CAIRNS CBD
TROPICAL REEF SHIPYARD
HMAS CAIRNS
Multiple docking options to 3000 tonnes, with upgrade works progressing to 4000 tonnes capacity. See separate proposed upgrade infrastructure outline
BSE MARITIME SOLUTIONS Multiple vessel capability, and the world’s largest mobile boat hoist (Bessie) with a lifting capability of 1120 tonnes. See separate proposed upgrade infrastructure outline
NORSHIP
Multiple, flexible berthing, layup and docking options with 3 travel lifts up to 400 tonnes. See separate proposed upgrade infrastructure outline
Anchored by three major shipyards, the Cairns port is one of the busiest ports in Australia with capacity to service vessels up to 100 metres and 3000 tonnes.
0m
50m
capacity to accommodate all-weather maintenance
UPGRADE
100m
WESTERN YARD
UPGRADE
workshop to increase efficiency
proposed infrastructure upgrades
EXPAND
paint and blast sheds to accommodate larger vessels
to build resilience into local supply chains
NEW WAREHOUSE
(60x24m) for refits of vessels up to 58m LOA
to accommodate renewable energy
UPGRADE POWER SUPPLY
CONSTRUCT SHED
to modernise and expand maintenance services
CONSTRUCT WORKSHOP
EASTERN YARD
to enhance safety and increase lay up capacity
NEW HARDSTAND
CONSTRUCT SHED
(50x24m) for refits of vessels up to 48m LOA
by 40 metres & 70 metres for in-water maintenance of multiple vessels
EXTEND WHARVES
0m
50m
for in-water berthing of large vessels to accommodate emergency works
RECLAIM LAND
100m
site carpark to safely accommodate increased workforce
UPGRADE
client offices to modernise services and site security
CONSTRUCT
site carpark to safely accommodate increased workforce
UPGRADE
by 30 metres to accommodate docking of two OPVs simultaneously
EXTEND DRY DOCK
proposed infrastructure upgrades
workshop (40x20m) to modernise and expand maintenance services
CONSTRUCT
from 3000 tonne to 4000 tonne capacity
UPGRADE EXISTING SLIPWAY
of slipway to enable safe access to capacity-building work areas
DREDGING
hardstand to accommodate safe use of heavy lift machinery
CONSTRUCT
environmental controls to mitigate risk of potential impacts
UPGRADE
proposed infrastructure upgrades
UPGRADE
shed capacity with a top hat to accommodate larger vessels
CONSTRUCT
superyacht shed (70x28m) to enable climate controlled painting and blasting
MODERNISE RAIL
system to increase efficiency and increase hardstand capacity
CONSTRUCT
OPV shed (105x28m) for refits of vessels up to 100m LOA
CONSTRUCT
5000 tonne Synchrolift (90x20m platform) to modernise docking capabilities
UPGRADE WHARVES with 100 metre extension for in-water maintenance of larger vessels
0m
50m
100m