JAMES K. POLK ELEMENTARY SCHOOL
BUREAU VERITAS PROJECT: 148303.21R000-009.354
2. Building and Site Information
Systems Summary Condition
System
Description
Structure
Masonry bearing walls with metal roof deck supported by open-web steel joists and concrete wall footing foundation system
Good
Façade
Brick veneer, and cementitious board siding with aluminum windows
Poor
Roof
Primary: Flat construction with single-ply TPO/PVC membrane Secondary: Flat construction with green roof
Good
Interiors
Walls: Painted gypsum board and CMU and unfinished Floors: VCT, ceramic tile, quarry tile, laminated wood and unfinished Ceilings: Painted gypsum board and exposed
Elevators
None
Plumbing
Distribution: Copper supply and cast-iron waste and venting Hot Water: Gas boiler with hot water tank Fixtures: Toilets, urinals, and sinks
Fair
HVAC
Geothermal system with water sourced heat pumps, Individual package units, fan coils, air handlers. Supplemental components: ductless split-systems.
Fair
Fire Suppression
Fire extinguishers and kitchen hood system
Good
Electrical
Source and Distribution: Main switchboard and panels with copper wiring Interior Lighting: LED, T-8, CFL
Good
Fire Alarm
Alarm panel with smoke detectors, heat detectors, alarms, strobes, pull stations, back-up emergency lights, and exit signs
Good
Equipment/Special
Commercial kitchen equipment
Site Pavement
Asphalt lots and adjacent concrete sidewalks, curbs, ramps, and stairs
Fair
--
Fair
8 www.us.bureauveritas.com | p 800.733.0660
Good