Junior Year Construction Documents Final

Page 1

Drawing List Sheet Number A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16

Title Sheet Floor Plan Building Sections Wall Sections Interior Elevations Interior Elevations Door Schedule Enlarged Plans & Details Details Details Details Furniture Plan Finish Plan Finish Schedule & Elevations RCP Lighting Plan

Classroom View

AFF ACT CW DWG EA EL ELEC ENAM EQ EQUIP FIN FLR FRM GL GYP GWB

INT PLAM PT MTL MIN PLAS PLWD REQ'D RM SCHED S SS SF STD TYP WD

Above Finish Floor Acoustical Tile Casework Drawing Each Elevation Electric Enamel Equal Equipment Finish Floor Frame Glass Gypsum Gypsum Board

Interior Plastic Laminate Paint Metal Minimum Plaster Plywood Required Room Schedule Switch Solid Surface Sheet Flooring Stud Typical Wood

Abbreviations 1/8" = 1'-0"

101 1 A101

Door tag

SIM

1

SIM

Section symbol

A101

Detail callout

Room name Centerline

101 150 SF

North arrow

?

Name Elevation

Level indicator

Room tag

1

Tag

View Name 1/8" = 1'-0" Drawing title

Key to Symbols 1/4" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

GENERAL NOTES 1. The GC shall verify all printed dimensions in field prior to construction. Do not scale drawings. 2. The GC shall verify the location of all partitions in the field and shall confer with the Interior Designer about any existing condition which may affect the general layout as shown on drawings. 3. Blocking in walls shall be provided in all areas where required, which shall include all cabinetry, access panels, closets, and communication panels 4. The GC shall be responsible for filing all documents with the required regulatory agencies, paying related fees, and obtaining required approvals and permits. 5. Sprinkler and HVAC will be coordinated with others; relocation of sprinkler, heat, diffusers, or returns to be coordinated with Interior Designer 6. Installation and trim requirement to be coordinated with Manufacturer and all appropriate Contractors 7. All recessed incandescent fixtures will have thermal protection 8. All fixtures contacting insulation will require special protection 9. All installations will meet federal, state, and local fire and safety codes 10. Circuiting and wiring diagrams done by others 11. All electrical and telephone installations shall be in accordance with federal, state and local codes 12. GC to coordinate all plumbing, mechanical, and electrical work with sub-contractors and engineers.

Description

Date

Title Sheet Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather Pj do Val

A1

5/11/2011 3:22:14 PM

1

Sheet Name


Chase Wall (see partition types) Custom Plaster Partifion (see partition types) Interior Partition (see partition types) Fire-Rated Interior Partition (see partition types)

Key to Wall Types 3/16" = 1'-0" 4 A3

303 1/2" 90 1/2"

106 1/2"

106 1/2"

Women

Men

103

104

EQ

EQ

159"

1

1

2

22 1/2" A14 -

5

84" 3

84"

A3

22 1/2"

4

Reception 2

3

3 2

A14 A5

76"

98 1/2"

EQ

1

EQ

49 1/2"

101

Storage/Wash 102

2 1

A3

3

52"

A3

302 1/2"

153 3/4"

Classroom 192 1/4"

105 9 12

10

A6 11

53"

186"

295 1/2" Floor Plan 3/16" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Floor Plan Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A2

5/11/2011 3:24:46 PM

1


1

North Section 1 3/16" = 1'-0"

1 A5

2

North Section 2 3/16" = 1'-0"

3

South Section 3/16" = 1'-0"

4

East Section 3/16" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Building Sections Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A3

5/11/2011 3:24:54 PM

12"

13 A10


FILL ALL VOIDS WITH FIRE-RATED SEALER WHEN REQUIRED FOR FIRE RATING TOP

METAL RUNNER CHANNEL; FASTEN @ 16" O.C., MAX.

SECTION

PROVIDE RETURN AIR DUCTOWRK; PROVIDE FIRE DAMPER AS REQUIRED

PROVIDE RETURN AIR DUCTOWRK; PROVIDE FIRE DAMPER AS REQUIRED SECTION

SCHEDULED CEILING WALL ANGLE, TYP. ACOUSTICAL INSULATION

0' - 0 5/8"

2

1' - 2 7/8" 1' - 4 1/8"

0' - 0 5/8"

Chase Partition 1" = 1'-0"

FILL ALL VOIDS WITH FIRE-RATED SEALER WHEN REQUIRED FOR FIRE RATING

FILL ALL VOIDS WITH FIRE-RATED SEALER WHEN REQUIRED FOR FIRE RATING

METAL RUNNER CHANNEL; FASTEN @ 16" O.C., MAX.

