PORTFOLIO ALICE GALLIGO
Office + Studies
SOMMAIRE OFFICE Kersten Geers David Van Severen Selected work Tower - Art Gallery / Scheme design / Portland Deposit Bruxelles-Propreté / Competition / Bruxelles Towers / Havenlaan / Urban planning application / Bruxelles Housing / Godecharle / Urban planning application / Bruxelles Extension Music center / Design development / Sagheraa Barhain INTERNSHIPS BRUTHER - A+11 / Convention Center / Competition / Charleroi V+ / Primary school / Competition / Bruxelles
STUDIES Selected work Sanatorium - Degree zero / Graduated project / Bruxelles King Arthur’s legend museum / Archmedium / Camelot Collective housing / CUB / Bordeaux Public square / Europan / Don Benito
CV
TOWER - YALE UNION PORTLAND USA 6780m²
Scheme design conception, 2D
The program is divided in two: the restructuring of a gallery: the Yale Union; and a new development : a L-shape tower with a flexible and generic program. It is the important seismic constraint which will guide the structure, the plan and the elevation of this new part. The diagonal columns , works as bracing system, go along the tower to meet on their extremity on each of its facades in a graphic game. The structure is omnipresent, and become the identity of the yale union. The round and sensual 70cm columns, intersect with the straight one without ever being in real intersection, because their aren’t in the same plane. Which mean that each columns , diagonal and straight, preserve their formal autonomy of continuous element, their own presence in the building. The other part of the program is the Yale Union. The gallery is installed in an old laundry of the 19th century. The starting point of the restructuring was the event room, which become also the entrance of the complex, distributing all the new needs (cafeteria, workshop, conference and artist’s residence ...). This room is actually a vacuum below the new tower, and is in proportion the negative volume of the existing building.
SE YAMHILL ST
SE TALOR ST
19
EXISTING STRUCTURE
9
3 buckling restrained bracing
shearing wall
reinforced slabs
yale union
Structure
1/500
PROPOSAL
25 +11.90 YU [+39.04] +10.70 YU PARAPET [+35.10]
+11.90 YU [+39.04] +10.70 YU PARAPET nd FLOOR +4.55 2 [+35.10] [+14.93]
25 25
+11.90 YU +2.05 MEZZANINE [+39.04] [+6.72] +10.70 YU PARAPET [+35.10]
YALE UNION
±0.00 1st YU [±0.00] –1.35 1st OFFICE +4.55 2nd FLOOR [–4.43] [+14.93] –3.35 BASEMENT-1 +11.90 YU [–10.99] +2.05 MEZZANINE [+39.04] [+6.72] nd FLOOR +10.70 YU PARAPET +4.55 2 –5.20 BASEMENT-2 [+35.10] [+14.93] [–17.06] ±0.00 1st YU [±0.00]
YALE UNION
+2.05 MEZZANINE –1.35 1st OFFICE [+6.72] [–4.43]
YALE UNION
±0.00 1st YU –3.35 BASEMENT-1 [±0.00] [–10.99]
–3.35 BASEMENT-1 [–10.99] +2.05 MEZZANINE [+6.72] –5.20 BASEMENT-2 [–17.06] ±0.00 1st YU [±0.00]
YALE UNION
+45 .8m [150.2
–1.35 1st OFFICE [–4.43]
+45 .8m
–3.35 BASEMENT-1 [150.26] [–10.99]
+45 .8m [150.26]
–5.20 BASEMENT-2 [–17.06]
+45 .8m [150.26]
+45 .8m [150.26]
22.40m [73.49] +11.90 YU [+39.04]
+11.90 [+39.04
+10.70 YU PARAPET [+35.10]
+10.70 [+35.10
22.40m [73.49] +11.90 YU [+39.04] nd +4.55 2 +10.70 YU FLOOR PARAPET [+14.93] [+35.10] +11.90 YU +11.90 YU +2.05 MEZZANINE [+39.04] [+39.04] [+6.72] +10.70 YU PARAPET +10.70 YU PARAPET [+35.10] [+35.10]
YU 4]
YU PARAPET 0]
±0.00 1st YU [±0.00] –1.35 1st OFFICE +4.55 2nd FLOOR [–4.43] [+14.93] –3.35 BASEMENT-1 +11.90[–10.99] YU +11.90 YU +2.05 MEZZANINE [+39.04] [+39.04] nd [+6.72] nd FLOOR +4.55 2 +4.55 2YU +10.70 YU FLOOR PARAPET +10.70 PARAPET –5.20 BASEMENT-2 [+14.93] [+14.93] [+35.10] [+35.10] [–17.06]
U
2ndPARAPET FLOOR U 3]
±0.00 1st YU [±0.00] +2.05 MEZZANINE +2.05 MEZZANINE –1.35 1st[+6.72] OFFICE [+6.72] [–4.43]
+1.50
MEZZANINE ]
YALE UNION
+0.00
1st YU ]
±0.00 1st YU ±0.00 1st YU –3.35 BASEMENT-1 [±0.00] [±0.00] [–10.99] –1.35 1st OFFICE –1.35 1st OFFICE +4.55 2nd FLOOR [–4.43] +4.55 2nd FLOOR [–4.43] –5.20 BASEMENT-2 [+14.93] [+14.93] [–17.06]
1st OFFICE ]FLOOR
BASEMENT-1 9] ZZANINE
–3.35 BASEMENT-1 –3.35 BASEMENT-1 [–10.99] [–10.99] +2.05 MEZZANINE +2.05 MEZZANINE [+6.72] [+6.72] –5.20 BASEMENT-2 –5.20 BASEMENT-2 [–17.06] [–17.06]
+1.50 YALE UNION
BASEMENT-2 6]
+0.00
YU
±0.00 1st YU ±0.00 1st YU [±0.00] [±0.00]
OFFICE
SEMENT-1
+45 .8 [150.2
–1.35 1st OFFICE +4.55 2nd FLOOR [–4.43] –5.20 BASEMENT-2 [+14.93] [–17.06]
+45 .8m [150.26]
SEMENT-2
+45 .8m [150.26]
WEST FACADE EXISTING (top) / PROPOSAL (bottom)
WEST FACADE EXISTING (top) / PROPOSAL (bottom)
22.40m [73.49]
+11.90 Y [+39.04] +4.55 2Y +10.70 [+14.93 [+35.10]
+11.90 YU +2.05 M [+39.04] [+6.72] +10.70 YU P [+35.10]
±0.00 1 [±0.00]
–1.35 1s +4.55 [–4.43]2n [+14.93]
–3.35 B +11.90 YU [–10.99] +2.05 M [+39.04] nd FL [+6.72] +4.55 2YU +10.70 P –5.20 B [+14.93] [+35.10] [–17.06
±0.00 1s [±0.00] +2.05 MEZZ –1.35 1st [+6.72] [–4.43]
±0.00 1st YU –3.35 BA [±0.00] [–10.99] –1.35 1st OF +4.55 [–4.43]2nd FLO –5.20 BA [+14.93] [–17.06]
–3.35 BASEM [–10.99] +2.05 MEZZ [+6.72] –5.20 BASE [–17.06]
±0.00 1st YU [±0.00]
–1.35 1st OFFICE –1.35 1st OFFICE [–4.43] [–4.43]
–1.35 1st OFF [–4.43]
–3.35 BASEMENT-1 –3.35 BASEMENT-1 [–10.99] [–10.99]
–3.35 BASEM [–10.99]
–5.20 BASEMENT-2 –5.20 BASEMENT-2 [–17.06] [–17.06]
–5.20 BASEM [–17.06]
25
+45 .8m [150.26]
+45 .8m [150.26]
+45 .8m [150.26]
22.40m [73.49]
22.40m [73.49]
22.40m [73.49]
ARAPET
YALE UNION
PET
+0.00
FICE OOR
YALE UNION
PET MENT-2
+0.00 +1.50
NE FICE
YALE UNION
+45 .8m [150.26]
+0.00
T-1
+45 .8m [150.26]
PET 0 YU PARAPET 10]
ICE OOR
MENT-1 0 YU ANINE 04]
PET 02nd YUFLOOR PARAPET MENT-2 10] 93]
EICE MEZZANINE 2]
MENT-1 1st YU 0]
st OFFICE 21nd FLOOR MENT-2 3] 93]
T-1 BASEMENT-1 99] EMEZZANINE 2]
T-2 BASEMENT-2 06]
1st YU 0]
1st OFFICE 3]
±0.00 1st [±0.00]
st –1.35 OFFICE –1.35 21nd OFFICE +4.55 21nd FLOOR +4.55 FLOOR [–4.43] [–4.43] [+14.93] [+14.93]
–1.35 +4.55 12stnd [–4.43] [+14.93]
+2.05 MEZZANINE 1st OFFICE –1.35 1st –1.35 OFFICE [+6.72] [–4.43] [–4.43]
–1.35 1st [–4.43]
–3.35 BAS [–10.99]
–1.35 21 FLOOR OFFICE +4.55 –5.20 BASEMENT-2 –5.20 BASEMENT-2 [–4.43] [+14.93] [–17.06] [–17.06]
–5.20 BA [–17.06]
–1.35 1st OFFICE [–4.43]
+45 .8m [150.26]
–3.35 BASEMENT-1 [–10.99] –5.20 BASEMENT-2 [–17.06]
+45 .8m [150.26]
22.40m [73.49]
22.40m [73.49]
22.40m [73.49] +11.90 YU [+39.04] +10.70 YU PARAPET [+35.10]
22.40m [73.49] +11.90 YU [+39.04] +10.70 YUFLOOR PARAPET +4.55 2nd [+35.10] [+14.93]
+4.55 [14.93]
+11.90 YU +2.05 MEZZANINE [+39.04] [+6.72] +10.70 YU PARAPET [+35.10] ±0.00 1st YU [±0.00] –1.35 +4.55 12stndOFFICE FLOOR [–4.43] [+14.93]
+0.00 +4.55 [14.93]
–3.35 BASEMENT-1
+11.90 YU [–10.99] +2.05 MEZZANINE [+39.04] [+6.72] +10.70 YUFLOOR PARAPET +4.55 2nd –5.20 BASEMENT-2 [+35.10] [+14.93] [–17.06] ±0.00 1st YU [±0.00]
+4.55 [14.93] +0.00
+2.05 MEZZANINE –1.35 1st OFFICE [+6.72] [–4.43] ±0.00 1st YU –3.35 BASEMENT-1 [±0.00] [–10.99] –1.35 12stndOFFICE +4.55 FLOOR –5.20 BASEMENT-2 [–4.43] [+14.93] [–17.06]
+0.00 +4.55 [14.93]
1/400
–3.35 BASEMENT-1 [–10.99] +2.05 MEZZANINE [+6.72] –5.20 BASEMENT-2 [–17.06] ±0.00 1st YU [±0.00]
+0.00
1/400
–1.35 1st OFFICE [–4.43]
T-1 BASEMENT-1 99]
–3.35 BASEMENT-1 [–10.99]
T-2 BASEMENT-2 06]
–5.20 BASEMENT-2 [–17.06]
1/400
EAST FACADE EXISTING (top) / PROPOSAL (bottom) EAST FACADE EXISTING (top) / PROPOSAL (bottom)
–3.35 BAS [–10.99] +2.05 ME [+6.72]
–5.20 BA [–17.06] ±0.00 1st [±0.00]
±0.00 1st YU –3.35 BASEMENT-1 –3.35 BASEMENT-1 [±0.00] [–10.99] [–10.99]
–5.20 BASEMENT-2 [–17.06] ±0.00 1st YU [±0.00]
+0.00
+2.05 ME [+6.72]
±0.00 1st±0.00 YU 1st YU [±0.00] [±0.00]
–3.35 BASEMENT-1 YALE UNION
T-2
0 YU ANINE 04]
+10.70 Y +4.55 2nd [+35.10] [+14.93]
[–10.99] +2.05 MEZZANINE [+6.72]
+1.50
NE
ARAPET OOR
+11.90 Y [+39.04]
+10.70 YUFLOOR PARAPET +10.70 PARAPET nd +4.55 2nd +4.55 2YU FLOOR [+35.10] [+35.10] [+14.93][+14.93]
st nd
MENT-2
ARAPET
+11.90 YU +11.90 YU [+39.04][+39.04]
–3.35 –3.35 BASEMENT-1 +11.90 YU BASEMENT-1 [–10.99] [–10.99] +2.05 MEZZANINE [+39.04] +2.05 MEZZANINE [+6.72] [+6.72] +10.70 YUFLOOR PARAPET +4.55 2nd –5.20 BASEMENT-2 [+35.10] –5.20 BASEMENT-2 [+14.93] [–17.06] [–17.06] ±0.00 1st±0.00 YU 1st YU [±0.00] [±0.00]
+1.50
ANINE
8m 26]
+10.70 Y [+35.10]
st
MENT-1
8m T-1 26]
+11.90 Y [+39.04]
+10.70 YU PARAPET +10.70 YU PARAPET [+35.10][+35.10]
+11.90 YU +2.05 MEZZANINE [+39.04] +2.05 MEZZANINE [+6.72] [+6.72] +10.70 YU PARAPET [+35.10]
+1.50
ANINE
T-2
+11.90 YU +11.90 YU [+39.04][+39.04]
22.40m [73.49]
ARAPET OOR
MENT-1
+45 .8m [150.26
1/400
24 24
+11.90 YU [+39.04]
+11.90 [+39.0
+10.70 YU PARAPET [+35.10]
+10.70 [+35.1
+11.90 YU +4.55 2nd FLOOR [+39.04] [+14.93] +10.70 YU PARAPET [+35.10]
+11.90 Y +4.55 [+39.04] [+14.9 +10.70 Y [+35.10]
+2.05 MEZZANINE [+6.72]
+2.05 [+6.72
±0.00 1st YU [±0.00]
±0.00 [±0.00
–1.35 1st OFFICE [–4.43]
–1.35 [–4.43
+4.55 2nd FLOOR [+14.93] –3.35 BASEMENT-1 [–10.99]
+4.55 2n [+14.93] –3.35 [–10.9
+2.05 MEZZANINE –5.20 BASEMENT-2 [+6.72] [–17.06]
+2.05 M –5.20 [+6.72] [–17.0
±0.00 1st YU [±0.00]
±0.00 1s [±0.00]
–1.35 1st OFFICE [–4.43]
–1.35 1s [–4.43]
–3.35 BASEMENT-1 [–10.99]
–3.35 BA [–10.99]
–5.20 BASEMENT-2 +45 .8m [–17.06]
–5.20 B [–17.06]
[150.26]
+45 .8m [150.26]
+22 .40 [73.49]
+22 .40 [73.49]
+11.90 YU [+39.04]
+11.90 YU [+39.04]
+10.70 YU PARAPET [+35.10]
+10.70 YU PARA [+35.10]
+11.90 YU [+39.04] +10.70 YU PARAPET [+35.10]
+11.90 YU +4.55 2nd FLOOR [+39.04] [+14.93] +10.70 YU PARAPET [+35.10] +2.05 MEZZANINE [+6.72] +11.90 YU +4.55 2nd FLOOR [+39.04] ±0.00 1st YU [+14.93] +10.70 YU PARAPET [±0.00] [+35.10]
+1.50 [4.92]
+1.00 [+3.28] ±0.00
–1.35 1st OFFICE +2.05 MEZZANINE [–4.43] [+6.72] +4.55 2nd FLOOR [+14.93] –3.35 BASEMENT-1 ±0.00 1st YU [–10.99] [±0.00] +2.05 MEZZANINE –5.20 BASEMENT-2 –1.35 1st OFFICE [+6.72] [–17.06] [–4.43] ±0.00 1st YU [±0.00]
+1.50 [4.92]
+1.00 [+3.28] ±0.00
+4.55 2nd FLOOR [+14.93] –3.35 BASEMENT-1 [–10.99]
+11.90 YU +4.55 2nd FLOOR [+39.04] [+14.93] +10.70 YU PARAP [+35.10]
+2.05 MEZZANI [+6.72] ±0.00 1st YU [±0.00]
–1.35 1st OFFIC [–4.43]
+4.55 2nd FLOOR [+14.93] –3.35 BASEMEN [–10.99]
+2.05 MEZZANINE –5.20 BASEMEN [+6.72] [–17.06] ±0.00 1st YU [±0.00]
–1.35 1st OFFICE +2.05 MEZZANINE –5.20 BASEMENT-2 [–4.43] [+6.72] [–17.06]
–1.35 1st OFFICE [–4.43]
–3.35 BASEMENT-1 ±0.00 1st YU [–10.99] [±0.00]
–3.35 BASEMENT [–10.99]
–5.20 BASEMENT-2 –1.35 1st OFFICE +45 .8m [–4.43] [–17.06]
–5.20 BASEMENT [–17.06]
[150.26]
–3.35 BASEMENT-1 [–10.99] –5.20 BASEMENT-2 [–17.06]
+45 .8m [150.26]
NORTH FACADE EXISTING (top) / PROPOSAL (bottom)
+22 .40 [73.49]
+22 .40 [73.49]
+22 .40 [73.49]
+22 .40 [73.49]
+11.90 YU [+39.04] +10.70 YU PARAPET [+35.10]
+11.90 YU [+39.04]
+11.90 YU [+39.04]
+10.70 YU PARAPET [+35.10]
+10.70 YU PARAPET [+35.10]
+11.90 nd YU +4.55 2 FLOOR [+39.04] [+14.93] +10.70 YU PARAPET [+35.10]
+11.90 YU +4.55 2nd FLOOR [+39.04] [+14.93] +10.70 YU PARAPET [+35.10]
+1.50 [4.92]
+1.50 [4.92] +1.00 [+3.28]
+1.00 [+3.28]
±0.00
±0.00
+2.05 MEZZANINE [+6.72] ±0.00 1st YU [±0.00] –1.35 1st OFFICE [–4.43] +4.55 2nd FLOOR [+14.93] –3.35 BASEMENT-1 [–10.99]
+1.50 [4.92]
+1.50 [4.92] +1.00 [+3.28]
+1.00 [+3.28]
±0.00
±0.00
+45 .8m [150.26]
+2.05 MEZZANINE [+6.72] +11.90 YU +4.55 2nd FLOOR [+39.04] [+14.93] ±0.00 1st YU +10.70 YU PARAPET [±0.00] [+35.10] –1.35 1st OFFICE +2.05 MEZZANINE [–4.43] [+6.72] +4.55 2nd FLOOR [+14.93] –3.35 BASEMENT-1 ±0.00 1st YU [–10.99] [±0.00] +2.05 BASEMENT-2–1.35 1st OFFICE –5.20 MEZZANINE [+6.72] [–17.06] [–4.43] ±0.00 1st YU [±0.00]
–1.35 1st OFFICE +2.05 –5.20 MEZZANINE BASEMENT-2 [–4.43] [+6.72] [–17.06]
±0.00 1st YU [±0.00]
–3.35 BASEMENT-1 ±0.00 1st YU [–10.99] [±0.00] –5.20 BASEMENT-2–1.35 1st OFFICE +45 .8m [–4.43] [–17.06]
–1.35 1st OFFICE [–4.43]
[150.26]
–3.35 BASEMENT-1 [–10.99]
–3.35 BASEMENT-1 [–10.99]
–5.20 BASEMENT-2 [–17.06]
–5.20 BASEMENT-2 [–17.06]
+45 .8m [150.26]
+45 .8m [150.26]
+11.90 YU [+39.04]
+11.90 YU [+39.04]
+10.70 YU PARAPET [+35.10]
+10.70 YU PARAPET [+35.10]
+11.90 nd YU +4.55 2 FLOOR [+39.04] [+14.93] +10.70 YU PARAPET [+35.10]
+11.90 nd YU +4.55 2 FLOOR [+39.04] [+14.93] +10.70 YU PARAPET [+35.10]
+2.05 MEZZANINE [+6.72]
+0.00
+0.30 [+0.98] –1.20 [–3.94]
±0.00 1st YU [±0.00]
+2.05 MEZZANINE [+6.72]
+0.00
+0.30 [+0.98] –1.20 [–3.94]
–1.35 1st OFFICE [–4.43] 2nd
+4.55 FLOOR [+14.93] –3.35 BASEMENT-1 [–10.99]
+0.30 [+0.98] –1.20 [–3.94]
