The site is low lying with black cotton soil. Like most part of the region, monsoon rain will cause flooding, so to protect the guest all buildings are 1 build at a podium which is 1 meter above ground level. The podium is also use for the storage of water and for services to run though. Concrete is the main material used in the project, one of the reason for choosing this material is because there is good supplies .
School: University of Adelaide
2
Precedent Study
Ground floor plan
1
1. Parking Guests 2. Temporary Parking 3. W.C. 4. Reception 5. Hotel Office 6. Meeting Room (Above) 7. Landscape Workshop 8. Spa & Fitness 9. Swimming Pool 10. F&B
Circulation
1
1
11. Kitchen 12. Storage 13. Employee Cafeteria 14. Lockers 15. Staff Parking 16. Bar-Lounge 17. Shop 18. Exclusive elevator for V.I.P. 19. Main Guest Rooms building
+
+
Waste water and clean water be treated at this building. The storage of these water would be at the podium level
+
+
+
= The Majority of guest would coming to this hotel going to these historical site surrounding the hotel. So I have been looking at the traditional temples and the how local hotels are design.
Design Brief To design a Four-star, international class boutique hotel (40 rooms/ 80-100 Guests) for a regional centre of tourism and religious pilgrimage at a small town call Ilkal in southern India.
Tutor: Pragathi Sridhar
Year:2015
Application No.: 15330731
Project 7
Generic Urban Building
Application No.: 15330731
Generic Urban Building
Columns used at the Barcelona pavilion
Section A.A
Project Brief
I wanted to design a building which are long lasting and able to withstand against time. This is why concrete is chosen as the main material, the solid- The building must be capable to change its use from working to living ity of the material is to demonstrate its pleasant. The rhythm on the facade is define by the program inside, just like ripples on the river which is define without major change to structure and facade by the movements around the water. Finally the interesting contrast between - The building must include a range of different sizes of dwelling space. the building I designed in my site and the building outside the boundary line hopefully could be maintained, the contrast between old and new, little and - The building must have a public use. tall, is the true fabric of how this little community works. - The manifesto would be the foundation of the design process. - The building must be able to used for both working and living.
1:5 concrete columns model The Columns than adjusted was made and found out the and also enable windows to middle part is too thin. echo the river.
Residential
Office
Exhibition
Ground floor gallery
School: Kingston University
Tutor: Jonathan Woolf
First floor atrium space
Year:2012
Typical courtyard building
Application No.: 15330731
Removed and replace
Multifunction
Facade Responds to the river
Project 5
Generic Urban Building
Application No.: 15330731
Early Development 1
2
3
4
1-4 Early massing development in search of the massing that would function well and maximize sunlight in to the building 5
6
7
1 1. Ground floor Exibition Plaza 2. Third floor residential deck
7 1:50 Facade model to test ideas.
5-6 1:200 Structural model to test early ideas.
Typical flats
1 Bed studio flat Total 16 flats
2 Beds flat Total 12 flats
Gross area: 70 m2 Net area: 68 m2
Gross area: 100 m2 Net area: 95 m2
Duplex flats
Lower floor
Lower floor 2 Beds Duplex flat Total 16 flats
3 Beds duplex flat Total 6 flats
Gross area: 140 m2 Net area: 126 m2
Gross area: 200 m2 Net area: 175 m2
0 3 6 9 15
Office
Residential
School: Kingston University
Exhibition
Ground floor plan
Tutor: Jonathan Woolf
First floor plan
Second floor plan
Year:2012
2
Third floor plan
Application No.: 15330731
Forth floor plan
Upper floor
Upper floor
Project 5
Generic Urban Building (Master Planning)
Application No.: 15330731
Sketch Of Final Masterplan
Project Brief Our site is located at Newham East London, it is very close to the 2012 Olympic Park. Our task was to choice an area within the site to develop and the development should have a good diversity of uses.
