BIM ARCHITECT PORTFOLIO

Page 1

ARCHITECTURE PORTFOLIO MOHAMED AHMED ABDELSALAM - BIM ARCHITECT AIN SHAMS UNIVERSITY - ARCHITECTURAL DEPARTMENT “2018” www.behance.net/abdelsalam3652

STUDIO FIVE CAIRO DUBAI HOUSTON


R.A HOUSE

4 - 13

69- 80 14 - 27 28 - 38 39 - 45

THE LONDON RESTOBAR

IGNITE GYM

R.S HOUSE

M.K HOUSE

CAMELOT SPA - TONINO LAMBORGHINI

SELECTED BIM PROJECTS 46- 56 STUDIO FIVE

57 -68

AL- ARABIYA OFFICE BUILDING

CAIRO DUBAI HOUSTON


CAMELOT SPA - TONINO LAMORGHINI SHARM EL-SHEIKH , EGYPT


3

4

6

8

4.54

SEATING AREA

RECEPTION Area:AREA 120 SQM

A

0.60

STUDIO 1 Z03

4.30

2.85

B

7

2.87

A

5

3.97

2

0.50

1

STUDIO 1 Area: 24 SQM

REFRESHMENT AREA

3.50

1.00 12.20

0.60

STAIRS 05

6.05 2.00

STAIRS 02

SALON Area: 79.5 SQM

Z10

STAIRS 01

STAIRS 04

ROOM 01 Area: 20 SQM 4.80

2.79

ROOM 02 Area: 20 SQM 4.75

1.60

5.52

1.55

2.20

3.00

1.14

1.14

2.92

1.40

4.35

4.35

9.18 3.16

4.18

WOMEN'S Area: 80 SQM LOCKERS Mirror wall

2.89

3.62

0.8

MEN'S LOCKERS Area: 76 SQM

4.25

2.89

STAIRS 03

Area: 54 SQM 6.20

0.80

5.98

ICE FOUNTAIN

2.16 1.86

0.80

3.25

3.20

TOWEL DUMP

1.60

TOWEL DUMP

1.89

2.70

6.84

6.76

4.36

12.58

6.14

4.04

9.93

STEAM ROOM

SAUNA

STEAM ROOM

RELAXATION AREA

TOWEL DUMP

SHOWER & CHANGING ROOMS

electrical panel existing location

Z04

Refreshment Area 2.31

0.47

1.50

STAFF LOUNGE

TOWEL DUMP

0.40

TOWEL DUMP

0.40

ADDITIONAL ZONE IF NEEDED STORE

1.80

ROOM 05 Area: 42 SQM4.08

7.28

1.13

2.65

1.60

COLD VITALITY POOL

1.14 3.04

ROOM 07 Area: 24 SQM

2.82

3.53

1.60

1.80

0.60

H

6.03

3.21

7.43

Steam Mech.

1.30

ROOM 06 Area: 44 SQM

3.62

ROOM 08 Area: 20 SQM

COLD VITALITY POOL

BRUNCH AREA

7.30

3.47

3.47

STORAGE ROOM

G

0.50 1.09

3.36

Serving Counter 6.02

2.85

6.03

2.82

3.50

STORAGE

STAFF LOCKERS

3.21

4.41

Z09

Steam Mech.

5.12

7.50

F

4.40

3.47

0.60

SHOWER & CHANGING ROOMS

OPEN KITCHENETTE

TOWEL DUMP

Mech.

4.01

Z05

Mech.

server existing location

0.40

F

3.61

SAUNA

3.24

RASUL

1.53

5.74

STORAGE & KITCHEN AREA

4.25

ROOM 04 Area: 56 SQM

0.94

Z06

5.80

E

2.00

Mirror wall OPEN SHOWER

2.70

D

ROOM 03 Area: 50 SQM

5.85

12.68

2.00

1.74 1.9

Mirror wall

PLANT ROOM

STOR.

G

C

3.76

Z08

ATM

0.60

STUDIO 3 STUDIO 3 Z03 Area: 24 SQM

0.50

STOR.

E

1.59

4.30

12.20

JUICE BAR

2.98

2.50

D

1.16

1.88

OFFICE Z-01

3.23

Z07

0.50

MANICURE & PEDICURE ROOM Area: 74 SQM

OFFICE Area: 10 SQM

6.76

OPEN SHOWER

Area: 25 SQM

display STOR.

SEATING AREA

TOWEL DUMP

STUDIO 2 Z03 2 STUDIO 5.89

YOGA & CLASSES ROOM

B

2.92

Area: 46 SQM

GYM Area: 143 SQM

11.87

3.98

TOWEL DUMP

Z03

GYM Z03

Refreshment1.33 Area

5.24

STOR.

Water feature

2.15

Plunge Area

4.41

RECEPTION Z01

VITALITY POOL

6.63

Z02 3.23

C

Z01

12.20

7.92

11.76

RETAIL AREA

H

MEN'S TOILETS

WOMEN'S TOILETS

1

2

3 4

1

5

6

7

8

GROUND FLOOR F.F.L Copy 1 1 : 200

BIM ARCHITECT PORTFOLIO

4


6

INTERIOR WALL

0.260.09

1.20

W-01

0.130.26

W-01

1.36

4

EG22001-DD-AR-Z04-7-01

EG22001-DD-AR-Z04-7-00

2

W-01

2.89

3

FLOOR TYPE

3

E

E

W-01

3.06 0.47

0.50

TH-01

DESCRIPTION

C-01 C-02

GYPSUM BOARD - CONCREATE EFFECT PAIN AS APPROVED SAMPLE WOODEN RIBS CEILING

Z04-ROOM 02 - FURNITURE LAYOUT 1 : 50

2

THRESHOLD TYPE TH-01

Z04-ROOM 02 -DETAILED LAYOUT 1 : 50

3

DESCRIPTION TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE

TYPE

DESCRIPTION

C-01 C-02

GYPSUM BOARD - CONCREATE EFFECT PAIN AS APPROVED SAMPLE WOODEN RIBS CEILING

START POINT SYMBOLS

DESIGN DEVELOPMENT

7

E

SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS

4

5.31

FIXED WOODEN CABINET:REFER TO THE RELEVANT DETAILS

2.12

8

1.13

3

MARCH 2022

0.55

E No.

Description

0

3

2.66 1.98

1.70

0.65 0.33

0.65

0.80

W-02

2.70

2 5.97

EG22001-DD-AR-Z04-7-07 EG22001-DD-AR-Z04-7-06

0.10

ROOM 04 Z04

DESIGN DEVELOPMENT

3 1.51

EG22001-DD-AR-Z04-125

W-03

4.01

W-01 1.61

MARCH 2022

W-03 0.32

1.80

5.44

FIXED WOODEN CABINET:REFER TO THE RELEVANT DETAILS

03-03-2022

0.90

1.13 W-03

F

Revisions

No.

Description

0

Date

TENDER DETAILS

03-03-2022

8

SHARM EL SHEIKH

SHARM EL SHEIKH

CAMELOT SPA

CAMELOT SPA

Z04 - DETAILED PLAN

Z04 - DETAILED PLAN

Date Drawn by

EG22001

Project number

1-3-2022

Date

M.ABDELSALAM

Checked by

BIM ARCHITECT PORTFOLIO

4

3.02

W-01

W-03

GL-01

GL-01

Date

TENDER DETAILS

0.36

0.10

GL-01

W-01

W-02

3 EG22001-DD-AR-Z04-12-00

W-01

0.26

F

Revisions

EG22001-DD-AR-Z04-12-00

1.45

W-03

DESCRIPTION SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS

1 1.03

0.26 0.90

D-04

1.16

0.93 0.32

Project number

Z04-ROOM 03 - DETAILED PLAN 1 : 50

W-01

GL-01 W-01

1.59

DESIGN DEVELOPMENT

W-02

0.90

W-02

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08

1.09

1.80

GL-01 1.94

0.26

0.65

W-01

W-01

1.48

W-04

E

2.70

W-03

0.80

0.80 4.17

1.94

1.06

0.31

0.80 1.24

0.20

0.50

0.98

0.95

E

0.80

0.37

0.82

W-02

W-04

W-01

GL-01

0.94

0.10

0.26

0.86

W-03 W-01

0.58

1.59

0.60

3

1.86

4

W-01

5.58 0.78

EG22001-DD-AR-Z04-125

EG22001-DD-AR-Z04-001-02

Wall Type

FIXED WOODEN SEAT:REFER TO THE RELEVANT DETAILS

EG22001-DD-AR-Z04-001-02

2.70

GL-01

GL-01

INTERIOR WALL

8

DESCRIPTION

W-01

ROOM 03 Z04

0.86

0.47

CAIRO.DUBAI.HOUSTON

0.60

2

A2

STUDIOFIVE

1.28

1.89

3

0.03

0.41

EG22001-DD-AR-Z04-7-05 EG22001-DD-AR-Z04-7-04

As indicated

Scale

CAIRO.DUBAI.HOUSTON

5.64

4

M.WALY

EG22001-DD-AR-Z04-0-01

STUDIOFIVE

1

0.62

GL-01

Z04-ROOM 02 - REFLECTED CEILING PLAN 1 : 50

4

1.29

0.73 0.03 0.80

1.76

W-01

0.62

1-3-2022 M.ABDELSALAM

Sheet Size

W-02

EG22001-DD-AR-Z04-12-00

3.74

0.90 0.90

Z04-ROOM 02 - FLOORING LAYOUT 1 : 50

1

0.69

W-03

EG22001

Date Checked by

0.30

W-02

Project number

7

0.50

W-03 4.50 7.20

Z04 - ROOM 02

Drawn by

0.69

W-02

3.11

A2

Wall Type W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08

1.45

1.70

0.50

0.45 1.20

1.20

0.73

3 0.43

0.93

0.90

D-04

0.70

W-03

W-03

0.72

0.78

7

As indicated

Scale

D

2.70

W-04

SP 0.90

CAMELOT SPA

E

INTERIOR WALL

FIXED WOODEN SEAT:REFER TO THE RELEVANT DETAILS

W-02

2.35

E

M.WALY

EG22001-DD-AR-Z04-0-00

8

W-03

2.40

Date 03-03-2022

SHARM EL SHEIKH

+4.00

E

Description TENDER DETAILS

1.31

S.C.L C-01

4.75

0.90

No. 0

0.26

ROOM 02 Z04

1-3-2022 M.ABDELSALAM

Sheet Size

0.90

CEILING PROFILE

0.55

1.42

EG22001

Date Checked by

1.32

0.90

0.90

E

0.72

Project number Drawn by

D

0.90

0.26

+0.00 F.F.L.

Z04 - ROOM 01

Z04-ROOM 01 -REFLECTED CEILING PLAN 1 : 50

ROOM 02 Z04

1.36

0.90

0.47

0.47

0.40

0.90

0.82 3.06

TRAVERTINE MARBLE FLOORING

F-01

CAMELOT SPA

6

4

0.78

0.90

E 0.80

Z04-ROOM 01 - FLOORING PLAN 1 : 50

0.90

SHARM EL SHEIKH

E

0.68

0.90

0.90

0.60

0.40

0.90

0.90

E

0.78

0.47

03-03-2022

3.74

ROOM 01 Z04

S.C.L C-01

0.89

1.20

0.86

0.12

TENDER DETAILS

Revisions

TH-01

0.78

3.74

0

1.36

Date

0.78

Description

0.90

0.26

No.

MARCH 2022

7

0.40

1.42

3.74

0.60 0.90

0.90

0.90 0.90

1.51

0.40

THRESHOLD FINISH

E

0.72

W-02

7

0.85 0.26

6

1

3.11

7

0.90

0.90

0.90

1.39

SP

3

W-01

4.56 0.78

TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE

CEILING SCHEDULE

+4.00

0.90

ROOM 02 Z04

CAIRO.DUBAI.HOUSTON

DESCRIPTION

F-01 F-02 F-03 F-04

CEILING SCHEDULE TYPE

MARCH 2022

0.85

0.78

0.78

0.12 0.78 0.90

0.90

+0.00 F.F.L.

0.90

2

3

W-01

E

FIXED WOODEN SEAT:REFER TO THE RELEVANT DETAILS

TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE

Revisions

F-01

0.73

E

DESCRIPTION

CEILING PROFILE 0.90

1.56

EG22001-DD-AR-Z04-7-03 EG22001-DD-AR-Z04-7-02

EG22001-DD-AR-Z04-12-00

E

1.20

ROOM 01 Z04

0.87

4

3

6

4.83

E

FLOOR TYPE

W-01

W-01

ROOM 02 Z04

STUDIOFIVE

FLOOR FINISH

W-01 W-01 1.31

0.26

1-

TH-01

0.90

W-01 1.42

0.26

DESCRIPTION SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS

DESIGN DEVELOPMENT

6

0.90

W-01

W-01

4.61

START POINT SYMBOLS

0.63

W-01 1.36

THRESHOLD FINISH THRESHOLD TYPE

Z04-ROOM 01 - DETAILED PLAN 1 : 50

2

4 EG22001-DD-AR-Z04-001-02

CAIRO.DUBAI.HOUSTON

TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE

0.82

6

Z04-ROOM 01 - FURNITURE LAYOUT 1 : 50

STUDIOFIVE

DESCRIPTION

F-01 F-02 F-03 F-04

0.82

W-02

6

1

E

4.69 0.80

FIXED WOODEN SEAT:REFER TO THE RELEVANT DETAILS

0.47

E

ROOM 01 Z04

EG22001-DD-AR-Z04-12-00

W-01

SINK UNIT:REFER TO THE RELEVANT DETAILS

FLOOR FINISH

2.89

W-01

ROOM 01 Z04

4.14

1

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08

7

0.86

W-01

W-01

1.39

7

SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS

4.21 2.88

W-01

0.85

0.85

4 EG22001-DD-AR-Z04-001-02

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08

Wall Type

0.47

D-04 W-01

INTERIOR WALL

DESCRIPTION

0.86

Wall Type

2.88

SINK UNIT:REFER TO THE RELEVANT DETAILS

0.47

6

M.WALY

Sheet Size

M.ABDELSALAM M.WALY

Checked by

EG22001-DD-AR-Z04-3-01 Scale

EG22001 1-3-2022

Drawn by

EG22001-DD-AR-Z04-3-02 1 : 50 A2

1

Z04-ROOM 04- DETAILED PLAN 1 : 50

1 : 50

Scale Sheet Size

A2

5


Z04 - ROOM 01 - INTERNAL ELEVATION 1 : 50

2

0.47

0.78

0.60

SP

GROUND FLOOR F.F.L

+0.00 F.F.L

+0.00 F.F.L

0.90

0.75

STUDIOFIVE

1.20

0.86

CAIRO.DUBAI.HOUSTON

ROOM 02 Z04

1.20

1.20

4.00

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

+0.00 F.F.L.

SP

GROUND FLOOR F.F.L

1

+0.00 F.F.L.

EG22001-DD-AR-Z04-12-00

SP

Z04 - ROOM 02 - INTERNAL ELELVATION 1 : 50

3

Z04 - ROOM 01 - INTERNAL ELEVATION 1 : 50

0.90

1.20

1 EG22001-DD-AR-Z04-12-00

0.33

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

2.95

ROOM 02 Z04

+4.80 F.F.L

0.71 0.42 0.65

1.20

0.90

1.20

4.00 1.20

SP

0.90

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

0.45

GROUND FLOOR F.F.L

+0.00 F.F.L.

0.66

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

ROOM 01 Z04

1.20

2.40

SP

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

0.250.10 0.35 0.20 0.20

+0.00 F.F.L.

0.72

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

CAIRO.DUBAI.HOUSTON

1.20

D-04

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

0.05

0.71 0.05

2.95

1.20

1.20 1.20

EG22001-DD-AR-Z04-001-02

BOTTOM OF SLAB

0.60

1.60

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

1.85

4.00

TRAVERTINE MARBLE SINK AS PER 1 APPROVE SAMPLE

BOTTOM OF SLAB

4.00

0.05

0.50

STUDIOFIVE

1.06

ROOM 01 Z04

CLEAR MIRROR

1

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

0.50

0.05

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

+0.00 F.F.L

+4.80 F.F.L

0.71

BOTTOM OF SLAB 0.71

BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

+4.80 F.F.L

0.35 0.10

+4.80 F.F.L

E

7

E

0.50

6

4

GROUND FLOOR F.F.L

+0.00 F.F.L

Z04 - ROOM 02 - INTERNAL ELELVATION 1 : 50

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

MARCH 2022

Revisions

No.

Revisions

Description

0

Date

TENDER DETAILS

No.

03-03-2022

SHARM EL SHEIKH CAMELOT SPA

Z04 - INTERNAL ELEVATIONS

Z04 - INTERNAL ELEVATIONS

Drawn by

EG22001

Project number

1-3-2022

Date

M.ABDELSALAM

ROOM 02 - 3D 01 Copy 1

1

1 : 50

Sheet Size

0.65

STUDIOFIVE

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

CAIRO.DUBAI.HOUSTON

WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE

EG22001-DD-AR-Z04-12-00

3

+4.80 F.F.L

0.71

GROUND FLOOR F.F.L

SP

2

4

0.58

SHARM EL SHEIKH

1.20

0.58 +0.00 F.F.L.

CAMELOT SPA

2 EG22001-DD-AR-Z04-125

SP

Z04 - INTERNAL ELEVATIONS

+0.00 F.F.L.

EG22001

Project number

Date

1-3-2022

Date

Z04-ROOM 03 - 3D

M.ABDELSALAM M.WALY

EG22001-DD-AR-Z04-7-04 Scale Sheet Size

BIM ARCHITECT PORTFOLIO

ROOM 04 Z04

Project number

Checked by

1 : 50 A2

Date 03-03-2022

2.80 1.20

EG22001-DD-AR-Z04-125

Drawn by

Z04 - ROOM 03 -INTERNAL ELEVATION 1 : 50

WALNUT VENEER WOODEN SEATING +0.00 F.F.L GROUND FLOOR F.F.L

Z04 - INTERNAL ELEVATIONS

2 +0.00 F.F.L.

TENDER DETAILS

0.90

WALNUT VENEER WOOD CLADDING AS 1 PER APPROVE SAMPLE

0.35 0.10

+0.00 F.F.L.

1.20

0.60

1

EG22001-DD-AR-Z04-12-00

0.35 0.10

+0.00 F.F.L

Description

0 0.90

0.50

4.00

1.20

4.00

CAMELOT SPA

EG22001-DD-AR-Z04-12-00

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

0.50

0.05

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

SHARM EL SHEIKH ROOM 03 Z04

0.71

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

0.90

2.95

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

No. 0.90 1.20

0.90

DESIGN DEVELOPMENT

Revisions

0.05

0.71 0.90

03-03-2022

1.20

1.70

TENDER DETAILS

Z04 - ROOM 04 - 3D

BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

4.00

WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE

0

Date

3

F

2.98

0.05

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

Description

0.05

0.71

No.

+0.00 F.F.L.

MARCH 2022

Revisions

BOTTOM OF SLAB

0.50

+4.80 F.F.L

SP

E

MARCH 2022

E

+0.00 F.F.L.

Z04 - ROOM 04 - INTERNAL ELEVATION 1 : 50

1

Z04-ROOM 03 - 3D

DESIGN DEVELOPMENT

D

CAIRO.DUBAI.HOUSTON

0.35 0.10

1.20 1.20

0.60 0.35 0.10

ROOM 04 Z04

WALNUT VENEER WOODEN SEATING 4 +0.00 F.F.L GROUND FLOOR F.F.L

+0.00 F.F.L.

Z04 - ROOM 03 -INTERNAL ELEVATION 1 : 50

1

STUDIOFIVE

0.75

1.20

2.95 4.00

GROUND FLOOR F.F.L

SP

0.90

LED PROFILE AS PER APPROVED SAMPLE

4

SP

0.90

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

ROOM 03 Z04

WALNUT VENEER WOODEN SEATING

0.90

1.20

0.75

4.00

0.90

0.70

0.90

0.50

0.90

2.98

0.50 0.90

1.20

0.90

EG22001-DD-AR-Z04-12-00

+0.00 F.F.L.

A2

4.00

0.71 0.05 0.90

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

+0.00 F.F.L

1 : 50

Scale

BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

LED PROFILE AS PER APPROVED SAMPLE WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE

ROOM 02 - 3D 02 Copy 1

Sheet Size

+4.80 F.F.L

0.40

2

8

BOTTOM OF SLAB

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

M.WALY

EG22001-DD-AR-Z04-7-03

A2

8

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

1-3-2022 M.ABDELSALAM

Checked by

EG22001-DD-AR-Z04-7-00 Scale

EG22001

Drawn by

M.WALY

Checked by

+4.80 F.F.L

03-03-2022

CAMELOT SPA

Date

02 Z04 - ROOM 01 -3D

Date

TENDER DETAILS

SHARM EL SHEIKH

Project number

01 Z04 - ROOM 01 -3D

Description

0

2

Z04 - ROOM 04 - INTERNAL ELEVATION 1 : 50

4

Z04 - ROOM 04 - 3D

EG22001 1-3-2022

Drawn by

M.ABDELSALAM M.WALY

Checked by EG22001-DD-AR-Z04-7-06

1 : 50

Scale Sheet Size

A2

6


0.30

1.92 0.90

0.90

0.08

7

W-04

E

6

STUDIOFIVE

E

7

STUDIOFIVE

0.90

6

0.90

4.14

4.14

0.90

0.90

0.08

CAIRO.DUBAI.HOUSTON

CAIRO.DUBAI.HOUSTON

0.90

0.68

0.90

FLOOR FINISH

0.86

0.90

0.90 0.230.11

SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS

FLOOR TYPE

0.18

0.90

0.59

F-03

0.56

0.90

GRAVEL AREA

DESCRIPTION

F-01 F-02 F-03 F-04

TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE

THRESHOLD FINISH THRESHOLD TYPE

0.90

0.90

1.33

0.90

0.90

1.71

1.35

WOODEN LOCKERS

0.90

0.90

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08

W-04

0.90

DESCRIPTION

0.90

W-04

3.89

0.08

0.18

Wall Type

2.77

W-08

0.90

1.35

INTERIOR WALL

9.63

W-04

WOODEN LOCKERS

0.90

3.33

0.78

0.90

EG22001-DD-AR-Z04-12-00

1.53

0.82

0.50

0.50

3

DESCRIPTION

TH-01 0.90

0.88

0.23

0.69

TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE

0.90

START POINT SYMBOLS 0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90 0.90

D-04

1.16

1.20

1.35

W-08

0.90

0.90

0.90

0.90

0.90

0.90

0.90

F

RELAXATION AREA Z04

3

MARCH 2022

0.90

0.90

+0.00 F.F.L.

0

Date

TENDER DETAILS

0.18

03-03-2022

0.90

0.90

0.90

0.90

0.90

Revisions

0.90

0.90 0.90

0.90

0.90

0.90

0.90

No.

0.90

TRAVERTINE BAR:REFER TO THE RELEVANT DETAILS 0.90

0.90

SHARM EL SHEIKH

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

1.80

0.90

Z04-FLOORING PLAN

0.90

0.90

0.90

0.90

Date

0.90

Project number

1-3-2022 M.ABDELSALAM

1 : 50 A2

0.90

1

Z04 - RELAXATION AREA - FLOORING PLAN 1 : 50

0.90

0.90

0.90

0.90

0.11 0.34

0.45

0.90

1-3-2022

6

M.ABDELSALAM M.WALY

Checked by

0.78

0.90

0.32

0.34 0.15

0.32

H

Sheet Size

0.41

0.78

M.WALY

EG22001-DD-AR-Z04-3-05 Scale

EG22001

Drawn by 0.93

0.78

1.35

0.90

0.90

0.90

0.90

0.90

0.90

0.90 0.90

0.90

G

EG22001

Checked by

7

H

EG22001-DD-AR-Z04-4-05 As indicated

Scale

7

Sheet Size

A2

CEILING PROFILE

STUDIOFIVE

3.74

7

3.74

6

0.90

Date

H

6

0.90

0.32

D-06

1.35

0.90

4.19

Z04-RELAXATION AREA - DETAILED PLAN 1 : 50

0.34

0.90

Project number Drawn by

W-04 1.86

0.90

4.19

1

W-04

0.18

D-04

0.32

0.30

H

9.01 2.00

0.90

0.78

1.20

3.35 1.70

W-04

03-03-2022

CAMELOT SPA G

Z04-DETAILED PLAN

W-04

1.80

0.90

0.90

G

W-04

0.34

0.90

CAMELOT SPA

1.32

W-08

SP 0.90

0.90

0.90

1.60

SHARM EL SHEIKH W-08

G

W-04

Date

TENDER DETAILS

TRAVERTINE MARBLE FLOORING

6.30

1.32

Description

0

0.90

Description

0.90

1.30

No.

0.90

Revisions

EG22001-DD-AR-Z04-12-01

0.90

13.53

13.53

0.62

RELAXATION AREA Z04

1

DESIGN DEVELOPMENT

F-01

MARCH 2022

0.90

EG22001-DD-AR-Z04-7-17 EG22001-DD-AR-Z04-7-17

0.90

2

0.90

EG22001-DD-AR-Z04-7-16 EG22001-DD-AR-Z04-7-18

1.20

1.14

1 4

0.90

F 0.90

F DESIGN DEVELOPMENT

0.90

1.33

1.35

F

0.17

5.81

0.55

6

STUDIOFIVE

7

CAIRO.DUBAI.HOUSTON

CAIRO.DUBAI.HOUSTON 0.82

3.11

0.50 1.94

2.77

CEILING SCHEDULE 0.60

1.18

0.78

1.29

0.13

1.53

0.67 1.81

1.31

2.74

0.47

0.47

0.78

0.47

0.47

3.06

TYPE

DESCRIPTION

C-01 C-02

GYPSUM BOARD - CONCREATE EFFECT PAIN AS APPROVED SAMPLE WOODEN RIBS CEILING

0.60 0.76

3.42

1.59

1.16 0.17

2.00

1.20

2.73

1.16

F

0.13

4.02

F

3.89

0 0.5

2.00

0. 50

F

1.33

F

RELAXATION AREA Z04

0.58 5.68

0.15

2.01

DESIGN DEVELOPMENT MARCH 2022

1.20

MARCH 2022

2.00

1.44

0.17

2.34

DESIGN DEVELOPMENT

Revisions

G

03-03-2022

0.17

Revisions

No.

+4.00

Description

0

1.13

TENDER DETAILS

RELAXATION AREA Z04

1.92

0

Date

Date

TENDER DETAILS

03-03-2022

S.C.L

1.60

G

1.05

Description

1.92

No.

CEILING PROFILE 0.55

SHARM EL SHEIKH

1.46

SHARM EL SHEIKH

G

CAMELOT SPA G

0.18

Z04-FURNITURE LAYOUT

1.92

H

1.13

CAMELOT SPA H

Z04-CEILING PLAN

0.55

EG22001

Date

1-3-2022

Z04-RELAXATION AREA- FURNITURE LAYOUT 1 : 50

BIM ARCHITECT PORTFOLIO

Sheet Size

1

Z04- RELAXATION AREA - CEILING PLAN 1 : 50

0.34

5.66

0.34

1.35

H 6

7

M.ABDELSALAM M.WALY

Checked by

1.05

1.32

A2

1-3-2022

Drawn by

M.WALY

1 : 50

EG22001

Date

EG22001-DD-AR-Z04-1-04 Scale

Project number

M.ABDELSALAM

Checked by

1

9.01

1.05

Drawn by

1.05

1.20

Project number

0.30

7

1.70

6

H

EG22001-DD-AR-Z04-5-05 1 : 50

Scale Sheet Size

A2

7


E

G

H

6 +4.80 F.F.L

STUDIOFIVE CAIRO.DUBAI.HOUSTON

1.90

WALNUT VENEER WOODEN RIBS AS PER APPROVE SAMPLE

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

GROUND FLOOR F.F.L

2

4.00

2.10

RELAXATION AREA Z04 +0.00 F.F.L.

+0.00 F.F.L

2.40

+0.00 F.F.L

CAIRO.DUBAI.HOUSTON

WALNUT VENEER WOODEN RIBS AS PER APPROVE SAMPLE

4.00

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

STUDIOFIVE

CONCRETE EFFECT WALL FINISH AS PER APPROVED SAMPLE

1.60

CONCRETE EFFECT WALL FINISH AS PER APPROVED SAMPLE

BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

0.05

0.05

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

7

0.71

BOTTOM OF SLAB 0.71

+4.80 F.F.L

F

+0.00 F.F.L.

GROUND FLOOR F.F.L

Z04 - RELAXATION AREA - INTERNAL ELEVATION 1 : 50

1

Z04 - RELAXATION AREA - INTERNAL ELEVATION 1 : 50

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

MARCH 2022

7

6

Revisions

Revisions

Description

0

Date

TENDER DETAILS

03-03-2022

+4.80 F.F.L

No.

BOTTOM OF SLAB

CONCRETE EFFECT WALL FINISH AS PER APPROVED SAMPLE

CAMELOT SPA

CAMELOT SPA 4.00

WALNUT VENEER WOODEN RIBS AS PER APPROVE SAMPLE

Z04-INTERNAL ELEVATIONS

Project number

EG22001

Date

1-3-2022 M.ABDELSALAM

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

+0.00 F.F.L

Project number

+0.00 F.F.L.

GROUND FLOOR F.F.L

1-3-2022

Drawn by

Z04 - RELAXATION AREA - 3D

H +4.80 F.F.L

1 : 50

Sheet Size

F

M.WALY

EG22001-DD-AR-Z04-7-17

Scale

G

M.ABDELSALAM

Checked by

EG22001-DD-AR-Z04-7-16

1

EG22001

Date

M.WALY

Checked by

03-03-2022

SHARM EL SHEIKH

Z04-INTERNAL ELEVATIONS

Drawn by

Date

TENDER DETAILS

0.05

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

SHARM EL SHEIKH

Description

0 0.71

No.

3

A2

Z04 - RELAXATION AREA - INTERNAL ELEVATION 1 : 50

1 : 50

Scale Sheet Size

A2

E

BOTTOM OF SLAB

1.90

CAIRO.DUBAI.HOUSTON

EG22001-DD-AR-Z04-12-02

7-

CLEAR MIRROR Z04-03 -

RELAXATION AREA Z04

0.20

2.10

TRAVERTINE MARBLE CALDDING AS PER APPROVED SAMPLE

E

0.10

0.35

STEEL STRUCTURE

E

0.90

TRAVERTINE MARBLE FLOORING AS +0.00 PER APPROVE SAMPLE F.F.L. +0.00 F.F.L GROUND FLOOR F.F.L

+0.00 F.F.L

2

0.25

TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

0.20

WOODEN FRAME AS PER APPROVED SAMPLE

4.00

WALNUT VENEER WOODEN UNITS AS PER APPROVE SAMPLE

STUDIOFIVE

1.85

1

CAIRO.DUBAI.HOUSTON

3.10

WALNUT VENEER WOODEN RIBS AS PER APPROVE SAMPLE

2.95

0.71 0.05

STUDIOFIVE

CONCRETE EFFECT WALL FINISH AS PER APPROVED SAMPLE

VARIABLE

0.71 0.05

0.45

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

GROUND FLOOR F.F.L

EG22001-DD-AR-Z04-12-02

4

Z04 - RELAXATION AREA - INTERNAL ELEVATION 1 : 50

4

Z04-ROOM 03 - DETAILED PLAN - Callout 1 1 : 25

1

Z04- TRAVERTINE SINK UNIT - SECTION 1 : 25

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

MARCH 2022

Revisions

Revisions

Description TENDER DETAILS

No.

03-03-2022

CAMELOT SPA

CAMELOT SPA

WOODEN FRAME AS PER APPROVED SAMPLE

Z04-INTERNAL ELEVATIONS

Date

1-3-2022

TRAVERTINE MARBLE CALDDING AS PER APPROVED SAMPLE

DETAILS VARIABLE

Project number

M.ABDELSALAM

+0.00 F.F.L

M.WALY

GROUND FLOOR F.F.L

Z04 - RELAXATION AREA -3D

BIM ARCHITECT PORTFOLIO

Scale Sheet Size

1-3-2022

Drawn by

M.ABDELSALAM M.WALY

Checked by

EG22001-DD-AR-Z04-7-18

2

EG22001

Date 0.70

EG22001

Date 03-03-2022

SHARM EL SHEIKH

CLEAR MIRROR

Project number

Checked by

TENDER DETAILS

1.85

SHARM EL SHEIKH

Drawn by

Description

0

0.20

0

Date

0.20

No.

EG22001-DD-AR-Z04-12-02 1 : 50 A2

3

TRAVERTINE MARBLE SINK UNIT

2

Z04 - TRAVERTINE SINK UNIT - ELEVATION 1 : 25

1 : 25

Scale Sheet Size

A2

8


4

5

4

5

STUDIOFIVE

STUDIOFIVE CAIRO.DUBAI.HOUSTON

0.77

0.77

3.59

0.30 0.70

6

D-01

W-01

D-01

SAUNA Z05

DESIGN DEVELOPMENT

0.30

Z05-0002

0.34

7

0.70

D-01

STEAM ROOM Z05

1.31

0.78

0.70

0.76

0.76

STEAM ROOM Z05

1.57

5 8

1.73

D-01

0.76

0.32

0.32

W-01

0.70

D-01

1.73

D-01

D-01

W-01

1.57

W-01 0.70

0.76

W-01

0.34

0.71

1.48 0.03

D-01

DESCRIPTION SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS

MARCH 2022

M.WALY

TH-01

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

F

Description

0

1.92 1.48 S-01 S-01

S-01

S-01

Date

TENDER DETAILS

03-03-2022

F

0.56

STEAM ROOM Z05

No. F-02

F-02

F

Description

0

TENDER DETAILS

Date 03-03-2022

S-01

S-01

S-01

F-03

0.90

0.90 0.90

0.90

F-03

WOMEN'S SHOWER CHANGING ROOMS Z05

0.90

SHARM EL SHEIKH CAMELOT SPA

S-01

S-01

S-01

S-01

F-01

T

Z05-FLOORING PLAN

F-02

S-01

S-01

F-02

CAMELOT SPA

0.11

T

Z05 - LIGHTING REFLECTED CEILING PLAN

Project number

EG22001

Project number

Date

1-3-2022

Date

Drawn by

4

M.ABDELSALAM M.WALY

Checked by

5

Sheet Size

EG22001 1-3-2022

Drawn by

M.ABDELSALAM M.WALY

Checked by

EG22001-DD-AR-Z05-4-01 Scale

BIM ARCHITECT PORTFOLIO

Revisions

F-01

S-01

5

MARCH 2022

SAUNA Z05

F-03

MEN'S SHOWER CHANGING ROOMS Z05

SHARM EL SHEIKH

0.90

0.90

0.90

0.90

0.90

4

DESIGN DEVELOPMENT S-01

S-01

S-01

STEAM ROOM Z05

F-03

F-01

No.

TOILET Z05

F-02

SAUNA Z05

SP SP

Z05 - BATHROOMS AREA - FLOORING PLAN 1 : 50

2.61 0.54 S-01 F-03

F-01

1

2.02

0.91 0.99 S-01

S-01

TOILET Z05

F-02

MARCH 2022

0.90

TOILET Z05

TOILET Z05

0.80

0.90

TOILET Z05

F-03

SAUNA Z05

0.53

S-01

S-01

0.86 +0.00 F.F.L.

TOILET Z05

S-01

0.53

E

LT -01

DESIGN DEVELOPMENT

0.90

0.90 0.90

S-01

MEN'S BATHROOM Z05

0.90

0.90

0.90 0.90

0.90 0.90

S-01

S-01

START POINT SYMBOLS

F-01

0.90 0.90

0.90

WOMEN'S SHOWER CHANGING ROOMS Z05 +0.00 F.F.L.

S-01

S-01

S-01

0.90 0.90

0.90

0.90

F-01

0.60

3.36

0.15

TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE

F-01

0.90

0.90

0.80

0.80

0.90

S-01

S-01

SYMBOL

S-01 S-02 F-01 F-02 F-03 F-04 L-01 T

S-01

0.90

0.63

0.90

0.80 0.90

MEN'S SHOWER CHANGING ROOMS Z05 +0.00 F.F.L.

S-01

S-01

0.90

0.50

0.90

F

0.90

S-01

S-01 S-01

E

CODE

WOMEN'S BATHROOM Z05

DESCRIPTION

Revisions 0.60

S-01

S-01

0.90

S-01

S-01

0.90 0.86

F-01 SP

0.78

S-01

S-01

0.94

STEAM ROOM Z05

F-01

S-01

S-01

STEAM ROOM Z05

0.79

0.90

0.61

0.06 +0.00 F.F.L.

STUDIOFIVE CEILING LIGHTING

MEN'S BATHROOM Z05

S-01

0.90

+0.00 F.F.L.

S-01

S-01

0.90

WOMEN'S BATHROOM Z05

S-01

S-01

SP

S-01

S-01

+0.00 F.F.L.

0.83

0.86

S-01

S-01

F-01

0.86

A2

5

S-01

0.83

0.53

0.90

F-01

+0.00 F.F.L.

0.90

0.90

+0.00 F.F.L.

F-01

0.11

0.90

F-01

0.67

THRESHOLD FINISH THRESHOLD TYPE

0.17

0.90

E

1 : 50

CAIRO.DUBAI.HOUSTON

TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE

0.90

+0.00 F.F.L.

0.90

0.83

0.90

0.90

0.79 SP

0.90

0.61

0.61

0.83

0.83

0.90

0.90

0.84

0.66

M.WALY

Checked by

Sheet Size

DESCRIPTION

F-01 F-02 F-03 F-04

M.ABDELSALAM

Scale

S-01

0.90

0.90

0.90

1-3-2022

Drawn by

5

Z05 - BATHROOMS AREA - DETAILED PLAN 1 : 50

S-01

0.67

0.32 0.60

0.90

SAUNA Z05

1

S-01

0.14

0.90

0.90

A2

0.66 0.90

0.90

0.90

EG22001

EG22001-DD-AR-Z05-3-01 1 : 50

FLOOR TYPE

0.72

0.90

0.94

0.90

0.90

0.90

0.90

0.90

0.85

0.90

0.90

0.90

SP

F-01 0.60

1.22

CAIRO.DUBAI.HOUSTON

0.72

0.90

0.90

0.17

0.69

0.90

+0.00 F.F.L.

4

S-01

0.93

0.90

0.86

0.90

0.90

0.09

0.90

0.90

0.90

0.90

MEN'S BATHROOM Z05

1.48

1.48

M.ABDELSALAM

STUDIOFIVE

0.64

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.83

0.60

0.90

Z05-DETAILED PLAN

W-01

4.14

Date

FLOOR FINISH

1.42

0.90

0.11 0.93

0.67

0.90

F-01

0.60

0.90

0.83

2.37

0.90

0.90

0.90

0.58

0.90

1.82

Project number

0.70

0.60 0.84 0.90

0.57

0.20

0.60

CAMELOT SPA

3 1

W-01

1.60

4

0.90

0.90

0.90

0.90

0.90

0.38

0.58 0.90

0.90

0.90

0.42

0.52

0.90

0.90 0.60

0.90

0.90

0.90

0.90

E

SHARM EL SHEIKH

0.45

W-01

2-

1-3-2022

Scale

0.90

0.90

+0.00 F.F.L.

0.60

0.90

0.58

0.42

0.93

0.90

0.90

EG22001-DD-AR-Z05-7-00 EG22001-DD-AR-Z05-7-01 Z05-0002 -

W-01

GL-01

EG22001

5

0.52

0.46

0.90

0.90

4 2

W-01 2.13

WOMEN'S SHOWER CHANGING ROOMS Z05

1-

Date

Sheet Size

F-01

0.90

F

0.15

5

4

0.58

W-01 0.150.25

Date 03-03-2022

1.83

1.29

EG22001-DD-AR-Z05-1-01

Z05 - BATHROOMS AREA - FURNITURE PLAN 4 1 : 50

0.90

3 2 0.72

W-01

Checked by

0.38

1.60

Project number Drawn by

0.40

GL-01 3.36

EG22001-DD-AR-Z05-7-03 EG22001-DD-AR-Z05-7-04 Z05-0003

1.72

0.90

GL-01

1.82

Description TENDER DETAILS

1.44

0.89

3.36

CAMELOT SPA

5 2

4 1

0.58

W-01

GL-01

2 1

0.99

GL-01

Z05-FURNITURE PLAN

1

W-01

1.88

2.20

GL-01

SHARM EL SHEIKH

WOMEN'S SHOWER CHANGING ROOMS Z05

No. 0

1.71

0.90

1.80

W-01

MEN'S SHOWER CHANGING ROOMS Z05

Revisions

0.72

F

W-01

0.69

0.71

03-03-2022

1.09

TENDER DETAILS

1.18

1.73

0.90

0

1.19

0.99

F

1.19

Date

0.76

F

Description

1.85

No.

2.61

2.85

Revisions

0.91

1.90

SAUNA Z05

0.32

1.68

MARCH 2022

1.56

W-01

E

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08

1.08

1.59

W-01

0.70

0.47

SAUNA Z05

D-01

0.70

STEAM ROOM Z05

W-01

1.59

1.59

7-

Z05-0003 -

STEAM ROOM Z05

0.70

0.26

W-02

1.80

DESIGN DEVELOPMENT SAUNA Z05

W-01

0.70

TOILET Z05

1.78

TOILET Z05

6

W-01

0.53

F-01

W-01

W-01

W-01

W-01

W-01 3.12

1.59

D-01

TOILET Z05

W-01

2.27

W-01 0.71

WOMEN'S BATHROOM Z05 0.90

MEN'S BATHROOM Z05

TOILET Z05

TOILET Z05

10 2

11

MEN'S BATHROOM Z05

1.10

W-04

1.13

EG22001-DD-AR-Z05-7-02

W-01 0.42

W-01

9 1

2.78

2.78

W-01

0.76

9 2

W-05

TOILET Z05

W-02 W-02

0.68

EG22001-DD-AR-Z05-7-05 Z05-0003

W-04

0.32

W-05

0.64

E

8 1

2.80

E

1.60

W-01 W-01

W-04

E

0.57

3.06

Wall Type

3.59

1.19

1.04

0.66

W-01

INTERIOR WALL W-04

W-01

0.06

0.26 1.81

W-01

D-02

2.51

0.86

W-01

D-02

W-01

W-01

3.37 1.05

1.05

1.36

W-04

2.71 1.36

1.59

UP

0.90

1.81

0.08

CAIRO.DUBAI.HOUSTON

UP

EG22001-DD-LD-Z05-1-01

As indicated A2

1

ABDELSALAM_CEILING PLAN - Dependent 5 1 : 50

Scale

As indicated

Sheet Size

A2

9


E

0.53

1.20

0.50

1.00

D-01

0.50

STUDIOFIVE CAIRO.DUBAI.HOUSTON

2.40

1.20

SP

GROUND FLOOR F.F.L

GROUND FLOOR F.F.L

+0.00 F.F.L

+0.00 F.F.L.

GROUND FLOOR F.F.L

1.20

+0.00 F.F.L

2.10

2.40 0.40

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

D-02

GROUND FLOOR F.F.L

+0.00 F.F.L

0.40

2.40

D-01

+0.00 F.F.L.

0.80

1.80

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

+0.00 F.F.L D-01

0.78

0.80

1.20

+0.00 F.F.L.

1.20

1.20

FIBER GLASS SINK UNIT WITH COCRETE EFFECT FINISH

1.20

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

0.77

1.80

CLEAR MIRROR

GLASS PARTITION WALNUT VENEER WOODEN LOCKERS AS PER APPROVE SAMPLE

0.51

TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

1.60

TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

0.53

WALNUT VENEER WOODEN LOCKERS AS PER APPROVE SAMPLE

+4.80 F.F.L

1.20

0.51

1.60

0.90

1.60

0.90

BOTTOM OF SLAB

1.90

0.54

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

CAIRO.DUBAI.HOUSTON

BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

0.05

0.50

STUDIOFIVE

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

+4.80 F.F.L

0.71

BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

BOTTOM OF SLAB

+0.00 F.F.L

BOTTOM OF SLAB

+4.80 F.F.L

1.20

+4.80 F.F.L

E

E

1.00

F

+4.80 F.F.L

GROUND FLOOR F.F.L

Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50

1

2

Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50

Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50

2

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

MARCH 2022

5 Revisions

No.

+4.80 F.F.L

Description

0

No.

03-03-2022

Description

0

Date

TENDER DETAILS

03-03-2022

0.50

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

0.05

0.71

BOTTOM OF SLAB

Revisions

Date

TENDER DETAILS

TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

0.90

0.90

0.90

0.90

0.90

0.90

0.90

SHARM EL SHEIKH

0.83

1.20

0.04

SHARM EL SHEIKH

CAMELOT SPA

CAMELOT SPA

1.20

4.00

GLASS PARTITION

Z05-INTERNAL ELEVATIONS

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

Project number SP

Sheet Size

SP

Z05 -WOMENS BATHROOM - INTERNAL ELEVATION 1 : 50

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

0.71

0.50 0.70

0.30

0.70

0.30

0.70

0.90

0.90

STUDIOFIVE

0.22

1.60

0.86

CAIRO.DUBAI.HOUSTON

GLASS PARTITION WALNUT VENEER WOODEN LOCKERS AS PER APPROVE SAMPLE TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

0.40

D-02

+0.00 F.F.L

1.20

+0.00 F.F.L.

GROUND FLOOR F.F.L

2

0.05

TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

CAIRO.DUBAI.HOUSTON

1.20

STUDIOFIVE

0.53

1.80

CLEAR MIRROR

+0.00 F.F.L

0.90

1.20

0.90

0.80

0.40 0.80

1.20

GROUND FLOOR F.F.L

1

0.45

1.20

1.80

4.00 1.20

4.00 +0.00 F.F.L.

0.52

FIBER GLASS SINK UNIT WITH COCRETE EFFECT FINISH

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

+0.00 F.F.L

0.52

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

CLEAR MIRROR

FIBER GLASS SINK UNIT WITH COCRETE EFFECT FINISH

TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

D-01

D-01

D-01

+0.00 F.F.L.

2.40

0.74

1.20

0.90

1.00

0.90

1.20

0.44

BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

1.60

0.46

A2

F

BOTTOM OF SLAB

2.40

0.81 1.20

0.66

E

0.50

0.05

0.50

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

Sheet Size

+4.80 F.F.L

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

0.71

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

1 : 50

Scale

4.00

+4.80 F.F.L

BOTTOM OF SLAB

1.00

+4.80 F.F.L

M.WALY

EG22001-DD-AR-Z05-7-02

A2

E

4

M.ABDELSALAM

Checked by

MEN'S BATHROOM - 3D

3

1 : 50

Scale

1-3-2022

Drawn by

M.WALY

EG22001-DD-AR-Z05-7-01

Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50

EG22001

Date

M.ABDELSALAM

Checked by

1

Project number

1-3-2022

Drawn by

1.90

GROUND FLOOR F.F.L

EG22001

Date

2.10

+0.00 F.F.L.

1.20

+0.00 F.F.L

Z05-INTERNAL ELEVATIONS

SP

GROUND FLOOR F.F.L

SP

2

Z05 -WOMENS BATHROOM - INTERNAL ELEVATION 1 : 50

Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

MARCH 2022

5

Revisions TENDER DETAILS

03-03-2022

+4.80 F.F.L

No. BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

Description TENDER DETAILS

0.83

0.90

0.90

0.79

0.64

0.64

0.44

0.90

Date 03-03-2022

SHARM EL SHEIKH

0.49

1.20

SHARM EL SHEIKH

Revisions 0 0.71

0

Date

0.05

Description

0.50

No.

CAMELOT SPA 1.20

4.00

CAMELOT SPA Z05-INTERNAL ELEVATIONS EG22001

Date

1-3-2022

Drawn by

M.ABDELSALAM

Checked by

3

WOMEN'S BATHROOM - 3D

Scale

Project number +0.00 F.F.L.

GROUND FLOOR F.F.L

M.WALY

1 : 50 A2

EG22001

Date SP

1-3-2022

Drawn by

M.ABDELSALAM M.WALY

Checked by

EG22001-DD-AR-Z05-7-05

Sheet Size

BIM ARCHITECT PORTFOLIO

+0.00 F.F.L

1.20

Project number

Z05-INTERNAL ELEVATIONS

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

1

Z05 -MEN'S BATHROOM - INTERNAL ELEVATION 1 : 50

EG22001-DD-AR-Z05-7-00 1 : 50

Scale Sheet Size

A2

10


1.00

MAIN CORRIDOR Z10

0.50

0.70

W-02

0.03

0.70

0.03

1.20

0.03

W-02

W-03 W-03

W-03

0.03

0.70

0.02

0.70

0.03

0.95

1.00

W-03

1.20

0.03

0.70

0.26

+0.00 F.F.L.

0.03

0.83

UP

1.00

0.43

W-06

W-02

1.91

1.55

1.20

1.28

1.50

1.32

1.46

1.10

0.10 0.35

3.90

W-03

W-02 W-03

CAIRO.DUBAI.HOUSTON

0.87

W-02

MAIN CORRIDOR Z10

W-03

+0.45 F.F.L. 0.30 0.15

1.53

W-03

+0.45 F.F.L.

0.50

1.55

0.50

W-03

+0.45 F.F.L.

W-03

INTERIOR WALL

+0.00 F.F.L.

W-03 0.39

3.40

UP

Wall Type

W-03

W-02 W-03

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08

UP

W-04

DESCRIPTION SMOOTH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPLE ROUGH TRAVERTINE MARBLE CLADDING MECHANICAL AS APPROVED SAMPL WALNUT VENEER WOOD CLADDING AS PER APPROVE SAMPLE CONCRETE EFFECT PAINT AS APPROVED SAMPLE CLEAR MIRROR CLADDING WITH PLYWOOD FROM BEHIND GREEN WALL AS APPROVED SAMPLE ACP CLADDING AS PER APPROVED SAMPLE BROWN WOODEN RIBS

3.55

3.55

STUDIOFIVE

D

+0.45 F.F.L.

0.31

0.70

W-02

0.96

CAIRO.DUBAI.HOUSTON

W-06

0.95

W-02

0.46

D

0.19 0.37

STUDIOFIVE

5

GREEN WALL

0.24

D

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

4

GREEN WALL

1.41

D

3

0.95

2

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

0.46

5

0.25

4

0.19 0.37

3

0.40

2

W-04

2

2

3

4

5

Z10 - FURNITURE 02 1 : 50

1

Z10 -MAIN CORRIDOR - DETAILED PLAN 1 : 50

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

7

7

Revisions

Revisions

Description

No.

03-03-2022

Description

0

D

D

0.87

1.85

0.03

1.50

0.03

+0.00 F.F.L.

W-03

W-02

0.02

6

2.70

W-03

EG22001-DD-AR-Z10-7-03 EG22001-DD-AR-Z10-7-01 EG22001-DD-AR-Z10-7-00 EG22001-DD-AR-Z10-7-02 Z10-01

0.030.380.03

3.67

0.03

1.22

0.03

3.60

W-03

W-02

W-03

0.03

1.00

0.03

W-02

2.16

W-02

1.00

0.03

1.20

0.03

0.99

0.03

W-03

15.87

0.91

1.92

0.81

0.03

W-03 1.07

0.03

1.20

0.03

SHARM EL SHEIKH

W-03

4

5 1

W-03

0.39

1.37

3 1

W-03 +0.45 F.F.L.

CAMELOT SPA

1.30

0.03

CAMELOT SPA

W-03 2.14

Z10-FURNITURE LAYOUT

Z10-DETAILED PLAN

Project number

EG22001

Date

1-3-2022

Drawn by

7

0.90

0.90 0.90

0.90

1.55

0.90

0.90

0.90

FLOOR TYPE

DESCRIPTION

F-01 F-02 F-03 F-04

UP

0.15 0.39 0.15

TRAVERTINE MARBLE FLOORING AS PER APPROVED SAMPLE RUBBER FLOORING ON MOSIC TILES AS PER APPROVED SAMPLE GRAVEL AS PER APPROVED SAMPLE WPC FLOORING AS PER APPROVED SAMPLE

0.90 0.90

7.72

0.20 1.92

5

DESCRIPTION

TH-01

S.C.L

6.48

CEILING SCHEDULE 0.15

TYPE

DESCRIPTION

C-01 C-02

GYPSUM BOARD - CONCREATE EFFECT PAIN AS APPROVED SAMPLE WOODEN RIBS CEILING

3.37

THRESHOLD FINISH THRESHOLD TYPE

CAIRO.DUBAI.HOUSTON

+4.00

FLOOR FINISH

0.15

STUDIOFIVE

0.15

0.90

D 16.86

MAIN CORRIDOR Z10 2.05

0.90

A2

7

0.15

0.90

0.86

0.90

0.73

0.90

6

0.15

0.28

0.75 0.90

0.90 0.90

Sheet Size

CAIRO.DUBAI.HOUSTON

0.30 0.30 0.30

0.40

0.90

1.79

0.90

0.86

0.90

F-01

0.90

0.90

1 : 50

Scale

D

STUDIOFIVE

SP

+0.45 F.F.L. 0.90

0.90 0.90

Z10 -MAIN CORRIDOR - DETAILED PLAN 1 : 50

0.20

D

0.28

0.38

0.44

MAIN CORRIDOR Z10

0.66

0.90

2

2.05

D

UP

A2

5

1.50

SP 0.07 0.90

1 : 50

0.15

1.21

+0.00 F.F.L.

M.WALY

5

1.53

F-01

M.ABDELSALAM

Checked by

2.05

4

MAIN CORRIDOR Z10

1-3-2022

Drawn by

EG22001-DD-AR-Z10-3-00

Sheet Size

3

EG22001

Date

7

Checker

Scale

Z10 - FURNITURE 1 : 50

2

6

EG22001-DD-AR-Z10-1-00

0.30 0.30 0.30

1

6

Project number

5

Author

Checked by

5

03-03-2022

D

W-02

SHARM EL SHEIKH

Date

TENDER DETAILS

0.50

D

Date

TENDER DETAILS

1.20

No. 0

2.40

6

6

0.70

5

MARCH 2022

5

6

7

TRAVERTINE MARBLE THRESHOLD AS PER APPROVED SAMPLE

0.87

START POINT SYMBOLS

1

Z10 -MAIN CORRIDOR - FLOORING PLAN 1 : 50

1

Z10 - CORRIDOR - CEILING PLAN 1 : 50

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

MARCH 2022

2

7

3

4

Revisions

0.15 0.25

9.34

0.15 0.35 0.15

3.60

0.15 0.50 0.15

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

5

Z10 -MAIN CORRIDOR - FLOORING PLAN 1 : 50

BIM ARCHITECT PORTFOLIO

0.90

0.90

0.90

0.90

0.44

6

7

TENDER DETAILS

0.15 0.50 0.15

3.10

SHARM EL SHEIKH

0.15 0.39 0.15

CAMELOT SPA

Z10-FLOOR FINISH PLAN

Z10-REFLECTED CEILING PLAN

Project number

EG22001

Date

1-3-2022

Drawn by

Project number

2

M.ABDELSALAM M.WALY

Checked by

3

4

5

Sheet Size

EG22001

Date

1-3-2022

Drawn by

M.ABDELSALAM M.WALY

Checked by

EG22001-DD-AR-Z10-4-00 Scale

Date 03-03-2022

3.15 1.25

0.15

0.15

1.10

0.87

SP

0.15 0.35 0.15

S.C.L

Description

0

0.15

C-01

+4.00

5.50

CAMELOT SPA

0.35

0.90 0.35

0.20

1.71

0.56

+0.00 F.F.L. 0.87

0.15

0.15 0.35 0.15

0.75

SHARM EL SHEIKH

F-01

No.

D

MAIN CORRIDOR Z10 5.30

1.60

0.38

0.15

0.90

0.90

MAIN CORRIDOR Z10

UP

2

D

D 0.38

D

Revisions

1.45

Date 03-03-2022

0.15

Description TENDER DETAILS

0.15

No. 0

5

0.15

6

0.77

5

EG22001-DD-AR-Z10-5-00

As indicated A2

2

Z10 - CORRIDOR - CEILING PLAN 1 : 50

1 : 50

Scale Sheet Size

A2

11


7

5

8 +4.80 F.F.L

BOTTOM OF SLAB

0.90

0.90

0.40

0.90

GROUND FLOOR F.F.L

2.40

D-03

SP

SP

+0.00 F.F.L

SP

Z10 - MAIN CORRIDOR - INTERNAL ELEVATIONS 1 : 50

1

1

0.71 0.05 0.90

0.90

0.90

0.15

STUDIOFIVE

1.20 1.70

0.90

CAIRO.DUBAI.HOUSTON

3.03

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE +0.00 F.F.L.

SP

0.15

D-04

WALNUT VENEER WOOD CALDDING AS PER APPROVED SAMPLE

1.20

+0.00 F.F.L

D-05

+0.45 F.F.L.