±0.00 1st YU [±0.00] –1.35 1st OFFICE [–4.43]
±0.00 1st YU [±0.00] –1.35 1st OFFICE [–4.43] +4.55 2nd FLOOR [+14.93] –3.35 BASEMENT-1 [–10.99]
+2.05 –5.20 MEZZANINE BASEMENT-2 [+6.72] [–17.06]
+0.00
+4.55 2nd FLOOR [+14.93] –3.35 BASEMENT-1 [–10.99]
+2.05 –5.20 MEZZANINE BASEMENT-2 [+6.72] [–17.06]
+2.05 –5.20 MEZZANINE BASEMENT-2 [+6.72] [–17.06]
+0.00
+0.30 [+0.98] –1.20 [–3.94]
±0.00 1st YU [±0.00] –1.35 1st OFFICE [–4.43]
–3.35 BASEMENT-1 [–10.99]
–3.35 BASEMENT-1 [–10.99]
–5.20 BASEMENT-2 [–17.06]
–5.20 BASEMENT-2 [–17.06]
1/400
1/400
1/400
1/400
20 +45.8m [150.26]
+22.40m [+73.49]
horizon ab
3,9 [12,8]
+11.90 YU [+39.04]
4,6 [15,2]
+10.70 YU PARAPET [+35.10]
expo yu room
+2.05 MEZZANINE [+6.72] ±0.00 1st YU [±0.00] –1.35 1st OFFICE [–4.43]
+4.55 [+14.93] 5,4 [17,7]
+4.55 2nd FLOOR [+14.93]
café +0.00
office / co parking +1.50 [+4.92]
+0.00
-1.20
–3.35 BASEMENT-1 [–10.99] –5.20 BASEMENT-2 [–17.06]
Sec SECT
28,7 [94]
SE BELMONT ST
SE MORRISON ST
10 28,7 [94]
+1.50
–0.30 PRIVATE ACCESS restricted
TRUCK ACCESS restricted
TOWER
+1.50
ROOM YU 430m 2 [4628,48sq f]
+0.00
–0.70
ACCES PARKING
PUBLIC ACCESS free
+1.00
–1.20
BOOK STORE 170m2 [1829.8sq f]
ART STUDIO 170m2 [1829.8sq f]
CAFE 170m2 [1829.8sq f]
RESTAURANT 200m2 [2152.8sq f]
15,2 [50,0]
PRINT SHOP WOOD SHOP 170m2 [1829.8sq f]
+0.00
+0.00 –0.10
ACCES free
–0.8
–1.55
ACCES free
ACCES OFFICE
–1.85
–2.25
ACCES OFFICE
SE 10TH AVE
FLOOR PLAN, ±00
Ground floor s
scale 1:2501/250
0,6 [2,0]
1,2 [3,9]
2,5 [8,2]
3,3 [10,8]
0,8 [2,6]
0,6 [2,0]
23
23
0,2 [.6] 0,2 [.6]
0,6 [2,0] 0,6 [2,0]
0,6 [2,0] 0,6 [2,0]
0,2 [.7] 0,2 [.7]
1,5 [5,0] 1,5 [5,0]
Section Section 1/50 1/50
0,8 [2,6]
0,6 [2,0]
45.8m
0,6 [2,0]
1,2 [3,9]
2,5 [8,2]
3,3 [10,8]
SECTION, scale 1/50
0,6 [2,0]
1,5 [5,0]
Plan Plan 1/50 1/50 Elevation 1/50
45.8m
0,6 [2,0]
1,2 [3,9] 2,5 [8,2] 3,3 [10,8]
0,8 [2,6]
0,6 [2,0]
22
0,6 [2,0]
1,5 [5,0]
ELEVATION, scale 1/50
Cette cour est le point de départ de notre projet. Elle définit l’organisation des bâtiments entre eux sur la parcelle et leur rapport à un contexte plus large, plus diffus le long du canal. Les irrégularités du site s’en trouvent corrigées. La cours, DEPÔT BRUXELLES-PROPRETÉ de 63 mètres de large par 70 mètres de long offre un MARLY cadre, une structure à l’organisation spatiale et fonction-
BRUXELLES
nelle 5250m²des différents programmes sur la parcelle. Competition conception, 2D, images
Place des Vosges Paris
Place des vosges Paris
4
The project is about the redevelopment of an industrial site to install a part of the cleaning service of Bruxelles-PropretĂŠ. Our proposal begins with the definition of a vacuum: the courtyard. Each of the buildings: administrative building, frost-free parking and cleaningmaintenance area is sticking on one of these sides leaving the fourth open on the canal.The building creates a porous limit on public space by featuring the activities of Bruxelles-PropretĂŠ in its courtyard. In many cases, the strategy used in peri-urban areas consists in creating heterogeneous architectures, floating objects around which come annexed programs. The project proposes the exact opposite. The buildings occupy the site to its limits, correct its irregularities, and organize buildings in a homogeneous way around the void. The affimation of a front built on the limits of the plot mark the public space, begining the transformation of the neighborhood along the canal. The architectural expression of the project is reduced to the purest definition of this void: its periphery. Its presence must be obvious while offering the flexibility necessary to activate its back. It takes the shap of a colonnade. A thickness that offers a transition between the different functions.
A'
B'
B
C'
C
ENTREE VEHICULES
ENTREE PIETONS
A
1/
5
Vue sur la zone d’entretien et maintenance
19
Vue sur le bâtiment administratif
18
11
A'
B'
B
C'
C
ENTREE VEHICULES
ENTREE PIETONS
A
1/5 0
1,00 4,50 1,00
8,00
4,50
8,00
2,50 2,50
7,00
7,00
7,00
7,00
7,00
7,0
7,00
7,00
7,00
7,00
7,00
7,00
7,0
7,00
7,00
7,00
7,00
7,0
7,00
7,00
7,00
7,00
7,0
3,35
8,00 8,00
3,35 30
30 3,35
3,35 1,00
1,00
7,00
3,95
1,20
3,95
1,20
7,80
1,60
1,30
7,80
1,60
1,30
16,65
16,65
16 16
00
7,00
7,00
7,00
7,00
7,00
7,00
4,78
00
7,00
7,00
7,00
7,00
7,00
7,00
4,78
Elévation
00
7,00
7,00
7,00
7,00
00
7,00
7,00
7,00
7,00
1,30
14,90
1,30
16,20 14,90
8,00 8,00
7,00
7,00
1,00
1,00
Elévation
16,20
Coup e CC’ 17 17
Coup e CC’
31
TOWERS HAVENLAAN 12 BRUXELLES 28 000 m²
Urban planning application 2D, images, model
collaboration with Bureau Bas Smets and Nicolas Firket Architects
Havenlaan 12 sit along the canal. The site, is currently occupied by an office building. This one will be replaced by a family of three small towers and a linear housing block, organised around a central semi-public garden. The elongated volume all along the plot with generous views on the park and the canal, is the starting point of the project. This building give the new scale to the projet, make the transition with the context, and become the new background. The main volumes - three small tower buildings - are positioned in such a way that they make the site visible in its depth from the canal. Havenlaan 12 is a family of buildings that are related in scale and materiality. The attention is given to the size and proportions, openings, entrance. The façades are built out of prefabricated, mass colored concrete panels that give each building its character and create an elegant urbanity through their massiveness. The residential buildings are simple in design with great spatial flexibility. Each building has an interior space seeks a relationship with a specific outdoor space or semi-outdoor space. Vertical circulation is centralized for effiient tower plans with all-round orientation. The complex will contain a mix of housing, hotel, public equipment and commercial spaces. The various types of housing (row houses, apartments and studios) will be complemented with private outside spaces, from gardens at the ground level until terraces, loggia’s and winter garden in the upper levels.
1
17.71 7
17.75
Molenbeek Saint-Jean Bruxelles-ville
17.70
N° 166L5 R+1 Bureau
17.35
Parking
17.30 17.39
42,82
Parking
10,15
17.45 17.47
17.94 Entrée Parking
N° 166L5 Rdc Bureau
17.92 17.36 17.11
17.47
17.87
12 Avenue du Port
127,14
18.02
PLAN DE SYNTHÈSE Plan d'implantation situation existante
N° 168T Rd 11 Frichc e
N° 164H6 R+3 Logement 30.35
17.34 Parking
17.46
Rue Bouvier
communale 85,82 rue asphalte 109,4 17.33 Parking
17.42
N° 167R6
17.12
18.25
25.00
N° 166K6 / /
7,77
17.26
20,44
18.04 18.11 Entrée
14 Avenue du Port
C 18.25
Avenue du Port avenue régionale pavement
18.03
24.42
18.23
N° 150M5 R+1 Bureau
8 H
18.21
N° 157R2 R+1 Logement N° 157F3 R+1 Logement
28.65 25.68
17.44 17.40 17.55
18.04
18.22
N° 164H6 R+3 Logement
21.77
N° 166A5
17.59
18.28
N° 150H6 Rdc Entrepôt
17.75
18.15
18.29
2
17.54 17.88
N° 166B5 R+6 Bureau
20,42
Limite du site
18.08
32.39
N° 157W2 R+2 Logement
35.61
N° 164H6 R+3 Logement
Parking
17.98
Rue Picard rue régionale asphalte
N° 168H R+ 11 Burea2 u
33.71
17.47
N° 164G6 R+2 Logement 30.43
17,27
17.41
N° 167P6 R+3 Logement 30.82
59,62
17.50 Servitude existante
N° 16 R+ 8G9 Loge 2 me nt 30.00
17.51
N° 167P6 R+3 Logement 30.73
25,41
ng
Parki
ng
Parki
17.54
N° 167H6 R+3 Logement 30.29
19,34
17.45
Limite du site
9
67,4
34.08
6
22,77
Rue rue Van Mey co asphmmun el alte ale
N° 16 RD 8E11 Ateli C er
N° 167N R+3 Logement 30.27
Rayon de 50m autour du du site
17.38 ng
ng
Parki
17.37
N° 157A2 R+3 Logement
30.29 N° 16 R+ 7M Loge 3 me nt
N° 16 RD 8H11 Bu C Patrimreau oine
N° 16 R+ 7K Loge 3 me nt
ng
N° 164H EquipR+3 6 em ent
N° 16 R+ 7G5 Loge 3 me nt
N° 157K3 R+3 Logement
N° 157K3 R+2 Logement
Rue le Lorrain rue communale asphalte
N° 16 R+ 7K6 Loge 3 me nt
N° 164N5 R+3 Logement
B'
A'
N° 16 R+ 7D5 Loge 3 me nt
N° 168L R+ 11 Loge 2 me nt
N° 157K3 R+3 Logement
N° 157K3 R+2 Logement
N° 157K3 R+3 Logement
N° 157K3 R+3 Bureau
N° 164N5 R+3 Logement
N° 16 R+ 5X4 Loge 3 me nt
N° 16 R+ 5C6 Loge 3 me nt
N° 16 R+ 8D6 Loge 3 me nt
N° 168D R+ 10 Loge 2 me nt
N° 164R3 R+3 Logement
N° 16 R+ 5P3 Loge 3 me nt
N° 16 R+ 8N6 Loge 3 me nt
N° 168D R+ 10 Ateli 2 er
N° 16 RD 8R Loge C 8 me nt
N° 16 R+ 7T5 Loge 3 me nt
N° 16 R+ 8P8 Loge 2 me nt
N° 168F R+ 11 Loge 1 me nt
N° 16 RD 8R8 Ateli C er
Rue rue Van Mey co asphmmun el alte ale
N° 167K R+ 11 Loge 3 me nt
N° 16 RD 8F11 Ateli C er
Parki
ng
Parki
N° 157K3 R+3 Logement
Parking
32.25
N° 16 R+ 7L Loge 3 me nt
5
B
25.84
Parki
N° 168V R+ 11 Burea6 u
A
17.42
3 2,2
everen 43.16
17.44 17.54 4
17.60
Parking
28.61 18.03
18.41
3
18.33 18.28
48,06 Parking
18.10
18.29 18.2
18.16 18.2
BATIMENT A DEMOLIR 18.06 18.23
H
17.96
18
17.97
17.45 18.2
Entrée
16 Avenue du Port 17.96
Molenbeek Saint-Jean Bruxelles - ville 18.21
17.53 18.23
21.13
N° 150B5 / /
18.24
23.81
Quai des materia pavement ux
9
Ph
Sc
Fo
N° 16 R+ 8V9 Loge 3 me nt
N° 164N5 R+3 Logement
N° 157H3 R+3 Logement
Bureau
N° 157K3 R+3
Bureau
N° 164K6 R+1
N° 158P2 R+3 Logement
N° 158N2 R+2 Logement
N° 158NB2 R+3 Logement
N° 158P R+3 Logement
N° 16 RD 5P3 Equip C em ent
N° 16 R+ 5B3 Loge 2 me nt
N° 157H2 R+2 Logement
N° 164F5 R+3 Logement
N° 16 R+ 5C3 Loge 2 me nt
N° 157A3 R+2 Logement
N° 164K6 R+3 Logement
N° 16 R+ 5W3 Loge 3 me nt
N° 158S2 R+2 Logement
N° 16 R+ 5V4 Loge 3 me nt
N° 16 R+ 5D3 Loge 2 me nt
N° 16 RD 8X8 Ateli C er
N° 16 R+ 8T9 Ateli 4 er
N° 16 R+ 5D3 Loge 2 me nt
N° 168G R+ 11 Loge 2 me nt
N° 16 R+ 5F5 Loge 2 me nt
N° 16 R+ 5X3 Loge 3 me nt
N° 16 R+ 5V5 Loge 3 me nt
N° 164C6 R+3 Logement
N° 16 R+ 5X4 Loge 3 me nt
N° 16 R+ 9X8 Loge 3 me nt
N° 16 RD 8S9 Ateli C er
N° 168G R+ 10 Loge 1 me nt
N° 16 R+ 5R5 Loge 2 me nt
N° 168H R+ 11 Burea2 u
17.34
420
420
17.41
420
17.36
420
420
420
Rue Bouvier rue communale asphalte
17.11
420
420
420
420
420
420
420
109,4
9725
1.00m
Parking
420
420
420
420
420
420
420
17.42
N° 158NB2 R+3 Logement
21.77
17.40 17.55
17.44
17.88
18.10
2
470 1.00m
0.75m
2
18.29 2
EI 30
EI 30
ST-504 1C-80m 2
525
525
525
525
525
525
525
525
304 3
130
525
1
236 2
1,3
130
4,6 460
132 ,5
392 ,5
+18.60 132 ,5
130
132 ,5
130
1,3
525
525
525
525
10461
1.8
0 2,1
9
5,72
9 67 ,4
Limite du site
17.45 +18.55
+18.10
17.26
2%
Rue rue Van Mey co asphmmun el alte ale
+18.18
+18.18
+41.15
+18.18
17.98
1,5
h
H
Parking 2 roues 5 6 7 8
17.39
EI 30
+40.0
2
17.96 exutoire de 245 fumées244 1m² 243 242
ng
panneaux solaires
241 240
zone accessible
+17.89
239
4
zone accessible
Exutoire
T2-E1 238
2%
de fumées 1 m²
panneaux solaires
237
+18.60
ng
235
Parki
234 233
231 232 233
3
234 235 236 237 238
240
T2-E2 241
exutoire de fumées 1m²
242
2
243 244 245
Exutoire de fumées 1 m²
+18.18
+18.18
1,5
H
18.04
Avenue du Port avenue régionale pavement
C 18.02
6,31
Entrée
18.04
18.25
18.25
18.15
18.21
18.29
17.59 17.53 17.70
18.03
18.23
18.22
18.08
Molenbeek Saint-Jean Bruxelles - ville
18.28
H: La/B
18.23
18.24
6,1
17.92
25.00
N° 166L5 R+1 Bureau
24.42
N° 166L5 Rdc Bureau
N° 166K6 / /
N° 150M5 R+1 Bureau
21.13
N° 150H6 Rdc Entrepôt
N° 150B5 / /
B
23.81
A
17.71
18.2
17.96
18.11
H: 1.45m X La/Br: 1.25m
Rayon de 50m autour du du site
17.87
18,17
17.94
Voie Pompier
Voie Pompier
%
1
3 Molenbeek Saint-Jean Bruxelles-ville
5% 1,
+18.18
+18.18
127,14
17.75
2 ,5%
2 ,5%
Limite du site
%
+18.18
2,2
17.38 17.42
18
Parking
2 ,5%
1,5
17.45
19,34
239
17.35
H: 1.45m X La/Br: 1.20m
17.97
236
+18.40
17.12
L'aire de livraison
Parki
h EI 30
Parking voiture
43.16
%
1,5
17.30
18.2
%
%
Entrée
1,5
2 ,5%
+18.18
+13(toi +40 .80 t)
18.06
N° 166B5 R+6 Bureau
N° 166A5
5
Rue Picard rue régionale asphalte
+18.80 +18.70
N° 167R6
+41.1
25,41
2
17.47
25.84
18
18.16
3,9
27m2
70
26m2
303
132 ,5
135
130
210
304 3
132 ,5
26m2
TERRASSE PRIVEE 40
525
40
236 2
392 ,5
135
132 ,5
70 525
210
130
26m2
70 525
70
132 ,5
135
130
210
135
1,3 210
3,9
40 525
40
ng
525
18
177
385
+18m75
17,27
0.75m
Servitude existante
2
ST-503 2C-77m 2
4,6 460
525
La/Br: 0.50m H: 0.50m X
H: 0.85m X La/Br: 0.8m
Parking
208
150 0.75m
ST-502 2C-79m 2
2
JARDIN COLLECTIF Herbe et mélange de fleurs
17.50
3,8
La/Br: 1.20m H: 1.80m X
18.33
Parking
673
ST-501 2C-77 ,4m
140
140
177
2
+18m75 EI 30
+16m10
Parki 0
0.75m
385
+16m25
+16m10
18.28
18.03
H: 0.95m X La/Br: 0.8m
1317
385
+16m25
+16m10
+05 +15m80
EI 30
150
208
150
385
8 pers .