OLD
NEW
Light industrial School & Public building
Commercial Residential
Proposed Masterplan
B.L
This section drawing is to show the relationship of the site and its context. It compares the residential area inside the site and the newly build residential area outside the site, although most of the buildings in this section are all residential buildings, there are still a strong contracts in terms of building height and building mass with the majority of buildings in our site at 2 to 3 storeys high, this create a strong contrasts when you see on the other side of the Green way we see a 41 storeys high residential buildings reaching up to 139 meters.
OLD NEW
1
2
We found the relationship between the river and the buildings on the north east side quite interesting. We tried different forms.
On our second revision master plan we reduce the variety of forms used within the site.
Final The ideas at revision 3 is than developed to this ďŹ nal design.
Revision 3 Mass design by Alex Mass design by other team member
Section A.A
School: Kingston University
Tutor: Jonathan Woolf
Year:2011
Application No.: 15330731
Project 4
Room of it’s own
Application No.: 15330731 Project Brief PROJECT 3
Design Solution
The Project was located at Old Kent Road, South East London. A historic Roman road which ran from Dover (South East England) to Holyhead (West Wales). The task was to find a place at Old Kent Road to build a room which able to accommodate your self and the room could not be larger than 25 square metres.
Light Weight Structure
Toilet
PROJECT 2
I have chosen to build on top of a supermarket name ASDA, the reason been is because I felt the location is well located with plenty of shops around and a good transport links it also used up free spaces with in the city, which I think was a good idea at the time. As I started to develop my idea, I felt there was an opportunity to build a series of rooms similar to this room so others could enjoy the spaces on top of a supermarket. The other benefits of building in a higher density, is to increase its energy efficiency and use up the heat which escapes from the large roof top of the existing building. The material used for this room would be similar to the material used on the supermarket, which is a light weight steel structure with steel and glass panels. The reason for this approach is to keep the overall language of the existing building.
Study Area 25 square meters space
Existing
Proposal 01
Proposal 02
Massive surface area for green space Supermarket Circulation
Why this site?
South render
School: Kingston University
Tutor: Aoife Donnelly
Year:2011
Application No.: 15330731
My Room
There is a lot of space left !!!
More Rooms
So more people could enjoy it
Project 2
St Mary’s Secret Garden
Application No.: 15330731
3
1
Activities Room
2
3
Office
2
1
Changing area
Interior view of shop and changing rooms
Shop
Project Brief
Design Solution
The Project was located in Hackney, London. The Garden was run by charities and other nonprofit organisations. As the garden grew in popularity, more spaces are needed in order to provide projects including horticultural education, therapeutical sessions and other services for students and the community.
To allow the Garden to run more efficiently. I designed two sperate building to handle different services. The Garden shop would be located at north east end of the garden this allow shoppers to have an easy access from the main road, and also give visitors a good view into the garden, students could also prepare themselves. The second building would be where most activities could be held, it allows students to enjoy preparing plants and other horticultural activities.
Existing
Tutor: Joanna Bailey
Proposal
Storage
Ground floor: activities room First floor Green house
School: Kingston University
Greenhouse
Year:2010
The problem with the existing building is victors often missed the shop and the garden office, therefor people often don’t understand what is the garden for.
Application No.: 15330731
I have relocate the shop changing room and the office , at the front of the garden. So victors could be attracted from the street and they could first learn about Office, changing the garden before they room, shop, Learning centre enters.
Learning centre / Greenhouse Greenhouse Storage
Changing room, shop and office
Project 1
Women Refuge
Application No.: 15330731
Section B.B
Section B.B
Section A.A
1:20 Model of stair case
Design Solution Project Brief
The building would provided a place for women who are hurt by domestic This Project was also located violence. The refuge would give them at Old Kent Road, the brief was and their children’s a place to heal and to build a women refuge for the also to learn new skills. This is why I have community, it would be a short located the cafe and a laundry shop at the term home for those women who ground floor. Rooms and backup house are in need of a shelter, or just for the shops below are located at the first wanted times away from home. and second floor. The kitchens and the This would be the place where backup house is not on the ground floor women in the neighbourhood is because I wanted new comers could could gather and share their learn from the more experience house problems. mates, creating an atmosphere of a home. A home that would allow them to heal and to learn new skills so hopefully they could have a speedy recovery and return to the community.
