ATTRACTIVITE SUITABILITY
The hotel was built not facing residents' houses so that activities in the hotel are maintained privacy. Development must not disturb the surrounding conditions so that occupants do not need excessive adaptation to the existence of a new building
ARCHITECTURE STUDIO 5 // 2020 PROJECT#1 led erthasè 4-STAR HOTEL ISSUE
SHAPE CONCEPT
LEGO
Legoisakindofsmallplasticblock game tool originating from Denmark which is world famous, especially among children or adolescents regardless of gender These and other pieces can be assembledintoanyshape.
CONCEPT APPROACH
Implementation
Lego piles are like a multistorey building
The stack of legos is reversed so that the stacks are getting smaller and smaller
The word lego comes from the Danish language,led godtwhich means to play well. However,inLatin,thewordlegomeans"Iassemble"or"Iassemble".Legogameshave good benefits, especially in increasing one's creativity. Someone who plays lego is challengedtothinkabouthowtomakeshapesthatareappropriateandinterestingbutstill funtoplaywith.
Play Well Arrange Creativity
Appropriate and attractive shape
GOALS
Assembling buildings creatively as well as appropriate and attractive
ATTRACTIVE SUITABILITY
SHAPE CONCEPT
ThesiteislocatedinSlemanRegency,SpecialRegionofYogyakarta. The Special Region of Yogyakarta (DIY) has many interesting things that characterize it. Starting from food, tourist attractions, culture, and others.The concept of this composition takes 3 characteristics from Yogyakartawhicharewellknowntothepublic,namelyMountMerapi, PrambananTemple,andBakpia.
From the shape of MountMerapi,thebasic shape is taken, namely atriangle
From the shape of Prambanan Temple, the basic shape is taken,namelyasquare
From the shape of Bakpia,thebasicshape istaken,namelyacircle
Concept Amalgamation +
Combining the concept of the basicformofDIYcharacteristics withthelegoconcept
The mass composition will contain 3 basic shapes, namely triangles, squares and circles which can d e s c r i b e t h e 3 characteristics of the Special Region of Yogyakarta.
Thewordlegocomes from the Danish language,ledgodt
InJavanese: Circle:bunder
Square:kothak
Triangle:segitelu
led erthasè
ARCHITECTURE STUDIO 5 // 2020 PROJECT#1 led erthasè 4-STAR HOTEL
ARCHITECTURE STUDIO 5 // 2020
Masscompositionhasagapinthemiddleofthebuildingwhichaimsto allowsunlighttospreadintothebuilding.Inaddition,aircanalsoflow throughoutthebuildingandintoneighboringbuildings.Thedifference intheareaofthebuildingthatisgettingsmallerandhigheralsoaimsto improveaircirculation.
Implementation led erthasè
The led erthasè concept can respond to the considerations
that exist in the preparation of mass compositions
Floor Concept
1stfloor(Podium)
On this floor, the focus is on arranging public spaces so they are easily visible and accessibletovisitors.Theshapeofthisflooris a1/4circlerespondingtotheshapeofthesite.
Floors2-4
On this floor, the focus is on arranging public/semi-private spaces in the form of ballrooms and amusements which require a large enough building area. Consists of 2 rectanglesarrangedtoformtheletterLsothat thebuildingissufficientforalargeroom.
Floors5-6
On this floor, the focus is on semi-private spatial arrangement. The area of the building begantodecreaseduetolessandlessspace requirements. The shape remains the same, butintheconnectingpart(middle)thebuilding ismadeintoabridge.
Floors7-10
On this floor, the focus is on arranging private spacesintheformofguestrooms.Thehigher it contains rooms with a higher class. Guests can more freely enjoy the view around the building because it is located on a high floor Floors 8-10 only consist of 1 quadrilateral on the left so that the building on the right side does not hold a heavy load and also requires lessspace.
PROJECT#1 led erthasè 4-STAR HOTEL
Thepodiumfloorisatriangularshapewithmodifications tofollowtheshapeofthesite
Amodified4-sidedshapebycuttingononeside
Thelowerfloorshavecurvedcornersat90
SITE PLAN
ARCHITECTURE STUDIO 5 // 2020 PROJECT#1 led erthasè 4-STAR HOTEL 2nd Basement 1st Basement 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6-7th Floor 8th Floor 9th Floor 10th floor Rooftop FLOOR PLAN
ELEVATION
ISOMETRIC STRUCTURE
There are 3 cores in this build. Core wall or core wall is a linear supportingwallsystemthatisquitesuitableforhigh-risebuildings thatcanwithstandthelateralforcesthatoccurinthebuilding.Core walls in this building are used in constructions such as elevator rooms,shafts,serviceducts,andstairs.
ARCHITECTURE STUDIO 5 // 2020 PROJECT#1 led erthasè 4-STAR HOTEL
SECTION A-A SECTION B-B
East Elevation
South Elevation
North Elevation
West Elevation
Core 1
Core 2
Core 3
MATRIAL SELECTION EXTERIOR WALL
Exterior wall material uses an insulated wall with a UValue of 0.18 W/m2K which is finished with white wall paint with an albedo value of 0.5 - 0.9 which is a high numbersothatmoreandmorereflectedradiation
ROOF
The roofing material uses non-concrete with a U-Value of 0.25 W/m2K.The roof is then finished using a leak-proof coating thatisresistanttosunlightandanti-fungal.
SHADING
ShadingusesAluminumCompositePanel (ACP)materialwithabrownwoodpattern
INTERIOR WALL
Exterior wall paint using the Brilliant White color from the Dulux Wheatershield Powerflexx brand specifically for the exterior walls
Interiorwallmaterialusesgypsumboardpartitions.Theuseofpartitions isintendedtoreducetheloadonthesubstructure
Advantages:
-Practicalinstallation
-Reduceheat
-Environmentallyfriendly
-Easymaintenance
-Lightweightandflexible
ENERGY SAVING PLANNING
Disadvantages:
- Not able to withstand heavyloads
-Sensitivetoimpact
- Maintenance should be doneperiodically
FLOOR
The floor material uses ceramic with a UValueof0.13W/m2K.
Granito|PalazzoMirorMonza 600x600
HVAC PLANNING
LED LAMP CENSOR SYSTEM POOL VAV
MATERIAL SELECTION
Variable air volume (VAV) systems supply air at variable temperature from an air handling unit (AHU). AHU draws fresh air and return air from inside the building and heats or cools it before it reaches the space it is occupied. Within each chamber, the amount of air is adjusted to control the room temperature using a VAV terminal, whichmayalsohavesomelocalheatingcapacity.
Advantages:
-Flatandsmoothsurface
-Easyapplication
-Highdurability
-Easytoshape
GLASS
Theglassusesdouble glass with Low-E & Argon with a U-Value of 1.67 W/m2K. In addition to reducing energy use, the use of glass does not block natural light from enteringthebuilding.
STUDIO 5 // 2020 PROJECT#1 led erthasè 4-STAR HOTEL
ARCHITECTURE
VOLUME UDARA VARIABEL(VAV)
BACKGROUND
Children aged 4 to 10 years are at their golden age. At that time, children experiencerapidgrowthanddevelopmentsothatchildrenaremostsensitive andhavethepotentialtolearnsomethingbecausetheircuriosityisverygreat. In Yogyakarta itself, as a Student City, it certainly tries to improve children's education through learning at school. However, when children study at school,theyhavelimitedtimeandspacetoexploretheirindividualinterests. At school they are focused on formal education, so non-formal education is onlyanadditionallesson.
The children's creativity development center located in Yogyakarta is considered to be able to help children's activities to freely develop their creativity and learn to socialize. This development center aims to be able to providenewexperiencesandlearningforchildrenandinvitethemtoactively gettoknowtheirsurroundings.
ISSUE
Children's creativity is less noticed
Delinquency in children carried over to teenager
Lack of adequate facilities as a place for children to study
Parents do not understand how to help children to be creative
ARCHITECTURE STUDIO 6 // 2021 PROJECT#2 KUBè Children’s Creativity Development Center
LOCATION AREA 16.200 sqm KDB 60% 60% x 16.200 sqm = 9.720 sqm
3.6 3.6 x 9.720 sqm = 34.992 sqm
min 20% 20% x 16.200 sqm = 3.240 sqm
KLB
KDH
Jl.Kaliwaru,Kaliwaru,Condongcatur, Kec Depok, Kabupaten Sleman, DaerahIstimewaYogyakarta
10
ARCHITECTURE STUDIO 6 // 2021
DESIGN CONCEPT
Design approach: Child Characteristics
Theselectedcharacteristicswillbedevelopedinthebuildingdesignconceptsothatitcan be properly implemented in buildings. These 6 characteristics will be applied both to the shapeofthebuilding,thelayoutofthebuilding,thelayoutofthesite,aswellastheselection ofbuildingcolorsandfurniture.theapplicationofcharacteristicstobuildingsisconsidered important in order to create comfort and satisfaction for children when doing activities in buildingsoroutsidebuildings.
Active
Free & Creative
Brave
High Curiosity
Expressive
Cheerful
MASSING CONCEPT
Buildings are designed with bold shapes (not monotonous) with free or flexible spatial planning to addressactiveandcuriouschildren'sbehavior
Thechoiceofcheerfulandexpressivecolorswillbemore suitableforchildrentoenjoy
MetaphorApproach: Rubik’sCube
The Rubik's Cube is a mechanical puzzle game invented in 1974 by the Hungariansculptorandprofessorofarchitecture,ErnőRubik.Thecubeis madeofplasticandconsistsof27smallpartswhichrotateonavisibleaxis.
Implementation
A3x3 cube-shaped Rubik is likened to a 3-storey building
Mass Composition Transformation
A3x3 cube-shaped Rubik is likened to a 3-storey building
The rubik's cube is subtracted so that it is no longer in the shape of a cube
Mass Composition Transformation
For the concept approach, the rubik is rotated so that there is a shift in shape
PROJECT
#2 KUBè Children’s Creativity Development Center
Some parts of the cube are subtracted again, causing a forward and backward rhythm
Inspired by the shape of a hand holding a rubik's cube
Both hands are likened to touching the top of the rubik's cube
For a better transformation, the hands are reversed
The final form is the combination of the Rubik's concept on the building and the hand concept on the roof
ARCHITECTURE STUDIO 6 // 2021
Development
SITE PLAN 1ST FLOORPLAN MAIN BUILDING 2ND FLOORPLAN MAIN BUILDING 3RD FLOORPLAN MAIN BUILDING
PROJECT#2 KUBè Children’s Creativity
Center
PERSPECTIVE
MAIN BUILDING ELEVATION
ARCHITECTURE STUDIO 6 // 2021 PROJECT#2 KUBè
Children’s Creativity Development Center
SECTION B-B MAIN BUILDING
SECTION A-A MAIN BUILDING
East Elevation West Elevation North Elevation South Elevation
BACKGROUND
ThemaindealerprojectofPTAstraInternationalTbk-AstraMotorSamarindabranch was built because the existing Astra Motor office in Samarinda City has not met the requirements of the newAstra Office. Therefore, it is necessary to build a new office withasizeandfacilitiesthataremorecompleteandlargerthantheexistingoffice.Astra InternationalTbk-AstraMotorSamarindabranchisamaindealerthataccommodates motorcycle showrooms, motorcycle services, offices, and other supporting buildings suchascafes.ThedesignofthisnewofficeprojectisaFlagshiptypeofficedesign,but theBigWingtypedesignhasalsobeenpreparedforfurtherdevelopment.Oneofthe requirementsoftheFlagshipcategoryisthepresenceofacafé.Inaddition,theservice facilitiesofferedarealsomoreexclusiveandtheequipmentismorecomplete.
PRACTICALWORK // 2021 PROJECT#4 Pitstop Café Honda Sales Motor Samarinda 14
FLOOR PLAN
PRACTICALWORK // 2021
CONCEPT
Thevintageconceptthatisnowingreatdemandwaschosenastheconceptofthiscafe.Determinationofthisconceptinadditiontofollowingthecurrentcafetrend,italsoadaptstothe mainbuildingoftheAstraMotormaindealersothatthereisstillcontinuitybetweenbuildings.
FURNITURE CONCEPT
T o m e e t t h e n e e d s o f c ons u m e r s o r v i s i t o r s , t h e a rr a ng e m e nt o f f ur nitur e ca n be a rr a ng ed f o r in divid ual o r gr o up/m ee ting a ctivitie s. E a ch t able will be equipped with a po w e r o utle t tha t f a cilit a te s co nfigur a tio n cha ng e s.
AMBIANCE CONCEPT ZONING CONCEPT
T he am b i an c e i n t he c af e suc h as t he selectio n o f ma te rial colo r s, t e xtur e s, a n d a t m o s ph e r e in-lin e with th e a mbia n ce o f th e main b uilding giv e s th e im p r e s sio n o f unity. This d e sign use s 3 main colo r s:
Z o ning in th e ca f é is divid ed int o 3 a r e a s: sit ting a r e a/w o rk s pa ce ( i n d o o r ) , s m o k i n g a r e a (o utdoo r), a n d pa nt ry a r e a. Th e dim e n sio n s o f th e th r ee a r e a s a r e a djus t ed t o th e n eed s a n d a v ailability o f s pa ce.
SittingArea / Workspace (Indoor)
SmokingArea (Outdoor)
Exterior
PROJECT#4 Pitstop Café Honda Sales Motor Samarinda
Source: Juklak Desain Added Value pada Dealer Big Wing
Source: Juklak Desain Added Value pada Dealer Big Wing
PROJECT
Jogja Park Teen-venture
Jogja TeenageAdventure Park
Jogja Teen-venture Park is a public space that becomes a means of channeling energy and emotions for teenagers through challenging game facilities and an educational park with a focus on arrangingoutdoorspacesinpublicopenspaces.The designofthisfacilityisbasedonthecharacteristicsof youth which is the approach in designing so as to create facilities that suit the needs of youth in Yogyakarta
Project Procurement Background
Alot of juvenile delinquency is happening again, such as drinking alcohol to street crime (klitih) whichoccursduetointernalandexternalfactors.
Lack of public facilities for educational spaces andplacesofexpressionforyouthtofilltheirfree time
Few open spaces for the public that can be enjoyedfreeofcharge
BACKGROUND
Background Issue
Jogja Teen-venture Park
designing Challenging as well as educational game facilities for teenagers
goal
Spaceforexpressioninchannelingenergyandemotions sothatteenagercanfocusonself-developmentactivities andawayfromjuveniledelinquency
FINALPROJECT// 2022
PROJECT#3 Jogja Teen-venture Park
16
FINALPROJECT// 2022
DESIGN EMPHASIS
Challenging Game Facilities
Designemphasisisappliedtogamefacilitiesdesignedtoprovideachallengeforteenager tochanneltheirenergyandemotionssothattheycanfindpositivewaystofindsatisfaction andself-identity
Outdoor Space Focused on the arrangement of outdoor space where the main facilityasthecenterofactivitiescarriedoutinthisareahasnatural boundariesonthefloorandwalls
LOCATION
Jl. Selokan Mataram 1, Kledokan, Caturtunggal, Kec. Depok, Kabupaten Sleman, Daerah IstimewaYogyakarta
Location selection was carried out by looking at the number of teenagers population (10-18 years) in Yogyakarta starting from districts, sub-districts, to urban village.
Thisisintendedsothattheessenceofpublic open space is more felt by visitors who come aswell ascloserhuman relations withnature itself
Floor Wall Ceiling
District Boundary Arterial Road Local Road Railroad River Site
Region Kabupaten Sleman Kecamatan Depok Kelurahan Caturtunggal Population 146.630 16.409 5.851 220m 114,3 m 118,7 m 220m 116,3m 233,5 m Marjinal School SMAN 1 Depok SMPN 4 Depok Close to several schools 38.750 sqm 20% 80% 0,5 5,5 m 3 m 6 m 5,5 m Area KDB KDH KLB GSB GSS Road Width Gutter Width RDTR RTH
PROJECT#3 Jogja Teen-venture Park
FINALPROJECT// 2022
MACRO CONCEPT
Issue
Juvenile Delinquency
Idea
Arrangement ofAreas Based onActivity
Design Problem
Lack of Public Space
Potency
Concept
Goals
Memayu Hayuning Bawana
Alternative OutdoorActivities Adrenaline-pumping Pleasure PositiveActivity Education
MEMAYU HAYUNING BAWANA
Human to Human Relationship
Providing commercial areas for community economic growth
Functional Interesting Up to Date Communication Interactions
Human to Nature Relationship
Provide a gathering area for community interaction
Arrange green open space as a place for interaction
Human to God Relationship
Maintain existing natural elements
BLOCKPLAN CONCEPT
Based on Emotional Energy Level (Source: David R. Hawkins, M.D., Ph.D. - Emotions + Emotions Neutral
Utilizing natural and local materials that are recycled
Taman Edukasi Permainan Menantang Area Service
The natura settng heps to calm negative emotionsandbringthemdowntoaneutrallevel
Circulation Flow Circulation Pattern: Linear
Pos tive and fun act vities can increase the emotional energy level topositive
Taman Edukasi Area Service
Neutral
Emotional energy that is already high can be neutralized to save energy in the body so it doesn'tdropdrasticallytoanegativelevel
Permainan Menantang dan Olahraga
The main circulation must pass through a l area zones start ng from the educational-service-challenging-gameservice-sportspark
Main Circulation Area Circulation
Thereisasmallcirculationin
areazoneforfurtherexploration
each
FeelTheTexture Listen Up! Fruit Garden OutboundArea Skatepark
Track & Soccer Field
Entrance Foodcourt Labyrinth Garden Flower Garden
Jogging
PROJECT#3 Jogja Teen-venture Park
PROJECT#3 Jogja Teen-venture Park
Foodcourt B Mushola C Staff Room D Entrance 2 3 1 4 5 6 7 8 9 10 A B 11 12 13 14 15 16 17 18 19 C D 21 D D 20 21 22 23 1 Security Post 2 Car Park 3 Motorcycle Parking 4 Bicycle Parking 5 Sight SenseArea A Entrance (Information Center) 6 Smell SenseArea B Staff Room C Mushola 7 Touch SenseArea 8 Hearing SenseArea 9 RestArea 10 GatheringArea 11 Taste SenseArea D Foodcourt &Toilet 12 OutboundArea 13 Warehouse 14 Flying Fox 15 Skatepark 16 RestArea 17 Open Field 18 Soccer Field 19 Tribune 20 Rinse & Change Room 21 22 Medical Room 23 Mechanical Electrical Room Labyrinth Instalation Assembly Point Description: Casuarinaceae Syzygium paniculatum Livistona saribus Dypsis lutescens Dialium indum Citrus x senesis Solanum lycopersicum Lavandula Lilium A A B B FRONT ELEVATION
SECTIONA-A SECTION B-B Touch SenseArea Foodcourt RestArea Mushola Information Center Tribune Security Post Foodcourt Mushola Information Center OutboundArea Skatepark Warehouse Foodcourt 0 25 50 100 200 0 25 50 100 200 0 25 50 100 200 0 25 50 100 200 SCAN HERE
FINALPROJECT A
REAR ELEVATION
PROJECT
n House AVid
Natural House Anti Covid
ISSUE
COVID-19 Pandemic
ISSUE
PROBLEM
POTENCY
Low-cost
Small space
Site located in busy area
Natural lighting
Natural air conditioning
BACKGROUND
Homeisoneofthebasichumanneedstoday Residentialhousesbesides functioningtoprotectthemselvesfromnaturealsofunctiontoincreasethe qualityoflifeasbuildingsingeneral.
Duringthispandemic,thehouseisthefirstandforemostplaceofrefugeto savethemselvesfromthecoronaviruspandemicthathasbeencirculating since the beginning of 2020. With social distancing regulations in place, peoplewhoworkandaresupportedareforcedtocarryouttheiractivities athome.Otheractivitiessuchasrecreation,exercise,andothersarealso forcedtobecarriedoutathome.Sohousesbuiltatthistimeneedtohave adesignthatisresponsivetothecurrentsituationsothattheoccupantsin it can take advantage of the function of the house as a place to rest effectively,andbeabletocarryoutactivitiesoptimally.
AREA 96 sqm 16 m x 6 m
KDB 80% 80% x 96 sqm = 75.8 sqm
KLB 1.5 1.5 x 76.8 sqm = 115.2 sqm
KDH min 10% 10% x 96 sqm = 9.6 sqm
LOCATION
SEPEKANARSITEKTUR 2021 // 2021
PROJECT#4 nAVid HOUSE (with Patricia Karenina)
20
Jl.TentaraPelajarNo.1,001,Bumijo, Kec. Jetis, Kota Yogyakarta, Daerah IstimewaYogyakarta55231
To respond to design issues, this house will use the concept of Ecological Architecture,whichisaconceptwiththemainorientationondevelopmentmodels that pay attention to the balance of the natural environment and the harmonious builtenvironmentbetweentheenvironment,humans,andbuildings. Navid House comes from the words natural, avid, and anti-covid, which aims to fighttheCOVID-19pandemicnaturallyandwithenthusiasm.Withthisecological concept,thehousewillbedesignedtoblendwithitsnaturalenvironment.Buildings willalsobedesignedbyutilizingnaturallightingandventilation,bothofwhichare requirementsforahealthyhome.Goodlightingandventilationarebelievedtobe able to reduce the spread of COVID-19 indoors. In addition, buildings are also provided with additional rooms that are able to support activities during this COVID-19 situation. This house will have a transitional area that can be used to clean up before entering the house, as well as a special work area that can accommodate activities during the mass rolling work-from-home and work-fromoffice.Theselectedfurnitureandmaterialsarealsomodern,natural,anddurable sothattheyareattractive,eye-catching,andareexpectedtobeabletogetridof boredom because they are only confined at home during this pandemic.The site willbegivenplantsinthefrontareatoreducenoiseandpollutionfromenteringthe building,aswellasforshading.
BUDGET PLAN
Thiscostestimateisaroughestimate,withoutaddingdetailedcalculationssuch as facade materials, floor coverings, roof trusses, metalwork, and many other works,sopricescanbehigher
SEPEKAN
ARSITEKTUR 2021 // 2021 CONCEPT
1ST FLOORPLAN
SECTIONA-A SECTION B-B
2ND FLOORPLAN
PROJECT#4 nAVid HOUSE (with Patricia Karenina)
EXTERIOR PERSPECTIVE
Light Brick
Light, fast, sound proof, water proof, strong against compressive forces so it is earthquake resistant
PROJECT#4 nAVid HOUSE (with Patricia Karenina)
INTERIOR PERSPECTIVE
Reinforced Concrete
Sturdy, resistant to compressive forces, easy to form, low maintenance, economical
MATERIALS & TECHNOLOGY
Cellulose
Is a recycle building material, lightweight, fire resistant and water resistant
Wood
Used on doors and windows, fences, and facades to respond to natural concepts
Bitumen
Durable, light weight, fireresistant, termite-resistant, mildew-resistant, anti-corrosion, good sound insulation
Wood
Used on doors and windows so that the house seems to blend with the inner area
SEPEKANARSITEKTUR 2021 // 2021 NORTH ELEVATION SOUTH ELEVATION EAST ELEVATION WEST ELEVATION
BEDROOM LIVING ROOM MAIN BEDROOM
MINI GARDEN & DRYING AREA
LAUNDRY AREA KITCHEN & DINING AREA
MINI GARDEN
MUD ROOM FAMILY ROOM
BACKGROUND
Theincreasingpopulationeveryyearhasanimpactonusefulareasbothinurban and rural areas, causing a reduction in the amount of land and rural areas. Increasinggrowthoftheincreasingnumberofhousesalsosothatinthefutureitis necessarytodesignanefficienthouseinordertosavebuildingland.Innovative and effective house design and able to make good use of narrow land which is very necessary for future mass changes, the use of technology is also used so thathousescandevelopbetter,notjustordinaryhousesbutmultifunctionalsmall housesthatcanhelptheirowners.