+05 +15m80
EI 30
+16m25
18.41
28.61
17.75
8p.
2 entr .
8 pers .
+05 +15m80
EI 30
208
150
8 pers .
JARDIN COLLECTIF dalles en béton
32.39
35.61
N° 157W2 R+2 Logement
N° 164H6 R+3 Logement
110
8p.
2 entr .
177
177
140
177
208
150
1755
H: 1.2 La/B 0m r: 0.8 X 0m
ng Parki
17.44
+05 +15m80
EI 30
EI 30
5 1.8
La/Br: 1.07m H: 1.85m X
N° 157H3 R+3 Logement N° 157K3 R+3 Logement N° 157K3 R+3 Logement N° 157K3 R+3 Logement
Parking
N° 164H6 R+3 Logement
165
110
8p.
2 entr .
8 pers .
+05 +15m80
165
110
8p.
2 entr .
140
30.00
165
110
8p.
208
165
110
140
165
2 entr . 8 pers .
EI 30
2,4
everen
25.68
417
17.33
2
N° 157F3 R+1 Logement
17.54
385
34.08
420
2
1.00m
28.65
3,62
33.71
17.54 17.47
N° 16 R+ 8G9 Loge 2 me nt
17.46
Parking
13,77
Parking N° 157R2 R+1 Logement
N° 164H6 R+3 Logement 30.35
H: 1.20m X La/Br: 0.80m
17.45
N° 168V R+ 11 Burea6 u
N° 157K3 R+2 Logement
Rue le Lorrain rue communale asphalte
N° 164G6 R+2 Logement 30.43
5,25
N° 157A2 R+3 Logement
La/Br: 0.80m H: 1.20m X
N° 167P6 R+3 Logement 30.82
1.80 2,44
N° 167P6 R+3 Logement 30.73
17.47
17.37
N° 157K3 R+3 Logement
N° 157K3 R+2 Logement N° 164N5 R+3 Logement 32.25
30.29 N° 16 R+ 7M Loge 3 me nt
N° 167H6 R+3 Logement 30.29
2,42 1.80
N° 168T Rd 11 Frichc e N° 16 RD 8E11 Ateli C er
N° 167N R+3 Logement 30.27
420
N° 158N2 R+2 Logement
N° 158S2 R+2 Logement
Bureau
N° 157K3 R+3
Bureau
N° 157K3 R+3
N° 164N5 R+3 Logement
N° 164R3 R+3 Logement
B'
A' N° 164H EquipR+3 6 em ent
N° 16 R+ 7L Loge 3 me nt
1,84
17.60
17.51
N° 158P2 R+3 Logement
N° 157A3 R+2 Logement
N° 164F5 R+3 Logement Bureau
N° 164K6 R+1
N° 164N5 R+3 Logement
N° 164C6 R+3 Logement
N° 16 R+ 5X4 Loge 3 me nt
N° 16 R+ 5P3 Loge 3 me nt N° 16 R+ 7T5 Loge 3 me nt N° 16 R+ 7D5 Loge 3 me nt N° 16 R+ 7G5 Loge 3 me nt N° 16 R+ 7K6 Loge 3 me nt
Parki
ng
N° 16 R+ 7K Loge 3 me nt
ng Parki N° 16 RD 8H11 Bu C Patrimreau oine
N° 16 R+ 5V5 Loge 3 me nt
N° 16 R+ 5X3 Loge 3 me nt N° 16 R+ 5X4 Loge 3 me nt N° 16 R+ 5C6 Loge 3 me nt
N° 16 R+ 8D6 Loge 3 me nt N° 16 R+ 8N6 Loge 3 me nt
H: La/B1.20m r: 0.8 X 0m
N° 16 R+ 8P8 Loge 2 me nt N° 167K R+ 11 Loge 3 me nt
Rue rue Van Mey co asphmmun el alte ale
N° 168L R+ 11 Loge 2 me nt
N° 16 RD 8R8 Ateli C er N° 16 RD 8F11 Ateli C er
N° 164K6 R+3 Logement
N° 16 R+ 5W3 Loge 3 me nt N° 16 R+ 5V4 Loge 3 me nt
N° 16 R+ 5D3 Loge 2 me nt N° 16 R+ 5F5 Loge 2 me nt N° 16 R+ 9X8 Loge 3 me nt
N° 16 RD 8S9 Ateli C er N° 168D R+ 10 Ateli 2 er
N° 16 RD 8R Loge C 8 me nt N° 168F R+ 11 Loge 1 me nt
N° 157H2 R+2 Logement
N° 16 RD 5P3 Equip C em ent
N° 158P R+3 Logement
N° 16 R+ 5R5 Loge 2 me nt N° 16 R+ 5B3 Loge 2 me nt N° 16 R+ 5C3 Loge 2 me nt N° 16 R+ 5D3 Loge 2 me nt
N° 16 RD 8X8 Ateli C er
N° 16 R+ 8T9 Ateli 4 er N° 168G R+ 11 Loge 2 me nt N° 16 R+ 8V9 Loge 3 me nt N° 168G R+ 10 Loge 1 me nt N° 168D R+ 10 Loge 2 me nt
17.54
Quai des materia pavement ux
PLAN DE SYNTHÈSE Plan d'implantation situation nouvelle
Ph
Sc
Fo
L
i
30.2 9 N° 1 67M LogR+3 em ent
N°
B Patr 17.60
N° 167N R+3 Logement
N° 167H6 R+3 Logement
30.27
30.29
N° 167P6 R+3 Logement
N° 1 R+ Loge
30.73
30.8
N° 1 68 R H11 Bure+2 au
17.47
17.34
33.7
1
17.54
17.47
Entrée
17.41
17.51
17.11
17.36Entrée
EI 30
EI 30
EI 30
17.45
N° 1 68G LogR+2 9 em ent
17.54
0
EI 30
EI 30
8p.
8p.
30.0
2 entr .
2 entr .
8 pers .
8 pers .
EI 30
17,5
5
EI 30
ing
ST-002 134m2 Duplex
passage vers jardin
ST-003 141m2 Duplex
ST-004 140m2 Duplex
ST-005 140m2 Duplex
ST-006 137m2 Duplex
passage vers jardin
ST-007 143m2 Duplex
ST-00 140m Dupl
ST-008 142m2 Duplex
Entr ée
Park
ing
Park
17.44
ST-001 53m2 Espace commun
17.50
Entrée
34.0
8
12,4
8
Entrée
17.47
N° 167R6 17.37
17.45 Entr
ée
17.26
+18.10
Ru rue e Van Me co asp mmun yel halt ale e
17
En Pomtrée pier
1,5 %
8
2,5%
Entrée Entrée de la crèche
43.1 6
H
%
29,8
1,5
17.30
+18.18
+18.18
17.39
Park
ing
h
H
h
Par k
ing
+18.40 17.12
T1-0 Hô 01 544 tel m2
17.45
En de trée l'hô tel
24,5
7
Entrée Vélos Entr du ée bar
+18.18
9,69
IMMEUBLE 1 17.75
Molenbeek Saint-Jean
2,5%
SQUARE DE L'HOTEL Dalle de béton
17.94
Entrée Parking
Limite du site
Entrée de la brasserie
%
5
1,5
7,5
8
2,5%
T2-001 Brasserie 247m2
+18.18
22
18,32
IMMEUBLE 2
17.87
18.04
Bruxelles-ville
18.02
18.25
N° 157A2 R+3 Logement
32
167P6 +3 ement
N° 164G6 R+2 Logement
82
30.35
17.46
Parking
Rue Bouvier rue communale asphalte Parking
Entrée
98,63
17.33 Entrée
Entrée
Rénovation de la façade avec le matériel récupéré issu de la demolition
17.44
EI 30
EI 30
EI 30
17.42
EI 30
EI 30
8p.
8p.
2 entr .
2 entr .
8 pers .
8 pers .
EI 30
ST-010 131m2 Duplex
ST-011 137m2 Duplex
ST-012 122m2 Duplex
ST-013 133m2 Duplex
passage vers jardin
ST-014 125m2 Duplex
ST-015 132m2 Duplex
ST-016 130m2 Duplex
ST-017 125m2 Duplex
ST-018 122m2 Bar
passage vers jardin
103
passage vers jardin
EI 30
Servitude existant
8p. 2 entr . 8 pers .
13,18
EI 30
EI 30
Entrée
4,3
Entrée
2,49
Entrée
+18.60
TERRASSE PRIVE
Entrée
JARDIN PRIVE herbe +18.80 +18.70
10,72
N° 166A5
Entrée
2%
3,9
+18.55
Limite du site
JARDIN COLLECTIF Herbe et mélange de fleurs
+18.18
+18.18
%
T2-002 crèche 205m2
Espace extérieur crèche
T3-001 Fitness 269m2
Entrée
27
+17.89
+18.60
2%
JARDIN URBAIN COLLECTIF Pavé scié
31,54
1,5
T3-002 Commerce (supermaché) 222m2
1,5 %
Entrée pompiers
H
09 m2 lex
N° 164H6 R+3 Logement
30.43
2,5% %
1,5
+18.18 18.11
+18.18
26,05
+18.18
Entrée du Fitness
Entrée
21,72
Entrée du commerce
H
IMMEUBLE 3 18.04
Avenue du Port avenue régionale pavement 18.25
18.21
1
13 23
14
+41m15
f5
+6m90
+5m40
f2
Immeuble 1
Immeub
+41m15
+41m15
+41m15
+19m70
f3
f1
f1
f5
f3
f2
ble 2
Immeuble 3
+41m15
+41m15
+19m70 +19m15
f2
36.34±
51.14±
tioT
80.73+
21 .viN
50.43+
11 .viN
20.13+
01 .viN
99.72+
9 .viN
69.42+
8 .viN
39.12+
7 .viN
09.81+
6 .viN
78.51+
5 .viN
48.21+
4 .viN
18.9+
3 .viN
87.6+
2 .viN
57.3+
1 .viN
FITCELLOC NIDRAJ notéb ne sellad
elopuoc -neséd egamuf 2m1
014-TS
2m47-C2
3E–S
113-TS
2m47-C2
3E–S
112-TS
2m47-C2
3E–S
010-TS xelpud 2m131 3E–S
NIDRAJ SREV EGASSAP
05.0+
.V.R
:ngiS
71'/21/22
:etaD
02.81 = 00.0±
:seton
UP
:esahP
002/1 :elacS 3A :tamroF
53.0+
20.0-
20.0-
BB EPUOC
00.0± 0 .viN )02.81+(
89.2-
1- .viN
84.5-
2- .viN
nereveS naV divaD sreeG netsreK ECIFFO stcetihcrA tekriF salociN - AFN troP ud eunevA 21 naalnevaH
±43.63 ±43.63
Toit ±41.15 Toit ±41.15
Niv. 12 +37.08 Niv. 12 +37.08
Niv. 11 +34.05 Niv. 11 +34.05
Niv. 10 +31.02 Niv. 10 +31.02
T2 -1205
T2 -1202
T2 -1105
T2 -1102
T2 -1005
T2 -1002
T2 - 905
T2 - 902
T2 - 805
T2 - 802
T2 - 705
T2 - 702
T2 - 605
T2 - 602
T2 - 505
T2 - 502
ST-502 2C-76m2
T2 - 405
T2 - 402
ST-410 ST-413 2 2C-74m 2 2C-74m
T2 - 305
T2 - 302
ST-311 ST-315 2C-74m2 2C-74m2
ST-314 STUDIO-58m2
T2 - 205
T2 - 202
ST-211 ST-215 2C-74m2 2C-74m2
ST-214 STUDIO-58m2
T2 - 105
T2 - 102
ST-010 ST-014 duplex duplex 2 2 131m 125m
ST-014 duplex 125m2
Niv. 9 +27.99 Niv. 9 +27.99
Niv. Niv. 88 +24.96 +24.96
Niv. Niv. 77 +21.93 +21.93
Niv. Niv. 66 +18.90 +18.90
JARDIN COLLECTIF JARDIN dallesCOLLECTIF en béton dalles en béton
Niv. Niv. 55 +15.87 +15.87
coupole ST-412 désenfumage STUDIO 1m 43m2 2
Niv. Niv. 44 +12.84 +12.84
S–E3
Niv. 3 +9.81 +9.81
S–E3
Niv. 2 +6.78
S–E3
Niv. 1 +3.75
S–E3
Niv. 0 ±0.00
PASSAGE VERS JARDIN ST-014 duplex 125m2
T2 - 003 Entrée appartements
T2 - 001 Brasserie
-0.02
-0.02
+0.35 +0.35
+0.50 +0.50
(+18.20) (+18.20)
Niv. -1 -2.98 bac de retention
Niv. -2 -5.48
OFFICE Kersten Geers David Van Severen OFFICE NFA -- Nicolas Nicolas Firket Architects NFA Havenlaan 12 Avenue du Port Havenlaan
COUPE AA BB
Phase: PU Phase: PU Scale: Scale: 1/200 1/200 Format: A3 Format: A3
Sign: R.V. Sign: R.V. Date: 22/12/'17 Date: 22/17/'17 notes: notes: ±0.00 ±0.00==18.20 18.20
2' 1'
2''
3'
2' 1'
2''
3'
A' chambre 2 10m2
A chambre 1 15m2
A
5'
6'
6''
3'
8
9'
10'
5'
6'
6''
3'
8
9'
10'
6,5m2
6m2
5,4m2
5m2
6,5m2
6m2
5,4m2
5m2
chambre 1 16m2
S–E1
8p. 2S-A1 entr. 8 pers.
hall
chambre 1 15m2
1.00m2
1.00m2
6,71m 2
3 4
3 4
chambre 1 16m2 hall2 6,71m
3 4
3 4
chambre 1 16m2
chambre 1 16m2
6,71m 2
6,71m 2
3 4
3 4
chambre 1 16m2 hall2 6,71m
3 4
3 4
chambre 1 16m2
6m2
4,5m2
4m2
3,4m2
6m2
4,5m2
4m2
3,4m2
chambre 1 15m2
chambre 1 15m2
Niv 8p. 2S-A1 entr. VP 8 pers. sas 8m 2
EI 30
S–E1
dalle en brique de verre EI 30 REI 60'
Niv VP
Niv VP
hall
hall
séjour+cuisine ST-101 28m2 2
1.00m
2
hall
salle de bain
3 4
3 4
chambre 1 15m2 hall2 6,71m
3 4
3 4
salle de bain
salle de bain
6,71m 2
chambre 1 15m2 hall 2 6,71m
0.75m2
6,71m 2
3 4
3 4
1.00m
chambre 1 15m2 hall2 6,71m
3 4
3 4
chambre 1 15m2
8p. 2S-A3 entr. 8 pers.
