GR-FFL +0
50
GR-FFL +0
WHITE PAINT ON GYPSUM BOARD CEILING
EG20027
Project number
BLACK MIRROR WALL WOOD CLADDING
SKIRTING GROOVE 5CM
750
WOOD VEIN MARBLE TILES 100*100 CM
WOOD CLADDING
430 50
350 430 50
BLACK MIRROR WALL
WHITE PAINT ON GYPSUM BOARD
GROUND INTERNAL ELEVATIONS
No. SLIDING WOODEN DOOR
WASHROOM-D 10 1GR-GUEST : 50
GR- GUEST WASHROOM 1 : 50
2200
X05 WHITE PAINT ON GYPSUM BOARD CEILING
6
Y05
875
X05
2900
X04
GR-DINING-3D
780
X03
WHITE PAINT ON GYPSUM BOARD CEILING
6
1 : 50
2900
BLACK MARBLE TILES 100*100 CM
FIXED WINDOW 90*120 CM
WOOD VEIN MARBLE TILES 100*100 CM
X03
Y04
VILLA MR. RAMADAN SOBHY
20
X02
GR-LOBBY-B
8
1 : 50
9
SLIDING WOODEN DOOR
Y04
GROUND FLOOR PLAN - LOBBY
7
GR-FFL +0
1670
Y03
WHITE PAINT ON GYPSUM BOARD CEILING
7
9 8 GUEST WASHROOM
Revisions
X02
350
JULY 2021
2200
X03
GROUND FLOOR-MAIN AREA-3D
For TENDER
EG20027-TD-ID-7-GR-0
WOOD CLADDING
X03
5
1 : 50
Y05
X05
SHADOW GAP WITH INDIRECT LIGHT
No.
GR-MAIN AREA-C
4
Y04
JULY 2021
700
8
X04
GR - MAIN AREA 1 : 50
For TENDER
50
WHITE PAINT ON GYPSUM BOARD CEILING 9 10 EG20027-TD-ID-7-GR-1
1200
1 : 50
Y04
X05
WOOD VEIN MARBLE TILES 100*100 CM
GR-FFL +0
GR-DINNING-D
5
1 : 50
Y05
500
Y03
GREY PAINT SKIRTING GROOVE 2CM
GR-TOS +-100
4
1 : 50
X05
800 1200
1
FR-TOS +3600
GROOVE 2CM
X05
SKIRTING GR-FFLGROOVE 2CM +0
GR-TOS +-100
Y03
GR-MAIN AREA-B 1 : 50
2900
Y02
WHITE PAINT ON GYPSUM BOARD CEILING
Y05
GR-GUEST WASHROOM-B
11 GR-GUEST BT-3D
1 : 50
1 : 50
Scale
Y05 2 EG20027-TD-ID-12-GR-0 2.50
1
2
3
4
5
6
18
7
X03 17
16
4 EG20027-TD-ID-11-GN-0
X03
22 15
14
13
X02 12
45
+0.000
X02
23
11
24
25
26
27
4 EG20027-TD-ID-11-GN-0
44
43
42
9
10
-1.624
X01
X01 Y04
X03 41
40
39
28
29 6 30 EG20027-TD-ID-11-GN-0 31
8
32
33
34
38
X02 37
36
X03
X04 70
69
68
47
X02
48
49
50
51
52
53
+1.924
X01 Y04
BASEMENT FLOOR DETAILED PLAN - Callout 1
2
1 : 50
GROUND FLOOR DETAILED PLAN - Callout 7 1 : 50
54
66
55
3 EG20027-TD-ID-12-GR-0
X03 65
56
64
57
63
58
62
61
X02 60
59
GR - BAR CALLOUT
1
1 : 20
+5.332
X01
X01
1.25
Y05 Y04
1
67
+3.700
35
X01
Y05
71
3
BLACK MIRROR CLADDING AS PER APPROVED SAMPLE
Y05
GR-FFL +0
FIRST FLOOR DETAILED PLAN - Callout 7
2 INDIRECT LIGHT LED PROFILE
+7.100
RF-TOS +7000
GR-FFL +0
GR-FFL +0
GR-FFL +0
GR - BAR DETAILED SECTION 01 1 : 20
3
GR - BAR DETAILED SECTION 02
4
1 : 20
GR - BAR - 3D
7 EG20027-TD-ID-12-GR-0
RF-TOS +7000
71
STEEL BOXES 5*5 CM
1 : 50
RF - FFL +7100
RF - FFL +7100
1.25
2CM GROOVE
1.00
19
X04
0.05
46 20
-3.100
X02
X04
1.00
21
X03
4 EG20027-TD-ID-11-GN-0
X04
0.05
X04
0.70
X04
2.50
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
70 69 68 67
For TENDER
66 65 64 63 62 60
For TENDER
JULY 2021
WOOD CLADDING AS PER APPROVED SAMPLE
+5.332
61 59
JULY 2021
58 57 56
6 EG20027-TD-ID-11-GN-0
55 54 53
FR-FFL +3700
52
FR-FFL +3700
51 50
Description
Date
No.
49
+3.700
FR-TOS +3600
No.
6 EG20027-TD-ID-12-GR-0
48
FR-TOS +3600
47 46
5
45 44 43 42
HADNRAIL DETAILED PLAN
41 39 38 37
+1.924
36 35
Revisions
1 : 10
0.20
7
40
Description
Date
GR - WOOD VEIN WALL CALLOUT 1 : 20
Revisions
STEEL BOXES 5*5 CM
34 33
0.50
32 31 30 29
17
0.37
18
15 14 12 11
0.02
STAIR DETAILS
16
-1.624
BF-FFL +-3100
6 5 4
-3.100
BF-TOS +-3200
BF-FFL +-3100
Date
3 2 1
BF-TOS +-3200
Drawn by WOOD CLADDING AS PER APPROVED SAMPLE
Checked by
EG20027
Section 17 1 : 50
BIM ARCHITECT PORTFOLIO
6
HANDRAIL DETAILED SECTION 1 : 10
5
STAIRS 3D
Scale
GROUND FLOOR DETAILS Project number
LED PROFILE
Issue Date
Date
M.ABDELSALAM M.WALY
EG20027-TD-ID-11-GN-0
4
GLASS SHELVES AS PER APPROVED SAMPLE
As indicated
0.90
Project number
Drawn by STEEL BOXES 5*5 CM
01/08/2021 05:47:42 ﻡ
STEEL BOXES 5*5 CM
8 7
GLASS SHELVES AS PER APPROVED SAMPLE
0.50
10 9
VILLA MR. RAMADAN SOBHY
WOOD VEIN MARBLE CLADDING AS PER APPROVED SAMPLE
GR-FFL +0
6
GR-FFL +0
GR - WOOD VEIN WALL SECTION 01 1 : 20
GR-FFL +0
7
GR - WOOD VEIN WALL SECTION 02 1 : 20
Checked by
GR-FFL +0
EG20027 Issue Date Author Checker
EG20027-TD-ID-12-GR-0
8
GR - WOOD VEIN WALL - 3D
Scale
34
1 : 20
01/08/2021 05:50:50 ﻡ
19
13
WOOD VEIN MARBLE CLADDING AS PER APPROVED SAMPLE
1.80
INDIRECT LIGHT LED PROFILE
20
0.90
GR-TOS +-100
21
0.02
VILLA MR. RAMADAN SOBHY
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
GR-FFL +0
9 EG20027-TD-ID-12-GN-0
23 22
0.02
+0.000
GR-TOS +-100
ø 1800
26 25 24
0.37
28 27
GR-FFL +0
01/08/2021 05:13:10 ﻡ
2
Y04
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
WOOD VEIN MARBLE TILES 100*100 CM
EG20027-TD-ID-12-GR-0
3
1 : 50
FR-TOS +3600
GREY PAINT
SKIRTING GR-FFL GROOVE 2CM +0
WOOD VEIN MARBLE TILES 100*100 CM
GR-FFL +0
GR-MAIN AREA-A
2
Y03
2800
X05
SKIRTING GROOVE 2CM
SKIRTING GROOVE 2CM
GR-TOS +-100
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
WOOD VEIN MARBLE TILES 100*100 CM
2900
GR-FFL +0
GREY PAINT WOOD VEIN MARBLE TILES 100*100 CM
3
1 : 50
WHITE PAINT ON GYPSUM BOARD CEILING
GROOVE 2CM
GREY PAINT ON GYPSUM BOARD
EG20027-TD-ID-7-GR-02
Y02
GREY PAINT
FR-TOS +3600
500 03
4
X07
WHITE PAINT ON GYPSUM BOARD CEILING
Y04
350
X06
1 : 50
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
MAIN SEATING AREA
2 EG20027-TD-ID-12-GR-0
X05
Y05
WHITE PAINT ON GYPSUM BOARD CEILING
875
2
X06
GR-TOS +-100
3 GR-DINING-A
X06
GREY PAINT ON GYPSUM BOARD
1200
2000
SKIRTING GROOVE 2CM
3
GR-FFL
WHITE PAINT ON GYPSUM BOARD CEILING
GROOVE 2CM
SKIRTING GROOVE 2CM GR-FFL +0
2
DINING AREA 04
X05
1200
GR-FFL +0 GR-TOS +-100
X06
WOOD CLADDING AS PER APPROVED SAMPLE
WOOD VEIN MARBLE TILES 100*100 CM
EG20027-TD-ID-12-GR-0
900
5
X07
WOOD VIEN MARBLE PARTITION WALL
GLASS HANDRAIL
WOOD VEIN MARBLE TILES 100*100 CM
4 2 EG20027-TD-ID-7-GR-1
X07
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
GREY PAINT
X06
X07
Y05
FR-TOS +3600
WHITE PAINT ON GYPSUM BOARD CEILING
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
X06
Y04
WHITE PAINT ON GYPSUM BOARD CEILING
100 350
X07
Y02
2900
X07
Y03
X06
2800
X07
350
Y03
350
Y02
FR-FFL +3700
FR-FFL +3700
400 50 2390
HPL WOODEN FLOOR AS PER APPROVED SAMPLE 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
WOODEN RIBS CLADDING AS PER APPROVED SAMPLE
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
FR-FFL +3700
FR-FFL +3700
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
FR-FFL +3700
3
SECONDARY DRESSING ROOM
X06
FR-FFL +3700
FIRST FLOOR DETAILED PLAN - Callout 6
3
LOBBY Elevation 7 - c
4
1 : 50
400
RF-TOS +7000
50
1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE HPL WOODEN FLOOR AS PER APPROVED SAMPLE
HPL WOODEN FLOOR AS PER APPROVED SAMPLE
FR-FFL +3700
350
WHITE GYPSUM BOARD CALDDING
WHITE GYPSUM BOARD CALDDING 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
FR-FFL +3700 FR-FFL +3700
1 : 50
Y02
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
GREY PAINT ON GYPSUM BOARD CLADDING
1550
GREY PAINT ON GYPSUM BOARD CLADDING
WOOD VEIN MARBLE TILES 100*100 CM
FR-FFL +3700
Y03
500
WHITE PAINT ON GYPSUM BOARD CEILING
Y03
400
Y01Y02
150
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
AS PER APPROVED SAMPLE
RF-TOS +7000
RF-TOS +7000
50
350
50 400
RF-TOS +7000
07 D02
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
1500
RF-TOS +7000
BLACK MIRROR CALDDING
FR-FFL +3700
WOODEN RIBS CLADDING AS PER APPROVED SAMPLE
840
FR-FFL +3700
WHITE PAINT FINISH ON GYPSUM BOARD 1 CM METAL CLADDING PROFILE GROOVE AS PER APPROVED WHITE WOOD SAMPLE SKIRTING 15 CM AS PER APPROVED SAMPLE
X02
SECONDARY BEDROOM C Elevation 3 - b 1 : 50
150 10
950
WOOD VEIN MARBLE TILES 100*100 CM
09 D02
WHITE PAINT ON GYPSUM BOARD 1CEILING CM METAL PROFILE GROOVE AS PER APPROVED WHITE WOOD SAMPLE 15 CM SKIRTING
X03
1800
CALCATTA GOLD MARBLE CLADDING
X04
RF-TOS +7000
2
1 : 50
2200
WOOD CALDDING AS PER APPROVED SAMPLE
RF-TOS +7000
2550
20 600 20 500 20 420 50 400
WHITE PAINT ON GYPSUM BOARD CEILING
Y04 50 400
Y03
2390
RF-TOS +7000
2200
Y04
150 10
Y03
SECONDARY BEDROOM C Elevation 3 - a
1
X02
2200
LOBBY Elevation 7 - b 1 : 50
2390
2
150 10
LOBBY Elevation 7 - a 1 : 50
20
X02
1
600
X03
390
1
X03
5
150
50
WOODEN RIBS CLADDING AS PER APPROVED SAMPLE
2
WHITE GYPSUM BOARD CALDDING
1800 AL07 3000
GREY PAINT ON GYPSUM BOARD CLADDING
HPL WOODEN FLOOR AS PER APPROVED SAMPLE 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
1 4 EG20027-TD-ID-7-FR-4
2 4 EG20027-TD-ID-7-FR-5
1550
WHITE GYPSUM BOARD CALDDING
X06
1800
350
GREY PAINT ON GYPSUM BOARD CLADDING
X06
RF-TOS +7000
WHITE PAINT ON GYPSUM BOARD CEILING
150 10
FR-FFL +3700
WHITE PAINT ON GYPSUM BOARD CEILING
Y03
RF-TOS +7000
400
20
1 CM METAL PROFILE GROOVE AS PER APPROVED WHITE WOOD SAMPLE SKIRTING 15 CM AS PER APPROVED SAMPLE
Y03
RF-TOS +7000
600
WOOD VEIN MARBLE TILES 100*100 CM
FR-FFL +3700
Y01Y02
Y02
X06
RF-TOS +7000
840
INDIRECT LED LIGHT CALCATTA GOLD MARBLE CLADDING
RF-TOS +7000
2200
WOODEN SHELVES AS PER APPROVED SAMPLE WOOD CALDDING AS PER APPROVED SAMPLE CALCATTA GOLD MARBLE CLADDING
X04
150 10
2200 AL09 1200
FR-FFL +3700
X04
3
X03 20 600 20 500 20 420 50 390
20 600 20 500 20 420 20
2200
WOOD VEIN MARBLE TILES 100*100 CM
X04
X02
WHITE PAINT ON GYPSUM BOARD CEILING
50
350
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING WOOD CALDDING FOR STAIR HANDRAIL
950
Y04
RF-TOS +7000
+7000
400
Y03
Y03RF-TOS
950
Y04
RF-TOS +7000 WHITE PAINT ON GYPSUM BOARD CEILING
FR-FFL +3700
LOBBY Elevation 7 - d 1 : 50
5
For TENDER
FIRST FLOOR DETAILED PLAN - Callout 5
SECONDARY BEDRROM C Elevation 3 - c
4
1 : 50
3
1 : 50
SECONDARY BEDROOM C Elevation 3 - d 1 : 50
For TENDER
JULY 2021 No.
JULY 2021
Description
Date
No.
Description
Da
Revisions Revisions
VILLA MR. RAMADAN SOBHY
VILLA MR. RAMADAN SOBHY
FIRST FLOOR INTERNAL ELEVATIONS
EG20027-TD-ID-7-FR-5
LOBBY 3D Copy 1
1 : 50
Scale
FR-FFL +3700
1 : 50
3
SECONDARY BEDROOM A ELEVATION 1 - c 1 : 50
+7000
150
1800 AL10 1600 CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
FR-FFL +3700
FR-FFL +3700
600
FR-FFL +3700
FR-FFL +3700
X04
X03
X03
1
SECONDARY BEDROOM B Elevation 5 - a
RF-TOS +7000
Y05
RF-TOS +7000
1550
1800 AL10 1600
TERAZZO TILES AS PER APPROVED SAMPLE WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
FR-FFL +3700
FR-FFL +3700
FR-FFL +3700
WOODEN RIBS CLADDING AS PER APPROVED SAMPLE
SECONDARY BEDROOM B Elevation 5 - b 1 : 50
RF-TOS +7000
RF-TOS +7000
WHITE PAINT ON GYPSUM BOARD CEILING
X03
X04
X05
RF-TOS +7000
CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE
CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
FR-FFL +3700
FR-FFL +3700
1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
FR-FFL +3700
FR-FFL +3700
SECONDARY BEDROOM A ELEVATION 1 - d
4
Y04
1800
HPL WOODEN FLOOR AS PER APPROVED SAMPLE
Y05
WHITE PAINT ON GYPSUM BOARD CEILING
50
WHITE PAINT ON GYPSUM BOARD CEILING
X02
2
1 : 50
400
X04
50
X01
5
FIRST FLOOR DETAILED PLAN - Callout 3
RANDOM WOODEN RIBS
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
400
400 50 2550
400 50 150
RF-TOS +7000
TERAZZO TILES AS PER APPROVED SAMPLE
WOODEN RIBS CLADDING AS PER APPROVED SAMPLE
X03 RF-TOS
1 : 50
RF-TOS +7000
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
1800
1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
X04
2550
X05
4 2 EG20027-TD-ID-7-FR-3
SECONDARY BEDROOM A ELEVATION 1 - b
150 10 840
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
1800
1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
10 440
Y03
Y02Y01
150
Y01Y02
HPL WOODEN FLOOR AS PER APPROVED SAMPLE
Y03
400 50
X05
X01
WHITE PAINT ON GYPSUM BOARD CEILING
5
CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE
1
FR-FFL +3700
3
RF-TOS +7000
X05
RF-TOS +7000 WHITE PAINT ON GYPSUM BOARD CEILING
2390
WOODEN UNIT AS PER APPROVED SAMPLE
4 2 EG20027-TD-ID-7-FR-2
X01
RF-TOS +7000
400
1870
FR-FFL +3700
2
1 : 50
Y05
2390
SECONDARY BEDROOM A ELEVATION 1 - a
Y04
50
400
RF-TOS +7000
WHITE PAINT ON GYPSUM BOARD CEILING
150 10
1
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
FR-FFL +3700
Y05
CLEAR MIRROR CLADDING
3
1
H = 1.20 S = 1.20
WOODEN UNIT AS PER APPROVED SAMPLE
-
400
SECONDARY BEDROOM
02 D02
-
1200
2390
FR-FFL +3700
1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
RF-TOS +7000
150
WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE
X02
800
1:
Scale
50
1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE
7
150 10
X02
780
EG20027-TD-ID-7-FR-4
BEDROOM C Copy 1
600
X03
780
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING HPL WOODEN FLOOR AS PER APPROVED SAMPLE
2200
X03
HPL WOODEN FLOOR AS PER APPROVED SAMPLE 2390
SECONDARY DRESSING ROOM
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
10 300
X04
RF-TOS +7000
WHITE PAINT ON GYPSUM BOARD CEILING
150 10
X04
RF-TOS +7000
X01
50
50
WHITE PAINT ON GYPSUM BOARD CEILING
X02
220 150
Y03
6
BEDROOM C
2550
RF-TOS +7000
Y01Y02
350
Y03
400
Y01Y02
M.WA
Checked by
150 10
7
01/08/2021 05:07:52 ﻡ
LOBBY 3D
M.ABDELSAL
Drawn by
M.WALY
Checked by
Issue D
Date
M.ABDELSALAM
Drawn by
EG200
Project number
Issue Date
Date
6
FIRST FLOOR INTERNAL ELEVATIONS
EG20027
Project number
FIRST FLOOR DETAILED PLAN - Callout 4 1 : 50
3
SECONDARY BEDROOM B Elevation 5 - c 1 : 50
4
SECONDARY BEDROOM B Elevation 5 - d 1 : 50
For TENDER
For TENDER
1 : 50
JULY 2021
JULY 2021 No.
Description
No.
Date
Description
Date
Revisions
Revisions
VILLA MR. RAMADAN SOBHY
VILLA MR. RAMADAN SOBHY
FIRST FLOOR INTERNAL ELEVATIONS Project number
Date Drawn by Checked by
6
7
BEDROOM A 3D Copy 2
Scale
Date
Issue Date
Drawn by
M.ABDELSALAM
Checked by
M.WALY
EG20027-TD-ID-7-FR-2
BEDROOM A 3D Copy 1
BIM ARCHITECT PORTFOLIO
EG20027
1 : 50
6
01/08/2021 05:05:22 ﻡ
Project number
EG20027 Issue Date M.ABDELSALAM M.WALY
EG20027-TD-ID-7-FR-3
BEDROOM B
7
BEDROOM B Copy 1 Scale
35
1 : 50
01/08/2021 05:06:00 ﻡ
FIRST FLOOR INTERNAL ELEVATIONS
X06
X05
Y02
BLACK MARBLE WALL TILES 100* 100CM
WHITE PAINT
WOODEN FLOOR AS PER APPROVED SAMPLE
BF-FFL +-3100
X06
BF-TOS +-3200
X06
GLASS PANEL DOOR
WOODEN FLOOR AS PER APPROVED SAMPLE
07
BF-JACUZZI-A
2
5 3 EG20027-TD-ID-7-BF-1
BF-FFL
BF-TOS +-3200
BF-FFL +-3100
6
BF-TOS +-3200
4 2 EG20027-TD-ID-7-BF-0
2
BF-LIVING-A
X05
X06
X07
X05
X08
BF-JACUZZI-D
5
X04
Y02
JULY 2021 Y05
No.
Date
X04
EG20027-TD-ID-7-BF-0 0510 BF-FFL 8
2000
BF-FFL +-3100
X02
X02
BF-DRIVER'S BT-A Y05
X02
SINGLE WOODEN DOOR 80*220CM
BF-FFL +-3100
BF-FFL +-3100
BF-TOS +-3200
BF-DRIVER'S BT-B
Drawn by
BASEMENT-JACUZZI 3D
400 2250
BASEMENT INTERNAL ELEVATIONS
Y02
X04 CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE
M.WALY
BF-FFL +-3100
SP
BF-TOS +-3200
1 : 50
9
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
BF-FFL +-3100
EG20027-TD-ID-7-BF-1 Scale
EG20027
Project number
Issue Date
Date
CERAMIC FLOOR R.ABDELHAMIDTILES 60*60 AS PER
Checked by
BT-D 11 1BF-DRIVER'S : 50
X03
CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE
APPROVED SAMPLE
BF-TOS +-3200
1 : 50
X02
VILLA MR. RAMADAN SOBHY
12 MAID'S BT-3D
Issue Date
Date
6
BF-MAID'S BATHROOM-A
Y02
EG20027
Project number
BF-FFL +-3100
BT-C 10 1BF-DRIVER'S : 50
1 : 50
8
1 : 50
CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
BF-TOS +-3200
7
BF-FFL +-3100
SP
BF-MAID'S BATHROOM-B
BATHROOM-C 10 1BF-MAID'S : 50
1 : 50
R.ABDELHAMID
Drawn by
M.WALY
Checked by
SP
BF-TOS +-3200
BF-TOS +-3200
EG20027-TD-ID-7-BF-0
BATHROOM-D 11 1BF-MAID'S : 50
13 BASEMENT FLOOR-LIVING 3D -02
1 : 50
Scale
F.F.L
F.F.L
F.F.L
0.70 WIDTH
2.00 WIDTH
IN
OUT
OUT
IN
OUT
D01
DOOR TYPE
D02
DOOR TYPE
D03
DOOR TYPE
D04
OPENING TYPE
SINGLE HINGED WOODEN DOOR
OPENING TYPE
SINGLE HINGED WOODEN DOOR
OPENING TYPE
DOUBLE HINGED WOODEN DOOR
OPENING TYPE
DOUBLE SLIDING WOODEN DOOR
OPENING SIZE
800*2200 mm
OPENING SIZE
900*2200 mm
OPENING SIZE
2000*2200 MM
OPENING SIZE
1600*2200 mm
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
S5-WOODEN DOORS SCHEDULE
2.20 HEIGHT
2.20 HEIGHT
Type Mark D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D02 D02
Door Size Width Height 800 800 800 800 800 800 800 800 800 800 900 900
2200 2200 2200 2200 2200 2200 2200 2200 2200 2200 2200 2200
S5-WOODEN DOORS SCHEDULE
Count
Type Mark
1 1 1 1 1 1 1 1 1 1 1 1
Door Size Width Height 900 900 900 900 900 900 900
2200 2200 2200 2200 2200 2200 2200
1 1 1 1 1 1 1
D03
2060
2200
1
D04
1500
2200
1
D05
800
2200
1
Level
Count
No.
Type Mark 0.80 WIDTH
IN
OUT
DOOR TYPE
D05
Sill Height
S5-ALUMINIUM SCHEDULE
AL01 AL01 AL01
700 700 700
900 900 900
900 1500 1500
BF-FFL FR-FFL FR-FFL
1 1 1
AL02 AL02 AL02
900 900 900
1200 1200 1200
1200 1200 1300
GR-FFL GR-FFL FR-TOS
1 1 1
Type Mark
Window Size Width Height
Sill Height
Level
AL06 AL06 AL06 AL06 AL06
600 600 600 600 600
2400 2400 2400 2400 2400
2225 2225 2125 2125 2125
GR-FFL GR-FFL FR-FFL FR-FFL FR-FFL
1 1 1 1 1
AL07 AL07
3000 3000
1800 1800
600 600
FR-FFL FR-FFL
1 1
AL08 AL08 AL08
2000 2000 2000
2750 2750 2750
0 0 0
RF - FFL RF - FFL RF - FFL
1 1 1
AL03 AL03 AL03
3000 3000 3000
2800 2800 2800
0 0 0
GR-FFL GR-FFL GR-FFL
1 1 1
2400 2400
1800 1800
600 700
GR-FFL FR-TOS
1 1
AL09
1200
2200
0
FR-FFL
1
OPENING TYPE
SINGLE SLIDING WOODEN DOOR
OPENING SIZE
800*2200 mm
AL05
3000
2400
0
FR-FFL
1
AL10
1600
1800
600
FR-FFL
1
AL06
600
2400
2225
GR-FFL
1
AL11
2700
2200
0
RF - FFL
1
WOODEN DOORS DETAILS 1 : 25
BIM ARCHITECT PORTFOLIO
AL02
WINDOW TYPE
AL03 - AL05 - AL07
WINDOW TYPE
AL04
OPENING TYPE
HINGED
OPENING TYPE
SLIDING
OPENING TYPE
SLIDING
OPENING SIZE
700*900 MM
OPENING SIZE
900*1200 MM
OPENING SIZE
3000 MM WIDTH
OPENING SIZE
2400*1800 MM
WINDOW MATERIAL
ALUMINIUM AND GLASS
WINDOW MATERIAL
ALUMINIUM AND GLASS
WINDOW MATERIAL
ALUMINIUM AND GLASS
WINDOW MATERIAL
ALUMINIUM AND GLASS
For TENDER
JULY 2021
JULY 2021
Description
No.
Date
VILLA MR. RAMADAN SOBHY
Count
AL04 AL04
DOOR & DOOR OAK PIGMENTED FRAME MATERIAL VENEER
WINDOW TYPE
HINGED
Revisions
S5-ALUMINIUM SCHEDULE Window Size Width Height
AL01
OPENING TYPE
For TENDER
Count
D02 D02 D02 D02 D02 D02 D02
WINDOW TYPE
2.40 HEIGHT
OAK PIGMENTED VENEER
2.40 WIDTH
Date Drawn by Checked by
0.60 WIDTH
2.00 WIDTH
1.20 WIDTH
1.60 WIDTH
VILLA MR. RAMADAN SOBHY
2.70 WIDTH
DOOR/WINDOW TYPES/SCHEDULES Project number
EG20027
Date
Issue Date
Drawn by
M.ABDELSALAM
WINDOW TYPE
M.WALY
OPENING TYPE
EG20027-TD-ID-9-GN-0OPENING SIZE WINDOW
Scale
Date
Revisions
DOOR/WINDOW TYPES/SCHEDULES Project number
Description
1 MATERIAL : 25
AL06
WINDOW TYPE
AL08
WINDOW TYPE
AL09
WINDOW TYPE
AL10
WINDOW TYPE
AL11
HINGED
OPENING TYPE
SLIDING
OPENING TYPE
HINGED
OPENING TYPE
SLIDING
OPENING TYPE
SLIDING
1200*2200 MM
OPENING SIZE
VARIABLE
OPENING SIZE
VARIABLE
3200*2750 mm
OPENING SIZE
2000*2750 MM
OPENING SIZE
ALUMINIUM AND GLASS
WINDOW MATERIAL
ALUMINIUM AND GLASS
DOOR & DOOR DOOR & DOOR FRAME MATERIAL ALUMINIUM AND GLASS FRAME MATERIAL ALUMINIUM AND GLASS
DOOR & DOOR FRAME MATERIAL ALUMINIUM AND GLASS
Checked by
EG20027 Issue Date M.ABDELSALAM M.WALY
EG20027-TD-ID-9-GN-1 Scale
ALUMINIUM TYPES DETAILS 1 : 25
36
1 : 25
01/08/2021 05:34:46 ﻡ
IN
DOOR TYPE
DOOR & DOOR FRAME MATERIAL
3.00 WIDTH
2.20 HEIGHT
IN
OUT
0.90 WIDTH
1.50 WIDTH
2.75 HEIGHT
0.90 WIDTH
01/08/2021 05:34:37 ﻡ
0.80 WIDTH
VARIABLE SILL HEIGHT
VARAIABLE
VARIABLE SILL HEIGHT
2.20 HEIGHT
2.20 HEIGHT
F.F.L
2.20 HEIGHT
F.F.L
2.20 HEIGHT
2.20 HEIGHT
2.20 HEIGHT
F.F.L
1.80 HEIGHT
F.F.L
2.20 HEIGHT
2.20 HEIGHT
2.20 HEIGHT
VARIABLE HEIGHT
1.80 HEIGHT
1.20 HEIGHT
0.90 HEIGHT
9
Date
BASEMENT FLOOR-LIVING 3D
5
BF - MAID'S BATHROOM
BASEMENT INTERNAL ELEVATIONS
FIXED WINDOW 70*90 CM
FIXED WINDOW 70*90 CM
2200
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
900
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
Y05 CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE
480
880
CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE
900
FIXED WINDOW 70*90 CM
12 BF- DRIVER'S BT 3D
1 : 50
800
X03 CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE
Description
Revisions
SP
BF-TOS +-3200
800
8
JULY 2021
Y02
VILLA MR. RAMADAN SOBHY
01/08/2021 05:02:49 ﻡ
BF - DRIVER'S BT 1 : 50
For TENDER
X02
No.
