ANTHONY DOMBROWSKI
DESIGN PORTFOLIO
ABOUT a: 2021 Dorchester Ave, Algonquin IL, 60102 p: 847.346.4717 e: dombrowski.anthony@gmail.com w: www.dombrowskidesign.com University of Illinois at Urbana-Champaign, Illinois Bachelor of Science in Architectural Studies 2013 Fourth Year Undergraduate Student GPA: 3.70 Dean’s List
recognition First Place Earl Prize Award for design excellence at Junior Grade Level Spring 2012 Earl Prize Award Nominee for design excellence at Junior Grade Level Fall 2011 AIA Student Award Nomination from Northwest Illinois Chapter for AIA
PREVIEW OF CONTENTS
SOPHOMORE YEAR
T
H
E
M
E
S
A
H
O
| 4 WEEK PROJECT
U
S
E
A single unit house as an exercise in spatial understanding, using a tartan grid as an underlying design guideline. A single shift to the tartan grid was possible to create circulation and transition spaces.
4
FIRST FLOOR PLAN
SECOND FLOOR PLAN
Designed as an oasis from both the desert heat and the stress of urban living. Adjustable shade screens allow occupants the ability to control direct sun and also create privacy from street traffic and neighbouring homes.
T
H
E
M
E
S
A
H
O
U
S
E
|
5
6
CONTROLLED LIGHT PENETRATION
open
open JUNE 5 PM
closed
JANUARY 5 PM
closed T
H
E
M
E
S
A
H
O
U
S
E
|
7
UNIVERSITY OF ILLINOIS ARBORETUM
P A V I L I O N
A T
T H E
JUNIOR YEAR | 3 WEEK PROJECT
A R B O R E T U M
A ceremonial pavilion that is a reaction to the designed landscape of the arboretum. The pavilion should be positioned so that it does not inter fere with the views from the on site Japan house.
8
A lightweight ceremonial pavilion that blends with the surrounding landscape. A transparent skin allows a visual connection to the beautiful variety of flora which surrounds the site while also providing cover to shield occupants from unwelcome elements. The pavilion is intended to be of minimal impact to the already established environment which has been carefully crafted. It is positioned to be hidden from already established views within the arboretum without compromising the views while inside the pavilion.
P A V
I
L
I
O
N
A T
T
H
E
A
R
B
O
R
E
T
U
M
|
9
STRUCTURE
LIGHTWEIGHT METAL SUBFRAME
POLYCARBONATE SKIN SUBFRAME
SKIN
ENGINEERED LUMBER STRUCTURE
10
P A V
I
L
I
O
N
A T
T
H
E
A
R
B
O
R
E
T
U
M
|
11
KICKAPOO STATE PARK, VERMILION, ILLINOIS
B
R
I
D
G
E
T
O
A
JUNIOR YEAR | 5 WEEK PROJECT
V
I
E
W
A research retreat that will accommodate two researchers for two seasons out of the year. Careful attention to the site is a requirement. The site is located on an old strip mine that has been reclaimed by nature.
12
TREE CANOPY AND ROOT DIAGRAM
TYPICAL WALL CONSTRUCTION
TOPOGRAPHIC SITE PLAN
The structure pays close attention
TOP PLATE
to the unique ground conditions. A truss structure that is supported
STRUCTUAL INSULATED PANEL (S.I.P.)
by minimal amounts of columns is an ideal solution. With only a
OPERABLE WINDOW
few columns touching the ground, only
a
small
amount
of
the
s u r r o u n d i n g t r e e ’s r o o t s w i l l b e
MOSITURE BARRIER AND WOOD SIDING FIXED WINDOW
disturbed. The steep slope of the site provides a large challenge for
c o n s t r u c t a b i l i t y.
With
the
option of prefabricating the truss and using SIP panels for exterior walls, getting pieces to the site would
B
R
I
D
G
E
be
T
O
considerably
A
V
I
E
e a s i e r.
W
|
13
14
B
R
I
D
G
E
T
O
A
V
I
E
W
|
15
MOSES
B
I
O
LAKE,
JUNIOR YEAR
WASHINGTON
C
A
N
O
| 6
WEEK PROJECT
P
Y
“The goal of the project is to expand and generate a new identity for the network of hostels with biodiesel and electric car charging stations across the United States.”