6,71m 2
EI 30
chambre 1 15m2 hall2 6,71m
8p. 2S-A3 entr. 8 pers. s 0.75m2EI 30
0.75m20.75m2 hall
sas 8m 2 dalle en brique de salle verre de bain salle de bain REI 60' 0.75m2 0.75m2
salle de bain
0.75m20.75m2
S–E2
dalle en brique de verre REI 60'
6,71m 2
hall salle de bain
salle de bain
hall
hall
salle de bain
dalle en
s dalle en salle de bain 0.75m2
salle de bain
0.75m20.75m2
salle de bain
salle de bain
chambre 2 13m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 2 13m2
chambre 2 13m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 2 13m2
chambre 2 13m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 2 13m2
chambre 2 13m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 2 13m2
2,8m 2
1C-82m 16 ,6m
séjour+cuisine 28m2
8p. 2S-A2 entr. 8 pers. 2 sas 8mNiv VP
0.75m2EI 30 hall
salle de bain
0.75m2 salle de bain
ST-101 1C-82m2
EI 30
chambre 1 16m2 hall2 6,71m
0.75m20.75m2
2 sas 8m 2 dalle 0.75m en brique de salle verre de bain REI 60' 0.75m2
salle de bain
chambre 1 16m2 hall 2 6,71m
0.75m2
chambre 1 15m2
S–E2
8p. 2S-A2 entr. 8 pers.
6,71m 2
EI 30 EI 30
5,8m 2
C
4 4
chambre 2 10m2
5,8m 2
salle de bain hall
B' B B' B
A' A'
A'
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
16 ,6m2
C
9m2
2
3
1'
1
2
3
A
1
4
5
6
7
8
9
A
9m2
1'
4
5
6
7
8
9
3'
EI 30
EI 30
EI 308
S–E1
EI 30
2 8p. entr. 8 pers.
6''
3'
8
9'
10'
6'
Entrée 6''
3'
8
9'
10'
S–E1
0.75mEI230
0.75m2
ST-001 LOCAL ASSOCIATIVE 65m2 ST-001 LOCAL ASSOCIATIVE 65m2
passage vers jardin
C
atelier/entrée 12m2
atelier/entrée 12m2
atelier/entrée rgt2 13m
atelier/entrée rgt 13m2
atelier/entrée rgt 12m2
atelier/entrée rgt 2 12m
rgt séjour+cuisine 46m2
rgt séjour+cuisine 40m2 10 ,45m2
rgt séjour+cuisine 46m2
13 ,25m2
séjour+cuisine rgt 2 40m2 0.75m210 ,45m2
rgt 2
rgt 2
rgt 2
10 ,45m2
séjour+cuisine séjour+cuisine rgt 2 46m2 46m2 2 13 ,25m2 0.75m20.75m2 13 ,25m
rgt 2
rgt 2
rgt 2
ST-003 duplex 141m2 ST-003 duplex 141m2
EI 30
rgt séjour+cuisine 40m2
13 ,25m2
hall d'entrée 10m2
2 8p. entr. pers.
EI 308
S–E2
EI 30
2 8p. entr. 8 pers. séjour+cuisine 40m2 10 ,45m2 2 30 0.75mEI
S–E2
0.75m2
0.75m20.75m2
ST-002 duplex 134m2 ST-002 duplex 134m2
hall d'entrée 10m2
ST-004 duplex 140m2 ST-004 duplex 140m2
ST-005 duplex 140m2 ST-005 duplex 140m2
Entrée atelier/entrée 11m2
atelier/entrée 10m2
atelier/entrée 9m2
atelier/entrée 9m2
atelier/entrée rgt2 11m
atelier/entrée rgt 10m2
atelier/entrée rgt 9m2
atelier/entrée rgt 9m2
rgt séjour+cuisine 46m2
rgt séjour+cuisine 40m2 10 ,45m2
passage vers jardin passage vers jardin
séjour+cuisine rgt 2 40m2 0.75m210 ,45m2
rgt 2
rgt 2
rgt 2
séjour+cuisine séjour+cuisine rgt 2 46m2 46m2 13 ,25m2 13 ,25m2 0.75m20.75m2
rgt 2
rgt 2
rgt 2
ST-007 duplex 143m2 ST-007 duplex 143m2
9.5m2
13m2
13m2
9.5m2
Entrée
9.5m2
13m2
13m2
9.5m2
13m2
13m2
9.5m2
9.5m2
13m2
13m2
1
1'
1
2
3 3
4
5
4
5
6
NFA Nicolas Firket Architects OFFICE Kersten Geers David Van Severen OFFICE 216: Firket Havenlaan 12 NFA Nicolas Architects
S–E3
ST-009 duplex 140m2 ST-009 duplex 140m2
passage vers jardin passage vers jardin
9.5m2
Entrée
9.5m2
7
8
9
Entrée 10
7
8
9
10
+18.10 +18.10
OFFICE Kersten Geers David Van Severen
S–E3
EI 30
2 8p. entr. 8 pers. séjour+cuisine 40m2 10 ,45m2 2 30 0.75mEI
ST-008 duplex 142m2 ST-008 duplex 142m2
Entrée
1'
hall d'entrée 8m2
2 8p. entr. pers.
EI 308
0.75m2
12m2
Entrée 6
EI 30
10 ,45m2
0.75m20.75m2
ST-006 duplex 137m2 ST-006 duplex 137m2
hall d'entrée 8m2
rgt séjour+cuisine 40m2
13 ,25m2
12m2
Entrée 2
OFFICE 216: Havenlaan 12
rgt séjour+cuisine 46m2
13 ,25m2
0.75m2
A
C
atelier/entrée 13m2
0.75m2
passage vers jardin
1
Entrée 1
Entrée atelier/entrée 13m2
A
B' B B' B
Entrée Entrée
6'
5'
EI 30
EI 30
EI 30 EI 30
hall d'entrée 11m2
2 8p. entr. pers.
A
C'
5'
4
hall d'entrée 11m2
A
C'
4
B' B'
3'
2''
EI 30
2''
B
Entrée
B
A'
Entrée
EI 30
2' 1'
EI 30
2' 1' A'
A' A'
PLAN niv VP +3m6 PLAN niv VP +3m6
PLAN n VP ±0 PLAN n VP ±0
PLAN DE SYNTHÈSE PLAN DE SYNTHÈSE IMMEUBLE LONG (+0, +1,) IMMEUBLE LONG (+0, +1,)
12
13'
14'
14''
12
13'
14'
14''
15'
16
17'
18'
15'
16
17'
18'
D' D'
11' 11'
C' C'
B' B'
10''
10''
18''
19'
20''
18''
19'
20''
m2
A' A A' A
m2
S–E3
n brique de verre REI 60'
3 4
3 4
chambre 1 16m2 hall2 3,3m
3 4
3 4
chambre 1 16m2 chambre 1 16m2 hall2 3,3m
0.75m2
n brique de salle verre REI 60'
3,3m 2
3 4
3 4
chambre 1 16m2 hall2 3,3m
3 4
3 4
chambre 1 15m2
8p. 2S-A4 entr. 8 pers. 2 sas 8mNiv VP
2 30 0.75mEI
hall
de bain 0.75m2
salle de bain
hall
hall
salle de bain
salle de bain
3,3m 2
3 4
3 4
chambre 1 14m2 hall2 3,3m
3 4
3 4
salle de bain
salle de bain
chambre 1 14m2
chambre 1 14m2
3,3m 2
3,3m 2
3 4
3 4
chambre 1 14m2 hall2 3,3m
3 4
3 4
chambre 1 15m2
ST-102 54m2
S–E5
8p. 2S-A5 entr. 8 pers.
3,3m 2
séjour+cuisine+chambre 38m2
EI 30
S–E4
dalle en brique de verre REI 60'
chambre 1 14m2 hall2 3,3m
0.75m2
EI 30
chambre 1 15m2 hall2 3,3m
Niv 8p. 2S-A5 entr. VP 8 pers. sas 8m 2
2 30 0.75mEI
0.75m20.75m2 hall
sas 8m 2 dalle en brique de salle verre de bain salle de bain REI 60' 0.75m2 0.75m2
salle de bain
0.75m20.75m2
Niv VP
EI 30
chambre 1 15m2 hall2 3,3m
chambre 1 14m2
S–E4
8p. 2S-A4 entr. 8 pers.
3,3m 2
0.75m20.75m2 hall
sas 8m 2
chambre 1 16m2
3,3m 2
hall
salle de bain
hall
hall
salle de bain
salle de bain
Niv VP
sas 8m 2 dalle en brique de verre salle de bain REI 60' 0.75m2
salle de bain
0.75m20.75m2
salle de bain
9,9m 2
ST-102
S–E5
dalle en brique de verre EI 30 REI 60'
salle de 54m2 bain 1.00m2
0.75m2
Niv VP
. 2 sas 8mNiv VP
3,3m 2
ST-103 2C-76m2
salle de bain
séjour+cuisine+chambre 38m2
B' B B' B
9,9m 2
salle de bain 1.00m2
0.75m2
chambre 1 16m2
S–E3
.
rgt salle de bain hall rgt salle de bain
ST-103
chambre 2 13m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 2 13m2
chambre 2 13m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 2 13m2
chambre 2 13m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 2 13m2
chambre 2 13m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 3 10m2
chambre 2 12m2
chambre 3 10m2
chambre 2 13m2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
2,8m 2
séjour+cuisine 2 2C-76m 31m2
hall2 chambre 9m2
chambre 1 14m2
séjour+cuisine 31m2
chambre 2 9m2
chambre 1 14m2
8,1m 2
2,8m 2
5,9m 2
2,8m 2
2,8m 2
8,1m 2
2,8m 2
5,9m 2
2,8m 2
C
9m2
C C'
14
13
14
B
15
16
17
18
19
20
15
16
17
18
19
20
D
13
12
D
12
11
C
11
10
B
10
C
9m2
C'
11'
12
13'
14'
14''
10''
11'
12
13'
14'
14''
17'
18'
17'
18'
Entrée
rgt 2
rgt 2
rgt 2
13 ,25m2
10 ,45m2
séjour+cuisine séjour+cuisine rgt 2 46m2 46m2 2 13 ,25m2 0.75m20.75m2 13 ,25m
rgt 2
rgt 2
rgt 2
0.75m2
ST-010 duplex 131m2 ST-010 duplex 131m2
ST-011 duplex 137m2 ST-011 duplex 137m2
S–E4
0.75m2
0.75m20.75m2
ST-012 duplex 136m2 ST-012 duplex 136m2
ST-013 duplex 133m2 ST-013 duplex 133m2
9.5m2
13m2
13m2
9.5m2
9.5m2
13m2
13m2
9.5m2
10 ,45m2
rgt 2
rgt 2
rgt 2
passage vers jardin passage vers jardin
rgt entrée 4m2
rgt séjour+cuisine 46m2
13 ,25m2
séjour+cuisine rgt 2 40m2 0.75m210 ,45m2
13 ,25m2
rgt 2
rgt 2
rgt 2
S–E5
EI 30
2 8p. entr. 8 pers. séjour+cuisine 40m2 10 ,45m2 0.75m2EI 30
rgt S–E5
0.75m2
ST-016 duplex 130m2 ST-016 duplex 130m2
passage vers jardin
ST-017 duplex 125m2 ST-017 duplex 125m2
passage vers jardin
Entrée
13m2
13m2
9.5m2
Entrée
9.5m2
13m2
13m2
9.5m2
11
12
13
12
13
14
1.00m2 rgt
1.00m2
9.5m2
11
A' A A' A
EI 30
hall d'entrée 4m2
hall d'entrée 4m2 2 8p. entr. EI 308 pers.
10 ,45m2
séjour+cuisine séjour+cuisine rgt 2 46m2 46m2 2 13 ,25m2 0.75m20.75m2 13 ,25m
ST-015 duplex 132m2 ST-015 duplex 132m2
EI 30
rgt séjour+cuisine 40m2
0.75m20.75m2
ST-014 duplex 125m2 ST-014 duplex 125m2
Entrée
entrée 4m2
rgt entrée 4m2
rgt séjour+cuisine 46m2
rgt séjour+cuisine 40m2
0.75m2
Entrée 14
niv +0 0m60 niv +0 0m60
rgt entrée 5m2
rgt entrée 5m2
S–E4
EI 30
2 8p. entr. 8 pers. séjour+cuisine 40m2 10 ,45m2 0.75m2EI 30
entrée 4m2
15
16
17
Entrée 18
15
16
17
18
B' B B' B
ST-018 ESPACE COMMERCIAL 122m2 ST-018 ESPACE COMMERCIAL 122m2
+18.60 +18.60
C C'
19
20
C'
19
20
Entrée Entrée
13 ,25m2
séjour+cuisine rgt 2 40m2 0.75m2 10 ,45m2
rgt séjour+cuisine 40m2
hall d'entrée 6m2 2 8p. entr. EI 308 pers.
entrée 5m2
0.75m2
10 ,45m2
rgt séjour+cuisine 46m2
EI 30
20'' 20''
0.75m2
rgt séjour+cuisine 46m2
rgt séjour+cuisine 40m2
rgt atelier/entrée 6m2
19' 19'
EI 30
rgt atelier/entrée 7m2
entrée 5m2
D
rgt atelier/entrée 8m2
rgt atelier/entrée 8m2
hall d'entrée 6m2
18''
18''
Entrée
Entrée
atelier/entrée 6m2
D
atelier/entrée 7m2
EI 30
atelier/entrée 8m2
EI 30
atelier/entrée 8m2
C
3
16 16
C
3
15' 15'
D' D'
10''
C' C'
+1 60 +1 60
C
+18.80 +18.70 +18.80 +18.70
+18.55 +18.55
Phase:
PU
Sign:
SJ
Scale: 300 Phase: PU Format: A3 Scale: 300
Date: Sign:
22/12/'17 SJ
notes: Date:
22/12/'17
Format: A3
notes:
2' 1'
2''
3'
2''
3'
A'
3'
4
5'
6'
A'
2''
4
5'
6'
A'
2' 1'
4
5'
6'
6''
3'
8
9'
10'
6''
3'
8
9'
10'
A' 1.00m2
A'
A'
B' B
3
3 3'
3 3'
A
2
1
4
5
AA'
1'
4 4
5' 5
AA'
C
4 4
5' terrasse 29m 5
A'
C' 6
1'
1
2' 1'
1
2' 1'
2
2''
2
2''
4
43m 5' terrasse 29m
6'
6
8
9
7 3'
8 8
9' 9
7 3'
8 8
9' terrasse 9
3'
8
43m 9' terrasse
10
JARDIN COLLECTIF PLAN niv Herbe et mélange de fleursVP ±15m
C' C
7
6''
10'
1.00m2
1'
ST-402 STUDIO 43m2 terrasse
2''
EI 30
A
A'
31m2
ST-401 1C-82m2
A
terrasse 27m2
C
1'
1 terrasse 27m2
31m2
29m2
ST-402 STUDIO 43m2
2
ST-401 1C-82m2
6''
terrasse 26m2
2
6''
terrasse 26m2
24m2
0.75m2
0.75m2
3
4
ST-405 2C-74 m2
5
6
ST-406 4C-117m2
7
terrasse 26m2
2' 1'
1 A'
C'
2
2''
3 3'
terrasse 27m2
AA'
1'
4 4
8
ST-408 2C-74m2
9
terrasse 26m2
5' 5
terrasse 26m2
2' 1'
1 A'
A'
0.75m2
terrasse 26m2
ST-201 1C-82m2
A
0.75m2 0.75m2 2 8p. entr. 8 pers.
B' B
ST-201 1C-82m2 26m2
1'
1
10m2
4 0.75m20.75m2
ST-202 1C-62m2
5'
6'
6
8p. 2 1.00m entr. 8 pers.
6''
ST-204 1C-70m2
0.75m2
ST-204 1C-70m2
0.75m2
3'
8
ST-201 1C-82m2
2
ST-203 2C-74,5m2
3
4
26m2
26m2
1
2
OFFICE Kersten Geers David Van Severen 26m2
3
4
26m2
5
C'
2
NFA Nicolas Firket Architects OFFICE 216: Havenlaan 12 OFFICE Kersten Geers David Van Severen NFA Nicolas Firket Architects
3
A
1
OFFICE 216: Havenlaan 12 OFFICE Kersten Geers David Van Severen
5
1.00m2
10
ST-208 1C-66m 6.2m2 2
10'
2 8p. entr. 8 pers. 1.00m2
EI 30
0.75m2
2 8p. entr. 8 pers. 1.00m2
ST-209EI 30 2C-74,5m2 0.75m2
0.75m20.75m2
ST-208 1C-66m2
2 8p. entr. 8 pers.
ST-209EI 30 2C-74,5m2
0.75m2 26m2
0.75m20.75m2
0.75m2 26m2
ST-205 2C-74,5m2
6
ST-207 2C-74,5 m2
7
8
26m2
4
6
7
9
ST-209 2C-74,5m2
10
26m2
8
PLAN niv + VP ±6m60/ 9
10
PLAN niv + PLAN DE SYNTHÈSE VP ±6m60/ 5 6 7 8 10 IMMEUBLE LONG (+2/3,9 +4, +5 PLAN niv + PLAN DE SYNTHÈSE VP ±6m60/ IMMEUBLE LONG (+2/3, +4, +5 PLAN DE SYNTHÈSE
26m2
NFA Nicolas Firket Architects 1'
9'
ST-207 2C-74,5 m2
26m2
A
1'
10'
ST-208 1C-66m 6.2m2 2
C' C
6.2m2
PLAN niv VP ±12m
ST-206 1C-59m2
26m2
10
PLAN niv VP ±12m
0.75m20.75m2
0.75m2
0.75m2
0.75m20.75m2
9' 9
ST-207 2C-74,5 m2
ST-205EI 30 2C-74,5m2
26m2
8 8
ST-206 8.3m2 2 1C-59m
2
2 8p. entr. 8 pers.
0.75m2
ST-206 8.3m2 2 1C-59m
10'
terrasse 26m2
7 3'
0.75m2
8p. 2 1.00m entr. 8 pers.
ST-205EI 30 2C-74,5m2 0.75m20.75m2
9' 9
8.3m2
6''
2
EI 30
10m2
ST-202 1C-62m2
8 8
10
PLAN niv VP ±12m
0.75m2
C' C
1.00m2
6'
ST-203 2C-74,5m2
EI 30
C
7 3' terrasse 26m2
5' 5
ST-203 2C-74,5m2
EI 30
B' B
3'
12m2
0.75m2 2 8p. entr. 8 pers.
6''
ST-204 1C-70m2
A'
2''
6
10m2
4 4
12m2
2 8p. entr. 8 pers.
EI 30
A
3 3' ST-202 1C-62m2
2' 1' B' B
2''
A
A
2
AA'
12m2
1'
6'
terrasse 26m2
2 8p. entr. 8 pers.
ST-408EI 30 2C-74m2
terrasse 26m2
C' C
2 8p. entr. 8 pers. 1.00m2
ST-408EI 30 2C-74m2
0.75m2
0.75m20.75m2
terrasse 26m2
2 8p. entr. 8 pers. 1.00m2
0.75m2
ST-407 STUDIO 43m2
ST-406 4C-117m2
10
0.75m2
0.75m20.75m2
ST-405EI 30 2C-74 m2
1.00m2
EI 30
terrasse 24m2
2 8p. entr. 8 pers.
terrasse 26m2
terrasse 26m2
10'
2
ST-407 STUDIO 43m2
ST-406 4C-117m2
terrasse 26m2
0.75m2
ST-407 STUDIO
0.75m20.75m2
2
ST-405EI 30 2C-74 m2
0.75m20.75m2
10'
PLAN niv VP ±15m
24m2
0.75m2
8p. 2 1.00m entr. 8 pers.
0.75m2
ST-404 STUDIO 43m2
terrasse 26m2
ST-403 2C-74m2
8p. 2 1.00m entr. 8 pers.
EI 30
0.75m2
ST-404 STUDIO 43m2 terrasse
0.75m2 0.75m2
C'
6'
2
2
0.75m20.75m2
ST-403 2C-74m2
EI 30
B' B
ST-402 STUDIO 43m2 terrasse
0.75m2 0.75m2 2 8p. entr. 8 pers.
ST-401 1C-82m2
ST-404 STUDIO
0.75m20.75m2
ST-403 2C-74m2
EI 30
C
3'
0.75m2 0.75m2 2 8p. entr. 8 pers.
B' B
6
B
2 8p. entr. 8 pers.
2' 1' B' B
6'
2
A'
A
A
terrasse 31m2
10
PLAN niv VP ±15m
A'
C'
2 8p. entr. 8 pers. EI 30
B
2 8p. entr. 8 pers. EI 30
EI 30
B
2 8p. entr. 8 pers.
2 8p. entr. 8 pers. 1.00m2
JARDIN COLLECTIF dalles en béton JARDIN COLLECTIF Herbe et mélange de fleurs JARDIN COLLECTIF dalles en béton JARDIN COLLECTIF Herbe et mélange de fleurs
A
2 8p. entr. 8 pers. 1.00m2
EI 30
2
EI 30
EI 30
C
10'
B
8p. 2 1.00m entr. 8 pers.
2 8p. entr. 8 pers. EI 30
B' B
3' 8 9' JARDIN COLLECTIF dalles en béton
6''
B
A
2
B
B' B
8p. 2 1.00m entr. 8 pers.
EI 30
B
EI 30
B
2 8p. entr. 8 pers.
2' 1'
26m2
26m2
B
A
1.00m2
14''
B'
11'
12
13'
14'
14''
10''
15'
16
17'
18'
15'
16
17'
18'
D'
14'
19'
20''
D'
13'
C'
12
C'
B'
11'
10''
19'
20''
18''
18''
14''
EI 30
15'
0.75m2
16
17'
18'
ST-502 2C-79m2
EI 30
ST-503 EI 30 2C-77m2
ST-502 2C-79m2
ST-503 EI 30 2C-77m2
+05 m80
B'
B'
10''
13' 13
14'
11 11'
terrasse 20m2
ST-409 STUDIO 43m2
11'
12 12
14'
13'
14'
ST-409 STUDIO 43m2
C 14''
14''
ST-409 STUDIO 43m2
ST-413 2C-74m2
EI 30
terrasse 18m2
0.75m2
ST-411 4C-117m2
ST-413 2C-74m2
EI 30
0.75m2
0.75m20.75m2 terrasse 26m2
terrasse 26m2
18''
18
19 19'
20'' 20
C
27m2
17' 17
ST-414 STUDIO 43m2
16
18'
18''
18
19 19'
17'
18'
2 8p. entr. 8 pers.
18''
EI 30
terrasse 14m2
terrasse 12m2
A' B' A B
8 pers.
ST-415EI 30 2C-74m2
ST-416 4C-120m2
A' B' A B
terrasse 9m2
0.75m2
ST-414 STUDIO 43m2
1.00m2 2 8p. entr. 8 pers.
ST-415EI 30 2C-74m2
ST-416 4C-120m2
0.75m2
0.75m20.75m2 terrasse 26m2
1.00m2 2 8p. entr.
0.75m20.75m2
ST-412 STUDIO 43m2
20''
terrasse 9m2 0.75m2
ST-414 STUDIO 43m2
A' A
19'
terrasse 12m2
ST-412 STUDIO 43m2
20'' 20
terrasse 9m2
0.75m20.75m2
0.75m2
C
20
C' 16 16
ST-412 STUDIO 43m2
0.75m2
2 8p. entr. 8 pers.
18'
26m2
terrasse 12m2
15'
19
27m2
17' 17
terrasse 14m2
0.75m2
8 pers.
ST-411 4C-117m2
15 15'
ST-504 1C-80m2
18
C' 16 16
terrasse 14m2 0.75m2
2 8p. entr.
terrasse 20m2
0.75m2
2 8p. entr. 8 pers.
EI 30
terrasse 18m2
0.75m20.75m2
ST-410 2C-74m2
14
18m2
12
15 15' 26m2
0.75m20.75m2
0.75m2
14''
ST-503 2C-77m2
26m2
TERRASSE PRIVEE
13' 13 terrasse
terrasse 20m2 0.75m2
ST-410 2C-74m2
14
26m2
10''
+05 m80
12 12
17
0.75m2
11 11'
C B' B
0.75m2 27m2
C' 16
26m2
CC'
10''
15
TERRASSE PRIVEE
CC'
B'
26m2
ST-502 2C-79m2
C'
+05 m80
14
1.00m2 26m2
TERRASSE PRIVEE
13
ST-504 1C-80m2
0.75m20.75m2 26m2
0.75m2
0.75m2
D
EI 30
ST-501 2C-77,4m2
A' B' A B
0.75m2
1.00m2 2 8p. entr. 8 pers.
26m2
12
A' B' A B
ST-504 1C-80m2
0.75m20.75m2
2 8p. entr. 8 pers.
11
20''
2 8p. entr. 8 pers.
0.75m2
ST-501 2C-77,4m2
19' 0.75m2
1.00m2
2 8p. entr. 8 pers.
ST-501 2C-77,4m2
18''
EI 30
0.75m20.75m2
1.00m2
terrasse 26m2
C B' B
0.75m2
14'
D'
13'
D D'
12
D D'
11'
2 8p. entr. 8 pers.
D'
10''
C'
B'
A' A 2 8p. entr. 8 pers.
terrasse 26m2
C' 13 terrasse 26m2
15
16
terrasse 26m2
17
ST-415 2C-74m2
ST-416 4C-120m2
18
19
terrasse 26m2
C
20
terrasse 26m2
14'
14
14''
terrasse 26m2
15 15'
16 16
terrasse 26m2
17' 17
18'
18''
18
19 19'
terrasse 26m2
C
20'' 20
terrasse 26m2
13' 13
14'
14
14''
15 15'
16 16
17' 17
D D'
12 12
CC'
C' 11 11'
18'
18''
18
19 19'
20'' 20 A' A
2 8p. entr. 8 pers.
14''
EI 30
0.75m2
0.75m20.75m2
ST-210 1C-63m2
14'
ST-212 1C-66m2
ST-211 2C-74,5m2
0.75m2
ST-210 1C-63m2
ST-212 1C-66m2
ST-211 2C-74,5m2
20'' A' B' A B
ST-219 2C-76,5m2
0.75m2
1.00m2
A' B' A B
ST-218 STUDIO-54m2
2 8p. entr. 8 pers.
ST-219 2C-76,5m2
0.75m2
0.75m20.75m2 26m2
19'
ST-218 STUDIO-54m2
2 8p. entr. 8 pers.
ST-216 STUDIO-59m2
ST-218 STUDIO-54m2
1.00m2
ST-217EI 30 2C-74,5m2
0.75m2
26m2
18''
ST-217EI 30 2C-74,5m2 0.75m20.75m2
ST-215 2C-74,5m2
0.75m2
0.75m20.75m2 26m2
2 8p. entr. 8 pers.
0.75m2
ST-216 STUDIO-59m2
ST-214 STUDIO-58m2
2 8p. entr. 8 pers.
18'
EI 30
0.75m20.75m2
0.75m2
ST-213EI 30 2C-74,5 m2
0.75m2
17'
ST-215 2C-74,5m2
0.75m2
0.75m20.75m2
16
ST-214 STUDIO-58m2
2 8p. entr. 8 pers.
ST-213EI 30 2C-74,5 m2
0.75m2
15'
0.75m2
13'
ST-216 STUDIO-59m2
0.75m2
12
ST-214 STUDIO-58m2
1.00m2
26m2
C B' B
0.75m2
0.75m2
11'
ST-212 1C-66m2
D'
ST-210 1C-63m2
C'
B'
terrasse 26m2
13' 13
D D'
12 12
+04 m60
B'
ST-413 2C-74m2
CC'
11 11'
10''
10''
14
C'
10''
+04 m60
ST-411 4C-117m2
D
12
terrasse 26m2
B'
+04 m60
11
C
ST-410 2C-74m2
26m2
C'
+02/03 /9m60
26m2
+02/03 /9m60
26m2
+02/03 /9m60
5)
ST-213 2C-74,5 m2
14
ST-215 2C-74,5m2
26m2
15
16
26m2
17
ST-217 2C-74,5m2
18
D
13
26m2
ST-219 2C-76,5m2
19
C
20
26m2
11
13
14
26m2
12
13
15
16
26m2
14
15
17
Phase:
PU
Scale:
300
26m2
16
18
D
12
C
C' 11
17
Format: A3 Phase: PU Scale:
300
19 26m2
19
C
20
Sign:
SJ
Date: 18
D
5)
12
C
11
C
ST-211 2C-74,5m2
notes:
C'
22/12/'17 20
Sign:
SJ
Date:
22/12/'17
Format: A3 Phase: PU
notes:
Sign:
SJ
Scale:
Date:
22/12/'17
300
N°1 91 R+ hab 2+T itat
N°1 95 R+ hab 2+T itat
N°1
N°1 97 R+ hab 2+T itat
Tro
ale
ion
99
pav ée ton
bé
20 1
N°
4B
21
21 6
N°
8
N° 21
e
R+ Co habit 3+ mm at T erc
N° 22 0
R+ Co habit 3+ mm at T erc e
2
R+
C
T
R+ Co habit 3+ mm at T er ce
T
3+
R+
RD
A 20 T
C
RD
RDC
ha R+4 bit at
A 18 K2 N°
R+ Co habitat5 mm erc e
D'
A 20 R+ T 1
B
D
C
ée de re
Wa v
n°12
+5m20 VP
Niv.1
R+ hab 2 itat
n°11 6,4
n°19
ss
au
A
R+7
A 22 P R+1
RDC R+2+T habitat R+2+T habitat R+2+T habitat R+2+T habitat
R+1 R+2
32,1
R+2+T habitat
RDC T 3+ at R+ bit erce ha mm Co
R+2+T habitat
RDC R+1
T 3+ at R+ bit erce ha mm Co
T 2+ at R+ bit erce ha mm Co
07/06/'18 ±0.00 = 00.00
A.G. Date: notes:
Sign:
Vue satellite PU 1/500 Format: A3
Scale:
Phase:
R+10
RDC
N° 22 6
T 2+ at R+ bit erce ha mm Co
N° 22 4
N° 22 8
N° 2
22
Plan d'implantation
+12m50
RDC
N°1
bét on
N°4 on
20
N°3-19
ch
1
n°6-8
R+3 habitat
R+ hab 2+T itat
és
bét
R+5 habitat R+5 habitat
14,9
R+2+T habitat
tto ir pav
E
VR
WA
rég
DE
és
R+ Co habitat5 mm erc e
ir pav
14A
N°2
rue du Trône
Tro tto
A
C'
+15m10
n°13 6,4
A 22 V2
Vo irie
EE
SS
AU
CH
SQUARE DE LA RESIDENCE N°6
2
R+8
21-29 Rue Godecharle
93
R+ 6
Limite de propriété
A 13 W17
R+ hab 2+T itat
N°1
14
N°2
R+ hab 4+T itat
3
rue Godecharle
OFFICE Kersten Geers David Van Severen
89
N°1
6
R+
B'
A'
4
terrasse privé 16m 2
n°15 n°17 +17m00
N°3
+13m70
n°19 +18m20
R habitat
R+2+T habitat
R+ hab 2+T itat
12
R+ hab 4+T itat
N°2
C
RD
m
50
N°5 R+ hab 5 itat
G H I J
toiture Niv
+11m90 VP
+7m25 VP toiture Niv toiture Niv
+14m45 VP
A B' B C 37,5
D E F
terrasse privé 16m 2 terrasse privé 15m 2
5,4 4,4 4,5 9 6,4 7
terrasse privé 15m 2 terrasse privé 11m 2 terrasse privé 11m 2
+12m50 5,4 9
6,4
n°29
n°10
R+4
R+2+T habitat
n°21
4,4
n°23 4,5
n°25
n°27
7 +13m40
terrasse privé 11m 2 terrasse privé 11m 2
n°19 n°31 n°31
R+3 +16m80
R+3+T habitat n°33
RUE GODECHARLE
n°35
R+4+T habitat R+3 habitat
n°37
R+5
n°39
R+3 habitat
n°41
R+3 habitat
n°43
R+4
n°45
R+5
n°14
R+6
n°47
+12m10
rue d’Idalie
Plan Particulier d’affectation du Sol
HOUSING GODECHARLE BRUXELLES
4270m²
Scheme design - Urban Planning application conception, 2D
R+6
R+4 A 24 P2
R+5 R+6 R+4
R+4
RDC RDC
The context is the one of a typical Brussels block: on the street front some terraced houses with pitched roofs, which annexes and industrial workshops have been added at the end of the plot. The project set on the regrouping of five of these plots. The challenge here is to compose a new building resolutely comporain and sober taking into account all the urban planning rules of the city (facade conservation, alignment, maximum depth, set back, profile, size, consistency with the context,...). On the street front, two heritage facades have to be preserved. The new volume with unit facades includes the existing one as a stamp, in this way they can keep their own autonomy, alignment, and aesthetics. A game of symmetry is operated between the front facade and the back facade of the main building. The two last floors is cut on terraces to follow the authorized profile. A textil set on a light structure, in order to recreate the profile of the Brussels pitched roof in a virtual, flexible and porous way. We dig in the existing block, to bring a courtyard to the new housing, necessary to find some qualities of habitability. A portico with climbing plants unifies and frames the mineral courtyard. This one is shared by the building on the street front and the workshops at the bottom of the plot, conserved and converted into a single-family house.
