MS DESIGN GROUP
Request For Proposal
Mercedes - Benz Headquaters - office
February, 16, 2023
Alice.Tshibanda . J.Moorman . Commercial II . Feb, 16, 2023
02/16/2023
Mrs. J. Moorman Mercedes-Benz Houston,
TX
Dear Mrs. J. Moorman and other members of the Selection Committee.
We are pleased to present our credentials for your consideration regarding the Mercedes - Benz HQ - Renovation. We offer a comprehensive team of highly qualified professionals who bring great value to our project.
About The Company
MS Design Group is a design and architecture firm based in Houston, TX. For 30+ years in business, we’ve led the way in Workplace, Hospitality, Healthcare, and K-12 Design. Since our first Design-Build healthcare project, we’ve focused on designing innovative workplace spaces that drive value for owners and enhance employee experience. Much has changed in the design world. But what has always stayed the same is the importance of diligent planning and innovative design. Long before the hammer hits the nail or the shovel breaks ground, great minds must come together.
February 2023 - Company
01 02 Company Intro. Firm Personnel 03 04 Qualifications
Past Projects
Company Mission Statement
As steward of the public environment, our purpose is to elevate the human experience through design. We design for impact at all scales, addressing individual, community, societal, and global challenges.
Across many sectors our firm ensures the right skills, expertise, experience, and the highest level of teamwork.
Our team brings the following specific attributes to your project:
1. Creative thinkers and skilled problem solvers
2. Strong graphic presentation skills which are both informative and compelling.
3. A collaborative team philosophy and appreciation for the strengths that each participants brings to the team.
4. We have a strong desire to be a part of your team for this project.
Our team is eager and committed to provide the high quality of work needed to ensure the success of this exciting project. We look forward to working with you on this project. February 2023 - Mission statement
01 02 Company Intro. Firm Personnel 03 04 Qualifications Past Projects
February 2023 - Personnel Firm Personnel 01 02 Company Intro. Firm Personnel 03 04 Qualifications Past Projects
Alice Tshibanda - Senior Designer
EDUCATION
AAS Interior design program
Kirkwood Community College
With 18 years of experience; Alice is a published Interior Designer who works closely with her team in order to ensure the vision of her clients. She approaches the design of interior environments with energy and passion for excellence that resonates with her clients. Alice will work closely with all team members, however coordination of the Interior design, Architectural, and structural will be her main focus. Special attention will be given to the boards, submittal process, and various reports required during the project.
HONORS
- LEED Green Professional
- IIDA Competition Winner
-NEXT Competition Nominee
- NEWH board association
- KSID Communication Liaison
February 2023 - Firm Personnel
02 Company Intro.
Firm Personnel 03
Qualifications
Past Projects
01
04
February 2023 - Firm Qualifications Firm Qualifications 02 03 Firm personnel Qualifications 04 05 Previous Pro. Current pro.
Our Qualifications
MS Design Group is an Design and architecture firm that utilizes renovation and authenticity in all projects. MS Design has experience in every size and shape in the design world, and we have worked on many projects around the world, including Workplace, Hospitality, Healthcare, and K-12. The firm’s profession focuses on Mission, Communication, and Client Values.
Firm - Award
MS Design Group is a leading Workplace design firm. We hold many award-wining project; Design Innovation, NYCxDESIGN Awards, Texas Ruby awards, International Design Award for Excellence in Healthcare Design, Sustainable Building Award for Best Office, and VMSD Magazine, Designer Dozen Awards.
Firm personnel Qualifications
Previous pro.
February 2023 - Firm Qualifications
02 03
04 05
Current
pro.
February 2023 - Previous Projects of similar nature Previous Projects 03 04 Qualifications Previous Pro. 05 06 Current Pro. Scope of project Disclaimer:
examples are purely for a project simulation and not to be considered as plagiarized contents.
These
Previous Projects
Twitter Offices - Singapore
Location: Singapore
Type: Technology
Completed 2022
Area: 22,230 sq ft February
This project exemplifies an ambitious pilot study towards agile working for Twitter globally. The design inspiration draws directly from Twitter’s vision and new playbook that defines a shift towards hybrid enabled work environments.
