Construction Document

Page 1

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

UP

A

NO.

DATE

REVISIONS

Date 04/26/2011

Sheet Title:

Sheet Number

Title Page

1 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

Demolition Floor Plan

2 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard West Lafayette, IN

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

1st Level Floor Plan

3 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

Host/ess station

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

2nd Level Floor Plan

4 of 23

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue; Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

Sheet Title:

Sheet Number

Door & Window Schedule

5 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

Enlarged Floor Plan

6 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

Enlarged Floor Plan

7 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

Enlarged Floor Plan

8 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

Sheet Title:

Sheet Number

Building Wall Section

9 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue; Taos, New Mexico Mr. Rick Gonzales, Owner

La Luz Restaurant

Project Number

1234 La Luz

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

Exterior Elevations

10 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

West Lafayette, IN


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard West Lafayette, IN

3 3

4 3

120 Plaza Avenue; Taos, New Mexico Mr. Rick Gonzales, Owner

La Luz Restaurant

2 3

5 3

Project Number

1234

8 3

B

7 3

A

6 3

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

10 3

11 3

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

9 3

12 3

Sheet Number

Interior Elevations

11 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

1 3


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard West Lafayette, IN

16 3

17 3

18 3

20 3

Project Number

21 3

1234

24 4

25 4

B

23 3

Sheet Title:

Interior Elevations

26 4

27 4

28 4

Sheet Number

22 3

NO.

DATE

REVISIONS

Date 04/26/2012

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

19 3

12 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz

120 Plaza Avenue; Taos, New Mexico Mr. Rick Gonzales, Owner

15 3

La Luz Restaurant

14 3

A

13 3


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard West Lafayette, IN

33 4

34 4

32 4

120 Plaza Avenue; Taos, New Mexico Mr. Rick Gonzales, Owner

31 4

La Luz Restaurant

30 4

Project Number

35 4

1234

B

A

37 4

36 4

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

Interior Elevations

36 4

13 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

29 4


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

1st Level Finish Plan

14 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

2nd Level Finish Plan

15 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

1st Floor Reflected Ceiling Plan

16 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue; Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 03/29/2012

Sheet Title:

Sheet Number

Second Floor Reflected Ceiling Plan

17 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234 Date 04/26/2012

B

A

NO.

DATE

REVISIONS

UP

Sheet Title:

Sheet Number

1st Floor Electrical Plan

18 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

2nd Floor Electrical Plan

19 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number UP

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

1st Floor Furniture Installation Plan

20 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Amy Smith Holly Lawecki Katherine Fay Tayler Howard

120 Plaza Avenue, Taos, New Mexico Mr. Rick Gonzales, Owner

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

Project Number

1234

B

A

NO.

DATE

REVISIONS

Date 04/26/2012

Sheet Title:

Sheet Number

2nd Floor Furniture Installation Plan

21 of 22

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT

La Luz Restaurant

West Lafayette, IN

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT


SPECIFICATIONS DIVISION 1 – GENERAL REQUIRMENTS 1.

BEFORE BEGINNING ANY CONSTRUCTION, CONTRACTER SHALL VISIT, ASSESS AND KNOW CONSTRUCTION SITE.

2.

IF ANY PROBLEMS OCCUR WHEN ASSESSING THE CONSTRUCTION SITE AND/OR DOCUMENTS, CONTRACTER IS TO CONTACT THE DESIGNER RIGHT AWAY.

1.

TO STOP AIR FILTRATION, DOORS AND WINDOWS SHOULD BE CAULKED OR FOAMED IN THE MIDDLE OFTHE FRAME AND WALL FRAMING.

3.

DESIGNER AND OWNER ARE TO APPROVE THE PLUMBING FIXTURES AND FITTINGS BEFORE INSTALLATION.

2.

AFTER CONCRETE SLAB IS DRYED AND CURED, WATERPROOFING IS TO BE COMPLETED.

4.

IN ACCORDANCE WITH NATIONAL, STATE AND LOCAL CODES AND ORDINANCES, THE PLUMBING SUB-CONTRACTER IS TO INSTALL PLUMBING SYSTEMS IN HARMONY WITH THE DRAWINGS.

