Design Collaborative - Workplace Studio Portfolio

Page 1

WORKPL ACE o v e r v i e w


CONTACT 200 East Main Street Suite 600 Fort Wayne, IN 46802 260.422.4241 2

Wo r k p l a c e O ve r view

designcollaborative.com


PEOPLE-FIRST PL ACES

We design to make a positive impact on the people that use, interact with, and are affected by our work. We bring companies closer to their companies. We help administrators connect with their teams. We help staff members be more efficient and engaged. We design unique, welcoming, and memorable experiences.

d e signco ll ab o rative.co m

1


A people-first place helps a person do whatever it is they do,

B E T T E R

2

Wo r k p l a c e O ve r view


ABOUT US Overview Process

pg. 5 pg. 8

OUR WORK Projects

pg. 13

d e signco ll ab o rative.co m

3


4

Wo r k p l a a c e O ve r view


ABOUT US

d e signco ll ab o rative.co m

5


DESIGN COLL ABOR ATIVE

Design Collaborative is an award-winning, interdisciplinary design firm founded in 1992 with the belief that through our work, we can make the world a more beautiful, functional, and well-designed place—one user, one client, one co-worker, one person at a time. Our staff includes architects, engineers, interior designers, cost estimators, graphic designers, and support staff that work collaboratively across disciplines to improve people’s worlds. We believe people are more important than projects, and everyone should love what they do. We believe in digging deep to make a difference every day, and giving back to the communities that have helped us so much. Lastly, we believe in having fun because we take our work seriously, but we don’t take ourselves too seriously!

6

Wo r k p l a c e O ve r view


SERVICES

AWARDS

Architecture

Lighting Design

MEP/FP Engineering

Urban Planning & Design

Interior Architecture & Design

Tenant Fit-out

Cost Estimating Roofing Design Building Envelope Master Planning Product Design Sustainable Design Code Analysis IT, AV & Security Design

2 019 AIA Indiana Citation Design Award

Historic Preservation

PSMJ Circle of Excellence Award

Environmental Branding

2 017, 2 016,

Site Services

2 017

Strategic Planning

2 015, 2 014,

Change Management Growth Assessment

Indiana Best Places to Work

Construction Administration

2 015

Facility Assessments

Space Planning

Furniture Design & Coordination

Energy Consulting

Visioning & Planning

2 013, 2 010, 2009

Indiana Companies to Watch AIA Indiana Distinguished Firm of the Year

2 011

d e signco ll ab o rative.co m

7


OUR PROCESS

ASSEMBLE & ASSESS

At Design Collaborative, it’s not just what we do that differentiates us. IT’S HOW WE DO IT. We explore the heart of any space—its people. Their needs, their flow, their motivations and their vision. Our process helps us create spaces and places

8

Wo r k p l a c e O ve r view

that serve and reflect their values—and improve their worlds. And we think that makes for a better outcome, every time.

The foundation of Fingerprint is a full and comprehensive understanding of who you are. Through surveying and studying your entire team and program, and intense assessing of guidelines and standards, we’re able to better understand where you are in your journey—and what’s next.


VOICE & VISION

CONCEPT & CREATE

DESIGN DEVELOPMENT

Fingerprint’s vision sessions are interactive and engaging opportunities to reflect on where you are, and paint a vivid picture of where you’re going—and why.

Sleeves rolled up, we’re designing. Our creative process is driven by the phases before it, ensuring we’re accurate and inspired at all times.

Together, we’ll learn about your organization’s culture and ideology, articulate the key drivers of design, and define the critical factors of success. Uniquely for you.

Fingerprint keeps you and your team involved at every level, from in-person creative sessions and bubble diagrams through analysis and technical narratives.

Vision begins to become reality in Design Development. The clear and collaborative work that led us here comes to fruition in this phase, as we develop the analyses, plans, and strategies (and cost estimates!) that pave our path to success.

d e signco ll ab o rative.co m

9


CONSTRUCTION DOCUMENTATION

CONSTRUCTION ADMINISTRATION

RETURNS & RESULTS

“The DC is for Detail Connoisseurs.”

