port aisah azhari marwangi
folio
.BE
positive thinking person
Aisah Azhari Marwangi
+62 8572 8466 010
SUCCESS IN THE WORLD AND IN THE HEREAFTER
EDUCATION BACKGROUND 2009 - 2013 SMK N 2 Depok Sleman - GAMBAR BANGUNAN
2013 - 2017 Universitas Islam Indonesia - ARSITEKTUR
ORGANIZATION 2014 - 2015 Himpunan Mahasiswa Arsitektur UII - Keilmuan
SEMINAR & WORKSHOP 2017 Space for Development
2015 Clipan
2015 Parenting Skills
2011 Internal Training Entrepreneurship
THE EXPERIENCES AND AWARD
Hobby Sketching, Traveling, Eating, Designing, Sleeping
Additional QualiFication Hard Working, Having a Great Motivation, Able to Handle The Responbility, Truthfulness, Powerfull
Language Ability Indonesian, Java, English
Soft Skills
ACADEMIC
WORKS architecture design studio
Architecture Design Studio 1 1st Year, 2nd Semester Lecturer: Wisnu Hendrawan Bayuaji S.T. MA Site: Universitas Islam Indonesia
Crossing this Walkway concept on a bird that was skating along with the wind nimbly across the street below. This bridge connects the Faculty of Civil Engineering and Planning Building with UII rectorate building. The altitude is about 3.5m from the ground. There are two alternative ways: 1. For someone who is in a hurry 2. For people who want to enjoy the scenery ď€ rst
N
Entering Wind of Wing with the pleasure of sistance from the low fence, the oor is large enough, the wind fence accompaniment that always make us feel more relaxed
Come here and stop for a moment to enjoy the surrounding beauty of this place. Relax? Yes you need that. Once tired of activity in your busy campus.
Skip me, I know you're in a hurry. Do not worry you can run. I will protect you with my solid pillars. But be careful because not only yourself in this place
Architecture Design Studio 1 1st Year, 2nd Semester Lecturer: Wisnu Hendrawan Bayuaji S.T. MA
in the night
in the morning
H E A V Y CONSTRUCTION I built this relaxing place with a heavy unbinding material, so I stacked the material intersecting to create an interesting space. The height from the tip of the tip decreases, to show the harmony in the building. The picture below are mockups that I montage so there are human beings in
Architecture Design Studio 4 2nd Year, 4th Semester Lecturer: Ar. Ir Munichy Eddress B. M.Arch, IAI Site: Malioboro
SOSIATA FUNCTION SOSIATA functioned as market plus. Which in there is a souvenir market with high acoustics while the hostel as a private place for backpackers who require low acoustics.
market plus
The more human population will indirectly require more and more life facilities, including didalmnyakebutuhan primary namely board and food. Markets are often used to search for primary needs and hotels are also needed to meet the primary needs of packpackers who want a price to meet them. While the area is limited which is to meet the needs of the people. Then the design is done with 3 oors. There is a green area so the oxygen around it. Given the area is in urban areas and adjacent to the city center
CONCEPT of MAINENTRANCE Alumunium Composite Panel White Paint Concrete Light Steel
FACILITY
Vines
- Food Court - Musholla - Green Space - Traditional Market - Hostel
elevation
Green Paint Steel
White Paint Steel
DETAIL OF FACADE
SITEPLAN
ELEVATION
Architecture Design Studio 5 3rd Year, 5th Semester Lecturer: Noor Cholis Idham M. Arch IAI Ph D
GADEANG
TRADITIONAL ISLAMIC CENTER IN BUSAN
Gadeang is an ISLAMIC CENTER design located in 1590-16 Yeonsan 2 (i) -dong, Yeonje-gu, Busan, South Korea. This location belongs to the minority of Islam which is one of the reasons for the construction of this Gadeang as a place of worship of the Muslims who are there and at the same place to socialize among fellow Muslims or non Muslims.
Around the site there are very simple residential neighborhoods and small restaurants, but there are also other sides that have built high apartment buildings. In addition there is also a park as oxygen city.
SITE AREA BUILT AREA BCB
School
Restaurant
Government
City Park
Residential
Site
Apartement/hotel
= 6.754,1 Msq = 1713,4 Msq = 25,4 %
Wide of road 22m Wide of road 11m Wide of road 4,5m
CONCEPT Architecture Archipelago is architecture that resides in Indoneisa by lifting traditional house as reference in making design accompanied by leap of creativity of architecture. It is also applied to the Gadeang design which raised the traditional Minangkabau building architecture, Rumah Gadang. Then combined with the existing culture in Korea
philosophy Arch is conď€ rmed GADANG House
SEPARATED
KOREA House
Both types of roofs have distinctive features of the arch and have a pointed edge. This roof symbolizes victory. Expected GADEANG this can be an interesting place either for Muslims or non Muslims. Which ultimately can spread the religion of Islam in the minority of Islam
White
Brown
PURITY, CLEANLINESS (Mosque)
WOOD (Traditional House Material)
CULTURAL
Gadeang is located in a residential area that is still simple residents by using sloping roof and adjacent high modern buildings that form a sloping design with a large-scale tilt shape and make this building very conspicuous.
ORIENTED IS TO PRAY MOSLEM PEOPLE
TAHU TEMPE CANTEEN ISLAMIC LIBRARY RELAX AREA
BUSAN MOSQUE
ADDITIONAL FUNCTION
TOURIST PLACE FESTIVAL TRADITION MINORITAS MOSLEM
WINTER When the snow season, the snow can go down easily and does not involve on the roof because of the rhythmic roof temenggingan
SUMMER & RAINY The principle of Gadeang sheath is almost the same as the house in general. So it can response to rain and heat
RUMAH INDONESIA BIASA
SPRING The leaves in the spring can go down well because of the steep slope of the roof
GADEANG
The facade uses a lot of carvings like the Gadang house with the name of Allah and the interior of many Islamic motifs seem crowded like a festival tradition in Busan. But for Prayer Hall little motive so khusyu' in performing worship.
ENTRANCE
Efď€ ciently designed disinfected parking lot adjacent to the circulation to the entrance and exit the building
Entrance to Prayer Hall with Islamic carvings and also greeted with symbols Gadeang
Relax Area is used to rest the visitors who come. The design is typical with the characteristics of home carving Gadang
RELAX AREA
MIHRAB
Mihrab with small engravings inscribed Allah and one carving with the largest size as a marker of Qiblah
ISLAMIC LIBRARY
Islamic libraries used for public. This library contains many Islamic books that can easily be learned. Especially for people who just converted to Islam. The design of this library displays a lot of carvings such as the Gadang home
RELAX AREA
PARKIR DIFABLE
A temporary garbage dump near the road to make it easy to exclude and not disturb the sense of smell and sight of visitors, and maintain cleanliness, in addition to having its own vehicle circulation RESERVOIR
Water sources are exposed as a sign of respect for clean water which is the preservation of sanctity in buildings and visitors can enjoy as well
STRUCTURE GADEANG structure with wide span with span 33 meters in main building using 3 type of structure system that is space frame, truss steel frame and truss pipe. The foundation used is the foundation of the basement on the main building and the pile on the supporting function
Steel Pipe d= 300mm Basement foundation Steel Pipe d= 300mm
E LEVATION
EAST e l e v a t i o n
NORTH e l e v a t i o n
WEST e l e v a t i o n
Truss 150mm Space Frame Truss 120mm Truss 150mm
PRAYER HALL
RELAX AREA
Prayer Hall which
Interior Relax area using cool ornaments (brown) wood color so that penghuninnya feel comfortable.
contains about 900 pilgrims with natural lighting from the skylight space frame
ABLUTION ROOM Wudlu place that can not be separated from the ornaments typical of Gadang
TOILET Toilet tidak terlepas dari ukiran-ukiran khas Gadang
ISLAMIC LIBRARY The library is not only for reading Islamic books but also can be a sharing place about Islam
CANTEEN Canteen that sells halal food and beverages and Indonesian specialties
Architecture Design Studio 6 3rd Year, 6th Semester Lecturer: Noor Cholis Idham M. Arch IAI Ph D
MARWANGI
bank & office
BACKGROUND Yogyakarta with the city of education, culture and tourism has grown more rapidly the last few years. The widening urban growth along with the increasing economic value of the land ofce land requirement results in a high strategic value, especially for trading functions and services. Respresentatif ofce area needs, strategic and affordable in-trade zone has increased so built of rental ofces into one form of alternative to meet those needs. m2
U
Bank BCA / bank Natasha Border Of Yogyakarta
EXISTING LOCATION
The company has a program of national private banks increased efciency in managing its asset building. The location of the building related to "Brand Image" as the image of the reliability of the bank, so that it always occupies a strategic urban locations. Bank building is located in a strategic area in the urban built only to meet the needs of the ofce spaces of their own would be too expensive operational costs. thus the banks are no longer ofce building planned just to accommodate the needs of their own spaces, but it can be used commercially to serve the function of the ofce for the needs. This idea became the basis of the bank's ofce building that also serves as a rental ofce
:EX BCA Bank / Natasha’s Bank :JL.urip sumuharjo no.76, gondukusuman, Yogyakarta
SITE
2131,5
PARKIR
30m 1,5m
motor
mobil
200
81
KDB m2
1500
78m
75m
RTH m2
292
KLB m2
10140
29m
Building Manager
Nasabah
15 people
35 people
m2
Customers are people who visit the bank for the purposes of the Consultants: concultation, or save money, transfer, etc.
Building manager is the person who manage and maintain the building as a whole
USER 500 people BANK
OFFICE
50 people
400 people
Clerks and Bank leaders who maintain and work on the main branch bank independent in Yogyakarta
Employees and leaders who use the rental ofď€ ce in each of the existing ofď€ ce rental agreement
PROPERTY SIZE RTH
MEE Annex
Rental Office
Parking & Circulation
Bank Business Meeting Lobby ATM Center
SECTION
920m2
Rental Office
3.4m
920m2 920m2
24m
920m2 920m2 1270m2
Bank & Annex
3.5m 7m
1270m2 1500m2 1500m2
Basement
2.8m
5.6m
mass concept Building orientation does not consider the direction of the sun but will be respon with facade design
30m
open space
1,5m
mass position building mass position in the center of site. Aim to give a space between buildings around and for the circulation of vehicles. The back and front for the green open space as well
78m
75m
main entrance In the front have bigger open space than the back cause for public activity and park. 29m
Primary Building Annex Building
Separated annex to the primary building for the comforts the public so as not disturb the activities in the primary building. Position of annex building in front of the site to ease of access
relation of space Each user has a different activities, even The different activities can interfere with other activities, so every space should considered according to user.
privat semi public
public parking public St. URIP SUMUHARJO outside circulation circulation to the site circulation out from the site
landscape GIVE EACH OTHER ANNEX
COMFORT
It can be accessed by people in general, without disturbing the internal activity within buildings
Although using a composition perpendicular to the sunlight, but the comfort maintained with shading design and space arrangement
EASY
PARK Although need many functions in the building, with a small site, the park can be perceived by the user as the oxygen inside the building and reduces heating
Access to the basement efď€ ciently and can be loaded vehicles
SYMBOL sunset
sunrise
It have smooth shape and after transformation, this concept for shape of site plan. That with park in center of the if front of the entrance. The smooth shape makes it easy the vehicle to drive
siteplan
This open space for oxygen and for safety area if emergency and there are residential roads
Typical service area till 7th oor to efcient room and structure
Typical service area till 7th oor to minimize the primary activities in the west side cause it have a bad sunlight.
Circulation to Basement & from Basement Drop off Circulation Difabel Car Circulation Service Area Annex Building Smoking Room Pantry Area Emergency Exit Nasabah Area Bank Rental Office Parking Area
Service Area Annex Building Smoking Room Pantry Area
Typical Floor
Emergency Exit Nasabah Area Bank Rental Office
1st Floor
Parking Area
Ground Floor
Basement -1
Basement -2
Using Grid Structure 5m, 7m, and 7,5m Type of fonndation is Borpile Fondation, depth : 5m
Emergency Stair Meeting Room Work Longue
facade response the facade design adapted to space-related functions. The service area covered with massive facades, and work part lounge, ofce, bank using a curtain wall for the purpose of saving energy by sunlight
Elevator
South Elevation
Service Area
North Elevation Emergency Stair Work Longue
Smoking Room Rental Office
Service Area
West Elevation
Elevator Rental Office
Pantry Room
filtrate that the winds with heat air winds with heat air
road
reduce the noise
shading for parking
shading for ground floor
East Elevation
facade response Filtrate the sunny
section detail Tha facade on the West and East side using design like in picture, because in Indonesia the bad sun come from East to West that can make people feel uncomfortable. But, with the facade, user can get light from the sun but they don’t get a sunny from the sun. Vegetation around the facade can making inside more than fresh
difabel response
section detail Another facade in west and east area using the horizontal shading to avoid direct sunny On the ground oor till roof top, the building have toilet priority for difable. Cause they can’t move like people in general.
plan detail Another facade in north and south area using the vertical shading to avoid direct sunny
Parkir for difable on groundoor, to easy access for them. in the different oor level it have ramp for them access
interior
exterior
Good cities know that streets are for people, not just cars. Great cities know that street are places to linger and lives not just move trough
Architecture Design Studio 7 4TH Year, 7th Semester Lecturer: Ir. Wiryono Raharjo, M.Arch., Ph.D.
