alexandre.sokolov@bluewin.ch 0041 (79) 366 20 63
Rue des Grandes-Portes, 1 1213 Onex Switzerland
Portfolio
MSc Architecture I Architecte HES
Alexander Sokolov
2018
Curriculum vitae
Education and professional experience Master of Science in architecture UniLi
09.2016 – 08.2018
Liechtenstein University Vaduz, Liechtenstein
Tampere University of Technology
08.2017 – 01.2018
Tampere, Finland
Militärischer Nachrichtendienst
10.2015 – 08.2016
Bern, Switzerland
Bachelor of Arts HES-SO in architecture College of Engineering and Architecture of Fribourg
09.2011 – 06.2015
University of Applied Sciences of Western Switzerland
Alexander Sokolov
Full-time trainee at Mosproekt OAO
10.2014 – 02.2015
Moscow, Russia
Age: 28 Swiss I Russian driving licence
Full-time trainee at MVT Architectes SA
04.2010 – 08.2011
Mies, Vaud; Switzerland
EPFL - Federal Institute of Technology
09.2008 – 06.2010
Lausanne, Switzerland
High School and Swiss Federal Maturity
09.2003 – 08.2008
Institut Florimont, Geneva; Switzerland
Herderschule Gymnasium
02.2002 – 07.2003
Frankfurt am Main; Germany
School N1275 Moscow; Russia
4
09.1996 – 02.2002
Computer skills and knowledge
Affliation National contact for Liechtenstein
09.2018 –
(European Architecture Students Assembly, EASA)
Committee member of the ciné-club (FL)
02.2017 – 07.2018
Bachelor degree monitor (EIA-Fr)
09.2013 – 06.2014
Class monitor (EIA-Fr)
09.2011 – 06.2014
President of the student architect
09.2012 – 06.2013
02.2012 – 06.2013
Class monitor (EPFL)
09.2009 – 06.2010
Committee member of architecture student
09.2008 – 06.2010
+++++
SketchUp
++
Rhino + Grasshopper
++
Artlantis
+++
Adobe suite
organization (A4AS in EIA-Fr) Communication group, school PR (EIA-Fr)
ArchiCAD
Photoshop
+++++
Indesign I Illustrator
+++++
Lightroom + photography knowledge
+++++
Dreamweaver + html knowledge
+++
Final cut pro
++++
2D / 3D printing
++++
organization (ASAR in EPFL)
Languages Russian
+++++
French
+++++
English
++++
German
+++
Photography, theater and cinematography, skiing,
Finnish
+
travel, community occupation
Interests
5
6
Urban design
Vibes
Ways of life
Lochau, Austria. 5000 inhabitants
Sao Paulo, Brazil.
City center - lake connection.
Competition for a new district instead of the old market.
Liitos
Southgate
Vuosaari, Finland. 115’000 build m2
Nijnij-Novgorod, Russia.
Competition for a new city center
Competition for a new district for 70’000 inhabitants. 1st place
7
Vibes Urban project in Lochau, Austria (5’700 inhabitants).
ss17 MSc. Uni-Li
Work with the administration of the city.
Teamwork with Kateryna Dyma prof. P.Lutz - G. Papathanasiou - J.Kick
Lochau is a small municipality in the Austrian
some cultural and leisure activities integrated
the area in the form of temporary conditions
state of Vorarlberg. On the one side, half of the
into it, implemented following a concept.
and renovations. All together will create an
area consists of forests, and on the other hand,
Vibes proposal is about participation and
entirely new leisure and cultural program but
it has a fantastic view of the Lake Constance.
decision. It is an attempt to find alternative
on a continuing basis.
Considered as an unknown place, Lochau has a
ways of creating distinctive atmosphere by
lack of identity and city atmosphere. From the
redefining the role of the existing urban
first step out the train station, one encounters
conditions and creating a strategy for local
with an issue of finding a city center or any
people to revitalize ‘lost’ places into the new
public places.
public spaces in the current context.
Urban proposal Vibes is aimed to improve
It is an attempt to revitalize unused spaces and
the quality of leisure in Lochau as well as
through the setting up of a temporary space
to identify it as a well-known place with
that slowly taken over by local inhabitants
its distinctive atmosphere. Vibes takes into
and turned into self-managed spaces with an
account the existing urban situation and
appropriate program following home-grown
proposes to make a connection between the
interests. As a result, the newly created areas
area of the train station and old city center
with its program become efficient, following
located closer to the mountains. Besides,
participation process with minimum costs.
several approaches as Lochau activity center
Such an approach, where people are involved
next to the train station and the renovation of
in the development of their built environment
an old jam factory in the old city center, with
will affect the results of new interventions for
8
vibes. y o u
9
a r e
h e r e
22 lochness kino 3 bahnhofstrasse - pedestrian 21 market 2 park way green area permission - pedestrian 23way 4 car entrance with special 22 lochness kino 3 bahnhofstrasse 24 workshops 5 bäumlequartier am4seecar entrance with special permission 23 green area 6 martin-apotheke 5 bäumlequartier am see 25 stores 24 workshops 7 workshops 26 canalhof 6 martin-apotheke 25 stores 27 new bridge 8 barnyard 26 canalhof 7 workshops 28 restaurant mangold 9 local production 8 barnyard 27 new bridge 29 messmer yard 10 chapel 28 restaurant mangold 9 local production catyard10 chapel 11 restaurant 30 blumenplatz bahnhofplatz 1 bahnhofplatz 20 new connections 20 new connections 29 messmer yard 12 new 31 church 2 park market 21 market park 21 bridge 11 restaurant catyard 30 blumenplatz 13 promenade 32 gemeinschaftshaus 3 bahnhofstrasse 22 lochnessway kino12 new bridge 22 lochness kino - pedestrian bahnhofstrasse - pedestrian way 31 church old barn bar (OBB)13 promenade 23 green area33 stadium 14with 4 car entrance 23special green area permission car entrance with special permission 32 gemeinschaftshaus space 14 old barn bar24 15 renewed 24 see workshops am workshops 5 bäumlequartier bäumlequartier