During Construction Administration, we manage quality control at every level, through final punch and walkthrough, and beyond— including comprehensive performance review and evaluation. As with every step of Fingerprint, we keep our client relationship at the forefront—communicating clearly and responsively, and managing expectations at every turn.

Fingerprint follows through. Six months after occupancy, we’ll be back to revisit our Assemble & Assess work, arming you with tools to continue to motivate and inspire your workforce, and assessing and reporting on the overall climate and culture. As you grow and flourish, so does our relationship—allowing us to support you even better as you climb your next mountain.

Construction Documentation is where the details drive success. Fortunately, our depth and experience in this discipline is only surpassed by our genuine passion for it. Count on Design Collaborative to set the stage for construction without surprises.

10

Wo r k p l a c e O ve r view


We make our mark by finding yours —  distinct, unique, and remarkable.

d e signco ll ab o rative.co m

11


12

Wo r k p l a a c e O ve r view


OUR WORK

d e signco ll ab o rative.co m

13


PROJECT T YPES HEADQUARTERS

We’ve provided design and engineering services for a wide range of workplace project types, from test-fits to new operations centers and most things in-between.

CALL CENTERS

RENOVATION 14

Wo r k p l a c e O ve r view


EXISTING BUILDINGS

EXISTING BUILDINGS

FLEET PARKING

NEW OPEN CANOPY PARKING

MPLOYEE RKING NEW WAREHOUSE NEW OPERATIONS

E1

65 T

H

ST R

EE T

STORAGE YARD

CORPORATE CAMPUSES

OPERATIONS CENTERS

BRANDED ENVIRONMENTS

ADAPTIVE REUSE

HISTORIC PRESERVATION

TENANT FIT-OUT & IMPROVEMENTS d e signco ll ab o rative.co m

15


16

Wo r k p l a c e O ve r view


SAFE FEDERAL CREDIT UNION Operations Center

Growing and disjointed teams made SAFE Federal Credit Union in need of a new space to house their administrative and call center teams. The new 38,700 square foot facility will provide ample room for growing teams, including a shell space ready for expansion. The large call center space with updated technology will enhance their reach with branches and customers. The workplace was carefully considered and spaces for training, internal and external meetings, and collaborating were designed to optimize SAFE’s workflow. Comfortable and striking amenities for employees include a community hub, a large outdoor and covered patio, a coffee bar with a lounge area, and a gym including private showers. LOCATION

Sumter, SC

COMPLETED

December 2020

SIZE

38,700 sf

COST

$9,750,000

d e signco ll ab o rative.co m

17


MACH & SITES MEDICAL Office Fit-Out

Connectivity was the biggest goal when designing this office, manufacturing and warehouse space in the orthopedic industry. This new space was an opportunity to support a culture of innovation and bring a newly acquired business into the fold. Blurring the line between old and new businesses, as well as the office and manufacturing space, allows for unprecedented collaboration and access across all office departments and manufacturing teams. As the teams come together, grow, and evolve with the industry, the space will be able to adapt and support the business for many years to come. LOCATION

Columbia City, IN

COMPLETED

August 2020

SIZE

35,970 sf

COST

18

$233,000

Wo r k p l a c e O ve r view


d e signco ll ab o rative.co m

19


20

Wo r k p l a c e O ve r view


ORNL FEDERAL CREDIT UNION Regional Headquarters

Located in Knoxville, Tennessee, the Northshore headquarters for ORNL Federal Credit Union houses various departments in this 24,000-squarefoot building, as well as a credit union branch on the main level. Daylight pours in through the building’s windows and allows for views of the area’s natural landscape. The building’s exterior and interior feature similar finishes to create an inviting feel and celebrate the natural beauty of the area. The finishes and colors throughout are consistent with its other branches and brand. With ORNL’s community in mind, the large conference space was designed to fit employees from various locations for large company gatherings. The first floor features cove spaces and open conference rooms for relaxation or private conversations. LOCATION