South Elevation
1:20 Model of stair case
School: Kingston University
Tutor: Aoife Donnelly
Common Room
Year:2011
Site
Application No.: 15330731
Green space, Access & Set back
Blend in
Project 3
Women Refuge
Application No.: 15330731
1 6
2
3 4
7
4
5
5
1
2
1
2
3rd Floor plan
Legends 1. One Bed Room 2. Three Bed’s Room
8
1
Development model
1
2
2
1
2
2
3
4
5
1
Ground floor plan
Legends 1. Laundry Service Desk 2. Laundry Storage 3. Constatation Room 4. Boiler and E&M
5. Office (Managers) 6. Cafe 7. General Office 8. Function Room
B
2F
1
A-Women who needs help would start of in the consultation room which is more private
BCDE- New comers would stay in the second floor which is more private and as they recover, they could come out and enjoy the living room and able to look at how others are recovering.
GH- As she recovers she can
learn new skills and get ready to return to the society
School: Kingston University
E 1F
GF
1
C
D
F A
H G
Legends 1. One Bed Room 2. Two Bed’s Room 3. Kitchen
Consultation
A
Solitary
Tutor: Aoife Donnelly
6
2nd Floor plan
4. Laundry Room 5. Dinning Room 6. Common Room
Living
B,C,D,E
Learning
F,G,H
Community
Year:2011
1:100 model: A curved facade was used to respond to the busy cross-road, as I see the road as a flowing river and the building as a pebble in this river breaking waves. This pebble would act as a sanctuary for the women’s who need help. This is also the reason why there is a stream of water surrounding the building. However this was than later developed as I don’t want the building to stand out from the surrounding.
Application No.: 15330731
1:50 Typical room
1:100 2nd floor Interior
1:100 Exterior
1:500 Site Model
Project 3
New World Linghan Zone 5
Restaurant Design Option 1
Application No.: 15330731
Sports Centre
Commercial
Hotel
Design Brief
Concept
The New World Linghan Zone 5, is a multifunction community centre at the northern part of Guangzhou with a site area of more than 100,000 Sq.m. Facilities include: appox 18,000 Sq.m. Of sport & Community health Centre; Approx 6000 sq.m. of 5-Star Hotel & appox 4000sq.m. Restaurant area.
Sports Centre
Commercial
Concept Hotel
Interlocking mass
Restaurants
Restaurants
Circulation V.I.P.
Two material
Company: P&T Architects
Project Architect: Tong Cho Hau
Year:2012
Application No.: 15330731
Two function
Large windows allow best views, Fins are used to reduces excess sunlight.
Project 6
New World Linghan Zone 5 (Restaurant)
Restaurant Design Option 2
Application No.: 15330731
Design Solution
In the design of the facade of the restaurant a series of balconies are used to give users to enjoy the indoor and outdoor spaces. Wooden fins are than used to warp around the building to reduce the amount of sunlight in to the building.
1
1
2
2
1
6
7
3
4
5
First floor plan
Ground floor plan
Company: P&T Architects
1. Lobby 2. V.I.P. 3. English Restaurant 4. Cafe
5. Kitchen 6. Chinese Restaurant 7. Banquet Room
V.I.P.
Circulation
Cafe
Restaurant
Project Architect: Tong Cho Hau
Second floor plan
Setting back and offsetting some part of the building to allow better view and spatial experience.
Year:2013
Underground passage to the rest of the site
Application No.: 15330731
Project 6
Application No.: 15330731
New World Hotel Location: Guangzhou GFA : 60700 M2 Building Height: 60 M I am involved with the design and development of the hotel, during the 2.5 years I worked in P&T.
Grand Court Location: Hong Kong GFA : 14200 M2 Building Height: 28 M During the years at P&T I also worked closely with the design development of this residential project. Some of my sketches are used to develop the canopy for the club house entrance.
Company: P&T Architects
Project Architect: Tong Cho Hau
Year:2012-2015