MC 2122 q2 review output presentation
MC GRIT 2122 Q2 review
OCTOBER | NOVEMBER | DECEMBER
bit.ly/mcgrit-report-q2
bottomline updates | goals & projects
national office | updates
individual | updates
network | updates
quarter three & four | priorities
OUR PURPOSE
"WE INTEGRATE A DATA DRIVEN MINDSET WHILST FOCUSING ON OUR CULTURE TO RESULT IN A SUSTAINABLE ORGANISATION THAT OUR MEMBERSHIP CAN BE PROUD OF."
OUR VALUES
STAY SIMPLE
PROFESSIONAL
TRANSPARENT
WE ARE INTERNATIONAL & EMBRACE DIFFERENCE
FLEXIBLE & AGILE
OUR LEGACY
WE ARE CREATING THE FIRST PHYSICAL Y2B SINCE 2014 ALONGSIDE THE NORDIC SUMMIT (NORDS) IN MAY 2022
quarter two priorities and battles
I
Objective #1: HR sustainability | Increase membership engagement in their FA
Objective #2: Establishing and Developing External Partnerships
Why do we want to achieve this objective? Our members enjoy the experience that they have in the organisation and therefore choose to stay. We have the right systems in place to be able to facilitate and enable their experience.
Why do we want to achieve this objective? We want the LCs to be able to diversify their revenue streams and core activities to enable leadership development under the current context. .
Goals for Quarter 2 1. 2.
# EB positions fulfillment downscale NEC % of members certificates
Objective #3: Change the direction
Why do we want to achieve this objective? We need to ensure that (1) boost ewa | bd on the local level(2) change to a data-based mindset (3) build system of operation improvement
Goals for Quarter 2 1. 2.
# of partners sign up for conferences ( CITIUS, NorLDS, NPM, Y2B) # of leads for iGTa (B2B marketing, sales navigator, alumni, etc.)
Goals for Quarter 2 1.
Refreshing the LCs tools for 22.23 gen
bottomline goals and projects
MC GRIT STRATEGIC OBJECTIVES
#1 - HR sustainability Increase membership engagement in their FA #proudtobeAIESECinDenmark
Why do we want to achieve this objective? Our members enjoy the experience that they have in the organisation and therefore choose to stay. We have the right systems in place to be able to facilitate and enable their experience. #proudtobeAIESECinDenmark
#2 -Establishing and Developing External Partnerships Money for the sustainability of organization/partnerships #parternships
Why do we want to achieve this objective? We want the aiesec in denmark network to be able to diversify their revenue streams and core activities to enable leadership development under the current context.
#3 - Change the direction #1 Boost ewa | bd on the local level #2 Change to a data-based mindset #3 Build system of operation improvement
Why do we want to achieve this objective? We need to ensure that
(1) boost ewa | bd on the local level (2) change to a data-based mindset (3) build system of operation improvement
MC Focus for 21.22 Q2
FOCUS
OPERATIONS
1
iGTa
2
BD
3
oGTa
4
EwA
5
iGV
6
oGV
Sustainable Metrics
Entity Performance
Partnership Metrics
PvA(Q2)
PvA(Q2)
PvA(Q2 & Q1)
35 | 13
442,500.00 kr. 180,799.16 kr (MC revenue)
# ELD realisations
kr Revenue Signed
3|1
0 (tba)
16 | 6
# MoCR
# People Engaged (EwA)
# BD Partners
94 | 98
# ideal number of members
national office finance & legal
I
MC budget 21.22 October - December 2021 Budget of AIESEC IN DENMARK
Budget Q2
Actual Q2
difference %
Total Revenue
131.000 DKK
101.000 DKK
-23%
LC Share Revenue
52.500 DKK
44.900 DKK
-14%
MC iGTa Revenue
48.000 DKK
34.101 DKK
-29%
Salary Costs
178.500 DKK
193.412 DKK
8%
Overhead Office Costs - to FILL
7.934 DKK
8.202,06 DKK
3%
Comments Revenues are lower due to not achieved sales targets Increased Salary Costs are due to Holiday Money payments from last year that were not accounted for
I
partner receivables as of 31/12/2021
December
0-45 days
32.062,50 DKK
45-90 days
0 DKK
Comments
Big accounts seem to delay payments of our invoices, need expectation settings
90+ days
100.763 DKK
3 iGTa partners still haven’t paid their obligations, 2 of them submitted to debt collection agency
Total
132.825,50 DKK
+32% since Q1 (100k)
I
LC receivables as of 31/12/2021
September 0-45 days
8.419,68 DKK
45-90 days
15.000 DKK
90+ days
25.482,40 DKK
Total
48.902,08 DKK
Comments
LCs still struggle with revenue streams and thus delays in payments due to insufficient funds
+52% since Q1 (32k)
national office entity control board
Q2 21.22
Morgana Patrocinio Costa ECB Chair 21.22
Key Insights & Next Steps
ecb
Key Insights:
Next Steps:
-
New LCVPs are eager to learn more about audit
-
Organize time and agenda for the next quarter
-
Communication from International Side (AI/ICB) is not always aligned with MC/ECB and cause issues with audit
-
Educate new VPs on Audit and Standards Management
Q2 21.22
Morgana Patrocinio Costa ECB Chair 21.22
individual wins | Q2
“
“
ecb
key metrics
1
iGV Resumed
2
ECB Annex Legislated
ECB Annex Legislated
3
Reduction of fines invoiced
%reduction of debt invoiced
iGV resumed
key success
-
Organizing all materials and alignment with MCVP ICX and LCP Aalborg <3
-
Getting constant feedback form my auditor coach, keeping in touch and asking feedback from LCPs
-
Audit education and consultancies with LCs <3
Q2 21.22
Morgana Patrocinio Costa ECB Chair 21.22
ecb
What went well? | Why
1 2
iGV resumption
ICB AUDIT
WE CAN DO IT FINALLY
We got cookies from ICB :D
Even better if.. | WHY
GV Beyond - RO/AI communicated more clearly
Different info from different sources gave us a headache
Educational Cycle running
Had more people doing the forms
iGTa
EPs were followed-up properly
Morgana Patrocinio Costa
Q2 21.22
ECB Chair 21.22
I spend my time on ecb
Morgana Patrocinio Costa ECB Chair 21.22
ecb
main learnings | Q2
1
-
Communication is key
2
-
Preparing for ICB Audit made the delivery of documents much easier
-
Templates for IPS/OPS need urgently a revamp
3
Q2 21.22
Morgana Patrocinio Costa
Q3 21.22
ECB Chair 21.22
ecb
main priorities
1 2 3
-
Education of new EB
-
Membership/Branding insertion on Audit System
-
Membership Application
key metrics # of consultancies given % of areas covered % of EBs/Members attending touchpoints
Draft creation Legislation of draft
Having members! <3
individual plan output presentation
FINANCE w/ALEX
SUSTAINABLE LC'S LCs diversifying into running EwA apart from exchange | LCs determining 1 product of focus and moving its sustainability 1 Level Up
STRATEGIC FINANCES Reporting to BoD and MC on developed relevant metrics to enhance decision making of the entity
STRATEGIC FUNDING | REVENUE SOURCING EST responsible to develop a framework for funding options for LCs and MC | Applying for at least 1 fund
Q2 21.22
Alex Perunov National VP Finance
individual wins | Q1
“
Finance text Stabilisation
key metrics
1
GFB Survey Data Correction
2
External Audit Communication
Documents submitted Questions answered
3
CEO Summit
# sessions delivered
# months corrected
“
finance
2021 purpose
key success
-
Getting an approval from GFB to correct mistakes in past data which resulted in lower projected AI Fees
-
Timely communication with auditors, providing them with all necessary documents and answering follow up questions
-
Wonderful experience to be able to be part of the Summit which I believe greatly contributed to LCP preparation for the term
Q2 21.22
Alex Perunov National VP Finance
finance
What went well? | Why
1 2 3
External Audit progress
BoF Collaboration
FIN and OP / BD synergy progress
Thanks to External Bookkeeper we submitted all needed documents. AI also granted us extension of DDL
Meeting with Kristoffer to discuss future of finance and strengthen BoF relationship
Discussions on how to streamline the invoicing process and communication between each other
Even better if.. | WHY
Having a full elected FIN Commission
Not all LCs have a finance responsible with only one position which will require careful commission management
The entity had sustainable revenue sources
MC and LCs do not generate enough revenue to stay sustainable in the long-run
Partners paid on time
Some partners have difficulties paying on time which affects our cashflow
Alex Perunov
Q2 21.22
National VP Finance
I spend my time on finance
Q2 21.22
Alex Perunov National VP Finance
finance
main learnings | Q2
1 2 3
-
It’s very easy to get overwhelmed with endless tasks and demands from different stakeholders. Especially it is difficult to recognise priorities and say no to other relevant projects
-
Physical touchpoints as an entity can have miraculous results
-
It’s important to be transparent and openly talk about important aspects of AIESEC experience such as elections, this way we give people opportunity to embrace it as a challenge and increase their motivation
Alex Perunov
Q3 21.22
National VP Finance
finance
main priorities
1 2 3
-
Finalise External Audit
-
New FIN commission on-boarding
-
EB Summit & ALTIUS 22
key metrics # touchpoints with Kreston CM Annual report delivered
# Commission Calls # Individual Meetings
FA Session delivered
OPERATIONS w/ LINA
FULFILL GV RESUMPTION PLAN We can make GV after 01/12/21
BUILD BASIC PROCESSES IN OGX Focus fields are BA and MKT | regular MoGX synergies in all LCs (where we have OGX and MKT)
BUILD BASIC PROCESSES IN ICX 35 RE (30% LCs / 70% MC) - 24 RE by MC
Q2 21.22
Angelina Vaikhel National VP Operations
Key Insights & Next Steps operations
iGTa funnel iGTa
Conversio Program n Goal
Oct
Q2 achieved Planne Achieve d d
Nov %PA
Plan ned
Achieve d
Key Insights: Process before Xmas holidays stay longer than we expected. We need to change timeline for iGTa according to this info
Dec %PA
Planned
Achieve d
%PA
-
Opens (OPPs)
0%
5
2
2
1
-
2
0
-
1
2
200%
Applicants
10%
47
105
23
2
10%
16
68
400%
8
35
400%
Accepted
100%
6
1
2
1
50%
2
0
-
2
0
-
Approvals
90%
6
1
2
1
50%
2
0
-
2
0
-
Realised
90%
4
2
1
0
-
2
1
50%
1
1
100%
0
0
0
0
-
0
0
-
0
0
-
0
0
0
0
-
0
0
-
0
0
-
Finished Complete
100%
We receive a lot of applicants, but still number of good EU candidates so low. IR needed
Next Steps: Create National IR with EST support Timeline and goals changing during re-planning
Q2 21.22
Angelina Vaikhel National VP Operations
Key Insights & Next Steps
operations
iGV funnel iGV Opens (OPPs)
Oct Q1 Convers Program achieve Planne Achieve ion Goal d d d
Nov Planne Achiev d ed
%PA
Key Insights: Need to start our work for WP for iGV ASAP
Dec Planne Achiev d ed
%PA
%PA
0
0
0
0
-
0
0
-
0
-
0
0
-
0
-
0
0
-
0
0
-
0
0
-
0
0
-
0
0
-
-
0
0
-
0
0
-
-
0
0
-
0
0
-
-
0
Applicants
0
1
0
1
-
0
Accepted
0
0
0
0
-
0
Approvals
0
0
0
0
-
Realised
0
0
0
0
-
Finished
0
1
0
1
Complete
0
0
0
0
0
IR alignment needed
Next Steps: Conduct CC and other routine for iGV commission Manage National IR with EST
Q2 21.22
Angelina Vaikhel National VP Operations
Key Insights & Next Steps
operations
oGTa funnel oGTa
Conversio Program n Goal
Q2 achieve d
Oct Planne Achieved d
%PA
Nov
Dec
Planned
Achieve d
Planned
Achieve d
%PA
%PA
Opens
30%
51
47
28
31
111%
17
7
500%
7
7
100%
Applicants
30%
17
14
8
6
75%
7
4
-
2
4
200%
Accepted
80%
5
1
2
0
0%
2
0
-
1
1
100%
Approvals
50%
3
1
2
0
0%
1
0
-
0
1
-
Realised
50%
2
1
1
0
0%
1
0
-
0
0
-
Finished
100%
2
0
0
0
0%
1
0
-
1
0
0%
0
0
0
0%
1
0
-
1
0
0%
Complete
2
Key Insights: OGX is in unstable situation in LCs and we should create a future of OGX in AIESEC in Denmark -
A lot of Alumni applied and it’s easier to approve them
Next Steps: Understand the future of OGX in Denmark
Q2 21.22
Angelina Vaikhel National VP Operations
Key Insights & Next Steps
operations
oGV funnel July
August
September
Planned
Achieve d
Planned
Achieve d
Key Insights: Still in
Conversio Program n Goal
Q1 achieve d
Opens (SU)
0
0
0
0
0
0
0
0
0
0
0
Applicants
0
0
0
0
0
0
0
0
0
0
0
Accepted
0
0
0
0
0
0
0
0
0
0
0
Approvals
0
0
0
0
0
0
0
0
0
0
0
Realised
0
0
0
0
0
0
0
0
0
0
0
Finished
0
0
0
0
0
0
0
0
0
0
0
Complete
0
0
0
0
0
0
0
0
0
0
0
oGV
Planne Achieved d
%PA
%PA
%PA
oGV Resumption process
Next Steps: Pass GV Resumption plan Understand what we should do with oGX in Denmark
Q2 21.22
Angelina Vaikhel National VP Operations
individual wins | Q2
“
Build basic processes in Ops
key metrics
key success
1
high level of ECB Audit passing
2
GV Resumption
%of achievements
-
Finished iGV Resumption oGV Resumption in process
LCs engagement
#people attend CCs #LCs attend touchpoints #LCs who have APRs #LCs support MC in RE
-
3 LCs have RE with MC 100% LCVPs attend CCs 80% LCVPs attend O2O
3
#WP
“
operations
2021 purpose
-
LCs start to make Audit better and take care of Standards
Q2 21.22
Angelina Vaikhel National VP Operations
operations
What went well? | Why
1 2 3
Communication with LCs
They engage in FA activities
We have REs and APRs
EPs come and it made LCs more motivated
Synergies
I feel team support with MC during touchpoints
Even better if.. | WHY
Informal activities with Commissions and MC
In remote work, it is easy to lose connection with the entity
More APRs
I see that we can have more OPPs to sell
Being in Denmark
Easier to communicate and build processes
Angelina Vaikhel
Q2 21.22
National VP Operations
I spend my time on operations
Angelina Vaikhel
Q2 21.22
National VP Operations
operations
main learnings | Q2
1 2 3 4
-
Processes are so long and we need to adapt out timeline according to this info. Also support LCs in processes with companies. We need to add it to the transition EB2EB and MC2MC
-
Need to have roadmap for realizations with LCs when each side understand responsibilities. The same for BDxOps synergy
-
GV Resumption is done, but that was the easiest part. We need to build our working system according to the new changes
-
We want to run oGX, but we need to put more resources on it for having SUs and Approvals. Now we can’t allocate enough resources for oGX (money, people, time) because iGTa/BD are the main focuses. Because of it we need to align with LCs that maybe oGX will be mostly iXP product as a part of RnR for members
Angelina Vaikhel
Q3 21.22
National VP Operations
operations
main priorities
1 2 3 4
key metrics
-
Start to run oGV and iGV + LCs support in GV products via NEC (iGV, oGV) and coaching by EST
#APR in GV PvA GV
-
Transition for LCVPs elect
NPS %coverage
-
National Operations
-
LCs Operations
#APR CR APR->RE #process time OP->APR Process time APR->RE
%GA in LCs
national office business development
BD GOALS | Q2 21.22 New Sales
Former Accounts
New Sales Funnel
PLANNED
ACHIEVED
%
GAP
Suspects
163
169
103.68%
+6
First approach
147
138
93,87%
-9
Prospect
56
36
64.05%
-20
Qualified lead
24
8
33,3%
-3
Proposals Sent
21
8
38%
-13
Proposals Confirmed
6
4
66,7%
-2
Contracts Signed #
6
4
66,7%
-2
/
0.00
New Sales CS $
57.750 DKK 12.000 DKK
Grundfos
PLANNED
ACHIEVED
%
Global Talent
16.500 dkk
27.017 dkk
163%
Total
16.500 dkk
27.017 dkk
163%
DSV
PLANNED
ACHIEVED
%
Global Talent
15.000 dkk
15.000 dkk
100%
Total
15.000 dkk
15.000 dkk
100%
BUSINESS DEVELOPMENT w/ GABRIEL
CUSTOMER SUCCESS IMPLEMENTATION Implementation of Customer Success measurables and initiatives (metrics that go beyond just NPS, such as health score) CREATING THE AIESEC'S PLAYBOOK FOR SALES AND MARKETING B2B Find the right positioning, the right message, the ideal customer profile, the process to reach these people and to optimize all of these elements: positioning, messages, segmentation, portfolio development, pricing
GOING DIGITAL Digitalising our attraction and most of our sales processes
Q2 21.22
Gabriel Costa National VP BD
Key Insights & Next Steps
business development
Key Insights: -
Physical Meetings are usually more successful than a process that happens fully digital. It helps to create rapport with the partner.
-
Our pricing is a bit off depending on the position we are going to open, for example if it's positions that the danish market has lots of professionals it is harder to show the value we provide to our partners.
-
Specializing members in specific functions ensure a better compliance to the process and higher conversion rates throughout the funnel.
-
-
We need better and more consistent strategies for lead nurturing, we have lots of contacts on our CRM, but little strategy to educate our customer about our product. Alumnus can be a good resource to supply us with referrals and easy access to decision makers in key accounts
Next Steps: -
Tickets pipeline creation to control interns from companies
-
Audit process move from Podio to Hubspot
-
B2B Inbound Marketing (e-mail marketing & linkedin posting)
-
Google Ads campaings
-
Youth to Business & iTtT
-
Funding applications
-
Follow-up on warm leads from the first semester
-
BD network education
-
Portfolio Consolidation
Q1 21.22
Gabriel Costa National VP BD
individual wins | Q2
1 2 3
4 new MC accounts
Business Development Playbook
Account Management
“
The purpose of BD in 21.22 is to create the foundation for Sales and Marketing for the BD department of AIESEC in Denmark, both at the national level and local level.
key metrics
#Opens #New partners
key success
-
Efficient Communication and standardized sales process
-
Created a playbook with information on how to call companies, how to prepare for meetings, meetings flow, pitches template, what's BD, our products, key selling points, how to create lists of suspects, sales sequences and many more!
-
Creation of a framework for account management, meeting with higher stakeholders from Grundfos to upsell to different departments.
#Processes for each stage of the BD Funnel #Processes implementation
#Upsell
“
business development
2021 purpose
Q1 21.22
Gabriel Costa National VP BD
business development
What went well? | Why
1 2 3
Hubspot National Implementation
A lot of automations in places, standardized usage of hubspot as a CRM, 90% migration from Podio to Hubspot
EST management
Managed to have the whole team performing until the last day of their experience
New BD processes in place
Easy to track data, easy to understand what are the companies in my pipeline and create a forecast
Even better if.. | WHY It had happened earlier and LCs were better educated about it & Ops start using it
It took a while until we finally migrated everything and the education plan w/ hasn't been so efficient.
We had more FUN TOGETHER as a team
Most of the touchpoints with them were individual, which means there wasn't so much of a team bonding
LCs implement the same processes themselves
We deliver the sames levels of services no matter the team doing it
Gabriel Costa
Q2 2021
National VP BD
I spend my time on business development
Q1 21.22
Gabriel Costa National VP BD
business development
main learnings | Q2
1 2 3
-
Our pricing might be a little bit off for companies recruiting people in departments that are not IT. Although Denmark is an expensive country, it is huge the pricing difference between us and any other entity in AIESEC, for example, one year intern in Denmark costs around 8000 euros, meanwhile in the netherlands it costs 2250 euros, in germany 1300 euros and in sweden 3300 euros and the service provided is pretty much the same as they're also AIESEC. So for a big company if it's not non-negotiable that their intern is in Denmark even if they start the partnership with us they will obviously prefer to take the intern somewhere else.
