Ahern_Undergraduate Portfolio

Page 1

ABIGAIL AHERN

Undergraduate Portfolio


TABLE OF CONTENTS 4

Creative Development Center

26

Ecological Research Center

20 30 36 40 44 48

2

Axis Dance Company

Dennis Colwell Architects North Shore Residence

Resurgence Preservation and Engineering Parker Torres Design

Digital Fabrication/Personal Artwork


3


CREATIVE DEVELOPMENT CENTER Location: Louisiana Professor: Mark Pasnik Date: Spring 2019 Group Project The Creative Development Center is a continuation based from last semester’s proposed design; The Entrepreneurial Center. The original design features two insertions, social and opportunity, that run along a common axis within the building. Our design accentuates this axis by making it an open atrium space that runs the entire height and length of the building. This acts as a “spine” surrounded by solid mass on each side. The spine acts as a main connection to the neighborhood; it runs parallel to North Claiborne, provides views at either end of the building and creates inviting access points to the adjacent lots. “Special Boxes” highlight key programmatic elements that are either projecting outward from the mass and away from the spine, or further into the mass and penetrate the spine. The movement is dependent on site context, where boxes towards North Claiborne project outwards as an invitation to visit and subtract inwards along the residential neighborhood. These “special boxes” are composed of glass and are encased with a screening system. This screening element brings importance to these “special spaces”, as well as provide shade and intriguing shadows inside the building.

4


5


Parti Diagram

Mass and Spine

Boxes

Boxes Shifted

Parti Diagram

6


Program Diagram Artist Box Art Studio Auditorium Culinary Arts Dance Studio

7


Exterior View- West

East Entrance

8


South Elevation

Roof 40'

Level 3 27'

Level 2 15'

Level 1 3'

North Elevation

Roof 40'

Level 3 27'

Level 2 15'

Level 1 3'

East Elevation

9


Main Entrance

Gallery Space

10


All Box Section

Roof 40'

Level 3 27'

Level 2 15'

Level 1 3'

Green, Orange, Red Box Section

Roof 40'

Level 3 27'

Level 2 15'

Level 1 3'

Main Entrance Section

11


Tectonic Axon

12


Detail Wall Section

4” L BRACKET 6” SCREW 4” STUD

1” x 1” VERTICAL OAK LOUVER 4” x 1” HORIZONTAL OAK LOUVER 4” L BRACKET 3” SCREW 4” STUD

4” STUD

4” L BRACKET 6” SCREW

18” x 28” x 1” CEMENT CLADDING MORTAR SETTING BED MORTAR SCRATCH COAT METAL LATH

13


Facade Sun Study

Sun Study- December

14

Sun Study- June

Screen Detail


Stair Landing to Third Level

Roof Space

15


Main Entrance

Main Circulation

Auditorium

16


Gathering Space

Main Staircase

Art Studio Porch

17


Third Floor Plan PORCH 235 SF

EGRESS 261 SF

HEAD OFFICE 267 SF

CONFRENCE ROOM 232 SF

RESIDENT ARTIST WORKSHOP 665 SF

DN

EGRESS 206 SF

DN OPEN TO BELOW

DN

ELV. 52 SF

GARDEN 887 SF

OFFICE 190 SF

GARDEN STORAGE 298 SF

AUDITORIUM 944 SF

GARDEN 436 SF

OFFICE 282 SF

OPEN TO BELOW

WAITING 152 SF UP

INTERVIEW PREP. 185 SF

36 SF

25 SF

DN

51 SF

DANCE STUDIO / MULTI-FUNCTIONAL 602 SF

Second Floor Plan

EGRESS 206 SF

PORCH 181 SF

GENDER-NUETRAL BATH 253 SF 39 SF 25 SF

BALLET BAR

JOB TRAINING 247 SF

MIRRORED GLASS

TELE. RM. 90 SF

EGRESS 261 SF

DN

UP

DN

MECH 34 SF

ELV. 52 SF

MUSICIAN PRACTICE SPACE 218 SF

ART STUDIO 889 SF

GATHERING / GROUP LESSON SPACE 1066 SF

MUSICIAN PRACTICE SPACE 263 SF

ARTIST'S PORCH 504 SF

AUDITORIUM 946 SF

Freez. Refrig.

