Drawing List Sheet Number A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16
Title Sheet Floor Plan Building Sections Wall Sections Interior Elevations Interior Elevations Door Schedule Enlarged Plans & Details Details Details Details Furniture Plan Finish Plan Finish Schedule & Elevations RCP Lighting Plan
Classroom View
AFF ACT CW DWG EA EL ELEC ENAM EQ EQUIP FIN FLR FRM GL GYP GWB
INT PLAM PT MTL MIN PLAS PLWD REQ'D RM SCHED S SS SF STD TYP WD
Above Finish Floor Acoustical Tile Casework Drawing Each Elevation Electric Enamel Equal Equipment Finish Floor Frame Glass Gypsum Gypsum Board
Interior Plastic Laminate Paint Metal Minimum Plaster Plywood Required Room Schedule Switch Solid Surface Sheet Flooring Stud Typical Wood
Abbreviations 1/8" = 1'-0"
101 1 A101
Door tag
SIM
1
SIM
Section symbol
A101
Detail callout
Room name Centerline
101 150 SF
North arrow
?
Name Elevation
Level indicator
Room tag
1
Tag
View Name 1/8" = 1'-0" Drawing title
Key to Symbols 1/4" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
GENERAL NOTES 1. The GC shall verify all printed dimensions in field prior to construction. Do not scale drawings. 2. The GC shall verify the location of all partitions in the field and shall confer with the Interior Designer about any existing condition which may affect the general layout as shown on drawings. 3. Blocking in walls shall be provided in all areas where required, which shall include all cabinetry, access panels, closets, and communication panels 4. The GC shall be responsible for filing all documents with the required regulatory agencies, paying related fees, and obtaining required approvals and permits. 5. Sprinkler and HVAC will be coordinated with others; relocation of sprinkler, heat, diffusers, or returns to be coordinated with Interior Designer 6. Installation and trim requirement to be coordinated with Manufacturer and all appropriate Contractors 7. All recessed incandescent fixtures will have thermal protection 8. All fixtures contacting insulation will require special protection 9. All installations will meet federal, state, and local fire and safety codes 10. Circuiting and wiring diagrams done by others 11. All electrical and telephone installations shall be in accordance with federal, state and local codes 12. GC to coordinate all plumbing, mechanical, and electrical work with sub-contractors and engineers.
Description
Date
Title Sheet Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather Pj do Val
A1
5/11/2011 3:22:14 PM
1
Sheet Name
Chase Wall (see partition types) Custom Plaster Partifion (see partition types) Interior Partition (see partition types) Fire-Rated Interior Partition (see partition types)
Key to Wall Types 3/16" = 1'-0" 4 A3
303 1/2" 90 1/2"
106 1/2"
106 1/2"
Women
Men
103
104
EQ
EQ
159"
1
1
2
22 1/2" A14 -
5
84" 3
84"
A3
22 1/2"
4
Reception 2
3
3 2
A14 A5
76"
98 1/2"
EQ
1
EQ
49 1/2"
101
Storage/Wash 102
2 1
A3
3
52"
A3
302 1/2"
153 3/4"
Classroom 192 1/4"
105 9 12
10
A6 11
53"
186"
295 1/2" Floor Plan 3/16" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Floor Plan Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A2
5/11/2011 3:24:46 PM
1
1
North Section 1 3/16" = 1'-0"
1 A5
2
North Section 2 3/16" = 1'-0"
3
South Section 3/16" = 1'-0"
4
East Section 3/16" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Building Sections Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A3
5/11/2011 3:24:54 PM
12"
13 A10
FILL ALL VOIDS WITH FIRE-RATED SEALER WHEN REQUIRED FOR FIRE RATING TOP
METAL RUNNER CHANNEL; FASTEN @ 16" O.C., MAX.
SECTION
PROVIDE RETURN AIR DUCTOWRK; PROVIDE FIRE DAMPER AS REQUIRED
PROVIDE RETURN AIR DUCTOWRK; PROVIDE FIRE DAMPER AS REQUIRED SECTION
SCHEDULED CEILING WALL ANGLE, TYP. ACOUSTICAL INSULATION
0' - 0 5/8"
2
1' - 2 7/8" 1' - 4 1/8"
0' - 0 5/8"
Chase Partition 1" = 1'-0"
FILL ALL VOIDS WITH FIRE-RATED SEALER WHEN REQUIRED FOR FIRE RATING
FILL ALL VOIDS WITH FIRE-RATED SEALER WHEN REQUIRED FOR FIRE RATING
METAL RUNNER CHANNEL; FASTEN @ 16" O.C., MAX.
