PORTFOLIO - ALBERT KARAM - ENGLISH

Page 1

ALBERT KARAM

PORTFOLIO IN ARCHITECTURE BUILT ENVIRONMENT - INTERIORS SELECTED WORKS 2016-2019


CONTENT:

1

BIBLIOGRAPHY.

2

VILLAGE REHABILITATION PROJECT

-

VESCASA BASSA

3

SUSTAINABLE PAVILLION PROJECT

-

DUBAI 2022 COMPETITION.

4

AMAZON WAREHOUSE PROJECT

5

SUSTAINABLE ADDITION - INNSBRUCK - AUSTRIA

6

RESIDENTIAL COMPLEX / SOCIAL HOUSING PROJECT

7

PERSONAL STATEMENT

2

-

-

PLAZA DE CASTILLA

-

-

ITALY

SPAIN

-

-

INSIDE IN-SIGHT.

WELCOME TO THE MACHINE.

CASCINA MERLATA

-

ITALY.


BIBLIOGRAPHY

ALBERT KARAM

email: albert.karam@mail.polimi.it tel: +393202278614

We are not at the mercy of this world, we create it, we are the architects of change. Not to take from this world, but to contribute to it, as what we desire most cannot be given, it must be sculpted.

PERSONAL DETAILS BIRTH: NATIONALITY:

05/01/1994 LEBANESE

EDUCATION 1998 2012 2013 2017 –

2012 2013 2017 2019

LEBANESE BACC II IN ECONOMICS AT COLLÈGE DES FRÈRES MARISTES CHAMPVILLE. BACHELOR OF ARTS IN ARCHITECTURE AT ACADÉMIE LIBANAISE DES BEAUX-ARTS. BACHELOR OF ARTS IN ARCHITECTURE AT UNIVERSITÉ SAINT-ESPRIT DE KASLIK(USEK). MASTERS OF SCIENCE IN ARCHITECTURE BUILT ENVIRONMENT - INTERIORS AT POLITECNICO DI MILANO.

WORK EXPERIENCE 2013 FEBRUARY JULY - AUGUST JULY - AUGUST MAY - JULY JANUARY - MARCH

2013 2016 2015 2015 2016 2019 2020

PART-TIME JOB AS SALES MAN AT MIKE SPORT. (Beirut - Lebanon) PART-TIME JOB AT YAHALA HOSTESSING AGENCY. (Sin el Fil - Lebanon) INTERN AT 109 ARCHITECTES. (Beirut - Lebanon) INTERN AT INJAZ HOLDING. (Sin el Fil - Lebanon) ON FIELD INTERN AT SPACE BUILDERS SARL. (Beirut - Lebanon) INTERN AT STUDIO ARCHITETTO CONGIU (Milan - Italy) TRAINEE AT BRICKX S.C.A.R.L(Milan - Italy)

COMPUTER SKILLS AUTOCAD REVIT SKETCHUP ADOBE PHOTOSHOP ADOBE INDESIGN LUMION 3DS MAX RHINO V-RAY ADOBE PREMIERE PRO

LANGUAGE SKILLS ENGLISH FRENCH ITALIAN ARABIC

3


BIBLIOGRAPHY Competitions BAMIYAN CULTURAL CENTER BIENNALE 2018

http://archinect.com/109Architectes/project/bamiyan-cultural-center “ARCHITECTURE AS A GIFT”PROJECT EXHIBITION AND LIVE PRESENTATION.

VOLUNTEERING 2001 - 2013 2016 - 2017 2017 - 2019 2019 - Present 2019 - Present

4

Member of the boys scouts of Lebanon. Youth development project for the disabled. Enrolled in be a buddy program for exchange students. Member of “Hillsong Milano” Member of “Associazione Amici del Fai”


VILLAGE REHABILITATION

INSIDE IN-SIGHT

-

VESCASA BASSA - PONTE DI LEGNO - ITALY 5


VILLAGE REHABILITATION The signs are categories:

divided

into

3

Section - Elevation 1/20

- Finger Posts(Map): Usually placed at the start of a path, as well as at junctions with other paths. - Waymarking: markers along the route at points where the direction of the path may be unclear . - Advisory: Road Crosses...