EGRESS 261 SF

39 SF 36 SF

25 SF

STAGE 117 SF

51 SF 16 SF

MAIN STAIR 492 SF MAIN STAIR / GALLERY RETAIL 631 SF

UP

GATHERING SPACE 886 SF

MAIN LOBBY 1113 SF

MECH 34 SF

DELIVERY 176 SF

EGRESS 206 SF

GENDER-NUETRAL BATH 253 SF 25 SF

Range

UP

UP

First Floor Plan

Refrig.Freez. Range

KITCHEN LEARNING SPACE 689 SF

DN

ELV. 52 SF

STOR. 234 SF

176 SF

UP

176 SF

LOWER 9 MUSIC GALLERY 935 SF

109 SF

CAFE 1120 SF

EXTERIOR GATHERING SPACE 1508 SF

UP DN UP

UP DN

UP

UP

18


64

16 0

Program

Quantity

Area

Total Area

A. Delivery/Storage B. Cafe C. Lobby/Gathering D. Gallery/Retail E. Kitchen F. Bathrooms G. Art Studio H. Music Space I. Offices J. Job Training K. Dance Studio L. Outdoor Porches M. Artist Workshop N. Lesson Space O. Mechanical P. Circulation/Elevator

4 1 2 2 1 6 1 3 3 4 1 5 1 1 1 3

200 1,120 2,740 1430 650 90 890 2,390 160 710 600 3150 650 510 600 2,100

800 1,120 2,740 1430 650 540 890 2,390 480 710 600 3150 650 510 600 6,300

32

23,560

19


AXIS DANCE COMPANY Location: Cambridge, MA Professor: Ingrid Strong Date: Spring 2018 Comprehensive Studio: Group Project The AXIS Dance Company is a contemporary dance studio and school located in Oakland, CA. The company consists of able-bodied and disabled dancers. Using wheelchairs, hands, feet, and torsos, the dancers perform interactive, kinetic choreographed pieces. AXIS is 50% professional company, 50% dance school. This is a new building design for the company, located on Church Street in Cambridge, MA. The design responds to context (geography, topography), climate (sun, wind, light and water), and culture (patterns of interaction rising from human occupation of place). By redefining the front of the building and revitalizing the alleyway, it allows the separation of the building to create a social and artistic gathering space which helps give accessibility to everyone and construct the flexibility and containment of the program and thresholds throughout the building.

20


1/2 Inch=1 Foot Facade Model

21


Accessibility Diagram

Program Diagram Dance Studios Training and Physical Therapy Miscellaneous Auditorium Lobby Lounge Administration

Building Systems Diagram Radiant Heating Radiant Cooling First Floor Chilled Beams Second Floor Chilled Beams Third Floor Chilled Beams

22


Second Floor Plan

First Floor Plan

Ground Floor Plan

23


PRIMARY STRUCTURE: CONCRETE PARALLEL WALLS

ALUMINUM LOUVERS

Facade Detail Section

DRAIN 2%

FOAM INSULATION

2%

STEEL PLATE WELDED TO I-BEAM

SECONDARY STRUCTURE: STEEL COLUMNS

VINYL SURFACE ALUMINUM MOUNT SHOP WELDED TO TRUSS

SEMI FLEX PANEL SHOCK DAMPENING PAD P.I.P. CONCRETE METAL DECKING

SPACE TRUSS

2X12 JOIST SECURED TO BEAM GYPSUM BOARD

ALUMINUM MULLION

EXPANSION JOINT SPANDREL GLASS

NEOPRENE RUBBER END STOPS PREVENT BLDG. TO LOUVER CONTACT

24" STEEL I-BEAMS

CHILLED BEAMS

INSULATING DOUBLE PANE TEMPERED GLASS

DRAIN

RADIANT HEATING AND COOLING

Section A

24


Front Entrance

Second Floor Dance Studio

Back Entrance

25


ECOLOGICAL RESEARCH CENTER Location: Chestnut Hill Reservoir Professor: Myrna Ayoub Date: Fall 2016 Located at the Chestnut Hill Reservoir, the Ecological Research Center is designed for local elementary schools and summer camps to emphasize environmental education. There’s often the question of whether a formal or informal learning program is the right way to go. This building integrates both formal and informal ways of education in order to incorporate all types of learning styles. The building creates a transition from “city to landscape” through the deconstruction of the building through unraveling. As you walk through this building the program used for learning is very structured and becomes more and more hands on until the visitor is actually integrated into the natural landscape and can experience what they’ve learned in nature. A full understanding of environmental education is obtained through the classrooms, exhibition areas, environmental library, art education studios, rain gardens, pollinator gardens, and vernal pools included in this research center.

