AI 1415 Q1 report - Operations

Page 1

Operation team Q1 report


Operations team DESCRIPTION Operations Team Bottomline Operations team has the main responsible of: VP Operations: guarantee of S&D alignment and Operations growth in the region VP OD: work with the leadership development of the region for a sustainable growth All our activities are measured by the Operations goals and delivery of main activities in the region. Also responsible for the management of Cluster 1 MCPs (started in Q1). In the subteam we also have the role of TM guarantee the team minimuns strategies, productivity and good TM processes implementation for operations growth.

People Involved Camila Serpa Soares. VP OD; Team Leader of Operations team. Laura Law. VP OP AP; Responsible for AP region growth and leadership pipeline. Shayo Tinuoye. VP OP Africa; Responsible for Africa region growth and leadership pipeline. Aleksa Nikolic. VP OP CEE; Responsible for CEE region growth and leadership pipeline. Ana Saldarriaga. VP OP WENA; Responsible for WENA region growth and leadership pipeline Lucia Taboada. VP OP LATAM; Responsible for IGN region growth and leadership pipeline Karim Swelim. VP OP MENA; Responsible for MENA region growth and leadership pipeline Anasofia Espejo. VP TM; Responsible TM bottomline implementation

AIESEC International Q1 2015 Report


efforts GENERAL COMMENT Q4 was a quarter of a still a lot of direct contact with the network and a moment to get their inputs. Most of our efforts were in mainly touchpoints, including visits, conferences, summits that were made in the region and also in TM.

INDIVIDUAL EFFORTS Camila Serpa Soares. Team management (50%), XPRO preparation and delivery (20%), IPM delivery (10%), other conferences (Chindia) (5%), Organizational Culture Project (10%), Cluster 1 management (5%) Laura Law. IPM Project Manager (30%), Asia Pacific Conference (30%), Entity Visits (10%), Company Opportunity Portal (10%),Regional Management (20%) Shayo Tinuoye. Sub-regional conferences(30), Entity Visits(30%), MCP Summit (20%), Coaching Calls (10%) Regional Management (10%) OST management (10%) Aleksa Nikolic. Global Entrepreneurs (35%), Support team selection and management (20%), Regional conference (EuroXpro) (20%), IPM (25%) Ana Saldarriaga. Entity Visit (15%), Global Entrepreneurs (5%), OST Management (10%), IPM (25%) Regional Conferences (WENA LDS, EUROXPRO-AP-MENA-AFRICA) (20%), PAI Elect (25%) Lucia Taboada. Internal Comms (10%), ILC (40%), OST Leadership (15%), IPM (25%) Karim Swelim IPM (30 %), MENAXLDS (30 %), GEC (10%), MCP Coaching (10 %), MCVP Coaching (10 %), MET (10 %) Anasofia Espejo. IPM Preparation & Delivery (35%), Global TM materials and alignment for XPRO’s Preparation & APC Delivery (30%), AI Projects Follow-Ups (15%), EXPA (10%), Others (5%)

AIESEC International Q1 2015 Report


Africa Region Q1 report


OUTCOMES Q1 ACTIVITIES CHECK IPM

PAI & AI 1516 S(E)lection

Regional space delivery Focused on behaviour shaping, consultancies to entities and PAI elections management

PAI Elections management and AI 1516 Selection management (Q&A, Interviews, external assessment etc)

Coaching Calls Coaching call to 10 entities in the region for EXPA usage and general consulltancy

AIESEC International Q1 2015 Report

Entity Visits

AFROXLDS

Entity Visit to Mauriitius to solve entity crisis and align the entity for fruit peak

Agenda management, conference delivery , focused on shaping behaviours and alignment of entities in the region for a great fruit peak


RESULTS MONITORING GCDP Q1 Realisation

Q1 Realisation

iGCDP 600

571

oGCDP 180

164

160 500

140

126

120

400

100 300 200

80 187

60 40

100

20 0

0

RE

RE 2014

2015

AIESEC International Q1 2015 Report

2014

2015


RESULTS MONITORING-GIP Q1 Realisation

Q1 Realisation iGIP

oGIP

40 35 30

57

60

35

50 26

25

40

20

30

15

46

20

10 10

5 0

0

RE

RE 2014

AIESEC International Q1 2015 Report

2015

2014

2015


RESULTS MONITORING AFRICA Progress oGCDP

iGCDP 2500

5000

2269

4537

4500

500

350 298

300

2000

4000

oGIP

iGIP

400 250

3500 1500

3000

350 300

200

250

2500 150

1000

2000 1500

431

450

1202

500

1000

100

499

200 89

150 100

50

500

Achieved

Planned

AIESEC International Q1 2015 Report

50

0

0

0

Achieved

Planned

167

0 Achieved

Planned

Achieved

Planned


challenges •  •  •  •  •  •

How to capitalize on sub-regional initiatives for growth Action Orientation EXPA Usage How to boost regional cooperation S&D Alignment HR & Financial difficulties

successes •  •  •  •  •  •  •

Sub-regional initiative driving growth in West Africa Strategic Alliance in some entities ex. Rwanda and Cote D’voire AFROXLDS for shaping behaviours in the region and alignment of entities for fruit peak BD and TM Agenda successfully delivered at AFROXLDS Tier 4 growth in West Africa GIP Innovation/collaboration in some entities in East Africa; Ethiopia and Uganda Regional Collaboration improved as compared to previous year Ex. Ghana-Nigeria, Burkina Faso-Cote Divoire, TanzaniaUganda etc

AIESEC International Q1 2015 Report


Q2 evolution -  -  -  -  -  -

Coaching and consultancies to Tier 4 entities for fruit peak delivery S&D Alignment EXPA Usage focus Entity Visits and MCP Summit for transition and planning support Coaching Calls to current MCPs for fruit peak alignment MCP elects support and coaching for transition and planning

AIESEC International Q1 2015 Report


AP Region Q1 report


OUTCOMES Q1 MILESTONES CHECK IPM

Asia Pacific Conference

Malaysia Entity Visit

Japan Entity Visit

Project manager duties done. Regional roadmap for 2015 including embassy relations project and regional HR structure for 2015-16.

Downloading to AI strategies to the local level.

MCP and MC coaching for summer peak sprint.

In collaboration with EF, visit objective was to start the change process towards using English as means of communication in AIESEC. EF test to replace their current English test.

Virtual MCP Coaching

Regional Management

Company OP

Coaching not delivered to all focus entities.

Compendium changes for additional HR support and conference managment. Iran is now part of AP.

Inivitation sent to contacts for private beta testing. Planning for company op visit and implementation in Singapore.

Monthly News (region + MCPs) Newsletters for 2 target audiences

AIESEC International Q1 2015 Report


RESULTS MONITORING - IGCDP JAN-MAR – MA, RE

iGCDP 2000 1800

1748

1600 1400

1271 1130

1200 1000

877

800 600 400 200 0 RE

MA 2014

AIESEC International Q1 2015 Report

2015


RESULTS MONITORING - OGCDP JAN-MAR – MA, RE

2500

2339

2000 1588 1378

1500

2014 883

1000

2015

500 0 RE AIESEC International Q1 2015 Report

MA


RESULTS MONITORING - IGIP JAN-MAR – MA, RE

iGIP 500 450

429

427 387

400 350

310

300 250 200 150 100 50 0 RE

MA 2014

AIESEC International Q1 2015 Report

2015


RESULTS MONITORING - OGIP JAN-MAR – MA, RE

oGIP 200 180

172

172

160

136

140 120 100

87

80 60 40 20 0 RE

MA 2014

AIESEC International Q1 2015 Report

2015


RESULTS MONITORING – 1415 AP Progress oGCDP

iGCDP 12000

12000

1800

3500 3145

10354

10020

10000

10000

oGIP

iGIP

3000

1615 1600 1400

2500

8000

8000

1200

2000

1000

1500

800

6000

6000

4746

4638 4000

4000

Achieved

Planned

AIESEC International Q1 2015 Report

467

400 500

200

0

0

0

600

1000

2000

2000

1169

Achieved

Planned

0 Achieved

Planned

Achieved

Planned


challenges •  Importance of using EXPA •  Difficulties in getting offline results online, especially on the EP side. •  Main challenge in the region is the downloading of MC strategies to the local level. The ripple effect of MCs’ actions and communications needs to be a greater focus.

successes •  •  •  •

CHINDIA AP PR activities in SEA Focus on SEA and capitalising on ASEAN plan Regional collaboration is strengthening.

AIESEC International Q1 2015 Report


Q2 evolution Main focuses for Q2 will be •  MCP elected coaching calls for team forming, transition and fruitpeak delivery •  MCP current coaching calls for team engagement in last mile, transition and fruitpeak delivery •  Visits in entities for transition and peak delivery support •  Summit for SEA focus (they wont need visa in a short term future) •  Chindia follow up

AIESEC International Q1 2015 Report


cEE Region Q1 report


OUTCOMES Q1 ACTIVITIES CHECK

Global Entrepreneursn (Short term unpaid GIP) Product packaging created, launched to the network thgrough IPM and Xpros, 2 GSTs recruited, special module for it on EXPA, initial plans of entities collected and over 2000 Realizations in total.

IPM

Session preparation, session delivery and entity consultancy during the conference

AIESEC International Q1 2015 Report

EuroXpro

Support team selection and management

Agenda management, faci and chair selection and preparation, session preparation and delivery, output creation and release to the network

2 more support team members (GSTs) recruited for sub regions (Balkans and Baltics), regional weekly meetings, Xpro and CEE LDS preparation, monthly regional newsletters cocreation, tracking and coaching


RESULTS MONITORING - IGCDP JAN, FEB, MAR – MATCH

JAN, FEB, MAR – REALIZE

iGCDP 1000 981

980

IGCDP 1800

1653

1600 1400

960

1200

940

1000

989

800

920 900

600

901

400 200

880

0

860 total 2014

2015

AIESEC International Q1 2015 Report

2014

2015 2014

2015


RESULTS MONITORING - OGCDP JAN, FEB, MAR – MATCH

JAN, FEB, MAR – REALIZE

oGCDP 460 450

450

OGCDP 800 700

440

600

430

500

420

400

410

712

407

454

300 200

400

100

390

0

380 total 2014

2015

AIESEC International Q1 2015 Report

2014

2015 2014

2015


RESULTS MONITORING - igip JAN, FEB, MAR – MATCH

JAN, FEB, MAR – REALIZE

iGCDP 250

237

200

181

IGIP 300

266

250 200

150

139

150

100

100 50

50

0

2014

0 total 2014

2015

AIESEC International Q1 2015 Report

2015 2014

2015


RESULTS MONITORING - Ogip JAN, FEB, MAR – MATCH

JAN, FEB, MAR – REALIZE 400

oGIP 450

396

400

376

350 300

350 300

OGIP

238

250

279

200

250

150

200

100

150

50

100

0

50

2014

0 Jan 2014

2015

AIESEC International Q1 2015 Report

2015 2014

2015


RESULTS MONITORING – 1415 CEE Progress Chart Title 7000

6634

6000 5000

4101

4096

4000

2815

3000

2125 1700

2000

930

724

1000 0

GCDPi

GCDPo

GIPi Plan

AIESEC International Q1 2015 Report

Achieved

GIPo


challenges •  •  •  •

How to capitalize on sub-regions Putting regional collaboration in to actions Moving operations of entities to EXPA Cross tier regional collboration (T1&2 with T3&4)

successes •  Co-creation of regional vision and aims with MCPs in IPM •  First Global Entrepreneurs realizations (Romania, Russia, Serbia) •  Sub regional GSTs recruited .

AIESEC International Q1 2015 Report


Q2 evolution Main focuses for Q2 will be •  MCP elected coaching calls for team forming, transition and fruitpeak delivery •  MCP current coaching calls for team engagement in last mile, transition and fruitpeak delivery •  Work with OST subregional for coaching and projects •  Global Ent. Focus for the results in Q2 •  MCP Summit for planning focus

AIESEC International Q1 2015 Report


LATAM Region Q1 report


OUTCOMES Q1 ACTIVITIES CHECK IPM

ILC

Historical fruitpeak ambition Entity coaching chats with MCPe Latam 2015 #10 facts evolution

Historical fruitpeak ambition I AM 2015 culture in Latam Latam 2015 #10 facts evolution ** supported by AIVP OD

Virtual Engagement with Latam

OST LEADERSHIP # 1 teamdays delivered for final sprint strategies Ongoing meetings for strategy evolution and personal development.

#3 monthly newsleters to all MCs with general direction Ongoing coaching chats with MCVPs and MCPs on demand for performance (virtual and in conference)

AIESEC International Q1 2015 Report

OST - VENTURE SUMMIT

OST - ENTITY VISITS T3T4

GIP – Global Entrepreneurs focus: Colombia, Brazil, Argentina, Venezuela, Chile, Mexico, Peru, Panama | Goal: 700 GIP till June 2015

Fruitpeak oGCDP focus: Nicaragua, El Salvador, Puerto Rico, Dom. Republic, Guatemala, Panama) for average 300% growth in peak delivery

For OST further reports please check GCDP: https://drive.google.com/file/d/0By3NZ7IZTDgtbUNUYjdOUVhnbkVPSXk1ZjJtd2ZwaURwRzlB/view GIP: https://drive.google.com/file/d/0By3NZ7IZTDgtTkJDVVhCOVdEMDNQUUQ5a0h6OXp3c214N3RF/view Venture summit: http://anamariagip.wix.com/startinguplatam


RESULTS MONITORING - IGCDP JAN, FEB, MAR – MATCH

JAN, FEB, MAR – REALIZE

iGCDP 1600 1365

1400

1800

1612

1600 1400

1200 1000

iGCDP

1327

1200 866

1000

800

800

600

600

400

400

200

200

0 total 2014

2015

AIESEC International Q1 2015 Report

0 total 2014

2015


RESULTS MONITORING - OGCDP JAN, FEB, MAR – MATCH

JAN, FEB, MAR – REALIZE

oGCDP 1400

1319

oGCDP 1620 1610

1200 1000

1610

1600 1590

833

1580

800

1570 600

1560

1551

1550

400

1540

200

1530

0 total 2014

2015

AIESEC International Q1 2015 Report

1520 total 2014

2015


RESULTS MONITORING - igip JAN, FEB, MAR – MATCH

JAN, FEB, MAR – REALIZE

iGIP 600 501

500

iGIP 500 450 400 350

400

300 300 200

468

296

250 200

205

150 100

100

50 0 total 2014

2015

AIESEC International Q1 2015 Report

0 Jan 2014

2015


RESULTS MONITORING - Ogip JAN, FEB, MAR – MATCH

JAN, FEB, MAR – REALIZE

oGIP 450

396

400

370 365

350 300

oGIP

279

365

360

250

355

200 150

349

350

100

345

50 0 Jan 2014

2015

AIESEC International Q1 2015 Report

340 Jan 2014

2015


RESULTS MONITORING – 1415 LATAM Progress oGCDP

iGCDP 8000

8000 6700

7000 6000

6000

5000

5000

4000

1800 6900

7000

oGIP

iGIP 1700

1600

1600

1400

1400

1200

2976

1000

1000

800

800

600

600

400

400

3000

3000

2000

2000

1000

1000

200

200

0

0

0

0

Achieved

Planned

AIESEC International Q1 2015 Report

Achieved

Planned

Achieved

1700

1200

1025

4000

3654

1800

Planned

892

Achieved

Planned


challenges •  •  •  •  •

S&S implementation due to lack of HR Co-operation with other regions has been weaker than previous years due to regional focus. Moving offline operations to EXPA (specially on EP side) In spite of regional growth, Capacity of Cluster 4 entities still is the main issue for moving the region to the next level In spite of regional growth, dependance on Cluster 1 entities keeps being the most alarming fact for the region

successes •  •  •  •  •  •  •

Cluster 4 entities adopting project based and growing in oGCDP like Uruguay, Puerto Rico, Panama and Guatemala Contributions of MX and PER getting bigger (compared to C1 entities) Subregional collaboration with initiatives as the Central American Leadership Summit (fostered by MCPs after IPM and ILC) Venture summit for Global Entrepreneurs implementation in Latam (700 GIP goal for this project) ILC message for I AM 2015 culture, Historical Fruitpeak and Latam 2015 roadmap, proving succesful MC-LC communication MCP & MCPe empowerment for decision making and regional growth Americas BD Summit for the BD Latam growth

AIESEC International Q1 2015 Report


Q2 evolution Main focuses for Q2 will be •  MCP elected coaching calls for team forming, transition and fruitpeak delivery •  MCP current coaching calls for team engagement in last mile, transition and fruitpeak delivery •  Key MCVP operations elected coaching calls for fruitpeak •  Ongoing OST development •  MCP Summit for planning focus •  Entity visits by AIVP 14.15, AIVP 15.16 and OSTs with fruitpeak focus.

AIESEC International Q1 2015 Report


MENA Region Q1 report


OUTCOMES Q3 ACTIVITIES CHECK

IPM

Touchpoiint for currents and elects.

MET

Managing campaigns, newsletters and internal communication

AIESEC International Q1 2015 Report

MENA XLDS -  Understanding the new Business Model of AIESEC. -  Understanding their role for MENA’s future -  Bringing I AM 2015 Movement to MENA.

MCP Coaching Supporting MCP with team management and fundamental decisions in the entity.


RESULTS MONITORING - IGCDP MA

RE iGCDP

300 250

250

iGCDP 295

291

290 208

285

200

280 150 275 100

270

50

265

269

260 0 2014

2015

255 2014

AIESEC International Q1 2015 Report

2015


RESULTS MONITORING - OGCDP MA

RE OGCDP 350

328

300 250

OGCDP 380 370

243

367

360

200

350

150

340 326

330

100

320

50

310 0 2014

2015

300 2014

AIESEC International Q1 2015 Report

2015


RESULTS MONITORING - IGIP MA

RE IGIP 70 61 60

IGIP 58 56

56

50 40

54 37

52 50

30

48

20

47

46

10

44 0 2014

2015

42 2014

AIESEC International Q1 2015 Report

2015


RESULTS MONITORING - OGIP MA

RE OGIP 140

125

OGIP 108

107

120 100

106

100

104

80 60

102

40

100

20

100

98

0 2014

2015

96 2014

AIESEC International Q1 2015 Report

2015


RESULTS MONITORING – 1415 MENA Progress oGCDP

iGCDP 3000

2843

2500

2500 2000

1500

408

166

166

400

164

350

162

1611 1559

450

168

2000

2000

oGIP

iGIP

300

160

302

250

158

1500 1000

156

1000

200

155

150

154 500

500

0

0 Achieved

Planned

AIESEC International Q1 2015 Report

Achieved

Planned

152

100

150

50

148

0 Achieved

Planned

Achieved

Planned


challenges •  •  •  •  •  •

Little Financial Investments from Entities into entities and regional growth. Low productivity rate, as TLs, LCVPs fear to delegate. Negative growth in GCDP realizations due to late/weak OGX marketing. Programs are yet to be legal in most entities. Weak local leadership pipeline. Late/Slow process in MC team selections across the region.

successes •  •  •  •  •  •  •

Growth in both GIP Programs MA + RE. Growth in GCDP Matching. AIESEC in Egypt being proactive in role modeling to the region and leading projects + initatives. CEEDers from AIESEC in Egypt supporting with regional projects and operations. Amal Project Execution in the winter pilot, especially from Egypt, Morocco, Lebanon for the winter break. Most entities evolving and changing LC timelines. I am 2015 Movement at MENA XLDS.

AIESEC International Q1 2015 Report


Q2 evolution Main focuses for Q2 will be •  MCP elected coaching calls for team forming, transition and fruitpeak delivery •  MCP current coaching calls for team engagement in last mile, transition and fruitpeak delivery •  Visits in entities for Financial and legal support •  Visits for leadership pipeline support •  Summit for GCDP and GIP for elects MCVPs for the peak (Amal project) •  MCP Summit for planning focus

AIESEC International Q1 2015 Report


WENA Region Q1 report


OUTCOMES Q1 ACTIVITIES CHECK

Entity Visit + Follow up

IPM

WENA LDS + XPRO

Deliver entity visit for AIESEC in France, Canada, Iceland, Finland, Austria, Malta, Ireland, Italy, Greece

Session preparation, session delivery and entity consultancy during the conference

Virtual management of faci+chair selection and preparation, session preparation and delivery, output creation and release to the network

Aligment of supply and demand for the summer peak and general coaching on FO-BO synergy and team maagement

Creation of WENA SWOT and creation of the first regional collaboration projects.

In adition to WENA, physical attendance to AP, MENA and AFROXLDS

AIESEC International Q1 2015 Report

OST Team mgmt

Regional communication MCVP Coaching Global matching mania Customized partnership support


RESULTS MONITORING - ogip OGIP Q1 Matched

Realized 334

269

270

220

Q1 2014 AIESEC International Q1 2015 Report

Q1 2015


RESULTS MONITORING - Igip IGIP Q1 Matched

Realized

269 225 192 158

Q1 2014 AIESEC International Q1 2015 Report

Q1 2015


RESULTS MONITORING - OGCDP OGCDP Q1 Matched

Realized

784 702

692

431

Q1 2014 AIESEC International Q1 2015 Report

Q1 2015


RESULTS MONITORING - IGCDP IGCDP Q1 Matched 320

Realized 324

348

246

Q1 2014 AIESEC International Q1 2015 Report

Q1 2015


challenges •  •  •  •

Downscale straegies at a local level and ignite sense of urgency Putting regional collaboration in to actions in a faster way Moving operations of entities to EXPA Cross tier regional collboration (T1&2 with T3&4)

successes •  •  •  •  •

Regional conference model updated (WENA LDS, EuroCo) Entities running the first pilots of regional collaboration (Italy, Malta, US, Germany, Spain, Nordics) Co-creation of regional roadmap for 2015-2016 with MCPs at IPM Launch of Global Entrepreneurs Camapin among the subregion Entity visits to support the summer peak

AIESEC International Q1 2015 Report


Q2 evolution Main focuses for Q2 will be •  MCP elected coaching calls for team forming, transition and fruitpeak delivery •  MCP current coaching calls for team engagement in last mile, transition and fruitpeak delivery •  Follow up with OSTs for peak delivery •  MCP Summit for planning focus

AIESEC International Q1 2015 Report


Talent management Q1 report


OUTCOMES Q1 MILESTONES CHECK IPM Preparation & Delivery

TM XPRO’s Preparation and APC Delivery

TXP OP in EXPA Prep, Testing & Pre-Launch

LEAD

Agenda management, session preparation, dry running and delivering IPM.

Supporting in LEAD and TM tracks, alignment with FACIs for all XPRO’s. Preparing, dry running and delivering APC.

Finalising TXP launch materials, testing the TXP OP and functionalities on EXPA, preparing pre-launch in XPROs.

MCP LEAD 1415 and 1516 on track with steps for Q2, LEAD frameworks piloting and education, GLC launch and preparation

MAIN KPIs MONITORING KPI Name

Planned

Achieved

%

TMP/TLP NPS

0.60

unknown

-

Productivity

1.00

unknown

-

Team Mnms fulfillment

70%

unknown

-

Newsletters

3

3

100%

AIESEC International Q1 2015 Report


Main comments for tm 1.  In APC, a big challenge was MC-LC communication because all support, education and coaching was given to many entities but LC EB elects and members where not informed about many basic strategies regarding TM and LDM and such. 2.  Need to simplify the basic strategies AI suggests (everything around the business model) is not reaching LC levels in a way they understand and know what actions they need to take, i think we need to have a clearer support action plan for MC’s to download to LC’s

AIESEC International Q1 2015 Report


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.