-
It is possible to shorten at least two weeks the former overall process to bring an intern, for that it is crucial that from the moment the company signs the contract the timeline and deadlines are well aligned, so 10-15 days to shortlist and interview candidates, 10 days for the company to go over the shortlist (or more if they need it, but then it's their responsibility if it is taking longer). It is taking around 45-50 days for SIRI to give the permit, that's already a month and half, so everything else that is under our control (other parts of the process) we should strive a lot to shorten it. So the company signed the contract today, means we should post on expa the same day, shortlist and interview candidates as we are getting applications and have a clear deadline for the company to reject all candidates or pick one from the shortlist. Otherwise, they might slow down a lot the process.
-
Documenting information, feedbacks and inputs from companies is very important to ensure the longevity of the partnership. Since, they often provide account manager with very important insights, but since it's not documented, the next generations don't get to learn from that insight and tend to make the same mistake and with that lose the partnership.
Gabriel Costa
Q2 21.22
National VP BD
business development
main priorities
1 2 3 4
-
B2B Marketing (google ads)
-
Network Training regarding BD
-
Youth to Business
-
Pipeline creation/ Followups on prospects from the 1st sem
key metrics
#Leads
#LCs revenue coming from BD initiatives
#NPS #Signups #Participants #Partners #Profit
#opens
TALENT MANAGEMENT w/ ELENA
MXP IMPLEMENTATION Define project timelines and structures
LONG LASTING CONNECTIONS Strong alumni network
RECRUITMENT Plan of membership role promotion & Recruitment
Elena Cervantes
National VP Talent Management
talent management
Plan
Achieved
Retention Rate
90 %
91.6 %
LPS
8.5
8.6
NPS
8.5
8.8
Retention Rate
91.6 %
91.6 %
Realizations
100
108
Key Insights: -
CITIUS as key factor for EB application
-
LC planning recruitment according to needs
-
NEC wasn’t properly followed up, project to be nurtured in the next month to be ready for newbies
-
Structure suggestions
Next Steps: -
Nurture and promote National education cycle Downscale NEC through LEC Strengthening alumni network, social media and LC events, strong LC alumni network to make national
Q2 21.22
Elena Cervantes talent management
“
2021 purpose
Create Connecting a stronger withmembership the entity
individual wins | Q2
key metrics
key success
1
Onboarding
% RR % OB
RR: 91.6 % OB: 80.8 %
2
CITIUS
NPS
CITIUS NPS: 8.7 Alumni: 16
3
Succession
Positions filled
26 EBe /21 EBc
“
National VP Talent Management
Q2 21.22
Elena Cervantes
National VP Talent Management
talent management
What went well? | Why
1 2 3
On boarding
Increased Expectation vs reality
CITIUS 2021
Motivated people to apply 26 EBe members
MXP
85 % of completed. @DK MXP path and tools
Even better if.. | WHY
Increase feeling of productivity in first 10 days
Purposeful recruitment
Profitable
Decide if we care about money or experience for Altius
Stop being scared
Learn by doing
Elena Cervantes
Q2 2021
National VP Talent Management I spend my time on talent management
Elena Cervantes
Q2 21.22
National VP Talent Management
talent management
main learnings | Q2
1
Plan conferences at least 3 months in advance, have an OC team selected. Outsource OC to Alumni interested
2
Engage the members and alumni in the execution of National projects
3
Purposeful recruitment
Elena Cervantes
Q3 21.22
National VP Talent Management
talent management
main priorities
key metrics
1 2 3
EB Summit / Altius
NPS
Recruitment / On boarding
P/A
Education Delivery
#
4
Alumni - Long lasting AIESEC
NPS
national office marketing & brand
I
mini-campaigns/engagements quarter 2
Q2 - Operations’ Attraction Campaign - Did not happen #ProudToBe on-going campaign with aiesec. - Did not happen Events
MARKETING w/ BOGDAN
GENERAL MKT Research & Understanding | External Communication Strategy | Program Messaging & Positioning
IMPROVE THE EST ACTIVITIES By the end of my term, all campaigns are implemented optimally and give bigger payout
ENABLE LCS TO PERFORM MKT ACTIVITIES By the end of my term, all LCs will have a good understanding of marketing and independency capacity wise
Bogdan Gabor
National VP BRAND&MKT Facebook & Instagram Data
Key Insights & Next Steps Key Insights: General decrease in SoMe performance (October - January) -
Focus has been on physical support for LCs. Digital channels suffered.
-
#proudtobe campaign in January has a successful start
Next Steps: The new EST Team will take over after January 6th. Separate Facebook and Instagram responsibles will create promotion plans to improve our SoMe.
Q2 21.22
Bogdan Gabor
National VP BRAND&MKT
individual wins | Q2
1 2 3
Got a better understanding and direction of what MCVP Marketing should do this term.
“
text
key metrics
key success
-
Shift of focus from immediate Social Media results to the building of a foundation for our Digital MKT
-
We have recruited people who will dedicate themselves full time to co-creating and implementing a strategy for our social media channels along with MCVP MKT.
