Oil Field Monthly

Page 1


2)


Advertising Information Call: 325-829-8098

september 2011

Edition

(3


4)

Become our fan on Facebook


Advertising Information Call: 325-829-8098

september 2011

Edition

(5

® Lauren’s IAG Team Exemplifies Solid Customer Relationships

BUILDING EXCELLENCE AT

B

Lauren

uilding excellence at Lauren means more than building a high-quality product; It means building customer relationships that last. IAG is a prime example of this belief in practice. After Lauren’s successful completion of the Selexol Pipe Rack and Process Modules Project in 2009, Lauren is now completing additional work for IAG, much of which mirrors the scope of the first project.

“Due to the successful fabrication and assembly of the Train 1 Selexol Modules for International Alliance Group at the SandRidge Century Plant in Fort Stockton Texas, we are on our way to yet another success story for Train 2. This round, however, all that hard work paid off. In addition to the Selexol Modules, we also have been awarded the contract to fabricate and assemble the Process Modules including transportation to the site,” said Bill Holmes, Lauren’s Project Manager.

over 11,400 feet of linear pipe, as well as an estimated 548 tons of structural steel. Each module measures up to 16’x16’x90’ and weighs in at around 60 tons. The Process Skids consist of steel and pipe spool fabrication. The scope includes a total of 24 skids, thirteen which will be assembled in Abilene and eleven which will be shipped loose for assembly in Fort Stockton. All skids (60’ in average length) include over 12,000 feet of linear pipe, as well as an estimated 537 tons of structural steel. Each skid measures up to 20’x20’x60’ and weighs in at around 30 tons.

Amanda Marshall of International Alliance Group speaks to the success of this partnership. “Due to the successful fabrication and assembly of the Train 1 Selexol Modules at the SandRidge Century Plant in Fort Stockton Texas, we awarded Lauren the Selexol Pipe Rack Modules, the Process Modules and the transportation of same for Train 2. Overall the project is going very well and we are all working Specifically, the project will involve the as a team to ensure the fabrication, assembly assembly of a Selexol Pipe Rack Module and and delivery of all the modules are a success Selexol & C02 Process Skids, all of which will and are completed on time and on budget. be installed in Fort Stockton, TX. We are very confident that Lauren will deliver and look forward to the continuance of our The Pipe Rack Modules consist of steel and partnership.” pipe spool fabrication and assembly of four (4) parallel pipe rack modules (800’ in total length),

Lauren Engineers & Constructors 901 South 1st Abilene, Texas 79602

www.laurenec.com


6)


Advertising Information Call: 325-829-8098

september 2011

Edition

(7


8)


Advertising Information Call: 325-829-8098

september 2011

Edition

(9


10 )


Advertising Information Call: 325-829-8098

september 2011

Edition

( 11

No ChHaorugre 24 vice Ser

Neawtion o l c

325-573-1705 • 800-345-1705

Fax: 325-573-7023 • P.O. Box 668 • Snyder, TX 79550

432-563-1071

8007 W. Industrial Ave. • Midland, TX 79706


12 )


Advertising Information Call: 325-829-8098

september 2011

Edition

( 13


14 )


Advertising Information Call: 325-829-8098

september 2011

Edition

( 15



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.