CHAPTER 05
NARRATIVE & RESEARCH I have chosen a tripper storey abandoned building located in the middle of CHAN SOW LIN. I had a great site observation journey and I figured out CHAN SOW LIN was a place that crowded with traffic and industries which has caused a heavy traffic happened in front of my selected building. Population in this area are usually around 25-70 yrs. old mostly workers. I have discovered that CHAN SOW LIN used to be golden mining area, which leads it becomes the biggest industrial area in Kuala Lumpur. The average health zone of human physical health in CHAN SOW LIN was critically low caused from the exposed pollutions. This has clearly showed that urbanization has affected mental health through the influences of increased stressors and factors such as overcrowded, polluted environment, high levels of violence and reduced social support which led an unhealthy lifestyle for human It is highly influenced the reason of the concept of biophilia the human. moderating life be chosen, to encourage people to slow down their steps and look more into woods and nature presences. The site and narrative are relating to the proposed project and to introduce to THE LAGOM.
PROGRAMMING
To achieve the continuos’ goal, Lagom has showed a big root to lead people a better lifestyle with understanding the presence of 5 senses, mostly is to touch, sight visual and feel everything as they are proven to the most direct way towards the response of human body’s nervous system. With bringing the senses of touch, sight visual and feels, i created my program proposal to encourage to feel the ambiance and place them in the sense of woods. As this project is aimed a better solution for physical health recovering for the pedestrians in the area of my site there are three programs which are categorized and lead into each of the senses, tactile sensing therapeutic programs leads to the sense of touching; experiential studies leads to the sense of sight visual experiencing; and the healing integration program are more towards the indirect sense of feelings, that they don’t showed inside but they will feel better in the inner way. The programs reveal a visual of displaying the effects of wood textures and shapes upon to the design itself at it is mimicking the bodies of woods itself, where people absorb the negative ions which benefits mood-boosting that created by the woods. Throughout the senses of feelings within woods and humans, it helps human addressing the inner pain of kinetic body system and the imbalance of immune system by exposing under a bad living lifestyle for a long term. According to the proposed programs, they are all working in one word “the Lagom”. It is a moderate therapy healing center which helps to balance human life quality, mental and physical health, to enhance human acknowledge the beautifulness of sensing the nature adaption roots of biophilic presences.
DESIGN DEVELOPMENT AND INSPIRATION Biophilic design is focused on bringing experiences of nature to us in the built environment which patterns to incorporate depends on both needs of the structure and the personal preference of occupants, some people will resonate more with incorporating living textures of environmental features, while others love natural shapes and sounds. The beauty of biophilic design is that its elements can be mixed and matched to create its own personalized ecosystem. The space will utilize the direct and indirect presences to integrate with the multifunctional spaces that assist in the creation of a moderate open and relaxing mindset for visitors once they entered the building. It is a public space with no limitation for one another but a space to be connected between human and nature where people can understand the whole building structure is inspired by the roots in the woods. The Greek root word in biophilia means 'life,' and gives rise mostly to words from the realm of the 'life' sciences. The science behind our standards is based on uniform lateral root spread – roots spreading out evenly like a circle centered on the tree. Standards add in conditions, exceptions, and possible variations; ‘where pre-existing site conditions or other factors indicate that rooting has occurred asymmetrically’, we need to adjust the shape of the root protection area accordingly. So forth, the design itself was inspired from biomorphic forms & patterns, using the structure of tree itself to create ‘a life in shadow ‘to slow down their life being and interacting with the presence of nature in the space, combining curvy into the organic forms also create a soft, calm, and comfortable feelings to users. Also, the natural colors, materials and textures are all connected to each of the spaces as they are the essence of a traditional and industrial generation stimulate the sensations and encourage imagination through its natural relation with nature.
FINAL DESIGN Therefore, how does my design a solution? Highlighting the presence of nature, it is highly and strongly recommended that the incorporation of nature and more sustainable design into the urbanized world. The concept of exposure to natural settings and characteristics has a positive impact on human health and well-being. I attempted to create an optimism space with mimicking the shape of tree’s heart on the layout of the ground floor. There are no specific flows on the floor plans as nature are free for human to explore and integrate with, but the pathway is clearly stands out for the direction which leads them to the next step. For the overall floor plans, the keywords for them are centralized nature which how is the root of the tree spreads out to consolidate the whole structure. In this project, I am not only focusing one sensory but multisensory spaces to tackle the awareness of the world for human to realized. Therefore, how does my design, my space as a solution? As I strongly mentioned biophilic design in my project, the materiality of the whole design was expected to be eco-friendly and user-friendly as there is no aging boundaries for any users. The spaces itself creates awareness of the important using appropriate direct and indirect presence of nature, such as woods can be the most effective ways to benefit human life especially in an industrialization country. Thus, by interacting with the physical activities provided and exposed to the direct presence of nature, can be the most effective ways to benefit human health, either in physical or mental purpose. We could say this project instead of a healing center, but more towards a therapeutic center as it has no boundaries for any generations.
PERSPECTIVES Within all the research applied on the design itself, the design has a strong intension of bringing the nature presences integrate with human lives. Choosing the color of brown yellowish as the main color palette in my perspectives has strongly shows a system of harmonizing the environment and telling a sense of strength and reliability of the spaces. Summarize story of the whole project, THE THE THE THE THE
EXPLORE OF LIFE IS TO UNDERSTAND. PURPOSE OF LIFE IS TO GROW. ADVENTURE OF LIFE IS TO LEARN. NATURE OF LIFE IS TO CHANGE. CHALLENGE OF LIFE IS TO OVERCOME.
That leads to the meaning of everything will be working peace and integrate to each other with harmony.