Post top 1/20 200x200 Spruce Post Post hole back filled with well rammed granular soil. Studding bolted into suitable holes in post. seal with bitumen paint.

The village of vescasa Bassa is located in an isolated areain the mountains, however it has nearby attraction points. A specifically designed post was introduced, leading the way to the site from Ponte Di Legno village aswell as the ski slopes The post responds to the environmental conditions such as snow and natural surrounding (color, height, foundation...).

The main map: The different ways that would lead to Vescasa Bassa - By foot from ponte di legno. - By cable lift. - By car. About the signs: - Robustness: strong enough to withstand vandalism and people leaning on them. - Durability: May need to last for many years and still be legible.

D e s t i n at i o n Point “Vescasa Bassa” (1719m)

Proximity bar

- Easily replaceable: in case of damage, the simpler they are to replace the lower the maintenace cost. Starting Point “Ponte Di Legno” (1257m)

WAYMAKING FROM PONTE DI LEGNO VILLAGE 6


VILLAGE REHABILITATION

During summer some residents inhibit the village bringing along livestock, But During winter time the area is quite empty. The idea was to introduce new activities to the site in order to attract people to come and stay for a couple of days.

Development was split into 2 groups, first one dedicated to the cheese factory and second for residential small hubs with a common library space.

The new buildings are elevated on pilotis in order to lower the impact, preserve the natural topography of the site, and create outdoor shaded spaces underneath each volume.

Landscape is created using organised and sorted natural elements to keep this mountain nature escape feeling.

CONCEPT - DESIGN STRATEGY 7


VILLAGE REHABILITATION The idea was to create an After Destination for the cheese factory

The main volume is connected to other rental residential ones each having a different vue aswell as skylight for stargazing.

Reception key for distribution and info

The result is one main volume containing the reception and a double height space(library/ lounge) framing the beauty around. View Point Library/Relaxing warm space with fireplace and large openings towards the view. Sun Shelter The public spaces are created in between the buildings, giving life again to vescasa bassa. Outdoor Fireplace Water Pond Common Place

CONCEPT DEVELOPMENT 8


VILLAGE REHABILITATION

1. 180x200 Ikea Malm 2. Loubacken Wood side Table 3. Merano Solid Wood Chair 4. Ikea Ranarp Floor G1209 5. Ikea Hektar V1020 6. Khler Escale 7. Toto Paper Holder Yh87s 8. 70/22 Pine Planks 9. Lavamani WL1 10. Skhler k-13691-cp 11. Equioment Space 12. Sliding Door

MAIN COMMON SPACE - LIBRARY BUILDING 9


VILLAGE REHABILITATION

PRIVATE RESIDENTIAL BUILDINGS - PHYSICAL MODEL 10


SUSTAINABLE PAVILLION

Expo 2020

-

DUBAI 11


SUSTAINABLE PAVILLION

Sustainability is a critical subject to be taken care of in todays society. the pavillion exhibits futuristic design using renewable resources like bamboo, fast growing and easily transportable from nearby asian countries. For self sufficiency solar energy is integrated within the design showcasing 4 different types including a retractable roof one to protect from sandstorms.

Technical architectural Drawings 12


SUSTAINABLE PAVILLION

FIXING POINTS ROTATIONAL JOINT FIXING BOLT

ROTATIONAL JOINT

SPHERE JOINT

BAMBOO MODULE 1

STEEL BOLT

FIXING BOLT

ROTATIONAL JOINT BAMBOO TUBE

TENSION ADJUSMENT

ROPE FIBER FIBER ROPE

BAMBOO MODULE 2

ALUMINIUM L SHAPE

CAP

FORTIFYING EDGE FABRIC

CUT IN HALF BAMBOO FIBER ROPE END CONE

THREADED BOLT

STEEL BOLT

BANANA TREE FABRIC

SPHERE JOINT

SLEEVE SPHERE JOINT

CAP BAMBOO TUBE

BAMBOO TUBE

CHEMICAL FIXING POINT

TECHNICAL DETAILS 13


SUSTAINABLE PAVILLION SPHERE JOINT WELDED SEAM CAP

BAMBOO TUBE

END CONE SPHERICAL JOINT

STEEL ROTULE STEEL ROTULE FIBER ROPE THREADED BOLT END CONE STEEL ELEMENT CAP

design was focused on the use of a single element mass producted and used in different ways thus reducing the construction cost and facilitating its construction. main elements are consisted of treated bamboo sticks linked with spherical joints.