REJO WALK
Maguwoharjo is one of the suburbs that experienced rapid growth. According Hermanto, 2010:
“
Di Desa Maguwoharjo, faktor eksternal lebih besar pengaruhnya dibandingkan faktor internalnya mengingat bahwa interaksi atau keterkaitan antara Desa Maguwoharjo dengan Kota Yogyakarta sangat erat. Keterkaitan kuat tersebut jelas terlihat terutama di sektor jasa dan perdagangan.
“
The linkage of the trade sector is evident in the Traditional Market of Stan which is located in RW 043, Mustokorejo and Babrik Village, Stan Village, Maguwoharjo Village, Depok District, Sleman Regency, D.I Province. Yogyakarta. Satan Market is located at the corner of the intersection of Jl.Raya Tajem and Jl.Sopalan so that the road and market activities become one. In addition to the
LOCATION INDONESIA
D.I.YOGYAKARTA
market, around Satan there are also 3 universities and Maguwoharjo Stadium. So the citizens of RW 043 and the developers started to use some of the kos-kosan and kiosks. This is also a consideration of the existence of the market so there is ease in running its survival. Citizen houses on the sidewalks I was used as service and culinary stalls inuenced by Stan Market. Departing from the condition of the area, the authors conducted a eld survey to the market area of Satan. Through the Co-Design approach, the authors analyze the area and conduct interviews to some inuential informants in the region. With eld surveys and interviews, the authors obtain accurate information and later can be used as a reference design in accordance with the expectations of residents in the area of the booth.
SLEMAN
D.I.YOGYAKARTA
DEPOK
SLEMAN
LOCATION
URBAN DESIGN
SETAN VILLAGE
SITE PROFILE
STAGE HOLDER
Jl. D
Mrs. RINA
enok
an
Hamlet
a Taje Jl.Ray
stoko Jl. M u
RT 01
m
rejo
RT 02
Jl. M
Mr. RANTO
abr
ik
usto
kore
jo
Jl. B
Rt03
Chairman of RT 02 Jl.S
opa
PA setaSAR n
lan
RT 04 Jl.
Pa
se
ka
n
Mr. MARTONO Chairman of RW 43
setan 1503 PEOPLES rw 043 POPULATION 778 PEOPLES
rw 044 POPULATION 725 PEOPLES
Mr. KAMIDI The Village Elder
economy 50%
55%
5%
CIVIL
NON CIVIL SERVICE STALL BUSINESS CONTRACT’S HOUSE
FARMER
PROBLEM 1
DISEASE IN SETAN MARKET ENVIRONMENT
2
PEDESTRIAN WAYS is not used properly
aims
advantages
With the elaboration of the problems encountered as previously described, the authors want to solve these problems through the Co-Design approach by inviting residents to get used to walking when in the area of this economic center.
So what are the benets of the above strategy?
Why walk? Because of the condition of congestion that has been described above, the number of vehicles parking and the number of street vendors on the street so that makes Jl.Raya Tajem jammed. Well, the strategy is to move the parking area that has been provided by the government. When all the parking has been placed into the pocket, the citizens to reach this economic center area should be on foot. What is the purpose? The goal is that the crossroads of Satan Market can be paired Trafc Lights, regulate the circulation of people and vehicles considering the high density of visitors here, re-activate the pedestrian function so that street vendors can be arranged to a place that has been planned itself, the latter certainly to familiarize people here to walk
The benets are very much that is with the installation of trafc lights above, the circulation of vehicles can be regular and congestion can be minimized. With the pocket parking also, human activities and vehicles can be separated so that safety dapet and that way, air pollution around this economic center will be reduced. The benets of the pedestrian itself to the pedestrian area with a sense of security and comfort, because of the trees to be planned and on foot, visitors can gain experience of space from this area of Satan, where the area of the economic center is lled with various commercial and culinary functions, there is Also the Satan Mosque and Sabo River are still good conditions can be a destination as well as enjoy the area of this economic center. In addition, it can also reduce air pollution because parking activities parked on the side of the road has been moved.
AKTIVITAS DI PASAR STAN (PEREMPATAN) kondisi lalu lintas meunju perempatan
kondisi bangunan di sekiat seta
area border In the design project, the area is divided into 2 zones. The ď€ rst is the macro zone that covers a portion of the Satanic area that is the focus of the Rejo Walk design as it relates to circulation as shown in Figure 2. The second is the micro zone encompassing the core area of the rejo walk as in Figure 3. This location is processed in such a way through shortcuts of Co-Design so that it can solve problems and improve the environment of the area.
Picture 1. Mezo Zone
design scope In the design of this urban area design limits are divided into 2, namely: ď€ rst, the core design of Rejo Walk in the microcomputer to solve the existing problems as in Figure 3. The second limitation of the impact of design Rejo Walk which will be affected in the circulation system and the location of the function From commercial, educational, or residential buildings. These limits fall within the mezo boundary as in Figure 4 in 3D.
Picture 2. Micro Zone
The hope, the concept of Rejo Walk can be integrated well either the circulation or the function of the site by including the potential that exists in the region.
Picture 3. Design Area
implementation of co design theory co-design
1
Through the Co-Design approach, the authors began to interview the inuential citizens of Satan area, ie there are elders who have long lived in Pasar Satan, environment leaders and the leaders of Dukuh, the head of RT and RW Chairman. This interview is to explore the problems, potentials, etc. that exist in this area. From here, the author will solve the problem of congestion and pedestrian
Bu Rina
Pak Martono Pak Kamidi Pak Ranto
interview
2
After conducting an interview, proceed with a direct survey to the area to get accurate data and photos. In the survey, interviewed also residents who live in this area to strengthen the data and analysis later.
survey
3
Kemudian setelah wawancara dan survey, bersama warga memberikan solusi atas masalah kemacetan dan pedestrian yang kurang baik. Disitu warga memberikan berbagai solusi dan beberapa solusi berdasarkan oleh kebijakan pemerintah, namun belum diterapkan sampai saat ini. Dari situ maka diambilah keputusan perancangan desain bersama, supaya menjadi lebih baik.