0.75

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

1.20 2.40

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

0.80

SP

4.00

0.90

0.80

MAIN CORRIDOR Z10

2.40

0.90

0.90

D-03

+0.45 F.F.L. 0.52

0.90

0.90

SP

SP

2.40

1.60 0.90

0.80

1.15

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

CAIRO.DUBAI.HOUSTON

4.00

0.90

BOTTOM OF SLAB

0.50

STUDIOFIVE

1.20

WALNUT VENEER WOOD CALDDING AS PER APPROVED SAMPLE

2

1.20

0.05

0.50 1.70

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

3

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

0.71

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

4

1.20

+4.80 F.F.L

6

0.75

5

+0.00 F.F.L.

GROUND FLOOR F.F.L

Z10 - MAIN CORRIDOR - INTERNAL ELEVATIONS 1 : 50

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

MARCH 2022

Revisions

Revisions

No.

Description

0

Date

TENDER DETAILS

No.

03-03-2022

Description

0

SHARM EL SHEIKH

CAMELOT SPA

CAMELOT SPA

Z10-INTERNAL ELEVATIONS

Date Drawn by

Z10-INTERNAL ELEVATIONS

EG22001

Project number

1-3-2022

Date

M.ABDELSALAM

1-3-2022

1

0.71 0.50 1.20 0.73

0.83

Z10 - MAIN CORRIDOR - INTERNAL ELEVATIONS 1 : 50

1

GROUND FLOOR F.F.L

SP

+0.45 F.F.L.

0.59

2.40

D-03 +0.00 F.F.L.

0.60

MAIN CORRIDOR Z10

0.60

3.55

2.96 0.93

1.20

2.40

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

+0.00 F.F.L

0.05

0.71 0.05

0.93 4.00

1.20

WALNUT VENEER WOOD CALDDING AS PER APPROVED SAMPLE SP

STUDIOFIVE

1.70

1.70

0.50 1.20

0.05

ROUGH FINISH TRAVERTINE MARBLE WALL CLADDING MECHANICAL FIXATION

GROUND FLOOR F.F.L

5

CAIRO.DUBAI.HOUSTON

1.20

+0.00 F.F.L

4

0.66

0.66

0.60

0.50

0.87

SP

Z10 - MAIN CORRIDOR - INTERNAL ELEVATIONS 1 : 50

DESIGN DEVELOPMENT

DESIGN DEVELOPMENT

MARCH 2022

MARCH 2022

Revisions

No.

Revisions

Description

0

TENDER DETAILS

Date

No.

03-03-2022

Description

0

SHARM EL SHEIKH CAMELOT SPA

Z10-INTERNAL ELEVATIONS

Z10-INTERNAL ELEVATIONS

Date Drawn by

EG22001

Project number

1-3-2022

Date

M.ABDELSALAM

Checked by

Scale Sheet Size

EG22001 1-3-2022

Drawn by

M.WALY

M.ABDELSALAM M.WALY

Checked by

EG22001-DD-AR-Z10-7-02

BIM ARCHITECT PORTFOLIO

03-03-2022

CAMELOT SPA

Project number

MAIN CORRIDOR

Date

TENDER DETAILS

SHARM EL SHEIKH

2

A2

BOTTOM OF SLAB

TRAVERTINE MARBLE WALL CLADDING - MECHANICAL FIXATION

4.00

1.60

CAIRO.DUBAI.HOUSTON

D-04

2.40

TRAVERTINE MARBLE FLOORING AS PER APPROVE SAMPLE

3

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

STUDIOFIVE

0.80

D-04

Sheet Size

2 +4.80 F.F.L

1 : 50

Scale

MAIN CORRIDOR

5

BOTTOM OF SLAB

CONCRETE EFFECT GYPSUM BOARD CEILING AS PER APPROVED SAMPLE

WALNUT VENEER WOOD CALDDING AS PER APPROVED SAMPLE

2

1.20

A2

0.75

1 : 50

Sheet Size

0.71

+4.80 F.F.L

M.WALY

EG22001-DD-AR-Z10-7-01

Scale

6

M.ABDELSALAM

Checked by

EG22001-DD-AR-Z10-7-00

7

EG22001

Drawn by

M.WALY

Checked by

MAIN CORRIDOR

03-03-2022

SHARM EL SHEIKH

Project number

2

Date

TENDER DETAILS

EG22001-DD-AR-Z10-7-03 1 : 50 A2

2

MAIN CORRIDOR - 3D

1 : 50

Scale Sheet Size

A2

12


M.K HOUSE - 6 OCTOBRE GIZA, EGYPT


ELEVATION TARGETS

ELEVATION

ELEVATION DESIGNATION

01

A-02-02 000-0001

SHEET REFERENCE NUMBER SITE/BUILDING/SERIAL NUMBER

BUILDING SECTION TARGETS

SECTION DESIGNATION

01

A-03-02 000-0001

SHEET REFERENCE NUMBER

01

A-03-02 000-0001

WALL SECTION TARGETS

WS-A

0-G-000-01

SECTION DESIGNATION SHEET REFERENCE NUMBER

DETAIL TARGETS DETAIL DESIGNATION

01

2

A-04-01 000-0001

SHEET REFERENCE NUMBER SITE/BUILDING/SERIAL NUMBER

AREA DETAIL REFERENCE

2

DETAIL DESIGNATION

01

A-04-01 000-0001

SHEET REFERENCE NUMBER

ELEVATION MARK +289.90 F.F.L

+289.90 T.O.P

+289.90 T.O.S

+289.90 F.F.L

For CONSTRUCTION

LEVEL INDICATION ON PLAN

SEPTEMBER 2021 LEVEL INDICATION ON SECTIONS & ELEVATIONS

No.

DRAWING NUMBERING SYSTEM

0 1

EG20029 - TD - ID - 01 - GRF - 0001 - R00

Description APPROVED ISSUE AS CLOUDED

Date 01/09/2021 24/10/2021

REVISION SEQUENCE NO

Revisions

LEVEL INDICATOR DRAWING TYPE (DETAILED PLAN/CEILING PLAN) DISCIPLINE ACRONYM (INTERIOR DESIGN) PROJECT PHASE (TENDER DESIGN)

VILLA MR/ M .KHALIFA

PROJECT NUMBER

MISCELLANEOUS TARGETS

COVER

DOOR TAG DOOR CONSECUTIVE NUMBER

WINDOW CONSECUTIVE NUMBER

Date Drawn by

WALL TAG WALL TYPE

Checked by SPACE NAME ROOM NUMBER

EG20026 24/10/2021 M.ABDELSALAM M.WALY

EG20026-TD-ID-0-GN-0 FINISH NUMBER (REFER TO FINISH SCHEDULE) FLOOR NUMBER ROOM CONSECUTIVE NUMBER

BIM ARCHITECT PORTFOLIO

Scale

1 : 50

14

10/24/2021 12:34:52 PM

Project number WINDOW TAG


1

2

3

3'

4

5

6

6'

7

8

9

1

A'

2

3

3'

4

5

6

6'

7

8

9

A'

A'

A

A

A

B'

B'

B'

B

B

A'

DRIVER & PORTER'S BEDROOM 074

SUN BED

A BATHROOM 075

KITCHENETTE 082

B'

BATHROOM 077

SAUNA 085

POOL HOUSE 079 LAUNDRY 076

SHOWER 078

B

B

STORAGE 073

SECONDARY SEATING 064

DINING AREA 063

LIVING AREA 086

MAIN SEATING AREA 065

BATHROOM 083

C

C LOBBY 081

STORAGE 084

MAID'S BEDROOM 087

C

C

OUTDOOR GYM 089

D

RECEPTION 062

D

D

D

For CONSTRUCTION

E

E

No.

Description

E

No.

01/09/2021

G

F

G

0

GUEST WASHROOM 061

D

01/0

Revisions

G

VILLA MR/ M .KHALIFA

Description APPROVED ISSUE

F

KITCHEN 010

Revisions

HARD KITCHEN 088

SEPTEMBER 2021

Date

APPROVED ISSUE

F

INDOOR JACUZZI 080

For CONSTRUCTION

E

SEPTEMBER 2021

0

F

UP

G

VILLA MR/ M .KHALIF

CIGAR LOUNGE 066

H

M.WALY

Checked by

1

3

3'

4

5

6

6'

7

8

9

EG20026-TD-ID-1-BF-0

1 : 50

1 : 50

Scale

1

2

3

3'

4

5

6

6'

7

8

+0.35 F.F.L.

+0.20 F.F.L.

1

1

+0.05 F.F.L.

2

3

3'

4

5

6

6'

7

EG20

01/09/2

Date -0.10 F.F.L.

8

M.ABDELSAL

Drawn by

M.W

Checked by

9

EG20026-TD-ID-1-GR

GROUND FLOOR FURNITURE PLAN 1 : 50

1

Scale

9 1

A'

2

3

4

3'

5

6

6'

7

8

9

A' SECONDARY BEDROOM (A) F-01

A'

A

A'

A MASTER SUITE F-06

OUTDOOR AREA 095

A

B'

A

B' FAMILY LIVING ROOM F-07

2.35

LAUNDRY ROOM 067

D

KITCHENETTE/BAR AREA F-08

C

B

B

C

GUEST BATHROOM 090

D

FOYER F-09

E

SEATING AREA 092

C

D

FOYER F-04 UP

E

D

For CONSTRUCTION

For CONSTRUCT

E

SEPTEMBER 2021 HIS DRESSING ROOM F-05

No. 0

F

Description APPROVED ISSUE

Date

No. 0

F

Revisions

G

HER DRESSING ROOM F-10

G

G

VILLA MR/ M .KHALIFA

SECONDARY CLOSET B F-03

H

VILLA MR/ M .K

H

H

FIRST FLOOR FURNITURE PLAN

Date Drawn by

3

3'

4

5

6

6'

7

8

9

Checked by

1 : 50

BIM ARCHITECT PORTFOLIO

Scale

ROOF FLOOR FU PLAN

EG20026

Project number Date

M.ABDELSALAM M.WALY

EG20026-TD-ID-1- FR-0 FIRST FLOOR FURNITURE PLAN

H

01/09/2021

1 : 50

Drawn by

10/10/2021 7:01:25 PM

Project number

Description APPROVED ISSUE

F

PREPARATION COUNTER 093

Revisions

SECONDARY BEDROOM B F-02

2

SEPTEMBER 2

GUEST BEDROOM 091

01/09/2021

F

1

E

GUEST WASHROOM 094

UP

SECONDARY BATH ROOM (B) 068

G

B'

B

SECONDARY BATHROOM (A) 060

C

B'

0.35

B

1

GROUND FLOOR FURNITURE PLAN Project number

+0.20 F.F.L.

+0.05 F.F.L. -0.10 F.F.L.

M.ABDELSALAM

Drawn by

2

+0.35 F.F.L.

01/09/2021

Date

BASEMENT FURNITURE PLAN

H UP

EG20026

Project number

1

H

BASEMENT FLOOR FURNITURE PLAN

10/10/2021 7:01:26 PM

H

1

1

2

3

3'

4

5

6

6'

7

8

9

0

M.ABD

Checked by

EG20026-TD-ID

ROOF FLOOR FURNITURE PLAN 1 : 50

Scale

15


1

2

3

3'

4

5

6

6'

7

8

1

9

2

3

4

3'

5

6

6'

7

8

9

WALL FINISHES LEGEND WALL TYPE

20

21

22

0.90

W-01 W-01

M.WALY 1 EG20026-TD-ID-3-BF-2 1 : 50

1.57

+4.00 F.F.L.

24

0.22

1.62

3

H

42

43

44

45

W-01

SECONDARY CLOSET B F-03

W-02 W-02

W-02

W-02

2.00

1.55

Description APPROVED ISSUE

Date

5

01/09/2021

0.80

4.66

3.17

1.25 0.25

30

29

28

27

26

25

0.44

24

AL-01

33 34 35

HER DRESSING ROOM F-10

G

2.45

0.21

0.35

GUEST WASHROOM 094

0.80 0.11

0.43 0.60 1.93 2.08 1.93 1.50 2.02 2.74

SEPTEMBER 20

0.95

0.90

3.26

0.12

0.90

3.26

W-01

36 37

1.41

0.12

1.40

1.38

39

40

41

42

43

44

45

No.

W-01

W-01 PREPARATION COUNTER 093

46

W-14

0.08

2 EG20026-TD-ID-8-GN-2

0.95

W-01

Revisions

3.24

1 EG20026-TD-ID-8-GN-2

8.20

H

4.57

VILLA MR/ M .K

8.18

H

ROOF FLOOR DE PLAN

FIRST FLOOR DETAILED PLAN

Date 1 EG20026-TD-ID-8-GN-0

1

2

3

3'

4

5

Drawn by

6

6'

7

8

9

Checked by

EG20026

FIRST FLOOR DETAILED PLAN 1 : 50

BIM ARCHITECT PORTFOLIO

Scale

Date 1

M.ABDELSALAM M.WALY

EG20026-TD-ID-3- FR-0 1

Project number

01/09/2021

1 : 50

EG20026-TD-ID-8-GN-0

10/10/2021 7:01:31 PM

Project number

Description APPROVED ISSUE

G

0.90

H

0

F

1.36

W-14

0.09

For CONSTRUCT

E

W-01

0.12

G

VILLA MR/ M .KHALIFA

W-01

W-01

3.23

1.58

D

EG20026-TD-ID-8-GN-1 1

2.27 W-01

32

1 3 EG20026-TD-ID-7-RF-0

W-01

Revisions

W-01

3.26

UP

4

W-01 W-01

3.75

0.70

5.09 0.83

W-01

3.23

0.60

W-02

7.65

0.60 W-01

W-01

GUEST BEDROOM 091

W-01

0.80

0.80

2.68

0.43

EG20026-TD-ID-7-RF-0

F

B

4.29

C

38

W-01

4.22

0.40 0.40 0.40 0.50 0.89

0.80

0.35

W-01

SEATING AREA 092

31

W-01

3.67

W-01

0.39 0.35 0.25

1.24 1.59

E

0.35

0.27

6.57

1.90

4.80

No.

W-02

W-02

W-14

2

W-01

1 EG20026-TD-ID-8-GN-2

For CONSTRUCTION

3.09

W-01 4 EG20026-TD-ID-8-GN-2

W-01

GUEST W-01 BATHROOM 090

0.80

8.59

Descript

GYPSUM BOARD WITH WHITE PAINT WOOD CLADDING BIANCO WHITE MARBLE INTERIOR W NORMAL MIRROR CLADDING WHITE WOOD MDF CLADDING OFF WHITE PAINT PORCELIAN TILES 1.20X0.60 M CLAD WHITE WOOD MDF RIBS CALDDING WOODEN RIBS CLADDING INTERIOR CALCATTA MARBLE TILES 100*100 C GLASS PARTITION SHOWER SGLASS PARTITION GALSS PARTITON VEIN MARBLE TILES 100*100 CM MOSAIC TILES 5 X5 CM IVORY WHITE PAINT EXTERIOR FAC BIANCO WHITE MARBLE EXTERIOR PAINT CONCRETE EFFECT - EXTERI BIANCO WHITE MARBLE EXTERIOR WOODEN RIBS CLADDING EXTERIOR

6 EG20026-TD-ID-8-GN-2

1.11

W-01

W-01

1.57

46

0.35

W-60

2.83

W-14

D

0

WALL FINISHES L WALL TYPE W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-20 W-30 W-40 W-50 W-60 W-70

B'

W-01 W-70

W-14

SEPTEMBER 2021

3.50

41

0.10

0.38 0.10

2.38

40

3.28

4 2 2 EG20026-TD-ID-7-FR-4 EG20026-TD-ID-8-GN-2

0.26

1.55 0.60

39

W-01

1.25

C

E

F

0.35

W-01

W-02

1.44

W-02

SECONDARY BEDROOM B F-02

1

C

0.60

4.19

1.80

38

2.90

EG20026-TD-ID-7-FR-4 W-01

W-02

5 EG20026-TD-ID-8-GN-2

5

4.40 HIS DRESSING ROOM F-05

9

4.88

3.19

3.68

EG20026-TD-ID-7-FR-2

W-01

F-07

3.41

3.35

5

W-02

0.25

B'

1.60

0.22

1 : 50

A

EG20026-TD-ID-8-GN-1 2

W-01

35

2.90

W-09

0.90

1.25

2.31

W-01

8

0.35

25

W-01

7

0.35

26

6'

11.22

B

3.29

27

2.09

28

2.09

29

6

A

W-60

W-01

1.71

W-01

0.38

1.32

1.00

5

1.09

0.57

0.82

1.57

M.WALY

EG20026-TD-ID-3-GR-0

2

B

1.18

9

EG20026-TD-ID-8-GN-0

0.60

W-01

1.20

1.01

0.85

8

A'

TOILOET W-03 072

0.30 30

1.20

31

1.71

0.80

0.080.08

4

3'

4.88

D

3.17

37

0.94

0.85 W-03

7

A'

Description GYPSUM BOARD WITH WHITE PAINT CLADDING WOOD CLADDING BIANCO WHITE MARBLE INTERIOR WALL CLADDING NORMAL MIRROR CLADDING WHITE WOOD MDF CLADDING OFF WHITE PAINT PORCELIAN TILES 1.20X0.60 M CLADDING WHITE WOOD MDF RIBS CALDDING WOODEN RIBS CLADDING INTERIOR CALCATTA MARBLE TILES 100*100 CM GLASS PARTITION SHOWER SGLASS PARTITION GALSS PARTITON VEIN MARBLE TILES 100*100 CM MOSAIC TILES 5 X5 CM IVORY WHITE PAINT EXTERIOR FACADES BIANCO WHITE MARBLE EXTERIOR LANDSCAPE CALDDING PAINT CONCRETE EFFECT - EXTERIOR BIANCO WHITE MARBLE EXTERIOR FACADES CLADDING WOODEN RIBS CLADDING EXTERIOR FACADES

EG20026-TD-ID-8-GN-1 1

W-01

1.66

33

0.25

1.63

1.75

FOYER F-09

0.75

0.20 0.63 0.12

0.60

2.90

1.53

2.47

32

1.36 0.90

TOILET 071

3

4.30

1.18

6'

4.19

1.72 0.80

2.35

W-01

2

4.27

1.17

6

M.ABDELSALAM

Scale

2 EG20026-TD-ID-7-FR-2

1.17

5

GROUND FLOOR DETAILED PLAN

1.16

1

3 6 EG20026-TD-ID-8-GN-2 0.85 0.36 0.85

W-01

1.21

W-02

34

0.11

0.90

2.45

36

W-09

G

3.61

W-02

W-01

2.10

MASTER BATHROOM 070 4

Drawn by

EG20026 01/09/2021

1 : 50

W-01

+5.25 F.F.L.

0.22

0.803 0.13

W-04

4

3'

2.56

1.27 2.39 0.35 0.85

2.10

1.20

0.63 0.35

1.80

0.60

0.72 0.80

3.13

2.90

0.85

1 SECONDARY BATH ROOM 4 2 (B) EG20026-TD-ID-7-FR-5 F-07 068

5

W-04

W-02

+4.00 F.F.L.

E

W-01

W-02

FOYER F-04

EG20026-TD-ID-7-FR-5

4 EG20026-TD-ID-8-GN-2

KITCHENETTE/BAR AREA F-08

0.20 0.60

1.18

UP

F

1.15

0.60 2.84

0.90

0.35

D

W-01

W-01

0.92

EG20026-TD-ID-8-GN-1 2

0.85

0.73 LAUNDRY ROOM 067

0.10 0.80

0.52

0.80

0.15

0.37

2.04

C

W-01

W-01 W-01

W-01

3 5 EG20026-TD-ID-8-GN-2

W-04

0.54

0.63

0.70

SECONDARY BATHROOM (A) 4 2 060 EG20026-TD-ID-7-FR-3

2.00

EG20026-TD-ID-7-FR-3

0.54

B' W-04

3

2.09

3.25

3 EG20026-TD-ID-8-GN-2

0.55

1.00 1

5

EG20026-TD-ID-7-FR-0 W-02

2

0.80

5.13

0.60

FAMILY LIVING ROOM F-07

A

5

W-01

MASTER SUITE F-06

1.35

W-01

0.92

W-08

W-01

0.35

1

0.35

0.50

3.31

W-01

B

4 2 EG20026-TD-ID-7-FR-0

0.47 0.40 0.40 0.40

0.45

3.25

1.04

W-01

2.80

0.30

0.30

0.25

0.45 W-01

1.06

WALL TYPE W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-20 W-30 W-40 W-50 W-60 W-70

3

3.32

W-01

1.13

2.82

0.34

WALL FINISHES LEGEND

A'

Date

+0.05 F.F.L. -0.10 F.F.L.

1

0.25

Project number

+0.20 F.F.L.

3.27

1.60

1.60

1.60

2.99

4

3.78 1

GROUND FLOOR DETAILED PLAN

Checked by

9

2

W-08

W-08

0.300.25

EG20026-TD-ID-8-GN-0

3 2 EG20026-TD-ID-7-FR-1 SECONDARY W-01 W-08 BEDROOM (A) F-01

8

+0.05 F.F.L.

+0.35 F.F.L.

1.45

0.30

1

5 EG20026-TD-ID-7-FR-1

0.92

7

1.75

0.25

3.77

W-01

B'

6'

W-01

W-01

0.25

A

6

0.35 0.43

5.13

5

0.200.30

4

0.25

3'

0.40 0.25

0.250.30

A'

3

2.44

0.60

Scale

VILLA MR/ M .KHALIFA

1.04

BASEMENT FLOOR DETAILED PLAN

2

0.12

1.59

0.21

-0.10 F.F.L.

M.ABDELSALAM

Drawn by

9

1 : 50

1

1.62

1.60

+0.20 F.F.L.

-0.10 F.F.L.

01/09/2021

Checked by

1

W-01

0.80

8

W-01

3.12

7

G

1 EG20026-TD-ID-8-GN-2

6.78

2.70

6'

Revisions

0.60

W-01

W-02

0.35

0.66

6

0.90

H

4.36

5

0.40

10/10/2021 7:01:33 PM

4

3.09

3.75 W-01

+0.35 F.F.L.

EG20026

Date

3'

0.90

H

Project number

3

0.61

23

10/10/2021 7:01:35 PM

0.85

BASEMENT FLOOR DETAILED PLAN

2

1.52

1.60 0.35 3.15 19

UP

1

0.25

0.23 1.63 W-01

+0.35 F.F.L.

H

18

0.98

0.35

H

17

1.00

G

VILLA MR/ M .KHALIFA 2.80

0.30

0.30

0.35 0.40

16

2 EG20026-TD-ID-8-GN-2

1 EG20026-TD-ID-8-GN-2

W-03

Date 01/09/2021

1.00

G

18

CIGAR LOUNGE 7 066 EG20026-TD-ID-7-GR-3

RECEPTION 062

Description APPROVED ISSUE

F

3

14

W-02

W-01

Revisions

0

7 EG20026-TD-ID-7-GR-1

2.03

5.98

No.

1 4 2 EG20026-TD-ID-7-GR-1

1.38

0.35

17

2 EG20026-TD-ID-8-GN-2

13

SEPTEMBER 2021

---

2

15

KITCHEN 010

24

GUEST WASHROOM 061

0.35

G

9

For CONSTRUCTION

-

2.05

23

W-01

W-04

16

3 1 EG20026-TD-ID-7-GR-3

11

0.86

F

D

10

DUMBWAITER

12

01/09/2021

EG20026-TD-ID-8-GN-1 1

E

0.56

1.03

22

W-01

2.29 4

1.50

21

APPROVED ISSUE

Date

0.57

1.84

20

+0.45 F.F.L.

1

1.00

19

2

1.09

18

3

3.39

17

4

W-01

4.48

16

0

Description

C

0.52

0.50

2.14

15

5

0.26

W-02

1.47

W-02 HARD KITCHEN 088

14

F

INDOOR JACUZZI 080

15

13

6

1.20

4.10

W-04

14

12

0.31

11

1.52

1

No.

1.18

2.23

2

UP

13

7

UP

3

W-04

8

W-02

SEPTEMBER 2021

4

W-02

F

2.08

5

11 12

10

+1.70 F.F.L.

1.20

4.50

10

9

E

2.59

0.35

2.00

2.00

For CONSTRUCTION

6

9 8

E

7

W-01

1.55

W-02

5.62

2.28

UP

W-02

3.87

W-02 +0.45 F.F.L.

2.06

W-02

W-02

1

D

1.71

2

4.57

W-01

2.30

3

B

W-02

UP

8

3.92 W-01

0.35

4

1.14

W-01

W-01

1.80

5

2.88

EG20026-TD-ID-8-GN-1 2

1.71

6

3

EG20026-TD-ID-7-BF-00 OUTDOOR GYM 089

6 EG20026-TD-ID-8-GN-2

3

9

0.93

2.20

7

4 2 EG20026-TD-ID-7-GR-0

C

C

D W-01

4.31

3.34

8

3.62

1.39

10

B'

Description GYPSUM BOARD WITH WHITE PAINT CLADDING WOOD CLADDING BIANCO WHITE MARBLE INTERIOR WALL CLADDING NORMAL MIRROR CLADDING WHITE WOOD MDF CLADDING OFF WHITE PAINT PORCELIAN TILES 1.20X0.60 M CLADDING WHITE WOOD MDF RIBS CALDDING WOODEN RIBS CLADDING INTERIOR CALCATTA MARBLE TILES 100*100 CM GLASS PARTITION SHOWER SGLASS PARTITION GALSS PARTITON VEIN MARBLE TILES 100*100 CM MOSAIC TILES 5 X5 CM IVORY WHITE PAINT EXTERIOR FACADES BIANCO WHITE MARBLE EXTERIOR LANDSCAPE CALDDING PAINT CONCRETE EFFECT - EXTERIOR BIANCO WHITE MARBLE EXTERIOR FACADES CLADDING WOODEN RIBS CLADDING EXTERIOR FACADES

MAIN SEATING AREA 065

W-01 SECONDARY SEATING 064

0.84

12

W-04

-1.70 F.F.L.

3 EG20026-TD-ID-8-GN-2

1.93

5.37

13

6 7

5 EG20026-TD-ID-8-GN-2

14

11

A

0.50

W-01

B

15

2.83

W-06

2.32

3.16

3.77

DINING AREA 063

1.24

W-06

2.95

B'

W-01 W-01

0.35

16

W-04

0.25

4 EG20026-TD-ID-8-GN-2 1

0.31

W-06 W-06

STORAGE 084

3.63

2.32

W-01

17

W-01

6 EG20026-TD-ID-8-GN-2

5

E

LIVING AREA 086

W-01

4.16

0.43 0.96

W-06

4

2.85

3.63

0.12 1.34

0.80

A

18

W-06

W-06

1.14

3

0.90

0.12

MAID'S BEDROOM 087

1.70

0.12

2.57

2

0.56

1.27

3.05

W-06

1.15

0.46

1

D

1.90

0.85

0.85

LOBBY 081

0.80

1.52

1.34

1.24

0.36

1.42

UP

0.80

W-01

0.90

3.78

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-20 W-30 W-40 W-50 W-60 W-70

2

0.50

4.12 0.12

2.49

1.90

0.80

C

2.99

2 EG20026-TD-ID-10-GN-8

0.25 BATHROOM 083

W-07

EG20026-TD-ID-8-GN-0

GYPSUM BOARD WITH WHITE PAINT CLADDING WOOD CLADDING BIANCO WHITE MARBLE INTERIOR WALL CLADDING NORMAL MIRROR CLADDING WHITE WOOD MDF CLADDING OFF WHITE PAINT PORCELIAN TILES 1.20X0.60 M CLADDING WHITE WOOD MDF RIBS CALDDING WOODEN RIBS CLADDING INTERIOR CALCATTA MARBLE TILES 100*100 CM GLASS PARTITION SHOWER SGLASS PARTITION GALSS PARTITON VEIN MARBLE TILES 100*100 CM MOSAIC TILES 5 X5 CM IVORY WHITE PAINT EXTERIOR FACADES BIANCO WHITE MARBLE EXTERIOR LANDSCAPE CALDDING PAINT CONCRETE EFFECT - EXTERIOR BIANCO WHITE MARBLE EXTERIOR FACADES CLADDING WOODEN RIBS CLADDING EXTERIOR FACADES

1.94

0.67

2.82 1.41

5 EG20026-TD-ID-8-GN-2

0.25

0.25

1.10

W-06

3.78

0.80

0.12

2.32

0.25

B

0.13

0.31

0.59

SHOWER 078

0.16

4.24

2.82

0.85

0.85

0.15

STORAGE 073

0.90

0.78

085

0.80

2.00 0.85 0.15

0.12

B'

3 EG20026-TD-ID-8-GN-2 SAUNA

W-01 POOL HOUSE 079

0.80

W-07

1.53

4.48

2.31

3.40

W-07 LAUNDRY 076

W-06

B

0.54 0.12

2.24 2.39

A

2.53 W-01

0.80

W-07

W-06

0.13

0.25

BATHROOM 077

0.27

2.31

1.49

1.49

2.82

0.80

0.76

3.46

3.49

B'

0.85 BATHROOM 075

0.42

0.63

Description

0.63

-

KITCHENETTE 082

W-01 W-02 W-03 W-04 W-05 W-06 W-07 W-08 W-09 W-10 W-11 W-12 W-13 W-14 W-20 W-30 W-40 W-50 W-60 W-70

W-09

2 EG20026-TD-ID-7-BF-00

0.91

0.18

A

0.85

2.15

W-06

2.55

WALL TYPE

1

W-01

1.90

1.90

DRIVER & PORTER'S BEDROOM 074

A'

4.23

1.92

4.32

A'

3.96

A'

A'

WALL FINISHES LEGEND

1

1

2

3

3'

4

5

01

Drawn by

6

6'

7

8

9

Checked by

ROOF FLOOR DETAILED PLAN

EG20026-TD-ID

1 : 50

Scale

16


3 EG20026-TD-ID-10-GN-6

1

2

3

3'

4

5

6

6'

7

8

9

1

4 EG20026-TD-ID-10-GN-6

2

3

4

3'

5

6

6'

7

8

9

Floor Schedule LEGEND

1.00

1.00

24

0.60

0.60

H

1

6

6'

G

VILLA MR/ M .KHALIFA

4

5

6

6'

7

G

BASEMENT FLOOR FLOORING PLAN

H

9

8

1.00 1.00

0.61 1.00

1.00 1.00

1.00 6 0.88 EG20026-TD-ID-8-GN-2 1.00

1.00

17.36 1.00

C

1.00 1.00

D

For

KITCHEN 010

F-01

EG20026

0.32

1.00 1.00

1.00

CIGAR LOUNGE 066

1.00

1.00

1.00

1.00

1.00

0.52

1 EG20026-TD-ID-8-GN-2

0.51

APPRO

F Revisions

F-01

+0.45 F.F.L.

SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²

0.24 SP

1.00

1.00 4.12

G

1.00

VILLA M

0.88

SP SP

GRO FLO

H

6 EG20026-TD-ID-10-GN-8

+0.35 F.F.L.

01/09/2021

1 : 50

+0.45 F.F.L.

De

0

UP

+0.35 F.F.L.

+0.20 F.F.L.

M.ABDELSALAM

EG20026-TD-ID-4- BF-0

GUEST WASHROOM 061

1.00

SE

No.

F-01 SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²

E

+0.45 F.F.L.

2 1.00EG20026-TD-ID-8-GN-2 1.00 1.00

H

M.WALY

SILVER EMPRADOR FLOORING 1.00 * 1.00 M 15 m²

SP

+0.45 F.F.L.

1.00

1.00

RECEPTION 062

SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²

0.62

8

1.00

1.00

1.00

7

1.00

1.00

F

Revisions

Project numbe +0.20 F.F.L.

+0.05 F.F.L.

Date

+0.05 F.F.L.

-0.10 F.F.L.

-0.10 F.F.L.

Drawn by Checked by

1

1

2

3

4

3'

5

6

6'

7

8

9

EG2002

GROUND FLOOR FLOORING PLAN

Scale

1 : 50

1 3'

1.00

1.00 1.00

4.38

Scale

3

1.00

1.00

01/09/2021

F

1 : 50

2

+0.45 F.F.L.

1.00

1.00

APPROVED ISSUE

1

BASEMENT FLOOR FLOORING PLAN

1

1.00

1.00 1.00 10.04 1.00 1.00 1.00

0

Date

1.00

5

1.00

0.63

2

Checked by

4

1.00

UP

Drawn by

3'

1.00

1.00

F-60

INDOOR JACUZZI 080 -3.10 F.F.L.

SP

3

1.00

UP

Description

Date

2

1.00

F-01

No.

Project number

1

1.00

1.00

23

1.00

1.00

22

1.00

1.00

21

D

SEPTEMBER 2021

E

11 m²

20

2 EG20026-TD-ID-10-GN-8

1.00

B

1.00

0.60

E

5

MOSIC FLOORING 0.05 * 0.05 M

19

+0.45 F.F.L.

1.00

4

9

18

B'

0.41

0.60

C

For CONSTRUCTION

8

0.95

13

15

F-01 SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²

4 EG20026-TD-ID-8-GN-2

1.00

1.00

+0.45 F.F.L.

1.00 0.73

D

9

0.24

0.60

OUTDOOR GYM 089

6

0.60 0.60

0.60

0.18 0.60

C

46 m²

-2.75 F.F.L.

1.00

0.60

18

RUBBER FLOORNG TILES

5 EG20026-TD-ID-8-GN-2

1.00

17

F-09

7

1.00

SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²

1.00 12.07

1.00

SILVER EMPRADOR FLOORING 1.00 * 1.00 M 274 m²

1.00

1.00

11

17

0.99

MAIN SEATING AREA 065

1.00

1.00

F-01

1.00

1.00

10

16

F-80 F-90

1.00

1.00

1.00

0.36

1.00 1.00 1.00 1.00 0.30 1.00

UP

1.00

1.00

SLAB ON G SILVER EM CALACATTA BIANCO W WPC FLOO TERAZZO M LIGHT WOO HPL ON MO PORCELAIN RUBBER FL TEAK WOO MOSIC FLO BIANCO W M WPC FLOO MOSIC FLO

1.00 1.00

0.45 0.75 0.60 0.60

1.00

11 10

1

1.00

1.00

1.00

2

SECONDARY SEATING 064

F-01

1.00

0.80

1.00 0.52

1.00 1.00 0.60 0.60 0.60

12

1.00

G

14

16 m²

STORAGE 084 -2.75 F.F.L.

DINING AREA 063

15

13

1.00

30 m²

HARD KITCHEN 088 -2.75 F.F.L.

16

-2.75 F.F.L.

0.60

16

0.60 0.17

1.00

15

0.60

3

0.60

0.60

14

0.60

F-08

14

PORCELAIN FLOORING 60 *60 CM

13

0.75

0.60 0.25

3

1.00

1.00

4

1.00

1.00

5

1.00

1.00

6

1.00

1.00

7

1.00

1.00

8

0.66

0.60

11 12

0.34

0.51

0.60

0.60

PORCELAIN FLOORING 60 *60 CM

12

F-08

0.60

F

0.60

1.00

3 EG20026-TD-ID-8-GN-2

17

1.00

0.60

0.60

1.00

1.00

0.60

0.60

0.60

1.00

0.60

0.60

1.00

0.98

0.60 0.60

0.60

1.00

0.30

0.60

0.60

0.60 0.60

9

0.60

1.00

18

1.00

0.60

MAID'S BEDROOM 087 -2.75 F.F.L.

111 m²

LIVING AREA 086

0.60

0.60

0.60

-1.70 F.F.L.

0.60

dumbwaiter 0.51

8

B'

B

1.00

7

10

0.60

F-08

1.00

B

0.20

0.60

5 6

0.60

0.09 0.60

0.60

0.10 0.60

4

0.60

PORCELAIN FLOORING 60 *60 CM

F-03

SP SP

15 m²

0.10 0.60

3

0.57

0.60

A 0.73

4.38

1.00

0.60

0.60

0.60

0.60

+0.35 F.F.L.

A

BIANCO WHITE MARBLE 100*100 CM

1.00

0.60

SP0.56

2

0.60

BATHROOM 083 -2.75 F.F.L.

F-80 F-90

A'

50 m²

B'

SAUNA 085

POOL HOUSE 079 -2.75 F.F.L.

0.60

0.60

111 m²

0.09 0.60

LOBBY 081

0.60

SP

0.60

SP

0.60

0.60

7 m²

0.60 0.60 0.34

0.60

0.48

0.60

0.60 0.19

0.60 0.19

0.60 0.60

F-08 0.60

PORCELAIN FLOORING 60 *60 CM

SHOWER 078

0.60

0.60 0.60

0.20 0.60

0.60

0.60 0.28

0.60

0.60

0.60

0.05 0.60

0.56

BIANCO WHITE MARBLE 100*100 CM

16 m²

0.60

0.60

0.60

0.38

1.00

WPC FLOORING

F-03

SP

0.60

STORAGE 073 -2.75 F.F.L.

0.60

0.60 0.21

12 m²

0.60

-2.75 F.F.L.

1.00

PORCELAIN FLOORING 60 *60 CM

LAUNDRY 076 -2.75 F.F.L.

0.60

F-08 PORCELAIN FLOORING 60 *60 CM

0.21

1.00

BATHROOM 077

0.60

0.60 0.10

0.60 0.60

0.60

A

SP

0.60

F-08

0.60

0.60

0.22 0.60 UP

1

0.60

0.60

KITCHENETTE 082 -2.75 F.F.L.

0.22 0.60

C

0.60

15 m²

0.60

B

0.60

0.60

0.48

1.00

1.00

0.60

BATHROOM 075

PORCELAIN FLOORING 60 *60 CM

0.37

0.09 0.60

0.60 0.60

F-08

0.60

B'

E

1.00

4 m²

SP

0.60

0.60

0.53

BIANCO WHITE MARBLE 100*100 CM

A

A'

1.00

1.00

F-00 F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-60 F-70

1.00

1.00

1.00

1.00

1.00

0.33

F-03

0.60

0.60

0.60 0.18

1.00

0.60

1.00 5.30

0.60

TYPE

F-04

1.00

0.60

Floor S

DESCRIPTION SLAB ON GRADE SILVER EMPRADOR FLOORING 1.00 * 1.00 M CALACATTA MARBLE TILES 100*100 CM BIANCO WHITE MARBLE 100*100 CM WPC FLOORING TERAZZO MARBLE TILES 100*100 CM LIGHT WOOD VEIN MARBLE 100*100 CM HPL ON MOSIC FLOORING PORCELAIN FLOORING 60 *60 CM RUBBER FLOORNG TILES TEAK WOOD FLOORING ON STEEL MOSIC FLOORING 0.05 * 0.05 M BIANCO WHITE MARBLE FLOORING SWIMMING POOL 1.00 X1.00 M WPC FLOORING MOSIC FLOORING 0.02 * 0.02M

10/10/2021 7:01:36 PM

0.60 DRIVER & PORTER'S BEDROOM 074

1.00

0.60

0.60 0.23

0.60 0.23

0.60

D

A'

SP

10.36

A'

1.00

TYPE F-00 F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-60 F-70

2

3

3'

4

5

6

6'

7

8

9

9 Floor Schedule LEGEND

F-07

F-07

HPL ON MOSIC FLOORING

HPL ON MOSIC FLOORING

26 m²

SECONDARY BEDROOM (A) F-01 +4.00 F.F.L.

F-80 F-90

56 m²

A

1.00

1.00

1.00

1.00

1.00

1.52

B

1.00

1.00

25

1.00

0

54 m²

HIS DRESSING ROOM F-05 +4.00 F.F.L.

33

Description APPROVED ISSUE

Date

35

F

36 37

41

42

43

44

45

46

VILLA MR/ M .KHALIFA

54 m²

HPL ON MOSIC FLOORING 6 m²

SECONDARY CLOSET B F-03

H

H

Date Drawn by Checked by

5

6

6'

7

1.00 1.00 1.00 1.00 1.00

1.00

0.62

No.

1.52

PREPARATION COUNTER 093 +7.55 F.F.L.

0

8

9

Scale

Des

APPROV

F Revisions

G

H

H

ROOF FLO

EG20026 Project number

01/09/2021

Date

M.ABDELSALAM M.WALY

EG20026-TD-ID-4- FR-0 4

1.00

F-01

SILVER EMPRADOR FLOORING 1.00 * 1.00 M 13 m²

VILLA M

FIRST FLOOR FLOORING PLAN Project number

3'

1.00

G

HPL ON MOSIC FLOORING

HER DRESSING ROOM F-10 +4.00 F.F.L.

F-07

0.86

0.35

40

16 m²

GUEST WASHROOM 094 +7.55 F.F.L.

G

1 : 50

10/10/2021 7:01:38 PM

39

F-07

HPL ON MOSIC FLOORING

3

1.00

4.38

F-07

SECONDARY BEDROOM B F-02 +4.00 F.F.L.

1.00

Revisions

38

SEP

SP

13 m²

+7.55 F.F.L.

1.00

34

For C

E

1.00

LIGHT WOOD VEIN MARBLE 100*100 CM

GUEST BEDROOM 091

F

1.00

F-06

20 m²

01/09/2021

1.00

UP

HPL ON MOSIC FLOORING

4.46

0.44

HPL ON MOSIC FLOORING

32

F-02

No.

24

+4.00 F.F.L.

0.19

F-07

1.00

26

1.00

E

1.00

27

D

SP SP

SEPTEMBER 2021

E

C

0.93

28

1.00

1.00

29

1.00

1.00

0.92

For CONSTRUCTION

D

1.00

0.19

1.00

1.00

0.45

1.00

1.00

1.00

SEATING AREA 092

1.00

30

F-01 SILVER EMPRADOR FLOORING 1.00 * 1.00 M 98 m²

1.00

1.00

+4.00 F.F.L.

SECONDARY BATH ROOM CALACATTA MARBLE (B) TILES 100*100 CM 068 1.00 SP 1.00 4 m²0.76

BIM ARCHITECT PORTFOLIO

1.00

0.67

0.19

60 m²

FOYER F-09

F-07

1 : 50

1.00

1.00

0.93

D

1.00

F-07

FOYER F-04

2

1.00

+7.55 F.F.L.

GUEST BATHROOM 090 +7.55 F.F.L.

C

HPL ON MOSIC FLOORING

0.60

31

FIRST FLOOR FLOORING PLAN 1

1.00

LIGHT WOOD VEIN MARBLE 100*100 CM 8 m²

+5.25 F.F.L.

1

1.00

0.93

1.00 1.00

F-06

C

+4.00 F.F.L.

UP

G

1.00

1.21

0.78

1.00

1.00 0.10

0.50

SP SP

E

F

1.00

1.00

0.60

1.00

0.40

0.60

1.00

9 m²

KITCHENETTE/BAR AREA F-08

0.60

6 m²

LAUNDRY ROOM 067

1.00

F-03 BIANCO WHITE MARBLE 100*100 CM

SP

0.60

0.60

0.47

PORCELAIN FLOORING 60 *60 CM

0.60 0.40

D

0.60

1.00

1.00

F-08

0.60

1.00

0.60

SECONDARY BATHROOM (A) 060

0.30 0.60

0.50

SP

6 m²

2 m²

0.36

B

TERAZZO MARBLE TILES 100*100 CM

TEAK WOOD FLOORING ON STEEL

C

1.00

0.40

F-10

F-05

1.00

0.82

SP

B

+4.00 F.F.L.

0.40

1.00

F-80 F-90

B'

1.00

60 m²

B

A

SLAB ON GRAD SILVER EMPRA CALACATTA MA BIANCO WHITE WPC FLOORIN TERAZZO MAR LIGHT WOOD V HPL ON MOSIC PORCELAIN FL RUBBER FLOOR TEAK WOOD F MOSIC FLOORI BIANCO WHITE M WPC FLOORIN MOSIC FLOORI

B'

HPL ON MOSIC FLOORING

FAMILY LIVING ROOM F-07

SP

OUTDOOR AREA 095 +7.55 F.F.L.

1.00

B'

F-07

B'

0.34

A

F-00 F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-60 F-70

SILVER EMPRADOR FLOORING 1.00 * 1.00 M 116 m²

2.78

A

MASTER SUITE F-06 +4.00 F.F.L.

TYPE

A'

F-01

1.00

A'

A'

1.00

A'

Floor Sc

DESCRIPTION SLAB ON GRADE SILVER EMPRADOR FLOORING 1.00 * 1.00 M CALACATTA MARBLE TILES 100*100 CM BIANCO WHITE MARBLE 100*100 CM WPC FLOORING TERAZZO MARBLE TILES 100*100 CM LIGHT WOOD VEIN MARBLE 100*100 CM HPL ON MOSIC FLOORING PORCELAIN FLOORING 60 *60 CM RUBBER FLOORNG TILES TEAK WOOD FLOORING ON STEEL MOSIC FLOORING 0.05 * 0.05 M BIANCO WHITE MARBLE FLOORING SWIMMING POOL 1.00 X1.00 M WPC FLOORING MOSIC FLOORING 0.02 * 0.02M

1.00

TYPE F-00 F-01 F-02 F-03 F-04 F-05 F-06 F-07 F-08 F-09 F-10 F-60 F-70

Drawn by

1

1

2

3

3'

4

5

6

6'

7

8

9

Checked by

EG20026

ROOF FLOOR FLOORING PLAN 1 : 50

17

Scale


1 3

4

5

6

6'

7

8

A'

A'

4.32

0.25

+2.35

S.C.L

B'

B'

1.10

8.03

B

C1

C1 WHITE PAINT ON GYPSUM BOARD CEILING

3.56

+2.70

S.C.L

E

E

SEPTEMBER 2021

0.35

2.15

0.78

3.06

WHITE PAINT ON GYPSUM BOARD CEILING

4 EG20026-TD-ID-12-GN-1

7.54

3.19

F

KITCHEN 010

CIGAR LOUNGE 066

+2.70

S.C.L

S.C.L

1.76

1.71

6'

7

8

M.WALY

EG20026-TD-ID-5-BF-0 1 : 50

Scale

5

6

6'

7

8

0.20

4.07

3

3'

0.50

4

5

6

6'

7

8

9

M.A

Drawn by Checked by

1

EG20026-TD

GROUND FLOOR CEILING PLAN 1 : 50

Scale

2

3

3'

4

5

6

6'

7

8

9

A'

A'

A

A

B'

B'

A'

0.30

0.30

SECONDARY BEDROOM (A) F-01

2

9

0.30

0.30

A'

4

GROUND FLO PL

Date

1

1 3'

H

Project number

M.ABDELSALAM

1 : 50

3

0.62

24/10/2021

Checked by

BASEMENT FLOOR CEILING PLAN

3.42

EG20026

Project number

9

Drawn by

4.28

0.22

MASTER SUITE F-06

C1

C1

WHITE PAINT ON GYPSUM BOARD CEILING

3.47

S.C.L

0.20

0.20

7.83

0.10 5.52

0.10

A

+2.70

0.30

4.07

0.20

0.20

WHITE PAINT ON GYPSUM BOARD CEILING

A

B'

B' 0.37

1.91

0.10

0.10

TOILET 071

1.90

No.

C1

0 1

Description APPROVED ISSUE AS CLOUDED

S.C.L

4.28

+2.70

0.38

0.23

0.69

0.62

2.77 +2.70

G

VILLA MR/ M .KHALIFA

0.35

H

FIRST FLOOR CEILING PLAN

Drawn by Checked by

FIRST FLOOR CEILING PLAN 1 : 50

BIM ARCHITECT PORTFOLIO

3

3'

4

5

6

6'

7

S.C.L

+2.87

PREPARATION COUNTER 093

0 1

F

Descr

APPROVED AS CLOUDED

S.C.L

Revisions

4.27

G

H

Date

2

No.

WHITE PAINT ON GYPSUM BOARD CEILING

+2.35

VILLA MR/

0.16

S.C.L

Project number

1

S.C.L

2.12

2.89 2.95 3.42

0.41

0.30

S.C.L

C1

8

9

EG20026

Project number

24/10/2021

Date

M.ABDELSALAM M.WALY

EG20026-TD-ID-5- FR-0 Scale

H

ROOF FLO PL

1 : 50

Drawn by 10/24/2021 2:09:46 PM

2.38

C1

GUEST WASHROOM 094

+2.35

G

HER DRESSING ROOM F-10

WHITE PAINT ON GYPSUM BOARD CEILING

SEPTEM

1.36

1.39 0.26

WHITE PAINT ON GYPSUM BOARD CEILING

H

3.50

0.35

S.C.L

1.71

C1

+2.70 1.25

1.19

SECONDARY CLOSET B F-03

2.12

C1 WHITE PAINT ON GYPSUM BOARD CEILING

For CONS

C1 WHITE PAINT ON GYPSUM BOARD CEILING

---

0.74 3.50

G

5 EG20026-TD-ID-12-GN-2

GUEST BEDROOM 091

Revisions

SECONDARY BEDROOM B F-02

3.26

E

F

F

1.58

7.14

F

4.66

4 EG20026-TD-ID-12-GN-1

Date 01/09/2021 24/10/2021

+2.70

1.26

3.23

WHITE PAINT ON GYPSUM BOARD CEILING

WHITE PAINT ON GYPSUM BOARD CEILING

4.03

D

1.11

C1

3.29

3.29

E

SEPTEMBER 2021

E

7.66

0.60

2.83

D

HIS DRESSING ROOM F-05

C

---

S.C.L

D For CONSTRUCTION

4.59

S.C.L

+2.35

TOILOET 072

S.C.L

S.C.L

6 EG20026-TD-ID-8-GN-2

+2.35

SKYLIGHT

6.27

GUEST BATHROOM 090

+2.70

+2.70

WHITE PAINT ON GYPSUM BOARD CEILING

C

0.82

0.55

9.25

3.82

1.36

SECONDARY BATH ROOM (B) 068

1.51

C1 WHITE PAINT ON GYPSUM BOARD CEILING

2.93

0.22

S.C.L

0.20

0.35 0.63

+2.70

3.01

1.19

0.10

C1

C

0.35

WHITE PAINT ON GYPSUM BOARD CEILING

FOYER F-09

0.72

C1

1.73

E

FOYER F-04

0.10

SEATING AREA 092

1.00

+2.70

S.C.L

3.02

3.39

1.43

WHITE PAINT ON GYPSUM BOARD CEILING

2.84

D

0.10 0.10

S.C.L

1.12

2.15

2.44

C1 WHITE PAINT ON GYPSUM BOARD CEILING

C1

+2.70

0.10

LAUNDRY ROOM 067

0.80 1.41

KITCHENETTE/BAR AREA F-08

1.25

C1 WHITE PAINT ON GYPSUM BOARD CEILING

5 EG20026-TD-ID-8-GN-2

MASTER BATHROOM 070

2.08

0.73

2.04

B

4 EG20026-TD-ID-8-GN-2

4.40

0.20

0.10

2.80

7.09

15.77

B

0.10

0.10

0.10 0.80 0.10

3.13

7.30

2.00

C1 WHITE PAINT ON GYPSUM BOARD CEILING

C

0.20

S.C.L

SECONDARY BATHROOM (A) 060

0.30

B

+2.70

B

2.83

7.83

0.30

0.20

C1 WHITE PAINT ON GYPSUM BOARD CEILING

4.87

FAMILY LIVING ROOM F-07

2.68

0.10

2.70

1.15

4.87

2.82

4.83

0.20

1

1 EG20026-TD-ID-8-GN-2

0.41

H

BASEMENT FLOOR CEILING PLAN

Date

2

VILLA MR/

3.75

0.85

10/24/2021 2:09:46 PM

6

G

+2.70

0.23

5

Revisions

WHITE PAINT ON GYPSUM BOARD CEILING

4.27

Descri

APPROVED IS AS CLOUDED

F C1

WHITE PAINT ON GYPSUM BOARD CEILING

G

H

4

0 1

C1

---

VILLA MR/ M .KHALIFA

H

3'

No.

GUEST WASHROOM 061

1.18

2 EG20026-TD-ID-8-GN-2

3

SEPTEM

C1 WHITE PAINT ON GYPSUM BOARD CEILING

+2.70

3.96

3.55

4.00

2.23

For CONS

E

S.C.L

G

0.35

S.C.L 4.59

2.30

Date

C1

2.80

+2.70

5 EG20026-TD-ID-12-GN-2

01/09/2021 24/10/2021

Revisions WHITE PAINT ON GYPSUM BOARD CEILING

D

RECEPTION 062

0.93

1.24

Description APPROVED ISSUE AS CLOUDED

F

4.00

3.07

3.33

0.35

4.06 0.31

2.09

3.83

7.50

3.31 1.26

0 1

INDOOR JACUZZI 080

S.C.L

1

6 EG20026-TD-ID-8-GN-2

4.59

3.34

4.50

+2.35

1

+2.70

S.C.L

1.16

For CONSTRUCTION

No.

2

MAIN SEATING AREA 065

3.62

0.94

4.31

0.35

B

WHITE PAINT ON GYPSUM BOARD CEILING

C

D

D

HARD KITCHEN 088

1

0.48

4 EG20026-TD-ID-8-GN-2

7.71

2.00

0.31

B' 7.76

C1

S.C.L

+2.87

2.09

C1

3 EG20026-TD-ID-8-GN-2

0.20

S.C.L

0.21

+2.87

MAID'S BEDROOM 087 S.C.L 2.32

1.15

3.63

STORAGE 084

WHITE PAINT

WHITE PAINT ON GYPSUM BOARD CEILING

0.48

C

C 4.16

3.63

3.63

C2

E

0.94

A' 3.95

C1

SECONDARY SEATING 064

+2.70

5 EG20026-TD-ID-8-GN-2

WHITE PAINT

2.32 0.96

1.34

3.13

0.86

0.20

WHITE PAINT ON GYPSUM BOARD CEILING

4.62

4.31

1.70

2.95

G

9

A

DINING AREA 063

C2

1.34

A

B

1.31

0.12

1.14

LIVING AREA 086

0.61 4.57

0.90

4.24

1.34

1.42

0.20

7.11

1.94

2.32

2.57

F

8

BATHROOM 083

C2 WHITE PAINT

7

9.46

1.53 0.12

A

0.80

SAUNA 085

S.C.L

2.32

2.99

D

SHOWER 078

S.C.L

2.82

1.15

6'

0.20

2.40

+2.35

S.C.L

2.24

2.42

3.46

3.49 2.00

4.48

+2.87

0.60

4.21

0.21

+2.35

WHITE PAINT ON GYPSUM BOARD CEILING

LAUNDRY 076

STORAGE 073

S.C.L

POOL HOUSE 079

2.31 C1

WHITE PAINT

+2.87

3.75

C

BATHROOM 077

S.C.L

2.05

+2.35 C2

WHITE PAINT

1.15

6

WOODEN RIBS CEILING

3.13

BATHROOM 075

2.39 C2

1.75

C3

2.53

WHITE PAINT ON GYPSUM BOARD CEILING

S.C.L

KITCHENETTE 082

0.13

1.10

1.49

5.57

+2.87

WOODEN RIBS CEILING

2.31 C1

2.82

4.12

C3

2.24 C2 WHITE PAINT

B

5

2.15

3.20

0.67

B'

4

2.35

0.21

1.90

DRIVER & PORTER'S BEDROOM 074

S.C.L

A

3'

4.23

WHITE PAINT

+2.87

3

9.80

C2

2

9

1.80

A'

3'

0.20

2

0.20

1

1

1

2

3

3'

4

5

6

6'

7

8

9

M.

Checked by

EG20026-T

ROOF CEILING PLAN 1 : 50

18

Scale


1

1

2

3

3'

4

5

6

6'

7

8

2

3

A'

KITCHENETTE 082

BATHROOM 075

B'

P2

DOT10

LED120

B'

S3.2

S3.2

B

S6.1

LED120

DOT10

LED120

LED60

DOT10

DOT10

DOT10

LED120

LED60

C

C S6.1 S3.2

STORAGE 084

MAID'S BEDROOM 087

S3.2

LED60

IL LED 68

LED120

IL1

CY1

E

S3.2

ILM

S4

E

PR

SEPTEMBER 2021

E

TR-3300

CY1

0 1

DOT10

INDOOR JACUZZI 080

DOT10

SF8

SF8

Description

Date

APPROVED ISSUE AS CLOUDED

01/09/2021 24/10/2021

S4

S4

S4

S4

S0

D.L

CY9

F

S4

WM

S4

UP2.1

G

VILLA MR/ M .KHALIFA

S.A.D 28"X14" FROM BASEMENT UP EX.A.D 30"X14" TO ROOF FROM H BASEMENT UP

3'

4

5

6

6'

7

8

9

M.WALY

Checked by

EG20026-TD-ID-6-BF-0

BASEMENT FLOOR REFLECTED CEILING PLAN 1 : 50

1 : 50

Scale

2

4

3'

5

6

6'

7

8

VILLA M

GRO REFLEC

3

4

3'

5

6

6'

7

8

9

Date

Checked by

1

EG2002

GROUND FLOOR REFLECTED CEILING PLAN 1 : 50

Scale

2

3

3'

4

5

6

6'

7

8

9

9

A'

A'

A

A

B'

B'

A'

IL1

IL1

S3

Drawn by

1 3

S3

S3

Project number

1

M.ABDELSALAM

Drawn by

S3

EG20026 24/10/2021

Date

G

S.A.D 28"X14" FROM BASEMENT UP EX.A.D 30"X14" TO ROOF FROM BASEMENT HUP TO ROOF

FL3

H

BASEMENT FLOOR REFLECTED CEILING PLAN Project number

3

Revisions

UC

S4 S4 S4

S4

De

APPROV AS CLO

SF8

F50

UC

LOUVERS ABOVE DOOR

10/24/2021 2:09:47 PM

H

0 1

F

SF8

3xPR

G

LED60

CIGAR LOUNGE 066

F50

Revisions

LED120

No.