METAL RUNNER CHANNEL; FASTEN @ 16" O.C., MAX.

TOP

TOP

Non-rated Partition 1" = 1'-0"

METAL STUDS @ 16" O.C., MAX. TYP. 7 1/4" PLASTIC BASE BOARD ON ALL WALL TYPES. METAL RUNNER CHANNEL, FASTEN @ 2'-0" O.C., MAX.

BASE

METAL RUNNER CHANNEL, FASTEN @ 16" O.C., MAX. 0' - 0 5/8"

5/8" GYPSUM GREEN BOARD

PLAN

PLAN BASE

METAL STUDS @ 16" O.C., MAX. TYP. 7 1/4" PLASTIC BASE BOARD ON ALL WALL TYPES.

0' - 4 7/8"

1

PLUMBING PIPES

5/8" GYPSUM BOARD

0' - 0 5/8" 0' - 3 5/8"

SCHEDULED CEILING WALL ANGLE, TYP.

PROVIDE RETURN AIR DUCTOWRK; PROVIDE FIRE DAMPER AS REQUIRED

PLAN

5/8" TYPE X GYPSUM BOARD METAL STUDS @ 16" O.C., MAX.

BASE

TYP. 7 1/4" PLASTIC BASE BOARD ON ALL WALL TYPES. METAL RUNNER CHANNEL, FASTEN @ 16" O.C., MAX.

GYPSUM GREEN BOARD

PROVIDE FIRE-RATED SEALANT AT BASE, BOTH SIDES OF PARTITION

0' - 3 5/8" 0' - 0 5/8" 0' - 4 7/8"

3

PLASTER

SECTION

PAINTED FINISH

Surfaces Painting Studio Allyson Fairweather

5/8" TYPE X GYPSUM BOARD METAL STUDS @ 16" O.C., MAX. TYP. 7 1/4" PLASTIC BASE BOARD ON ALL WALL TYPES.

0' - 3 5/8" 0' - 0 5/8"

0' - 0 5/8"

1-Hour Fire-rated Partition 1" = 1'-0"

SCHEDULED CEILING WALL ANGLE, TYP.

PLAN

SCHEDULED CEILING WALL ANGLE, TYP.

BASE

SECTION

PROVIDE RETURN AIR DUCTOWRK; PROVIDE FIRE DAMPER AS REQUIRED

0' - 4 7/8"

4

No.

METAL RUNNER CHANNEL, FASTEN @ 16" O.C., MAX. PROVIDE FIRE-RATED SEALANT AT BASE, BOTH SIDES OF PARTITION 0' - 0 5/8"

Custom Plaster Partition 1" = 1'-0"

Description

Date

Wall Sections Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A4

5/11/2011 3:25:00 PM

TOP

METAL RUNNER CHANNEL; FASTEN @ 16" O.C., MAX.


Room 101 East 3/16" = 1'-0"

10 A9

Room 101 South 3/16" = 1'-0"

2

56"

26"

4" 32" 4"

60"

C L

C L

60"

4 A8

42"

12"

25"

Wall Mounted Art

Room 101 West 3/16" = 1'-0"

Room 103 North 1/4" = 1'-0"

4

EQ 13" 21"

C L

4"

30" 5

C L

C L

C L

35" 19"

C L

EQ

EQ EQ

6"

Room 103 North 2 1/4" = 1'-0"

6

23"

36"

30"

Room 103 East 1/4" = 1'-0"

C L

32 1/2"

C L

21"

C L

21"

32"

32"

Surfaces Painting Studio Allyson Fairweather

8

No.