Kemacetan Di Perempatan Setan
Pedestrian yang kurang terawat
discussion
rejo walk
rejowalk concept
rejo
walk
REJO name taken from one of the hamlet name in RW 043 which means crowd. So the predecessors in this village, want this area crowded
The means of WALK is expected that the dominant activity of people in this area is done by walking
REJO WALK means crowds of people walking, considering the roadside area of this area ď€ lled with commercial buildings, so people will be treated to the experience of space from the buildings. In general, Rejo Walk seeks to unify the same market function and separate the circulation of vehicles and people with the revitalization of pedestrian way Please look in Figure 1.1 that illustrates the location of the Morning Market, a separate Evening Market and street vendors that meet the roadside around the Market
before Same Function, Different Places Different Circulation, One Place evening market morning market
sv
vehicle people PEDESTRIAN area sv : street vendors
after Same function, One Place Different Circulation, Different Places
Analysis Map of Market and Street Vendors
Reduce Air Pollution
morning market
evening market
sv
People can socialize As a means to exercise Enjoy with environment surrounding
STRATEGY FOR REJO WALK
rw rejo walk
After making a description of the problem and its completion, then Rejo Walk is divided into 5 designs that also utilize the existing potential of the region.
problems
market rearrangement The rearrangement of the market is concerned with the displacement of the afternoon market and some street vendors into the Stan Market. Around the outskirts of Pasar Stan are given space for Pedestrian because of its location on the road.
parkir arrangement
potential
street vendors arrangement
Parking in the The street vendors area is placed in are partly placed in the parking the Stan Market spaces that have and some are been planned placed in cash by the residents ď€ elds that citizens so as not to want to make disturb the road public parks, circulation and because of the other activities. potential of a large ď€ eld and its place in the midst of commercial and residential activities.
comercial building arrangement
pedestrian revitalization
Structuring of this Pedestrian ways are commercial building deď€ ned by using to provide space elevation difference experience as a and urgency to regional image to difable as it is a the pedestrians so commercial that convenience environment that can be realized. people can use in Some commodities general. The width of are used as the pedestrian is shophouses due to based on the rules of the large number of Satan's territory. boarding houses in the region due to campuses and close proximity to the market.
morning market
location of parking plan new market
evening market
The scope of market planning limits. The afternoon market becomes one in the Morning Market
market rearrangement
1
2
PARKIR arrangement
lokasi pkl perencanaan
The scope of commercial building arrangement
lokasi parkir perencanaan Pasar setan perencanaan
location of street vendors plan
street vendors arrangement
location of parking plan setan market area
3
The former afternoon market is also used as a commercial function for the addition of landowners' income. (Privately owned estate market land)
comercial building arrangement
4
Finally Once the strategy can be done, then the Setan Market crossroad can be installed TraďŹƒc Lights to produce better environmental conditions. So that human activities and vehicles can run properly with a sense of security and comfort.
pedestrian cangkupan penataan bangunan komersil
lokasi pkl perencanaan lokasi parkir perencanaan Pasar setan perencanaan
pedestrian revitalization
5
market rearrangement
NORTH morning market evening market market area
b
a
ARAH ENTRANCE
Jl. ra ya se
tan
PASAR SORE MOVE
existing
parkir pkl Setan market
parkir stall
vehicle circulation
section A
11M
St. setan road
design
Palm Tree planter
Wide from Planter in Market is 1m
mass market b 5m 11m
pkl
pkl people
people circulation
circulation
12m
mass market a
11m
corridor
Ÿ
section b
Setan Market Activity which was originally at Jl. Raya Satan is taken into the hall between two new market buildings that can reduce activity on Jl. Great Devil. This is to separate human activities with vehicles
mass process design Market mass is made into 2 compositions that are mirrored with open areas in the middle so that the activities of street vendors and market activities that originally were on the road, replaced among the new Market compositions
mass b
plan note
locaiton of street vendors
from
Parkir Mobil
ir park
lokasi pkl
mass a St. Tajem Road
Ÿ
from
et
mark
St. Sopalan Road point garden
kdb Mass A = 1,128 m2 Mass B = 979 m2
trees
circulation
Between the distance of one palm tree to another 7m. Placement of palm trees along with planters to provide green spaces and shade in this market corridor.
n the market corridor is used for human circulation and street vendors. The new Satan Market can be accessed from 8 doors to make it easier for pedestrians to access it.
parkir arrangement PASAR SETAN tempat parkir perencanaan sd n 1 depok TANAH KAS parkir on street sd dep
ok
Public Park
Jl. Mu
stoko
a
rejo
B Jl. Raya
Tajem
Jl. Sopalan
KONSEP LETAK GUBAHAN
potongan parkir mobil
pohon ketapang
parkir motor parkir mobil
5m Parking Stall
3d gubahan parkir
1m Planter
5m Parking Stall
Based On Precedent in San Mateo
circulation parkir a
parkir b
The width of the car circulation in Parking A is 5m wide because of 1 direction
The width of the car circulation on Parking B is 6m wide because of 2 directions.
parkir a
420 motor
2,5m
PARKIR MOTOR
Basement is used for parking because the height of buildings in this area a maximum of 2 oors while parking needs can be ď€ lled with 3 oors
wind
140 motor /lantai
2,5m
2,5m
32 mobil
potongan
PARKIR Mobil Parking the car using a horizontal system or so-called parking lot. In this car park apply the study of precedent in San Mateo by considering the location of vegetation and stromwater.
parkir b
46 mobil
Parking B also uses a parking lot system located on the north side of the Market. Parking is devoted to car parking. The car park is separated due to limited land and a lot of parking needs which uses a horizontal parking system. Efforts to maintain the car park horizontally to let air circulate well and reduce the heat of this region.
parkir on street
On street parking is specially used for drop off of elementary school students of Depok who delivered. Widening for 2m parking so that the mustokorejo road circulation is not disturbed
street vendors arrangement Establishment of street vendors module as in precedent. This modular module is based on the concept of Dutch building form, considering the emergence of Setan name is due to the Dutch
The arrangement of street vendors location is divided into 2 places area pasar Setan public park (lapangan kas)
salah satu bentuk atap Belanda
Ukuran tiap modul 2,3m x 2,3m
pasar setan
1
lapangan kas (Public park)
2
total pKL
50 pkl
Jl. Mustokorejo
Planning street vendors module of 50 stalls. Same with the needs of street vendors currently numbering approximately 50 street vendors
18 sisi utara +
The street vendors are placed inside the Setan Market hall with the specied Modules.
The street vendors are on the outside of the eld and the orientation is the same as the street vendors in the market. Placement of street vendors in this eld to turn their own eld into Public Park in accordance with the wishes of citizens so that there is open space for the later oxygen
18 sisi selatan
32 pkl 8 sisi utara + 11 sisi selatan
18 pkl
COMERCIAL BUILDING ARRANGEMENT
Jalan Musto
Jalan S
opalan
note: letak shako
The arrangement of commercial buildings that will be used as SHAKO (Share House & Shop) is devoted to mezo design area, can be seen in the picture beside.
Jalan Raya Tajem
korejo
Jalan P asekan
The impact of this mezo region arrangement, resulting in some houses that were replaced with other functions. Thus, they are left homeless. Here's the data of the house that switch the function according to the author's analysis:
konsep gubahan massa The concept of mass composition of commercial buildings such as the concept of module for street vendors is by using the Dutch style of building, because the name of Satan obtained because of the DUTCH.
7 RUMAH BERALIH FUNGSI
PENGHUNI TINGGAL DIMANA
?