FIXING BOLTS

BAMBOO TUBE

TECHNICAL DETAILS - MODEL 14


AMAZON WAREHOUSE

WELCOME TO THE MACHINE - PLAZA DE CASTILLA - SPAIN 15


AMAZON WAREHOUSE

MADRID NORTE IS A NEW GENERATION OF THE URBAN FABRIC OF THE CITY. IT IS IDENTIFIED AS A BUSINESS CENTER WITH DIFFERENT DAILY ACTIVITIES AND IN IT PLAZA CASTILLA CONTAINS A HIGH DENSITY OF CON-NECTIONS TO THE DIFFERENT PARTS OF THE CITY WITH A CENTER FOR PUBLIC TRANSPORTATION TO GET ACCESS TO DIFFERENT PARTS OF THIS URBAN FABRIC. A POWERFUL DESIGN CAN CONSIST OF A SYSTEM THAT NOT ONLY JOINS ALL THE EXISTING FUNCTIONS (PUBLIC TRANSPORTATION: TRAIN, UNDERGROUND METRO. BUS AND CAR SHARING). BUT ALSO CREATES AN ENJOYABLE PLACE FOR THE PEOPLE AROUND. WELCOME TO THE MACHINE, A NEW GUEST IN YOUR CITY, A JUNGLE THAT SATISFIES YOUR NEEDS AND BRING IT HOME TO YOU BY THE HELP OF FAST AND UPDATED TECHNOLOGY. THE PROJECT FITS AN INDUSTRIAL PLACE CLOSE TO PEOPLE AND COMMUNICATES WITH THEM. AFFECTING THE CITY FABRIC, IT IS DESIGNED TO BE AN EXOTIC SPACE WITH INDUSTRIAL, COMMERCIAL, PUBLIC FUNCTIONS BRINGING A NEW DAILY ACTIVITY FOR PEOPLE TO LIVE BETTER AND SATISFY THEIR NEEDS EASIER.

MASTER PLAN - SURROUNDINGS 16


AMAZON WAREHOUSE

The starting point is a pure rectangular shape of a standard warehouse(known for its functionality and efficiency. It can be easily organised.)

The Volume is elevated to create a sheltered space underneath and not to disrupt the circulation flow of the busy area.

The level around the metro area is lower demanding more light which is why sides of the volume are reduced. Located above the most frequented area makes it a perfect form of advertisment with the circulation of the goods on top.

In the Middle of an urban area a massive rectangular shape may not be the best solution considering the architectural quality. The middle part is removed for 3 reasons: light, space, public area

Public space is developed on a slope connecting metro area and ground floor to amazon which pushes people and invites them to visit the place.

Public space is spread on multiple levels with multiple functions where circulation and workflow is showcased making it more entertaining and enjoyable for visitors.

CONCEPT DESIGN 17


AMAZON WAREHOUSE

PLANS - MAIN SECTION 18


AMAZON WAREHOUSE The chosen module fits all situations properly:

Stair Modules

Office Modules

Store Modules

Parking System

Warehouse System

PERSPECTIVE

Parking Modules

Warehouse Modules

- MODULAR DEVELOPMENT 19


Sustainable Addition

SUSTAINABLE LIV-INN - INNSBRUCK - AUSTRIA 20


Sustainable Addition The main idea of the project was an addition on a present building that would add to its sustainability. Choice of the building was based upon the function as well as a good level of radiation using several types of analysis from small to large scale. Due to its residential nature, the surrounding services and connections such as railway transport, river and city center were important too.

Summer Radiation 1372 M

793 M

662 M

574 M 3,6 km/h

631 M

7,2 km/h

662 M

1372 M

Bioclimatic Map Altitude Custom Solar(kwh/m2) 1126

563

0

Haud Der Begegnung Winter Radiation

Sun study start: 1/1/2010 12:00 AM Sun study end: 12/31/2010 11:59 PM

SOLAR RADIATION ANALYSIS 21


Sustainable Addition By the use of the software(Climate Consultant) analysis was made for winter and summer season using specific months for each, and according to results a % of comfortability level can be reached by using only passive solutions proposed by the software.