T
95
99
N°1
ton bét on
vé s bé ton
ha R+4 bit at
N°2 01
14 B
N°2
R+ Comhabita5 mer t ce
21-29 Rue Godecharle
s bé
R+ ha 2+T bita t
vé ée
pa
E
N°4
B'
A'
16
N°2 +5m20 VP Niv.1
N°2 20
R+ Co hab 3+ mm ita T erc t e
R+ 2
6
R+
N°1 91 R+ ha 2+T bita t
R+ ha 4+T bita t
12
N°2
18
N°2
R+ Co hab 3+ mm ita T erc t e
N°1 89 R+ ha 2+T bita t
G
H
4
OFFICE Kersten Geers David Van Severen
ir pa pav
RE
le
AV
Trot toir
R+ Comhabita5 mer t ce
A
SQUARE DE LA RESIDENC N°5
R+5 habitat
A 18 K2
I
J
3+ T
T
R+ C hab 3+ om it T m at erc e
R+
20
N°2 14
D'
C'
A
R+ ha 4+T bita t
N°1 93 R+ ha 2+T bita t
A
C
RD
RD C
m
50
toiture Niv
toiture Niv
+11m90 VP
+14m45 VP
+7m25 VP toiture Niv
20
RD
T
C
R+ 6
N°2
3
N°1
95 R+ ha 2+T bita t
24
26
A 2 R+ 0 T 1
N°1 97 R+ ha 2+T bita t
N°2
28
R ha +2 bita t N°1
toir pa
E
D
C
37,5
B
B'
A
32,1
7
6,4
9
4,5
4,4
5,4
pa
ée
A
R+ Comhabita5 mer t ce
pav
E
N°6
14
N°1 99
ton
le
AV R
Trot toir
N°2
iona
s bé
F
+13m70
2
bét on
s bé
vé
ton
R+2+T habitat
R+1
R+2
+12m10
SQUARE DE LA RESIDENC
E
+15m10 terrasse privé 11m 2
terrasse privé 11m 2
R+ habi 5 tat
N°5
terrasse privé 15m 2
N°2
ha R+4 bit at
R+2+T habitat
terrasse privé 16m 2
+12m50
01
R+5 habitat
N°4
6,4
+18m20
14,9
+16m80
14 B
R+ Comhabita5 mer t ce
N°2
n°31
n°33
n°35
terrasse privé 11m 2
terrasse privé 11m 2
terrasse privé 15m 2
n°15
n°17
n°19
+17m00 6,4
R+2+T habitat
n°43
N°3
n°37
R+2+T habitat
n°45
R habitat
R+ ha 2+T bita t
vé
rég
EE DE W
Voi rie
AU SS
Trot
CH
Limite de propriété
T 2+ at R+ abit erce h m m Co RDC
R+2+T habitat
n°47
N°3
14
N°2
iona
W
rég
DE
rie
EE
Voi
SS
AU
Trot to
CH
97
N°1
R+ ha 2+T bita t
R ha +2 bita t N°1
N°6
R+ habi 5 tat
R+5 habitat
T 3+ at R+ abit erce h m m Co
RDC
N°2 T 2+ at R+ abit erce h m m Co
R+1 RDC RDC
RDC
A 22 V2
R+2+T habitat
R habitat
N°2
22
RDC
T 3+ at R+ abit erce h m m Co RDC
R+2+T habitat A 22 P
n°39
R+3
n°41
R+4+T habitat A 13 W17
R+2+T habitat
RDC
n°11
n°13
R+5 habitat
R+1 R+2+T habitat
N°3-19
A 18 K2
terrasse privé 16m 2
R+3+T habitat n°19 n°19
n°31
1
+13m40
7
6,4
9
4,5
n°25
4,4
n°23
+12m50
5,4
n°21
B'
n°27
A'
n°29
D
C
B
A
RUE GODECHARLE
16
N°2
N°2
R+ Co hab 3+ mm ita T erc t e
18
n°14
I
J
n°12
G
H
R+3 habitat
n°6-8 +5m20 VP Niv.1
R+3 habitat
4
R+3 habitat
R+4
R+4
20
R+5
R+ C hab 3+ om it T m at erc e
C
A
R+4
R+
RD
R+4
3+
20
R+6
N°2
R+3 habitat
R+ Co hab 3+ mm ita T erc t e
R+ 2
n°10
R+4 R+5 R+6
R+5
T
T
N°2
22
A 24 P2
T 3+ at R+ abit erce h m m Co
D'
C'
toiture Niv
toiture Niv
+11m90 VP
+14m45 VP
+7m25 VP toiture Niv
A 20
RDC
RD
T
C
R+6
N°2
24
T 3+ at R+ abit erce h m m Co
3
RDC
A 2 R+ 0 T 1
R+8
N°2
26
RDC
T 2+ at R+ abit erce h m m Co
R+1
R+7
N°2
28
Limite de propriété
T 2+ at R+ abit erce h m m Co
R+2+T habitat
F
E
D
C
37,5
B
B'
A
R+10
RDC
32,1
7
6,4
9
4,5
4,4
5,4
2
+13m70 +12m10
RDC
A 22 P RDC
+15m10 terrasse privé 11m 2
terrasse privé 11m 2
terrasse privé 15m 2
terrasse privé 16m 2
RDC n°37
n°39
R+3
n°41
R+4+T habitat
+12m50
A 13 W17
R+2+T habitat
R+2+T habitat
R+2+T habitat
R+2+T habitat
R+1
R+2
RDC 6,4
14,9
6,4
n°13
n°15
n°17
n°19
+17m00 +18m20
R+1 R+2+T habitat
R+2+T habitat
n°43
n°45
n°11
N°3-19 +16m80
R+2+T habitat
terrasse privé 11m 2
A 22 V2
n°47
R+2+T habitat n°31
n°33
n°35
terrasse privé 11m 2
terrasse privé 15m 2
terrasse privé 16m 2
R+3+T habitat n°19 n°19
n°31
1
+13m40
7
6,4
n°29
9
n°27
4,5
n°25
4,4
n°23
+12m50
5,4
n°21
D
C
B
A
RUE GODECHARLE
n°12
R+3 habitat
n°14
n°6-8
R+3 habitat
n°10
R+4
R+3 habitat
R+4
R+3 habitat
R+5
R+4
R+5
R+4 R+6
R+4
R+5
R+6 A 24 P2
R+6 R+7
Scale:
Phase:
R+8
PU
1/500
R+10
Date:
Sign:
07/06/'18
A.G.
PROFIL PPAS
Niv. 4 +15m10
DUP-3.2 3CH-92m2
coupole désenfumage 1m2
45°
15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 00
2,65
Niv. corniche+13m70 DUP-3.8 2CH-92m2 Niv.3 +12m10
+12m40
2,65
2.7 1CH-55m2 Niv. 2 +9m05
2,2 1.2 Studio-47m2
15
12
13 12 11 10 09 08 07
15
4,45
0.1 STUDIO-43m2
Coupe BB' 2,2
13 12 11 10 09 08 07 06 05 04 03 02 01 00
2,4
Local profession libérale 107m2
2,15
4,7
4,45
2,4
Niv. 1 +5m20
Niv. RDC ±00m00
31
04
05
06
30
28
15
07
coupole désenfumage 1m2
29
14
08
09
10
-04 -05 -06 -07 -08 -09 -10 46 -11 45 -12 44 -13 43 -14 42 -15 41 -16 -16 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14
03 02 01 00
-11 -12 -13 -14 -15 -16 -16
12
04
-10
05
-09
06
-08
07
-07
08
-06
09
-05
10
-04
13 12 11
14,8 Niv. 1 +5m20 Niv. toiture1 +14m45
+12m40 Niv. mezz. +2m30 14
13
12
11
10
09
08
07
0.7 3CH-154 m2 06
05
04
-01 -02 -03
03
02
01
00
Niv. Rue ±00m00 Niv. RDC -00m40
2.9 2CH-120 m2
Niv. 2 +8m25
15
1.9 3CH-112 m2
9,5 Niv. 1 +5m20
13 12 11
Niv. mezz. +2m30
14
-01 -02 -03
13
12
11
10
09
08
07
Phase: 0.7 3CH-154 m2
06
05
04
03
02
01
00
Coupe BB'
PU
Scale: 1/200 Niv. Rue ±00m00 Format: A3 Niv. RDC -00m40
15
Sign:
A.G.
Date:
07/06/'18 ±0.00 = 00.00
notes:
9,5
Phase:
OFFICE Kersten Geers David Van Severen 21-29 Rue Godecharle
+11m20 03 02 01 00
2,4 1.7 1CH-55m2
27
16
46
14,8
Profil 31
0.1 STUDIO-43m2 2.2 Studio-47m2
Niv. 2 +9m05
8,9
32
26
17
45
5,2
13 12 11 10 09 08 07
25
18
44
3,2
13 12 11 10 09 08 07 06 05 04 03 02 01 00
24 23 22 21 20 19
43
42
33
2,65
2,4
DUP-3.2 3CH-92m2 Profil 19
41
34
5,2
2,65 4,7 2,65
Local profession libérale 107m2 2.7 1CH-55m2
Niv. RDC ±00m00
15 14 13 12 11 10 09 08 07 06 05 04 03 02 01 00
3,45
RUE GODECHARLE
4,45
DUP-3.8 2CH-92m2
2,15
4,5
45°
Niv. corniche+13m70
OFFICE Kersten Geers David Van Severen
1.9 3CH-112 m2
Niv. 2 +8m25
40 39 38 37 36 35
1.2 Studio-47m2
DUP-3.2 3CH-92m2
4,45
1.7 1CH-55m2
Niv. Niv. 1 4 +5m20 +15m10
Niv.3 +12m10
2.8 3CH-120 m2
PROFIL PPAS
Niv. toiture PPAS +18m20
+16m20
8,9
+11m20
2.2 Studio-47m2
3,45 2,65
RUE GODECHARLE
Profil 31
21-29 Rue Godecharle
Niv. toiture1 +14m45
DUP-3.2 3CH-92m2 Profil 19
3,2
4,5
2,65
+16m20
2,65
Niv. toiture PPAS +18m20
PU
Scale: 1/200 Format: A3
Sign:
A.G.
Date:
07/06/'18 ±0.00 = 00.00
notes:
B'
A'
jardin privé
jardin privé
jardin privé
I
J 0.7 3CH-154 m 2
G
H 0.6 4CH-178m 2
0.5 3CH-155m 2
22,73
4
0,3
7,98
0,35
7,42
0,35
02
02
01
01
01
00
00 02 03 04 05
6,65
0,27
00
03
séjour 56m 2
03
séjour 52m 2
04 05
séjour 47m 2
04 05
15,15
rgt
rgt
D'
C'
rgt
-2
sdb
-0m40 VP
sas 2.5m 2
hall
0.50m 2
+00 Niv
-0m40 VP
+00 Niv
hall
0.50m 2
0.60m 2
rgt
sdb -0m40 VP
sdb
+00 Niv
-1
-3
+0m00 VP
-4 -5
+00 Niv
-6
chambre 1 16m 2
0,3
chambre3 15m 2
07 06 05
5,8
0,3504
1,9
0,35
chambre 4 14m 2
4
0,1
chambre 3 13.5m 2
3,32
0,35
3,43
0,1
3,14
0,27
03 02
01
hall
00
3
14,05
jardin privé
jardin privé
jardin privé
jardin collectif dalles en béton
12
+0m00 VP +00 Niv
Limite de propriété
F
0.3 STUDIO-69m
2
E
D
C
0.2 1CH-76m 2
jardin privé
7
jardin privé
0.1 STUDIO-43m
37,2
6,4
9
B
B'
A
2
4,5
4,4
5,4
2
0,2
6,77
0,35
5,9
séjour +cuisine 33m 2
0,35
8,65
0,35
4,15
séjour +cuisine 43m 2
38
emplacements vélos
05
hall
hall
0,35
9,6
0,2
séjour +cuisine 18m 2
06 05 04 03 02 01
04
03
02 01
rgt
hall
01 02 03 04 05 06
sas 2.6m 2 +0m00 VP
rgt
sas 6.5m 2
+00 Niv
+0m00 VP
4
+00 Niv
15
écran de fumée
20% 01 02 03 -12 -11
+0m00 VP 2 Niv 24m +00
0.6m 2
-06 -05 -04 -03 -02 -01 00
8
-10
15
-07
1.1m 2
-11 -12 03 02 01
18m 2
-09 -08
rgt
15
-10
0.9m 2
+0m00 VP
-09
+00 Niv
-08
00 -01 -02 -03 -04 -05 -06
0.5m 2 12%
-07
06 05 04 03 02 01
hall
séjour +cuisine 31m 2
0,2
06 05 04 03 02 01
bureaux 63m 2 4%
6,75
0,35
5,95
0,35
13,15
0,35
9,6
0,2
1
7
6,4
0.4 STUDIO-67m
9
4,5
4,4
5,4
37,6
Local profession libérale 107m 2
2
D
C
B
A
RUE GODECHARLE
Niv. toiture PPAS +18m20
+17m10
+16m90
+15m10
Niv. 4 +15m10
+13m70
Niv. 3 +12m10
Niv. 2 +9m05
Niv. 1 +5m20
Niv. RDC ±00m00
Phase:
OFFICE Kersten Geers David Van Severen 21-29 Rue Godecharle
Facade rue Godecharle
PU
Scale: 1/100 Format: A3
Sign:
A.G.
Date:
07/06/'18 ±0.00 = 00.00
notes:
Niv. toiture PPAS +18m20
Niv. toiture PPAS +18m20
+17m10
+16m90 +15m10
+15m10
Niv. 4 +15m10
Niv. 4 +15m10
+13m70
+13m70
Niv. 3 +12m10
Niv. 3 +12m10
Niv. 2 +9m05
Niv. 2 +9m05
Niv. 1 +5m20
Niv. 1 +5m20
Niv. RDC ±00m00
Niv. RDC ±00m00
Phase:
OFFICE Kersten Geers David Van Severen 21-29 Rue Godecharle
Facade Jardin
PU
Scale: 1/100 Format: A3
Sign:
A.G.