2023 - Past
03 04 Qualifications Previous Pro. 05 06 Current Pro. Scope of project
Projects
Twitter Offices - Singapore February 2023 - Past Projects 03 04 Qualifications Previous Pro. 05 06 Current Pro. Scope of project
Previous Project
LiveRamp Offices - San Francisco
Location: California, United States
Type: Tecnology
Completed: 2019
Area: 21, 000 sq ft
Previous Pro.
After designing two new floors for LiveRamp’s San Francisco headquarters in the iconic Standard Oil Building, O+A came back at LiveRamp’s request to design a third. While the two previous floors were conceived to mirror each other in the way they juxtaposed highly finished contemporary design with the rawness of the building’s original infrastructure, the third reached for a larger continuity, bringing all three floors together in a single narrative of unity, clarity and vitality.
February 2023 - Past Projects
03 04
Qualifications
05 06
Current Pro. Scope of project
February 2023 - Past Projects LiveRamp Office - San Francisco 03 04 Qualifications Previous Pro. 05 06 Current Pro. Scope of project
February 2023 - Previous Projects of similar nature Current Projects 04 05 Previous pro. Current Pro. 06 07 Scope of project Space program
project
plagiarized
Disclaimer: These examples are purely for a
simulation and not to be considered as
contents.
Current Project
TenX Offices - Singapore
Location: Singapore
Type: Technology/ Financial
Completed: 2019
Area: 12, 443 sq ft
The new TenX headquarters is a bold expression of the brand’s refreshed identity, showcased in an atmosphere that is welcoming and incorporates biophilic design principles. With its logo incorporated into the space in multiple and unexpected ways –from greenery walls to ceiling lights – the space depicts the story of a bold FinTech firm that is united in its mission.
February 2023 - Current Project
04 05
Previous pro.
Current Pro. 06
Scope of project
07
Space program
TenX Offices - Singapore February 2023 - Current Project 04 05 Previous pro. Current Pro. 06 07 Scope of project Space program
Current Project
LinkedIn Production Center - Sunnyvale
Location: Sunnyvale California, U.S
Type: Technology
Completed: 2022
Area: 11,000 sq ft
The design seamlessly blends workspaces for visioning, storyboarding, and workshopping with state-of-the-art studio environments, bringing creative and technical teams under one roof to streamline video-on-demand and live broadcast content production.
Scope of project
2023 - Current Project 04 05
06 07
February
Previous pro. Current Pro.
Space program
February 2023 - Current Project LinkedIn Production Center - Sunnyvale 04 05 Previous pro. Current Pro. 06 07 Scope of project Space program
February 2023 - Project Scope Scope of Project 05 06 Current pro. Scope of project 07 08 Space Program Sus. Design
Mercedes Benz - HQ Renovation Scope of Project February 2023 - Scope of Project 05 06 Current pro. Scope of project 07 08 Space Program Sus. Design
Scope of Project
Mercedez-Benz is a German Luxury commercial vehicle automative band. Mercedes Benz is looking to open a new high tech marketing office located in Houston,TX. The new office seats on roughly 3,400 sq ft, and occupies the first two levels of a large business campus district in Houston, TX.
-Working collaboratively with the Owner, Architect, 3D Renderer, Project Super and Estimator on conceptual, schematic, design development and production activities to develop, manage, monitor and record the technical aspects of the interior design phase of all Design/Build projects.
- Developing a timeline for the interior design process.
-Cost estimates.
1. PROGRAM DEVELOPMENT
- Conceptual Design
- Conceptual Program
- Space Adjacencies
2. DESIGN DEVELOPMENT
- Initial Drawings
- Preliminarily Finish, Fixture, and Equipment Selections.
3. CONSTRUCTION DOCUMENTATION
- Final Drawing Set
- Final Finish, Fixture, and Equipment Selections
February 2023 - Scope of Project
Scope of Services 05 06 Current pro. Scope of project 07 08 Space Program Sus. Design
February 2023 - Scope of Project 05 06 Current pro. Scope of project 07 08 Space Program Sus. Design Stadium seating preliminary Design.
Scope of Project
February 2023 - Space Program Space Program 06 07 Scope of project Space program 08 09 Sus. Design Project timeline
Space Program
A. RECEPTION / WAITING AREA
- This working reception station greets visitors and Controls visitors traffic, and provides Secretarial services. There are 3 secretarial positions at this location.
- Total work surface must be at least 20 sq. ft, accommodate a flat screen monitor, keyboard tray, and a small desktop printer, and provide at least one box/file drawer pedestal.
- A transaction counter is required for arriving visitors
- Lateral files, 18 lin. Ft., must be within easy reach.
- Waiting area should include seating for 12, plus coat closet or storage.
- There should be wall-mounted display racks for company liter
B. EQUIPMENT ROOM
- Central control and equipment storage for all of the presentation and conference spaces, located adjacent to the reception station
- provide 90 to 100 sq. ft. room with lockable door
C. PRESENTATION ROOM
- A conventional lecture space with comfortable fixed seating for 24 people
- A speaker’s lectern or a panelists’ table and chairs for four, at the front of the room
- A motorized ceiling recessed projection screen, a ceiling mounted projector
- A marker board surface
- A closet for stacking chairs and tables.
February 2023 - Space program
07 Scope of project Space program
Sus. Design
06
09
Project
08
timeline
Space Program
D. TRAINING/SEMINAR ROOM
- Seating for 16 people at eight training tables 72”w x 24” d.
- Each table should contain a flat screen monitor, keyboard tray, and a desktop printer
- a speakers lectern at the front of the room
- A motorized ceiling recessed projection screen, a ceiling mounted projector
- A marker board surface
E. LARGE CONFERENCE ROOM
- A central, modular conference table for 12 people
- A motorized ceiling recessed projection screen, a ceiling mounted projector
- A marker board surface
- A pin-up wall
F. SMALL CONFERENCE ROOM
- A central, modular conference table for 6 people
- A motorized ceiling recessed projection screen, a ceiling mounted projector
- A marker board surface
- A pin-up wall
February 2023 - Space program
06 07 Scope of
Space program 08 09 Sus. Design Project timeline
project
Space Program
G. A BEVERAGE CENTER
- At least 10 sq. ft. of open counter space, plus full complement of base and wall cabinets
- Single- bowl sink, stand up refrigerator, under counter dishwasher, two burner coffeemaker, and a location for a microwave.
H. LUNCH/BREAK ROOM
- Flexible table seating for 15 people
I. WORKROOM
- Freestanding copier
- Mail sorting table
- Lockable supply shelving in cabinets or closet
- Employee coat closet with 6 lin. Ft. of hanging rod.
J. VICE PRESIDENTS OFFICE
- Executive desk, 18 to 22 lin. Ft. of desk space
- Flat screen monitor, keyboard tray, small desktop printer, and book shelves
- Task chair and 2 pull up guest chairs
- Conversational conference area with lounge seating for four plus space for the two pull up chairs to become part of the grouping when needed.
06
07 Scope of project Space program 08 09 Sus. Design
February 2023 - Space program
Project timeline
Space Program
K. ACCOUNT EXECUTIVES (3)
- Management work station with at least 20 sq. ft. of desk surface, a flat screen monitor, keyboard tray, and a small desktop printer
- Management task chair with two pull up guest chairs
- 9 linear feet of lateral files
L. SUPPORT STAFF (15)
- A work station with lateral storage and pedestal storage cabinets
- A vertical coat storage area
- Methods of personalization
M. REST ROOMS
- Men: 4 lavatories, 3 urinals, 5 toilet stalls
- Women: 4 lavatories, 8 toilet stalls
N. A BLEACHER STYLE FORUM SPACE
February 2023 - Space program
06 07 Scope of project Space
08 09 Sus. Design Project timeline
program
February 2023 - Space Program Sustainable Design 07 08 Space program Sus. Design 09 10 Project timeline Budget
Sustainable Design
With confidence in our team, our design and architectural team has experience and strategies in the design of sustainable buildings.