Winter Solutions: - Space heated by direct Sunlight - Slates surface Mass to absorb heat. - Proper Glazing Dimension for Enough Sunlight

Summer Solutions: - Stack Effect - Re emissive roof surface - Proper Shading

General Strategy:

-The present roof is already an extensive green roof. -The present roof is equipped with PV panels.

The structure is based on a grid of 6 x 4 (m)

- To make proper use of the present green roof, a Greenhouse is installed. - Solar panels removed to be relocated in the design.

- Housing units are added around the green house. - Circulation is added with elevator and stairs to provide connection between the 2 buildings

CLIMATE ANALYSIS - DESIGN STRATEGY 22


Sustainable Addition Potentiality:

Sun Behavior:

Rain Behavior:

Wind Behavior:

The modules are shifted to ensure proper orientation.

Comfortable semi-outdoor space

Addition of secondary slope aswell as drainage pipe

Sloped Roof Oriented South.

2 sheets of polycarbonate with in between aerogel for thermal and acoustic insulation.

Creation of a compact space for less heat loss and better efficiency

Openings facing dominant winds.

Thermal Simulations: 1) First proposal Results:

2) After Ventilation Results:

3) After Shading Results:

Main

openings to create passive ventilation.

Winter

Winter

Double Glazing Glass Summer

Polycarbonate Multilayer

Aerogel Insulation

Steel Structure Summer

Winter

Internal retractable sliding fabric fixed on the main structure of the roof.

Summer

CLIMATE ANALYSIS - ENVIRONMENTAL BEHAVIOR 23


Sustainable Addition

EAST ELEVATION 1/100

+ 11.50

+ 7.00

+ 3.50

+ 0.10

GENERAL PLAN 1/100

Section B-B 1/100

GENERAL PLAN - SECTION - DETAILED MODULE 24


Sustainable Addition Baker Rod Setting Block Structural Sealant Glazing Strip

Shading Fabric

A

B - ROOFING DETAIL 1/10

B

Aluminium Cap Fasteners Weather Sealant Glazing Strip Spacer Block Aluminium Retainer

ROOFING DETAIL 1/10

Aluminium Cap

Aluminium Retainer Weather Sealant Structural Sealant Backer Rod Glazing Strip Glazing Strip

ROOFING DETAIL GREENHOUSE DETAIL 1/20

DETAILED GREENHOUSE 25


Sustainable Addition Corrugated Sheet with Solar Panels Water Proofing Layer 0.1cm Wood Support 4cm Thickness Air Gap Vapor Barrier 0.1cm Cork Insulation 13cm Wooden Beams 9x5cm Wood Composite Insulation 9cm Wooden Purlins 3cm Wooden Beams 18x10cm with 60cm wheelbase

Reclaimed Wood Covering Wooden Vertical Beams Support Wooden Beams 17x8cm Sliding Shading

Flashing with Foam Insulation Wooden Sill Wood Composite Insulation 6cm Wood Beams 10x5cm Waterproofing 0.3cm OSB 1.5cm

MODULE 1/20

Wood Composite Insulation 6cm Interior Gypsum Cardboard 1cm

Sealant

Interior Parquet Pavement Pavement Support 1cm Screed with Installations Metal Plate

Fastener Pressure Bar Fastener

Igloo 14cm

Polycarbonate Sheets x2 Steel Beam

Ventilation Hole

WALL SECTION 1/20 Greenhouse/Module

Wooden Beam

WALL SECTION

JOINT 1/10

Greenhouse/Module

Greenhouse/Module

DETAILED MODULE 26


RESIDENTIAL COMPLEX

CASCINA MERLATA - MILANO - ITALY 27


RESIDENTIAL COMPLEX Site Analysis:

User Profile: Design Concept UnderThe design the concept of “policentric started with a stepping hierarcy of spaces, the focus being more on the enclosure of the spaces and Milano�, Cascina Merlata has the privacy, on the 3 well defines types of spaces: public,site semi-private and private. Gradually, we opened up the spaces, creating a flowy circulation around the site, which is more welcoming and allows people to acces the potential of becoming a centre for the whole area. We positioned the tower on the North side of the site, in order to not create shadow over the rest of the buildings. At first, it had an East-West orientation, but this changed aslike: we rotated it North-South for better community around it with functions

The proposed site is surrounded by a lower built density rate than the rest of the city. It is noticeable also that building typologies all around are clearly different ranging from industrial composition to planned districts, to historical Accessibility Main Routes/Public Transport ones.