-
Ensured that each LC has an access person with blue book knowledge to the AIESEC in Denmark pages, so we can still have content flowing from LC side while the EST is in the reworks.
~
Recruited a new EST Team to work full-time starting Q3
#EST Positions filled #Campaign initiatives
Supported LCs
#LC Visits, #Supporting activities
“
brand&mkt
2021 purpose
Q2 Q1 21.22
Bogdan Gabor
National VP BRAND&MKT
brand&mkt
What went well? | Why
1 2
LC Collaboration
Each LC was open to collaborating with MCVP MKT in order to stay brand aligned and start building a brand presence.
Focus shift
Our focus shifted from generating immediate results towards building something for our successors to have results
Even better if.. | WHY
Better content management
Being brand aligned doesn’t include other factors such as consistency and design principles. We need more specific brand guidelines (in progress)
Active EST
The absence of an EST Team can be seen in our insights, having an EST team present and able to support the LCs will also tackle the problem above.
Commission Workshops
While there have been LC visits and I have collaborated with both VPs, TLs and Members on education, there has been less of a focus on commission capacity building in the past 3 months.
Bogdan Gabor
JULY Q2 21.22 2021
National VP BRAND&MKT I spend my time on brand&mkt
Q2 Q1 21.22
Bogdan Gabor
National VP BRAND&MKT
brand&mkt
main learnings | Q2
1
-
We need a more specific brand & SoMe guideline starting Q3
2
-
The new EST Team needs to be closely monitored in order to ensure accountability
-
Focusing on results without a foundation is not a good approach in the current context.
3
Q3 21.22
Bogdan Gabor
National VP BRAND&MKT
brand&mkt
main priorities
1 2 3 4
-
Release the AIESEC in Denmark Blue Book by ALTIUS
-
Ensure optimal transition for the EST Team and a good start to their term
-
Hold commission capacity building sessions & give transition
-
LC Visits & Workshops
key metrics
~
%reach & engagements growth GvA SUs for RCTM GvA SUs for ELD
#Sessions within commission #LCs with 100% completed transition
#LC Visits & Workshops happening
ORGANIZATION DEVELOPMENT
w/ YOAN
ORGANISATIONAL DEVELOPMENT MODEL (ODM) CREATION Finalising the tool and features. Keeping metrics relevant.
OD reporting Helping us to think strategically and give more data backed insights.
ENTITY DEVELOPMENT As the name suggests, developing the entity. Supporting the LCs to grow in a healthy and deliberate way, and supporting MC to make sustainable and long term strategic decisions
Q2 21.22
Yoan Stoyanov
National VP Org. Development
key metrics
individual wins | Q2
%Adherence to ODM Roadmap
ODM development
2
CITIUS Agenda
3
EB Pipeline
Implementing OD text department in the EY.
-
#drafts/iterations #feedbacks received
#of LCP and EB applicants #of LCP and EB positions filled
“
“
Org.Development
1
2021 purpose
key success
-
Tier system design Roadmap creation Mini EY OD education at NPM
-
Good feedback from plenary (high NPS) Adherence to agenda, given external delays and miscommunications Design of agenda achieved conference purpose (EB pipeline)
-
-
4/4 LCPs elected No EB vacancies due to lack of HR
JULY Q2 21.22 2021
Yoan Stoyanov
National VP Org. Development
Org.Development
What went well? | Why
1 2 3
Even better if.. | WHY
OD sessions at NatCo
Short but informative
OD Reports
Bit delayed until ODM completion
ODM
Completion of Backend
ODM
Data collection to start soon as not all metrics currently measured
iComms
More structure and regularity
CITIUS
EB Pipeline
Yoan Stoyanov
Q2 21.22
National VP Org. Development I spend my time on Org.Development
Q2 21.22
Yoan Stoyanov
National VP Org. Development
Org.Development
main learnings | Q2
1 2 3
-
Agenda Manager. A beautiful role that allowed me to shape the entity’s experience at CITIUS 2021, and to drive specific messages or results to fruition - Happily the LCP pipeline appeared and the EB pipeline soon after, with little to no gaps.
-
LC Cycles. The rise and fall of each of the LCs over the past few years. Every LC in the entity has been the best LC and in a bad enough position to be closed, before recovering again. Every LC has been through this cycle over the past 5-6 years. The journeys of the LCs are all unique, and all identical.
-
Choose your battles wisely. Prioritisation of main tasks or important or urgent ones. Learning to say no. It is neither necessary nor doable to do everything - pick a few key areas to work on and develop them.
Yoan Stoyanov
Q2 21.22
National VP Org. Development
Org.Development
main priorities
1 2 3 4
-
ODM
-
CITIUS 2021 | EB Summit/NorLDS 2022
-
OD reporting w/ SONA and ODM inputs
-
LC Coaching
key metrics ODM data collection Benchmarks created
Adherence to agenda
#reports #feedback implemented
#touchpoints w/ coachees #tracking tool for coaches
local committees evaluation
AIESEC in Aalborg Key Insights & Next Steps
Key Insights: GV has been resumed which is great! The possible transition to GTe has potential legal issues, internally with ECB and externally with country law - ensure thorough research is done, perhaps a legal advisor or a certain BoA could be someone to approach for this subject. -
PD/BD is a new department/role in the LC which is great to see. Make sure to check out the update ER principles courtesy of Gabriel! As a newer department across the entity, it will be great to share as much GCPs within the new commission!
