GREEN HAMMERS REPUBLIC OF SINGAPORE STUDENTS MENTORS BAYLEY SHIPLEY CARLY SMITH RAPHAEL STONE RYAN McGAULEY SAMANTHA GARZA YEVETTE CASTRO
CESAR GONZALEZ JR. JESSICA MARTINEZ JOSE PEREZ OLIVIA PITT-PEREZ TAYLOR ODELL
LOCATION
SINGAPORE
MASSING .
4
7
8
5 9 6 3
2 1
LOBBY PLAN + UTILITY TIE IN
KEY 1. ENTRANCE 2. RETAIL (11,100 sq ft.) 3. LOBBY, CIRCULATION + PUBLIC SPACE 4.WATER + FIRE RISER (900 sq ft.) 5. LOADING DOCK (5,000 sq ft.) 6. MAIN ELECTRICAL ROOM (4,200 sq ft.) 7. RAMP UP TO PARKING 8. TRASH + RECYCLING (1,600 sq ft.) 9. BICYCLE APRKING + BUS STOP 10. RESIDENTIAL UNITS E. ELECTRICAL D. STORM DRAIN W. DOMESTIC WATER S. WASTE WATER
10
10
10
3
10
10
10 10 10
3 10 10
10
LOWEST RESIDENTIAL PLAN
3
10
10
3
10
10
10
10
10
10
10
KEY 3. LOBBY, CIRCULATION + PUBLIC SPACE 10. RESIDENTIAL UNITS HIGHEST RESIDENTIAL PLAN
10
10
2 2
2 3
2 2
2 2 2 2
2 2
2 2
3
2
2
2
KEY 2. RETAIL 3. LOBBY, CIRCULATION + PUBLIC SPACE LOWEST RETAIL PLAN
2
3
HIGHEST RETAIL PLAN
AMENITY POOL DECK PERSPECTIVE
GREEN ROOF PERSPECTIVE
24” CONCRETE CORE WALLS
DISTRIBUTED TENDONS
24” CONCRETE COLUMNS
BANDED TENDONS
12” POST-TENSIONED SLAB TYPICAL RESIDENTIAL STRUCTURAL PLAN
STRUCTURAL CORE PERSPECTIVE
SUSTAINABLE APPLICATIONS
-Insulated Glass -Green Roofs -Rainwater collection -Materials with high recycling content -Fly-Ash in the concrete mix
SUSTAINABILITY THOUGHTS + GOALS .
SCHEDULE EVALUATION
TOTAL SCHEDULE
PROJECT TAKEOFF
Excavation – Duration
0
Full Floor Construction
5.25
Partial Floor Construction
26.25
Total Duration of Project
31.5.5
Commercial SF
79,760
Residential SF
600,000
Parking Garage SF
48,000
Below Grade SF
(this can be the garage but has a different cost than above)
-
Total Duration of Project
727,760
Roof SF
20,000
Green Roof SF
160,000
Swimming Pool SF
2,000
Curtainwall SF
170,000
Masonry SF
Metal Panels SF
150,000
Total Skin System SF
320,000
Handrails (LF)
COMMERCIAL AREA
RESIDENTIAL AREA
PARKING GARAGE AREA
$17,938,024
$124,938,024
$5,954,400
Overall Cost/SF
Commercial Cost/SF
Residential Cost/SF
Parking Garage/SF
$291
$255
$207
$124
GENERAL AREA
Total Project Cost Area
Total Project Cost
Cost Per Square Foot
4.,200
$63,648,100
$211,800,524
CONSTRUCTION BUDGET
SITE LOGISTICS
CLOSING REMARKS