Ajane' Milana Ramsey | Design Portfolio

Page 1

Ajane’ Milana Ramsey

PROFESSIONAL DESIGN PORTFOLIO

2022AJANE MILANA RAMSEY // PORTFOLIO

born in va grew up in nc college in GA work in fl

PAGE 2AJANE MILANA RAMSEY // PORTFOLIO
PAGE 3AJANE MILANA RAMSEY // PORTFOLIO design responsibilities project coordination
fabric shoppingsite visits material selections stone sourcingconstruction meetings
PAGE 4AJANE MILANA RAMSEY // PORTFOLIO design responsibilities project coordination
FINISH SELECTIONSMATERIAL SCHEMES redlines field MEASUREsclient meetings
PAGE 5AJANE MILANA RAMSEY // PORTFOLIO architectural
drawings
drawing + drafting plans 7/25/22 3/16" 1'-0"A139A139 1 Furniture Plan A
PAGE 7AJANE MILANA RAMSEY // PORTFOLIO drawing + drafting plans A Construction 5/3/22 AR 215 3/16" = 1'-0"A 102 1 Leve 1 Cons ruc on NEW ADD T ON 2330
AJANE MILANA RAMSEY A114A114
Bunker Road Guest
3/29/22 AR
Cummings Flagler/Bunker Guest House
1/4" 1'-0"A114A114 1 Guest House Level 2 1/4" 1'-0"A114A114 2 Guest House Level 1 drawing + drafting plans
PAGE 9AJANE MILANA RAMSEY // PORTFOLIO G R E A T R OOM 52" Ce ng F an 7 3 1 / 2 " 7 3 1 / 2 " 1 4 7 75" TV GAS F.P. C L Flat of Wall & T.V. FIREWOODNEW INSERT IN EXISTING FIRE BOX SIZE; CREATE NEW OPENING ON OTHER SIDE IN SAME SIZE FOR FIREWOOD EQ EQ 1 0 1 2 2 0 40 EQ EQ Align with edge of opening 21 40 21" Santa Anna Porcelain Matte 126" x 59" x 1/2" 69" 47 1 2" 1 0 " 1 0 " 1 0 1 2 " 1 0 1 2 " A B C E D F G A B C D E F G 1/4" = 1'-0"A 124 1 F i re p a ce H i gh l and Pl a ce | Fireplace 3/8" = 1'-0"A 124 2 F rep la ce H ea rt h 3/8" = 1'-0"A 124 3 S a n t a A nn a P o rc ela i n A 124 4 F i re p a ce 3/8" = 1'-0"A 124 5 F i re p a ce S e ct o n drawing + drafting details

drawing

drafting

29"

Overall Height to Crown Needs to Be Confirmed On-Site

EQ 3" 8 1/2"

8 1/2" 105" 18"

3" EQ 3"

3 1/2" 3" 23" 3" 16" 3" 16" 3" 16" 3" 16" 3" 15" 3"

Crown Molding (provided by builder, molding will match rest of house) *VIF height of crown*

Circa Lighting Langham Medium Picture Light (provided by CRI, see attached spec sheet)

Wallpaper Backing (by others)

Carlisle & Co. Latitude Collection LX1040 Dove

*Installed directly on wall in visible,open spaces behind shelves and TV

3" Notch-In Shelves (light wood tbd) Dado Joint Construction

28 1/2" 1/2"

Elevation 3/8" 1'-0"

14" 14"

3" Frame Paint-Grade BM Simply White

16" Shelf Spacing (23" at Top Shelf)

19" 19"

80" TV (Exact Dimensions TBC) 18" 18" 18" 18" 18" 18"

62 1/2" 62 1/2" 16 1/2" 12" 1/2"

236" 3" 58" 3" 108" 3" 58" 3" 6"

3" Seat Cushion (fabric tbd, provided by others)

DrawersDrawers Paint-Grade 2" Frame Drawer Front with Inset Panel on Undermount Self-Closing Glides

Exterior: BM Simply White Interior: Clear Polished Maple Finish All Hardware (provided by CRI)

8 1/2" 3" 23" 3" 16" 3" 16" 3" 16" 3" 16" 3" 2" 13" 3"