Knoxville, TN

COMPLETED

January 2017

SIZE

24,100 sf

COST

$7,100,000

d e signco ll ab o rative.co m

21


BARNES & THORNBURG Office Fit-Out

Law firm Barnes and Thornburg wanted an office that promoted connection and interaction between staff and clients. Their previous location consisted of mostly private offices with very limited community spaces. To combat this, we designed a 15,000-sf sophisticated but not opulent space featuring glass walls that allow for privacy and visibility, as well as provide access to natural light. Each room features unique LED light fixtures, as well as a curated art collection. A variety of wood ceilings are placed throughout the office, featuring an individual profile while using the same wood tone. To connect the indoors to the outdoors, one of Indiana’s largest green roofs, Skyline Park, is accessed from the office. The office is designed with an intentional sense of community meant to draw people out of their offices and into shared spaces. LOCATION

Fort Wayne, IN

COMPLETED

August 2016

SIZE 15,061-sf COST

22

$1,491,617

Wo r k p l a c e O ve r view


d e signco ll ab o rative.co m

23


24

Wo r k p l a c e O ve r view


FORT WAYNE METALS Office Additions

Fort Wayne Metals is adding a 24,000-sf expansion to its building. The expansion includes an executive wing, new entryway, new cafeteria, and space for their continued growth. The new front door will feature an inviting space for guests and employees. Heritage and history of the company will be showcased in internal displays. Using the same material palette as the existing building, the expansion will blend with the company’s past and represent its future. LOCATION

Fort Wayne, IN

COMPLETED

In Progress

SIZE

24,000 sf

COST

$3,500,000

d e signco ll ab o rative.co m

25


NISOURCE Multiple Project Types

NISOURCE • Multiple Facility Master Plans • Hale Ave Renovations • Merillville Canopy • Goshen Structural Assessment • Bristol Field Assessment • Chosen Structural Our utility experience brought us close Assessment HVAC to many company buyouts, and we • Merrillville SLC Storage Garage supported them through design on many • Restroom Renovation different project types. Not only have we maintained a long-lasting and successful NIPSCO relationship with NiSource, but we’ve • Kokomo Operations Center built similar relationships with other Renovation utilities like Frontier. We have continued • LaPorte Master Plan to work with the facility even after the • Hammond Data Center company evolved from GTE to Verizon, and finally Frontier, to help support the AEP new parent company’s mission and • I&M Tower facility needs. • Line Training Facility When company cultures are being combined or transitioned into something new, supporting positive outcomes is of the utmost importance to DC when considering the design direction of the workspace.

26

Wo r k p l a c e O ve r view

FRONTIER • General Operations HR Fit-Out • General Ops Vehicle Access Control • General Ops Executive Offices Expansion • Wayne Trace Field Assessment • Message Center Study • Princeton Re-Roof • Seymour Re-Roof • Data Services Executive Offices • Data Center Second Floor Tower Remodel • Fort Wayne Main HVAC Chiller • Data Center Roof Replacement • 4th Floor Berry St. Battery Room HVAC • Berry Street CLEC 4th HVAC Unit


EXISTING BUILDINGS

EXISTING BUILDINGS

FLEET PARKING

NEW OPEN CANOPY PARKING

NEW WAREHOUSE NEW OPERATIONS

E1

65 T

H

STORAGE YARD

ST R

EE T

d e signco ll ab o rative.co m

27


28

Wo r k p l a c e O ve r view


INDIANA MICHIGAN POWER CENTER Office Renovation

Renovation of an outdated cubicle farm office into a dynamic, collaborative, and open office environment designed to highlight the architectural character of the existing building. Renovated spaces include café, fitness, meeting, conference, open and private office space, and breakout spaces to support a variety of workstyles. LOCATION

Fort Wayne, IN

COMPLETED

February 2016

SIZE

119,710 sf

COST

$3,200,000

d e signco ll ab o rative.co m

29


KATZ, SAPPER, MILLER Office Renovation

Renovation of outdated office space into a new, culture-supporting and collaborative space for a professional services firm. Renovated spaces include conference and training, café, lobby and reception, formal and informal collaboration spaces, and ample transparency between areas to promote connectedness and daylight. LOCATION

Fort Wayne, IN

COMPLETED

August 2016

SIZE 9,000 sf COST

30

$800,000 (excludes FFE)