METAL RUNNER CHANNEL; FASTEN @ 16" O.C., MAX.
TOP
TOP
Non-rated Partition 1" = 1'-0"
METAL STUDS @ 16" O.C., MAX. TYP. 7 1/4" PLASTIC BASE BOARD ON ALL WALL TYPES. METAL RUNNER CHANNEL, FASTEN @ 2'-0" O.C., MAX.
BASE
METAL RUNNER CHANNEL, FASTEN @ 16" O.C., MAX. 0' - 0 5/8"
5/8" GYPSUM GREEN BOARD
PLAN
PLAN BASE
METAL STUDS @ 16" O.C., MAX. TYP. 7 1/4" PLASTIC BASE BOARD ON ALL WALL TYPES.
0' - 4 7/8"
1
PLUMBING PIPES
5/8" GYPSUM BOARD
0' - 0 5/8" 0' - 3 5/8"
SCHEDULED CEILING WALL ANGLE, TYP.
PROVIDE RETURN AIR DUCTOWRK; PROVIDE FIRE DAMPER AS REQUIRED
PLAN
5/8" TYPE X GYPSUM BOARD METAL STUDS @ 16" O.C., MAX.
BASE
TYP. 7 1/4" PLASTIC BASE BOARD ON ALL WALL TYPES. METAL RUNNER CHANNEL, FASTEN @ 16" O.C., MAX.
GYPSUM GREEN BOARD
PROVIDE FIRE-RATED SEALANT AT BASE, BOTH SIDES OF PARTITION
0' - 3 5/8" 0' - 0 5/8" 0' - 4 7/8"
3
PLASTER
SECTION
PAINTED FINISH
Surfaces Painting Studio Allyson Fairweather
5/8" TYPE X GYPSUM BOARD METAL STUDS @ 16" O.C., MAX. TYP. 7 1/4" PLASTIC BASE BOARD ON ALL WALL TYPES.
0' - 3 5/8" 0' - 0 5/8"
0' - 0 5/8"
1-Hour Fire-rated Partition 1" = 1'-0"
SCHEDULED CEILING WALL ANGLE, TYP.
PLAN
SCHEDULED CEILING WALL ANGLE, TYP.
BASE
SECTION
PROVIDE RETURN AIR DUCTOWRK; PROVIDE FIRE DAMPER AS REQUIRED
0' - 4 7/8"
4
No.
METAL RUNNER CHANNEL, FASTEN @ 16" O.C., MAX. PROVIDE FIRE-RATED SEALANT AT BASE, BOTH SIDES OF PARTITION 0' - 0 5/8"
Custom Plaster Partition 1" = 1'-0"
Description
Date
Wall Sections Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A4
5/11/2011 3:25:00 PM
TOP
METAL RUNNER CHANNEL; FASTEN @ 16" O.C., MAX.
Room 101 East 3/16" = 1'-0"
10 A9
Room 101 South 3/16" = 1'-0"
2
56"
26"
4" 32" 4"
60"
C L
C L
60"
4 A8
42"
12"
25"
Wall Mounted Art
Room 101 West 3/16" = 1'-0"
Room 103 North 1/4" = 1'-0"
4
EQ 13" 21"
C L
4"
30" 5
C L
C L
C L
35" 19"
C L
EQ
EQ EQ
6"
Room 103 North 2 1/4" = 1'-0"
6
23"
36"
30"
Room 103 East 1/4" = 1'-0"
C L
32 1/2"
C L
21"
C L
21"
32"
32"
Surfaces Painting Studio Allyson Fairweather
8
No.
