bcm

Page 1

PRODUCED BY AN AUTODESK STUDENT VERSION

NOTE ALL DRAWINGS ARE CONCEPTUAL AND MAY DIFFER FROM IMAGES

TUBULAR STEEL PILING RIG

VALVE

300,350 400 or 450 HELICAL BINDING IN HEAD

DRAWING IS NOT TO SCALE AND KINDLY REFER DIMENSIONS AND DETAILS .

STEAM OR AIR VALVE TO OPERATE HAMMER STEEL SHELL BANDS

HEAD OF PILE

EXTRACTING GEAR FITTED TO TOP OF HAMMER

STEEL MANDREL INSIDE CONCRETE SHELL

40 COVER OF CONCRETE TO MAIN REINFORCEMENT

CASING STEEL BANDS COATED IN BITUMEN AROUND JOINT BETWEEN SHELLS

PRESSED STEEL FORFOS EVERY 1.5

5,6 OR 8 LINKS

DROP HAMMER

20 KG HAMMER

HAMMER

CONCRETE SHELL

LIFTING HOLE 600 FROM HEAD

REINFORCEMENT CAGE

DRIVING HREAD DRIVING HREAD

BODY OF PILE

20 TO 40 MM DIA REINFORCEMENT

STEEL BANDS COATED IN BITUME N AROUND JOINT BETWEEN S H E L L S

799,29

REBATE FOR STEEL BAND

Section at AA'

HAMMER CASING

STEEL SHELL BANDS REINFORCED CONCRETE SHELLS ARE THREADED ON TO STEEL MANDREL AND RAISED BETWEEN TUBULAR STEEL GUIDES OF PILING RIG

PRESSED STEEL FORKS

STEEL MANDREL INSIDE CONCRETE SHELL

LIFTING HOLE

FINISHED REINFORCED CONCRETE PILE

HELMET STEEL MANDREL AND SHELLS INTO GROUND (BLOWS FROM HAMMER DRIVE)

400 DIA. STEEL TUBE

SPLIT AND TURNED ENDS

BUILDING CONSTRUCTION AND MATERIAL

STEEL TUBE

A'

SUB ECT

65X10 M.S STRAPS CAST INTO CAST IRON SHOE

A

BASE OF PILING FRAME

LIFTING HOLE 51 LENGTH OF PILE FROM TOE

3

CHILLED CAST IRON SHOE

STEEL MANDREL AND SHELLS (BLOWS FROM HAMMER DRIVE)

MILD STEEL STRAP CAST IRON SHOE

INTO

PRO ECT

400 DIAMETER STEEL TUBE

GROUND

PILE FOUNDATION

1

SHOE OF PILE CAST IRON SHOE

CHILLED CAST IRON SHOE

PILE FOUNDATION PUMP TO OPERATE JACK

EXISTING WALL EXISTING FOUNDATION

SHORT LENGTH OF BEAM AND BEARING PLATE TO SPREAD FOUNDATION IN FOUNDATION

JACK

PILE SECTION BEING JACKED IN

EXCAVATION

END OF TUBE

COLLEGE

A PILE IS BASICALLY A LONG CYLINDER OF A STRONG MATERIAL SUCH AS CONCRETE THAT IS PUSHED INTO THE GROUND TO ACT AS A STEADY SUPPORT FOR STRUCTURE BUILT ON TOP OF IT.PILE FOUNDATIONS ARE USED IN THE FOLLOWING SITUATIONS: WHEN THERE IS A LAYER OF WEAK SOIL AT THE SURFACE. THIS LAYER CANNOT SUPPORT THE WEIGHT OF THE BUILDING, SO THE LOADS OF THE BUILDING HAVE TO BYPASS THIS LAYER AND BE TRANSFERRED TO THE LAYER OF STRONGER SOIL OR ROCK THAT IS BELOW THE WEAK LAYER. WHEN A BUILDING HAS VERY HEAVY, CONCENTRATED LOADS, SUCH AS IN A HIGH RISE STRUCTURE, BRIDGE, OR WATER TANK.