S0

KITCHEN 010

IL LED 68

G

F50

GUEST WASHROOM 061

ILM

F

DOT10 SF8

SE

WM

No. HARD KITCHEN 088

For C

F50

LED60

dumbwaiter

D

SU10

D

E

S3.2

RECEPTION 062

D For CONSTRUCTION

IL1

LED60

LED120

C

A'

LED120

FL

C

2

DOT10

P2

S3.2

IL1

BATHROOM 083

1

DOT10

SU1

DOT10

1

A

DOT10

SECONDARY SEATING 064

B

2

LED60

TL1

B

S5

1

IL1

SU1

DOT10

B

D

SU20

IL1

P2

DOT10

P2

S5

F

LED120

DINING AREA 063

B' DOT10

LOBBY 081

A'

IL1

IL1

B'

DOT10

STORAGE 073

9

TL1

A

SAUNA 085

LAUNDRY 076

8

IL1

DOT10

POOL HOUSE 079

S4

7

IL1

A

ILP-3100

6'

IL1

SU20

LED120

LIVING AREA 086

S4

6

IL1

A'

A

5

9

A' DRIVER & PORTER'S BEDROOM 074

4

3'

FL10

FL55 S3.2

PRO

S3.2

PRO

S3.2 S3.2 S3.2

PRO

PRO

A

IL1

IL1

SECONDARY BEDROOM (A) F-01

TL66

IL1

IL1

PRO

A

MASTER SUITE F-06

S3.2

PRO

PRO

B'

S6.1

S3.2

S6.1

PRO

PRO

PRO

PRO

TL55

SU2

ILM

B'

SU1 LED56

W1

LED20

S5

S6.1

LOUVERS ABOVE WINDOW

ILM

S4

S4

MASTER BATHROOM 070

S3

S5

EX.WM-1ST-01 100 CFM

S5

UC

UC

LED67

D.L

IL1 SU97 S3.2

S3.2

CY1

TOILET 071

S3.2

S3.2

FOYER F-04

S0

S3.2

S3 TOILOET

S5

S3

SELF LIT

S10

S3.2

S3

S3

LED67

LED20 2xLED20

F

S10

ILM

S5

SECONDARY BATH ROOM (B) 068

LED67

S3

S5

W1

SELF LIT

SELF LIT

SELF LIT

SELF LIT

G

S3.2

SECONDARY BEDROOM B F-02

CY9-W

S3

S3

SELF LIT

ILM S3.2

S3

HER DRESSING ROOM F-10

CY9-W

SU77

SELF LIT

S10

SELF LIT

IL1

SELF LIT

S3

H

Description APPROVED ISSUE AS CLOUDED

EX.A.D 30"X14" FROM BASEMENT UP TO H ROOF

FIRST FLOOR REFLECTED CEILING PLAN

1

FIRST FLOOR REFLECTED CEILING PLAN 1 : 50

BIM ARCHITECT PORTFOLIO

4

5

6

6'

7

8

9

UC S3

F

UC

S3

S3

3xPR

IL1

ILM

LED67

Revisions

IL1

ILM

G

LED67

VILLA M H

H

RO REFLE

Project numbe Date

M.ABDELSALAM

1 : 50

D

APPRO AS CLO

S3

EG20026

M.WALY

0 1

S3

24/10/2021

EG20026-TD-ID-6-FR-0 Scale

No.

ILM

CY9 LED20

F S3

VILLA MR/ M .KHALIFA

Checked by

3'

SE

S6.B

01/09/2021 24/10/2021

S.A.D 28"X14" G FROM BASEMENT UP TO ROOF

Drawn by

3

For

S6.B

Date

Revisions

Date

2

E S3

Project number

1

D

PRO

SU50

G

S10 S10.3

LED1200

E

SEPTEMBER 2021

SELF LIT

3xPR

LED1200

SU12

SELF LIT

ILM

SELF LIT

SECONDARY BEDROOM B F-02

LED1200

D.L

For CONSTRUCTION

0 1

F W1

SELF LIT

S6.1

F1

S5

E

D.L ILM

C

LED1200 PRO

ILM S5

No.

ILM SELF LIT

CY9

PRO

SF8

D

LOUVERS ABOVE WINDOW

072

S3

S3

PRO

SF8

S3

ILM

HIS DRESSING ROOM F-05

SELF LIT

SU0

LOUVERS ABOVE WINDOW

S10.3

SKYLIGHT

S3

SF8

PRO

C

SELF LIT

SU50

S3.2

C

SELF LIT

E CY1

ILM

PRO

SF8

PRO

EX.WM-1ST-02 D 100 CFM

W1

SELF LIT

LED1200

S3

S5

SELF LIT

S3.2

PRO

LOUVERS ABOVE WINDOW

S5

S3

P3

S3.2

LED1200

ILM

LED67

SUP

FOYER F-09

EX.WM-1ST-05 100 CFM

IL1

WM5

2xLED20

2x mirror lights P3

LED20

S3.2

EX.WM-1ST-04 100 CFM

WM5

F1

S3 IL1

LAUNDRY ROOM 067

WM5 downwards

B

B

W5

D.L

S2 S2 S2

S6.1

ILM

LOUVERS ABOVE WINDOW

W5

D.L SU0

LED20

C

D

IL1 IL1

LED20 S3

EX.WM-1ST-03 100 CFM

WM5 downwards

IL1

LED67

FAMILY LIVING ROOM F-07

S3

SECONDARY BATHROOM (A) 060

WM5 downwards

B

PRO

Drawn by 10/24/2021 5:38:11 PM

B

SF8

PRO

LED67

WM5 downwards

SF8

1

1

2

3

3'

4

5

6

6'

7

8

9

Checked by

EG2002

ROOF FLOOR REFLECTED CEILING PLAN 1 : 50

19

Scale


7

8

1

9

2

3

3'

4

5

6

6'

7

8

9

0.50 0.05

WHITE PAINT ON GYPSUM BOARD CEILING

0.08

A'

0.50

FIRST FLOOR PLAN T.O.S +3900

A' 1

WHITE PAINT ON GYPSUM BOARD CLADDING

WHITE PAINT ON GYPSUM BOARD CLADDING

2 EG20026-TD-ID-7-BF-00 -

A

SILVER EMPERADOR MARBLE TILES 100 *100 CM AS PER APPROVED SAMPLE

CURTAIN WALL

A

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350

B'

SEATING AREA - GR - ELEV 01

1

1 : 50

9

8

7

6'

E

3

2

1

RIMADESIO DOOR WHITE PAINT ON GYPSUM BOARD CLADDING

1.80

SILVER EMPERADOR MARBLE TILES 100 *100 CM AS PER APPROVED SAMPLE

2.20 0.70

0.90

FIRE PLACE

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

0.20

GROUND FLOOR PLAN F.F.L +450

E

3'

0.10

WHITE BIANCO MARBLE CLADDING FOR BAR AS PER APPROVED SAMPLE

C

D

4

1.80

1.70

WOOD CALDDING AS PER APPROVED SAMPLE

D

5

0.05 0.50 0.50

WHITE PAINT ON GYPSUM BOARD CEILING

C

6

FIRST FLOOR PLAN T.O.S +3900

B

0.05 0.50

B

0.70

B'

GROUND FLOOR PLAN T.O.S +350

SEATING AREA - GR - ELEV 03

3

1 : 50

B

C

D

E

F

G

H

FIRST FLOOR PLAN T.O.S +3900

7

8

9

BASEMENT FLOOR DETAILED PLAN - Callout 1

No. 0 1

Description

No.

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

Date

APPROVED ISSUE AS CLOUDED

SEPTEMBER 2021

SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

WHITE PAINT ON GYPSUM BOARD CLADDING

BASEMENT 3D 01

4

1 : 50

For CONSTRUCTION

2 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

WOOD CALDDING AS PER APPROVED SAMPLE

SEPTEMBER 2021

3

RIMADESIO DOOR

WHITE PAINT ON GYPSUM BOARD CEILING

For CONSTRUCTION

01/09/2021 24/10/2021

0 1

GROUND FLOOR PLAN F.F.L +450

Description

Da

APPROVED ISSUE AS CLOUDED

01/09 24/10

GROUND FLOOR PLAN T.O.S +350

Revisions Revisions

SEATING AREA - GR - ELEV 02

2

1 : 50

VILLA MR/ M .KHALIFA

VILLA MR/ M .KHALIFA 7

H

9

H

E

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

WHITE BIANCO MARBLE CLADDING FOR BAR AS PER APPROVED SAMPLE FIRE PLACE

GROUND FLOOR PLAN F.F.L +450

GROUND FLOOR PLAN F.F.L +450

GROUND FLOOR PLAN T.O.S +350

GROUND FLOOR PLAN T.O.S +350

E

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

1

E

4

1

BAR AREA - ELE 01

1 : 50

9

WHITE BIANCO MARBLE CLADDING FOR BAR AS PER APPROVED SAMPLE

GROUND FLOOR PLAN F.F.L +450

GROUND FLOOR PLAN F.F.L +450

GROUND FLOOR PLAN T.O.S +350

GROUND FLOOR PLAN T.O.S +350

H

BIANCO WHITE MARBLE CALDDING FOR SINKS AS PER APPROVED SAMPLE

6

7 3

BAR AREA - ELE 03

4

1 : 50

BAR AREA - ELE 04

6'

GROUND FLOOR PLAN F.F.L +450

7

1 : 50

3

0.50 0.05

SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

GROUND FLOOR PLAN F.F.L +450

2

F

GUEST WASHROOM - ELE 02 1 : 50

E

6

6'

7

WHITE PAINT ON GYPSUM BOARD CEILING WHITE PAINT ON GYPSUM BOARD CLADDING SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

2 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE GROUND FLOOR PLAN F.F.L +450

GROUND FLOOR PLAN T.O.S +350

GROUND FLOOR DETAILED PLAN - Callout 3

6

FIRST FLOOR PLAN T.O.S +3900

H

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

6'

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

FIRST FLOOR PLAN T.O.S +3900

WHITE PAINT ON GYPSUM BOARD CLADDING SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

G

2.20

WHITE PAINT ON GYPSUM BOARD CLADDING

G

WHITE PAINT ON GYPSUM BOARD CEILING

1.70

SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

WHITE PAINT ON GYPSUM BOARD CLADDING

WHITE PAINT ON GYPSUM BOARD CLADDING

GUEST WASHROOM - ELE 01

D G

0.10

BIANCO WHITE MARBLE CALDDING AS PER APPROVED SAMPLE

GROUND FLOOR DETAILED PLAN - Callout 2 8

E

0.90

WHITE PAINT ON GYPSUM BOARD CEILING WOOD CALDDING AS PER APPROVED SAMPLE

2.72

H

F

0.50

WHITE PAINT ON GYPSUM BOARD CEILING WOOD CALDDING AS PER APPROVED SAMPLE

H

G

WHITE PAINT ON GYPSUM BOARD CEILING

SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

1 : 50

0.50

H

0.05

G

7

1

F

H

FIRST FLOOR PLAN T.O.S +3900

0.05 0.50

G

1 : 50

F

0.05

7

7

GROUND FLOOR PLAN T.O.S +350

2.20

8 FIRST FLOOR PLAN T.O.S +3900

H

GROUND FLOOR PLAN T.O.S +350

F

3

7

BIANCO WHITE MARBLE CALDDING FOR SINKS AS PER APPROVED SAMPLE

BAR AREA - ELE 02

2

1 : 50

GLASS PARTITION AS PER APPROVED SAMPLE

GROUND FLOOR PLAN F.F.L +450

3 1 EG20026-TD-ID-7-GR-3

2.70

F

G

FIRST FLOOR PLAN T.O.S +3900

WHITE PAINT ON GYPSUM BOARD CLADDING

SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

2

4 2 EG20026-TD-ID-7-GR-1

F

FIRST FLOOR PLAN T.O.S +3900

7

1:

Scale

1.90

BIANCO WHITE MARBLE CALDDING AS PER APPROVED SAMPLE

2.70

1.70 0.10

WHITE PAINT ON GYPSUM BOARD CLADDING

6'

WHITE PAINT ON GYPSUM BOARD CEILING

1.80

WOOD CALDDING AS PER APPROVED SAMPLE

SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

6

RECEPTION - 3D - 01

5

1 : 50

0.05

WHITE PAINT ON GYPSUM BOARD CEILING

M.WA

0.80

E

SEATING AREA - GR - ELEV 04

4

H

0.20 0.70

E

G

M.ABDELSAL

Drawn by

EG20026-TD-ID-7-GR-

0.50

0.05 0.50

WHITE PAINT ON GYPSUM BOARD CEILING

D

F

EG200

24/10/20

Checked by

FIRST FLOOR PLAN T.O.S +3900

BIANCO WHITE MARBLE CALDDING AS PER APPROVED SAMPLE

D

E

2 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350

0.50

D

8

1 : 50

Scale

Date

0.05

M.WALY

Project number

WHITE PAINT ON GYPSUM BOARD CLADDING

0.50

7 FIRST FLOOR PLAN T.O.S +3900

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

M.ABDELSALAM

Drawn by

BASEMENT ELE 01 1 : 50

SILVER EMPERADOR MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

24/10/2021

Date

WOOD CALDDING AS PER APPROVED SAMPLE

2.20

BASEMENT FLOOR PLAN F.F.L +-2750

EG20026

Project number

GROUND FLOOR INTERNAL ELEVATION

WHITE PAINT ON GYPSUM BOARD CEILING

2.20

1

9

B

0.50

BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

EG20026-TD-ID-7-BF-00 BASEMENT ELE 02 1 : 50

8

C

2.70

0.05

0.50

WOODEN RIBS 3CM x 3CM

BASEMENT FLOOR PLAN F.F.L BASEMENT FLOOR PLAN F.F.L +-2750 +-2750

7

D

0.50

1.80

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

Checked by

2

E

ELEVATOR

10/24/2021 2:25:49 PM

0.25

WOODEN RIBS CEILING

BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

BASEMENT FLOOR PLAN F.F.L +-2750

F

WOOD CALDDING AS PER APPROVED SAMPLE

BASEMENT FLOOR INTERNAL ELEVATIONS

ZERO LEVEL +-100

2.35

0.50

0.05

0.50

0.05

2.35

2.34

WHITE PAINT ON GYPSUM BOARD CLADDING

ZERO LEVEL +-100

2.05

WOODEN RIBS CEILING

G

FIRST FLOOR PLAN T.O.S +3900

GROUND FLOOR PLAN T.O.S +350

0.050.50

GROUND FLOOR PLAN T.O.S +350

8

0.05

G

1.90

F

0.80

E

0.50

D

0.05

C

0.50

B

1.90

B'

0.80

A

0.50

A'

GROUND FLOOR PLAN T.O.S +350

GUEST WASHROOM - ELE 03

4

1 : 50

GUEST WASHROOM - ELE 04 1 : 50

1 : 50

For CONSTRUCTION For CONSTRUCTION

SEPTEMBER 2021

SEPTEMBER 2021

No. 0 1

Description APPROVED ISSUE AS CLOUDED

Date

No.

01/09/2021 24/10/2021

0 1

Description APPROVED ISSUE AS CLOUDED

D

01/0 24/1

Revisions Revisions

VILLA MR/ M .KHALIFA

VILLA MR/ M .KHALIF

GROUND FLOOR INTERNAL ELEVATIONS

Date Drawn by Checked by

BIM ARCHITECT PORTFOLIO

BAR AREA - 3D 01

6

BAR AREA - 3D 02

Scale

Project number

24/10/2021

Date

M.ABDELSALAM M.WALY

EG20026-TD-ID-7-GR-1 5

GROUND FLOOR INTERNAL ELEVATION

EG20026

1 : 50

Drawn by 10/24/2021 2:36:48 PM

Project number

Checked by

EG20

24/10/2

M.ABDELSAL

M.W

EG20026-TD-ID-7-GR 6

GUEST WASHROOM - 3D - 02

5

GUEST WASHROOM - 3D - 01

Scale

20

1


A

A

2

1 : 50

B'

9

8

7

B

8

9

FIRST FLOOR F.F.L +4000

5

MASTER SUITE - CALLOUT

3

1 : 50

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE

WHITE PAINT ON GYPSUM BOARD CLADDING

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

1.10

4 2 EG20026-TD-ID-7-FR-2

A

A

SECONDARY BEDROOM (A) F-01

1

0.50

2.29

1.90

0.05

0.05

0.50

0.50 0.05

0.80

FIRST FLOOR F.F.L +4000

3 B'

B

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE

CLEAR MIRROR CLADDING

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

B 1

2

4

2

MASTER SUITE - ELEV 04

SECONDARY BEDROOOM A - CALLOUT

5

1 : 50

B

1

WHITE WOOD RIBS

FIRST FLOOR F.F.L +4000

1 : 50

4

SECONDARY BEDROOM A - ELEV 02 1 : 50

B'

A

A'

ROOF FLOOR PLAN T.O.S +7450

3

FIRST FLOOR F.F.L +4000

MASTER SUITE - ELEV 03

2

ROOF FLOOR PLAN T.O.S +7450

B'

WHITE PAINT ON GYPSUM BOARD CEILING

WHITE PAINT ON GYPSUM BOARD CLADDING

1 : 50

SECONDARY BEDROOM A - ELEV 01 1 : 50

A'

WHITE PAINT ON GYPSUM BOARD CEILING

0.05

WHITE PAINT ON GYPSUM BOARD CEILING

1.60

B

B'

ROOF FLOOR PLAN T.O.S +7450

0.50

ROOF FLOOR PLAN T.O.S +7450

FIRST FLOOR F.F.L +4000

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

1 : 50

A

B'

B

A'

WHITE PAINT ON GYPSUM BOARD CLADDING

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

MASTER SUITE - ELEV 02

MASTER SUITE F-06

7

WHITE PAINT ON GYPSUM BOARD CLADDING

A'

MASTER SUITE - ELEV 01

1

3

6'

3

1.00

1 4 2 EG20026-TD-ID-7-FR-0

6

2

FIRST FLOOR F.F.L +4000

B'

0.41

1

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

1.70

WHITE PAINT ON GYPSUM BOARD CLADDING

FIRST FLOOR F.F.L +4000

A

ROOF FLOOR PLAN T.O.S +7450

WHITE PAINT ON GYPSUM BOARD CEILING

0.50

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

A'

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE

CLEAR MIRROR CALDDING

ROOF FLOOR PLAN F.F.L +7550

WHITE PAINT ON GYPSUM BOARD CEILING

0.05

2.70

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE

A'

3

1.70

A'

WHITE PAINT ON GYPSUM BOARD CEILING

WOODEN SHELVES WHITE PAINT ON GYPSUM BOARD CLADDING

2

1.00

0.50

9

1

ROOF FLOOR PLAN F.F.L +7550

2.20

8

B

2.70

7

2.70

6'

B'

WHITE PAINT ON GYPSUM BOARD CEILING

0.05

WHITE PAINT ON GYPSUM BOARD CEILING

6

A

0.50

A' ROOF FLOOR PLAN T.O.S +7450

0.05 0.50

9

0.50

8

0.05

7 ROOF FLOOR PLAN T.O.S +7450

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

WHITE PAINT ON GYPSUM BOARD CLADDING

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE

WHITE WOOD RIBS

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

FIRST FLOOR F.F.L +4000

SECONDARY BEDROOM A - ELEV 03

3

1 : 50

SECONDARY BEDROOM A - ELEV 04 1 : 50

For CONSTRUCTION For CONSTRUCTION

SEPTEMBER 2021

SEPTEMBER 2021

No. 0 1

Description APPROVED ISSUE AS CLOUDED

Date

No.

01/09/2021 24/10/2021

0 1

Description

Date

APPROVED ISSUE AS CLOUDED

01/09/2021 24/10/2021

Revisions Revisions

VILLA MR/ M .KHALIFA

VILLA MR/ M .KHALIFA

FIRST FLOOR INTERNAL ELEVATIONS

7

1

SP

1

1 : 50

MASTER BATHROOM - ELEV 02

B

1 : 50

BATHROOM A - ELEV 01

2

1 : 50

MASTER BATHROOM - CALLOUT 1 : 50

3

4

1 : 50

TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

2

BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

CLEAR MIRROR WITH INDIRECT LED LIGHT

TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

TERAZZO CLADDING FOR SINK

TEAK WOOD FLOORING AS PER APPROVED SAMPLE

FIRST FLOOR F.F.L +4000

SP

TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

1.20

0.50 0.30

0.20

0.50

MASTER BATHROOM - ELEV 03

FIRST FLOOR F.F.L +4000

1

WHITE PAINT ON GYPSUM BOARD CEILING 0.50

WHITE PAINT ON GYPSUM BOARD CEILING

0.05 0.50

1.00

BIANCO WHITE MARBLE CLADDING FOR SINK

0.90

BIANCO WHITE MARBLE TILES 100 * 100 CM AS PER APPROVED SAMPLE

0.80

0.05 0.70 0.50

BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

0.50

B

1.00

2.70

0.90

0.05

0.50

FIRST FLOOR F.F.L +4000

0.40

WHITE PAINT ON GYPSUM BOARD CLADDING

MIRROR WITH INDIRECT LED LIGHT

WHITE PAINT ON GYPSUM BOARD CEILING

0.20 0.70

9

0.38 0.38 0.38 0.38 0.37

8

WHITE PAINT ON GYPSUM BOARD CEILING

C

0.50 2.20

B

0.05

D ROOF FLOOR PLAN T.O.S +7450

1.70

7

BATHROOM A - ELEV 02

ROOF FLOOR PLAN T.O.S +7450

0.20

8

TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

1 : 50

1

0.80

9

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

SP

B 2

ROOF FLOOR PLAN T.O.S +7450

0.50

0.50 0.05

0.20

2.30

FIRST FLOOR F.F.L +4000

SP

ROOF FLOOR PLAN T.O.S +7450

D

7

TERAZZO CLADDING FOR SINK

FIRST FLOOR F.F.L +4000

TEAK WOOD FLOORING AS PER APPROVED SAMPLE TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE 1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE SP

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

5

SECONDARY BATHROOM A - CALLOUT 1 : 50

3

BATHROOM A - ELEV 03 1 : 50

4

BATHROOM A - ELEV 04 1 : 50

MASTER BATHROOM - ELEV 04 1 : 50

For CONSTRUCTION

For CONSTRUCTION

SEPTEMBER 2021

No. 0 1

Description APPROVED ISSUE AS CLOUDED

SEPTEMBER 2021

Date

No.

01/09/2021 24/10/2021

0 1

Revisions

VILLA MR/ M .KHALIFA

FIRST FLOOR INTERNAL ELEVATIONS

Drawn by Checked by

MASTER BATHROOM - 3D 01

BIM ARCHITECT PORTFOLIO

7

MASTER BATHROOM - 3D 02

Scale

Project number

24/10/2021

Date

M.ABDELSALAM M.WALY

EG20026-TD-ID-7-FR-2 6

FIRST FLOOR INTERNAL ELEVATIONS

EG20026

1 : 50

Drawn by 10/24/2021 2:27:38 PM

Date

Date 01/09/2021 24/10/2021

Revisions

VILLA MR/ M .KHALIFA

Project number

Description APPROVED ISSUE AS CLOUDED

Checked by

6

BATHROOM A - 3D 01

7

EG20026 24/10/2021 M.ABDELSALAM M.WALY

EG20026-TD-ID-7-FR-3

BATHROOM A - 3D 02

Scale

21

1 : 50

10/24/2021 2:28:09 PM

2

TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

2

1

MASTER BATHROOM - ELEV 01

WHITE PAINT ON GYPSUM BOARD CEILING

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE 0.40

FIRST FLOOR F.F.L +4000

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

1.60

0.40 1.00 0.40 0.43 0.47

BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

0.90

0.050.50

0.50 0.05

TERAZZO MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

TOILOET 072

D

5

WHITE PAINT ON GYPSUM BOARD CEILING

ROOF FLOOR PLAN T.O.S +7450

0.05 0.70 0.50

C TOILET 071

B

2

1.00

C

1

FIRST FLOOR F.F.L +4000

0.20

FIRST FLOOR F.F.L +4000

2.70

B MASTER BATHROOM 070

WHITE PAINT ON GYPSUM BOARD CLADDING

1 CM METAL PROFILE GRROVE AS PER APPROVED SAMPLE

0.20 0.30 0.20 0.90

B

BIANCO WHITE MARBLE TILES 100*100 CM AS PER APPROVED SAMPLE

D

1.50

WHITE PAINT ON GYPSUM BOARD CLADDING

0.20

MIRROR WITH INDIRECT LED LIGHT

1.50

9

0.05

8

1.80

7

WHITE PAINT ON GYPSUM BOARD CEILING

C

0.20

ROOF FLOOR PLAN T.O.S +7450

0.50

ROOF FLOOR PLAN T.O.S +7450

WHITE PAINT ON GYPSUM BOARD CEILING

B

1 : 50

Scale

ROOF FLOOR PLAN T.O.S +7450

9

0.50

8

0.96 0.05

7

SECONDARY BEDROOM A - 3D 02

10/24/2021 2:26:59 PM

SECONDARY BEDROOM A - 3D 01

1.00

6

EG20026-TD-ID-7-FR-1

0.05 0.70

1 : 50

Scale

M.WALY

Checked by

1.00

MASTER SUITE - 3D 02

7

M.ABDELSALAM

Drawn by

1.00

EG20026-TD-ID-7-FR-0

1.00

MASTER SUITE - 3D 01

10/24/2021 2:26:24 PM

M.WALY

Checked by

24/10/2021

Date

M.ABDELSALAM

Drawn by

EG20026

Project number

24/10/2021

Date

6

FIRST FLOOR INTERNAL ELEVATIONS

EG20026

Project number


8

7

6'

6

5

4

3'

3

2

1 TOP ROOF PLAN +10650

0.40

0.40

9

2.27

1.97

3.20

W-60

W-30

1.10 2.73

2

10.95

10.95

3.45

1.10

SPANDREL GLASS

3.45

ROOF FLOOR PLAN T.O.S +7450

2.73

W-30

0.66

0.66

W-60

ROOF FLOOR PLAN F.F.L +7550

BIANCO WHITE MARBLE CLADDING

W-70

3.20

1.97

2.27

WPC RIBS

TINTED GLASS

8.68

FIRST FLOOR F.F.L +4000

AL-01

AL-01 0.85

0.85

FIRST FLOOR PLAN T.O.S +3900

3.65

SPANDREL GLASS

3.65

2.70

-

2.80 GROUND FLOOR PLAN F.F.L +450

---

+0.45 F.F.L.

GROUND FLOOR PLAN T.O.S +350

ZERO LEVEL +-100

0.45

+0.00 F.F.L.

0.45

2

8.68

EG20026-TD-ID-9-GN-2

EXTERNAL ELEVATION - 02

3

-

EG20026-TD-ID-9-GN-2

---

1 : 50

1

2

3

3'

4

5

6

6'

7

8

9 For CONSTRUCTION

TOP ROOF PLAN +10650

TOP ROOF PLAN +10650

SEPTEMBER 2021

BIANCO WHITE MARBLE CLADDING

3.20

3.20

3.20

3.20

WPC RIBS

0.90

TINTED GLASS

ROOF FLOOR PLAN F.F.L +7550

0.40

ROOF FLOOR PLAN F.F.L +7550 ROOF FLOOR PLAN T.O.S +7450

ROOF FLOOR PLAN T.O.S +7450

No. 0 1

Description APPROVED ISSUE AS CLOUDED

Date 01/09/2021 24/10/2021

Revisions

SPANDREL GLASS

3.45

VILLA MR/ M .KHALIFA

WPC RIBS

10.95

3.25

10.95

3.35

3.45

BIANCO WHITE MARBLE CLADDING

8.30

TINTED GLASS

7.75

FIRST FLOOR F.F.L +4000

0.85

7.75

0.20

FIRST FLOOR F.F.L +4000 FIRST FLOOR PLAN T.O.S +3900

FIRST FLOOR PLAN T.O.S +3900

1 EG20026-TD-ID-9-GN-2

EXTERNAL ELEVATIONS

SPANDREL GLASS

EG20026

1

EXTERNAL ELEVATION - 01

3.65

Drawn by

GROUND FLOOR PLAN F.F.L +450

0.45

0.15

0.15

0.45

ZERO LEVEL +-100

+0.00 F.F.L.

24/10/2021

Date IVORY WHITE PAINT

+0.45 F.F.L.

GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350

2.80

3.80

3.65

Project number

GROUND FLOOR PLAN T.O.S +350

M.ABDELSALAM M.WALY

Checked by

EG20026-TD-ID-8-GN-0

ZERO LEVEL +-100

1 : 50

Scale

1 : 50

BIM ARCHITECT PORTFOLIO

22


H

G

F

W-30

E

D

C

B

B'

A

A' TOP ROOF PLAN +10650

2.27 3.20

ROOF FLOOR PLAN F.F.L +7550

1.93

ROOF FLOOR PLAN F.F.L +7550

1.17

0.86

3.20

3.40

2.35

2.23

2.23

TOP ROOF PLAN +10650

ROOF FLOOR PLAN T.O.S +7450

1.15

ROOF FLOOR PLAN T.O.S +7450

10.95

3.45 4.80

2.70

10.95

3.45

1.00

BIANCO WHITE MARBLE CLADDING

IVORY WHITE PAINT

W-30

W-60 FIRST FLOOR F.F.L +4000 FIRST FLOOR PLAN T.O.S +3900

2.20

GROUND FLOOR PLAN F.F.L +450

ZERO LEVEL +-100

1

GROUND FLOOR PLAN T.O.S +350

0.45

0.55

0.45

+0.00 F.F.L.

0.55

GROUND FLOOR PLAN T.O.S +350

+0.45 F.F.L.

+0.45 F.F.L. 0.45

GROUND FLOOR PLAN F.F.L +450

2.30

2.20

3.65

3.65

1.35

7.75

2.65

8.68

FIRST FLOOR F.F.L +4000 FIRST FLOOR PLAN T.O.S +3900

ZERO LEVEL +-100

Elevation 1 - a 1 : 50

A'

A

B'

B

C

D

E

F

G

H

For CONSTRUCTION TOP ROOF PLAN +10650

SEPTEMBER 2021

No.

3.20

0 1

Description APPROVED ISSUE AS CLOUDED

Date

01/09/2021 24/10/2021

1.05

1.10

ROOF FLOOR PLAN F.F.L +7550

0.89

4.65

3.20

2.31

2.31

2.30

2.27

TOP ROOF PLAN +10650

ROOF FLOOR PLAN F.F.L +7550

Revisions

ROOF FLOOR PLAN T.O.S +7450 1.25

ROOF FLOOR PLAN T.O.S +7450

IVORY WHITE PAINT

3.45

10.95

FIRST FLOOR F.F.L +4000 W-60

EXTERNAL ELEVATIONS

FIRST FLOOR PLAN T.O.S +3900

1.35

FIRST FLOOR PLAN T.O.S +3900

7.75

2.55

8.68

FIRST FLOOR F.F.L +4000

BIANCO WHITE MARBLE CLADDING

4.84

2.20

10.95

1.00

3.45

VILLA MR/ M .KHALIFA

EG20026

Project number

W-30

24/10/2021

3.65

3.65

Date

M.ABDELSALAM

2.30

2.20

2.20

Drawn by Checked by

BIM ARCHITECT PORTFOLIO

ZERO LEVEL +-100

0.45

0.55

Elevation 2 - a 1 : 50

M.WALY

EG20026-TD-ID-8-GN-1 0.45

2

0.55

GROUND FLOOR PLAN T.O.S +350

0.45

GROUND FLOOR PLAN F.F.L +450

ZERO LEVEL +-100

1 : 50

Scale

23


2.50

W-50

GLASS RAILING BIANCO WHITE MARBLE - STAIR

W-50

0.10

38 75

W-50

CONCRETE PAVEMENT

E

1

26.26

-0.10 F.F.L.

18 17 16 15 14 13 12 11 10

W-40

3

0 1

3

W-40

1

0.10

4.90

7.40 28.15 18.60

11.20

5

4

0.10

3.25

0.10

W-50

5.55

0.10

EG20026-TD-ID-10-GN-5 1 3

-0.10 F.F.L.

7.20

2

-0.15 F.F.L.

-0.10 F.F.L.

W-40

5.20

W-50

-0.15 F.F.L.

For CONSTR

SEPTEMBE

7.20 W-50

3'

0.10

29.00

4

4

3

-0.10 F.F.L.

-0.55 F.F.L.

-0.90 F.F.L.

2.45

1 2 3 4 5

-0.10 F.F.L.

ALUMINUM GATE

9.97

CONCRETE PAVEMENT

6.7

W-50

4

No.

3

2

3 2 1

0 1

29.61

1

37.81

2 EG20026-TD-ID-8-GN-1

UP

-0.10 F.F.L.

W-50

W-50

-0.10 F.F.L.

Descrip

APPROVED ISS AS CLOUDED

-0.05 F.F.L.

2

3 2 1

1

1.00

W-50

VILLA MR/ M .KHALIFA

5.70

SEATING AREA

2.68

1.40

1

6

ALUMINUM GATE

Revisions

5.80

W-50 -0.40 F.F.L.

CONCRETE PAVEMENT

0 32 17

2

STEEL COLUM

Revisions

+0.35 F.F.L. 3.05

W-40

W-40

2

3'

4.00

01/09/2021 24/10/2021

1.20

CONCRETE PAVEMENT

W-40

Date

APPROVED ISSUE AS CLOUDED

4

7.70

6'

5.0 0

W-40

Description

-1.60 F.F.L. 5.30 14.34

2.60

1.20

5

SEPTEMBER 2021

No.

1.00

2 EG20026-TD-ID-7-GR-0 1 3

6.80

3.1

1.20

0.50

1.60

11.50

3'

3

2.00

5.78

VILLA MR/ M

0.10

3'

5

2.86

2

STEEL COLUM

For CONSTRUCTION

1.20

1.20

4

OVERFLOW SWIMMING POOL

2.60

W-40

4

4

EG20026-TD-ID-10-GN-4 1 3

6

2.68

5

5.30

3.70

7

1

EG20026-TD-ID-7-GR-3 4 2

0.80

2.45

5

STEEL COLUM

0.30

6

2.60

0.10

-0.15 F.F.L.

-0.10 F.F.L.

4

6'

W-40

0.30

6

32.13

W-40

6.80

9 8

2

1

31.60

W-40

2.15

EG20026-TD-ID-7-GR-1 1 3

7

7 6 5 4 3 2 1

2.45

6'

1.20

2.45 4.00

W-40

7

6'

EG20026-TD-ID-7-BF-00 1

MOSIC STAIR

PEROGOLA LIMIT

7

2

0.10

8

-0.10 F.F.L.

0.10

7 .1 35

-0.10 F.F.L.

FIRE PLACE

8

2

8

W-40

2.66

9

11.02

-0.10 F.F.L.

9 W-40

9

CONCRETE PAVEMENT

13.09

STEEL COLUM

47.98

9 8 7 6 5 4 3 2 1

1.55

W-50

3.00 27.15

H

1.60

G

0.96

F

4.77

E

11.11 1.60

D

4

W-50

4.78

C

H

4.90

B

B'

G

23.79

EG20026-TD-ID-8-GN-1

A

A'

F

0.10

D

8.00

C

3.39

B

4.50

B'

5124

A

6.70

7.92

8.45

3

A'

UP

1 EG20026-TD-ID-10-GN-7

B

B'

C

D

E

F

G

H

LANDSCAPE FURNITURE PLAN

GLASS RAILING

C

D

BIANCO WHITE MARBLE - STAIR

E

F

G

GLASS RAILING

H

BIANCO WHITE MARBLE -STEEL STAIR

4

EG20026-TD-ID-10-GN-8

LANDSCAPE PLA Project number

EG20026-TD-ID-10-GN-8

Date Drawn by

M.ABDELSALAM

Drawn by

M.WALY

Checked by

EG20026-TD-ID-10-GN-0

LANDSCAPE FURNITURE PLAN

B

24/10/2021

Date

1 : 100

B'

EG20026

Project number

1

BIANCO WHITE

A'MARBLE -STEEL STAIR A

1

1 : 100

Scale

EG20026-TD1

LANDSCAPE DETAILED PLAN

Scale

1 : 100

C

D

E

-0.10 F.F.L.

-0.10 F.F.L.

0.10 1.20 1.20

0.95 0.400.400.40

6'

2.70

-0.10 F.F.L.

0.30

5.00

1.55 0.40

0.40

0.40

2.86

+0.35 F.F.L.

0.10

1.80

0.10

2.80 26.76

1.74

0.50

1.20 0.10

4

0.30

3 5.00

3 1.20

0.86

-0.90 F.F.L.

2 1

0.30

-0.10 F.F.L.

5.50

0.10

F-20

-0.10 F.F.L.

BIANCO WHITE MARBLE STEEL STAIR

-0.10 F.F.L.

-0.40 F.F.L.

F-50

F-30

-0.10 F.F.L. 5.70

0.10

3.25

0.10

F-30

-0.15 F.F.L. 5.55

For CONSTRUCTION

-0.15 F.F.L. 31.26

0.10

7.20

0.10

SEPTEMBER 2021

7.46

F-60 -0.40 F.F.L.

No. 0 1

Description APPROVED ISSUE AS CLOUDED

Date 01/09/2021 24/10/2021

F-110 -0.05 F.F.L.

Revisions

1 36.90

2.68

F-30

F-20

F-60

2

32.00 2.68

5.75

-0.10 F.F.L.

BIANCO WHITE MARBLE STEEL STAIR

A'

A

B'

B

C

D

E

F

G

VILLA MR/ M .KHALIFA 4.80

UP

0.10

F-04

1.20

4.60

F-04

4

11.50

3.60

F-04

5

3'

3.74

8.90

0.35

3'

1.25

6

0.10

3.42

F-04

3.20

11.11

-1.60 F.F.L.

22.45

3.25

H

BIANCO WHITE MARBLE STEEL STAIR

LANDSCAPE FLOORING PLAN Project number Date Drawn by Checked by

EG20026 24/10/2021 M.ABDELSALAM M.WALY

EG20026-TD-ID-10-GN-3 1

LANDSCAPE FLOORING PLAN 1 : 100

BIM ARCHITECT PORTFOLIO

Scale

1 : 100

10/24/2021 3:36:02 PM

0.80

3.03

5

11.11

10.55

3.20 1.10 0.10

5.80

8

6'

17.79

F-60

9

7

6

10.10

-0.15 F.F.L.

7

31.98 1.10

3.50

F-30

7.40

-0.10 F.F.L.

0.10

0.10

-0.10 F.F.L.

6.80

7.40

F-50

0.90

0.10

4.90

8

F-50

-0.10 F.F.L.

7.50

5.30

F-20

0.10

F-30

0.30

8.90

H

3.75

12.00

3.60

G

F-30

9 1.00

F 47.77

37.27

5.59

B

B'

0.10

A

3.00

7.50

8.30

8.45

0.10

2.00

MOSIC STAIR

A'

M.AB

Checked by 10/24/2021 3:35:59 PM

A

A'

BIANCO WHITE MARBLE - STAIR

1 EG20026-TD-ID-10-GN-6

24


6'

7

1

3

3'

4

5

6

6'

7

8

9

BIANCO WHITE MARBLE CLADDING

TOP +3.00 TOP +2.00 PAINT CONCRETE EFFECT 3.00

GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350

+0.45 F.F.L. +0.00 F.F.L.

PAVEMENT STONE

2.00

GRASS

-0.05 F.F.L.

GLASS RAILING

BIANCO WHITE MARBLE STEEL STAIR

TOP +3.00

PAINT CONCRETE EFFECT

PAINT CONCRETE EFFECT

3.00

+0.00 F.F.L.

BIANCO WHITE MARBLE STEEL STAIR

FIRST FLOOR F.F.L +4000

BIANCO WHITE MARBLE CLADDING

3.00

TOP +3.00

0.20 0.55

+0.00 F.F.L.

2

2.55

3.05

ALUMINUM BLACK GLOSSY FINISH PAINT CONCRETE EFFECT

3.00

0.30

0.30 4.10

3.80

3.00

2.55

3.00

TOP +3.00

-0.05 F.F.L.

0.45

9

TOP +4.10

FIRE PLACE

TOP +3.00

GROUNDFLOOR FLOORPLAN PLANT.O.S F.F.L GROUND +450 +350

8

WPC FLOORING

0.45

6

BIANCO WHITE MARBLE FLOORING

2.55

5 GLASS SKY LIGHT

2.55

4

3.00

3' WPC PERGOLA

0.45

3 WPC FLOORING

0.45

2

4.10

1

FIRST FLOOR F.F.L +4000

BASALT

-0.05 F.F.L.

GRASS

LANDSCAPE ELEVATION 01 1 : 100

1

A' BIANCO WHITE MARBLE STEEL STAIR

WPC PERGOLA

GLASS SKY LIGHT ALUMINUM BLACK GLOSSY FINISH

TOP +4.10

4.10

3.00

1.50 0.90 0.60

0.45

5

8

7

6'

6

5

WPC FLOORING

4

3'

3

SKY LIGHT

2

1

GRASS

PAINT CONCRETE EFFECT

TOP +3.00

No. 0 1

3.05

3.55 4.10

PAINT CONCRETE EFFECT

+0.45 F.F.L.

+0.00 F.F.L.

0.55

-0.05 F.F.L.

9

8

7

6'

6

5

4

3'

LANDSCAPE 3D

3

For CONSTRUCTION

SEPTEMBER 2021

TOP +3.00

3.00

-0.05 F.F.L.

0.45

GROUNDFLOOR FLOORPLAN PLANT.O.S F.F.L GROUND +450 +350

2.55

3.00

PAINT CONCRETE EFFECT

BIANCO WHITE MARBLE STEEL STAIR

5

-0.05 F.F.L.

GLASS RAILING

Description

Date

APPROVED ISSUE AS CLOUDED

PAINT CONCRETE EFFECT

BASALT

SEPTEMBER 2021

PAVEMENT STONE

TOP +3.00

01/09/2021 24/10/2021

TOP +3.00

No.

+0.05 F.F.L.

+0.00 F.F.L.

-0.05 F.F.L.

Revisions

Description

0 1

PAINT CONCRETE EFFECT

GRASS

3.00

GLASS RAILING

GLASS RAILING

LANDSCAPE ELEVATION 06

ALUMINUM BLACK GLOSSY FINISH

TOP +4.10 GRASS

PAINT CONCRETE EFFECT

+0.45 F.F.L.

1 : 100

For CONSTRUCTION

WPC PERGOLA

BIANCO WHITE MARBLE STEEL STAIR

-0.05 F.F.L.

LANDSCAPE 3D 2

FIRST FLOOR F.F.L +4000

+0.00 F.F.L.

-0.05 F.F.L.

1 : 100

9

BIANCO WHITE MARBLE CLADDING

TOP +3.00

GRAVEL

LANDSCAPE ELEVATION 02

2

ALUMINUM GATE

BIANCO WHITE MARBLE FLOORING

+0.00 F.F.L. -1.50 F.F.L.

GRASS

PAVEMENT STONE PAINT CONCRETE EFFECT

GLASS RAILING

ALUMINUM GATE

1.00

+0.46 F.F.L.

PAINT CONCRETE EFFECT

TOP +3.00

3.00

+0.70 F.F.L.

+0.55 F.F.L.

PAINT CONCRETE EFFECT

BIANCO WHITE MARBLE CLADDING

3.00

1.10 3.65

4.10

2.55

OVERFLOW SWIMMING POOL - MOSIC TILES

GROUNDFLOOR FLOORPLAN PLANT.O.S F.F.L GROUND +450 +350 0.45

PAINT CONCRETE EFFECT

TOP +3.00

2.00

WPC FLOORING

PAVEMENT STONE

FIRST FLOOR F.F.L +4000

LANDSCAPE ELEVATION 05 1 : 100

0.07

A

3.00

B'

3.00

1

Da

APPROVED ISSUE AS CLOUDED

01/09/ 24/10/

ALUMINUM GATE

Revisions

LANDSCAPE ELEVATION 03

VILLA MR/ M .KHALIFA

1 : 100

A' GLASS SKY LIGHT ALUMINUM BLACK GLOSSY FINISH

WPC PERGOLA

WPC FLOORING

PAVEMENT STONE

VILLA MR/ M .KHALIFA

LANDSCAPE ELEVATIO

LANDSCAPE 3D

1 : 100

Scale

+0.05 F.F.L.

+0.00 F.F.L.

4

LANDSCAPE ELEVATION 08

6

16.10 0.13

1.25

3.38

2.94

4.60

0.75

2.06

2.06

0.35

0.75

4.90 4.80

0.05

2.79

10.55

7 WPC PERGOLA

0.10

1.10

0.05

0.30

6'

8 ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM

9

ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM

PAINT CONCRETE EFFECT

TOP +3.00

0.30

1

0.90

2

3

4

5

6

MOSIC - STAIR

0.95

0.40

0.40

0.40

0.40

0.40 0.30

ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM

ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM PAINT CONCRETE EFFECT

2.80

21.10

21.00

1 : 50

SWIMING POOL-SEATING AREA 3D

21.10 2.30

5

2.30

GLASS SKY LIGHT

SWIMING POOL-SEATING AREA PLAN

3.80

4.10

0.70

3.80

0.60

1.40

1

GLASS SKY LIGHT

TOP +4.10

FIRST FLOOR PLAN T.O.S +3900

0.30

0.40

+4.00 F.F.L.

TOP +3.00

0.25 0.050.30

-0.55 F.F.L.

8.15

WPC PERGOLA FIRST FLOOR F.F.L +4000

0.30

0.10

5.45

0.35

2.40

0.90

0.78 0.28

8.15

1 : 50

0.30

0.95

0.75

BIANCO WHITE MARBLE - SEATING

3.85

+0.00 F.F.L.

PERGOLA SECTION 01

2

F-60

0.35

0.30

0.75

-0.10 F.F.L.

-1.60 F.F.L.

4.60 0.85

0.30 0.30

-0.90 F.F.L.

F-04

5.15

-0.50 F.F.L.

3.20

1

1.60

2

9.40

0.85

3

1.80

4

5.60

5

-0.10 F.F.L.

+0.00 F.F.L.

OVERFLOW SWIMMING POOL

SEATING AREA

2 EG20026-TD-ID-10-GN-6

GROUND FLOOR PLAN F.F.L GROUND FLOOR PLAN+450 T.O.S +350

7

16.10

0.45

-0.55 F.F.L.

9.40

BIANCO WHITE MARBLE - STAIR

0.75

0.75

0.30

0.30

3.00

0.30

ALUMINUM BLACK GLOSSY FINISH

6'

6 GLASS SKY LIGHT

3.80

6

5

3.55

5

4.10

3 EG20026-TD-ID-10-GN-7

4

1:1

Scale

TOP +4.10

FIRST FLOOR F.F.L FIRST FLOOR PLAN T.O.S +4000 +3900

3.80

4

3'

ALUMINUM BLACK GLOSSY FINISH 5 CM * 5 CM

LANDSCAPE 3D

0.05

3'

3

0.30

WPC PERGOLA 4 EG20026-TD-ID-10-GN-6

3

2

I-BEAM

PAINT CONCRETE EFFECT

3

M.WA

Checked by

1 : 100

1

2 EG20026-TD-ID-10-GN-6

M.ABDELSAL

GRASS

-0.05 F.F.L.

EG20026-TD-ID-10-GN-

2 EG20026-TD-ID-10-GN-7

1

+0.05 F.F.L.

0.30

6

24/10/20

Drawn by

3.00

4.10

LANDSCAPE ELEVATION 04

TOP +3.00

PAINT CONCRETE EFFECT

+0.45 F.F.L.

EG200

Project number Date

3.00

0.46

EG20026-TD-ID-10-GN-4

1 : 100

TOP +3.00

0.07

1.10 3.00

1.50

M.WALY

Checked by BASEMENT FLOOR PLAN F.F.L +-2750

GRASS

M.ABDELSALAM

Drawn by

-1.50 F.F.L.

PAVEMENT STONE

BIANCO WHITE MARBLE STEEL STAIR

24/10/2021

Date +0.70 F.F.L.

+0.46 F.F.L.

MOSIC STAIR

+0.00 F.F.L.

GLASS RAILING

PAINT CONCRETE EFFECT

EG20026

Project number

OVERFLOW SWIMMING POOL - MOSIC TILES

BIANCO WHITE MARBLE FLOORING

0.45

PAINT CONCRETE EFFECT GROUNDFLOOR FLOORPLAN PLANT.O.S F.F.L GROUND GRAVEL +450 +350

4

LANDSCAPE ELEVATION 07 1 : 100

LANDSCAPE ELEVATION

TOP +3.00

3.65

BIANCO WHITE MARBLE CLADDING 4.10

BIANCO WHITE MARBLE STEEL STAIR

3

B'

TOP +4.10

PAINT CONCRETE EFFECT

2.54

FIRST FLOOR F.F.L +4000

A

10/24/2021 3:37:05 PM

3

-0.05 F.F.L.

+0.00 F.F.L.

PERGOLA SECTION 02

3

1 : 50

3 EG20026-TD-ID-10-GN-7

For CONSTRUCTION For CONSTRUCTION

SEPTEMBER 2021

SEPTEMBER 2021 SEATING AREA

BIANCO WHITE MARBLE -SEATING

3

3'

4

5

6

6'

7

No. 0 1

Description APPROVED ISSUE AS CLOUDED

0 1

Date 01/09/2021 24/10/2021

-0.80 F.F.L.

OVERFLOW SWIMMING POOL

SEATING AREA BIANCO WHITE MARBLE - SEATING

CONCRETE PAVEMENT

3

MOSIC TILES STAIR

SWIMINF POOL /SEATING AREA SECTION 02 1 : 50

VILLA MR/ M .KHALIF VILLA MR/ M .KHALIFA

+0.00 F.F.L.

0.60

-1.50 F.F.L.

GROUND FLOOR PLAN F.F.L +450

MOSIC TILES STAIR +0.00 F.F.L.

MOSIC FLOORING 5 CM * 5 CM

Project number

1.50

Date -1.50 F.F.L.

Drawn by Checked by

SWIMINF POOL /SEATING AREA SECTION 01 1 : 50

BIM ARCHITECT PORTFOLIO

4

SWIMINF POOL /SEATING AREA SECTION 03 1 : 50

Scale

Project number

EG20026

Date

24/10/2021

Drawn by

M.ABDELSALAM M.WALY

EG20026-TD-ID-10-GN-6 2

PERGOLA DETAILS

OVERFLOW SWIMMING POOL- SEATING AREA DETAILS 0.05

OVERFLOW SWIMMING POOL

1.50 0.90

-0.80 F.F.L.

MOSIC TILES 5 CM * 5 CM MOSIC FLOORING 5 CM * 5 CM

+0.00 F.F.L.

0.20

0.40 0.40

-0.40 F.F.L.

0.60

WPC FLOORING

+0.00 F.F.L.

1 : 50

Checked by 10/24/2021 3:38:35 PM

BIANCO WHITE MARBLE - STAIR

D

01/0 24/1

Revisions Revisions

GROUND FLOOR PLAN F.F.L +450

Description APPROVED ISSUE AS CLOUDED

9.40

2

WPC FLOORING +0.00 F.F.L.

9.40

1

No.

BIANCO WHITE MARBLE - STAIR

GROUND FLOOR PLAN F.F.L +450

EG20

24/10/20

M.ABDELSAL

M.WA

EG20026-TD-ID-10-GN 1

PERGOLA DETAILS PLAN 1 : 50

4

PERGOLA 3D

Scale

25

1


1 EG20026-TD-ID-7-GR-0

2 GLASS RAILING EG20026-TD-ID-10-GN-8

1

G

4

6

-1.55 F.F.L.

10 11

2.70 9 TREADS

F

12 13

1.67

---

14 15 16

1

LANDSCAOE STAIR

2.75

-1.46 F.F.L.

1 LANDSCAPE STAIR SECTION

2

6'

1.55

6

5

MOSIC TILES 5 CM * 5 CM

-0.40 F.F.L.

4 BIANCO WHITE MARBLE - FLOORING

3

MOSIC TILES 5 CM * 5 CM

MOSIC FLOORING 5 CM * 5 CM

W-20

2 GRAVEL

CONCRETE PAVEMENT

MOSIC TILES 5 CM * 5 CM

0.10 2.80

D

1

E 14

13

15

16

17

18

19

E

20

D

D +2.05 29 F.F.L.

4 EG20026-TD-ID-12-GN-1

D 29

30

28

27

26

25

24

23

22

21 UP

28

27

26

25

24

23

22

21 UP

1

2

BASEMENT FLOOR - SERVICE STAIR

2

1 : 50

2

+0.45 F.F.L.

E

31

4 EG20026-TD-ID-12-GN-1

E

34

35

36

37

38

39

E

31

32 33

+2.60 F.F.L.

33

34

35

36

37

38

39

+4.00 F.F.L.

40

40

1

2

2

GROUND FLOOR - SERVICE STAIR

3

1 : 50

FIRST FLOOR - SERVICE STAIR 1 : 50

3

TOP ROOF PLAN +10650

MOSIC FLOORING 5 CM * 5 CM

TOP ROOF PLAN +10650

+0.05 F.F.L.

-0.30 F.F.L.

3.20

0.35

0.35

2.06 3.00

2

1

MOSIC FLOORING 5 CM * 5 CM

WATER FEATURE

-0.10 F.F.L.

F-50 2.06

3

11

1

3'

GLASS RAILING

0.10

4

WATER FEATURE

CONCRETE PAVEMENT

5

5

LANDSCAPE STAIR 3D

3

1 : 50

0.10

F-60

W-20

6

30

1

-2.65 F.F.L.

0.10

0.29 0.10

6

BASEMENT FLOOR PLAN T.O.S +-2850

18

W-20

0.75 1.55

6'

2

32

5.90 5.70

0.10

7

12

17 W-01

1 : 50

8

-1.15 F.F.L.

E

1.29

9

1

2

UP

0.00

8

D 9

10

GLASS RAILING

4 EG20026-TD-ID-12-GN-1

1.00

1.10

D BIANCO WHITE MARBLE - STAIR GROUND FLOOR PLAN F.F.L +450

0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30

6.40 2.59 1.00 LOANDING

4 7 EG20026-TD-ID-12-GN-1

1

1.53 9 RISER

3

5

E

2

D

1.19 9 RISER

2

E

0.10

1

1

F

1.46

EG20026-TD-ID-8-GN-1 2

1.13 2.70 9 TREADS

D

0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30

1.01

C

5.70

WATER FEATURE SECTION 01

5

0.10

1 : 50

0.10

5.90

4

ROOF FLOOR PLAN F.F.L +7550

ROOF FLOOR PLAN F.F.L +7550

ROOF FLOOR PLAN T.O.S +7450

ROOF FLOOR PLAN T.O.S +7450

For CONSTRUCTION SEPTEMBER 2021

0.75

For CONSTRUCTION CONCRETE PAVEMENT W-20

GLASS RAILING

W-20

6 EG20026-TD-ID-10-GN-8

SEPTEMBER 2021

MOSIC TILES 5 CM * 5 CM MOSIC FLOORING 5 CM * 5 CM

GROUND FLOOR PLAN F.F.L +450

No.

+0.05 F.F.L.

Description APPROVED ISSUE AS CLOUDED

No. 0 1

Date

+4.00 F.F.L.

FIRST FLOOR F.F.L +4000

01/09/2021 24/10/2021

Description

Date

APPROVED ISSUE AS CLOUDED

01/09/202 24/10/202

FIRST FLOOR F.F.L +4000

40

FIRST FLOOR PLAN T.O.S +3900

16.26

16.26

0 1

-0.30 F.F.L.