Plus - minus identification:
PROBLEM ISSUES
Thelimitedlandforhousingcausestheneedforanefficienthousesothatitis practical in its use. The not yet maximal use of technology in house constructioncurrentlycausesalackofefficiencyfromthehouseitself,coupled withtheabsenceofutilizationofdeadspaceornarrowlandbecausehouses are generally made permanent in one location and pay less attention to the surrounding context so that existing houses become an obstacle to growth another house. design location is in Indonesia so that the tropical climate causesthedesignofthehousetouseagableroofandusesolarpanelsonthe rooftoabsorbsunlight.
AFFAIR 2022 // 2021
PROJECT#5 Go Home (with Ellycia Celine & Stefanus Henry)
Population Growth Technology Limited Land
Efficent
23
Contextual Design
House Technology Advances Tropical Climate
AFFAIR 2022 // 2021 DESIGN FOCUS
Thedesignfocusesondesigninghousesby applying movable architecture technology withtheaimofeasyhouserelocation. Movable Building
CONCEPT
Go Home has the meaning of a moving house or can be called a Movable House. It is hoped that wherever the locationofthehouseis,GoHomeownerscanfeelrelaxed andcomfortablewiththisGoHome.
CONCEPT DEVEOPMENT
Box Basic Shape Wheels Moveable House Extended Space Foldable Partition Roofing Respon to Tropical Climate
EXPLODAMETRI
PROJECT#5 Go Home (with Ellycia Celine & Stefanus Henry)
AFFAIR 2022 // 2021 ELEVATION FLOOR PLAN SECTION 3D VISUALIZATION
PROJECT#5 Go Home (with Ellycia Celine & Stefanus Henry)
BACKGROUND & CONCEPT
TheSafetyRidingCenterSemarangownedbyAstraHondaMotorisagood & safe driving competency training place to anticipate travel risks from human,vehicleandenvironmentalaspects.Withacombinationofindustrial andminimalistconcepts,SRCSemarangisexpectedtomakevisitorsofall agesfeelcomfortabledoingactivitiesinit.
**This design is not final, but will be included in theAstra DesignAward.
INTERIOR DESIGN // 2023 PROJECT#6
Center
26
Safety Riding
Semarang
Waiting Room
INTERIOR DESIGN // 2023 PROJECT#6
Safety Riding Center Semarang
INTERIOR DESIGN // 2023
PROJECT#6 Safety Riding Center Semarang
Service Area
Riding Gear Room
Locker Room (Male)
Locker Room (Female)
INTERIOR DESIGN // 2023 PROJECT#6
Safety Riding Center Semarang
Kids Park
Showroom
INTERIOR DESIGN // 2023
PROJECT#6 Safety Riding Center Semarang
Community Space
INTERIOR DESIGN // 2023 PROJECT#6
Safety Riding Center Semarang
Space
INTERIOR DESIGN // 2023 PROJECT#6 Safety Riding Center Semarang
Restroom Office
INTERIOR DESIGN // 2023
PROJECT#6 Safety Riding Center Semarang
Exterior
OTHER PROJECT// 2021 - 2022
PROJECT#6 Tempat Wisata KerajinanDesa Wukirsari // KKN
PROJECT#8 Warehouse Unit & Part Astra Motor Samarinda // 3D Animation & Rendering
PROJECT#7 Warehouse Unit & Part Astra Motor Pontianak // 3D Animation & Rendering
PROJECT#9 De’ Corner // Internal Design Competition “HIMA Corner” (with E. Celine and S. Henry)
ALFONSA MARIA QUINNEMARCHIA CHRISATMANA port architecture folio 081226921226 // amquinne38@gmail.com