27"
34"
40"
Room 103 South 1/4" = 1'-0"
Room 103 West 1/4" = 1'-0"
Description
Date
Interior Elevations Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A5
5/11/2011 3:25:06 PM
7
C L
38"
36" 39"
3
34" 4"
C L
58"
58 1/2"
PLAM-2
27"
1
36" 18"
Room 105 North 3/16" = 1'-0"
84"
9
Room 105 East 3/16" = 1'-0"
11
Room 105 South 3/16" = 1'-0"
18"
70"
18"
10
6 A9
28"
68"
PS-1
Room 105 West 3/16" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Interior Elevations Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A6
5/11/2011 3:25:12 PM
12
Door Number Type
Width
Door Schedule Door Height Thickness Material
1
DR-2 36"
80"
2"
Wood
2
DR-1 36"
84"
2"
Steel
3
DR-1 36"
84"
2"
Steel
36"
Hardware
GL-1 DH-1 Glazing Carmel Tan DH-1 & DH-2 Carmel Tan DH-1 & DH-2
3"
3"
36"
3"
1
4"
3"
76"
84"
4"
41 1/4"
84"
3"
3"
Finish
Elevation of Door Type 1 1/4" = 1'-0"
2
Elevation of Door Type 2 1/4" = 1'-0"
DH-1
MNF: DRA DOOR TYPE: PULL HANDLE FINISH: ANODIZED ALUMINUM
DH-2
MNF: DRA DOOR TYPE: PUSH PLATE FINISH: STAINLESS STEEL
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Door Schedule Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A7
5/11/2011 3:25:16 PM
DOOR HARDWARE
A-1
18"
G
46"
Q
B
F A-2
I
159"
H-1 2 4 A14 A5 -
8 5
J
SN-1 E 6 3
7 4
SN-1 SS-2
D
106 1/2"
1
Enlarged Restrooms Plan 1/4" = 1'-0"
2
Restroom Plumbing Plan 1/4" = 1'-0"
5 1/2" 1 1/2"
6 1/4" 3"
2 1/4"
19"
3/4" Corian
SECURE METAL STUD FRAMING TO STRUCTURE ABOVE PROVIDE CROSS BRACING AS REQD
1"
8"
" 21
12 1.4 3째
3/4" Plywood
9"
MOTORIZED PROJECTION SCREEN
Blocking as Required
ACCESS DOORS AND EXPOSED HOUSING TRIM 3
Projection Screen Detail 1" = 1'-0"
4
Restroom Counter Detail 3/4" = 1'-0"
BATHROOM ACCESSORIES LEGEND 5" WOOD BLOCKING AS REQD. SCHEDULED ACCOUSTIC CEILING TILE STEEL POCKET
1 3/4"
Blackout Shade Detail 1" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Enlarged Plans & Details Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A8
5/11/2011 3:25:21 PM
5
MOTORIZED BLACKOUT SHADE
101"
20" W-1
EQ
EQ
EQ
EQ
EQ
30" 6 1/2" 18"
6 3/4"
6
Casework Elevation 3/8" = 1'-0"
72 1/2"
W-1
18"
5 1/2"
22 1/2"
EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ
COAT HANGER 72 3/4"
COAT HANGER
30"
18"
18"
EQ
Custom Casework Section 1/2" = 1'-0"
7
84" 24"
60"
3"6"
3/ 4"
/4"
26"
1 10
56 1/4"
28 3/4 "
Outlet Blocking as Required
3"
16"
6"
11
2" Gromet
2
31 3/4"
1
133"
74 3/4"
48"
1" TYP.
18"
36.83째
28" 56 3/4"
8
Desk Floor Plan 4'-0" AFF 3/8" = 1'-0"
9
Desk Floor Plan 1'-0" AFF 3/8" = 1'-0"
3 1/4"
4"
1/2" Glass
4"
1" Tubular Steel 1/4" Corian Solid Surface
4"
1" Croma 3Form
34 1/4"
SurFACES Painting Center
32"
Paint Wood Laminate
44"
1/2" Corian
10
Desk North Elevation 3/8" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
11 No.
Description
Date
Desk East Elevation 3/8" = 1'-0"
Details Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ DoVal
A9
5/11/2011 3:25:28 PM
1/2" Chroma 3Form
33"
21"
1/4" TYP.
19" 22"
4" Desk South Elevation 3/8" = 1'-0"
13
5 1/2"
1 1/2" TYP. 4" L-Bracket
18"
Desk West Elevation 3/8" = 1'-0"
1 1/4" 1/2" Glass TYP. 3" Tubular Steel TYP. 1/2" Corian Solid Surface 1/4" Corian Solid Surface
1" TYP.
1 3/4"
4 1/4"
3/4" 2 3/4" 3/4"
3" TYP.
2 1/2"
Wood Laminate
8" L-Bracket
Toggle Bolt & Pin System
Wood Laminate 1" Chroma 3Form 4"
Pin & Bolt System
Blocking as Required 2 1/2"
14
Desk Section 1 3/4" = 1'-0"
14 1/2"
Toggle Bolt & Pin System 1 1/2"
Wood Laminate
8" L-Bracket
7"
3/4" TYP.