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
X03
9
Revisions
BF-TOS +-3200
7
X03
SINGLE WOODEN DOOR 80*220CM
X04
11
X03
BF-FFL +-3100
Y05
BF-LIVING-D 1 : 50
MAID'S BATHROOM
CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE
X02
11
Description
800
X02
8
6
2200
X03
10 EG20027-TD-ID-7-BF-19 EG20027-TD-ID-7-BF-1
BF-LIVING-C 1 : 50
CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE
CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE
800
X03
BF-TOS +-3200
For TENDER
1 : 50
1 : 50
SKIRTING GROOVE 2CM
BF-FFL +-3100
20
400 2250
BF-JACUZZI-C
4
4
1 : 50
800
BASEMENT FLOOR PLAN -JACUZZI 1 : 50
BASEMENT FLOOR PLAN - LIVING
1
2020
Y05
BF-TOS +-3200
WHITE PAINT WOODEN FLOOR AS PER APPROVED SAMPLE
800
Y04
CURTAIN WALL
BF-FFL +-3100
BF-TOS +-3200
WHITE PAINT ON GYPSUM BOARD CEILING
SKIRTING GROOVE 2CM
BF-TOS +-3200
Y03
Y03
WHITE PAINT
BF-FFL +-3100
Y02
Y02
WHITE PAINT
WOODEN FLOOR AS PER APPROVED SAMPLE
WHITE PAINT
WOODEN FLOOR AS PER APPROVED SAMPLE
JACUZZI
BF-FFL +-3100
BF-FFL
BLACK MARBLE WALL TILES 100 *100CM
GLASS PANEL DOOR
WOODEN FLOOR AS PER APPROVED SAMPLE
X05
06
X07
BLACK MARBLE TILES 100*100CM
X05
KITCHENETTE
800
X05
X05
WHITE PAINT ON GYPSUM BOARD CEILING
MIRROR CEILING
WHITE PAINT
1
X06
WHITE PAINT ON GYPSUM BOARD CEILING
BF-FFL
WHITE PAINT ON GYPSUM BOARD CEILING
1 : 50
1 : 50
Y04
JACUZZI 08
WOODEN FLOOR AS PER APPROVED SAMPLE
BF-LIVING-B
3
1 : 50
4
Y05
BF-FFL +-3100 BF-TOS +-3200
BF-JACUZZI-B
3
1 : 50
SKIRTING GROOVE 2CM
SKIRTING GROOVE 2CM BF-FFL +-3100
LIVING AREA
3
2
50
WOODEN FLOOR AS PER APPROVED SAMPLE
X06
WHITE PAINT
SINGLE WOODEN DOOR 80*220CM
WHITE PAINT
X06
BLACK MARBLE WALL TILES 100* 100CM
01/08/2021 05:01:53 ﻡ
X07
GLASS PANEL DOOR
2230
X07
WHITE PAINT ON GYPSUM BOARD CEILING
MIRROR CEILING
BF-FFL
GR-TOS +-100
WHITE PAINT ON GYPSUM BOARD CEILING
20
11
Y02
GR-TOS +-100
2230
BF-FFL
GR-TOS +-100
2250
12
Y03
X05
WHITE PAINT ON GYPSUM BOARD CEILING
WHITE PAINT ON GYPSUM BOARD CEILING
STEAM SHOWER & DRY AREA
SAUNA
BF-FFL
X06
2230
13
X07 GR-TOS +-100
X07
2000
TOILET CABINET
Y03
X07
50 400
X07
2200
X08
20
Y05
400
Y04 X08
2230
Y05
20
Y04 X08
2
X04
X04
1 3 EG20027-TD-ID-7-RF-0
WOODEN SHELVES AS PER APPROVED SAMPLE
4
4
X03
X03
X02
X02
RF - FFL +7100
WHITE QUARTZ MARBLE TILES 100*100 CM
CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE
FR-FFL +3700
CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE RF - FFL +7100
X07
RF - FFL +7100
ROOF BEDROOM Elevation 10 - a
ROOF BEDROOM Elevation 10 - b
2
1 : 50
400
RF-TOS +7000
TEAK WOOD FLOORING AS PER APPROVED SAMPLE
TEAK WOOD FLOORING AS PER APPROVED SAMPLE
FR-FFL +3700
FR-FFL +3700
11 D02
2130
WHITE QUARTZ MARBLE TILES 100*100 CM
ICE GREEN MARBLE TILES 100*100 CM
1800 AL04 2400
2200
Y05
GLASS PARTITION
2450
Y04
CLEAR MIRROR CALDDING
X07
50
50
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
2550
WOODEN RIBS 50*25 MM AS PER APPROVED SAMPLE
RF - FFL +7100
WHITE PAINT ON GYPSUM BOARD CEILING
1750
WHITE QUARTZ MARBLE TILES 100*100 CM
50
50
WHITE PAINT ON GYPSUM BOARD CEILING WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
X06
RF-TOS +7000
400
WHITE PAINT ON GYPSUM BOARD CEILING
WHITE QUARTZ MARBLE TILES 100*100 CM ICE GREEN MARBLE TILES 100*100 CM
FR-FFL +3700
X07
1
3
1
RF-TOS +7000
300
ARMANI GREY MARBLE CLADDING
Y04
RF-TOS +7000
Y02
BOT +10650
500
4
X05
2800
WOODEN RIBS 50*25 MM AS PER APPROVED SAMPLE
50
WHITE PAINT ON GYPSUM BOARD CEILING
2 1 EG20027-TD-ID-7-FR-6
X04
400
X05
20 500 20 500 20 500 20 500 20 500 200 400
X05
X03
2800
X02
BOT +10650
420
Y05
EG20027-TD-ID-7-RF-1
100
Y03
400
Y01Y02
MASTER BATHROOM ELEVATION 6 - a
MASTER BATHROOM ELEVATION 6 - b
2
1 : 50
1 : 50
2 4 EG20027-TD-ID-7-FR-1
X06
1 : 50
X06
1
1
5
ROOF FLOOR DETAILED PLAN - Callout 1
3
1 : 50
ROOF BEDROOM Elevation 10 - c
RF - FFL +7100
400 50
ICE GREEN MARBLE TILES 100*100 CM
2450
2130
1800 AL04 2400
ICE GREEN MARBLE TILES 100*100 CM
1750
CLEAR MIRROR CALDDING
FR-FFL +3700
FR-FFL +3700
RF - FFL +7100
5
ROOF BEDROOM Elevation 10 - d
4
1 : 50
FR-FFL +3700
MASTER BATHROOM CALLOUT PLAN
3
1 : 50
RF-TOS +7000
MASTER BATHROOM ELEVATION 6 - c
FR-FFL +3700
MASTER BATHROOM ELEVATION 6 - d
4
1 : 50
WHITE QUARTZ MARBLE TILES 100*100 CM CLEAR MIRROR CALDDING
TEAK WOOD FLOORING AS PER APPROVED SAMPLE
100
RF - FFL +7100
50
WHITE QUARTZ MARBLE TILES 100*100 CM
CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE
WHITE PAINT ON GYPSUM BOARD CEILING
300
2200 AL11 2700
RF - FFL
RF - FFL +7100
1800 AL04 2400
X06
500
04
CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE
2200
RF - FFL
1050
05
2200
05 D02
2200
GUEST BEDROOM
Y03
WHITE QUARTZ MARBLE TILES 100*100 CM
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
TERRACE
Y01Y02
Y05
X07
RF-TOS +7000
420
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
RF-TOS +7000
WHITE PAINT ON GYPSUM BOARD CEILING
400
Y04
Y05
RF-TOS +7000
EG20027-TD-ID-7-GR-0
300
X01
Y04
4
BOT +10650
420
50 600
600
X01
WHITE PAINT ON GYPSUM BOARD CEILING
400
WHITE PAINT ON GYPSUM BOARD CEILING
Y02
BOT +10650
500
BOT +10650
1750
X01
2130
X02
50 400
X03
BOT +10650
2550
3
600 50 400
X04
4 2 EG20027-TD-ID-7-FR-2
1 : 50
1 : 50
For TENDER
For TEN
JULY 2021 No.
JULY 2
Description
Date
No.
Revisions
Revisions
VILLA MR. RAMADAN SOBHY
VILLA MR. R SOB
FIRST FLOOR ELEVAT
ROOF INTERNAL ELEVATIONS
Issue Date
Date
20
1000
20
1000
20
1000
20
1000
20
1000
HPL WOODEN FLOOR AS PER APPROVED SAMPLE RF - FFL +7100
RF - FFL +7100
1
4 EG20027-TD-ID-7-RF-1 1 3
Y03
2
1 : 50
ROOF LIVING AREA Elevation 9 - b
X05
1 : 50
FR-FFL +3700
SECONDARY BATHROOM ELEVATION 8 - a
400 50 1750
1000
LED PROFILE
WOOD VEIN MARBLE TILES AS PER APPROVED SAMPLE
300
FR-FFL +3700
2
550
130 70 400
WOOD CLADDING AS PER APPROVED SAMPLE
WHITE QUARTZ MARBLE CLADDING
WHITE QUARTZ MARBLE TILES 100*100 CM
900
CLEAR MIRROR CLADDING WHITE QUARTZ MARBLE TILES 100*100 CM
1500
50
RF-TOS +7000
1000
900 AL01 700
300
165 1750
900
900 150
400
150 50 400
WHITE PAINT ON GYPSUM BOARD CEILING
1 : 50
FR-FFL +3700
SECONDARY BATHROOM ELEVATION 8 - b 1 : 50
X05 X05
2
Y03
2
300
FR-FFL +3700
Y02
RF - FFL +7100
1
ROOF LIVING AREA Elevation 9 - a
535
WHITE QUARTZ MARBLE TILES 100*100 CM
HPL WOODEN FLOOR AS PER APPROVED SAMPLE
RF-TOS +7000
Y02
500
1000
RF-TOS +7000
500
37020
WOOD CLADDING AS PER APPROVED SAMPLE
2800
GROOVES 2 CM WIDTH
2200
06 D04
900 AL01 700
CLEAR MIRROR CLADDING
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
RF - FFL +7100
WHITE PAINT ON GYPSUM BOARD CEILING
50
WHITE PAINT ON GYPSUM BOARD CEILING
WOODEN UNITS AS PER APPROVED SAMPLE
RF-TOS +7000
BOT +10650
300
BOT +10650
WHITE PAINT ON GYPSUM BOARD CEILING
500
BOT +10650
580
Y04
Scale
X05
500
BOT +10650
WOODEN RIBS CEILING
EG20027-TD
MASTER BATHROOM 3D Copy 1
7
Y02
X05 Y04
MASTER BATHROOM 3D
400
Y03
6
165
1 : 50
Scale
Y04
Checked by
535
EG20027-TD-ID-7-RF-0
ROOF BEDROOM 3D Copy 1
M.
Drawn by
01/08/2021 06:54:17 ﻡ
M.WALY
Checked by
7
Date
M.ABDELSALAM
Drawn by
ROOF BEDROOM 3D
Project number
EG20027
Project number
6
Descrip
RF-TOS +7000
1 3 EG20027-TD-ID-7-FR-6
RF-TOS +7000
Y02
RF-TOS +7000
RF-TOS +7000
Y02 X05
3
600
2750
HPL WOODEN FLOOR AS PER APPROVED SAMPLE
RF - FFL +7100
RF - FFL +7100
4
400 550
1050 50
550
1000
300
1750 2550
WHITE QUARTZ MARBLE TILES 100*100 CM
165 535
1000
FR-FFL +3700
2200
WOOD VEIN MARBLE TILES AS PER APPROVED SAMPLE
FR-FFL +3700
1000
50
WHITE QUARTZ MARBLE CLADDING
04 D01
500
FR-FFL +3700
WHITE QUARTZ MARBLE TILES 100*100 CM
GLASS PARTITION
1000
400
50
WHITE QUARTZ MARBLE TILES 100*100 CM
300
WOODEN UNITS AS PER APPROVED SAMPLE
CLEAR MIRROR CLADDING
500
50 1200
WOODEN UNITS AS PER APPROVED SAMPLE
CLEAR MIRROR CLADDING
WOOD CLADDING AS PER APPROVED SAMPLE
FR-FFL +3700
7
RF - FFL +7100
FIRST FLOOR DETAILED PLAN - Callout 1 1 : 50
3
SECONDARY BATHROOM Elevation 8 - c 1 : 50
4
SECONDARY BATHROOM Elevation 8 - d 1 : 50
ROOF LIVING AREA Elevation 9 - d 1 : 50
KIDS AREA - CALLOUT 1 : 50
For TENDER
For TENDER
JULY 2021
JULY 2021 No.
Description
No.
Date
Description
Revisions
Revisions
VILLA MR. RAMADAN SOBHY
VILLA MR. RAMADAN SOBHY
FIRST FLOOR INTERNAL ELEVATIONS
ROOF INTERNAL ELEVATIONS
Project number
Date Drawn by Checked by
6
KIDS AREA - 3D
Date Drawn by
M.ABDELSALAM M.WALY
EG20027-TD-ID-7-RF-1 Scale
BIM ARCHITECT PORTFOLIO
EG20027 Issue Date
1 : 50
Checked by
01/08/2021 05:33:49 ﻡ
Project number
Date
EG20027 Issue Date M.ABDELSALAM M.WALY
EG20027-TD-ID-7-FR-6
5
SECONDARY BATHROOM - 3D 01
6
SECONDARY BATHROOM - 3D 02
Scale
37
1 : 50
01/08/2021 05:08:47 ﻡ
5
ROOF LIVING AREA Elevation 9 - c 1 : 50
2750 AL08 2000
X04 Y02
1750
400
RF - FFL +7100
2750 AL08 2000
1200
50
Y02
2750 AL08 2000
1000
HPL WOODEN FLOOR AS PER APPROVED SAMPLE
3250
WHITE PAINT FINISH ON GYPSUM BOARD CLADDING
X04
2550
BOT +10650
WHITE PAINT ON GYPSUM BOARD CEILING
300
BOT +10650
+10650
500
Y04 BOT
400
Y03
WHITE PAINT ON GYPSUM BOARD CEILING
600
Y02
1000
BOT +10650 WHITE PAINT ON GYPSUM BOARD CEILING
WHITE PAINT ON GYPSUM BOARD CEILING
400
4
C2
C2
S5-Ceiling Schedule Type Mark
GR-FFL +0
Description
GR-TOS +-100
C1 C2 C3
2
Section 14
PERGOLA 02- CEILING PLAN
8
1 : 50
7
8.00
1 : 50
GYPSUM BOARD CEILING WOODEN RIBS CEILING MIRROR CEILING
PERGOLA 01- CEILING PLAN 1 : 50
BLACK MARBLE CLADDING
BLACK MARBLE CLADDING
BLACK MARBLE CLADDING
BLACK MARBLE CLADDING
OPEN BOOK CALCATTA MARBLE CALDDING
OPEN BOOK CALCATTA MARBLE CLADDING
GLASS HANDRAIL
BLACK STONE FENCE
GR-FFL +0
OVERFLOW SWIMMING POOL
BLACK STONE FENCE
OVERFLOW SWIMMING POOL
TRAVERTINE MARBLE FLOORING
TRAVERTINE MARBLE FLOORING
POOL STAIRS TRAVERTINE MARBLE FLOORING
POOL TILES
4.85
BLACK MARBLE CLADDING
4.85
6.00
BLACK STONE FENCE
TRAVERTINE MARBLE FLOORING
FIRE PLACE
8.00
GRASS
GR-TOS +-100
6.00
LANDSCAPE PERGOLA 2 DETAILED PLAN
2
1
1 : 50
For TENDER
BLACK MARBLE CLADDING AS PER APPROVED SAMPLE
0.33 0.55
0.33 0.55
Date
X08
X07
JULY 2021
OPEN BOOK CALCATTA MARBLE CALDDING AS PER APPROVED SAMPLE
No.
Revisions
BLACK MARBLE CLADDING
Description
Date
3.00
1 : 50
Description
3.00
4
No.
For TENDER
BLACK MARBLE CALDDING AS PER APPROVED SAMPLE
JULY 2021 Section 16
LANDSCAPE PERGOLA 1 DETAILED PLAN 1 : 50
Revisions
4
PERGOLA 2 - SECTION
3
1 : 50
PERGOLA 1 - SECTION 1 : 50
BLACK MARBLE CLADDING
TRAVERTINE MARBLE FLOORING
JACUZZI
BLACK MARBLE FLOORING
POOL STAIRS
BLACK STONE FENCE
GLASS HANDRAIL TRAVERTINE MARBLE FLOORING
0.95
EG20027
Project number
Drawn by
R.ABDELHAMID
Drawn by
M.WALY
Checked by
1 : 50
Scale
1 : 50
5
PERGOLA 1 -3D
5x9CM WOOD JOIST AS PER APPROVED SAMPLE
2
CEILING INDIRECT LIGHTING 1 : 10
5
BULK HEAD
CLADDING DETAIL 12 1MIRROR :5
1 : 10
0.30
ACRYLIC PAINT
20MM MARBLE RISER
GALVANIZED STEEL CORNER BEAD
0.50
PVC CORNER BEAD
0.40
WALL/COLUMN
QUARRY/CERAMIC TILES
40mm MARBLE TREAD
STEEL BOXES 5*5 CM
0.30
0.50
0.50
0.50
0.50
STANLESS STEEL RAILING
0.27 STAIR THREAD BORDER
0.50
0.50
0.50
0.50
GLASS PANEL
0.50
EXTERIOR PAINT ON CEMENT PLASTER
20 mm THICK SETTING MORTAR FIXING NAIL
20mm MORTER
WALL/COLUMN
WALL CORNER DETAIL 1:2
CORNER DETAIL 10 1CERAMIC :2
WALNUT VENEER MDF 18 MM
0.02
CONCRETE SLAB
THRESHOLD HALF AND HALF FLOOR FINISH-REFER TO ID PACKAGE
LANDSCAPE FLYING STAIRS DETAILED
FLOOR FINISH-REFER TO ID PACKAGE
1 : 20
0.02
1
0.02
NON-SLIP CARBORANDUM STRIP
20mm CEMENT PLASTER
4
ANTIQUE MIRROR AS PER APPROVED SAMPLE
ANTIQUE MIRROR AS PER APPROVED SAMPLE
Metal Furring Channel O.C Clipped To Main Channel
100
CEILING DETAILS 1 : 10
18MM MDF AS PER APPROVED SAMPLE
Paint on Gypsum Board Regular Type
Strap Hanger
18MM MDF AS PER APPROVED SAMPLE
5x9CM WOOD JOIST AS PER APPROVED SAMPLE
Corner Bead 200
1 : 50
Scale
GALVANIZED SUSPENSION METAL RAIL EVVERY 450 MM
GYPSUM BOARD 12 MM
0.50
M.WALY
EG20027-TD-ID-12-LS-0
Galvanized Steel Hanger Wire Primary Support Channel Corner Reinforcement Trap Gypsum Boad Tiles
1
M.ABDELSALAM
Checked by
EG20027-TD-ID-10-GN-3 6 PERGOLA 2 -3D
Section 15
Issue Date
Date
Issue Date
Date
TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
EG20027
Project number
GR-TOS +-100
1
LANDSCAPE PERGOLA DETAILS
LANDSCAPE ELEVATIONS
MASONARY BRICKS
WOOD BACKING 30*30 mm SOFTWOOD EVERY 600 MM
For TENDER JULY 2021
DETAIL GR-FFL +0
GR-FFL +0
3
GLASS HANDRIAL 1 : 10
CLADDING DETAIL 13 1WOOD :5
DETAIL 11 1THRESHOLD : 10
9
STAIRS MARBLE FLOORING DETAIL
No.
1:5
Description
Date
STEEL BOXES 5*5 CM
TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
Revisions BATHROOM FLOOR FINISH (AS ID DRAWINGS)
MORTAR BED
2
LANDSCAPE FLYING STAIRS - SECTION 1 : 20
3
FLYING STAIRS - 3D
200x200x20mm CEMENT ROOF TILES 2mm PROTECTION BOARD 50mm EXTRUDED POLYSTYRENE
For TENDER
30mm CEMENT SCREED (REFER TO SPECS) 4mm WATERPROOFING MEMBRANE (REFER TO SPECS)
ALUM. C CHANEL SHADO GAB
VILLA MR. RAMADAN SOBHY
WATERPROOFING MEMBRANE
STRUCTURE CONCRETE SLAB.
70mm L. WEIGHT CONCRETE FOR SLOPE 70/100
LIGHT WEIGHT CONCRETE FOR SLOPE 70:100mm
STRUCTURE SLAB (AS PER STR DRAWINGS)
RC. STRUCTURE SLAB
20MM MARBLE BASE W/ CHAMFERED EDGE
JULY 2021
70mm L. WEIGHT CONCRETE FOR SLOPE 70/100
GRAVEL PROTECTION LAYER WATERPROOFING MEMBRANE (REFER TO SPECIFICATION) PROTECTION LAYER
50mm MORTAR & SAND BED
20MM PLASTER
TYPICAL DETAILS
PAINT
MARBLE FLOOR TILE
Project number
F.FL.
Date
Date Drawn by Checked by
Revisions
M.ABDELSALAM M.WALY
EG20027-TD-ID-12-GN-0
GAP DETAIL 14 1SHADOW :5
VILLA MR. RAMADAN SOBHY
BIM ARCHITECT PORTFOLIO
EG20027 Issue Date
LANDSCAPE DETAILS
6
ROOF LAYERS DETAIL 1:5
8
GRAVEL ROOF FINISH 1 : 10
7
WATER PROOFING / WET AREAS DETAIL 1:5
Scale
38
As indicated
01/08/2021 05:50:14 ﻡ
Description
100.00
No.
01/08/2021 05:52:07 ﻡ
BLACK MARBLE FLOORING
WOODEN FLOOR AS PER APPROVED SAMPLE
0.04
GR-FFL +0
POOL TILES
01/08/2021 05:35:51 ﻡ
GRASS
BLACK STONE FENCE
VILLA MR. RAMADAN SOBHY
VILLA MR. RAMADAN SOBHY
BLACK MARBLE CLADDING
OPEN BOOK CALCATTA MARBLE CLADDING
IGNITE GYM - MADINATY CAIRO , EGYPT
STUDIO FIVE CAIRO DUBAI HOUSTON
STUD
STUDIOFIVE
CAIRO.DU
CAIRO.DUBAI.HOUSTON
UP
UP
ELEVATOR UP
KIDS AREA 074 23.95 UP
STUDIO
CONTROL ROOM
073 137.76
WAITING AREA
060 2.40
089
094 11.41
062 94.70
0.12
249.66
OFFICE 03
WOMEN'S BATHROOM
UP
CORRIDOR
UP
061 1.20
3.90
UP
OFFICE 02
OFFICE 01
093
092 9.97
9.83
3.00
070 20.09
081
096
3.26
6.19
CLINIC 01
2.06
CLINIC 08
072 4.88
SAUNA
9 KW
BATHROOM
STORE
065 8.07
STUDIO
PHYSIO THERABY
MEN'S BATHROOM
064
UP
63.74
090
MACHINES AREA
2.14
208.99
085 871.14
2.11
063 109.77
F&B
3.06
082 42.40
CLINIC 02
JACCUZZI
066
076
12.05
5.94 CLINIC 03
CLINIC 05
CLINIC 04
100
099
9.38
9.46
CLINIC 06
JACCUZZI 080 5.13
CLINIC 08
068
069
070
12.20
30.08
20.09
BICYCLES AREA
091
078 5.57
3.33
SAUNA
9 KW
102 1.57
6.18
2.18
M.R
075
2.11
STEAM
097
079 6.50
2.18
3.33
124.12 STEAM M.R 2.01 1.25
2.55
RECEPTION 077 68.18
OPEN TO BELOW
MACHINES AREA
085 871.14
SCHEMAT
SCHEMATIC DESIGN
Revisions
Revisions No.
Description
0 2 3
No.
Date
APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE 087
122.97
Descrip
0 2 3
06-10-2021 11-11-2021 23-11-2021
TRACK AREA
APPROVED ISSU APPROVED ISSU APPROVED ISSU
IGNIT
IGNITE GYM
FIRST FURNITU
GROUND FLOOR FURNITURE PLAN Project number
Project number
EG21009
Date
11-11-2021
Date
M.ABDELSALAM
Drawn by
Drawn by
EG21009-SD-ID-1-GR-0
GROUND FLOOR FURNITURE PLAN - Dependent 1 11 : 110
1
Checked by
11/24/2021 12:40:34 PM
M.WALY
Checked by
EG21009-S
FIRST FLOOR FURNITURE PLAN - Dependent 1 1 : 110
Scale
STUDIOFIVE
1 : 110
CAIRO.DUBAI.HOUSTON
Scale
STUDIO
CAIRO.DUBA
UP
Wall Schedule
3.59
W-05
0.95
0.80
0.50
W-05 W-05 0.80
0.41
0.80
0.47
0.80
0.32
0.80
0.14
0.18
0.17 0.70
0.17
W-05
W-05
1.03
1.06
1.03
W-05
W-05
1.03
1.03
1.25
0.70
1.43
W-05 2.21
0.03
2.52
0.80
0.36
0.80
0.39
0.80
0.40
0.80
0.41
0.80 8
0.40
0.80
0.45
0.80
W-05 W-05
W-05
W-05
W-05
W-05
W-05
1.00
0.97
1.03
1.03
1.03
1.03
102 1.57
0.80
W-05
W-05 1.00
1.36
0.80
W-05
0.16
0.70
078 5.57
2.30
SAUNA W-05
10 11 12
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
+4.35 F.F.L.
2.27
0.80 0.01
STEAM
9
4EG21009-SD-ID-7-FR-001 2
5.13
079 6.50
BICYCLES AREA
+4.30 F.F.L.
1
CW-02
M.R W-05 W-05
1.07
2.97
1.68
2.34
STEAM 075 6.18
W-05
8
090 208.99
080
2.12
0.39
W-05
W-05 1.03
7
STUDIO
3
JACCUZZI W-05
1.78
W-05
3 W-05
0.82
6
0.8 0
091 124.12
+4.35 F.F.L.
2.49
1.39 4.00
CW-01
1.6 5 0.2 0
0.80 8.24
5
0.8 0
0.95
CW-02
+4.35 F.F.L.
10.70
4
MACHINES AREA
1.00
W-08
3
W-01 0.8 4
0.80
0.23
10.08
3.73
-
2
10. 57
4.25
085 871.14
2.12
W-05 BW1
W-01 0.36
0.80
2.47
W-01 1.00
1
W-01
3.0 5
W-08 4EG21009-SD-ID-7-GR-002
W-01 0.95
7.42
0.77
9.23
W-01
RECEPTION
W-08
0.77
W-01
9.22
W-08
0.77
W-01
8.77
W-08
0.77
W-01
9.71
W-01
W-08
0.77
W-01
W-01
W-08 9.22
0.77
6.63
W-01
W-01
W-01
1.00 2.38
1.39
077 68.18
1.39
5.52
076
W-01
6.22
W-01
JACCUZZI
2.10
2.60
1
W-05 EG21009-SD-ID-7-GR-001
1.14 0.32 0.80 0.41 0.80 EG21009-SD-ID-12-GR-01
W-01
070 20.09 W-01 2.33
0.64
0.63 0.66
0.66 2.67
1.72
2.06
W-05
12.4
4
1.29
W-05
UP
W-01
W-01
0.80
0.40
1.03
W-05
EG21009-SD-ID-7-GR-001 4.13
W-01 1.42
0.11 0.09
0.40
1.03
W-05
2.08
W-01
W-01
W-01
0.80
0.40
1.03
W-05
0.70
W-01
8.89
092 9.97
W-01 1.32
2.82
-
6.41
GLASS HANDRAIL 100 CM HEIGHT
W-01
093 9.83
CW-01
W-01
6.86
29 28 27 26 25 24 23 22 21 20 19 18 17 16
W-01
W-01
OFFICE 02
OFFICE 01
2.00
1.03
W-05
7
2.11
4 EG21009-SD-ID-7-GR-001
1.23
W-01
1.82
1.03
W-05
0.95
W-01 W-01
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
2.02
3
EG21009-SD-ID-7-GR-002
11.41
W-01
10 11 12
13.96
GLASS HANDRAIL 100 CM HEIGHT
W-01
2.07
OFFICE 03 094
9
2.16
9 10 11 12 13 14 15
0.40
1.57
1.20
0.24 1.60
1.60
1.03
W-05
0.80
0.70
2.53
1.65
W-05
0.95
3.06
0.18
0.12
7.26
0.80
8
0.40
0.42
0.92 0.80
0.82
0.82
1.58
1.58
0.52
1.60
1.97 3.67
3.51
0.15
2
CLINIC 08 W-01
1.19
W-05
7
0.39
W-01
1.27
W-05
6
0.40
W-01 3.51
1.27
W-05
5
+4.35 F.F.L.