Top Section 3/8" 1'-0"

This dimension can be reduced to accomadate exact height of crown

Side Section 3/8" 1'-0"

1/2"

Detail of Top Left Corner 1" 1'-0"

16 1/2" 1/2" 5" 3 1/2" 3" 23" 3"

Light Switch to control picture lights (tbd) 4'-0" AFF to center of plate (Placement will be sent to builder)

3"

48"

16 1/2" 5 1/4" to 6 3/4" Extension 29"

Dado Joint

Shelf is 16 1/4" deep (1/4" recessed from front face of frame)

1/2" notch-In on both sides of shelving

PAGE 10AJANE MILANA RAMSEY // PORTFOLIO
+
custom millwork VIF
108" 3"
EQ EQ
Living Room Built-In Revised 5.15.20
50" TV 5'-0" 4'-0" Hanging HangingHangingHanging False Fronts -Chimney Behind Recessed Lutron Black-Out Roller in a Channel Recessed Lutron Black-Out Roller in a Channel Match Profile per Family Room 1" 4" 4'-3" 2'-7" B ong i o v i N e w J ers e y |Jesse Bedroom Closet Built-In 1/2" = 1'-0"A 1 1 0 1 J e sse Be d ro o m B ui lt In 1/2" = 1'-0"A 1 1 0 2 Bu il t In S e ct i o n Match Door Profile per Family Room Cabinetry * N ot e : Design Sketch, not for Construction. Please Confirm all Dimensions.*
AJANE MILANA RAMSEY drawing + drafting CABINETRY elevations 6810 8/16/22 1/2" = 1'-0"A 301 1 K tchen Eas 1/2" = 1'-0"A 301 2 K c en Wes 1/2" = 1'-0"A 301 3 K tchen North 1/2" = 1'-0"A 301 4 K c en East s and 1/2" = 1'-0"A 301 5 K c en Wes s and 1/2" = 1'-0"A 301 6 K tchen 1/2" = 1'-0"A 301 7 K chen RCP 1/2" = 1'-0"A 301 8 K tchen So th
AJANE MILANA RAMSEY 6810 Washington Master 6/21/22 AR 1/2" = 1'-0"A 311 1 Master Bath 1/2" = 1'-0"A 311 2 Mas e Ba h RCP 1/2" = 1'-0"A 311 3 Mas e Ba h Wes 1/2" = 1'-0"A 311 4 Mas e Ba h East 1/2" = 1'-0"A 311 5 M s e Ba h Showe Nor h 1/2" = 1'-0"A 311 6 Mas e Ba h South 1/2" = 1'-0"A 311 7 Mas e Ba h Nor h 1/2" = 1'-0"A 311 8 Mas e Bath WC South 1/2" = 1'-0"A 311 9 Mas e Ba h Showe South drawing + drafting BATHROOM Elevations
PAGE 14AJANE MILANA RAMSEY // PORTFOLIO
visual graphics
PAGE 15AJANE MILANA RAMSEY // PORTFOLIO renderings Material studies
PAGE 16AJANE MILANA RAMSEY // PORTFOLIO renderings axonometric
PAGE 17AJANE MILANA RAMSEY // PORTFOLIO renderings views
KITCHEN GREAT ROOM
PAGE 18AJANE MILANA RAMSEY // PORTFOLIO renderings foyer den
PAGE 19AJANE MILANA RAMSEY // PORTFOLIO
presentation
graphics mood
boards
PAGE 20AJANE MILANA RAMSEY // PORTFOLIO shopping + sourcing FURNITURE SHOPPING
PAGE 21AJANE MILANA RAMSEY // PORTFOLIO client presentations INDESIGN