14 1/2"
2 3/4"
16 3/4"
3/4" TYP.
Wood Laminate
3/4" Plywood Blocking as Required 15
Desk Section 2 3/4" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Details Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather Checker
A10
5/11/2011 3:25:32 PM
12
4"
4"18 3/4" 11"
2" TYP.
29 1/2"
EQ EQ
29" 5 1/2"
28"
1 1/2"
16 3/4"8 1/2" 4 1/4"
27"
1 3/4"
1/4"
3/4"
1/4" Corian Solid Surface Epoxy
Wood Laminate Blocking as Required 3/4" Plywood
16
Desk Edge Detail 1" = 1'-0"
3" 1"
4 1/4"
1/2" Chroma 3Form
Pin & Bolt System
Desk Signage Detail 3/4" = 1'-0"
SurFACES Painting Center 2" 2 1/4"
2 1/4" 3/4" 2 1/4" 1 1/2"
2 1/4"
2 1/2" 1 1/2"
Desk Signage Detail 2 1" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Details Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A11
5/11/2011 3:25:37 PM
18
5 3/4"
1"
4 1/4" 5 3/4" 4 3/4"
4 1/2"
3" 3 1/2"
4 1/4" 5 3/4" 4 1/4" 3"
2 1/4"
17
FF & E
1 A8
Women
Men
Women
Men
103
104
Reception
Storage/Wash
H-2
CW-1
102
101 CW-1
CW-2 CW-3
SN-2 CW-2 CW-1 CW-3 SS-1
8 A9
CW-2 CW-1
C-1
C-1
CW-3 SN-2 CW-2 CW-1
CW-3 C-3
C-3
Classroom 105 T-1 M
M PD
C-4
Furniture Plan 3/16" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Furniture Plan Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A12
5/11/2011 3:25:41 PM
1
PAINT SCHEDULE
FLOOR FINISHES SCHEDULE PC-1 SF-1
PORCELAIN TILE - CROSSVILLE - MUD PIE 6"x12" SHEET FLOORING - MARMOLEUM - VIVACE ASIAN TIGER
SF-2
SHEET FLOORING - MARMOLEUM - MINERAL - TIGER EYE
SF-3
SHEET FLOORING - MARMOLEUM - MINERAL - MOONSTONE
SUPPLIED AND APPLIED BY THE GENERAL CONSTRACTOR UNLESS NOTED OTHERWISE NOTES: 1. PAINT MANUFACTURT IS SPECIFIED AS BENJAMIN MOORE. 2. PREFERED METHOD OF PAINT APPLICATION IS BY ROLLER PT-1
FLOOR COVERING NOTES
PT-2
1. GROUT TO BE SUPPLIED AND INSTALLED BY GC, TILES TO BE INSTALLED WITH CONSISTENT GROUT WIDTH THROUGHOUT - APPROX 1/16" GROUT JOINT WIDTH.
PT-3
PT-1
PT-2
PT-3
BENJAMIN MOORE # - SEMI-GLOSS LATEX COLOR BENJAMIN MOORE # - SEMI-GLOSS LATEX COLOR BENJAMIN MOORE # - SEMI-GLOSS LATEX COLOR
PAINT NOTES 1. CONTRACTOR TO REVIE W DETAIL SHEETS, FINISH PLANS, AND ELEVATIONS FOR PAINTED SURFACES 2. FINISH COATS MUST NOT SHOW BRUSH MARKS, IF THIS METHOD IS USED VS. ROLLING
START APPLICATION HERE START APPLICATION HERE
Women
Men
103
104
PT-3 PC-1
PC-1
PT-2 PT-2
START APPLICATION HERE
PT-1
SF-1
Reception
PT-2
Storage/Wash
101
SF-1
102
SF-2 Custom paint finish see finish elevation
PT-3
PT-1
Classroom PT-1
SF-2
SF-3
105
START APPLICATION HERE PT-3
Finish Plan 3/16" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Finish Plan Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A13
5/11/2011 3:25:45 PM
1
PT-1 PT-1
PT-1
Contractor will consult with Designer in the field to coordinate plaster wall paint pattern
PC-1
PC-1