2

E:\(1) B.ARCH\(A) BONAFIDE\logo-image.png

Hindu School of Architecture Sonepat, Haryana

DRAWING TITLE

PILE FOUNDATION DETAIL CONCRETE IS PLACED IN BORING TUBES AND COMPACTED BY AIR PRESSURE SHEAR LEG

MOTAR ANDCABLE

AIR LINE

PRESSURE CAP STARTER BARS

LENGTH OF STEEL TUBE GROUNTED INTO HOLE TO JOIN PILE SECTION

STEEL SHOE

THERE ARE TWO FUNDAMENTAL TYPES OF PILE FOUNDATIONS (BASED ON FUNCTION AND USES), EACH OF WHICH WORKS IN ITS OWN WAY. SHEET PILE LOAD BEARING PILE FRICTION PILE SOIL COMPACT PILE END BEARING PILE

AIR PRESSURE HELPS TO LIFT TUBES AS CONCRETE IS COMPACTED

STEEL BARING TUBES DRIVEN IN A CLAY CUTTER TAKES OUT SOIL

CONCRETE UNDER PRESSURE FILLS WEAK POCKETS OF SUBSOIL

BORING TUBES DRIVEN IN A SHELL TAKES OUT GRANULAR SOIL

COMPLETED PILE

WHEN BORING HAS REACHED REQUIRED DEPTH, REINFORCING CAGE IS LOWEVED INTO TUBES PILING FRAME 9.0 TO 16.5M HIGH

CABLE ATTACHED TO TOP OF TUBE HOLD IT IN POSITION

CONCRETE COMPACTED UNDER PRESSURE IN PILE BORING

420 TO 470 O/D AT TUBE TUBE GRADUALLY WITHDRAWN AS CONC. IS HAMMERED IN

ENLARGED TOE FORMED BY CONCRETE

BORING TUBE

BORING TUBE

STEEL TUBE

DRAWN STEEL TUBE SUPPORTED IN LEADERS OF PILING FRAME

LIFTING ARM

REINFORCEMENT CAGE

COMPLETED REINFORCED PILE

6.0 LONG CYLINDRICAL DROP HAMMER WEIGHING 2000 TO 3000 KG

STEEL BORING TUBES WITH MALE & FEMALE THREADS ARE SCREWED TOGETHER

HAMMER

BRACE

STEEL CUTTING TUBE

CUTTING TUBE

ROLL NO.

SEM

GAGAN METHIL

14025006024

IX TH

DATE

24/07/2018

NAME

SHEET NO.

CHECKED BY

DROP HAMMER DROP HAMMER

WINCH

CIRCULAR CAST IRON CLACK PLATE HINGES TO OPEN UPWARDS TO SHELL RING

STIFF CONCRETE HAMMERED

DIESEL MOTOR

ENLARGED TOE

1

600 TO 900 DEEP PLUG OF GRAVEL BEING COMPACTED IN BOTTOM OF TUBE BY DROP HAMMER

2

5

WHILE TUBE IS HELD THE DROP HAMMER FORCES PLUG OF GRAVEL OUT OF TUBE TO FORCES PLUG OF GRAVEL OUT OF TUBE TO FORM AN ENLARGED TOE AND THEN SHIFT FORM AN ENLARGED TOE AND THEN SHIFT CONCRETE IS HAMMERED INTO TUBE

3

LEAD HOE WITH CUTTING EDGE IS FILLED TO LOWEST BORING TUBE

CLAY CUTTER

BORING TUBE AND LEAD SHOE BORED CAST IN PLACE CONCRETE PILE

SHELL RING STEEL CUTTING SHOE SCREWED TO CUTTING TUBE SHELL CUTTER FOR GRANULAR SOIL

4 PRODUCED BY AN AUTODESK STUDENT VERSION

AS PLUG OF GRAVEL IS HAMMERED INTO GROUND FRICTION BETWEEN IT AND TUBE DRAGS INTO THE GROUND

REINFORCEMENT CAGE

REMARKS

CLAY CUTTER

CONCRETE

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

PRECAST R.C.C. PILE


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.