am see 33 stadium (OBB) 16 jazz B bus 6 martin-apotheke 25 yard stores 25 stores martin-apotheke 15 renewed space 7 workshops17 gallery workshops 26 canalhof 16 jazz yard 26 canalhof H housing B bus hall 8 barnyard 18 concert barnyard 27 new bridgeH+ mixed-use development bridge 17 gallery 27 new H housing 19 marmeladeplatz P parking 9 local production local production 28 restaurant mangold H+ mixed-use development 18 concert hall 28 restaurant mangold 29 messmer yard chapel 29 messmer yard 10 chapel P parking 19 marmeladeplatz 11 restaurant catyard 30 blumenplatz restaurant catyard 30 blumenplatz 12 new bridge new bridge 31 church 31 church 13 promenade promenade 32 gemeinschaftshaus 32 gemeinschaftshaus 14 old barn bar (OBB) old barn bar (OBB) 33 stadium 33 stadium 15 renewed space renewed space 16 jazz yard jazz yard B bus B bus gallery 17 gallery H housing H housing 1 bahnhofplatz 20 new connections concert hall 18 concert hall H+ mixed-use development H+ mixed-use development 21 market 2 park 1 bahnhofplatz 20 new connections marmeladeplatz 19 marmeladeplatz P parking P parking 22 lochness kino 3 bahnhofstrasse - pedestrian 21 market 2 park way green area permission - pedestrian 23way 4 car entrance with special 22 lochness kino 3 bahnhofstrasse 24 workshops 5 bäumlequartier am4seecar entrance with special permission 23 green area 6 martin-apotheke 5 bäumlequartier am see 25 stores 24 workshops 7 workshops 26 canalhof 6 martin-apotheke 25 stores 27 new bridge 8 barnyard 26 canalhof 7 workshops test vibes. vibes. produce vibes. 28 restaurant mangold 9 local production 8 connect barnyard 27 new bridge 29 messmer yard 10 chapel 28 restaurant mangold 9 local production catyard10 chapel 11 restaurant 30 blumenplatz bahnhofplatz 1 bahnhofplatz 20 new connections 20 new connections 29 messmer yard 12 new 31 church park 21 market 2 park market 21 bridge 30 blumenplatz 11 restaurant catyard 13 promenade 32 gemeinschaftshaus bahnhofstrasse - pedestrian way 3 bahnhofstrasse 22 lochnessway kino12 new bridge 22 lochness kino - pedestrian 31 church old barn bar (OBB)13 promenade 23 green area33 stadium 14with car entrance with special permission 4 car entrance 23special green area permission 32 gemeinschaftshaus space 14 old barn bar24 15 renewed bäumlequartier am see workshops 24 see workshops am 5 bäumlequartier 33 stadium (OBB) 16 jazz B bus martin-apotheke 25 stores 6 martin-apotheke 25 yard stores 15 renewed space workshops 7 workshops17 gallery 26 canalhof B bus 16 jazz yard 26 canalhof H housing hall barnyard 27 new bridgeH+ mixed-use development 8 barnyard 18 concert bridge 17 gallery 27 new H housing 19 marmeladeplatz P parking local production 9 local production 28 restaurant mangold H+ mixed-use development 18 concert hall 28 restaurant mangold chapel 29 messmer yard 29 messmer yard 10 chapel P parking 19 marmeladeplatz 11 restaurant catyard 30 blumenplatz restaurant catyard 30 blumenplatz 12 new bridge new bridge 31 church 31 church 13 promenade promenade 32 gemeinschaftshaus 32 gemeinschaftshaus 14 old barn bar (OBB) old barn bar (OBB) 33 stadium 33 stadium 15 renewed space renewed space
vibes.vibes. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
33
5
H
20
20
H+
vibes. vibes. H
H+
14
9
6
P
B
2
4
3
C
8
P
7
YOU ARE HERE
29
30
28
12
10
31
B
vibes.vibes.
10
27
D
15
32
26
20
15
13
13
A
F E
24
25
11
1
23
COME HERE
19
16
H+
H
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
22
18
17
B
21
P
vibes. y o u
a r e
h e r e
vibes. y o u
a r e
vibes. y o u
a r e
h e r e
vibes.
h e r e
y o u
11
a r e
h e r e
Liitos Competition for the new center of Vuosaari. Finland
ws17-18 MSc. TUT
New build: 115’000 m2. Site: 17,5 ha
Teamwork with Paulina Sawczuk & Konsta Korpela prof. Rajaniemi Juho - Chudoba Minna
Vuosaari is a satellite community of 35’000
administration asked to reformulate the
The metro and highway area cutting the city
inhabitants, situated in the East of Helsinki.
center of Vuosaari. The project “Liitos”,
in two parts should be recovered in the last
It is one of the fastest growing areas in
translated from Finnish, as “link” aims to
stage to create the link between southern
the region. During the past years, the city
find connections in the urban pattern, public
and northern city. The new concert hall
developed exceptional conditions for living.
spaces and circulation, functions and living,
will finance the intervention and become an
The housing has a strong architectural
people and the city of Helsinki.
attractive point, connected directly via subway
potential. The urban scale of the city is
with Helsinki center in 20 minutes. It will also
complemented by an extensive green network
The project was proposed to be developed in
generate the new central plaza and rebrand
providing excellent quality of life. The city
four stages to overcome economic and social
the image of Vuosaari.
center is formed around the subway station
issues. The housing was divided into different
and is connected by a straight axis with the
types, starting with more traditional living
waterfront. The central area was established
and going to more experimental ones in the
in the sixties, and it has issues, that the
spirit of the city development. The urban
administration would like to overcome. There
pattern integrated into the existing system
is no functional mixture, and no housing is
proposes a new way of life, bringing people
located in this zone. In this area, there is a
outside. The playful streetscape aims to
school, cultural and sports centers, mall. For
provide comfortable and optimistic living
that reasons during the night, space becomes
conditions. The multitude of hidden and
empty and dangerous.
visible public spaces propose a vast choice of events and happenings.