0.23

0.45

2.94

GROUND FLOOR PLAN T.O.S +350

3.55

3'

FIRST FLOOR PLAN T.O.S +3900

39 38

Revisions

37 36 35

3

34

Revisions

31

WATER FEATURE SECTION 02

6

30 29

1 : 50

VILLA MR/ M .KHALIFA

3.55

-0.05 F.F.L.

F-110

33

32

28 27 26

VILLA MR/ M .KHALIFA

11.50

3.38 11.50

2 EG20026-TD-ID-8-GN-2

25 24

+0.45 F.F.L.

23 22

GROUND FLOOR PLAN F.F.L +450

GROUND FLOOR PLAN F.F.L +450

21 20

GROUND FLOOR PLAN T.O.S +350

GROUND FLOOR PLAN T.O.S +350

19 18

Stairs Details

17 16

1.25

14

11 10 9 8

2.78

W-20 0.10

EG20026-TD-ID-10-GN-8

5 WATER FEATURE PLAN EG20026-TD-ID-10-GN-8

WATER FEATURE 3D

7

4

-2.75 F.F.L.

3 2

BASEMENT FLOOR PLAN T.O.S +-2850

1 : 50

Scale

M.ABDELSALAM

Drawn by

1

M.WALY

Checked by

EG20026-TD-ID-12-GN-1

10/24/2021 3:40:09 PM

M.WALY

Checked by

1 : 50

5

M.ABDELSALAM

Drawn by

24/10/2021

Date

6

24/10/2021

Date W-20

EG20026

Project number

7

EG20026

Project number

0.10

13

12

F-60

1

4

15

LANDSCAPE STAIRCASE DETAILS

-0.40 F.F.L.

3.20

2

4

5

SERVICE STAIR

SERVICE STAIR 3D

1 : 50

Scale

1 : 50

REINFORCED CONCRETE STAIR CONCRETE+EPOXY PAINT

20MM GRANITE RISER

3'

4

3

4

3'

3

4

3'

E

E 8

7

6

5

4

3

2

31

30

29

28

27

26

25

E

E +5.30 F.F.L.

24

+0.45 F.F.L.

5 EG20026-TD-ID-12-GN-2

UP

9

32

55

10

33

56

11

34

57

12

35

58

F

13

F

F

36

F

54

53

52

51

50

49

48

47

E

+5.30 F.F.L.

+4.00 F.F.L.

5 EG20026-TD-ID-12-GN-2

UP

2

60 61

21

22

23

39

G

3

3

BASEMENT FLOOR - STAIR

2

1 : 50

4

41

42

43

44

45

46

62

G

4

3'

40

G

3'

GROUND FLOOR - STAIR 1 : 50

63

64

65

66

67

68

G

3

3

3'

FIRST FLOOR - STAIR 1 : 50

48

5 EG20026-TD-ID-12-GN-2

TREAD

F

+6.40 F.F.L.

69

G

4

49

59

61

20

50

58

F

60

19

51

TREAD

57

4

38

18

52

56

F

59

37

17

53

MASONRY WALL CERAMIC TILES MORTAR CERAMIC TILES MORTAR BED CONCRETE SLAB

0.02

55

15

16

E 54

UP

14

G

1

E +1.75 F.F.L.

5 EG20026-TD-ID-12-GN-2

UP

F

E

1

0.25

0.02

-1.60 F.F.L.

0.05

0.02

RISER

STRUCTURE CONCRETE SLAB.

20mm MORTER NON-SLIP CARBORANDUM STRIP CONCRETE SLAB

0.10

3

4

40mm GRANITE TREAD

0.05

3'

RISER

3

0.01 0.01

G. STEEL ANTI SLIP FINISH FOR EXPOSED SURFACE (50X50X2mm) TILES (GRANITE,MARBLE OR CERAMIC) MORTAR BED SAND

1

TILES FLOORING

2

1:5

STEP DETAIL.EGRESS STAIR 1 : 10

3

TYP.STEP DETAIL.GRANITE TILE FINISH 1 : 10

4

CERAMIC SKIRTING DETAIL. 1:5

+7.55 F.F.L. 62

63

64

65

66

67

68

69

G

G 3

4

4

3'

4 Alum.Cladding 01 Alum.Angle 20*20mm

ROOF FLOOR - STAIR

S.Steel Screw S.Steel Screw Vertical Steel Sub-frame 40*40mm Horizontal Steel Sub-frame 40*40mm Steel Bracket

1 : 50

3' 0.02 0.01

0.01

TOP ROOF PLAN +10650

90MM CONC. BLOCK

20MM PLASTER

40*40 Primary Support Channel

20MM GRANITE BASE W/ CHAMFERED EDGE

0.10

TOP ROOF PLAN +10650

MASONRY WALL MORTAR PORCELAIN TILES GROUT PORCELAIN TILES MORTAR BED CONCRETE SLAB

Cross Furring Channel 600mm

0.10

3

ADHESIVE

3.20

GRANITE FLOOR TILE

Alum.Cladding 01 Alum.Angle 20*20mm +7.55 F.F.L.

ROOF FLOOR PLAN F.F.L +7550

69 68

ROOF FLOOR PLAN T.O.S +7450

ROOF FLOOR PLAN T.O.S +7450

67 66

FALSE CEILING (REFER TO ID)

SEPTEMBER 2021

65 64

+6.40 F.F.L.

63 62

S.Steel Screw Vertical Steel Sub-frame 40*40mm S.Steel Screw Horizontal Steel Sub-frame 40*40mm Alum.Cladding 01

For CONSTRUCTION

ROOF FLOOR PLAN F.F.L +7550

For CONSTRUCTIO

SEPTEMBER 2021

CURTAIN FIXATION FRAME

61 60 59

No.

57 56 55

3.55

58

0 1

54 53

Description

Date

APPROVED ISSUE AS CLOUDED

5

01/09/2021 24/10/2021

ANTI-RUST METAL ROD FOR FIXATION 60X60 MM

52 51 50

+4.00 F.F.L.

FIRST FLOOR F.F.L +4000

PORCELAIN SKIRTING DETAIL 1:5

49 48

FIRST FLOOR F.F.L +4000

46 47 45

FIRST FLOOR PLAN T.O.S +3900

Revisions

FIRST FLOOR PLAN T.O.S +3900

44 43

50X50 MM ALUMINIUM LOUVERS WITH SPACING 50 MM

6

SKIRTING DETAIL. MARBLE TILE 1:2

BULKHEAD DETAIL 12 1CURTAIN : 20

8

No.

ALU.CLADDING

0 1

1:5

Description APPROVED ISSUE AS CLOUDED

BEAM PAINT

Revisions

42 41

+2.85 F.F.L.

40 39

38 36

34

32

VILLA MR/ M .KH

-

3.55

35 33

50X50 MM ALUMINIUM LOUVERS WITH SPACING 50 MM

VILLA MR/ M .KHALIFA

37

31 30 29

ANTI-RUST METAL ROD FOR FIXATION 30X30 MM

28 27 26 25

GROUND FLOOR PLAN F.F.L +450

23 24 22 20 19 18

-0.55 F.F.L.

17 16

Project number

15 14 13 12

9

Date

3.20

11 10

8 7

Drawn by

6 5

EG20026 24/10/2021

3 2 1

Checked by

BASEMENT FLOOR PLAN T.O.S +-2850

M.ABDELSALAM M.WALY

EG20026-TD-ID-12-GN-2 5

STAIR 1 : 50

BIM ARCHITECT PORTFOLIO

6

STAIR 3D

Scale

1 : 50

Strap Hanger

Strap Hanger BEAM

9

ALU.LOUVERS CLADDING 1 : 10

Metal Furring Channel O.C Clipped To Main Channel

HEAD 10 1BULK : 10

Paint on Gypsum Board Regular Type

Project number

FLUSH LIFT HANDLE FORGED BRASS HINGES GALVANIZED STEELPINS

Metal Wall Angle Sealant Finish Refer to ID

GENERAL DET

SLAM LOCK 6mm DIAMOND PLATE COVER

Primary Support Channel

Corner Bead

4

-2.75 F.F.L.

BASEMENT FLOOR PLAN T.O.S +-2850

PLAN

Galvanized Steel Hanger Wire Primary Support Channel Corner Reinforcement Trap Gypsum Boad Tiles

Stairs Details

GROUND FLOOR PLAN T.O.S +350

21

10/24/2021 2:54:52 PM

+0.45 F.F.L.

GROUND FLOOR PLAN F.F.L +450 GROUND FLOOR PLAN T.O.S +350

Paint on Gypsum Board Metal Furring Channel

RED VINYL GRIP

Date

AUTOMATIC HOLD OPEN ARM AND COVER RELEASE

Drawn by LIFTING MECHANISM HOUSING -

7

M.ABDE

Checked by

EG20026-TD-ID-1

SECTION

DETAIL 11 1CEILING : 10

E

24/

ACCESS STEEL DOOR

Scale

1 : 20

26

As


R.S HOUSE - PALM HILLS NEW CAIRO, EGYPT


For CONSTRUCTION JULY 2021

No.

Description

Date

Revisions

VILLA MR. RAMADAN SOBHY

GENERAL NOTES. SYMBOLS, AND ABBREVIATIONS Project number

EG20027 Issue Date

Date Drawn by

M.ABDELSALAM M.WALY

Checked by EG20027-TD-ID-0-GN-0

Scale

BIM ARCHITECT PORTFOLIO

1 : 50

28


Y01Y02

Y05

Y03

Y04

Y05

15445 10095

520

X08

4045

500 9085

1950

W01

X07 280

135

456 GLASS PARTITIONS

X06

2190

W09

14

W02

JACUZZI

1

9455

W09

08

W02

8535

600

12675

W20 W21

800 235

03 D01

2505

BF-FFL

03

21

2695

2555

1

7

1 : 50

FLOOR TYPES

520

1

BASEMENT FLOOR DETAILED PLAN

12

BF-FFL

11

X07

F05

F05

WOODEN HPL TILES

WOODEN HPL TILES

WOODEN HPL TILES

42 m²

42 m²

42 m²

4430 960

X06

Y03

Y04

Y01Y02

Y03

Y04

2230

675 800

X08

925

X06

F04 F05 F06 F08 F09 F10

Description 2100

TOILET CABINET 13

X07 4005

540

4385

1215

BF-FFL

SAUNA 12

4660

X06

4205

BF-FFL

145

-3.100

X06

BF-FFL

-0.800 C3

-0.850

WOODEN FLOOR AS PER APPROVED SAMPLE

-0.850

145 765

340 640

BLACK MARBLE TILES 100*100 CM

Descriptio

GYPSUM BOARD C WOODEN RIBS CE MIRROR CEILING

145

JACUZZI

C1

OPENING ABOVE

4600

BF-FFL

9415

7950

7945

42 m² JACUZZI

BF-FFL

340

BF-FFL

C1

WOODEN HPL TILES

08

11

X07

3575

07

C1 C2 C3

STEAM SHOWER & DRY AREA

140

340

GYPSUM BOARD 35 CM DEPTH

Type Mark

1535

340

LIVING AREA

BF-FFL

S5-Ceiling Schedule

X08 1230

F05

-3.100 4600

1 : 50

Y05

08

BLACK SPANISH MARBLE TILES 100*100 CM 19 m²

14

EG20027-TD-ID-3-BF-0

Y05

Scale

SP

WOODEN FLOOR AS PER APPROVED SAMPLE

4205

145

340

4170 KITCHENETTE BF-FFL

1800 CERAMIC TILES 60*60 CM

600

7 m²

600

600

600

240

F04 600

SP

3 m²

600

35 85

WOODEN FLOOR AS PER APPROVED SAMPLE

Description APPROVED ISSUE

BF-FFL

640

1470

BF-FFL

For TENDER JULY 2021

DRIVER'S BEDROOM LOBBY

BF-FFL

56 5

600

1110

STORAGE 02

01

09

BF-FFL

-0.420

X04

No.

MAID'S BATHROOM 05

01/06/2021

BF-FFL

MAID'S BEDROOM 04

-0.420

X02

Revisions

1

LAUNDRY ROOM

BF-FFL

03

-0.420

BF-FFL

DRIVER'S BATHROOM

-0.420

10

X03 X02

Revisions

VILLA MR. RAMADAN SOBHY

X01

X01

BASMENT CEILING

EG20027

Project number

Issue Date

Drawn by Checked by

M.WALY

Scale

1 : 50

Is

Date

R.ABDELHAMID

EG20027-TD-ID-4-BF-0 Y05

VILLA MR. RAMA SOBHY

BASEMENT FLOORING PLAN

Date

BASEMENT FLOORING PLAN

Description APPROVED ISSUE

BF-FFL

CONCRETE SLAB WHITE PAINT FINISH

SP

Project number

BIM ARCHITECT PORTFOLIO

130

X04

Date

X05 CONCRETE SLAB WHITE PAINT FINISH

-0.420

X02

X01

Y04

800

DRIVER'S BATHROOM 10

600

X01

Y03

85

-0.420

X03

13 00

Y01Y02

290 3090

X03

CERAMIC TILES 60*60 CM

11 70

No. 1

120

C1

JULY 2021 X04

600

BF-FFL

600

185 600

1490

CERAMIC TILES 60*60 CM

15 50

-3.100

320

600

4015

87 m²

600

BF-FFL

F04

5 50

WOODEN HPL TILES

5 m²

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

600

600 600 30 600

SP

For TENDER

200

600 600

600

06

1595

130

KITCHENETTE

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

4110

3145

X05

X05

BF-FFL

F04

38 0

600

03

600

600

LAUNDRY ROOM

09

15 50

600

7 m²

600

600

BF-FFL

F05

600

600

600 5 m²

01

605

CERAMIC TILES 60*60 CM

600

CERAMIC TILES 60*60 CM

600

600 280

140

90

600

600

600

90

205

BF-FFL

F04

600

04

4 m²

X02

140 600

MAID'S BEDROOM

600

F04

CERAMIC TILES 60*60 CM

X03

F04

SP

600

BF-FFL

600

X04

05

DRIVER'S BEDROOM LOBBY

SP

MAID'S BATHROOM

BF-FFL

1595

600

250

02

1150

SP

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

SP

SP STORAGE

Drawn by 01/08/2021 04:56:56 ‫ﻡ‬

4150

87 m²

4225

600

F05 WOODEN HPL TILES

X05

600

06

1 : 50

Y01Y02

F08

ENTERTAINMENT AREA

M.WALY

Checked by

1 : 50

WOOD VEIN MARBLE TILES WHITE QUARTZ MARBLE TILES 100*100 CM TRAVENTINE MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM WOODEN HPL TILES WOODEN CHEVRON TILES BLACK SPANISH MARBLE TILES 100*100 CM TEAK WOOD TILES 60*60 CM ICE GREEN MARBLE TILES

F03

BF-FFL

F05

4170

9415

STEAM SHOWER & DRY AREA

SAUNA

BF-FFL

9095

BF-FFL

R.ABDELHAMID

1075

15220

1510

X07

-3.100

Drawn by

4630 6250

640

13

1

4745 7895

100

TOILET CABINET

07

4525

1515

F01 F02

87 m² LIVING AREA

EG20027 Issue Date

Date

640

X08

WOODEN HPL TILES

BASEMENT FLOOR DETAILED PLAN

Y05

X08

4695

10

Project number

BUILDING FLOOR SCHEDULE

F05

9

X01

100

Y04

Revisions

01/08/2021 04:56:52 ‫ﻡ‬

EG20027-TD-ID-1-BF-0

Y05

Date 01/06/2021

EG20027-TD-ID-7-BF-1

8

1

100

Y03

7

Description APPROVED ISSUE

X02

W03

11

7

3495

3455

M.WALY

Scale

Y01Y02

11

No. 1

EG20027-TD-ID-11-GN-0

01/08/2021 04:56:47 ‫ﻡ‬

BASEMENT FLOOR PLAN Y04

12

X01

R.ABDELHAMID

Checked by

Y03

8

13

EG20027

Drawn by

Y01Y02

6

14

X03

BF-FFL

900 AL01 700

Issue Date

Date

1 : 50

15

DRIVER'S BATHROOM 10

10

EG20027-TD-ID-7-BF-19 EG20027-TD-ID-7-BF-1

BASEMENT FLOOR FURNITURE LAYOUT Project number

1

16

JULY 2021

X04

70

10 D01

W03 17

2

5

800

VILLA MR. RAMADAN SOBHY

VILLA MR. RAMADAN SOBHY

X01

18

W10 3 4 4 EG20027-TD-ID-11-GN-0

EG20027-TD-ID-7-BF-0

X01

19

W01

X02 Revisions

20

BF-FFL

X02

BF-FFL

X02

1315

LAUNDRY ROOM

W01

W01

-3.100

For TENDER

09 D01

W01

1070

W01 90

BF-FFL

W01

BF-FFL

01

90

1125

800

09

LOBBY

575

610

1665

2050

470

720 800

800

600

1150

1845

600

04

W01

800

DRIVER'S BEDROOM

1000

600

250 1410

MAID'S BEDROOM

05 D01

1665

1800

9

W03

610

1475

2505

10 EG20027-TD-ID-7-BF-08

X03

DRIVER'S BATHROOM 10

120

800

Date 01/06/2021

130

04 D01

X05

2735

W01

02 D01

5065

X03

BF-FFL

Description APPROVED ISSUE

800

BF-FFL

02

3495

03

1

W35

10010

BF-FFL

11

85

W01

4150

W01

2100

04

W03

2555 STORAGE

W01

1560

W01

2085

X03

LAUNDRY ROOM

BF-FFL

1070

BF-FFL

No. MAID'S BEDROOM

05

08 GLASS PARTITIONS

0 75

01

MAID'S BATHROOM BF-FFL

X04

X04

LOBBY

3090

MAID'S BATHROOM

JULY 2021

3105

130 120

W01

18215

200

W02

08 GLASS PARTITIONS

W01

BF-FFL

230

BF-FFL

BF-FFL

X04

2135

For TENDER

DRIVER'S BEDROOM 09

06

W01

BF-FFL

STORAGE

05

16135

X05

02

W01

KITCHENETTE

W02

1000

06

W17 W18 W19

-3.100

-3.100

-3.100

KITCHENETTE

W07 W08 W09 W10

W14 W16

BF-FFL

EG20027-TD-ID-7-BF-0

BF-FFL

X05

X05

W03 W04 W05 W06

W12 W13

1 EG20027-TD-ID-7-BF-1

4 3615

3

PROVISIONA L LOCATION FOR TV

2 5 3 EG20027-TD-ID-7-BF-1

BF-FFL

8050

4 2 EG20027-TD-ID-7-BF-0

OPENING ABOVE

W09

ENTERTAINMENT AREA

LIVING AREA

6400

2050

2085

800

BF-FFL

OPENING ABOVE

JACUZZI

120

800

13155

07

6

08

195 305

W08 W02

BF-FFL

11

800

Description OFF WHITE PAINT BLACK SPANISH MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM VEIN MARBLE TILES 100*100 CM WOOD CLADDING GREY GYPSUM BOARD CLADDING GREY PAINT CLEAR MIRROR CLADDING BLACK MIRROR CLADDING WHITE GYPSUM BOARD CLADDING ROUGH STONE CLADDING WHITE QUARTZ MARBLE TILES 100*100 CM TERRAZZO TILES 100*100 CM ICE GREEN MARBLE TILES 100*100 CM WOODEN RIBS CLADDING FABRIC CLADDING CALCATTA MARBLE TILES 100*100 CM CALCATTA GOLD MARBLE TILES 100*100 CM CLEAR MIRROR CLADDING BY PIECE FOR BATHROOMS EXTERIOR WHITE PAINT

LIVING AREA

BF-FFL

BF-FFL

260

120

200

W01 W01

07

280

BF-FFL

08 GLASS PARTITIONS

ENTERTAINMENT AREA 14

800

160

X06

X06

115 170

12

BUILDING WALL SCHEDULE WALL TYPES W01 W02

STEAM SHOWER & DRY AREA

SAUNA

BF-FFL

330

X06

4425

W01

1950

13

655

X07

1405

W01

TOILET CABINET

X07

BF-FFL

600

12

1255

W01

BF-FFL

11 SAUNA

BF-FFL

X07

595

4630

1250

STEAM SHOWER & DRY AREA

13

4745

X08

X08

TOILET CABINET

4525

2050

X08

4750

2085

Y04

7965

Y03

2085

Y01Y02

R.ABDE

Checked by

1

BASEMENT CEILING PLAN 1 : 50

EG20027-TD-ID-5Y01Y02

Y03

Y04

Y05 Scale

29


Y01Y02

Y03

Y04

Y05

Y01Y02

Y03

Y04

Y05

BUILDING WALL S

X08

X08

X08

WALL TYPES

X08

W01 W02 2800 AL03 3000

X07

X07

2800 AL03 3000

1530

1500

1710

W07

X06

1520

1500

1500

560

X06 03

GR-FFL

1

UP

DINING AREA

4

5

EG20027-TD-ID-7-GR-1

4 2 EG20027-TD-ID-7-GR-1

GR-FFL

8895

1

3

EG20027-TD-ID-12-GN-0

+0.000 -3.100

EG20027-TD-ID-12-GR-0

+0.000

W20 W05

Sim

520

640

W21 W35

520

1200 AL02 900

900

0.70

180

2.50

4065 300

No. 1

W10

X02

Revisions

4850

UP UP

2060

470

UP

22

23

UP

01 D03

24

25

26

27

7 EG20027-TD-ID-7-GR-1

05

05

VILLA MR. RAMADAN SOBHY

GR-FFL

1170

X01

GR-FFL

1165

1235

290

9

8

45

28

44

375

JULY 20

29

7 43

30

6

GR-FFL

42

31

41

32

40

33

39

38

X04

No.

APPROVED ISSUE

X03 X02

37

Descriptio

1

EG20027-TD-ID-7-GR-0

W05

EG20027-TD-ID-11-GN-0

Revisions

36 UP 35

VILLA MR. RA SOBHY

34

1170

X01

GROUND FLOOR FURNITURE LAYOUT

X01

7

02

KITCHEN

KITCHEN

W05

For TEND

1200 AL02 900

W21 46

5195

X02

10

EG20027-TD-ID-7-GR-0

+0.000 80 34

200

X05

1715

W02

W02

GUEST WASHROOM

625

X02

350

8

X03

X03 UP

620 890

4425

250

+0.000

300

690

900 830

X04

Date 01/06/2021

615

90 37

X03

Description APPROVED ISSUE

300

95 29

X04

02 D02

9 10 EG20027-TD-ID-7-GR-1 625

615

900

2425

W01

5

GR-FFL

X04

W05

GR-FFL

0 94

02

GR-FFL

01

EG20027-TD-ID-12-GR-0

300

W02

LOBBY

05 D02

615

0 48

01

1225

2435

JULY 2021

GUEST WASHROOM

W09

W09

For TENDER LOBBY

300 350

W05

17 15

2435

X05

X05

W17 W18 W19

EG20027-TD-ID-7-GR-0

W06

1

EG20027-TD-ID-12-GN-0

X05

W14 W16

UP

EG20027-TD-ID-7-GR-02

3

3

14

W12 W13

GR-FFL

OPENING BELOW

GR-FFL

X06

W05

MAIN SEATING AREA

DINING AREA 04

W07 W08 W09 W10

W07

5545

03

1500

W06

W07

04

1500

W07

MAIN SEATING AREA

OPENING BELOW

W03 W04 W05 W06

X07 600

X06

2800 AL03 3000

X07

Descr

OFF WHITE PAIN BLACK SPANISH 100*100 CM CERAMIC TILES 6 VEIN MARBLE TIL WOOD CLADDING GREY GYPSUM B CLADDING GREY PAINT CLEAR MIRROR C BLACK MIRROR C WHITE GYPSUM CLADDING ROUGH STONE C WHITE QUARTZ M 100*100 CM TERRAZZO TILES ICE GREEN MARB 100*100 CM WOODEN RIBS C FABRIC CLADDIN CALCATTA MARB 100*100 CM CALCATTA GOLD 100*100 CM CLEAR MIRROR C PIECE FOR BATH EXTERIOR WHITE

GROUND FLOOR PLAN

X01

2

1800 AL04 2400

EG20027-TD-ID-11-GN-0

Project number

EG20027

Project number

Checked by

01/08/2021 04:56:48 ‫ﻡ‬

M.WALY

Checked by

GROUND FLOOR PLAN

EG20027-TD-ID-1-GR-0

1 : 50

Y01Y02

Y03

Y04

Y05

1 : 50

Scale

Y01Y02

Y03

Y04

R.A

Drawn by

R.ABDELHAMID

Drawn by

1

Date

Issue Date

Date

1

EG20027-TD-ID

GROUND FLOOR DETAILED PLAN 1 : 50

Y05

Y01Y02

Y03

Y04

Y05

Y01Y02

Y03

Y04

Y05

Scale

BUILDING FLOOR SCHEDULE FLOOR TYPES

X08

F01 F02

195

X07

1000

1000

1000

1000

1000

1000

F04 F05 F06 F08

795

1000

X06

1000

1000

1000

475

1000

1000

195 1000

1000

2000

1000

625

195

F03

X07

F09 F10

X06

Description WOOD VEIN MARBLE TILES WHITE QUARTZ MARBLE TILES 100*100 CM TRAVENTINE MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM WOODEN HPL TILES WOODEN CHEVRON TILES BLACK SPANISH MARBLE TILES 100*100 CM TEAK WOOD TILES 60*60 CM ICE GREEN MARBLE TILES

X08

X08

X07

X07

F01

1000

03

GR-FFL

04

UP

GR-FFL

+2.900

+2.900

1000

143 m²

520

725

1000

1000

10620

+0.000

+0.000 2 EG20027-TD-ID-12-GR-0

03

+2.900 GYPSUM BOARD

WOOD VEIN MARBLE TILES

1000

143 m²

4495 MAIN SEATING AREA

GR-FFL

F01

WOOD VEIN MARBLE TILES

4205

DINING AREA

WOOD VEIN MARBLE TILES 100*100 CM

MAIN SEATING AREA

GR-FFL

1000

04

GYPSUM BOARD CE WOODEN RIBS CEIL MIRROR CEILING

X06

1000

1000

OPENING BELOW

DINING AREA

C1 C2 C3

Description

13360

X06 4660

WOOD VEIN MARBLE TILES 100*100 CM

S5-Ceiling Schedule Type Mark

5485

X08

1000

SHADOW GAP WITH INDIRECT LIGHT

X04

1000

GR-FFL

UP WOOD VEIN MARBLE TILES 100*100 CM

X02

UP

143 m²

1000 1000

Drawn by Checked by

BIM ARCHITECT PORTFOLIO

Description APPROVED ISSUE

Revisions

Y03

Y04

Y05

Scale

2505

4475

X01

GROUND CEILING Project number

EG20027

Date

Issue Date

Drawn by

R.ABDELHAMID M.WALY

EG20027-TD-ID-4-GR-0 Y01Y02

X02

GR-FFL

X01

GROUND FLOORING PLAN

1 : 50

Checked by

01/08/2021 04:56:59 ‫ﻡ‬

X01

Date

GROUND FLOORING PLAN

1

X03

4705

Project number

1 : 50

No.

GR-FFL

VILLA MR. RAMAD SOBHY

600

X01

1

02

+2.900

KITCHEN 05

+2.900

445

1000

GUEST WASHROOM

VILLA MR. RAMADAN SOBHY

+0.000 1000

X04

GR-FFL

1000

WOOD VEIN MARBLE TILES

1000

LOBBY

4705

X02

Revisions

UP

F01

145

605

JULY 2021

+2.900 01

520

X03

4810

1000

WOOD VEIN MARBLE TILES 100*100 CM

1000

KITCHEN 05

Date 01/06/2021

SP

SP

X02

Description APPROVED ISSUE

605

X04

X03

00 10

X03

No. 1

+0.000 10 00

1000

00 10

1000

GR-FFL

For TENDER GYPSUM BOARD

GUEST WASHROOM 02

X05 +2.900

7345

1000

1000

00 10

7 m²

4065

JULY 2021

WOOD VEIN MARBLE TILES 100*100 CM

90 29

1010

00 10

143 m²

+0.000

X04

F01 WOOD VEIN MARBLE TILES

4145

290

130 1000

1000

0 41

F01 WOOD VEIN MARBLE TILES

445

845

For TENDER

LOBBY GR-FFL

840

X05

X05

5155

143 m²

X05 01

320 200

2500

1000

1000

1000

830

1000

520

F01 WOOD VEIN MARBLE TILES

1

E

Iss

R.ABDE

M

EG20027-TD-ID-5-G

GROUND CEILING PLAN 1 : 50

Y01Y02

Y03

Y04

Y05

Scale

30


Y05 Y01Y02

X08

BUILDING WALL SCHEDULE

X08 3895

320

1420

650 1880

135

330

12

815

FR-FFL

760

500

X02

Date 01/06/2021

X03

W01

2030 655

W01 3345

01

4 2 EG20027-TD-ID-7-FR-2

3695

Y04

M.WALY

EG20027-TD-ID-1-FR-0

Y05

1 : 50

Scale

1 : 50

Y03

Y04

X08 645

1000

1000

1000

1000

625

WOOD VEIN MARBLE TILES WHITE QUARTZ MARBLE TILES 100*100 CM TRAVENTINE MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM WOODEN HPL TILES WOODEN CHEVRON TILES BLACK SPANISH MARBLE TILES 100*100 CM TEAK WOOD TILES 60*60 CM ICE GREEN MARBLE TILES

F04 F05 F06 F08 F09 F10

X06

4090

200

4460

08

2495

FR-FFL

+6.250

900

2530

5 67

X02

X02

200

1295

2430

3285

C1 580

730

2825

3300

1125

JULY 2021 X04

FR-FFL

No.

55 15

Description APPROVED ISSUE

01

X02

Revisions

4 EG20027-TD-ID-11-GN-0

00 17

FR-FFL WOOD VEIN MARBLE TILES

1

X03

2665

2510 5785

Revisions

FR-FFL

+6.250

For TENDER

LOBBY 01

33 40

03

4365

+6.250

DRESSING ROOM A

X03

FR-FFL

+6.250

2120

1125

C1

Date 01/06/2021

520

F01

955

X05

C1

14

2825

200

SECONDARY BEDROOM B

420

FR-FFL

1825

C2 2305

FR-FFL

+6.250

580

Description APPROVED ISSUE

09

C1

675

1

800

0 20

X03

C2 SECONDARY BATHROOM A

1155

No.

35 17

735

FR-FFL

MASTER DRESSING ROOM

C1

FR-FFL

C2

X04

X04

965

BEDROOM C BATHROOM

04

13

4585

2685

JULY 2021

BATHROOM B

FR-FFL

2030

770

For TENDER

FR-FFL

12

1665

+6.250

485

X05

X05

C1

DRESSING ROOM B

4070

2170

FR-FFL

06

940

C1

2825

SP

1385

1665

5540

1120

C1

34 80

2160

1180

MASTER BEDROOM

FR-FFL

+6.250

DRESSING ROOM C

UP

TERRACE

GYPSUM BOARD CEILI WOODEN RIBS CEILING MIRROR CEILING

X06

520

07

2130

FR-FFL

C1 C2 C3

775

0

C1

SECONDARY BEDROOM C

FR-FFL

41 35

+3.700

2480

75 38

2170

Description

FR-FFL

11

795

2740

13

F01

WOOD VEIN MARBLE TILES

SP

4 m²

3495

FR-FFL

VILLA MR. RAMADAN SOBHY

X01

Date Drawn by Checked by

Y04

Y05

X01

FIRST CEILING PLA

EG20027

Project number Date

M.ABDELSALAM M.WALY

1

Scale

X01

Issue Date

EG20027-TD-ID-4-FR-0

1 : 50

VILLA MR. RAMADA SOBHY

FR-FFL

+6.250

FIRST FLOORING PLAN Project number

Y03

02

1 : 50

Drawn by

01/08/2021 04:56:58 ‫ﻡ‬

4745

C1 SECONDARY BEDROOM A

200

28 m²

3815

MASTER BATHROOM

BATHROOM B

+3.700

BIM ARCHITECT PORTFOLIO

S5-Ceiling Schedule Type Mark

X07

650

X07

935

4720

SP

SP

Y01Y02

M.W

2020

F03

SECONDARY BEDROOM A

FIRST FLOORING PLAN

M.ABDELSA

Scale

X08

05

+3.700

15

1

1240

X08

F06 22 m²

WOODEN HPL TILES

Issue

Y05

C1

WOODEN CHEVRON TILES

14

0

480

SECONDARY BEDROOM B

F05

X01

Y04

480

+3.700

14 m²

X02

EG2

Project number

Y05

200 840

1050

2490

3335

F06

2865

02

Y03

1820

WOODEN CHEVRON TILES

SP

FIRST FLOOR DETAIL PLAN

60 16

520

FR-FFL

Y01Y02

FR-FFL

01

03

Y04

4150

20 m²

DRESSING ROOM A

Y03

1000

2780

22 m²

WHITE QUARTZ MARBLE TILES 100*100 CM 4 m²

LOBBY

X03

Y01Y02

820

1000

09

2865

X04

FIRST FLOOR DETAILED PLAN 1 : 50

MASTER DRESSING ROOM

SP

WOOD VEIN MARBLE TILES 1 m²

X01 EG20027-TD-ID-11-GN-0

2970

SP

F01

WHITE QUARTZ MARBLE TILES 100*100 CM 3 m²

VILLA MR. RAMADAN SOBHY

EG20027-TD-ID-12-GN-0

Description

30 17

SP

X06

205

2 m²

4625

1 m²

F02

1

F02

1705

WHITE QUARTZ MARBLE TILES 100*100 CM 1 m²

WOOD VEIN MARBLE TILES

790

365

1000

58

9

EG20027-TD-ID-3-FR-

2810

4355 5660

F02

2330

2210

F01

WHITE QUARTZ MARBLE TILES 100*100 CM 3 m² 790

980

FR-FFL

F06 WOODEN CHEVRON TILES

2805

1000 315

X05

1000

4205

3330 2210

5085

23 m²

1240

57

Revisions

59

Checked by

WOOD VEIN MARBLE TILES

DRESSING ROOM B

WOODEN HPL TILES

1240

56

X02 60

C1

+3.700

SP

SP

55

61

D

01

3

F01 12

F02

1000

TEAK WOOD TILES 60*60 CM

FR-FFL

2865

54

62

815

1 m²

2865 DRESSING ROOM C

SP

1000

21 m²

F05

FR-FFL

3000

F09

FR-FFL

F06

23 m²

06

W08

WOODEN CHEVRON TILES

WOODEN HPL TILES

+3.700

53

63

Description APPROVED ISSUE

EG20027-TD-ID-7-FR-2

4060

945 MASTER BEDROOM

FR-FFL

FR-FFL

WHITE QUARTZ MARBLE TILES 100*100 CM 13 m²

4225

08

620

MASTER BATHROOM 11

1400

2 m²

SP

4770

SECONDARY BEDROOM C

X07

1000

1000

+3.700

F02

2985

390

200

F10 ICE GREEN MARBLE TILES

SP

F05

52

64

No. 1

X03

Drawn by

865

1000

F03 12 m²

07

790

51

65

1800 AL10 1600

Date

BUILDING FLOOR SCHEDULE FLOOR TYPES F01 F02

FR-FFL

TRAVENTINE MARBLE TILES 100*100 CM

X06

250

50

66

TERRACE 10

X07

67

1800 AL07 3000

Y05

X08

68

200

Y01Y02

810

200

FIRST FLOOR PLAN

Y03

X01

69

5

SECONDARY BEDROOM A

X04

M.ABDELSALAM

Checked by

Y01Y02

790

49

JULY 2021

EG20027-TD-ID-7-FR-3

5

Issue Date

Date Drawn by

250

3

EG20027

Project number

780

48

2200 AL09 1200

1180

FIRST FLOOR FURNITURE LAYOUT

70

2235

1

W10

01/08/2021 04:56:47 ‫ﻡ‬

X01

+3.700

W10

2115

W10

02

X01

71

For TENDER

5

FR-FFL

EG20027-TD-ID-7-FR-5

FR-FFL

47

W14

VILLA MR. RAMADAN SOBHY

W10

UP

415

FR-FFL

3

1

2520

X05

SECONDARY BEDROOM B

1895

W10

2 4 EG20027-TD-ID-7-FR-5

W05

1125

W10

1

02 D02

3500

SECONDARY BEDROOM A 02

2430

1255

W01

X02

Revisions

W01

FR-FFL

+3.700

14

975

DRESSING ROOM A 03

520

3

14 D02

16 50

Description APPROVED ISSUE

900

1155

UP

X02

No. 1

1565

LOBBY

800

1 4 2 EG20027-TD-ID-7-FR-3

2565

X03

420

04 D01

1050 1410

FR-FFL

03

X04

1120

FR-FFL

720

DRESSING ROOM A

X03

04

4

W13

W05

55 30

FR-FFL

900 AL01 700

W21 W35

W10

09 D02

W10

890

W20

W21

2505

15 17

X04

LOBBY 01

2 SECONDARY 1 3 EG20027-TD-ID-7-FR-6 BATHROOM A

-

800

0 90

X04

W21 W05

JULY 2021

07 D02

W13

W05

365

FR-FFL

+3.700

890 2685

EG20027-TD-ID-12-GN-0

FR-FFL

1690

W21

1305

For TENDER

FR-FFL

FR-FFL

Sim

09

735

W05

0 12

14

SECONDARY BATHROOM A

05

W05

EG20027-TD-ID-7-FR-6

12

05 D01

BEDROOM C BATHROOM

770

X05

W13

800

-

-

430

1770

MASTER DRESSING ROOM

W05

630

7

X05 SECONDARY BEDROOM B

900 AL01 700

980

-

FR-FFL

-

800

FR-FFL

FR-FFL

X05

04

800

630

05

1065

855

735

09

BEDROOM C BATHROOM

1965

635

MASTER DRESSING ROOM

410

FR-FFL

06

2280

2170

W01 DRESSING ROOM C

13

FR-FFL

13 D01

W17 W18 W19

BATHROOM B

DRESSING ROOM B

2715

W08 0

W04

EG20027-TD-ID-7-FR-0

800

W08

1985

7 W01

W19

DRESSING ROOM C 06

W14 W16

EG20027-TD-ID-7-GR-0 1665

+3.700

2775

W12 W13

1385

4

700

2825

X06

W05

W13

FR-FFL

5540

W17

1085

FR-FFL

935

13

FR-FFL

W07 W08 W09 W10

5

EG20027-TD-ID-7-FR-1

775

2495

MASTER BEDROOM 08

W21

1

2

5

EG20027-TD-ID-7-FR-4

12

895

3 1 EG20027-TD-ID-7-FR-0

+3.700

W10

2970

BATHROOM B

DRESSING ROOM B

980

4 2000

FR-FFL

W10

W10

W18

W16

2 4 EG20027-TD-ID-7-FR-1 3275

Description

OFF WHITE PAINT BLACK SPANISH MARBLE T 100*100 CM CERAMIC TILES 60*60 CM VEIN MARBLE TILES 100*10 WOOD CLADDING GREY GYPSUM BOARD CLADDING GREY PAINT CLEAR MIRROR CLADDING BLACK MIRROR CLADDING WHITE GYPSUM BOARD CLADDING ROUGH STONE CLADDING WHITE QUARTZ MARBLE T 100*100 CM TERRAZZO TILES 100*100 C ICE GREEN MARBLE TILES 100*100 CM WOODEN RIBS CLADDING FABRIC CLADDING CALCATTA MARBLE TILES 100*100 CM CALCATTA GOLD MARBLE 100*100 CM CLEAR MIRROR CLADDING PIECE FOR BATHROOMS EXTERIOR WHITE PAINT

W03 W04 W05 W06

X07

FR-FFL

3

795

105

11 D02

W10

2480

W13

965

900

2880

2740

W06

815

W01 W02

MASTER BATHROOM 11

790

1255

07

3

3000

2075

3210

SECONDARY BEDROOM C

1 4 EG20027-TD-ID-7-FR-4

795

W10 W17

W10 2

FR-FFL

08

775

W10

MASTER BEDROOM

FR-FFL

475

3000

310

X06

1100

X06

07

FR-FFL

2400 AL05 3000

1800 AL07 3000

X06

10

X07

FR-FFL

900

1840

TERRACE

X07

MASTER BATHROOM 11

WALL TYPES

1800 AL04 2400

370

FR-FFL

X07

SECONDARY BEDROOM C

Y05

X08

TERRACE 10

Y04

290

X08

Y03

4155

Y04

290

Y03

1190

Y01Y02

FIRST CEILING PLAN

1 : 50

Checked by

EG

Issue

M.ABDELS M.

EG20027-TD-ID-5-FR Y01Y02

Y03

Y04

Y05

Scale

31


Y01Y02

Y03

Y04

Y05

Y01Y02

X08

X08

X07

X07

Y03

Y04

Y05

X08

BUILDIN

X08

WALL TYPES W01 W02

X07

X07 3600

305

895

305

550

X06

ROOFTOP DINNING 07

X06

RF - FFL

3595

3

780

250

2705

W07 W08 W09 W10

2 4 EG20027-TD-ID-7-FR-1

1020

X06

X06

1

790

W12 W13

ROOFTOP SEATING

1030

600

3275

3

07

RF - FFL

4120

ROOFTOP DINNING

RF - FFL

1

ROOFTOP SEATING 08

W14 W16 8405

2750 AL08 2000

2000

500

W17 W18 W19

4480

2750 AL08 2000

2750 AL08 2000

2000

500

2000

705

PLAYING AREA

RF - FFL

X05

X02

550

X02

Revisions

200

200

2700

165

2700

04

5

1135 600

EG20027-TD-ID-1-RF-0

1 : 50

1 : 50

Scale

Y01Y02

Y03

Y04

X07

1000

255

1020

915

F04 F05 F06 F08

X06

SP 1000

1000

1000

1000

1000

1000

1000

1000

1000

ROOFTOP SEATING 08

F09 F10

925

ROOF FL

Checked by

1

ROOF FLOOR DETAILED PLAN 1 : 50

EG2002 Y01Y02

Y03

Y04

Y05 Scale

Y03

Y04

Y05

X08

X08

S5-Ceiling Sche Type Mark

Description

X07

X07

X06

X06

C1 C2 C3

Descr

GYPSUM BOAR WOODEN RIBS MIRROR CEILIN

1000

1000

1000

1000

1000

1000

X01

Drawn by

WOOD VEIN MARBLE TILES WHITE QUARTZ MARBLE TILES 100*100 CM TRAVENTINE MARBLE TILES 100*100 CM CERAMIC TILES 60*60 CM WOODEN HPL TILES WOODEN CHEVRON TILES BLACK SPANISH MARBLE TILES 100*100 CM TEAK WOOD TILES 60*60 CM ICE GREEN MARBLE TILES

F03

VILLA

305

Date

BUILDING FLOOR SCHEDULE FLOOR TYPES F01 F02

X06

3000

Y01Y02

X08

X07

EG20027-TD-ID-7-RF-1

Project number

Y05

X08

Revisions

5

M.ABDELSALAM M.WALY

De

APPROV

X02

4 EG20027-TD-ID-11-GN-0

X01

01/08/2021 04:56:49 ‫ﻡ‬

1

W13

EG20027

Checked by

Y05

No. 1

X03

Issue Date

Drawn by

Y04

14 35

1970

ROOF FLOOR FURNITURE LAYOUT

Date

Y03

W04

1345

RF - FFL

300

Project number

Y01Y02

RF - FFL

W13

645

3105

RF - FFL

VILLA MR. RAMADAN SOBHY

ROOF FLOOR FURNITURE PLAN

JU X04

W10

4

EG20027-TD-ID-7-RF-0

TERRACE

X01

03

W21

W05

TERRACE

X01

990

W13

17 80

W10

3545

2200 AL11 2700

04

800

RF - FFL

11 70

635

01

1625

600

Fo

19 20 LOBBY

GUEST BATHROOM

4

01/06/2021

X03

02 W10 D02

RF - FFL

3

21 70

APPROVED ISSUE

02

900 100

130

05 D02

1 3 EG20027-TD-ID-7-RF-0

700

X02

1

X04

Date

2RF - FFL

2040

X03

RF - FFL

Description

05

CORRIDOR

X05

EG20027-TD-ID-7-FR-32

2125

85 45

No.

GUEST BEDROOM

215 470

06 D04 2370

900

W10 W17

X04

GUEST BATHROOM 03

W35

RF - FFL

4200

1500

JULY 2021

RF - FFL

0.53

01

09

1

LOBBY

RF - FFL

X03

W21

SERVICE ZONE

1

2020

05

W10

3545

2790

GUEST BEDROOM

W10

RF - FFL

X05

For TENDER X04

06

GROOVE 2CMEG20027-TD-ID-7-RF-1 2 4

1230

X05

W10

3

3495

3020

09

W10

W10 W10

SERVICE ZONE

PLAYING AREA

3020

RF - FFL

240

06

W20

720

470 680

500

RF - FFL

2000

08

OFF W BLACK 100*100 CERAM VEIN M WOOD GREY G CLADD GREY P CLEAR BLACK WHITE CLADD ROUGH WHITE 100*100 TERRA ICE GR 100*100 WOOD FABRIC CALCA 100*100 CALCA 100*100 CLEAR PIECE EXTER

W03 W04 W05 W06

RF - FFL

ROOFTOP DINNING RF - FFL

F03

F03

TRAVENTINE MARBLE TILES 100*100 CM 79 m²

1000

1000

79 m²

780

200

310 8755

5980 5920

1000

1000

1000

For TENDER

01

RF - FFL

SP

500

WOOD VEIN MARBLE TILES

No.

F01

X03

9 m²

1000

1000

175 1000

245

1000

X03 200

GUEST BATHROOM 03

2745

C2

RF - FFL

JULY 202

X04

C1

RF - FFL

C1

No.

X03

1

600

Descriptio APPROVED ISSUE

X02 Revisions

F03

VILLA MR. RAM SOBHY

VILLA MR. RAMADAN SOBHY

12 m²

3645

X01

X01

Checked by

Y04

ROOF CEILING

Y05 Scale

Project number

EG20027

Date

Issue Date

Drawn by

M.ABDELSALAM M.WALY

EG20027-TD-ID-4-RF-0 Y03

X01

ROOF FLOORING PLAN

Drawn by

Y01Y02

For TEND LOBBY 01

RF - FFL

Date

BIM ARCHITECT PORTFOLIO

Date 01/06/2021

1790

X02

Project number

ROOF FLOORING PLAN

RF - FFL

635

Revisions

X01

1 : 50

02

C1 3 1 EG20027-TD-ID-7-RF-0 4

1 : 50

M.AB

Checked by

01/08/2021 04:56:59 ‫ﻡ‬

1000

1000

TRAVENTINE MARBLE TILES 100*100 CM

145

Description APPROVED ISSUE

2 RF - FFL

45 53

1000

TERRACE

1000

1

05

X04

X02

SP

04

1

GUEST BEDROOM

X04

WOOD VEIN MARBLE TILES

2 m²

990

2125

200

F01

F02

1000

2370 CORRIDOR

C1

JULY 2021

575

LOBBY

RF - FFL

WHITE QUARTZ MARBLE TILES 100*100 CM 3 m²

X02

1000

1000

03

1000

14 m²

GUEST BATHROOM

2140

WOODEN CHEVRON TILES

X03

1000

120

F06

1000

550

3610

1000

X05

3345

2075

RF - FFL

1000

1350

200

1230

1000

CORRIDOR 02

X05

X05

240

1000

C2

10 56

X04

RF - FFL

RF - FFL

8205

1820

490

79 m²

GUEST BEDROOM 05

C1

1

1000

3670

TRAVENTINE MARBLE TILES 100*100 CM

SP SP

2 4 EG20027-TD-ID-7-RF-1

2820

580

SP

06

RF - FFL

F03

465

PLAYING AREA

3

RF - FFL

1000

09

27 m²

SP

06

SERVICE ZONE

F05 WOODEN HPL TILES

X05

2285

200 PLAYING AREA

RF - FFL

1000

3140

06

1230

595 PLAYING AREA

2625

1000

TRAVENTINE MARBLE TILES 100*100 CM

310

1000

1000

1000

07

1

ROOF CEILING PLAN

Y01Y02

Y03

Y04

EG20027-TD-ID

Y05

1 : 50

Scale

32


GR-FFL

GR-DINING-B

GR - DINING

GR-DINING-C

100 350

Y04

1 Y03

X05

X04

350

DOUBLE WOODEN SLIDING DOOR 206* 220CM

Description

X05

Date

WHITE PAINT ON GYPSUM BOARD CEILING

10

X02

2900

WOOD VEIN MARBLE TILES 100*100 CM

02

X04

GR-FFL

BLACK MARBLE TILES 100* 100CM

X04

X03

GR-TOS +-100

WOOD VEIN MARBLE TILES 100*100 CM

GR-FFL +0

GR-FFL +0

GR-TOS +-100

GR-TOS +-100

GR-LOBBY-C

11 GR-LOBBY-3D Y04

Y05

1 : 50

Scale

Y04

Y05

350

350

2900

GR-FFL +0

GR-GUEST WASHROOM-C

8

1 : 50

R.ABDELHAMID M.WALY

Checked by SP

EG20027-TD-ID-7-GR-0

GR-TOS +-100

GR-TOS +-100

9

Issue Date

Date Drawn by

WOOD VEIN MARBLE TILES 100*100 CM

EG20027

Project number

875

GR-FFL +0

GROUND INTERNAL ELEVATIONS

1200

FIXED WINDOW 90*120 CM

2.99 WOOD VEIN MARBLE TILES 100*100 CM

VILLA MR. RAMADAN SOBHY

500

350

350

EG20027-TD-ID-7-GR-1

10 1GR-LOBBY-D : 50

Y04

M.WALY

Checked by

GR-TOS +-100

1 : 50

R.ABDELHAMID

Drawn by

Date

Revisions

GR-GUEST WASHROOM-A

WHITE PAINT ON GYPSUM BOARD CEILING

1.54

Description

1 : 50

BLACK MARBLE TILES 100*100 CM

BLACK MARBLE WOOD CLADDING

01/08/2021 05:15:10 ‫ﻡ‬

1670

2900

GR-TOS +-100

WOOD VEIN MARBLE TILES 100*100 CM SKIRTING GROOVE 2CM

7

FIXED MIRROR

Issue Date

Date

GR-FFL +0

50

GR-FFL +0

WHITE PAINT ON GYPSUM BOARD CEILING

EG20027

Project number

BLACK MIRROR WALL WOOD CLADDING

SKIRTING GROOVE 5CM

750

WOOD VEIN MARBLE TILES 100*100 CM

WOOD CLADDING

430 50

350 430 50

BLACK MIRROR WALL

WHITE PAINT ON GYPSUM BOARD

GROUND INTERNAL ELEVATIONS

No. SLIDING WOODEN DOOR

WASHROOM-D 10 1GR-GUEST : 50

GR- GUEST WASHROOM 1 : 50

2200

X05 WHITE PAINT ON GYPSUM BOARD CEILING

6

Y05

875

X05

2900

X04

GR-DINING-3D

780

X03

WHITE PAINT ON GYPSUM BOARD CEILING

6

1 : 50

2900

BLACK MARBLE TILES 100*100 CM

FIXED WINDOW 90*120 CM

WOOD VEIN MARBLE TILES 100*100 CM

X03

Y04

VILLA MR. RAMADAN SOBHY

20

X02

GR-LOBBY-B

8

1 : 50

9

SLIDING WOODEN DOOR

Y04

GROUND FLOOR PLAN - LOBBY

7

GR-FFL +0

1670

Y03

WHITE PAINT ON GYPSUM BOARD CEILING

7

9 8 GUEST WASHROOM

Revisions

X02

350

JULY 2021

2200

X03

GROUND FLOOR-MAIN AREA-3D

For TENDER

EG20027-TD-ID-7-GR-0

WOOD CLADDING

X03

5

1 : 50

Y05

X05

SHADOW GAP WITH INDIRECT LIGHT

No.

GR-MAIN AREA-C

4

Y04

JULY 2021

700

8

X04

GR - MAIN AREA 1 : 50

For TENDER

50

WHITE PAINT ON GYPSUM BOARD CEILING 9 10 EG20027-TD-ID-7-GR-1

1200

1 : 50

Y04

X05

WOOD VEIN MARBLE TILES 100*100 CM

GR-FFL +0

GR-DINNING-D

5

1 : 50

Y05

500

Y03

GREY PAINT SKIRTING GROOVE 2CM

GR-TOS +-100

4

1 : 50

X05

800 1200

1

FR-TOS +3600

GROOVE 2CM

X05

SKIRTING GR-FFLGROOVE 2CM +0

GR-TOS +-100

Y03

GR-MAIN AREA-B 1 : 50

2900

Y02

WHITE PAINT ON GYPSUM BOARD CEILING

Y05

GR-GUEST WASHROOM-B

11 GR-GUEST BT-3D

1 : 50

1 : 50

Scale

Y05 2 EG20027-TD-ID-12-GR-0 2.50

1

2

3

4

5

6

18

7

X03 17

16

4 EG20027-TD-ID-11-GN-0

X03

22 15

14

13

X02 12

45

+0.000

X02

23

11

24

25

26

27

4 EG20027-TD-ID-11-GN-0

44

43

42

9

10

-1.624

X01

X01 Y04

X03 41

40

39

28

29 6 30 EG20027-TD-ID-11-GN-0 31

8

32

33

34

38

X02 37

36

X03

X04 70

69

68

47

X02

48

49

50

51

52

53

+1.924

X01 Y04

BASEMENT FLOOR DETAILED PLAN - Callout 1

2

1 : 50

GROUND FLOOR DETAILED PLAN - Callout 7 1 : 50

54

66

55

3 EG20027-TD-ID-12-GR-0

X03 65

56

64

57

63

58

62

61

X02 60

59

GR - BAR CALLOUT

1

1 : 20

+5.332

X01

X01

1.25

Y05 Y04

1

67

+3.700

35

X01

Y05

71

3

BLACK MIRROR CLADDING AS PER APPROVED SAMPLE

Y05

GR-FFL +0

FIRST FLOOR DETAILED PLAN - Callout 7

2 INDIRECT LIGHT LED PROFILE

+7.100

RF-TOS +7000

GR-FFL +0

GR-FFL +0

GR-FFL +0

GR - BAR DETAILED SECTION 01 1 : 20

3

GR - BAR DETAILED SECTION 02

4

1 : 20

GR - BAR - 3D

7 EG20027-TD-ID-12-GR-0

RF-TOS +7000

71

STEEL BOXES 5*5 CM

1 : 50

RF - FFL +7100

RF - FFL +7100

1.25

2CM GROOVE

1.00

19

X04

0.05

46 20

-3.100

X02

X04

1.00

21

X03

4 EG20027-TD-ID-11-GN-0

X04

0.05

X04

0.70

X04

2.50

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

70 69 68 67

For TENDER

66 65 64 63 62 60

For TENDER

JULY 2021

WOOD CLADDING AS PER APPROVED SAMPLE

+5.332

61 59

JULY 2021

58 57 56

6 EG20027-TD-ID-11-GN-0

55 54 53

FR-FFL +3700

52

FR-FFL +3700

51 50

Description

Date

No.

49

+3.700

FR-TOS +3600

No.