Group Project With Mike Wong EARL PRIZE AWARD NOMINEE BY STUDIO PROFESSOR FOR DESIGN EXCELLENCE AT JUNIOR LEVEL FALL 2011
16
One Of Two Nominee’s Out Of 10 Projects
EXISTING SITE CONDITIONS
The Bio Canopy is more than just a single solution to a specific design problem. The Bio Canopy aims to develop a new visual language, and create a 21st century icon for the American roadway system. America is fascinated with auto travel and the destination. The project is developed to signal a new generation of auto travel, the electric generation. Long gone are the glory days of 5 liter v8 muscle cars, instead forward thinking consumers are excited for the future of all electric travel. JANUARY 5:00 PM
upper canopy collects rain water
JANUARY 12:00 PM
solar panels on roof collect energy water runs down the canopy and is directed down the columns JUNE 5:00 PM
energy from the solar arrays is transfered for collection
JUNE 12:00 PM
lush grass and green space facilitated by lower temperature and directed water
+
-
+
-
+
-
+
-
energy from the solar arrays is stored in large capacity underground batteries and is distributed to cars
B
I
O
C
A
N
O
P
Y
|
17
HOTEL ELEVATION
0’
64’
128’
CANOPY’S CAN BE ATTACHED DIRECTLY TO THE OLD HOTEL TO “RETRO-FIT” THE OLD STRUCTURE
BIO-CANOPY ARRAY DEPLOYED ACROSS THE SITE TO FACILATE NEW GROWTH AND CREATE CLEAN ENERGY
NEW AREA FOR GREENSPACE REPLACING THE OLD HARDSCAPE AND REDUCING HEAT ISLAND EFFECT
ROADHOUSE ELEVATION EXISTING HOTEL ON SITE
18
ROADHOUSE HOSTEL Currently charging your electric vehicle takes many hours. The roadhouse was developed to provide a services to travellers while waiting for their car to charge. In the near future the time required to charge your car will only get shorter. The “sleep box� is a room where families or individuals can recharge their body while there cars are recharging under the canopies.
B
I
O
C
A
N
O
P
Y
|
19
BRONZEVILLE, CHICAGO ILLINOIS
U
R
B
A
N
I
JUNIOR YEAR | 6 WEEK PROJECT
N
F
I
L
L
Project must be conceived in and predominantly use current technology and materials. The design must be sensitive to the surrounding context while being appropriate for current social and functional needs.
20
Div Ch
Pu
lask
i
Ke
dzi
e
est W
n
ac
ern Da
me
n Ash
lan
d
k
re
rm
h
o
th
e k
st
a
31
0
n
L
W
26
29 elt
isio
go
s
W
ev
ica
ke
9
Ce
os
so
4
Ro
ck
edge
D iv is io
Pu
n
C
lask
i
h ic a g o
L
Ke
dzi
e
a k
Humboldt Park
e
J
Garfield Park 29 0 a
c
est W
k
ern
s
o
n
R o o s
Da
me
n
e v e
Ash
lt
lan
d
94
C e rm a c k
Douglas Park
W 2 6 th
Piotrowski Park W
La
3
1
s
t
This modern infill housing project is designed as a solution to the problems associated with living in a dense urban fabric. The massing was derived to allow light to penetrate three sides of the building. The light entering from the third facade creates an improved living condition for the building inhabitants. Keeping with the historical nature of the street, the facade is designed to maintain the three dimensional aspect of the street and achieved by using similar building materials, while still being a design of the 21st century.
La Ja
node
ke
sh
ore
Millennium Park Grant Park
Mc Kinley Park
Meseum Campus 39th Street Beach
HIGHPOINT OF ROOF: OPTIMAL LOCATION FOR SOLAR PANELS
D iv is
Pu
io n
C
lask
i
h
Sears Tower
ic a g o
L
Ke
dzi
e
a k e
J a
est W
c k s o
o o s
0
n
R
29
ern Da
me
John Hancock Building
n
e v e
Ash
d
4
lt
lan
9 C e rm a c k
1
a
3
k
e
W
s
th
h
6
o
2
re
W s
L
SPACE FOR ROOF GARDEN AND GREEN SPACE
t
Navy Pier
landmark
Millennium Park Macy’s
(Marshall Fields)
Buckingham Fountain Museum Campus
U.S. Celllular Field
Soldier’s Field
West Side
district
Near North
Mc Kinley Park
The Loop
South Side
Ch Ja
th
elt
Div ica
isio
go
n
Pu
las
ki Ke
ke
dz
ie es W
n
0
31
26
ac
ev
La so
9
W W
rm
os
2
Ro Ce
ck
tern Da
me
n
As
k
hla
nd
94
La
st
ke
sh
or
e
path
U
R
B
A
N
I
N
F
I
L
L
|
21
22
0’
12’
24’’’’ UNIT 2 3 BEDROOMS 2.5 BATH 2400 SQ. FT 875 SQ. FT OF PATIO/GARDEN SPACE
N
UNIT 1 3 BEDROOMS 2.5 BATH 2400 SQ. FT 600 SQ. FT OF PATIO/GARDEN SPACE
GARDEN LEVEL
LEVEL 1
LEVEL 2
ROOF TERRACE
LEVEL 3
U
R
B
A
N
I
N
F
I
L
L
|
23
24
U
R
B
A
N
I
N
F
I
L
L
|
25
DOWNTOWN CHICAGO,IL
H
E
L
I
X
T
JUNIOR YEAR | 6 WEEK PROJECT
O
W
E
R
To design a high-rise condominium building with street level retail space in Chicago. The project required designing for the needs of the two different street level functions within a dense urban environment, a range of residential units from studio to three-bedroom and developing a building core all so that the architecture supports daily living. A range of needs from social interaction to those of privacy are addressed at street level and within the individual residential units. Due to the location of the building and the abundance of public transportation, parking was not required.
26
FIRST PLACE EARL PRIZE AWARD FOR DESIGN EXCELLENCE AT JUNIOR LEVEL SPRING 2011 First Place Out Of 80 Students AIA Student Award Nomination from Northwest Illinois Chapter for AIA Designed to embrace the movement of the city. The Helix Tower is never the same from any angle, evoking the interest and encouraging the movement of urban dwellers. Breaking the pristine geometry of the miesian glass box, a subtractive double helix infuses the DNA of the city into the building.
H
E
L
I
X
T
O
W
E
R
|
27
28
N. LA SALLE DR.
GROUND FLOOR
W. CHICAGO AVE.
AMENITIES FLOOR
FITNESS
BANQUET
MENS LOCKER ROOM
WOMENS LOCKER ROOM
DOG RUN
POOL DECK
0’
H
E
L
I
X
T
O
W
8’
24’
E
N
R
|
29
TYPICAL FLOOR
PENTHOUSE UNIT
THE INTERN 1 bedrooms 1.5 baths 850 sq. ft
0’
8’
32’
N
PENTHOUSE ROOF TERRACE
0’
THE PARTNER 2 bedrooms 2 baths 2000 sq. ft
THE ARCHITECT 1 bedrooms 1.5 baths 1200 sq. ft
8’
30
32’ 16’
N
8’
32’
N
H
E
L
I
X
T
O
W
E
R
|
31
DOWNTOWN CHAMPAIGN, IL
M U S E U M
O F
SENIOR YEAR | 14 WEEK PROJECT
A N C I E N T
L I F E
A museum and research facility for downtown Champaign, IL. The site is located on the corner of Neil and Washington Street, adjacent to the existing Orpheum Children’s Museum. The new facility’s main feature is to be the reconstructed skeleton of a small Tyrannosaurus Rex which will be on display in the main exhibit space.
32
The Museum of Ancient Life is designed to be an iconic building for the downtown area; it signals a movement of rehabilitation and revitalization. The northern facade is a reaction to the 7,000 passing cars daily, the parametric louvers facilitate varying levels of visibility to spark interest in the museums exhibits. Once inside the museum, patrons are exposed to cutting edge technology that would otherwise be unattainable to the general public. The goal of the museum is to offer the public an experience unlike that of any other museum and encourage community education.
EET T STR
PROJECT VASARI
MON
CONCEPTUAL ENERGY MODELING
FREE
NEIL STREET
WASHINGTON STREET
Location: Weather Station: Outdoor Temperature: Floor Area: Exterior Wall Area: Average Lighting Power: Peo ple: Exterior Window Ratio: Electrical Cost: Fuel Cost :
Champaign, IL 61820, USA 37369 Max: 91°F/Min: -10°F 28,218 sf 17,859 sf 1.10 W / ft² 1,054 people 0.27 $0.08 / kWh $0.79 / Therm load
Location: Weather Station: Outdoor Temperature: Floor Area: Exterior Wall Area: Average Lighting Power: Peo ple: Exterior Window Ratio: Electrical Cost: Fuel Cost :
fuel con
Champaign, IL 61820, USA 37369 Max: 91°F/Min: -10°F 22,851 sf 15,551 sf 1.10 W / ft² 853 people 0.29 $0.08 / kWh $0.79 / Therm
N
M
U
S
E
U
M
O
F
A
N
C
I
E
N
T
L
I
F
E
|
33
LEGEND 1
FRONT DESK
2
MUSEUM DISPLAY CASE
3
DINOSAUR DISPLAY
4
INTERACTIVE DISPLAY TABLE
5
MODULE SEATING
6
LEARNING TABLES WITH iPAD DISPLAYS
7
3D PRINTING STATIONS
P
PROJECTION WALL
G
INFOGRAPHIC WALL 5 6
4 4
P
LIBRARY
2
7
EXHIBIT SPACE GIFT SHOP
3 5
2
2
OBSERVATION DECK
1 G
ENTRY/ VESTIBULE
OFFICE
COORDINATOR’S OFFICE
up ELEV. MECH.
WOMENS
DIRECTOR’S OFFICE
MENS
ASSISTANT DIRECTOR’S OFFICE
SECRETARY’S AREA
MENS
WOMENS
LOUNGE
dn
dn
up
KITCHEN
JANITOR
EQUIPMENT
HVAC ROOM
WORK ROOM
STORAGE ROOM
ACCOUNTING OFFICE ORENTIATION STORAGE
FIRST FLOOR PLAN
34
SECOND FLOOR PLAN
0’
10’
30’
70’
N
GRASSHOPPER DEFINITION
PARAMETRIC LOUVERS WIDTH
HEIGHT
DENSITY
VISIBILITY
GRASSHOPPER DEFINITION
PARAMETRIC LOUVERS width
height
density
visibility
orientation of louvers
A reaction to the nearly 7,000 cars of daily traffic that pass by the northern facade, a series of parametric louvers are designed to facilitate varying levels of visibility. Based on the values of a sign curve, each louver is rotated by a different degree at both the top and bottom. This results in areas of high and low visibility, sparking interest in those who drive or walk by the museum.
thickness input curve
density
height of louvers depth
INPUT
DIVIDE
EXTRUDE
M
U
S
E
U
M
ROTATE
O
F
A
N
C
I
E
N
T
L
I
F
E
|
35
up
dn
LEGEND
ROOF FRAMING PLAN SECOND FLOOR FRAMING PLAN
GYP. FINISH
UNFINISHED EXPOSED CEILING PAINTED BLACK
SPRINKLER 2’ x 2’ AIR RETURN 2’ x 2’ AIR SUPPLY SLOT AIR SUPPLY FLOURESCENT LIGHT FIXTURE CAN LIGHT FIXTURE
HID TRACK LIGHTING
LED STRIP LIGHTING
2’ x 2’ ARMSTRONG “TECHZONE” LAY-IN CEILING W/ 6” ‘TECHZONE’ PANELS.
EXHAUST FAN
WALL LIGHT
WALL DIFFUSER
HID TRACK LIGHTING
LIBRARY
GIFT SHOP
VAV4
OBSERVATION DECK
EXHIBIT SPACE
MENS
WOMENS
LOUNGE
VAV4
SECRETARY’S AREA
VAV5 VAV3 ASSISTANT DIRECTOR’S OFFICE
VAV5
DIRECTOR’S OFFICE
MENS
WOMENS
ELEV. MECH.
VAV2
VAV3
COORDINATOR’S OFFICE
OFFICE
ENTRY/ VESTIBULE
0’
16’
STORAGE
ORENTIATION
VAV6
KITCHEN
VAV2
N
8’
ACCOUNTING OFFICE
VAV1
4’
SECOND FLOOR REFLECTED CEILING PLAN
ANTHONY DOMBROWSKI
VAV5
WORK ROOM
STORAGE ROOM
HVAC ROOM
JANITOR
VAV1 EQUIPMENT
N
70’ 30’ 10’ 0’
SECOND FLOOR HVAC PLAN FIRST FLOOR HVAC PLAN
AIR RETURN AIR SUPPLY
NOTES VARIABLE AIR VOLUME (VAV) HVAC SYSTEM GROUND UNIT VENTILATOR TO SUPPLIMENT AIR SUPPLYIN STAIR ZONES (ZS1, ZS2)
GYP. FINISH
UNFINISHED EXPOSED CEILING PAINTED BLACK
RETURN AIR PLENUM PER ZONE
GAS FIRED AIR HANDLER W/ PACKAGE UNIT W/R134 A REFRIGENT
LEGEND
SPRINKLER 2’ x 2’ AIR RETURN 2’ x 2’ AIR SUPPLY SLOT AIR SUPPLY FLOURESCENT LIGHT FIXTURE CAN LIGHT FIXTURE LED STRIP LIGHTING
2’ x 2’ ARMSTRONG “TECHZONE” LAY-IN CEILING
36
dn up
LEGEND
GYP. FINISH
UNFINISHED EXPOSED CEILING PAINTED BLACK
SPRINKLER 2’ x 2’ AIR RETURN 2’ x 2’ AIR SUPPLY SLOT AIR SUPPLY FLOURESCENT LIGHT FIXTURE CAN LIGHT FIXTURE
HID TRACK LIGHTING
LED STRIP LIGHTING
EXHAUST FAN
2’ x 2’ ARMSTRONG “TECHZONE” LAY-IN CEILING W/ 6” ‘TECHZONE’ PANELS.
LIBRARY GIFT SHOP
EXHIBIT SPACE
OBSERVATION DECK
MENS
WOMENS
LOUNGE
SECRETARY’S AREA
STORAGE
ORENTIATION
KITCHEN
ACCOUNTING OFFICE
WORK ROOM
STORAGE ROOM
HVAC ROOM
JANITOR
EQUIPMENT
4’
8’
16’
37 | E F I L T N E I C N A F O M U E S U M
ASSISTANT DIRECTOR’S OFFICE
DIRECTOR’S OFFICE
MENS
WOMENS
ELEV. MECH. COORDINATOR’S OFFICE
OFFICE
ENTRY/ VESTIBULE
0’
SECOND FLOOR REFLECTED CEILING PLAN FIRST FLOOR REFLECTED CEILING PLAN
38
M
U
S
E
U
M
O
F
A
N
C
I
E
N
T
L
I
F
E
|
39
1 PLY CONTINOUS MEMBRANE PLASTIC ROOF 1’ PARAPIT WALL
ROOF FINISHED WITH 1-PLY CONTINUOUS PLASTIC MEMBRANE INSULATION SHAVED TO ACHIEVE 1/8” -1’ SLOPE CENMENTOUS PANELS 2” STEEL ROOF DECKING
METAL STUD BACK UP WALL
RIDGE CAP 2” AIR GAP EXTERIOR PANEL 4” CONTINOUS RIDGID INSULATION ROOF T.O.S. 35’ -0”
VAPOR BARRIER 4” RIDIG CONTINUOUS INSULATION 1/2” OSB SHEATHING 4” METAL STUD, 16” O.C. TYP.
STEEL ANGLE W21 X 51 GIRDER TYP. 2-1/2” SPRAY APPLIED FIRE PROOFING TYP.
AIR SUPPLY
W12 X 58 COL. TYP. DOWN LIGHTING
ROOF DETAIL
DROP CEILING
0”
6”
1’ - 6”
3’ - 6”
FIRE PROTECTION
SCALE: 1” = 1’ -0” WATER SUPPLY AND RETURN PIPES
SPLINE FASTENER CONTINUOUS GASKET WEEP HOLE 5/8” SPACING
ALUCOBOND PANEL CONTINUOUS FRAME ALUMINUM CLIP CHANNEL FOR PANEL SYSTEM GIRT 6” Z-CLIP 4” CONTINOUS INSULATION
FLOOR FINISH
1/2” OSB SHEATHING 4” METAL STUD 2 LAYERS OF 5/8” GYP. BOARD
2” CONCRETE FLOOR ON 3” METAL DECK
PANEL SYSTEM DETAIL
LEVEL 2 15’ -0”
0”
3”
9”
1’ - 3”
SCALE: 1” = 6”
W12 X 58 COL. TYP. 2 LAYERS OF 5/8” GYP. BOARD 4” METAL STUD 1/2” OSB SHEATHING 4” CONTINOUS RIDIG INSULATION VAPOR BARRIER 2” AIR SPACE
INTERIOR FLOOR FINISH BASE PLATE J-ANCHOR BOLT 5” FLOOR SLAB SILL PLATE
5” FLOOR SLAB
VAPOR AND MOISTURE BARRIER
GRADE BEAM
FOUNDATION AND GRADE BEAM GROUND 0’ -0”
EXPANSION BOLT COLUMN PIER
COLUMN FOOTING FLOOR INSULATION VAPOR BARRIER
-3 - 6”
FOUNDATION DETAIL 0”
6”
1’ - 6”
3’ - 6”
SCALE: 1” = 1’ -0”
40
41
P
42
H
O
T
O
G
R
A
P
PERSONAL
H
Y
P
H
O
T
O
G
R
A
P
H
Y
|
43
44
P
H
O
T
O
G
R
A
P
H
Y
|
45