W-01
0.40
W-01
W-05
W-01
2.45
8
W-01
W-05
0.44
W-01
7
2.60
W-05
0.30
0.40
W-01 W-01
W-05
1.14
W-05
0.66
1.26
6
0.33
0.40
0.40
0.43
3.02
0.83
096 6.19
5
EG21009-SD-ID-7-GR-001
4.09
069 30.08
068
W-01 1.03
SAUNA
081 3.26
4
0.80
2.26
6
5.94
0.40
CLINIC 06
3.51
3.51
CLINIC 05
W-01
2.84
+0.40 F.F.L.
W-01
3.28
3.64
099 9.46
3.51
3.33
3.33
4.51
4.51
3.68
100 9.38
2.83
STORE
W-05
1.54
1.77
3
2.00
CW-02
W-01 1.15
0.84
W-05
W-01
W-01
1.94
12.20
0.83
6
W-05 EG21009-SD-ID-7-GR-001
EG21009-SD-ID-12-GR-01 W-01
W-01
CLINIC 04
CLINIC 03 W-01
W-01
063 109.77
W-05
4
UP
1.97
2.57
0.15 0.80
W-05
0.46
0.76
1.95
MEN'S BATHROOM
W-05
2.70
061 3.90
2
062 94.70 +0.40 F.F.L. EG21009-SD-ID-7-GR-001
3.99
1
1.19
2.70
12.05 1.35
6.42
WOMEN'S BATHROOM
1.38
W-01
0.40
2.41
W-05
W-05
0.46
0.80
2.48
0.23 1.94 W-01
W-01
0.80
0.80
0.80
W-05
W-05
0.40
0.30
060 2.40
2.09
4.70
W-05
4.89
3.35
W-01
1.12
4.79
0.80
18.22
1.31
2.46
CONTROL ROOM
CORRIDOR
0.43
0.40
0.84
0.77
5.00
5.67
0.80
W-01
0.70
1.16
W-06
W-01
0.38
3.83
0.01 0.79
0.80
0.80
066
4EG21009-SD-ID-7-GR-002
0.78
W-05
0.20
0.80
W-01
0.03
0.41
0.04 0.20
W-01
2.00
1.17 0.32
W-01
W-01
63.74 2
0.80
0.80
CLINIC 02
W-05
072 4.88
3.21
064
0.18
BATHROOM
W-05
0.39
W-05
0.02
0.55
0.55
0.54
0.38
2.94
0.81
PHYSIO THERABY
EG21009-SD-ID-7-GR-002
F&B 082 42.40
7.36
0.75
0.80
0.75
W-01
0.80
1.94
1.94
10.11
W-01
2.74
2.00
0.80 2.41
W-05
0.80
1.00
7.22
W-01
+0.40 F.F.L.
W-01
2.00
W-01 1.50
065
2.74
2.00
CW-02
W-01
8.07
2.00
+0.40 F.F.L.
UP
13.20
8.17
2.00
UP
2.74
UP
2.00
3.97
1.74
2.00
1.53
0.70
2.00
1.20
0.20
2.00
1.57
CW-02
ACCESS GATES
CLINIC 01
UP
0.77
0 5.9
+0.10 F.F.L.
1
+0.40 F.F.L.
1.43
W-01
3 W-01
+0.40 F.F.L.
4.03
074 23.95
CW-02
+0.10 F.F.L.
1.50
W-01
KIDS AREA
5.92
1.57
0.34
2.05
0.65
0.20
W-01
0.34
2.00
0.65
2.47
0.34
1.06
1.69
2.18
6.70
W-01
-
+0.10 F.F.L.
0.89
1.16
073 137.76
2.39
0.76
1.71
0.55
29 28 27 26 25 24 23 22 21 20 19 18 17 16
6.21
EG21009-SD-ID-7-GR-002
STUDIO
W-01
D
0.40
3
2.44
0.40
STORAGE
W-01
2.01
W-01
0.43
9 10 11 12 13 14 15
7.36
8
bulk head CURTAIN WALL GLASS PARTITION OFF WHITE PAINT PORCELIAN TILES 0.6X0.60 M WOODEN FENCE NORMAL MIRROR CLADDING
5.2 8
7
CW-01 CW-02 W-01 W-05 W-06 W-08
7.3 8
6
9
5
WALL TYPES VERTICAL STEEL COLUMN (EXISTING)
13.5
4
GL A 20 SS 0 C HA M ND HE R IG AIL HT
2 3
UP
Wall Sche
Description bulk head CURTAIN WALL GLASS PARTITION OFF WHITE PAINT PORCELIAN TILES 0.6X0.60 M CLADDING WOODEN FENCE NORMAL MIRROR CLADDING
0.71
0.62
1
+0.10 F.F.L.
1.98
W-01 2.68
CW-01 CW-02 W-01 W-05 W-06 W-08
W-01
2.72
WALL TYPES 1.89
W-01
5.59
W-01
3.39
CW-02
W-01
3.82
1.01
0.82
0.82
GLA SS 200 H CM ANDR HEI AIL GH T
2.66
W-01
0.74
3.13 1.02
3.82
2.26
CW-01
3.45
MACHINES AREA
085 871.14 +4.35 F.F.L.
2 1.2
SCHEMATIC DESIGN 2.08
CW-01
Description
FIRST F DETAILED Project number
EG21009 11-11-2021
Date
M.ABDELSALAM M.WALY
Drawn by Checked by
EG21009-SD-ID-3-GR-0 FIRST FLOOR DETAILED PLAN - Dependent 1 1 : 110
Scale
BIM ARCHITECT PORTFOLIO
CW-01
Descriptio
APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE
GROUND FLOOR DETAILED PLAN
Checked by
1
No.
0 2 3
IGNITE
Drawn by
GROUND FLOOR DETAILED PLAN - Dependent 1
Date
06-10-2021 GLASS HANDRAIL 200 CM HEIGHT 11-11-2021 23-11-2021
IGNITE GYM
Date
1 : 110
087 122.97
APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE
Project number
1
Revisions
TRACK AREA
11/24/2021 12:40:36 PM
No.
0 2 3
SCHEMATIC
5 4.1
28.3 8
Revisions
1 : 110
EG21009-SD
Scale
40
STUDIOFIVE
STU
CAIRO.DUBAI.HOUSTON
CAIRO
Floor Schedule TYPE F-01 F-02 F-03 F-06 F-07 F-08
DESCRIPTION
TYPE
PORCELIAN FLOORING 0.60 M * 0.60 M HPL FLOORING ON MOSAIC TILES RUBBER FLOORING ON MOSIC TILES RUBBER ROLL FLOORING ON MOSIC TILES ARTIFICIAL GRASS NEOCEMENT FLOORING
F-01 F-02 F-03 F-06 F-07 F-08
PORCELIAN FLOORIN HPL FLOORING ON MO RUBBER FLOORING O RUBBER ROLL FLOOR ARTIFICIAL GRASS NEOCEMENT FLOORIN
UP
START POINT SYMBOLS
0.72
2.47
START POINT SYMB
2.42
2.17
13.97
2.00
1.24
2.68
1.43
0.60
0.60
0.60
0.60
0.60
0.58
0.58
1.60
STORE 081
0.15
0.80
3.76
0.12
0.80
3.73
0.49
0.49
0.47
0.47
0.47
0.47
0.50
0.50
1.01
0.98
0.98
1.02
4.13
6.22
2.72
10. 59
STUDIO 090 208.99
1.03
1.03
1.03
0.54 SP
SP
080 5.13
5.94
0.80
SP
0.39
0.80
1.31
0.55 1.03
SP
0.41
0.80
SP
0.47
0.80
SP
0.32
0.80
0.14
SP
0.18
0.17 0.70 SP
1.25
0.70
1.03
1.03
+0.40 F.F.L. 2.21
0.80
0.41
0.80
SP
0.40
0.80
SP
0.45
0.80
SP
2.97
0.80
SP
F-06
0.80 0.01
SAUNA
078 5.57
1.6 5
RUBBER ROLL FLOORING ON MOSIC TILES 125.27 m²
STEAM
6.18 1.07
0.8 0
091 124.12
3.13
SP 1.68
STEAM 075
1.03
0.40
SP
2.34
1.43
0.55 1.06
0.80
+4.35 F.F.L.
079 6.50
0.8 4
0.41
0.39
SP
2.12 2.24
SP
0.80
1.78
0.80
1.03
0.50
0.36
SP
2.12
4.89
4.79
0.32
0.60
1.14
0.82 8.24
0.80
2.52
NEOCEMENT FLOORING +4.20 2.62 m² F.F.L.
BICYCLES AREA
JACCUZZI
076
SP
F-08
+4.35 F.F.L.
10.67
JACCUZZI 0.54
SP
0.8 0
1.03
SP
+4.35 F.F.L.
2.03
1.03
RUBBER FLOORING ON MOSIC TILES 209.97 m²
085 871.14 F-03
7.36
1.65
1.03
F-03
MACHINES AREA
RUBBER FLOORING ON MOSIC TILES 698.08 m²
0.66
+0.40 F.F.L.
0.17
0.23
UP
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
2.47
3.26
1.19
3.73
0.61
1.27
5.2 8
0.64
0.56
1.20
0.24 0.61
2.53
0.60 0.60 0.60
0.61
1.27
7.26
0.03
0.39 2.33
0.61
1.14
SP
HPL FLOORING ON MOSAIC TILES 12.36 m² +0.50 F.F.L.
3.51
0.60
1.22
0.84
0.60
3.51
3.51
F-02 HPL FLOORING ON MOSAIC TILES 12.59 m² +0.50 F.F.L.
0.60 1.95
063 109.77
PORCELIAN FLOORING 0.60 M * 0.60 M 106.12 m²
F-02 F-02 HPL FLOORING ON MOSAIC TILES 12.39 m² +0.50 F.F.L. 3.51
0.66
MEN'S BATHROOM
F-01
3.99
4.70 0.60
0.90
1.60
0.90
0.82
0.82 0.90
1.58
0.90
1.58
1.20
1.42
0.90
0.60
070 20.09 4.11
069 30.08
0.43
0.2 0
0.60
+0.40 F.F.L.
1.36
1.00
0.97
1.03
1.03
1.03
1.03
CONTROL ROOM
2.49
3.00
0.95
7.42
0.77
9.23
1.39
0.43
0.77
9.22
0.77
8.77
0.77
9.71
0.77
9.22
0.77
6.63
1.38
0.60
0.40
0.60
0.40
0.60
0.40
0.60
10.06
0.60
1.82
0.60
3
0.40
0.60
12.4
0.40
0.60
+4.35 F.F.L.
+4.35 F.F.L. 2.23
0.64
0.60
0.60
0.60
8.89
7.3 8
1.57
0.14
0.45 0.60
0.18
1.97
2.48
2.73
CLINIC 08
1.94
CLINIC 06
1.28
1.14
0.80
0.23 1.94
0.80
068 12.20
0.80
1.14
0.60
0.80
0.76
CLINIC 05
0.22
+0.50 F.F.L. 2.84
0.60
PORCELIAN FLOORING 0.60 M * 0.60 M 10.19 m²
10 11 12
0.60
3.35
2.41
3.51
0.80
F-02 HPL FLOORING ON MOSAIC TILES 9.81 m²
+0.50 F.F.L. 2.85
3.51
HPL FLOORING ON MOSAIC TILES 9.81 m²
3.33
1.82
1.84
F-02
3.35
3.68
0.80
1.15
0.60
9
2.87
0.40
0.83
0.60
F-01
8
0.40
0.77
0.60
7
6.86
0.40
0.60
0.60
6
0.69
F-08
0.40
0.60
0.60
1.10
NEOCEMENT FLOORING 16.18 m² +4.35 F.F.L.
PORCELIAN FLOORING 0.60 M * 0.60 M 10.19 m²
0.40
0.60
0.60
0.43
0.60
0.60
0.60
0.60
0.60
0.46
0.60
0.60
1.17
0.25
0.38
0.60
0.60
0.60
0.80
0.80
0.40
0.60
0.45
0.30
0.60
5.67
0.44
0.60
0.20
0.80 2.04
0.40
0.60
0.17
0.60
3.33
0.20
F-02 HPL FLOORING ON MOSAIC TILES 12.42 m²
0.60
3.35
7.36
4.54
099 9.46
0.04
0.39 0.37
0.01 0.79
0.80
CLINIC 04
100 9.38
3.67
3.83
CLINIC 03
HPL FLOORING ON MOSAIC TILES 8.16 m² +0.50 F.F.L. 2.73
0.40
0.80
066 12.05
0.60
0.17
F-02
0.80 0.18
CLINIC 02
0.60
0.80
0.80
0.80 0.80
0.41
2.94
2.74
082
0.60
0.60
0.34
F-01
0.26
0.60
2.41
PORCELIAN FLOORING 0.60 M * 0.60 M 4.98 m² 3.21
0.06 0.20
4.90
F&B 42.40
0.38
064 63.74
0.20
1.94
1.94
PHYSIO THERABY
F-02
2.74
+0.10 F.F.L.
0.60
F-01
065 8.07
PORCELIAN FLOORING 0.60 M * 0.60 M 42.85 m²
0.60
0.52
0.55
0.54
0.55
0.75
0.80
0.75
CLINIC 01
1.35
0.60
F-01
9.97
2.67
0.60
092
5
F-01
1.67
0.60
4
+0.40 F.F.L.
2.06
0.60
9.83
OFFICE 01
3
PORCELIAN FLOORING 0.60 M * 0.60 M 93.52 m²
1.38
5.52
0.60
0.65
PORCELIAN FLOORING 0.60 M * 0.60 M 11.80 m² +4.35 F.F.L.
093
2
3.06
0.60
0.46
0.60
1
2.13
0.60
SP
10.11
2.74
0.60
2.05
0.60
0.40
0.60
0.46
0.60
0.80
0.60 SP
0.80
0.60 1.00
UP
11.16
0.60
+0.10 F.F.L.
HPL FLOORING ON MOSAIC TILES 8.39 m²
3.98
F-01 PORCELIAN FLOORING 0.60 M * 0.60 M 74.12 m² +0.40 F.F.L.
2.09
062 94.70
SP
0.28 1.04
UP
249.66
WOMEN'S BATHROOM
6 5.8
089
0.60
WAITING AREA
9.62
3.97
F-01
OFFICE 02
UP
060
2.09
094 11.41
SP
CONTROL ROOM
2.40
106.62 m²
UP
OFFICE 03 2.45
F-03
+0.40 F.F.L.
2.01
074 23.95
RUBBER FLOORING ON MOSIC TILES 25.33 m²
0.27
NEOCEMENT FLOORING
0.42
2.26
KIDS AREA
+0.10 F.F.L.
+0.10 F.F.L.
1.57
5.92
1.74
0.34
5.06
0.65
0.40
0.34
ACCESS GATES
F-08
UP
1.77
F-03 RUBBER FLOORING ON MOSIC TILES 146.72 m²
RUBBER FLOORING ON MOSIC TILES 146.72 m²
0.20 0.65
2.00
0.34
6.70
073 137.76 F-03
1.69
4.00
6.70
13.62 m²
6.71
1.71
+0.10 F.F.L.
073 137.76
STUDIO
1.96
PORCELIAN FLOORING 0.60 M * 0.60 M 11.80 m² +4.35 F.F.L.
SP
STUDIO
F-08 NEOCEMENT FLOORING
2.68
F-01
UP
0.15
+4.30 F.F.L.
095 F-01 5.11 PORCELIAN FLOORING 0.60 M * 0.60 M 5.38 m²
1.39
F-01
7.83
F-01
PORCELIAN FLOORING 0.60 M * 0.60 M 5.87 m²
PORCELIAN FLOORING 0.60 M * 0.60 M 9.12 m²
3.39
1.41
5.59
1.02
0.82
0.92
3.82
SCHEMATIC DESIGN
SCHEMA MACHINES AREA
085 871.14
Revisions No.
0 2 3
F-06
Revisions
RUBBER ROLL FLOORING ON MOSIC TILES 141.26 m²
Description
Date
APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE
+4.35 F.F.L.
No.
06-10-2021 11-11-2021 23-11-2021
Desc
0 2 3
APPROVED IS APPROVED IS APPROVED IS
TRACK AREA
087 122.97 F-07
ARTIFICIAL GRASS 122.34 m²
+4.35 F.F.L.
IGNITE GYM
IGNI
GROUND FLOOR FLOORING PLAN Project number
FIRST FLOOR
EG21009
Project number
11-11-2021
Date
Date
M.ABDELSALAM
Drawn by
Drawn by
EG21009-SD-ID-4-GR-0
GROUND FLOOR FLOORING PLAN - Dependent 1 11 : 110
FIRST FLOOR FLOORING
1
1 : 110
Scale
Checked by
11/24/2021 12:40:38 PM
M.WALY
Checked by
As indicated
STUDIOFIVE
EG21009
Scale
STUD
CAIRO.DUBAI.HOUSTON
CAIRO.
CEILIN TYPE 1.56
1.92
0.80
C1 C2 C3
0.32
2.26
WHITE PAINT ON WATER RESIS WHITE PAINT ON FIRE RATED G BLACK DOKU PAINT
2.64
C3
+4.84 S.C.L
C3 BLACK DOKU PAINT
C3
C3
BLACK DOKU PAINT
BLACK DOKU PAINT
8.91
+4.84 S.C.L
+7.64 S.C.L
7.3 8
BLACK DOKU PAINT
+7.64 S.C.L
+7.64 S.C.L
BLACK PAINTED STRUCTURAL BEAMS (EXISTING) 2.41
LIGHTING TRACKS
13. 05
2.68
STEEL BOXES 5*5 CM WITH LED PROFILE
C3
C3
C3
BLACK DOKU PAINT
BLACK DOKU PAINT
BLACK DOKU PAINT
11.95
1.70
0.72
2.47
13.96
4.23
C3 BLACK DOKU PAINT
STUDIO 073 137.76
1.70 6.71 6.70
EXPOSED CEILING
KIDS AREA 074 23.95
1.70 2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00
0.78
0.0 0
0.56
3.99
0.64
3.97
1.88
0.14
2.40
0.64
060
1.57
CONTROL ROOM
1.74
EXPOSED CEILING
1.57
1.39
5.06
2.00
0.03
STRUCTURAL BEAMS (EXISTING)
0.15
6.70
2.32
1.38
CORRIDOR
EXPOSED CEILING
061
0.24 1.03
0.83
0.12
2.67 1.03
1.03
1.03
3.73
1.67
2.06
2.47
7.14
6.22
JACCUZZI
10.67
076 5.94
C1
C1
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
0.50
0.80
0.39
0.80
0.41
0.80
0.47
0.80
0.32
0.80
0.18
0.70 0.17
0.03
2.52
1.25
0.80
0.36
0.80
0.39
0.80
0.40
0.80
0.41
0.80
0.40
0.80
1.03
1.06
1.03
1.03
1.03
0.87
0.45
0.80
2.97
0.80
1.68 1.78
1.07 1.03
1.36
1.00
0.97
1.03
1.03
1.03
1.03
0.80
078 5.57
3.13
0.01
SAUNA 079 6.50
STEAM
C1
2.18
0.41
2.34
8.24
2.12
0.80
0.82
0.23
2.18
0.32
0.14
0.39
2.12
1.14
0.46
4.79
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
+3.00 S.C.L
2.33
2.06
1.03
3.06
1.03
C1
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
2.06
2.06
1.60
1.60
1.58
0.18
1.03
0.66
2.10
+3.00 S.C.L
3.51
062 94.70
C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD
4.13
3.67
3.51
C1
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
0.48 3.51
3.73
1.31
+3.00 S.C.L
3.51
C1
1.34 1.33
0.80
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
0.38
2.84
3.51
C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
2.83
0.82
1.58
063
0.12
0.46
070 20.09
096 6.19 3.76
109.77
CLINIC 08
0.40
2.74
0.40
1.74
0.40
0.40
1.42
2.73 2.73
7.26
C1
1.94
069 30.08
3.51
C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD
3.33
3.68
+3.00 S.C.L
+3.30 S.C.L 6.42
0.82
0.52 2.48
0.23 1.94
CLINIC 06
WOMEN'S BATHROOM
3.00
SAUNA
0.80
2.05
0.80
068 12.20
4.54
C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD
0.73
081
0.15
0.40
0.76
1.14
1.19
0.40
0.80
2.41
CLINIC 05
0.84
MEN'S BATHROOM
1.27
2.53
3.35
0.80
+3.00 S.C.L
1.27
1.65
0.80
0.30
0.80
0.80
0.47
1.60
1.55
1.97
0.80
0.39
1.99
1.22
4.89
0.40
0.40
4.09 4.11
099 9.46
1.58
STORE 3.26
1.14
0.43
0.80
CLINIC 04
1.95
2.50 1.14
5.67
3.83
100 9.38
0.04 0.20
0.80 0.80
20.09
0.80
0.06
066 12.05
1.17
5.64 0.34
070
C1
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
+3.00 S.C.L
0.41
0.80 0.20 0.80
7.80
0.18
CLINIC 03
CLINIC 02
CLINIC 08
0.01 0.79
7.36
0.80
2.74
082
+3.00 S.C.L
072 4.88 3.03
3.21
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
C2 WHITE PAINT ON FIRE RATED GYPSUM BOARD
2.41
BATHROOM
C1
0.38
2.94
F&B
+3.00 S.C.L 2.74
0.54
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
C1
C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD
42.40
0.75
064 63.74
0.80
0.75
PHYSIO THERABY
0.20
10.11
1.94
1.94
065 8.07
0.55
0.55
2.74
CLINIC 01
9.66
0.60
0.80
3.90
EXPOSED CEILING
WHITE PAINT ON WATER RESISIT GYPSUM BOARD
EXISTING CANOBY CLADDING AT THE ATRIUM AREA
2.49
+3.30 S.C.L
1.39
EXPOSED CEILING 5.59
SCHEMATIC DESIGN
SCHEMA
Revisions No.
0 2 3
Description
Revisions
Date
APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE
No.
06-10-2021 11-11-2021 23-11-2021
0 2 3
Desc
APPROVED IS APPROVED IS APPROVED IS
IGNITE GYM
IGNIT
GROUND FLOOR CEILING PLAN Project number
EG21009
Checked by
1
BIM ARCHITECT PORTFOLIO
M.WALY
EG21009-SD-ID-5-GR-0
GROUND FLOOR PLAN - Dependent 1
FIRST FLOOR LIGHTING PLAN 1 : 110
Scale
Date
M.ABDELSALAM
1 : 110
Drawn by Checked by
11/24/2021 12:40:40 PM
Drawn by
1 : 110
Project number
11-11-2021
Date
1
FIRST FLO P
EG21009-S
Scale
41
4 EG21009-SD-ID-12-GR-01
FIRST FLOOR PLAN +4.20
FIRST FLOOR PLAN +4.20
1.51
STRUCTURAL BEAMS ( EXISTING )
CONCRETE EFFECT PAINT
2.29
ACRYLIC LOGO AS PER APPROVED SAMPLE
+0.40 F.F.L.
+0.10 F.F.L.
1.00
NEOCEMENT FLOORING AS PER APPROVED SAMPLE
GROUND FLOOR PLAN +0.00
NEOCEMENT FLOORING AS PER APPROVED SAMPLE
+0.10 F.F.L.
STUDIOFIVE
GROUND FLOOR PLAN +0.00
CAIRO.DUBAI.HOUSTON
1
5
WAITING AREA - ELE 01 1 : 50
WAITING AREA - 3D
FIRST FLOOR PLAN +4.20
STRUCTURAL BEAMS ( EXISTING )
0.75
0.75
0.70
FIRST FLOOR PLAN +4.20
0.90
STEEL BOXES 5*5 CM WITH LED PROFILE
3.05
OFF WHTE PAINT
073 137.76
2.20
3.10
3.09
2.65
CLEAR MIRROR CLADDING
STUDIO
GROUND FLOOR PLAN +0.00
0.40
3 6
RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE
+0.10 F.F.L.
GROUND FLOOR PLAN +0.00
STUDIO - ELE 01 1 : 50
STUDIO - 3D
FIRST FLOOR PLAN +4.20
FIRST FLOOR PLAN +4.20
0.30
0.09
0.81
SCHEMATIC DESIGN CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING
Revisions CONCRETE EFFECT PAINT 2.20
PHYSIO THERABY
064 63.74
PHYSIO THERABY
064 63.74
HPL ON MOSAIC TILES AS PER APPROVED SAMPLE
7
No.
2 3
Description
Date
APPROVED ISSUE APPROVED ISSUE
11-11-2021 23-11-2021
CLINICS - 3D 2
PHYSIO THERABY - ELE 01
IGNITE GYM
1 : 50
FIRST FLOOR PLAN +4.20
GROUND FLOOR INTERNAL ELEVATIONS
FIRST FLOOR PLAN +4.20
0.60
0.10
WOODEN SHELVES
Project number
CONCRETE EFFECT PAINT 3.50
3.50
0.10 0.60 0.10
M.ABDELSALAM
0.10
0.60
Drawn by NEOCEMENT FLOORING
EG21009
11-11-2021
Date
M.WALY
Checked by
EG21009-SD-ID-7-GR-002
8
DISPLAY UNIT - 3D
BIM ARCHITECT PORTFOLIO
4
ENTRANCE DISPLAY - ELE 01 1 : 50
Scale
1 : 50
42
FIRST FLOOR PLAN +4.20
0.81
FIRST FLOOR PLAN +4.20
0.90
0.90
0.90
0.90
0.70
0.90
0.20
0.09
0.20
CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING GREY PORCELAIN TILES AS PER APPROVED SAMPLE
HPL PARTITIONS
0.20
0.30
2.05
2.60
0.80
CLEAR MIRROR
1.08
+0.40 F.F.L.
0.15
0.60
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
0.70
TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
GROUND FLOOR PLAN +0.00
GROUND FLOOR PLAN +0.00
1
MEN'S BATHROOM - ELE 01
5
STUDIOFIVE
EG21009-SD-ID-12-GR-01
1 : 50
CAIRO.DUBAI.HOUSTON
FIRST FLOOR PLAN +4.20
FIRST FLOOR PLAN +4.20
FIRST FLOOR PLAN +4.20
0.09
0.81
FIRST FLOOR PLAN +4.20
0.67
CONCRETE EFFECT PAINT
1.83
2.20
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
LOCKERS
+0.40 F.F.L.
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
+0.40 F.F.L.
0.40
EG21009-SD-ID-7-GR-001 6
TRAVERTINE MARBLE CLADDING SEATS AS PER APPROVED SAMPLE
0.10
EG21009-SD-ID-7-GR-001 8
CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING
0.40
CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING
CONCRETE EFFECT PAINT
GROUND FLOOR PLAN +0.00
GROUND FLOOR PLAN +0.00
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
WOMEN'S BATHROOM
062 94.70
2
EG21009-SD-ID-7-GR-001 7
MEN'S BATHROOM - ELE 02
3
1 : 50
MEN'S BATHROOM - ELE 03 1 : 50
FIRST FLOOR PLAN +4.20
0.09
0.81
FIRST FLOOR PLAN +4.20
0.90
0.90
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
0.80
0.67
0.70
CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING 0.90
CLEAR MIRROR
TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
0.20
1.93
LOCKERS
0.30
2.60
CONCRETE EFFECT PAINT
0.60
+0.40 F.F.L.
WOMEN'S BATHROOM - ELE 01
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
---
1 : 50
FIRST FLOOR PLAN +4.20
CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING
0.40
0.09
CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING
FIRST FLOOR PLAN +4.20
0.81
FIRST FLOOR PLAN +4.20
0.81
FIRST FLOOR PLAN +4.20
0.09
6
0.40
TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
1.50
GREYT PORCELAIN TILES AS PER APPROVED SAMPLE
SCHEMATIC DESIGN
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
+0.40 F.F.L.
+0.40 F.F.L.
0.50
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
0.60
2.20
GREY PORCELAIN TILES AS PER APPROVED SAMPLE
Revisions 8
WOMEN'S BATHROOM - ELE 03 1 : 50
7
WOMEN'S BATHROOM - ELE 02 1 : 50
No.