6 EG20027-TD-ID-12-GR-0

48

FR-TOS +3600

47 46

5

45 44 43 42

HADNRAIL DETAILED PLAN

41 39 38 37

+1.924

36 35

Revisions

1 : 10

0.20

7

40

Description

Date

GR - WOOD VEIN WALL CALLOUT 1 : 20

Revisions

STEEL BOXES 5*5 CM

34 33

0.50

32 31 30 29

17

0.37

18

15 14 12 11

0.02

STAIR DETAILS

16

-1.624

BF-FFL +-3100

6 5 4

-3.100

BF-TOS +-3200

BF-FFL +-3100

Date

3 2 1

BF-TOS +-3200

Drawn by WOOD CLADDING AS PER APPROVED SAMPLE

Checked by

EG20027

Section 17 1 : 50

BIM ARCHITECT PORTFOLIO

6

HANDRAIL DETAILED SECTION 1 : 10

5

STAIRS 3D

Scale

GROUND FLOOR DETAILS Project number

LED PROFILE

Issue Date

Date

M.ABDELSALAM M.WALY

EG20027-TD-ID-11-GN-0

4

GLASS SHELVES AS PER APPROVED SAMPLE

As indicated

0.90

Project number

Drawn by STEEL BOXES 5*5 CM

01/08/2021 05:47:42 ‫ﻡ‬

STEEL BOXES 5*5 CM

8 7

GLASS SHELVES AS PER APPROVED SAMPLE

0.50

10 9

VILLA MR. RAMADAN SOBHY

WOOD VEIN MARBLE CLADDING AS PER APPROVED SAMPLE

GR-FFL +0

6

GR-FFL +0

GR - WOOD VEIN WALL SECTION 01 1 : 20

GR-FFL +0

7

GR - WOOD VEIN WALL SECTION 02 1 : 20

Checked by

GR-FFL +0

EG20027 Issue Date Author Checker

EG20027-TD-ID-12-GR-0

8

GR - WOOD VEIN WALL - 3D

Scale

33

1 : 20

01/08/2021 05:50:50 ‫ﻡ‬

19

13

WOOD VEIN MARBLE CLADDING AS PER APPROVED SAMPLE

1.80

INDIRECT LIGHT LED PROFILE

20

0.90

GR-TOS +-100

21

0.02

VILLA MR. RAMADAN SOBHY

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

GR-FFL +0

9 EG20027-TD-ID-12-GN-0

23 22

0.02

+0.000

GR-TOS +-100

ø 1800

26 25 24

0.37

28 27

GR-FFL +0

01/08/2021 05:13:10 ‫ﻡ‬

2

Y04

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

WOOD VEIN MARBLE TILES 100*100 CM

EG20027-TD-ID-12-GR-0

3

1 : 50

FR-TOS +3600

GREY PAINT

SKIRTING GR-FFL GROOVE 2CM +0

WOOD VEIN MARBLE TILES 100*100 CM

GR-FFL +0

GR-MAIN AREA-A

2

Y03

2800

X05

SKIRTING GROOVE 2CM

SKIRTING GROOVE 2CM

GR-TOS +-100

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

WOOD VEIN MARBLE TILES 100*100 CM

2900

GR-FFL +0

GREY PAINT WOOD VEIN MARBLE TILES 100*100 CM

3

1 : 50

WHITE PAINT ON GYPSUM BOARD CEILING

GROOVE 2CM

GREY PAINT ON GYPSUM BOARD

EG20027-TD-ID-7-GR-02

Y02

GREY PAINT

FR-TOS +3600

500 03

4

X07

WHITE PAINT ON GYPSUM BOARD CEILING

Y04

350

X06

1 : 50

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

MAIN SEATING AREA

2 EG20027-TD-ID-12-GR-0

X05

Y05

WHITE PAINT ON GYPSUM BOARD CEILING

875

2

X06

GR-TOS +-100

3 GR-DINING-A

X06

GREY PAINT ON GYPSUM BOARD

1200

2000

SKIRTING GROOVE 2CM

3

GR-FFL

WHITE PAINT ON GYPSUM BOARD CEILING

GROOVE 2CM

SKIRTING GROOVE 2CM GR-FFL +0

2

DINING AREA 04

X05

1200

GR-FFL +0 GR-TOS +-100

X06

WOOD CLADDING AS PER APPROVED SAMPLE

WOOD VEIN MARBLE TILES 100*100 CM

EG20027-TD-ID-12-GR-0

900

5

X07

WOOD VIEN MARBLE PARTITION WALL

GLASS HANDRAIL

WOOD VEIN MARBLE TILES 100*100 CM

4 2 EG20027-TD-ID-7-GR-1

X07

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

GREY PAINT

X06

X07

Y05

FR-TOS +3600

WHITE PAINT ON GYPSUM BOARD CEILING

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

X06

Y04

WHITE PAINT ON GYPSUM BOARD CEILING

100 350

X07

Y02

2900

X07

Y03

X06

2800

X07

350

Y03

350

Y02


FR-FFL +3700

FR-FFL +3700

400 50 2390

HPL WOODEN FLOOR AS PER APPROVED SAMPLE 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

WOODEN RIBS CLADDING AS PER APPROVED SAMPLE

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

FR-FFL +3700

FR-FFL +3700

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

FR-FFL +3700

3

SECONDARY DRESSING ROOM

X06

FR-FFL +3700

FIRST FLOOR DETAILED PLAN - Callout 6

3

LOBBY Elevation 7 - c

4

1 : 50

400

RF-TOS +7000

50

1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE HPL WOODEN FLOOR AS PER APPROVED SAMPLE

HPL WOODEN FLOOR AS PER APPROVED SAMPLE

FR-FFL +3700

350

WHITE GYPSUM BOARD CALDDING

WHITE GYPSUM BOARD CALDDING 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

FR-FFL +3700 FR-FFL +3700

1 : 50

Y02

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

GREY PAINT ON GYPSUM BOARD CLADDING

1550

GREY PAINT ON GYPSUM BOARD CLADDING

WOOD VEIN MARBLE TILES 100*100 CM

FR-FFL +3700

Y03

500

WHITE PAINT ON GYPSUM BOARD CEILING

Y03

400

Y01Y02

150

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

AS PER APPROVED SAMPLE

RF-TOS +7000

RF-TOS +7000

50

350

50 400

RF-TOS +7000

07 D02

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

1500

RF-TOS +7000

BLACK MIRROR CALDDING

FR-FFL +3700

WOODEN RIBS CLADDING AS PER APPROVED SAMPLE

840

FR-FFL +3700

WHITE PAINT FINISH ON GYPSUM BOARD 1 CM METAL CLADDING PROFILE GROOVE AS PER APPROVED WHITE WOOD SAMPLE SKIRTING 15 CM AS PER APPROVED SAMPLE

X02

SECONDARY BEDROOM C Elevation 3 - b 1 : 50

150 10

950

WOOD VEIN MARBLE TILES 100*100 CM

09 D02

WHITE PAINT ON GYPSUM BOARD 1CEILING CM METAL PROFILE GROOVE AS PER APPROVED WHITE WOOD SAMPLE 15 CM SKIRTING

X03

1800

CALCATTA GOLD MARBLE CLADDING

X04

RF-TOS +7000

2

1 : 50

2200

WOOD CALDDING AS PER APPROVED SAMPLE

RF-TOS +7000

2550

20 600 20 500 20 420 50 400

WHITE PAINT ON GYPSUM BOARD CEILING

Y04 50 400

Y03

2390

RF-TOS +7000

2200

Y04

150 10

Y03

SECONDARY BEDROOM C Elevation 3 - a

1

X02

2200

LOBBY Elevation 7 - b 1 : 50

2390

2

150 10

LOBBY Elevation 7 - a 1 : 50

20

X02

1

600

X03

390

1

X03

5

150

50

WOODEN RIBS CLADDING AS PER APPROVED SAMPLE

2

WHITE GYPSUM BOARD CALDDING

1800 AL07 3000

GREY PAINT ON GYPSUM BOARD CLADDING

HPL WOODEN FLOOR AS PER APPROVED SAMPLE 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

1 4 EG20027-TD-ID-7-FR-4

2 4 EG20027-TD-ID-7-FR-5

1550

WHITE GYPSUM BOARD CALDDING

X06

1800

350

GREY PAINT ON GYPSUM BOARD CLADDING

X06

RF-TOS +7000

WHITE PAINT ON GYPSUM BOARD CEILING

150 10

FR-FFL +3700

WHITE PAINT ON GYPSUM BOARD CEILING

Y03

RF-TOS +7000

400

20

1 CM METAL PROFILE GROOVE AS PER APPROVED WHITE WOOD SAMPLE SKIRTING 15 CM AS PER APPROVED SAMPLE

Y03

RF-TOS +7000

600

WOOD VEIN MARBLE TILES 100*100 CM

FR-FFL +3700

Y01Y02

Y02

X06

RF-TOS +7000

840

INDIRECT LED LIGHT CALCATTA GOLD MARBLE CLADDING

RF-TOS +7000

2200

WOODEN SHELVES AS PER APPROVED SAMPLE WOOD CALDDING AS PER APPROVED SAMPLE CALCATTA GOLD MARBLE CLADDING

X04

150 10

2200 AL09 1200

FR-FFL +3700

X04

3

X03 20 600 20 500 20 420 50 390

20 600 20 500 20 420 20

2200

WOOD VEIN MARBLE TILES 100*100 CM

X04

X02

WHITE PAINT ON GYPSUM BOARD CEILING

50

350

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING WOOD CALDDING FOR STAIR HANDRAIL

950

Y04

RF-TOS +7000

+7000

400

Y03

Y03RF-TOS

950

Y04

RF-TOS +7000 WHITE PAINT ON GYPSUM BOARD CEILING

FR-FFL +3700

LOBBY Elevation 7 - d 1 : 50

5

For TENDER

FIRST FLOOR DETAILED PLAN - Callout 5

SECONDARY BEDRROM C Elevation 3 - c

4

1 : 50

3

1 : 50

SECONDARY BEDROOM C Elevation 3 - d 1 : 50

For TENDER

JULY 2021 No.

JULY 2021

Description

Date

No.

Description

Da

Revisions Revisions

VILLA MR. RAMADAN SOBHY

VILLA MR. RAMADAN SOBHY

FIRST FLOOR INTERNAL ELEVATIONS

EG20027-TD-ID-7-FR-5

LOBBY 3D Copy 1

1 : 50

Scale

FR-FFL +3700

1 : 50

3

SECONDARY BEDROOM A ELEVATION 1 - c 1 : 50

+7000

150

1800 AL10 1600 CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

FR-FFL +3700

FR-FFL +3700

600

FR-FFL +3700

FR-FFL +3700

X04

X03

X03

1

SECONDARY BEDROOM B Elevation 5 - a

RF-TOS +7000

Y05

RF-TOS +7000

1550

1800 AL10 1600

TERAZZO TILES AS PER APPROVED SAMPLE WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

FR-FFL +3700

FR-FFL +3700

FR-FFL +3700

WOODEN RIBS CLADDING AS PER APPROVED SAMPLE

SECONDARY BEDROOM B Elevation 5 - b 1 : 50

RF-TOS +7000

RF-TOS +7000

WHITE PAINT ON GYPSUM BOARD CEILING

X03

X04

X05

RF-TOS +7000

CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE

CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE 1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

FR-FFL +3700

FR-FFL +3700

1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

FR-FFL +3700

FR-FFL +3700

SECONDARY BEDROOM A ELEVATION 1 - d

4

Y04

1800

HPL WOODEN FLOOR AS PER APPROVED SAMPLE

Y05

WHITE PAINT ON GYPSUM BOARD CEILING

50

WHITE PAINT ON GYPSUM BOARD CEILING

X02

2

1 : 50

400

X04

50

X01

5

FIRST FLOOR DETAILED PLAN - Callout 3

RANDOM WOODEN RIBS

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

400

400 50 2550

400 50 150

RF-TOS +7000

TERAZZO TILES AS PER APPROVED SAMPLE

WOODEN RIBS CLADDING AS PER APPROVED SAMPLE

X03 RF-TOS

1 : 50

RF-TOS +7000

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

1800

1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

X04

2550

X05

4 2 EG20027-TD-ID-7-FR-3

SECONDARY BEDROOM A ELEVATION 1 - b

150 10 840

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

1800

1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

10 440

Y03

Y02Y01

150

Y01Y02

HPL WOODEN FLOOR AS PER APPROVED SAMPLE

Y03

400 50

X05

X01

WHITE PAINT ON GYPSUM BOARD CEILING

5

CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE

1

FR-FFL +3700

3

RF-TOS +7000

X05

RF-TOS +7000 WHITE PAINT ON GYPSUM BOARD CEILING

2390

WOODEN UNIT AS PER APPROVED SAMPLE

4 2 EG20027-TD-ID-7-FR-2

X01

RF-TOS +7000

400

1870

FR-FFL +3700

2

1 : 50

Y05

2390

SECONDARY BEDROOM A ELEVATION 1 - a

Y04

50

400

RF-TOS +7000

WHITE PAINT ON GYPSUM BOARD CEILING

150 10

1

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

FR-FFL +3700

Y05

CLEAR MIRROR CLADDING

3

1

H = 1.20 S = 1.20

WOODEN UNIT AS PER APPROVED SAMPLE

-

400

SECONDARY BEDROOM

02 D02

-

1200

2390

FR-FFL +3700

1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

RF-TOS +7000

150

WHITE WOOD SKIRTING 15 CM AS PER APPROVED SAMPLE

X02

800

1:

Scale

50

1 CM METAL PROFILE GROOVE AS PER APPROVED SAMPLE

7

150 10

X02

780

EG20027-TD-ID-7-FR-4

BEDROOM C Copy 1

600

X03

780

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING HPL WOODEN FLOOR AS PER APPROVED SAMPLE

2200

X03

HPL WOODEN FLOOR AS PER APPROVED SAMPLE 2390

SECONDARY DRESSING ROOM

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

10 300

X04

RF-TOS +7000

WHITE PAINT ON GYPSUM BOARD CEILING

150 10

X04

RF-TOS +7000

X01

50

50

WHITE PAINT ON GYPSUM BOARD CEILING

X02

220 150

Y03

6

BEDROOM C

2550

RF-TOS +7000

Y01Y02

350

Y03

400

Y01Y02

M.WA

Checked by

150 10

7

01/08/2021 05:07:52 ‫ﻡ‬

LOBBY 3D

M.ABDELSAL

Drawn by

M.WALY

Checked by

Issue D

Date

M.ABDELSALAM

Drawn by

EG200

Project number

Issue Date

Date

6

FIRST FLOOR INTERNAL ELEVATIONS

EG20027

Project number

FIRST FLOOR DETAILED PLAN - Callout 4 1 : 50

3

SECONDARY BEDROOM B Elevation 5 - c 1 : 50

4

SECONDARY BEDROOM B Elevation 5 - d 1 : 50

For TENDER

For TENDER

1 : 50

JULY 2021

JULY 2021 No.

Description

No.

Date

Description

Date

Revisions

Revisions

VILLA MR. RAMADAN SOBHY

VILLA MR. RAMADAN SOBHY

FIRST FLOOR INTERNAL ELEVATIONS Project number

Date Drawn by Checked by

6

7

BEDROOM A 3D Copy 2

Scale

Date

Issue Date

Drawn by

M.ABDELSALAM

Checked by

M.WALY

EG20027-TD-ID-7-FR-2

BEDROOM A 3D Copy 1

BIM ARCHITECT PORTFOLIO

EG20027

1 : 50

6

01/08/2021 05:05:22 ‫ﻡ‬

Project number

EG20027 Issue Date M.ABDELSALAM M.WALY

EG20027-TD-ID-7-FR-3

BEDROOM B

7

BEDROOM B Copy 1 Scale

34

1 : 50

01/08/2021 05:06:00 ‫ﻡ‬

FIRST FLOOR INTERNAL ELEVATIONS


X06

X05

Y02

BLACK MARBLE WALL TILES 100* 100CM

WHITE PAINT

WOODEN FLOOR AS PER APPROVED SAMPLE

BF-FFL +-3100

X06

BF-TOS +-3200

X06

GLASS PANEL DOOR

WOODEN FLOOR AS PER APPROVED SAMPLE

07

BF-JACUZZI-A

2

5 3 EG20027-TD-ID-7-BF-1

BF-FFL

BF-TOS +-3200

BF-FFL +-3100

6

BF-TOS +-3200

4 2 EG20027-TD-ID-7-BF-0

2

BF-LIVING-A

X05

X06

X07

X05

X08

BF-JACUZZI-D

5

X04

Y02

JULY 2021 Y05

No.

Date

X04

EG20027-TD-ID-7-BF-0 0510 BF-FFL 8

2000

BF-FFL +-3100

X02

X02

BF-DRIVER'S BT-A Y05

X02

SINGLE WOODEN DOOR 80*220CM

BF-FFL +-3100

BF-FFL +-3100

BF-TOS +-3200

BF-DRIVER'S BT-B

Drawn by

BASEMENT-JACUZZI 3D

400 2250

BASEMENT INTERNAL ELEVATIONS

Y02

X04 CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE

M.WALY

BF-FFL +-3100

SP

BF-TOS +-3200

1 : 50

9

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

BF-FFL +-3100

EG20027-TD-ID-7-BF-1 Scale

EG20027

Project number

Issue Date

Date

CERAMIC FLOOR R.ABDELHAMIDTILES 60*60 AS PER

Checked by

BT-D 11 1BF-DRIVER'S : 50

X03

CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE

APPROVED SAMPLE

BF-TOS +-3200

1 : 50

X02

VILLA MR. RAMADAN SOBHY

12 MAID'S BT-3D

Issue Date

Date

6

BF-MAID'S BATHROOM-A

Y02

EG20027

Project number

BF-FFL +-3100

BT-C 10 1BF-DRIVER'S : 50

1 : 50

8

1 : 50

CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

BF-TOS +-3200

7

BF-FFL +-3100

SP

BF-MAID'S BATHROOM-B

BATHROOM-C 10 1BF-MAID'S : 50

1 : 50

R.ABDELHAMID

Drawn by

M.WALY

Checked by

SP

BF-TOS +-3200

BF-TOS +-3200

EG20027-TD-ID-7-BF-0

BATHROOM-D 11 1BF-MAID'S : 50

13 BASEMENT FLOOR-LIVING 3D -02

1 : 50

Scale

F.F.L

F.F.L

F.F.L

0.70 WIDTH

2.00 WIDTH

IN

OUT

OUT

IN

OUT

D01

DOOR TYPE

D02

DOOR TYPE

D03

DOOR TYPE

D04

OPENING TYPE

SINGLE HINGED WOODEN DOOR

OPENING TYPE

SINGLE HINGED WOODEN DOOR

OPENING TYPE

DOUBLE HINGED WOODEN DOOR

OPENING TYPE

DOUBLE SLIDING WOODEN DOOR

OPENING SIZE

800*2200 mm

OPENING SIZE

900*2200 mm

OPENING SIZE

2000*2200 MM

OPENING SIZE

1600*2200 mm

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

S5-WOODEN DOORS SCHEDULE

2.20 HEIGHT

2.20 HEIGHT

Type Mark D01 D01 D01 D01 D01 D01 D01 D01 D01 D01 D02 D02

Door Size Width Height 800 800 800 800 800 800 800 800 800 800 900 900

2200 2200 2200 2200 2200 2200 2200 2200 2200 2200 2200 2200

S5-WOODEN DOORS SCHEDULE

Count

Type Mark

1 1 1 1 1 1 1 1 1 1 1 1

Door Size Width Height 900 900 900 900 900 900 900

2200 2200 2200 2200 2200 2200 2200

1 1 1 1 1 1 1

D03

2060

2200

1

D04

1500

2200

1

D05

800

2200

1

Level

Count

No.

Type Mark 0.80 WIDTH

IN

OUT

DOOR TYPE

D05

Sill Height

S5-ALUMINIUM SCHEDULE

AL01 AL01 AL01

700 700 700

900 900 900

900 1500 1500

BF-FFL FR-FFL FR-FFL

1 1 1

AL02 AL02 AL02

900 900 900

1200 1200 1200

1200 1200 1300

GR-FFL GR-FFL FR-TOS

1 1 1

Type Mark

Window Size Width Height

Sill Height

Level

AL06 AL06 AL06 AL06 AL06

600 600 600 600 600

2400 2400 2400 2400 2400

2225 2225 2125 2125 2125

GR-FFL GR-FFL FR-FFL FR-FFL FR-FFL

1 1 1 1 1

AL07 AL07

3000 3000

1800 1800

600 600

FR-FFL FR-FFL

1 1

AL08 AL08 AL08

2000 2000 2000

2750 2750 2750

0 0 0

RF - FFL RF - FFL RF - FFL

1 1 1

AL03 AL03 AL03

3000 3000 3000

2800 2800 2800

0 0 0

GR-FFL GR-FFL GR-FFL

1 1 1

2400 2400

1800 1800

600 700

GR-FFL FR-TOS

1 1

AL09

1200

2200

0

FR-FFL

1

OPENING TYPE

SINGLE SLIDING WOODEN DOOR

OPENING SIZE

800*2200 mm

AL05

3000

2400

0

FR-FFL

1

AL10

1600

1800

600

FR-FFL

1

AL06

600

2400

2225

GR-FFL

1

AL11

2700

2200

0

RF - FFL

1

WOODEN DOORS DETAILS 1 : 25

BIM ARCHITECT PORTFOLIO

AL02

WINDOW TYPE

AL03 - AL05 - AL07

WINDOW TYPE

AL04

OPENING TYPE

HINGED

OPENING TYPE

SLIDING

OPENING TYPE

SLIDING

OPENING SIZE

700*900 MM

OPENING SIZE

900*1200 MM

OPENING SIZE

3000 MM WIDTH

OPENING SIZE

2400*1800 MM

WINDOW MATERIAL

ALUMINIUM AND GLASS

WINDOW MATERIAL

ALUMINIUM AND GLASS

WINDOW MATERIAL

ALUMINIUM AND GLASS

WINDOW MATERIAL

ALUMINIUM AND GLASS

For TENDER

JULY 2021

JULY 2021

Description

No.

Date

VILLA MR. RAMADAN SOBHY

Count

AL04 AL04

DOOR & DOOR OAK PIGMENTED FRAME MATERIAL VENEER

WINDOW TYPE

HINGED

Revisions

S5-ALUMINIUM SCHEDULE Window Size Width Height

AL01

OPENING TYPE

For TENDER

Count

D02 D02 D02 D02 D02 D02 D02

WINDOW TYPE

2.40 HEIGHT

OAK PIGMENTED VENEER

2.40 WIDTH

Date Drawn by Checked by

0.60 WIDTH

2.00 WIDTH

1.20 WIDTH

1.60 WIDTH

VILLA MR. RAMADAN SOBHY

2.70 WIDTH

DOOR/WINDOW TYPES/SCHEDULES Project number

EG20027

Date

Issue Date

Drawn by

M.ABDELSALAM

WINDOW TYPE

M.WALY

OPENING TYPE

EG20027-TD-ID-9-GN-0OPENING SIZE WINDOW

Scale

Date

Revisions

DOOR/WINDOW TYPES/SCHEDULES Project number

Description

1 MATERIAL : 25

AL06

WINDOW TYPE

AL08

WINDOW TYPE

AL09

WINDOW TYPE

AL10

WINDOW TYPE

AL11

HINGED

OPENING TYPE

SLIDING

OPENING TYPE

HINGED

OPENING TYPE

SLIDING

OPENING TYPE

SLIDING

1200*2200 MM

OPENING SIZE

VARIABLE

OPENING SIZE

VARIABLE

3200*2750 mm

OPENING SIZE

2000*2750 MM

OPENING SIZE

ALUMINIUM AND GLASS

WINDOW MATERIAL

ALUMINIUM AND GLASS

DOOR & DOOR DOOR & DOOR FRAME MATERIAL ALUMINIUM AND GLASS FRAME MATERIAL ALUMINIUM AND GLASS

DOOR & DOOR FRAME MATERIAL ALUMINIUM AND GLASS

Checked by

EG20027 Issue Date M.ABDELSALAM M.WALY

EG20027-TD-ID-9-GN-1 Scale

ALUMINIUM TYPES DETAILS 1 : 25

35

1 : 25

01/08/2021 05:34:46 ‫ﻡ‬

IN

DOOR TYPE

DOOR & DOOR FRAME MATERIAL

3.00 WIDTH

2.20 HEIGHT

IN

OUT

0.90 WIDTH

1.50 WIDTH

2.75 HEIGHT

0.90 WIDTH

01/08/2021 05:34:37 ‫ﻡ‬

0.80 WIDTH

VARIABLE SILL HEIGHT

VARAIABLE

VARIABLE SILL HEIGHT

2.20 HEIGHT

2.20 HEIGHT

F.F.L

2.20 HEIGHT

F.F.L

2.20 HEIGHT

2.20 HEIGHT

2.20 HEIGHT

F.F.L

1.80 HEIGHT

F.F.L

2.20 HEIGHT

2.20 HEIGHT

2.20 HEIGHT

VARIABLE HEIGHT

1.80 HEIGHT

1.20 HEIGHT

0.90 HEIGHT

9

Date

BASEMENT FLOOR-LIVING 3D

5

BF - MAID'S BATHROOM

BASEMENT INTERNAL ELEVATIONS

FIXED WINDOW 70*90 CM

FIXED WINDOW 70*90 CM

2200

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

900

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

Y05 CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE

480

880

CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE

900

FIXED WINDOW 70*90 CM

12 BF- DRIVER'S BT 3D

1 : 50

800

X03 CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE

Description

Revisions

SP

BF-TOS +-3200

800

8

JULY 2021

Y02

VILLA MR. RAMADAN SOBHY

01/08/2021 05:02:49 ‫ﻡ‬

BF - DRIVER'S BT 1 : 50

For TENDER

X02

No.

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

X03

9

Revisions

BF-TOS +-3200

7

X03

SINGLE WOODEN DOOR 80*220CM

X04

11

X03

BF-FFL +-3100

Y05

BF-LIVING-D 1 : 50

MAID'S BATHROOM

CERAMIC FLOOR TILES 60*60 AS PER APPROVED SAMPLE

X02

11

Description

800

X02

8

6

2200

X03

10 EG20027-TD-ID-7-BF-19 EG20027-TD-ID-7-BF-1

BF-LIVING-C 1 : 50

CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE

CERAMIC WALL TILES 60*60 AS PER APPROVED SAMPLE

800

X03

BF-TOS +-3200

For TENDER

1 : 50

1 : 50

SKIRTING GROOVE 2CM

BF-FFL +-3100

20

400 2250

BF-JACUZZI-C

4

4

1 : 50

800

BASEMENT FLOOR PLAN -JACUZZI 1 : 50

BASEMENT FLOOR PLAN - LIVING

1

2020

Y05

BF-TOS +-3200

WHITE PAINT WOODEN FLOOR AS PER APPROVED SAMPLE

800

Y04

CURTAIN WALL

BF-FFL +-3100

BF-TOS +-3200

WHITE PAINT ON GYPSUM BOARD CEILING

SKIRTING GROOVE 2CM

BF-TOS +-3200

Y03

Y03

WHITE PAINT

BF-FFL +-3100

Y02

Y02

WHITE PAINT

WOODEN FLOOR AS PER APPROVED SAMPLE

WHITE PAINT

WOODEN FLOOR AS PER APPROVED SAMPLE

JACUZZI

BF-FFL +-3100

BF-FFL

BLACK MARBLE WALL TILES 100 *100CM

GLASS PANEL DOOR

WOODEN FLOOR AS PER APPROVED SAMPLE

X05

06

X07

BLACK MARBLE TILES 100*100CM

X05

KITCHENETTE

800

X05

X05

WHITE PAINT ON GYPSUM BOARD CEILING

MIRROR CEILING

WHITE PAINT

1

X06

WHITE PAINT ON GYPSUM BOARD CEILING

BF-FFL

WHITE PAINT ON GYPSUM BOARD CEILING

1 : 50

1 : 50

Y04

JACUZZI 08

WOODEN FLOOR AS PER APPROVED SAMPLE

BF-LIVING-B

3

1 : 50

4

Y05

BF-FFL +-3100 BF-TOS +-3200

BF-JACUZZI-B

3

1 : 50

SKIRTING GROOVE 2CM

SKIRTING GROOVE 2CM BF-FFL +-3100

LIVING AREA

3

2

50

WOODEN FLOOR AS PER APPROVED SAMPLE

X06

WHITE PAINT

SINGLE WOODEN DOOR 80*220CM

WHITE PAINT

X06

BLACK MARBLE WALL TILES 100* 100CM

01/08/2021 05:01:53 ‫ﻡ‬

X07

GLASS PANEL DOOR

2230

X07

WHITE PAINT ON GYPSUM BOARD CEILING

MIRROR CEILING

BF-FFL

GR-TOS +-100

WHITE PAINT ON GYPSUM BOARD CEILING

20

11

Y02

GR-TOS +-100

2230

BF-FFL

GR-TOS +-100

2250

12

Y03

X05

WHITE PAINT ON GYPSUM BOARD CEILING

WHITE PAINT ON GYPSUM BOARD CEILING

STEAM SHOWER & DRY AREA

SAUNA

BF-FFL

X06

2230

13

X07 GR-TOS +-100

X07

2000

TOILET CABINET

Y03

X07

50 400

X07

2200

X08

20

Y05

400

Y04 X08

2230

Y05

20

Y04 X08


2

X04

X04

1 3 EG20027-TD-ID-7-RF-0

WOODEN SHELVES AS PER APPROVED SAMPLE

4

4

X03

X03

X02

X02

RF - FFL +7100

WHITE QUARTZ MARBLE TILES 100*100 CM

CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE

FR-FFL +3700

CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE RF - FFL +7100

X07

RF - FFL +7100

ROOF BEDROOM Elevation 10 - a

ROOF BEDROOM Elevation 10 - b

2

1 : 50

400

RF-TOS +7000

TEAK WOOD FLOORING AS PER APPROVED SAMPLE

TEAK WOOD FLOORING AS PER APPROVED SAMPLE

FR-FFL +3700

FR-FFL +3700

11 D02

2130

WHITE QUARTZ MARBLE TILES 100*100 CM

ICE GREEN MARBLE TILES 100*100 CM

1800 AL04 2400

2200

Y05

GLASS PARTITION

2450

Y04

CLEAR MIRROR CALDDING

X07

50

50

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

2550

WOODEN RIBS 50*25 MM AS PER APPROVED SAMPLE

RF - FFL +7100

WHITE PAINT ON GYPSUM BOARD CEILING

1750

WHITE QUARTZ MARBLE TILES 100*100 CM

50

50

WHITE PAINT ON GYPSUM BOARD CEILING WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

X06

RF-TOS +7000

400

WHITE PAINT ON GYPSUM BOARD CEILING

WHITE QUARTZ MARBLE TILES 100*100 CM ICE GREEN MARBLE TILES 100*100 CM

FR-FFL +3700

X07

1

3

1

RF-TOS +7000

300

ARMANI GREY MARBLE CLADDING

Y04

RF-TOS +7000

Y02

BOT +10650

500

4

X05

2800

WOODEN RIBS 50*25 MM AS PER APPROVED SAMPLE

50

WHITE PAINT ON GYPSUM BOARD CEILING

2 1 EG20027-TD-ID-7-FR-6

X04

400

X05

20 500 20 500 20 500 20 500 20 500 200 400

X05

X03

2800

X02

BOT +10650

420

Y05

EG20027-TD-ID-7-RF-1

100

Y03

400

Y01Y02

MASTER BATHROOM ELEVATION 6 - a

MASTER BATHROOM ELEVATION 6 - b

2

1 : 50

1 : 50

2 4 EG20027-TD-ID-7-FR-1

X06

1 : 50

X06

1

1

5

ROOF FLOOR DETAILED PLAN - Callout 1

3

1 : 50

ROOF BEDROOM Elevation 10 - c

RF - FFL +7100

400 50

ICE GREEN MARBLE TILES 100*100 CM

2450

2130

1800 AL04 2400

ICE GREEN MARBLE TILES 100*100 CM

1750

CLEAR MIRROR CALDDING

FR-FFL +3700

FR-FFL +3700

RF - FFL +7100

5

ROOF BEDROOM Elevation 10 - d

4

1 : 50

FR-FFL +3700

MASTER BATHROOM CALLOUT PLAN

3

1 : 50

RF-TOS +7000

MASTER BATHROOM ELEVATION 6 - c

FR-FFL +3700

MASTER BATHROOM ELEVATION 6 - d

4

1 : 50

WHITE QUARTZ MARBLE TILES 100*100 CM CLEAR MIRROR CALDDING

TEAK WOOD FLOORING AS PER APPROVED SAMPLE

100

RF - FFL +7100

50

WHITE QUARTZ MARBLE TILES 100*100 CM

CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE

WHITE PAINT ON GYPSUM BOARD CEILING

300

2200 AL11 2700

RF - FFL

RF - FFL +7100

1800 AL04 2400

X06

500

04

CHEVRON WOODEN FLOOR AS PER APPROVED SAMPLE

2200

RF - FFL

1050

05

2200

05 D02

2200

GUEST BEDROOM

Y03

WHITE QUARTZ MARBLE TILES 100*100 CM

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

TERRACE

Y01Y02

Y05

X07

RF-TOS +7000

420

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

RF-TOS +7000

WHITE PAINT ON GYPSUM BOARD CEILING

400

Y04

Y05

RF-TOS +7000

EG20027-TD-ID-7-GR-0

300

X01

Y04

4

BOT +10650

420

50 600

600

X01

WHITE PAINT ON GYPSUM BOARD CEILING

400

WHITE PAINT ON GYPSUM BOARD CEILING

Y02

BOT +10650

500

BOT +10650

1750

X01

2130

X02

50 400

X03

BOT +10650

2550

3

600 50 400

X04

4 2 EG20027-TD-ID-7-FR-2

1 : 50

1 : 50

For TENDER

For TEN

JULY 2021 No.

JULY 2

Description

Date

No.

Revisions

Revisions

VILLA MR. RAMADAN SOBHY

VILLA MR. R SOB

FIRST FLOOR ELEVAT

ROOF INTERNAL ELEVATIONS

Issue Date

Date

20

1000

20

1000

20

1000

20

1000

20

1000

HPL WOODEN FLOOR AS PER APPROVED SAMPLE RF - FFL +7100

RF - FFL +7100

1

4 EG20027-TD-ID-7-RF-1 1 3

Y03

2

1 : 50

ROOF LIVING AREA Elevation 9 - b

X05

1 : 50

FR-FFL +3700

SECONDARY BATHROOM ELEVATION 8 - a

400 50 1750

1000

LED PROFILE

WOOD VEIN MARBLE TILES AS PER APPROVED SAMPLE

300

FR-FFL +3700

2

550

130 70 400

WOOD CLADDING AS PER APPROVED SAMPLE

WHITE QUARTZ MARBLE CLADDING

WHITE QUARTZ MARBLE TILES 100*100 CM

900

CLEAR MIRROR CLADDING WHITE QUARTZ MARBLE TILES 100*100 CM

1500

50

RF-TOS +7000

1000

900 AL01 700

300

165 1750

900

900 150

400

150 50 400

WHITE PAINT ON GYPSUM BOARD CEILING

1 : 50

FR-FFL +3700

SECONDARY BATHROOM ELEVATION 8 - b 1 : 50

X05 X05

2

Y03

2

300

FR-FFL +3700

Y02

RF - FFL +7100

1

ROOF LIVING AREA Elevation 9 - a

535

WHITE QUARTZ MARBLE TILES 100*100 CM

HPL WOODEN FLOOR AS PER APPROVED SAMPLE

RF-TOS +7000

Y02

500

1000

RF-TOS +7000

500

37020

WOOD CLADDING AS PER APPROVED SAMPLE

2800

GROOVES 2 CM WIDTH

2200

06 D04

900 AL01 700

CLEAR MIRROR CLADDING

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

RF - FFL +7100

WHITE PAINT ON GYPSUM BOARD CEILING

50

WHITE PAINT ON GYPSUM BOARD CEILING

WOODEN UNITS AS PER APPROVED SAMPLE

RF-TOS +7000

BOT +10650

300

BOT +10650

WHITE PAINT ON GYPSUM BOARD CEILING

500

BOT +10650

580

Y04

Scale

X05

500

BOT +10650

WOODEN RIBS CEILING

EG20027-TD

MASTER BATHROOM 3D Copy 1

7

Y02

X05 Y04

MASTER BATHROOM 3D

400

Y03

6

165

1 : 50

Scale

Y04

Checked by

535

EG20027-TD-ID-7-RF-0

ROOF BEDROOM 3D Copy 1

M.

Drawn by

01/08/2021 06:54:17 ‫ﻡ‬

M.WALY

Checked by

7

Date

M.ABDELSALAM

Drawn by

ROOF BEDROOM 3D

Project number

EG20027

Project number

6

Descrip

RF-TOS +7000

1 3 EG20027-TD-ID-7-FR-6

RF-TOS +7000

Y02

RF-TOS +7000

RF-TOS +7000

Y02 X05

3

600

2750

HPL WOODEN FLOOR AS PER APPROVED SAMPLE

RF - FFL +7100

RF - FFL +7100

4

400 550

1050 50

550

1000

300

1750 2550

WHITE QUARTZ MARBLE TILES 100*100 CM

165 535

1000

FR-FFL +3700

2200

WOOD VEIN MARBLE TILES AS PER APPROVED SAMPLE

FR-FFL +3700

1000

50

WHITE QUARTZ MARBLE CLADDING

04 D01

500

FR-FFL +3700

WHITE QUARTZ MARBLE TILES 100*100 CM

GLASS PARTITION

1000

400

50

WHITE QUARTZ MARBLE TILES 100*100 CM

300

WOODEN UNITS AS PER APPROVED SAMPLE

CLEAR MIRROR CLADDING

500

50 1200

WOODEN UNITS AS PER APPROVED SAMPLE

CLEAR MIRROR CLADDING

WOOD CLADDING AS PER APPROVED SAMPLE

FR-FFL +3700

7

RF - FFL +7100

FIRST FLOOR DETAILED PLAN - Callout 1 1 : 50

3

SECONDARY BATHROOM Elevation 8 - c 1 : 50

4

SECONDARY BATHROOM Elevation 8 - d 1 : 50

ROOF LIVING AREA Elevation 9 - d 1 : 50

KIDS AREA - CALLOUT 1 : 50

For TENDER

For TENDER

JULY 2021

JULY 2021 No.

Description

No.

Date

Description

Revisions

Revisions

VILLA MR. RAMADAN SOBHY

VILLA MR. RAMADAN SOBHY

FIRST FLOOR INTERNAL ELEVATIONS

ROOF INTERNAL ELEVATIONS

Project number

Date Drawn by Checked by

6

KIDS AREA - 3D

Date Drawn by

M.ABDELSALAM M.WALY

EG20027-TD-ID-7-RF-1 Scale

BIM ARCHITECT PORTFOLIO

EG20027 Issue Date

1 : 50

Checked by

01/08/2021 05:33:49 ‫ﻡ‬

Project number

Date

EG20027 Issue Date M.ABDELSALAM M.WALY

EG20027-TD-ID-7-FR-6

5

SECONDARY BATHROOM - 3D 01

6

SECONDARY BATHROOM - 3D 02

Scale

36

1 : 50

01/08/2021 05:08:47 ‫ﻡ‬

5

ROOF LIVING AREA Elevation 9 - c 1 : 50

2750 AL08 2000

X04 Y02

1750

400

RF - FFL +7100

2750 AL08 2000

1200

50

Y02

2750 AL08 2000

1000

HPL WOODEN FLOOR AS PER APPROVED SAMPLE

3250

WHITE PAINT FINISH ON GYPSUM BOARD CLADDING

X04

2550

BOT +10650

WHITE PAINT ON GYPSUM BOARD CEILING

300

BOT +10650

+10650

500

Y04 BOT

400

Y03

WHITE PAINT ON GYPSUM BOARD CEILING

600

Y02

1000

BOT +10650 WHITE PAINT ON GYPSUM BOARD CEILING

WHITE PAINT ON GYPSUM BOARD CEILING

400

4


C2

C2

S5-Ceiling Schedule Type Mark

GR-FFL +0

Description

GR-TOS +-100

C1 C2 C3

2

Section 14

PERGOLA 02- CEILING PLAN

8

1 : 50

7

8.00

1 : 50

GYPSUM BOARD CEILING WOODEN RIBS CEILING MIRROR CEILING

PERGOLA 01- CEILING PLAN 1 : 50

BLACK MARBLE CLADDING

BLACK MARBLE CLADDING

BLACK MARBLE CLADDING

BLACK MARBLE CLADDING

OPEN BOOK CALCATTA MARBLE CALDDING

OPEN BOOK CALCATTA MARBLE CLADDING

GLASS HANDRAIL

BLACK STONE FENCE

GR-FFL +0

OVERFLOW SWIMMING POOL

BLACK STONE FENCE

OVERFLOW SWIMMING POOL

TRAVERTINE MARBLE FLOORING

TRAVERTINE MARBLE FLOORING

POOL STAIRS TRAVERTINE MARBLE FLOORING

POOL TILES

4.85

BLACK MARBLE CLADDING

4.85

6.00

BLACK STONE FENCE

TRAVERTINE MARBLE FLOORING

FIRE PLACE

8.00

GRASS

GR-TOS +-100

6.00

LANDSCAPE PERGOLA 2 DETAILED PLAN

2

1

1 : 50

For TENDER

BLACK MARBLE CLADDING AS PER APPROVED SAMPLE

0.33 0.55

0.33 0.55

Date

X08

X07

JULY 2021

OPEN BOOK CALCATTA MARBLE CALDDING AS PER APPROVED SAMPLE

No.

Revisions

BLACK MARBLE CLADDING

Description

Date

3.00

1 : 50

Description

3.00

4

No.

For TENDER

BLACK MARBLE CALDDING AS PER APPROVED SAMPLE

JULY 2021 Section 16

LANDSCAPE PERGOLA 1 DETAILED PLAN 1 : 50

Revisions

4

PERGOLA 2 - SECTION

3

1 : 50

PERGOLA 1 - SECTION 1 : 50

BLACK MARBLE CLADDING

TRAVERTINE MARBLE FLOORING

JACUZZI

BLACK MARBLE FLOORING

POOL STAIRS

BLACK STONE FENCE

GLASS HANDRAIL TRAVERTINE MARBLE FLOORING

0.95

EG20027

Project number

Drawn by

R.ABDELHAMID

Drawn by

M.WALY

Checked by

1 : 50

Scale

1 : 50

5

PERGOLA 1 -3D

5x9CM WOOD JOIST AS PER APPROVED SAMPLE

2

CEILING INDIRECT LIGHTING 1 : 10

5

BULK HEAD

CLADDING DETAIL 12 1MIRROR :5

1 : 10

0.30

ACRYLIC PAINT

20MM MARBLE RISER

GALVANIZED STEEL CORNER BEAD

0.50

PVC CORNER BEAD

0.40

WALL/COLUMN

QUARRY/CERAMIC TILES

40mm MARBLE TREAD

STEEL BOXES 5*5 CM

0.30

0.50

0.50

0.50

0.50

STANLESS STEEL RAILING

0.27 STAIR THREAD BORDER

0.50

0.50

0.50

0.50

GLASS PANEL

0.50

EXTERIOR PAINT ON CEMENT PLASTER

20 mm THICK SETTING MORTAR FIXING NAIL

20mm MORTER

WALL/COLUMN

WALL CORNER DETAIL 1:2

CORNER DETAIL 10 1CERAMIC :2

WALNUT VENEER MDF 18 MM

0.02

CONCRETE SLAB

THRESHOLD HALF AND HALF FLOOR FINISH-REFER TO ID PACKAGE

LANDSCAPE FLYING STAIRS DETAILED

FLOOR FINISH-REFER TO ID PACKAGE

1 : 20

0.02

1

0.02

NON-SLIP CARBORANDUM STRIP

20mm CEMENT PLASTER

4

ANTIQUE MIRROR AS PER APPROVED SAMPLE

ANTIQUE MIRROR AS PER APPROVED SAMPLE

Metal Furring Channel O.C Clipped To Main Channel

100

CEILING DETAILS 1 : 10

18MM MDF AS PER APPROVED SAMPLE

Paint on Gypsum Board Regular Type

Strap Hanger

18MM MDF AS PER APPROVED SAMPLE

5x9CM WOOD JOIST AS PER APPROVED SAMPLE

Corner Bead 200

1 : 50

Scale

GALVANIZED SUSPENSION METAL RAIL EVVERY 450 MM

GYPSUM BOARD 12 MM

0.50

M.WALY

EG20027-TD-ID-12-LS-0

Galvanized Steel Hanger Wire Primary Support Channel Corner Reinforcement Trap Gypsum Boad Tiles

1

M.ABDELSALAM

Checked by

EG20027-TD-ID-10-GN-3 6 PERGOLA 2 -3D

Section 15

Issue Date

Date

Issue Date

Date

TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

EG20027

Project number

GR-TOS +-100

1

LANDSCAPE PERGOLA DETAILS

LANDSCAPE ELEVATIONS

MASONARY BRICKS

WOOD BACKING 30*30 mm SOFTWOOD EVERY 600 MM

For TENDER JULY 2021

DETAIL GR-FFL +0

GR-FFL +0

3

GLASS HANDRIAL 1 : 10

CLADDING DETAIL 13 1WOOD :5

DETAIL 11 1THRESHOLD : 10

9

STAIRS MARBLE FLOORING DETAIL

No.

1:5

Description

Date

STEEL BOXES 5*5 CM

TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

Revisions BATHROOM FLOOR FINISH (AS ID DRAWINGS)

MORTAR BED

2

LANDSCAPE FLYING STAIRS - SECTION 1 : 20

3

FLYING STAIRS - 3D

200x200x20mm CEMENT ROOF TILES 2mm PROTECTION BOARD 50mm EXTRUDED POLYSTYRENE

For TENDER

30mm CEMENT SCREED (REFER TO SPECS) 4mm WATERPROOFING MEMBRANE (REFER TO SPECS)

ALUM. C CHANEL SHADO GAB

VILLA MR. RAMADAN SOBHY

WATERPROOFING MEMBRANE

STRUCTURE CONCRETE SLAB.

70mm L. WEIGHT CONCRETE FOR SLOPE 70/100

LIGHT WEIGHT CONCRETE FOR SLOPE 70:100mm

STRUCTURE SLAB (AS PER STR DRAWINGS)

RC. STRUCTURE SLAB

20MM MARBLE BASE W/ CHAMFERED EDGE

JULY 2021

70mm L. WEIGHT CONCRETE FOR SLOPE 70/100

GRAVEL PROTECTION LAYER WATERPROOFING MEMBRANE (REFER TO SPECIFICATION) PROTECTION LAYER

50mm MORTAR & SAND BED

20MM PLASTER

TYPICAL DETAILS

PAINT

MARBLE FLOOR TILE

Project number

F.FL.

Date

Date Drawn by Checked by

Revisions

M.ABDELSALAM M.WALY

EG20027-TD-ID-12-GN-0

GAP DETAIL 14 1SHADOW :5

VILLA MR. RAMADAN SOBHY

BIM ARCHITECT PORTFOLIO

EG20027 Issue Date

LANDSCAPE DETAILS

6

ROOF LAYERS DETAIL 1:5

8

GRAVEL ROOF FINISH 1 : 10

7

WATER PROOFING / WET AREAS DETAIL 1:5

Scale

37

As indicated

01/08/2021 05:50:14 ‫ﻡ‬

Description

100.00

No.

01/08/2021 05:52:07 ‫ﻡ‬

BLACK MARBLE FLOORING

WOODEN FLOOR AS PER APPROVED SAMPLE

0.04

GR-FFL +0

POOL TILES

01/08/2021 05:35:51 ‫ﻡ‬

GRASS

BLACK STONE FENCE

VILLA MR. RAMADAN SOBHY

VILLA MR. RAMADAN SOBHY

BLACK MARBLE CLADDING

OPEN BOOK CALCATTA MARBLE CLADDING


IGNITE GYM - MADINATY CAIRO , EGYPT

STUDIO FIVE CAIRO DUBAI HOUSTON


STUD

STUDIOFIVE

CAIRO.DU

CAIRO.DUBAI.HOUSTON

UP

UP

ELEVATOR UP

KIDS AREA 074 23.95 UP

STUDIO

CONTROL ROOM

073 137.76

WAITING AREA

060 2.40

089

094 11.41

062 94.70

0.12

249.66

OFFICE 03

WOMEN'S BATHROOM

UP

CORRIDOR

UP

061 1.20

3.90

UP

OFFICE 02

OFFICE 01

093

092 9.97

9.83

3.00

070 20.09

081

096

3.26

6.19

CLINIC 01

2.06

CLINIC 08

072 4.88

SAUNA

9 KW

BATHROOM

STORE

065 8.07

STUDIO

PHYSIO THERABY

MEN'S BATHROOM

064

UP

63.74

090

MACHINES AREA

2.14

208.99

085 871.14

2.11

063 109.77

F&B

3.06

082 42.40

CLINIC 02

JACCUZZI

066

076

12.05

5.94 CLINIC 03

CLINIC 05

CLINIC 04

100

099

9.38

9.46

CLINIC 06

JACCUZZI 080 5.13

CLINIC 08

068

069

070

12.20

30.08

20.09

BICYCLES AREA

091

078 5.57

3.33

SAUNA

9 KW

102 1.57

6.18

2.18

M.R

075

2.11

STEAM

097

079 6.50

2.18

3.33

124.12 STEAM M.R 2.01 1.25

2.55

RECEPTION 077 68.18

OPEN TO BELOW

MACHINES AREA

085 871.14

SCHEMAT

SCHEMATIC DESIGN

Revisions

Revisions No.

Description

0 2 3

No.

Date

APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE 087

122.97

Descrip

0 2 3

06-10-2021 11-11-2021 23-11-2021

TRACK AREA

APPROVED ISSU APPROVED ISSU APPROVED ISSU

IGNIT

IGNITE GYM

FIRST FURNITU

GROUND FLOOR FURNITURE PLAN Project number

Project number

EG21009

Date

11-11-2021

Date

M.ABDELSALAM

Drawn by

Drawn by

EG21009-SD-ID-1-GR-0

GROUND FLOOR FURNITURE PLAN - Dependent 1 11 : 110

1

Checked by

11/24/2021 12:40:34 PM

M.WALY

Checked by

EG21009-S

FIRST FLOOR FURNITURE PLAN - Dependent 1 1 : 110

Scale

STUDIOFIVE

1 : 110

CAIRO.DUBAI.HOUSTON

Scale

STUDIO

CAIRO.DUBA

UP

Wall Schedule

3.59

W-05

0.95

0.80

0.50

W-05 W-05 0.80

0.41

0.80

0.47

0.80

0.32

0.80

0.14

0.18

0.17 0.70

0.17

W-05

W-05

1.03

1.06

1.03

W-05

W-05

1.03

1.03

1.25

0.70

1.43

W-05 2.21

0.03

2.52

0.80

0.36

0.80

0.39

0.80

0.40

0.80

0.41

0.80 8

0.40

0.80

0.45

0.80

W-05 W-05

W-05

W-05

W-05

W-05

W-05

1.00

0.97

1.03

1.03

1.03

1.03

102 1.57

0.80

W-05

W-05 1.00

1.36

0.80

W-05

0.16

0.70

078 5.57

2.30

SAUNA W-05

10 11 12

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

+4.35 F.F.L.

2.27

0.80 0.01

STEAM

9

4EG21009-SD-ID-7-FR-001 2

5.13

079 6.50

BICYCLES AREA

+4.30 F.F.L.

1

CW-02

M.R W-05 W-05

1.07

2.97

1.68

2.34

STEAM 075 6.18

W-05

8

090 208.99

080

2.12

0.39

W-05

W-05 1.03

7

STUDIO

3

JACCUZZI W-05

1.78

W-05

3 W-05

0.82

6

0.8 0

091 124.12

+4.35 F.F.L.

2.49

1.39 4.00

CW-01

1.6 5 0.2 0

0.80 8.24

5

0.8 0

0.95

CW-02

+4.35 F.F.L.

10.70

4

MACHINES AREA

1.00

W-08

3

W-01 0.8 4

0.80

0.23

10.08

3.73

-

2

10. 57

4.25

085 871.14

2.12

W-05 BW1

W-01 0.36

0.80

2.47

W-01 1.00

1

W-01

3.0 5

W-08 4EG21009-SD-ID-7-GR-002

W-01 0.95

7.42

0.77

9.23

W-01

RECEPTION

W-08

0.77

W-01

9.22

W-08

0.77

W-01

8.77

W-08

0.77

W-01

9.71

W-01

W-08

0.77

W-01

W-01

W-08 9.22

0.77

6.63

W-01

W-01

W-01

1.00 2.38

1.39

077 68.18

1.39

5.52

076

W-01

6.22

W-01

JACCUZZI

2.10

2.60

1

W-05 EG21009-SD-ID-7-GR-001

1.14 0.32 0.80 0.41 0.80 EG21009-SD-ID-12-GR-01

W-01

070 20.09 W-01 2.33

0.64

0.63 0.66

0.66 2.67

1.72

2.06

W-05

12.4

4

1.29

W-05

UP

W-01

W-01

0.80

0.40

1.03

W-05

EG21009-SD-ID-7-GR-001 4.13

W-01 1.42

0.11 0.09

0.40

1.03

W-05

2.08

W-01

W-01

W-01

0.80

0.40

1.03

W-05

0.70

W-01

8.89

092 9.97

W-01 1.32

2.82

-

6.41

GLASS HANDRAIL 100 CM HEIGHT

W-01

093 9.83

CW-01

W-01

6.86

29 28 27 26 25 24 23 22 21 20 19 18 17 16

W-01

W-01

OFFICE 02

OFFICE 01

2.00

1.03

W-05

7

2.11

4 EG21009-SD-ID-7-GR-001

1.23

W-01

1.82

1.03

W-05

0.95

W-01 W-01

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

2.02

3

EG21009-SD-ID-7-GR-002

11.41

W-01

10 11 12

13.96

GLASS HANDRAIL 100 CM HEIGHT

W-01

2.07

OFFICE 03 094

9

2.16

9 10 11 12 13 14 15

0.40

1.57

1.20

0.24 1.60

1.60

1.03

W-05

0.80

0.70

2.53

1.65

W-05

0.95

3.06

0.18

0.12

7.26

0.80

8

0.40

0.42

0.92 0.80

0.82

0.82

1.58

1.58

0.52

1.60

1.97 3.67

3.51

0.15

2

CLINIC 08 W-01

1.19

W-05

7

0.39

W-01

1.27

W-05

6

0.40

W-01 3.51

1.27

W-05

5

+4.35 F.F.L.

W-01

0.40

W-01

W-05

W-01

2.45

8

W-01

W-05

0.44

W-01

7

2.60

W-05

0.30

0.40

W-01 W-01

W-05

1.14

W-05

0.66

1.26

6

0.33

0.40

0.40

0.43

3.02

0.83

096 6.19

5

EG21009-SD-ID-7-GR-001

4.09

069 30.08

068

W-01 1.03

SAUNA

081 3.26

4

0.80

2.26

6

5.94

0.40

CLINIC 06

3.51

3.51

CLINIC 05

W-01

2.84

+0.40 F.F.L.

W-01

3.28

3.64

099 9.46

3.51

3.33

3.33

4.51

4.51

3.68

100 9.38

2.83

STORE

W-05

1.54

1.77

3

2.00

CW-02

W-01 1.15

0.84

W-05

W-01

W-01

1.94

12.20

0.83

6

W-05 EG21009-SD-ID-7-GR-001

EG21009-SD-ID-12-GR-01 W-01

W-01

CLINIC 04

CLINIC 03 W-01

W-01

063 109.77

W-05

4

UP

1.97

2.57

0.15 0.80

W-05

0.46

0.76

1.95

MEN'S BATHROOM

W-05

2.70

061 3.90

2

062 94.70 +0.40 F.F.L. EG21009-SD-ID-7-GR-001

3.99

1

1.19

2.70

12.05 1.35

6.42

WOMEN'S BATHROOM

1.38

W-01

0.40

2.41

W-05

W-05

0.46

0.80

2.48

0.23 1.94 W-01

W-01

0.80

0.80

0.80

W-05

W-05

0.40

0.30

060 2.40

2.09

4.70

W-05

4.89

3.35

W-01

1.12

4.79

0.80

18.22

1.31

2.46

CONTROL ROOM

CORRIDOR

0.43

0.40

0.84

0.77

5.00

5.67

0.80

W-01

0.70

1.16

W-06

W-01

0.38

3.83

0.01 0.79

0.80

0.80

066

4EG21009-SD-ID-7-GR-002

0.78

W-05

0.20

0.80

W-01

0.03

0.41

0.04 0.20

W-01

2.00

1.17 0.32

W-01

W-01

63.74 2

0.80

0.80

CLINIC 02

W-05

072 4.88

3.21

064

0.18

BATHROOM

W-05

0.39

W-05

0.02

0.55

0.55

0.54

0.38

2.94

0.81

PHYSIO THERABY

EG21009-SD-ID-7-GR-002

F&B 082 42.40

7.36

0.75

0.80

0.75

W-01

0.80

1.94

1.94

10.11

W-01

2.74

2.00

0.80 2.41

W-05

0.80

1.00

7.22

W-01

+0.40 F.F.L.

W-01

2.00

W-01 1.50

065

2.74

2.00

CW-02

W-01

8.07

2.00

+0.40 F.F.L.

UP

13.20

8.17

2.00

UP

2.74

UP

2.00

3.97

1.74

2.00

1.53

0.70

2.00

1.20

0.20

2.00

1.57

CW-02

ACCESS GATES

CLINIC 01

UP

0.77

0 5.9

+0.10 F.F.L.

1

+0.40 F.F.L.

1.43

W-01

3 W-01

+0.40 F.F.L.

4.03

074 23.95

CW-02

+0.10 F.F.L.

1.50

W-01

KIDS AREA

5.92

1.57

0.34

2.05

0.65

0.20

W-01

0.34

2.00

0.65

2.47

0.34

1.06

1.69

2.18

6.70

W-01

-

+0.10 F.F.L.