Start Tile Application Here Start Tile Application Here Finish Elev Room 103 North 2 Finish Elev Room 103 East 2 3 1/4" = 1'-0" 1/4" = 1'-0"
Finish Elev Room 101 South 1 1/4" = 1'-0"
PT-1
PT-1
PC-1 PC-1
Start Tile Application Here 4
Room Name
Floor Finish
101
Reception
SF-1
102 103
Storage/Wash SF-2 & SF-3 Women PRC-1
104
Men
105
Classroom
Base Finish
Finish Elev Room 103 South 1/4" = 1'-0"
Room Finish Schedule North East South West Wall Wall Wall Wall Finish Finish Finish Finish
5
Finish Elev Room 103 West 1/4" = 1'-0"
Ceiling Finish
Ceiling Height
Area
WB-1
PT-2
PT-3
CUST PT-2 OM
GYP, ACT-1, & ACT-3
108"
295 SF
WB-1
PT-2
PT-1
PT-1
GYP
96"
88 SF
N/A
PT-1 & PT-1 & PT-1 & PT-1 & ACT-4 PC-1 PC-1 PC-1 PC-1
96"
103 SF
PRC-1
N/A
PT-1 & ACT-4 PC-1
96"
103 SF
SF-2 & SF-3
WB-1
PT-1 & PT-1 & PT-1 PORC- PC-1 1 PT-3 PT-1 PT-1
PT-3
114"
426 SF
PT-1
GYP, ACT-2 & ACT-3
Comments See finish elev 1/A15 for custom painted south wall
See finish elev 2-5/A15 for wall finishes See finish elev 2-5/A15 for wall finishes Ceiling height varies - see RCP
1014 SF
Grand total: 5
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
Finish Schedule & Elevations Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A14
5/11/2011 3:25:50 PM
Room Number
Start Tile Application Here
Sprinkler
Supply Air
Supply Air Return Air
Return Air
Linear Light
Wire Hanger Rail
Centerline Projector Ceiling Mounted
P
Name Elevation
Elevation Marker
6" Recessed Can
S
ACT L-Mold GYP L-BRACKET C-BRACKET
Track Light
Switch
Pendant Light
Key to RCP Symbols 1/4" = 1'-0"
2
Classroom Ceiling Detail 1 1/2" = 1'-0"
RCP LEGEND 108"
ACT-1
96"
96"
ACT-4
ACT-4
50 1/2"
45 3/4"
38"
144"
96"
129"
9 1/4"
GYP
GYP
96 1/4"
108"
9 1/4"
96"
GYP 114"
PJ
ACT-2
PS-1
3 A8
141 1/2"
5 A8
114"
BLS-1
Surfaces Painting Studio Allyson Fairweather
No.
Description
Date
RCP Project number Date Drawn by Checked by
201101 5/10/2011 Author Checker
A15
5/11/2011 3:25:55 PM
GYP
RCP 1 3/16" = 1'-0"
3/4"
EQ 6 1/4" EQ
FROSTED GLASS 19"
4" 1/
1/4"
8
54 .1 5째
METAL HOUSING PLATE
9"
8"
9" 2
3 1/4"
18"
1"
3"
7 1/4"
LIGHT BULB
3 1/4"
1 Sconce Detail_Plan 1" = 1'-0"
1
1/4" METAL
2
Sconce Detail_Elevation 1 1" = 1'-0"
Sconce Detail_Elevation 2 1" = 1'-0"
3
LT-1
LT-1
LT-1
LT-1
LT-1
LT-1
LT-1
LT-1
LT-1
LT-1
LT-1
26 3/4"
SS
LT-2
34 1/2"
S
LT-1
72"
S
38"
LT-5
72"
LT-1
LT-1
23"
LT-1
60"
50 1/4"
LT-2 LT-1
LT-1
LT-1
LT-1
72"
LT-3
60"
LT-4
LIGHTING LEGEND
8 32
2 A16
60"
4" 3/
S S LT-1
LT-2
LT-2
Linear Light 6" Recessed Can LT-2
Track Light
LT-2
Pendant Light
Custom Sconce
Lighting Plan 3/16" = 1'-0"
Surfaces Painting Studio Allyson Fairweather
Key to Lighting Symbols 1/4" = 1'-0"
No.
Description
Date
Lighting Plan Project number Date Drawn by Checked by
201101 5/10/2011 Allyson Fairweather PJ Do Val
A16
5/11/2011 3:25:59 PM
4