630, Lorong Pak Midin, Kg Kubang Ikan, Chendering, 21080 Kuala Terengganu, Terengganu Darul Iman.
+6011-16127203 a.afiqmustafa@gmail.com i n s t a g r a m . c o m /a f i q x m u s t a f a
Sketching, illustration, Creativity, Teamwork, Organization.
Design, Rendering, Drafting, Multimedia Design.
THE LIGHT FROM WITHIN
5 - 17
CONSTRUCTION DRAWINGS
18 - 24
ADAPT + REFORM
25 - 45
VOID OF LIGHT
47 - 70
OTHERS
71 - 79
THE
LIGHT FROM
WITHIN
5
P ROJ ECT R EQ U I R E M E N TS
SITE The site is located inside Infrastructure University Kuala Lumpur (IUKL) field and besides Block 5. it is the foremost back side area of this university and the size given for this site is 1026m2 On the north of the site is facing IUKL field, Block 5 on the west, electrical faculties on east and small road to engineering faculties on south. There are also some abandoned building on the site that we can decide either keeping it or demolish it. ISSUES For the main issues, this site is abandoned and far from main road. There are almost no activities of people on it. This area is only a path that students use to passing by to go to their faculties and
6
7
ROOF PLAN NOT TO SCALE
Orientation is set to facing the most exposed or large surface to north and south. This reducing the heat and glare from direct natural light. There are 2 outdoor gyms which are multipurpose and tennis court on the north side. Spectators can choose either watching the games at the steps that specially design for s e a t i n g o r a t p a v i l l i o n l o c a t e d o n f i r s t f l o o r. There
6
9
GROUND FLOOR PLAN NOT TO SCALE
The circulation is separated by public and private areas. Private areas is given for people that have certain permission like a student id and other permision access. The private area is given certain priveleges of facilities including indoor jogging track, clubroom, laundry, medical room, toilets with showers and locker room and pavillion or mini stadium to see sport matches.
PRIVATE AREAS PUBLIC AREAS
FIRST FLOOR PLAN NOT TO SCALE
This floor is completely for private access. The main features of this building, the pavillion is located on north facing multipurpose gymnasium and IUKL field. People who enter this floor will passing the jogging track that have void on middle that
PRIVATE AREAS
10
WEST
NOT TO SCALE
NORTH NOT TO SCALE
SOUTH NOT TO SCALE
EAST
NOT TO SCALE
11
D E TA I L A NOT TO SCALE
D E TA I L B NOT TO SCALE
SECTION X-X NOT TO SCALE
S ECT I O N Y-Y NOT TO SCALE
SECTIONAL PERSPECTIVE NOT TO SCALE
Facade is designed by building blank walls that prevent direct sunlight from entering certain areas. Minimizing as much as posibble openings or windows for west facing wall and lots of openings for north and south walls.
12
R O O F T O F O U N D AT I O N C U T NOT TO SCALE
INTERIOR NOT TO SCALE
EXTERIOR NOT TO SCALE
13
POST & BEAM NOT TO SCALE
EXPLODED NOT TO SCALE
NOT TO SCALE
E M E R G E N CY S TA I R C A S E S E R V I C E S E L E VAT O R
NOT TO SCALE
14
D ES I G N
D EV E LO P M E N T
Notes is showing the process of how and the features and requirements been applied to building in handrawn ideas before implemented it into digital.
16
17
18
L O C AT I O N P L A N NOT TO SCALE
GROUND FLOOR PLAN NOT TO SCALE
19
FIRST FLOOR PLAN NOT TO SCALE
ROOF PLAN NOT TO SCALE
20
N O R T H & S O U T H E L E VAT I O N NOT TO SCALE
W E S T & E A S T E L E VAT I O N NOT TO SCALE
21
S ECT I O N Y-Y & X-X NOT TO SCALE
SECTION A-A & B-B NOT TO SCALE
22
W AT E R S U P P LY S Y S T E M D I A G R A M NOT TO SCALE
S A N I TA RY NOT TO SCALE
23
WINDOW & DOOR SCHEDULES NOT TO SCALE
D E TA I L S NOT TO SCALE
24
ADAPT +
REFORM
25
27
PROMENADE SITE PLAN NOT TO SCALE
29
30
PROGRAMMES PROVIDED IN NCI
L O C AT I O N S i t e i s l o c a t e d 1 . 2 k m
from
templer park.
The institute is residential area.
located
The total square area h e c t a r e s o r 3 2 0 0 0 0 m 2.
is
near about
a 32
There
S PAC E P L A N N I N G
S PAT I A L O R G A N I Z AT I O N
31
32
33
35
SITE PLAN NOT TO SCALE
36
GROUND FLOOR PLAN NOT TO SCALE
1. 2. 3. 4. 5. 6. 7. 8.
Main entrance Entrance elevator Office entrance Office Dining Assembly hall Classroom 1
pump room
37
FIRST FLOOR PLAN NOT TO SCALE
1. 2. 3. 4. 5. 6. 7. 8.
38
Main entrance Lobby Reception Office Fire control room Waiting area Projection room
SECOND FLOOR PLAN NOT TO SCALE
1. 2. 3. 4. 5.
Store Non-permanent gallery Sanitary Exhibitor private room Viewing platform
39
SOUTH NOT TO SCALE
WEST
NOT TO SCALE
NORTH NOT TO SCALE
EAST
NOT TO SCALE
40
SECTION X-X NOT TO SCALE
S ECT I O N Y-Y NOT TO SCALE
41
SECTION Z-Z NOT TO SCALE
L E V I TAT I O N half-circular shaped column and the walls inside the cultural hall which has no column creating a sense of levitation as the area is designed centilevered from the building. 42
V E N T I L A T I O N
several spaces are create with double volumes level and openings are places on top of it to pull the air up through the building due to different air pressure
43
C U LT U R A L H A L L o p e n t o p u b l i c f o r v a r i o u s a c t i v i t i e s a n d e v e n f o r exhibit their crafts. This is designed to create an attractive people activity hence inviting people to visit and learn about craft art.
44
FIRE HYDRANT REQUIREMENT
located away from any obstructed element not less than 2 meter from adjacent building.
BOMBA ACCESS ROUTE
A S S E M B LY A R E A P O I N T
F I R E S TA I R C A S E C O V E R A G E
45
46
VOID OF
LIGHT
47
48
49
52
S PAT I A L R E L AT I O N S H I P
53
SITE PLAN NOT TO SCALE
TO P O G R A P H Y Highest contour in-site is 3m height and gives a slight slope due to the size of the site. The building has been adjusted to fit with the slope and the calculation has been made by creating steps according to slope in building.
54
55
GROUND FLOOR PLAN NOT TO SCALE
56
57
FIRST FLOOR PLAN NOT TO SCALE
58
59
SECOND FLOOR PLAN NOT TO SCALE
60
61
THIRD FLOOR PLAN NOT TO SCALE
62
63
EAST
NOT TO SCALE
NORTH NOT TO SCALE
WEST
NOT TO SCALE
SOUTH NOT TO SCALE
64
SECTION X-X NOT TO SCALE
S ECT I O N Y-Y NOT TO SCALE
D E TA I L S E C T I O N NOT TO SCALE
65
66
DESIGN PROCESS
69
70
71
shelter
board 1
arch 3435 building structure (iii) / assignment 2 group 1 ahmad afiq bin mustafa 161016322 muhammad hidzwanuddin bin mohd hiduan 161016767 muhammad jabbar muim bin mohd fahbell
timber floor
polycarbonate roofing
timber rafter
steel joist
72
73
board 2
74
board 3
75
board 4
76
77
78
79