27"

34"

40"

Room 103 South 1/4" = 1'-0"

Room 103 West 1/4" = 1'-0"

Description

Date

Interior Elevations Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A5

5/11/2011 3:25:06 PM

7

C L

38"

36" 39"

3

34" 4"

C L

58"

58 1/2"

PLAM-2

27"

1


36" 18"

Room 105 North 3/16" = 1'-0"

84"

9

Room 105 East 3/16" = 1'-0"

11

Room 105 South 3/16" = 1'-0"

18"

70"

18"

10

6 A9

28"

68"

PS-1

Room 105 West 3/16" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Interior Elevations Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A6

5/11/2011 3:25:12 PM

12


Door Number Type

Width

Door Schedule Door Height Thickness Material

1

DR-2 36"

80"

2"

Wood

2

DR-1 36"

84"

2"

Steel

3

DR-1 36"

84"

2"

Steel

36"

Hardware

GL-1 DH-1 Glazing Carmel Tan DH-1 & DH-2 Carmel Tan DH-1 & DH-2

3"

3"

36"

3"

1

4"

3"

76"

84"

4"

41 1/4"

84"

3"

3"

Finish

Elevation of Door Type 1 1/4" = 1'-0"

2

Elevation of Door Type 2 1/4" = 1'-0"

DH-1

MNF: DRA DOOR TYPE: PULL HANDLE FINISH: ANODIZED ALUMINUM

DH-2

MNF: DRA DOOR TYPE: PUSH PLATE FINISH: STAINLESS STEEL

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Door Schedule Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A7

5/11/2011 3:25:16 PM

DOOR HARDWARE


A-1

18"

G

46"

Q

B

F A-2

I

159"

H-1 2 4 A14 A5 -

8 5

J

SN-1 E 6 3

7 4

SN-1 SS-2

D

106 1/2"

1

Enlarged Restrooms Plan 1/4" = 1'-0"

2

Restroom Plumbing Plan 1/4" = 1'-0"

5 1/2" 1 1/2"

6 1/4" 3"

2 1/4"

19"

3/4" Corian

SECURE METAL STUD FRAMING TO STRUCTURE ABOVE PROVIDE CROSS BRACING AS REQD

1"

8"

" 21

12 1.4 3째

3/4" Plywood

9"

MOTORIZED PROJECTION SCREEN

Blocking as Required

ACCESS DOORS AND EXPOSED HOUSING TRIM 3

Projection Screen Detail 1" = 1'-0"

4

Restroom Counter Detail 3/4" = 1'-0"

BATHROOM ACCESSORIES LEGEND 5" WOOD BLOCKING AS REQD. SCHEDULED ACCOUSTIC CEILING TILE STEEL POCKET

1 3/4"

Blackout Shade Detail 1" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Enlarged Plans & Details Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A8

5/11/2011 3:25:21 PM

5

MOTORIZED BLACKOUT SHADE


101"

20" W-1

EQ

EQ

EQ

EQ

EQ

30" 6 1/2" 18"

6 3/4"

6

Casework Elevation 3/8" = 1'-0"

72 1/2"

W-1

18"

5 1/2"

22 1/2"

EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ

COAT HANGER 72 3/4"

COAT HANGER

30"

18"

18"

EQ

Custom Casework Section 1/2" = 1'-0"

7

84" 24"

60"

3"6"

3/ 4"

/4"

26"

1 10

56 1/4"

28 3/4 "

Outlet Blocking as Required

3"

16"

6"

11

2" Gromet

2

31 3/4"

1

133"

74 3/4"

48"

1" TYP.

18"

36.83째

28" 56 3/4"

8

Desk Floor Plan 4'-0" AFF 3/8" = 1'-0"

9

Desk Floor Plan 1'-0" AFF 3/8" = 1'-0"

3 1/4"

4"

1/2" Glass

4"

1" Tubular Steel 1/4" Corian Solid Surface

4"

1" Croma 3Form

34 1/4"

SurFACES Painting Center

32"

Paint Wood Laminate

44"

1/2" Corian

10

Desk North Elevation 3/8" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

11 No.

Description

Date

Desk East Elevation 3/8" = 1'-0"

Details Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ DoVal

A9

5/11/2011 3:25:28 PM

1/2" Chroma 3Form


33"

21"

1/4" TYP.

19" 22"

4" Desk South Elevation 3/8" = 1'-0"

13

5 1/2"

1 1/2" TYP. 4" L-Bracket

18"

Desk West Elevation 3/8" = 1'-0"

1 1/4" 1/2" Glass TYP. 3" Tubular Steel TYP. 1/2" Corian Solid Surface 1/4" Corian Solid Surface

1" TYP.

1 3/4"

4 1/4"

3/4" 2 3/4" 3/4"

3" TYP.

2 1/2"

Wood Laminate

8" L-Bracket

Toggle Bolt & Pin System

Wood Laminate 1" Chroma 3Form 4"

Pin & Bolt System

Blocking as Required 2 1/2"

14

Desk Section 1 3/4" = 1'-0"

14 1/2"

Toggle Bolt & Pin System 1 1/2"

Wood Laminate

8" L-Bracket

7"

3/4" TYP.