0.89

1.16

073 137.76

2.39

0.76

1.71

0.55

29 28 27 26 25 24 23 22 21 20 19 18 17 16

6.21

EG21009-SD-ID-7-GR-002

STUDIO

W-01

D

0.40

3

2.44

0.40

STORAGE

W-01

2.01

W-01

0.43

9 10 11 12 13 14 15

7.36

8

bulk head CURTAIN WALL GLASS PARTITION OFF WHITE PAINT PORCELIAN TILES 0.6X0.60 M WOODEN FENCE NORMAL MIRROR CLADDING

5.2 8

7

CW-01 CW-02 W-01 W-05 W-06 W-08

7.3 8

6

9

5

WALL TYPES VERTICAL STEEL COLUMN (EXISTING)

13.5

4

GL A 20 SS 0 C HA M ND HE R IG AIL HT

2 3

UP

Wall Sche

Description bulk head CURTAIN WALL GLASS PARTITION OFF WHITE PAINT PORCELIAN TILES 0.6X0.60 M CLADDING WOODEN FENCE NORMAL MIRROR CLADDING

0.71

0.62

1

+0.10 F.F.L.

1.98

W-01 2.68

CW-01 CW-02 W-01 W-05 W-06 W-08

W-01

2.72

WALL TYPES 1.89

W-01

5.59

W-01

3.39

CW-02

W-01

3.82

1.01

0.82

0.82

GLA SS 200 H CM ANDR HEI AIL GH T

2.66

W-01

0.74

3.13 1.02

3.82

2.26

CW-01

3.45

MACHINES AREA

085 871.14 +4.35 F.F.L.

2 1.2

SCHEMATIC DESIGN 2.08

CW-01

Description

FIRST F DETAILED Project number

EG21009 11-11-2021

Date

M.ABDELSALAM M.WALY

Drawn by Checked by

EG21009-SD-ID-3-GR-0 FIRST FLOOR DETAILED PLAN - Dependent 1 1 : 110

Scale

BIM ARCHITECT PORTFOLIO

CW-01

Descriptio

APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE

GROUND FLOOR DETAILED PLAN

Checked by

1

No.

0 2 3

IGNITE

Drawn by

GROUND FLOOR DETAILED PLAN - Dependent 1

Date

06-10-2021 GLASS HANDRAIL 200 CM HEIGHT 11-11-2021 23-11-2021

IGNITE GYM

Date

1 : 110

087 122.97

APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE

Project number

1

Revisions

TRACK AREA

11/24/2021 12:40:36 PM

No.

0 2 3

SCHEMATIC

5 4.1

28.3 8

Revisions

1 : 110

EG21009-SD

Scale

39


STUDIOFIVE

STU

CAIRO.DUBAI.HOUSTON

CAIRO

Floor Schedule TYPE F-01 F-02 F-03 F-06 F-07 F-08

DESCRIPTION

TYPE

PORCELIAN FLOORING 0.60 M * 0.60 M HPL FLOORING ON MOSAIC TILES RUBBER FLOORING ON MOSIC TILES RUBBER ROLL FLOORING ON MOSIC TILES ARTIFICIAL GRASS NEOCEMENT FLOORING

F-01 F-02 F-03 F-06 F-07 F-08

PORCELIAN FLOORIN HPL FLOORING ON MO RUBBER FLOORING O RUBBER ROLL FLOOR ARTIFICIAL GRASS NEOCEMENT FLOORIN

UP

START POINT SYMBOLS

0.72

2.47

START POINT SYMB

2.42

2.17

13.97

2.00

1.24

2.68

1.43

0.60

0.60

0.60

0.60

0.60

0.58

0.58

1.60

STORE 081

0.15

0.80

3.76

0.12

0.80

3.73

0.49

0.49

0.47

0.47

0.47

0.47

0.50

0.50

1.01

0.98

0.98

1.02

4.13

6.22

2.72

10. 59

STUDIO 090 208.99

1.03

1.03

1.03

0.54 SP

SP

080 5.13

5.94

0.80

SP

0.39

0.80

1.31

0.55 1.03

SP

0.41

0.80

SP

0.47

0.80

SP

0.32

0.80

0.14

SP

0.18

0.17 0.70 SP

1.25

0.70

1.03

1.03

+0.40 F.F.L. 2.21

0.80

0.41

0.80

SP

0.40

0.80

SP

0.45

0.80

SP

2.97

0.80

SP

F-06

0.80 0.01

SAUNA

078 5.57

1.6 5

RUBBER ROLL FLOORING ON MOSIC TILES 125.27 m²

STEAM

6.18 1.07

0.8 0

091 124.12

3.13

SP 1.68

STEAM 075

1.03

0.40

SP

2.34

1.43

0.55 1.06

0.80

+4.35 F.F.L.

079 6.50

0.8 4

0.41

0.39

SP

2.12 2.24

SP

0.80

1.78

0.80

1.03

0.50

0.36

SP

2.12

4.89

4.79

0.32

0.60

1.14

0.82 8.24

0.80

2.52

NEOCEMENT FLOORING +4.20 2.62 m² F.F.L.

BICYCLES AREA

JACCUZZI

076

SP

F-08

+4.35 F.F.L.

10.67

JACCUZZI 0.54

SP

0.8 0

1.03

SP

+4.35 F.F.L.

2.03

1.03

RUBBER FLOORING ON MOSIC TILES 209.97 m²

085 871.14 F-03

7.36

1.65

1.03

F-03

MACHINES AREA

RUBBER FLOORING ON MOSIC TILES 698.08 m²

0.66

+0.40 F.F.L.

0.17

0.23

UP

13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

2.47

3.26

1.19

3.73

0.61

1.27

5.2 8

0.64

0.56

1.20

0.24 0.61

2.53

0.60 0.60 0.60

0.61

1.27

7.26

0.03

0.39 2.33

0.61

1.14

SP

HPL FLOORING ON MOSAIC TILES 12.36 m² +0.50 F.F.L.

3.51

0.60

1.22

0.84

0.60

3.51

3.51

F-02 HPL FLOORING ON MOSAIC TILES 12.59 m² +0.50 F.F.L.

0.60 1.95

063 109.77

PORCELIAN FLOORING 0.60 M * 0.60 M 106.12 m²

F-02 F-02 HPL FLOORING ON MOSAIC TILES 12.39 m² +0.50 F.F.L. 3.51

0.66

MEN'S BATHROOM

F-01

3.99

4.70 0.60

0.90

1.60

0.90

0.82

0.82 0.90

1.58

0.90

1.58

1.20

1.42

0.90

0.60

070 20.09 4.11

069 30.08

0.43

0.2 0

0.60

+0.40 F.F.L.

1.36

1.00

0.97

1.03

1.03

1.03

1.03

CONTROL ROOM

2.49

3.00

0.95

7.42

0.77

9.23

1.39

0.43

0.77

9.22

0.77

8.77

0.77

9.71

0.77

9.22

0.77

6.63

1.38

0.60

0.40

0.60

0.40

0.60

0.40

0.60

10.06

0.60

1.82

0.60

3

0.40

0.60

12.4

0.40

0.60

+4.35 F.F.L.

+4.35 F.F.L. 2.23

0.64

0.60

0.60

0.60

8.89

7.3 8

1.57

0.14

0.45 0.60

0.18

1.97

2.48

2.73

CLINIC 08

1.94

CLINIC 06

1.28

1.14

0.80

0.23 1.94

0.80

068 12.20

0.80

1.14

0.60

0.80

0.76

CLINIC 05

0.22

+0.50 F.F.L. 2.84

0.60

PORCELIAN FLOORING 0.60 M * 0.60 M 10.19 m²

10 11 12

0.60

3.35

2.41

3.51

0.80

F-02 HPL FLOORING ON MOSAIC TILES 9.81 m²

+0.50 F.F.L. 2.85

3.51

HPL FLOORING ON MOSAIC TILES 9.81 m²

3.33

1.82

1.84

F-02

3.35

3.68

0.80

1.15

0.60

9

2.87

0.40

0.83

0.60

F-01

8

0.40

0.77

0.60

7

6.86

0.40

0.60

0.60

6

0.69

F-08

0.40

0.60

0.60

1.10

NEOCEMENT FLOORING 16.18 m² +4.35 F.F.L.

PORCELIAN FLOORING 0.60 M * 0.60 M 10.19 m²

0.40

0.60

0.60

0.43

0.60

0.60

0.60

0.60

0.60

0.46

0.60

0.60

1.17

0.25

0.38

0.60

0.60

0.60

0.80

0.80

0.40

0.60

0.45

0.30

0.60

5.67

0.44

0.60

0.20

0.80 2.04

0.40

0.60

0.17

0.60

3.33

0.20

F-02 HPL FLOORING ON MOSAIC TILES 12.42 m²

0.60

3.35

7.36

4.54

099 9.46

0.04

0.39 0.37

0.01 0.79

0.80

CLINIC 04

100 9.38

3.67

3.83

CLINIC 03

HPL FLOORING ON MOSAIC TILES 8.16 m² +0.50 F.F.L. 2.73

0.40

0.80

066 12.05

0.60

0.17

F-02

0.80 0.18

CLINIC 02

0.60

0.80

0.80

0.80 0.80

0.41

2.94

2.74

082

0.60

0.60

0.34

F-01

0.26

0.60

2.41

PORCELIAN FLOORING 0.60 M * 0.60 M 4.98 m² 3.21

0.06 0.20

4.90

F&B 42.40

0.38

064 63.74

0.20

1.94

1.94

PHYSIO THERABY

F-02

2.74

+0.10 F.F.L.

0.60

F-01

065 8.07

PORCELIAN FLOORING 0.60 M * 0.60 M 42.85 m²

0.60

0.52

0.55

0.54

0.55

0.75

0.80

0.75

CLINIC 01

1.35

0.60

F-01

9.97

2.67

0.60

092

5

F-01

1.67

0.60

4

+0.40 F.F.L.

2.06

0.60

9.83

OFFICE 01

3

PORCELIAN FLOORING 0.60 M * 0.60 M 93.52 m²

1.38

5.52

0.60

0.65

PORCELIAN FLOORING 0.60 M * 0.60 M 11.80 m² +4.35 F.F.L.

093

2

3.06

0.60

0.46

0.60

1

2.13

0.60

SP

10.11

2.74

0.60

2.05

0.60

0.40

0.60

0.46

0.60

0.80

0.60 SP

0.80

0.60 1.00

UP

11.16

0.60

+0.10 F.F.L.

HPL FLOORING ON MOSAIC TILES 8.39 m²

3.98

F-01 PORCELIAN FLOORING 0.60 M * 0.60 M 74.12 m² +0.40 F.F.L.

2.09

062 94.70

SP

0.28 1.04

UP

249.66

WOMEN'S BATHROOM

6 5.8

089

0.60

WAITING AREA

9.62

3.97

F-01

OFFICE 02

UP

060

2.09

094 11.41

SP

CONTROL ROOM

2.40

106.62 m²

UP

OFFICE 03 2.45

F-03

+0.40 F.F.L.

2.01

074 23.95

RUBBER FLOORING ON MOSIC TILES 25.33 m²

0.27

NEOCEMENT FLOORING

0.42

2.26

KIDS AREA

+0.10 F.F.L.

+0.10 F.F.L.

1.57

5.92

1.74

0.34

5.06

0.65

0.40

0.34

ACCESS GATES

F-08

UP

1.77

F-03 RUBBER FLOORING ON MOSIC TILES 146.72 m²

RUBBER FLOORING ON MOSIC TILES 146.72 m²

0.20 0.65

2.00

0.34

6.70

073 137.76 F-03

1.69

4.00

6.70

13.62 m²

6.71

1.71

+0.10 F.F.L.

073 137.76

STUDIO

1.96

PORCELIAN FLOORING 0.60 M * 0.60 M 11.80 m² +4.35 F.F.L.

SP

STUDIO

F-08 NEOCEMENT FLOORING

2.68

F-01

UP

0.15

+4.30 F.F.L.

095 F-01 5.11 PORCELIAN FLOORING 0.60 M * 0.60 M 5.38 m²

1.39

F-01

7.83

F-01

PORCELIAN FLOORING 0.60 M * 0.60 M 5.87 m²

PORCELIAN FLOORING 0.60 M * 0.60 M 9.12 m²

3.39

1.41

5.59

1.02

0.82

0.92

3.82

SCHEMATIC DESIGN

SCHEMA MACHINES AREA

085 871.14

Revisions No.

0 2 3

F-06

Revisions

RUBBER ROLL FLOORING ON MOSIC TILES 141.26 m²

Description

Date

APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE

+4.35 F.F.L.

No.

06-10-2021 11-11-2021 23-11-2021

Desc

0 2 3

APPROVED IS APPROVED IS APPROVED IS

TRACK AREA

087 122.97 F-07

ARTIFICIAL GRASS 122.34 m²

+4.35 F.F.L.

IGNITE GYM

IGNI

GROUND FLOOR FLOORING PLAN Project number

FIRST FLOOR

EG21009

Project number

11-11-2021

Date

Date

M.ABDELSALAM

Drawn by

Drawn by

EG21009-SD-ID-4-GR-0

GROUND FLOOR FLOORING PLAN - Dependent 1 11 : 110

FIRST FLOOR FLOORING

1

1 : 110

Scale

Checked by

11/24/2021 12:40:38 PM

M.WALY

Checked by

As indicated

STUDIOFIVE

EG21009

Scale

STUD

CAIRO.DUBAI.HOUSTON

CAIRO.

CEILIN TYPE 1.56

1.92

0.80

C1 C2 C3

0.32

2.26

WHITE PAINT ON WATER RESIS WHITE PAINT ON FIRE RATED G BLACK DOKU PAINT

2.64

C3

+4.84 S.C.L

C3 BLACK DOKU PAINT

C3

C3

BLACK DOKU PAINT

BLACK DOKU PAINT

8.91

+4.84 S.C.L

+7.64 S.C.L

7.3 8

BLACK DOKU PAINT

+7.64 S.C.L

+7.64 S.C.L

BLACK PAINTED STRUCTURAL BEAMS (EXISTING) 2.41

LIGHTING TRACKS

13. 05

2.68

STEEL BOXES 5*5 CM WITH LED PROFILE

C3

C3

C3

BLACK DOKU PAINT

BLACK DOKU PAINT

BLACK DOKU PAINT

11.95

1.70

0.72

2.47

13.96

4.23

C3 BLACK DOKU PAINT

STUDIO 073 137.76

1.70 6.71 6.70

EXPOSED CEILING

KIDS AREA 074 23.95

1.70 2.00

2.00

2.00

2.00

2.00

2.00

2.00

2.00

0.78

0.0 0

0.56

3.99

0.64

3.97

1.88

0.14

2.40

0.64

060

1.57

CONTROL ROOM

1.74

EXPOSED CEILING

1.57

1.39

5.06

2.00

0.03

STRUCTURAL BEAMS (EXISTING)

0.15

6.70

2.32

1.38

CORRIDOR

EXPOSED CEILING

061

0.24 1.03

0.83

0.12

2.67 1.03

1.03

1.03

3.73

1.67

2.06

2.47

7.14

6.22

JACCUZZI

10.67

076 5.94

C1

C1

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

0.50

0.80

0.39

0.80

0.41

0.80

0.47

0.80

0.32

0.80

0.18

0.70 0.17

0.03

2.52

1.25

0.80

0.36

0.80

0.39

0.80

0.40

0.80

0.41

0.80

0.40

0.80

1.03

1.06

1.03

1.03

1.03

0.87

0.45

0.80

2.97

0.80

1.68 1.78

1.07 1.03

1.36

1.00

0.97

1.03

1.03

1.03

1.03

0.80

078 5.57

3.13

0.01

SAUNA 079 6.50

STEAM

C1

2.18

0.41

2.34

8.24

2.12

0.80

0.82

0.23

2.18

0.32

0.14

0.39

2.12

1.14

0.46

4.79

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

+3.00 S.C.L

2.33

2.06

1.03

3.06

1.03

C1

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

2.06

2.06

1.60

1.60

1.58

0.18

1.03

0.66

2.10

+3.00 S.C.L

3.51

062 94.70

C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD

4.13

3.67

3.51

C1

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

0.48 3.51

3.73

1.31

+3.00 S.C.L

3.51

C1

1.34 1.33

0.80

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

0.38

2.84

3.51

C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

2.83

0.82

1.58

063

0.12

0.46

070 20.09

096 6.19 3.76

109.77

CLINIC 08

0.40

2.74

0.40

1.74

0.40

0.40

1.42

2.73 2.73

7.26

C1

1.94

069 30.08

3.51

C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD

3.33

3.68

+3.00 S.C.L

+3.30 S.C.L 6.42

0.82

0.52 2.48

0.23 1.94

CLINIC 06

WOMEN'S BATHROOM

3.00

SAUNA

0.80

2.05

0.80

068 12.20

4.54

C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD

0.73

081

0.15

0.40

0.76

1.14

1.19

0.40

0.80

2.41

CLINIC 05

0.84

MEN'S BATHROOM

1.27

2.53

3.35

0.80

+3.00 S.C.L

1.27

1.65

0.80

0.30

0.80

0.80

0.47

1.60

1.55

1.97

0.80

0.39

1.99

1.22

4.89

0.40

0.40

4.09 4.11

099 9.46

1.58

STORE 3.26

1.14

0.43

0.80

CLINIC 04

1.95

2.50 1.14

5.67

3.83

100 9.38

0.04 0.20

0.80 0.80

20.09

0.80

0.06

066 12.05

1.17

5.64 0.34

070

C1

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

+3.00 S.C.L

0.41

0.80 0.20 0.80

7.80

0.18

CLINIC 03

CLINIC 02

CLINIC 08

0.01 0.79

7.36

0.80

2.74

082

+3.00 S.C.L

072 4.88 3.03

3.21

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

C2 WHITE PAINT ON FIRE RATED GYPSUM BOARD

2.41

BATHROOM

C1

0.38

2.94

F&B

+3.00 S.C.L 2.74

0.54

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

C1

C1 WHITE PAINT ON WATER RESISIT GYPSUM BOARD

42.40

0.75

064 63.74

0.80

0.75

PHYSIO THERABY

0.20

10.11

1.94

1.94

065 8.07

0.55

0.55

2.74

CLINIC 01

9.66

0.60

0.80

3.90

EXPOSED CEILING

WHITE PAINT ON WATER RESISIT GYPSUM BOARD

EXISTING CANOBY CLADDING AT THE ATRIUM AREA

2.49

+3.30 S.C.L

1.39

EXPOSED CEILING 5.59

SCHEMATIC DESIGN

SCHEMA

Revisions No.

0 2 3

Description

Revisions

Date

APPROVED ISSUE APPROVED ISSUE APPROVED ISSUE

No.

06-10-2021 11-11-2021 23-11-2021

0 2 3

Desc

APPROVED IS APPROVED IS APPROVED IS

IGNITE GYM

IGNIT

GROUND FLOOR CEILING PLAN Project number

EG21009

Checked by

1

BIM ARCHITECT PORTFOLIO

M.WALY

EG21009-SD-ID-5-GR-0

GROUND FLOOR PLAN - Dependent 1

FIRST FLOOR LIGHTING PLAN 1 : 110

Scale

Date

M.ABDELSALAM

1 : 110

Drawn by Checked by

11/24/2021 12:40:40 PM

Drawn by

1 : 110

Project number

11-11-2021

Date

1

FIRST FLO P

EG21009-S

Scale

40


4 EG21009-SD-ID-12-GR-01

FIRST FLOOR PLAN +4.20

FIRST FLOOR PLAN +4.20

1.51

STRUCTURAL BEAMS ( EXISTING )

CONCRETE EFFECT PAINT

2.29

ACRYLIC LOGO AS PER APPROVED SAMPLE

+0.40 F.F.L.

+0.10 F.F.L.

1.00

NEOCEMENT FLOORING AS PER APPROVED SAMPLE

GROUND FLOOR PLAN +0.00

NEOCEMENT FLOORING AS PER APPROVED SAMPLE

+0.10 F.F.L.

STUDIOFIVE

GROUND FLOOR PLAN +0.00

CAIRO.DUBAI.HOUSTON

1

5

WAITING AREA - ELE 01 1 : 50

WAITING AREA - 3D

FIRST FLOOR PLAN +4.20

STRUCTURAL BEAMS ( EXISTING )

0.75

0.75

0.70

FIRST FLOOR PLAN +4.20

0.90

STEEL BOXES 5*5 CM WITH LED PROFILE

3.05

OFF WHTE PAINT

073 137.76

2.20

3.10

3.09

2.65

CLEAR MIRROR CLADDING

STUDIO

GROUND FLOOR PLAN +0.00

0.40

3 6

RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE

+0.10 F.F.L.

GROUND FLOOR PLAN +0.00

STUDIO - ELE 01 1 : 50

STUDIO - 3D

FIRST FLOOR PLAN +4.20

FIRST FLOOR PLAN +4.20

0.30

0.09

0.81

SCHEMATIC DESIGN CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING

Revisions CONCRETE EFFECT PAINT 2.20

PHYSIO THERABY

064 63.74

PHYSIO THERABY

064 63.74

HPL ON MOSAIC TILES AS PER APPROVED SAMPLE

7

No.

2 3

Description

Date

APPROVED ISSUE APPROVED ISSUE

11-11-2021 23-11-2021

CLINICS - 3D 2

PHYSIO THERABY - ELE 01

IGNITE GYM

1 : 50

FIRST FLOOR PLAN +4.20

GROUND FLOOR INTERNAL ELEVATIONS

FIRST FLOOR PLAN +4.20

0.60

0.10

WOODEN SHELVES

Project number

CONCRETE EFFECT PAINT 3.50

3.50

0.10 0.60 0.10

M.ABDELSALAM

0.10

0.60

Drawn by NEOCEMENT FLOORING

EG21009

11-11-2021

Date

M.WALY

Checked by

EG21009-SD-ID-7-GR-002

8

DISPLAY UNIT - 3D

BIM ARCHITECT PORTFOLIO

4

ENTRANCE DISPLAY - ELE 01 1 : 50

Scale

1 : 50

41


FIRST FLOOR PLAN +4.20

0.81

FIRST FLOOR PLAN +4.20

0.90

0.90

0.90

0.90

0.70

0.90

0.20

0.09

0.20

CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING GREY PORCELAIN TILES AS PER APPROVED SAMPLE

HPL PARTITIONS

0.20

0.30

2.05

2.60

0.80

CLEAR MIRROR

1.08

+0.40 F.F.L.

0.15

0.60

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

0.70

TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

GROUND FLOOR PLAN +0.00

GROUND FLOOR PLAN +0.00

1

MEN'S BATHROOM - ELE 01

5

STUDIOFIVE

EG21009-SD-ID-12-GR-01

1 : 50

CAIRO.DUBAI.HOUSTON

FIRST FLOOR PLAN +4.20

FIRST FLOOR PLAN +4.20

FIRST FLOOR PLAN +4.20

0.09

0.81

FIRST FLOOR PLAN +4.20

0.67

CONCRETE EFFECT PAINT

1.83

2.20

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

LOCKERS

+0.40 F.F.L.

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

+0.40 F.F.L.

0.40

EG21009-SD-ID-7-GR-001 6

TRAVERTINE MARBLE CLADDING SEATS AS PER APPROVED SAMPLE

0.10

EG21009-SD-ID-7-GR-001 8

CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING

0.40

CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING

CONCRETE EFFECT PAINT

GROUND FLOOR PLAN +0.00

GROUND FLOOR PLAN +0.00

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

WOMEN'S BATHROOM

062 94.70

2

EG21009-SD-ID-7-GR-001 7

MEN'S BATHROOM - ELE 02

3

1 : 50

MEN'S BATHROOM - ELE 03 1 : 50

FIRST FLOOR PLAN +4.20

0.09

0.81

FIRST FLOOR PLAN +4.20

0.90

0.90

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

0.80

0.67

0.70

CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING 0.90

CLEAR MIRROR

TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

0.20

1.93

LOCKERS

0.30

2.60

CONCRETE EFFECT PAINT

0.60

+0.40 F.F.L.

WOMEN'S BATHROOM - ELE 01

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

---

1 : 50

FIRST FLOOR PLAN +4.20

CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING

0.40

0.09

CONCRETE EFFECT PAINT ON GYPSUM BOARD CEILING

FIRST FLOOR PLAN +4.20

0.81

FIRST FLOOR PLAN +4.20

0.81

FIRST FLOOR PLAN +4.20

0.09

6

0.40

TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

1.50

GREYT PORCELAIN TILES AS PER APPROVED SAMPLE

SCHEMATIC DESIGN

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

+0.40 F.F.L.

+0.40 F.F.L.

0.50

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

0.60

2.20

GREY PORCELAIN TILES AS PER APPROVED SAMPLE

Revisions 8

WOMEN'S BATHROOM - ELE 03 1 : 50

7

WOMEN'S BATHROOM - ELE 02 1 : 50

No.

2 3

Description

Date

APPROVED ISSUE APPROVED ISSUE

11-11-202 23-11-202

EG21009-SD-ID-7-GR-001 3

IGNITE GYM

GROUND FLOOR INTERNAL ELEVATIONS

EG21009-SD-ID-7-GR-001 1 2

MEN'S BATHROOM

063 109.77

Project number

EG2100

11-11-202

Date

M.ABDELSALAM

Drawn by Checked by

M.WAL

EG21009-SD-ID-7-GR-001 4

BATHROOMS AREA 1 : 50

BIM ARCHITECT PORTFOLIO

5

MEN'S BATHROOM- 3D

9

WOMEN'S BATHROOM - 3D

Scale

1:5

42


TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

STEEL STRUCTURE BOXES 5*5 CM

0.66

1.20

WOODEN TOP AS PER APPROVED SAMPLE

STUDIOFIV

0.40

0.28

2.60

2 EG21009-SD-ID-12-GR-01

TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

STEEL STRUCTURE BOXES 5*5 CM

1.20

CAIRO.DUBAI.HOUSTON

SEATS - CALLOUT

1

2

SEATS - SECTION

3

1 : 20

SEATS - 3D

0.25

0.09

0.25

0.35

0.34

0.15

0.25

0.39

0.22

1 : 20

0.15

1.00

0.15

0.20

0.44

0.15

0.15

0.15

0.15

0.93

0.15

0.80

0.25

0.20

0.15

0.20

0.15

1.37

0.20

GREEN FINISH ACRYLIC LOGO AS PER APPROVED SAMPLE

4

IGNITE LOGO - DETAIL- RECEPTION AREA

9

1 : 25

IGNITE LOGO - 3D

SCHEMATIC DE 0.80

Revisions No.

Description

APPROVED ISSUE APPROVED ISSUE

0.60

0.20

0.30

2 3

IGNITE GYM TRAVERTINE MARBLE STEEL STRUCTURE BOXES 5*5 CM

LED LIGHT PROFILE

7 EG21009-SD-ID-12-GR-01

GROUND FLO DETAILS

CLEAR MIRROR

0.80

LED LIGHT PROFILE

0.60

0.20

0.60

0.20

0.60

0.20

0.60

0.20

0.60

0.20

0.60

0.16

CLEAR MIRROR TRAVERTINE MARBLE

Project number

0.30

0.24

0.35

0.35

0.80

Date

0.80

STEEL STRUCTURE BOXES 5*5 CM

Drawn by TRAVERTINE MARBLE CLADDING AS PER APPROVED SAMPLE

M.A

Checked by

EG21009-SD-ID-12-G

5

BIM ARCHITECT PORTFOLIO

SINK & MIRROR - DETAIL 1 : 25

8

SINK & MIRROR - 3D

Scale

43


W-08

W-08

W-08

W-08

SECOND FLOOR PLAN +12.23

2.81

SECOND FLOOR PLAN +12.23

STRUCTURAL BEAMS ( EXISTING )

0.08

LIGHTING TRACKS

1.34

STUDIOFIVE CAIRO.DUBAI.HOUSTON

4.69

CLEAR MIRROR CLADDING 3.00

4.69

OFF WHTE PAINT

RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE

1

FIRST FLOOR PLAN +4.20

0.35

FIRST FLOOR PLAN +4.20

FIRST FLOOR - ELE 01 1 : 50

SECOND FLOOR PLAN +12.23

SECOND FLOOR PLAN +12.23

2.81

STRUCTURAL BEAMS ( EXISTING )

0.08

LIGHTING TRACKS

OFF WHTE PAINT

4.48

4.70

4.48

4.48

CONCRETE EFFECT PAINT AS PER APPROVED SAMPLE

2.20

GLASS HANDRAIL

1.00

RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE FIRST FLOOR PLAN +4.20

3

FIRST FLOOR PLAN +4.20

SCHEMATIC DESIGN

FIRST FLOOR - ELE 03 1 : 50

Revisions No.

CW-02

2 3

SECOND FLOOR PLAN +12.23

SECOND FLOOR PLAN +12.23

SECOND FLOOR PLAN +12.23

STRUCTURAL BEAMS ( EXISTING )

1.74

IGNITE GYM LIGHTING TRACKS

LIGHTING TRACKS

FIRST FLOOR INTERNAL ELEVATIONS

2.49

0.58 2.57

Date

11-11-20 23-11-20

SECOND FLOOR PLAN +12.23

STRUCTURAL BEAMS ( EXISTING )

0.50

Description

APPROVED ISSUE APPROVED ISSUE

GLASS PARTITION

4.46

4.69

OFF WHTE PAINT OFF WHTE PAINT

CLEAR MIRROR CLADDING

Project number

EG210

11-11-2

3.15

Date

FIRST FLOOR PLAN +4.20

Drawn by

2.20

RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE FIRST FLOOR PLAN +4.20

1.00

2.20

GLASS HANDRAIL

FIRST FLOOR PLAN +4.20

RUBBER FLOORING ON MOSAIC TILES AS PER APPROVED SAMPLE FIRST FLOOR PLAN +4.20

Checked by

M.ABDELSAL

M.WA

EG21009-SD-ID-7-FR-001 2

FIRST FLOOR - ELE 02 1 : 50

BIM ARCHITECT PORTFOLIO

4

FIRST FLOOR - ELE 04 1 : 50

Scale

1

44


THE LONDON RESTOBAR - ZAMALEK GIZA , EGYPT


ELEVATION TARGETS

ELEVATION

ELEVATION DESIGNATION

01

A-02-02 000-0001

SHEET REFERENCE NUMBER SITE/BUILDING/SERIAL NUMBER

BUILDING SECTION TARGETS

SECTION DESIGNATION

01

A-03-02 000-0001

SHEET REFERENCE NUMBER

01

A-03-02 000-0001

WALL SECTION TARGETS

WS-A

0-G-000-01

SECTION DESIGNATION SHEET REFERENCE NUMBER

DETAIL TARGETS DETAIL DESIGNATION

01

2

A-04-01 000-0001

SHEET REFERENCE NUMBER SITE/BUILDING/SERIAL NUMBER

AREA DETAIL REFERENCE

2

DETAIL DESIGNATION

01

A-04-01 000-0001

SHEET REFERENCE NUMBER

ELEVATION MARK +289.90 F.F.L

+289.90 T.O.P

+289.90 T.O.S

+289.90 F.F.L

For CONSTRUCTION

LEVEL INDICATION ON PLAN

SEPTEMBER 2021

LEVEL INDICATION ON SECTIONS & ELEVATIONS

No.

DRAWING NUMBERING SYSTEM

1 2

EG20029 - TD - ID - 01 - GRF - 0001 - R00

Description APPROVED ISSUE APPROVED ISSUE

Date 06-12-2021 27-12-2021

REVISION SEQUENCE NO

Revisions

LEVEL INDICATOR DRAWING TYPE (DETAILED PLAN/CEILING PLAN) DISCIPLINE ACRONYM (INTERIOR DESIGN) PROJECT PHASE (TENDER DESIGN)

THE LONDON RESTOBAR

PROJECT NUMBER

MISCELLANEOUS TARGETS

COVER

DOOR TAG DOOR CONSECUTIVE NUMBER

Project number WINDOW CONSECUTIVE NUMBER

Date WALL TAG

Drawn by WALL TYPE

SPACE NAME ROOM NUMBER

Checked by

EG21012 28-12-2021 M.ABDELSALAM A.HANY

EG21012-TD-ID-0-GR-0 FINISH NUMBER (REFER TO FINISH SCHEDULE) FLOOR NUMBER ROOM CONSECUTIVE NUMBER

BIM ARCHITECT PORTFOLIO

Scale

1 : 50

46

12/28/2021 7:54:19 PM

WINDOW TAG


NILE RIVER

BEVERAGE ROOM

FOOD STORE

COOLING ROOM

FREEZING ROOM

KITCHEN LOBBY

DN BACK STAGE

MAIN ENTRANCE

MEN'S BATHROOM

RECEPTION DESK SATGE & DJ SET PICK UP

SHISHA CORNER

BATHROOM LOBBY

HOT LINE

SUSHI CORNER

WOMEN'S BATHROOM

HOT LINE

HOT LINE

KITCHEN LOBBY

R BA

No. 1

AP

CASHIER ZONE

Revisions

THE L

FU

Project nu Date Drawn by

Checked b

1

FURNITURE PLAN 1 : 100 Scale

BIM ARCHITECT PORTFOLIO

47


WALL FINISHES Type Mark

BW-01 G-01 W-01 W-02 W-03 W-04

Description

BRICK WALL 12 CM GLASS PARTITION CONCRETE EFFECT GOLDEN WATER RIPPLE STAINLESS STEEEL THE LONDON ART WALLPAPER BLACK MIRROR CLADDING

NILE RIVER

3 EG21012-TD-ID-7-GR-0

OUTDOOR AREA

25657

23713

2000 21655 2001

4

1332

8 174

2. 49 °

1226

°2 .4 9° 2.4 9

1640

1201 24

1275

15

720

720 24

W-03 24 15

1276

15

720

720

W-03 24 15

24 15

1276

24

1006

W-03

L AIN ST

L EE ST

° 49 2.

9 2.4

° .49 °2

2653

1738

1854

1648

1612

1675

1772

1020

670

800

1170

800

500

PICK UP

1 2

HOT LINE

2800

2767

1050

4283

SUSHI CORNER

3759

SHISHA CORNER

3039

1288

3639

800

1100

800 10339

1012

860

1700

1500

5618 HOT LINE

90 800 HOT LINE

1000

Revisio

1298

WOMEN'S BATHROOM

716

680 79

2010

1243 1244 260 800

No.

1900

1196

409

8889 KITCHEN LOBBY

3 1879

992 120 1124

1340

1758

BATHROOM LOBBY

900

800

FREEZING ROOM

ELECTRICITY ROOM

THE

1 73 12

81 76

2. 49 °

W-02 1225

EN LD O

S ES

1720

1800

COOLING ROOM

892

1

W-03

W-03

FLOWER BOX

W-02

966

1524

1206

529 900

6

97 10

75

15

1524

EG21012-TD-ID-7-GR-0 6 43

FLOWER BOX

G

W-02 12

710

710

W-02 4783

9900

872

EG21012-TD-ID-7-GR-0

800

KITCHEN

1968

2400

466

1203

6514

1305

466

1979 900 200

5072

6487

816

FLOWER BOX

1275 24 15

994

200 900

6 2 EG21012-TD-ID-7-GR-0

0 90

W-02

1917

SATGE & DJ SET

1650 516

02 18

722

3777

4715

5

W-03

1005

MEN'S BATHROOM

120

766

766

5080

15

24

466

W-01

1146

2044

-

6530

BACK STAGE

927

1727

1727

RECEPTION DESK

-

466

600

MAIN ENTRANCE

6549

2044

516

820

1900

FOOD STORE

2396

DN

100

1500

2400

BEVERAGE ROOM

2890

W-03

2164

3000

KITCHEN LOBBY

5124

1970

1970

3212

1316

974

G-01

816

858

2001

1130

1130

21655

2400

3125

5602

2000

1227

611

7 EG21012-TD-ID-12-GR-0

CASHIER ZONE

83

2

2323

Project 1

Date

EG21012-TD-ID-12-GR-0

Drawn

1

DETAILED PLAN

Checke

1 : 100

BIM ARCHITECT PORTFOLIO

EG

48

Scale


FLOOR FINISHES Type Mark

F-01 F-02

Description

NEOCEMENT FLOORING MOSAIC TILES 30*30 CM

NILE RIVER

3 EG21012-TD-ID-7-GR-0

BEVERAGE ROOM

FOOD STORE

COOLING ROOM

FREEZING ROOM

KITCHEN LOBBY

F-02

DN BACK STAGE

MAIN ENTRANCE

MEN'S BATHROOM

MOSAIC TILES 30*30 CM 128 m²

RECEPTION DESK SATGE & DJ SET

SHISHA CORNER

PICK UP

F-01 NEOCEMENT FLOORING

SHISHA CORNER

381 m²

516

6487

+0.00 F.F.L.

466

6514

466

BATHROOM LOBBY

HOT LINE

SUSHI CORNER

WOMEN'S BATHROOM

HOT LINE

No.

HOT LINE

KITCHEN LOBBY

1 2

FLOWER BOX

FLOWER BOX

Revis

CASHIER ZONE

THE

Proje

Date

Draw

1

FLOORING PLAN

Chec

1 : 100

E

Scale

BIM ARCHITECT PORTFOLIO

49


CEILING FINISHES Type Mark C-01 C-02 C-03 C-04

Description ALCOBOND REFLECTIVE CEILING WHITE PAINT ON GYPSUM BOARD STAINLESS STEEL GOLDEN RIBS GOLDEN WATER RIPPLE SHEET

3 EG21012-TD-ID-7-GR-0

BEVERAGE ROOM

FOOD STORE

COOLING ROOM

FREEZING ROOM

KITCHEN LOBBY

STRUCTURE CAP

STRUCTURE CAP

6237

516

6549

466

6530

466

6522

BACK STAGE

MEN'S BATHROOM

2950 C-04 4254

GOLDEN WATER RIPPLE SHEET

SATGE & DJ SET

C-03

C-02 WHITE PAINT ON GYPSUM BOARD

STAINLESS STEEL GOLDEN RIBS

SHISHA CORNER

BLACK PAINTED SLAB

200

200

200

BATHROOM LOBBY STRUCTURE CAP

WOMEN'S BATHROOM

SUSHI CORNER

KITCHEN 3

156 8

200

200

200

STRUCTURE CAP

8210

2700 2700

ELECTRICITY ROOM

6 151

ING EIL HC TC E ING R EIL ST HC TC E R ST

44 73

2950

C-01

KITCHEN LOBBY

ALCOBOND REFLECTIVE CEILING

2950 1786 17 39

1

CEILING PLAN 1 : 100

BIM ARCHITECT PORTFOLIO

50


C-01

C-01

C-03

ALCOBOND REFLECTIVE CEILING

STAINLESS STEEL GOLDEN RIBS

ALCOBOND REFLECTIVE CEILING

750

60 340

60 340

STAINLESS STEEL GOLDEN RIBS

1750

LONDON ART WALLPAPER

1100

1950

FIBER GLASS WITH AUTOMOTIVE PAINT

1750

1750

ALCOBOND REFLECTIVE CEILING

2500

C-01 WOODEN CAP

200

GOLDEN WATER RIPPLE STAINLESS STEEEL

ALCOBOND REFLECTIVE CEILING

4

900

962

NEOCEMENT FLOORING

400

NEOCEMENT FLOORING

238

1200

1200

GOLDEN WATER RIPPLE STAINLESS STEEL

600

ACRYLIC LONDON LOGO AS PER APPROVED SAMPLE

ELEVATION 03

2

1 : 50

ELEVATION 02 1 : 50

C-01 ALCOBOND REFLECTIVE CEILING

C-01

2700

ALCOBOND REFLECTIVE CEILING

250

ALCOBOND REFLECTIVE CEILING

STAINLESS STEEL ELECTROSTATIC GOLD 30 MM THICKNESS

2000 2950

2950

STAINLESS STEEL ELECTROSTATIC GOLD 100 MM THICKNESS

GOLDEN WATER RIPPLE STAINLESS STEEL

GOLDEN WATER RIPPLE STAINLESS STEEL

200

2400

CALACATTA MARBLE TOP BAR AS PER APPROVED SAMPLE

1100

FIBER GLASS WITH AUTOMOTIVE PAINT

1600

STAINLESS STEEL ELECTROSTATIC GOLD 50 MM THICKNESS

550

ALCOBOND REFLECTIVE CEILING

950

NEOCEMENT FLOORING

NEOCEMENT FLOORING

6

ELEVATION 04 1 : 50

1

C-03

C-01

STAINLESS STEEL GOLDEN RIBS

ALCOBOND REFLECTIVE CEILING

BAR - ELEVATION 1 : 50 For CONSTRUCTION

STRUCTURE CEILING

2950

SEPTEMBER 2021

3350

STAINLESS STEEL GOLDEN RIBS

ALCOBOND REFLECTIVE CEILING

FALSE CEILING

No.

CONCRETE EFFECT PAINT

1 2

GOLDEN WATER RIPPLE STAINLESS STEEL

D

0627-

Revisions

STAGE LEVEL +0.00 F.F.L.

NEOCEMENT FLOORING

Description APPROVED ISSUE APPROVED ISSUE

2950

2950

2950

250 zero 0

3

Section 1 1 : 50

C-04

C-03

GOLDEN WATER RIPPLE SHEET

STAINLESS STEEL GOLDEN RIBS

STRUCTURE CEILING 3350

STAINLESS STEEL GOLDEN RIBS

FALSE CEILING 550

60

ALCOBOND REFLECTIVE CEILING

2950

2950

2400

2950

2950 2400

2950

950 NEOCEMENT FLOORING

Date STAGE LEVEL

WOODEN DESK AS PER APPROVED SAMPLE

250 zero 0

5

ELEVATION 01 1 : 50

BIM ARCHITECT PORTFOLIO

INTERNAL ELEVATIO Project number

2000

CONCRETE EFFECT PAINT

ACRYLIC LONDON LOGO AS PER APPROVED SAMPLE

THE LONDON RESTOB

Drawn by Checked by

EG21

28-12-2

M.ABDELSA

A.H

EG21012-TD-ID-7-GR Scale

51

1


STEEL STRUCTURE BOXES 5*5 CM

1461

8. 00 °

450

98 16

450

° 00 8.

GOLDEN WATER RIPPLE STAINLESS STEEL SHEET 1.2 MM THICKNESS AS PER APPROVED SAMPLE

1608

16 98

1608

FLOWER BOX 45 0

0 45

SEATS - Callout

1

3

1 : 25

SEATS 02- Callout 1 : 25

FALSE CEILING

FALSE CEILING 50

860 12.78°

2950 8°

15

2950

° .17

WOODEN CAP

15.46°

31 .1

28.7 1°

.0 44

9 23

1565

2030

FIBER GLASS WITH AUTOMOTIVE PAINT AS PER APPROVED SAMPLE

zero 0

4

SEAT - 3D

2

SHADE - SECTION

For CONSTRUCTION

1 : 25

SEPTEMBER 2021

No.

CALACATTA MARBLE TOP BAR AS PER APPROVED SAMPLE

200

1 2

900

0 80

Revisions

EG21012-TD-ID-7-GR-0

EG21012-TD-ID-12-GR-0

1

280

8

BAR- ELEVATION 02

30

1 : 50

400 400

DETAILS

200

30

2. 49 °

CALACATTA MARBLE TOP BAR AS PER APPROVED SAMPLE

400

2. 49 °

400

STAINLESS STEEL ELECTROSTATIC GOLD 50 MM THICKNESS

2. 49 °

400

STAINLESS STEEL ELECTROSTATIC GOLD 100 MM THICKNESS

400

STAINLESS STEEL ELECTROSTATIC GOLD 50 MM THICKNESS

STAINLESS STEEL ELECTROSTATIC GOLD 30 MM THICKNESS

5

2800

560

EG21012-TD-ID-12-GR-0

THE LONDON RESTOB

30

° 49 2.

6

STRETCH CEILING AS PER APPROVED SAMPLE

400

2950

9° 2.4

30

9° 2.4

Project number

2.4 9

700

700

900

400

Date Drawn by Checked by

5

BIM ARCHITECT PORTFOLIO

BAR UNIT - ELEVATION 1 : 50

7

BAR AREA - Callout 2 1 : 50

8

BAR - SECTION 1 : 25

EG21

28-12-20

°

STAINLESS STEEL ELECTROSTATIC GOLD 30 MM THICKNESS

2700 STEEL BOXES 10*10 CM

0

2700

D

06-1 27-1

2950

zero

6

Description APPROVED ISSUE APPROVED ISSUE

M.ABDELSAL

A.HA

EG21012-TD-ID-12-GR

As indica

Scale

52


3

SEATS - 3D

2

TABLES - 3D

For CONSTRUCTION SEPTEMBER 2021

No. 1 2

Description APPROVED ISSUE APPROVED ISSUE

D

0627-

Revisions

THE LONDON RESTOB

3D VIEWS

4

Project number

ENTRANCE - 3D

Date Drawn by Checked by

1

BAR - 3D

28-12-2

M.ABDELSA

A.H

EG21012-TD-ID-12-GR Scale

BIM ARCHITECT PORTFOLIO

EG21

53


2.94

FLOWER BOX CONCRETE EFFECT FINISH

FLOWER BOX CONCRETE EFFECT FINISH

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

0.48 0.98

1.48

1.00

0.30 0.33

1.00

0.20

1.00

0.20

0.20

1.00

1.00

0.62

EG21012-TD-ID-0-GN-5

3.70

3.70

3.70

3.70

3

3

1.00

1.00

1.00

0.76

OUTDOOR ROC BENCHES ( DURBANIS BRAND )

1.00

1.00

1.00

0.78

EG21012-TD-ID-0-GN-5

0.76

0.50

0.26

6.04

0.76

0.26

W-03 W-04 W-05

GREY BASALT BLOCKS AS PER APPROVED SAMPLE

0.26

0.50

<varies> BRICK WALL 12 CM GLASS PARTITION CONCRETE EFFECT GOLDEN WATER RIPPLE STAINLESS STEEEL THE LONDON ART WALLPAPER BLACK MIRROR CLADDING KARARA WHITE MARBLE WALL CLADDING

GREY GRANITE AS PER APPROVED SAMPLE

1.73

3

0.62

EG21012-TD-ID-0-GN-5

3.70

3.70

3.70

GREY GRANITE AS PER APPROVED SAMPLE

3.70

MAIN ENTRANCE 3.70

MAIN ENTRANCE

Description

BW-01 G-01 W-01 W-02

1.97

0.20

0.98

0.98

0.62

1.48

6.80

1.00

WALL FINISHES Type Mark

0.48

0.10 0.10 0.30

7.30

0.48

0.10 0.10 0.30

7.30

W-01

CNC STAINLESS STEEL UNIT

1.00

1.00

CNC STAINLESS STEEL UNIT

CONCRETE EFFECT WALL FINISH

1.00

1.00

1.00

1.00

1.00

0.76

0.44

0.10

W-01

7.30

6.80

CONCRETE EFFECT WALL FINISH

0.78

1.00

+0.00 F.F.L.

0.10 0.27

0.10 0.27

0.10 0.30

0.44

0.10

0.10

6.04

0.50

1

1.00

1.00

GREY GRANITE AS PER APPROVED SAMPLE 1.00

GREY GRANITE AS PER APPROVED SAMPLE

50

+0.00 F.F.L.

1.00

6.43

GREY GRANITE AS PER APPROVED SAMPLE

0.

6.43

FLOWER BOX CONCRETE EFFECT FINISH

5.44

5.70

5 0.50 0.4

1.20

GREY GRANITE AS PER APPROVED SAMPLE

1.20

W-01 W-01

FLOWER BOX CONCRETE EFFECT FINISH

0.4 5

1 EG21012-TD-ID-0-GN-6

For CONSTRUCTION

FLOWER BOX CONCRETE EFFECT FINISH

FLOWER BOX CONCRETE EFFECT FINISH

OUTDOOR - DETAILED PLAN

2

1 : 50

OUTDOOR -FLOORING PLAN

5

1 : 50

No.

OUTDOOR - FURNITURE PLAN

6

1 : 50

Description

Da

APPROVED ISSUE

16-03

GREY BASALT BLOCKS AS PER APPROVED SAMPLE GREY GRANITE AS PER APPROVED SAMPLE

FABRIC CANOPY AS PER APPROVED SAMPLE

FABRIC CANOPY AS PER APPROVED SAMPLE

BLACK ACRYLIC AS PER APPROVED SAMPLE

3.02

1.30

FALSE CEILING +2.95

FLOWER BOX CONCRETE EFFECT FINISH

3.70

CONCRETE EFFECT WALL FINISH

0.35

B.O.S +3.35

3.70

DOUBLE HINGED GLAZING DOOR

WHITE ACRYLIC AS PER APPROVED SAMPLE

B.O.S +3.35

0.40

DOUBLE HINGED GLAZING DOOR

STEEL STRUCTURE

CONCRETE EFFECT WALL FINISH

FALSE CEILING +2.95

OUTDOOR ROC BENCHES ( DURBANIS BRAND )

Revisions

CONCRETE EFFECT WALL FINISH

THE LONDON

CNC STAINLESS STEEL UNIT BLACK ACRYLIC AS PER APPROVED SAMPLE WHITE ACRYLIC AS PER APPROVED SAMPLE

3.70

STEEL STRUCTURE

OUTDOOR PACKAGE 0.40

3.70

3.30 2.40 0.40

0.40

F.F.L - GR +0.00

Checked by

F.F.L - GR +0.00

EG210

16-03-20

Drawn by

0.40

0.40

Project number Date

2.95

3.30

TEAK WOOD FLOORING AS PER APPROVED SAMPLE

M.ABDELSAL

A.HA

EG21012-TD-ID-0-GN3

OUTDOOR - ELEVATION 1 1 : 50

BIM ARCHITECT PORTFOLIO

4

OUTDOOR -3D

1:

Scale

54


5 EG21012-TD-ID-0-GN-6 OUTDOOR ROC BENCHES ( DURBANIS BRAND )

FLOWER BOX CONCRETE EFFECT FINISH

CNC STAINLESS STEEL UNIT

3.69

OUTDOOR ROC BENCHES ( DURBANIS BRAND )

LONDON WORD (VOID)

CNC STAINLESS STEEL UNIT

GREY GRANITE AS PER APPROVED SAMPLE

FLOWER BOX CONCRETE EFFECT FINISH

3.70

B.O.S +3.35

B.O.S +3.35

WALL FINISHES Type Mark

Description

0 0.5 1.85

LONDON

LONDON LONDON

LONDON

LONDON

1.85

LONDON

LONDON

LONDON

OUTDOOR - DETAILED PLAN - Callout 1

LONDON

0.40

LONDON

0.40

LONDON

LONDON

LONDON

LONDON

LONDON

+0.00 F.F.L.

F.F.L - GR +0.00

OUTDOOR - SECTION

4

1 : 25

LONDON

LONDON

LONDON LONDON

LONDON

LONDON

LONDON

0.40

0.40

LONDON

LONDON 2.01

3.69

3.29

LONDON

4 EG21012-TD-ID-0-GN-6

F.F.L - GR +0.00

W-03 W-04 W-05

1.00

0.40

45 0.

<varies> BRICK WALL 12 CM GLASS PARTITION CONCRETE EFFECT GOLDEN WATER RIPPLE STAINLESS STEEEL THE LONDON ART WALLPAPER BLACK MIRROR CLADDING KARARA WHITE MARBLE WALL CLADDING

BW-01 G-01 W-01 W-02

1.20

1

FALSE CEILING +2.95

1.28

FALSE CEILING +2.95

1 : 25

FABRIC CANOPY AS PER APPROVED SAMPLE

FLOWER BOX CONCRETE EFFECT FINISH

OUTDOOR ROC BENCHES ( DURBANIS BRAND )

LONDON WORD (VOID)

CNC STAINLESS STEEL UNIT

For CONSTRUCTION

FLOWER BOX CONCRETE EFFECT FINISH

GREY GRANITE AS PER APPROVED SAMPLE

3.70

B.O.S +3.35

B.O.S +3.35

FALSE CEILING +2.95

Description

Dat

APPROVED ISSUE

16-03-2

1.85

1.30

FALSE CEILING +2.95

No. 6

2.40

Revisions 1.85 1.00

LONDON

LONDON

2.00

LONDON LONDON

LONDON

LONDON

1.85

LONDON

0.40

0.40

LONDON

OUTDOOR DETAILS

0.40

LONDON

LONDON

LONDON

LONDON

LONDON

LONDON

LONDON

LONDON

0.00 F.F.L - GR +0.00

LONDON

LONDON

LONDON

LONDON

LONDON

THE LONDON

LONDON

LONDON

LONDON

LONDON

+0.00 F.F.L.

F.F.L - GR +0.00

Project number

16-03-202

Date Drawn by Checked by

2

OUTDOOR -3D

5

OUTDOOR - SECTION

M.ABDELSALA

A.HAN

EG21012-TD-ID-0-GN-6

1 : 25

1:2

Scale

BIM ARCHITECT PORTFOLIO

EG2101

55


AL-ARABIYA OFFICE BUILDING - LANDSCAPE RIYADH, SAUDI ARABIA


1

2

3

5 4

I

7

8

9

10

11

12

13

14

15

16

6

I

H

H

G

G

F

F

E

E ELECTRICAL ROOM

D

D

PUMP ROOM

C

C 1 / KS20001-TD-AR-10-GN-004

B

B

1 / KS20001-TD-AR-10-GN-003 1 / KS20001-TD-AR-10-GN-002

SEATING AREA

TENDER DESIGN

A

JANUARY 2021

A +0.25 M

UP

No.

UP

0

Description APPROVED ISSUE

UP

UP

UP

Revisions FEMALE SEARCH AREA

1 KS20001-TD-AR-10-GN-006

Al Arabiya Headquarter B

X-RAY

STAFF DELIVERY WAITING AREA

SEATING AREA WAITING AREA

FRONT SECURITY BLOCK

O.B ENTRANCE & EXIT

1

2

LANDSCAPE GE LAYOUT

PEDESTERIAN ACCESS

3

4

5

6

7

8

9

10

11

12

13

14

15

16 Project number Date Drawn by

M

Checked by

1

LANDSCAPE GENERAL LAYOUT 1 : 200

BIM ARCHITECT PORTFOLIO

0

1

2 METER

KS20001-TD-AR-10-G Scale

57


1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1 / KS20001-TD-AR-10-GN-004

B

2 KS20001-TD-AR-10-GN-005

A

SEATING AREA 5 81 12

F05

Type Mark

A

F01 F02 F03 F05

KS20001-TD-AR-10-GN-005

F03 BASALT POLISHED TILES

UP

15

BASALT POLISHED TILES

KS20001-TD-AR-10-GN-007

F03

5880

45 10

BASALT POLISHED TILES

TENDER DESIGN

10 45

6 KS20001-TD-AR-10-GN-005

5

-0.600

4

JANUARY 2021

F03

15

0

85

Description APPROVED ISSUE

Date

BASALT POLISHED TILES

25 18

No.

4 KS20001-TD-AR-10-GN-007

36

35

2 KS20001-TD-AR-10-GN-007

70 15

6100

0 163

12110

-0.450

F06 F10 F11

4 KS20001-TD-AR-10-GN-006

FEMALE SEARCH AREA

1

X-RAY

05

TEAK WOOD BENCHES SECURITY ROOM

F02

4

STAFF DELIVERY WAITING AREA

5

100*100 cm

KS20001-TD-AR-10-GN-005

WAITING AREA

RELATED TO THE RELEVANT PACKAGE SUBMITTED BY AL-ARABIYA

4

FRONT SECURITY BLOCK

F02

5

KS20001-TD-AR-10-GN-007

DP ROOM

KS20001-TD-AR-10-GN-005

Grey Granite Tiles 100*100 cm

No.

GRASS

0 3 KS20001-TD-AR-10-GN-006

ENTRANCE

D

APPR

PEDESTERIAN ACCESS

F02

2 KS20001-TD-AR-10-GN-007

4000

5

KS20001-TD-AR-10-GN-005

KS20001-TD-AR-10-GN-007Grey Granite Tiles KS20001-TD-AR-10-GN-007

EXIT

4 KS20001-TD-AR-10-GN-007

KS20001-TD-AR-10-GN-007

20 1505 95 5 3

27-06-2021

SEATING AREA -0.450

215

10 45 50

52 5

40 27

785

KS20001-TD-AR-10-GN-007

KS20001-TD-AR-10-GN-007

F02

UP

BA 10 Gr BA GR MA GR PO PO

F02 F03 F05

Grey Granite Tiles 100*100 cm

3

4500

5

00 10

7850

1 KS20001-TD-AR-10-GN-006

4

1570

0 21

KS20001-TD-AR-10-GN-007

BASALT POLISHED TILES

F03

UP

5 57 10

05 18

24 10

-0.450

UP

0 02 10 10 45

10 65

5

-0.600

F02

1 KS20001-TD-AR-10-GN-006

525

F03

5315

21570

F02

F01

BARDIGLIO MARBLE TILES 100*100 CM

2925

10 45

15 42

20365

F03 BASALT POLISHED TILES

10 45

Grey Granite Tiles 100*100 cm

GREY GRANITE CURBSTONE

90 25

GREEK THASSOS ROUGH MARBLE TILES

8435

525 27

F02

-0.600

Grey Granite Tiles 100*100 cm

5

KS20001-TD-AR-10-GN-007

-0.450

KS20001-TD-AR-10-GN-007

Grey Granite Tiles 100*100 cm

BASALT POLISHED TILES

-0.600

395

13595

F06 F10 F11

BIKES RACKS

65

F01

+0.000

2620

0 70 15

5

BIKES RACKS

74

525

5

UP

F03

1570

BASALT POLISHED TILES

Type Mark

+0.600

91 70

10 45

12680

525

80 39

5 26 19

F03 +0.25 M

F01

GLASS HANDRAIL FOR HANDICAPPED RAMP

14805

BARDIGLIO MARBLE TILES 100*100 CM Grey Granite Tiles 100*100 cm BASALT POLISHED TILES GREEK THASSOS POLISHED MARBLE TILES 100*100 CM GRASS 525 PORCELAIN 80*80 CM PORCELAIN 60*60 CM

90 24

BARDIGLIO MARBLE TILES 100*100 CM

-0.450

Description

A

1 KS20001-TD-AR-10-GN-005

2 KS20001-TD-AR-10-GN-006

GREEK THASSOS POLISHED MARBLE TILES 100*100 CM

5000

A

-0.150

814 0

Floor Schedule

3010

785

Grey Granite Tiles 100*100 cm

52 5 1155

F02

62 85

525

5 KS20001-TD-AR-10-GN-006

B

Grey Granite Tiles 100*100 cm

25530

Revisions

Revisions

-0.450

10

11

12

13

14

15

16

Al Ara

Al Arabiya Headquarter Building 1 KS20001-TD-AR-10-GN-007

O.B ENTRANCE & EXIT

2

3

4

5

6

7

8

9

KS20001-TD-AR-10-GN-005

Project number

Drawn by

0

1 : 100

1

2

2

3

4

5

6

7

8

Drawn by Checked by

M.WALY

0

KS20001-TD-AR-10-GN-003

LAYOUT - Dependent 1 1 1LANDSCAPE Scale : 100 1 : 100

METER 1

Date

M.ABDELSALAM

Checked by

LANDSCAPE LAYOUT - Dependent 2

Project numb

KS20001 27-06-2021

Date

1

LAND

LANDSCAPE PATRIAL LAYOUT 2

5

1

1

2 METER

9

800

400

50

350

GREEK THASSOS MARBLE ROUGH FINISH

PLAN

Description

R.C SLAB

70 15

13335

70 15

6 BASALT POLISHED TILES KS20001-TD-AR-10-GN-006

F06 F10 F11

POLYURETHANE TRAFFIC COATING ON SCREED GRADE

2400

S.S STRIP DIVIDER 100X5 mm.

SLOPE 1:12

FFL

200

E

6245

6375

E

COLORED EPOXY PAINT

BARRIER

100 100

F03 15 70

CONTROL UNIT

1200

5375

1640

1770

15 85

F02 F03 F05

70 15

36345

70 15

BARDIGLIO MARBLE TILES 100*100 CM Grey Granite Tiles 100*100 cm BASALT POLISHED TILES GREEK THASSOS POLISHED MARBLE TILES 100*100 CM GRASS PORCELAIN 80*80 CM PORCELAIN 60*60 CM

4000

F F01

WATERPROOFING MEMBRANE

1000

F

SETTING MORTAR 20 mm. SAND BED 80 mm.

1600

Floor Schedule Type Mark

SECTION

ELECTRICAL ROOM

ELEVATION

1

70 15

5410

23 55

15 70

15 70 1700

D

D

ARM BARRIER DETAIL

ROAD ARROW DETAIL

5

3

HANDICAPPED RAMP SECTION

TENDER DESIGN JANUARY 2021

PLANT POT

0

Description APPROVED ISSUE

Date

JANUARY 2021

100

No.

BASALT POLISHED TILES

27-06-2021

C

Revisions

Grey Granite Tiles 100*100 cm

METAL FLASHING FFL

1800

1800

EQ.

135

No. 0

Description APPROVED ISSUE

Date 27-06-2021

CEMENT PLASTER 20 mm CLEAN SAND

15

EQ. Al Arabiya Headquarter Building

GALV. STEEL FLASHING 0.7 mm THICK FIXED BY EXPANSION BOLTS EVERY 500 mm

Revisions

165

F02

200 700

12470

PUMP ROOM

13520

-0.450

C

TENDER DESIGN

GALV.STEEL PLASTER STOP

F03

Al Arabiya Headquarter Building

VAR.

FFL

LANDSCAPE PARTIAL LAYOUT 3

5 KS20001-TD-AR-10-GN-006

WHITE MARKING EPOXY PAINT

STEEL PLATE WELDED TO STEEL ROD

GREASED HEX. NUT

15

200 170

GRAVEL (SIZE NOT TO EXCEED ∅50 mm)

15

1 mm GALV. STEEL CONTAINER

PRECAST CONCRETE WHEEL STOP

1

2

3

4

5

6

7

8

KS20001 27-06-2021

Date Drawn by

LANDSCAPE LAYOUT - Dependent 3

0

1

2 METER

BIM ARCHITECT PORTFOLIO

1 : 100

Project number

100

KS20001 27-06-2021

Date Drawn by

M.WALY

KS20001-TD-AR-10-GN-004 Scale

VAR.

M.ABDELSALAM

Checked by

1 : 100

R.C. SLAB WITH CONCRETE HARDINER

STEEL PLATE WELDED TO STEEL ROD

100

LANDSCAPE GENERAL DETAILS

4 mm BITUMINOUS MEMBRANE

PLAIN CONCRETE SLAB OR CONCRETE PIT

9 Project number

1

SCREED 50 mm THICK 290

PIPE SLEEVE CAST IN CONCRETE WHEEL STOP

CEMENT MORTAR 30x30 mm

M.ABDELSALAM M.WALY

Checked by

2

CONCRETE WHEEL STOPPER PLAN

4

PLANTER DETAIL

KS20001-TD-AR-10-GN-007

1 : 200

Scale

58

As indicated

KS20 Scale


3 KS20001-TD-AR-10-GN-006

3 KS20001-TD-AR-10-GN-005

F01

F02

BARDIGLIO MARBLE TILES 100*100 CM

Grey Granite Tiles 100*100 cm

4 KS20001-TD-AR-10-GN-006

+0.700

TEAK WOOD BENCHES

+0.000 -0.450

GRF-FFL +0

GRF-FFL +0

Floor Schedule

1

Type Mark

Section 8

Description

3 KS20001-TD-AR-10-GN-006

1 : 50

F01 F01

F05

F02

F03

BARDIGLIO MARBLE TILES 100*100 CM

GREEK THASSOS POLISHED MARBLE TILES 100*100 CM

Grey Granite Tiles 100*100 cm

BASALT POLISHED TILES

F02 F03 F05 WHITE PAINT

3500

KS20001-TD-AR-10-GN-005

2

F06 F10 F11

WHITE ALUMINIUM LOUVERS AS PER APPROVED SAMPLE

4

ARM BARRIER

ENTRANCE GATE

-0.450

-0.450

GRF-FFL +0

BARDIGLIO MARBLE T 100*100 CM Grey Granite Tiles 100*1 BASALT POLISHED TI GREEK THASSOS POL MARBLE TILES 100*10 GRASS PORCELAIN 80*80 CM PORCELAIN 60*60 CM

GRF-FFL +0

Section 7 1 : 50

TENDER DESIGN JANUARY 2021

No.

150 150

+0.700

250

+0.000 GRF-FFL +0

450

GRF-TOS +-100

0

6 KS20001-TD-AR-10-GN-005

150

BARDIGLIO MARBLE TILES AS PER APPROVED SAMPLE

GRF-FFL +0

Revisions

GRF-TOS +-100

Al Arabiya Headquarter Build

WATER DRAINAGE

5

BENCH CALLOUT 1 : 100

7

BENCH 3D

STEPS CALLOUT

LANDSCAPE SECTIO DETAILS

1 : 25

GRF-FFL +0

GREEK THASSOS ROUGH MARBLE FOR RAMP AS PER APPROVED SAMPLE

+0.000

GRF-FFL +0

150

GREEK THASSOS POLISHED MARBLE AS PER APPROVED SAMPLE

150

GRF-TOS +-100

150

3

Project number

BARDIGLIO MARBLE TILES

GRF-TOS +-100 GREY GRANITE TILES AS PER APPROVED SAMPLE

METAL BOXES 2 CM THICKNESS

Drawn by

BRICK WALL

4

1 : 25

BIM ARCHITECT PORTFOLIO

6

Section 9 1 : 25

0

2

Date

TEAK WOOD

STAIRS CALLOUT

Description APPROVED ISSUE

M.ABD

Checked by

1

2 METER

KS20001-TD-AR-10-GN-00 Scale

59

As ind


WHITE PAINT

3

3500

3500

WHITE ALUMINIUM LOUVERS AS PER APPROVED SAMPLE

ELEVATION 1 - SECURITY BUILDING

4

1 : 50

ELEVATION 2- SECURITY BUILDING 1 : 50

WHITE PAINT WHITE ALUMINIUM LOUVERS AS PER APPROVED SAMPLE

3500

LOUVER WINDOW 2.60 M WIDTH

5

ELEVATION 1- PUMPING & ELECTRICAL ROOM

6

1 : 50

ELEVATION 2 - PUMPING & ELECTRICAL ROOM

TENDER DESIGN

1 : 50

JANUARY 2021

No. 0

GRF-FFL +0

+0.000

2

Revisions

GRF-FFL +0

GRF-TOS +-100

Description APPROVED ISSUE

GRF-TOS +-100

Al Arabiya Headquarter

SECTION - RAMP

LANDSCAPE SEC DETAILS

1 : 50

F03

F05

F01

F02

BASALT POLISHED TILES

GREEK THASSOS POLISHED MARBLE TILES 100*100 CM

BARDIGLIO MARBLE TILES 100*100 CM

Grey Granite Tiles 100*100 cm

Project number Date

-0.450

+0.600

Drawn by

M

Checked by

KS20001-TD-AR-10-G

1

Section 6

Scale

1 : 200

BIM ARCHITECT PORTFOLIO

60

As


AL - ARABIYA OFFICE BUILDING - VIP LOUNGE RIYADH, SAUDI ARABIA


10

11

12

---

F

900

900

900

900

900

900

900

900

900

900

900

900

900

900

900

900

900

900

834

4744

900

1200

1200

900

3659

3355

1200

665

F

1000

F02 GRASS AREA

1200

1000

WHITE TEAK WOOD SEATINGS

GRASS AREA

F02

1000

F02

1200

WHITE TEAK WOOD SEATINGS

3510

F02

1000

GRASS AREA

3

KS20001-TD-AR12-ATR-307

GRASS AREA

F02

1000

E 1200

E

GRASS AREA

1200

1000

1000

F02

1000

1200

5

KS20001-TD-AR12-ATR-308

2

KS20001-TD-AR12-ATR-307

ALUMINIUM COLUMNS 50 MM RADIUS

2000

F02

1200

2000

GRASS AREA

3476

GRASS AREA

TENDER DESIGN

2000

0 40

40 0

1200

2990

JANUARY 2021

GREEK THASSOS SEATINGS

No.

3005

3005

2000

1200

600

GRASS AREA

390

D

1200

0

4189

1200

F02

3471

Revisions

GRASS AREA

5 39

1050

900

1050

Al Arabiya Headquarter Building

1000

F02

F02

1200

1000

1000

1200

3321

GRASS AREA

GRASS AREA

F01

ATRIUM ZONE-GROUND FLOOR PLAN 3166

3340

3340

1200

1200

GREEK THASSOS MARBLE TILES 1200*900 MM

Project number

C

C

KS20001 28-06-2021

Date Drawn by

M.ABDELSALAM / M.HASSAAN M.WALY

Checked by

1

ATRIUM - GROUND FLOOR PLAN 1 : 50

BIM ARCHITECT PORTFOLIO

KS20001-TD-AR- 12-ATR-300

1 KS20001-TD-AR- 12-ATR-303

10

Date 28-06-2021

5 39

1000

1 KS20001-TD-AR- 12-ATR-302

Description APPROVED ISSUE

1000

1000

D

F02

1377

1 KS20001-TD-AR- 12-ATR-307

11

12

1 : 50

Scale

62


10

11

12

---

F

F

1200

F01

1200

1200

GREEK THASSOS MARBLE TILES 1200*900 MM

F02

4000

1000

3

3000

1000

1200

GRASS AREA

KS20001-TD-AR12-ATR-308

4000

1200

F02 GRASS AREA

3000

E 2000

1200

E

3000

1200

2000

2000

G

GREEK THASSOS MARBLE TILES 1200*900 MM

F01

1000

1200

F01

3000

2000

2000

01

1200

ALUMINIUM PROFILE 50 MM WIDTH

2000

ATRIUM

2000

GREEK THASSOS MARBLE TILES 1200*900 MM

TENDER DESIGN

2000

1200

1000

JANUARY 2021

2000

5000

ALUMINIUM LOUVERS 50MM WIDTH

1200

D

No.

F02

2000

1200

100

ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM

0

GRASS AREA

1

Description APPROVED ISSUE

2

D

KS20001-TD-AR12-ATR-308

RECESSED LED STRIP LIGHTING 1200

Revisions 2000

1000

F02

TINTED GLASS AS PER APPROVED SAMPLE

1000

5000

1200

1 KS20001-TD-AR- 12-ATR-302

2000

3000

Al Arabiya Headquarter Buildin

1200

GRASS AREA

900

900

900

900

900

900

900

900

900

900

1200

900

ATRIUM ZONE-FIR FLOOR PLAN

3000

900

900

900

900

900

900

900

900

900

900

F01 GREEK THASSOS MARBLE TILES 1200*900 MM

1200

Project number

28

Date

C

C

10

1

ATRIUM - FIRST FLOOR PLAN 1 : 50

BIM ARCHITECT PORTFOLIO

11

12

Drawn by

M.ABDELSALAM / M.H

Checked by

KS20001-TD-AR- 12-ATR-30 1 KS20001-TD-AR- 12-ATR-303

Scale

63


---

10

11

GYPSUM BOARD

12

WHITE WOOD CLADDING

F

2618

F

463

+3.430

WHITE WOOD CLADDING

WHITE WOOD CLADDING

GYPSUM BOARD

GYPSUM BOARD

E

E

12815

463

2584

21344

463

15463

2547

+3.430

TENDER DESIGN JANUARY 2021

D

D

No. 0

Description APPROVED ISSUE

Date 28-06-2021

Revisions

463

Al Arabiya Headquarter Building

14838

GROUND FLOOR CEILING PLAN

1999

2340

1996

Project number

C

C GYPSUM BOARD

WHITE WOOD CLADDING

KS20001 28-06-2021

Date Drawn by

M.ABDELSALAM / M.HASSAAN M.WALY

Checked by

1

GROUND FLOOR CEILING PLAN 1 : 50

BIM ARCHITECT PORTFOLIO

10

11

12

KS20001-TD-AR- 12-ATR-304

1 : 50

Scale

64


---

10

11

GYPSUM BOARD

12

WHITE WOOD CLADDING

F

2618

F

+3.425

200

1041

463

+3.425

ALUMINUM SKY LIGHT 2000

ALUMINUM SKY LIGHT

WHITE WOOD CLADDING

GYPSUM BOARD

200

GYPSUM BOARD

WHITE WOOD CLADDING

E

200

2000

E

463

801

200

2000

200

2000

200

2000

200

2000

200

2000

200

813

463

2584

200

21344

2000

2547

C-02

2000

+3.425 C-01

TENDER DESIGN

2000

200

JANUARY 2021

D

No. 0

Description APPROVED ISSUE

Date 18-01-2021

200

D

2000

Revisions

1022

200

Al Arabiya Headquarter Building

463

ALUMINUM SKY BORDER

14838

FIRST FLOOR CEILING PLAN

1999

2340

1996

Project number

C

C GYPSUM BOARD

WHITE WOOD CLADDING

KS20001 28-06-2021

Date Drawn by

M.ABDELSALAM / M.HASSAAN M.WALY

Checked by

1

FIRST FLOOR CEILING PLAN 1 : 200

10

11

KS20001-TD-AR- 12-ATR-305

12

As indicated

Scale

BIM ARCHITECT PORTFOLIO

65


---

10

11

12

ALUMINUM MULLION

GYPSUM BOARD

0.20X0.20 ALUMIUM MULLION

ALUMINIUM RIBS HANDRAIL 100* 100 MM WITH SPACING 100 MM

DOUBLE GALSS

F

2629

F

+3.425

200

1293

200

+6.395

ALUMINUM SKY LIGHT

ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM

ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM

2000

ALUMINUM SKY LIGHT

GYPSUM BOARD

200

GYPSUM BOARD

MOSIC TILES CEMENT MORTAR SAND BED THERMAL RIGID INSULATION WATERPROOFING MEMBRANE SLOPED CONCRETE 100 mm AVERAGE

E

2000

E

STRUCTURE BEAM

200

0.20X0.20 ALUMIUM MULLION

PRECAST SLAB

WHITE METAL SHEET

SILICONE SEALANT 200

1060

200

2000

200

2000

200

2000

200

2000

200

2000

200

1060

200

2601

200

+6.395

21344

2000

2551

2000

+3.425 C-01

TENDER DESIGN

200

JANUARY 2021 WHITE PAINT

No.

2000

0.20X0.20 ALUMIUM MULLION

D

Description APPROVED ISSUE

28

200

D

0

2000

Revisions Insulating glazing unit (34 or 46 mm)

Al Arabiya Headquarter Buildin ALUMINUM MULLION DOUBLE GALSS

1293

200

CLADDING

SKY LIGHT DETAILS P

200

ALUMINUM SKY BORDER

14838

1999

2332

1996

Project number

C

C GYPSUM BOARD

0.20X0.20 ALUMIUM MULLION

28

Date Drawn by

ALUMINUM LOUVER 0.10X0.10 M

M.ABDELSALAM / M.H

Checked by

1

SKY LIGHT DETAILS 1 : 50

BIM ARCHITECT PORTFOLIO

KS20001-TD-AR- 12-ATR-306

10

11

12

Scale

66

As indi


C 10

11

D

E

F

12

---

+11.095

+11.095 SKY LIGHT TOP RF-TOS +10960

ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM

WHITE WOOD CLADDING

1000

+4.500

F01

FIRST FLOOR CEILING PLAN +4500

700

1070

700

G

+4.500

FIRST FLOOR CEILING PLAN +4500

Description

1070

No.

Date

F01

28-06-2021

F02

GREEK THASSOS MARBLE TILES 1200*900 MM

GRASS AREA

GRASS AREA

899

F02

F02

1 GRASS AREA KS20001-TD-AR12-ATR-307

GRASS AREA

0

F02

F02

F02

GRASS AREA

GRASS AREA

GRASS AREA

Revisions

Des

APPROVE

F01 GREEK THASSOS MARBLE TILES 1200*900 MM

GRF-FFL +0

400

JA

GUPSUM BOARD

APPROVED ISSUE

4500

3430

3430

No. 0

WHITE TEAK WOOD SEATINGS

3050

GREEK THASSOS MARBLE TILES 1200*900 MM

F02

1100

+0.000

2500

F01

3000

3430

4005

4500

RECESSED LED PROFILE

WHITE WOOD JANUARY 2021 CLADDING

3050

ALUMINIUM LOUVERS 50MM WIDTH

F01 GREEK THASSOS MARBLE TILES 1200*900 MM

TEN

FRF-TOS TENDER DESIGN +4340

C-01

GRF-FFL +0

ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM

ATRIUM 01

GREEK THASSOS MARBLE TILES 1200*900 MM

3425

GRASS AREA

GRASS AREA

F01 GREEK THASSOS MARBLE TILES 1200*900 MM

1000

3425

F02

G

100

FIRST FLOOR CEILING PLAN +4500

01

1450

ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM

ATRIUM

F02

11095

GUPSUM BOARD

2425

F01 GREEK THASSOS MARBLE TILES 1200*900 MM

8045

C-01

WHITE WOOD CLADDING

3430

174

C-01

1170

700

WHITE WOOD CLADDING

ROOF TOS +9095

1170

1152

499

2000

TOP RF-BOS +10540

ROOF TOS +9095

6595

ALUMINIUM RIBS HANDRAIL 100*100 MM WITH SPACING 100 MM

ROOF TOS +9095

2000

TOP RF-BOS +10540 1800

TOP RF-TOS +10960

TOP RF-BOS +10540

3595

SKY LIGHT TOP RF-TOS +10960

Revisions

WHITE TEAK WOOD SEATINGS

+0.000 GRF-FFL +0

Al Arabiya

Al Arabiya HeadquarterGRF-TOS Building +-100

ATRIUM ZO

ATRIUM ZONE-SECTION 1

Project number

Drawn by

ATRIUM ZONE - SECTION 1

1

1 : 50

Date Drawn by

M.ABDELSALAM / M.HASSAAN

KS20001-

KS20001-TD-AR- 12-ATR-302

ATRIUM ZONE-SECTION 2 Scale 1 : 50

1 : 50

Scale

PROVISIONAL LOCATION FOR BAR SINK

400

50

5000

608

FROSTED AND TINTED STRIPE GLASS AS PER APPROVED SAMPLE

250

30 0

300 FROSTED AND TINTED STRIPE GLASS AS PER APPROVED SAMPLE

1 KS20001-TD-AR- 12-ATR-307

ALUMINIUM PROFILE 50 MM POLISHED CHROME FINISH

4 KS20001-TD-AR- 12-ATR-307

608

1874

RECESSED LED PROFILE 3000

608

ALUMINIUM PROFILE 100 MM EXTERNAL DIAMETER POLISHED CHROME FINISH

2550

400

2500

600

3000

1500

5000

600

3000

2074

400

900

30 0

608

30 0

1010

ALUMINIUM BASE CAP POLISHED CHROME FINISH GRF-FFL +0

GRF-FFL +0

GRF-TOS +-100

GRF-TOS +-100

900

2

4 KS20001-TD-AR- 12-ATR-308

1050

1050

ATRIUM - BAR DETAIL- Callout 1

3

1 : 20

ATRIUM - SEATING DETAILED PLAN - CALLOUT

2 KS20001-TD-AR- 12-ATR-308

1 : 20

1

SHADING WITH FROSTED AND TINTED GLASS 3 STRIPE ABOVE 1 : 25

4

Section 11 1 : 25

SHADING WITH LOUVERS DETAIL 1 : 25

TENDER DESIGN

GREEK THASSOS MARBLE CLADDING AS PER APPROVED SAMPLE

TENDER DESIGN

500

500

1200

JANUARY 2021

JANUARY 2021 WHITE TEAK WOOD CLADDING AS PER APPROVED SAMPLE

400

STEEL BOXES 5*5 CM

400

900

900

1200

GRASS AREA

STEEL BOXES 5*5 CM

No.

Description

No.

Date

Description

Date

RECESSED LED PROFILE

ALUMINIUM PROFILE 50 MM POLISHED CHROME FINISH

1

SECTION - BAR 1 : 20

4

SECTION - SEATING 1 : 20

GREEK THASSOS SEATING RECESSED LED PROFILE

Revisions

GREEK THASSOS SEATING

Revisions

STEEL CHASSIS FOR MARBLE CLADDING

Al Arabiya Headquarter Building

ALUMINIUM PROFILE 100 MM EXTERNAL DIAMETER POLISHED CHROME FINISH

Al Arabiya Headquarter Building

RECESSED LED PROFILE 1070

4500

1040

4005

6 KS20001-TD-AR- 12-ATR-308

ALUMINUM SHADING DETAIL

GRF-FFL +0

BAR & SEATS DETAILS

GRF-TOS +-100

Project number

Project number

Drawn by Checked by

6

3D SHOT - BAR

BIM ARCHITECT PORTFOLIO

5

3D SHOT - SEATS 2

M.WALY

Scale

28-06-2021

Date Drawn by

M.ABDELSALAM

KS20001-TD-AR- 12-ATR-307

KS20001

ALUMINIUM BASE CAP POLISHED CHROME FINISH

KS20001 28-06-2021

Date

Author Checker

Checked by

2

Section 9 1 : 25

M.A

Checked by

M.WALY

Checked by

1

Project number

KS20001 28-06-2021

Date

5

MARBLE SEATING PLAN 1 : 10

6

MARBLE SEATING SECTION

KS20001-TD-AR- 12-ATR-308

1 : 10

Scale

1 : 20

67

As indicated


R.A HOUSE - CENTRAL PARK NEW CAIRO , Egypt


WALL FINISHES WALL TYPE W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17

EG20012-TD-ID-8-GN-1

1

EG20012-TD-ID-8-GN-2

4

W08

BF

W08

W08

2.55

BF

Revisions

BF

TENDER DETAIL

3.30

0.18 0.90

1.14

1.05

0.80

1.13

BF

4.90

0.28

W18 W-09

DRIVER'S BEDROOM

W09 W09

1.32

W09

2.98

3.01

0.57

3.32

BF

06

BF

12 D05

0.90

0.18

10 D05

0.90

W08

0.56

0.20

0.90

0.56

0.20

0.90

09 D05

1.31

0.90

1.94

W12

BF

W02

-2.350

1.96

W09

For CONSTRUCTION

08 D05

1.10

0.24

2.90

1.25

APRIL 2021

W02 5

W07

EG20012-TD-ID-7-BF-1

10

0.84

EG20012-TD-ID-7-BF-1

No.

W02

0.84

0

1

1.94

Revisions W03

SERVER ROOM 09

TENDER DETA

GUEST TOILET

BF

08

VILLA RAMY SALIB

BF

VILLA RAMY SA

BASEMENT FLOOR FURNITURE LAYOUT

Project number

EG20012

Drawn by

Project number Date

M.ABDELSALAM

Drawn by

M.WALY

Checked by EG20012-TD-ID-1-BF-0

0.66

0.60

1.00

F10

F8

APRIL 2021

F2

BF

0.60

0.60

0.48

F2

F2

F2

F14 F14

F2

F14 F14

For C

F2

F8

A

F10

No. 0

Description APPROVED ISSUE

No.

Date 22/04/2021

1

F3

F18

F5

F5

F5

F5

F5

F5

F5

F5

F14 F14 F3

F18

Revisions

F18

TENDER DETAIL

F03

F18

VILLA RAMY SALIB

F18

F3

F3

Revisions

TEND

F18

VILLA F14

BASEMEN CEIL

BASEMENT FLOORING PLAN

Project number

Project number

EG20012

Date

18/05/2021

Date Drawn by

Drawn by

M.ABDELSALAM

Checked by

M.WALY

Checked by

EG200

EG20012-TD-ID-4-BF-0

1

1

BASEMENT FLOORING PLAN 1 : 50

BIM ARCHITECT PORTFOLIO

Scale

Des

APPROV

AD

08 SP

F14 F14

F14 F14

For CONSTRUCTION

0.11

0.38 0.60

F14 F14

0.60 0.60

0.60

0.60 0.17 0.60

1.00 1.00 1.00

1.04

0.47

1.00

GUEST TOILET

BF

F14

0.60 0.60 0.60

0.60 0.60 0.60

1.00

1.00 1.00

0.86

F8

F5

0.60

09

F10

F5

0.60

SP

F01

0.54

F03 0.60

SERVER ROOM

0.54

BF

0.57

11

F01

1.00

1.80

0.25

0.60

F03

0.45

0.60 0.60 0.60

BF

F18

1.80

0.23

STORAGE

0.57

0.33

10

1.00

0.43

LAUNDRY

SP

-2.250

0.61

POWDER AREA F01 12 BF

F18

F7

0.14

1.00

0.39

1.00

0.87

SP SP

F18

F10

F7

F8

1.01

F14 F14

F14 F14

0.50

1.00

0.43

1.00

-2.350

CORRIDOR F01 13 BF

0.22

1.00

SP

-2.250

0.57

1.00

0.47

1.00 1.00

1.00

1.01

0.87

F14 F14

F8

F7

1.03

1.00

F18

F18

0.58

0.60

SP

BF

0.86

F7

F7

0.38

0.45

F4

0.60

0.60 0.60

0.60 0.17 0.60 0.60 0.18 0.60

0.34

0.18 0.60

0.60 0.60

0.18

0.58

0.58

0.60

0.43 0.60 0.60

0.60 0.60

0.06

0.60 0.60

0.60 0.60

0.60 0.60 0.60

0.60 0.58 1.00

0.58 1.00

0.60 0.60

0.60 0.60 0.60 0.60 0.60

0.60 0.58

0.58

1.00 1.00

F7

F18 F8

F8

0.87

0.60

0.06

0.60 0.60

0.60

1.00 1.00 1.00 1.00 1.00 1.00

0.60

F7

F8

F7

1.00

0.60

F7

0.05

F7

1.00

BF

0.60

F7

F7

0.60

F7

06

0.60

F7

0.04 0.60

F7

F7

F18

BF

F03

F7

0.04 0.60

0.60

F7

0.60

F03

07 0.60

F18

AD

0.60

0.60

F7

0.60

DRIVER'S BATHROOM

F7

0.60

0.04 0.60

0.60

F7

0.48

0.60

F7

13

0.60

F03 0.60

F7

CORRIDOR

0.60 SP

F28

-2.250

DRIVER'S BEDROOM

F7

-2.350

0.30

BF

F7

0.60

F28

F7

0.60

05

SP

F03

F28

F5

0.63

0.60

BF

F28

F14

0.60

04

DRIVER'S LIVING AREA

0.60

MAID'S BATHROOM

F28

F4

0.60

F03 SP

-2.250

F5

0.60

BF

SP

F14

F03

MAID'S BEDROOM 03

0.04

F5

-2.250

BF

0.60

F5

0.60 SP

0.60

F5

F01

0.60

F5

BF

0.60

F5

-2.250

MAIN KITCHEN 02

0.60

F5

01

0.60

F5

RECEPTION

SP

F03

F5

-2.250

F1

0.19

0.14

AD

0.89

0.60

F1

0.60

F1

F1

0.60

F1

F1

F1

0.60

F28

0.60

F28

0.60

Scale

Description BARDIGLIO MARBLE TILES 100*100 CM CALCATTA MARBLE TILES 100*100 CM PORCELAIN TILES 60*60 CM WHITE QUARTZ MARBLE TILES 100*100 CM CHEVRON WOOD FLOORING WOOD PLASTIC COMPOSITE TEAK WOOD FLOORING CALCATTA GOLD MARBLE TILES 100*100 CM NEO CEMENT FLOOR

F28

Type Mark

0.97

1 : 50

FLOOR FINISHES

Scale

F01 F02 F03 F04 F05 F06 F07 F08 F09

UP

EG20012-TD-ID-3-BF

BASEMENT FLOOR DETAILED PLAN 1 : 50

F28

1

F28

BASEMENT FLOOR PLAN 1 : 50

M.A

Checked by

F28

1

BASEMENT FLO DETAILED PLA

18/05/2021

Date

Description APPROVED ISSUE

EG20012-TD-ID-11-GN-0

W12

1.99

0.65

11 D05

04

0.27 1.46

0.30

0.30 1.79

0.99

W09 0.57

0.53

DRIVER'S BATHROOM

MAID'S BATHROOM

W09

1.33

0.18

0.18

0.90

0.90

2.28 1.51

BF W09

1.05

11

08

BF

0.50

09

11

GUEST TOILET

SERVER ROOM

13

BF

W09

0.53

2.21

STORAGE

STORAGE

BF W09

22/04/2021 3.32

BF

2.06

W09

07

0.80

2.98

0.11

1.33

Date

10

0.26

0.92

Description APPROVED ISSUE

LAUNDRY

W02

LAUNDRY 10

W09

2.21

2.88

0

12

1.00

0.80

No.

BF

0.79

EG20012-TD-ID-12-GN-3

1.00

POWDER AREA

W09

1

4.23

APRIL 2021

12

2.00

2.00

For CONSTRUCTION AL16

1.35

BF 06 D03 W09

W04

CORRIDOR

01 D06 POWDER AREA

BF

1.00

13

0.80

0.85

0.10

1.06

W09

13 D05

CORRIDOR

1.36

W04

0.10

W09 DRIVER'S LIVINGW09 AREA 05

0.80

1.64

1.44

1.00

0.56

W09

1.63

EG20012-TD-ID-7-BF-0

1.29

1

0.56

0.85

3.58

RECEPTION

W08

BF

0.67

1.02

01

0.30

RECEPTION

BF

1.00

W09

0.90

04 D03

0.83

3

W09

BF

W09 3.62

1.00 1.00

W09

3

EG20012-TD-ID-7-GR-1

03

W09

BF

0.48

W09 07 D05

MAID'S BEDROOM

MAIN KITCHEN 02

4

1.88

W09

03 D05

0.72

06

EG20012-TD-ID-7-BF-0

0.85

0.85 AL13 1.20

0.20

BF

2 5

DRIVER'S BATHROOM

MAID'S BATHROOM 04

BF

W09

3.95

-2.250

DRIVER'S BEDROOM

BF

07

01

4

5.96

EG20012-TD-ID-9-GN-3

5.98

1.00

BF

1.47

02

05

BF

0.92

1.16

W09

0.36

03

1.00

AL16

DRIVER'S LIVING AREA

MAID'S BEDROOM MAIN KITCHEN

W09

0.30

EG20012-TD-ID-9-GN-3

0.77

03 D05

0.85 AL13 1.20

3.30

W12

1.00

5

05 D05

0.85 AL13 1.20

0.45

1.36

0.69

W09

W09

0.55

3.30

0.91

0.90 0.12

0.45

2.24

0.67

2.12

0.90

0.84

6

EG20012-TD-ID-12-GN-3

0.30

0.77

EG20012-TD-ID-11-GN-1

0.90

0.58

0.58

6.90

1

UP

3.82

02 D05

UP

Desc

FIBER BOARD ACRYLIC CLADDING GYPSUM BOARD CLADDING ALCOBOND CLADDING PORCELAIN TILES 60*60 CM BLACK MIRROR CLADDING CALCATTA MARBLE TILES 100*100 GREY TIRESTA MARBLE TILES 100 NORMAL MIRROR CLADDING OFF WHITE PAINT VEIN MARBLE TILES 100*100 CM WHITE ONYX MARBLE OPEN BOOK WOOD CLADDING WOOD RIBS CREMA MARFIL CRUSHED MARBL CALCATTA MARBLE TILES 100*100 MOSAIC TILES 5 X5 CM DRYMIX PAINT (JOTASHIELD TEX F AS PER APPROVED DRAWINGS DRYMIX OAINT ARMANI GREY CLADDING WOOD CLADDING

BASEMENT REFLECTED CEILING PLAN

1 : 50

Scale

1 : 50

69


WALL FINISHES

EG20012-TD-ID-8-GN-1

FIXED WINDOW

UP

UP

WALL TYPE

2

1.20 AL10 2.35

1

4.00 AL12 2.35

1.20 EG20012-TD-ID-11-GN-1 AL10 2.35

W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17

6

W05

OFFICE

17 GR.

0.56 0.36

1.61

0.66

W12

0.68 0.78

3.64

4.33

W09

18 D01

8

0.46 0.18

LOBBY 20 GR.

19 D01

1.87

W09

W09

0.18

1.61

4.66

1 EG20012-TD-ID-7-GR-1

W09

W09

+0.800

W09

2.50

2.40

W11

APRIL 2021

0.70

1

0.25

W18 W-09

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

EG20012-TD-ID-8-GN-2

W09

0.41

1.10

W09

0.39

21 D04

1.50

3.11

21 GR.

+0.500

For CONSTRUCTION

3.60 AL03 2.35

GLASS HANDRAIL 90 CM

4.27

ENTRANCE LOBBY

21 GR.

6

EG20012-TD-ID-7-GR-0

W09

W12

ENTRANCE LOBBY

10

9

W10

7

0.50

W12

UP

W12

0.60

W02

W12

4

W12 13.57

0.33

3

0.64

0.54

3.90

W12

4

UP

EG20012-TD-ID-7-GR-1

0.56

6 EG20012-TD-ID-12-GN-2 EG20012-TD-ID-8-GN-2

W09

0.36

W05

20 GR.

5

W12

19 GR.

2

EG20012-TD-ID-7-GR-0

3

W10

0.64

2

W12

EG20012-TD-ID-7-GR-0

W09

KITCHEN

19 GR. 0.18

4

W10

16 GR.

LOBBY

1

OFFICE

EG20012-TD-ID-7-GR-0

EG20012-TD-ID-12-GN-2

DINNING ROOM

15 GR.

1

5

+0.800

W05

LIVING ROOM

4.52

18 GR.

W09

3.42

3.60

5.80 AL01 2.75

0.32

GUEST TOILET

0.53

4

0.53

0.96

EG20012-TD-ID-9-GN-3

1.20

W10

0.90

4.01

0.86

18 GR.

15 GR.

W05

0.45

1.00

17 GR.

+0.800

4.36

GUEST TOILET

W05

1.20

1.48

LIVING ROOM

4.35

KITCHEN

16 GR.

6.00

DINNING ROOM

W05

FIRE PLACE AT 30 CM HEIGHT

0.47 0.20

0.86 0.26

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

0.35

17 D05

0.55

0.10

0.93

1.56

0.89

4.33

0.47

W09

4.36

0.30

0.85

0.58

0.32 0.34

0.84

0.33

0.7

0.7 6

2.65

4.00

0.23

0.86

For CONSTRUCTI

W02

22/04/2021

3.23

W09 W09

3.20 AL04 2.75

TENDER DETAIL

1.26

W09

0.50

2.09

W09

1.76

3.60 AL02 2.75

1.20 AL09 2.75

2.00 AL08 2.75

TENDER DET

AL17

1.20 AL09 2.75

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

FIXED GLASS WINDOW

Revisions DOUBLE GLASS SLIDING DOOR ALUMIL M12500

1

VILLA RAMY SALIB

EG20012-TD-ID-8-GN-0

VILLA RAMY S

FIXED GLASS WINDOW

GROUND FLOOR FURNITURE LAYOUT

Project number

GROUND FLO DETAILED PL 2

EG20012

EG20012-TD-ID-10-4

4

Project number

18/05/2021

Date Drawn by

Date

M.ABDELSALAM

Drawn by

M.WALY

Checked by

GROUND FLOOR PLAN

FLOOR FINISHES GROUND FLOOR DETAILED PLAN

1

Type Mark1 : 50

1 : 50

Scale F01 F02 F03 F04 F05 F06 F07 F08 F09

WHITE QURATZ SKIRTING 15 CM

Description

EG20012-TD-ID-3-G

1 : 50

BARDIGLIO MARBLE TILES 100*100 CM CALCATTA MARBLE TILES 100*100 CM PORCELAIN TILES 60*60 CM WHITE QUARTZ MARBLE TILES 100*100 CM CHEVRON WOOD FLOORING WOOD PLASTIC COMPOSITE TEAK WOOD FLOORING CALCATTA GOLD MARBLE TILES 100*100 CM NEO CEMENT FLOOR

Scale

F20

F20

UP

GUEST TOILET

0.39

F7

0.10 F7

0.61 0.10 0.64 F23

0.27

1.39 0.10

5

F5

F5

0.58

AD F21

F30 F5

F21

F5

0.77

0.89

TENDER DETAIL

WHITE QURATZ SKIRTING 15 CM

F3 5

1.00

F5

Revisions

VILLA RAMY SALIB

0.19

1.00

1.74

F4

F5 F4

F5

F4

1.00

1.46

1.82 0.30

F16

F5

F8

F16

F7

F16

F7

F8

F7

0.85

0.30 1.00

F5

F21

1.00

22/04/2021 F3

0.26

Date

F16

Description APPROVED ISSUE

F7

No. 0

F16

0.12

0.79

21 GR.

F20

1.00

F7

1.00

0.31

0.73 F8 F16

F16

F7

1.00

ENTRANCE LOBBY

0.30

F8

F16 F7

F7 F7

F7

F7

F7

F16

0.12

F7

1.56

F7

F7

APRIL 2021

F04 1.00

F7

For CONSTRUCTION

F7

1.00

F7

F7

0.71 0.35 0.89

0.28

WHITE QURATZ SKIRTING 15 CM

F7

0.40

0.10

F7

20 GR.

F7

F16

0.34

0.35

0.12

LOBBY

F5

0.06

F7

4.00

1.00 1.00 1.00

0.58

0.38 0.28

0.77

F7

1.00

F7

F16 0.12 1.00

0.74

0.12

0.10

1.00 1.00 0.44 0.56

0.56

F7

1.00

1.00

F7

0.11 1.00

4.05

F7

1.00

0.10

F7

1.00

1.04

F16

1.00

1.00

1.00

0.71

0.71 1.00 1.00 0.71

0.71

1.00

21 GR.

1.00

0.10

F7

0.51

1.42

0.37

0.52

0.60

0.62

0.10 1.00 1.00 1.00

1.00

0.38

1.00

SP

ENTRANCE LOBBY

1.00

3.77

F4

1.00

0.20

AD

0.71

19 GR. 0.10 0.62 0.180.29 0.10

F8

0.68

2.60

F8

F04

F7

F04

0.27

F21

0.68

F7

AD

F21

BAR WITH WHITE QUARTZ FINISH

OFFICE

F3 F3

0.64

+0.800

WHITE QURATZ SKIRTING 15 CM

+0.500

F7

LOBBY

AD

UP

0.17 0.10 0.71

20 GR.

0.57

0.11

SP

F7

0.73

F3 F3

F8

F8

2.31

F7

0.24

0.35

F7

0.26

1.58

F7

1.00

F3 F3

F7

1.00

17 GR.

F7

1.00

16 GR.

F21

1.00

15 GR.

F21

0.68

KITCHEN

F7

SP

F21

WHITE QURATZ STAIR

DINNING ROOM

F8

F04

SP

LIVING ROOM

F8

F04

F10

F16

F04

F10

19 GR.

0.93

KITCHEN 17 GR.

F10

F8

F04

0.44

F7

F7

BAR WITH PANDA MARBLE FINISH

F7

F8

16 GR.

F7

F7

F21

OFFICE

DINNING ROOM

F8

F7

+0.800

15 GR.

F3 F3

F7

F8 F7

+0.800

F04

LIVING ROOM

18 GR. 0.70

F16

+0.800

F8

18 GR.

0.77

F7

F7

GUEST TOILET 0.24

5.75

F7

0.77

0.44

F7

1.00

0.62

AD

1.00

0.20

AD

1.00

2.60

F21

0.88

0.71

AD

0.17

0.58

WHITE QURATZ SKIRTING 15 CM

GROUND FLOORING PLAN

Project number

EG20012 18/05/2021

Date Drawn by

M.ABDELSALAM

Checked by

1

GROUND FLOORING PLAN

1

M.WALY

GROUND REFLECTED CEILING PLAN

1 : 50

EG20012-TD-ID-4-GR-0

1 : 50

Scale

BIM ARCHITECT PORTFOLIO

M

Checked by

EG20012-TD-ID-1-GR-0

1

Description APPROVED ISSUE

W09

0.29

W09

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

No. 0

4.02

1.14

2.38

Revisions

APRIL 2021

W09

0.54

2.00 AL08 2.75

3 EG20012-TD-ID-11-GN-0

W02

W09

2.64

APPROVED ISSUE

0.37 0.25

0

Date

0.54

Description

W07

W09

1.05

No.

W02

De

FIBER BOARD ACRYLIC CLADD GYPSUM BOARD CLADDING ALCOBOND CLADDING PORCELAIN TILES 60*60 CM BLACK MIRROR CLADDING CALCATTA MARBLE TILES 100*1 GREY TIRESTA MARBLE TILES NORMAL MIRROR CLADDING OFF WHITE PAINT VEIN MARBLE TILES 100*100 CM WHITE ONYX MARBLE OPEN BO WOOD CLADDING WOOD RIBS CREMA MARFIL CRUSHED MAR CALCATTA MARBLE TILES 100*1 MOSAIC TILES 5 X5 CM DRYMIX PAINT (JOTASHIELD TE AS PER APPROVED DRAWINGS DRYMIX OAINT ARMANI GREY CLADDING WOOD CLADDING

1 : 50

70


WALL FINI WALL TYPE

EG20012-TD-ID-8-GN-1

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

FR

29

4

3

2

W06

W08

W08

W06

W06

30 D02

5

30

FR

1.36

1.07

29 D02

W09

0.80

1.35

0.80

0.78

0.80

1.35

0.80

0.78

EG20012-TD-ID-7-FR-0

3

1.86

MASTER BEDROOM 29

W06

28 D03

28

FR

3.60

2

W12

W06

W06

W13

1.56

1.20

1.20

1.50

1

EG20012-TD-ID-8-GN-2

4.66

+4.050

W09

W09

FIRST FLOOR CORRIDOR 33

FR

WOOD CLADDING

W02 W09

0.12

1.10

0.39

2.76

1.25

For CONST

0.86

APRIL

FR

W07 W02

W09

22/04/2021 W09

No.

0.43

3.60

0

2

W09

1.17

0.27

Revisions

0.50

3.68

3.60 AL03 2.35

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

FIXED GLASS WINDOW 1.20 AL10 2.35

3.20 AL05 2.35

TENDER

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

1 DOUBLE GLASS SLIDING DOOR ALUMIL M12500

Descrip

APPROVED ISS

EG20012-TD-ID-11-GN-0

W09

TENDER DETAIL VILLA RAMY SALIB

W06 W09

1.16

28 D03

MASTER DRESSING ROOM

0.59

4

W09

0.90

0.38

3.60 AL03 2.35

5

0.47

1.60

W09

0.59

2.66

1.82

1.45

1.77

0.89

EG20012-TD-ID-7-FR-2

0.71

0.90

W12

1.68

0.90 0.12

27 D01

W09

3

W09

W09

3.00

MASTER BATHROOM

Date

UP

4 3

0.42

4

1.59

0.58

GLASS HANDRAIL 90 CM

Revisions

2

EG20012-TD-ID-7-FR-4

3.76

31 D03

EG20012-TD-ID-7-FR-1

TEAK WOOD PANELS

FR

W09 2.82

3.19

5

2.21

30

MASTER BEDROOM

0.60

25 D01

FIBER BOARD AC GYPSUM BOARD ALCOBOND CLAD PORCELAIN TILES BLACK MIRROR C CALCATTA MARBL GREY TIRESTA M NORMAL MIRROR OFF WHITE PAINT VEIN MARBLE TIL WHITE ONYX MAR WOOD CLADDING WOOD RIBS CREMA MARFIL C CALCATTA MARBL MOSAIC TILES 5 X DRYMIX PAINT (JO AS PER APPROVE DRYMIX OAINT ARMANI GREY CL WOOD CLADDING

W18 W-09

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

FR

3.63

MASTER BATHROOM

Description APPROVED ISSUE

0.70

W09

0.55

APRIL 2021

No.

0.60

0.62

0.68

W09

ANDRE'S BEDROOM

4.35

For CONSTRUCTION

0.80

2

32 D03

5.36

W09

W06 0.74

W06

0

0.99

1.54

1.12

0.37 W06 0.80 0.69

W06

FR

0.70

0.61

0.80

0.17

0.45

FR

UP

28

0.60

4.35

32

MASTER DRESSING ROOM

W12 0.70

0.85

TOILET 2

FR

W02

0.56

4

EG20012-TD-ID-8-GN-2

TOILET 2 32

W09

FR

0.80

1.20

W12

W09

5.96

31

FR

1

W12

4.74

W15

0.58

0.41

2.30 10.73

0.47

27

FR

2.12

33

1.40 0.22

W09

26 D03

0.99

0.29

W09 2.30

W09

W09

3

27

0.62

0.14

24 D01

F08

2

EG20012-TD-ID-7-FR-3

1.24

0.64

0.95

FIRST FLOOR CORRIDOR

1.60

FR

1.60

22

FR

0.57

31

0.98

TOILET 1

22 D01

TOILET 1

ANDRE'S BEDROOM

4

0.14 0.99 0.13

0.59

0.62

3

0.97

ALIEN'S BEDROOM

2.69

2.69

1.29

1.20 AL10 2.35

0.59

1.95

W09

4.24

2.98

0.80

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

W15

W15

2

EG20012-TD-ID-7-FR-5

1.20

W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17

5

W09

W15

0.99

SP

23 D03 0.61

4

5.80 AL01 2.35

W09

W09

1.20 AL10 2.35

W15

0.22

FR

W09

10

FR

0.86

0.37

0.90

26

0.47

0.14

FR

1.48

0.29

25

FR

0.74

11 W15

0.22

24

0.45

0.14

FR

1.09

W09

EG20012-TD-ID-7-FR-3

W15

5

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

ANDRE'S BATHROOM

12

2.66

W02

FR

0.69

9

0.90

ALIEN'S BATHROOM 23

ANDRE'S DRESSING ROOM

1.20

W15

W12

ALIEN'S BEDROOM 22

0.81

0.88

W01

2.66

2.92

W09

26

0.56

1.20 AL10 2.35

1.20

ALIEN'S DRESSING ROOM

1

FR

ANDRE'S BATHROOM

2.66

23

1.20 AL10 2.35

0.24

ALIEN'S DRESSING ANDRE'S DRESSING ROOM ROOM 5 24 FR EG20012-TD-ID-7-FR-4 25 FR

ALIEN'S BATHROOM

4.24

FIXED GLASS WINDOW

AL17

EG20012-TD-ID-8-GN-0

VILLA RAM

3 EG20012-TD-ID-9-GN-3

3.60 AL03 2.35

FIRST FLOOR PLA

FIRST FLOOR FURNITURE LAYOUT

Project number

Project number

EG20012

Drawn by

1

Scale FLOOR Type Mark

BARDIGLIO MARBLE TILES 100*100 CM CALCATTA MARBLE TILES 100*100 CM PORCELAIN TILES 60*60 CM WHITE QUARTZ MARBLE TILES 100*100 CM CHEVRON WOOD FLOORING WOOD PLASTIC COMPOSITE TEAK WOOD FLOORING CALCATTA GOLD MARBLE TILES 100*100 CM NEO CEMENT FLOOR

ALIEN'S DRESSING ROOM 24

ANDRE'S DRESSING ROOM

FR

25

ANDRE'S BATHROOM

FR

26

FR

0.73

+4.050 F3 F3

0.73

+4.050

ANDRE'S DRESSING ROOM

Scale

1 : 50

FINISHES Description

F01 F02 F03 F04 F05 F06 F07 F08 F09

+4.050

EG20012-TD

1 : 50

1 : 50

ALIEN'S DRESSING ROOM

Checked by

M.WALY

FIRST FLOOR DETAILED PLAN EG20012-TD-ID-1-FR-0

1

+4.050

Drawn by

M.ABDELSALAM

Checked by

FIRST FLOOR PLAN

Date

18/05/2021

Date

AD

ALIEN'S BATHROOM

+4.050

ALIEN'S BEDROOM FR CALCATTA MARBLE THRESHOLD

CALCATTA MARBLE THRESHOLD

F7

ANDRE'S BEDROOM 27

23

F3 F3

FR

F16

F16

F16

F16

F17

22

F3 F3

FR

F3 F3

F3 F3

F16

31

FIRST FLOOR CORRIDOR F3 F3

FR

0.39

F17

F01

FR

F16

F16

F2

1.00

APRIL 2021

0.05

FR

No.

Description

0

APPROVED ISSUE

Date 22/04/2021

MASTER BATHROOM 30 F25F25

F05

F16

F16

F16

F16

F16

F16

F16

33

F2

F2

For CONSTR

FR

APRIL 2

AD

1.00

F25F25

1.00 1.00

0.71

1.00

FR

F16

F16

F16

F16

F5

F5

F5

F5

F5

F5

F5

F5

No.

Descrip

1

APPROVED ISSU

F25F25 F3

F17

1.00

F17

F17

28

1.00

F17

F17

FR F05

MASTER DRESSING ROOM

0.45

F2

FIRST FLOOR CORRIDOR

F17

F16

TEAK WOOD FLOORING

Revisions

Revisions F3

F07

F2

F2

F17

F17

For CONSTRUCTION F25F25

MASTER BEDROOM 29

F2

F3 F3

+4.050 +4.050

+4.050

F2

TENDER DETAIL VILLA RAMY SALIB

MASTER BEDROOM F3 F3

29

FR

F3 F3

MASTER DRESSING ROOM 28

F5

33 CEMENT FLOOR THRESHOLD

F17

FR

F17

30

FR

F17

F09

32

1.00

MASTER BATHROOM

0.05

F3 F3

F3

F3 F3

+4.050

FIRST FLOOR CORRIDOR

F25

UP

FR

F16

F3 F3

F3 F3

31

0.75

TOILET 1

FR

F3

FR

AD

32

F17

F25

TOILET 2

F3

TOILET 2

FR

F16

F36

33

F16

F16

0.80

F3 F3

F16

0.77

F16

1.00

27

F7

1.00

TOILET 1

F01

0.82

1.00

F7

1.00

F7

1.00

0.82

0.82

1.00

F7

1.00 GREY TIRESTA THRESHOLD

F7

1.00

F16

ANDRE'S BEDROOM F17

F7

1.00

F3 F3

FR F05

1.00

SP

F17

ALIEN'S BEDROOM

TENDER

F5

F05

F7

F7

F17

22

F7

F17

SP

F3

1.00

FR

F08

F16

26 0.71

F17

FR

F05

F17

25

F16

FR

F05

0.76

F3

1.00

F16

F3 F3

1.00

F16

AD

24

F08 SP

ANDRE'S BATHROOM F3 F3

+4.050

FR

F3 F3

23

1.00

F25

ALIEN'S BATHROOM

VILLA RAM

FR

FIRST REF CEILING

FIRST FLOORING PLAN

Project number

Project number

EG20012 Date

18/05/2021

Date

Drawn by

Drawn by

M.ABDELSALAM Checked by

Checked by

M.WALY

EG20012-TD-I

1

FIRST FLOORING PLAN

1

1 : 50

Scale

BIM ARCHITECT PORTFOLIO

EG20012-TD-ID-4-FR-0

FIRST REFLECTED CEILING PLAN

1 : 50

Scale

1 : 50

71


WALL FINISH WALL TYPE W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17

EG20012-TD-ID-8-GN-1

1

1.07

16.09

3.15

FIBER BOARD ACRYLIC GYPSUM BOARD CLAD ALCOBOND CLADDING PORCELAIN TILES 60*6 BLACK MIRROR CLADD CALCATTA MARBLE TIL GREY TIRESTA MARBL NORMAL MIRROR CLAD OFF WHITE PAINT VEIN MARBLE TILES 10 WHITE ONYX MARBLE WOOD CLADDING WOOD RIBS CREMA MARFIL CRUSH CALCATTA MARBLE TIL MOSAIC TILES 5 X5 CM DRYMIX PAINT (JOTAS AS PER APPROVED DR DRYMIX OAINT ARMANI GREY CLADDI WOOD CLADDING

W18 W-09

3.65

36

+7.340

ROOF 36

RF

1

BATHROOM

EG20012-TD-ID-12-GN-1

35

RF

1.20 AL10 2.35

6

RF

EG20012-TD-ID-7-RF-0

5.03

4.20

0.80

2.21

1.20

0.80

2.21

1.20

1.39

2 EG20012-TD-ID-12-GN-1

ROOF

5.15

4.98

2.19

5.94

2.19

1.07

10

ROOF LOBBY 37

7

APRIL 2021

0

Description

Date

APPROVED ISSUE

W13 1

22/04/2021

4 1.00

1.00 AL11 2.20

For CONSTRU

EG20012-TD-ID-7-RF-0

1.10

0.39

2.76

1.25

2.78

No. 0

Descriptio

APPROVED ISSUE

2

W12

3

0.60

APRIL 202 0.12

RF

0.86

BEDROOM

1.71

No.