These are sustainable aspects we are implementing in the design of the project:
- Integrated Design Process
- Equipment and HVAC - Life Cycle Cost Assessment
- Energy and water meters -
- Energy efficient light fixtures
- Operable Windows - Daylighting design
- On-site rainwater storage for landscape irrigation
- Low flush plumbing fixtures
- Construction and demolition waste management
- Specification of local/ domestic materials
- Purchase of renewable energy
February 2023
- Sustainable Design
Space program Sus. Design
Project timeline
07
09 10
Budget
08
Site Analysis
Anticipated site interac-
day.
Utilizing Ecotect - this is a site analysis that provides weather simulation and determine how the building will perform.
February 2023 - Sustainable Design
A 3D visualization of stereographic diagram, showing the movement of the sun throughout the
07 08 Space program Sus. Design 09 10 Project timeline Budget
Site Analysis
Utilizing Ecotect - this is a site analysis that provides weather simulation and determine how the building will perform.
February 2023 - Sustainable Design
07 08 Space program
A 3D visualization of stereographic diagram, showing the movement of the sun throughout the day. Design 09 10 Project timeline Budget
Summer Sun Path
Sus.
February 2023 - Space Program Project Timeline 07 08 Space program Sus. Design 09 10 Project timeline Budget
Proposed Design Timeline
Project Inception
Date: Feb - 2023
Programming:
Schematic Design
Date: Feb - May 2023
Design Phase:
- Initial Budgeting
- Introduction and initial design development for Client approval
Documentation phase
Date: Dec -July 2024
Development Phase:
- Fully document all approved materials and finishes, fixtures, and equipment for bidding and purchasing.
- Specification books
- Finalize drawings
- Analyzing site and existing conditions
- Budget
- Timeline
- Desired Style
Design Dev. Phase
Date: May - Dec 2023
Development Phase:
- Developed all spaces per concept
- Materials, finishes, fixtures, and equipment selections
- Final design presentation and materials approved
Construction Admin.
Date: April 2025
Con. Admin. Phase:
- Subcontractors quotes
- Finalize Budget and value
Engineering
- Start up construction, Purchasing, and installation
- Budget
- In filed solutions
07
08 Space program
Sus. Design
February 2023 - Project Timeline
09 10 Project timeline Budget
February 2023 - Space Program Project Design Budget 07 08 Space program Sus. Design 09 10 Project timeline Budget
Projects in certain states cost more per square foot to construct than others.
Variation is mainly the result of higher labor and materials costs in certain regions of the country. This map provides a guideline of the media cost per square foot for construction in specific states. Projects completed in Massachusetts, New York, California, and the District of Columbia typically have higher costs per square foot due to higher labor rates. And, states with larger rural populations tend to have lower costs per square foot. The isolation states of Hawaii and Alaska must account for transportation of materials, inflating their costs, and making them the areas with the highest cost per square foot.
TX February 2023 - Project Budget 07 08
Space program
09 10
Budget
Sus. Design
Project timeline
MS Design Group believes in the importance of an organized system when it comes to budgeting for our projects. We understand that project costs are most easily and effectively defined and controlled during the early stages programming, planning, and schematic design. Our established system monitors the budget development at each stage.
February 2023 - Project Budget Proposed Design Budget Mercedes - Benz Headquarters - Office MS Projected Budget Cost: $26M 07 08 Space program Sus. Design 09 10 Project timeline Budget
Proposed Design Budget
General Requirements $80,000.00 Concrete $1,000,000.00 Metal $2,000,000.00 Wood $700,000.00 Finishes $2,000,000.00 Equipment $5,000,000.00 Furnishings $4,000,000.00 Special Construction $100,000.00 Fire Suppression $400,000.00 Plumbing $1,000,000.00 Heating, Ventilation, $4,000,000.00 and HVAC Integrated Automation $400,000.00 Electrical $4.5,000,000.00 Communications $300,000.00 Electronic Safety $1,000,000.00 + Security Subtotal Direct Cost $26,480,000.00 Cost/ Area $290.00 per sq February 2023 - Project Budget 07 08 Space program Sus. Design 09 10 Project timeline Budget
MS DESIGN GROUP Thank you We look forward to working with you. Request For Proposal Mercedes - Benz Headquarters - Office February, 04, 2023