14 1/2"

2 3/4"

16 3/4"

3/4" TYP.

Wood Laminate

3/4" Plywood Blocking as Required 15

Desk Section 2 3/4" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Details Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather Checker

A10

5/11/2011 3:25:32 PM

12

4"

4"18 3/4" 11"

2" TYP.

29 1/2"

EQ EQ

29" 5 1/2"

28"

1 1/2"

16 3/4"8 1/2" 4 1/4"

27"


1 3/4"

1/4"

3/4"

1/4" Corian Solid Surface Epoxy

Wood Laminate Blocking as Required 3/4" Plywood

16

Desk Edge Detail 1" = 1'-0"

3" 1"

4 1/4"

1/2" Chroma 3Form

Pin & Bolt System

Desk Signage Detail 3/4" = 1'-0"

SurFACES Painting Center 2" 2 1/4"

2 1/4" 3/4" 2 1/4" 1 1/2"

2 1/4"

2 1/2" 1 1/2"

Desk Signage Detail 2 1" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Details Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A11

5/11/2011 3:25:37 PM

18

5 3/4"

1"

4 1/4" 5 3/4" 4 3/4"

4 1/2"

3" 3 1/2"

4 1/4" 5 3/4" 4 1/4" 3"

2 1/4"

17


FF & E

1 A8

Women

Men

Women

Men

103

104

Reception

Storage/Wash

H-2

CW-1

102

101 CW-1

CW-2 CW-3

SN-2 CW-2 CW-1 CW-3 SS-1

8 A9

CW-2 CW-1

C-1

C-1

CW-3 SN-2 CW-2 CW-1

CW-3 C-3

C-3

Classroom 105 T-1 M

M PD

C-4

Furniture Plan 3/16" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Furniture Plan Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A12

5/11/2011 3:25:41 PM

1


PAINT SCHEDULE

FLOOR FINISHES SCHEDULE PC-1 SF-1

PORCELAIN TILE - CROSSVILLE - MUD PIE 6"x12" SHEET FLOORING - MARMOLEUM - VIVACE ASIAN TIGER

SF-2

SHEET FLOORING - MARMOLEUM - MINERAL - TIGER EYE

SF-3

SHEET FLOORING - MARMOLEUM - MINERAL - MOONSTONE

SUPPLIED AND APPLIED BY THE GENERAL CONSTRACTOR UNLESS NOTED OTHERWISE NOTES: 1. PAINT MANUFACTURT IS SPECIFIED AS BENJAMIN MOORE. 2. PREFERED METHOD OF PAINT APPLICATION IS BY ROLLER PT-1

FLOOR COVERING NOTES

PT-2

1. GROUT TO BE SUPPLIED AND INSTALLED BY GC, TILES TO BE INSTALLED WITH CONSISTENT GROUT WIDTH THROUGHOUT - APPROX 1/16" GROUT JOINT WIDTH.

PT-3

PT-1

PT-2

PT-3

BENJAMIN MOORE # - SEMI-GLOSS LATEX COLOR BENJAMIN MOORE # - SEMI-GLOSS LATEX COLOR BENJAMIN MOORE # - SEMI-GLOSS LATEX COLOR

PAINT NOTES 1. CONTRACTOR TO REVIE W DETAIL SHEETS, FINISH PLANS, AND ELEVATIONS FOR PAINTED SURFACES 2. FINISH COATS MUST NOT SHOW BRUSH MARKS, IF THIS METHOD IS USED VS. ROLLING

START APPLICATION HERE START APPLICATION HERE

Women

Men

103

104

PT-3 PC-1

PC-1

PT-2 PT-2

START APPLICATION HERE

PT-1

SF-1

Reception

PT-2

Storage/Wash

101

SF-1

102

SF-2 Custom paint finish see finish elevation

PT-3

PT-1

Classroom PT-1

SF-2

SF-3

105

START APPLICATION HERE PT-3

Finish Plan 3/16" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Finish Plan Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A13

5/11/2011 3:25:45 PM

1


PT-1 PT-1

PT-1

Contractor will consult with Designer in the field to coordinate plaster wall paint pattern