Next Steps: In recent years, iGV has proven to be a tough department who’s managers change more frequently that Hogwarts’ Defence Against the Dark Arts’ Professors. Remember that help will always be given at iGV to those who ask for it. Both Yoan and Lina will be happy to support with any transition needed. -
Leadership Academy time is approaching. Review the outputs of the previous iteration to see what can be improved, and keep the ECB in the loop - it will save you many headaches.
AIESEC in Aarhus | Horsens Key Insights & Next Steps
Key Insights: The term started an Initiative Group, evolved into an Official Expansion, and now the entity in Aarhus has matured to Local Committee, and one with Full Member status for the first time in almost 5 years. This paragraph is testament to the hard work of the combined EB of Aarhus and Horsens. -
The structure has been very fluid so ensure that going into the next EB term, that there will be enough continuity and stability of structure.
Next Steps: The LC is going through a merger of sorts, having combined the people of both entities. With a new EB Cycle and comes a chance to build upon the previous year’s foundations and really develop the LC’s culture to a new level. -
There will be some proposals at EB Summit about the future of Horsens, it will be up to you to decide which route to pursue.
AIESEC in Copenhagen Key Insights & Next Steps
Key Insights: PD/BD had it’s revival in Denmark through LC Copenhagen, a couple years ago, though a bit shaky as a it was a new department. With the new EB cycle comes a chance to crystalise the JD of the department as well the goals. -
The LCPe migrated from a very different LC, this will provide a challenge for him and the LC. It is, however, very manageable and has been done before. Old bonds will serve to strengthen the EY as LC-LC connections deepened. He need only remember that he is in a new LC, one that chose him, that trusts him, and that will achieve great things with him at the helm.
Next Steps: (LCP) Ask questions. As many as possible about different departments. -
Communicate often and well, and the gap will minimise with time.
AIESEC in Odense Key Insights & Next Steps
Key Insights: Odense continues to be one of the more stable LCs. It is great to see that the EB structure is expanding, and with it surely the opportunities it can tackle! -
Marketing is still a young department and in 22.23 will be the first dedicated VP MKT to develop the area further!
Next Steps: Keep a close synergy with Bogdan to ensure that the MKT department grows in a healthy direction. -
Focus on partnerships. Odense is one of the LCs that has driven partnership development within their local community. It could be a good move to continue developing these existing partnerships as well as looking to create new ones - both with community partners and with ICX companies.
MCP w/ TUDOR
GOVERNANCE & REPRESENTATION
LCPS MANAGEMENT -> PLENARY
MC TEAM MANAGEMENT GLOBAL REPRESENTATION GEN 22.23 ELECTION & TRANSITION
Q2 21.22
Tudor-Vasile Nae
Member Committee President
key success
individual wins | Q2
1 2 3
-
LCP 22.23 | MCP 22.23 application 100% LCPs in all LCs MCP 22.23 candidates
-
-
Ensuring financial sustainability
-
Ensuring smooth transition between the two EB Generations
Unfold the Blindspot for Denmark
Throughout, purposeful people, passionate action, relevant presence.
“
“
president
-
2021 purpose
-
Quarter 2 of MC GRIT have been blessed with getting 3 out 4 LCs having 2 candidates for LCP position. Also, on the 16 of December we received 2 candidates applications ( Bogdan and Elena) for the MCP position for the term 22.23. Paying for Received the ESC and finishing up the previous year final report. Signing agreement contract for collaboration with Kreston, External Audit after consultation with BoF BoF meeting in November for ensuring cash liquidity and topping up the NFC, ICF, EST account (and during Jan/Feb 22 to apply for potential extra for helping members in participating in NatCos ) After 11 years the NemID ownership of AIESEC in Denmark is finally updated. Finally after many security documents, we got full access the organization government forms and formalities. - CEO Summit in December - EB Summit planning in December, executed in January 2022 - BoDe attending BoD calls from earlier and being involved in the decision making process and legislations New transition tool for LCP 21.22 and EBtoEB 21.22 Introduction new planning tools for gen 22.23 to fit the MC planning tools and also, to have more overview on operations, mxp, finances, etc.
JULY Q2 21.22 2021
Tudor-Vasile Nae
Member Committee President Even better if.. | WHY president
What went well? | Why -
1 2 3
conferences
Physical touch points with MC team
Physical touch points with LCs
Successfully Co-creating the 2nd physical national conference, CITIUS 2021, hosted by LC Odense, which revolutionised the way we are organizing conference by finding a skole that can fit our requirements, sleep on bed and having space for session. This was possible for the first time after many many year, and it is here to stay. Nonetheless, this conference made our membership reconnect and connect with AIESEC at a different level, and soon after majority of the people applied for higher roles. #proudtobe #aiesecindenmark
-
Finally VISAs for MC members have been approved and during January 2022 we will meet for the first time. Have been a long wait.
-
During Q2 MC GRIT members have been invited to LCs new gen elections, Christmas parties. This created a bond and trust within the entity leaders and giving all we have for our membership to success and in the end to contribute to our purposes.