26


27


First Floor Plan

Ground Floor Plan

28


Section D

Section C

Section A

29


DENNIS COLWELL ARCHITECTS Location: Foxborough, MA Job Title: Intern Architect and Interior Designer Date: April-August 2019

30


Schematic Design

Blackstone Dispensary

31


Ground Floor Plan

Jensen Farm Braintree, MA

32


Exterior Elevation

Jensen Farm Braintree, MA

33


Interior Renderings

The Apothecary Las Vegas, NV

34


Interior Renderings

The Apothecary Las Vegas, NV

35


NORTH SHORE RESIDENCE Location: New Durham, NH Job Title: Freelance Architect Date: June-October 2019

36


Ground Floor Plan

North Shore Residence

37


Basement Floor Plan

North Shore Residence

38


Foundation Plan

North Shore Residence

39


RESURGENCE ENGINEERING Location: Portland, ME Job Title: Intern Architect Date: April-August 2018

40


Electrical Plan

Anchorage Restoration

P

LIGHT FIXTURE KEY S

DUPLEX RECEPTACLE

F

DOUBLE DUPLEX RECEPTACLE

C

THIRD FLOOR PLAN - ELECTRICAL PLAN

3 E1.1

P

R

C

E

1/4" = 1'-0"

SS

S SSS

3

F R S

S

P

P

P

P

P

SS

P

3

R

R

SS R

R

R

R

SS

S

SS R

P

R

R E

R

R

R R

S

R

SS

R

R

SS

R

SS

S

S

3

S

R

132 BRENTWOOD STREET PORTLAND, ME 04103 207.773.4880

C

CABLE TELEVISION OUTLET

ELECTRICAL PLANS

DIMMER SWITCH

ResurgencE

E

WEATHERPROOF (GFCI) DUPLEX

SDM

R

R

S S R

R

R S

3

SS

3

SSS

P

S

WP

GROUND FAULT CIRCUIT INTERRUPTER DUPLEX

S

GFCI

R

P

ENGINEERING & PRESERVATION, INC

COMBINATION SWITCH AND RECEPTACLE

THE ANCHORAGE RENOVATIONS

S

S

RANGE OUTLET 125/250V

S

R

C

S

SINGLE RECEPTANCE

S

ELECTRICAL SYMBOLS KEY

S

E

Project #

18-006 08/03/18

Date: P

Issued for:

3

SSS

REVISIONS NO.

C

1 E1.1

N

FIRST FLOOR PLAN - ELECTRICAL PLAN

2 E1.1

1/4" = 1'-0"

SECOND FLOOR PLAN - ELECTRICAL PLAN 1/4" = 1'-0"

1 2

DATE MM-DD-YY MM-DD-YY

SHEET

SCALE: 1/4" = 1'-0" 0'

5'

10'

25'

E-1.1

41


South Tower Details

Old Orchard Beach Town Hall

NEW 5/4"X12" AZEK PVC BOARD TRIM

REMOVE EXISTING WOOD TRIM FROM POST INSTALL 1/2" PLYWOOD SHEATHING WITH VAPROSHIELD WRAPSHIELD SA AND CLAD WITH NEW PVC EACH SIDE TRIM TO MATCH. TYP.

NEW AZM-45 AZEK PVC CROWN OVER SOLID BLOCKING

2"

SOUTH TOWER LARGE COLUMN-PLAN DETAIL SCALE: 3" = 1'-0"

1/4"

1 A-2.5

VERIFY

NEW 5/4"x8" PVC TRIM BOARDS, RIPPED

NEW RIPPED 5/4"X4" AZEK PVC BOARD TRIM

2" VERIFY EXISTING WOOD PIER TO REMAIN 6" (ACTUAL)

NEW 5/4"X10" AZEK PVC BOARD TRIM APPLY NEW CONTINUOUS VAPROSHIELD WRAPSHIELD SA NEW AZM-287 AZEK RAKE MOULDING NEW RIPPED 5/4"X4" AZEK PVC BOARD TRIM

NEW 5/4"x12" PVC TRIM BOARDS

1 4"

8" (ACTUAL)

NEW 5/4"X12" AZEK PVC BOARD TRIM OVER CONTINUOUS VAPROSHIELD WRAPSHIELD SA OVER NEW 1/2" EXT. P.T. PLYWOOD SHEATHING OVER EXISTING WOOD POST TO REMAIN.

