4.3 Plan for landscaping

Figure 4-19.Compost bin for human waste ("Dalek Compost Bin: Is it any good? - Compost Magazine" , 2021)

Figure 4-20.Organic natural compost ("Composting 101: How to Start Your First Compost Pile - Lawnstarter" , 2021)

Advertisement

4.3 Plan for landscaping

Although the landscape design of the project has completed the preliminary design drawing according to the provided information, before the project is officially implemented, the following steps need to be completed to determine the final scheme and carry out the construction.

1. make an on-the-spot survey ● Present situation analysis of site, investigation of climate, location, topography, landform and soil layer thickness, etc. ● Analyze the existing natural landscape and observe the local plant varieties ● Analysis of traffic roads and entrances and exits

● Analysis of local customs, history, culture and humanities ● Analysis of style and layout of local architecture

2. landscaping ● After the field survey is completed, see if the design drawing should be changed according to the actual situation

● After the change of landscape design, communicate with the local residents and communities, the preference of plant varieties and the demand of functional facilities, and whether it is necessary to change the planted species or reduce the planted species.

● After both parties are satisfied, sign a contract with the local construction team, pay the down payment and determine the construction period (the estimated time is about 8 days)

3. Construction process

● The construction team will inspect the site and prepare necessary tools and materials.

● Sourcing seeds, seedlings, etc. of local plants according to the scheme and planting trees and shrubs on site. (Crops could be grown by women themselves)

● During the construction process, it is necessary to keep communication with the designer. After each working procedure is completed, it must be accepted by the designer, and then the next working procedure can be carried out.

● Preliminary acceptance: designers and local residents check the completed landscape quality, and correct any defects and defects in time.

● Final acceptance: the designer and local residents pass the preliminary acceptance of the quality, and then make the final handover.