WalltoWall ADELAIDE CANBERRA BRISBANE MELBOURNE SYDNEY
APR 2016
MORE THAN
69,000
2 m
A F S LO G I C WA L L速 + R E D I WA L L I N S TA L L E D T H I S I S S U E
3+1
134
8,143m2
HEIGHT
UNITS
INSTALLED
AFS AFS AFS AFS AFS
2
LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L® LO G I C WA L L®
1 2 0 M M I N T E R N A L WA L LS 1 2 0 M M I N T/ E X T WA L LS 1 5 0 M M E X T E R N A L WA L LS 1 5 0 M M L I F T & STA I R WA L LS 2 0 0 M M E X T E R N A L WA L LS
ACT
Amaya, 18 Austin Street, Griffith
LARGE SITE Seven buildings, 134 units
AFS DESIGN TOOLBOX Design/specify resources and construction guides
REDUCED CRANAGE Lightweight panels avoid costly tower cranage
3
9+2
52
4,648m2
HEIGHT
UNITS
INSTALLED
A F S LO G I C WA L L速 1 5 0 M M E X T E R N A L WA L LS A F S LO G I C WA L L速 1 6 2 M M PA RT Y WA L LS AFS LOGICWALL速 200MM LIF T & STAIR CORE
4
QLD
19 Playfield Street, Chermside
‘‘
Easy materials handling…not crane dependent…cleaner site… We have used AFS LOGICWALL® on our Playfield St, Chermside project predominantly for its speed of construction and materials handling efficiencies. The lightweight nature of the product enables easy handling means it is not crane dependent, and less wastage makes for a cleaner site. The overall finish of the product, which doesn’t require over-sheeting, is also an extremely attractive benefit. We’ll continue to use AFS on future projects. DARREN TOMARCHIO, PROJECT MANAGER, OPALYN PROPERTY GROUP
’’
Doesn’t require over-sheeting, extremely attractive benefit
5+1
34
1,835m2
HEIGHT
UNITS
INSTALLED
A F S LO G I C WA L L速 1 5 0 M M C O R R I D O R WA L LS A F S LO G I C WA L L速 1 5 0 M M PA RT Y WA L LS AFS LOGICWALL速 200MM LIF T & STAIR CORE
6
QLD
Kingsford Terrace, 260 Clivenden Avenue, Corinda
7
LESS TOOLS AND MATERIALS
NOT WEATHER DEPENDENT
LESS WALL, MORE FLOORSPACE
Reduced transportation time and costs
LOGICWALL速 panels can be stood wet
Increase floor area for each unit by up to 10%
PVC PERMANENT FORMWORK
6+2
52
LOGICWALL®
HEIGHT
UNITS
REDIWALL®
AFS AFS AFS AFS
6,717m2 898m2
LO G I C WA L L® 1 5 0 M M E X T E R N A L WA L LS LO G I C WA L L® 1 5 0 M M C O R R I D O R WA L LS LOGICWALL® 162MM LIF T & STAIR CORE WALLS LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS
AFS REDIWALL® 200MM BASEMENT RETAINING WALLS
8
NSW
4 Charles Street, Canterbury
SPEED OF CONSTRUCTION Reduced transportation time and costs
STRUCTURAL INTEGRITY
SHOP-DRAWN SYSTEM
Solid-feel concrete walls
Rapid installation and less on-site waste
9
PVC PERMANENT FORMWORK
8+
213
8,431m2
BASEMENTS
UNITS
INSTALLED
A F S R E D I WA L L® 1 5 0 M M B A S E M E N T R E TA I N I N G WA L LS A F S R E D I WA L L® 2 0 0 M M B A S E M E N T R E TA I N I N G WA L LS
10
NSW
Sevana, 7–15 Centennial Avenue, Lane Cove
‘‘
Using REDIWALL® for the building’s cores and load-bearing walls saved money and alleviated pressure on the formwork critical path by virture of the speed and simplicity of its installation. GLEB ZINGER, PROJECT MANAGER, NORTH SHORE PROPERTY CONSTRUCTION
’’
Saved money and alleviated pressure on the formwork critical path
9+2
47
4,753m2
HEIGHT
UNITS
INSTALLED
AFS AFS AFS AFS AFS
12
LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS LO G I C WA L L® 1 6 2 M M C O R R I D O R WA L LS LOGICWALL® 162MM STAIR CORE LO G I C WA L L® 1 6 2 M M E X T E R N A L WA L LS LO G I C WA L L® 2 0 0 M M L I F T C O R E
NSW
North 33, 31–35 Devonshire Street, Chatswood
‘‘
Saves time…cleaner site
This is the second time we have used AFS. The building was designed from the get-go to use the AFS system for the walls between apartments and the lift shaft walls. We like the ease of installation and the good acoustic qualities of a solid, concrete core-filled wall. Further, the wall finish is already in place which saves time and the AFS system leads to a cleaner construction site.