DIVISION 8 – DOORS AND WINDOWS 1.

3.

WHEN COMPARING WRITTEN AND SCALED DIMENSIONS, ONE SHOULD REFER TO THE WRITTEN.

4.

DRAWINGS AND FF&E SELECTIONS ARE REQUIRED TO BE IN COMPLIANCE WITH THE CODES APPLIED. PRODUCTS TO BE INSTALLED SHOULD FOLLOW THE MAUFACTURER’S RECOMMENDATIONS. THE OWNER CONTROLLS ALL THE PAPER PRODUCED BY THE MANUFACTURER.

5.

WINDOW AND DOOR INSTALLATION SHOULD BE COMPLETED IN A PROFESSIONAL MANNER. ANY DAMAGES OR MISFITS ARE TO BE REPLACED.

2.

CONTRACTER IS TO GIVE ALL DOOR AND FRAME DRAWINGS.

3.

ALL DOOR HARDWARE SCHEDULES SHALL BE SUBMITTED BY CONTARCTOR.

4.

WINDOW INSTALLATION SHOULD FOLLOW ALL MANUFACTURER INSTRUCTIONS. CONTRACTER IS TO GIVE ALL ACCESSORIES AND TRIM NECESSARY.

6.

ALL CONTRUCTION IS TO BE OF PROFESSIONAL QUALITY.

7.

FOR ANY ADDITIONAL UTILITY SOURCES NOT SPECIFIED BY THE OWNER, CONTRACTER IS RESPONSIBLE.

5.

FRONT WINDOWS OF RESTAURANTS SHOULD FOLLOW THE MANUFACTURER’S INTRUCTIONS FOR INSTALLATION.

8.

IT IS THE RESPONSIBILITY OF THE CONTRACTER TO PREVENT DAMAGE DURING CONSTRUCTION.

6.

SKYLIGHT SPECIFICATIONS ARE PROVIDED BY THE MANUFACTURER.

9.

IT IS THE RESPONSIBILITY OF THE CONTRACTER TO KEEP SITE CLEAN DURING CONSTRUCTION.

DIVISION 9 – FINISHES

10. WHEN CONSTRUCTION IS DONE, CONTRACTER IS TO PRESENT THE SITE TO THE OWNER IN A CLEAN AND PRESENTABLE ENVIRONMENT.

1.

DRYWALL CONSTRUCTION SHOULD BE IN ACCORDANCE WITH THE LATEST EDITION OF U.S. GYPSUM CO. HANDBOOK.

11. BEFORE FINAL PAYMENT AND MOVE IN, DESIGNER AND OWNER ARE TO REVIEW ANY PROBLEMS AND GIVE THEM TO THE CONTRACTER.

2.

ALL INSTALLATION SHOULD BE DONE BY SEASONED CRAFTSMEN.

3.

AFTER SPACKLING AND NAIL HOLES ARE SUCCESSFULLY COMPLETED, SURFACES ARE TO BE CLEAN AND READY FOR PAINTING.

DIVISION 2 – SITE WORK 1.

NO DAMAGE IS TO OCCUR TO THE UTILITIES.

4.

WHILE FINISHES ARE COMPLETED, ALL SURROUNDING MATERIALS SHOULD BE COVERED.

2.

CONTRACTER WILL PAY FOR DAMAGE THAT MAY OCCUR TO SURROUNDING BUILDINGS.

5.

DESIGNER IS TO APPROVE ALL FLOORING SAMPLES BEFORE INSTALLATION.

6.

SURFACES ARE TO BE CLEANED PRIOR TO INSTALLATION ACCORDING TO THE MANUFACTURER’S INSTRUCTIONS.

7.

TRIM IS TO BE USED WHERE CARPET ENDS.

8.

FLOORING SHOULD BE CLEANED AND COVERED FROM DAMAGES DURING CONSTRUCTION.

9.

BEFORE FINISHES BEGIN, DESIGNER AND OWNER ARE TO APPROVE WOOD STAINS SELECTED BY THE CONTRACTOR.