SHARE HOUSE
konsep atap The roof concept maintains the roof shape of the kampong that is widely used by existing buildings there. Because commercial buildings with each other coincide, then every roof requires a at gutter. In the concept here, at gutters is like a building that is used as a roof garden. As in the scheme below.
konsep letak shako
Between buildings with each other coincide. However the specied plotting is, every 5 buildings are spaced 2 m, to enter light, air circulation, human circulation
1
2
3
4
5
1
2
3
4
5
1
2
3
4
Plotting Massa SHAKO
air hujan turun Roof Garden Atap Kampung
35
o
Share House
Retail/Kuliner
Menuju saluran air hujan
ketentuan fungsi bangunan shako share house
A culinary comparison with 1: 3 retail. So every 4 SHAKO buildings, one of which serves as Culinary and 3 as retail. This is done so that the distribution is evenly distributed.
retail/kuliner
25,3 %
75,7 % fungsi retail
ketentuan LUAS BANGUNAN fungsi kuliner
Each building has a width of 5m. The length of 2 sizes is 15m and 10m.
pedestrian revitalization C A
B D
B
Stromwater Planters
G
E F
Figure C. Pedestrian Road
PEDESTRIAN JALAN RAYA
> 1500mm
Water ways
900mm
Figure A. 2D Pedestrian Section
Pedestrian Planning
600mm
The tree used for pedestrian is Waru Tree because according to the residents this tree is easy to ď€ nd in Satan area.
Waru Tree Ceramic Size 25x25
The smallest pedestrian width is 1.5m based on the pedestrian location due to limited land. However, all pedestrians are equipped with 900mm wide stromwater planters and gutters with a width of 600mm. The width of the pedestrian is based on the symbol in Figure C Figure B. 3D Pedestrian Section
Waterways
900mm
600mm
Stromwater Planters
3000mm
1000mm Pedestrian Way
3000mm
A
Pedestrian Wide 1,5m
B
Pedestrian Wide 2m
C
Pedestrian Wide 3m
D
Pedestrian Wide 2,5m
E
Pedestrian Wide 1,5m
F
Pedestrian Wide 1,5m
G
Pedestrian Wide 1,5m
1500-3000mm
Figure D. Denah Pedestrian
POINT GARDEN Point Garden is a gathering design by applying RAIN GARDEN as it is at a precedent lying in Setan's position. When walking from the parking area then enter the market, then can go directly to this Point Garden. It is expected that with the furniture at Point Garden, many of the walkers who enjoy the environment here. Then indirectly become the NODE of the 4 directions of the pedestrian because of its location at the placement. There are 2 point garden points in the West and East Setan area. As in the Figure E
actor network KELURAHAN MAGUWOHARJO
no
Setan Community
yes KELURAHAN MAGUWOHARJO
government
user
landuse
Commercial Area Residential Area m
Parking Lot Jl. Raya Taje
Land use is guided by the condition of RW 043 existing area, but to separate between private and public activities the writer rearranges in such a way that between the two activities can be well established. In the rearrangement, the authors also pay attention to the condition of the residents so that no miss communication occurs with the community. Commercial areas are placed alongside roads to exploit existing and residential potentials within villages where noise levels are lower than on the roadside. Green open space is also inserted into the design to become oxygen for the user as wanted by Mr. Martono sekawa RW chairman.
Open Space Field Sabo River
circulation Based on the concept of Rejo Walk, then the circulation must be considered, as well as the circulation of vehicles in the village. In the existing, the road circulation of the land is still in the form of land, the boundary is not clear and between the roads with each other is not connected. So with this urban design, the authors connect all the way so that circulation can run well. Soil Roads are given pavement, so that rainwater ow can be arranged properly.
Jl. M
usto
kore
jo
Jl. Sopa
lan
Primer Street (high way) Sekunder Street Villager Street
Jl. Pase
kan
This 1-way circulation is applied to the surrounding streets of the Market area, as it is the main route to get to the parking lot. This is to anticipate congestion from meeting 2 vehicles opposite
circulation 1 - way circulation 2 - ways circulation
In addition to the market street area, the circulation remains in two directions. Roads in the North and South of the devil's crossroads are bordered between circulation directions to avoid riders who are back and forth without signs. Because it will make other vehicles obstructed circulation
street wide Rejo Walk urban arrangement involves the widening and narrowing of some roads as well. This is to support the achievement of one activity with another. Inscribed explanation: St. Pasekan road and St Sopalanroad are wide at 6m, but by the government it has been planned to widen that is 1 m to the right side and 1 m to the left side. So the width becomes 8m
The wide Tajem highway was originally 12 m, narrowed to 11 m. This is related to the revitalization of pedestrian to be accomplished without displacing the east mass of the road.
This one-way street is 4 m in width initially, but since there is a main parking function that must pass through this path then the road is widened 0.5 m on the right side and 0.5 m to the left side.
CALCULATION THE DISTANCE OF PEDESTRIAN Berikut perkiraan waktu tempuh berjalan kaki dari titik-titik Rejo Walk:
car park in east side
scenery in west street along setan market
scenery of public park with street vendors
view of market hallway
BUILDING RULES The mass of market buildings and commercial buildings using the indische style with roofed roofs of the village. Commercial building height of maximum 3 oors and residential building maximum 2 oors. Every 5 commercial buildings coincide there should be a space for the circulation of people at least 1.5m. The mass for street vendors module must be in accordance with the design module.
view in setan crossroad
scenery in of commercial building
Bachelor Final Project 4TH Year, 8th Semester Lecturer: Dr. -Ing. Nensi Golda Yuli, S.T., M.T,
REDESIGN OF TRADITIONAL MARKET IN SETAN, SLEMAN baded on Inclusive Design Appoarch
INDONESIA LINGKUP URBAN DESIGN
DESA SeTAN D.I.YOGYAKARTA
LOKASI
D.I.YOGYAKARTA SLEMAN
maguwoharjo SLEMAN
DEPOK
SITE AREA
LOCATION Setan, Maguwoharjo, Depok, Sleman, Yogyakarta
BATAS SITE North East South West
: Green area with trees : Tajem highway by status as a city street. : Pasekan Highway by status as a city street. : Mustokoerjo Street by status as a village road,
5.251 msq
BACKGROUND Street Vendors
Parkir
30 food
214 motorcycle
20 drink
22 car
MORNING market
03.00-12.00
209 Trader
The Solid and Increasing Traditional Market Conditions
Informal Activities Roadside Around Market
NEGATIVE
USELESS
Open Space Can Not Accommodate Social Activities
Number of Unused Commercial Space In The Market
space
EVENING market
stall
problem Less Effective Use of Market Space
15.00-20.00
41 Trader
The existence of the Informal Evening Market
InclusIve design
INCLUSIVE DESIGN is a design approach for generating facilities and products for everyone (as users) in general, without physical limitations, age ranges, and gender. With such a design approach, a facility or product will experience a 'compromise' so that everyone as a user can be accommodated for their needs in the move, without excluding some people. (Yusita, 2007) Implementing Inclusive Design can provide facilities for everyone. In a facility architecture that can be used for everyone is a social facility. Linkage to design is a design that can generate shopping facilities and recreational facilities in one location. The shopping facilities here are the Satan Traditional Market.