The
competition
launched
by
the
12
13
schwarzplan new
VII VI
VII
III VI
IV
IX IV
IV
IV V
V
VI
IV II
IV
I
V
III
IV
VIII
V
IX
V IV
V I
V VI
14
VI
15
Ways of life The international competition «Schindler Global Award». Sao Paulo
ws16-17 MSc. Uni-Li Teamwork with Olga Ivakina
The project emphasizes the mobility systems and the future development of one of the most significant cities in Latin America. Sao Paulo, while being the biggest city in South America, has a particular and diverse culture, which spreads from the inherited European traditions to the varies local identities. The proposed site is located at the market territory – CEAGESP, in the west part of the city. The decision was made by the government to remove the market because of the traffic problems and pollution it causes. The project itself has been developed during three main stages – Research, Competition Submission, and the Academic Submission; all these stages are presented in this workbook. During the phase of the Research, a lot of problems were identified, which are typical for the
city of this scale – social segregation, traffic jams, high level of crime; these directions also became a basis for the further thoughts. The first steps to the design process started on the small scale, the seed, which grew an inspiration for the new development of the site. During the next steps, the project was developed from the small scale to the urban concept, which includes various stages and scenarios of how the territory should look like in the future. The representation of Sao Paulo as the “City of Walls” became a starting point for this project. To overcome the segregation and alienation between people and to solve the traffic problems, the city should provide more opportunities for the pedestrians and offer more space for interactions. During the
16
prof. P.Staub - G. Papathanasiou
research three main directions were highlighted - the mobility issues, the social aspects and the quality of life. The project proposes better integration of the CEAGESP wholesale market site into the city fabric and the creation of the high quality urban spaces while offering a new mobility concept, which is based on the spot’s network and the new typologies of the streets – Low Speed (pedestrian priority), Medium Speed (soft mobility) and High Speed streets (car priority). These streets form the new modes of development and directly influence the typologies of the buildings. The project also aims to provide mixed usage and to extend the public spaces inside the premises through the terraces, common areas and creation of the Interaction Core.
connection I attraction place learning concentration
avenue
municipality spot
starting spot
park entry
market greenhouse
silo I art place
transit green zone
cândido portinari park
water presence
QL 26
villa lobos park
Int 14 QL 36
Int 15 Int 10
QL 33
QL 02
Int 11
Int 04
Int 18
QL 13
Int 08 QL 39
QL 08 QL 01
QL 22
Int 09 QL 28
Zoom 4 metro
Int 01
Zoom 3
Int 16
metro
QL 11
alternatif district place
market
waterfront
QL 14
QL 25 quarry park QL 19
metro
QL 06 creativity crossroads
Int 20
QL 03
QL 17
QL 27
transit place
new park
QL 16
QL 23
restaurant green place
market riverfront
riverfront next to the hub
QL 09
sculpture park
QL 40
QL 20
Int 01 Int 12
Zoom 1
densification via isolated objects
riverbank
QL 29 QL 32 tropical
offices hub
Distance Time (meter) Walk Bike
QL 07
activation of central spot
ab ae cd ec ek
Int 19
Distance Time (meter) Walk Bike
Zoom 2 as 1700 900 Ps Mr 2500 700 df 600 iM QL 12 QL 04
800 1100 900 800 1300
Distance Time (meter) Walk Bike
28’ 6.8’ 15’ 42’ 11.5’ 2.8’ 10’ 2.4’
13’ 18’ 4.4’ 15’ 3.6’ 13’ 3.2’ 21’ 5.2’
ih at ac
850 1550 350
Distance Time (meter) Bike
le eG Gj jl
30’ 7.4’ 26’ 6.2’ 6’
1700 1300 1500 1500
QL 18 j
Int 03
QL 30 Int 05
QL 05 QL 24
Int 15
QL 21
Ql.46
k
v
Int 07 t
l
QL 35
Int 02
r
d
QL 31
QL 41
QL 42 h
Zoom 5
QL 47
P
G f
QL 43 c
o b
n
i QL 44
Int 17
s a
e M
Int 13 u
QL 15
QL 45 Int 21 QL 10
QL 37
Speed activation via small scale and terrace building
QL 34
activation via neighborhood
riverfront activation via business area
walk bike bus
max
3,6 km/h 15 km/h
20km/h
14 km/h
14km/h
Speed
Metro car in the city car hiGhway
QL 38
17
max
20 - 30 km/h 10 -12 km/h
50 km/h 70 km/h
7.5’ 5.5’ 6.5’ 6.5’
Tramway
Metro
Street side
QL 01
QL 02
QL 03
Walk
QL 04
Facade
Sitting platform
canopy outside cafe
QL 06
common sitting place
Theater
scene
Shopping
police security
QL 10
bleachers
QL 16
application food online screen home delivery
lighting
trashcan bench tree
Free wi-fi
QL 11
tribune
QL 17
information screen
QL 07
showcase
Fountains
wi-fi + power socket
Samba
Exchange box
small objects box
free newspaper
Cinema
QL 18
big box
Run
Segway
vegetation
Share e-bike
food-track
Shadow
tree
QL 19
place to sit
QL 14
Rest
open air cinema
18
QL 05
QL 08
QL 13
Scouter
In the street
water place
QL 12
place to dance music light
Electro-Bus
Electro-Car
Walk
separating tree
Water taxi
hammock
Wheelchair
water fountain
QL 09
cloth canopy
QL 15
street piano
QL 20
Market
degustation table
Bike
counter
counter
avenue
municipality spot
starting spot
<--- NORTH
connection I attraction place learning concentration
park entry
market greenhouse
silo I art place
transit green zone
cândido portinari park
water presence
Distance Time (meter) Walk Bike
villa lobos park
densification via isolated objects
AB AE CD EC EK
activation of central spot
800 1100 900 800 1300
Distance Time (meter) Walk Bike
AS PS MR DF IM
13’ 18’ 4.4’ 15’ 3.6’ 13’ 3.2’ 21’ 5.2’
1700 900 2500 700 600
Distance Time (meter) Walk Bike
28’ 6.8’ 15’ 42’ 11.5’ 2.8’ 10’ 2.4’
IH AT AC
850 1550 Ql 30 350
Distance Time (meter) Bike
LE EG GJ JL
30’ 7.4’ 26’ 6.2’ 6’
1700 1300 1500 1500
7.5’ 5.5’ 6.5’ 6.5’
J H
R
D
Ql 01
S K
Int 02
T
Ql 06
L
A
V
Ql 28
P
G F
O
C
B
N
I
Ql 29
E M U Ql 03 Ql 34 Ql 35 Ql 36
metro
transit place
new park
metro
metro
quarry park
restaurant green place
market riverfront
riverbank
alternatif district place
waterfront
market
tropical
offices hub
riverfront next to the hub
max
Speed activation via small scale and terrace building
creativity crossroads
activation via Ql neigh04 borhood
riverfront activation via business area
sculpture park
Walk Bike Bus
Speed
Metro Car in the city Car highway
3,6 km/h 15 km/h
20km/h
14 km/h
14km/h
max
20 - 30 km/h 10 -12 km/h
50 km/h 70 km/h
<--- NORTH
Ql 30
Ql 28 Ql 30
Ql 20
Ql 18
Ql 01
Ql 07
Ql 01
Ql 35
Ql 28
Ql 31 Ql 29
Ql 06
Ql 08 Ql 22
Int 02
Ql 41
Ql 19
Ql 03
Ql 06
Ql 25
Ql 34 Ql 35 Ql 36
Ql 24
Ql 09
Ql 04
Ql 02
Ql 21
Int 08
Ql 30
Ql 39
Int 11
19
Ql 28
Int 07
Int 09
Ql 12
Int 19
Ql 20
Ql 05
Southgate, Nijnii-Novgorod Urban competition for a new 70â&#x20AC;&#x2122;000 inhabitants district in N.Novgorod.
2015, Mosproekt Teamwork
Six clusters form space structure. The site area includes 1100 ha and consists of 14 parcels (total area 450 ha). The first site cluster is proposed to be a hotel and business center, which connects the new district with the city.
building, city hall, mall, and tramway line. From the entrance side to the city, between 7th and 9th parcels, the multifunctional hub with subway, bus and tramway stations, hotels and offices is formed.
The second one, composed by 2nd and 4th parcels, is formed by lowrise apartment houses with social functions and landscape design along the river.
The 5th parcel creates the distant district with the higher comfort living apartments. Across the embankment, the low-density housing is designed, which is condensing away from the littoral zone.
On the other river bank, over the hills, denser multi-story housing is designed (parcels 6th and 7th). The primary composition element is the straight boulevard, uniting public
One of the most important parts is the 8th parcel. It forms the ÂŤSouth GateÂť in the entrance to the city. It is a multifunctional high-rise building complex - a new trademark of Nijnij-
20
Novgorod. The 9th and 10th parcels create the densest central cluster. Descending the valley the density decreases to the individual houses. In the recreational zone, a park with sports complex and learning are is proposed. The 6th cluster is composed of highdensity buildings along the electric main. It is a social housing area. The tramway line connects all six clusters of the project and allows to receive easy access to the subway station and district center.
21
9 9
12
24 12
12
9
Ж 9
9
12
9 9 9
3
12
12
24
12
12 12
12 12
12 12
9
9
12
9
12
12
9 24
12
9
12
12
12 9
12
12
12
12
12
9
12
12
9
12
9
12
12
9
12
12
12
24
12 12
12
9 12
9
9
9
12
9 9
24
12
12
9
9
9
З
12
9
12
9
9
9
24
9
9
12
12
9
9
12 12
12
9
24
12
12
12 12
12 12 12
12
24
9
12
9
12
9
9
9
9
9 9 24
9 9 9 9
zoninG
ОД О-1
Зоны многофункциональной новой коммерческой/ деловой застройки
О-1
Зоны многофункциональной застройки городского центра и подцентров вне исторических и охранных зон
-66.447,8 м²
О-2
Зоны многофункциональной застройки местного значения
-57.056,7 м²
Осп-с Жм-2
Рз-с Жм-2 Жм-2 Жм-2
Жм-2
Рз-н
Т
Рз-н
Рз-п Осп-у
Жм-2
Жм-2 Жм-2 Жм-2
Т
Жм-2
Рз-с
Жм-2
Рз-н
Жм-1
Жи-2 Жм-3
Жм-3
Осп-л
Жм-3
Жм-2
Рз-с Рз-с
Жи-2
С-3
Рз-н
Жм-2
Жм-2 Жм-1
Жи-2
М Рз-т
Жм-3 Жм-1
Жи-2
Осп-л
Рз-т
Жм-2
Т Рз-н
P
Т
Рз-п Осп-у
О-2
Осп-т
Осп-с
Т
Осп-л
Жм-1
Рз-п
Осп-т О-1
Жм-1
Осп-у
Осп-у
Т
Жм-1
Жм-1
Жм-2
Жм-2
Осп-т
Жм-1
Жи-3 Жи-3
Жи-3
Т
Рз-т Жи-2
Жи-3
Жи-1
Жи-1 Жи-1
Жм-2 ОД
Рз-т
Жм-2
Осп-у Жм-2
ОД
Жм-2 Осп-у
ОД Жм-2
Осп-у
-13.040,1 м²
Зоны индивидуальной жилой застройки низкой плотности
-29.901,5 м²
Жи-2
Зоны индивидуальной жилой застройки средней плотности
-105.916,5 м²
Жи-3
Зоны индивидуальной жилой застройки высокой плотности
-20.948,4 м²
Жм-1
Зоны многоквартирной малоэтажной застройки средней плотности
-104.873,8 м²
Жм-2
Зоны многоквартирной среднееэтажной застройки средней плотности
-711.916,8 м²
mall Зоны многоквартирной многоэтажной застройки Жм-3 высокой плотности
-271.407,6 м²
Пк-о
Зоны коммунально-обслуживающих объектов, обслуживающих небольшие потоки посетителей
-92.281,3 м²
Жсм
Зоны многоквартирной многоэтажной застройки высокой плотности
-271.407,6 м²
ПК-о
Жм-2
Т
Жм-2
Жсм
Жм-2
Жм-2
Рз-тех
Жм-2
Жм-2
Осп-у
Жм-2
Жм-2
Осп-у
Жм-3 Жм-2
Жм-2 Жм-2
-222.834,7 м²
Р3-п
Зоны парков
-331.386,9 м²
Р3-н
Зоны набережных
-189.511,2 м²
stadium
Жм-2
Жм-3
Жм-2 Жм-2
Р3-т Зоны озеленённых террас ПК-о
Жм-2
Жм-2
м²
Жи-1
Жм-2
Т
Осп-у
Т
Жм-3 Жм-2
Жм-2 Осп-у
cultural center Зоны технической зелени [ЛЭП/САНИТАРНЫЕ
Жм-3
Жм-2
Осп-с Жм-2
function
-198.816
Осп-т Зоны торгово-бытового назначения
Рз-т
Рз-тех
Жм-2
Осп-с
Жи-2
Жм-2 Жм-2
Жм-3
Рз-тех
-17.825,3 м²
sport center учебно-образовательных учреждений Осп-у Зоны [Детские сады/школы]
Рз-н
Жи-2 Жм-1
Жм-1
Жм-2
Т
Жм-1
Жм-2
Жм-2 Жм-3
О-2
Жи-2
Жм-1
Жм-2
Жм-3
Жи-2
Жм-1
Жсм Рз-тех
-17.825,3 м²
Осп-л Зоны лечебно-оздоровительных учреждений
church
Рз-п
ОД
многофункциональной застройки hotel О-3 Зоны коммунальных,административных, торговых
Жм-2 Жм-1
Жи-2
Рз-тех
Жм-2
Жм-2
Т
ПК-о
Жм-2 ОД
Жм-2
О-2
Жм-3
Жм-2
Жм-3
Жм-2
Жм-2 Жм-2
Жм-2
Жм-2
Осп-с
О-3 Жм-2 Жм-2
Рз-с
Осп-у
Осп-т
Жсм
Жм-3 Рз-т Рз-т
Жм-2
Осп-у
Жм-3
Осп-у
Жм-1
Жм-3
Рз-н
Рз-т
Т
Жм-2
Т
ПК-о
Рз-с
Жм-2 Жм-3
Жи-2
-76.917,7 м²
функций/ малого бизнеса.
Жм-3 Жм-2
Жсм
Жм-3
ПК-о
Жм-3 Жм-2
Жм-1
Жи-2
Жсм
Рз-тех
ОД
Рз-тех Рз-тех ПК-о
zoning
Р3-тех ЗОНЫ]
market С-3 Зоны кладбищ и мемориальных парков
-219.502,3 м² -42.736 м²
recycling plant
22
23
24
Architectural design
MSc Thesis
Sunbeams
Sberbank center
Triesenberg, Liechtenstein.
Fribourg, Switzerland.
Skolkovo, Russia. 115â&#x20AC;&#x2122;000 m2
The legend of the underground
Wellness center.
Competition for a new head office.
BIG 3
La conserve qui roule
Fribourg, Switzerland.
Fribourg, Switzerland.
BA Thesis
Multifunctional hall, hostel, and the
Restoration project in the old city.
Weyermannshaus, Bern. 7,9 ha
restaurant.
archive. Part of Liechtenstein exhibition for Venice Biennale
The project of the ice rink with curling.
Transformation
and
extension of the bath complex.
25
MSc Thesis The legend of the underground archive.
ss18 MSc. Uni-Li
Architectural design project, part of Liechtenstein exposition on the Venice Biennale 2018.
prof. L.Hilti - M.Igual - B.Bรถckle
In order to integrate the local
The work is answering this question
by a built construction, it needs to
community and to bring changes and
in two parts. In the first, theoretical
produce a narrative, receptive for the
knowledge to the existing situation,
research, it approaches a specific
natives. The architecture should be
it is essential to understand and to
area defined by the line which is
a mediator which opens the door for
study its culture, and its physical
crossing
the interaction.
environment.
into consideration and studies the
The
architectural
Liechtenstein.
It
takes
the
physical and the cultural aspects of
collective memories, be a reminder
the region. In the second part, an
and bring support to unite people
empirical approach, divided in two,
under universal values. It should
consists in the building process and
be possible to provide a view of an
the exploration of the region using
intangible and forgotten heritage.
different mechanisms.
How can architecture build a narrative to unearth the hidden layers of local identities?
The project results in the test of a
intervention
can
stimulate
sensitive way to interconnect with the local identity through the curiosity and the imagination. Supported
26
27
3440
3440
3440 3280 3140 3010 2880 2770 2670 2570 2470 2400 2340 2280 2240
2100
2100 1870
820
820
820 615 410 205
front elevation
1160 1250 1330 1390 1450 1500
930
810
670
520
370
190
0
800
1050
0
section
28
The legend of the underground archive
In Triesenberg, down from Masescha,
dangerous to approach the ravine:
an underground archive was built.
a guard of the archive is trying to
We donâ&#x20AC;&#x2122;t know by whom and when
save each part of it and could throw
it was made. However, it contained
a tree trunk on your head to protect
all possible rocks, artifacts, legends
his treasury. Only daredevils are
and names from Liechtenstein. You
ready to meet him. They hope to
could find as many stories as the
find a precious light stone or another
mind can imagine. Nobody knew
treasure. Some of them, armed with
where the archive ended. People
a shovel and pickaxe, even try to dig,
were disappearing in the darkness.
and they risk a lot because they are
Once it was flooded by the Duraboda
going against the law.
underground lake and the whole archive became inaccessible and
Still, they know that the place, called
closed. Some artifacts picked up
Archive, in Triesenberg, down from
by the water came outside. It is
Masescha is worth the effort.
29
BA Thesis Weyermannshaus, Bern. Site: 7,9 ha.
6th semester. EIA-Fr
The project of the ice rink with curling. Transformation and extension of the bath complex.
The building is located between the natural landscape and urban area. This project reacts to this collision as a front on the street side and opens to the park side by terraces. The critical part of the design was to integrate the existing outdoor pool into a new complex. This project can be described as a basement - terraces, providing views to the different activities of the site, and light roof, situated in the north part. This roof covers the «ice» functions: curling and ice rink itself. Basement, pylons, and roof organize the existing construction system. It has a raster net of 4.8 meters. This construction principle is taken as a regular composition of bath complex, service areas, ice rink and technical locals.
The construction of the roof is a tube framework that develops in three dimensions. The system, which was used, is called «KK-Kugelknoten». The roof leans on the concrete pylons, fixed in two spots: ground floor and terrace level. The suspended ceiling is made of wood that complies acoustic needs and creates a warm atmosphere. The material, which was chosen for the facades, is polycarbonate. It allows to unite the volumes, gives them a minimalistic form and creates spectacular light effects in the interior space. The choice of colors for the structural elements embodies the temperature conditions of respective functions. Many spaces offer multifunctional usage. For example, the ice rink can be used for exhibitions or concerts;
30
prof. M.Boegli - A.Kramp
terraces are used as tribunes for the outdoor pool and as a diving tower.
31
n from sthe ection city on fromthe city from the city
sectionfrom from the spark ection park from the park section the 1stfloor floor plan1st floor plan 1st plan
masterplan
Ground floor G plan round floor plan Ground floor plan
PLAN PLANSITATION SITATION PLAN SITATION 1:1000 1:1000
C UC RU LR ILNI NG G
ZONE VESTIAIRES
EEI INNGGAANNGG MMAATT CC HH
SALLES SALLES
KK II NN OO OPENAIR EOI NP EG NA AN IGR M A T C H
KINO OPENAIR
SALLES
HHCOOUCCRKKKEEIYYN G
HOCKEY
RESTAURANT R E S T A U R AU NNT ETN
BAD1
UNTEN
BAD2 BAD2
BAR
RESTAURANT
UNTEN
SPRUNGTURM SPRUNGTURM
SPRUNGTURM SEE SEE
SEE
S T SE IT NE IE N E
BAD
3
B ABDA3 D 3
BAD2
VELO+MOTO
UNTEN
S P A OBEN
STRAND STRAND
PARKING
HAUPT EINGANG
H A HU AP UT PETI NE GI NA GN AGN G
V E LVOE +L OM +OMT OO T O
UNTEN UNTEN
S P A OBEN S P A OBEN
SONNE
SPIEL
PARKING
EINGANG ICE I EXPO
B ABDA1D 1
E I ENIGN AGNA GN GI CIEC EI IE XE PX OP O
B AB RA R
SONNE SONNE
SPIEL SPIEL
PARKING PARKING
E NPT AR RE KECICUNURGRKKI INNGG PATINOIRE
STEINE
PARKING E ENPNT ART RE KEE EI N G P AP AT IT NI NO OI RI RE E
1:1000
CURLING
TECH ZONE VESTIAIRES TECH ZONE VESTIAIRES TECH
P A RPKAIRNKGI N G
rplan erplan
GIPFELI
GIPFELI
GRILL
GRILL
STRAND
GIPFELI
GRILL
situation
ALEXANDRE I EIA-FR
floor 1
PROJET DE BACHELOR 2015 I BERN I PATINOIRE
EXANDRE SOKOLOV I EIA-FR ALEXANDRE I EIA-FR
section - city situation
floor 0 section
PROJET DE BACHELOR PROJET2015 DE BACHELOR I BERN I PATINOIRE 2015 I BERN I PATINOIRE
32
section - P 1st level PLAN SITATION
1:1000
model section TROP PLEIN ACIER FIXATIONS PLASTIQUE
ECOULEMEN
BOIS
GARDE CORPS 20CM
JOINT DE DEFORMATION ENTRE LE SOCLE EXISTANT ET NOUVEAU A PREVOIR ECOULEMENT DEVANT TRIBUNES
DEUXIEME INFILTRATION PREMIERE INFILTRATION
ZONE TEMPERÉ
ZONE CHAUFFÉ
detail detail PLAN SITATION
1:1000
33
ISOLATION INTÉRIEURE POUR L’EXISTANT
CAISSON STORE
Sunbeams The wellness center project in the low city of Fribourg, an extension of the Motta bath.
5th semester. EIA-Fr prof. S.Buchhofer - P.Gloor
This project, at first, is focused on the ambiance and the quality of interior spaces. The challenge was to start with an atmospheric image. That required to make a choice of materials and begin to work on the project in full entirety. Sarine river, in the law city, is a spectacular event. Unfortunately, the district around the Motta bath is not providing an urban link to the river. The access to this part of the city is chaotic and has no hierarchy. The aim of the project was a creation of new meeting space, a real reception place. The cafe-bar, which is situated on the ground level, will animate this area. Principal functions, hammam, and wellness center are placed on the low level. Visitors will go down along the
34
river and discover the walking path, which is connected to the Sarine river. The inside itinerary overthinks the bending course of the river. It will go up and down. Through multiple openings, many visual connections between interior and exterior spaces will be provided. The building appearance looks for the similitude with the retaining wall. Raw material will give more importance to the incorporated reflecting particles - the sunbeams.
35
floor 0
floor -1
floor -2
section BB
36
facade section AA
situation
interior space
37
atmosphere model 1:20
BIG 3 Multifunctional hall, hostel, and the restaurant on the riverside merged in «BIG 3».
5th semester. EIA-Fr
Fribourg
teamwork Matias Cesari prof. S.Buchhofer - P.Gloor
The difficulty of the task was to work with different functions and to combine them. The chosen solution for this project was to mix three functions in the same big building. We called it - the machine. The problem that engrosses us was to show different relations, as well as the interior footage of individual interior spaces.
the vertical trunk, the primary distribution area. Public spaces branch from it in four directions and breach the facade. The bark is composed of the hostel, which covers the rest of the building. In this part, the facade is made from metal laminates, which merge the hole center and intensify the industrial look of the area.
The new building aims to give back a fresh breath to this area. The project is related to the significant central buildings of the city. The building takes its place in the urban density and generates a marketplace, the new center of the quiet part of Fribourg. The project would also connect both sides of the river and propose to make the Fribourg beach on the other bank.
The place, the repetitions rooms that transform into a small concert hall, as well as the main hall, will more animate the «calm» part of Fribourg.
The
building
revolves
38
around
Thereby the tree functions: multipurpose hall, the restaurant, and hostel, cohabit in the new cultural center of the lower city, in the BIG Three.
39
acceuil
2nd floor plan entrée
s sectionGround floor plan
Plan 3ème
3rd floor plan
floor. 1
4th floor plan Plan 2ème
Plan 1ér
2nd floor plan
1st floor plan
floor. 2 Plan rez-de-chauSSée
Ground floor plan
6ème Preception lan 1ér
eSt
n
2nd floor plan
floor. 0
Pe tranSverSale Plan rez-de-chauSSée
n
3rd floor plan 5th floor plan
- entrée
4ème
cafe & multifunctional hall
Plan rez-de-chauSSée
elévation Sud - marché
1st floor plan
Ground floor plan
elévation Sud - marché
40
model 1:50
4ème
foyer
deS relationS viSuelleS
roof plan
lan
5ème
Plan 3ème
floor. 3
Plan 4ème
SchémaS
et circulation PrinciPale
4th floor plan Plan 2ème
floor. 4
S
niGht view
3ème
couPe longitudinale
bar
section
eSPace Public
2ème
reStaurant
toit
site plan
masterplan 1er
6ème
3rd floor plan
3ème
acceuil
eSPace comun
4th floor plan
2nd floor plan
lonGitudinal section
Plan 2ème Plan 1ér
Plan toiture
Plan rez-de-chauSSée
5ème
entrée
rez
SchémaS 4ème
foyer
circulation
3ème
rd floor plan
lan
6th floor plan
blocS PrivéS
th floor plan
lan
5th floor plan
1st floor plan
bar
2nd floor plan
Ground floor plan
1ér
Plan 5ème
Plan rez-de-chauSSée 2ème
reStaurant
elévation Sud - marché
niGht view
41
night view
Sberbank center, Skolkovo Competition for a new Sberbank head office in Skokovo, Moscow.
