Boutique Hotel (Preliminary design)

Application No.: 15330731

19

19 17

18 16

7

8

17

18 16

9

10

11 12 13 14

15

7

8

9

10

4

5

11 12 13 14

15

6 3

4

3

5

2

The site is low lying with black cotton soil. Like most part of the region, monsoon rain will cause flooding, so to protect the guest all buildings are 1 build at a podium which is 1 meter above ground level. The podium is also use for the storage of water and for services to run though. Concrete is the main material used in the project, one of the reason for choosing this material is because there is good supplies .

School: University of Adelaide

2

Precedent Study

Ground floor plan

1

1. Parking Guests 2. Temporary Parking 3. W.C. 4. Reception 5. Hotel Office 6. Meeting Room (Above) 7. Landscape Workshop 8. Spa & Fitness 9. Swimming Pool 10. F&B

Circulation

1

1

11. Kitchen 12. Storage 13. Employee Cafeteria 14. Lockers 15. Staff Parking 16. Bar-Lounge 17. Shop 18. Exclusive elevator for V.I.P. 19. Main Guest Rooms building

+

+

Waste water and clean water be treated at this building. The storage of these water would be at the podium level

+

+

+

= The Majority of guest would coming to this hotel going to these historical site surrounding the hotel. So I have been looking at the traditional temples and the how local hotels are design.

Design Brief To design a Four-star, international class boutique hotel (40 rooms/ 80-100 Guests) for a regional centre of tourism and religious pilgrimage at a small town call Ilkal in southern India.

Tutor: Pragathi Sridhar

Year:2015

Application No.: 15330731

Project 7


Generic Urban Building

Application No.: 15330731

Generic Urban Building

Columns used at the Barcelona pavilion

Section A.A

Project Brief

I wanted to design a building which are long lasting and able to withstand against time. This is why concrete is chosen as the main material, the solid- The building must be capable to change its use from working to living ity of the material is to demonstrate its pleasant. The rhythm on the facade is define by the program inside, just like ripples on the river which is define without major change to structure and facade by the movements around the water. Finally the interesting contrast between - The building must include a range of different sizes of dwelling space. the building I designed in my site and the building outside the boundary line hopefully could be maintained, the contrast between old and new, little and - The building must have a public use. tall, is the true fabric of how this little community works. - The manifesto would be the foundation of the design process. - The building must be able to used for both working and living.

1:5 concrete columns model The Columns than adjusted was made and found out the and also enable windows to middle part is too thin. echo the river.

Residential

Office

Exhibition

Ground floor gallery

School: Kingston University

Tutor: Jonathan Woolf

First floor atrium space

Year:2012

Typical courtyard building

Application No.: 15330731

Removed and replace

Multifunction

Facade Responds to the river

Project 5


Generic Urban Building

Application No.: 15330731

Early Development 1

2

3

4

1-4 Early massing development in search of the massing that would function well and maximize sunlight in to the building 5

6

7

1 1. Ground floor Exibition Plaza 2. Third floor residential deck

7 1:50 Facade model to test ideas.

5-6 1:200 Structural model to test early ideas.

Typical flats

1 Bed studio flat Total 16 flats

2 Beds flat Total 12 flats

Gross area: 70 m2 Net area: 68 m2

Gross area: 100 m2 Net area: 95 m2

Duplex flats

Lower floor

Lower floor 2 Beds Duplex flat Total 16 flats

3 Beds duplex flat Total 6 flats

Gross area: 140 m2 Net area: 126 m2

Gross area: 200 m2 Net area: 175 m2

0 3 6 9 15

Office

Residential

School: Kingston University

Exhibition

Ground floor plan

Tutor: Jonathan Woolf

First floor plan

Second floor plan

Year:2012

2

Third floor plan

Application No.: 15330731

Forth floor plan

Upper floor

Upper floor

Project 5


Generic Urban Building (Master Planning)

Application No.: 15330731

Sketch Of Final Masterplan

Project Brief Our site is located at Newham East London, it is very close to the 2012 Olympic Park. Our task was to choice an area within the site to develop and the development should have a good diversity of uses.