NEW 5/4"x10" PVC TRIM BOARDS

2 A-2.5

SOUTH TOWER LARGE COLUMN-PLAN DETAIL SCALE: 3" = 1'-0"

Project #

42

18-023 07/19/18

Date: Issued for:

3 A-2.5

SOUTH TOWER COLUMN CAPITAL SCALE: 3" = 1'-0"

REVISIONS NO. 1 2

GENERAL NOTE 1: INSTALL AS PER PVC TRIM MANUFACTURERS WRITTEN GUIDELINES REGARDING STORAGE AND HANDLING, CUTTING, DRILLING, ROUTING, FASTENING, GLUING, PAINTING, EXPANSION AND SPANNING REQUIREMENTS. SEE SHEETS AZ-1 AND AZ-2.

132 BRENTWOOD STREET PORTLAND, ME 04103 207.773.4880

1/2" HEM

SOUTH TOWER PVC AND DETAILS

NEW 5/4"x8" PVC TRIM BOARDS

ResurgencE

APPLY NEW CONTINUOUS VAPROSHIELD WRAPSHIELD SA

ENGINEERING & PRESERVATION, INC

1 4"

6" (ACTUAL)

CONT. ALUMINUM FLASHING OVER VAPROSHIELD WRAPSHIELD SA OVER 1/2" EXT. P.T. PLYWOOD SHEATHING OVER SHAPED 2X10 OUTRIGGERS

EXISTING WOOD PIER TO REMAIN

TOWN OF OLD ORCHARD BEACH, MAINE TOWN HALL TOWERS SELECT REPAIR

4" (ACTUAL) REMOVE EXISTING WOOD TRIM BOARDS AND APPLY NEW 1/2" EXT. P.T. PLY SHEATHING

WRAP VAPROSHIELD FLASHING OVER ALUMINUM FLASHING

GENERAL NOTE 2: ALTERNATIVE #1-PAINT ALL NEW PVC AND POLYURETHANE SHINGLES, BOARDS, AND ORNAMENTAL TRIM.

DATE MM-DD-YY MM-DD-YY

SHEET

A-2.5

SHEET 16 OF 19


Phase 2 Overview

Kennebunk First Parish Church

43


PARKER TORRES DESIGN Location: Sudbury, MA Job Title: Design Intern Date: January-May 2017

44


Westin Denver Model Room

45


Prefunction

Ritz Carlton Marina Del Rey

Meeting and Board Room Ritz Carlton Marina Del Rey

Grand Staircase/ Prefunction Foyer Ritz Carlton Marina Del Rey

46


Ballroom and Terrace

Ritz Carlton Marina Del Rey

Oval Suite

Willard Intercontinental Washington D.C.

Presidential Suite

Willard Intercontinental Washington D.C.

47


DIGITAL FABRICATION/PERSONAL ARTWORK

48


Hanging Lamp Design

Multi(ply) Elective Displayed at BSA

49


Craft-ply, Yarn

Hanging Lamp Design

Acetate, Acrylic Paint, Craft-ply

Concept Model

Museum Board, Bass Wood

Villa Mairea Precedent Study

50


Plaster, Wood, Plexiglas 1/2”=1’ Facade Model

Plexiglas, 3D Printing Story Time Pavilion

Piano Wire, String, Graphite Urban Analysis Model

51


Pavilion Design

Multi(ply) Elective Displayed at BSA

52


53


Risk Taking Watercolor Pencil February 2015

Parle Vou Francais Acrylic Paint on Canvas January 2015

54


It’s Just Art Chalk Pastel March 2015

Go Green Gouache, Watercolor Pencil, Ink December 2016

55


Confusion Black and White Charcoal September 2014 American Visions Award

Wanderlust Tinted Charcoal September 2014

56


Time Out Charcoal November 2013

Sixty Forty Tinted Charcoal March 2015

57


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.