Wo r k p l a c e O ve r view


d e signco ll ab o rative.co m

31


32

Wo r k p l a c e O ve r view


ALEC FEDERAL CREDIT UNION Headquarters & Branch

ALEC (Abbott Laboratories Employee Credit Union) wanted to create a corporate office where employees and credit union members would feel welcome in a dynamic setting. The nearly 32,000-square-foot building is surrounded by nature with walking trails for employees and the community to access. The building houses offices for ALEC’s executives and investment advisors, as well as a public credit union branch. Large, steel X-braces can be found throughout, celebrating the structure of the building by not covering it with walls. A large employee break room looks out over the area’s beautiful landscape. LOCATION

Gurnee, IL

COMPLETED

May 2019

SIZE

31,340 sf

COST

$8,700,000

d e signco ll ab o rative.co m

33


VERA BRADLEY Headquarters

Vera Bradley wanted to consolidate their design, marketing, and administrative offices to their south Fort Wayne campus. The new 189,000-sf design center combines three buildings into a single, cohesive collaborative facility, creating a positive and creative team environment, while giving Vera Bradley’s facility team a lot of flexibility to stage departments and teams. The Design Center also features fitness facilities, a full-service kitchen, photo labs, conference center, and a “mock” retail store, accommodating a wide range of creative and administrative functions under one roof. LOCATION

Fort Wayne, IN

COMPLETED

February 2015

SIZE 189,000 sf COST

34

$18,000,000

Wo r k p l a c e O ve r view


d e signco ll ab o rative.co m

35


36

Wo r k p l a c e O ve r view


CBRE

|

STURGES Office Fit-Out

CBRE | Sturges wanted a space that would foster teamwork in an open environment. The office renovation was designed to accommodate on-site staff, as well as hotel space for employees that work remote and are only in the office part-time. The office also functions as a testing lab to inspire their clients and a platform for their many services. The cafe is the heart of their office. Located in the center, it accommodates staff break time, lunch hours, and impromptu client meetings. Colors in the finishes, furniture, and graphic installations are inspired by the CBRE | Sturges brand, and they are coordinated to represent their services. Multiple materials, including wood and pops of colors in the furniture, bring energy and lightness to the space. LOCATION

Fort Wayne, IN

COMPLETED

October 2018

SIZE

7,820 sf

d e signco ll ab o rative.co m

37


PIZZA HUT Office Fit-Out

Pizza Hut’s regional headquarters fit-out in the heart of downtown Fort Wayne offered the opportunity to tell their history in a more modern way. Their local history inspired design details from trapezoid tile shapes, pizza inspired lighting design, and custom wall graphics derived from the tablecloths used in the restaurants. Together, these subtle branded moments create a cohesive and modern space that will inspire trainees and offer a more collaborative and open office for its current staff.

38

LOCATION

Fort Wayne, IN

COMPLETED

March 2020

SIZE

8,425 sf

Wo r k p l a c e O ve r view


d e signco ll ab o rative.co m

39


40

Wo r k p l a c e O ve r view


APTERA Office Fit-Out

Digital marketing firm Aptera needed more room for their expanding company that would support their collaborative work style. The loft-like space is in a historic building in downtown Fort Wayne that was once home to a Sears department store. The renovated space promotes culture, increases visibility and flexibility, and has plenty of room for growth. The space also reflects Aptera’s laidback culture, featuring amenities like comfortable seating spaces, an employee kitchen, and a pool table. Aptera is now in a space that helps them attract and retain talent, where employees want to come to work, and is a true reflection of the company’s unique personality. LOCATION

Fort Wayne, IN

COMPLETED

June 2018

SIZE

38,757 sf

COST

$2,600,000

d e signco ll ab o rative.co m

41


SIRVA Office Fit-Out

SIRVA’s office was not only outdated, but it was too small for their growing company. They decided to move downtown to the Indiana Michigan Power building. They renovated seven floors, leaving room for growth. The spaces feature multiple unique conference rooms, a large community space for breaks and company gatherings, and many office and cubicle spaces. Each floor has its own kitchenette. At their previous office, there was very little daylight. Now, occupying floors 5-11 of a 26-story building, everyone has access to daylight and beautiful city views. LOCATION

November 2017

COMPLETED

December 2017

SIZE 67,000 sf COST

42

$2,800,000

Wo r k p l a c e O ve r view


d e signco ll ab o rative.co m

43


Pe ople -first

PLACES




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.