1 minute read
1) Brick Facade Proposal
Advertisement
Sanskardham Campus, Ahmedabad I Facade Design
Successful execution of the front facade for the auditorium at Sanskardham provided the firm an opportunity to design the VIP entrance. In tandem with the design language prevalent at IIM-A, bricks were used for the design proposal.
2) Auditorium Brick Facade
The front facade of the Auditorium at Sanskardham had begun its execution when I joined the firm. The project entailed me designing the flooring layouts, electrical layouts, planter layouts and the seating furniture for its execution on site.
Notes
1. ALL DIMENSIONS ARE IN MMS. & ARE TO BE READ NOT TO MEASURED.
2. DISCREPANCY FOUND IN DRG SHOULD BE BROUGHT TO ARCHITECT'S NOTICE IMMEDIATELY BEFORE COMMENCEMENT OF WORK.
3. ARCH. DRGS. TO HAVE PRECEDENCE OVER STRL. DWGS. FOR LEVELS & DIMENSIONS.
4. LARGE SCALE DRGS TO HAVE PRECENDENCE OVER SMALL SCALE DRGS
5. ALL DIMENSIONS & LEVELS ARE TO THE FINISHED SURFACE DIMENSIONS.
6. WALL MATERIALS TO BE CHECKED WITH RESPECT TO THE ABBREVIATIONS MENTIONED.
7. FINISHES THICKNESS TO BE DEDUCTED OR ADDED IF REQUIRED.
Legends
Notes
1. ALL DIMENSIONS ARE IN MMS. & ARE TO BE READ NOT TO MEASURED.
Legends
2. DISCREPANCY FOUND IN DRG SHOULD BE BROUGHT TO ARCHITECT'S NOTICE IMMEDIATELY BEFORE COMMENCEMENT OF WORK.
3. ARCH. DRGS. TO HAVE PRECEDENCE OVER STRL. DWGS. FOR LEVELS & DIMENSIONS.
4. LARGE SCALE DRGS TO HAVE PRECENDENCE OVER SMALL SCALE DRGS
5. ALL DIMENSIONS & LEVELS ARE TO THE FINISHED SURFACE DIMENSIONS.
6. WALL MATERIALS TO BE CHECKED WITH RESPECT TO THE ABBREVIATIONS MENTIONED.
7. FINISHES THICKNESS TO BE DEDUCTED OR ADDED IF REQUIRED. ABBREVIATIONS
TONO FOOT LIGHT CODE:FPE1188 QUANTITY: 4
FLOORING LIGHTS(FL) CODE:FPE1197 QUANTITY: 6
ERBA SPIKE LIGHTS(SL) CODE:FPE715 QUANTITY:9
SLAB MOUNT LIGHTS CODE:[FPIXXX] QUANTITY: 3
POLAR WALL MOUNTED LIGHTS (WL) QUANTITY: 10
FLOOD LIGHT WALL WASHER(WFL) QUANTITY: