Cairns Marine Precinct - Proposed Project Maps - July 2020

Page 1

CAIRNS CBD

TROPICAL REEF SHIPYARD

HMAS CAIRNS

Multiple docking options to 3000 tonnes, with upgrade works progressing to 4000 tonnes capacity. See separate proposed upgrade infrastructure outline

BSE MARITIME SOLUTIONS Multiple vessel capability, and the world’s largest mobile boat hoist (Bessie) with a lifting capability of 1120 tonnes. See separate proposed upgrade infrastructure outline

NORSHIP

Multiple, flexible berthing, layup and docking options with 3 travel lifts up to 400 tonnes. See separate proposed upgrade infrastructure outline

Anchored by three major shipyards, the Cairns port is one of the busiest ports in Australia with capacity to service vessels up to 100 metres and 3000 tonnes.


0m

50m

capacity to accommodate all-weather maintenance

UPGRADE

100m

WESTERN YARD

UPGRADE

workshop to increase efficiency

proposed infrastructure upgrades

EXPAND

paint and blast sheds to accommodate larger vessels

to build resilience into local supply chains

NEW WAREHOUSE

(60x24m) for refits of vessels up to 58m LOA

to accommodate renewable energy

UPGRADE POWER SUPPLY

CONSTRUCT SHED

to modernise and expand maintenance services

CONSTRUCT WORKSHOP

EASTERN YARD

to enhance safety and increase lay up capacity

NEW HARDSTAND

CONSTRUCT SHED

(50x24m) for refits of vessels up to 48m LOA

by 40 metres & 70 metres for in-water maintenance of multiple vessels

EXTEND WHARVES


0m

50m

for in-water berthing of large vessels to accommodate emergency works

RECLAIM LAND

100m

site carpark to safely accommodate increased workforce

UPGRADE

client offices to modernise services and site security

CONSTRUCT

site carpark to safely accommodate increased workforce

UPGRADE

by 30 metres to accommodate docking of two OPVs simultaneously

EXTEND DRY DOCK

proposed infrastructure upgrades

workshop (40x20m) to modernise and expand maintenance services

CONSTRUCT

from 3000 tonne to 4000 tonne capacity

UPGRADE EXISTING SLIPWAY

of slipway to enable safe access to capacity-building work areas

DREDGING

hardstand to accommodate safe use of heavy lift machinery

CONSTRUCT

environmental controls to mitigate risk of potential impacts

UPGRADE


proposed infrastructure upgrades

UPGRADE

shed capacity with a top hat to accommodate larger vessels

CONSTRUCT

superyacht shed (70x28m) to enable climate controlled painting and blasting

MODERNISE RAIL

system to increase efficiency and increase hardstand capacity

CONSTRUCT

OPV shed (105x28m) for refits of vessels up to 100m LOA

CONSTRUCT

5000 tonne Synchrolift (90x20m platform) to modernise docking capabilities

UPGRADE WHARVES with 100 metre extension for in-water maintenance of larger vessels

0m

50m

100m