PC-1

PC-1

Start Tile Application Here Start Tile Application Here Finish Elev Room 103 North 2 Finish Elev Room 103 East 2 3 1/4" = 1'-0" 1/4" = 1'-0"

Finish Elev Room 101 South 1 1/4" = 1'-0"

PT-1

PT-1

PC-1 PC-1

Start Tile Application Here 4

Room Name

Floor Finish

101

Reception

SF-1

102 103

Storage/Wash SF-2 & SF-3 Women PRC-1

104

Men

105

Classroom

Base Finish

Finish Elev Room 103 South 1/4" = 1'-0"

Room Finish Schedule North East South West Wall Wall Wall Wall Finish Finish Finish Finish

5

Finish Elev Room 103 West 1/4" = 1'-0"

Ceiling Finish

Ceiling Height

Area

WB-1

PT-2

PT-3

CUST PT-2 OM

GYP, ACT-1, & ACT-3

108"

295 SF

WB-1

PT-2

PT-1

PT-1

GYP

96"

88 SF

N/A

PT-1 & PT-1 & PT-1 & PT-1 & ACT-4 PC-1 PC-1 PC-1 PC-1

96"

103 SF

PRC-1

N/A

PT-1 & ACT-4 PC-1

96"

103 SF

SF-2 & SF-3

WB-1

PT-1 & PT-1 & PT-1 PORC- PC-1 1 PT-3 PT-1 PT-1

PT-3

114"

426 SF

PT-1

GYP, ACT-2 & ACT-3

Comments See finish elev 1/A15 for custom painted south wall

See finish elev 2-5/A15 for wall finishes See finish elev 2-5/A15 for wall finishes Ceiling height varies - see RCP

1014 SF

Grand total: 5

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

Finish Schedule & Elevations Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A14

5/11/2011 3:25:50 PM

Room Number

Start Tile Application Here


Sprinkler

Supply Air

Supply Air Return Air

Return Air

Linear Light

Wire Hanger Rail

Centerline Projector Ceiling Mounted

P

Name Elevation

Elevation Marker

6" Recessed Can

S

ACT L-Mold GYP L-BRACKET C-BRACKET

Track Light

Switch

Pendant Light

Key to RCP Symbols 1/4" = 1'-0"

2

Classroom Ceiling Detail 1 1/2" = 1'-0"

RCP LEGEND 108"

ACT-1

96"

96"

ACT-4

ACT-4

50 1/2"

45 3/4"

38"

144"

96"

129"

9 1/4"

GYP

GYP

96 1/4"

108"

9 1/4"

96"

GYP 114"

PJ

ACT-2

PS-1

3 A8

141 1/2"

5 A8

114"

BLS-1

Surfaces Painting Studio Allyson Fairweather

No.

Description

Date

RCP Project number Date Drawn by Checked by

201101 5/10/2011 Author Checker

A15

5/11/2011 3:25:55 PM

GYP

RCP 1 3/16" = 1'-0"


3/4"

EQ 6 1/4" EQ

FROSTED GLASS 19"

4" 1/

1/4"

8

54 .1 5째

METAL HOUSING PLATE

9"

8"

9" 2

3 1/4"

18"

1"

3"

7 1/4"

LIGHT BULB

3 1/4"

1 Sconce Detail_Plan 1" = 1'-0"

1

1/4" METAL

2

Sconce Detail_Elevation 1 1" = 1'-0"

Sconce Detail_Elevation 2 1" = 1'-0"

3

LT-1

LT-1

LT-1

LT-1

LT-1

LT-1

LT-1

LT-1

LT-1

LT-1

LT-1

26 3/4"

SS

LT-2

34 1/2"

S

LT-1

72"

S

38"

LT-5

72"

LT-1

LT-1

23"

LT-1

60"

50 1/4"

LT-2 LT-1

LT-1

LT-1

LT-1

72"

LT-3

60"

LT-4

LIGHTING LEGEND

8 32

2 A16

60"

4" 3/

S S LT-1

LT-2

LT-2

Linear Light 6" Recessed Can LT-2

Track Light

LT-2

Pendant Light

Custom Sconce

Lighting Plan 3/16" = 1'-0"

Surfaces Painting Studio Allyson Fairweather

Key to Lighting Symbols 1/4" = 1'-0"

No.

Description

Date

Lighting Plan Project number Date Drawn by Checked by

201101 5/10/2011 Allyson Fairweather PJ Do Val

A16

5/11/2011 3:25:59 PM