ICB case with the netherlands
MC synergies and experience
This harassment case created in the netherlands by our EP have been taking lots of time to process and escalated very quickly due to lack of communication for the the netherlands LC involved. In the end AIESEC in Denmark is ok, but we learned a lots of things that we should be aware of it and prevent them in DK. All of this, thanks to our ECB Chair
Unfortunately the fact that we do not meet physically is not the best for our synergizing, also the fast open up of Denmark and the Front Office to never been in DK situation had ups and down
Tudor-Vasile Nae
Q1 21.22
Member Committee President I spend my time on president
Tudor-Vasile Nae
Q2 21.22
Member Committee President
president
main learnings | Q2 -
1
-
-
2 3
-
-
"G.A.P" the acronym and the words of the quarter. Gratitude. Accountability. Perspective. This are the 3 things I learned during the Q2. ! Appreciation towards my teams I am leading. Show them new paths, for example ( transition to BD and OPS mindset). An awareness of what is already done, what is already owned, and what we’ve got to work with is the foundation of all success. Accountability? For you? Surely in a global pandemic, the last thing we need is unwarranted guilt and/or responsibility…. Accountability is tricky because people confuse it with stress – there’s almost an instant lack of compassion…but I don’t see it that way. I view accountability as what can I control. Is the glass half-full or half-empty? The truth is, it’s bang in the middle. The rest is your perspective. You Were Born For Greatness - be like a fish and learn your GAPs…and you’ll be good to go. “And remember this. Have faith when things are challenging, difficult, and unstable…because that is exactly when leaders do well.” Well- planned and test LC Simulation are lit. During this quarter, I finally got to do something I wanted for AIESEC in Denmark for many year. Have a proper and crazy LC Simulation rundown, in a national Conference. That have been possible during CITIUS 2021. Where each LC members had to be act as EB member and do certain task as a team, however, mixing the LCs members. What I learned during this space, is that such space are sparking lots of emotions for the participants but in the end even if they don't consider it important, nowadays, more than 60% people that participated in the simulation are now in the EB term gen 22.23 The story continue with #proudtobe - finally after so many years, people are using these words, posting on social media, and talking about their AIESEC in Denmark experience with pride. Over the past few years, it seemed like members were afraid of sharing their experience because it was an unpaid, professional job; which supposedly makes it less worthy? But, as long as you are at peace with yourself, happy, and feel appreciated, challenged and develop leadership--what people and society says, is just white noise.
Tudor-Vasile Nae
Q3 21.22
Member Committee President
president
main priorities
1 2 3 4
key metrics
MCP 22.23 Transition start
weekly calls, and make ready the next MCP for the position
-
MC GRIT Re-planning in January 2022
Have our purposeful spaces were we talk out what the EY needs in the next 3 months before starting the transition with the next gen 22.23 and also enjoy our times as a team needed (the things provided from RO were filtered)
-
BD involvement from my side to help our sales, by colding and learning how to sell AIESEC for our conference or internships. Help Gabriel to sell for Y2B and also, contribution for the next term cash flow.
-
-
-
BoD UNITATEM support
#3 contracts signed
weekly calls, capacity building, 1o1, and visits
quarter three priorities and battles
MC GRIT STRATEGIC OBJECTIVES
#1 - HR sustainability Increase membership engagement in their FA #proudtobeAIESECinDenmark
Why do we want to achieve this objective? Our members enjoy the experience that they have in the organisation and therefore choose to stay. We have the right systems in place to be able to facilitate and enable their experience. #proudtobeAIESECinDenmark
#2 -Establishing and Developing External Partnerships Money for the sustainability of organization/partnerships #parternships
Why do we want to achieve this objective? We want the aiesec in denmark network to be able to diversify their revenue streams and core activities to enable leadership development under the current context.
#3 - Change the direction #1 Boost ewa | bd on the local level #2 Change to a data-based mindset #3 Build system of operation improvement
Why do we want to achieve this objective? We need to ensure that
(1) boost ewa | bd on the local level (2) change to a data-based mindset (3) build system of operation improvement
MC GRIT STRATEGIC OBJECTIVES Q3&4
#1 - HR sustainability Increase membership engagement in their FA #proudtobeAIESECinDenmark
# 1 TL per / FA(OPS,BD,MKT) / LC 80% of position TL fulfilled # newbies number TBA
#2 -Establishing and Developing External Partnerships Money for the sustainability of organization/partnerships #parternships
# 3 signed contracts / per LC # 240 delegates Y2B 66,5K profit for Y2B
#3 - Change the direction #1 Boost ewa | bd on the local level #2 Change to a data-based mindset #3 Build system of operation improvement
# LCs in Cluster 1 od report / newsletter / od visit # coach visits # OPS/BD visits
IMPORTANT LINKS
MC Team Dash
bit.ly/MC-GRIT-dashboard
MC Instagram
instagram.com/mc.denmark/
AIESEC in Denmark Calendar
bit.ly/aiesec-dk-calendar22
Knowledge Hub (coming soon)
https://humanresources48.wixsite.co m/knowledge-hub
Denmark MCVPs JDs
bit.ly/mcvp2122-jd