2015, Mosproekt
115’000 m2
The project of Sberbank center is the extreme district of technologiccity of Skolkovo. It has four principal functional areas. Office center, conference center, parking (hub) and the recreation zone. The west part of the site is situated near the motorway. Two sections of parking are used as a buffer zone. It’s also a place for changing the means of transport. Skolkovo-city is eco-friendly and has no diesel cars. In the second part are parked electric cars, Segways, and bikes. Two parallel streets are generating the site. One of them is a walkway, along which the office functional zone is located. Works spaces are situated on 2nd and 3rd floors and are connected with bridges. The first floor is a public zone, and each building provides many entrances. A
Teamwork
big cafeteria with the terrace in the center of the office area is a global meeting point. The walkway ends with the «big boss» tower, situated at the visual junction of the central axis. From the tower, over the significant boulevard of Skolkovo, we can reach the conference center. The bridge is used as the bar and produces the animation at the entrance of Sberbank office center. Conference building is an «icon» type building in the form of the stylized bank logo. The round shape is also the integral object in Skolkovo-city planning. In the building are situated conference rooms, restaurant, conservatory and lecture hall. On the roof of the building, the place with significant steps will attract people by the good weather for an open-
42
air cinema, or some special events.
43
Cколково
ЕРБАНК
К О Н К У Р С Н О Е
П Р Е Д Л О Ж Е Н И Е
2014
Зона офисных помещений ОАО "СБЕРБАНК" ЗАО "СБЕРТЕХ" Зона вендоров Зоны общественного пользования
G2
Администрация + дирекция Временные офисы
1
Зоны общественного питания ПАРКИНГ Общественные пространства Спорт - Рекриация
П а р к о в к а д л я э л е к т р о к а р о в
G1
2
2
а
р
к
о
в
к
а
м
Б Л О К
,5 10 40
У Ч Е Б Н Ы Й
П
2
,4 96 16
м
2
,8 68 10
м
В
2
J
Н
У
Т
Р
Е
Н
Н
Я
Я
У
Л
И
Ц
А
A
м
Й
Е
,9 55 14
А
О
З
ЕТ
З Н
ЕГ
О
О
Н
Т Р
2
,2 77 42
м
С
м
Ф
Е
А
Н
С
О
Р
М
Е
Р
E
А
КА 2
1,2 72
Ф
F1 H Л
Л Ф
Т
2
О
Л
О
,2 30 22
В
А
м
D
Я
I
C 2
F2
,7 26 26
м
2
5,7 97
м
B
2 1
round floor ground G floor
БЕРБАНК
Т Е Х Н О П А Р К О А О "С Б Е Р Б А Н К Р О С С И И "
Cколково
К О Н К У Р С Н О Е
П Р Е Д Л О Ж Е Н И Е
зонирования 44Схема функионального 1 этаж
ОАО "МОСПРОЕКТ" 2014
Main view conference hall section
45
concervatory section
La conserve qui roule Restoration project in the old city of Fribourg.
4th Semester. EIA-Fr
Construction teamwork.
Prof. Seiler - Hummbert
The project is located in the old city of Fribourg in the classified building. The exercise aimed to propose a restaurant or a cafe and to keep apart for housing. It was essential to concentrate on the technical and economic ends; also the atmosphere was very significant. We made calculations, proposed some offers, brought samples and prepared the expertise file. The jury was composed not only of our construction and design professors but also from professional victuallers. Our team decided to keep the ground floor for the housing, and inclined to use the traditional solution in this region - cave project. The idea was to design a degustation shop, where the first kitchen and products will be prepared in a different place, in the suburbs. This decision allowed
46
saving a lot of money. Thereby, the restaurant project can be used as a cellar. After studying old plans, I understood, that three different houses composed the building. Each house had its stairs, so we found a hidden one. That let us divide clients and residents flows. That was also the cheapest solution that allowed excluding complicated construction works. The jury approved this procedure and distinguished the project. The proposed design was minimalistic and had just indispensable interventions. We also choose colors, lights, and equipment. Furthermore, we designed furniture and made a 1:1 model for our modular unit.
D1
MEUBLE CUISINE À DÉFINIR
MEUBLE CUISINE À DÉFINIR
Montecharge
S07
S: 27.3 m²
CARRELAGE 2 CM MUR BRIQUE CIMENT 10 CM CREPIS 1 CM
S: 20.2 m²
sol: radier murs: crépi plafond: crépi
H: 2.57 m
S01
S: 4.7 m²
Petit local
sol: radier murs: pierre/cépi plafond: ...
H: 3.40 m
sol: béton ciré murs: brique T.C./pierre/cépi plafond: béton
FAUX-PLAFOND BACS ALLU FINITION MÉTALLISÉES 7178
Local technique
S08
D2
Cuisine / vestiaire
MEUBLE CUISINE À DÉFINIR
MEUBLE CUISINE À DÉFINIR
FAUX-PLAFOND LUXALON GRILLE 40 FINITION MÉTALLISÉES 7178
S01
Zone d'accueil
EI 30
S: 28.9 m²
H:2.89 m
sol: dallage béton ciré murs: crépi/pierre plafond: faux-plafond
M2
D1
EI 30
M1
FAUX-PLAFOND LUXALON GRILLE 40 FINITION MÉTALLISÉES 7178
S09
S: 9 m²
MEUBLE CUISINE À DÉFINIR
FAUX-PLAFOND LUXALON GRILLE 40 FINITION MÉTALLISÉES 7178
Zone vente
MEUBLE CUISINE À DÉFINIR
H: 3.18 m
D2
sol : dallage béton ciré murs : crépi/pierre plafond : voûte brique T.C.