REFLECTIVE Time flies, here comes the end of the semester and the end of University lifes, I have gone through two hectic and worst semesters, I thought I would failed this semester as well as the pandemic is still happening, and we could only study online as required. Soon, all of the final year batch students will graduate and be prepared to face the future challanges. I hope I am able to overcome some technical issues in future’s working and communicating with using all the knowledge I learnt, studied and taught in Interior Architecture Course. Course Very appreciate those who have been raising me, teaching me while I am lost in my direction, those who are still willing to guide me patietly especially during virtual studies. I wish I could say more, but mostly, I would like to say I have the best uni lifes, friends and classmates ever, thank you.
PROPOSED INTERIOR DESIGN FOR PROJECT THE LAGOM AT THE SELECTED ABANDONED BUILDING BESIDES THE SOUTHGATE COMMERCIAL CENTER LOCATED IN JALAN 2, CHAN SOW LIN, 55200 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR. BA OF ARTS (HONS) IN INTERIOR ARCHITECTURE - SEM 7 ARC60808107032 - ADVANCE INTERIOR ARCHITECTURE DESIGN II HIEW CHAI YAO 0335302
6
5
4
3
2
1
ITEM
COMPONENT 1 DETAILS COMPONENT 2 DETAILS COMPONENT 3 DETAILS
COMPONENTS
SECTION A-A SECTION B-B SECTION C-C
SECTION DRAWINGS
GF - FLOOR FINISHES PLAN MF - FLOOR FINISHES PLAN 1F - FLOOR FINISHES PLAN 2F - FLOOR FINISHES PLAN
FLOOR FINISHES PLAN
GF - LAYOUT PLAN MF - LAYOUT PLAN 1F - LAYOUT PLAN 2F - LAYOUT PLAN ROOF - LAYOUT PLAN
LAYOUT PLAN
GF - SETTING OUT PLAN MF - SETTING OUT PLAN 1F - SETTING OUT PLAN 2F - SETTING OUT PLAN ROOF - SETTING OUT PLAN
BASE WORK
GF - EXISTING PLAN 1F - EXISTING PLAN 2F - EXISTING PLAN ROOF - EXISTING PLAN
EXISTING SITE
DESCRIPTION OF DRAWING
DWG_HCY_SC_03 DWG_HCY_SC_03 DWG_HCY_SC_02
DWG_HCY_SC_01 DWG_HCY_SC_01 DWG_HCY_SC_02
DWG_HCY_FFP_GF_01 DWG_HCY_FFP_MF_02 DWG_HCY_FFP_FF_03 DWG_HCY_FFP_SF_04
DWG_HCY_LP_GF_01 DWG_HCY_LP_MF_02 DWG_HCY_LP_FF_03 DWG_HCY_LP_SF_04 DWG_HCY_LP_RF_05
DWG_HCY_SOP_GF_01 DWG_HCY_SOP_MF_02 DWG_HCY_SOP_FF_03 DWG_HCY_SOP_SF_04 DWG_HCY_SOP_RF_05
DWG_HCY_ELP_GF_01 DWG_HCY_ELP_FF_02 DWG_HCY_ELP_SF_03 DWG_HCY_ELP_RF_04
DRAWING NO.
4 4 4
4 4 4
4 4 4 4
4 4 4 4 4
4 4 4 4 4
4 4 4 4
15 JUL 2021 15 JUL 2021 15 JUL 2021
15 JUL 2021 15 JUL 2021 15 JUL 2021
15 JUL 2021 15 JUL 2021 15 JUL 2021 15 JUL 2021
15 JUL 2021 15 JUL 2021 15 JUL 2021 15 JUL 2021 15 JUL 2021
15 JUL 2021 15 JUL 2021 15 JUL 2021 15 JUL 2021 15 JUL 2021
15 JUL 2021 15 JUL 2021 15 JUL 2021 15 JUL 2021
TARGET DATE
24 JUN 2021 24 JUN 2021 24 JUN 2021
24 JUN 2021 24 JUN 2021 24 JUN 2021
24 JUN 2021 24 JUN 2021 24 JUN 2021 24 JUN 2021
24 JUN 2021 24 JUN 2021 24 JUN 2021 24 JUN 2021 24 JUN 2021
24 JUN 2021 24 JUN 2021 24 JUN 2021 24 JUN 2021 24 JUN 2021
24 JUN 2021 24 JUN 2021 24 JUN 2021 24 JUN 2021
TARGET APPROVED DATE
08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021
DATE DISTRIBUTED
DATE: July 19, 2021
DOCUMENTED BY: HIEW CHAI YAO REVISION NO.
REF NO: DWG_AIA_HCY
PROJECT: THE LAGOM OF BIOPHILIA
LIST OF DRAWINGS
08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021
08 JUL 2021 08 JUL 2021 08 JUL 2021 08 JUL 2021
DATE RECEIVED
MS. SUZY MS. SUZY MS. SUZY
MS. SUZY MS. SUZY MS. SUZY
MS. SUZY MS. SUZY MS. SUZY MS. SUZY
MS. SUZY MS. SUZY MS. SUZY MS. SUZY MS. SUZY
MS. SUZY MS. SUZY MS. SUZY MS. SUZY MS. SUZY
MS. SUZY MS. SUZY MS. SUZY MS. SUZY
DISTRIBUTED TO STATUS
REMARKS
1
2
1170
B 3405
3
4
1345
18288 5964
5
A
6
6404
NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
B
1.
C
NO.
C
5275
C
REVISE
DATE
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
CLIENT: 5425
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT: GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
34004
E
INTERIOR DESIGNER: 5350
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CONTRACTOR:
F
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
G
5392
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
H 1928
DATE: July 1, 2021
I
SCALE: 1 : 55
B
ELP 01
EXISTING GROUND FLOOR SCALE 1:55 (A1)
DRAWING TITLE:
A
EXISTING LAYOUT PLAN - GF
DRAWING NUMBER: DWG_HCY_ELP_GF_01
1
2
1170
B 3405
3
5
4 18288 1345
5964
A
6
6404
1800
A NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
B
1.
C
C
NO.
REVISE
DATE
5280
C
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
CLIENT: 5425
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT: 35802
E
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
INTERIOR DESIGNER: 5350
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CONTRACTOR:
F
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
G
5392
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
H 1928
DATE: July 1, 2021
I
SCALE: 1 : 55
B
A DRAWING TITLE: EXISTING LAYOUT PLAN - FF
ELP 02
EXISTING FIRST FLOOR SCALE 1:55 (A1)
DRAWING NUMBER: DWG_HCY_ELP_FF_02
1
2
1170
B 3405
3
5
4 18288 1345
5964
A
6
6404
1800
A NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
B
1.
C
C
NO.
REVISE
DATE
5280
C
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
CLIENT: 5425
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT: 35802
E
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
INTERIOR DESIGNER: 5350
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CONTRACTOR:
F
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
G
5392
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
H 1928
DATE: July 1, 2021
I
SCALE: 1 : 55
B
A DRAWING TITLE: EXISTING LAYOUT PLAN - SF
ELP 03
EXISTING SECOND FLOOR SCALE 1:55 (A1)
DRAWING NUMBER: DWG_HCY_ELP_SF_03
1
2
1170
B 3405
3
5
4 18288 1345
5964
A
6
6404
1800
A NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
B
1.
C
C
NO.
REVISE
DATE
5280
C
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
CLIENT: 5425
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT: 35802
E
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
INTERIOR DESIGNER: 5350
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CONTRACTOR:
F
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
G
5392
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
H 1928
DATE: July 1, 2021
I
SCALE: 1 : 55
B
A DRAWING TITLE: EXISTING LAYOUT PLAN - ROOF
ELP 04
EXISTING ROOF PLAN SCALE 1:55 (A1)
DRAWING NUMBER: DWG_HCY_ELP_RP_04
1
B
2
1170
B
3
3405
4
5
18288
1345
A
5964
6
6404
NOTE:
W3 P3
W3 P3
W3 P3
W3 P3
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
UP
P1
W2
P1 W1 P1
C
W3 P3
C
C NO.
P1
REVISE
DATE
P1
5275
+50
W2
UP
P5
W1 P1
PROJECT:
P5
D
D3
W3 P3 +100
+100
W1 P1
P6
5425
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
+100
CLIENT:
UP
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
W2
W1 P1 +100
W4 P4
E
ARCHITECT: W3 P3
34004
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
W3 P3
W3 P3
+50
W1
5350
W4 P4
INTERIOR DESIGNER:
W2
W1 P1
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
W3 P3 +150
F
CONTRACTOR:
W3 P3
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
-200
W3 P3
5260
W2 P2 W2 UP
W1
W3 P3 W3 P3 +150
G
-150
-500
W2 P2
W2 P2 -150
5392
+150
+150
D2
D1
DRAWN BY: D1
HIEW CHAI YAO W2 P2
D3 P6
P6
UP
CHECKED BY:
W1 P1
H 1928
MS SUZY D1
D1
D1
D2
DATE: July 2, 2021
W1
I B
SCALE: 1 : 55
A
DRAWING TITLE: CODE
SOP 01
SETTING OUT PLAN - GF SCALE 1:55 (A1)
LEGEND : WALLS & PARTITIONS
CODE
SETTING OUT PLAN - GF
LEGEND : WINDOWS
P1
SELECTED 4500MM(H) X 150MM(W) CUSTOM CONCRETE WALL C/W CEMENT PLASTERING FINISHES
W1
SELECTED 1800MM(R) X 5MM (THK) TEMPERED GLASS C/W WATER RESISTANCE SOLID WOOD FRAME C/W WATERPROOF SEALANT - STAINS FINISHES
P2
SELECTED 4500MM(H) X 150MM(W) CUSTOM CONCRETE C/W SELECTED 15MM(THK) PLYWOOD BACKING FINISHES
W2
SELECTED 2100MM(R) X 5MM (THK) CUSTOM-SHAPED WINDOWS WITH CLEAR GLASS C/W SOLID WOOD FRAMES IN WATERPROOF SEALANT - STAINS FINISHES
P3 P4 P5 P6
SELECTED 4500MM(H) X 150MM(W) CUSTOM CONCRETE WALL SUPPORT BY STEELS REBAR WIRE TO BE CAST ON THE SELECTED COLUMNS C/W CEMENT PLASTERING FINISHES SELECTED 2400MM(H) X 150MM(W) CUSTOM CONCRETE MASONRY WALL C/W CEMENT PLASTERING FINISHES
CODE
LEGEND : DOORS
D1
SELECTED 2200MM(H) X 600MM(L) X 40MM (THK) SOLID WOODEN COMPOSITE DOOR C/W PVC FILM FINISHES
D2
SELECTED 2100MM(H) X 900MM(L) X 40MM (THK) SOLID WOODEN COMPOSITE DOOR C/W PVC FILM FINISHES
EXISTING BRICK WALLS
SELECTED 4500MM(H) X 150MM(W) CUSTOM CONCRETE WALL SUPPORT BY STEELS REBAR WIRE TO BE CAST ON THE SELECTED COLUMNS AND GLUED WITH 20MM(THK) LAMINATED WOOD FINISHES
NEW PURPOSE WORK
SELECTED 4500MM(H) X 150MM(W) BRICK WALLS C/W CEMENT PLASTERING FINISHES
D3
SELECTED 2100MM(H) X 1000MM(L) X 50MM (THK) SOLID WOODEN SLIDING DOOR WITH HARDWARE HIDDEN TRACK C/W ALUMINIUM ALLOY BRUSHED FINISHES
LEGEND : DEMOLISH WORK 150MM(W) NEW PURPOSE BRICK WALLS
DRAWING NUMBER: DWG_HCY_SOP_GF_01
1 1170
2
B
3405
3 1345
4
18288 5964
5
A
6
6404
B
NOTE: 1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
UP
C
C
C
REVISE
DATE
5275
NO.
PROJECT:
D
5425
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
CLIENT: A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
E
ARCHITECT:
5350
34004
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
DN
F
CONTRACTOR:
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
DN
5392
G
DRAWN BY: HIEW CHAI YAO UP
CHECKED BY:
H 1928
MS SUZY
DATE: July 2, 2021
I B
SCALE: 1 : 55
A
DRAWING TITLE: SETTING OUT PLAN - MF SOP 02
SETTING OUT PLAN - MF SCALE 1:55 (A1) LEGEND : EXISTING BRICK WALLS DEMOLISH WORK NEW PURPOSE WORK 150MM(W) NEW PURPOSE BRICK WALLS
DRAWING NUMBER: DWG_HCY_SOP_MF_02
1
2
3
B
1170
3405
4
5
18288
1345
6
A
5964
6404
1800
A B
NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
P1 P9
P1 P9
5373
+50 +50
P13
P13
P14 UP
C
1.
P10
C
C NO.
P13
REVISE
DATE
5280
P13
P9
P7
P11 P5
PROJECT:
D
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
P11 P5
P9
5425
CLIENT:
P7
P7
P11 P5
P11
35802
E
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT:
P11 DN
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
+160 +160
+160 +160 +160
+160
P1 P9
5350
UP
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
+600
P7 P1 P9
P1 P9 +150
F
CONTRACTOR: GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
C1
5260
+150
C1
C1
C1
C1 P11 P5
C1
G
5392
P12
D2
D1
DRAWN BY:
+150
HIEW CHAI YAO UP
D3 P12
CHECKED BY:
P11 P5 P12
1928
H D1 D2
MS SUZY P2 P8
DATE: July 2, 2021
W1
I B CODE
SOP 03
SETTING OUT PLAN - FF SCALE 1:55 (A1)
SCALE: 1 : 55
A LEGEND : WALLS & PARTITIONS
P7
SELECTED 3000MM(H) X 200MM(W) CUSTOM CONCRETE WALL C/W CEMENT PLASTERING FINISHES
P8
SELECTED 3500MM(H) X 150MM(W) CUSTOM CONCRETE C/W SELECTED 15MM(THK) PLYWOOD BACKING FINISHES
P9
SELECTED 3500MM(H) X 150MM(W) CUSTOM CONCRETE WALL C/W CEMENT PLASTERING FINISHES
P10 P11 P12 P13 P14
SELECTED 1200MM(H) X 280MM(W) CUSTOM CONCRETE WALL C/W CEMENT PLASTERING FINISHES SELECTED 3500MM(H) X 150MM(W) CUSTOM CONCRETE WALL SUPPORT BY STEELS REBAR WIRE TO BE CAST ON THE SELECTED COLUMNS AND GLUED WITH 20MM(THK) LAMINATED WOOD FINISHES SELECTED 3500MM(H) X 150MM(W) BRICK WALLS C/W CEMENT PLASTERING FINISHES SELECTED 3500MM(H) X 150MM(W) CUSTOM CONCRETE WALL C/W CEMENT PLASTERING FINISHES SELECTED 2400MM(R) X 75MM(THK) CUSTOM TEMPERED GLASS WALL C/W 100MM(THK) STAINLESS STEEL FRAME SUPPORT
CODE C1
LEGEND : WALLS & PARTITIONS SELECTED 3500MM(H) X 300MM(R) CONCRETE COLUMNS C/W CEMENT PLASTERING FINISHES
DRAWING TITLE: SETTING OUT PLAN - FF
CODE W1
CODE
LEGEND : WINDOWS SELECTED 1800MM(R) X 5MM (THK) TEMPERED GLASS C/W WATER RESISTANCE SOLID WOOD FRAME C/W WATERPROOF SEALANT - STAINS FINISHES
LEGEND : DOORS LEGEND :
D1
SELECTED 2200MM(H) X 600MM(L) X 40MM (THK) SOLID WOODEN COMPOSITE DOOR C/W PVC FILM FINISHES
D2
SELECTED 2100MM(H) X 900MM(L) X 40MM (THK) SOLID WOODEN COMPOSITE DOOR C/W PVC FILM FINISHES
DEMOLISH WORK
D3
SELECTED 2100MM(H) X 1000MM(L) X 50MM (THK) SOLID WOODEN SLIDING DOOR WITH HARDWARE HIDDEN TRACK C/W ALUMINIUM ALLOY BRUSHED FINISHES
150MM(W) NEW PURPOSE BRICK WALLS
EXISTING BRICK WALLS NEW PURPOSE WORK
DRAWING NUMBER: DWG_HCY_SOP_FF_03
1
2
3
B
1170
3405
4
5
18288
1345
6
A
5964
6404
1800
A B
5373
NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
UP
UP
C
1.
C
C
REVISE
DATE
5280
NO.
PROJECT:
DN
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D P16 +50
P16
5425
+50
CLIENT:
+50
P17
W3 P18
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
P17
E
35802
P18
ARCHITECT:
P18 P18
P15
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
P18 P18
5350
P18 P15
INTERIOR DESIGNER:
P18
P17
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
P18 D3
W3
F
CONTRACTOR: P17
W1
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
5260
P15
W3 -150
P15 P16
G P15 P12 DN
D2
P15 P16
5392
D1
DRAWN BY: HIEW CHAI YAO D3 P12
CHECKED BY:
P15
H
MS SUZY
1928
P12 D1 D2
DATE: July 2, 2021
I B
A CODE
SOP 04
SETTING OUT PLAN - SF SCALE 1:55 (A1)
LEGEND : WALLS & PARTITIONS
CODE
SCALE: 1 : 55
LEGEND : DOORS
P15
SELECTED 3200MM(H) X 150MM(W) CUSTOM CONCRETE WALL C/W CEMENT PLASTERING FINISHES
D1
SELECTED 2200MM(H) X 600MM(L) X 40MM (THK) SOLID WOODEN COMPOSITE DOOR C/W PVC FILM FINISHES
DRAWING TITLE:
P16
SELECTED 3200MM(H) X 150MM(W) CUSTOM CONCRETE C/W SELECTED 15MM(THK) WOOD VENEER FINISHES
D2
SELECTED 2100MM(H) X 900MM(L) X 40MM (THK) SOLID WOODEN COMPOSITE DOOR C/W PVC FILM FINISHES
SETTING OUT PLAN - SF
P17
SELECTED 3500MM(H) X 150MM(W) CUSTOM CONCRETE SUPPORT BY SELECTED 15MM(THK) PLYWOOD BACKING IN WOOD VENEER FINISHES
D3
SELECTED 2100MM(H) X 1000MM(L) X 50MM (THK) SOLID WOODEN SLIDING DOOR WITH HARDWARE HIDDEN TRACK C/W ALUMINIUM ALLOY BRUSHED FINISHES
P12
SELECTED 3500MM(H) X 150MM(W) BRICK WALLS C/W CEMENT PLASTERING FINISHES
D3
SELECTED 1200MM(H) X 1400MM(L) X 50MM (THK) DOUBLE WOODEN GARDEN FENCING GATE IN WATERPROOF SEALANT FINISHES
P18
SELECTED 2400MM(H) X 3200MM (L) X 150MM(W) CUSTOM CONCRETE WALL POD C/W CEMENT PLASTERING FINISHES
LEGEND : EXISTING BRICK WALLS
CODE
LEGEND : WINDOWS
W1
SELECTED 1800MM(R) X 5MM (THK) TEMPERED GLASS C/W WATER RESISTANCE SOLID WOOD FRAME C/W WATERPROOF SEALANT - STAINS FINISHES
W3
SELECTED 1200MM(R) X 5MM (THK) TEMPERED GLASS C/W WATER RESISTANCE SOLID WOOD FRAME C/W WATERPROOF SEALANT - STAINS FINISHES
DEMOLISH WORK NEW PURPOSE WORK 150MM(W) NEW PURPOSE BRICK WALLS
DRAWING NUMBER: DWG_HCY_SOP_SF_04
1 1170
2
B 3405
3 1345
4
18288 5964
5
A
6
6404
1800
A B
5373
NOTE:
C
C
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
C REVISE
DATE
5280
NO.
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
5425
CLIENT: A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
35802
ARCHITECT: GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
5350
E
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
F
CONTRACTOR:
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
5392
G
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
1928
H
DATE: July 2, 2021
I B
SCALE: 1 : 55
A
DRAWING TITLE: SETTING OUT PLAN - RP SOP 05
SETTING OUT PLAN - RP SCALE 1:55 (A1) LEGEND : EXISTING BRICK WALLS DEMOLISH WORK
CODE W4
LEGEND : WINDOWS
NEW PURPOSE WORK
SELECTED 4200MM (R) PURPOSE SKYLIGHT C/W TEMPERED GLASS SUPPORTED BY STAINLESS STEEL IN SATIN FINISHES
150MM(W) NEW PURPOSE BRICK WALLS
DRAWING NUMBER: DWG_HCY_SOP_RP_05
1
2
1170
B
3405
3 1345
4
18288 5964
5
A
6
6404
B
5373
NOTE:
C
C
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
C
REVISE
DATE
290142
NO.
PROJECT:
D
5425
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
CLIENT: A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
E
ARCHITECT:
5350
34004
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
F
CONTRACTOR:
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
5392
G
DRAWN BY: HIEW CHAI YAO
CHECKED BY:
H 1928
MS SUZY
DATE: July 1, 2021
I B
A
SCALE: 1 : 55 DRAWING TITLE: LAYOUT PLAN - GF
LP
GROUND FLOOR
01
SCALE 1:55 (A1)
DRAWING NUMBER: DWG_HCY_LP_GF_01
1
2
1170
B
3405
3 1345
4
18288 5964
5
A
6
6404
NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
B
1.
C
C
NO.
REVISE
DATE
5275
C
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
CLIENT: 5425
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT: GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
34004
E
INTERIOR DESIGNER: 5350
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CONTRACTOR:
F
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
G
5392
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
H 1928
DATE: July 1, 2021
I
SCALE: 1 : 55
B
A DRAWING TITLE: LAYOUT PLAN - MF
LP
MEZZANINE FLOOR
02
SCALE 1:55 (A1)
DRAWING NUMBER: DWG_HCY_LP_MF_02
1
2
1170
B 3405
3
5
4 18288
1345
5964
A
6
6404
1800
A NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
B
1.
C
C
NO.
REVISE
DATE
5280
C
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
CLIENT: 5425
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
REFER DWG NO : CD03
E
ARCHITECT: GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
35802
CD
INTERIOR DESIGNER: 5350
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CONTRACTOR:
F
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
G
5392
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
H 1928
DATE: July 1, 2021
I
SCALE: 1 : 55
B
A DRAWING TITLE: LAYOUT PLAN - FF
LP
FIRST FLOOR
03
SCALE 1:55 (A1)
DRAWING NUMBER: DWG_HCY_LP_FF_03
1
2
1170
B 3405
3
5
4
A
18288 1345
5964
6
6404
1800
A NOTE:
B
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
dp 10
1.
0
5373
dp 10 0
dp 10 0
C
C
C
NO.
REVISE
DATE
dp100 dp10
5280
0
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
CLIENT: 5425
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT: 35802
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
E
INTERIOR DESIGNER: 5350
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CONTRACTOR:
F
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
CD
REFER DWG NO : CD02
G
5392
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
H 1928
DATE: July 1, 2021
I
SCALE: 1 : 55
B
A DRAWING TITLE: LAYOUT PLAN - SF
LP
SECOND FLOOR
04
SCALE 1:55 (A1)
DRAWING NUMBER: DWG_HCY_LP_SF_04
1 1170
2
B 3405
3
5
4 18288 1345
5964
A
6
6404
1800
A NOTE: CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
5373
B
1.