2 3
Description
Date
APPROVED ISSUE APPROVED ISSUE
11-11-202 23-11-202
EG21009-SD-ID-7-GR-001 3
IGNITE GYM
GROUND FLOOR INTERNAL ELEVATIONS
EG21009-SD-ID-7-GR-001 1 2
MEN'S BATHROOM
063 109.77
Project number
EG2100
11-11-202
Date
M.ABDELSALAM
Drawn by Checked by
M.WAL
EG21009-SD-ID-7-GR-001 4
BATHROOMS AREA 1 : 50
BIM ARCHITECT PORTFOLIO
5
MEN'S BATHROOM- 3D
9
WOMEN'S BATHROOM - 3D
Scale
1:5
43
TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
STEEL STRUCTURE BOXES 5*5 CM
0.66
1.20
WOODEN TOP AS PER APPROVED SAMPLE
STUDIOFIV
0.40
0.28
2.60
2 EG21009-SD-ID-12-GR-01
TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
STEEL STRUCTURE BOXES 5*5 CM
1.20
CAIRO.DUBAI.HOUSTON
SEATS - CALLOUT
1
2
SEATS - SECTION
3
1 : 20
SEATS - 3D
0.25
0.09
0.25
0.35
0.34
0.15
0.25
0.39
0.22
1 : 20
0.15
1.00
0.15
0.20
0.44
0.15
0.15
0.15
0.15
0.93
0.15
0.80
0.25
0.20
0.15
0.20
0.15
1.37
0.20
GREEN FINISH ACRYLIC LOGO AS PER APPROVED SAMPLE
4
IGNITE LOGO - DETAIL- RECEPTION AREA
9
1 : 25
IGNITE LOGO - 3D
SCHEMATIC DE 0.80
Revisions No.
Description
APPROVED ISSUE APPROVED ISSUE
0.60
0.20
0.30
2 3
IGNITE GYM TRAVERTINE MARBLE STEEL STRUCTURE BOXES 5*5 CM
LED LIGHT PROFILE
7 EG21009-SD-ID-12-GR-01
GROUND FLO DETAILS
CLEAR MIRROR
0.80
LED LIGHT PROFILE
0.60
0.20
0.60
0.20
0.60
0.20
0.60
0.20
0.60
0.20
0.60
0.16
CLEAR MIRROR TRAVERTINE MARBLE
Project number
0.30
0.24
0.35
0.35
0.80
Date
0.80
STEEL STRUCTURE BOXES 5*5 CM
Drawn by TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE
M.A
Checked by
EG21009-SD-ID-12-G
5
BIM ARCHITECT PORTFOLIO
SINK & MIRROR - DETAIL 1 : 25
8
SINK & MIRROR - 3D
Scale
44
W-08
W-08
W-08
W-08
SECOND FLOOR PLAN +12.23
2.81
SECOND FLOOR PLAN +12.23
STRUCTURAL BEAMS ( EXISTING )
0.08
LIGHTING TRACKS
1.34
STUDIOFIVE CAIRO.DUBAI.HOUSTON
4.69
CLEAR MIRROR CLADDING 3.00
4.69
OFF WHTE PAINT
RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE
1
FIRST FLOOR PLAN +4.20
0.35
FIRST FLOOR PLAN +4.20
FIRST FLOOR - ELE 01 1 : 50
SECOND FLOOR PLAN +12.23
SECOND FLOOR PLAN +12.23
2.81
STRUCTURAL BEAMS ( EXISTING )
0.08
LIGHTING TRACKS
OFF WHTE PAINT
4.48
4.70
4.48
4.48
CONCRETE EFFECT PAINT AS PER APPROVED SAMPLE
2.20
GLASS HANDRAIL
1.00
RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE FIRST FLOOR PLAN +4.20
3
FIRST FLOOR PLAN +4.20
SCHEMATIC DESIGN
FIRST FLOOR - ELE 03 1 : 50
Revisions No.
CW-02
2 3
SECOND FLOOR PLAN +12.23
SECOND FLOOR PLAN +12.23
SECOND FLOOR PLAN +12.23
STRUCTURAL BEAMS ( EXISTING )
1.74
IGNITE GYM LIGHTING TRACKS
LIGHTING TRACKS
FIRST FLOOR INTERNAL ELEVATIONS
2.49
0.58 2.57
Date
11-11-20 23-11-20
SECOND FLOOR PLAN +12.23
STRUCTURAL BEAMS ( EXISTING )
0.50
Description
APPROVED ISSUE APPROVED ISSUE
GLASS PARTITION
4.46
4.69
OFF WHTE PAINT OFF WHTE PAINT
CLEAR MIRROR CLADDING
Project number
EG210
11-11-2
3.15
Date
FIRST FLOOR PLAN +4.20
Drawn by
2.20
RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE FIRST FLOOR PLAN +4.20
1.00
2.20
GLASS HANDRAIL
FIRST FLOOR PLAN +4.20
RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE FIRST FLOOR PLAN +4.20
Checked by
M.ABDELSAL
M.WA
EG21009-SD-ID-7-FR-001 2
FIRST FLOOR - ELE 02 1 : 50
BIM ARCHITECT PORTFOLIO
4
FIRST FLOOR - ELE 04 1 : 50
Scale
1
45
THE LONDON RESTOBAR - ZAMALEK GIZA , EGYPT
ELEVATION TARGETS
ELEVATION
ELEVATION DESIGNATION
01
A-02-02 000-0001
SHEET REFERENCE NUMBER SITE/BUILDING/SERIAL NUMBER
BUILDING SECTION TARGETS
SECTION DESIGNATION
01
A-03-02 000-0001
SHEET REFERENCE NUMBER
01
A-03-02 000-0001
WALL SECTION TARGETS
WS-A
0-G-000-01
SECTION DESIGNATION SHEET REFERENCE NUMBER
DETAIL TARGETS DETAIL DESIGNATION
01
2
A-04-01 000-0001
SHEET REFERENCE NUMBER SITE/BUILDING/SERIAL NUMBER
AREA DETAIL REFERENCE
2
DETAIL DESIGNATION
01
A-04-01 000-0001
SHEET REFERENCE NUMBER
ELEVATION MARK +289.90 F.F.L
+289.90 T.O.P
+289.90 T.O.S
+289.90 F.F.L
For CONSTRUCTION
LEVEL INDICATION ON PLAN
SEPTEMBER 2021
LEVEL INDICATION ON SECTIONS & ELEVATIONS
No.
DRAWING NUMBERING SYSTEM
1 2
EG20029 - TD - ID - 01 - GRF - 0001 - R00
Description APPROVED ISSUE APPROVED ISSUE
Date 06-12-2021 27-12-2021
REVISION SEQUENCE NO
Revisions
LEVEL INDICATOR DRAWING TYPE (DETAILED PLAN/CEILING PLAN) DISCIPLINE ACRONYM (INTERIOR DESIGN) PROJECT PHASE (TENDER DESIGN)
THE LONDON RESTOBAR
PROJECT NUMBER
MISCELLANEOUS TARGETS
COVER
DOOR TAG DOOR CONSECUTIVE NUMBER
Project number WINDOW CONSECUTIVE NUMBER
Date WALL TAG
Drawn by WALL TYPE
SPACE NAME ROOM NUMBER
Checked by
EG21012 28-12-2021 M.ABDELSALAM A.HANY
EG21012-TD-ID-0-GR-0 FINISH NUMBER (REFER TO FINISH SCHEDULE) FLOOR NUMBER ROOM CONSECUTIVE NUMBER
BIM ARCHITECT PORTFOLIO
Scale
1 : 50
47
12/28/2021 7:54:19 PM
WINDOW TAG
NILE RIVER
BEVERAGE ROOM
FOOD STORE
COOLING ROOM
FREEZING ROOM
KITCHEN LOBBY
DN BACK STAGE
MAIN ENTRANCE
MEN'S BATHROOM
RECEPTION DESK SATGE & DJ SET PICK UP
SHISHA CORNER
BATHROOM LOBBY
HOT LINE
SUSHI CORNER
WOMEN'S BATHROOM
HOT LINE
HOT LINE
KITCHEN LOBBY
R BA
No. 1
AP
CASHIER ZONE
Revisions
THE L
FU
Project nu Date Drawn by
Checked b
1
FURNITURE PLAN 1 : 100 Scale
BIM ARCHITECT PORTFOLIO
48
WALL FINISHES Type Mark
BW-01 G-01 W-01 W-02 W-03 W-04
Description
BRICK WALL 12 CM GLASS PARTITION CONCRETE EFFECT GOLDEN WATER RIPPLE STAINLESS STEEEL THE LONDON ART WALLPAPER BLACK MIRROR CLADDING
NILE RIVER
3 EG21012-TD-ID-7-GR-0
OUTDOOR AREA
25657
23713
2000 21655 2001
4
1332
8 174
2. 49 °
1226
°2 .4 9° 2.4 9
1640
1201 24
1275
15
720
720 24
W-03 24 15
1276
15
720
720
W-03 24 15
24 15
1276
24
1006
W-03
L AIN ST
L EE ST
° 49 2.
9 2.4
° .49 °2
2653
1738
1854
1648
1612
1675
1772
1020
670
800
1170
800
500
PICK UP
1 2
HOT LINE
2800
2767
1050
4283
SUSHI CORNER
3759
SHISHA CORNER
3039
1288
3639
800
1100
800 10339
1012
860
1700
1500
5618 HOT LINE
90 800 HOT LINE
1000
Revisio
1298
WOMEN'S BATHROOM
716
680 79
2010
1243 1244 260 800
No.
1900
1196
409
8889 KITCHEN LOBBY
3 1879
992 120 1124
1340
1758
BATHROOM LOBBY
900
800
FREEZING ROOM
ELECTRICITY ROOM
THE
1 73 12
81 76
2. 49 °
W-02 1225
EN LD O
S ES
1720
1800
COOLING ROOM
892
1
W-03
W-03
FLOWER BOX
W-02
966
1524
1206
529 900
6
97 10
75
15
1524
EG21012-TD-ID-7-GR-0 6 43
FLOWER BOX
G
W-02 12
710
710
W-02 4783
9900
872
EG21012-TD-ID-7-GR-0
800
KITCHEN
1968
2400
466
1203
6514
1305
466
1979 900 200
5072
6487
816
FLOWER BOX
1275 24 15
994
200 900
6 2 EG21012-TD-ID-7-GR-0
0 90
W-02
1917
SATGE & DJ SET
1650 516
02 18
722
3777
4715
5
W-03
1005
MEN'S BATHROOM
120
766
766
5080
15
24
466
W-01
1146
2044
-
6530
BACK STAGE
927
1727
1727
RECEPTION DESK
-
466
600
MAIN ENTRANCE
6549
2044
516
820
1900
FOOD STORE
2396
DN
100
1500
2400
BEVERAGE ROOM
2890
W-03
2164
3000
KITCHEN LOBBY
5124
1970
1970
3212
1316
974
G-01
816
858
2001
1130
1130
21655
2400
3125
5602
2000
1227
611
7 EG21012-TD-ID-12-GR-0
CASHIER ZONE
83
2
2323
Project 1
Date
EG21012-TD-ID-12-GR-0
Drawn
1
DETAILED PLAN
Checke
1 : 100
BIM ARCHITECT PORTFOLIO
EG
49
Scale
FLOOR FINISHES Type Mark
F-01 F-02
Description
NEOCEMENT FLOORING MOSAIC TILES 30*30 CM
NILE RIVER
3 EG21012-TD-ID-7-GR-0
BEVERAGE ROOM
FOOD STORE
COOLING ROOM
FREEZING ROOM
KITCHEN LOBBY
F-02
DN BACK STAGE
MAIN ENTRANCE
MEN'S BATHROOM
MOSAIC TILES 30*30 CM 128 m²
RECEPTION DESK SATGE & DJ SET
SHISHA CORNER
PICK UP
F-01 NEOCEMENT FLOORING
SHISHA CORNER
381 m²
516
6487
+0.00 F.F.L.
466
6514
466
BATHROOM LOBBY
HOT LINE
SUSHI CORNER
WOMEN'S BATHROOM
HOT LINE
No.
HOT LINE
KITCHEN LOBBY
1 2
FLOWER BOX
FLOWER BOX
Revis
CASHIER ZONE
THE
Proje
Date
Draw
1
FLOORING PLAN
Chec
1 : 100
E
Scale
BIM ARCHITECT PORTFOLIO
50
CEILING FINISHES Type Mark C-01 C-02 C-03 C-04
Description ALCOBOND REFLECTIVE CEILING WHITE PAINT ON GYPSUM BOARD STAINLESS STEEL GOLDEN RIBS GOLDEN WATER RIPPLE SHEET
3 EG21012-TD-ID-7-GR-0
BEVERAGE ROOM
FOOD STORE
COOLING ROOM
FREEZING ROOM
KITCHEN LOBBY
STRUCTURE CAP
STRUCTURE CAP
6237
516
6549
466
6530
466
6522
BACK STAGE
MEN'S BATHROOM
2950 C-04 4254
GOLDEN WATER RIPPLE SHEET
SATGE & DJ SET
C-03
C-02 WHITE PAINT ON GYPSUM BOARD
STAINLESS STEEL GOLDEN RIBS
SHISHA CORNER
BLACK PAINTED SLAB
200
200
200
BATHROOM LOBBY STRUCTURE CAP
WOMEN'S BATHROOM
SUSHI CORNER
KITCHEN 3
156 8
200
200
200
STRUCTURE CAP
8210
2700 2700
ELECTRICITY ROOM
6 151
ING EIL HC TC E ING R EIL ST HC TC E R ST
44 73
2950
C-01
KITCHEN LOBBY
ALCOBOND REFLECTIVE CEILING
2950 1786 17 39
1
CEILING PLAN 1 : 100
BIM ARCHITECT PORTFOLIO
51
C-01
C-01
C-03
ALCOBOND REFLECTIVE CEILING
STAINLESS STEEL GOLDEN RIBS
ALCOBOND REFLECTIVE CEILING
750
60 340
60 340
STAINLESS STEEL GOLDEN RIBS
1750
LONDON ART WALLPAPER
1100
1950
FIBER GLASS WITH AUTOMOTIVE PAINT
1750
1750
ALCOBOND REFLECTIVE CEILING
2500
C-01 WOODEN CAP
200
GOLDEN WATER RIPPLE STAINLESS STEEEL
ALCOBOND REFLECTIVE CEILING
4
900
962
NEOCEMENT FLOORING
400
NEOCEMENT FLOORING
238
1200
1200
GOLDEN WATER RIPPLE STAINLESS STEEL
600
ACRYLIC LONDON LOGO AS PER APPROVED SAMPLE
ELEVATION 03
2
1 : 50
ELEVATION 02 1 : 50
C-01 ALCOBOND REFLECTIVE CEILING
C-01
2700
ALCOBOND REFLECTIVE CEILING
250
ALCOBOND REFLECTIVE CEILING
STAINLESS STEEL ELECTROSTATIC GOLD 30 MM THICKNESS
2000 2950
2950
STAINLESS STEEL ELECTROSTATIC GOLD 100 MM THICKNESS
GOLDEN WATER RIPPLE STAINLESS STEEL
GOLDEN WATER RIPPLE STAINLESS STEEL
200
2400
CALACATTA MARBLE TOP BAR AS PER APPROVED SAMPLE
1100
FIBER GLASS WITH AUTOMOTIVE PAINT
1600
STAINLESS STEEL ELECTROSTATIC GOLD 50 MM THICKNESS
550
ALCOBOND REFLECTIVE CEILING
950
NEOCEMENT FLOORING
NEOCEMENT FLOORING
6
ELEVATION 04 1 : 50
1
C-03
C-01
STAINLESS STEEL GOLDEN RIBS
ALCOBOND REFLECTIVE CEILING
BAR - ELEVATION 1 : 50 For CONSTRUCTION
STRUCTURE CEILING
2950
SEPTEMBER 2021
3350
STAINLESS STEEL GOLDEN RIBS
ALCOBOND REFLECTIVE CEILING
FALSE CEILING
No.
CONCRETE EFFECT PAINT
1 2
GOLDEN WATER RIPPLE STAINLESS STEEL
D
0627-
Revisions
STAGE LEVEL +0.00 F.F.L.
NEOCEMENT FLOORING
Description APPROVED ISSUE APPROVED ISSUE
2950
2950
2950
250 zero 0
3
Section 1 1 : 50
C-04
C-03
GOLDEN WATER RIPPLE SHEET
STAINLESS STEEL GOLDEN RIBS
STRUCTURE CEILING 3350
STAINLESS STEEL GOLDEN RIBS
FALSE CEILING 550
60
ALCOBOND REFLECTIVE CEILING
2950
2950
2400
2950
2950 2400
2950
950 NEOCEMENT FLOORING
Date STAGE LEVEL
WOODEN DESK AS PER APPROVED SAMPLE
250 zero 0
5
ELEVATION 01 1 : 50
BIM ARCHITECT PORTFOLIO
INTERNAL ELEVATIO Project number
2000
CONCRETE EFFECT PAINT
ACRYLIC LONDON LOGO AS PER APPROVED SAMPLE
THE LONDON RESTOB
Drawn by Checked by
EG21
28-12-2
M.ABDELSA
A.H
EG21012-TD-ID-7-GR Scale
52
1
STEEL STRUCTURE BOXES 5*5 CM
1461
8. 00 °
450
98 16
450
° 00 8.
GOLDEN WATER RIPPLE STAINLESS STEEL SHEET 1.2 MM THICKNESS AS PER APPROVED SAMPLE
1608
16 98
1608
FLOWER BOX 45 0
0 45
SEATS - Callout
1
3
1 : 25
SEATS 02- Callout 1 : 25
FALSE CEILING
FALSE CEILING 50
860 12.78°
2950 8°
15
2950
° .17
WOODEN CAP
15.46°
31 .1
3°
28.7 1°
.0 44
9 23
1565
2030
FIBER GLASS WITH AUTOMOTIVE PAINT AS PER APPROVED SAMPLE
zero 0
4
SEAT - 3D
2
SHADE - SECTION
For CONSTRUCTION
1 : 25
SEPTEMBER 2021
No.
CALACATTA MARBLE TOP BAR AS PER APPROVED SAMPLE
200
1 2
900
0 80
Revisions
EG21012-TD-ID-7-GR-0
EG21012-TD-ID-12-GR-0
1
280
8
BAR- ELEVATION 02
30
1 : 50
400 400
DETAILS
200
30
2. 49 °
CALACATTA MARBLE TOP BAR AS PER APPROVED SAMPLE
400
2. 49 °
400
STAINLESS STEEL ELECTROSTATIC GOLD 50 MM THICKNESS
2. 49 °
400
STAINLESS STEEL ELECTROSTATIC GOLD 100 MM THICKNESS
400
STAINLESS STEEL ELECTROSTATIC GOLD 50 MM THICKNESS
STAINLESS STEEL ELECTROSTATIC GOLD 30 MM THICKNESS
5
2800
560
EG21012-TD-ID-12-GR-0
THE LONDON RESTOB
30
° 49 2.
6
STRETCH CEILING AS PER APPROVED SAMPLE
400
2950
9° 2.4
30
9° 2.4
Project number
2.4 9
700
700
900
400
Date Drawn by Checked by
5
BIM ARCHITECT PORTFOLIO
BAR UNIT - ELEVATION 1 : 50
7
BAR AREA - Callout 2 1 : 50
8
BAR - SECTION 1 : 25
EG21
28-12-20
°
STAINLESS STEEL ELECTROSTATIC GOLD 30 MM THICKNESS
2700 STEEL BOXES 10*10 CM
0
2700
D
06-1 27-1
2950
zero
6
Description APPROVED ISSUE APPROVED ISSUE
M.ABDELSAL
A.HA
EG21012-TD-ID-12-GR
As indica
Scale
53
3
SEATS - 3D
2
TABLES - 3D
For CONSTRUCTION SEPTEMBER 2021
No. 1 2
Description APPROVED ISSUE APPROVED ISSUE
D
0627-
Revisions
THE LONDON RESTOB
3D VIEWS
4
Project number
ENTRANCE - 3D
Date Drawn by Checked by
1
BAR - 3D
28-12-2
M.ABDELSA
A.H
EG21012-TD-ID-12-GR Scale
BIM ARCHITECT PORTFOLIO
EG21
54
2.94
FLOWER BOX CONCRETE EFFECT FINISH
FLOWER BOX CONCRETE EFFECT FINISH
1.00
0.20
1.00
0.20
1.00
0.20
1.00
0.20
1.00
0.20
1.00
0.20
0.48 0.98
1.48
1.00
0.30 0.33
1.00
0.20
1.00
0.20
0.20
1.00
1.00
0.62
EG21012-TD-ID-0-GN-5
3.70
3.70
3.70
3.70
3
3
1.00
1.00
1.00
0.76
OUTDOOR ROC BENCHES ( DURBANIS BRAND )
1.00
1.00
1.00
0.78
EG21012-TD-ID-0-GN-5
0.76
0.50
0.26
6.04
0.76
0.26
W-03 W-04 W-05
GREY BASALT BLOCKS AS PER APPROVED SAMPLE
0.26
0.50
<varies> BRICK WALL 12 CM GLASS PARTITION CONCRETE EFFECT GOLDEN WATER RIPPLE STAINLESS STEEEL THE LONDON ART WALLPAPER BLACK MIRROR CLADDING KARARA WHITE MARBLE WALL CLADDING
GREY GRANITE AS PER APPROVED SAMPLE
1.73
3
0.62
EG21012-TD-ID-0-GN-5
3.70
3.70
3.70
GREY GRANITE AS PER APPROVED SAMPLE
3.70
MAIN ENTRANCE 3.70
MAIN ENTRANCE
Description
BW-01 G-01 W-01 W-02
1.97
0.20
0.98
0.98
0.62
1.48
6.80
1.00
WALL FINISHES Type Mark
0.48
0.10 0.10 0.30
7.30
0.48
0.10 0.10 0.30
7.30
W-01
CNC STAINLESS STEEL UNIT
1.00
1.00
CNC STAINLESS STEEL UNIT
CONCRETE EFFECT WALL FINISH
1.00
1.00
1.00
1.00
1.00
0.76
0.44
0.10
W-01
7.30
6.80
CONCRETE EFFECT WALL FINISH
0.78
1.00
+0.00 F.F.L.
0.10 0.27
0.10 0.27
0.10 0.30
0.44
0.10
0.10
6.04
0.50
1
1.00
1.00
GREY GRANITE AS PER APPROVED SAMPLE 1.00
GREY GRANITE AS PER APPROVED SAMPLE
50
+0.00 F.F.L.
1.00
6.43
GREY GRANITE AS PER APPROVED SAMPLE
0.
6.43
FLOWER BOX CONCRETE EFFECT FINISH
5.44
5.70
5 0.50 0.4
1.20
GREY GRANITE AS PER APPROVED SAMPLE
1.20
W-01 W-01
FLOWER BOX CONCRETE EFFECT FINISH
0.4 5
1 EG21012-TD-ID-0-GN-6
For CONSTRUCTION
FLOWER BOX CONCRETE EFFECT FINISH
FLOWER BOX CONCRETE EFFECT FINISH
OUTDOOR - DETAILED PLAN
2
1 : 50
OUTDOOR -FLOORING PLAN
5
1 : 50
No.
OUTDOOR - FURNITURE PLAN
6
1 : 50
Description
Da
APPROVED ISSUE
16-03
GREY BASALT BLOCKS AS PER APPROVED SAMPLE GREY GRANITE AS PER APPROVED SAMPLE
FABRIC CANOPY AS PER APPROVED SAMPLE
FABRIC CANOPY AS PER APPROVED SAMPLE
BLACK ACRYLIC AS PER APPROVED SAMPLE
3.02
1.30
FALSE CEILING +2.95
FLOWER BOX CONCRETE EFFECT FINISH
3.70
CONCRETE EFFECT WALL FINISH
0.35
B.O.S +3.35
3.70
DOUBLE HINGED GLAZING DOOR
WHITE ACRYLIC AS PER APPROVED SAMPLE
B.O.S +3.35
0.40
DOUBLE HINGED GLAZING DOOR
STEEL STRUCTURE
CONCRETE EFFECT WALL FINISH
FALSE CEILING +2.95
OUTDOOR ROC BENCHES ( DURBANIS BRAND )
Revisions
CONCRETE EFFECT WALL FINISH
THE LONDON
CNC STAINLESS STEEL UNIT BLACK ACRYLIC AS PER APPROVED SAMPLE WHITE ACRYLIC AS PER APPROVED SAMPLE
3.70
STEEL STRUCTURE
OUTDOOR PACKAGE 0.40
3.70
3.30 2.40 0.40
0.40
F.F.L - GR +0.00
Checked by
F.F.L - GR +0.00
EG210
16-03-20
Drawn by
0.40
0.40
Project number Date
2.95
3.30
TEAK WOOD FLOORING AS PER APPROVED SAMPLE
M.ABDELSAL
A.HA
EG21012-TD-ID-0-GN3
OUTDOOR - ELEVATION 1 1 : 50
BIM ARCHITECT PORTFOLIO
4
OUTDOOR -3D
1:
Scale
55
5 EG21012-TD-ID-0-GN-6 OUTDOOR ROC BENCHES ( DURBANIS BRAND )
FLOWER BOX CONCRETE EFFECT FINISH
CNC STAINLESS STEEL UNIT
3.69
OUTDOOR ROC BENCHES ( DURBANIS BRAND )
LONDON WORD (VOID)
CNC STAINLESS STEEL UNIT
GREY GRANITE AS PER APPROVED SAMPLE
FLOWER BOX CONCRETE EFFECT FINISH
3.70
B.O.S +3.35
B.O.S +3.35
WALL FINISHES Type Mark
Description
0 0.5 1.85
LONDON
LONDON LONDON
LONDON
LONDON
1.85
LONDON
LONDON
LONDON
OUTDOOR - DETAILED PLAN - Callout 1
LONDON
0.40
LONDON
0.40
LONDON
LONDON
LONDON
LONDON
LONDON
+0.00 F.F.L.
F.F.L - GR +0.00
OUTDOOR - SECTION
4
1 : 25
LONDON
LONDON
LONDON LONDON
LONDON
LONDON
LONDON
0.40
0.40
LONDON
LONDON 2.01
3.69
3.29
LONDON
4 EG21012-TD-ID-0-GN-6
F.F.L - GR +0.00
W-03 W-04 W-05
1.00
0.40
45 0.
<varies> BRICK WALL 12 CM GLASS PARTITION CONCRETE EFFECT GOLDEN WATER RIPPLE STAINLESS STEEEL THE LONDON ART WALLPAPER BLACK MIRROR CLADDING KARARA WHITE MARBLE WALL CLADDING
BW-01 G-01 W-01 W-02
1.20
1
FALSE CEILING +2.95
1.28
FALSE CEILING +2.95
1 : 25
FABRIC CANOPY AS PER APPROVED SAMPLE
FLOWER BOX CONCRETE EFFECT FINISH
OUTDOOR ROC BENCHES ( DURBANIS BRAND )
LONDON WORD (VOID)
CNC STAINLESS STEEL UNIT
For CONSTRUCTION
FLOWER BOX CONCRETE EFFECT FINISH
GREY GRANITE AS PER APPROVED SAMPLE
3.70
B.O.S +3.35
B.O.S +3.35
FALSE CEILING +2.95
Description
Dat
APPROVED ISSUE
16-03-2
1.85
1.30
FALSE CEILING +2.95
No. 6
2.40
Revisions 1.85 1.00
LONDON
LONDON
2.00
LONDON LONDON
LONDON
LONDON
1.85
LONDON
0.40
0.40
LONDON
OUTDOOR DETAILS
0.40
LONDON
LONDON
LONDON
LONDON
LONDON
LONDON
LONDON
LONDON
0.00 F.F.L - GR +0.00
LONDON
LONDON
LONDON
LONDON
LONDON
THE LONDON
LONDON
LONDON
LONDON
LONDON
+0.00 F.F.L.
F.F.L - GR +0.00
Project number
16-03-202
Date Drawn by Checked by
2
OUTDOOR -3D
5
OUTDOOR - SECTION
M.ABDELSALA
A.HAN
EG21012-TD-ID-0-GN-6
1 : 25
1:2
Scale
BIM ARCHITECT PORTFOLIO
EG2101
56
AL-ARABIYA OFFICE BUILDING - LANDSCAPE RIYADH, SAUDI ARABIA
1
2
3
5 4
I
7
8
9
10
11
12
13
14
15
16
6
I
H
H
G
G
F
F
E
E ELECTRICAL ROOM
D
D
PUMP ROOM
C
C 1 / KS20001-TD-AR-10-GN-004
B
B
1 / KS20001-TD-AR-10-GN-003 1 / KS20001-TD-AR-10-GN-002
SEATING AREA
TENDER DESIGN
A
JANUARY 2021
A +0.25 M
UP
No.