Facilities Building Functions

Natural Features Greenery, Solar Path

lighting in the block and better communication with the future commercial centre.

-

Business and Commerce State Bodies Cultural Buildings Parks and Recreations

Fiera Milano

Fiera Milano

Via Gallarate Route around the Site Secondary Routes Highway Metro Station Bus Stop

Restaurant Health Markets Fuel Stations Hotels Educational Playgrounds

Cascina Merlata - socialising

Green Spaces - walking

Residetntial Towers - living

Playground - children activities

First sketches testing ideas

Green Field Organised Green Area Empty Land Summer Solar Path Winter Solar Path Sun Position at 2PM

Sketch elevations to understand the volumes

SITE ANALYSIS 28


The tower ends with a spatious penthouse, with a private terrace.

15th F

3Bed Apartment

Roof terraces

RESIDENTIAL COMPLEX

1. We opened up the space in order to create a better connection with the North side of the park, where a future commercial building will be. Also the passages between the buildings maintain the communication between them and create gates which lead to the open spaces, but in the same time they also offer a sense of privacy.

Design Process

One the la

2. The next step was to develop the shape of the tower, based on solar orientation, site features and functionality of the building and its surroundings. Also, we started adding different levels to the landscape, in order to better define the open spaces. Sketch elevations to understand the volumes

3. A pavillion was created at the entrance of the public area in front of the

tower, in order to emphasize the transition to another space coming from the 16th-17th Floor park on the West side of the site.

The 16th and 17th floors are occupied by luxurious 3bedroom apartments. There are two entrances, a dining room, a spatious livingroom and an office.

Penthouse Private Terrace Louvers on the office floors

11th-14

The secon vary from

Residents Gym Terrace

First sketches testing ideas

Restroom Circulation between buildings

18th Floor

Concrete panels

Underground parking

The tower ends with a spatious penthouse, with a private terrace. 3Bed Apartment

15th Floor One the last partition there is a gym, accessible only for the residents of the tower.

10th F

1Bed Type 3 Roof terraces

The was opened thea better northern 1. Wespace opened up the space in order on to create connectionside with theof the topark, create better connection with North park side of the where a a future commercial building will be. Also the a future commercial building. Passagesbetween between passages between the buildings maintain the communication them and create gates which lead to the open spaces, but in the same they buildings maintain the communication andtime create also offerleading a sense of privacy. gates to open spaces, in the same time they also offer a sense of privacy.

Next step was to develop the shape 2. The next step was to develop the shape of the tower, based onof solarthe oritower, solar orientation, site entation, site based features and on functionality of the building and its surroundings. Also, we started adding different levels to theof landscape, in order to better features and functionality the building and define the open spaces.Multiple levels were also added surroundings. Sketch elevations to understand the to better define the open spaces volumes

1Bed Type 5

The facades started to take shape, giving character to tothe site. buildings 4. The facades started take shape, givingThe character to the site. Thehave builddifferent features, which also illustrate ings have different features, which also illustrate the variety of functionsthe variety available onof site.functions available on site.

site.

The 16th and 17th floors are occupied by luxurious 3bedroom apartments. There are two entrances, a dining room, a spatious livingroom and an office. Residents Gym

Louvers on the office floors

On the 10 mon terra

1Bed Type 4

Residential Services Facilities Student Halls A pavillion was created at the entrance of the 3. A pavillion was created at the entrance of the public area in front of the public area in front of the tower, in order tower, in order to emphasize the transition to another space coming from the to transition to another space park emphasize on the West side the of the site. coming on of the west Grid imposed by 16th-17th the site Evolution the fist designside conceptof the Floor from the park

No

11th-14th Floor The second set of apartments are 3 different types of 1 bedroom apartments. They vary from 45 sq.m to a larger, more luxurious ones of 90 sq.m.