C
C
NO.
REVISE
DATE
5280
C
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
D
CLIENT: 5425
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT: 35802
E
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
INTERIOR DESIGNER: 5350
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CONTRACTOR:
F
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
G
5392
DRAWN BY: HIEW CHAI YAO
CHECKED BY: MS SUZY
H 1928
DATE: July 1, 2021
I
SCALE: 1 : 55
B
A DRAWING TITLE: LAYOUT PLAN - ROOF
LP
ROOF PLAN
05
SCALE 1:55 (A1)
DRAWING NUMBER: DWG_HCY_LP_RP_05
1
B
2
1170
3
3405
4
5
18288
1345
A
5964
6
6404
B
NOTE: F6
5373
F2
F7 F5 F6
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
F6
F3
C
F3
C
C
F3
NO.
REVISE
DATE
5275
F1
F7
PROJECT:
D
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
F2
+100
F1
+100
F6
5425
F3
CLIENT: A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
F5
+100
F4
E
ARCHITECT:
F6
34004
F6
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
F8
F2
+50
5350
F5
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
F6 F2
+150
F
CONTRACTOR: GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
5260
-200
F6
F9 F6
G
-500
F8 F5
-150
5392
+150
+150
F1
DRAWN BY:
F8
HIEW CHAI YAO F10 F8 F10
H
CHECKED BY:
1928
MS SUZY F10
F3
DATE: July 2, 2021
I B
SCALE: 1 : 55
A
DRAWING TITLE: CODE SYM.
FFP 01
FLOOR FINISHES PLAN - GF
DESCRIPTION
CODE SYM.
F1
SELECTED 600MM(L) X 600MM(W) MULTIPLE COLORS WOOD VINYL FLOOR TILES C/W VARNISH FINISHES
F7
F2
SELECTED 4.75MM (THK) BRUSHED FINE SAND FINISHES
F8
SCALE 1:55 (A1) F3 F4 F5 F6
SELECTED 600MM(L) X 600MM(W) X 9MM (H) LANDSCAPING ARTIFICIAL GRASS CARPET C/W SBR LATEX BACKING SELECTED 17000MM(L) X 2700MM(W) NATURE GRASS PILE TO BE PLANTED ON THE LANDSCAPE PURPOSE SELECTED 600MM(L) X 600MM(W) BAMBOO TILES IN MATRIX FINISHES SELECTED FINE SAND STONES AGGREGATE FINISHES IN LATEX BACKING
DESCRIPTION
FLOOR FINISHES PLAN - GF
SELECTED 20MM (THK) MARBLE FLOOR TILES IN POLISHED FINISHES SELECTED 1200MM(L) X 600MM (W) X 50MM (THK) TIMBER FLOOR TILES IN WOOD STAINING FINISHES
F9
SELECTED 600MM(L) X 600MM(W) X 20MM (THK) OAK WOOD TILES IN VARNISH FINISHES
F10
RAW CONCRETE FINISHES TO BE POURED AND POLISHED AS FINISHES AFTER FLOORING CONSTRUCTION IS DONE
DRAWING NUMBER: DWG_HCY_FFP_GF_01
1 1170
2
B
3405
3
4 1345
A
5
18288 5964
6
6404
B
5373
NOTE:
C
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
C
C
REVISE
DATE
5275
NO.
PROJECT:
D
5425
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
CLIENT: F6
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
F2
F5
E
ARCHITECT: 34004
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
5350
F3
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
F
CONTRACTOR:
5260
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
F9
5392
G
DRAWN BY: HIEW CHAI YAO
CHECKED BY:
H 1928
MS SUZY
DATE: July 2, 2021
I B
SCALE: 1 : 55
A
DRAWING TITLE: CODE SYM. F6
FFP 02
FLOOR FINISHES PLAN - MF
F2
SCALE 1:55 (A1)
F3 F9 F5 F11
DESCRIPTION
FLOOR FINISHES PLAN - MF
SELECTED FINE SAND STONES AGGREGATE FINISHES IN LATEX BACKING SELECTED 4.75MM (THK) BRUSHED FINE SAND FINISHES SELECTED 600MM(L) X 600MM(W) X 9MM (H) LANDSCAPING ARTIFICIAL GRASS CARPET C/W SBR LATEX BACKING SELECTED 600MM(L) X 600MM(W) X 20MM (THK) OAK WOOD TILES IN VARNISH FINISHES SELECTED 600MM(L) X 600MM(W) BAMBOO TILES IN MATRIX FINISHES SELECTED 3650MM(L) BLACK RUBBER NETTING SUPPORTED BY STAINLESS STEEL IN SATIN FINISHES
DRAWING NUMBER: DWG_HCY_FFP_MF_02
1
2
3
B
5
4
6
A
18288 1170
3405
1345
5964
6404
1800
A F10
F10
B
NOTE: 1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
F1 F3 F3
5373
+50 +50
F10
C
C
C F3
REVISE
DATE
5275
NO.