UP
0
Description APPROVED ISSUE
UP
UP
UP
Revisions FEMALE SEARCH AREA
1 KS20001-TD-AR-10-GN-006
Al Arabiya Headquarter B
X-RAY
STAFF DELIVERY WAITING AREA
SEATING AREA WAITING AREA
FRONT SECURITY BLOCK
O.B ENTRANCE & EXIT
1
2
LANDSCAPE GE LAYOUT
PEDESTERIAN ACCESS
3
4
5
6
7
8
9
10
11
12
13
14
15
16 Project number Date Drawn by
M
Checked by
1
LANDSCAPE GENERAL LAYOUT 1 : 200
BIM ARCHITECT PORTFOLIO
0
1
2 METER
KS20001-TD-AR-10-G Scale
58
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1 / KS20001-TD-AR-10-GN-004
B
2 KS20001-TD-AR-10-GN-005
A
SEATING AREA 5 81 12
F05
Type Mark
A
F01 F02 F03 F05
KS20001-TD-AR-10-GN-005
F03 BASALT POLISHED TILES
UP
15
BASALT POLISHED TILES
KS20001-TD-AR-10-GN-007
F03
5880
45 10
BASALT POLISHED TILES
TENDER DESIGN
10 45
6 KS20001-TD-AR-10-GN-005
5
-0.600
4
JANUARY 2021
F03
15
0
85
Description APPROVED ISSUE
Date
BASALT POLISHED TILES
25 18
No.
4 KS20001-TD-AR-10-GN-007
36
35
2 KS20001-TD-AR-10-GN-007
70 15
6100
0 163
12110
-0.450
F06 F10 F11
4 KS20001-TD-AR-10-GN-006
FEMALE SEARCH AREA
1
X-RAY
05
TEAK WOOD BENCHES SECURITY ROOM
F02
4
STAFF DELIVERY WAITING AREA
5
100*100 cm
KS20001-TD-AR-10-GN-005
WAITING AREA
RELATED TO THE RELEVANT PACKAGE SUBMITTED BY AL-ARABIYA
4
FRONT SECURITY BLOCK
F02
5
KS20001-TD-AR-10-GN-007
DP ROOM
KS20001-TD-AR-10-GN-005
Grey Granite Tiles 100*100 cm
No.
GRASS
0 3 KS20001-TD-AR-10-GN-006
ENTRANCE
D
APPR
PEDESTERIAN ACCESS
F02
2 KS20001-TD-AR-10-GN-007
4000
5
KS20001-TD-AR-10-GN-005
KS20001-TD-AR-10-GN-007Grey Granite Tiles KS20001-TD-AR-10-GN-007
EXIT
4 KS20001-TD-AR-10-GN-007
KS20001-TD-AR-10-GN-007
20 1505 95 5 3
27-06-2021
SEATING AREA -0.450
215
10 45 50
52 5
40 27
785
KS20001-TD-AR-10-GN-007
KS20001-TD-AR-10-GN-007
F02
UP
BA 10 Gr BA GR MA GR PO PO
F02 F03 F05
Grey Granite Tiles 100*100 cm
3
4500
5
00 10
7850
1 KS20001-TD-AR-10-GN-006
4
1570
0 21
KS20001-TD-AR-10-GN-007
BASALT POLISHED TILES
F03
UP
5 57 10
05 18
24 10
-0.450
UP
0 02 10 10 45
10 65
5
-0.600
F02
1 KS20001-TD-AR-10-GN-006
525
F03
5315
21570
F02
F01
BARDIGLIO MARBLE TILES 100*100 CM
2925
10 45
15 42
20365
F03 BASALT POLISHED TILES
10 45
Grey Granite Tiles 100*100 cm
GREY GRANITE CURBSTONE
90 25
GREEK THASSOS ROUGH MARBLE TILES
8435
525 27
F02
-0.600
Grey Granite Tiles 100*100 cm
5
KS20001-TD-AR-10-GN-007
-0.450
KS20001-TD-AR-10-GN-007
Grey Granite Tiles 100*100 cm
BASALT POLISHED TILES
-0.600
395
13595
F06 F10 F11
BIKES RACKS
65
F01
+0.000
2620
0 70 15
5
BIKES RACKS
74
525
5
UP
F03
1570
BASALT POLISHED TILES
Type Mark
+0.600
91 70
10 45
12680
525
80 39
5 26 19
F03 +0.25 M
F01
GLASS HANDRAIL FOR HANDICAPPED RAMP
14805
BARDIGLIO MARBLE TILES 100*100 CM Grey Granite Tiles 100*100 cm BASALT POLISHED TILES GREEK THASSOS POLISHED MARBLE TILES 100*100 CM GRASS 525 PORCELAIN 80*80 CM PORCELAIN 60*60 CM
90 24
BARDIGLIO MARBLE TILES 100*100 CM
-0.450
Description
A
1 KS20001-TD-AR-10-GN-005
2 KS20001-TD-AR-10-GN-006
GREEK THASSOS POLISHED MARBLE TILES 100*100 CM
5000
A
-0.150
814 0
Floor Schedule
3010
785
Grey Granite Tiles 100*100 cm
52 5 1155
F02
62 85
525
5 KS20001-TD-AR-10-GN-006
B
Grey Granite Tiles 100*100 cm
25530
Revisions
Revisions
-0.450
10
11
12
13
14
15
16
Al Ara
Al Arabiya Headquarter Building 1 KS20001-TD-AR-10-GN-007
O.B ENTRANCE & EXIT
2
3
4
5
6
7
8
9
KS20001-TD-AR-10-GN-005
Project number
Drawn by
0
1 : 100
1
2
2
3
4
5
6
7
8
Drawn by Checked by
M.WALY
0
KS20001-TD-AR-10-GN-003
LAYOUT - Dependent 1 1 1LANDSCAPE Scale : 100 1 : 100
METER 1
Date
M.ABDELSALAM
Checked by
LANDSCAPE LAYOUT - Dependent 2
Project numb
KS20001 27-06-2021
Date
1
LAND
LANDSCAPE PATRIAL LAYOUT 2
5
1
1
2 METER
9
800
400
50
350
GREEK THASSOS MARBLE ROUGH FINISH
PLAN
Description
R.C SLAB
70 15
13335
70 15
6 BASALT POLISHED TILES KS20001-TD-AR-10-GN-006
F06 F10 F11
POLYURETHANE TRAFFIC COATING ON SCREED GRADE
2400
S.S STRIP DIVIDER 100X5 mm.
SLOPE 1:12
FFL
200
E
6245
6375
E
COLORED EPOXY PAINT
BARRIER
100 100
F03 15 70
CONTROL UNIT
1200
5375
1640
1770
15 85
F02 F03 F05
70 15
36345
70 15
BARDIGLIO MARBLE TILES 100*100 CM Grey Granite Tiles 100*100 cm BASALT POLISHED TILES GREEK THASSOS POLISHED MARBLE TILES 100*100 CM GRASS PORCELAIN 80*80 CM PORCELAIN 60*60 CM
4000
F F01
WATERPROOFING MEMBRANE
1000
F
SETTING MORTAR 20 mm. SAND BED 80 mm.
1600
Floor Schedule Type Mark
SECTION
ELECTRICAL ROOM
ELEVATION
1
70 15
5410
23 55
15 70
15 70 1700
D
D
ARM BARRIER DETAIL
ROAD ARROW DETAIL
5
3
HANDICAPPED RAMP SECTION
TENDER DESIGN JANUARY 2021
PLANT POT
0
Description APPROVED ISSUE
Date
JANUARY 2021
100
No.
BASALT POLISHED TILES
27-06-2021
C
Revisions
Grey Granite Tiles 100*100 cm
METAL FLASHING FFL
1800
1800
EQ.
135
No. 0
Description APPROVED ISSUE
Date 27-06-2021
CEMENT PLASTER 20 mm CLEAN SAND
15
EQ. Al Arabiya Headquarter Building
GALV. STEEL FLASHING 0.7 mm THICK FIXED BY EXPANSION BOLTS EVERY 500 mm
Revisions
165
F02
200 700
12470
PUMP ROOM
13520
-0.450
C
TENDER DESIGN
GALV.STEEL PLASTER STOP
F03
Al Arabiya Headquarter Building
VAR.
FFL
LANDSCAPE PARTIAL LAYOUT 3
5 KS20001-TD-AR-10-GN-006
WHITE MARKING EPOXY PAINT
STEEL PLATE WELDED TO STEEL ROD
GREASED HEX. NUT
15
200 170
GRAVEL (SIZE NOT TO EXCEED ∅50 mm)
15
1 mm GALV. STEEL CONTAINER
PRECAST CONCRETE WHEEL STOP
1
2
3
4
5
6
7
8
KS20001 27-06-2021
Date Drawn by
LANDSCAPE LAYOUT - Dependent 3
0
1
2 METER
BIM ARCHITECT PORTFOLIO
1 : 100
Project number
100
KS20001 27-06-2021
Date Drawn by
M.WALY
KS20001-TD-AR-10-GN-004 Scale
VAR.
M.ABDELSALAM
Checked by
1 : 100
R.C. SLAB WITH CONCRETE HARDINER
STEEL PLATE WELDED TO STEEL ROD
100
LANDSCAPE GENERAL DETAILS
4 mm BITUMINOUS MEMBRANE
PLAIN CONCRETE SLAB OR CONCRETE PIT
9 Project number
1
SCREED 50 mm THICK 290
PIPE SLEEVE CAST IN CONCRETE WHEEL STOP
CEMENT MORTAR 30x30 mm
M.ABDELSALAM M.WALY
Checked by
2
CONCRETE WHEEL STOPPER PLAN
4
PLANTER DETAIL
KS20001-TD-AR-10-GN-007
1 : 200
Scale
59
As indicated
KS20 Scale
3 KS20001-TD-AR-10-GN-006
3 KS20001-TD-AR-10-GN-005
F01
F02
BARDIGLIO MARBLE TILES 100*100 CM
Grey Granite Tiles 100*100 cm
4 KS20001-TD-AR-10-GN-006
+0.700
TEAK WOOD BENCHES
+0.000 -0.450
GRF-FFL +0
GRF-FFL +0
Floor Schedule
1
Type Mark
Section 8
Description
3 KS20001-TD-AR-10-GN-006
1 : 50
F01 F01
F05
F02
F03
BARDIGLIO MARBLE TILES 100*100 CM
GREEK THASSOS POLISHED MARBLE TILES 100*100 CM
Grey Granite Tiles 100*100 cm
BASALT POLISHED TILES
F02 F03 F05 WHITE PAINT
3500
KS20001-TD-AR-10-GN-005
2
F06 F10 F11
WHITE ALUMINIUM LOUVERS AS PER APPROVED SAMPLE
4
ARM BARRIER
ENTRANCE GATE
-0.450
-0.450
GRF-FFL +0
BARDIGLIO MARBLE T 100*100 CM Grey Granite Tiles 100*1 BASALT POLISHED TI GREEK THASSOS POL MARBLE TILES 100*10 GRASS PORCELAIN 80*80 CM PORCELAIN 60*60 CM
GRF-FFL +0
Section 7 1 : 50
TENDER DESIGN JANUARY 2021
No.
150 150
+0.700
250
+0.000 GRF-FFL +0
450
GRF-TOS +-100
0
6 KS20001-TD-AR-10-GN-005
150
BARDIGLIO MARBLE TILES AS PER APPROVED SAMPLE
GRF-FFL +0
Revisions
GRF-TOS +-100
Al Arabiya Headquarter Build
WATER DRAINAGE
5
BENCH CALLOUT 1 : 100
7
BENCH 3D
STEPS CALLOUT
LANDSCAPE SECTIO DETAILS
1 : 25
GRF-FFL +0
GREEK THASSOS ROUGH MARBLE FOR RAMP AS PER APPROVED SAMPLE
+0.000
GRF-FFL +0
150
GREEK THASSOS POLISHED MARBLE AS PER APPROVED SAMPLE
150
GRF-TOS +-100
150
3
Project number
BARDIGLIO MARBLE TILES
GRF-TOS +-100 GREY GRANITE TILES AS PER APPROVED SAMPLE
METAL BOXES 2 CM THICKNESS
Drawn by
BRICK WALL
4
1 : 25
BIM ARCHITECT PORTFOLIO
6
Section 9 1 : 25
0
2
Date
TEAK WOOD
STAIRS CALLOUT
Description APPROVED ISSUE
M.ABD
Checked by
1
2 METER
KS20001-TD-AR-10-GN-00 Scale
60
As ind
WHITE PAINT
3
3500
3500
WHITE ALUMINIUM LOUVERS AS PER APPROVED SAMPLE
ELEVATION 1 - SECURITY BUILDING
4
1 : 50
ELEVATION 2- SECURITY BUILDING 1 : 50
WHITE PAINT WHITE ALUMINIUM LOUVERS AS PER APPROVED SAMPLE
3500
LOUVER WINDOW 2.60 M WIDTH
5
ELEVATION 1- PUMPING & ELECTRICAL ROOM
6
1 : 50
ELEVATION 2 - PUMPING & ELECTRICAL ROOM
TENDER DESIGN
1 : 50
JANUARY 2021
No. 0
GRF-FFL +0
+0.000
2
Revisions
GRF-FFL +0
GRF-TOS +-100
Description APPROVED ISSUE
GRF-TOS +-100
Al Arabiya Headquarter
SECTION - RAMP
LANDSCAPE SEC DETAILS
1 : 50
F03
F05
F01
F02
BASALT POLISHED TILES
GREEK THASSOS POLISHED MARBLE TILES 100*100 CM
BARDIGLIO MARBLE TILES 100*100 CM
Grey Granite Tiles 100*100 cm
Project number Date
-0.450
+0.600
Drawn by
M
Checked by
KS20001-TD-AR-10-G
1
Section 6
Scale
1 : 200
BIM ARCHITECT PORTFOLIO
61
As
AL - ARABIYA OFFICE BUILDING - VIP LOUNGE RIYADH, SAUDI ARABIA
10
11
12
---
F
900
900
900
900
900
900
900
900
900
900
900
900
900
900
900
900
900
900
834
4744
900
1200
1200
900
3659
3355
1200
665
F
1000
F02 GRASS AREA
1200
1000
WHITE TEAK WOOD SEATINGS
GRASS AREA
F02
1000
F02
1200
WHITE TEAK WOOD SEATINGS
3510
F02
1000
GRASS AREA
3
KS20001-TD-AR12-ATR-307
GRASS AREA
F02
1000
E 1200
E
GRASS AREA
1200
1000
1000
F02
1000
1200
5
KS20001-TD-AR12-ATR-308
2
KS20001-TD-AR12-ATR-307
ALUMINIUM COLUMNS 50 MM RADIUS
2000
F02
1200
2000
GRASS AREA
3476
GRASS AREA
TENDER DESIGN
2000
0 40
40 0
1200
2990
JANUARY 2021
GREEK THASSOS SEATINGS
No.
3005
3005
2000
1200
600
GRASS AREA
390
D
1200
0
4189
1200
F02
3471
Revisions
GRASS AREA
5 39
1050
900
1050
Al Arabiya Headquarter Building
1000
F02
F02
1200
1000
1000
1200
3321
GRASS AREA
GRASS AREA
F01
ATRIUM ZONE-GROUND FLOOR PLAN 3166
3340
3340
1200
1200
GREEK THASSOS MARBLE TILES 1200*900 MM
Project number
C
C
KS20001 28-06-2021
Date Drawn by
M.ABDELSALAM / M.HASSAAN M.WALY
Checked by
1
ATRIUM - GROUND FLOOR PLAN 1 : 50
BIM ARCHITECT PORTFOLIO
KS20001-TD-AR- 12-ATR-300
1 KS20001-TD-AR- 12-ATR-303
10
Date 28-06-2021
5 39
1000
1 KS20001-TD-AR- 12-ATR-302
Description APPROVED ISSUE
1000
1000
D
F02
1377
1 KS20001-TD-AR- 12-ATR-307
11
12
1 : 50
Scale
63
10
11
12
---
F
F
1200
F01
1200
1200
GREEK THASSOS MARBLE TILES 1200*900 MM
F02
4000
1000
3
3000
1000
1200
GRASS AREA
KS20001-TD-AR12-ATR-308
4000
1200
F02 GRASS AREA
3000
E 2000
1200
E
3000
1200
2000
2000
G
GREEK THASSOS MARBLE TILES 1200*900 MM
F01
1000
1200
F01
3000
2000
2000
01
1200
ALUMINIUM PROFILE 50 MM WIDTH
2000
ATRIUM
2000
GREEK THASSOS MARBLE TILES 1200*900 MM
TENDER DESIGN
2000
1200
1000
JANUARY 2021
2000
5000
ALUMINIUM LOUVERS 50MM WIDTH
1200
D
No.
F02
2000
1200
100
ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM
0
GRASS AREA
1
Description APPROVED ISSUE
2
D
KS20001-TD-AR12-ATR-308
RECESSED LED STRIP LIGHTING 1200
Revisions 2000
1000
F02
TINTED GLASS AS PER APPROVED SAMPLE
1000
5000
1200
1 KS20001-TD-AR- 12-ATR-302
2000
3000
Al Arabiya Headquarter Buildin
1200
GRASS AREA
900
900
900
900
900
900
900
900
900
900
1200
900
ATRIUM ZONE-FIR FLOOR PLAN
3000
900
900
900
900
900
900
900
900
900
900
F01 GREEK THASSOS MARBLE TILES 1200*900 MM
1200
Project number
28
Date
C
C
10
1
ATRIUM - FIRST FLOOR PLAN 1 : 50
BIM ARCHITECT PORTFOLIO
11
12
Drawn by
M.ABDELSALAM / M.H
Checked by
KS20001-TD-AR- 12-ATR-30 1 KS20001-TD-AR- 12-ATR-303
Scale
64
---
10
11
GYPSUM BOARD
12
WHITE WOOD CLADDING
F
2618
F
463
+3.430
WHITE WOOD CLADDING
WHITE WOOD CLADDING
GYPSUM BOARD
GYPSUM BOARD
E
E
12815
463
2584
21344
463
15463
2547
+3.430
TENDER DESIGN JANUARY 2021
D
D
No. 0
Description APPROVED ISSUE
Date 28-06-2021
Revisions
463
Al Arabiya Headquarter Building
14838
GROUND FLOOR CEILING PLAN
1999
2340
1996
Project number
C
C GYPSUM BOARD
WHITE WOOD CLADDING
KS20001 28-06-2021
Date Drawn by
M.ABDELSALAM / M.HASSAAN M.WALY
Checked by
1
GROUND FLOOR CEILING PLAN 1 : 50
BIM ARCHITECT PORTFOLIO
10
11
12
KS20001-TD-AR- 12-ATR-304
1 : 50
Scale
65
---
10
11
GYPSUM BOARD
12
WHITE WOOD CLADDING
F
2618
F
+3.425
200
1041
463
+3.425
ALUMINUM SKY LIGHT 2000
ALUMINUM SKY LIGHT
WHITE WOOD CLADDING
GYPSUM BOARD
200
GYPSUM BOARD
WHITE WOOD CLADDING
E
200
2000
E
463
801
200
2000
200
2000
200
2000
200
2000
200
2000
200
813
463
2584
200
21344
2000
2547
C-02
2000
+3.425 C-01
TENDER DESIGN
2000
200
JANUARY 2021
D
No. 0
Description APPROVED ISSUE
Date 18-01-2021
200
D
2000
Revisions
1022
200
Al Arabiya Headquarter Building
463
ALUMINUM SKY BORDER
14838
FIRST FLOOR CEILING PLAN
1999
2340
1996
Project number
C
C GYPSUM BOARD
WHITE WOOD CLADDING
KS20001 28-06-2021
Date Drawn by
M.ABDELSALAM / M.HASSAAN M.WALY
Checked by
1
FIRST FLOOR CEILING PLAN 1 : 200
10
11
KS20001-TD-AR- 12-ATR-305
12
As indicated
Scale
BIM ARCHITECT PORTFOLIO
66
---
10
11
12
ALUMINUM MULLION
GYPSUM BOARD
0.20X0.20 ALUMIUM MULLION
ALUMINIUM RIBS HANDRAIL 100* 100 MM WITH SPACING 100 MM
DOUBLE GALSS
F
2629
F
+3.425
200
1293
200
+6.395
ALUMINUM SKY LIGHT
ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM
ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM
2000
ALUMINUM SKY LIGHT
GYPSUM BOARD
200
GYPSUM BOARD
MOSIC TILES CEMENT MORTAR SAND BED THERMAL RIGID INSULATION WATERPROOFING MEMBRANE SLOPED CONCRETE 100 mm AVERAGE
E
2000
E
STRUCTURE BEAM
200
0.20X0.20 ALUMIUM MULLION
PRECAST SLAB
WHITE METAL SHEET
SILICONE SEALANT 200
1060
200
2000
200
2000
200
2000
200
2000
200
2000
200
1060
200
2601
200
+6.395
21344
2000
2551
2000
+3.425 C-01
TENDER DESIGN
200
JANUARY 2021 WHITE PAINT
No.
2000
0.20X0.20 ALUMIUM MULLION
D
Description APPROVED ISSUE
28
200
D
0
2000
Revisions Insulating glazing unit (34 or 46 mm)
Al Arabiya Headquarter Buildin ALUMINUM MULLION DOUBLE GALSS
1293
200
CLADDING
SKY LIGHT DETAILS P
200
ALUMINUM SKY BORDER
14838
1999
2332
1996
Project number
C
C GYPSUM BOARD
0.20X0.20 ALUMIUM MULLION
28
Date Drawn by
ALUMINUM LOUVER 0.10X0.10 M
M.ABDELSALAM / M.H
Checked by
1
SKY LIGHT DETAILS 1 : 50
BIM ARCHITECT PORTFOLIO
KS20001-TD-AR- 12-ATR-306
10
11
12
Scale
67
As indi
C 10
11
D
E
F
12
---
+11.095
+11.095 SKY LIGHT TOP RF-TOS +10960
ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM
WHITE WOOD CLADDING
1000
+4.500
F01
FIRST FLOOR CEILING PLAN +4500
700
1070
700
G
+4.500
FIRST FLOOR CEILING PLAN +4500
Description
1070
No.
Date
F01
28-06-2021
F02
GREEK THASSOS MARBLE TILES 1200*900 MM
GRASS AREA
GRASS AREA
899
F02
F02
1 GRASS AREA KS20001-TD-AR12-ATR-307
GRASS AREA
0
F02
F02
F02
GRASS AREA
GRASS AREA
GRASS AREA
Revisions
Des
APPROVE
F01 GREEK THASSOS MARBLE TILES 1200*900 MM
GRF-FFL +0
400
JA
GUPSUM BOARD
APPROVED ISSUE
4500
3430
3430
No. 0
WHITE TEAK WOOD SEATINGS
3050
GREEK THASSOS MARBLE TILES 1200*900 MM
F02
1100
+0.000
2500
F01
3000
3430
4005
4500
RECESSED LED PROFILE
WHITE WOOD JANUARY 2021 CLADDING
3050
ALUMINIUM LOUVERS 50MM WIDTH
F01 GREEK THASSOS MARBLE TILES 1200*900 MM
TEN
FRF-TOS TENDER DESIGN +4340
C-01
GRF-FFL +0
ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM
ATRIUM 01
GREEK THASSOS MARBLE TILES 1200*900 MM
3425
GRASS AREA
GRASS AREA
F01 GREEK THASSOS MARBLE TILES 1200*900 MM
1000
3425
F02
G
100
FIRST FLOOR CEILING PLAN +4500
01
1450
ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM
ATRIUM
F02
11095
GUPSUM BOARD
2425
F01 GREEK THASSOS MARBLE TILES 1200*900 MM
8045
C-01
WHITE WOOD CLADDING
3430
174
C-01
1170
700
WHITE WOOD CLADDING
ROOF TOS +9095
1170
1152
499
2000
TOP RF-BOS +10540
ROOF TOS +9095
6595
ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM
ROOF TOS +9095
2000
TOP RF-BOS +10540 1800
TOP RF-TOS +10960
TOP RF-BOS +10540
3595
SKY LIGHT TOP RF-TOS +10960
Revisions
WHITE TEAK WOOD SEATINGS
+0.000 GRF-FFL +0
Al Arabiya
Al Arabiya HeadquarterGRF-TOS Building +-100
ATRIUM ZO
ATRIUM ZONE-SECTION 1
Project number
Drawn by
ATRIUM ZONE - SECTION 1
1
1 : 50
Date Drawn by
M.ABDELSALAM / M.HASSAAN
KS20001-
KS20001-TD-AR- 12-ATR-302
ATRIUM ZONE-SECTION 2 Scale 1 : 50
1 : 50
Scale
PROVISIONAL LOCATION FOR BAR SINK
400
50
5000
608
FROSTED AND TINTED STRIPE GLASS AS PER APPROVED SAMPLE
250
30 0
300 FROSTED AND TINTED STRIPE GLASS AS PER APPROVED SAMPLE
1 KS20001-TD-AR- 12-ATR-307
ALUMINIUM PROFILE 50 MM POLISHED CHROME FINISH
4 KS20001-TD-AR- 12-ATR-307
608
1874
RECESSED LED PROFILE 3000
608
ALUMINIUM PROFILE 100 MM EXTERNAL DIAMETER POLISHED CHROME FINISH
2550
400
2500
600
3000
1500
5000
600
3000
2074
400
900
30 0
608
30 0
1010
ALUMINIUM BASE CAP POLISHED CHROME FINISH GRF-FFL +0
GRF-FFL +0
GRF-TOS +-100
GRF-TOS +-100
900
2
4 KS20001-TD-AR- 12-ATR-308
1050
1050
ATRIUM - BAR DETAIL- Callout 1
3
1 : 20
ATRIUM - SEATING DETAILED PLAN - CALLOUT
2 KS20001-TD-AR- 12-ATR-308
1 : 20
1
SHADING WITH FROSTED AND TINTED GLASS 3 STRIPE ABOVE 1 : 25
4
Section 11 1 : 25
SHADING WITH LOUVERS DETAIL 1 : 25
TENDER DESIGN
GREEK THASSOS MARBLE CLADDING AS PER APPROVED SAMPLE
TENDER DESIGN
500
500
1200
JANUARY 2021
JANUARY 2021 WHITE TEAK WOOD CLADDING AS PER APPROVED SAMPLE
400
STEEL BOXES 5*5 CM
400
900
900
1200
GRASS AREA
STEEL BOXES 5*5 CM
No.
Description
No.
Date
Description
Date
RECESSED LED PROFILE
ALUMINIUM PROFILE 50 MM POLISHED CHROME FINISH
1
SECTION - BAR 1 : 20
4
SECTION - SEATING 1 : 20
GREEK THASSOS SEATING RECESSED LED PROFILE
Revisions
GREEK THASSOS SEATING
Revisions
STEEL CHASSIS FOR MARBLE CLADDING
Al Arabiya Headquarter Building
ALUMINIUM PROFILE 100 MM EXTERNAL DIAMETER POLISHED CHROME FINISH
Al Arabiya Headquarter Building
RECESSED LED PROFILE 1070
4500
1040
4005
6 KS20001-TD-AR- 12-ATR-308
ALUMINUM SHADING DETAIL
GRF-FFL +0
BAR & SEATS DETAILS
GRF-TOS +-100
Project number
Project number
Drawn by Checked by
6
3D SHOT - BAR
BIM ARCHITECT PORTFOLIO
5
3D SHOT - SEATS 2
M.WALY
Scale
28-06-2021
Date Drawn by
M.ABDELSALAM
KS20001-TD-AR- 12-ATR-307
KS20001
ALUMINIUM BASE CAP POLISHED CHROME FINISH
KS20001 28-06-2021
Date
Author Checker
Checked by
2
Section 9 1 : 25
M.A
Checked by
M.WALY
Checked by
1
Project number
KS20001 28-06-2021
Date
5
MARBLE SEATING PLAN 1 : 10
6
MARBLE SEATING SECTION
KS20001-TD-AR- 12-ATR-308
1 : 10
Scale
1 : 20
68
As indicated
R.A HOUSE - CENTRAL PARK NEW CAIRO , Egypt
WALL FINISHES WALL TYPE W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17
EG20012-TD-ID-8-GN-1
1
EG20012-TD-ID-8-GN-2
4
W08
BF
W08
W08
2.55
BF
Revisions
BF
TENDER DETAIL
3.30
0.18 0.90
1.14
1.05
0.80
1.13
BF
4.90
0.28
W18 W-09
DRIVER'S BEDROOM
W09 W09
1.32
W09
2.98
3.01
0.57
3.32
BF
06
BF
12 D05
0.90
0.18
10 D05
0.90
W08
0.56
0.20
0.90
0.56
0.20
0.90
09 D05
1.31
0.90
1.94
W12
BF
W02
-2.350
1.96
W09
For CONSTRUCTION
08 D05
1.10
0.24
2.90
1.25
APRIL 2021
W02 5
W07
EG20012-TD-ID-7-BF-1
10
0.84
EG20012-TD-ID-7-BF-1
No.
W02
0.84
0
1
1.94
Revisions W03
SERVER ROOM 09
TENDER DETA
GUEST TOILET
BF
08
VILLA RAMY SALIB
BF
VILLA RAMY SA
BASEMENT FLOOR FURNITURE LAYOUT
Project number
EG20012
Drawn by
Project number Date
M.ABDELSALAM
Drawn by
M.WALY
Checked by EG20012-TD-ID-1-BF-0
0.66
0.60
1.00
F10
F8
APRIL 2021
F2
BF
0.60
0.60
0.48
F2
F2
F2
F14 F14
F2
F14 F14
For C
F2
F8
A
F10
No. 0
Description APPROVED ISSUE
No.