Prep

9/3/22 9/3/22

Foundation

Rough Plumbing and Gas 9/5/22 9/9/22

Rough Plumbing Inspection 9/9/22 9/12/22

Prep to Level Floor, Make Openings, Pour Floor in 2 Rooms 9/5/22 9/15/22

Exterior and Interior Framing 9/12/22 9/19/22

AC 9/12/22 9/20/22

Roof 9/12/22 9/20/22

Electrical 9/20/22 9/30/22

Exterior Demo 9/26/22 9/27/22

Insulation 10/5/22 10/6/22

Bathrooms Tile 9/25/22 10/15/22

Impact Doors & Windows 9/25/22 10/30/22

Exterior Stucco 10/3/22 10/10/22

Drywall & Finish 10/5/22 10/15/22

Final Electrical 10/16/22 10/18/22

Wood Flooring 10/15/22 10/30/22

Interior Doors 10/15/22 10/30/22

Baseboards 10/15/22 10/30/22

Stairs 10/15/22 10/30/22

Pool 10/15/22 1/15/23

Exterior Painting 10/15/22 10/20/22

Final Plumbing and Details 10/16/22 10/20/22

PAGE 22AJANE MILANA RAMSEY // PORTFOLIO PROJECT MANAGEMENT ConsTRUCTION SCHEDULES 6810 Washington Road | Construction Schedule Contractor: Palm Beach Remodeling PHASE ONE PHASE TWO TASK TITLE START DATE END DATE DURATION % OF TASK COMPLETE WEEK (8/22 8/28) WEEK 2 (8/29 - 9/4) WEEK 3 (9/5 9/11) WEEK 4 (9/12 9/18) WEEK (9/19 - 9/25) WEEK 6 (9/26- 10/2) WEEK 7 (10/3 - 10/9) WEEK 8 (10/10 10/16) WEEK 9 (10/17 10/23) WEEK 10 (10/24 - 10/30) WEEK 11 (10/31 - 11/6) WEEK 12 (11/7 11/13) M W R F S/S M T W R F S/S M T W R S/S M T W R F S/S M W R F S/S M T W R F S/S M T W R S/S M T W R F S/S M W R F S/S M T W R F S/S M T W R S/S M T W R F S/S 22 23 24 25 26 27/28 29 30 31 1 2 3/4 6 7 8 10/11 12 13 14 15 16 17/18 19 20 21 22 23 24/25 26 27 28 29 30 1/2 3 4 5 8/9 10 11 12 13 14 15/16 17 18 19 20 21 22/23 24 25 26 27 28 29/30 31 2 5/6 8 10 11 12/13 Permit Approval 8/23/33 8/23/33 0 100% Underground Plumbing Inspection 8/26/22 8/29/22 0% Pest Control for Sod 8/30/22 8/31/22 0 0%
to Cover Floor After Underground Inspection 9/1/2022 9/2/2022 0%
Inspection
0 0%
0%
0%
10 0%
0%
8 0%
8 0%
10 0%
0%
0%
20 0%
35 0%
0%
10 0%
0%
15 0%
15 0%
15 0%
15 0%
90 0%
0%
4 0% PHASE THREE PHASE FOUR TASK TITLE START DATE END DATE DURATION % OF TASK COMPLETE WEEK 13 (11/14 11/20) WEEK 14 (11/21 - 11/27) WEEK 15 (11/28 - 12/4) WEEK 16 (12/5 12/11) WEEK 17 (12/12 12/18) WEEK 18 (12/19 12/25) WEEK 19 (12/26 1/1) WEEK 20 (1/2 1/8) WEEK 21 (1/9 1/15) WEEK 22 (1/16 - 1/22) WEEK 23 (1/23 1/29) WEEK 24 (1/30 2/5) M W R F S/S M T W R F S/S M T W R S/S M T W R F S/S M W R F S/S M T W R F S/S M T W R S/S M T W R F S/S M W R F S/S M T W R F S/S M T W R S/S M T W R F S/S 14 15 16 17 18 19/20 21 22 23 24 25 26/27 28 29 30 1 3/4 5 6 9 10/11 12 13 14 15 16 17/18 19 20 21 22 23 24/25 26 27 28 29 30 31/1 2 3 6 7/8 9 10 11 12 13 14/15 16 17 18 19 20 21/22 23 24 25 26 27 28/29 30 31 3 4/5 Pool 10/15/22 1/15/23 90 0% Kitchen 11/15/22 12/15/22 30 0% Interior Painting 12/1/22 12/31/22 30 0% Landscaping and Pavers 1/2/22 1/15/22 13 0% Final Inspections (Depends on Pool) 1/20/22 1/31/22 11 0%

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.