OLD

NEW

Light industrial School & Public building

Commercial Residential

Proposed Masterplan

B.L

This section drawing is to show the relationship of the site and its context. It compares the residential area inside the site and the newly build residential area outside the site, although most of the buildings in this section are all residential buildings, there are still a strong contracts in terms of building height and building mass with the majority of buildings in our site at 2 to 3 storeys high, this create a strong contrasts when you see on the other side of the Green way we see a 41 storeys high residential buildings reaching up to 139 meters.

OLD NEW

1

2

We found the relationship between the river and the buildings on the north east side quite interesting. We tried different forms.

On our second revision master plan we reduce the variety of forms used within the site.

Final The ideas at revision 3 is than developed to this ďŹ nal design.

Revision 3 Mass design by Alex Mass design by other team member

Section A.A

School: Kingston University

Tutor: Jonathan Woolf

Year:2011

Application No.: 15330731

Project 4


Room of it’s own

Application No.: 15330731 Project Brief PROJECT 3

Design Solution

The Project was located at Old Kent Road, South East London. A historic Roman road which ran from Dover (South East England) to Holyhead (West Wales). The task was to find a place at Old Kent Road to build a room which able to accommodate your self and the room could not be larger than 25 square metres.

Light Weight Structure

Toilet

PROJECT 2

I have chosen to build on top of a supermarket name ASDA, the reason been is because I felt the location is well located with plenty of shops around and a good transport links it also used up free spaces with in the city, which I think was a good idea at the time. As I started to develop my idea, I felt there was an opportunity to build a series of rooms similar to this room so others could enjoy the spaces on top of a supermarket. The other benefits of building in a higher density, is to increase its energy efficiency and use up the heat which escapes from the large roof top of the existing building. The material used for this room would be similar to the material used on the supermarket, which is a light weight steel structure with steel and glass panels. The reason for this approach is to keep the overall language of the existing building.

Study Area 25 square meters space

Existing

Proposal 01

Proposal 02

Massive surface area for green space Supermarket Circulation

Why this site?

South render

School: Kingston University

Tutor: Aoife Donnelly

Year:2011

Application No.: 15330731

My Room

There is a lot of space left !!!

More Rooms

So more people could enjoy it

Project 2


St Mary’s Secret Garden

Application No.: 15330731

3

1

Activities Room

2

3

Office

2

1

Changing area

Interior view of shop and changing rooms

Shop

Project Brief

Design Solution

The Project was located in Hackney, London. The Garden was run by charities and other nonprofit organisations. As the garden grew in popularity, more spaces are needed in order to provide projects including horticultural education, therapeutical sessions and other services for students and the community.

To allow the Garden to run more efficiently. I designed two sperate building to handle different services. The Garden shop would be located at north east end of the garden this allow shoppers to have an easy access from the main road, and also give visitors a good view into the garden, students could also prepare themselves. The second building would be where most activities could be held, it allows students to enjoy preparing plants and other horticultural activities.

Existing

Tutor: Joanna Bailey

Proposal

Storage

Ground floor: activities room First floor Green house

School: Kingston University

Greenhouse

Year:2010

The problem with the existing building is victors often missed the shop and the garden office, therefor people often don’t understand what is the garden for.

Application No.: 15330731

I have relocate the shop changing room and the office , at the front of the garden. So victors could be attracted from the street and they could first learn about Office, changing the garden before they room, shop, Learning centre enters.

Learning centre / Greenhouse Greenhouse Storage

Changing room, shop and office

Project 1


Women Refuge

Application No.: 15330731

Section B.B

Section B.B

Section A.A

1:20 Model of stair case

Design Solution Project Brief

The building would provided a place for women who are hurt by domestic This Project was also located violence. The refuge would give them at Old Kent Road, the brief was and their children’s a place to heal and to build a women refuge for the also to learn new skills. This is why I have community, it would be a short located the cafe and a laundry shop at the term home for those women who ground floor. Rooms and backup house are in need of a shelter, or just for the shops below are located at the first wanted times away from home. and second floor. The kitchens and the This would be the place where backup house is not on the ground floor women in the neighbourhood is because I wanted new comers could could gather and share their learn from the more experience house problems. mates, creating an atmosphere of a home. A home that would allow them to heal and to learn new skills so hopefully they could have a speedy recovery and return to the community.