Date 22/04/2021
1
F3
F18
F5
F5
F5
F5
F5
F5
F5
F5
F14 F14 F3
F18
Revisions
F18
TENDER DETAIL
F03
F18
VILLA RAMY SALIB
F18
F3
F3
Revisions
TEND
F18
VILLA F14
BASEMEN CEIL
BASEMENT FLOORING PLAN
Project number
Project number
EG20012
Date
18/05/2021
Date Drawn by
Drawn by
M.ABDELSALAM
Checked by
M.WALY
Checked by
EG200
EG20012-TD-ID-4-BF-0
1
1
BASEMENT FLOORING PLAN 1 : 50
BIM ARCHITECT PORTFOLIO
Scale
Des
APPROV
AD
08 SP
F14 F14
F14 F14
For CONSTRUCTION
0.11
0.38 0.60
F14 F14
0.60 0.60
0.60
0.60 0.17 0.60
1.00 1.00 1.00
1.04
0.47
1.00
GUEST TOILET
BF
F14
0.60 0.60 0.60
0.60 0.60 0.60
1.00
1.00 1.00
0.86
F8
F5
0.60
09
F10
F5
0.60
SP
F01
0.54
F03 0.60
SERVER ROOM
0.54
BF
0.57
11
F01
1.00
1.80
0.25
0.60
F03
0.45
0.60 0.60 0.60
BF
F18
1.80
0.23
STORAGE
0.57
0.33
10
1.00
0.43
LAUNDRY
SP
-2.250
0.61
POWDER AREA F01 12 BF
F18
F7
0.14
1.00
0.39
1.00
0.87
SP SP
F18
F10
F7
F8
1.01
F14 F14
F14 F14
0.50
1.00
0.43
1.00
-2.350
CORRIDOR F01 13 BF
0.22
1.00
SP
-2.250
0.57
1.00
0.47
1.00 1.00
1.00
1.01
0.87
F14 F14
F8
F7
1.03
1.00
F18
F18
0.58
0.60
SP
BF
0.86
F7
F7
0.38
0.45
F4
0.60
0.60 0.60
0.60 0.17 0.60 0.60 0.18 0.60
0.34
0.18 0.60
0.60 0.60
0.18
0.58
0.58
0.60
0.43 0.60 0.60
0.60 0.60
0.06
0.60 0.60
0.60 0.60
0.60 0.60 0.60
0.60 0.58 1.00
0.58 1.00
0.60 0.60
0.60 0.60 0.60 0.60 0.60
0.60 0.58
0.58
1.00 1.00
F7
F18 F8
F8
0.87
0.60
0.06
0.60 0.60
0.60
1.00 1.00 1.00 1.00 1.00 1.00
0.60
F7
F8
F7
1.00
0.60
F7
0.05
F7
1.00
BF
0.60
F7
F7
0.60
F7
06
0.60
F7
0.04 0.60
F7
F7
F18
BF
F03
F7
0.04 0.60
0.60
F7
0.60
F03
07 0.60
F18
AD
0.60
0.60
F7
0.60
DRIVER'S BATHROOM
F7
0.60
0.04 0.60
0.60
F7
0.48
0.60
F7
13
0.60
F03 0.60
F7
CORRIDOR
0.60 SP
F28
-2.250
DRIVER'S BEDROOM
F7
-2.350
0.30
BF
F7
0.60
F28
F7
0.60
05
SP
F03
F28
F5
0.63
0.60
BF
F28
F14
0.60
04
DRIVER'S LIVING AREA
0.60
MAID'S BATHROOM
F28
F4
0.60
F03 SP
-2.250
F5
0.60
BF
SP
F14
F03
MAID'S BEDROOM 03
0.04
F5
-2.250
BF
0.60
F5
0.60 SP
0.60
F5
F01
0.60
F5
BF
0.60
F5
-2.250
MAIN KITCHEN 02
0.60
F5
01
0.60
F5
RECEPTION
SP
F03
F5
-2.250
F1
0.19
0.14
AD
0.89
0.60
F1
0.60
F1
F1
0.60
F1
F1
F1
0.60
F28
0.60
F28
0.60
Scale
Description BARDIGLIO MARBLE TILES 100*100 CM CALCATTA MARBLE TILES 100*100 CM PORCELAIN TILES 60*60 CM WHITE QUARTZ MARBLE TILES 100*100 CM CHEVRON WOOD FLOORING WOOD PLASTIC COMPOSITE TEAK WOOD FLOORING CALCATTA GOLD MARBLE TILES 100*100 CM NEO CEMENT FLOOR
F28
Type Mark
0.97
1 : 50
FLOOR FINISHES
Scale
F01 F02 F03 F04 F05 F06 F07 F08 F09
UP
EG20012-TD-ID-3-BF
BASEMENT FLOOR DETAILED PLAN 1 : 50
F28
1
F28
BASEMENT FLOOR PLAN 1 : 50
M.A
Checked by
F28
1
BASEMENT FLO DETAILED PLA
18/05/2021
Date
Description APPROVED ISSUE
EG20012-TD-ID-11-GN-0
W12
1.99
0.65
11 D05
04
0.27 1.46
0.30
0.30 1.79
0.99
W09 0.57
0.53
DRIVER'S BATHROOM
MAID'S BATHROOM
W09
1.33
0.18
0.18
0.90
0.90
2.28 1.51
BF W09
1.05
11
08
BF
0.50
09
11
GUEST TOILET
SERVER ROOM
13
BF
W09
0.53
2.21
STORAGE
STORAGE
BF W09
22/04/2021 3.32
BF
2.06
W09
07
0.80
2.98
0.11
1.33
Date
10
0.26
0.92
Description APPROVED ISSUE
LAUNDRY
W02
LAUNDRY 10
W09
2.21
2.88
0
12
1.00
0.80
No.
BF
0.79
EG20012-TD-ID-12-GN-3
1.00
POWDER AREA
W09
1
4.23
APRIL 2021
12
2.00
2.00
For CONSTRUCTION AL16
1.35
BF 06 D03 W09
W04
CORRIDOR
01 D06 POWDER AREA
BF
1.00
13
0.80
0.85
0.10
1.06
W09
13 D05
CORRIDOR
1.36
W04
0.10
W09 DRIVER'S LIVINGW09 AREA 05
0.80
1.64
1.44
1.00
0.56
W09
1.63
EG20012-TD-ID-7-BF-0
1.29
1
0.56
0.85
3.58
RECEPTION
W08
BF
0.67
1.02
01
0.30
RECEPTION
BF
1.00
W09
0.90
04 D03
0.83
3
W09
BF
W09 3.62
1.00 1.00
W09
3
EG20012-TD-ID-7-GR-1
03
W09
BF
0.48
W09 07 D05
MAID'S BEDROOM
MAIN KITCHEN 02
4
1.88
W09
03 D05
0.72
06
EG20012-TD-ID-7-BF-0
0.85
0.85 AL13 1.20
0.20
BF
2 5
DRIVER'S BATHROOM
MAID'S BATHROOM 04
BF
W09
3.95
-2.250
DRIVER'S BEDROOM
BF
07
01
4
5.96
EG20012-TD-ID-9-GN-3
5.98
1.00
BF
1.47
02
05
BF
0.92
1.16
W09
0.36
03
1.00
AL16
DRIVER'S LIVING AREA
MAID'S BEDROOM MAIN KITCHEN
W09
0.30
EG20012-TD-ID-9-GN-3
0.77
03 D05
0.85 AL13 1.20
3.30
W12
1.00
5
05 D05
0.85 AL13 1.20
0.45
1.36
0.69
W09
W09
0.55
3.30
0.91
0.90 0.12
0.45
2.24
0.67
2.12
0.90
0.84
6
EG20012-TD-ID-12-GN-3
0.30
0.77
EG20012-TD-ID-11-GN-1
0.90
0.58
0.58
6.90
1
UP
3.82
02 D05
UP
Desc
FIBER BOARD ACRYLIC CLADDING GYPSUM BOARD CLADDING ALCOBOND CLADDING PORCELAIN TILES 60*60 CM BLACK MIRROR CLADDING CALCATTA MARBLE TILES 100*100 GREY TIRESTA MARBLE TILES 100 NORMAL MIRROR CLADDING OFF WHITE PAINT VEIN MARBLE TILES 100*100 CM WHITE ONYX MARBLE OPEN BOOK WOOD CLADDING WOOD RIBS CREMA MARFIL CRUSHED MARBL CALCATTA MARBLE TILES 100*100 MOSAIC TILES 5 X5 CM DRYMIX PAINT (JOTASHIELD TEX F AS PER APPROVED DRAWINGS DRYMIX OAINT ARMANI GREY CLADDING WOOD CLADDING
BASEMENT REFLECTED CEILING PLAN
1 : 50
Scale
1 : 50
70
WALL FINISHES
EG20012-TD-ID-8-GN-1
FIXED WINDOW
UP
UP
WALL TYPE
2
1.20 AL10 2.35
1
4.00 AL12 2.35
1.20 EG20012-TD-ID-11-GN-1 AL10 2.35
W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17
6
W05
OFFICE
17 GR.
0.56 0.36
1.61
0.66
W12
0.68 0.78
3.64
4.33
W09
18 D01
8
0.46 0.18
LOBBY 20 GR.
19 D01
1.87
W09
W09
0.18
1.61
4.66
1 EG20012-TD-ID-7-GR-1
W09
W09
+0.800
W09
2.50
2.40
W11
APRIL 2021
0.70
1
0.25
W18 W-09
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
EG20012-TD-ID-8-GN-2
W09
0.41
1.10
W09
0.39
21 D04
1.50
3.11
21 GR.
+0.500
For CONSTRUCTION
3.60 AL03 2.35
GLASS HANDRAIL 90 CM
4.27
ENTRANCE LOBBY
21 GR.
6
EG20012-TD-ID-7-GR-0
W09
W12
ENTRANCE LOBBY
10
9
W10
7
0.50
W12
UP
W12
0.60
W02
W12
4
W12 13.57
0.33
3
0.64
0.54
3.90
W12
4
UP
EG20012-TD-ID-7-GR-1
0.56
6 EG20012-TD-ID-12-GN-2 EG20012-TD-ID-8-GN-2
W09
0.36
W05
20 GR.
5
W12
19 GR.
2
EG20012-TD-ID-7-GR-0
3
W10
0.64
2
W12
EG20012-TD-ID-7-GR-0
W09
KITCHEN
19 GR. 0.18
4
W10
16 GR.
LOBBY
1
OFFICE
EG20012-TD-ID-7-GR-0
EG20012-TD-ID-12-GN-2
DINNING ROOM
15 GR.
1
5
+0.800
W05
LIVING ROOM
4.52
18 GR.
W09
3.42
3.60
5.80 AL01 2.75
0.32
GUEST TOILET
0.53
4
0.53
0.96
EG20012-TD-ID-9-GN-3
1.20
W10
0.90
4.01
0.86
18 GR.
15 GR.
W05
0.45
1.00
17 GR.
+0.800
4.36
GUEST TOILET
W05
1.20
1.48
LIVING ROOM
4.35
KITCHEN
16 GR.
6.00
DINNING ROOM
W05
FIRE PLACE AT 30 CM HEIGHT
0.47 0.20
0.86 0.26
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
0.35
17 D05
0.55
0.10
0.93
1.56
0.89
4.33
0.47
W09
4.36
0.30
0.85
0.58
0.32 0.34
0.84
0.33
0.7
0.7 6
2.65
4.00
0.23
0.86
For CONSTRUCTI
W02
22/04/2021
3.23
W09 W09
3.20 AL04 2.75
TENDER DETAIL
1.26
W09
0.50
2.09
W09
1.76
3.60 AL02 2.75
1.20 AL09 2.75
2.00 AL08 2.75
TENDER DET
AL17
1.20 AL09 2.75
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
FIXED GLASS WINDOW
Revisions DOUBLE GLASS SLIDING DOOR ALUMIL M12500
1
VILLA RAMY SALIB
EG20012-TD-ID-8-GN-0
VILLA RAMY S
FIXED GLASS WINDOW
GROUND FLOOR FURNITURE LAYOUT
Project number
GROUND FLO DETAILED PL 2
EG20012
EG20012-TD-ID-10-4
4
Project number
18/05/2021
Date Drawn by
Date
M.ABDELSALAM
Drawn by
M.WALY
Checked by
GROUND FLOOR PLAN
FLOOR FINISHES GROUND FLOOR DETAILED PLAN
1
Type Mark1 : 50
1 : 50
Scale F01 F02 F03 F04 F05 F06 F07 F08 F09
WHITE QURATZ SKIRTING 15 CM
Description
EG20012-TD-ID-3-G
1 : 50
BARDIGLIO MARBLE TILES 100*100 CM CALCATTA MARBLE TILES 100*100 CM PORCELAIN TILES 60*60 CM WHITE QUARTZ MARBLE TILES 100*100 CM CHEVRON WOOD FLOORING WOOD PLASTIC COMPOSITE TEAK WOOD FLOORING CALCATTA GOLD MARBLE TILES 100*100 CM NEO CEMENT FLOOR
Scale
F20
F20
UP
GUEST TOILET
0.39
F7
0.10 F7
0.61 0.10 0.64 F23
0.27
1.39 0.10
5
F5
F5
0.58
AD F21
F30 F5
F21
F5
0.77
0.89
TENDER DETAIL
WHITE QURATZ SKIRTING 15 CM
F3 5
1.00
F5
Revisions
VILLA RAMY SALIB
0.19
1.00
1.74
F4
F5 F4
F5
F4
1.00
1.46
1.82 0.30
F16
F5
F8
F16
F7
F16
F7
F8
F7
0.85
0.30 1.00
F5
F21
1.00
22/04/2021 F3
0.26
Date
F16
Description APPROVED ISSUE
F7
No. 0
F16
0.12
0.79
21 GR.
F20
1.00
F7
1.00
0.31
0.73 F8 F16
F16
F7
1.00
ENTRANCE LOBBY
0.30
F8
F16 F7
F7 F7
F7
F7
F7
F16
0.12
F7
1.56
F7
F7
APRIL 2021
F04 1.00
F7
For CONSTRUCTION
F7
1.00
F7
F7
0.71 0.35 0.89
0.28
WHITE QURATZ SKIRTING 15 CM
F7
0.40
0.10
F7
20 GR.
F7
F16
0.34
0.35
0.12
LOBBY
F5
0.06
F7
4.00
1.00 1.00 1.00
0.58
0.38 0.28
0.77
F7
1.00
F7
F16 0.12 1.00
0.74
0.12
0.10
1.00 1.00 0.44 0.56
0.56
F7
1.00
1.00
F7
0.11 1.00
4.05
F7
1.00
0.10
F7
1.00
1.04
F16
1.00
1.00
1.00
0.71
0.71 1.00 1.00 0.71
0.71
1.00
21 GR.
1.00
0.10
F7
0.51
1.42
0.37
0.52
0.60
0.62
0.10 1.00 1.00 1.00
1.00
0.38
1.00
SP
ENTRANCE LOBBY
1.00
3.77
F4
1.00
0.20
AD
0.71
19 GR. 0.10 0.62 0.180.29 0.10
F8
0.68
2.60
F8
F04
F7
F04
0.27
F21
0.68
F7
AD
F21
BAR WITH WHITE QUARTZ FINISH
OFFICE
F3 F3
0.64
+0.800
WHITE QURATZ SKIRTING 15 CM
+0.500
F7
LOBBY
AD
UP
0.17 0.10 0.71
20 GR.
0.57
0.11
SP
F7
0.73
F3 F3
F8
F8
2.31
F7
0.24
0.35
F7
0.26
1.58
F7
1.00
F3 F3
F7
1.00
17 GR.
F7
1.00
16 GR.
F21
1.00
15 GR.
F21
0.68
KITCHEN
F7
SP
F21
WHITE QURATZ STAIR
DINNING ROOM
F8
F04
SP
LIVING ROOM
F8
F04
F10
F16
F04
F10
19 GR.
0.93
KITCHEN 17 GR.
F10
F8
F04
0.44
F7
F7
BAR WITH PANDA MARBLE FINISH
F7
F8
16 GR.
F7
F7
F21
OFFICE
DINNING ROOM
F8
F7
+0.800
15 GR.
F3 F3
F7
F8 F7
+0.800
F04
LIVING ROOM
18 GR. 0.70
F16
+0.800
F8
18 GR.
0.77
F7
F7
GUEST TOILET 0.24
5.75
F7
0.77
0.44
F7
1.00
0.62
AD
1.00
0.20
AD
1.00
2.60
F21
0.88
0.71
AD
0.17
0.58
WHITE QURATZ SKIRTING 15 CM
GROUND FLOORING PLAN
Project number
EG20012 18/05/2021
Date Drawn by
M.ABDELSALAM
Checked by
1
GROUND FLOORING PLAN
1
M.WALY
GROUND REFLECTED CEILING PLAN
1 : 50
EG20012-TD-ID-4-GR-0
1 : 50
Scale
BIM ARCHITECT PORTFOLIO
M
Checked by
EG20012-TD-ID-1-GR-0
1
Description APPROVED ISSUE
W09
0.29
W09
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
No. 0
4.02
1.14
2.38
Revisions
APRIL 2021
W09
0.54
2.00 AL08 2.75
3 EG20012-TD-ID-11-GN-0
W02
W09
2.64
APPROVED ISSUE
0.37 0.25
0
Date
0.54
Description
W07
W09
1.05
No.
W02
De
FIBER BOARD ACRYLIC CLADD GYPSUM BOARD CLADDING ALCOBOND CLADDING PORCELAIN TILES 60*60 CM BLACK MIRROR CLADDING CALCATTA MARBLE TILES 100*1 GREY TIRESTA MARBLE TILES NORMAL MIRROR CLADDING OFF WHITE PAINT VEIN MARBLE TILES 100*100 CM WHITE ONYX MARBLE OPEN BO WOOD CLADDING WOOD RIBS CREMA MARFIL CRUSHED MAR CALCATTA MARBLE TILES 100*1 MOSAIC TILES 5 X5 CM DRYMIX PAINT (JOTASHIELD TE AS PER APPROVED DRAWINGS DRYMIX OAINT ARMANI GREY CLADDING WOOD CLADDING
1 : 50
71
WALL FINI WALL TYPE
EG20012-TD-ID-8-GN-1
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
FR
29
4
3
2
W06
W08
W08
W06
W06
30 D02
5
30
FR
1.36
1.07
29 D02
W09
0.80
1.35
0.80
0.78
0.80
1.35
0.80
0.78
EG20012-TD-ID-7-FR-0
3
1.86
MASTER BEDROOM 29
W06
28 D03
28
FR
3.60
2
W12
W06
W06
W13
1.56
1.20
1.20
1.50
1
EG20012-TD-ID-8-GN-2
4.66
+4.050
W09
W09
FIRST FLOOR CORRIDOR 33
FR
WOOD CLADDING
W02 W09
0.12
1.10
0.39
2.76
1.25
For CONST
0.86
APRIL
FR
W07 W02
W09
22/04/2021 W09
No.
0.43
3.60
0
2
W09
1.17
0.27
Revisions
0.50
3.68
3.60 AL03 2.35
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
FIXED GLASS WINDOW 1.20 AL10 2.35
3.20 AL05 2.35
TENDER
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
1 DOUBLE GLASS SLIDING DOOR ALUMIL M12500
Descrip
APPROVED ISS
EG20012-TD-ID-11-GN-0
W09
TENDER DETAIL VILLA RAMY SALIB
W06 W09
1.16
28 D03
MASTER DRESSING ROOM
0.59
4
W09
0.90
0.38
3.60 AL03 2.35
5
0.47
1.60
W09
0.59
2.66
1.82
1.45
1.77
0.89
EG20012-TD-ID-7-FR-2
0.71
0.90
W12
1.68
0.90 0.12
27 D01
W09
3
W09
W09
3.00
MASTER BATHROOM
Date
UP
4 3
0.42
4
1.59
0.58
GLASS HANDRAIL 90 CM
Revisions
2
EG20012-TD-ID-7-FR-4
3.76
31 D03
EG20012-TD-ID-7-FR-1
TEAK WOOD PANELS
FR
W09 2.82
3.19
5
2.21
30
MASTER BEDROOM
0.60
25 D01
FIBER BOARD AC GYPSUM BOARD ALCOBOND CLAD PORCELAIN TILES BLACK MIRROR C CALCATTA MARBL GREY TIRESTA M NORMAL MIRROR OFF WHITE PAINT VEIN MARBLE TIL WHITE ONYX MAR WOOD CLADDING WOOD RIBS CREMA MARFIL C CALCATTA MARBL MOSAIC TILES 5 X DRYMIX PAINT (JO AS PER APPROVE DRYMIX OAINT ARMANI GREY CL WOOD CLADDING
W18 W-09
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
FR
3.63
MASTER BATHROOM
Description APPROVED ISSUE
0.70
W09
0.55
APRIL 2021
No.
0.60
0.62
0.68
W09
ANDRE'S BEDROOM
4.35
For CONSTRUCTION
0.80
2
32 D03
5.36
W09
W06 0.74
W06
0
0.99
1.54
1.12
0.37 W06 0.80 0.69
W06
FR
0.70
0.61
0.80
0.17
0.45
FR
UP
28
0.60
4.35
32
MASTER DRESSING ROOM
W12 0.70
0.85
TOILET 2
FR
W02
0.56
4
EG20012-TD-ID-8-GN-2
TOILET 2 32
W09
FR
0.80
1.20
W12
W09
5.96
31
FR
1
W12
4.74
W15
0.58
0.41
2.30 10.73
0.47
27
FR
2.12
33
1.40 0.22
W09
26 D03
0.99
0.29
W09 2.30
W09
W09
3
27
0.62
0.14
24 D01
F08
2
EG20012-TD-ID-7-FR-3
1.24
0.64
0.95
FIRST FLOOR CORRIDOR
1.60
FR
1.60
22
FR
0.57
31
0.98
TOILET 1
22 D01
TOILET 1
ANDRE'S BEDROOM
4
0.14 0.99 0.13
0.59
0.62
3
0.97
ALIEN'S BEDROOM
2.69
2.69
1.29
1.20 AL10 2.35
0.59
1.95
W09
4.24
2.98
0.80
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
W15
W15
2
EG20012-TD-ID-7-FR-5
1.20
W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17
5
W09
W15
0.99
SP
23 D03 0.61
4
5.80 AL01 2.35
W09
W09
1.20 AL10 2.35
W15
0.22
FR
W09
10
FR
0.86
0.37
0.90
26
0.47
0.14
FR
1.48
0.29
25
FR
0.74
11 W15
0.22
24
0.45
0.14
FR
1.09
W09
EG20012-TD-ID-7-FR-3
W15
5
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
ANDRE'S BATHROOM
12
2.66
W02
FR
0.69
9
0.90
ALIEN'S BATHROOM 23
ANDRE'S DRESSING ROOM
1.20
W15
W12
ALIEN'S BEDROOM 22
0.81
0.88
W01
2.66
2.92
W09
26
0.56
1.20 AL10 2.35
1.20
ALIEN'S DRESSING ROOM
1
FR
ANDRE'S BATHROOM
2.66
23
1.20 AL10 2.35
0.24
ALIEN'S DRESSING ANDRE'S DRESSING ROOM ROOM 5 24 FR EG20012-TD-ID-7-FR-4 25 FR
ALIEN'S BATHROOM
4.24
FIXED GLASS WINDOW
AL17
EG20012-TD-ID-8-GN-0
VILLA RAM
3 EG20012-TD-ID-9-GN-3
3.60 AL03 2.35
FIRST FLOOR PLA
FIRST FLOOR FURNITURE LAYOUT
Project number
Project number
EG20012
Drawn by
1
Scale FLOOR Type Mark
BARDIGLIO MARBLE TILES 100*100 CM CALCATTA MARBLE TILES 100*100 CM PORCELAIN TILES 60*60 CM WHITE QUARTZ MARBLE TILES 100*100 CM CHEVRON WOOD FLOORING WOOD PLASTIC COMPOSITE TEAK WOOD FLOORING CALCATTA GOLD MARBLE TILES 100*100 CM NEO CEMENT FLOOR
ALIEN'S DRESSING ROOM 24
ANDRE'S DRESSING ROOM
FR
25
ANDRE'S BATHROOM
FR
26
FR
0.73
+4.050 F3 F3
0.73
+4.050
ANDRE'S DRESSING ROOM
Scale
1 : 50
FINISHES Description
F01 F02 F03 F04 F05 F06 F07 F08 F09
+4.050
EG20012-TD
1 : 50
1 : 50
ALIEN'S DRESSING ROOM
Checked by
M.WALY
FIRST FLOOR DETAILED PLAN EG20012-TD-ID-1-FR-0
1
+4.050
Drawn by
M.ABDELSALAM
Checked by
FIRST FLOOR PLAN
Date
18/05/2021
Date
AD
ALIEN'S BATHROOM
+4.050
ALIEN'S BEDROOM FR CALCATTA MARBLE THRESHOLD
CALCATTA MARBLE THRESHOLD
F7
ANDRE'S BEDROOM 27
23
F3 F3
FR
F16
F16
F16
F16
F17
22
F3 F3
FR
F3 F3
F3 F3
F16
31
FIRST FLOOR CORRIDOR F3 F3
FR
0.39
F17
F01
FR
F16
F16
F2
1.00
APRIL 2021
0.05
FR
No.
Description
0
APPROVED ISSUE
Date 22/04/2021
MASTER BATHROOM 30 F25F25
F05
F16
F16
F16
F16
F16
F16
F16
33
F2
F2
For CONSTR
FR
APRIL 2
AD
1.00
F25F25
1.00 1.00
0.71
1.00
FR
F16
F16
F16
F16
F5
F5
F5
F5
F5
F5
F5
F5
No.
Descrip
1
APPROVED ISSU
F25F25 F3
F17
1.00
F17
F17
28
1.00
F17
F17
FR F05
MASTER DRESSING ROOM
0.45
F2
FIRST FLOOR CORRIDOR
F17
F16
TEAK WOOD FLOORING
Revisions
Revisions F3
F07
F2
F2
F17
F17
For CONSTRUCTION F25F25
MASTER BEDROOM 29
F2
F3 F3
+4.050 +4.050
+4.050
F2
TENDER DETAIL VILLA RAMY SALIB
MASTER BEDROOM F3 F3
29
FR
F3 F3
MASTER DRESSING ROOM 28
F5
33 CEMENT FLOOR THRESHOLD
F17
FR
F17
30
FR
F17
F09
32
1.00
MASTER BATHROOM
0.05
F3 F3
F3
F3 F3
+4.050
FIRST FLOOR CORRIDOR
F25
UP
FR
F16
F3 F3
F3 F3
31
0.75
TOILET 1
FR
F3
FR
AD
32
F17
F25
TOILET 2
F3
TOILET 2
FR
F16
F36
33
F16
F16
0.80
F3 F3
F16
0.77
F16
1.00
27
F7
1.00
TOILET 1
F01
0.82
1.00
F7
1.00
F7
1.00
0.82
0.82
1.00
F7
1.00 GREY TIRESTA THRESHOLD
F7
1.00
F16
ANDRE'S BEDROOM F17
F7
1.00
F3 F3
FR F05
1.00
SP
F17
ALIEN'S BEDROOM
TENDER
F5
F05
F7
F7
F17
22
F7
F17
SP
F3
1.00
FR
F08
F16
26 0.71
F17
FR
F05
F17
25
F16
FR
F05
0.76
F3
1.00
F16
F3 F3
1.00
F16
AD
24
F08 SP
ANDRE'S BATHROOM F3 F3
+4.050
FR
F3 F3
23
1.00
F25
ALIEN'S BATHROOM
VILLA RAM
FR
FIRST REF CEILING
FIRST FLOORING PLAN
Project number
Project number
EG20012 Date
18/05/2021
Date
Drawn by
Drawn by
M.ABDELSALAM Checked by
Checked by
M.WALY
EG20012-TD-I
1
FIRST FLOORING PLAN
1
1 : 50
Scale
BIM ARCHITECT PORTFOLIO
EG20012-TD-ID-4-FR-0
FIRST REFLECTED CEILING PLAN
1 : 50
Scale
1 : 50
72
WALL FINISH WALL TYPE W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17
EG20012-TD-ID-8-GN-1
1
1.07
16.09
3.15
FIBER BOARD ACRYLIC GYPSUM BOARD CLAD ALCOBOND CLADDING PORCELAIN TILES 60*6 BLACK MIRROR CLADD CALCATTA MARBLE TIL GREY TIRESTA MARBL NORMAL MIRROR CLAD OFF WHITE PAINT VEIN MARBLE TILES 10 WHITE ONYX MARBLE WOOD CLADDING WOOD RIBS CREMA MARFIL CRUSH CALCATTA MARBLE TIL MOSAIC TILES 5 X5 CM DRYMIX PAINT (JOTAS AS PER APPROVED DR DRYMIX OAINT ARMANI GREY CLADDI WOOD CLADDING
W18 W-09
3.65
36
+7.340
ROOF 36
RF
1
BATHROOM
EG20012-TD-ID-12-GN-1
35
RF
1.20 AL10 2.35
6
RF
EG20012-TD-ID-7-RF-0
5.03
4.20
0.80
2.21
1.20
0.80
2.21
1.20
1.39
2 EG20012-TD-ID-12-GN-1
ROOF
5.15
4.98
2.19
5.94
2.19
1.07
10
ROOF LOBBY 37
7
APRIL 2021
0
Description
Date
APPROVED ISSUE
W13 1
22/04/2021
4 1.00
1.00 AL11 2.20
For CONSTRU
EG20012-TD-ID-7-RF-0
1.10
0.39
2.76
1.25
2.78
No. 0
Descriptio
APPROVED ISSUE
2
W12
3
0.60
APRIL 202 0.12
RF
0.86
BEDROOM
1.71
No.