Recreational facilities that can solve the problem of negative activities in the market environment of Open Space. With this design approach, no users are excluded, they can accommodate their needs in the move. This is related to the existence of the formal sector and the informal sector within the Satan Market environment which is a problem in this design. The formal sector deals with traders within the Satan Market, and the informal sector is traders who are in the Evening Market, street vendors around the street, and illegal parking on the street. Through the Inclusive Design approach, the informal sectors have the same rights as the formal sector, including having a proper place.
INCLUSIVE DESIGN
Vehicle circulation is closer to the seller
Rearrangement of street vendors so that no other street vendors
Traders and street vendors are in a formal place
The Moring and Evening markets are in one place
Structuring the trading space that takes into account the efďŹ ciency of the premises
Provide social facilities that can be used in general until the evening
STRATEGY
Parking is easy to reach the seller
circulation output
space organization
How to design a morning morning grocery and afternoon trader in a single building considering space efďŹ ciency?
How to design the street vendors that can minimize the existence of street vendors and pedestrians?
How to design a social layout on the Devil Market that citizens and market users can use?
How to design vehicle circulation and parking within a market that easily reach traders in all parts of the building?
space organization
space organization
space organization
circulatuon
TRADER
open space street vendors
VEHICLE
analysis site analysis
AREA 5251 m²
2.426 m²
sun analysis Parts of the site are always exposed to the sun afternoon and afternoon based on the results of ecotect
WIND analysis Dominant winds come from east to west
This section is used as green open space so that the heat of the sun when entering the building has been reduced The mass stretches from east to west to minimize direct sunlight
Parts of the building there are perpendicular to the direction of the wind coming, to capture the wind with the maximum 108/5000 there is a mass that is not perpendicular to the wind to follow the formation site and neutralize incoming wind
access analisys
Enter via Jl. Mustokorejo relatively quiet so as to minimize congestion Exit directly to the main road to facilitate circulation
Avoiding access to buildings in crossroads because this area is a meeting point from any direction, unlike access to existing
zone function analysis
Depens on the above
Berdasarkan analisis matahari, maka area yang paling kritis terkena sinar matahari digunakan untuk ruang terbuka
Berdasarkan analisis view, maka view terbaik berada dibagian utara dan selatan yaitu pepohonan dan deretan toko
Berdasarkan fungsi Akses menggunakan sekitar, maka bagian jalan yang bangunan tidak dekat dengan diletakkan dekat jalan utama, untuk dengan jalan mengurangi resiko supaya mudah kemacetan salaing berinteraksi
Pasar Pagi, Pasar Sore dan Area Servise
PKL, Pasar Pagi, dan Pasar Sore
USER
TRADER
STREET VENDORS
VISITORS
MANAGER
TYPE OF ACTIVITY
Loading Dock Li Service Parkir Stall Toilet TPS Dray Toilet TPS
Put the Vehicle on Shop Breas eeding children Defecate Worship Interact with others Relax
Parkir Market Breas eeding room Toilet Mushola Open Space Open Space
Put the Vehicle on Stand Guard Opera ng around the Market Defecate Worship
Parkir Management Room Stall Toilet Mushola
MANAGER (security)
Put the Vehicle on Maintain the security and order of the building
MANAGER (cleaning service)
Put the Vehicle on Take cleaning tools Take a rest
Parkir Security Post Parking manager Storage Cleaning Service Room
Trader 209
USER
SPACE NEEDED
Accommodate Goods Li ing Goods Put the Vehicle on Sell Defecate Throw Garbage Berjualan Defecate Throw Garbage
Street Vendors 41
50
Traders on the redesign of the market amounted to 300 traders, 209 of the morning market traders, 41 traders from the afternoon market and 50 traders from the street vendors
Visitors
Manager
200
12
Visitors who come to the market every day approximately 200 people either drive or not drive.
Manager consists of 4 managers, 3 cleaners, 1 health post guard, 3 security guards, 1 guardian disenfektan,
COMODITY EVENING
8
MORNING
market
market
Sembako
8
Daging Ikan, Ayam
25
Sayur-sayuran
51
Sayur-sayuran
6
Plastik
23
Daging Ikan, Ayam
30
Warung/Makanan Jadi
Pakaian
27
Buah-buahan
6
Penggilingan
7
Jajanan Pasar
12 6
Alat-alat dapur
market trader The total of Setan Market traders is 250 traders. 209 is a trader in the morning and 41 is a trader in the afternoon
Needs space with partially shared los
41
shared stall
168
Usual stall
168 los biasa x 2.75m2 = 4.62 41 los shared x 3.35m2 =137.35 2
Total 599.35M
Analysis Alternative of storage stall For Shared Los strategy is needed so as to maximize the existing land but still maintain the security of merchandise goods. So an alternative is needed to store merchandise.
1
The shared los space is in the bottom cabinet
2
Storage space shared los is at the bottom of the los
Choose no.2 This is based on the consideration of safety and efď€ ciency, when storage space is under the los so visitors can not know the space and in terms of efď€ ciency, the capacity of the cabinets that should be used for more storage space, because the storage space is under
The morning traders operate from 03.00 WIB - 12.00 WIB and the afternoon traders operate from 15.00 WIB - 20.00 WIB.
Analysis Alternative The laying of traders by time
1
The morning market on the rst oor and the morning and afternoon markets on the ground oor
2 The morning market on the ground oor and the morning market until the afternoon on the rst oor
3 The morning market and the afternoon market are divided on the ground oor and rst oor
Choose no.1 This is based on the place efciency considerations. When it's 12:00 then the morning market is at the top is not used, but at the bottom of the market is used until the evening without having to rise upwards.
street vendors Street Vendor is provided by means of carts arranged in rows with carts perpendicular and parallel to the road
pasar
pasar
circulation From street vendors to market
circulation From street vendors to market
Pedestrian with 1.2m entered into the border to avoid any new street vendors
With such a thing, the circulation of pedestrian ways to the wider market is treated to street vendors facing each other, so there is little possibility of empty space potentially occupied by other merchants.
Area shared stall
green open space
street vendors Pedestrian wide1,2m
Delimiter elements
street vendors o
3 Pedestrian wide 1,2m
Untuk menghindari adanya PKL dipinggir jalan maka antara area hijau dan jalan raya terdapat elemen pembatas yang runcing sehingga orang merasa takut untuk menempati area tersebut.
green open space
road
Street Vendors Area Pedestrian Ways
Green Open Space
open space
high object In the social space there is a high object so easily recognizable people around the social space.