W12

W09

7.07

RF

W09

34

BEDROOM

1.60 AL14 1.45

0.16

1.18

1.00

1.00 AL11 2.20

For CONSTRUCTION

1.36

0.18

2.95

1.71

RF

RF +7.200

2.62

ROOF LOBBY 37

34

EG20012-TD-ID-7-RF-0

3.51

8

W06

+8.014

1.20

RF

W06

2.49

6.60

35

2.27

1.35

0.13

W09 1.82

1.79

BATHROOM

W06

1.60

9

1.67

1.25

2.62

1.79

3 EG20012-TD-ID-12-GN-1 13.80

4

0.80

0.45 EG20012-TD-ID-8-GN-2

3.60

Revisions

0.27

Revisions

TENDER D 1.15

TENDER DETAIL 8.96

3.60 AL06 2.20

0.27

VILLA RAMY SALIB

VILLA RAMY

5 1

EG20012-TD-ID-7-RF-0

AL17

EG20012-TD-ID-8-GN-0

ROOF FLOOR D PLAN

ROOF FLOOR FURNITURE LAYOUT

Project number Project number

EG20012

Drawn by

Checked by

M.WALY

EG20012-TD-ID

ROOF FLOOR DETAILED PLAN

1

ROOF FLOOR PLAN

Drawn by

M.ABDELSALAM

Checked by

EG20012-TD-ID-1-RF-0 1 : 50

1 : 50

1 : 50Description

Type Mark

0.05

F01 F02 F03 F04 F05 F06 F07 F08 F09

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

0.12

GRAVEL FLOORING

1.00

0.96

1.28

BARDIGLIO MARBLE TILES 100*100 CM CALCATTA MARBLE TILES 100*100 CM PORCELAIN TILES 60*60 CM WHITE QUARTZ MARBLE TILES 100*100 CM CHEVRON WOOD FLOORING WOOD PLASTIC COMPOSITE TEAK WOOD FLOORING CALCATTA GOLD MARBLE TILES 100*100 CM NEO CEMENT FLOOR

W.P.C FLOORING

3.65

1.00

5.62

1.79

1.00

BATHROOM

6.04

1.00

0.98

1.00

1.00

Scale

FLOOR FINISHES

Scale

35

RF

2.62

1.67

5.15

1.00

1.00

C-01

37

ARMANI GREY MARBLE

0.30

1.39

3.81

1.00

1.00

BEDROOM

SP

2.79

ROOF LOBBY

RF

37

1.00

1.00

SP

+8.014

RF +7.200

For CONSTRUCTION

For C

0.9 8

APRIL 2021

2.53

0.8

8

1.00

1.00

RF

0.30

35

1.00

1.00

1.00

0.69

34

C-01

3.51

1.00

0.86

BATHROOM

2.59

3.68

0.60

1.00

0.45

SP

4.00

6.39

1.61

+7.340

2.37

RF C-01

1.00

4.18

1.00

ROOF LOBBY

3.44

1

Date

18/05/2021

Date

34

RF

0.48

1.00

BEDROOM 1.00

1.00

1.00

1.00

1.00

0.70

2.78

No.

Description APPROVED ISSUE

Date

No.

22/04/2021

0

De

APPROV

1.00

7.19

0

1.00

Revisions

0.40

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

VILLA

ROOF FLOORING PLAN

ROOF C

0.27

Project number

EG20012

Drawn by

Drawn by

M.WALY

Checked by

EG20012-TD-ID-4-RF-0

1

1 : 50

Scale

BIM ARCHITECT PORTFOLIO

Date

M.ABDELSALAM

Checked by

ROOF FLOORING PLAN

Project number

18/05/2021

Date

1

TEND

VILLA RAMY SALIB

0.77

0.75 0.96

Revisions

TENDER DETAIL

EG20

ROOF FLOOR PLAN

1 : 50

1 : 50

Scale

72


1

8

2

2.20

WOOD CLADDING BARDIGLIO MARBLE TILES 100*100 CM

BARDIGLIO MARBLE TILES 100*100 CM

0.05 0.05

0.10

GR +0.00

WOOD CLADDING WOODEN DOOR 80*220 CM

BARDIGLIO MARBLE TILES 100*100 CM

BARDIGLIO MARBLE TILES 100*100 CM

SAINT LAUREN SINK UNIT

0.05

GR +0.00

GYPSUM BOARD CEILING

0.05

0.05

GR +0.00

WOOD CLADDING

CLEAR MIRROR CLADDING WITH 2 LED PROFILES

2.30

WOODEN DOOR 80*220 CM

WOOD CLADDING

GR +0.00

GYPSUM BOARD CEILING

1 : 50

2.20

WOODEN DOOR 80*220 CM

1.40

1 : 50

GR +0.00

ID-BF-BASEMENT POWDER AREA-B

7

1 : 50

0.05

GR GYPSUM BOARD +0.00 CEILING

ID-BF-BASEMENT POWDER AREA-A

6

2.30

1.15

BARDIGLIO MARBLE TILES 100*100 CM

2.30

LS +0.00

2.30

0.05

LS +0.00

ID-BF-BASEMENT TOILET-B 1 : 50

0.90

1

GYPSUM BOARD CEILING

RECEPTION -BF- 3D

2

0.10

6

BASEMENT FLOOR - RECEPTION- Callout

ID-BF-BASEMENT TOILET-A 1 : 50

0.05

1

GR +0.00

0.45

BARDIGLIO MARBLE TILES 100*100 CM

0.54 0.17

1.15

ALCOBOND CLADDING

BARDIGLIO MARBLE TILES 100*100 CM

WOOD CLADDING

0.45

0.70

BARDIGLIO MARBLE TILES 100*100 CM

GR +0.00

GYPSUM BOARD CEILING

GR +0.00

WOOD CLADDING

WOODEN DOOR 80*220 CM

SAINT LAUREN SINK UNIT

GR +0.00

GYPSUM BOARD CEILING

0.51 0.30 0.50

WOOD CLADDING

0.30

2.30

0.30

SAINT LAUREN SINK

GR +0.00

2.20

CLEAR MIRROR CLADDING

GR +0.00

0.54 0.17

GYPSUM BOARD CEILING

WOOD CLADDING

1.39

BF

GR +0.00

2.30

GR +0.00

LED PROFILE

0.21

01

0.05

GYPSUM BOARD CEILING

0.05

4

6

7

BF

FLOOR-GUEST TOILET -Callout 10 1BASEMENT : 25

1 : 25

3

RECEPTION

BF

BASEMENT FLOOR -POWDER AREA - Callout

5

EG20012-TD-ID-7-BF-0

08

0.10

2 5

EG20012-TD-ID-7-BF-1

GUEST TOILET

POWDER AREA 12

0.51

9

EG20012-TD-ID-7-BF-1

0.30

4 3

For CONSTRUCTION

For CONSTRUC

APRIL 2021

1.19

CLEAR MIRROR CLADDING

0.10

1.19 0.10

2.22

GYPSUM BOARD CLADDING

GYPSUM BOARD CLADDING WITH GROOVES WOODEN DOUBLE DOOR 200*220 CM

GROOVE 2 CM WIDTH

CLEAR MIRROR CLADDING

BARDIGLIUO MARBLE TILES 100*100 CM

BAR WITH SAINT LAUREN MARBLE BF FINISH AS THE RELEVANT DETAIL +-2.35

3 EG20012-TD-ID-12-GN-3

BF +-2.35

BLACK WOOD EN SHELVES WITH INDIRECT LIGHT

No.

Description

0

APPROVED ISSUE

5

BF +-2.35

EG20012-TD-ID-12-GN-0

LS +0.00

BARDIGLIUO MARBLE TILES 100*100 CM BF +-2.35

BF +-2.35

Project number

0.10

CLEAR MIRROR CLADDING

4

1 : 50

Descriptio APPROVED ISSUE

Revisions

TENDER DE

VILLA RAMY

BASEMENT IN ELEVATIO

EG20012

Project number BAR WITH SAINT LAUREN MARBLE FINISH

18/05/2021

Date

Date

BF +-2.35

Drawn by

M.ABDELSALAM

Checked by

2

No. 0

BASEMENT INTERNAL ELEVATIONS

LS +0.00

GROOVE 2 CM WIDTH

ID-BF-RECEPTION-A

1 : 50

1.19

GYPSUM BOARD CLADDING

OFF WHITE PAINT FINISH

1 : 50

22/04/2021

VILLA RAMY SALIB

1.00

INDIRECT LIGHT ALUM. WINDOW BARDIGLIUO MARBLE TILES 100*100 CM

GYPSUM BOARD CEILING

WOODEN UNITS

2.30

BLACK WOODEN SHELVES

1 : 50

ID-BF-BASEMENT POWDER AREA-D

9

12

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

GYPSUM BOARD CEILING

ID-BF-BASEMENT POWDER AREA-C

8

0.05

0.05 0.35 0.40 0.30 0.40 0.30 0.46

GYPSUM BOARD CEILING

1 : 50

ID-BF-BASEMENT TOILET-D

Revisions

ID-BF-RECEPTION-D

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

LS +0.00

0.05

LS +0.00

4

ALUM. WINDOW BF +-2.35

1 : 50

12 EG20012-TD-ID-12-GN-0

Date

ID-BF-BASEMENT TOILET-C

TENDER DETAIL

0.05

ID-BF-RECEPTION-B 1 : 50

3

OFF WHITE PAINT FINISH

INDIRECT LIGHT

3

APRIL 2021

LS +0.00 0.02 0.02 0.02 0.02 0.35 0.40 0.30 0.40 0.30 0.46

BF +-2.35

1.00

BARDIGLIUO MARBLE TILES 100*100 CM

2.25

INDIRECT LIGHT

0.05

BLACK WOODEN SHELVES WITH INDIRECT LIGHT

LS +0.00

GYPSUM BOARD CEILING

OFF WHITE PAINT FINISH

2.30

LS +0.00

1.00

LS +0.00 0.35 0.40 0.30 0.40 0.30 0.46

GYPSUM BOARD CEILING

ID-BF-RECEPTION-C

EG20012-TD-ID-7-BF-0

1 : 50

Drawn by

M.WALY

14 .........

13 POWDER AREA 3D

11 BASEMENT TOILET 3D

12 BASEMENT TOILET 3D Copy 1

Checked by

EG20012-TD-ID-

1 : 50

Scale

Scale

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

0.15

FIRE PLACE AT 30 CM HEIGHT

GR. +0.70

WHITE QUARTZ SKIRTING 15 CM

ID-GR-GUEST BATHROOM-C

5

ID-GR-GUEST BATHRROM-D 1 : 50

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL FR +3.95

0.81

ID-GR-OFFICE CALLOUT-D

GR. +0.70 WHITE QUARTZ SKIRTING 15 CM

6

Revisions

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

BIM ARCHITECT PORTFOLIO

Scale

INDIRECT LIGHT

0.40

0.05

0.25 2.20 0.40 0.05 2.45

VILLA RAMY SALIB

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

0.40 0.80

2.75

0.02 0.80 0.02

0.05 0.81

0.40

0.00

0.05 1.75

2.75

0.10

GR. +0.70

BLACK MIRROR CLADDING

GROUND INTERNAL ELEVATIONS

WOOD CLADDING GYPSUM BOARD CLADDING FIRE PLACE AT 30 CM HEIGHT

GR. +0.70

WHITE QUARTZ MARBLE TILES 100*100 CM

Project number

EG20012 18/05/2021

Date Drawn by

M.ABDELSALAM M.WALY

Checked by

M.WALY

1 : 50

7

GROUND RECEPTION 02 3D

Date 22/04/2021

FR +3.95

0.89

BAR WITH WHITE QUARTZ FINISH

EG20012-TD-ID-7-GR-0

14 OFFICE 3D Copy 1

Description APPROVED ISSUE

TENDER DETAIL 12

WHITE ONYX OPEN BOOK MARBLE CLADDING

M.ABDELSALAM

Checked by

No. 0

GR. +0.70

EG20012-TD-ID-12-GN-0

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

18/05/2021

Drawn by

WHITE QUARTZ MARBLE TILES 100*100 CM

1 : 50

GYPSUM BOARD CEILING

EG20012

APRIL 2021

Elevation 1 - c

GYPSUM BOARD CLADDING

Date

For CONSTRUCTION

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

Revisions

4

FR +3.95

Project number

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

GROUND RECEPTION 3D

GROUND INTERNAL ELEVATIONS

13 OFFICE 3D

0.40 0.81

0.05

0.29 0.40

0.40

GROOVE 1 CM

22/04/2021

0.02 0.80 0.02

Date

2.00

Description APPROVED ISSUE

WOOD CLADDING

0.80

0

2.29

OFF WHITE PAINT FINISH

0.15 0.01

GLASS GR. HANDRAIL +0.70

1 : 50

No.

1.00

2.35

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

FR +3.95

0.15

1.18 0.02 1.25

WHITE QUARTZ MARBLE TILES 100*100 CM

Elevation 1 - b

GYPSUM BOARD CEILING

APRIL 2021

VILLA RAMY SALIB

12 GUEST TOILET 3D Copy 1

0.10

GR +0.00

1 : 50

0.05

0.40

For CONSTRUCTION

TENDER DETAIL

11 GUEST TOILET 3D

1.45

0.40

GR. WHITE QUARTZ MARBLE +0.70 TILES 100*100 CM

GROOVE 1 CM

3

WOOD CLADDING

GR. GR. +0.70 +0.70

9

+0.500

FR +3.95

0.05

OFF WHITE PAINT FINISH

2.45

+0.800

OFF WHITE PAINT FINISH

FIXED GLASS PANEL 120*260 CM

ID-GR-OFFICE CALLOUT-B 1 : 50

FR +3.95

GYPSUM BOARD CEILING

1.18

0.40 0.05

0.15 0.01

2.45

2.45

WOOD CLADDING

GR +0.00

7

0.40

0.40

GYPSUM BOARD CEILING

GR. +0.70 WHITE QUARTZ SKIRTING 15 CM

WHITE WOOD GR. +0.70 UNIT

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

FR +3.95

0.400.17

2.29

0.05

12 EG20012-TD-ID-12-GN-0

FR +3.95

0.05

0.40

0.40 0.40

0.00 0.02 1.00

1 : 50

WOODEN DOOR 90*220 CM

GLASS HANDRAIL

2.45

1.00

ID-GR-OFFICE CALLOUT-C 1 : 50

GROUND FLOOR AREA - Callout

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

1 : 100

0.30

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

WHITE QUARTZ MARBLE TILES 100*100 CM GR. +0.70 +0.70

0.02

0.02 0.30

WHITE WOOD UNIT

0.020.45

0.40 0.02 0.40 0.02

1.00

CLEAR MIRROR CLADDING

EG20012-TD-ID-8-GN-0

1

WOOD CLADDING

0.30

WHITE QUARTZ MARBLE TILES 100*100 CM GR. +0.70

8

CLEAR MIRROR CLADDING

0.30

2.45 0.40 0.40

0.02 0.40

WOODEN UNIT

WOODEN DOOR 90*220 CM

GR. +0.70

OFF WHITE PAINT

FR +3.95

0.02

SP

0.60 0.20

0.33

WHITE QUARTZ MARBLE TILES 100*100 CM GR. GR. +0.70 +0.70

BLACK WOOD SHELVES

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

OFF WHITE PAINT FINISH FIXED WINDOW 120 *250 CM

CLEAR MIRROR

CALCATTA SINK

1 : 50

1.65

1.52

GALSS PARTITION

1.95

INDIRECT LIGHT

0.60

2.35 0.20 0.60

0.04 0.20

2.20

4

SP

0.30 0.26

WHITE QUARTZ MARBLE TILES 100*100 CM GR. +0.70

FIXED WINDOW 120 *250 CM

0.50

.00

0.10

ø1

.00

CLEAR MIRROR CALCATTA SINK

GYPSUM BOARD CEILING

WOOD VEIN MARBLE TILES 100*100 CM

1 FR +3.95

GYPSUM BOARD CEILING BLACK WOOD SHELVES

ID-GR-OFFICE CALLOUT-A 1 : 50

FR +3.95 GYPSUM BOARD CEILING

1.65

ø1

1.65

WOOD VEIN MARBLE TILES 100*100 CM

0.05

0.25

GYPSUM BOARD CEILING

6

0.40

FR +3.95

0.40

FR +3.95

ID-GR-GUEST BATHROOM-B 1 : 50

0.25

3

0.05

ID-GR-GUEST BATHROOM-A 1 : 50

WHITE QUARTZ MARBLE TILES 100*100 CM

2.45

GR. +0.70

2.20

SP

0.05

2.20

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

0.73

WHITE QUARTZ MARBLE TILES 100*100 CM GR. GR. +0.70 +0.70

GR. +0.70

2

12 EG20012-TD-ID-12-GN-0

0.40 1.52

0.05

0.25

GRROVE 1 CM

+0.800 SP

OFF WHITE PAINT FINISH

0.20

2.20

0.60 0.20

GROOVE 2 CM WHITE QUARTZ MARBLE TILES 100*100 CM GR. +0.70

GYPSUM BOARD CEILING

WOODEN DOOR 90*220 CM

2.45

FIXED WINDOW 120*250 CM

FR +3.95

0.02

0.25

1.65

WOOD VEIN MARBLE TILES 100*100 CM

EG20012-TD-ID-12-GN-0

FR +3.95

0.30

GYPSUM BOARD CEILING

0.05

GYPSUM BOARD CEILING

FR +3.95

Elevation 1 - a

2

0.30

FR +3.95

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL FR +3.95

12

0.40

FR +3.95

0.40

FR +3.95

WOOD VEIN MARBLE TILES 100*100 CM

FLOOR -OFFICE- Callout 10 1GROUND : 50 SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

BAR WITH PANDA GR. MARBLE FINISH AS THE +0.70 RELEVANT DETAIL WHITE QUARTZ MARBLE TILES 100*100 CM

GROOVE 1 CM

0.01

GROUND FLOOR-GUEST TOILET- Callout 1 : 50

0.05

1

OFF WHITE PAINT FINISH

BLACK MIRROR CLADDING

0.90

4

4

1.10

GYPSUM BOARD CLADDING

1.18

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

1.10

EG20012-TD-ID-8-GN-2

19 GR.

0.40

BLACK MIRROR CLADDING

3

0.29 0.40

EG20012-TD-ID-7-GR-1

OFFICE

0.02 0.80 0.02

5

FR +3.95

2.46

2

6

7

FR +3.95

GYPSUM BOARD CEILING

0.80

EG20012-TD-ID-7-GR-0

17 GR.

0.81

8

2

3

KITCHEN

16 GR.

0.02 0.80 0.02

EG20012-TD-ID-7-GR-0

DINNING ROOM

15 GR.

0.80

4

LIVING ROOM

2.29

9

5

2.45

18 GR.

0.01

GUEST TOILET

5

EG20012-TD-ID-7-GR-1

Elevation 1 - d 1 : 50

Scale

73

As indicated

A


6 SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

EG20012-TD-ID-7-FR-0

0.55

EG20012-TD-ID-7-FR-1

9

EG20012-TD-ID-7-FR-1

3

4 6

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

2.35

2.35

2.35

10

7

EG20012-TD-ID-7-FR-1

2 5

1.33 0.02

FR +3.95

8

OFF WHITE PAINT FINISH

CHEVRON WOODEN FLOORING

FR +3.95

3

PUSH TO OPEN WOODEN PANELS

OFF WHITE PAINT FINISH

1.00

CHEVRON WOODEN FLOORING

4

GYPSUM BOARD CEILING

0.05

0.15

5

2.20

PUSH TO OPEN WOODEN PANELS

-

-

-

RF +7.10

0.05

GYPSUM BOARD CEILING

WOODEN SLIDING DOOR 180*220 CM

2

RF +7.10

-

0.40

RF +7.10

0.40

RF +7.10

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

12 EG20012-TD-ID-12-GN-0

-

GROOVE 1 CM

FR +3.95

FR +3.95

32

MASTER BATHROOM 30

8

-

-

TOILET 2

-

FR

EG20012-TD-ID-7-FR-1

9

7

TOILET 1 31

FR

FR

0.59

ID-FR-MASTER BEDROOM-A

2

3

1 : 50

ID-FR-MASTER BEDROOM-B 1 : 50

FIRST FLOOR PLAN - MASTER BATHROOM 10 Callout 1 1 : 25 MASTER BEDROOM

VILLA RAMY SALIB

0.05

0.35 1.00

For CONSTRUCTION

FR +3.95

1.00

0.05

FR +3.95

9

1 : 50

0.40 1.00

NEOCEMENT FLOORING

1 : 50

0

TENDER DETAIL

Elevation 2 - c

VILLA RAMY SALIB

1 : 50

FIRST INTERNAL ELEVATIONS

Project number

EG20012

Drawn by

Drawn by

M.ABDELSALAM

MASTER BEDROOM 3D

MASTER BEDROOM 3D Copy 1

7

11 MASTER BATHROOM 3D

1 : 50

Scale

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

M.WALY

EG20012-TD-ID-7-FR-1

EG20012-TD-ID-7-FR-0

6

M.ABDELSALAM

Checked by

M.WALY

Checked by

EG20012 18/05/2021

Date

18/05/2021

Date

12 MASTER BATHROOM 3D Copy 1

13 MASTER BATHROOM TOILET 3D

14 MASTER BATHROOM TOILET 3D 01

As indicated

Scale

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

RF +7.10

2

0.05 0.15

9 OFF WHITE PAINT FINISH

12

EG20012-TD-ID-7-FR-3

2

FR +3.95

26

BLACK WOOD UNIT

EG20012-TD-ID-7-FR-3

0.60

10

11

ALIEN'S BATHROOM

ANDRE'S BATHROOM 3

FR +3.95

ID-FR-ANDRE'S BEDROOM-A

4

WOOD CLADDING

CHEVRON WOODEN FLOORING

23

FR

FR

ID-FR-ANDRE'S BEDROOM-B

3

1 : 50

5

1.75 2.20

0.47

0.20

0.40 0.18

INDIRECT LIGHT LACQUERED WOOD UNIT FR +3.95

WOODEN DOOR 90*220 CM

LACQUERED WOOD UNIT

0.60

FR +3.95

WOODEN DOOR 90*220 CM

0.60

0.60

CHEVRON WOODEN FLOORING

WOODEN RIBS 3*3CM

0.40

0.05

GYPSUM BOARD CEILING

1.75

0.02 0.02 0.02 0.02 0.02

0.44

0.30 0.30 0.30 0.30

CALCATTA MARBLE CLADDING

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

RF +7.10 0.40

RF +7.10 0.40

RF +7.10 GYPSUM BOARD CEILING

1 : 50

FIRST FLOOR PLAN -ANDRE'S BEDROOM 1 BATHROOM - CALLOUT 1 : 50

FIXED WINDOW 120*250 CM

FIRST FLOOR PLAN - ALIEN'S BEDROOM 8 BATHROOMCALLOUT 1 : 50

4 5

Revisions

4

1 : 50

CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95

FR +3.95

ID-FR-ANDRE'S BEDROOM- BATHROOM-C

9

5

ID-FR-BEDROOM2 BATHROOM-A

0.40

0.35

2.35

GLASS PARTITION

1.00

CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95

FR +3.95

SP

0.54 0.17

1.00

FIXED WINDOW 120*250 CM

0.50

2.35

1.00

1.00

1.15

0.05

0.35

0.40

0.00

0.05

2.35

2.35

1.13 0.52 0.20 0.50

RF +7.10

SP

FR +3.95

BATHROOM-B 10 1ID-FR-BEDROOM2 : 50

1 : 50

For CONSTRUCTION

ID-FR-ANDRE'S BEDROOM-BATHROOM-D 1 : 50

FR +3.95

WOODEN SHELF CALCATTA MARBLE TILES 100*100 CM

FR +3.95

BATHROOM-C 11 1ID-FR-BEDROOM2 : 50

CALCATTA GOLD MARBLE CLADDING

WOODEN DRAWERS

APRIL 2021

0.05 0.000.40

0.50

0.35

0.40

ROUND MIRROR WITH INDIRECT LIGHT

FIXED WINDOW 120*250 CM

No.

Description

0

APPROVED ISSUE

Date 22/04/2021

2.35

2.35

WOODEN SHELF FR +3.95

WOODEN DRAWERS

RF +7.10

1.00

0.35

ROUND MIRROR WITH INDIRECT LIGHT CALCATTA MARBLE CLADDING

1.00

SLIDING WOODEN DOOR 80*220 CM

0.05 0.15

0.40

GLASS PARTITION

RF +7.10 GYPSUM BOARD CEILING

GYPSUM BOARD CEILING

0.05

RF +7.10

2.35

RF +7.10

0.05

0.40

RF +7.10

WOODEN SHELF CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95

1.00

CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95

CALCATTA GOLD MARBLE CLADDING

CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95

ALCOBOND CLADDING

CALCATTA GOLD MARBLE CLADDING

FIXED WINDOW 120*250 CM

WOODEN SHELF

1.00

22/04/2021

GLASS PARTITION ALCOBOND CLADDING

CALCATTA GOLD MARBLE CLADDING

WOODEN DRAWERS

FR +3.95

RF +7.10 GYPSUM BOARD CEILING

EG20012-TD-ID-12-GN-0

RF +7.10

GYPSUM BOARD CEILING

RF +7.10

ROUND MIRROR WITH INDIRECT LIGHT

12

0.25 0.25

APPROVED ISSUE

CALCATTA GOLD MARBLE CLADDING

Date

2.35

0

Description

2.20

No.

0.15

APRIL 2021

ALCOBOND CLADDING

1 : 50

RF +7.10

0.00

RF +7.10

For CONSTRUCTION

CALCATTA GOLD MARBLE CLADDING

ID-FR-ANDRE'S BEDROOM- BATHROOM-B SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

RF +7.10 GYPSUM BOARD CEILING

2.20

3

0.05 0.40

0.40 0.05 1.56

2.20

2.20

0.20

0.10

1 : 50

SP

0.25 0.10 0.250.20

0.40 1.20 0.05

0.40 0.05 2.35

0.15 0.40

FR +3.95

1.56

ID-FR-ANDRE'S BEDROOM-D

WOODEN SHELF

CALCATTA GOLD MARBLE TILES 100*100 CM FR +3.95

1 : 50

0.05 0.40

5

CALCATTA GOLD MARBLE CLADDING

ID-FR-ANDRE'S BEDROOM- BATHROOM -A

2.35

ID-FR-ANDRE'S BEDROOM-C 1 : 50

WOODEN SLIDING DOOR 80*220 CM CALCATTA GOLD MARBLE CLADDING ALCOBOND CLADDING

ALCOBOND STRIP CLADDING FLUSH WITH MARBLE

0.10 0.20

2

4

0.25

FR +3.95

FR +3.95

RF +7.10

GYPSUM BOARD CEILING

MIRROR

0.25

CHEVRON WOODEN FLOORING FR +3.95

CALCATTA GOLD MARBLE TILES 100*100 CM

RF +7.10

LED PROFILE

0.36

GALSS PARTITION FIXED WINDOW 120*250 CM

0.05 0.40

FR +3.95

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

WOODEN SLIDING DOOR 80*220 CM

LACQUERED WOOD UNIT

1.13

FR +3.95

GYPSUM BOARD CEILING

0.52 0.20

FIXED WINDOW 120*250 CM

0.60

CHEVRON WOODEN FLOORING

FIXED WINDOW 120*250 CM

RF +7.10

0.50

2.35

BLACK WOOD UNIT

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

RF +7.10

RF +7.10

0.30 0.30 0.30 0.30

OFF WHITE PAINT FINISH

1.75

INDIRECT LIGHT

RF +7.10

0.60

WOOD CLADDING

FIRST FLOOR PLAN - ANDRE'S 1 BEDROOM-CALLOUT 1 : 50

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

GYPSUM BOARD CEILING

0.05

0.05

GYPSUM BOARD CEILING

2.35

FR

RF +7.10

0.40

27

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

RF +7.10 0.40

ANDRE'S BEDROOM

0.40

2

0.05

EG20012-TD-ID-7-FR-2

2.35

3

FR +3.95

Revisions

BATHROOM-D 12 1ID-FR-BEDROOM2 : 50

TENDER DETAIL

TENDER DETAIL

VILLA RAMY SALIB

VILLA RAMY SALIB FIRST INTERNAL ELEVATIONS

FIRST INTERNAL ELEVATIONS

Project number

Project number

6

ANDRE'S BEDROOM

BIM ARCHITECT PORTFOLIO

7

ANDRE'S BEDROOM Copy 1

M.WALY

EG20012-TD-ID-7-FR-2

M.WALY

EG20012-TD-ID-7-FR-3

6

ANDRE'S BATHROOM 3D

7

ANDRE'S BATHROOM 3D Copy 1

13 ALIEN'S BATHROOM 3D

14 ALIEN'S BATHROOM 3D 01 Scale

1 : 50

M.ABDELSALAM

Checked by

M.ABDELSALAM

Checked by

Scale

Drawn by

18/05/2021

Drawn by

EG20012 18/05/2021

Date

EG20012

Date

Date 22/04/2021

Revisions FR +3.95

SP

FIRST INTERNAL ELEVATIONS

Project number

Description APPROVED ISSUE

1.00

CALCATTA MARBLE TILES 100*100 CM

FR +3.95

No.

0.35

GYPSUM BOARD CEILING

Elevation 2 - d

8

RF +7.10

0.05

0.40

NEOCEMENT FLOORING

NEOCEMENT FLOORING

ID-FR-MASTER BATHROOM-D

5

0.54 0.17

1.55

WOODEN DRAWRS

0.80

CALCATTA MARBLE TILES 100*100 CM

CALCATTA MARBLE CLADDING

FR +3.95

1.00

Elevation 2 - b 1 : 50

0.35

0.35

GYPSUM BOARD CEILING

0.61

0.40

0.05

0.40 0.35

1.15

1.00 0.54 0.17

1.00

7

FR +3.95

APRIL 2021

0.40

FR +3.95

1 : 50

Elevation 2 - a 1 : 50

0.05

TEAK WOOD FLOORING

ID-FR-MASTER BATHROOM-C

SP FR +3.95

RF +7.10

TENDER DETAIL 4

CALCATTA MARBLE TILES 100*100 CM NEOCEMENT FLOORING FR +3.95

1.00

TEAK WOOD FLOORING

0.50

0.15

2.35

0.40

0.40 0.05

0.05 2.20

0.15 2.20

2.35

1.00

CLEAR MIRROR FLUSH WITH MARBLE

FR +3.95

GYPSUM BOARD CEILING

RF +7.10

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

WOODEN DRAWERS

FR +3.95

NEOCEMENT FLOORING FR +3.95

0.50

0.35

NEOCEMENT FLOORING

Revisions

TEAK WOOD FLOORING

6

RF +7.10

GYPSUM BOARD CEILING

0.11

CALCATTA MARBLE TILES 100*100 CM

0.35

0.15 2.20

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

FR +3.95

1 : 50

1.55

Date 22/04/2021

SP

RF +7.10

CALCATTA MARBLE TILES 100*100 CM

ID-FR-MASTER BATHROOM-B

3

RF +7.10

GYPSUM BOARD CEILING

WOODEN SLIDING DOOR 180*220 CM

2.20

Description APPROVED ISSUE

NEOCEMENT FLOORING

0.15

No.

FR +3.95

1 : 50

RF +7.10

APRIL 2021

0

FR +3.95

ID-FR-MASTER BATHROOM-A

2

For CONSTRUCTION

CALCATTA MARBLE TILES 100*100 CM

0.87

SP

RF +7.10

GYPSUM BOARD CEILING

0.20 0.50 0.11

ID-FR-MASTER BEDROOM-D

0.87

1.00

0.05

NEOCEMENT FLOORING FR +3.95

1 : 50

0.40 0.35

CALCATTA MARBLE TILES 100*100 CM

0.40

2.40

1.00

0.15

PUSH TO OPEN WOODEN PANELS

FR GROOVE 1 CM +3.95

RF +7.10

WOODEN SLIDING DOOR 80*220 CM

0.05

5

1 : 50

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

1.55

ID-FR-MASTER BEDROOM-C

4

WOODEN SLIDING DOOR 180*220 CM

RF +7.10

GYPSUM BOARD CEILING

0.80

FR +3.95

RF +7.10

1.00

FR +3.95

GYPSUM BOARD CEILING

CHEVRON WOODEN FLOORING

GLASS HANDRAIL

FR +3.95

OFF WHITE PAINT FINISH

1.55

CHEVRON WOODEN FLOORING

2.35

2.35

2.20

FIXED WINDOW 120*250 CM

2.20

WOODEN SLIDING DOOR 180*220 CM

1 : 50

RF +7.10

0.40

FIXED WINDOW 120*250 CM

1.50

2.35

2.35

FABRIC CLADDING

0.05

GYPSUM BOARD CEILING

CALCATTA MARBLE CLADDING

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL RF +7.10

0.90

0.40

GYPSUM BOARD CEILING

RF +7.10

0.00

FIRST FLOOR PLAN - MASTER BEDROOM 1 : 50

0.05 0.85

1

RF +7.10

0.20

12 EG20012-TD-ID-12-GN-0 RF +7.10

FIRST FLOOR PLAN - MASTER BATHROOM

1

FR

0.15

29

74

1 : 50


12 EG20012-TD-ID-12-GN-0

2

2

3

RF +7.10

FIRST FLOOR CORRIDOR- Callout

BARDIGLIO MARBLE TILES 100*100 CM FR +3.95

2

1 : 50

0.60 0.30 0.60 0.60

0.30 0.60

0.30 0.40 0.70

0.30 0.60

0.40

0.80 0.60

0.60

0.60

0.30 0.30 0.40

0.25

1.88 0.60

0.29

0.30 0.60

0.60

0.30 0.30 0.40

0.30

0.30 0.60 0.60

FR +3.95

BARDIGLIO MARBLE TILES 100*100 CM

FIRST FLOOR PLAN - ALIEN'S BEDROOM 1 CALLOUT 1 : 50

FR +3.95

4

ID-FR-ALIEN'S BEDROOM-B 1 : 50 12

12

EG20012-TD-ID-12-GN-0

EG20012-TD-ID-12-GN-0

2.50

0.40 0.40

0.40 0.40

FIXED WINDOW 120*250 CM

0.40 0.40

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

0.40

0.50 2.20

2.70

2.20

FIBER BOARD ACRYLIC CLADDING

FIXED WINDOW 120*250 CM

CHEVRON WOODEN FLOORING FR +3.95

OFF WHITE PAINT FINISH

GROOVE 1 CM FR +3.95

CORRIDOR - C

1

1 : 50

0.08

GROOVE 2CM

WOODEN DOOR 90*220 CM

FR +3.95

0.02

0.50

WOOD CLADDING

5

GYPSUM BOARD CEILING

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

WOODEN RIBS CEILING 5*5 CM

WOODEN DOOR 90*220 CM

0.70

RF +7.10

GYPSUM BOARD CEILING

FR

0.70

RF +7.10

OFF WHITE PAINT FINISH

0.80

0.30 0.40

RF +7.10

0.30 0.40

22

3

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

ALIEN'S BEDROOM

WOODEN RIBS CEILING 5*5 CM

0.60

0.40

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

RF +7.10

RF +7.10

0.60

0.30 0.30 0.40 0.80

0.30

0.30 0.25

0.05

ID-FR-ALIEN'S BEDROOM-A 1 : 50

3

0.40

CHEVRON WOODEN FLOORING FR +3.95

FR +3.95

ID-FR-ALIEN'S BEDROOM-C

5

1 : 50

0.30 0.30 0.30 0.30 0.37

EG20012-TD-ID-7-FR-5

0.70 0.10

4

2

RF +7.10

0.60

FR +3.95

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

RF +7.10

0.25

EG20012-TD-ID-7-FR-4

CHEVRON WOODEN FLOORING

FR +3.95

0.20

5

1 4

WOODEN CABINETS

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

1 : 50

2.50

1 : 50

CHEVRON WOODEN FLOORING FR +3.95

GYPSUM BOARD CEILING

WOODEN UNIT

WOODEN DOOR 90*220 CM

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

RF +7.10

0.60

CORRIDOR-B

4

12 EG20012-TD-ID-12-GN-0

RF +7.10

WOODEN UNIT

0.60

EG20012-TD-ID-7-FR-3

CORRIDOR-A

3

2.20

2.20

WOODEN SHELVES FLUSH FULL MOON MIRROR

00 1. 2.20

1.80 0.02

BARDIGLIO MARBLE TILES 100*100 CM FR +3.95

1.70

0.38

0.50

FR +3.95

0.30 0.30 0.30 0.30 0.37

FR +3.95

FIBER BOARD ACRYLIC CLADDING

0.50

BARDIGLIO MARBLE TILES 100*100 CM FR +3.95

FR

2.20

WOODEN DOOR 90*220 CM

RF +7.10

GYPSUM BOARD CEILING

OFF WHITE PAINT FINISH

2.70

2.20

FIRST FLOOR CORRIDOR

RF +7.10

0.02

WOOD CLADDING

OFF WHITE PAINT FINISH

SHADOW GAP WITH INDIRECT LIGHT AS THE RELEVANT DETAIL

RF +7.10

WOOD CLADDING

WOODEN DOOR 90*220 CM

33

RF +7.10 WOODEN RIBS CEILING 5*5 CM

0.02

0.50

WOODEN RIBS CEILING 5*5 CM

0.70 0.10

RF +7.10

0.08

RF +7.10

GROOVE 2 CM INDIRECT LIGHT FLUSH FULL MOON MIRROR WOODEN SHELVES

FR +3.95

ID-FR-ALIEN'S BEDROOM-D 1 : 50

CORRIDOR - D 1 : 50

For CONSTRUCTION For CONSTRUCTION

APRIL 2021 APRIL 2021

No. 0

Description APPROVED ISSUE

Date

No.

22/04/2021 0

Revisions

TENDER DETAIL

VILLA RAMY SALIB

VILLA RAMY SALIB

FIRST INTERNAL ELEVATIONS

Project number

EG20012

Drawn by

7

8

Drawn by

ALIEN'S BEDROOM 3D

6

7

ALIEN'S BEDROOM 3D Copy 1

8

ALIEN'S BEDROOM 3D Copy 1 Copy 1

1.25

1

19

2

18

W09

3

17

4

16

5

15

6

14

7

W02

3.77

59

42

58

43

57

44

56

45

55

46

11

10

1.30

+6.098

9 W09

1.1 9

53

W09 1.1

H = 1.20

3

4

5

6

7

8

9 10 11 12 13 14 15 16 17 18 19 20 0.99

+7.180

W02 GLASS RF +7.10

RF +7.10

GREY TRIESTA AS PER APPROVED SAMPLE

1

STAIR 02-BASEMENT FLOOR DETAILED PLAN 1 : 25

WHITE PAINT

52

51

50

EG20012-TD-ID-8-GN-1

1

WHITE PAINT

+4.050

1

2

3

4

5

6

7

8

9 10 11 12 13 14 15 16 17 18 19 20

+0.800

W09

1

4 EG20012-TD-ID-11-GN-0

2

1 : 25

4

5

5

6

6

7

7

8

8

9

9

10

10 -0.925

1.01

GLASS

+5.310

49 W09

STAIR 01-BASEMENT FLOOR DETAILED PLAN

3

4

1.04

5

4 EG20012-TD-ID-11-GN-0

2

3

-0.925

1.06

12

2

2

1.45

1.31

1.28

13

1

W07

47

1.29

-1.030

-0.268

-2.350

48

1.45

W09

41

54

8 1.29

60

1.33

2.93

W09

W07

3 EG20012-TD-ID-11-GN-1

1

1.15

20

W02

1.15

+4.050

1

1 : 50

Scale

1.14

W02

M.WALY

EG20012-TD-ID-7-FR-5

5 EG20012-TD-ID-11-GN-1

-2.350

1.25

M.ABDELSALAM

Checked by

1 : 50

Scale

EG20012 18/05/2021

Date

M.WALY

EG20012-TD-ID-7-FR-4

3D View 2

Project number

M.ABDELSALAM

Checked by

6

FIRST INTERNAL ELEVATIONS

18/05/2021

Date

CORRIDOR 3D Copy 1

Date 22/04/2021

Revisions

TENDER DETAIL

CORRIDOR 3D

Description APPROVED ISSUE

FR +3.95

FR +3.95

GLASS

STAIR 01-FIRST FLOOR DETAILED PLAN

GREY TRIESTA AS PER APPROVED SAMPLE

1 : 25

WHITE PAINT

2

STAIR 02- GROUND FLOOR DETAILED PLAN 1 : 25

11

11

12

12

13

13

14

14

15

15

16

16

17

17

18

18

19

19

20

20 +1.200

GLASS

For CONSTRUCTION

For CONSTRUCTION

1.25

APRIL 2021

+0.800

APRIL 2021

W02

W09

21

39

22

38

23

37

24

36

25

35

26

0 GR. +0.70

W02

Description APPROVED ISSUE

1 : 25

4

STAIR 03-GROUND FLOOR DETAILED PLAN 1 : 25

No.

Date

0

Description APPROVED ISSUE

Date 22/04/2021

22/04/2021

Revisions GR LS +0.00

GREY TRIESTA AS PER APPROVED SAMPLE

WHITE PAINT

LS GR +0.00

Revisions

GR. +0.70

GR. +0.70

GR LS +0.00

GR LS +0.00

TENDER DETAIL

TENDER DETAIL VILLA RAMY SALIB

GLASS

VILLA RAMY SALIB

1.28

1.31

1.45

+2.100

+2.913

33

32

31

30

STAIR DETAILS

STAIR DETAILS

29

GREY TRIESTA MARBLE STAIR

GREY TRIESTA MARBLE STAIR

WHITE PAINT

W09

-2.250

W09

Project number

Project number

Drawn by 4 EG20012-TD-ID-11-GN-0

STAIR 01-GROUND FLOOR DETAILED PLAN 1 : 25

4

M.WALY

EG20012 18/05/2021

Date Drawn by

M.ABDELSALAM

Checked by

M.ABDELSALAM

Checked by

BF +-2.35

M.WALY

EG20012-TD-ID-11-GN-1

EG20012-TD-ID-11-GN-0

STAIR SECTION 01

3

1 : 25

Scale

BIM ARCHITECT PORTFOLIO

EG20012 18/05/2021

Date

4.46

3

STAIR 03- BASEMENT FLOOR DETAILED PLAN

GR. +0.70

GLASS

28 1.29

No.

+0.800

W07

27

34

6

WHITE PAINT

3.84

3.77

W09

40

1 : 25

STAIR SECTION 02 1 : 25

5

STAIR SECTION 03

Scale

1 : 25

75

1 : 25


2 EG20012-TD-ID-8-GN-0

4 EG20012-TD-ID-8-GN-0

Top Roof +10.00

0.10 0.60 0.10

Top Roof +10.00

CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE

GLASS HANDRAIL

2.90 0.96

0.96

2.43

2.90

2.90

1.15

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

0.80

3 EG20012-TD-ID-8-GN-0

0.70

0.94

RF +7.10 0.94

RF +7.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

2.52

GROOVE 5 CM WIDTH STRUCTURE GLAZING

0.80

FR +3.95

9.45

3.15

WHITE PAINT

3.15

1.55

3.15

FIXED WINDOW 120 *235 CM

9.75

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

FR +3.95

CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE

1

2.60

3.25

3.25

EG20012-TD-ID-9-GN-3

2.75

3.25

FIXED WINDOW 120 *275 CM

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

5.60

0.70

0.80

9.68

+0.800

GR. +0.70

ELEVATION 1

0.10 0.60 0.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

2.43

RF +7.10

No.

STRUCTRE GLAZING DOUBLE GLASS SLIDING DOOR ALUMIL M12500

FR +3.95

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

Revisions

TENDER DETAIL FR +3.95

GR. +0.70

GR. +0.70

GR. +0.70

GR +0.00

GR +0.00

GR +0.00

VILLA RAMY SALIB

EXTERNAL ELEVATIONS 2.60

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

2.75

FIXED WINDOW 120 *275 CM

Dat

22/04/20

0.70

0.10 0.60 0.10

FR +3.95

3.25

FR +3.95

Description APPROVED ISSUE

0.70

0

2.52

3.15 2.35

RF +7.10

GLASS HANDRAIL

GLASS HANDRAIL FR +3.95

0.70

2.75

For CONSTRUCTION APRIL 2021

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

0.10

0.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

Top Roof +10.00

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

RF +7.10

0.10

RF +7.10

2.35 0.10 0.60 0.10

Top Roof +10.00

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

0.74

RF +7.10

FIXED WINDOW 120 *235 CM

FR +3.95

Top Roof +10.00

GLASS HANDRAIL

0.74

RF +7.10

0.10

1.00

2.11

Top Roof +10.00

0.10 0.60 0.10

1 : 50

2.90

1

GR. +0.70

GR. +0.70

GR. +0.70

GR. +0.70

GR +0.00

GR +0.00

GR +0.00

Project number

EG200

18/05/20

Date Drawn by

M.ABDELSAL

Checked by

M.WA

EG20012-TD-ID-8-GN-0

3

Section 26 1 : 50

BIM ARCHITECT PORTFOLIO

2

Section 27 1 : 50

4

Section 29 1 : 50

1:5

Scale

76


3 EG20012-TD-ID-8-GN-1

2.90

1.15 0.96 0.74 0.10 2.35

3.15

CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE

GLASS HANDRAIL 12.60

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

FR +3.95

3.25

0.80 0.10 0.60 0.10

FIXED WINDOW 120*235 CM

2.15

3.25

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

0.10 0.60 0.10

0.74 0.10 1.55

3.15 10.25

FR +3.95

RF +7.10

0.10

0.90

CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE

0.10

0.96

2.90

RF +7.10

GLASS HANDRAIL

Top Roof +10.00

0.10 0.60 0.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

0.25

0.10 0.60 0.10

Top Roof +10.00

2 EG20012-TD-ID-8-GN-1

FIXED WINDOW 400 * 235 CM

BF +-2.35

1

GR +0.00

2.35

0.70 2.35

GR +0.00

0.70

GR. +0.70 5.60

GR. +0.70

BF +-2.35

ELEVATION 02 1 : 50

For CONSTRUCTION

0.96

RF +7.10

0.10 2.35

FR +3.95

Section 33 1 : 50

BIM ARCHITECT PORTFOLIO

2

10.65

FIXED WINDOW 400*235 CM

2.45

GR. +0.70

GR +0.00

GR +0.00

BF +-2.35

2

Section 31 1 : 50

VILLA RAMY SAL

EXTERNAL ELEVATI

GR. +0.70

Project number GR +0.00

1

Date Drawn by

2.35

BF +-2.35

TENDER DETAIL DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

3.15

0.70

GR. +0.70

0.70

2.80

3

Description APPROVED ISSUE

FR +3.95

3.25

3.25

10.65

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

2.35

2.80

BF +-2.35

0

Revisions

0.10 0.60 0.10

2.35

FIXED WINDOW 120*235 CM

FR +3.95

GR. +0.70 GR +0.00

No. DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

3.15

3.15

0.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

0.10 0.60 0.10

FR +3.95

RF +7.10

0.74

0.10

RF +7.10

0.74

RF +7.10

0.10

0.96

APRIL 2021

M.ABD

Checked by EG20012-TD-ID-8-GN-1

BF +-2.35

Scale

77


2 EG20012-TD-ID-8-GN-2

0.90 0.96

2.90

0.74 1.55

9.45

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

8.65

2.35

3.15

0.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

0.80

FR +3.95

2.65

3.25

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

GR. +0.70

GR. +0.70 0.70

GR. +0.70

GR +0.00

ELEVATION 03

Top Roof +10.00

3.20

3 EG20012-TD-ID-8-GN-2 Top Roof +10.00 BF +-2.35

BF +-2.35

CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE

2

0.96

2.90

GLASS HANDRAIL

0.90

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

Section 32

For CONSTRUCTION

1 : 50

RF +7.10 0.96

APRIL 2021

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

RF +7.10

0.74

GLASS HANDRAIL

1.65

EXTERNAL ELEVATIONS

GR +0.00

1.20

5.60

GR. +0.70 0.70

GR. +0.70

GR. +0.70 GR +0.00

GR. +0.70 GR +0.00

Project number

EG2001

18/05/202

Date

2.35

BF +-2.35

ALUMINUIM PIVOT GLASS DOOR

BF +-2.35

BF +-2.35

4

VILLA RAMY SALIB

10.65

3.25

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

ALUMINUIM PIVOT GLASS DOOR

TENDER DETAIL

FR +3.95

0.10 0.60 0.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

GR +0.00

Date

22/04/202

Revisions

FR +3.95

FR +3.95

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

Description APPROVED ISSUE

1.45

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

0.90

0.90

FR +3.95

No. 0

0.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

0.80

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

1.45

3.15

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

GLASS HANDRAIL

RF +7.10

0.10

0.94

RF +7.10

CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE

GR +0.00

2.35

GR. +0.70

1 : 50

FR +3.95

0.10 0.60 0.10

FR +3.95

3.25

0.10 0.60 0.10 2.45

3.25

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

0.10 0.60 0.10

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

2.45

WOOD CLADDING

FR +3.95

1

RF +7.10

0.10

RF +7.10

3.15

RF +7.10

0.10 0.60

0.74 0.10 2.35

3.15

DOUBLE GLASS SLIDING DOOR ALUMIL M12500

9.45

DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

GLASS HANDRAIL

0.24

0.10

RF +7.10 DRY MIX PAINT AND PLASTER ON MESH FIXED ON STEEL STRUCTURE

Top Roof +10.00

2.90

0.10 0.60 0.10

0.96

GLASS HANDRAIL

Top Roof +10.00

0.96

2.90

0.90

1.15

CREMA MARFIL CRUSHED MARBLE POLISHED FINISH AS PER APPROVED SAMPLE

Top Roof +10.00

0.25

0.10 0.60 0.10

Top Roof +10.00

ELEVATION 04 1 : 50

BIM ARCHITECT PORTFOLIO

3

Section 30 1 : 50

Drawn by

M.ABDELSALAM

6 EG20012-TD-ID-9-GN-3

Checked by

M.WAL

EG20012-TD-ID-8-GN-2

BF +-2.35

1 : 50

Scale

78


3 EG20012-TD-ID-12-GN-3

2 EG20012-TD-ID-12-GN-2 3.47 2.50

0.80

2 EG20012-TD-ID-12-GN-3

1

0.60

1.00

4.23

7 EG20012-TD-ID-12-GN-2

3 EG20012-TD-ID-12-GN-2

BASEMENT BAR DETAIL 1 : 25

5

BASEMENT BAR 3D Copy 1

1

8 EG20012-TD-ID-12-GN-2

GROUND FLOOR BAR 1 DETAIL

6

1 : 25

GROUND FLOOR BAR 2 DETAIL 1 : 25

STEEL BOXES 5*5 CM

0.10

3.93

0.10

0.10

1.00

STEEL BOXES 5*5 CM PANDA MARBLE CLADDING 2 CM

0.10 0.25

STEEL BOXES 5*5 CM

Section 2

2

3

0.30

0.30

STEEL BOXES 5*5 CM

INDIRECT LIGHT

INDIRECT LIGHT

STEEL BOXES 5*5 CM

GR. +0.70

Section 3

7

1 : 25

Section 16

8

1 : 25

Section 17 1 : 25

0.40

1 : 25

GR. +0.70

0.07

GR. +0.70

0.07

GR. +0.70

9 EG20012-TD-ID-12-GN-3

WHITE QUARTZ MARBLE CLADDING 2 CM

0.10

1.00

BASEMENT BAR 3D

0.25

4

2.29

STEEL BOXES 5*5 CM

STEEL BOXES 2*2 CM

0.28

Section 12 1 : 25

1.00

2

0.28

Section 13 1 : 25

0.83

3

0.25

0.25

0.10

BF +-2.35

WHITE QUARTZ CLADDING 2 CM 0.10

PANDA MARBLE CLADDING 2 CM

PANDA MARBLE CLADDING 2 CM

BF +-2.35

1.00

1.00

SAINT LAUREN MARBLE CLADDING 2 CM

1.00

INDIRECT LIGHT STEEL BOXES 5*5 CM

0.83

0.10

SAINT LAUREN MARBLE CLADDING 2 CM

0.79

0.78

0.78

0.78

0.78

0.78

For CONSTRUCTION

For CONSTRUCTION

APRIL 2021

APRIL 2021

0.79

10 EG20012-TD-ID-12-GN-3

No.

BASEMENT TV UNIT

6

Description

0

Date

APPROVED ISSUE

No.

22/04/2021

Revisions

LS GR +0.00

GR LS +0.00

LS GR +0.00

Date

APPROVED ISSUE

22/04/2021

TENDER DETAIL

VILLA RAMY SALIB

VILLA RAMY SALIB

BASEMENT DETAILS

GROUND FLOOR DETAILS

0.30

0.30

2.30

0.40

0.40

BLACK WOODEN SHELVES

Revisions

TENDER DETAIL BASMENT TV UNIT 3D

0.30

WOODEN UNITS 0.30

7

0.46

GR LS +0.00

Description

0

1 : 25

Project number

BF +-2.35

0.40

BF +-2.35

BF +-2.35

EG20012

Drawn by BF +-2.35

Project number

18/05/2021

Date

0.35

0.35

0.40

INDIRECT LIGHT

M.ABDELSALAM

Drawn by

M.WALY

Checked by

4

BASMENT TV UNIT 3D Copy 1

VARIABLE

VARIABLE

VARIABLE

VARIABLE

2.20 HEIGHT

2.20 HEIGHT

2.20 HEIGHT

2.20 HEIGHT

5

GROUND BAR 1 3D Copy 1

9

GROUND BAR 2 3D

10 GROUND BAR 2 3D Copy 1

1 : 25

Scale

2.20 HEIGHT

2.20 HEIGHT

2.75 HEIGHT

VARIABLE

GROUND BAR 1 3D

1 : 25

Scale

2.20 HEIGHT

8

M.WALY

EG20012-TD-ID-12-GN-2

variable

19 10 1Section : 25

Section 18 1 : 25

M.ABDELSALAM

Checked by

EG20012-TD-ID-12-GN-3

9

EG20012 18/05/2021

Date

variable

F.F.L

F.F.L

1.50

F.F.L

0.90 WIDTH

OUT

IN

F.F.L

F.F.L

0.80 WIDTH

OUT

IN

F.F.L

F.F.L

3.60 WIDTH

F.F.L

0.90 WIDTH

OUT

IN IN

OUT

DOOR TYPE

D04

DOOR TYPE

D01

DOOR TYPE

D07

DOOR TYPE

D05

OPENING TYPE

SINGLE HINGED WOODEN DOOR

OPENING TYPE

SINGLE HINGED WOODEN DOOR

OPENING TYPE

SINGLE HINGED WOODEN DOOR

OPENING TYPE

SINGLE HINGED WOODEN DOOR

OPENING SIZE

1500*2200 mm

OPENING SIZE

900*2200 mm

OPENING SIZE

800*2200 mm

OPENING SIZE

900*2200 mm

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

DOOR & DOOR OAK PIGMENTED FRAME MATERIAL VENEER

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

WINDOW TYPE

AL01

WINDOW TYPE

OPENING TYPE

SLIDING

OPENING TYPE

AL02 - AL03 - AL04 - AL05 - AL06 - AL08

OPENING SIZE

5800*2750 mm

OPENING SIZE

VARIABLE

WINDOW MATERIAL

ALUMINIUM AND GLASS

WINDOW MATERIAL

ALUMINIUM AND GLASS

SLIDING

For CONSTRUCTION

For CONSTRUCTION

APRIL 2021

APRIL 2021

No.

0.70

Date

0

TENDER DETAIL 2.40

TENDER DETAIL

F.F.L

Date 22/04/2021

Revisions

Revisions

F.F.L

Description APPROVED ISSUE

VARIABLE HEIGHT

2.30 HEIGHT

22/04/2021

2.20 HEIGHT

2.20 HEIGHT

2.20 HEIGHT

2.20 HEIGHT

2.20 HEIGHT

2.20 HEIGHT

Description APPROVED ISSUE

2.30 HEIGHT

No. 0

VILLA RAMY SALIB

VILLA RAMY SALIB VARIABLE WIDTH

1.60 WIDTH

OUT

IN

Project number

EG20012

Drawn by

D02

DOOR TYPE

D03

DOOR TYPE

D06

OPENING TYPE

DOUBLE SLIDING WOODEN DOOR

OPENING TYPE

SINGLE SLIDING WOODEN DOOR

OPENING TYPE

DOUBLE HINGED WOODEN DOOR

OPENING SIZE

1600*2200 mm

OPENING SIZE

800*2200 MM

OPENING SIZE

2000*2200 MM

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

DOOR & DOOR FRAME MATERIAL

OAK PIGMENTED VENEER

BIM ARCHITECT PORTFOLIO

M.ABDELSALAM

Checked by

M.WALY

EG20012-TD-ID-9-GN-1

Scale

Project number

VARIABLE WIDTH 2.53

18/05/2021

Date

DOOR TYPE

ALUMINUM TYPES DETAILS

DOORS DETAILS

2.00 WIDTH

0.80

1 : 25

EG20012 18/05/2021

Date Drawn by

WINDOW TYPE

AL15 - AL16

WINDOW TYPE

AL17

DOOR TYPE

AL07 - AL09 - AL10 - AL11 - AL12 - AL13 - AL14

OPENING TYPE

PIVOT

OPENING TYPE

FIXED

OPENING TYPE

FIXED

OPENING SIZE

VARIABLE

OPENING SIZE

VARIABLE

OPENING SIZE

VARIABLE

WINDOW MATERIAL

ALUMINIUM AND GLASS

WINDOW MATERIAL

ALUMINIUM AND GLASS

DOOR & DOOR FRAME MATERIAL

ALUMINIUM AND GLASS

M.ABDELSALAM

Checked by

M.WALY

EG20012-TD-ID-9-GN-3

Scale

79

1 : 25


ARCHITECTURE PORTFOLIO THANK YOU !

STUDIO FIVE CAIRO DUBAI HOUSTON


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.