W12
W09
7.07
RF
W09
34
BEDROOM
1.60 AL14 1.45
0.16
1.18
1.00
1.00 AL11 2.20
For CONSTRUCTION
1.36
0.18
2.95
1.71
RF
RF +7.200
2.62
ROOF LOBBY 37
34
EG20012-TD-ID-7-RF-0
3.51
8
W06
+8.014
1.20
RF
W06
2.49
6.60
35
2.27
1.35
0.13
W09 1.82
1.79
BATHROOM
W06
1.60
9
1.67
1.25
2.62
1.79
3 EG20012-TD-ID-12-GN-1 13.80
4
0.80
0.45 EG20012-TD-ID-8-GN-2
3.60
Revisions
0.27
Revisions
TENDER D 1.15
TENDER DETAIL 8.96
3.60 AL06 2.20
0.27
VILLA RAMY SALIB
VILLA RAMY
5 1
EG20012-TD-ID-7-RF-0
AL17
EG20012-TD-ID-8-GN-0
ROOF FLOOR D PLAN
ROOF FLOOR FURNITURE LAYOUT
Project number Project number
EG20012
Drawn by
Checked by
M.WALY
EG20012-TD-ID
ROOF FLOOR DETAILED PLAN
1
ROOF FLOOR PLAN
Drawn by
M.ABDELSALAM
Checked by
EG20012-TD-ID-1-RF-0 1 : 50
1 : 50
1 : 50Description
Type Mark
0.05
F01 F02 F03 F04 F05 F06 F07 F08 F09
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.12
GRAVEL FLOORING
1.00
0.96
1.28
BARDIGLIO MARBLE TILES 100*100 CM CALCATTA MARBLE TILES 100*100 CM PORCELAIN TILES 60*60 CM WHITE QUARTZ MARBLE TILES 100*100 CM CHEVRON WOOD FLOORING WOOD PLASTIC COMPOSITE TEAK WOOD FLOORING CALCATTA GOLD MARBLE TILES 100*100 CM NEO CEMENT FLOOR
W.P.C FLOORING
3.65
1.00
5.62
1.79
1.00
BATHROOM
6.04
1.00
0.98
1.00
1.00
Scale
FLOOR FINISHES
Scale
35
RF
2.62
1.67
5.15
1.00
1.00
C-01
37
ARMANI GREY MARBLE
0.30
1.39
3.81
1.00
1.00
BEDROOM
SP
2.79
ROOF LOBBY
RF
37
1.00
1.00
SP
+8.014
RF +7.200
For CONSTRUCTION
For C
0.9 8
APRIL 2021
2.53
0.8
8
1.00
1.00
RF
0.30
35
1.00
1.00
1.00
0.69
34
C-01
3.51
1.00
0.86
BATHROOM
2.59
3.68
0.60
1.00
0.45
SP
4.00
6.39
1.61
+7.340
2.37
RF C-01
1.00
4.18
1.00
ROOF LOBBY
3.44
1
Date
18/05/2021
Date
34
RF
0.48
1.00
BEDROOM 1.00
1.00
1.00
1.00
1.00
0.70
2.78
No.
Description APPROVED ISSUE
Date
No.
22/04/2021
0
De
APPROV
1.00
7.19
0
1.00
Revisions
0.40
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
VILLA
ROOF FLOORING PLAN
ROOF C
0.27
Project number
EG20012
Drawn by
Drawn by
M.WALY
Checked by
EG20012-TD-ID-4-RF-0
1
1 : 50
Scale
BIM ARCHITECT PORTFOLIO
Date
M.ABDELSALAM
Checked by
ROOF FLOORING PLAN
Project number
18/05/2021
Date
1
TEND
VILLA RAMY SALIB
0.77
0.75 0.96
Revisions
TENDER DETAIL
EG20
ROOF FLOOR PLAN
1 : 50
1 : 50
Scale
73
1
8
2
2.20
WOOD CLADDING BARDIGLIO MARBLE TILES 100*100 CM
BARDIGLIO MARBLE TILES 100*100 CM
0.05 0.05
0.10
GR +0.00
WOOD CLADDING WOODEN DOOR 80*220 CM
BARDIGLIO MARBLE TILES 100*100 CM
BARDIGLIO MARBLE TILES 100*100 CM
SAINT LAUREN SINK UNIT
0.05
GR +0.00
GYPSUM BOARD CEILING
0.05
0.05
GR +0.00
WOOD CLADDING
CLEAR MIRROR CLADDING WITH 2 LED PROFILES
2.30
WOODEN DOOR 80*220 CM
WOOD CLADDING
GR +0.00
GYPSUM BOARD CEILING
1 : 50
2.20
WOODEN DOOR 80*220 CM
1.40
1 : 50
GR +0.00
ID-BF-BASEMENT POWDER AREA-B
7
1 : 50
0.05
GR GYPSUM BOARD +0.00 CEILING
ID-BF-BASEMENT POWDER AREA-A
6
2.30
1.15
BARDIGLIO MARBLE TILES 100*100 CM
2.30
LS +0.00
2.30
0.05
LS +0.00
ID-BF-BASEMENT TOILET-B 1 : 50
0.90
1
GYPSUM BOARD CEILING
RECEPTION -BF- 3D
2
0.10
6
BASEMENT FLOOR - RECEPTION- Callout
ID-BF-BASEMENT TOILET-A 1 : 50
0.05
1
GR +0.00
0.45
BARDIGLIO MARBLE TILES 100*100 CM
0.54 0.17
1.15
ALCOBOND CLADDING
BARDIGLIO MARBLE TILES 100*100 CM
WOOD CLADDING
0.45
0.70
BARDIGLIO MARBLE TILES 100*100 CM
GR +0.00
GYPSUM BOARD CEILING
GR +0.00
WOOD CLADDING
WOODEN DOOR 80*220 CM
SAINT LAUREN SINK UNIT
GR +0.00
GYPSUM BOARD CEILING
0.51 0.30 0.50
WOOD CLADDING
0.30
2.30
0.30
SAINT LAUREN SINK
GR +0.00
2.20
CLEAR MIRROR CLADDING
GR +0.00
0.54 0.17
GYPSUM BOARD CEILING
WOOD CLADDING
1.39
BF
GR +0.00
2.30
GR +0.00
LED PROFILE
0.21
01
0.05
GYPSUM BOARD CEILING
0.05
4
6
7
BF
FLOOR-GUEST TOILET -Callout 10 1BASEMENT : 25
1 : 25
3
RECEPTION
BF
BASEMENT FLOOR -POWDER AREA - Callout
5
EG20012-TD-ID-7-BF-0
08
0.10
2 5
EG20012-TD-ID-7-BF-1
GUEST TOILET
POWDER AREA 12
0.51
9
EG20012-TD-ID-7-BF-1
0.30
4 3
For CONSTRUCTION
For CONSTRUC
APRIL 2021
1.19
CLEAR MIRROR CLADDING
0.10
1.19 0.10
2.22
GYPSUM BOARD CLADDING
GYPSUM BOARD CLADDING WITH GROOVES WOODEN DOUBLE DOOR 200*220 CM
GROOVE 2 CM WIDTH
CLEAR MIRROR CLADDING
BARDIGLIUO MARBLE TILES 100*100 CM
BAR WITH SAINT LAUREN MARBLE BF FINISH AS THE RELEVANT DETAIL +-2.35
3 EG20012-TD-ID-12-GN-3
BF +-2.35
BLACK WOOD EN SHELVES WITH INDIRECT LIGHT
No.
Description
0
APPROVED ISSUE
5
BF +-2.35
EG20012-TD-ID-12-GN-0
LS +0.00
BARDIGLIUO MARBLE TILES 100*100 CM BF +-2.35
BF +-2.35
Project number
0.10
CLEAR MIRROR CLADDING
4
1 : 50
Descriptio APPROVED ISSUE
Revisions
TENDER DE
VILLA RAMY
BASEMENT IN ELEVATIO
EG20012
Project number BAR WITH SAINT LAUREN MARBLE FINISH
18/05/2021
Date
Date
BF +-2.35
Drawn by
M.ABDELSALAM
Checked by
2
No. 0
BASEMENT INTERNAL ELEVATIONS
LS +0.00
GROOVE 2 CM WIDTH
ID-BF-RECEPTION-A
1 : 50
1.19
GYPSUM BOARD CLADDING
OFF WHITE PAINT FINISH
1 : 50
22/04/2021
VILLA RAMY SALIB
1.00
INDIRECT LIGHT ALUM. WINDOW BARDIGLIUO MARBLE TILES 100*100 CM
GYPSUM BOARD CEILING
WOODEN UNITS
2.30
BLACK WOODEN SHELVES
1 : 50
ID-BF-BASEMENT POWDER AREA-D
9
12
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
GYPSUM BOARD CEILING
ID-BF-BASEMENT POWDER AREA-C
8
0.05
0.05 0.35 0.40 0.30 0.40 0.30 0.46
GYPSUM BOARD CEILING
1 : 50
ID-BF-BASEMENT TOILET-D
Revisions
ID-BF-RECEPTION-D
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
LS +0.00
0.05
LS +0.00
4
ALUM. WINDOW BF +-2.35
1 : 50
12 EG20012-TD-ID-12-GN-0
Date
ID-BF-BASEMENT TOILET-C
TENDER DETAIL
0.05
ID-BF-RECEPTION-B 1 : 50
3
OFF WHITE PAINT FINISH
INDIRECT LIGHT
3
APRIL 2021
LS +0.00 0.02 0.02 0.02 0.02 0.35 0.40 0.30 0.40 0.30 0.46
BF +-2.35
1.00
BARDIGLIUO MARBLE TILES 100*100 CM
2.25
INDIRECT LIGHT
0.05
BLACK WOODEN SHELVES WITH INDIRECT LIGHT
LS +0.00
GYPSUM BOARD CEILING
OFF WHITE PAINT FINISH
2.30
LS +0.00
1.00
LS +0.00 0.35 0.40 0.30 0.40 0.30 0.46
GYPSUM BOARD CEILING
ID-BF-RECEPTION-C
EG20012-TD-ID-7-BF-0
1 : 50
Drawn by
M.WALY
14 .........
13 POWDER AREA 3D
11 BASEMENT TOILET 3D
12 BASEMENT TOILET 3D Copy 1
Checked by
EG20012-TD-ID-
1 : 50
Scale
Scale
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
0.15
FIRE PLACE AT 30 CM HEIGHT
GR. +0.70
WHITE QUARTZ SKIRTING 15 CM
ID-GR-GUEST BATHROOM-C
5
ID-GR-GUEST BATHRROM-D 1 : 50
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL FR +3.95
0.81
ID-GR-OFFICE CALLOUT-D
GR. +0.70 WHITE QUARTZ SKIRTING 15 CM
6
Revisions
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
BIM ARCHITECT PORTFOLIO
Scale
INDIRECT LIGHT
0.40
0.05
0.25 2.20 0.40 0.05 2.45
VILLA RAMY SALIB
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
0.40 0.80
2.75
0.02 0.80 0.02
0.05 0.81
0.40
0.00
0.05 1.75
2.75
0.10
GR. +0.70
BLACK MIRROR CLADDING
GROUND INTERNAL ELEVATIONS
WOOD CLADDING GYPSUM BOARD CLADDING FIRE PLACE AT 30 CM HEIGHT
GR. +0.70
WHITE QUARTZ MARBLE TILES 100*100 CM
Project number
EG20012 18/05/2021
Date Drawn by
M.ABDELSALAM M.WALY
Checked by
M.WALY
1 : 50
7
GROUND RECEPTION 02 3D
Date 22/04/2021
FR +3.95
0.89
BAR WITH WHITE QUARTZ FINISH
EG20012-TD-ID-7-GR-0
14 OFFICE 3D Copy 1
Description APPROVED ISSUE
TENDER DETAIL 12
WHITE ONYX OPEN BOOK MARBLE CLADDING
M.ABDELSALAM
Checked by
No. 0
GR. +0.70
EG20012-TD-ID-12-GN-0
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
18/05/2021
Drawn by
WHITE QUARTZ MARBLE TILES 100*100 CM
1 : 50
GYPSUM BOARD CEILING
EG20012
APRIL 2021
Elevation 1 - c
GYPSUM BOARD CLADDING
Date
For CONSTRUCTION
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
Revisions
4
FR +3.95
Project number
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
GROUND RECEPTION 3D
GROUND INTERNAL ELEVATIONS
13 OFFICE 3D
0.40 0.81
0.05
0.29 0.40
0.40
GROOVE 1 CM
22/04/2021
0.02 0.80 0.02
Date
2.00
Description APPROVED ISSUE
WOOD CLADDING
0.80
0
2.29
OFF WHITE PAINT FINISH
0.15 0.01
GLASS GR. HANDRAIL +0.70
1 : 50
No.
1.00
2.35
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
FR +3.95
0.15
1.18 0.02 1.25
WHITE QUARTZ MARBLE TILES 100*100 CM
Elevation 1 - b
GYPSUM BOARD CEILING
APRIL 2021
VILLA RAMY SALIB
12 GUEST TOILET 3D Copy 1
0.10
GR +0.00
1 : 50
0.05
0.40
For CONSTRUCTION
TENDER DETAIL
11 GUEST TOILET 3D
1.45
0.40
GR. WHITE QUARTZ MARBLE +0.70 TILES 100*100 CM
GROOVE 1 CM
3
WOOD CLADDING
GR. GR. +0.70 +0.70
9
+0.500
FR +3.95
0.05
OFF WHITE PAINT FINISH
2.45
+0.800
OFF WHITE PAINT FINISH
FIXED GLASS PANEL 120*260 CM
ID-GR-OFFICE CALLOUT-B 1 : 50
FR +3.95
GYPSUM BOARD CEILING
1.18
0.40 0.05
0.15 0.01
2.45
2.45
WOOD CLADDING
GR +0.00
7
0.40
0.40
GYPSUM BOARD CEILING
GR. +0.70 WHITE QUARTZ SKIRTING 15 CM
WHITE WOOD GR. +0.70 UNIT
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
FR +3.95
0.400.17
2.29
0.05
12 EG20012-TD-ID-12-GN-0
FR +3.95
0.05
0.40
0.40 0.40
0.00 0.02 1.00
1 : 50
WOODEN DOOR 90*220 CM
GLASS HANDRAIL
2.45
1.00
ID-GR-OFFICE CALLOUT-C 1 : 50
GROUND FLOOR AREA - Callout
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
1 : 100
0.30
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
WHITE QUARTZ MARBLE TILES 100*100 CM GR. +0.70 +0.70
0.02
0.02 0.30
WHITE WOOD UNIT
0.020.45
0.40 0.02 0.40 0.02
1.00
CLEAR MIRROR CLADDING
EG20012-TD-ID-8-GN-0
1
WOOD CLADDING
0.30
WHITE QUARTZ MARBLE TILES 100*100 CM GR. +0.70
8
CLEAR MIRROR CLADDING
0.30
2.45 0.40 0.40
0.02 0.40
WOODEN UNIT
WOODEN DOOR 90*220 CM
GR. +0.70
OFF WHITE PAINT
FR +3.95
0.02
SP
0.60 0.20
0.33
WHITE QUARTZ MARBLE TILES 100*100 CM GR. GR. +0.70 +0.70
BLACK WOOD SHELVES
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
OFF WHITE PAINT FINISH FIXED WINDOW 120 *250 CM
CLEAR MIRROR
CALCATTA SINK
1 : 50
1.65
1.52
GALSS PARTITION
1.95
INDIRECT LIGHT
0.60
2.35 0.20 0.60
0.04 0.20
2.20
4
SP
0.30 0.26
WHITE QUARTZ MARBLE TILES 100*100 CM GR. +0.70
FIXED WINDOW 120 *250 CM
0.50
.00
0.10
ø1
.00
CLEAR MIRROR CALCATTA SINK
GYPSUM BOARD CEILING
WOOD VEIN MARBLE TILES 100*100 CM
1 FR +3.95
GYPSUM BOARD CEILING BLACK WOOD SHELVES
ID-GR-OFFICE CALLOUT-A 1 : 50
FR +3.95 GYPSUM BOARD CEILING
1.65
ø1
1.65
WOOD VEIN MARBLE TILES 100*100 CM
0.05
0.25
GYPSUM BOARD CEILING
6
0.40
FR +3.95
0.40
FR +3.95
ID-GR-GUEST BATHROOM-B 1 : 50
0.25
3
0.05
ID-GR-GUEST BATHROOM-A 1 : 50
WHITE QUARTZ MARBLE TILES 100*100 CM
2.45
GR. +0.70
2.20
SP
0.05
2.20
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
0.73
WHITE QUARTZ MARBLE TILES 100*100 CM GR. GR. +0.70 +0.70
GR. +0.70
2
12 EG20012-TD-ID-12-GN-0
0.40 1.52
0.05
0.25
GRROVE 1 CM
+0.800 SP
OFF WHITE PAINT FINISH
0.20
2.20
0.60 0.20
GROOVE 2 CM WHITE QUARTZ MARBLE TILES 100*100 CM GR. +0.70
GYPSUM BOARD CEILING
WOODEN DOOR 90*220 CM
2.45
FIXED WINDOW 120*250 CM
FR +3.95
0.02
0.25
1.65
WOOD VEIN MARBLE TILES 100*100 CM
EG20012-TD-ID-12-GN-0
FR +3.95
0.30
GYPSUM BOARD CEILING
0.05
GYPSUM BOARD CEILING
FR +3.95
Elevation 1 - a
2
0.30
FR +3.95
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL FR +3.95
12
0.40
FR +3.95
0.40
FR +3.95
WOOD VEIN MARBLE TILES 100*100 CM
FLOOR -OFFICE- Callout 10 1GROUND : 50 SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
BAR WITH PANDA GR. MARBLE FINISH AS THE +0.70 RELEVANT DETAIL WHITE QUARTZ MARBLE TILES 100*100 CM
GROOVE 1 CM
0.01
GROUND FLOOR-GUEST TOILET- Callout 1 : 50
0.05
1
OFF WHITE PAINT FINISH
BLACK MIRROR CLADDING
0.90
4
4
1.10
GYPSUM BOARD CLADDING
1.18
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
1.10
EG20012-TD-ID-8-GN-2
19 GR.
0.40
BLACK MIRROR CLADDING
3
0.29 0.40
EG20012-TD-ID-7-GR-1
OFFICE
0.02 0.80 0.02
5
FR +3.95
2.46
2
6
7
FR +3.95
GYPSUM BOARD CEILING
0.80
EG20012-TD-ID-7-GR-0
17 GR.
0.81
8
2
3
KITCHEN
16 GR.
0.02 0.80 0.02
EG20012-TD-ID-7-GR-0
DINNING ROOM
15 GR.
0.80
4
LIVING ROOM
2.29
9
5
2.45
18 GR.
0.01
GUEST TOILET
5
EG20012-TD-ID-7-GR-1
Elevation 1 - d 1 : 50
Scale
74
As indicated
A
6 SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
EG20012-TD-ID-7-FR-0
0.55
EG20012-TD-ID-7-FR-1
9
EG20012-TD-ID-7-FR-1
3
4 6
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
2.35
2.35
2.35
10
7
EG20012-TD-ID-7-FR-1
2 5
1.33 0.02
FR +3.95
8
OFF WHITE PAINT FINISH
CHEVRON WOODEN FLOORING
FR +3.95
3
PUSH TO OPEN WOODEN PANELS
OFF WHITE PAINT FINISH
1.00
CHEVRON WOODEN FLOORING
4
GYPSUM BOARD CEILING
0.05
0.15
5
2.20
PUSH TO OPEN WOODEN PANELS
-
-
-
RF +7.10
0.05
GYPSUM BOARD CEILING
WOODEN SLIDING DOOR 180*220 CM
2
RF +7.10
-
0.40
RF +7.10
0.40
RF +7.10
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
12 EG20012-TD-ID-12-GN-0
-
GROOVE 1 CM
FR +3.95
FR +3.95
32
MASTER BATHROOM 30
8
-
-
TOILET 2
-
FR
EG20012-TD-ID-7-FR-1
9
7
TOILET 1 31
FR
FR
0.59
ID-FR-MASTER BEDROOM-A
2
3
1 : 50
ID-FR-MASTER BEDROOM-B 1 : 50
FIRST FLOOR PLAN - MASTER BATHROOM 10 Callout 1 1 : 25 MASTER BEDROOM
VILLA RAMY SALIB
0.05
0.35 1.00
For CONSTRUCTION
FR +3.95
1.00
0.05
FR +3.95
9
1 : 50
0.40 1.00
NEOCEMENT FLOORING
1 : 50
0
TENDER DETAIL
Elevation 2 - c
VILLA RAMY SALIB
1 : 50
FIRST INTERNAL ELEVATIONS
Project number
EG20012
Drawn by
Drawn by
M.ABDELSALAM
MASTER BEDROOM 3D
MASTER BEDROOM 3D Copy 1
7
11 MASTER BATHROOM 3D
1 : 50
Scale
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
M.WALY
EG20012-TD-ID-7-FR-1
EG20012-TD-ID-7-FR-0
6
M.ABDELSALAM
Checked by
M.WALY
Checked by
EG20012 18/05/2021
Date
18/05/2021
Date
12 MASTER BATHROOM 3D Copy 1
13 MASTER BATHROOM TOILET 3D
14 MASTER BATHROOM TOILET 3D 01
As indicated
Scale
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
RF +7.10
2
0.05 0.15
9 OFF WHITE PAINT FINISH
12
EG20012-TD-ID-7-FR-3
2
FR +3.95
26
BLACK WOOD UNIT
EG20012-TD-ID-7-FR-3
0.60
10
11
ALIEN'S BATHROOM
ANDRE'S BATHROOM 3
FR +3.95
ID-FR-ANDRE'S BEDROOM-A
4
WOOD CLADDING
CHEVRON WOODEN FLOORING
23
FR
FR
ID-FR-ANDRE'S BEDROOM-B
3
1 : 50
5
1.75 2.20
0.47
0.20
0.40 0.18
INDIRECT LIGHT LACQUERED WOOD UNIT FR +3.95
WOODEN DOOR 90*220 CM
LACQUERED WOOD UNIT
0.60
FR +3.95
WOODEN DOOR 90*220 CM
0.60
0.60
CHEVRON WOODEN FLOORING
WOODEN RIBS 3*3CM
0.40
0.05
GYPSUM BOARD CEILING
1.75
0.02 0.02 0.02 0.02 0.02
0.44
0.30 0.30 0.30 0.30
CALCATTA MARBLE CLADDING
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
RF +7.10 0.40
RF +7.10 0.40
RF +7.10 GYPSUM BOARD CEILING
1 : 50
FIRST FLOOR PLAN -ANDRE'S BEDROOM 1 BATHROOM - CALLOUT 1 : 50
FIXED WINDOW 120*250 CM
FIRST FLOOR PLAN - ALIEN'S BEDROOM 8 BATHROOMCALLOUT 1 : 50
4 5
Revisions
4
1 : 50
CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95
FR +3.95
ID-FR-ANDRE'S BEDROOM- BATHROOM-C
9
5
ID-FR-BEDROOM2 BATHROOM-A
0.40
0.35
2.35
GLASS PARTITION
1.00
CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95
FR +3.95
SP
0.54 0.17
1.00
FIXED WINDOW 120*250 CM
0.50
2.35
1.00
1.00
1.15
0.05
0.35
0.40
0.00
0.05
2.35
2.35
1.13 0.52 0.20 0.50
RF +7.10
SP
FR +3.95
BATHROOM-B 10 1ID-FR-BEDROOM2 : 50
1 : 50
For CONSTRUCTION
ID-FR-ANDRE'S BEDROOM-BATHROOM-D 1 : 50
FR +3.95
WOODEN SHELF CALCATTA MARBLE TILES 100*100 CM
FR +3.95
BATHROOM-C 11 1ID-FR-BEDROOM2 : 50
CALCATTA GOLD MARBLE CLADDING
WOODEN DRAWERS
APRIL 2021
0.05 0.000.40
0.50
0.35
0.40
ROUND MIRROR WITH INDIRECT LIGHT
FIXED WINDOW 120*250 CM
No.
Description
0
APPROVED ISSUE
Date 22/04/2021
2.35
2.35
WOODEN SHELF FR +3.95
WOODEN DRAWERS
RF +7.10
1.00
0.35
ROUND MIRROR WITH INDIRECT LIGHT CALCATTA MARBLE CLADDING
1.00
SLIDING WOODEN DOOR 80*220 CM
0.05 0.15
0.40
GLASS PARTITION
RF +7.10 GYPSUM BOARD CEILING
GYPSUM BOARD CEILING
0.05
RF +7.10
2.35
RF +7.10
0.05
0.40
RF +7.10
WOODEN SHELF CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95
1.00
CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95
CALCATTA GOLD MARBLE CLADDING
CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95
ALCOBOND CLADDING
CALCATTA GOLD MARBLE CLADDING
FIXED WINDOW 120*250 CM
WOODEN SHELF
1.00
22/04/2021
GLASS PARTITION ALCOBOND CLADDING
CALCATTA GOLD MARBLE CLADDING
WOODEN DRAWERS
FR +3.95
RF +7.10 GYPSUM BOARD CEILING
EG20012-TD-ID-12-GN-0
RF +7.10
GYPSUM BOARD CEILING
RF +7.10
ROUND MIRROR WITH INDIRECT LIGHT
12
0.25 0.25
APPROVED ISSUE
CALCATTA GOLD MARBLE CLADDING
Date
2.35
0
Description
2.20
No.
0.15
APRIL 2021
ALCOBOND CLADDING
1 : 50
RF +7.10
0.00
RF +7.10
For CONSTRUCTION
CALCATTA GOLD MARBLE CLADDING
ID-FR-ANDRE'S BEDROOM- BATHROOM-B SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
RF +7.10 GYPSUM BOARD CEILING
2.20
3
0.05 0.40
0.40 0.05 1.56
2.20
2.20
0.20
0.10
1 : 50
SP
0.25 0.10 0.250.20
0.40 1.20 0.05
0.40 0.05 2.35
0.15 0.40
FR +3.95
1.56
ID-FR-ANDRE'S BEDROOM-D
WOODEN SHELF
CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95
1 : 50
0.05 0.40
5
CALCATTA GOLD MARBLE CLADDING
ID-FR-ANDRE'S BEDROOM- BATHROOM -A
2.35
ID-FR-ANDRE'S BEDROOM-C 1 : 50
WOODEN SLIDING DOOR 80*220 CM CALCATTA GOLD MARBLE CLADDING ALCOBOND CLADDING
ALCOBOND STRIP CLADDING FLUSH WITH MARBLE
0.10 0.20
2
4
0.25
FR +3.95
FR +3.95
RF +7.10
GYPSUM BOARD CEILING
MIRROR
0.25
CHEVRON WOODEN FLOORING FR +3.95
CALCATTA GOLD MARBLE TILES 100*100 CM
RF +7.10
LED PROFILE
0.36
GALSS PARTITION FIXED WINDOW 120*250 CM
0.05 0.40
FR +3.95
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
WOODEN SLIDING DOOR 80*220 CM
LACQUERED WOOD UNIT
1.13
FR +3.95
GYPSUM BOARD CEILING
0.52 0.20
FIXED WINDOW 120*250 CM
0.60
CHEVRON WOODEN FLOORING
FIXED WINDOW 120*250 CM
RF +7.10
0.50
2.35
BLACK WOOD UNIT
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
RF +7.10
RF +7.10
0.30 0.30 0.30 0.30
OFF WHITE PAINT FINISH
1.75
INDIRECT LIGHT
RF +7.10
0.60
WOOD CLADDING
FIRST FLOOR PLAN - ANDRE'S 1 BEDROOM-CALLOUT 1 : 50
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
GYPSUM BOARD CEILING
0.05
0.05
GYPSUM BOARD CEILING
2.35
FR
RF +7.10
0.40
27
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
RF +7.10 0.40
ANDRE'S BEDROOM
0.40
2
0.05
EG20012-TD-ID-7-FR-2
2.35
3
FR +3.95
Revisions
BATHROOM-D 12 1ID-FR-BEDROOM2 : 50
TENDER DETAIL
TENDER DETAIL
VILLA RAMY SALIB
VILLA RAMY SALIB FIRST INTERNAL ELEVATIONS
FIRST INTERNAL ELEVATIONS
Project number
Project number
6
ANDRE'S BEDROOM
BIM ARCHITECT PORTFOLIO
7
ANDRE'S BEDROOM Copy 1
M.WALY
EG20012-TD-ID-7-FR-2
M.WALY
EG20012-TD-ID-7-FR-3
6
ANDRE'S BATHROOM 3D
7
ANDRE'S BATHROOM 3D Copy 1
13 ALIEN'S BATHROOM 3D
14 ALIEN'S BATHROOM 3D 01 Scale
1 : 50
M.ABDELSALAM
Checked by
M.ABDELSALAM
Checked by
Scale
Drawn by
18/05/2021
Drawn by
EG20012 18/05/2021
Date
EG20012
Date
Date 22/04/2021
Revisions FR +3.95
SP
FIRST INTERNAL ELEVATIONS
Project number
Description APPROVED ISSUE
1.00
CALCATTA MARBLE TILES 100*100 CM
FR +3.95
No.
