01
FERENC PUSKAS, THE PEOPLE’S STADIUM
3
01
FERENC PUSKAS, THE PEOPLE’S STADIUM REPURPOSING ABANDONED SPORT VENUES The abandoned stadiums and structures after an the Olympic Games and World Cup event are a problem that many hosting cities and countries have to face. After the flourish months before and during the event, the city has to think how to keep all the newly built structures alive and with a valid purpose pertinent to the community. Many times, unfortunately, the new structures accommodate events and sports that are not popular in the city and therefore they end up being abandoned and fall into decay. We often do not take this problem in consideration. We watch the event, enjoy it, and almost forget about what happens afterwards. There are also problems during the construction of these new buildings, even though they bring new jobs and better infrastructures, many citizens of the hosting countries often complain about the ways money is spent. This is usually the case if the country in consideration has a fairly poor population (for example, the last World Cup in Brazil, 2014). We then need to think a better way on how to design structures that could serve the community before, during and after the event. Perhaps the purpose of the new structure could be totally changed after the event to better suit the people living in the context area.
4
ALESSANDRO COMOLI
PORTFOLIO 2019
5
1.
2.
3.
8.
6.
5.
4.
7.
9.
10.
EXISTING MASTER PLAN
N
1. Millenáris Cycling, Hockey 2. Kisstadion Hockey 3. Jégcsarnok (Ice Rink) Hockey 4. KSI Atlétika Pálya
5. Puskás Ferenc Stadion Football, Athletics 6. Puskás Ferenc Hotel 7. Puskás Ferenc Museum
11.
8. Abandoned Tennis Courts 9. Monument Field 10. SYMA Center Congress Halll 11. Krcsarnok (Round Hall) Indoor Sports
0m
50m 100m
EXISTING STADIUM Ferenc Puskás Stadium is a multipurpose stadium in Budapest, Hungary. It is situated on the Pest side of the capital between the Stadionok and the Keleti Palyaudvar metro stations. It is currently used mainly for football matches. The stadium, which is all-seater, has a capacity of 38,652, though its original capacity exceeded 100,000 The first plan of a national stadium were drafted as early as 1896 when there were chances that Budapest would host the first modern Olympic Games.
1. 3. 2.
.
6. 8.
5. 4.
7.
9.
10.
6
ALESSANDRO COMOLI
PORTFOLIO 2019
11.
300m
1.
2.
4. 5. 3.
NEW MASTER PLAN
N
1. New Millenáris 4. New Puskás Ferenc Stadion Cycling, Hockey Football, Athletics 2. Remodelled Kisstadion Hockey 3. Remodeled KSI Atlétika Pálya Main Olympic Sports
5. New Mixed used Complex
0m
50m 100m
300m
PROPOSED STADIUM The design of the arena followed the FIFA international spaces requirements by also applies new stadiums concepts and technology the new arena wants to reactivate the abandoned area and be active 24/7 by having a mixture of sports activities, private and public spaces within its old, already existing structure.
1.
FACTS Stadium: fixed 50.444 seats movable 9.640 seats total 60.084 new accommodation multi purpose arenas, new business center, new school, new park Apartments: 30, 1Bdr 50, 2Bdr 40, 3Bdr total 120 new apts
2.
3.
4.
5.
Hotel: 120 rooms
7
EXISTING STADIUM
Monument Field
Gates to stands
OLD STANDS
NEW FIRST “RING” STANDS
Stands structure
NEW SECOND “RING” STANDS
Inside stadium
NEW COMMERCIAL, EDUCATIONAL, RESIDENTAIL AREAS
Stairs to stadium
NEW ROOF
VIew of stadium
GSEducationalVersion GSPublisherVersion 0.0.100.100
8
ALESSANDRO COMOLI
PORTFOLIO 2019
EDUCATION RECREATION RESTAURANT/CAFE MULTI- PURPOSE SPORTS MEETING/ COMMERCIAL HOTEL RESIDENTIAL BUSINESS
GARAGE
GSEducationalVersion GSPublisherVersion 0.0.100.100
9
GSEducationalVersion GSPublisherVersion 0.0.100.100
1.