Terrace Restroom

6th-9th

Lounge

Circulation between buildings

The first r all 3 being

Terrace Restroom

Underground parking

15th Floor One the last partition there is a gym, accessible only for the residents of the tower.

Residential Services Facilities Student Halls

2. The next step was to develop the shape of the tower, based on solar orientation, site features and functionality of the building and its surroundings. Also, we started adding different levels to the landscape, in order to better and thedefine the open spaces.

Grid imposed by the site

3. A pavillion was created at the entrance of the public area in front of the tower, in order to emphasize the transition to another space coming from the park on the West side of the site.Evolution of the fist design concept

1Bed Type 3 1Bed Type 4

10th Floor On the 10th floor there is a common area, where the residents have acces to a common terrace and a variety of games (ping-pong, darts etc.)

1Bed Type 5 4. The facades started to take shape, giving character to the site. The buildings have different features, which also illustrate the variety of functions available on site.

2nd- 4

1Bed Ap. Type 1 1Bed Ap. Type 2

The 2nd t porating w

2Bed Apartment

North Elevation

11th-14th Floor The second set of apartments are 3 different types of 1 bedroom apartments. They vary from 45 sq.m to a larger, more luxurious ones of 90 sq.m. Lounge Circulation between buildings

Terrace Restroom

6th-9th Floor The first residential floors are occupied by 1 bedroom and 2 bedroom apartments, all 3 being connected by a common hall which leads to the lift and staircase. Open office Closed office Restrooms Common Area

10th Floor Residential Services Facilities spaces Student Halls

This diagram shows the variety of green around the built fabric, from completely public 3. A pavillionto was created at the entrance of the public area in front of the with spaces semi-public ones and others tower, in order to emphasize the transition another coming from the functions such asEvolution retail ofstores... thetofist designspace concept park on the West side of the site.

On the 10th floor there is a common area, where the residents have acces to a common terrace and a variety of games (ping-pong, darts etc.)

The above diagrams illustrate the circulation This diagram shows the connection between the around the 4. tower and to take theshape, environmental existing The facades started giving character to the site. The build- bridge in the north of the site with the conditions which were taken consideration open space in front of the tower, used a market ings have different features,into which also illustrate the variety of functions (solar path, wind...). for the comunity. available on site.

North Elevation

The pavilion marks the entrance to the market The three-floor offices are mainly open spaces, from the main pedestrian route, encouraging 2nd- 4th Floorthe with a few delimitations for the conference rooms, 1Bed Ap. Type 1 people to engage with the existing facilities on the restrooms etc. On the next floor there is a common The 2nd to the 4th floor are occupied by offices, as the tower is mix-use and incor1Bed Ap. Type 2 site. It also povides shelter and connects the two area for the with a cafe and kitchen porating workspaces will aid the development of theemployees, area. buildings which have different functions. 2Bed Apartment

concept design 6th-9th Floor The first residential floors are occupied by 1 bedroom and 2 bedroom apartments, all 3 being connected by a common hall which leads to the lift and staircase. Open office Closed office

29


RESIDENTIAL COMPLEX Design Concept

Penthouse Penthouse Private Terrace Private Terrace

The design started with a stepping hierarcy of spaces, the focus being more on the enclosure of the spaces and privacy, on the 3 well defines types of spaces: public, semi-private and private. Gradually, we opened up the spaces, creating a flowy circulation around the site, which is more welcoming and allows people to acces the whole area. We positioned the tower on the North side of the site, in order to not create shadow over the rest of the buildings. At first, it had an East-West orientation, but this changed as we rotated it North-South for better lighting in the block and better communication with the future commercial centre. Concrete panels

18thFloor Floor 18th

Thetower tower ends with penthouse, a spacious The ends with a spatious with apenthouse private terrace. and private terrace

Apartment 33Bed Bed Appartment

Roof terraces 1. We opened up the space in order to create a better connection with the North side of the park, where a future commercial building will be. Also the passages between the buildings maintain the communication between them and create gates which lead to the open spaces, but in the same time they also offer a sense of privacy.