’’
YEHAN KOO, CONSTRUCTION MANAGER, PANMAL CONSTRUCTIONS
We like the ease of installation and the good acoustic qualities
‘‘
…achieved additional floor space AFS was well suited to the configuration/topology of the Cargo Lane terraces. The structured approach to design allowed for minimal wall thicknesses, speed of construction and a sleek sharp aesthetic. And the ability to achieve acoustic and fire rating requirements without requiring excessive party wall width resulted in terraces achieving additional floor space. PAUL BULJEVIC,
’’
MANAGING DIRECTOR, PBD ARCHITECTS
5+1
39+8
2,922m2
HEIGHT
UNITS/T.HOUSE
INSTALLED
A F S LO G I C WA L L® 1 5 0 M M E X T E R N A L WA L LS A F S LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS AFS LOGICWALL® 162MM LIF T & STAIR CORE
14
NSW
Cargo Lane, 123–129 Wyndham Street, Alexandria
Minimal wall thicknesses, speed of construction, sleek aesthetic
6
201
10,463m2
HEIGHT
UNITS
INSTALLED
AFS AFS AFS AFS
16
LO G I C WA L L速 1 2 0 M M B A LU ST R A D E WA L LS LO G I C WA L L速 1 6 2 M M PA RT Y WA L LS LOGICWALL速 200MM BLADE WALLS LOGICWALL速 200MM LIF T & STAIR CORE
NSW
West Ryde Urban Village, 3 Betts Street, West Ryde
‘‘
Work finished ahead of program
Our structural experience with AFS LOGICWALL® was good during the design stage when various construction options were investigated with Toga Group (the developer builder). The available technical design data and support was most useful in assisting the design and documentation. Toga finalized negotiations with AFS as the preferred loadbearing system for the advantages of overall construction speed in conjunction with the pre-stressed floor structure, and the reduction in slab thicknesses using one way slab design in some areas instead of two way flat plate. The expected time savings were realised when construction work finished significantly ahead of program. ROD WONG, ASSOCIATE DIRECTOR, MEINHARDT AUS
Technical design data and support was most useful
’’
PVC PERMANENT FORMWORK
18+2
77
LOGICWALL®
HEIGHT
UNITS
REDIWALL®
8,605m2 271 m2
A F S LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS AFS LO GICWALL® 200MM LIF T & STAIR CORES A F S LO G I C WA L L® 2 6 2 M M L I F T C O R E AFS REDIWALL® 200MM BASEMENT RETAIN. WALLS
18
NSW
Victoria Tower, 36–38 Victoria Street, Burwood
‘‘
Critical for high-rise construction
AFS LOGICWALL® was an essential element in our structural load bearing wall systems that, combined with the precast system, resulted in an accelerated rapid floor-to-floor cost effective cycle-time was critical for high-rise construction. This would not have been achieved without AFS and precast being installed concurrently and was the only way to meet the functional and financial requirements of the project.