DIVISION 3 – CONCRETE 1.

3000 PSI IS THE MINIMUM CONCRETE STRENGTH TO BE USED.

2.

DURING INSTALLATION, REINFORCEMENTS SHOULD BE CLEAN AND SECURE.

DIVISION 4 – MASONRY 1.

SAMPLES OF ALL MATERIALS WILL BE APPROVED BY DESIGNER.

2.

ANY MATERIALS DAMAGED AND RECOGNIZED BY THE CONTRACTER SHALL BE REPLACED BY THE MAUFACTURER.

3.

ALL SLATE SHOULD BE WITHOUT FAULT OR IMPERFECTIONS THAT COULD INTERFERE WITH USE.

DIVISION 5 – METALS 1.

ALL STEEL SHOULD BE IN ACCORDANCE WITH IDEALS.

2.

STEEL SURFACES ARE TO BE PROTECTED BY COVER.

3.

GLASS, JOINTS, AND RAILINGS SHOULD BE IN ACCORDANCE WITH OSHA AND BOCA GUIDELINES.

DIVISION 6 – WOOD AND PLASTIC

DIVISION 10 – SPECIALITIES 1.

OWNER IS TO ORGANIZE HARDWARE AND SCHEDULE.

2.

OWNER IS TO SUPERVISE THE INSTALLATION OF BATH ACCESSORIES.

DIVISION 11 – EQUIPMENT 1.

KITCHEN AND BAR EQUIPMENT SPECICIFICATIONS ARE GIVEN BY THE MANUFACTURER.

DIVISION 12 – FURNISHINGS 1.

FURNISHINGS ARE TO BE INSTALLED IN A PROFESSIONAL MANNER. IN CASE OF DAMAGE, THE SUBCONTRACTOR IS RESPONSIBLE.

2.

FURNISHINGS ARE TO BE DELIVERED AND INSTALLED IN ACCORDANCE WITH DRAWINGS.

1.

WOODWORK SHOULD FOLLOW REQUIREMENTS GIVEN BY THE ARCHITECTURAL WOOD WORK INSTITUTE (AWI).

2.

WHEREVER ABLE, WOODWORK DEFECTS AND DAMAGES SHOULD BE ASSESSED.

1.

ELEVATOR SHALL BE INSTALLED ACCORDING TO DRAWINGS.

3.

WOODWORK SHOULD BE IN ACCORDANCE WITH FIRE CODES.

2.

THE SPECIFICATIONS FOR THE DUMBWAITER SHOULD FOLLOW THE MANUFACTURER’S GUIDELINES.

4.

WOOD SELECTIONS PICKED BY THE DESIGNER SHOULD BE DEFERED TO THE CONSTRUCTION SITE.

5.

ALL WOOD WORK SHOULD BE PROFESSIONAL AND DONE UNDER A SUPERVISOR.

6.

CORIAN MATERIAL SELECTION AND FINISHES SHALL FOLLOW MANUFACTURER INSTRUCTIONS.

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

DIVISION 14 – CONVEYING SYSTEMS

DIVISION 15 – MECHANICAL 1.

THE GENERAL CONTRACTER SHALL FOLLOW DRAWINGS FOR THE OPERATION OF HVAC AND PLUMBING SYSTEMS.

2.

DRAWINGS BY THE SUB-CONTRACTOR ARE TO SUPPLY THE SIZES FOR THE SIZES AND RUNS OF PIPING AND ARE TO BE APPROVED BY THE DESIGNER AND OWNER.

DIVISION 16 – ELECTRICAL 1.

ELECTRICAL SYSTEMS ARE TO FOLLOW THE CURRENT NATIONAL ELECTRICAL CODES, LOCAL AND STATE CODES AND ORDINANCES.

2.

DESIGNER AND OWNER ARE TO GO TO CONSTRUCTION SITE TO APPOVE OF ALL ELECTRICAL OUTLETS.

3.

THE ELECTRICAL SUB-CONTRACTOR IS TO WORK WITH OTHERS.

4.

FACEPLATE COLORS SHOULD MATCH THOSE IN THE FINISH PLAN.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.