16TH-17TH Floor 16th-17th Floor The 16th and 17th floors are occupied by luxurious The 16th and 17th floors are occupied by luxurious 3bedroom apartments. There are 3 bedroom apartments. there are 2 entrances, dining, two entrances, a dining room, aand spatious spatious livingroom anlivingroom office and an office. Residents Gym Gym Terrace Terrace Restroom Restroom

Louvers on the office floors

Underground parking

15THFloor Floor 15th On the there is only a gym, accessible only One the lastlast partitionpartition there is a gym, accessible for the residents of the tower. for residentsof the tower. 1bed type 1Bed Type 3 3 1Bed Type 4 4 1bed type 1Bed Type 5 5 1bed type 2. The next step was to develop the shape of the tower, based on solar orientation, site features and functionality of the building and its surroundings. Also, we started adding different levels to the landscape, in order to better define the open spaces.

11TH-14TH Floor 11th-14th Floor The second set of are apartments 3 different The second set of apartments 3 different typesare of 1 bedroom apartments.types They of a 1 bedroom. Varying from 45 sqm. to larger, more vary from 45 sq.m to a larger, moresqm luxurious ones of 90 sq.m. luxurious ones of 90

First sketches testing ideas

Lounge Lounge Terrace Terrace Restroom Restroom

Circulation between buildings

10THFloor Floor 10th On the floor there iswhere a common are, resiOn the 10th10th floor there is a common area, the residents havewhere acces to a comdents have to a(ping-pong, commondarts terrace and a variety mon games. terrace and aaccess variety of games etc.) of

1Bed Ap. Type 1 1bed ap.type1 1Bed Ap. Type 2 2 1bed ap.type 22Bed bedApartment ap.

3. A pavillion was created at the entrance of the public area in front of the tower, in order to emphasize the transition to another space coming from the park on the West side of the site. Sketch elevations to understand the volumes

6TH-9TH Floor 6th-9th Floor The first residential floors occupied by 1apartments, bedroom The first residential floors are occupied by 1are bedroom and 2 bedroom and 2 bedroom apartments, all 3tobeing connected by all common 3 being connected a common hall which the lift and staircase. a hallbywhich leads to leads the lift and staircase.

Section A-A

Residential Services Facilities Student Halls

Grid imposed by the site

Urbanistica e Ingegneria delle Costruzioni nterni A.Y. 2017-2018

o1

eo Moscatelli

Landscape Masterplan

EL CHAMMAS SAMI _ 10604358 KARAM ALBERT _ 10609377 PASCALE LAURA ADRIANA _10605420 YALCINSOY SARPER _ 10601888

nd Celeste Calzolari

30

Evolution of the fist design concept

Group 3 19 February 2018

Ground Floor Plan

Open office Open Office Closed office Closed Office Restrooms Restrooms Common Area Common Area

2ND-4TH Floor 2nd- 4th Floor The 2nd 4th floor are occupied offices, as The 2nd to theto 4th the are occupied by offices, as the tower isby mix-use and incorthe tower is floor mix-use. incorporating workspaces will aid porating workspaces will aid development the development ofthethe area of the area.

4. The facades started to take shape, giving character to the site. The buildings have different features, which also illustrate the variety of functions available on site.

North Elevation

master plan - tower section - plans


personal statement

To whom it may concern, It is true that i already graduated from politecnico di milano with a masters degree in “architecture built environment - interiors� but, my journey is far from over. I never failed to cease the opportunity to expand my knowledge further more, and this applies with a new chapter in my life which is my professional career, a big change full of challenges that i need to adapt myself to. the only constant is change wether it is from architecture to everything else, and this is why i embrace it, it is my doorstep to self development. Since i started learning architecture, the way i perceive the world has completely changed, i always keep a closer look on how things work from tiny appartments to giant urban landscapes, how does it interact fluidly with its context and for how long? Past, present and future have completely different needs. todays world is rapidly evolving with advancements in technology which means that flexibility needs to be taken in consideration in order to keep pace, however, this technological advancement is linked with an extremely important subject for me which is the crisis of climate change. We are in fact headed to collapse, a result from high carbon wastes, and architecture itself in my opinion, plays an important role in this matter through sustainable solutions, minimizing the negative environmental impact of buildings by efficiency and moderation in the use of materials, energy, and space development. My career is my priority in life, i am completely devoted to provide the best in order to make a change. Thank you for your consideration. albert karam

2

31



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.