Date:
07/06/'18 ±0.00 = 00.00
notes:
0,1
3,85
0,35
5,6
0,2
2,95
0,1
2,15
0,35
4,6
1.7 1.7
0,1
3,85
0,35
5,6
séjour+cuisine 28m 2
chambre 2 9m 2
séjour+cuisine 28m 2
sdb
hall
sdb
hall
23 21
21 20
rgt
24
24
19
19
1.1 1.1
VP +5m20 32m 2 Niv +01
18 34 33 32 31 30 29
18 34 33 32 31 30 29
0,2
A A
2.1 2.1 5,2
4m 2
0,35
1,85
0,35
4m 1,85
4m 2
VP +5m20 32m 2
Niv +01
2.2 2.2
0,1
4m 2
4
0,2
0,1
2,95
0,35
3,75
0,1
2,05
0,35
2,7
0,1
4
0,2
chambre 1 14m 2
chambre 1 14m 2
chambre 2 10m 2
chambre 2 16m 2
chambre 1 14m 2
chambre 1 14m 2
chambre 2 10m 2
chambre 2 16m 2
sdb
sdb
sdb
sdb
sdb
sdb
rgt
rgt
sdb
rgt
rgt hall hall
6,6
0,35
4,05
6,6
0,35
2 7.5m 4,05
chambre 1 14m 2 chambre 1 14m 2
séjour+cuisine 27m 2
7.5m 2
4,4
4,5
9
4,4
4,5
9
1.2-2.2 Studio-47m 2 1.2-2.2 Studio-47m 2
B B
VP +5m20 Niv +01
rgt
séjour+cuisine 27m 2
1.3 1.3
séjour+cuisine 33m 2
2.3 2.3 0,1
0,35
4,5
0,35
37,2
1.3-2.3
D D
1.3-2.3 1CH-62m 2
5,95
23 22
24
23
20
31 32 33 34 18 19
21 22 21
rgt
0.9m 2
rgt
0.9m 2
20
1.5 1.5
séjour+cuisine 32m 2 séjour+cuisine 32m 2
5,95
2.4 2.4
24
29 30 31 32 33 34 18 19
hall
1.4 1.4
sdb
28 27 26 25
VP +5m20 sas Niv +01 2.6m 2 VP +5m20 sas 2.6m 2 hall
séjour+cuisine 37m 2
4,5
1CH-62m 2 37,2
C C
VP +5m20 29 30
Niv +01
séjour+cuisine 37m 2
séjour+cuisine 33m 2
0,1
sdb
28 27 26 25
Niv +01
0.5m 2
chambre 1 10m 2
sdb
rgt
0.5m 2
chambre 1 10m 2
sdb
rgt
rgt
5,4
B' B'
0,1
2.6 2.6
hall
5,4
1.1-2.1 2CH-84m 2 1.1-2.1 2CH-84m 2
2,7
hall
VP +5m20
2
0,35
sas 13.8m 2
hall
1.2 1.2
2,05
hall
hall
sdb
0,1
sas 13.8m 2
rgt
0,1
3,75
sdb
Niv +01
25 26 27 28
0,35
hall
sdb
25 26 27 28
rgt
sdb
chambre 1 9m 2
5,2
séjour+cuisine 30m 2
sdb
VP +5m20 Niv +01
chambre 1 9m 2
séjour+cuisine 28m 2
0,2
séjour+cuisine 30m 2
chambre 1 15m 2
hall
séjour+cuisine 28m 2
1.6 1.6
7
2,95
0,35 7.5m 2
4,36
2.5 2.5
0,35
4,36
7.5m 2
2,03
0,2
4m 2,03
0,2
2
2,2
6,4
7
6,4
7
1.4-2.4 2CH-89m 2 1.4-2.4 2CH-89m 2
0,35 0,35
4m 2
2,2
1.5-2.5 2CH-85m 2/89m 2 1.5-2.5 2CH-85m 2/89m 2
E E
F F
5,4
4,4
4,5
Local profession libérale 2 Local107m profession 37,6 libérale 2 107m 9
6,4
5,4
4,4
4,5
9
6,4
A A
D D
B B
A A
R+1/+2 R+1/+2 C C
15
23 22
22 20
rgt
chambre 1 15m 2
2.7 2.7
0.6m 2 0.6m 2
chambre 2 9m 2
chambre 1 14m 2
7
6,4 0,1
6,4
4,6
6,4
0,35
Limite Limite de propriété de propriété
2,15
chambre 1 14m 2
6,4
9
0,1
hall
Limite Limite de propriété de propriété
2 1CH-60m 9
4,5
2,95
12,6
4,4
37,2
0,2
1.1m 2 1.1m 2
15
1.6-2.6 37,2 4,5
12,6
5,4
1.6-2.6 1CH-60m 2
1.7-2.7 1CH-55m 2
4,4
D D
C C
B B
A A
1.7-2.7 1CH-55m 2 5,4
0.4 STUDIO-67m 2
37,6
0.4 2 STUDIO-67m 7 7
0,2
9,6
0,35
13,15
0,35
5,95
0,35
6,75
0,2
0,2
9,6
0,35
13,15
0,35
5,95
0,35
6,75
0,2
7m 2
4% bureaux 63m 2
7m 2
0.4 0.4
0,35 0,35
séjour +cuisine 31m 2
4%
01 02 03 04 05 06
bureaux 63m 2
séjour +cuisine 31m 2
01 02 03 04 05 06
hall
-09 -10
01 02 03 04 05 06
24m 2 Niv +00
VP +0m00 24m 2 Niv +00
-11 -12 03 02 01
0.5m 2
Niv +00
VP +0m00
00 -01 -02 -03 -04 -05 -06
18m 2
20%
VP +0m00
-11 -12 03 02 01
00 -01 -02 -03 -04 -05 -06
12%
-06 -05 -04 -03 -02 -01 00
20%
sas 6.5m 2
01 02 03 -12 -11
18m 2
Niv +00
06 05 04 03 02 01
06 05 04 03 02 01
rgt
hall
hall
rgt
hall
01
01
02 03
04
05
02 03
04
05
0.1 0.1
0,2
9,6
0,2
A A
0,35
9,6
0,35
5,4
4,4
5,4
4,4
B' B'
B B
0,35
4,15
0,35
4,5
9
4,5
37,2 9
0.1 STUDIO-43m 2 0.1 STUDIO-43m 2
OFFICE Kersten Geers David Van Severen OFFICE Kersten Geers David Van Severen 21-29 Rue Godecharle 21-29 Rue Godecharle
C C
37,2
38
séjou 2
8,65
0,35
8,65
0,35
5,9
0,35
5,9
0,35
0.3 0.3
6,4
jardin privé
0.2 1CH-76m 2
RDC RDC
0,35 0,35
6,77
0,2
6,77
0,2
7m 2
7m 2
7
6,4
D D
7
E E
3 3
séjou 2
séjour +cuisine 33m 2 séjour +cuisine 33m 2
emplacements vélos
0.2 1CH-76m 2
sdb
rgt rgt
01 02 03 04 05 06
38
jardin privé
sdb
0.9m 2
-10
hall
séjour +cuisine 43m 2
4,15
-09
0.9m 2
hall
emplacements vélos
0.2 0.2
séjour +cuisine 18m 2
rgt
-08 -10
01 02 03 04 05 06
séjour +cuisine 43m 2
séjour +cuisine 18m 2
-08 -07 -09
VP +0m00 sas Niv +00 2.6m 2 VP +0m00 sas 2.6m 2
sas 6.5m 2
hall
01 02 03 -12 -11
rgt
-07
11,9
4 VP +0m00 4
0.5m 2
-06 -05 -04 -03 -02 -01 00
11,9
-08 -10
jardin privé
0.3 STUDIO-69m 2
jardin privé
0.3 STUDIO-69m 2
F F
Limite Limite de propriété de propriété
-07 -09
15
-08
0.6m 2 0.6m 2
VP +0m00 Niv +00
écran de écran de fumée fumée
15
15
1.1m 2 1.1m 2
Niv +00
8
VP +0m00 Niv +00
Limite Limite de propriété de propriété
15 15
-07
8
hall
12%
15
01 02 03 04 05 06
A A
Plan bâtiment front de rue Plan bâtiment front de rue
0,2
4
0,2
D D
C C
B B
A A
D D 4
5,4
4,4
4,5
9
6,4
7
5,4
4,4
4,5
9
6,4
7
chambre 1 10m 2
15m 2
16m 2
chambre 1 10m 2
11m 2
15m 2
16m 2
11m 2
11m 2
11m 2
sdb
0,35
sdb
3,8
05 06 04 07
3,8
05 08
12,6
0,35
04
1,85
0,35
4,05
0,1
4,5
0,35
6,1
0,35
4,2
0,35
2
0,35
0,9
2,15
0,35
1,85
0,35
4,05
0,1
4,5
0,35
6,1
0,35
4,2
0,35
2
0,35
08 11 09 12 10 13
15 14 13 12 11 10 09 08 07 06 05 04
séjour+cuisine 36m 2
12 15
3.2 3.2
séjour+cuisine 29m 2
13 14 15
séjour+cuisine 29m 2
sdb
chambre 1 14m 2
sdb
chambre 1 14m 2
3.6 3.6
3.4 3.4
séjour+cuisine 32m 2
séjour+cuisine 28m 2
séjour+cuisine 32m 2
séjour+cuisine 28m 2
15 14 13 12 11 10 09 08 07 06 05 04
6,4
séjour+cuisine 36m 2
6,4
3.8 3.8 11 14
6,4
0.9m 2
0,35
07 10
6,4
rgt
2,15
09 06
12,6
rgt
0.9m 2
0,9
Niv +04
0,35
VP +15m10 Niv +04
9,05
0,35
0,35
VP +15m10
9,05
0,35
2,3 05 06 07 08 09 10 11 12 13 14 15
2,3
6,35
0,35
6,05
0,35
6,35
0,35
6,05
0,35
05 06 07 08 09 10 11 12 13 14 15
0,35
2,03
0,2
Niv +04
0,35
4m 2,03
0,2
VP +15m10 Niv +04
2
2,5 04 05 06 07 08 09 10 11 12 13 14 15
2,5
4,1
0,35
4,1
0,35
04 05 06 07 08 09 10 11 12 13 14 15
16m 2
15m 2
11m 2
11m 2
16m 2
15m 2
11m 2
11m 2
VP +15m10 4m 2
Niv +03 VP +12m10 Niv +03 +13m70 VP +12m10 VP
2,2 2,2
5,4
4,4
4,5
4,4
4,5
9
6,4
VP +13m70
5,4
A A
B' B'
0.3 UDIO-69m 2
B B
C C
36,5 32,1
D D
7
6,4
DUP-3 .6 1CH-76m 2 DUP-3 .6 1CH-76m 2
7
DUP-3 .4 1CH-74m 2 DUP-3 .4 1CH-74m 2
E E
F F
5,4
4,4
5,4
4,4
DUP-3 .8 2CH-92m 2
D D
B B
A A
DUP-3 .8 2CH-92m 2
3.7 STUDIO-50m 2
DUP-3 .6 1CH-76m 2
35,653.7 2 STUDIO-50m 9
4,5
01
35,65
4,5
02
9
01 02
DUP-3 .6 2 1CH-76m 6,4
7
6,4
7
0,2 7m 2
11m 2
11m 2
8m 2
9m 2
0,2
0,35
4,4
0,35
4,05
0,1
0,35
4,05
0,1
chambre 1 14m 2
chambre 2 9m 2
chambre 1 14m 2 02
rgt
03
sdb
04
sdb
05 03 06 04
02
01
61
05 06
rgt 0.9m 2
sdb
0.9m 2
sdb
rgt
60
hall
sdb
59
rgt
11,9
sdb
hall
61
58
59 58
57 56 55 54 53 52
57 56 55 54 53 52
0,35
3.1 3.1
hall
chambre 2 9m 2
4,4
0,35
4,4
0,35
chambre 2 9m 2
4,5
3,2
0,35
séjour+cuisine 26m 2
chambre 1 13m 2
3.7 3.7
3.2 3.2 hall
0,1
4,5
0,1
0,35
5,95
0,35
VP +12m10 Niv +03
chambre 1 16m 2
VP +12m10
sdb
rgt
sdb
rgt
68 67 66 65 64 63 62
Niv +03
sdb
sdb
hall
rgt
sdb
sdb
06 05 04 03 02 01
68 67 66 65 64 63 62
VP +12m10 Niv +03
hall
VP +12m10 52
hall
06 05 04 03 02 01
Niv +03
sas 13.6m 2 hall
sas 13.6m 2
hall
01 02 03 04
séjour+cuisine 25m 2
01 02 03 04
séjour+cuisine 25m 2
chambre 3 9m 2 chambre 3 9m 2
3,95
0,35
5,35
3,95
0,35
5,35
sdb
rgt
sdb
rgt
hall sdb
chambre 1 13m 2
3.3 3.3
hall
sdb
3.4 3.4
3,2
0,35
0,1
3,2
0,35
57
rgt
61 60
rgt
61 59 60 58 59 58
VP +12m10
rgt
hall
rgt
hall
00 01 02 03 04 05 06
0,1
57
VP +12m10 Niv +03
sas 4.5m 2
chambre 1 15m 2 chambre 1 15m 2
53 54 55 56
52 53 54 55 56
Niv +03
sas 4.5m 2
00 01 02 03 04 05 06
chambre 1 13m 2
0,35
chambre 1 14m 2
0.5m 2 rgt
0,35
6 chambre 1 16m 2
3.6 3.6
hall
6
chambre 1 14m 2
0.5m 2 Niv +03
rgt rgt
9m 2
5,95
6,25
0,35
6,25
0,35
séjour+cuisine 28m 2
3.5 3.5
séjour+cuisine 28m 2
4,06
0,35
1,3
0,35
4,06
0,35
1,3 1,6
0,35
Niv +03
0,2 0,2
7m 2
VP +12m10 Niv +03
10m 2
10m 2
7.5m 2
5m 2
7m 2
VP +12m10 VP +13m70
10m 2
10m 2
7.5m 2
5m 2
5,4
4,4
4,5
9
VP +13m70
5,4
F F
0,1
0,35
chambre 1 14m 2
sdb
séjour+cuisine 28m 2
5,35
3,2
chambre 1 13m 2
VP +12m10
hall
sdb
0,1
séjour+cuisine 26m 2
VP +12m10 Niv +03
hall
séjour+cuisine 28m 2
0,35
4,4
8m 2
5,35
chambre 1 14m 2
62 63 64 65 66 67 68
rgt
0,35
0,35
62 63 64 65 66 67 68
11,9
15
15
60
rgt
3.8 3.8
chambre 2 9m 2
01
11m 2
4,4
11
4,4
11
11m 2
0,35
0.6m 2 0.6m 2
7m 2
Limite Limite de propriété de propriété
0.3 UDIO-69m 2
36,5 32,1
9
DUP-3 .2 3CH-92m 2 DUP-3 .2 3CH-92m 2
R+4 R+4
D D
Limite Limite de propriété de propriété
F F
2
DUP-3 .8 2CH-92m 2 DUP-3 .8 2CH-92m 2
C C
2
A A
timent front de rue timent front de rue
3.1 1CH-61m 2 3.1 1CH-61m 2
4,4
B' B'
DUP-3 .2 3CH-92m 2
B B
DUP-3 .2 3CH-92m 2
4,5
9
C C
6,4 36,5
3.3
7
6,4
STUDIO-51m 36,5
2
3.3 STUDIO-51m 2
D D
DUP-3 .4 1CH-74m 2 DUP-3 .4 1CH-74m 2
1,6
7
E E
3.5 1CH-59m 2 3.5 1CH-59m 2
F F
R+3 R+3
Phase: Phase: Scale: Scale: Format: Format:
PU PU 1/200 1/200 A3 A3
Sign: Sign: Date: Date: notes: notes:
A.G. A.G. 07/06/'18 07/06/'18 ±0.00 = 00.00 ±0.00 = 00.00
07 08 09
14
15
06
16
05
17
04
03
02
01
3
3
Niv +0.5
10
+2m50
chambre 2 15m2
chambre 3 14m2
3
chambre 1 20m2
12
chambre 2 16m2
17
04
15
07
0.60m2
10 11
VP
chambre 3 14m2
2m30 15
14
08 07
sdb
14
13
0.7
sas 2.5m2
12 11 10
sdb
09 08
13 12 11 10
sdb
rgt
09 sdb 08
07
07
0.60m2
09
0.50m2
0.50m2
Niv +0.5
15
0.6
12 11 10
06
06 05
05
04
04
Niv +0.5
03 02
VP
01 15 00 14
0.5
12
2m30
14 13
2m30
sdb
chambre 2 15m2
12 11 10 09
05
VP
01 15 00 14
0.6
13
06
Niv +0.5
03 02
2m30
2m30
0.7
13 12 11 10 09
04 03 02 01 15 00 14 13 12 11 10 09
08
08
08
07
07
07
06
06
06
05
05
C'
VP
+2m50
chambre 1 20m2
Niv +0.5
15
VP
sdb
09
2m30
Niv +0.5
Niv +0.5 VP
chambre 2 16m2
sdb
14
rgt
08
sdb
chambre 1 17m2
0.5
sdb
06
16
VP
sdb
05
sas 2.5m2
13
sdb
chambre 2 Niv +0.5 15m2
0.50m2
0.50m2
sdb
C'
03
02
01 13
3
chambre 1 17m2
11
VP chambre 2 15m2
05
04
04
04
03
03
03
02
02
01
01
00
00
00
4
4
02 01
H
I
J
I
J
4
4
G
Atelier Mezzanine H
G
Atelier Mezzanine jardin privé
jardin privé
3
3
jardin privé
00
hall 0,27
3,14
0,1
3,43
01 02
0,35
3,32
0,1
4
0,35
1,9
0,35
03
5,8
0,3
04 05
chambre 3 13.5m2
chambre 4 14m2
jardin privé
chambre3 15m2
jardin privé
chambre 1 16m2
06 07
VP
jardin privé
-6
Niv +00 +0m00
-5 -4
3,43
VP
chambre 3 13.5m2 sdb
rgt
sdb
-1 01 02
0,35
3,32
0,1
4
Niv +00
0,35 hall
Niv +00
-0m40
-0m40
03
sas 2.5m2
0,35
5,8 hall
04 05
chambre3 15m2
07
rgt
0,3
-6
Niv +00 VP
Niv +00 VP 1 -0m40 chambre 16m2
06
0.50m2
0.50m2
sdb
VP
chambre 4 14m2
1,9
C'
0,1
+0m00
rgt
-5 -4 -3
0.60m2
3,14
3
3
-3 -2 00
hall 0,27
rgt rgt
-2
sdb
rgt
sdb
15,15
-0m40
séjour 52m2
05 04
05
03 02
01
01
00
00
séjour 52m2
05 04
6,65
02 01
Niv +00
0.7 VP
rgt
-0m40
séjour 56m2
05 04 03 02 01 00
0.6
0.7 séjour 56m2
05 04
03
0,27
rgt
04
03 02
0.5 séjour 47m2
0.6 VP
hall
sas 2.5m2
0.60m2
0.5 séjour 47m2
-0m40 0.50m2
0.50m2
sdb
VP
hall
Niv +00
05 04
03
0,35
02
7,42
01
03
0,35
7,98
00
02 01
0,3
00
4
4
00
C'
15,15
-1
Niv +00
22,73
0.5 3CH-155m 2 0,27
6,65
0.6 4CH-178m 2 0,35
H
7,42
0.7 3CH-154 m 2 0,35
I
7,98
0,3
J 4
4
G
Atelier RDC 22,73
jardin privé
0.5 3CH-155m 2
G
0.6 4CH-178m 2
H
0.7 3CH-154 m 2
I
J
Atelier RDC jardin privé
OFFICE Kersten Geers David Van Severen 21-29 Rue Godecharle
Plan Atelier
OFFICE Kersten Geers David Van Severen 21-29 Rue Godecharle
Plan Atelier
38
39 40 46
45
30
44
31
43
32
42
33
41
34
35
36
37
3
Niv +02
38
chambre 2 13m2
39 40
sas 2.5m2
33
Niv +02
hall
VP
+8m25
sdb
sdb
0.60m2
46
45
30
44
31
43
32
C'
+7m90
35
VP
34
comble
42
C'
Niv
chambre 3 11m2
+8m25
36
37
VP
+7m25
41
3
chambre 2 17m2
Niv toiture VP
Niv +02 chambre 2 17m2
VP
+8m25
chambre 3 11m2
chambre 2 13m2
rgt 15
VP
14
sas 2.5m2
Niv 13 comble
1.8
+7m25
VP
12
hall
+7m90
11 10 09
8m2
08
Niv +02
2.8 VP
C'
C'
Niv toiture
+8m25
sdb
sdb
0.60m2
07 06 05 04
05 04
03
03
02
02
01 15 00 14
1.8
06
rgt
01 00
séjour 47m2
13
2.8
12 11 10 09
8m2
08 07 06
06
05
05
04
04
03
03
02
02
01
01
00
00
4
séjour 47m2
2.8 3CH-120 m2
H
J
I
4
G
Atelier R+2 2.8 3CH-120 m2
H
G
J
I
22
23 24 27 29
30
1m2
28
31
32
26
34
25
18
19
20
21
3
Atelier R+2
Niv +01
chambre 3 15m2
VP
chambre 3 11m2
+5m20
chambre 2 13m2
22
23 26 27
32 31
sdb
VP
hall
+5m20
+5m20
sdb
sas 2.5m2
chambre 3 11m2
hall
sdb 06
rgt
chambre 2 13m2
Niv +01
1.9 VP
rgt
sdb
C'
1.8 VP
0.50m2
+7m25
Niv +01
+5m20
sdb
0.60m2
C'
VP
Niv +01
+5m20
28
rgt chambre 3 15m2
Niv toiture
VP
29
sdb
30
0.50m2
1m2
sdb chambre 2 16m2
Niv +01
hall
C'
18
sas 2.5m2
0.60m2
hall
+5m20
24
VP
19
Niv +01
+7m25
25
Niv toiture VP
34
C'
20
21
3
chambre 2 16m2
05 04 03 02 01 00
rgt
séjour +cuisine 54m2
séjour +cuisine 36m2
1.8
1.9
sdb chambre 1 16m2
06 05 04 03 02 01 00
4
séjour +cuisine 54m2
séjour +cuisine 36m2
chambre 1 16m2
21m2
12m2
1.8 3CH-136m 2
H
J
I
4
G
1.9 3CH-112 m 2
Atelier R+1 21m2
12m2
1.8 3CH-136m 2
G
H
Atelier R+1
Plan Atelier
1.9 3CH-112 m 2
Phase:
PU
Scale: 1/200 Format: A3 Phase:
Plan Atelier
J
I
PU
Scale: 1/200 Format: A3
Sign:
A.G.