Open Space with mini garden model: - High object - Fir tree and tanjung _ Natural stone terraces - Swimming with water fountain - Aerobic area - Children's area
The social space of open space with mini garden model is located outside the market building so that it can be used by all users. In open space there are elements that need to be analyzed including the object used, the tree used, and the type of terrace. This is based on the standard social facilities for the market
The high object is easy to see from the outside because it is higher than the building covering it.
Low objects are hard to see from the outside because the height is the same as the building covering it.
Fir Tree and tanjung tree The use of pine and cape trees in the social space area because the pine serves to give the direction and the cape tree as a shade For pine vegetation is on the south side to give visitors visibility from the road and to the cape tree is around the social space in order to shade all its activities.
concept The high object used in the form of sculpture featuring the characteristics of the Satan Market is as follows:
P a s a r Tr a d i s i i o n a l d e n g a n penggunaan Atap Miring
Nama Re-Setan-In bermakna Redesain Pasar Setan dengan Inclusive Design
Penyelesaian tata r u a n g d a n sirkulasi saling mengikat untuk menciptakan d e s a i n Pa s a r Setan
natural stone terraces
The use of a at terrace so that people who walk and sit are in the same room
The use of terraces in storied so that people who sit and walk have their own space.
The alternative is to use a terraced terrace, in addition to giving space to the sitting person is also used to reduce the direct view to the market
concept Materian terrace used is a natural stone that gives the impression of familiar. The concept is combined with grass so that when interacting inside, users feel cool. The orientation of the terrace overlooks the Sclupture located in the center of the social space, the Sclupture is surrounded by a pond and fountain which on the edge also has a terrace that can be used for sitting as well. In the circulation section of the terrace also uses natural stone material that connects between the child area, leisure area, and aerobic area as in the picture above.
1
5
6 7
5
8
4 1
1 Pedestrian around social space 2 Pedestrian in social space 3 Playground Area 4 Aerobic Area
1
2
6
3 1
5 Street Vendors 6 Terrace 7 Pond with Fountain 8 Sculpture Setan Market
vehicle Spiral two-wheeled vehicles can reach each oor using sanvieria plants to transition to the market, so that pollutants do not enter the market. Once analyzed, the spiral circulation is emphasized on the rst oor so that people on the rst oor are easy to reach visitors at all sides of the building
As a transition from parking to market using sanvieria plant which is zigzag planting (perpendicular to dominant wind direction) in order to receive maximum wind as shown below.
To put the plant using a medium pot and rope so that plants can be arranged up and pollution into the building less and less.
SANVIERIA PLANT PARKIR MOTOR SPIRAL CIRCULATION
The parking size of each motor is 2.25m x 0.75m
Car vehicle with 90 ° direct parking angle with 5.5m wide circulation and 2.5m x 5m per vehicle space per vehicle Four-wheeled parking is on the ground oor consisting of a public parking lot and a difable park park. For difable is placed close to the entrance so as to provide comfort to ifable
Drive Thru service that uses service counters. The menu is served in the form of commodities of vegetables, fruits, and groceries
Below is an alternate circulation for drive thru. Alternative no.3 is the most exible circulation is the circulation in Figure No.3 because with the circulation on the back of the building will not disturb market activity on the front. Given, the circulation for drive thru should continue to ow.
The types of merchandise used for drive thru service are vegetables, fruits, and dried groceries. Here will be analyzed on the layout of drive thru space based on the type of merchandise placement. For ease of ofcers in taking orders, then orders in the drive thru differentiated by type of merchandise as in the following alternative images: The recommended trademark layout layout for Satan Market is Figure no.1 which uses 3 elongated tables which each table consists of one type of merchandise because by distinguishing the trade type based on the table it is easy for the ofcer to recognize and quickly be able to take his order without having to get around to the table another.
According to the standard on the drive thru there are 2 counters ie counter bookings, as well as payment and counter collection of goods. The time required to reach between counters is at least 60 seconds or about 5m. In the design, visitors every day to reach 200 people. If using one service has the potential to cause queue, so it will be used 2 services that is to be 4 counters, 2 as the place of order, as well as payment and 2 counters for place of order taking.
1
2
Counter service 1 Counter service 2
Based on the alternative analysis of the counter placement above, Figure no.1 is more appropriate for use in the design, because the space used is more efď€ cient, does not require 2 spaces for circulation as in Figure 2 and placing the order can be in one room, because the location of the counter is adjacen
3
1
1
2
2
1 3 2
1
1
Counter service
2
Serve dish For the Drivethru menu
3
Vehicle Circulation Drive Thru
PENCAPAIAN LANGSUNG KENDARAAN RODA EMPAT
PENCAPAIAN LANGSUNG KENDARAAN RODA DUA
DRIVE THRU OPERASIONAL PUKUL 03.00 - 20.00 wib PEDESTRIAN
RUANG SOSIAL
pEDAGANG KHAKI LIMA di ruang sosial
SHARED LOS
PEMBATAS PARTISI pEDAGANG KHAKI LIMA didalam pasar
GROUNDFLOOR
PENCAPAIAN spiral KENDARAAN RODA DUA
PENCAPAIAN spiral dengan tanaman sanvieria secara zigzag
OPERASIONAL PUKUL 03.00 - 12.00 wib
FIRST FLOOR
DESIGN TRANSFORMATION
The ground floor operates from 03:00 to 20:00 pm
On the ground oor use a shared los type to 41 traders
The first floor operates at 03.00-12.00 WIB
On the ground oor use the usual type of los for 168 merchants
PKL di bagian luar bangunan pasar dekat jalan
PKL formal dengan pola tegak lurus dengan jalan yang berada pada bagian dalam pasar sisi pinggir
ruang sosial dengan objek tinggi didalamnya
Letak ruang sosial berdasarkan analisis matahari dengan adanya objek yang tinggi
pencapain sirkulasi langsung
Pencapaian sirkulasi langsung dilantai dasar memecah ruang sosial dengan pasar sehingga fasilitas pendukung berada di luar bangunan supaya dapat digunakan secara maksimal
sirkulasi drive thru
Sirkulasi drive thru berada dibagian belakang bangunan supaya tidak menganggu aktivitas lain dan memanfaatkan bagian belakang bangunan
Spiral circulation on the first floor
Motorcycle spiral circulation on the ď€ rst oor using ramp
The roof response to the wind The main roof is faced in such a way as to respond to the coming of the wind which is then channeled into the social space
The ROOF response to the sun
The roof is given a gap for the entry of natural lighting
Roof response to the environment
Using sloping roof in accordance with the building conditions around the design site
teras bertingkat
pkl
pavement batu alam
air mancur sclupture
aerobic area
kolam playground
EXPERIENCES
baitul karim mosque Location at Yogyakarta City
plan
box stnk Location at Yogyakarta City
elevation
HOUSE & VILLA PROJECT Location at Yogyakarta City
Proyek rumah dua lantai yang berada di wilayah Demangan, Sleman
Pembangunan rumah dua lantai yang berada di hook jalan.