South Elevation

1:20 Model of stair case

School: Kingston University

Tutor: Aoife Donnelly

Common Room

Year:2011

Site

Application No.: 15330731

Green space, Access & Set back

Blend in

Project 3


Women Refuge

Application No.: 15330731

1 6

2

3 4

7

4

5

5

1

2

1

2

3rd Floor plan

Legends 1. One Bed Room 2. Three Bed’s Room

8

1

Development model

1

2

2

1

2

2

3

4

5

1

Ground floor plan

Legends 1. Laundry Service Desk 2. Laundry Storage 3. Constatation Room 4. Boiler and E&M

5. Office (Managers) 6. Cafe 7. General Office 8. Function Room

B

2F

1

A-Women who needs help would start of in the consultation room which is more private

BCDE- New comers would stay in the second floor which is more private and as they recover, they could come out and enjoy the living room and able to look at how others are recovering.

GH- As she recovers she can

learn new skills and get ready to return to the society

School: Kingston University

E 1F

GF

1

C

D

F A

H G

Legends 1. One Bed Room 2. Two Bed’s Room 3. Kitchen

Consultation

A

Solitary

Tutor: Aoife Donnelly

6

2nd Floor plan

4. Laundry Room 5. Dinning Room 6. Common Room

Living

B,C,D,E

Learning

F,G,H

Community

Year:2011

1:100 model: A curved facade was used to respond to the busy cross-road, as I see the road as a flowing river and the building as a pebble in this river breaking waves. This pebble would act as a sanctuary for the women’s who need help. This is also the reason why there is a stream of water surrounding the building. However this was than later developed as I don’t want the building to stand out from the surrounding.

Application No.: 15330731

1:50 Typical room

1:100 2nd floor Interior

1:100 Exterior

1:500 Site Model

Project 3


New World Linghan Zone 5

Restaurant Design Option 1

Application No.: 15330731

Sports Centre

Commercial

Hotel

Design Brief

Concept

The New World Linghan Zone 5, is a multifunction community centre at the northern part of Guangzhou with a site area of more than 100,000 Sq.m. Facilities include: appox 18,000 Sq.m. Of sport & Community health Centre; Approx 6000 sq.m. of 5-Star Hotel & appox 4000sq.m. Restaurant area.

Sports Centre

Commercial

Concept Hotel

Interlocking mass

Restaurants

Restaurants

Circulation V.I.P.

Two material

Company: P&T Architects

Project Architect: Tong Cho Hau

Year:2012

Application No.: 15330731

Two function

Large windows allow best views, Fins are used to reduces excess sunlight.

Project 6


New World Linghan Zone 5 (Restaurant)

Restaurant Design Option 2

Application No.: 15330731

Design Solution

In the design of the facade of the restaurant a series of balconies are used to give users to enjoy the indoor and outdoor spaces. Wooden fins are than used to warp around the building to reduce the amount of sunlight in to the building.

1

1

2

2

1

6

7

3

4

5

First floor plan

Ground floor plan

Company: P&T Architects

1. Lobby 2. V.I.P. 3. English Restaurant 4. Cafe

5. Kitchen 6. Chinese Restaurant 7. Banquet Room

V.I.P.

Circulation

Cafe

Restaurant

Project Architect: Tong Cho Hau

Second floor plan

Setting back and offsetting some part of the building to allow better view and spatial experience.

Year:2013

Underground passage to the rest of the site

Application No.: 15330731

Project 6


Application No.: 15330731

New World Hotel Location: Guangzhou GFA : 60700 M2 Building Height: 60 M I am involved with the design and development of the hotel, during the 2.5 years I worked in P&T.

Grand Court Location: Hong Kong GFA : 14200 M2 Building Height: 28 M During the years at P&T I also worked closely with the design development of this residential project. Some of my sketches are used to develop the canopy for the club house entrance.

Company: P&T Architects

Project Architect: Tong Cho Hau

Year:2012-2015


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.