Date:
07/06/'18 ±0.00 = 00.00
notes:
Sign:
A.G.
Date:
07/06/'18 ±0.00 = 00.00
notes:
EXTENSION MUSIC CENTER SAGHERAA BARHAIN 30m²
Design development conception, 2D, details, model
1 Contexte urbain
The program is about renovation and extension of a small music center. The difference between the surrounding vernacular architecture with this one is only in the extreme precision of the drawing, its pure geometry. The existing building consists of three rooms in a row to renovate. The extension of the center is the addition of three small independent buildings, each has a single function: kitchen, Majlis, toilet. The idea is to follow the size, proportions, and thickness of each of the three existing rooms for the new part. A squarish courtyard surounded by the building distributes the new rooms as well as the existing building. The fourth side of the courtyard ends softly: just a curtain , a metal mesh support by a big steel beam. The architecture is reduced to the minimum : niches and glazed doors developing in the thickness of 60cm of wall. The materiality is also reduced to perforated steel coated in whitish for all the opening and polished concrete.
77 38 EL RC PA PA EL
RC 76 38
EXISTING SITUATION
PROPOSAL
PROJECT
CLIENT
ARCHITECT
A – A RCHITECT URE | ISO METRIC VIEW
Architectural Consultancy for Dar Al Riffa Al Sagheerah
Bahrain Authority for Culture and Antiquities
OFFICE Kersten Geers David Van Severen
NOTES :
P.O box 2199 | Manama | Kingdom of Bahrain
251 Avenue Louise | B–1050 Brussels | Belgium www.officekgdvs.com | mail@officekgdvs.com | T +32 2 5030571
Sh Khalid Ave | Riffa | Kingdom of Bahrain Parcel Number 3876, 3877
AJ M C KIT
EL
RC
10 m
2
H EN
PA
RC
EL
38
77
20
m2
LIS
TO 5m ILE 2 T
7
PA 76 38
PROPOSAL
A – A RCHITECT URE | ISO METRIC VIEW
REF No :
A 004
SCALE:
1/200
NOTES :
ISSUED :
Preliminary
FORMAT:
A3
DATE :
21 11 2017
UNITS:
Centimeters
Main entra
nce
Toilet mod +0.57 +0.57 47.62 47.62
Desk
2 MAJLIS 695 x 240 16,68 S.M.
1 OFFICE / ARCHIVE 413 x 306 12,64 S.M.
3 ARCHIVE 260 x 170 4,42 S.M. 0.10 47.15 +0.13 47.18
50
Drain vertical diameter 70mm
A
8%
-0.00 47.05
Niche #07, as per B411
Steel Edge plate 7000x200x4mm powder coated RAL9001
+0.13 47.18
7 OUTDOOR PERFORM / COURTY 720 x 72 51,84m
-0.02 47.03
6 KITCHEN 395 x 270 10,67 S.M.
5%
Inox Kitchen element, model tbc
Glazed steel door as per B408
Drain vertical diameter 70mm tbc
Floor in polished concrete, as per aproved sample Niche #06, as per B411 Inox Kitchen Cupboard, as per B417
-0.02 47.13 2% -200mm Polished concrete -80mm Insulation -120mm Air cavity -200mm Polished concrete
-0.16 46.89
A
Steel Edge plate 7000x200x4mm powder coated RAL9001
B
Stai deta
C
B'
C'
-0.04 47.01
PROJECT
CLIENT
ARCHITECT
B – ARCHITECTURE
Architectural Consultancy for Dar Al Riffa Al Sagheerah
Bahrain Authority for Culture and Antiquities
OFFICE Kersten Geers David Van Severen
NOTES :
P.O box 2199 | Manama | Kingdom of Bahrain
251 Avenue Louise | B–1050 Brussels | Belgium www.officekgdvs.com | mail@officekgdvs.com | T +32 2 5030571
Sh Khalid Ave | Riffa | Kingdom of Bahrain Parcel Number 3876, 3877
del tbc
Door steel, as per B412
Sink, model tbc
Neighbourg building (3881 parcel)
4 TOILETS 260 x 163 4,24 S.M.
Airco cupboard steel, coated RAL 9001, as per B415
LEGEND
RENOVATION / PROPOSAL
PLASTER
TO BE REMOVE / DELETE
POLISHED CONCRETE
WOOD
EXISTING BUILDING 47.39
STEEL
WASHED AGGREGATE
+0.34
PRESSURE RESISTANT INSULATION
126
GRAVEL
X
+0.00 = 47.05 relative absolute
6%
LEVEL
D' 120
0.00 47.05
60
+0.13 47.18
Neighbourg building (3878 parcel)
-0.02 47.03 Steel glazed door, as per B409
tbc
360
Water fountain, as per B413
MANCE SPACE YARD Drain vertical diameter 70mm tbc 20 m2 -0.02 47.03
Glazed steel door as per B408
0.00 47.05
Exterior wall mounted luminaire fitting coated RAL 9001 diameter 140mm IP 65, model & lamp to be approved by the architect
5 MAJLIS \ STORAGE 790 x 270 21,33 S.M.
Floor polished concrete, as per aproved sample
360
5%
Sofa, model tbc
Steel Bench, coated RAL 2010, as per B414 Exterior wall mounted luminaire fitting coated RAL 9001 diameter 140mm IP 65, model & lamp to be approved by the architect
Steel glazed door, as per B410
Coated continous metal mesh stainless steel ring 10mm 2 diam thickness 11,25kg/m2
inless steel IPE 450, ail as per B403
E | PLAN
Steel Bench, coated RAL 2010, as per B414
D
E
E
C'
-0.14 46.91
Plot 0023877
-200mm Polished concrete -80mm Insulation -120mm Air cavity -200mm Polished concrete
Scope of work N
REF No :
B 104
SCALE:
1/75
ISSUED :
Preliminary
FORMAT:
A3
DATE :
21 11 2017
UNITS:
Centimeters
F'
LEGEND RENOVATION / PROPOSAL
PLASTER
TO BE REMOVE / DELETE
POLISHED CONCRETE
WOOD
EXISTING BUILDING
STEEL
WASHED AGGREGATE PRESSURE RESISTANT INSULATION
GRAVEL
X
Plot Boundary
LEVEL
+0.00 = 47.05 relative absolute
Enameled pendant light color & bulb to be approved by the architect
-Roofing -50-70mm screed (made to slope) -150mm Concrete -120mm Air cavity -80mm Insulation -200mm Concrete slab
Steel Door, as per B409
3.60
3.45
2%
2.85
Interior wall mounted luminaire IP65 fitting coated RAL 9001 diameter 140mm model & lamp to be approved by the architect Niche #05 as per B411 Kitchen, as per furniture dossier 0.05
0.00
-0.02
Pressure resistant insulation
-60 mm Interlock dark grey -40 mm Sand -Geotextile -130mm Washed aggregate (10/20mm diameter) -Drainage -Compacted earth
-100mm Polished concrete, as per approved sample -Epdm foil -50mm Insulation -Vapor barrier -200mm Concrete slab -Geotextile -200mm Gravel
A
C
B
PROJECT
CLIENT
ARCHITECT
B – ARCHITECTURE
Architectural Consultancy for Dar Al Riffa Al Sagheerah
Bahrain Authority for Culture and Antiquities
OFFICE Kersten Geers David Van Severen
NOTES :
P.O box 2199 | Manama | Kingdom of Bahrain
251 Avenue Louise | B–1050 Brussels | Belgium www.officekgdvs.com | mail@officekgdvs.com | T +32 2 5030571
Sh Khalid Ave | Riffa | Kingdom of Bahrain Parcel Number 3876, 3877
F'
Plot Boundary
F
Steel Door, as per B408
Recessed ceiling -Steel U profile 50x50mm luminaire IP44 -30mm Perforated wooden panel, 550Lm fitting coated MDF stained RAL 201, as aproved sample, RAL2010 as per B402
3.60 3.45
B402
B403
2%
Ventilation duct diam. 80mm -200mm Polished concrete -80mm Insulation -120mm Air cavity -200mm Polished concrete
2.77
Exterior wall mounted luminaire fitting coated RAL 9001 diameter 140mm IP 65, model & lamp to be approved by the architect
Recessed ceiling luminaire IP65 fitting to be coated RAL 9001
Steel plate
Glazed steel door as per B409
-0.02
B406
+0.05
0.00
B405
Steel Bench, coated RAL 2010, as per B414
Steel Airco Cupbord, coated RAL 9001, as per B415 -130 mm Washed aggregate (10/20 mm diameter) -Geotextile -1200 mm Earth mixture tbc - 6000 x 6000 x 12 stainless steel sheet to stabilize the tree trunks -Geotextile -Earth
E | SECTION FF'
C'
E
D
REF No :
B 304
SCALE:
1/50
ISSUED :
Preliminary
FORMAT:
A3
DATE :
21 11 2017
UNITS:
Centimeters
+0.34
LEGEND RENOVATION / PROPOSAL
PLASTER
TO BE REMOVE / DELETE
POLISHED CONCRETE
WOOD
EXISTING BUILDING
STEEL
WASHED AGGREGATE PRESSURE RESISTANT INSULATION
GRAVEL
+0.00 = 47.05 relative absolute
LEVEL
Plot Boundary
X
Steel IPE 450, as per B403
Glazed steel door, as per B408
+4.05
+3.60
Polished concrete as per approved sample
+2.10
210
Exterior wall-mounted luminaire fitting coated RAL 9001 diameter 140mm IP 65, model & lamp to be approved by the architect
Steel plate Bench, as per B414 +0.00 (+47.05)
-0.02 -0.15
-130 mm Washed aggregate (10/20 mm diameter) -Geotextile -1200 mm Earth mixture tbc - 6000 x 6000 x 12 stainless steel sheet to stabilize the tree trunks -Geotextile -Earth
1
2
PROJECT
CLIENT
ARCHITECT
B– ARCHITECTURE
Architectural Consultancy for Dar Al Riffa Al Sagheerah
Bahrain Authority for Culture and Antiquities
OFFICE Kersten Geers David Van Severen
NOTES :
P.O box 2199 | Manama | Kingdom of Bahrain
251 Avenue Louise | B–1050 Brussels | Belgium www.officekgdvs.com | mail@officekgdvs.com | T +32 2 5030571
Sh Khalid Ave | Riffa | Kingdom of Bahrain Parcel Number 3876, 3877
E'
Plot Boundary
E
-Roofing -50-70mm screed (made to slope) -150mm Concrete -120mm Air cavity -80mm Insulation -200mm Concrete slab
+3.60 +3.40
Door steel, as per B412
2%
-200mm Polished concrete -80mm Insulation -120mm Air cavity -200mm Polished concrete
+2.80
Recessed ceiling luminaire IP65 fitting to be coated RAL 9001
Interior wall mounted luminaire IP65 fitting to be coated RAL 9001
Sink & tap model tbc +0.57
+0.25
+0.00
-0.02
-100mm Polished concrete, as per approved sample -Epdm foil -50mm Insulation -Vapor barrier -200mm Concrete slab -Geotextile -200mm Gravel
3 | SECTION EE'
4
-60 mm Interlock dark grey -40 mm Sand -Geotextile -130mm Washed aggregate (10/20mm diameter) -Drainage -Compacted earth
5 REF No :
B 303
SCALE:
1/50
ISSUED :
Preliminary
FORMAT:
A3
DATE :
21 11 2017
UNITS:
Centimeters
INTERNSHIP Office BRUTHER / A+11
Competition / Convention center / Charleroi Images
INTERNSHIP Office V+ Vers plus de bien être
Competition / Primary school / Bruxelles 2D / Images
STUDIES
DEGREE ZERO TOUR ET TAXI SANATORIUM
What is the degree zero of architecture - The original concept of Barthes transposed from writing to architecture resulted to a plurality of interpretations whose analysis led us to offer our own definition, related to the theme of Supernormal proposed by the Production Unit workshop: The degree zero could consist of what to add to the Real built to reveal the architecture that is already present. It would be then a gesture which, applied to the Ordinary, background of our daily life, would work to strengthen the effect of presence. The Ordinary, in this context which we are interested in, is the one formed by the anarchic extensions updated by the railway track that separate the blocks at the north of Tour and Taxi. The project is conceived as the ultimate extension: the structure of the building located in a plot of the block comes pouring out in front of the shear walls of the housings, in the hollow formed by the old railway track recently converted into a park. The intervention is, by its orientation and its program - a sanatorium- wants to reconnect with the park and accomplish the faรงade reversal already begun by extensions. In its composition, structure makes manifest the contradiction between the regularity of the beam-pole and the irregular drawing of the plot which extends the housings plots. It aims then to build up a rationality base architectural to reveal the spontaneous constructions. Chancel & Loizidis
PUBLIC SQUARE DON BENITO EUROPAN
© HUO
The project is about a creation of a public square to Don Benito, for the competition Europan, on the current wild parking behind the church. Since the creation of the main square in front of the church, the city is expanded and the population increased. It then misses a vacuum for the current scale of the city. I merged the square in front of the church with the one located at the back to increase the area of the main square. So we have a unity square with a church as central object, allowing to upgrade the existing heritage. I redefined the limits of space synthetically, relative to the various unaligned buildings surrounding the new square. I create a new facade to homogenize the perception of the square, resuming in a minimal way, the rhythm of columns, existing on one of the facades of the square, for the gallery, the covered platform, and the tree trunks. I draw a horizontal line in order to unify (in our perception) the different sizes of the buildings bordering the square. Given the Don Benito weather, roofs and trees allow a shelter protecting the pedestrians from the sun. With least means and most of neutrality with the aim of adaptability, I restructure formally the square and offer qualitative empty spaces.
KING’S ARTHUR MUSEUM ARCHMEDIUM CAMELOT
The program is a research and tourism project centering around the legend of King Arthur and his castle. It is situated in the hill of Cadbury in England. I create a series of blocks that sink into the topography. Referring to ruins, I wanted to work on the concept of sedimentation: these blocks emerging from the earth, would be an additional layer in the landscape, drawing a horizontal along the bank . Its integration would play on the illusion of the existence of the legend. Between these differents blocks, I established a consistency in elevation, with a very neutral and high faรงade, using the same module, materiality and opacity. I use the gabion for a smoother integration into the landscape and the mysterious luminous atmosphere it gives of the inside of the museum. The building is located perpendicular to the arrived path, to face the village. Each groove between blocks allows, the crossing at the top of the hill, and the creation of openings on the side. The program is divided into three groups: the research center, reception and the cafeteria, and the museum. The museum is developped in its length, playing with differents levels.
CURRICULUM VITAE
Alice Galligo Born 5/12/1991 French nationality
30 av. générale Maizière 06570 Antibes
alicegalligo@gmail.com 0032 (0)485 86 98 52
Professional activities: Employee
OFFICE Kersten Geers David Van S everen
08/16 - 10-18
Scheme design
Tower-Art gallery
Portland
Building permit dossier
Towers
Bruxelles
Design development
Extension music center
Bahrain
Competition
Bridge
Barhain
Building permit dossier
Housing
Bruxelles
Competition
Masterplan
Antwerp
Competion
Footbridge
Bruxelles
Tender dossier
Housing
Paris
Competition
Cleaning center
Bruxelles
Professional activities: Intern BRUTHER / A+11 Competition
06/2015 - 08/2015 Convention Center
04/2015 - 05/2015
V+ Vers plus de bien être Competition
Charleroi
Primary school
Brussels
Academic curriculum MASTER at the faculty Lacambre Horta ULB in Brussels
with high distinction
2015 Master Degree BACHELOR at the faculty Lacambre Horta ULB in Brussels 2013 Bachelor Degree
with high distinction
H IGH SCHO OL at the hight school Massena in Nice France
with distinction
2009 Scientific high school degree math option
Academic activities MEMORY: The Neutral: Study of the absence of meaning in contemporary architecture under the direction of Xavier Bonneau laboratory director GERPHAU in Paris, and also Vincent Brunetta laboratory History Theory and Criticism Lacambre in Brussels.
PRICE LACAMBRE-HORTA 2015: 1st mention for PFE PUBLICATION of the PFE in the catalog Supernormal of Production Unit in 2015 EXHIBITION of Lacambre projects at the museum in 2012, 2013 and 2015
Another principals of interest: Music: 11 years of musical studies Harp at the Conservatory 2007 Diploma of Music Study Harp at the Conservatory - with high distinction Obtaining many 1st prizes during competitions, concerts and auditions.
Computer skills VectorWorks, Autocad, Photoshop, Indesign, Rhinoceros, Excel
alicegalligo@gmail.com