Desain Rumah dua lantai dengan semi basement ketinggian 2 m sebagai ruang parkir kendaraan
A
D
B
C
3,750
2,250
D 3,750
1,000
1,500
3,750
3,750 1,750
1,000 3 1,200
3 2,000
Teras -1.00
1,100
Teras ± 0.00 Tanah -2,00
Ramp
11,250 7,000
3,750
A
3,750
B
3,750
C
D
3,750
3,750
1
3
2
5
4
7
6
10R x 0,175 10G x 0,300
UP
9
8
10 DOWN
DOWN
10R x 0,175 10G x 0,300
UP
3,750
Ruang Tamu ± 0.00
10
9
8
7
6
5
4
Tanah -2.00
3
2
3
Court +3.35 Ruang Santai +3.50
Tangga -2.45
3
Ruang Tidur 3 +3.50
2
1
3,750
2
10,500
2
3,750
7,500
Dapur ± 0.00
Basement -4.00
6,000
KM/WC -3.55
3,750
3,750
3,750
Ruang Tidur 1 ± 0.00
2,000
KM/WC -0.05
Ruang Tidur 2 ± 0.00
2
1,500
1
1
4,500
1
1
A
B
C
D
1,200
C
11,250
1,200
B
2,000
A
11,250
Taman
KM/WC -0.05
KM/WC -0.05
Ruang Tidur 2 ± 0.00
Ruang Tamu ± 0.00
Teras -0,15
Ruang Keluarga ± 0.00
Dapur ± 0.00
Garasi -0,15
Ruang Tidur 3 ± 0.00
Teras -0,15
Desain Villa
Ruang Tidur 1 ± 0.00
Taman
Teras -0,15
12,425
satu lantai yang berada di wilayah Kaliurang.
3,500 3,000 16,500 5,000 3,000 2,000
RENOVASI rumah tinggal 2 lantai yaitu penambahan Garasi dan ruang tamu dibagian lahan samping rumah, serta penambahan kamar dan musholla di lantai 2
A
B
C
D
E
F
G
H
B
10,000 2,400
5,100
2,500
KM/WC -0.05
Dapur ± 0.00 7
6
5
4
3
2
1
KM/WC -0.05
Ruang Tidur Utama ± 0.00
4
Ruang Tidur 3 ± 0.00
A
1,400
A
Ruang Keluarga ± 0.00
7 8 2,500
-0.20
1,500 13,450
6
2,500
5
3,000
Ruang Makan ± 0.00
1,500
3
Tempat Cuci -0,05
8 10R x 0,175 10G x 0,300
UP
0,600
2
RG
1,900
1,300
1
KM/WC -0.05
Ruang Tidur 2 ± 0.00
9 Ruang Tamu ± 0.00
2,300
2,400
10
13
Teras -0.05
3,250
satu lantai yaitu dengan penambahan ruang garasi dan beberapa kamar sehingga dapat digunakan untuk usaha kos-kosan sekaligus sebagai rumah tinggal
Garasi -0.10
12
2,750
RENOVASI rumah tinggal
Ruang Tidur 1 ± 0.00
11
-0.20
14
1,500
3,000
3,000
B
2,500
HOTEL MLATI. Merupakan hotel dengan small type yang terletak di daerah Temanggung. Saat ini hotel tersebut sudah sampai ke tahap perijinan. Hotel ini menggunakan konsep dasar ramah lingkungan. Massa terbentuk berdasarkan bentuk site yang ada sehingga gubahan massa terbagi menjadi beberapa gubahan untuk memaksimalkan fungsi dari setiap gubahannya.
LOKASI : Jl. Temanggung Bulu No.184, Ngimbrang, Bulu, Kabupaten Temanggung, Jawa Tengah 56253 LUAS: 1.930.000 m2 LINGKUNGAN: Hotel, Permukiman, dan Sawah
HOTEL ARDITA
HOTEL MLATI
Kapasitas Kamar: 20 Kamar Standar Kapasitas Parkir: 10 Mobil Kamar A Kamar B Kamar C
= 4 kamar = 6 kamar = 10 kamar
N Permukiman Persawahan Sawah Kering
A
B
C
42m2
27m2
19m2
Bangunan utama terdiri dari 2 lantai. Lantai 1 untuk Lobby, Rest Area, Dapur, Ruang Kontrol. Kamar kelas B dan C berada di lantai 1 dan lantai 2. Pada bagian depan bangunan menonjolkan kesan sebagai hotel modern dengan Melalui parkir, secondary secara vertikal pengunjung untuk memberi kesan tinggi datang karena bangunan yang kemudian hanya mempunyai 2 lantai. masuk ke Pada bagian belakang bangunan bangunan utama terdapat utama. bagian yang menggunakan material bata. menunjukkan kesan sederhana dan kembali ke alam.
PARKIR
BANGUNAN UTAMA
Dibelakang bangunan utama akan bertemu dengan gubahan-gubahan kamar kelas A yang sekitarnya dimaksimalkan sebagai area terbuka untuk menetralisirkan suhu karena penggunaan AC di bangunan utama. Di area kamar akan mendapatkan kebisingan sedikit karena sudah tertutup dengan bangunan utama dan disekitarnya masih lahan sawah.
KAMAR KELAS A
Auditorium ditempatkan dibagian paling belakang bertujuan untuk memberikan pengalaman suasana HOTEL Mlati yaitu suasana didalam bangunan utama dan diselasar Kamar Kelas A. Bagian Depan Auditorium terdapat pohon ketapang untuk peneduh dan mengurangi sedikit kebisingan akibat penggunaan Auditorium
AUDITORIUM
Disetiap Kamar Kelas A, tiap unitnya dikelilingi ruang hijau dan beberapa pohon seperti bambu dan ketapang kencana untuk peneduh sekaligus memaksimalkan suasana dibagian ini tanpa harus menggunakan AC.
Ditengah selasar ditanami Pohon Beringin bonsai sebagai tanda penyekat antar kamar dan jalan sekaligus untuk memberikan kesejukan disekitar.
AUDITORIUM
Kamar KELAS A
1
LOBBY REST AREA DAPUR TOILET RUANG CONTROL Kamar KELAS B Kamar KELAS C
MAIN Entrance ENTRANCE PARKIR
2
selasar hotel menuju AUDITORIUM view dari MAIN ENTRANCE selasar hotel menuju bangunan utama
3
SKETCHES
... PORTPOLIO aisah azhari marwangi