CAU Canaveralejo spatial distribution of GRI project interventions and land value increment per neighborhood Land value increment per neighborhood in COP & USD due to Flood Risk Reduction
1683.30 COP 500,000 USD 841.65 COP 250,000 USD
due to Green Infrastructure
Venezuela - Urb. Canaveralejo
Belisario Caicedo
El Coliseo
U. D. A. Calindo Pl. de Toros
Nueva Tequendama
Urb. Militar
Departamental
CAU Canaveralejo GRI interventions per neighborhood
Panamericano
Jorge Zawadsky
La Selva
Las Granjas
San Judas Tadeo I
Departamental
Nueva Tequendama
Bike lanes
Pedestrian
Vegetation
Trees
Panamericano
Belisario Caicedo
Flood risk reduction
COMUNA 20
Venezuela - Urb. Canaveralejo
Urb. Militar El Coliseo U. D. A. Calindo Pl. de Toros
COMUNA 10
COMUNA 19
La Selva
Las Granjas San Judas Tadeo I
Jorge Zawadsky
Green Infrastructure
Resilience
Sect. Canaveralejo Guadalupe Antigua
COMUNA 19
Stratification per plot
Canaveral
Cuarto de Legua Guadalupe
Strato 0
COMUNA 19
Strato 1
Camino Real Joaquin Borrero Sinisterra
Strato 2
Camino Real Los Fundadores
Strato 3
Primero de Mayo
Strato 4
Santa Anita La Selva
Strato 5
COMUNA 17
Strato 6 1683.30 COP 500,000 USD
Spatial organization River part Canal part Neigborhoods in comuna 10 Neigborhoods in comuna 17 Neigborhoods in comuna 19 Neigborhoods in comuna 20
El Limonar Canaverales - Los Samanes
841.65 COP 250,000 USD
Canaveral
Sect. Canaveralejo Guadalupe Antigua
Cuarto de Legua - Guadalupe
Camino Real - Joaquin Borrero Sinisterra
Camino Real - Los Fundadores
Santa Anita - La Selva
Primero de Mayo
El Limonar
Canaverales - Los Samanes