0.35
GYPSUM BOARD CEILING
Elevation 2 - d
8
RF +7.10
0.05
0.40
NEOCEMENT FLOORING
NEOCEMENT FLOORING
ID-FR-MASTER BATHROOM-D
5
0.54 0.17
1.55
WOODEN DRAWRS
0.80
CALCATTA MARBLE TILES 100*100 CM
CALCATTA MARBLE CLADDING
FR +3.95
1.00
Elevation 2 - b 1 : 50
0.35
0.35
GYPSUM BOARD CEILING
0.61
0.40
0.05
0.40 0.35
1.15
1.00 0.54 0.17
1.00
7
FR +3.95
APRIL 2021
0.40
FR +3.95
1 : 50
Elevation 2 - a 1 : 50
0.05
TEAK WOOD FLOORING
ID-FR-MASTER BATHROOM-C
SP FR +3.95
RF +7.10
TENDER DETAIL 4
CALCATTA MARBLE TILES 100*100 CM NEOCEMENT FLOORING FR +3.95
1.00
TEAK WOOD FLOORING
0.50
0.15
2.35
0.40
0.40 0.05
0.05 2.20
0.15 2.20
2.35
1.00
CLEAR MIRROR FLUSH WITH MARBLE
FR +3.95
GYPSUM BOARD CEILING
RF +7.10
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
WOODEN DRAWERS
FR +3.95
NEOCEMENT FLOORING FR +3.95
0.50
0.35
NEOCEMENT FLOORING
Revisions
TEAK WOOD FLOORING
6
RF +7.10
GYPSUM BOARD CEILING
0.11
CALCATTA MARBLE TILES 100*100 CM
0.35
0.15 2.20
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
FR +3.95
1 : 50
1.55
Date 22/04/2021
SP
RF +7.10
CALCATTA MARBLE TILES 100*100 CM
ID-FR-MASTER BATHROOM-B
3
RF +7.10
GYPSUM BOARD CEILING
WOODEN SLIDING DOOR 180*220 CM
2.20
Description APPROVED ISSUE
NEOCEMENT FLOORING
0.15
No.
FR +3.95
1 : 50
RF +7.10
APRIL 2021
0
FR +3.95
ID-FR-MASTER BATHROOM-A
2
For CONSTRUCTION
CALCATTA MARBLE TILES 100*100 CM
0.87
SP
RF +7.10
GYPSUM BOARD CEILING
0.20 0.50 0.11
ID-FR-MASTER BEDROOM-D
0.87
1.00
0.05
NEOCEMENT FLOORING FR +3.95
1 : 50
0.40 0.35
CALCATTA MARBLE TILES 100*100 CM
0.40
2.40
1.00
0.15
PUSH TO OPEN WOODEN PANELS
FR GROOVE 1 CM +3.95
RF +7.10
WOODEN SLIDING DOOR 80*220 CM
0.05
5
1 : 50
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
1.55
ID-FR-MASTER BEDROOM-C
4
WOODEN SLIDING DOOR 180*220 CM
RF +7.10
GYPSUM BOARD CEILING
0.80
FR +3.95
RF +7.10
1.00
FR +3.95
GYPSUM BOARD CEILING
CHEVRON WOODEN FLOORING
GLASS HANDRAIL
FR +3.95
OFF WHITE PAINT FINISH
1.55
CHEVRON WOODEN FLOORING
2.35
2.35
2.20
FIXED WINDOW 120*250 CM
2.20
WOODEN SLIDING DOOR 180*220 CM
1 : 50
RF +7.10
0.40
FIXED WINDOW 120*250 CM
1.50
2.35
2.35
FABRIC CLADDING
0.05
GYPSUM BOARD CEILING
CALCATTA MARBLE CLADDING
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL RF +7.10
0.90
0.40
GYPSUM BOARD CEILING
RF +7.10
0.00
FIRST FLOOR PLAN - MASTER BEDROOM 1 : 50
0.05 0.85
1
RF +7.10
0.20
12 EG20012-TD-ID-12-GN-0 RF +7.10
FIRST FLOOR PLAN - MASTER BATHROOM
1
FR
0.15
29
75
1 : 50
12 EG20012-TD-ID-12-GN-0
2
2
3
RF +7.10
FIRST FLOOR CORRIDOR- Callout
BARDIGLIO MARBLE TILES 100*100 CM FR +3.95
2
1 : 50
0.60 0.30 0.60 0.60
0.30 0.60
0.30 0.40 0.70
0.30 0.60
0.40
0.80 0.60
0.60
0.60
0.30 0.30 0.40
0.25
1.88 0.60
0.29
0.30 0.60
0.60
0.30 0.30 0.40
0.30
0.30 0.60 0.60
FR +3.95
BARDIGLIO MARBLE TILES 100*100 CM
FIRST FLOOR PLAN - ALIEN'S BEDROOM 1 CALLOUT 1 : 50
FR +3.95
4
ID-FR-ALIEN'S BEDROOM-B 1 : 50 12
12
EG20012-TD-ID-12-GN-0
EG20012-TD-ID-12-GN-0
2.50
0.40 0.40
0.40 0.40
FIXED WINDOW 120*250 CM
0.40 0.40
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
0.40
0.50 2.20
2.70
2.20
FIBER BOARD ACRYLIC CLADDING
FIXED WINDOW 120*250 CM
CHEVRON WOODEN FLOORING FR +3.95
OFF WHITE PAINT FINISH
GROOVE 1 CM FR +3.95
CORRIDOR - C
1
1 : 50
0.08
GROOVE 2CM
WOODEN DOOR 90*220 CM
FR +3.95
0.02
0.50
WOOD CLADDING
5
GYPSUM BOARD CEILING
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
WOODEN RIBS CEILING 5*5 CM
WOODEN DOOR 90*220 CM
0.70
RF +7.10
GYPSUM BOARD CEILING
FR
0.70
RF +7.10
OFF WHITE PAINT FINISH
0.80
0.30 0.40
RF +7.10
0.30 0.40
22
3
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
ALIEN'S BEDROOM
WOODEN RIBS CEILING 5*5 CM
0.60
0.40
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
RF +7.10
RF +7.10
0.60
0.30 0.30 0.40 0.80
0.30
0.30 0.25
0.05
ID-FR-ALIEN'S BEDROOM-A 1 : 50
3
0.40
CHEVRON WOODEN FLOORING FR +3.95
FR +3.95
ID-FR-ALIEN'S BEDROOM-C
5
1 : 50
0.30 0.30 0.30 0.30 0.37
EG20012-TD-ID-7-FR-5
0.70 0.10
4
2
RF +7.10
0.60
FR +3.95
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
RF +7.10
0.25
EG20012-TD-ID-7-FR-4
CHEVRON WOODEN FLOORING
FR +3.95
0.20
5
1 4
WOODEN CABINETS
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
1 : 50
2.50
1 : 50
CHEVRON WOODEN FLOORING FR +3.95
GYPSUM BOARD CEILING
WOODEN UNIT
WOODEN DOOR 90*220 CM
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
RF +7.10
0.60
CORRIDOR-B
4
12 EG20012-TD-ID-12-GN-0
RF +7.10
WOODEN UNIT
0.60
EG20012-TD-ID-7-FR-3
CORRIDOR-A
3
2.20
2.20
WOODEN SHELVES FLUSH FULL MOON MIRROR
00 1. 2.20
1.80 0.02
BARDIGLIO MARBLE TILES 100*100 CM FR +3.95
1.70
0.38
0.50
FR +3.95
0.30 0.30 0.30 0.30 0.37
FR +3.95
FIBER BOARD ACRYLIC CLADDING
0.50
BARDIGLIO MARBLE TILES 100*100 CM FR +3.95
FR
2.20
WOODEN DOOR 90*220 CM
RF +7.10
GYPSUM BOARD CEILING
OFF WHITE PAINT FINISH
2.70
2.20
FIRST FLOOR CORRIDOR
RF +7.10
0.02
WOOD CLADDING
OFF WHITE PAINT FINISH
SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL
RF +7.10
WOOD CLADDING
WOODEN DOOR 90*220 CM
33
RF +7.10 WOODEN RIBS CEILING 5*5 CM
0.02
0.50
WOODEN RIBS CEILING 5*5 CM
0.70 0.10
RF +7.10
0.08
RF +7.10
GROOVE 2 CM INDIRECT LIGHT FLUSH FULL MOON MIRROR WOODEN SHELVES
FR +3.95
ID-FR-ALIEN'S BEDROOM-D 1 : 50
CORRIDOR - D 1 : 50
For CONSTRUCTION For CONSTRUCTION
APRIL 2021 APRIL 2021
No. 0
Description APPROVED ISSUE
Date
No.
22/04/2021 0
Revisions
TENDER DETAIL
VILLA RAMY SALIB
VILLA RAMY SALIB
FIRST INTERNAL ELEVATIONS
Project number
EG20012
Drawn by
7
8
Drawn by
ALIEN'S BEDROOM 3D
6
7
ALIEN'S BEDROOM 3D Copy 1
8
ALIEN'S BEDROOM 3D Copy 1 Copy 1
1.25
1
19
2
18
W09
3
17
4
16
5
15
6
14
7
W02
3.77
59
42
58
43
57
44
56
45
55
46
11
10
1.30
+6.098
9 W09
1.1 9
53
W09 1.1
H = 1.20
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20 0.99
+7.180
W02 GLASS RF +7.10
RF +7.10
GREY TRIESTA AS PER APPROVED SAMPLE
1
STAIR 02-BASEMENT FLOOR DETAILED PLAN 1 : 25
WHITE PAINT
52
51
50
EG20012-TD-ID-8-GN-1
1
WHITE PAINT
+4.050
1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
+0.800
W09
1
4 EG20012-TD-ID-11-GN-0
2
1 : 25
4
5
5
6
6
7
7
8
8
9
9
10
10 -0.925
1.01
GLASS
+5.310
49 W09
STAIR 01-BASEMENT FLOOR DETAILED PLAN
3
4
1.04
5
4 EG20012-TD-ID-11-GN-0
2
3
-0.925
1.06
12
2
2
1.45
1.31
1.28
13
1
W07
47
1.29
-1.030
-0.268
-2.350
48
1.45
W09
41
54
8 1.29
60
1.33
2.93
W09
W07
3 EG20012-TD-ID-11-GN-1
1
1.15
20
W02
1.15
+4.050
1
1 : 50
Scale
1.14
W02
M.WALY
EG20012-TD-ID-7-FR-5
5 EG20012-TD-ID-11-GN-1
-2.350
1.25
M.ABDELSALAM
Checked by
1 : 50
Scale
EG20012 18/05/2021
Date
M.WALY
EG20012-TD-ID-7-FR-4
3D View 2
Project number
M.ABDELSALAM
Checked by
6
FIRST INTERNAL ELEVATIONS
18/05/2021
Date
CORRIDOR 3D Copy 1
Date 22/04/2021
Revisions
TENDER DETAIL
CORRIDOR 3D
Description APPROVED ISSUE
FR +3.95
FR +3.95
GLASS
STAIR 01-FIRST FLOOR DETAILED PLAN
GREY TRIESTA AS PER APPROVED SAMPLE
1 : 25
WHITE PAINT
2
STAIR 02- GROUND FLOOR DETAILED PLAN 1 : 25
11
11
12
12
13
13
14
14
15
15
16
16
17
17
18
18
19
19
20
20 +1.200
GLASS
For CONSTRUCTION
For CONSTRUCTION
1.25
APRIL 2021
+0.800
APRIL 2021
W02
W09
21
39
22
38
23
37
24
36
25
35
26
0 GR. +0.70
W02
Description APPROVED ISSUE
1 : 25
4
STAIR 03-GROUND FLOOR DETAILED PLAN 1 : 25
No.
Date
0
Description APPROVED ISSUE
Date 22/04/2021
22/04/2021
Revisions GR LS +0.00
GREY TRIESTA AS PER APPROVED SAMPLE
WHITE PAINT
LS GR +0.00
Revisions
GR. +0.70
GR. +0.70
GR LS +0.00
GR LS +0.00
TENDER DETAIL
TENDER DETAIL VILLA RAMY SALIB
GLASS
VILLA RAMY SALIB
1.28
1.31
1.45
+2.100
+2.913
33
32
31
30
STAIR DETAILS
STAIR DETAILS
29
GREY TRIESTA MARBLE STAIR
GREY TRIESTA MARBLE STAIR
WHITE PAINT
W09
-2.250
W09
Project number
Project number
Drawn by 4 EG20012-TD-ID-11-GN-0
STAIR 01-GROUND FLOOR DETAILED PLAN 1 : 25
4
M.WALY
EG20012 18/05/2021
Date Drawn by
M.ABDELSALAM
Checked by
M.ABDELSALAM
Checked by
BF +-2.35
M.WALY
EG20012-TD-ID-11-GN-1
EG20012-TD-ID-11-GN-0
STAIR SECTION 01
3
1 : 25
Scale
BIM ARCHITECT PORTFOLIO
EG20012 18/05/2021
Date
4.46
3
STAIR 03- BASEMENT FLOOR DETAILED PLAN
GR. +0.70
GLASS
28 1.29
No.
+0.800
W07
27
34
6
WHITE PAINT
3.84
3.77
W09
40
1 : 25
STAIR SECTION 02 1 : 25
5
STAIR SECTION 03
Scale
1 : 25
76
1 : 25
2 EG20012-TD-ID-8-GN-0
4 EG20012-TD-ID-8-GN-0
Top Roof +10.00
0.10 0.60 0.10
Top Roof +10.00
CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE
GLASS HANDRAIL
2.90 0.96
0.96
2.43
2.90
2.90
1.15
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
0.80
3 EG20012-TD-ID-8-GN-0
0.70
0.94
RF +7.10 0.94
RF +7.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
2.52
GROOVE 5 CM WIDTH STRUCTURE GLAZING
0.80
FR +3.95
9.45
3.15
WHITE PAINT
3.15
1.55
3.15
FIXED WINDOW 120 *235 CM
9.75
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
FR +3.95
CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE
1
2.60
3.25
3.25
EG20012-TD-ID-9-GN-3
2.75
3.25
FIXED WINDOW 120 *275 CM
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
5.60
0.70
0.80
9.68
+0.800
GR. +0.70
ELEVATION 1
0.10 0.60 0.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
2.43
RF +7.10
No.
STRUCTRE GLAZING DOUBLE GLASS SLIDING DOOR ALUMIL M12500
FR +3.95
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
Revisions
TENDER DETAIL FR +3.95
GR. +0.70
GR. +0.70
GR. +0.70
GR +0.00
GR +0.00
GR +0.00
VILLA RAMY SALIB
EXTERNAL ELEVATIONS 2.60
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
2.75
FIXED WINDOW 120 *275 CM
Dat
22/04/20
0.70
0.10 0.60 0.10
FR +3.95
3.25
FR +3.95
Description APPROVED ISSUE
0.70
0
2.52
3.15 2.35
RF +7.10
GLASS HANDRAIL
GLASS HANDRAIL FR +3.95
0.70
2.75
For CONSTRUCTION APRIL 2021
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
0.10
0.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
Top Roof +10.00
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
RF +7.10
0.10
RF +7.10
2.35 0.10 0.60 0.10
Top Roof +10.00
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
0.74
RF +7.10
FIXED WINDOW 120 *235 CM
FR +3.95
Top Roof +10.00
GLASS HANDRAIL
0.74
RF +7.10
0.10
1.00
2.11
Top Roof +10.00
0.10 0.60 0.10
1 : 50
2.90
1
GR. +0.70
GR. +0.70
GR. +0.70
GR. +0.70
GR +0.00
GR +0.00
GR +0.00
Project number
EG200
18/05/20
Date Drawn by
M.ABDELSAL
Checked by
M.WA
EG20012-TD-ID-8-GN-0
3
Section 26 1 : 50
BIM ARCHITECT PORTFOLIO
2
Section 27 1 : 50
4
Section 29 1 : 50
1:5
Scale
77
3 EG20012-TD-ID-8-GN-1
2.90
1.15 0.96 0.74 0.10 2.35
3.15
CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE
GLASS HANDRAIL 12.60
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
FR +3.95
3.25
0.80 0.10 0.60 0.10
FIXED WINDOW 120*235 CM
2.15
3.25
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
0.10 0.60 0.10
0.74 0.10 1.55
3.15 10.25
FR +3.95
RF +7.10
0.10
0.90
CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE
0.10
0.96
2.90
RF +7.10
GLASS HANDRAIL
Top Roof +10.00
0.10 0.60 0.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
0.25
0.10 0.60 0.10
Top Roof +10.00
2 EG20012-TD-ID-8-GN-1
FIXED WINDOW 400 * 235 CM
BF +-2.35
1
GR +0.00
2.35
0.70 2.35
GR +0.00
0.70
GR. +0.70 5.60
GR. +0.70
BF +-2.35
ELEVATION 02 1 : 50
For CONSTRUCTION
0.96
RF +7.10
0.10 2.35
FR +3.95
Section 33 1 : 50
BIM ARCHITECT PORTFOLIO
2
10.65
FIXED WINDOW 400*235 CM
2.45
GR. +0.70
GR +0.00
GR +0.00
BF +-2.35
2
Section 31 1 : 50
VILLA RAMY SAL
EXTERNAL ELEVATI
GR. +0.70
Project number GR +0.00
1
Date Drawn by
2.35
BF +-2.35
TENDER DETAIL DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
3.15
0.70
GR. +0.70
0.70
2.80
3
Description APPROVED ISSUE
FR +3.95
3.25
3.25
10.65
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
2.35
2.80
BF +-2.35
0
Revisions
0.10 0.60 0.10
2.35
FIXED WINDOW 120*235 CM
FR +3.95
GR. +0.70 GR +0.00
No. DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
3.15
3.15
0.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
0.10 0.60 0.10
FR +3.95
RF +7.10
0.74
0.10
RF +7.10
0.74
RF +7.10
0.10
0.96
APRIL 2021
M.ABD
Checked by EG20012-TD-ID-8-GN-1
BF +-2.35
Scale
78
2 EG20012-TD-ID-8-GN-2
0.90 0.96
2.90
0.74 1.55
9.45
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
8.65
2.35
3.15
0.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
0.80
FR +3.95
2.65
3.25
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
GR. +0.70
GR. +0.70 0.70
GR. +0.70
GR +0.00
ELEVATION 03
Top Roof +10.00
3.20
3 EG20012-TD-ID-8-GN-2 Top Roof +10.00 BF +-2.35
BF +-2.35
CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE
2
0.96
2.90
GLASS HANDRAIL
0.90
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
Section 32
For CONSTRUCTION
1 : 50
RF +7.10 0.96
APRIL 2021
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
RF +7.10
0.74
GLASS HANDRAIL
1.65
EXTERNAL ELEVATIONS
GR +0.00
1.20
5.60
GR. +0.70 0.70
GR. +0.70
GR. +0.70 GR +0.00
GR. +0.70 GR +0.00
Project number
EG2001
18/05/202
Date
2.35
BF +-2.35
ALUMINUIM PIVOT GLASS DOOR
BF +-2.35
BF +-2.35
4
VILLA RAMY SALIB
10.65
3.25
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
ALUMINUIM PIVOT GLASS DOOR
TENDER DETAIL
FR +3.95
0.10 0.60 0.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
GR +0.00
Date
22/04/202
Revisions
FR +3.95
FR +3.95
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
Description APPROVED ISSUE
1.45
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
0.90
0.90
FR +3.95
No. 0
0.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
0.80
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
1.45
3.15
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
GLASS HANDRAIL
RF +7.10
0.10
0.94
RF +7.10
CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE
GR +0.00
2.35
GR. +0.70
1 : 50
FR +3.95
0.10 0.60 0.10
FR +3.95
3.25
0.10 0.60 0.10 2.45
3.25
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
0.10 0.60 0.10
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
2.45
WOOD CLADDING
FR +3.95
1
RF +7.10
0.10
RF +7.10
3.15
RF +7.10
0.10 0.60
0.74 0.10 2.35
3.15
DOUBLE GLASS SLIDING DOOR ALUMIL M12500
9.45
DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
GLASS HANDRAIL
0.24
0.10
RF +7.10 DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE
Top Roof +10.00
2.90
0.10 0.60 0.10
0.96
GLASS HANDRAIL
Top Roof +10.00
0.96
2.90
0.90
1.15
CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE
Top Roof +10.00
0.25
0.10 0.60 0.10
Top Roof +10.00
ELEVATION 04 1 : 50
BIM ARCHITECT PORTFOLIO
3
Section 30 1 : 50
Drawn by
M.ABDELSALAM
6 EG20012-TD-ID-9-GN-3
Checked by
M.WAL
EG20012-TD-ID-8-GN-2
BF +-2.35
1 : 50
Scale
79
3 EG20012-TD-ID-12-GN-3
2 EG20012-TD-ID-12-GN-2 3.47 2.50
0.80
2 EG20012-TD-ID-12-GN-3
1
0.60
1.00
4.23
7 EG20012-TD-ID-12-GN-2
3 EG20012-TD-ID-12-GN-2
BASEMENT BAR DETAIL 1 : 25
5
BASEMENT BAR 3D Copy 1
1
8 EG20012-TD-ID-12-GN-2
GROUND FLOOR BAR 1 DETAIL
6
1 : 25
GROUND FLOOR BAR 2 DETAIL 1 : 25
STEEL BOXES 5*5 CM
0.10
3.93
0.10
0.10
1.00
STEEL BOXES 5*5 CM PANDA MARBLE CLADDING 2 CM
0.10 0.25
STEEL BOXES 5*5 CM
Section 2
2
3
0.30
0.30
STEEL BOXES 5*5 CM
INDIRECT LIGHT
INDIRECT LIGHT
STEEL BOXES 5*5 CM
GR. +0.70
Section 3
7
1 : 25
Section 16
8
1 : 25
Section 17 1 : 25
0.40
1 : 25
GR. +0.70
0.07
GR. +0.70
0.07
GR. +0.70
9 EG20012-TD-ID-12-GN-3
WHITE QUARTZ MARBLE CLADDING 2 CM
0.10
1.00
BASEMENT BAR 3D
0.25
4
2.29
STEEL BOXES 5*5 CM
STEEL BOXES 2*2 CM
0.28
Section 12 1 : 25
1.00
2
0.28
Section 13 1 : 25
0.83
3
0.25
0.25
0.10
BF +-2.35
WHITE QUARTZ CLADDING 2 CM 0.10
PANDA MARBLE CLADDING 2 CM
PANDA MARBLE CLADDING 2 CM
BF +-2.35
1.00
1.00
SAINT LAUREN MARBLE CLADDING 2 CM
1.00
INDIRECT LIGHT STEEL BOXES 5*5 CM
0.83
0.10
SAINT LAUREN MARBLE CLADDING 2 CM
0.79
0.78
0.78
0.78
0.78
0.78
For CONSTRUCTION
For CONSTRUCTION
APRIL 2021
APRIL 2021
0.79
10 EG20012-TD-ID-12-GN-3
No.
BASEMENT TV UNIT
6
Description
0
Date
APPROVED ISSUE
No.
22/04/2021
Revisions
LS GR +0.00
GR LS +0.00
LS GR +0.00
Date
APPROVED ISSUE
22/04/2021
TENDER DETAIL
VILLA RAMY SALIB
VILLA RAMY SALIB
BASEMENT DETAILS
GROUND FLOOR DETAILS
0.30
0.30
2.30
0.40
0.40
BLACK WOODEN SHELVES
Revisions
TENDER DETAIL BASMENT TV UNIT 3D
0.30
WOODEN UNITS 0.30
7
0.46
GR LS +0.00
Description
0
1 : 25
Project number
BF +-2.35
0.40
BF +-2.35
BF +-2.35
EG20012
Drawn by BF +-2.35
Project number
18/05/2021
Date
0.35
0.35
0.40
INDIRECT LIGHT
M.ABDELSALAM
Drawn by
M.WALY
Checked by
4
BASMENT TV UNIT 3D Copy 1
VARIABLE
VARIABLE
VARIABLE
VARIABLE
2.20 HEIGHT
2.20 HEIGHT
2.20 HEIGHT
2.20 HEIGHT
5
GROUND BAR 1 3D Copy 1
9
GROUND BAR 2 3D
10 GROUND BAR 2 3D Copy 1
1 : 25
Scale
2.20 HEIGHT
2.20 HEIGHT
2.75 HEIGHT
VARIABLE
GROUND BAR 1 3D
1 : 25
Scale
2.20 HEIGHT
8
M.WALY
EG20012-TD-ID-12-GN-2
variable
19 10 1Section : 25
Section 18 1 : 25
M.ABDELSALAM
Checked by
EG20012-TD-ID-12-GN-3
9
EG20012 18/05/2021
Date
variable
F.F.L
F.F.L
1.50
F.F.L
0.90 WIDTH
OUT
IN
F.F.L
F.F.L
0.80 WIDTH
OUT
IN
F.F.L
F.F.L
3.60 WIDTH
F.F.L
0.90 WIDTH
OUT
IN IN
OUT
DOOR TYPE
D04
DOOR TYPE
D01
DOOR TYPE
D07
DOOR TYPE
D05
OPENING TYPE
SINGLE HINGED WOODEN DOOR
OPENING TYPE
SINGLE HINGED WOODEN DOOR
OPENING TYPE
SINGLE HINGED WOODEN DOOR
OPENING TYPE
SINGLE HINGED WOODEN DOOR
OPENING SIZE
1500*2200 mm
OPENING SIZE
900*2200 mm
OPENING SIZE
800*2200 mm
OPENING SIZE
900*2200 mm
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
DOOR & DOOR OAK PIGMENTED FRAME MATERIAL VENEER
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
WINDOW TYPE
AL01
WINDOW TYPE
OPENING TYPE
SLIDING
OPENING TYPE
AL02 - AL03 - AL04 - AL05 - AL06 - AL08
OPENING SIZE
5800*2750 mm
OPENING SIZE
VARIABLE
WINDOW MATERIAL
ALUMINIUM AND GLASS
WINDOW MATERIAL
ALUMINIUM AND GLASS
SLIDING
For CONSTRUCTION
For CONSTRUCTION
APRIL 2021
APRIL 2021
No.
0.70
Date
0
TENDER DETAIL 2.40
TENDER DETAIL
F.F.L
Date 22/04/2021
Revisions
Revisions
F.F.L
Description APPROVED ISSUE
VARIABLE HEIGHT
2.30 HEIGHT
22/04/2021
2.20 HEIGHT
2.20 HEIGHT
2.20 HEIGHT
2.20 HEIGHT
2.20 HEIGHT
2.20 HEIGHT
Description APPROVED ISSUE
2.30 HEIGHT
No. 0
VILLA RAMY SALIB
VILLA RAMY SALIB VARIABLE WIDTH
1.60 WIDTH
OUT
IN
Project number
EG20012
Drawn by
D02
DOOR TYPE
D03
DOOR TYPE
D06
OPENING TYPE
DOUBLE SLIDING WOODEN DOOR
OPENING TYPE
SINGLE SLIDING WOODEN DOOR
OPENING TYPE
DOUBLE HINGED WOODEN DOOR
OPENING SIZE
1600*2200 mm
OPENING SIZE
800*2200 MM
OPENING SIZE
2000*2200 MM
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
DOOR & DOOR FRAME MATERIAL
OAK PIGMENTED VENEER
BIM ARCHITECT PORTFOLIO
M.ABDELSALAM
Checked by
M.WALY
EG20012-TD-ID-9-GN-1
Scale
Project number
VARIABLE WIDTH 2.53
18/05/2021
Date
DOOR TYPE
ALUMINUM TYPES DETAILS
DOORS DETAILS
2.00 WIDTH
0.80
1 : 25
EG20012 18/05/2021
Date Drawn by
WINDOW TYPE
AL15 - AL16
WINDOW TYPE
AL17
DOOR TYPE
AL07 - AL09 - AL10 - AL11 - AL12 - AL13 - AL14
OPENING TYPE
PIVOT
OPENING TYPE
FIXED
OPENING TYPE
FIXED
OPENING SIZE
VARIABLE
OPENING SIZE
VARIABLE
OPENING SIZE
VARIABLE
WINDOW MATERIAL
ALUMINIUM AND GLASS
WINDOW MATERIAL
ALUMINIUM AND GLASS
DOOR & DOOR FRAME MATERIAL
ALUMINIUM AND GLASS
M.ABDELSALAM
Checked by
M.WALY
EG20012-TD-ID-9-GN-3
Scale
80
1 : 25