’’
MAROUN TAOUK, MANAGING DIRECTOR, TQM DESIGN & CONSTRUCT
Would not have been achieved without AFS LOGICWALL®
PVC PERMANENT FORMWORK
4+1
23
LOGICWALL®
HEIGHT
UNITS
REDIWALL®
AFS AFS AFS AFS AFS AFS
LO G I C WA L L® 1 6 2 M M E X T E R N A L WA L LS LO G I C WA L L® 1 6 2 M M C O R R I D O R WA L LS LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS LO G I C WA L L® 2 0 0 M M E X T E R N A L WA L LS LO GICWALL® 200MM LIF T & STAIR CORES LO G I C WA L L® 2 0 0 M M PA RT Y WA L LS
AFS REDIWALL® 200MM RAMP WALLS
VIC
20
989m2 177 m2
503 Keilor Road, Niddrie
21
3
14
2,482m2
HEIGHT
UNITS
INSTALLED
AFS AFS AFS AFS AFS AFS AFS AFS
LO G I C WA L L® 1 2 0 M M I N T E R N A L WA L LS LO G I C WA L L® 1 5 0 M M B A LU ST R A D E WA L LS LOGICWALL® 150MM INT/EXTERNAL WALLS LOGICWALL® 150MM CORRIDOR WALLS LO G I C WA L L® 1 5 0 M M PA RT Y WA L LS LO GICWALL® 200MM LIF T & STAIR CORES LOGICWALL® 262MM COLUMN WALLS LOGICWALL® 262MM EXTERNAL WALLS
VIC
22
57 Station Street, Fairfield
FAULTLESS INSTALLATION Panel’s ID-code identifies it with shop drawings
DIFFICULT ACCESS Lightweight panels for easier materials handling on tight sites
REDUCED CRANAGE Not crane dependent, panels can be positioned by hand
23
PVC PERMANENT FORMWORK
6+1
93
LOGICWALL®
HEIGHT
UNITS
REDIWALL®
AFS AFS AFS AFS AFS AFS AFS AFS AFS AFS AFS
6,804m2 1,614 m2
LO G I C WA L L® 1 2 0 M M E X T E R N A L WA L LS LO G I C WA L L® 1 2 0 M M C O R R I D O R WA L LS LO G I C WA L L® 1 2 0 M M PA RT Y WA L LS LO G I C WA L L® 1 5 0 M M C O R R I D O R WA L LS LOGICWALL® 150MM LIF T & STAIR WALLS LO G I C WA L L® 1 6 2 M M I N T/ E X T E R N A L WA L L LO G I C WA L L® 1 6 2 M M C O R R I D O R WA L LS LO G I C WA L L® 1 6 2 M M PA RT Y WA L LS LO G I C WA L L® 2 0 0 M M I N T/ E X T E R N A L WA L L LO G I C WA L L® 2 0 0 M M B L A D E WA L LS LO G I C WA L L® 2 0 0 M M C O LU M N S
‘‘
Just wanted to say a big ‘thank you’ on the use of the AFS walling system for the IVY Project. As a first time user, it’s great to see the ease of availability, as well as its constructing method. Chase Building Group (ACT) decided to look at using the AFS 162 wall system as part of the IVY Projects party wall for its fire and sound rating requirements. Once the wall was installed by the formwork contractor and then the final end product finished by the internal trades, I can truly say what a great product as the finish is unbelievable. I would highly recommend the use of the AFS wall system to anyone as [there] is a product out that really helps builders achieve speed and safety with minimal fuss. ANTONI VUKOJEVIC, PROJECT MANAGER, CHASE BUILDING GROUP
AFS REDIWALL® 200MM BASEMENT RETAIN. WALLS
ACT
24
Ivy Apartments, 39 Nullabor Avenue, Franklin
’’
‘‘
The finish is unbelievable…and [we achieved] speed and safety with minimal fuss.
Used LOGICWALL® for its fire and sound rating capabilities
’’
Certified resistant to fire and water Ideal for basements, columns, party walls, retention tanks, foundation and retaining walls, service and stormwater pits, stair and lift walls.
PVC PERMANENT FORMWORK
26
AFS can help you design and build your next project, contact us at: PVC PERMANENT FORMWORK
1300 727 237 or visit: afswall.com.au
3 men + 1 day = 100m
This information is copyright protected and may not be copied, rebroadcast or redistributed in any way, in whole or in part without the written permission of AFS Systems Pty Ltd. This newsletter is copyright© of AFS Systems Pty Ltd ABN 455 760 727 88.
A three-man team can erect one hundred square metres of LOGICWALL® in just one day
Document No: COR 00011 APR16