F3 F8
D
PROJECT:
F1
F3
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
F1
5425
F3 F3
CLIENT: A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
F8
E
35798
F7
ARCHITECT: GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
+160 +160 +300 +160
+160 +160 +300 +160
F3
5350
F8
INTERIOR DESIGNER:
+600
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
F1
+150
F
CONTRACTOR: GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
5260
F12
F3
5392
G
F10
DRAWN BY:
+150
HIEW CHAI YAO F10 F10
F12
CHECKED BY:
H 1928
MS SUZY
F10
DATE: July 2, 2021
I B
A
SCALE: 1 : 55 DRAWING TITLE:
DESCRIPTION
FLOOR FINISHES PLAN - FF
SELECTED 600MM(L) X 600MM(W) MULTIPLE COLORS WOOD VINYL FLOOR TILES C/W VARNISH FINISHES SELECTED 600MM(L) X 600MM(W) X 9MM (H) LANDSCAPING ARTIFICIAL GRASS CARPET C/W SBR LATEX BACKING SELECTED 20MM (THK) MARBLE FLOOR TILES IN POLISHED FINISHES SELECTED 1200MM(L) X 600MM (W) X 50MM (THK) TIMBER FLOOR TILES IN WOOD STAINING FINISHES
DRAWING NUMBER:
F10
RAW CONCRETE FINISHES TO BE POURED AND POLISHED AS FINISHES AFTER FLOORING CONSTRUCTION IS DONE
DWG_HCY_FFP_FF_03
F12
SELECTED 600MM(L) X 600MM(W) ENGINEERED FIBER WOOD FINISHES TO PURPOSE SAFETY AND USER FRIENDLY REQUIREMENT
CODE SYM. F1
FFP 03
FLOOR FINISHES PLAN - FF SCALE 1:55 (A1)
F3 F7 F8
1
2
3
B
5
4
6
A
18288 1170
3405
1345
5964
6404
1800
A F3 F3
F3
B
NOTE: F1
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
F8 F8
5373
F1
F5
C
C
C F3
NO.
5275
F3
REVISE
DATE
F5
F1
PROJECT:
D
PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
F1
F8 F2
+50
5425
+50
F2
CLIENT:
+50
F3
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
F2 F2 F5 F5
35798
E
F5 F5
ARCHITECT:
F10
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
F5 F10 F5 F10
5350
F5
INTERIOR DESIGNER:
F5
GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
F5
F
CONTRACTOR:
F11
F3
5260
F1
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
F11
F1
-150
G F1
5392
F1
F8
F10
DRAWN BY: HIEW CHAI YAO
F10 F10
F11
F10
CHECKED BY:
H 1928
MS SUZY
F10
DATE: July 2, 2021
I B
CODE SYM.
FFP 04
FLOOR FINISHES PLAN - SF
SCALE: 1 : 55
A
DESCRIPTION
F1
SELECTED 600MM(L) X 600MM(W) MULTIPLE COLORS WOOD VINYL FLOOR TILES C/W VARNISH FINISHES
F2
SELECTED 4.75MM (THK) BRUSHED FINE SAND FINISHES
F3
SCALE 1:55 (A1) F5
SELECTED 600MM(L) X 600MM(W) X 9MM (H) LANDSCAPING ARTIFICIAL GRASS CARPET C/W SBR LATEX BACKING SELECTED 600MM(L) X 600MM(W) BAMBOO TILES IN MATRIX FINISHES
F8
SELECTED 1200MM(L) X 600MM (W) X 50MM (THK) TIMBER FLOOR TILES IN WOOD STAINING FINISHES
F10
RAW CONCRETE FINISHES TO BE POURED AND POLISHED AS FINISHES AFTER FLOORING CONSTRUCTION IS DONE
F11
SELECTED 3650MM(L) BLACK RUBBER NETTING SUPPORTED BY STAINLESS STEEL IN SATIN FINISHES
DRAWING TITLE: FLOOR FINISHES PLAN - SF
DRAWING NUMBER: DWG_HCY_FFP_SF_04
A
B
D
C
F
E
H
G
I NOTE:
35804 1800
5373
5275
5425
5350
5261
5392
1928
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
CH =3500MM
SECOND FLOOR
CH =3500MM
NO.
REVISE
DATE
FIRST FLOOR
CH = 4500MM
MEZZANINE = 1900MM
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
GROUND FLOOR
CLIENT: SC
SECTION B-B'
001
SCALE 1:90 (A1)
A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT: GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
DD
REFER DWG NO : DD01
CD
REFER DWG NO : CD01
CONTRACTOR:
I
H 1928
F
G 5392
5261
E 5350
D 5425
5275
A
B
C 5373
1800
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
CH =3500MM
SECOND FLOOR
CH =3500MM
DRAWN BY: HIEW CHAI YAO FIRST FLOOR
CH = 4500MM
CHECKED BY: MS SUZY MEZZANINE = 1900MM
DATE: July 18, 2021
GROUND FLOOR
SCALE: AS SHOWN DRAWING TITLE: SC
SECTION A-A'
002
SCALE 1:90 (A1)
SECTION DRAWINGS
DRAWING NUMBER: DWG_HCY_SC_01
355MM (W) METAL CAP CONCRETE ROOF SLAB DOW STYROFOAM RTM - X OSB SHEATING
RIGID INSULATION
20mm (w) MEMBRANE STRIP UNDER PARAPET FOLDED DOWN OVER EXTERIOR RIGID INSULATION
WATER PROOFING MEMBRANE
NOTE:
34MM (W) GYPSUM BOARD WITH SEMI PERMEABLE (LATEX) PAINT
CAVITY INSULATION
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
SEALANT, ADHESIVE OR GASKET AT TOP PLATE
POLYMER MODIFIED (PM) OR TRADITIONAL CEMENT STUCCO
BUILDING PAPER BOND BREAK OVER DRAINAGE PLANE
METAL LAITH
DD
DETAILING DRAWING 01
01
SCALE 1:10
NO.