S06 S09
S: 13 m²
S: 18.6 m²
Toilettes
Espace de dégustation
S02
H: 2.94 m
S: 28 m²
sol: dallage béton teintémurs: crépi/pierre plafond: faux-plafond
H: 2.54 m
sol: dallage béton ciré murs: tuf peint plafond:voûte tuf peint
Espace de dégustation
ESCALIER A RESTAUR PIERRE DE LA MOLIÈR À DÉFINIR
H: 2.83 m
sol: dallage béton ciré murs: crépi/pierre plafond: faux-plafond
PORTE VITRE
VITRAGE
S04
S: 17.6 m²
Espace de dégustation
Zone de vente
S: 16.5 m²
M4
VITRAGE M3
Plan
S03
H: 3.00 m
sol: dallage béton ciré murs: tuf peint plafond: voûte tuf peint
floor -1
M1
H: 3.05 m
sol: dallage béton ciré murs: tuf peint plafond: voûte tuf peint
ESCALIER A RESTAUR PIERRE DE LA MOLIÈR À DÉFINIR
47
4
murs: tuf peint plafond: voûte tuf peint
M4
E VITRAGE M3 M3
murs: tuf peint plafond: voûte tuf peint
Plan Plan
ESCALIER A RESTAURE EN PIERRE DE LA MOLIÈRE À DÉFINIR
ESCALIER A RESTAURE EN PIERRE DE LA MOLIÈRE À DÉFINIR
GSEducationalVersion
GSEducationalVersion
0.5
1
0.5
1
AIR PULSE
2
5
AIR PULSE
2
5
AIR REPRIS
AIR REPRIS
Transformation Grand-Rue 32
affaire:
TGR TGR
GSEducationalVersion
P02 P02
Plan SOUS-SOL
modifications:
3
dessin:
3
dessin: date de création:
as/cp 27.11.2013
date de modification:
07.01.2014
date de création:
27.11.2013
date de modification:
07.01.2014
affaire: échelle:
as/cp
Transformation Grand-Rue 32 1:50 modifier par:
échelle:
1:50
modifier par:
cp/mc cp/mc
Plan SOUS-SOL / cp 1. Avant-projet 2. Mise à jour / mc modifications: 3. Mise à jour / mc 1. Avant-projet / cp 2. Mise à jour / mc 3. Mise à jour / mc
GSEducationalVersion
sections sections
EducationalVersion
section AA section BB
DALLE B.A EXISTANTE LISSAGE PLÂTRE PEINTURE AIR PULSE
DALLE B.A EXISTANTE LISSAGE PLÂTRE PEINTURE AIR PULSE
AIR REPRIS
DALLE B.A EXISTANTE VIDE TECHNIQUE FAUX-PLAFOND BACS ALLU FINITION MÉTALLISÉES 7178
DALLE B.A EXISTANTE VIDE TECHNIQUE FAUX-PLAFOND BACS ALLU FINITION MÉTALLISÉES 7178
MEUBLE CUISINE À DÉFINIR
MEUBLE CUISINE À DÉFINIR
AIR REPRIS
affaire:
TGR TGR
EducationalVersion
P04 P04
1 1
Transformation Grand-Rue 32
dessin: cp/mc Transformation Grand-Rue 32 affaire: échelle: 1:50 modifier par: mc dessin: cp/mc date de création: 04.12.2013 date de modification: 07.01.2014 échelle: 1:50 modifier par: mc date de création:
04.12.2013
date de modification:
07.01.2014
Coupes SOUS-SOL
modifications:
Coupes SOUS-SOL
1. Mise à jour / mc/cp modifications: 1. Mise à jour / mc/cp VITRE FIXE
VITRE FIXE
48
MEUBLE D'EXPOSITION 12
60 36
12
2
MEUBLE ACCUEIL
32 30 180 174
3
40
3
342 855 3
16
3
635
855 3
16
3
62
855 3
19
3
655
3
CAISSE EN EPICEA
155
67
2
3
40
855 45
96 05 5 05 055 5 15 15 11
3
MEUBLE POUR SALLE DE DEGUSTATION
BUSE
BUSE
BUSE
AIR PULSE
05
PIEDS REGLABLES
PIEDS REGLABLES
GRILLE
Coupe AA
715
TIROIR EN PANNEAU EPICEA 3 PLIS
30
35 2
45 BUSE
TIROIR DU BAS EN PANNEAU EPICEA 3 PLIS
65
AIR PULSE
AIR REPRIS
GRILLE
AIR REPRIS
58
52
3
58
1 1
90
INTRODUCTION ELECTRICITE
furniture elevations and sections
53
AIR PULSE 05
AIR REPRIS
2
Coupe AA
affaire:
TGR
furniture elevations and sections Transformation Grand-Rue 32 modifications:
échelle: 1/20
modifier par: Cynthia Pruvost
date de création: 18/12/2013
date de modification:
affaire:
GSEducationalVersion
GSEducationalVersion
49
42 41
1 1
TIROIR
ETAGERE
195
75
45 1
3
2
65 2 1 2
PIEDS REGLABLES
6
6
PANNEAU EPICEA 3 PLIS LASUREE
375
28
4
Coupe CC
94
91
2
3
3
VITRE FIXE
84 3 2 1 52 1 52 1 5 12 12 12 1 15
VITRE FIXE
NOURRICE
10 3
296
Coupe BB
90
90
3
INTRODUCTION ELECTRICITE
TGR
Transformation Grand-Rue 32
échelle: 1/20
modifier par: Cynthia Pruvost
date de création: 18/12/2013
date de modification:
Archi-appliqué Work selection released during different study phases.
The first part is the construction design: the jazz festival stand, interview stand, and Russian mountains. The stand design won during the semester and was rebuild with three others for the Willisau Jazz Festival. The interview stand, also a team-project that was selected and rebuild for the TV presentation. I participated in both cases in concept, drawing and construction phase. The «Russian mountains» project was the study, including the 1:20 model, of the wood system frames. I also worked with the materials: the nest design from papier-mâché and leaves, the money lamp or the mini safari-tower project; build with the rammed earth and the weathering steel. Furthermore, a project of revalorization of the old roman
fanum in the region of Fribourg is presented. It was an interdisciplinary work with engineer team. I participated in the concept and the design. This work was selected and presented to the administration and the residents of the village. The project of the city valorization in Feldkirch, Austria, was also selected and presented to the authorities in the city hall. Two projects are minimalistic «life» studies design: the house in the forest and the house near the lake. Another selected design proposal is on a different scale and is the project for a commercial center. The Signèse vine-center, at the first phase, is an implantation study. In the portfolio, the model of the site is presented. Other models are also
50
included: urban installation model made from vax, interior and exterior housing models in different scales.
51
COUPE 1:200
List of figures 1. House near the lake - view 2. House near the lake - construction model 3. Urban intervention - vax model 4. Artist gallery housing - model
5
5. Fanum valorization - information walk 6. Fanum valorization - information walk 7. Model - private house 8. Implantation model in Signèse (VS) 9. Safari observation tower 10. Model - private residence 11. Model - private residence
1
6 VUE INTERIEUR/ EXTERIEUR
12. Russian mountain - construction model 13. Multifunctional commercial center 14. Lampe 39 15. TV platform material 16. The nest 17. Urban valorization in Feldkirch (A) 18. House in the forest - minimal leaving
2
3
7
4
8
52
9
10
VUE INTERIEUR/ EXTERIEUR 17
13
11
12
15
14
16
53
18
S k l V