2017 Green Hammers Presentation

Page 1

GREEN HAMMERS REPUBLIC OF SINGAPORE STUDENTS MENTORS BAYLEY SHIPLEY CARLY SMITH RAPHAEL STONE RYAN McGAULEY SAMANTHA GARZA YEVETTE CASTRO

CESAR GONZALEZ JR. JESSICA MARTINEZ JOSE PEREZ OLIVIA PITT-PEREZ TAYLOR ODELL


LOCATION


SINGAPORE


MASSING .


4

7

8

5 9 6 3

2 1

LOBBY PLAN + UTILITY TIE IN

KEY 1. ENTRANCE 2. RETAIL (11,100 sq ft.) 3. LOBBY, CIRCULATION + PUBLIC SPACE 4.WATER + FIRE RISER (900 sq ft.) 5. LOADING DOCK (5,000 sq ft.) 6. MAIN ELECTRICAL ROOM (4,200 sq ft.) 7. RAMP UP TO PARKING 8. TRASH + RECYCLING (1,600 sq ft.) 9. BICYCLE APRKING + BUS STOP 10. RESIDENTIAL UNITS E. ELECTRICAL D. STORM DRAIN W. DOMESTIC WATER S. WASTE WATER


10

10

10

3

10

10

10 10 10

3 10 10

10

LOWEST RESIDENTIAL PLAN

3

10

10

3

10

10

10

10

10

10

10

KEY 3. LOBBY, CIRCULATION + PUBLIC SPACE 10. RESIDENTIAL UNITS HIGHEST RESIDENTIAL PLAN

10

10


2 2

2 3

2 2

2 2 2 2

2 2

2 2

3

2

2

2

KEY 2. RETAIL 3. LOBBY, CIRCULATION + PUBLIC SPACE LOWEST RETAIL PLAN

2

3

HIGHEST RETAIL PLAN


AMENITY POOL DECK PERSPECTIVE

GREEN ROOF PERSPECTIVE


24” CONCRETE CORE WALLS

DISTRIBUTED TENDONS

24” CONCRETE COLUMNS

BANDED TENDONS

12” POST-TENSIONED SLAB TYPICAL RESIDENTIAL STRUCTURAL PLAN

STRUCTURAL CORE PERSPECTIVE


SUSTAINABLE APPLICATIONS

-Insulated Glass -Green Roofs -Rainwater collection -Materials with high recycling content -Fly-Ash in the concrete mix

SUSTAINABILITY THOUGHTS + GOALS .


SCHEDULE EVALUATION

TOTAL SCHEDULE

PROJECT TAKEOFF

Excavation – Duration

0

Full Floor Construction

5.25

Partial Floor Construction

26.25

Total Duration of Project

31.5.5

Commercial SF

79,760

Residential SF

600,000

Parking Garage SF

48,000

Below Grade SF

(this can be the garage but has a different cost than above)

-

Total Duration of Project

727,760

Roof SF

20,000

Green Roof SF

160,000

Swimming Pool SF

2,000

Curtainwall SF

170,000

Masonry SF

Metal Panels SF

150,000

Total Skin System SF

320,000

Handrails (LF)

COMMERCIAL AREA

RESIDENTIAL AREA

PARKING GARAGE AREA

$17,938,024

$124,938,024

$5,954,400

Overall Cost/SF

Commercial Cost/SF

Residential Cost/SF

Parking Garage/SF

$291

$255

$207

$124

GENERAL AREA

Total Project Cost Area

Total Project Cost

Cost Per Square Foot

4.,200

$63,648,100

$211,800,524

CONSTRUCTION BUDGET

SITE LOGISTICS


CLOSING REMARKS


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.