1
2
3
4
REVISE
DATE
6
5 18288
1170
187279
1345
5964
6404
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
CH =3500MM
CLIENT: A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
ARCHITECT:
SECOND FLOOR
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
CH =3500MM
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
FIRST FLOOR
CH = 4500MM
CONTRACTOR: GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
MEZZANINE = 1900MM
GROUND FLOOR
SC
SECTION C-C'
003
SCALE 1:55 (A1)
DRAWN BY: HIEW CHAI YAO
458
241MM (R.) HOLLOW STAINLESS STEEL POLE IN SATIN FINISHES TO SUPPORT THE COMPONENT
44 44 44
133.3657
611
836
288
836
CHECKED BY:
241 89
MS SUZY
DATE: July 6, 2021
1382
CONNECTED WIRING TO THE MOVABLE TURNING COMPONENT FOR GALLERY SHOW CASE WITH THE SOCKET 2817
CD2
241 301.4319 29 50.5808
140
50.5808 28.802560.2864
SCALE: AS SHOWN
BCD 3D
253
93.8121
327
CD2
DRAWING TITLE: SECTION DETAILING DRAWINGS
164 99
241MM (W) U - SHAPE METAL PLATE TO SUPPORT AND FIXED THE STAINLESS STEEL HOLLOW POLE TO AVOID FROM MOVING
56.1879
50MM (THK) MOVABLE BACKER BEAM WITH LUMBER 30MM(THK) PLYWOOD WITH GLUES AND SCREWED
150.0000
21.2292 233.9044
D
BLOW UP COMPONENT DETAIL 03D
DRAWING NUMBER:
SCALE 1:5
DWG_HCY_SC_02
CD
COMPONENT DETAILING 03
03
SCALE 1:20
192.6000 4.0000 15.5200 4.0000 8.00007.0000
60
20MM BACKER PLYWOOD TO FIX THE ORGANIC FORMS TO BE POURED WITH CEMENT 40MM INSULATION COMES AFTER CONCRETE FORMS ARE FORMED
R19
CD
1
313
20MM(THK) STEEL STUD C/W CUSTOMADE 15MM(THK) BRANDED GYPSUM PANEL
NOTE:
15MM(DIA.) METAL POLE FOLLOWS WITH WIRE MESH TO FIX THE SHAPE OF THE FORMS TO BE CAST IN CONCRETE
BLOW UP COMPONENT DETAILING 01A
BCD 1A
SCALE 1:5
1.
CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS.
2.
FIGURE DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING.
3.
DISCREPANCIES OR INCONSISTENCIES IN THIS DRAWINGS OR BETWEEN DRAWINGS ARE TO ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY FOR INCORRECT WORKS.
4.
COPYRIGHT OF DESIGN SHOWN HEREON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.
CD 1
145 193
100
NO.
153
107MM (W) U-STEEL STUDS TO SUPPORT THE STEEL TRACK ALL ALONG THE POD FORMS
90 35 20 35
180
8
19MM POURED CONCRETE FIXED FORM WITH WHITE AGGREGATE SMOKE PLASTER FINISHES 60MM BACKER BEAM WITH LUMBER & 23MM (THK) PLYWOOD C/W GLUED AND SCREWED
60
19MM(THK) SOLID WOOD BASEBOARD, PLANED TO MATCHING THICKNESS & SCRIBED TO FINISH FLOOR
A
NUTS & BOLTS TO BE SCREWED THROUGH THE L-METAL PLATE TO SUPPORT THE BACKER BEAM
B
10MM (W) L-SHAPE METAL PLATE TO BE BOLTED WITH THE NUTS & BOLTS THROUGH THE BACKER BEAM
1B
COMPONENT DETAILING 01
01
SCALE 1:15
PROJECT: PROPOSED INTERIOR DESIGN FOR THE LAGOM LOCATED BESIDE THE SOUTHGATE COMMERCIAL CENTER, JALAN DUA, CHAN SOW LIN, KUALA LUMPUR. FEDERAL TERRITORY OF KUALA LUMPUR.
CLIENT: A+C Corp. Design. G 2, Jalan Hang Kasturi, City Centre, 50050 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
BLOW UP COMPONENT DETAIL 01B
BCD
CD
REVISE
DATE
319
ARCHITECT:
SCALE 1:5
GDP Architect Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
INTERIOR DESIGNER: GDP Interior.D Group 17, Jalan Setia Kasih 5. Bukit Damansara 50490 Kuala Lumpur WP Kuala Lumpur
PURPOSED ROOFING RAIN WATER DRAINAGE SYSTEM
CONTRACTOR:
283
186
100
PVC PIPING FOR WATER FLOWS THROUGH THE FILTERING SYSTEM CD2
39
INSECTS BARRIER
WATER ACCESS TUNNEL HOLE FOR ACCESSING CLEAN WATER PURPOSE FOR SPACIAL USAGE AND WATER STORAGE WATER METER TESTING SYSTEM CD2
19
131
19
626
131
19
131
19
171 60
578
100
230
WATER FILTERING FAN RUN WITH SOLAR POWER AND INTERACTIVE STIMULATION BOUNDARIES PUMPING SYSTEM
GDP Interior.D Group Menara Hap Seng, 12, Jalan P. Ramlee, 50250 Kuala Lumpur, Federal Territory of Kuala Lumpur
903
POWER STORAGE BAR SYSTEM
111
FLEXIBLE SEATING AREA TO CREATE SENSE OF FRICTION FORCE TO POWER UP THE FILTERING SYSTEM, ACTIVITIES TO BE INTERACTED BY HUMAN
DRAWN BY: HIEW CHAI YAO 63MM(W) U- METAL PLATE TO SUPPORT THE POWER WIRING SYSTEM
756
63
133
POWER SOCKET SYSTEM FOR POWER GENERATING USE
100
17
126
134
40
COMPONENT DETAILING 02
02
SCALE 1:15
17
100
CHECKED BY: MS SUZY
C
CD
126
40
40MM(W) NUTS & BOLTS TO BE SCREWED THROUGH THE METAL PLATE IN THE CONCRETE STRUCTURE TO FIX THE METAL WIRE HOLDER
DATE: July 18, 2021 SCALE: AS SHOWN
CONNECTED WIRING TO THE FLEXIBLE BOUNDARIES CHAIRS WITH THE WATER FILTERING SYSTEM
DRAWING TITLE: SECTION DETAILING DRAWINGS
57MM (THK) METAL WIRE HOLDER 57
DRAWING NUMBER: BCD 2C
BLOW UP COMPONENT DETAIL 02C SCALE 1:5
DWG_HCY_SC_03