-1. 1:2000
2.
2.
3.
13.54
6.77
%
%
13.54
13.5 4%
%
4% 13.5
6.77
%
1. PARKING ENTRANCE 2. LOADING ZONE 3. PLAYERS AND MEDIA
6.77
LEGEND
% 6.77
%
6.77 % %
6.77 %
%
13.54
13.54
6.77 %
%
13.54
%
%
13.54
6.77
10.00 %
20.00 %
10
N
GARAGE FLOOR PLAN
0m 10m 20m
ALESSANDRO COMOLI
PORTFOLIO 2019
100m
2. 1:2000
GSEducationalVersion GSPublisherVersion 0.0.100.100
LEGEND 1. MAIN ENTRANCE 2. APARTMENTS COMPLEX 3. HOTEL
1.
1.
3 2. N
FIRST FLOOR PLAN
0m 10m 20m
100m
11
5. 1:2000
GSEducationalVersion GSPublisherVersion 0.0.100.100
4.
1. RESTAURANT 2. CONFERENCE ROOM 3. KARATE,JUDO,WRESTLING 4. TABLE TENNIS 5. LOCKER ROOM 6. MULTIPURPOSE/SPORTS 7. HOTEL 8. APARTMENT COMPLEX
3.
3. 6. 5.
2.
5.
2.
1.
1.
6.
6.
DW
7.
12
8.
N
SECOND FLOOR PLAN
0m 10m 20m
ALESSANDRO COMOLI
PORTFOLIO 2019
100m
9. 1:2000
GSEducationalVersion GSPublisherVersion 0.0.100.100
LEGEND 1 . SCHOOL 2. RUNNING TRACK 3. GYM 4. RESTAURANT 5. THEATER 6. URBAN GARDENING 7. RECREATIONAL AREA 8. PARK
7.
7.
5.
7. 6. 4.
4.
8. 7. 2. 3.
N
ROOF PLAN
1.
0m 10m 20m
100m
13
NORTH SECTION
14
ALESSANDRO COMOLI
PORTFOLIO 2019
Section W-04 Detiled
N
0m
10m
20m
100m
15
2,800 400 2,800 400 2,800 WOODEN VERTICAL PANELS ALUMINUM PLANTING BOX SLOPED SCREED WATER DRAINAGE WATERPROOF MEMBRANE
400
INSULATION PARTLY PREFABRICATED BEAM
SUBCONCRETE/SCREED PE FOIL LAYER
2,800
GLUED PARQUET
MONERAL WOOL (SOUND INSULATION) PARTLY PREFABRICATED FLOOR SLAB BOXED STEEL STUD
PLASTERING
WOODEN VERTICAL PANELS
400
INSULATION
2,800
PARTLY PREFABRICATED BEAM
600
GSEducationalVersion GSPublisherVersion 0.0.100.100
APARTMENT COMPLEX SOUTH ELEVATION
1m
2m
5m
S
ALESSANDRO COMOLI
Section W-04 Detiled
Section W-04 Detiled
16
0m
APARTMENT COMPLEX SECTION
GSEducationalVersion GSPublisherVersion 0.0.100.100
PORTFOLIO 2019
0m
1m
2m
5m
2 Bedroom
1 Bedroom
N
TYPICAL APARTMENT FLOOR PLAN
3 Bedroom 0m 1m 2m
10m
17
GSEducationalVersion GSPublisherVersion 0.0.100.100
NORTH ELEVATION
Section W-04 Detiled
SOUTH ELEVATION
18
ALESSANDRO COMOLI
PORTFOLIO 2019
S
N
0m 10m 20m
100m
100m 0m 10m 20m
E
Section W-04 Detiled
W WEST ELEVATION
GSEducationalVersion GSPublisherVersion 0.0.100.100
EAST ELEVATION
19